the gÉo flam firebreak - europages datasheets géo staff 04/06 the gÉo flam firebreak with the...
TRANSCRIPT
TECHNICAL DATASHEETS
géo staff04/06
THE GÉO FLAM FIREBREAKWITH THE CTICM REPORTS
ONE SINGLE MATERIAL FORINTERNAL AND EXTERNAL FIRES
DUCTS FOR SMOKE CLEARING VENTILATION
PROTECTION FOR ELECTRICITY GAS METAL POSTS
WITH 1 HOUR - 1½ HOUR - 2 HOUR FIREBREAK
TECHNICAL DATASHEETGÉO FLAM PRODUCTS
géo staff
GEO STAFF Sales Department7, rue Charles François Daubigny - 95870 BEZONS
Tel: +33 (0)1.34.34.39.39. Fax: +33 (0)1.34.34.39.30.
- “Géo Flam” panels with firebreak rebates, 45 mm thick- “Géo Flam” panels with firebreak rebates, 35 mm thick- “Géo Flam” panels with firebreak rebates, 30 mm thick- “Géo Flam” channels with firebreak rebate, 45 mm thick- “Géo Flam” protective U-section- “Géo Flam” protective ½ shell- “Géo Flam” protective shell for post- Electrogalvanized threaded bolts, diameter 8 mm- Brass pins, diameter 8 mm- ZINC COATED NUTS, DIAMETER 8 MM- Galvanized U-section 25x25x25x2- Glue type PF3 from Lafarge- Prestia Normal No. 1 plaster from Lafarge- Oakum
CSTB TEST REPORT NO. ES-552-05-1126Coefficient of thermal conductivity Wet state 0.60 W / mk
Dry state 0.37 W / mk
Resistance to steam diffusion 3.79 kg / m.s.Pa
Maximum absorption of water 0.37 g / cm3
Hydrous dilation when 100% saturated with water
0.56 mm / m
Thermal dilation from 20° to 600° 14.2 um / m
Modulus of elasticity 4200 Mpa
Flexural strength 2.4 Mpa
Tensile strength 0.5 Mpa
Compressive strength 5.8 Mpa
Dimensional tolerance Length 0 mmWidth 3 mm Thickness 1.8 mm
Density 0.9 103 kg / m3
Degree of acidity 8.91 pH
1 HOUR - 1½ HOUR - 2 HOUR FIREBREAKWITH THE CTICM REPORTS
CONTAINING PLASTER, GLASS FIBRE AND VERMICULITE(MO FIREPROOF)
DESCRIPTION OF GÉO FLAM PRODUCTS
GEO STAFF Sales Department7, rue Charles François Daubigny - 95870 BEZONS
Tel: +33 (0)1.34.34.39.39. Fax: +33 (0)1.34.34.39.30.
géo staff
MADE FROM MO-CLASS MATERIALS
PROTECTIVE U-SECTIONFor protecting iron seating 25x25x25x2
100
60
45
Géo Flam panel
Iron U-section
Plaster U-section
REBATED PANEL45 mm thick
1 metre long
From 0.10 to 1 metre wide
(by 5 cm size increases)
Weight 50 kg/m² after stoving
Width
Length
45
PROTECTIVE ½ SHELLFor protecting the threaded bolts, Ø8
90
4545
Géo Flam panel
Shell
Bolt, Ø8
HEELFor supporting the vertical duct
45
Floor
Heel
Géo Flam panel
20
0
45
BAYONETFor crossing horizontal and vertical walls
45 45 5050
45
300
Ø Internal 50 100 150 200
Ø External 140 190 240 290
Ø Bore 150 200 250 300
SHELLS FOR PROTECTING POSTS
Containing plaster, glass fibre, vermiculite and water
GEO STAFF Sales Department7, rue Charles François Daubigny - 95870 BEZONS
Tel: +33 (0)1.34.34.39.39. Fax: +33 (0)1.34.34.39.30.
HORIZONTAL DUCTSMOKE CLEARING AND VENTILATION
Ø 90 Ø 90
1000
FerIron U-section
Géo Flam panels05
5
Ø 90 Ø 90
454545 70045
06
00
44
55
4
Plaster U-section
Géo Flam panels
Pin
Shell
700
Ø 900
45 45 4545
00
01
Bolt, Ø8Géo Flam panels
Shell
Top floor Top floor
X
06
00
44
54
5X
Method:
1) Mark out.
