logo area The High Luminosity LHC Project Lucio Rossi CERN HL-LHC Project Leader

Upload: phungdang

Post on 19-Feb-2019

225 views

Category:

Documents


0 download

TRANSCRIPT

logo

area

The High Luminosity LHC Project

Lucio Rossi – CERN

HL-LHC Project Leader

logo

area L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016 2

LHC: il gigante Ebeam 0.3BR

con 4 grandi occhi

Explorazione della nuova frontiera con collisioni adroniche

CMS

ALICE

LHCb

ATLAS

logo

area L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016 3

Higgs: the needle in thee haystack

Picture repeated 40 millions times each

second

Z μμ

Z μμ event from 2012 data with 25 reconstructed vertices

More luminosity

higher the

collision rate

logo

area

Ultimate performance established 2015-2016: with same hardware and same beam parameters: use of engineering margins:

Lpeak ult 7.5 1034 cm-2s-1 and Ultimate Integrated Lint ult 4000 fb-1 LHC should not be the limit, would Physics require more…

Goal of High Luminosity LHC (HL-LHC) as

fixed in November 2010

L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016 4

The main objective of HiLumi LHC Design Study is to determine a hardware configuration and a set of beam parameters that will allow the LHC to reach the following targets:

A peak luminosity of Lpeak = 5×1034 cm-2s-1 with levelling, allowing: An integrated luminosity of 250 fb-1 per year, enabling the goal of Lint = 3000 fb-1 twelve years after the upgrade. This luminosity is more than ten times the luminosity reach of the first 10 years of the LHC lifetime.

From FP7 HiLumi LHC Design Study application

logo

area L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016 5

Technical limits

to lumi increase

(Machine &

Experiments)

logo

area

Luminosity profile: ULTIMATE

L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016 6

logo

area

Project structure

L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016 7

Controls

WP17 subWPs: 1. CE

2. EL

3. CV

4. Access&Al.

5. Tech Mon

6. Survey-Align

7. Transport

8. (SM18 Upr)

9. Log&Storage

10. Op. Safety

Survey-Align

logo

area L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016 8

logo

area

HiLumi LHC landmarks

L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016 9

logo

area 10

The HL-LHC Domains of Activity and WPs

L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016

logo

area

The largest HEP accelerator in construction

L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016 11

Interaction Region (ITR) Matching Section (MS) Dispersion Suppressor (DS) in P7

ATLAS

CMS

> 1.2 km of LHC !!

Complete change and

new lay-out

1. TAXS

2. Q1-Q2a-Q2b-Q3

3. D1

4. All Correctors

Magnets

5. Heavy shielding (W)

Change/new lay-out

1. TAXN

2. D2

3. CC

4. Q4

5. Correctors

6. Q5

7. [email protected] in P6

8. New collimators

Modifications

1. In IP2: new DS

collim. in C.Cryost.

2. In IP7 new DS

collimation with 11 T

Cryogenics, Protection,

Interface, Vacuum,

Diagnostics, Inj/Extr…

extension of infrastr.

logo

area

The Insertion Region (till Q4)

L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016 12

Q1 Q2a

Q2b Q3 CP D1 DFX DFM

SC Links

Connection to LHC (UL) Service gallery (UR)

TAXS

Crab cavities

UA Gallery

Q4

BBLR

D2

Collimators

TAXN

Service cavern

logo

area

HL-LHC underground structures - Point 1

L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016 15

PM17

US17

UL13

UA13

UR15

UPR13 33

UL17 UA17

UPR17

UW17

P1

(ATLAS)

- Minimum distance of

~ 15 m between HL-LHC and experiment

structures

~ 7 m between HL-LHC galleries and LHC tunnel

(reduction of radiation & deformation impacts)

logo

area 16

Civil Engineering & Technical Infrastructures

L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016

More than 1 km of new underground technical galleries for infrastructures

New surface buildings at P1 and P5

Other sub-systems also involved: Electrical Distribution, Cooling and

Ventilation, Transport, Logistics, Accesses, Alarms, Safety)

