the great east japan earthquake, tsunami and nuclear meltdown an assessment one year on dr. peter...

32
The Great East Japan Earthquake, Tsunami and Nuclear Meltdown An Assessment One Year On Peter Matanle urer in Japanese Studies, onal Institute of Japanese Studies and ol of East Asian Studies, ersity of Sheffield. il: [email protected] The Japan Society of the UK Lect Geographical Association Annual Confere University of Manches 14 April 2 Japan Quake Map

Upload: ryan-larson

Post on 28-Mar-2015

218 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: The Great East Japan Earthquake, Tsunami and Nuclear Meltdown An Assessment One Year On Dr. Peter Matanle Lecturer in Japanese Studies, National Institute

The Great East Japan Earthquake, Tsunami and

Nuclear MeltdownAn Assessment One Year On

Dr. Peter MatanleLecturer in Japanese Studies,National Institute of Japanese Studies andSchool of East Asian Studies,University of Sheffield.E-mail: [email protected]

The Japan Society of the UK LectureGeographical Association Annual Conference

University of Manchester14 April 2012

Japan Quake Map

Page 2: The Great East Japan Earthquake, Tsunami and Nuclear Meltdown An Assessment One Year On Dr. Peter Matanle Lecturer in Japanese Studies, National Institute

The Great East Japan Earthquake, Tsunami and Nuclear MeltdownAn Assessment One Year On

• Introduction

• Japan and Tōhoku Prior to 11 March 2011

• What Happened on 11 March 2011?

• After the Disaster

• Can Japan Recover?

• Conclusion: Transformation or Status Quo?

Page 3: The Great East Japan Earthquake, Tsunami and Nuclear Meltdown An Assessment One Year On Dr. Peter Matanle Lecturer in Japanese Studies, National Institute

Japan and Tōhoku Prior to 11 March 2012

Ageing, Low-fertility and Depopulation2000 -2010 - Iwate, Miyagi and Fukushima Prefectures shrank by 3.5 percent, from 5.908 to 5.708 million people.

Prior to 11 March 2011, the Japanese government had forecast shrinkage of a further 791,000 to 4.917 million (13.9%) by 2030; making a total decline of 16.8%.

A total fall of 20 per cent (1.181 million) (2010-30) now seems plausible.

• Japan’s Net Reproduction Rate fell below 1.0 for the first time around 1955/60.• The Total Fertility Rate fell below 2.1 in 1974.• Japan began to shrink in around 2005/10.

United Nations Population Division (2010) World Population Prospects: The 2010 Revision, UNPD Website.

Page 4: The Great East Japan Earthquake, Tsunami and Nuclear Meltdown An Assessment One Year On Dr. Peter Matanle Lecturer in Japanese Studies, National Institute

Japan and Tōhoku Prior to 11 March 2012

Ageing, Low-fertility and Depopulation

Actual (1960-2010) and Projected (2020+) Population of Japan by Age Group (left hand scale, %), and Total Population (right hand scale, millions). Source: Statistics Bureau, 2011; NIPSSR, 2003.

Page 5: The Great East Japan Earthquake, Tsunami and Nuclear Meltdown An Assessment One Year On Dr. Peter Matanle Lecturer in Japanese Studies, National Institute

Iwate Prefecture

Miyagi Prefecture

Fukushima Prefecture

Population change in Japan by prefecture and prefectural capital, 1990–2010.Source: Statistics Bureau (2011).

Sendai City

Page 6: The Great East Japan Earthquake, Tsunami and Nuclear Meltdown An Assessment One Year On Dr. Peter Matanle Lecturer in Japanese Studies, National Institute

Kamaishi City

Rikuzentakata City

Minamisanriku Town

Projected population of Japan by prefecture and prefectural capital. 2010-30.Source: NIPSSR (2003).

Ishinomaki City

Page 7: The Great East Japan Earthquake, Tsunami and Nuclear Meltdown An Assessment One Year On Dr. Peter Matanle Lecturer in Japanese Studies, National Institute

What happened on 11 March 2011? A Compound Event

EarthquakeTime: 14:46 a M9.0 reverse megathrust earthquake. Location: NW Pacific Ocean (38.297°N, 142.372°E).

