1 Table of Contents 1. Executive summary 2. Introduction of the project/ Background information 3 Project Description. 4 Site Analysis 5. Planning Brief. 6 Proposed Infrastructure 7. Rehabilitation and Resettlement (R & R) Plan. 8. Project Schedule & Cost Estimates 9. Analysis of Proposal (Final Recommendations). PRE FEASIBILITY REPORT Of COROMANDEL LIMESTONE MINE (AREA: 602.137 Ha Non Forest Land) Chilamkur village, Yerraguntla Mandal, YSR Kadapa District, Andhra Pradesh. For INCREASE OF LIMESTONE PRODUCTION FROM 2.00 to 7.7 MTPA (Total Excavation at 7.7 MTPA Limestone production is 8.41 MTPA (Limestone : 7.7 MTPA + Top Soil : 0.71 MTPA) (CAPTIVE LIMESTONE MINE) of THE INDIA CEMENTS LIMITED

Upload: others

Post on 16-Oct-2019

13 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material

1

Table of Contents1. Executive summary2. Introduction of the project/ Background information3 Project Description.4 Site Analysis5. Planning Brief.6 Proposed Infrastructure7. Rehabilitation and Resettlement (R & R) Plan.8. Project Schedule & Cost Estimates9. Analysis of Proposal (Final Recommendations).

PRE FEASIBILITY REPORT

Of

COROMANDEL LIMESTONE MINE(AREA: 602.137 Ha – Non Forest Land)

Chilamkur village, Yerraguntla Mandal,YSR Kadapa District, Andhra Pradesh.

For

INCREASE OF LIMESTONE PRODUCTIONFROM 2.00 to 7.7 MTPA

(Total Excavation at 7.7 MTPA Limestone production is 8.41 MTPA(Limestone : 7.7 MTPA + Top Soil : 0.71 MTPA)

(CAPTIVE LIMESTONE MINE)

of

THE INDIA CEMENTS LIMITED

Page 2: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material

2

CHAPTER – 1 EXECUTIVE SUMMARY

1. EXECUTIVE SUMMARY

THE INDIA CEMENTS LIMITED., (ICL), is operating a Cement Plantof 1.485 Million Tonnes Per Annum (MTPA) Clinker capacity atChilamkur village, Yerraguntla Mandal, YSR Kadapa District, AndhraPradesh. The company is having a total installed capacity of 17million tonnes of cement production in the country, havingClinkerisation Units in Tamil Nadu, Andhra Pradesh, Telangana &Rajasthan with grinding units in Maharastra & Chennai.

The plant at Chilamkur was commissioned in 1984. The raw materialrequirement to the cement plant is being met from the Captive mineslocated adjacent to cement plant in Chilamkur village over an extentof 602.137 Ha. The company is producing Ordinary Portland Cement(OPC) and Portland Pozzolona Cement (PPC).

ICL proposes to increase the Clinker production from 1.485 to 5.15MTPA by installation of new Unit.

Limestone requirement for Cement Plant expansion will be met fromthe subject Coromandel Limestone mine for which ICL had alreadyexecuted the lease with Government of Andhra Pradesh. The mine isin operation for limestone production of 2.00 MTPA.

Captive Mining Lease comprises of North (about 266 Ha) and Southblock (about 336 Ha). A railway track exists between these twoblocks. Further, a village road divides the North block into two(eastern and western sides of the road).

Statutory safety zones are maintained along these infrastructures inaccordance with 'Regulations' and guidelines.

ICL has applied for Terms of Reference (TOR) for Increase ofLimestone Production from 2.0 to 5.0 MTPA to MoEF & CC videProposal No. IA/AP/MIN/69926/2017 on 27/09/2017. And the samewas called for the 23rd EAC Meeting held on 23-24th October, 2017.But the proponent didn’t attend the EAC meeting, since ICL has aproposal to further increase the Limestone capacity. Hence, theproposal was withdrawn.

ICL proposed to Increase of Limestone Production from 2.00 to 7.7MTPA (Total Excavation at 7.7 MTPA Limestone production is 8.41MTPA (Limestone : 7.7 MTPA + Top Soil : 0.71 MTPA). ICL hassubmitted vide proposal No. IA/AP/MIN/77201/2018.

The proposal was presented to the EAC (non coal mining) on 24-10-2018. The Committee returned the proposal informing the PP to

Page 3: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material

3

revise the Form1 as GC is not applicable in the instant case and alsoto submit authorization as per Ministry‟s O.M. No. O.M.No. J-11015/333/2009-IA. II(M) dated 25.02.2010. The proposal is beingresubmitted here with incorporating the comities observations on theshort comings pointed out on the proposal.

Background of Project:

The India Cements Limited (ICL) is operating 8 integrated cementfactories and two grinding units with an installed capacity of 15.55Million Tonnes Cement. Integrated plants are in Tamilnadu, AndhraPradesh, Telangana & Rajasthan and the grinding units are inTamilnadu & Maharastra.

This captive limestone mining lease (Coromandel Limestone Mine) iscatering to the Chilamkur cement plant having a capacity of 1.485MTPA Cement, located in Chilamkur village, Yerraguntla Mandal,YSR Kadapa district.

This ML was initially granted vide G.O.Ms.no. 326 dtd. 22.05.1981,to Coromandel Fertilizers Ltd for a period of 20 years (Annexure-I)and was later transferred to The India Cements Ltd (ICL) videG.O.Ms.no.482 dtd. 06.12.1990 (Annexure-II).