2) First box:- Drill two Ø10 holes every metre,- Fit two Ø8 pins,- Fit two Ø8 threaded bolts,- Fit pre-drilled galvanized iron U-section seating, 25x25x25x2 and nuts,- Fit lower panel,- Glue the rebates,- Fit two panels for vertical cheeks,- Glue the rebates,- Fit upper panel,- Fit pre-glued plaster U-section to protect iron U-section,- Fit the two pre-glued ½ shells to protect the two threaded bolts,- Apply gypsum in the panel joints.
3) Second box: identical to the first
EXAMPLE OF SPACE REQUIREMENTS
géo staff
géo staff
GEO STAFF Sales Department7, rue Charles François Daubigny - 95870 BEZONS
Tel: +33 (0)1.34.34.39.39. Fax: +33 (0)1.34.34.39.30.
VERTICAL DUCTSMOKE CLEARING AND VENTILATION
EXAMPLE OF SPACE REQUIREMENTS
First box
HeelCaulk
Floor
Floor
second box
Third box
Fourth box
100
010
00
100
0
20
0
45 45 700 45 45
Baseplate forthe first box
Heel
Géo Flampanel
45 45 700
Ø 900
45 45
4545
400
4545
Ø 90
0
Method:
1) Fit a baseplate to support the first box.
2) First box:- Fit four vertical panels gluing the vertical rebates beforehand,- Apply gypsum in the vertical joints,- Glue the horizontal upper rebates of these four panels.
3) Heel (every 6 metres maximum):- Fit heels around the duct resting on the lower floor and glue beforehand,- Apply gypsum in upper joint of the heels with the panels.
4) Second box and the following: fit identically to the first.
GÉO FLAM PROTECTIONFOR ELECTRICITY CABLES
GEO STAFF Sales Department7, rue Charles François Daubigny - 95870 BEZONS
Tel: +33 (0)1.34.34.39.39. Fax: +33 (0)1.34.34.39.30.
géo staff
A
B
SECTION A SECTION B
XX
45
45
60
90
45 4545 45
Iron U-section 25x25 withGéo Flam protective U-section
Géo Flam protective shell
Géo Flam precast channel
Géo Flam panel
RIZLAN collars or others
Threaded bolt Ø8
Pin Ø8
100
X
Géo Flam panel
Protective U-section
CROSS-SECTION
Géo Flamprotectiveshell
GÉO FLAM FOR PROTECTING CABLES AND OTHER WALL THROUGH-HOLE MOUNT COMPONENTS
GEO STAFF Sales Department7, rue Charles François Daubigny - 95870 BEZONS
Tel: +33 (0)1.34.34.39.39. Fax: +33 (0)1.34.34.39.30.
géo staff
Shell
051
Section C infloor
150
Cableway
Géo Flam heel
Shell
051
Section B inheel
Cableway
Géo Flam panel
CablewayFormation of a reservationand make-up afterwards
Shell
051
150
Section A onpanel
A
Géo Flam panel
Géo Flam heel support
150
15045 45
A
B
C
Floor
20
0
90
Free-running cableway
Floor
Firebreakthrough-holemountcomponent
Géo Flam panel
Pins for fixing cableways
Pins for fixing cableways
Géo Flam panel
Géo Flam panel
Concreteshell
USING TRADITIONAL PANELS WITH SQUARE HOLES AND MAKE-UP
GEO STAFF Sales Department7, rue Charles François Daubigny - 95870 BEZONS
Tel: +33 (0)1.34.34.39.39. Fax: +33 (0)1.34.34.39.30.
GÉO FLAM FOR PROTECTING CABLES AND OTHER WALL THROUGH-HOLE MOUNT COMPONENTS
Cableway between bayonets
Bored openingsBayonet
Interrupted cableway
Cableway between bayonets
Cableway fixing throughthe firebreak
Cableway fixing throughthe firebreak
150
Shell
051
Section A onGéo Flam panel Cableway
Shell
Section B onheel of bayonet
Ø 150
Bayonet with base heel
Through-hole mountcomponent protection
Shell
Section C onbayonet
Bored openings
Continuity of protection using bayonets
Coverage of protection by panels
45 45150
A
A
C
B
Floor 54
Cableway between bayonets
Cableway between bayonets
Géo Flam panel
Géo Flam bayonet
Géo Flam panel
Géo Flam panel
Concreteshell
USING BAYONETS WITH ROUND BORE WITHOUT MAKE-UP
géo staff
géo staff
GEO STAFF Sales Department7, rue Charles François Daubigny - 95870 BEZONS
Tel: +33 (0)1.34.34.39.39. Fax: +33 (0)1.34.34.39.30.
