TECHNICAL DATASHEETS géo staff 04/06 THE GÉO FLAM FIREBREAK WITH THE CTICM REPORTS ONE SINGLE MATERIAL FOR INTERNAL AND EXTERNAL FIRES DUCTS FOR SMOKE CLEARING VENTILATION PROTECTION FOR ELECTRICITY GAS METAL POSTS WITH 1 HOUR - 1½ HOUR - 2 HOUR FIREBREAK

Upload: ngotuong

Post on 03-Sep-2018

224 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: THE GÉO FLAM FIREBREAK - Europages datasheets géo staff 04/06 the gÉo flam firebreak with the cticm reports one single material for internal and external fires ducts for smoke clearing

TECHNICAL DATASHEETS

géo staff04/06

THE GÉO FLAM FIREBREAKWITH THE CTICM REPORTS

ONE SINGLE MATERIAL FORINTERNAL AND EXTERNAL FIRES

DUCTS FOR SMOKE CLEARING VENTILATION

PROTECTION FOR ELECTRICITY GAS METAL POSTS

WITH 1 HOUR - 1½ HOUR - 2 HOUR FIREBREAK

Page 2: THE GÉO FLAM FIREBREAK - Europages datasheets géo staff 04/06 the gÉo flam firebreak with the cticm reports one single material for internal and external fires ducts for smoke clearing

TECHNICAL DATASHEETGÉO FLAM PRODUCTS

géo staff

GEO STAFF Sales Department7, rue Charles François Daubigny - 95870 BEZONS

Tel: +33 (0)1.34.34.39.39. Fax: +33 (0)1.34.34.39.30.

- “Géo Flam” panels with firebreak rebates, 45 mm thick- “Géo Flam” panels with firebreak rebates, 35 mm thick- “Géo Flam” panels with firebreak rebates, 30 mm thick- “Géo Flam” channels with firebreak rebate, 45 mm thick- “Géo Flam” protective U-section- “Géo Flam” protective ½ shell- “Géo Flam” protective shell for post- Electrogalvanized threaded bolts, diameter 8 mm- Brass pins, diameter 8 mm- ZINC COATED NUTS, DIAMETER 8 MM- Galvanized U-section 25x25x25x2- Glue type PF3 from Lafarge- Prestia Normal No. 1 plaster from Lafarge- Oakum

CSTB TEST REPORT NO. ES-552-05-1126Coefficient of thermal conductivity Wet state 0.60 W / mk

Dry state 0.37 W / mk

Resistance to steam diffusion 3.79 kg / m.s.Pa

Maximum absorption of water 0.37 g / cm3

Hydrous dilation when 100% saturated with water

0.56 mm / m

Thermal dilation from 20° to 600° 14.2 um / m

Modulus of elasticity 4200 Mpa

Flexural strength 2.4 Mpa

Tensile strength 0.5 Mpa

Compressive strength 5.8 Mpa

Dimensional tolerance Length 0 mmWidth 3 mm Thickness 1.8 mm

Density 0.9 103 kg / m3

Degree of acidity 8.91 pH

1 HOUR - 1½ HOUR - 2 HOUR FIREBREAKWITH THE CTICM REPORTS

CONTAINING PLASTER, GLASS FIBRE AND VERMICULITE(MO FIREPROOF)

Page 3: THE GÉO FLAM FIREBREAK - Europages datasheets géo staff 04/06 the gÉo flam firebreak with the cticm reports one single material for internal and external fires ducts for smoke clearing

DESCRIPTION OF GÉO FLAM PRODUCTS

GEO STAFF Sales Department7, rue Charles François Daubigny - 95870 BEZONS

Tel: +33 (0)1.34.34.39.39. Fax: +33 (0)1.34.34.39.30.

géo staff

MADE FROM MO-CLASS MATERIALS

PROTECTIVE U-SECTIONFor protecting iron seating 25x25x25x2

100

60

45

Géo Flam panel

Iron U-section

Plaster U-section

REBATED PANEL45 mm thick

1 metre long

From 0.10 to 1 metre wide

(by 5 cm size increases)