Vide G.O.Ms.no. 539 dtd. 29.10.2001, this ML was ‘renewed’ foranother period of 20 years, valid upto 17.11.2021(Annexure-III).

And now as per new MMDR Act 2015, the lease period is extendedup to 2031(G.O.Ms 61 dated 26.04.2018).

Details of earlier approved Mining Plans and Scheme of Mining arefurnished in the following table

SI.No.

Mining Plan /Scheme ofMining

Period Approval letter and date

1 Mining Plan 1992-93 to1996-97

659(72)/Lst/90-NLR dt29.4.1992

2 Modified MiningPlan

1997-98 to2001-02

AP/CDP/LST/MP-MS-10/SZ dt26.11.1998.

3 Scheme ofMining

2002-03 to2006-07

MS/AP/CDP/LST-70-SZ dt:06.03.2003

4 Scheme ofMining

2007-08 to2011-12

MS/AP/CDP/Lst-139-SZ dt27.4.2007

5 Scheme ofMining

2012-13 to2016-17

AP/CDP/MS/LST-255-SZ/1091/Dtd:30.11.2012.

6 Scheme ofMining

2016-17 to2020-2021

659(72)/Lst/90-NLR dt06.12.2016

Page 4: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material

4

The Mine was in operation since 1982. The first Environmentalclearance was received in 2004 and later again in 2007.

Mine was opened on 1-10-1982. The details of productionauthenticated by DGMS from the year 1988 onwards which areenclosed as Annexure-IV. The mine opening notices submitted toIBM and DGMS are enclosed as Annexure-V

The details of earlier Environmental Clearances are given below.

S.No GrantedEnvironmentalClearance no

Grant Date Production details(Million TonnesPer Annum)

1 J-11015/47/2003/IAII(M), attached asAnnexure-VI

7th July2004

1.422 to 1.8

2 J-11015/513/2007 IAII(I) (INTEGRATEDCLEARANCE), attachedas Annexure-VII

30th Nov2007

1.8 to 2.00

Certified EC Compliance by Regional Office, Chennai is enclosed asAnnexure - VIII

Consent to establish and consent to operate obtained from APPCBfrom initial to subsequent renewals are enclosed as Annexure-IX

The lease deed executed in 2002 is attached as Annexure-X.

The production details from 1988-89 till date is given in table below

S.No Year LimestoneDespatches

S.No Year LimestoneDespatches

1 1988-89 10,80,517 16 2003-04 13,87,5002 1989-90 9,78,192 17 2004-05 12,20,0003 1990-91 10,14,629 18 2005-06 13,87,5004 1991-92 11,00,000 19 2006-07 16,15,0755 1992-93 9,00,000 20 2007-08 16,08,0006 1993-94 9,65,000 21 2008-09 14,90,0007 1994-95 10,69,800 22 2009-10 15,20,0008 1995-96 11,05,000 23 2010-11 12,75,0009 1996-97 14,96,715 24 2011-12 13,40,000

10 1997-98 15,18,548 25 2012-13 14,35,00011 1998-99 14,06,083 26 2013-14 14,05,00012 1999-2000 13,91,132 27 2014-15 13,08,00013 2000-01 14,32,591 28 2015-16 12,72,00014 2001-02 11,75,565 29 2016-17 15,04,19515 2002-03 12,20,000 30 2017-2018 14,85,000

31 2018-2019(up to Nov’18)

11,64,294

Page 5: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material

5

Year- wise chart clearly showing the comparison of productionachieved against CTE, CTO, MP/MS and EC Capacity is enclosed s asAnnexure-XI

PRESENT PROPOSAL

Present proposal pertains to Limestone mine of ICL. ICL possessesmining lease extending over an area of 602.137 Ha of private pattaland of ICL falling in the jurisdiction of Chilamkur village,Yerraguntla Mandal, YSR Kadapa District, Andhra Pradesh. Thislease is named as “COROMANDEL LIMESTONE MINE”.

ICL proposes to increase the limestone production from 2.0 to 7.7MTPA (Total Excavation at 7.7 MTPA Limestone production is 8.41MTPA (Limestone : 7.7 MTPA + Top Soil : 0.71 MTPA). The expansionof the existing mine is required to cater the limestone requirement ofthe interlinked cement plant expansion.

The mineral reserves and resources are estimated as 273.38 milliontonnes. Mechanized method of mining is adopted. The limestoneproduced is crushed and transported to cement plant by conveyor.

A total quantity of 10.3 million cum of top soil is estimated to begenerated from the mining activity for the life of the mine which willbe used for afforestation.

The present water requirement is 110 m3/day and additional Waterrequirement for the proposed expansion is 250 m3/day and the samewill be sourced from mine pit storm water storage.

Power requirement is mainly for lighting in the mine area, minepumps, Time office and Garage-cum-Workshop and is met fromgrid/Captive power plant.

Present manpower is 73 persons to carry out the mining operations.Additionally 20 persons will be employed for expansion. Existing fleetof mining machinery will be upgraded for higher productioncapability.

The capital Cost of expansion is estimated at Rs. 35 crores.

Page 6: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material

6

CHAPTER – 2 INTRODUCTION OF THE PROJECT / BACKGROUNDINFORMATION

2.0 INTRODUCTION OF THE PROJECT / BACKGROUNDINFORMATION

i. IDENTIFICATION OF PROJECT AND PROJECT PROPONENT. INCASE OF MINING PROJECT, A COPY OF MINING LEASE /LETTER OF INTENT SHOULD BE GIVEN.