Subduction zone between Pacific-N. American Plates.Distance: 129 km (80 miles) E of Sendai. 373 km (231 miles) NE of Tokyo.Aftershocks: 702 of M5.0 or greater.

TsunamiTime: Approx. 15:00-15:45 in Iwate, Miyagi and Fukushima Prefectures.Height: 5-20metres in Iwate, Miyagi and Fukushima.Max. Run-up: 38.9m (127.6ft). Miyako, Iwate Prefecture (Shogakukan Creative et al, 2011: 21) .Area Flooded: 507km2.

Casualties and Damage (11 April 2012 – National Police Agency Website)Dead: 15,856 Missing: 3,070 Injured: 6,027129,404 buildings totally destroyed, 255,737 buildings partially destroyed.26.7 million tons of debris (Asahi Shimbunsha, 2011).

Fukushima Daiichi Nuclear Power PlantCooling systems flooded and failed.Hydrogen explosions at Units 1, 3, and 4.Units 1, 2, and 3 experienced full meltdown.Evacuation within 20km radius, plus other areas (Iitate Town). 20-30km remain indoors.

Page 8: The Great East Japan Earthquake, Tsunami and Nuclear Meltdown An Assessment One Year On Dr. Peter Matanle Lecturer in Japanese Studies, National Institute

What happened on 11 March 2011?Rikuzentakata, Iwate Prefecture and Ishinomaki, Miyagi Prefecture

Rikuzentakata City (1 March 2012)Population (2005/10): 24,709 and 23,302 (-5.7%) (National Census data).Confirmed dead: 1,691 (41 missing) (Post-disaster population est.= 21,570)Estimated pop. 2015: 20,242 (Est. Pop. Change 2005-15 = -18.1%)*Buildings destroyed: 3,368 (3,159 [totally], 97 [mostly], 85 [half-destroyed], 27 [partially])

Ishinomaki City (11 March 2012)Population (2005/10): 167,324 and 160,826 (-3.9%)Confirmed dead: 3,280 (539 missing) (Post-disaster population est.= 157,007)Estimated pop. 2015: 150,735 (Est. Pop. Change 2005-15 = -6.0%)*Okawa Elementary School: 74/108 children died; 10/14 teachers.

*2015 population estimates do not include projections for out-migration.

Page 9: The Great East Japan Earthquake, Tsunami and Nuclear Meltdown An Assessment One Year On Dr. Peter Matanle Lecturer in Japanese Studies, National Institute

Rikuzentakata, August 2011: Apartment blocks facing the ocean.(Photo: Peter Matanle).

Page 10: The Great East Japan Earthquake, Tsunami and Nuclear Meltdown An Assessment One Year On Dr. Peter Matanle Lecturer in Japanese Studies, National Institute

Rikuzentakata, August 2011. Debris clearance is progressing. But the town has been destroyed.(Photo: Peter Matanle). Tsunami footage at Rikuzentakata.

Page 11: The Great East Japan Earthquake, Tsunami and Nuclear Meltdown An Assessment One Year On Dr. Peter Matanle Lecturer in Japanese Studies, National Institute

Rikuzentakata, August 2011. Municipal gymnasium and emergency shelter.(Photo: Peter Matanle).

Page 12: The Great East Japan Earthquake, Tsunami and Nuclear Meltdown An Assessment One Year On Dr. Peter Matanle Lecturer in Japanese Studies, National Institute

Rikuzentakata, August 2011. Junior High School (ages 12-15).(Photo: Peter Matanle).

Page 13: The Great East Japan Earthquake, Tsunami and Nuclear Meltdown An Assessment One Year On Dr. Peter Matanle Lecturer in Japanese Studies, National Institute

Rikuzentakata, August 2011. Temporary housing for tsunami refugees.(Photo: Peter Matanle).

Page 14: The Great East Japan Earthquake, Tsunami and Nuclear Meltdown An Assessment One Year On Dr. Peter Matanle Lecturer in Japanese Studies, National Institute

Ishinomaki, August 2011. Senior High School (Ages 15-18).(Photo: Peter Matanle).

Page 15: The Great East Japan Earthquake, Tsunami and Nuclear Meltdown An Assessment One Year On Dr. Peter Matanle Lecturer in Japanese Studies, National Institute

Ishinomaki, August 2011. Debris mountain.(Photo: Peter Matanle).

