the high luminosity lhc project - confindustria.piemonte.it · the high luminosity lhc project...
TRANSCRIPT
logo
area L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016 2
LHC: il gigante Ebeam 0.3BR
con 4 grandi occhi
Explorazione della nuova frontiera con collisioni adroniche
CMS
ALICE
LHCb
ATLAS
logo
area L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016 3
Higgs: the needle in thee haystack
Picture repeated 40 millions times each
second
Z μμ
Z μμ event from 2012 data with 25 reconstructed vertices
More luminosity
higher the
collision rate
logo
area
Ultimate performance established 2015-2016: with same hardware and same beam parameters: use of engineering margins:
Lpeak ult 7.5 1034 cm-2s-1 and Ultimate Integrated Lint ult 4000 fb-1 LHC should not be the limit, would Physics require more…
Goal of High Luminosity LHC (HL-LHC) as
fixed in November 2010
L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016 4
The main objective of HiLumi LHC Design Study is to determine a hardware configuration and a set of beam parameters that will allow the LHC to reach the following targets:
A peak luminosity of Lpeak = 5×1034 cm-2s-1 with levelling, allowing: An integrated luminosity of 250 fb-1 per year, enabling the goal of Lint = 3000 fb-1 twelve years after the upgrade. This luminosity is more than ten times the luminosity reach of the first 10 years of the LHC lifetime.
From FP7 HiLumi LHC Design Study application
logo
area L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016 5
Technical limits
to lumi increase
(Machine &
Experiments)
logo
area
Luminosity profile: ULTIMATE
L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016 6
logo
area
Project structure
L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016 7
Controls
WP17 subWPs: 1. CE
2. EL
3. CV
4. Access&Al.
5. Tech Mon
6. Survey-Align
7. Transport
8. (SM18 Upr)
9. Log&Storage
10. Op. Safety
Survey-Align
logo
area 10
The HL-LHC Domains of Activity and WPs
L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016
logo
area
The largest HEP accelerator in construction
L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016 11
Interaction Region (ITR) Matching Section (MS) Dispersion Suppressor (DS) in P7
ATLAS
CMS
> 1.2 km of LHC !!
Complete change and
new lay-out
1. TAXS
2. Q1-Q2a-Q2b-Q3
3. D1
4. All Correctors
Magnets
5. Heavy shielding (W)
Change/new lay-out
1. TAXN
2. D2
3. CC
4. Q4
5. Correctors
6. Q5
7. [email protected] in P6
8. New collimators
Modifications
1. In IP2: new DS
collim. in C.Cryost.
2. In IP7 new DS
collimation with 11 T
Cryogenics, Protection,
Interface, Vacuum,
Diagnostics, Inj/Extr…
extension of infrastr.
logo
area
The Insertion Region (till Q4)
L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016 12
Q1 Q2a
Q2b Q3 CP D1 DFX DFM
SC Links
Connection to LHC (UL) Service gallery (UR)
TAXS
Crab cavities
UA Gallery
Q4
BBLR
D2
Collimators
TAXN
Service cavern
logo
area
The Inner Triplet region with in-kinds
13 L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016
SC Links
D1 DFX
CP Q3
Q2b Q2a
Q1
Service gallery (UR) Connection to LHC (UL)
TAXS
DFM
logo
area
The MS region with in-kinds
L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016 14
Crab cavities D2
Collimators
TAXN
Service cavern
UA gallery
Q4 (BBLR)
logo
area
HL-LHC underground structures - Point 1
L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016 15
PM17
US17
UL13
UA13
UR15
UPR13 33
UL17 UA17
UPR17
UW17
P1
(ATLAS)
- Minimum distance of
~ 15 m between HL-LHC and experiment
structures
~ 7 m between HL-LHC galleries and LHC tunnel
(reduction of radiation & deformation impacts)
logo
area 16
Civil Engineering & Technical Infrastructures
L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016
More than 1 km of new underground technical galleries for infrastructures
New surface buildings at P1 and P5