PROJECT: ICL proposes to increase the limestone production from2.0 to 7.7 MTPA (Total Excavation at 7.7 MTPA Limestone productionis 8.41 MTPA (Limestone : 7.7 MTPA + Top Soil : 0.71 MTPA) inChilamkur Limestone mine located at Chilamkur village, YerraguntlaMandal, YSR Kadapa District, Andhra Pradesh.

ICL has earlier obtained an integrated Environmental Clearance (EC)vide Letter J-11011/513/2007-IA(II)(I) dated 30-11-2007 for 2.0MTPA of Limestone production.

The present proposal is for obtaining Environmental Clearance forincrease of limestone production from 2.0 to 7.7 MTPA from Ministryof Environment and Forests & Climate Change (MoEF & CC) under1(a) category of EIA notification SO 1533 dated 14th Sep. 2006 andsubsequent amendments.

A copy of the mining lease letters is enclosed as Annexure – I, II andIII.

PROJECT PROPONENT

THE INDIA CEMENTS LIMITED., (ICL), is operating a cement plantof 1.485 MTPA Clinker capacity at Chilamkur village, YerraguntlaMandal, YSR Kadapa District, Andhra Pradesh.

Exploitation of limestone in this leasehold commenced on01.10.1982. The raw material requirement to the cement plant isbeing met from the Captive mines located adjacent to the factory inChilamkur village. The company is producing the three types ofCements Viz., Ordinary Portland Cement (OPC), Pozzolona PortlandCement (PPC) and Sulphate Resisting Portland Cement

ICL proposes to increase the Clinker production from 1.485 to 5.15MTPA and Cement Production from 1.65 MTPA to 7.00 MTPA byinstallation of new Unit.

Page 7: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material

7

PRESENT PROPOSAL

Present proposal pertains to existing Limestone mine of ICL. ICLpossesses a mining lease extending over an area of 602.137Ha fallingin the jurisdiction of Chilamkur village, Yerraguntla Mandal, YSRKadapa District Andhra Pradesh. ICL proposes to increase thelimestone production from 2.0 to 7.7 MTPA (Total Excavation at 7.7MTPA Limestone production is 8.41 MTPA (Limestone: 7.7 MTPA +Top Soil : 0.71 MTPA). The expansion of the existing mine is requiredto cater the limestone requirement of the interlinked cement plant.

ii. BRIEF DESCRIPTION OF NATURE OF THE PROJECT

The limestone mine is spread over 602.137Ha with mineral reservesand resources of about 273.38 Million Tonnes is located atChilamkur village, Yerraguntla Mandal, YSR Kadapa District,Andhra Pradesh.

The mining of the deposit is worked by deep hole drilling & blastingwith fully mechanized open cast mining method. The benches areMaximum 9 mts in height. The limestone is loaded into 35T dumpersand transported to crusher and then to cement plant throughconveyor for its captive use.

A total quantity of 10.30 million cum of top soil is estimated to begenerated at the end of mine life, (3.31 million cum of top soil isestimated to be generated at the end of Lease Period) from the miningactivity which will be used for afforestation and part backfilling minedout pit to the extent of 332 Ha, out of total excavated pit area of453Ha.

Soil cover is underlain by massive / bedded dark / light greycoloured limestone followed by purple shale at depth. At the end ofthe life of this mine, three pits will be formed, North Pit on the eastside of village road, North Pit on the west of village road and SouthPit. Conceptually, area of excavation will be 453 Ha (Part of the areawill be backfilled and balance will be developed as Water Reservoir,Roads (Mines) - 5.56 Ha, Barrier Zone 7.5 m - 12.10 Ha, Safety Zonesfor Railway -68.28 Ha, Roads - 8.68 Ha, and Non Mineral Zone -54.53 Ha

These pits would be partly backfilled i.e. about 217 hectares area inSouth Pit with average soil thickness of 5 metres and 115 hectaresarea in North Pits, North-West Pit being completely backfilled whereas North-East Pit part will be backfilled and part will be convertedinto reservoir.

All efforts would be made to re-handle the existing surface dumpsand utilize the same for backfilling of the excavated pits during FinalMine Closure period. Mine pit conversion into water reservoir is about121 hectares excavated area would be undertaken. Ultimate pit slope

Page 8: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material

8

would be maintained at 450. It is estimated that by the end of life ofthe mine, 10.3 million cubic metres (3.31 million cum of top soil isestimated to be generated at the end of Lease Period) soil would beremoved for exploitation of underlying limestone formation.

After decommissioning mining activities, an area of 332 Ha of thepartly backfilled area and about 40 Ha of the lease including the 12Ha area of 7.50m boundary band will be developed under greenbelt.

iii. NEED FOR THE PROJECT AND ITS IMPORTANCE TO THECOUNTRY AND OR REGION.

With the demand for cement in the region ICL proposes to enhancethe cement production by establishing one more kiln .Accordingly thelimestone production capacity needs to be enhanced.

DEMAND – SUPPLY GAP

Limestone is the main raw material for cement production; thedemand is always there with that of cement. Moreover, the subjectmine produces good grade limestone leading to conservation ofmineral resources.

The cement market has growth due to the central governmentliberalization policies and new schemes for housing, road projects.Cement demand growth is anticipated to be about 11% increasemainly through road projects & Housing Projects.

Continuous demand for exports to South-East Asian countries alongwith the increased requirement of the domestic sector has been leadall the cement manufacturers in the country to plan for increasedcapacities.

iv. IMPORTS VS INDIGENOUS PRODUCTION.

