the full scale ccs-project at norcem brevik can it …...1990 1995 2000 2005 2010 2015 2020 2025...
TRANSCRIPT
![Page 1: The full scale CCS-project at Norcem Brevik Can it …...1990 1995 2000 2005 2010 2015 2020 2025 2030 Where are we, what’s done and what’s ahead? kg CO 2 /tonne cement Energy effeciency](https://reader033.vdocuments.mx/reader033/viewer/2022050115/5f4c484526719640cf2ec733/html5/thumbnails/1.jpg)
The full scale CCS-project at Norcem Brevik Can it be realised?
Per Brevik, Director Sustainability and Alternative fuels HC NE
Düsseldorf, 7 November 2017
![Page 2: The full scale CCS-project at Norcem Brevik Can it …...1990 1995 2000 2005 2010 2015 2020 2025 2030 Where are we, what’s done and what’s ahead? kg CO 2 /tonne cement Energy effeciency](https://reader033.vdocuments.mx/reader033/viewer/2022050115/5f4c484526719640cf2ec733/html5/thumbnails/2.jpg)
HeidelbergCement in figures
■ 63,000 employees.
■ Core business: –Aggregates.
–Cement.
–Downstream activities: ready-mixed concrete and asphalt.
■ 3,030 locations in 60 countries. – 620 production sites for sand, gravel, crushed rock.
– 161 cement and grinding plants.
– 1,740 ready-mixed concrete plants.
– 114 asphalt plants.
■ Aggregates reserves 19 billion tonnes.
■ Cement capacity 197 million tonnes.
■ CO2-emissions 70 million tonnes
7 November 2017 Düsseldorf Per Brevik HC NE Slide 2
![Page 3: The full scale CCS-project at Norcem Brevik Can it …...1990 1995 2000 2005 2010 2015 2020 2025 2030 Where are we, what’s done and what’s ahead? kg CO 2 /tonne cement Energy effeciency](https://reader033.vdocuments.mx/reader033/viewer/2022050115/5f4c484526719640cf2ec733/html5/thumbnails/3.jpg)
Per Brevik HC NE
Cement production; two sources for CO2 emissions
2/3
1/3
CaCO3 CaO + CO2
Limestone
Fuel
7 November 2017 Düsseldorf Slide 3 -
![Page 4: The full scale CCS-project at Norcem Brevik Can it …...1990 1995 2000 2005 2010 2015 2020 2025 2030 Where are we, what’s done and what’s ahead? kg CO 2 /tonne cement Energy effeciency](https://reader033.vdocuments.mx/reader033/viewer/2022050115/5f4c484526719640cf2ec733/html5/thumbnails/4.jpg)
HeidelbergCement Northern Europe’s Zero-vision:
CO2-neutral concrete products over the product’s life cycle (LCA)
by 2030
7 November 2017 Düsseldorf
Per Brevik HC NE
Slide 4 -
![Page 5: The full scale CCS-project at Norcem Brevik Can it …...1990 1995 2000 2005 2010 2015 2020 2025 2030 Where are we, what’s done and what’s ahead? kg CO 2 /tonne cement Energy effeciency](https://reader033.vdocuments.mx/reader033/viewer/2022050115/5f4c484526719640cf2ec733/html5/thumbnails/5.jpg)
0
100
200
300
400
500
600
700
800
900
1990 1995 2000 2005 2010 2015 2020 2025 2030
Where are we, what’s done and what’s ahead?
kg CO2/tonne cement
Energy effeciency
Bio mass (Alternative fuels)
New cement products
Carbon capture
7 November Düsseldorf
Per Brevik HC NE
Slide 5
CO2
Reduced emissions from cement production
Carbonation
![Page 6: The full scale CCS-project at Norcem Brevik Can it …...1990 1995 2000 2005 2010 2015 2020 2025 2030 Where are we, what’s done and what’s ahead? kg CO 2 /tonne cement Energy effeciency](https://reader033.vdocuments.mx/reader033/viewer/2022050115/5f4c484526719640cf2ec733/html5/thumbnails/6.jpg)
TestCenter Brevik
■ CLIMIT-project 2013–2017
■ Testing 4 capture technologies on real flue gas
■ Further steps towards a full-scale carbon capture project
–Possible integration into the cement plant (2014)
–Pre-feasibility study (2015)
– Feasibility study (2016)
–Concept study (2017)
7 November Düsseldorf - Per Brevik HC NE
![Page 7: The full scale CCS-project at Norcem Brevik Can it …...1990 1995 2000 2005 2010 2015 2020 2025 2030 Where are we, what’s done and what’s ahead? kg CO 2 /tonne cement Energy effeciency](https://reader033.vdocuments.mx/reader033/viewer/2022050115/5f4c484526719640cf2ec733/html5/thumbnails/7.jpg)
4 post-combustion capture technologies
7 November Düsseldorf Per Brevik HC NE
Slide 7 -
Aker Solutions amine technology – TRL 9
Air Products/ NTNU membrane technology – TRL 5
Alstom Power Calcium Looping – TRL 3
RTI solid sorbent technology – TRL 4
![Page 8: The full scale CCS-project at Norcem Brevik Can it …...1990 1995 2000 2005 2010 2015 2020 2025 2030 Where are we, what’s done and what’s ahead? kg CO 2 /tonne cement Energy effeciency](https://reader033.vdocuments.mx/reader033/viewer/2022050115/5f4c484526719640cf2ec733/html5/thumbnails/8.jpg)
CLIMIT project / Conclusions
■ Technologies for capture are available, but on different stages regarding development/maturity
■ CCS is technically feasible, but without economic support; realisation within 10–15 years will be difficult!
