The Highway of Change and a Practical Framework Approach to Change Contributed by Ron Leeman on February 20, 2015 in Organization, Change, & HR Since Monday, 9 th January 2015, my free Flevy download Practical Framework Approach to Change has been downloaded over 500 times. The document contains just a snapshotof my approach, rather than going into any explicit details about the tools and techniques related to each of the framework components. The level of interest shown has spurred me into writing this article to provide a little more meat on the boneabout the framework.

Upload: flevycom

Post on 12-Jan-2017

154 views

Category:

Business


1 download

TRANSCRIPT

The Highway of Change and a

Practical Framework Approach to

Change

Contributed by Ron Leeman on February 20, 2015 in Organization, Change, & HR

Since Monday, 9 th January 2015, my

free Flevy download Practical Framework

Approach to Change has been downloaded

over 500 times. The document contains just a

“snapshot” of my approach, rather than going

into any explicit details about the tools

and techniques related to each of the

framework components. The level of interest

shown has spurred me into writing this article

to provide a little more “meat on the bone” about the framework.

Aligned with this approach, you may want to pay due respect to some of the many “holistic”

change methodologies from the likes of Prosci, Kotter, etc. I have a document on Flevy

called A Snapshot Guide to Better Known Change Management Models/Methodologies .

A Short History

Over the last 25-years or so, I have developed and implemented many bespoke Business

Change and Transformation Approaches and Strategies for organisations to enable them to

drive through change initiatives/programmes and achieve considerable ROI and business

benefit.

These bespoke Approaches/Strategies have used as their basis my Practical Framework

Approach to Change. This was first developed in 1996, but has been regularly updated and

changed based on new learning, acquired knowledge and research through being involved in

many diverse change initiatives in a cross-section of different industry sectors between 1996

to present.

First of all, there are two things that you need to know:

1. The framework is modular which means it can be used in its totality or you can “pick

and choose” which modules you want to use dependent on the change initiative.

2. Implicit in the “framework” are:

Creating a positive environment for change

Managing change resistance

Engendering positive change behaviours

Addressing organisational culture

I am not saying I know it all (far from it) and what I have done and the way I have done it is

the right way but it is my way (as Frank Sinatra sang) and is based on my practical

experience, the things I have done for organisations and that have worked.

Sponsorship

Sponsorship is one of the key ingredients that make change initiatives successful. Executives

and senior leaders provide the authority and credibility needed for a change to be

successful. Senior leaders must be present to demonstrate their own and the organization’s

commitment to the change.

A sponsor provides resources required for change and has the ultimate responsibility for the

program or project, building commitment for the change particularly at the senior

management level across the organization. The sponsor can minimize barriers to change

and ensure the rapid and effective implementation of project outcomes.

You need to identify and work with a Sponsor to ensure commitment to the change initiative

and to regularly engage with them in relation to:

Their key responsibilities.

Their visibility during the change initiative

Building support.

Communication responsibilities.

Managing resistance.

Setting priorities and celebrating success.

For more information, I have a document available on Flevy related to Sponsorship .

Stakeholder Analysis and Management

Stakeholder Management involves taking into consideration the different interests and

values stakeholders have and addressing them during the duration of the change initiative

to ensure that all stakeholders are happy at the end.

A properly managed stakeholder can be your greatest asset, clearing organisational

roadblocks and supporting your project in times of need. In order to ensure the success of

your project you must properly manage all of your stakeholders.

Stakeholder Analysis is the technique used to identify key people who have to be

won over to build the support that drives success

Stakeholder Management is an important discipline to win support from others

as it helps ensure that projects succeed where others fail

Stakeholder Management, once completed, helps determine your approach to

Communication.

For more information, I have a document available on Flevy related to Stakeholder Analysis

& Management

Communication

A starting point in any change scenario is to clearly communicate the rationale behind the

change goals. Communication and engaging staff in discussions about

The business is absolutely critical to successfully implementing changes. It is the employees

who will be doing most of the legwork to make a new strategy work, so they must

understand the aims and objectives. They must also be clear on why the plan has been

introduced, how it will be implemented and what is expected of them. Ultimately,

employees want to be kept in the loop and informed of any internal developments.