Weight 50 kg/m² after stoving

Width

Length

45

PROTECTIVE ½ SHELLFor protecting the threaded bolts, Ø8

90

4545

Géo Flam panel

Shell

Bolt, Ø8

HEELFor supporting the vertical duct

45

Floor

Heel

Géo Flam panel

20

0

45

BAYONETFor crossing horizontal and vertical walls

45 45 5050

45

300

Ø Internal 50 100 150 200

Ø External 140 190 240 290

Ø Bore 150 200 250 300

SHELLS FOR PROTECTING POSTS

Containing plaster, glass fibre, vermiculite and water

Page 4: THE GÉO FLAM FIREBREAK - Europages datasheets géo staff 04/06 the gÉo flam firebreak with the cticm reports one single material for internal and external fires ducts for smoke clearing

GEO STAFF Sales Department7, rue Charles François Daubigny - 95870 BEZONS

Tel: +33 (0)1.34.34.39.39. Fax: +33 (0)1.34.34.39.30.

HORIZONTAL DUCTSMOKE CLEARING AND VENTILATION

Ø 90 Ø 90

1000

FerIron U-section

Géo Flam panels05

5

Ø 90 Ø 90

454545 70045

06

00

44

55

4

Plaster U-section

Géo Flam panels

Pin

Shell

700

Ø 900

45 45 4545

00

01

Bolt, Ø8Géo Flam panels

Shell

Top floor Top floor

X

06

00

44

54

5X

Method:

1) Mark out.

2) First box:- Drill two Ø10 holes every metre,- Fit two Ø8 pins,- Fit two Ø8 threaded bolts,- Fit pre-drilled galvanized iron U-section seating, 25x25x25x2 and nuts,- Fit lower panel,- Glue the rebates,- Fit two panels for vertical cheeks,- Glue the rebates,- Fit upper panel,- Fit pre-glued plaster U-section to protect iron U-section,- Fit the two pre-glued ½ shells to protect the two threaded bolts,- Apply gypsum in the panel joints.

3) Second box: identical to the first

EXAMPLE OF SPACE REQUIREMENTS

géo staff

Page 5: THE GÉO FLAM FIREBREAK - Europages datasheets géo staff 04/06 the gÉo flam firebreak with the cticm reports one single material for internal and external fires ducts for smoke clearing

géo staff

GEO STAFF Sales Department7, rue Charles François Daubigny - 95870 BEZONS

Tel: +33 (0)1.34.34.39.39. Fax: +33 (0)1.34.34.39.30.

VERTICAL DUCTSMOKE CLEARING AND VENTILATION

EXAMPLE OF SPACE REQUIREMENTS

First box

HeelCaulk

Floor

Floor

second box

Third box

Fourth box

100

010

00

100

0

20

0

45 45 700 45 45

Baseplate forthe first box

Heel

Géo Flampanel

45 45 700

Ø 900

45 45

4545

400

4545

Ø 90

0

Method:

1) Fit a baseplate to support the first box.

2) First box:- Fit four vertical panels gluing the vertical rebates beforehand,- Apply gypsum in the vertical joints,- Glue the horizontal upper rebates of these four panels.

3) Heel (every 6 metres maximum):- Fit heels around the duct resting on the lower floor and glue beforehand,- Apply gypsum in upper joint of the heels with the panels.

4) Second box and the following: fit identically to the first.

Page 6: THE GÉO FLAM FIREBREAK - Europages datasheets géo staff 04/06 the gÉo flam firebreak with the cticm reports one single material for internal and external fires ducts for smoke clearing

GÉO FLAM PROTECTIONFOR ELECTRICITY CABLES

GEO STAFF Sales Department7, rue Charles François Daubigny - 95870 BEZONS

Tel: +33 (0)1.34.34.39.39. Fax: +33 (0)1.34.34.39.30.

géo staff

A

B

SECTION A SECTION B

XX

45

45

60

90

45 4545 45

Iron U-section 25x25 withGéo Flam protective U-section

Géo Flam protective shell

Géo Flam precast channel

Géo Flam panel

RIZLAN collars or others

Threaded bolt Ø8

Pin Ø8

100

X

Géo Flam panel

Protective U-section

CROSS-SECTION

Géo Flamprotectiveshell

Page 7: THE GÉO FLAM FIREBREAK - Europages datasheets géo staff 04/06 the gÉo flam firebreak with the cticm reports one single material for internal and external fires ducts for smoke clearing