The limestone produced from ICL is meant for the captiveconsumption in the cement plant.

v. EXPORT POSSIBILITY

No export of limestone are proposed.

vi. DOMESTIC / EXPORT MARKETS

The limestone produced from Coromandel Limestone mine is meantfor the captive consumption in the cement plant.

vii. EMPLOYMENT GENERATION (DIRECT AND INDIRECT) DUE TOTHE PROJECT.

Present manpower is 73 persons to carry out the mining operations.The employment for the proposed expansion will be 20 more.

Page 9: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material

9

CHAPTER – 3 PROJECT DESCRIPTION

3.0 PROJECT DESCRIPTION

i. Type of project including interlinked and interdependentprojects, if any.

It is an opencast mining project. Inter linked with the cement plant.The project is for increase of limestone production capacity from 2.0to 7.7 MTPA (Total Excavation at 7.7 MTPA Limestone production is8.41 MTPA (Limestone : 7.7 MTPA + Top Soil : 0.71 MTPA) fromCoromandel Limestone mine spreading over an area of 602.137Ha.with about mineral reserves of 273.38 Million will last for 36 years.The limestone produced from the mine is of good grade limestone andis directly utilized for the cement production.

Status of the interlinked/interdependent projects:-

Project Location Capacity ApprovalsCementPlant

Chilamkur village,YerraguntlaMandal, YSRKadapa District,Andhra Pradesh.

Increased production-Clinker: 1.485 to 5.15MTPA

EnvironmentalClearance isunder process

It is categorized as Category ‘A’ Project under Schedule 1(a), hence itnecessitates obtaining Environment Clearance from Ministry ofEnvironment and Forest & Climate Change (MoEF & CC).

ii.Location (map showing general location, specific location, andproject boundary & project site layout) with coordinates.

The mining lease area comprising 602.137ha is situated atChilamkur village, Yerraguntla Mandal, YSR Kadapa District, AndhraPradesh.

The COROMANDEL LIMESTONE MINE is located at ChilamkurVillages, Yerraguntla Mandal, Y.S.R. Kadapa district of AndhraPradesh. Fig-1 shows the location map of the Plant site. This Plantsite falls between 1) 14° 38' 51.0''N - 14° 40' 31.1''N, 2) 78° 27'55.4''E- 78° 29' 40.4''E, North latitude and East longitude with anaverage altitude of 175 m above msl. The area is covered in theSurvey of India Toposheet nos. 57 J/6, [1:50000 scale].

Page 10: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material

10

Page 11: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material

11

Fig – 2 shows the Key Map of the Mine site.

The area is well connected by road and rail. National Highway - NH-40connecting Kadapa – Kurnool is at 28.0 km in Eastern direction to the Minesite.

State Highway - SH-31 connecting Bellary – Nellore is at 0.2 km inSouthern direction to the Mine site. Nearest Railway line connectingTadpatri to Y.S.R Kadapa of South Central Railway line is passing throughthe Mine Site. Nearest Railway station is Kalamala RS is Adjacent to themine site. Major Railway station is Yerraguntla which is at a distance of 5.3km in ESE to the Mine site.

Penneru River is at a distance of 7.2 km in NE direction and Pageru River –6.9 km SE direction to the mine site. Pedda Vanka adjacent (outside MLarea) to the mine site, Y.S.R Kadapa is the nearest town/city distance of38.0 km in SE to the Mine site.

Nearest Settlements: Chilamakur – 0.6 km – S, Niduzuvvi – 1.3 km – ESE

And Sunnapurallapalle – 2.2 km – WNW

Nearest Reserved Forests are Niduzuvvi RF – 2.5 km – S, Kosinepalle RF-3.4 km- WNW

Rajeev Gandhi national park is located at 9.03 km in NE direction.

Fig - 3 shows the 10 km radius of the study area around Mine site.

Table-1.1 gives the salient features of the Mine site

Page 12: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material

12

Page 13: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material

13

Page 14: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material

14

TABLE – 1.1SALIENT FEATURES OF THE MINE SITE

Feature DetailsAltitude 175 m above msl

Longitude & Latitude 1) 14° 38' 51.0''N - 14° 40' 31.1''N, 2) 78° 27'55.4''E- 78° 29' 40.4''E

Village, Mandal, District, State Chilamkur Village, Yerraguntla Mandal,Y.S.R.Kadapa district of Andhra Pradesh

Maximum Temperature oC 48Minimum Temperature oC 14Relative Humidity, % 25-77Annual rainfall, mm 648Topography PlainSoil Type ClayeyDistrict Head Quarters YSR Kadapa – 38.0 km - SENearest IMD Station KURNOOL – 132.0 km – NNW

Nearest Waterbodies

Penneru River – 7.2 km – NEPageru River – 6.9 km - SEPedda Vanka- Adjacent (Outside ML area)Penneru River –Third order Stream - 1.2 km –NNW

Nearest Highway

National Highway - NH-40 -Kurnool – Kadapa-28.0km - EState Highway - SH-31 - Bellary – Nellore-0.2km - S

Nearest Railway station Kalamala RS – 0.5 km - E

Nearest Industries

India Cements Limited (NidizuvvI) – 7.0 km –ESEZuari Cements – 8.8 km –SERayalaseema Thermal Power Station – 3.5 km –NNW

Nearest VillageChilamakur – 0.6 km – SNiduzuvvi – 1.3 km – ESESunnapurallapalle – 2.2 km – WNW

Nearest Town/City YSR Kadapa – 38 km – SE.National Parks/ bird sanctuaries Rajeev Gandhi National Park – 9.03 km – NE

Nearest Inter State Boundary Andhra Pradesh – Karnataka – 95.0 km – SW,Andhra Pradesh – Telangana – 152.0 km – N

Nearest Air portHyderabad (Shamshabad) Airport– 280.0 km –N,YSR Kadapa Airport – 31.0km – SE,

Nearest Forest Niduzuvvi RF – 2.5 km – SKosinepalle RF- 3.4 km- WNW

Historical places Gandikota – 24.2 km-NWNote: Distances mentioned are aerial distances

Page 15: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material

15

Details of alternate sites considered and the basis of selectingthe proposed site, particularly the environmental considerationsgone into should be highlighted.