The Communication aspect can take many forms but to an extent will be determined by

what channels are already in place within an organisation.

I use a simple four phase model which is:

Messages to be communicated.

Channels to be communicated through.

Stakeholder Groups to be communicated to.

Frequency of communication.

I cannot stress the importance of the first three components as these are the factors that are

key to a successful change outcome.

For more information, I have a document available on Flevy related to Communication .

Process Change

The process side of a change initiative is critically important. When embarking upon change

the goal is to eliminate waste, improve productivity, optimise existing resources, handle

growth without adding resources and to streamline existing operations to name but a

few. Companies with defined processes are better able to evaluate their strengths and

weaknesses and identify opportunities for improvement. Processes provide a blueprint for

employees and enable cross-training to minimise business interruption.

Process Change is about looking at the processes that are going to be impacted by the

change.

You need to initially create a Process Hierarchy and determine at which level process

information needs to be captured. Once this is done then processes need to be mapped. First

the “As Is” and then following a period of critical analysis the recommended “To Be“

processes.

It is helpful for end-users to get involved in the design stage of the new processes so that

they can provide their input and will be able to be involved and learn first-hand.

Comparing the “As Is” and the “To Be” will enable you to undertake an Impact Analysis and

identify where the major impacts are going to be and the associated Stakeholder Groups

that will be affected. This Impact Analysis will then need to be communicated to the

relevant Stakeholder Groups.

For more information, I have a number of documents available on Flevy related to Process

Change .

Organisational Change

Any change scenario will invariably involve some kind of organisational impact. You can be

sure that the value of the marginal improvements won’t be anywhere near the costs of an

expensive, time-consuming and resource-intensive implementation project. If your

organisation doesn’t take the opportunity to restructure its business, the change initiative

will be part of the statistical number of change failures that you so often read about.

Organisational change results from Process Changes and refers to the way tasks are divided

up and the patterns of co-ordination, communication, power distribution and workflow

associated with this. There are four basic elements to consider when looking at this aspect:

Reporting Structures.

Working Practices.

Job Design.

Management Systems.

This aspect will have to be carefully managed and again input from your key Stakeholder

Groups is essential in the design of Job Roles & Responsibilities and new Organisation

Structure. The best structure is influenced by many factors including company size,

technology, and environment BUT ultimately strategies, and not contingencies, shape the

structure (for better or worse).

This is the one aspect that people are most interested in as it involves “their jobs” so it

cannot be underestimated.

For more information, I have a document available on Flevy related to Organisational

Change .

Training & Education

This is all about training key Stakeholder Groups on the new Processes in relation to their

new Roles & Responsibilities.

Your company has likely invested a lot in their change initiative, but if you don’t train

people on the changes, the investment will be largely wasted. Failure to make training a

critical component of a change initiative is the number one mistake many organisations

make. Effective training is the cornerstone of every successful change. Training end-users

and preparing them for go-live directly contributes to bottom-line results and a successful

change.

Long before any actual training occurs it must be determined who, what, when, where, why

and how of training. This will invariably come from information from the work on Process

and Organisation changes and will reflect the following:

Organisation and its goals and objectives.

Jobs and related tasks that need to be learned.

Competencies and skills that are need to perform the job.

Individuals who are to be trained.

The final phase is evaluation of the program to determine whether the training objectives

were met. The end result of this will be a competent and ready workforce.

For more information, I have a document available on Flevy related to Training .

Adoption & Business Readiness

Failed change initiatives often come when organisations attempt to by-pass the readiness

and ownership transfer activities and go directly to capacity building.

Adoption/Business Readiness is a measure of preparation and is a term that means the

business’s ability to take on or adopt what a project delivers so in effect anything that

involves a change to Business Operations requires an organisation to be ready for and adopt

the change. A Business that is ready will have made all the preparations necessary to accept

the deliverables of a project and begin operating them. Adoption/Business Readiness

prepares each organisational unit for go-live by facilitating general business adoption of the

changes to achieve business goals.

Adoption & Business Readiness The following are the key stages of this component:

Agree approach.

Determine measurement areas

Agree questions.

Agree survey participants

Agree scoring criteria

Agree target score

Agree survey tool

Issue survey

Survey input, analysis and actions

This is a key aspect of the change process and it is extremely important that as many Key

Stakeholders as possible input to this process and agree all relevant actions and outcomes

including any remedial change interventions resulting from the output of the measurement

process.