Page 16: The Great East Japan Earthquake, Tsunami and Nuclear Meltdown An Assessment One Year On Dr. Peter Matanle Lecturer in Japanese Studies, National Institute

Ishinomaki, August 2011. (Photo: Peter Matanle).がんばろう!石巻 (Tough it out! Ishinomaki). 復興するぞ! (We will rebuild!)

Page 17: The Great East Japan Earthquake, Tsunami and Nuclear Meltdown An Assessment One Year On Dr. Peter Matanle Lecturer in Japanese Studies, National Institute

Minamisanriku town, Miyagi Prefecture before the tsunami (2001).Source: Sankei Shimbunsha (2011: 31); see also SankeiPhoto (2011).Reproduced by kind permission of Sankei Books.

Page 18: The Great East Japan Earthquake, Tsunami and Nuclear Meltdown An Assessment One Year On Dr. Peter Matanle Lecturer in Japanese Studies, National Institute

Minamisanriku town, Miyagi Prefecture after the tsunami (27 March 2011).Source: Sankei Shimbunsha (2011: 31); see also SankeiPhoto (2011).Reproduced by kind permission of Sankei Books.

Page 19: The Great East Japan Earthquake, Tsunami and Nuclear Meltdown An Assessment One Year On Dr. Peter Matanle Lecturer in Japanese Studies, National Institute

The Unosumai district of Kamaishi City, Iwate Prefecture before the tsunami (2007).Source: Sankei Shimbunsha (2011, p. 31); see also SankeiPhoto (2011).Reproduced by kind permission of Sankei Books.

Page 20: The Great East Japan Earthquake, Tsunami and Nuclear Meltdown An Assessment One Year On Dr. Peter Matanle Lecturer in Japanese Studies, National Institute

The Unosumai district of Kamaishi City, Iwate Prefecture after the tsunami (29 March 2011). Source: Sankei Shimbunsha (2011, p. 31); see also SankeiPhoto (2011).Reproduced by kind permission of Sankei Books.

Page 21: The Great East Japan Earthquake, Tsunami and Nuclear Meltdown An Assessment One Year On Dr. Peter Matanle Lecturer in Japanese Studies, National Institute

What happened on 11 March 2011?Exposing Problems of Governance

The disaster exposes difficult issues in 21st century Japanese society

• A society of gaps (kakusa shakai):

65.2% of dead were aged 60+; 92.5% of deaths by drowning (Japan Times, 2011).

• Post-traumatic psychological and emotional impacts.

Relocation damage tsunami and radiation affected areas: Anxiety, depression, hypertension.

• Government/bureaucracy/industry relations:

‘The Iron Triangle’ and the role of electricity providers: Regulatory capture; exploitation of vulnerable rural locales.

• Problems of nuclear management:

Erosion of public trust in government and expert systems; design, siting, construction, and management all flawed; belief in fail-safe systems.

Can Japan overcome these problems?

Page 22: The Great East Japan Earthquake, Tsunami and Nuclear Meltdown An Assessment One Year On Dr. Peter Matanle Lecturer in Japanese Studies, National Institute

Tomari (Hokkaido EPCO)Tomari Village, Hokkaido, Pop: 1,882 (2,185)3 X PWR: 2 X 579MW; 1 X 912MW MOX.1XPWR operating.

Higashidōri (Tōhoku EPCO/Tokyo EPCO)Higashidōri Village, Aomori Pref. Pop.: 7,253 (8,042)1 X BWR: 110MW (Tōhoku EPCO)Emergency shutdown, 11 March 2011. Not restarted.(1 X ABWR Planned - 2021; 138.5MW)(Tōhoku EPCO),(2 X ABWR Planned – 2017/19, 2 X 1,385MW)(Tokyo EPCO)

Onagawa (Tōhoku EPCO)Onagawa Town, Miyagi Pref.Pop.: 10,051 (10,723)3 X BWR (1 X 524 MW; 2 X 825MW) None operating, Emergency shutdown, 11 March 2011.