Other sub-systems also involved: Electrical Distribution, Cooling and
Ventilation, Transport, Logistics, Accesses, Alarms, Safety)
WP17
logo
area
How it could look like in point 5 (after HL)
17 L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016
logo
area
On the new HL-LHC infrastructures
18
L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016
logo
area
HL Technical infrastr. & CRYOGENICS - Point 1-5
L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016 19
SU chillers & pumping stations SU Ventilation units
SD He refrigerator SF cooling towers
SHM Helium
compressor
station
Access system
logo
area 20
HiLumi LHC magnet zoo
Triplet QXF (LARP and
CERN)
Separation dipole D1
(KEK)
Recombination dipole D2
(INFN)
Q4 (CEA)
11 T dipole (CERN)
Sextupole (INFN)
Dodecapole
(INFN)
Octupole (INFN)
Decapole
(INFN)
Orbit corrector (CIEMAT)
Overall, about 130 magnets are needed
Skew quadrupole (INFN)
L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016
WP3, WP11
logo
area
Non exhaustive list of components
Coil:
Impregnation resin
Winding poles
End spacers
Wedges
Quench heaters
Magnet:
Collars
Yoke laminations
Cold mass:
End domes
SS half shells
21
Magnets components and assemblies
L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016
WP3, WP11
logo
area
Need large infrastructure (reaction oven 10 m)
L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016 22
logo
area 23
Cryostats and subcomponents
L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016
Vacuum Vessels
Thermal Shields
Cold Supports
Expansion Joints
Piping & ancilliaries
Multi-layer insulation
WP3, WP11,
WP9 WP6b, WP4
logo
area 24
Crab cavities (DQW)
Vertical crossing for
ATLAS experiments
Crab cavities (RFD)
Horizontal crossing for
CMS experiment
Atm Pressure
L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016
High precision assembling and manufacturing
technologies: SRF CRAB CAVITY
WP4, WP5, WP8,
WP12, WP14
logo
area 25
Fundamental
Power Coupler
Tuning
Mechanism
HOM
Coupler
(Niobium) Helium Vessel
(Titanium)
Cavity
Cold
Magnetic
Shield
Tuner frame
(Titanium)
L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016
High precision assembling and
manufacturing technologies
Crab Cavities
WP4, WP5, WP8,
WP12, WP14
logo
area 26 L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016
High precision assembling and
manufacturing technologies
New absorbers & VAX module
WP4, WP5, WP8,
WP12, WP14
logo
area 27
Collimators & new material for high temperatures
L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016
Beam Intercepting Devices with the
main functions of:
Cleaning the beam by removing stray
particles which would induce quenches in
the SC magnets
Protect the downstream machine
elements by shielding them from beam
orbit errors
Cooling pipe
support
Screw M6x30
Bending
pipes
TIG
welding
WP5, WP8,
WP14
logo
area
TCPP /TCSP (LHC and HL-LHC) TCSPM (HL-HLC) TDIS (HL-LHC)
2D Carbon-Carbon
Tungsten Heavy Alloy
(95 W - 3.5 Ni - 1.5 Cu)
Materials of the jaws are the critical component because of the tough requirements
(robustness, geometrical stability, electrical conductivity, radiation resistance ...)
New advanced materials being investigated for HL-LHC
TCTPM (HL-HLC) TCTP (LHC and HL-LHC) TCLD (LHC and HL-LHC)
CuCD
Graphite-Al-CuCrZn MoGr
Tungsten Heavy Alloy
(95 W - 3.5 Ni - 1.5 Cu)
Collimators & new material for high temperatures
L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016
WP5, WP8,
WP14
28
logo
area 29
Ultra High Vacuum components and systems
L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016
The HL-LHC project requires modification / upgrade in all
the vacuum systems (insulation vacuum, room temperature
beam vacuum, cryo temperature beam vacuum and
experimental beam vacuum). About 1.2 km in total
Other systems related to be modified: Bake-out system,
Instrumentation & Control, Robotics, etc.
