the indigo subsea fibre system: eresearch infrastructure

8
THE INDIGO SUBSEA FIBRE SYSTEM: ERESEARCH INFRASTRUCTURE IN THE ASIAN CENTURY eResearch Australasia 2017 Peter Elford, Director, Government Relations and eResearch – [email protected]

Upload: others

Post on 15-Mar-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

THE INDIGO SUBSEA FIBRE SYSTEM: ERESEARCH INFRASTRUCTURE IN THE ASIAN CENTURY

eResearch Australasia 2017Peter Elford, Director, Government Relations and eResearch – [email protected]

2

EVOLUTION IN RESEARCH COLLABORATIONS

© AARNet Pty Ltd |Source: Dr. Paul Wong, INFORMS, Melbourne, 2016

3

EVOLUTION IN RESEARCH COLLABORATIONS (IRU)

© AARNet Pty Ltd |

https://www.iru.edu.au/wp-content/uploads/2017/02/Strengthening-Research-in-Asia-Publication-2016.pdf (SCOPUS)

2745

1490

3185

1145

716

0

500

1000

1500

2000

2500

3000

3500

2009 2010 2011 2012 2013 2020 Proj

Intensive Research Universities Publications:International Collaborators 2009-2013

USA UK China Germany Canada

AARNET – INTERNATIONAL NETWORK

4

5Gbps

240Gbps

5

PROJECT INDIGO

© AARNet Pty Ltd |

AARNet, Google, Indosat, Singtel, SubPartners, and Telstra

Two pair fibre system Singapore – Sydney via Perth – 9,000 km

Ready for Service (RFS) Q1 2019

Minimum capacity 18Tbps per fibre

This is the FIRST subsea project where a National Research and Education Network (NREN) has been a consortium partner

This is one of the first subsea projects to make available portionsof the fibre (spectrum or frequencies) to investors

This investment involves no Federal government funding, eitherfor the initial investment or for the operational support

The contracted life of this system is multiple decades

6

IMPACT

© AARNet Pty Ltd |

Terrestrially, access to fibre underpins AARNet’s ability to provide differentiated price/performance

Indigo provides this for international sub-sea broadband capacity

Increases in capacity facilitated by upgrading optical transmission equipment

Provides overall greater flexibility, low latency, increased redundancy for international traffic

Addresses network diversity challenges for between Perth and East coast

7

REGIONAL CONTEXT

© AARNet Pty Ltd |

NREN capacity from multiple directions meets in Guam

Hawaiki cable under construction AU-NZ-US

Increasing connectivity options for Pacific Island Countries

https://www.submarinecablemap.com/ Updated October 14, 2017

THANK YOU