GÉO FLAM FOR PROTECTING CABLES AND OTHER WALL THROUGH-HOLE MOUNT COMPONENTS

GEO STAFF Sales Department7, rue Charles François Daubigny - 95870 BEZONS

Tel: +33 (0)1.34.34.39.39. Fax: +33 (0)1.34.34.39.30.

géo staff

Shell

051

Section C infloor

150

Cableway

Géo Flam heel

Shell

051

Section B inheel

Cableway

Géo Flam panel

CablewayFormation of a reservationand make-up afterwards

Shell

051

150

Section A onpanel

A

Géo Flam panel

Géo Flam heel support

150

15045 45

A

B

C

Floor

20

0

90

Free-running cableway

Floor

Firebreakthrough-holemountcomponent

Géo Flam panel

Pins for fixing cableways

Pins for fixing cableways

Géo Flam panel

Géo Flam panel

Concreteshell

USING TRADITIONAL PANELS WITH SQUARE HOLES AND MAKE-UP

Page 8: THE GÉO FLAM FIREBREAK - Europages datasheets géo staff 04/06 the gÉo flam firebreak with the cticm reports one single material for internal and external fires ducts for smoke clearing

GEO STAFF Sales Department7, rue Charles François Daubigny - 95870 BEZONS

Tel: +33 (0)1.34.34.39.39. Fax: +33 (0)1.34.34.39.30.

GÉO FLAM FOR PROTECTING CABLES AND OTHER WALL THROUGH-HOLE MOUNT COMPONENTS

Cableway between bayonets

Bored openingsBayonet

Interrupted cableway

Cableway between bayonets

Cableway fixing throughthe firebreak

Cableway fixing throughthe firebreak

150

Shell

051

Section A onGéo Flam panel Cableway

Shell

Section B onheel of bayonet

Ø 150

Bayonet with base heel

Through-hole mountcomponent protection

Shell

Section C onbayonet

Bored openings

Continuity of protection using bayonets

Coverage of protection by panels

45 45150

A

A

C

B

Floor 54

Cableway between bayonets

Cableway between bayonets

Géo Flam panel

Géo Flam bayonet

Géo Flam panel

Géo Flam panel

Concreteshell

USING BAYONETS WITH ROUND BORE WITHOUT MAKE-UP

géo staff

Page 9: THE GÉO FLAM FIREBREAK - Europages datasheets géo staff 04/06 the gÉo flam firebreak with the cticm reports one single material for internal and external fires ducts for smoke clearing

géo staff

GEO STAFF Sales Department7, rue Charles François Daubigny - 95870 BEZONS

Tel: +33 (0)1.34.34.39.39. Fax: +33 (0)1.34.34.39.30.

Bore

Panels or channels

Bayonet

Géo Flam panel

SECTION A

Floor

Bayonet

45

Caulks

Bore

Panel or channel

A

Géo Flampanel orchannel

30

0

45

GÉO FLAM DESIGN DRAWING

FLOOR CROSSING WITH BORE AND BAYONET

Ø Internal 50 100 150 200

Ø External 140 190 240 290

Ø Bore 150 200 250 300

BAYONETS

Page 10: THE GÉO FLAM FIREBREAK - Europages datasheets géo staff 04/06 the gÉo flam firebreak with the cticm reports one single material for internal and external fires ducts for smoke clearing

GEO STAFF Sales Department7, rue Charles François Daubigny - 95870 BEZONS

Tel: +33 (0)1.34.34.39.39. Fax: +33 (0)1.34.34.39.30.

géo staff

GÉO FLAM ROUND, SQUARE AND OTHER PROTECTION TO MAKE POSTS RESISTANT TO FIRE

FITTING METHOD

OPTIONS

Shell rebate coatedwith PF3 glue

Plaster strip, PF3 glue

Plaster strip, PF3 glue

Shell rebate coatedwith PF3 glue

Page 11: THE GÉO FLAM FIREBREAK - Europages datasheets géo staff 04/06 the gÉo flam firebreak with the cticm reports one single material for internal and external fires ducts for smoke clearing