Ōma (J-Power)Ōma Town, Aomori Pref. Pop.: 6,340 (6,212)(1 X ABWR Planned - 2014; 1,383MW MOX)

Namie-Odaka (Tōhoku EPCO)Minamisoma City / Namie Town, Fukushima Pref. Pops. 70,895/20,908 (72,837/21,615)(1 X ABWR Planned – 2021; 825MW)

Fukushima Daiichi (Tokyo EPCO)Okuma and Futaba TownsPops. 11,511/6,932 (10,992/7,170)6 X BWR (1 X 460MW; 4 X 784MW 1 X MOX; 1 X 1100MW)None operating. All disabled, 11 March 2011.All to be decommissioned.(2 X ABWR Planned – 2016/17; 1380MW.Cancelled: April 2011)

Fukushima Daini (Tokyo EPCO)Naraha and Tomioka Towns, Fukushima Pref.Pops. 7,701/15,996 (8,188/15,910)4 X BWR (4 X 1100MW)None operating. Emergency shutdown, 11 March 2011.

Tōkai and Tōkai Daini (Japan Atomic Power Co.)Tōkai Village, Ibaraki Pref. Pop.: 37,430 (35,450)Tōkai: Magnox (159MW), Decommissioned.Tōkai Daini: BWR (1060MW).Not operating, emergency shutdown, 11 March 2011.

Hamaoka (Chubu EPCO)Omaezaki City, Shizuoka Pref. Pop.: 34,700 (35,272)4 X BWR(1 X 540MW; 1 X 840MW; 1 X 1100MW; 1 X 1137MW) 1 X ABWR (1267MW)All shut down. Prime Minister’s request, May 2011.(1 X ABWR Planned – 2020; 1400MW).

Kashiwazaki-Kariwa (Tokyo EPCO)Kashiwazaki City and Kariwa Village, Niigata Pref. Pops. 91,463/4,802 (94,648/4,806)5 X BWR (5 X 1100MW) 2 X ABWR (1356MW)1XABWR Operating.

Shika (Hokuriku EPCO)Shika Town, Ishikawa Pref. Pop.: 22,228 (23,790)1 X BWR (540MW) 1 X ABWR (1206MW)None operating.

Fugen (Japan Atomic Energy Agency)Tsuruga City, Fukui Pref. 67,765 (68,402)1 X Advanced Thermal Reactor (165MW)Shut down and awaiting decommissioning.

Monju (Japan Atomic Energy Agency)Tsuruga City, Fukui Pref. 67,765 (68,402)1 X Fast Breeder Reactor (280MW)Restarted in 2010 after accident shutdown in 1995.

Tsuruga (Japan Atomic Power Company)Tsuruga City, Fukui Pref. 67,765 (68,402)1 X BWR (357MW); 1 X PWR (1160MW)None operating.(2 X ABWR; Under construction – 2016/17; 2 X 1538MW)

Mihama (Kansai EPCO)Mihama Town, Fukui Pref. Pop.: 8,077 (8,462)3 X PWR (340MW, 500MW, 826MW)None operating.

Ōi (Kansai EPCO)Ōi Town, Fukui Pref. Pop.: 8,582 (9,217)4 X PWR (2 X 1175MW; 2 X 1180MW)None operating.

Takahama (Kansai EPCO)Takahama Town, Fukui Pref. 11,064 (11,630)4 X PWR (2 X 826MW; 2 X 870MW)None operating.

Ikata (Shikoku EPCO)Ikata Town, Ehime Pref.Pop.: 10,880 (12,095)3 X PWR (2 X 566MW; 1 X 890MW)None operating.

Kaminoseki (Chugoku EPCO)Kaminoseki Town, Yamaguchi Pref.Pop.: 3,332 (3,706)(2 X ABWR Planned – 2 X 1373MW)

Shimane (Chugoku EPCO)Matsue City, Shimane Pref. Pop.: 193,331 (196,603)2 X PWR (1 X 460MW; 1 X 820MW)(1 X PWR Planned – 2011; 1373MW)None operating.

Sendai (Kyūshū EPCO)Satsumasendai Town, Kagoshima Pref.Pop.: 99,558 (102,370)2 X PWR (2 X 890MW)None operating.(Planned 1 X APWR - 2019, 1590MW)

Philippine Plate

Pacific Plate

Eurasian Plate

North AmericanPlate

M9.0, 11/03/2011 M7.5, 11/03/2011

M7.4, 11/03/2011

M7.1, 07/04/2011

M7.011/04/2011

M7.711/03/2011

M7.2, 09/03/2011

M7.2,13/01/1995

M7.9, 01/09/1923

M8+, Expected

M6.616/07/2007

M6.923/10/2004

Jōyō (Japan Atomic Energy Agency)Ōarai Town, Ibaraki Pref. Pop.: 18,331 (19,205)Experimental FBR X 1 (140MW)Current Status unknown. Not commercially operating.