No alternate sites were considered as the project is mineral specific.

i. Size or magnitude of operation.

Mine area is about 602.137ha. The proposal is expansion oflimestone production from 2.0 to 7.7 MTPA (Total Excavation at 7.7MTPA Limestone production is 8.41 MTPA (Limestone: 7.7 MTPA +Top Soil : 0.71 MTPA).

ii. Project description with process details (a schematic diagram/flow chart showing the project layout , components of theproject etc. should be given)

ICL is adopting opencast mechanized mining which involves deepdrilling and blasting for breaking the rock, hydraulic excavators tohandle the broken material and loading into 35 T dumpers fortransporting the ROM material to crusher.

Drilling operations are presently conducted with 115 mm dia of AtlasCapco BVB-25-10 model drills with compressor of 550 Cfm.Hydraulic excavators with bucket capacity of 3.3m3 are deployed toload the blasted limestone into Dumpers. The blasted/ excavatedlimestone is sent to crusher and then to cement plant throughconveyor.

The maximum depth of the limestone deposit is 60 m at NE of mininglease. Four benches were developed. Another two benches will bedeveloped. Mining will not intersect ground water.

DRILLING

The drilling of holes is done by using 115 mm drill.

BLASTING

Blasting is done using cap sensitive explosives (class-2) as boosterand ammonium nitrate (ANFO) is used in the ratio of 20:80. Noneldetonators are utilized to control ground vibrations and fly rock.ICL is adopting the following blasting parameters in the mine.

Bench height : 7 - 8 mSpacing : 6 mBurden : 4 mDensity : 2.5 T/Cu.mPowder factor : 9 t/kg

Page 16: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material

16

LOADING

Loading is carried out by hydraulic excavators of 3.3 cum bucketcapacity.

HAULING/TRANSPORTThe limestone is loaded into 35T dumpers and transported to crusherand then to the cement plant (through conveyor) for its captive use.

v) Raw material required along with estimated quantity, likelysource, marketing area of final product/s, mode of transport ofraw material and finished product.

No raw material is required.

vi) Resource optimization / recycling and reuse envisaged in theproject, if any, should be briefly outlined.

A total quantity of 10.3 million cu.m of top soil is estimated to begenerated from the mining activity and will be used for afforestationat the end of mine life.

vii) Availability of water its source, energy /power requirement

The present water requirement is 110 m3/day and Waterrequirement after the proposed expansion is 250 m3/day to besourced from storm/rain water stored in mine pit. Mining will notintersect the water table.

Power requirement is mainly for lighting in the mine area, minepumps, Time office and Garage-cum-Workshop and is met from grid/Captive Power Plant.

viii. Quantity of wastes to be generated (liquid and solid) and schemefor their management / disposal.

A total quantity of 10.3 million Cu.m of top soil is estimated to begenerated from the mining activity at the end of mine life. (3.31million cum of top soil is estimated to be generated at the end ofLease Period) . Waste/ subgrade material are not anticipated, if anygenerated in small quantities will be absorbed completely in theR.O.M. material.

Page 17: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material

17

ix. Schematic representations of the feasibility drawing which giveinformation of EIA purpose.

Drilling

Blasting

Excavation

Loading into dumpers/tippers

Transportation to Crusher atCement Plant

MINING METHODOLOGY

(OPEN CAST MECHANISED MINING)

Page 18: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material

18

CHAPTER – 4 SITE ANALYSIS

4.0 Site Analysis

i. Connectivity.

The mine area under reference extends over an area of 602.137Hain Chilamakur Village, Yerraguntla Mandal, Y.S.R.Kadapa district ofAndhra Pradesh.

The area is well connected by road and rail. National Highway - NH-40 connecting Kadapa – Kurnool is at 28.0 km in Eastern direction tothe Mine site.

State Highway - SH-31 connecting Bellary – Nellore is at 0.2 km inSouthern direction to the Mine site. Nearest Railway line connectingTadpatri to Kadapa of South Central Railway line is Passing ThroughThe Mine Site. Nearest Railway station is Kalamala RS is Adjacent tothe mine site. Major Railway station is Yerraguntla which is at adistance of 5.3 km in ESE to the Mine site.

ii. Land form, land use and land ownership.

Total area of 602.137Ha is owned by ICL.

Topography:

The mining lease area is a near flat terrain with a maximum altitudeof 176 m above MSL and a minimum of 170 m above MSL. No majorstreams or river exists in the mining lease area. The drainage patternis of dendritic type.

Surface plan of the Mining lease area is enclosed as Fig – 4.

The Mining will be continued for 36 years @ 7.7 million tonnes oflimestone per year. The land use pattern is furnished in the followingtable.