For more information, I have a document available on Flevy related to Adoption & Business

Readiness .

Business Benefits Management

When undertaking a change initiative, it is often the case that businesses spend so much

time and energy on the preparation stages they overlook what comes after implementation.

It is the “after” implementation part (how we measure the success of the change) that is

often neglected until the project goes live. Measurement should entail a holistic approach

that assesses how well the initiative has established the foundation for business

transformation thereby providing the organisation opportunities to achieve substantial

business benefits.

Business Benefits is about planning and managing the overall delivery of benefits related to

the change initiative. The activities cover tracking the benefits from their initial

identification in the Business Case/Investment Proposal to their successful realisation. The

Business Case/Investment Proposal presents information necessary to support a series of

decisions.

There are four guiding principles to Benefits Management:

Performance only improves when people do things differently.

Benefits arise when improvements are exploited to the benefit of stakeholders.

Unless a benefit can at least be observed, it does not exist.

A benefit must have an owner who is responsible for delivery of that benefit.

Benefits fall into two categories:

Tangible e.g. Faster, Easier, Cheaper.

Non-tangible e.g. Happier, More Content, Less Complex.

But both can be measured using the right Measurement/Tracking system.

For more information, I have a document available on Flevy related to Business Benefits .

Continuous Improvement

Your change initiative go live should be the beginning of your Continuous Improvement

Program. With the pace of change and customer expectations, every business needs to be as

agile as possible. By constantly evaluating and improving processes in the light of their

efficiency, effectiveness and flexibility, organisations can quickly respond to change. The

only way to ensure that your business can keep up is to take a proactive and continuous

approach to improvement of your systems, processes and output.

Continuous Improvement is often overlooked by organisations as this is about improving

your processes as people get to know and understand the changes that have taken place and

will invariably find easier and better ways of doing their work.

There are various approaches but the one that seems most prevalent is the Plan, Do, Study,

Act cycle (PDSA):

Plan – what you want to happen or to achieve.

Do – what you planned to do in the previous step.

Study – the outcome and look at what happened.

Act – on the results and your analysis of them.

Creating Continuous Improvement Teams out of your original key Stakeholder Groups is

the best way for this. Teams should be empowered by Senior Management and meet on a

regular basis and follow the cycle for each of the improvement initiatives. It is important

that successful initiatives are seen to be implemented.

So, there we have it, my simple and practical approach.

You may also be interested in my best-selling A Comprehensive Guide to Change

Management , which in part includes the above approach.

About Ron Leeman

Ron Leeman has been involved in “change and process” work for more years than he

cares to remember. He has worked extensively across the UK, Europe, and globally--and

has an enviable track-record of delivering organisational change and process initiatives

across a wide cross section of industry sectors. In 2012, Ron was bestowed with a “Change Leader of

Tomorrow” award by the World HRD Congress “in recognition of my remarkable progress in initiating

changes enough for others in the same industry to follow my example”. Ron is firm believer in knowledge

transfer and now wants to share his vast knowledge with those who are considering getting into or at

various stages of “change” and/or “process” work or those working on specific Projects wanting to gain

practical insights into “how to” type situations. You can connect with Ron Leeman on LinkedIn here ,

where you can view his 85+ Recommendations and in excess of 800 Endorsements from clients and co-

workers alike to give you an indication of the quality of service that he has provided and can offer. Ron is

also a document author on Flevy. Browse his frameworks on Change Management, Process Analysis,

and Program Management here: http://flevy.com/seller/highwayofchange .

Flevy (www.flevy.com) is the marketplace for premium documents. These documents can range from Business Frameworks to Financial Models to PowerPoint Templates. Flevy was founded under the principle that companies waste a lot of time and money recreating the same foundational businessdocuments. Our vision is for Flevy to become a comprehensive knowledge base of business documents. All rganizations, from startups to large enterprises, can use Flevy— whether it's to jumpstart projects, to find reference or comparison materials, or just to learn.

Contact Us Please contact us with any questions you may haveabout our company. • General Inquiries [email protected] • Media/PR [email protected] • Billing [email protected]