WP17

logo

area

How it could look like in point 5 (after HL)

17 L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016

logo

area

On the new HL-LHC infrastructures

18

L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016

logo

area

HL Technical infrastr. & CRYOGENICS - Point 1-5

L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016 19

SU chillers & pumping stations SU Ventilation units

SD He refrigerator SF cooling towers

SHM Helium

compressor

station

Access system

logo

area 20

HiLumi LHC magnet zoo

Triplet QXF (LARP and

CERN)

Separation dipole D1

(KEK)

Recombination dipole D2

(INFN)

Q4 (CEA)

11 T dipole (CERN)

Sextupole (INFN)

Dodecapole

(INFN)

Octupole (INFN)

Decapole

(INFN)

Orbit corrector (CIEMAT)

Overall, about 130 magnets are needed

Skew quadrupole (INFN)

L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016

WP3, WP11

logo

area

Non exhaustive list of components

Coil:

Impregnation resin

Winding poles

End spacers

Wedges

Quench heaters

Magnet:

Collars

Yoke laminations

Cold mass:

End domes

SS half shells

21

Magnets components and assemblies

L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016

WP3, WP11

logo

area

Need large infrastructure (reaction oven 10 m)

L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016 22

logo

area 23

Cryostats and subcomponents

L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016

Vacuum Vessels

Thermal Shields

Cold Supports

Expansion Joints

Piping & ancilliaries

Multi-layer insulation

WP3, WP11,

WP9 WP6b, WP4

logo

area 24

Crab cavities (DQW)

Vertical crossing for

ATLAS experiments

Crab cavities (RFD)

Horizontal crossing for

CMS experiment

Atm Pressure

L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016

High precision assembling and manufacturing

technologies: SRF CRAB CAVITY

WP4, WP5, WP8,

WP12, WP14

logo

area 25

Fundamental

Power Coupler

Tuning

Mechanism

HOM

Coupler

(Niobium) Helium Vessel

(Titanium)

Cavity

Cold

Magnetic

Shield

Tuner frame

(Titanium)

L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016

High precision assembling and

manufacturing technologies

Crab Cavities

WP4, WP5, WP8,

WP12, WP14

logo

area 26 L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016

High precision assembling and

manufacturing technologies

New absorbers & VAX module

WP4, WP5, WP8,

WP12, WP14

logo

area 27

Collimators & new material for high temperatures

L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016

Beam Intercepting Devices with the

main functions of:

Cleaning the beam by removing stray

particles which would induce quenches in

the SC magnets

Protect the downstream machine

elements by shielding them from beam

orbit errors

Cooling pipe

support

Screw M6x30

Bending

pipes

TIG

welding

WP5, WP8,

WP14

logo

area

TCPP /TCSP (LHC and HL-LHC) TCSPM (HL-HLC) TDIS (HL-LHC)

2D Carbon-Carbon

Tungsten Heavy Alloy

(95 W - 3.5 Ni - 1.5 Cu)

Materials of the jaws are the critical component because of the tough requirements

(robustness, geometrical stability, electrical conductivity, radiation resistance ...)

New advanced materials being investigated for HL-LHC

TCTPM (HL-HLC) TCTP (LHC and HL-LHC) TCLD (LHC and HL-LHC)

CuCD

Graphite-Al-CuCrZn MoGr

Tungsten Heavy Alloy

(95 W - 3.5 Ni - 1.5 Cu)

Collimators & new material for high temperatures

L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016

WP5, WP8,

WP14

28

logo

area 29

Ultra High Vacuum components and systems

L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016

The HL-LHC project requires modification / upgrade in all

the vacuum systems (insulation vacuum, room temperature

beam vacuum, cryo temperature beam vacuum and

experimental beam vacuum). About 1.2 km in total

Other systems related to be modified: Bake-out system,

Instrumentation & Control, Robotics, etc.