Major activities will take place during LS3
WP12
logo
area 30
Ultra High Vacuum components and systems
L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016
- New BS designs for HiLumi (New a-C coating, shielded BS)
- New interconnection, plug-in modules
WP12
logo
area 31
Ultra High Vacuum components and systems
L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016
- Layout modifications (vacuum chambers, supports, etc.)
- Controls, Instrumentation, Bake-Out System
WP12
logo
area 32
Beam Instrumentation
L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016
Beam Instrumentation: ‘The eyes and ears
of an accelerator’ or
Instruments that observe beam behaviour
WP13
logo
area 33
Beam Instrumentation
L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016
Some numbers: 2500+ instruments integrated into the beam vacuum system of the
accelerators (the LHC and its injectors)
4500+ instruments close to the beamlines, in the accelerator tunnels
5 New instrument concepts for HL-LHC
100+ new beam vacuum instruments to be produced for HL-LHC
What is an instrument? Mechanics: vacuum chamber, movement systems, beam
intercepting devices
Detectors: Cameras, scintillators, transformers, pickups
Electronics: Fast, radiation hard, analogue and digital
Software: acquisition, low-level controls
For industry, this means Precision and state-of-the-art, small-medium series, high added
value
Collaboration with industry and institutes to develop new technology
WP13
logo
area 34
Beam Instrumentation
L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016
Beam Position Monitors (BPMs) to measure beam
positions as they approach collision, means sub-
micron beam orbit resolution
48 BPMs to be installed in HL-LHC triplet magnets
MirrorsMirrors
Pickup
KnifeEdgePrism
3DFiberStage
Collimator
HWP
Analyzer
PolarizingPlateSpli er
LiNbO3
High Bandwith BPMs for intra-bunch diagnostics
Bandwith > 10 GHz
Cryogenic Beam Loss Monitors (BLMs) will allow
fasts localisation of beam losses in critical areas
32 detectors planned for installation
WP13
logo
area 35
Beam Instrumentation
L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016
Wire Scanners will give beam profile
measurements to optimise machine performance
30 instruments for 2019 with more later
Beam Halo Monitoring (BHM) to handle the high-
intensity HL-Beams
High dynamic range cameras with state-of-the-art
range
Beam Gas Vertex Detector (BGV) for non-
destructive beam size measurement at high energy
Precision mechanics as one of the main
requirements
WP13
logo
area
Other HL-LHC equipment
Power Converters
L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016
Power Converters needed for the powering of the
HL-LHC circuits in IP1 and IP5
R&D activities from 2016 to 2020
Production 2021-2023
Testing for overall quality assurance 2023-
2024 Installation and commissioning in 2025
WP6B
36
logo
area
HL-LHC Challenges and the Industry
37
How?
From where?
Who?
The
Industry
L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016
logo
area 38
HL-LHC Information shared with Industries
Information will be shared through the HL-LHC communication channels (for
procurement matters):
HL-LHC procurement website (public website: http://project-hl-lhc-
industry.web.cern.ch)
ILOs Portal (restricted access)
L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016
logo
area
The Industry and HiLumi
39 L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016
CERN Procurement Website: https://found.cern.ch/java-ext/found/CFTSearch.do
Isabel Bejar Alonso [email protected]
Hector Garcia Gavela [email protected]
logo
area 40 L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016
HiLumi Industry Days and Workshops organized by CERN (Technical
Presentations, CERN2Business Meetings, B2B Meetings…)
The Industry and HiLumi
Hilumi goes to Industry at CERN (Jun 2015)
2nd Hilumi Industry Day at Lisbon (Oct 2016)
3rd Hilumi Industry Day will be held in UK by 2017:
We encourage you all to participate!!!!!
logo
area
Schematic time plan
L. Rossi - HiLumi LHC - Torino-Industrie Piemontesi, 29 Nov 2016 41
11 T and
cryo P4
installation