■ In a 2020-perspective: – The amine technology is proven/documented at site, and a possible full scale solution.
– Based on energy from excess heat; 400.000 tonnes of CO2 can be captured.
7 November Düsseldorf
Per Brevik HC NE
Slide 8
![Page 9: The full scale CCS-project at Norcem Brevik Can it …...1990 1995 2000 2005 2010 2015 2020 2025 2030 Where are we, what’s done and what’s ahead? kg CO 2 /tonne cement Energy effeciency](https://reader033.vdocuments.mx/reader033/viewer/2022050115/5f4c484526719640cf2ec733/html5/thumbnails/9.jpg)
2050
• Access to renewable energy
• Stable economic and political framework
conditions
• Norway an attractive host nation
• Authorities support industries’ efforts to
develop new technology and new
products
• Population: 9 billion
• Higher consumption
• Higher demand for energy
• Scarce resources
• Technological breakthroughs
• Cap: 2oC innen 2050
• Carbon negative by 2100
National
Global
![Page 10: The full scale CCS-project at Norcem Brevik Can it …...1990 1995 2000 2005 2010 2015 2020 2025 2030 Where are we, what’s done and what’s ahead? kg CO 2 /tonne cement Energy effeciency](https://reader033.vdocuments.mx/reader033/viewer/2022050115/5f4c484526719640cf2ec733/html5/thumbnails/10.jpg)
The Roadmap
![Page 11: The full scale CCS-project at Norcem Brevik Can it …...1990 1995 2000 2005 2010 2015 2020 2025 2030 Where are we, what’s done and what’s ahead? kg CO 2 /tonne cement Energy effeciency](https://reader033.vdocuments.mx/reader033/viewer/2022050115/5f4c484526719640cf2ec733/html5/thumbnails/11.jpg)
Emissions and emission reductions by technology
![Page 12: The full scale CCS-project at Norcem Brevik Can it …...1990 1995 2000 2005 2010 2015 2020 2025 2030 Where are we, what’s done and what’s ahead? kg CO 2 /tonne cement Energy effeciency](https://reader033.vdocuments.mx/reader033/viewer/2022050115/5f4c484526719640cf2ec733/html5/thumbnails/12.jpg)
Norcem
HeidelbergCement Cement production
Yara Porsgrunn Ammonia production
Fortum Oslo Varme AS Waste-to-energy plant
CO2-
TRANSPORT
• Gassco
• By ship
CO2-STORAGE
• Planning by
Statoil and
partners
• Intermediate
storage on shore
• Offshore storage
in the North Sea
• Huge capacity
CO2-
CAPTURE
Norway / Full scale CCS project
![Page 13: The full scale CCS-project at Norcem Brevik Can it …...1990 1995 2000 2005 2010 2015 2020 2025 2030 Where are we, what’s done and what’s ahead? kg CO 2 /tonne cement Energy effeciency](https://reader033.vdocuments.mx/reader033/viewer/2022050115/5f4c484526719640cf2ec733/html5/thumbnails/13.jpg)
Full scale CO2-capture / Norcem
Technology Aminsolvent
Technology provider Aker Solutions
Capture capacity 400 000 t/ år
Excess heat 46 MW
Intermediate storage CO2 5 300 t
Cost estimates (CAPEX/ OPEX) ± 30 %
7 November 2017 Düsseldorf – Per Brevik HC NE
Slide 13
![Page 14: The full scale CCS-project at Norcem Brevik Can it …...1990 1995 2000 2005 2010 2015 2020 2025 2030 Where are we, what’s done and what’s ahead? kg CO 2 /tonne cement Energy effeciency](https://reader033.vdocuments.mx/reader033/viewer/2022050115/5f4c484526719640cf2ec733/html5/thumbnails/14.jpg)
Concept study / Layout
7 November 2017 Düsseldorf
Per Brevik HC NE
Slide 14
![Page 15: The full scale CCS-project at Norcem Brevik Can it …...1990 1995 2000 2005 2010 2015 2020 2025 2030 Where are we, what’s done and what’s ahead? kg CO 2 /tonne cement Energy effeciency](https://reader033.vdocuments.mx/reader033/viewer/2022050115/5f4c484526719640cf2ec733/html5/thumbnails/15.jpg)
«Original» schedule towards realisation
7 November 2017 Düsseldorf - Per Brevik HC NE
Slide 15 -
Q2 2019:
Approval
regarding
realisation
2019 2020 2021 2022
Aug Jul May Jun Sep Oct Nov Dec Jan Feb Mar Apr May Jun Apr
CONCEPT 18.04 - 15. 09.2017
FEED 1.10.17 – 15.06.2018
2018 2017
Decission
process REALISATION
2Q 2019 - 2022
2022: In operation?
DG 2 DG 3
![Page 16: The full scale CCS-project at Norcem Brevik Can it …...1990 1995 2000 2005 2010 2015 2020 2025 2030 Where are we, what’s done and what’s ahead? kg CO 2 /tonne cement Energy effeciency](https://reader033.vdocuments.mx/reader033/viewer/2022050115/5f4c484526719640cf2ec733/html5/thumbnails/16.jpg)
National budget 2018 / Project realisation?
■ Reduced funding for FEED studies
■ Projects put on HOLD; awaiting the political process
■ Project evaluation in parliament Feb/March 2018
■ Some challenges, but it’s still possible to build the industry’s first full scale CC-plant in Brevik
■ Further delay; we are now talking about 2023!
■Thank you for your attention!
7 November 2017 Düsseldorf
Per Brevik HC NE
Slide 16