Page 19: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material

19

Page 20: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material

20

LANDUSE PATTERN OF THE MINE AREA (Ha)

S.NO LAND-USE PRESENT CONCEPTUALLEASE

PERIOD

CONCEPTUALMINE LIFE

PERIOD1 Area of

Excavation126.52 240.38 453 Ha

Part of the area will bebackfilled

and balance will bedeveloped as Water

Reservoir2 OB Dumps

(Temporary)50.52 72.56 -

3 Infrastructure

0.16 0.16 -

4 Roads(Mines)

5.56 8.0 5.56

5 Barrier Zone 7.5 mBarrierZone

12.10 12.10

6 Safety Zones ForRailway

68.28 68.28

7 Roads 8.68 8.688 Non Mineral

Zone54.53 54.53 54.53

9 Undisturbedarea

326.35 137.447 0

Total 602.137 602.137 602.137

* Afforestation area includes 12.5 Ha of 7.5m barrier zone and 12.0Ha Non mineral bearing area.

At the end of Mine Life period, about 121 Ha of mined-out area willbe developed into water reservoir. An area of 332 Ha will be developedunder greenbelt which includes 7.5 m safety barrier zone and non -mineral bearing zone and backfilled parts of the mine.

At the end of Lease Life period, about 96 Ha of mined-out area will bedeveloped into water reservoir. An area of 144 Ha will be developedunder greenbelt which includes 7.5 m safety barrier zone and non -mineral bearing zone and backfilled parts of the mine.

Page 21: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material

21

iii Existing land use pattern (agriculture, non-agriculture, forest,water bodies (including area under CRZ), shortest distances fromthe periphery of the project to periphery of the forests, nationalpark, wild life sanctuary, eco sensitive areas, water bodies(distance from the HFL of the river), CRZ, in case of notifiedindustrial area, a copy of the Gazette notification should begiven.

Total area of 602.137Ha is owned by ICL

Rajiv Gandhi National Park is located at 9.03 km in NE direction. .

The Reserved Forests located in 10km radius of the Mining Lease areNiduzuvvi RF – 2.5 km – S and Kosinepalle RF- 3.4 km- WNW

iv. Existing infrastructure.

None

v. Soil classification

The top soil is covered in the entire mining lease area with varyingthickness (from 3m to 5m).

vi. Climatic data from secondary sources

The tropical climate of the region is manifested in hot and humidsummer, moderately monsoon and mild winter seasons. May isthe hottest month in the year. The maximum temperature duringthe day time was recorded as 480C and December the coldest withthe temperature as low as 140C. The months of December,January & February are considered to have pleasant climate.

vii. Social infrastructure available.

ICL has constructed a full-fledged colony in upwind directionconsisting of 296 houses for the benefit of employees. The Colonycan accommodate the additional requirement for the newemployees.

All the necessary infrastructure facilities such as School,Dispensary, Park and Playground, Temple, Commercial Complex,etc., are provided in the colony.

A full-fledged water supply and drainage system is already inplace and the wastewater generated from the colony is beingtreated in the sewage treatment plant (STP) to meet thestandards. The treated sewage is used for greenbelt developmentwithin Cement plant complex.

Page 22: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material

22

CHAPTER – 5 PLANINIG BRIEF

5.0 Planning Brief

i. Planning concept (type of industries, facilities,transportation etc.) Town and country planning / developmentauthority classification.

The subjected mine is the captive limestone mine of ICL IndustriesLimited at Chilamkur village, Yerraguntla Mandal, YSR KadapaDistrict, Andhra Pradesh.with extent of 602.137Ha. The proposal isfor increase of limestone production from 2.0 to 7.7 MTPA (TotalExcavation at 7.7 MTPA Limestone production is 8.41 MTPA(Limestone : 7.7 MTPA + Top Soil : 0.71 MTPA).

ii. Population projection

Present manpower is 73 persons to carry out the mining operations.The employment for the proposed expansion will be 20 persons more

iii. Land use planning (breakup along with greenbelt etc.,)

During the life of the mine, about 121.00 Ha of mined-out area willbe developed into water reservoir. An area of 332.00 ha will bedeveloped under greenbelt which includes 7.5 m safety barrier zoneand non - mineral bearing zone and backfilled parts of the mine pit.

iv. Assessment of infrastructure demand (physical & social )

Total employment will be 93 after this expansion; there will beindirect employment to many more people, in the form of contractualjobs, business opportunities, service facilities etc. This will enhancethe economic status of the area.

Apart from the jobs, the company is providing medical andeducational facilities to the employees which are availed by the peoplein nearby villages.

v. Amenities / Facilities.

All the necessary infrastructure facilities such as School, Dispensary,Park and Playground, Temple, Commercial Complex, etc., areprovided in the colony.

Page 23: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material

23

CHAPTER – 6 PROPOSED INFRASTRUCTURE

i. Industrial area (processing area)

No processing is involved.

The mine will be operated by means of opencast fully mechanisedmethod of mining which includes deep drilling and blasting, loadingthe broken material by heavy machinery like hydraulic excavatorsand tippers for transporting the limestone to crusher at cement plant.

ii. Residential area (non-processing area)

No residential area is proposed at mine.

iii. Green belt.

An area of 332.00 Ha will be developed under greenbelt in the partlybackfilled mine pit which includes 12 Ha Non mineral zones & 12.10Ha area under 7.5 m safety barrier zone will be afforested.

iv. Social infrastructure.

The mining activity carried out in the area rather has a positive socio-economic impact upon the nearby human settlement as indirectemployment potential is created due to mining and allied activities inthe area. Apart from these, the company promotes health andeducation awareness in the area time to time by organizing healthand education camps.

v. Connectivity (traffic and transportation road / rail / metro /water ways etc.,)

The area is well connected by road and rail. National Highway - NH-40 connecting Kadapa – Kurnool is at 28.0 km in Eastern direction tothe Mine site.