Major activities will take place during LS3

WP12

logo

area 30

Ultra High Vacuum components and systems

L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016

- New BS designs for HiLumi (New a-C coating, shielded BS)

- New interconnection, plug-in modules

WP12

logo

area 31

Ultra High Vacuum components and systems

L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016

- Layout modifications (vacuum chambers, supports, etc.)

- Controls, Instrumentation, Bake-Out System

WP12

logo

area 32

Beam Instrumentation

L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016

Beam Instrumentation: ‘The eyes and ears

of an accelerator’ or

Instruments that observe beam behaviour

WP13

logo

area 33

Beam Instrumentation

L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016

Some numbers: 2500+ instruments integrated into the beam vacuum system of the

accelerators (the LHC and its injectors)

4500+ instruments close to the beamlines, in the accelerator tunnels

5 New instrument concepts for HL-LHC

100+ new beam vacuum instruments to be produced for HL-LHC

What is an instrument? Mechanics: vacuum chamber, movement systems, beam

intercepting devices

Detectors: Cameras, scintillators, transformers, pickups

Electronics: Fast, radiation hard, analogue and digital

Software: acquisition, low-level controls

For industry, this means Precision and state-of-the-art, small-medium series, high added

value

Collaboration with industry and institutes to develop new technology

WP13

logo

area 34

Beam Instrumentation

L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016

Beam Position Monitors (BPMs) to measure beam

positions as they approach collision, means sub-

micron beam orbit resolution

48 BPMs to be installed in HL-LHC triplet magnets

MirrorsMirrors

Pickup

KnifeEdgePrism

3DFiberStage

Collimator

HWP

Analyzer

PolarizingPlateSpli er

LiNbO3

High Bandwith BPMs for intra-bunch diagnostics

Bandwith > 10 GHz

Cryogenic Beam Loss Monitors (BLMs) will allow

fasts localisation of beam losses in critical areas

32 detectors planned for installation

WP13

logo

area 35

Beam Instrumentation

L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016

Wire Scanners will give beam profile

measurements to optimise machine performance

30 instruments for 2019 with more later

Beam Halo Monitoring (BHM) to handle the high-

intensity HL-Beams

High dynamic range cameras with state-of-the-art

range

Beam Gas Vertex Detector (BGV) for non-

destructive beam size measurement at high energy

Precision mechanics as one of the main

requirements

WP13

logo

area

Other HL-LHC equipment

Power Converters

L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016

Power Converters needed for the powering of the

HL-LHC circuits in IP1 and IP5

R&D activities from 2016 to 2020

Production 2021-2023

Testing for overall quality assurance 2023-

2024 Installation and commissioning in 2025

WP6B

36

logo

area

HL-LHC Challenges and the Industry

37

How?

From where?

Who?

The

Industry

L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016

logo

area 38

HL-LHC Information shared with Industries

Information will be shared through the HL-LHC communication channels (for

procurement matters):

HL-LHC procurement website (public website: http://project-hl-lhc-

industry.web.cern.ch)

ILOs Portal (restricted access)

L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016

logo

area

The Industry and HiLumi

39 L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016

CERN Procurement Website: https://found.cern.ch/java-ext/found/CFTSearch.do

Isabel Bejar Alonso [email protected]

Hector Garcia Gavela [email protected]

logo

area 40 L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016

HiLumi Industry Days and Workshops organized by CERN (Technical

Presentations, CERN2Business Meetings, B2B Meetings…)

The Industry and HiLumi

Hilumi goes to Industry at CERN (Jun 2015)

2nd Hilumi Industry Day at Lisbon (Oct 2016)

3rd Hilumi Industry Day will be held in UK by 2017:

We encourage you all to participate!!!!!

logo

area

Schematic time plan

L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016 41

11 T and

cryo P4

installation

logo

area

logo

area

We’re heading for construction!!

L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016

Thanks all WP leaders, PO office members, to Depts and

Groups working for the material provided

43