Bore
Panels or channels
Bayonet
Géo Flam panel
SECTION A
Floor
Bayonet
45
Caulks
Bore
Panel or channel
A
Géo Flampanel orchannel
30
0
45
GÉO FLAM DESIGN DRAWING
FLOOR CROSSING WITH BORE AND BAYONET
Ø Internal 50 100 150 200
Ø External 140 190 240 290
Ø Bore 150 200 250 300
BAYONETS
GEO STAFF Sales Department7, rue Charles François Daubigny - 95870 BEZONS
Tel: +33 (0)1.34.34.39.39. Fax: +33 (0)1.34.34.39.30.
géo staff
GÉO FLAM ROUND, SQUARE AND OTHER PROTECTION TO MAKE POSTS RESISTANT TO FIRE
FITTING METHOD
OPTIONS
Shell rebate coatedwith PF3 glue
Plaster strip, PF3 glue
Plaster strip, PF3 glue
Shell rebate coatedwith PF3 glue
HOW TO ASSEMBLE A DUCT OR GÉO FLAMHORIZONTAL PROTECTION
Concrete floor
Fit thethreaded bolts
Fit a 25x25 ironseating U-sectionevery metre
Fit the lowerpanel and glue
Fit the sidepanels andglue
Fit the upperpanel and glue
Marking - Boring - Pins
Pins
Fit theprotectiveU-section
Fit theprotective
½ shells
Applygypsum
Headro
om
under
fram
e
H
eadro
om
under
duct
GEO STAFF Sales Department7, rue Charles François Daubigny - 95870 BEZONS
Tel: +33 (0)1.34.34.39.39. Fax: +33 (0)1.34.34.39.30.
géo staff
GEO STAFF Sales Department7, rue Charles François Daubigny - 95870 BEZONS
Tel: +33 (0)1.34.34.39.39. Fax: +33 (0)1.34.34.39.30.
DUCTS SECTIONS CTICMreport No. VALIDITY FIREBREAK FLAME-
GUARD
Horizontal smoke clearing 450 x 300 to 750 x 500 88-G-150 April 2011 2H 3H 0 x 0 to 2275 x 1500 01-G-403 April 2011 2H 4H 0 x 0 to 3000 x 2250 02-A-110 April 2011 2H 3H
Vertical smoke clearing 600 x 450 to 1000 x 750 00-E-166 April 2011 2H 3H 0 x 0 to 2250 x 1500 01-E-445 April 2011 2H 3H 0 x 0 to 2250 x 2250 02-A-111 April 2011 2H 2H
Horizontal ventilation
450 x 300 to 750 x 500 88-G-138/03 April 2011 2H 2H 950 x 600 to 1500 x 1000 88-G-137/02 April 2011 2H 2H 1500 x 750 to 2500 x 1250 03-G-160 April 2011 2H 3H 350 x 200 to 1999 x 999
04-A-071 April 20112H 2H
2000 x 1000 to 2500 x 1500 3H 3H
Vertical ventilation1350 x 900 to 2250 x 1500 03-G-159 April 2011 3H 3H 350 x 200 to 2250 x2250 04-A-070 April 2011 2H 3H
Géo Flam ducts, 45, 35, 30 mm thick for 2h, 1½ h, 1h firebreaks
SEALING AND CAULKING SECTIONS CTICM
report No. VALIDITY FIREBREAK FLAME-GUARD
Shutter, “Aldes” gate type, 1 panel 250 x 250 to 800 x 650 03-V-284 April 2011 2H 2H
Shutter, “Aldes” gate type, 2 panels 300 x 300 to 750 x 700 03-V-288 April 2011 2H 2H
Valve, “Cinairgie” tunnel type 350 x 200 04-A-051 April 2011 2H 2H
Shutter “PANOL” gate type, 1 panel 511 x 438 to 900 x 970 05-V-285 April 2011 2H 2H
Shutter, “PANOL” tunnel type 300 x 300 to 800 x 700 05-V-291 April 2011 2H 2H
Shutter, “PANOL” gate type, 2 panels 356 x 448 to 781 x 970 06-A-076 April 2011 2H 2H
Light firebreak walls, 45 mm thick
PROTECTION CTICM REF. REMARKS
Electricity power cables Report No.93-G-162 Duration of electrical function = 2H
Electricity control cables Report No.93-G-138 Duration of electrical function = 2H
Metal pipes Ø100 x 2.5 thick Report No.93-G-163 Tube at temperature of 163° = 2H
Protection and fire resistance with 45 mm thickness
STEEL POST CTICMREPORT No. VALIDITY FIRE RESISTANCE
Rectangular or circular shells 03-U-052 April 2011 1/2 H à 3 H
Decorative protection for fire resistance