State Highway - SH-31 connecting Bellary – Nellore is at 0.2 km inSouthern direction to the Mine site. Nearest Railway line connectingTadpatri to Y.S.R Kadapa of South Central Railway line is passingthrough the Mine Site. Nearest Railway station is Kalamala RS isAdjacent to the mine site. Major Railway station is Yerraguntla whichis at a distance of 5.3 km in ESE to the Mine site.

vi. Drinking water management (source & supply of water)

Water requirement for the mine after expansion is about 250 m3/dayand is sourced from Mine pit.

Page 24: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material

24

vii. Sewerage system

Domestic waste water from mines office is treated in septic tankfollowed by soak pit.

viii. Industrial waste management

Not Applicable

ix. Solid waste management.

No waste generated from the mine.

A total quantity of 10.30 million cu.m of top soil is estimated to begenerated from the mining activity by the end of Mine life which willbe used for afforestation.

x. Power requirement & supply / source.

The power required for illumination and water pumping is met fromgrid / Captive Power Plant.

CHAPTER – 7

6.0 REHABILITATION AND RESETTLEMENT (R & R) PLAN

i. Policy to be adopted (central / state) in respect of the projectaffected persons including home oustees, land oustees andlandless labourers (a brief out line to be given).

Total area of 602.137 Ha is already owned by ICL.

Page 25: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material

25

CHAPTER – 8 PROJECT SCHEDULE & COST ESTIMATES

8.0 Project schedule & Cost Estimates

i. Likely date of start of construction and likely date ofcompletion (time schedule for the project to be given).

Enhanced production will be commenced after obtaining EC,CFE, CFO and all other regulatory clearances. Life of the mine @7.7 million tonnes per annum for the mineral reserve andresources of 273.38 million tonnes would be 36 years.

ii. Estimated project cost along with analysis in terms ofeconomic viability of the project.

The estimated project cost for increase of limestone productionwill be about Rs. 35 Crores.

CHAPTER – 9 ANALYSIS OF PROPOSAL (FINAL RECOMMENDATIONS)

9.0 Analysis of proposal (Final Recommendations)

i. Financial and social benefits with special emphasis on thebenefit to the local people including tribal population, if any, inthe area.

Economic development of the region depends largely upon the natureof activities undertaken in the surrounding region. Corporatedevelopment invariably contributes towards acceleration of theprocess of socio-economic upliftment of the rural society by meansof employment, health & study programme, medical camps etc.,

Employment: Preference is given for locals for employment based onqualifications & requirement.

Medical facilities: Medical facilities are provided for employee as wellas people of nearby villages.

Educational facilities: Basic educational and vocational facilities areprovided for the children of employees as well as nearby villages.

Infrastructure facilities: Approach roads is developed at par withmine roads.

Page 26: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material
Page 27: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material
Page 28: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material

Annexure - II

Page 29: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material
Page 30: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material

Annexure - III

Page 31: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material
Page 32: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material

Annexure - IV

Page 33: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material
Page 34: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material
Page 35: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material

Annexure - V

Page 36: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material
Page 37: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material
Page 38: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material

Scanned by CamScanner

Page 39: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material

Scanned by CamScanner

Page 40: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material

Scanned by CamScanner

Page 41: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material

Scanned by CamScanner

Page 42: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material

Scanned by CamScanner

Page 43: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material

Scanned by CamScanner

Page 44: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material

Scanned by CamScanner

Page 45: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material

Annexure - VI

Page 46: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material
Page 47: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material
Page 48: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material
Page 49: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material

Annexure - VII

Page 50: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material
Page 51: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material
Page 52: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material
Page 53: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material
Page 54: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material
Page 55: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material

Annexure - VIII

Page 56: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material
Page 57: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material
Page 58: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material
Page 59: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material
Page 60: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material
Page 61: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material
Page 62: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material
Page 63: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material
Page 64: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material
Page 65: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material
Page 66: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material
Page 67: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material
Page 68: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material
Page 69: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material
Page 70: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material
Page 71: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material
Page 72: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material
Page 73: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material
Page 74: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material

Annexure - IX

Page 75: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material
Page 76: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material
Page 77: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material
Page 78: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material
Page 79: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material
Page 80: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material
Page 81: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material
Page 82: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material
Page 83: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material

Single Desk Approval Ref Id : SDPCB069160138

Page 84: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material

Annexure - X

Page 85: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material
Page 86: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material
Page 87: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material
Page 88: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material
Page 89: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material
Page 90: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material
Page 91: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material
Page 92: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material
Page 93: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material
Page 94: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material
Page 95: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material
Page 96: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material
Page 97: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material
Page 98: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material
Page 99: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material
Page 100: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material
Page 101: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material
Page 102: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material
Page 103: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material
Page 104: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material
Page 105: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material
Page 106: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material

ANNEXURE - XIFinancial

YearMining Lease Detail (Initial,

Renewal, Transfer) with dateand Validity

EC Details Capacity(Tonne), Dated, LetterNo, Amendment Etc.

CTE CTO under Air act (Date, Validity,Capacity)

Mining Plan/Mining Scheme DMGCertified

Dispatches(Tonne)

Remarks

ProposedProduction(Tonne)

AchievedProduction(Tonne)

Mine Lease Sanctioned byGovt. of Andhra Pradesh to

Coromandel FertilizersLimited Vide G. O. Ms No.