HOW TO ASSEMBLE A DUCT OR GÉO FLAMHORIZONTAL PROTECTION

Concrete floor

Fit thethreaded bolts

Fit a 25x25 ironseating U-sectionevery metre

Fit the lowerpanel and glue

Fit the sidepanels andglue

Fit the upperpanel and glue

Marking - Boring - Pins

Pins

Fit theprotectiveU-section

Fit theprotective

½ shells

Applygypsum

Headro

om

under

fram

e

H

eadro

om

under

duct

GEO STAFF Sales Department7, rue Charles François Daubigny - 95870 BEZONS

Tel: +33 (0)1.34.34.39.39. Fax: +33 (0)1.34.34.39.30.

géo staff

Page 12: THE GÉO FLAM FIREBREAK - Europages datasheets géo staff 04/06 the gÉo flam firebreak with the cticm reports one single material for internal and external fires ducts for smoke clearing

GEO STAFF Sales Department7, rue Charles François Daubigny - 95870 BEZONS

Tel: +33 (0)1.34.34.39.39. Fax: +33 (0)1.34.34.39.30.

DUCTS SECTIONS CTICMreport No. VALIDITY FIREBREAK FLAME-

GUARD

Horizontal smoke clearing 450 x 300 to 750 x 500 88-G-150 April 2011 2H 3H 0 x 0 to 2275 x 1500 01-G-403 April 2011 2H 4H 0 x 0 to 3000 x 2250 02-A-110 April 2011 2H 3H

Vertical smoke clearing 600 x 450 to 1000 x 750 00-E-166 April 2011 2H 3H 0 x 0 to 2250 x 1500 01-E-445 April 2011 2H 3H 0 x 0 to 2250 x 2250 02-A-111 April 2011 2H 2H

Horizontal ventilation

450 x 300 to 750 x 500 88-G-138/03 April 2011 2H 2H 950 x 600 to 1500 x 1000 88-G-137/02 April 2011 2H 2H 1500 x 750 to 2500 x 1250 03-G-160 April 2011 2H 3H 350 x 200 to 1999 x 999

04-A-071 April 20112H 2H

2000 x 1000 to 2500 x 1500 3H 3H

Vertical ventilation1350 x 900 to 2250 x 1500 03-G-159 April 2011 3H 3H 350 x 200 to 2250 x2250 04-A-070 April 2011 2H 3H

Géo Flam ducts, 45, 35, 30 mm thick for 2h, 1½ h, 1h firebreaks

SEALING AND CAULKING SECTIONS CTICM

report No. VALIDITY FIREBREAK FLAME-GUARD

Shutter, “Aldes” gate type, 1 panel 250 x 250 to 800 x 650 03-V-284 April 2011 2H 2H

Shutter, “Aldes” gate type, 2 panels 300 x 300 to 750 x 700 03-V-288 April 2011 2H 2H

Valve, “Cinairgie” tunnel type 350 x 200 04-A-051 April 2011 2H 2H

Shutter “PANOL” gate type, 1 panel 511 x 438 to 900 x 970 05-V-285 April 2011 2H 2H

Shutter, “PANOL” tunnel type 300 x 300 to 800 x 700 05-V-291 April 2011 2H 2H

Shutter, “PANOL” gate type, 2 panels 356 x 448 to 781 x 970 06-A-076 April 2011 2H 2H

Light firebreak walls, 45 mm thick

PROTECTION CTICM REF. REMARKS

Electricity power cables Report No.93-G-162 Duration of electrical function = 2H

Electricity control cables Report No.93-G-138 Duration of electrical function = 2H

Metal pipes Ø100 x 2.5 thick Report No.93-G-163 Tube at temperature of 163° = 2H

Protection and fire resistance with 45 mm thickness

STEEL POST CTICMREPORT No. VALIDITY FIRE RESISTANCE

Rectangular or circular shells 03-U-052 April 2011 1/2 H à 3 H

Decorative protection for fire resistance

LIST OF CTICM FIREBREAK REPORTS

géo staff

© F

OR

MU

LA

CO

NS

EIL

- 6

07

50

CH

OIS

Y-A

U-B

AC

- +

33

(o)3

.44

.85

.25

.31