Genkai (Kyūshū EPCO)Genkai Town, Saga Pref.Pop.: 6,379 (6,738)4 X PWR(2 X 559; 2 X 1180MW)None operating.

Japan’s Nuclear Power Stations in March 2012 (JAIF Website)

Page 23: The Great East Japan Earthquake, Tsunami and Nuclear Meltdown An Assessment One Year On Dr. Peter Matanle Lecturer in Japanese Studies, National Institute

After the Disaster: The Months following 11 March 2011

The Government’s Immediate Response11 April 2011 PM Naoto Kan established three principles for recovery.

(1) to create a regional society that is highly resistant to natural disasters [SAFE],(2) to establish a social system that allows people to live in harmony with the globalEnvironment [SUSTAINABLE], and(3) to build a compassionate society that cares about people, in particular, theVulnerable [COMPASSIONATE].

• Government efforts to restore systems mired in political in-fighting over management of the Fukushima crisis, then intentions and status of PM Kan, and now over how to pay for recovery.• Reconstruction Agency took 11 months to establish (Kobe took 4 months, and that was criticised as a slow response).

Page 24: The Great East Japan Earthquake, Tsunami and Nuclear Meltdown An Assessment One Year On Dr. Peter Matanle Lecturer in Japanese Studies, National Institute

After the Disaster: One Year On

Government Reconstruction Response

24 June Basic Act on Reconstruction in response to the Great East Japan Earthquake25 June 2011 Reconstruction Design Council produced its report:Towards Reconstruction: Hope beyond the Disaster10 February 2012 Reconstruction Agency inaugurated.

Basic Principles of Report Recommendations1.Focus on Local Communities and human linkages (絆 - kizuna).2.Accept that disasters occur, and base survival on ‘self-aid’.3.Develop conditions for mutual aid and public aid.

Basic Principles of Reconstruction1.Reconstruct under concept of ‘Disaster Reduction’. There are some disasters so huge as to be impossible to defend against. Self-help essential, but mutual and public help important too.2.Reconstruction plans must incorporate a future vision for the region which takes account of structural changes in society and economy (principally ageing and depopulation).

Page 25: The Great East Japan Earthquake, Tsunami and Nuclear Meltdown An Assessment One Year On Dr. Peter Matanle Lecturer in Japanese Studies, National Institute

After the Disaster: One Year On

Main points from: Towards Reconstruction: Hope beyond the Disaster

1.Relocate onto higher ground – Compact Cities. [SAFE/SUSTAINABLE]2.Integrated land use regulations for building on low-lying land. [SAFE]3.Huge-scale coastal levees to protect coastal plains where community relocation to higher ground impossible. [SAFE]4.Municipality led consultation with citizen groups. [SUSTAINABLE]5.New government led disaster response structure. [SAFE]6.Restore community life and livelihood. [SUSTAINABLE/COMPASSIONATE]7.Provide comprehensive community care facilities. [COMPASSIONATE]8.Ensure education and restore culture. [SUSTAINABLE/COMPASSIONATE]9.From emergency employment to employment restoration. [SUSTAINABLE]10.Recovery of agriculture, forestry and fisheries. [SUSTAINABLE]11.Strengthening of infrastructure. [SAFE]12.Improved energy efficiency and promotion of renewable energy. [SUSTAINABLE]13.Utilisation of ICT involving local citizens. [SAFE/SUSTAINABLE/COMPASSIONATE]14.Creation of special zones and use of municipal independence. [SUSTAINABLE]15.Open Reconstruction; promotion of a New Public Commons. [COMPASSIONATE]

Page 26: The Great East Japan Earthquake, Tsunami and Nuclear Meltdown An Assessment One Year On Dr. Peter Matanle Lecturer in Japanese Studies, National Institute

After the Disaster: One Year On

Obstacles to Recovery

1.Securing financial stability and providing funds.2.Removal and disposal of irradiated debris …3.To make way for rebuilding.4.Ensuring adequate professional planning capacities at the municipal level.5.Topographical difficulties in constructing new communities on higher ground.6.Economic/environmental conflicts.7.Securing labour and resources needed for reconstruction while …8.Maintaining a high quality of life elsewhere in Japan.9.Maintaining a stable electricity supply while …10.Reforming the energy system.11.Planning for regeneration while … 12.Acknowledging shrinkage.13.Recovering public trust in agricultural and marine products.14.Resettlement/use of the areas around Fukushima Daiichi.15.Recovery/return of lost social, cultural, and human capital.