326 Dated 28.05.1981

- - - - - - -

Coromandel FertilizersLimited

Mine Opening :Form C1-23.08.1982Form C2-01.10.1982

- - - - - - -

1988-1989 - - - - - - 10,80,517 -

1989-1990 Transfer of Mining Leasefrom Coromandel Fertilizers

Limited to The IndiaCements Limited vide G. O.

Ms. No. 482 Dated06.12.1990

- - - - - 9,78,192 -

1990-1991 - - - - - 10,14,629 -

1991-1992 - - - 11,00,000 -

1992-1993 - - - - 13,33,750 8,59,225 9,00,000 -

1993-1994 - - - - 13,75,312 9,54,625 9,65,000 -

1994-1995 - - - - 14,22,400 10,64,775 10,69,800 -

1995-1996 - - - - 14,64,000 10,99,050 11,05,000 -

1996-1997 - - -- 14,64,000 13,43,250 14,96,715 -

1997-1998 - - - 14,00,000 14,07,000 15,18,548 -

1998-1999 - - - 15,00,000 13,05,000 14,06,083 -

1999-2000 - - - 16,00,000 13,02,500 13,91,132 -

2000-2001 - - - 15,70,000 13,04,600 14,32,591 -

2001-2002 Grant of 1st Renewal ofMining lease vide G.O Ms.No. 539 Dated 29.10.2001by Govt. of Andhra Pradesh

- - - 14,70,000 11,04,000 11,75,565 -

2002-2003 India Cements LimitedRenewal of Mining Lease:

- - 15,80,000 12,20,000 12,20,000 -

2003-2004 1.8 MTPA 1.8 MTPA 5300 TPD(1.75 MTPA) 18,00,000 13,87,500 13,87,500 -

Page 107: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material

Proc. No. 3704/M3/2001dated 28.03.2002Area 602.137 Ha

Valid from 18.04.2001 to17.11.2021

No. J-11015/47/2003-IA II(M) Dated07.07.2004

1.422 to 1.8 MTPA

CFE/APPCB/HO/R00/CFE/2003/1-260Dated 26.4.2003

Valid up to 25.4.20081.422 to 1.80 MTPA

APPCB/KNL/TPT/402/HO/W/2002/241-4314 Dated 03.02.2003Valid up to 31.12.2003

2004-2005 1.8 MTPA - 5300 TPD(1.75 MTPA) 18,00,000 12,46,000 12,46,000 -

APPCB/KNL/TPT/402/HO/W/2003/2541- 3282 Dated 04.03.2004Valid up to 31.12.2005

2005-2006 1.8 MTPA - 5300 TPD(1.75 MTPA) 18,00,000 15,50,600 15,50,600 -

2006-2007 1.8 MTPA - 6000 TPD(2.0 MTPA) 18,00,000 11,99,075 16,15,075 -

APPCB/KNL/TPT/402/HO/W&A/2006-661 Dated 05.07.2006Valid up to 31.12.2007

2007-2008 2.0 MTPA 2.0 MTPA 2.0 MTPA 19,99,537 16,10,000 16,08,000 -

F. No. J-11011/513/2007-IA

II(I) Dated 30.11.20071.80 to 2.0 MTPA

90/PCB/CFE/RO-TPT/HO/2007-964Dated 04.08.2007

Valid up to 03.08.20121.80 to 2.0 MTPA

APPCB/PTN/NGL/189/HO/2008 Dated23.09.2008

Valid up to 31.12.20102.0 MTPA

2008-2009 2.0 MTPA 2.0 MTPA 19,99,292 14,90,000 14,90,000 -

2009-2010 2.0 MTPA 2.0 MTPA 19,99,712 15,20,000 15,20,000 -

2010-2011 2.0MTPA 2.0 MTPA 19,99,962 12,70,000 12,75,000 -

APPCB/PTN/NGL/189/HO/2011-1775Dated 19.09.2011

Valid up to 31.12.2013

-

2011-2012 2.0 MTPA 2.0 MTPA 19,99,892 13,30,000 13,40,000 -

2012-2013 2.0 MTPA 2.0 MTPA 19,11,144 14,30,114 14,35,000 -

2013-2014 2.0MTPA 2.0 MTPA 19,08,626 14,05,575 14,05,000 -

APPCB/KNL/TPT/14379/CFO/HO/2014-903 Dated 26.06.2014Valid up to 31.12.2016

2014-2015 2.0 MTPA 2.0 MTPA 19,00,002 13,49,210 13,08,000 -

2015-2016 2.0 MTPA Auto Renewal dated 23.11.2016Valid up to 31.12.2021

18,99,999 12,47,350 12,72,000 -

2.0 MTPA

2016-2017 2.0 MTPA 2.0 MTPA 19,00,001 15,04,195 15,04,195 -

2017-2018 2.0 MTPA 2.0 MTPA 19,99,940 14,85,000

2018-2019Note: - The Data filled above should be supported by relevant document.

Page 108: THE INDIA CEMENTS LIMITED - environmentclearance.nic.in · Rajasthan with grinding units in Maharastra & Chennai. The plant at Chilamkur was commissioned in 1984. The raw material

Mining Lease Details

• ML was initially granted vide G.O.Ms.no. 326 Dt: 22.05.1981 to Coromandel fertilizers Ltd for a period of 20 Years.

• This ML was transferred to M/s the India cements Ltd., Vide G.O Ms No.482 Dt :06.12.1990

• This ML was Renewed vide G.O.Ms.No.539 Dt:29.10.2001for period of 20 Years Valid upto 17.11.2021

• Now, as per MMRD Act 2015 the lease period is extended up to 17.11.2031 vide G.O.Ms.No. 61 Dt: 26.04.2018