Page 27: The Great East Japan Earthquake, Tsunami and Nuclear Meltdown An Assessment One Year On Dr. Peter Matanle Lecturer in Japanese Studies, National Institute

The Future: Can Japan Recover?

Japan will not collapse tomorrow.• Tohoku accounts for under 10% of the national economy.• Was the disaster is too small to enable national transformation?

Can Tōhoku recover?• A realistic appraisal suggests continued, perhaps accelerated, shrinkage and decline.• A delicate balance should be struck.• Must not return to the past, but …• Need to root recovery in what the region possesses already.

What are the consequence of the nuclear disaster?• Nuclear power is likely to remain, but will probably be reduced.• Renewable generation will expand, with locally owned and managed wind, geothermal, tidal etc. Potential for local economic revival (See Fintry, Scotland.)• Fukushima Daiichi to be decommissioned and the area turned into a marine park or mega-solar array.

Page 28: The Great East Japan Earthquake, Tsunami and Nuclear Meltdown An Assessment One Year On Dr. Peter Matanle Lecturer in Japanese Studies, National Institute

Conclusion: Transformation or Status Quo?

Tohoku will remain a shrinking region• Ageing, low-fertility, out-migration and depopulation will continue.• Danger of false expectations: Reconstruction will take longer than anticipated.• This will discourage return and resettlement.• Reconstruction and recovery complicated by the status of decommissioning works

at Fukushima (which may take decades to complete).

Japan overall may not be transformed• Economic and political systems may be too rigid; too many particularist interests.• Early signs show a desire for ‘normalisation’ at all levels of politics and society.• A few strong challenges show some signs of emerging (e.g. Governor Hashimoto of Osaka, but these remain local (for now).

Japan’s energy system will undergo gradual reform, but it may take a long time.• Competition from small/local providers.• Feed-in tariffs.• More renewables and less nuclear (geothermal and wind; biomass etc.).• Cost and difficulty of decommissioning.

Page 29: The Great East Japan Earthquake, Tsunami and Nuclear Meltdown An Assessment One Year On Dr. Peter Matanle Lecturer in Japanese Studies, National Institute

Asahi Shimbunsha (eds.) (2011). Higashi Nihon daishinsai: Hōdō shashin zenkiroku 2011.3.11–4.11 [The Great East Japan Earthquake: a complete record of the photographic coverage 11 March to 11 April 2011]. Tokyo: Asahi Shimbun Shuppan.

Japan Times (2011) 90% of disaster casualties drowned. Japan Times Online [online], 21 April. Available from: http://search.japantimes.co.jp/cgi-bin/nn20110421a5.html [Accessed 1 June 2011].

NIPSSR (National Institute of Population and Social Security Research) (2003) To-dō-fu-ken no shōrai suikei jinkō (Heisei 14-nen 3-gatsu suikei) ni tsuite [online]. NIPSSR. Available from: http://www.ipss.go.jp/pp-fuken/j/fuken2002/Gaiyo02.asp [Accessed 3 January 2010].

Sankei Shimbunsha (eds.) (2011) Tatakau Nippon: Higashi Nihon daishinsai 1-kagetsu no zenkiroku [Japan battles: A complete record of The Great East Japan Earthquake one month on]. Tokyo: Sankei Shimbunsha.

SankeiPhoto (2011) SankeiPhoto home page. Available from http://photo.sankei.jp.msn.com/kodawari/data/Earthquake/201103/31/kuusatsu1 [Accessed 9 June 2011].

Shogakukan Creative et al. (eds.) (2011) Chizu de yomu higashi nihon daishinsai [Reading the Great East Japan Earthquake Disaster via Maps]. Seibido: Tokyo.

Statistics Bureau (2011) Population census [online]. Ministry of Internal Affairs and Communications. Available from: http://www.stat.go.jp/english/data/kokusei/index.htm [Accessed 1 June 2011].

Appendix 1. References

Page 30: The Great East Japan Earthquake, Tsunami and Nuclear Meltdown An Assessment One Year On Dr. Peter Matanle Lecturer in Japanese Studies, National Institute

Appendix 2. My experience of the event

My Circumstances in March 2011Living in Kyoto (521km distance from Fukushima).1 year research leave to study regional employment and revitalisation in Japan.

On the day in KyotoA lovely sunny early spring day.Visiting the International Manga Museum in Kyoto.Back to my office by 2.45. Booted computer and opened Facebook to find news of the event.Cycled home immediately to watch TV.Watched the disaster unfold live for many hours.

Succeeding Weeks and MonthsFirst Week: Every morning woke up to find the situation even worse than the night before.First Month: Stayed at home glued to TV and reading press reports.Welcomed various people (friends, students, colleagues) travelling away from the disaster.Kept in touch with University of Sheffield and assisted in managing response.First 6 Months: Wrote a journal article. Gathered research materials.August 2011 travelled to Sendai, Rikuzentakata ,and Ishinomaki to take photos.Left Japan in late August 2011 to return to Sheffield.

Page 31: The Great East Japan Earthquake, Tsunami and Nuclear Meltdown An Assessment One Year On Dr. Peter Matanle Lecturer in Japanese Studies, National Institute

GeophysicsJapan Meteorological Agency (JMA)

Tōhoku Earthquake PortalUnited States Geological Survey (USGS)

Japan Earthquake InformationTōhoku Earthquake Report

University of Tokyo, Earthquake Research InstitutePacific Tsunami Warning Centre (NOAA)

Great East Japan Earthquake , Tsunami and Nuclear MeltdownJapan Quake MapCabinet Office Earthquake SiteReconstruction AgencyAsia-Pacific Journal: Japan Focus 3.11 ResourcesGuardian – Japan DisasterBBC News – Japan EarthquakeTōhoku Planning Forum Square

Japan Atomic Industrial ForumNuclear Industrial Safety AgencyInternational Energy Agency (IEA)International Atomic Energy Agency (IAEA)

Fukushima Nuclear Accident Update LogTokyo Electric Power Company (TEPCO)

General Information on JapanStatistics Bureau of Japan

Statistical Handbook of JapanJapan Statistical Yearbook

National Institute of Population and Social Security ResearchJapan GuideJapan Times

Japan in the UKThe Japan SocietyGB-Sasakawa FoundationDaiwa Anglo-Japanese FoundationThe Japan Foundation UKJapan Local Government Centre, LondonEmbassy of Japan in the UKJapan-UK Events CalendarBritish Association for Japanese StudiesHyper Japan

Teacher and Student InterestDiscover Japanese StudiesJapan Exchange and Teaching ProgrammeHow to Make Sushi at Homeelectronic journal of contemporary japanese studies

Appendix 3. Internet Resources

Page 32: The Great East Japan Earthquake, Tsunami and Nuclear Meltdown An Assessment One Year On Dr. Peter Matanle Lecturer in Japanese Studies, National Institute

Recent publicationsMatanle, P. and Sato, Y. (2010) Coming to a City Near You! Learning to Live ‘Beyond Growth’ in Japan’s Shrinking Regions, Social Science Japan Journal, 13 (2): 187-210.

Matanle, P., Rausch, A., with the Shrinking Regions Research Group (2011) Japan’s Shrinking Regions in the 21st Century: Contemporary Responses to Depopulation and Socioeconomic Decline, Amherst, NY: Cambria Press.

Matanle, P. (2011) The Great East Japan Earthquake, Tsunami and Nuclear Meltdown: Towards the (Re)Construction of a Safe, Sustainable, and Compassionate Society in Japan’s Shrinking Regions, Local Environment, 16 (9): 823-847

Matanle, P. and Iles, T. (Eds) (2012) Researching Twenty-First Century Japan: New Directions and Approaches for the Electronic Age, Lanham, MD: Lexington Books.

Thank you for your attention!

Dr. Peter MatanleUniversity of [email protected]