the experts for your integrated fire protection systems · geoman consulting pty pipenet schematic...

3
the experts for your integrated fire protection systems innovative consultancies safety engineering

Upload: others

Post on 03-Aug-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: the experts for your integrated fire protection systems · Geoman Consulting Pty PIPENET Schematic Wednesday, January 29, 2020 Page 1 of 1 DELUGE VALVE 791-DXV-0019 L-601-P-001 L-601-V-004

the experts for your integrated fire protection systems

innovative consultancies safety engineering

Page 2: the experts for your integrated fire protection systems · Geoman Consulting Pty PIPENET Schematic Wednesday, January 29, 2020 Page 1 of 1 DELUGE VALVE 791-DXV-0019 L-601-P-001 L-601-V-004

Fire Safety Engineering & Consultancy Services

Experience:INCOS Engineering personnel/engineers have worked for INMACO,

Semco Maritime and Norfass with the first operating since 2002

supplying Fire and Safety System to more than 70 FPSO’s / Offshore Oil

& Gas Facilities. Some references are; Woodside Laminaria - Northern

Endeavor – Okha - Vincent, ConocoPhillips Bayu-Undan, Marathon

Alvheim, Maersk Peregrino, Bluewater AkoaMizu, TeekayPetrojarl Siri

and FPSO (Knarr), PTTEP (TPOT) Montara, INPEX Icthys.

Key personnel engineers with individually more than 25 years-

experience and daily use of international standards including DNV,

ABS, Lloyds, GL, BV, AS, ATEX, IECEX, ASME, API, ANSI, BS, ISO, NMD,

NORSOK, NFPA, PED, SIL, SOLAS, UL, IMO etc.

Capabilities:

FEED / CONCEPTUAL ENGINEERING• Hazardous Area Evaluation, Fire Risk consideration, preparation of Fire Protection equipment / system specifications• Material and Corrosion Technology; advisory on suitable materials for Fire water Systems• Review of applicable environmental regulations/policies/guidelines and performance standards for foam concentrate selection

BASIC ENGINEERING• Preparation of Fire Protection Plot Plans, Piping and Instrument Diagrams• Design of deluge distribution piping• Preparation of technical proposals from analysis of specification and standards, evaluating options/alternatives, designing/sizing• Fluid mechanic calculations: Pressure, flow rate, head losses, pump duties, (using software Pipenet, Bernoulli’s principles, Darcy-Weisbach and

Hazen-Williams equations etc)• Nozzle/discharge equipment selection (coverage, throw/reach, foam expansion ratio)

DETAILED ENGINEERING• Design of deluge, sprinkler, foam nozzles layout drawings• Perform Hydraulic calculations and balancing of deluge piping distribution systems• Foam concentrate proportioning calculations and proportioner’s selection• Write System functional specifications

PRE-OPERATION• Installation and Commissioning Procedures• Generic Maintenance Strategies and Preventive Maintenance Programs• Equipment Operations Performance Standards and testing programs

OPERATION• Optimisation of Operators Programs for Inspection, Testing, and Maintenance• Performance Strategy and testing procedures • Site surveys and review of facilities fire water systems • Provide specialised expertise in the design, testing and commissioning for fire protection

systems (sprinklers, deluge, foam, hydrants, hose reels, gaseous systems etc)• Foam concentrate transition feasibility review• Life Extension Programs

DE-COMMISSIONING• Environmental Management of Fire fighting Foam Policy• Fire fighting foam and fire water waste inevitably contain components that class as regulated

wastes that require special handling, treatment and disposal

Base Scenario 2Geoman Consulting Pty

PIPENET Schematic Page 1 of 1Wednesday, January 29, 2020

FW-0

32

113

115

116

118

FW-020

120

121

FW-0

35

123

125

126

128

FW-023

130

131

132

133

134

135

FW-6

16

117

124

127

136

FW-617

138

139

FW-1994FW-1993FW-1992

FW-0

26

129

137

140

141

FW-014

143

144

145

146

147

148

FW-017

150

151

152

153

FW-0

29

155

156157

158

159

160

FW-016

162

163

164

165

FW-0

28

167

168

169

170

171

172

FW-718

175

FW-7

15

180

181

182

183

184

185

186

187

188

FW-0091 FW-0092 FW-0093

FW-1981 FW-1982

FW-00913FW-00911FW-00910FW-0095

FW-1983

FW-1985

FW-1985

FW-0094

FW-1984

FW-612

FW-6

13

177

178

FW-0096

174

FW-0099FW-0098FW-0097

190FW

-007

FW-005

FW-003

FW-001

195196

197 198

FW-171

FW-171

FW-171

FW-172

FW-172

FW-172

201

202

203 204 205 206

FW-0

0920

FW-00920 FW-00915FW-00919 FW-00914

FW-00914

FW-00914FW-00912

FW-00916

FW-1

991

FW-1991

FW-00918 FW-00917

FW-00921

1

2

4

5

6 7

8

9

10

11

12

13

14

15

16

17

18

19

3

60

61

222324

25

26

27

28

29

30

31

32

33 34 35 36

36

37 38

39

40

41

42

43

21

44

44

45

20

20

46

46

47

1

2

4 3 5

P-001-A

P-001-D

P-002-B

P-002-A

P-001-B

P-001-C

DXV-071

DXV-131

DXV-141

DXV-161

DXV

-162

DXV

-142

DXV

-132

DXV

-072

DXV-041

DXV-051

DXV-061

DXV

-042

DXV

-052

DXV

-062

DXV-111

DXV-121

DXV-151

DXV

-112

DXV

-122

DXV

-152

DXV-201

DXV-090

DXV-091

DXV

-202

DXV

-093

DXV

-092

DXV-211

DXV-221

DXV-231

DXV-021

DXV-011

DXV-081

DXV-101

DXV

-212

DXV

-222

DXV

-232

DXV

-022

DXV

-012

DXV

-082

DXV

-102

STAINER

STAINER STAINER STAINER

STAINER STAINER

STAINER

STAINER

STAINER

STAINER

STAINER

STAINER

STAINER

STAINER

STAINER

STAINER

schroeder valve schroeder valve

Water Spray Calculation for 792-DXV-0019 (LNG Train) Geoman Consulting Pty

PIPENET Schematic Page 1 of 1Wednesday, January 29, 2020

DELUGE VALVE791-DXV-0019

L-601-P-001

L-601-V-004

L-601-V-008

L-601-V-001

From Bypass Line

FW733 1GA1 10391

FW734 1GA1 100395

F808-1GA1 10606

F731- 1GA1 10682

FW732 1GA1 10688 FW732-1GA1 10684

FW785 1GA1 10060

FW785 1GA1 10425

FW733 1GA1/03 10394

Demand 7434 l/min @ 7.54barg using INPEX layout

INCOS use the globally recognised computer program “PIPENET” for hydraulic calculations.

Specifically intended for the design of fire protection systems. PIPENET Spray/Sprinkler complies with the NFPA13, NFPA15 and NFPA16 rules. The module is used for designing a wide range of fire protection systems i.e. sprinkler, deluge, ring-main, and foam solution.

The result of the hydraulic design process is a written report discussing the results from the computer calculations, a noded isometric drawing, and the actual printout of the hydraulic report. Our Engineers have experience in evaluating the results obtained from the calculation program, and will give recommendations needed to obtain the most balanced and efficient fire water distribution system.

Safety design is a process defined as the integration of hazard identification and risk assessment methods early in the design process to eliminate or minimise the risks of injury throughout the life of a structure being designed. Safe design is everybody’s business - from clients to designers to constructors.

Subject matter experts within Active Fire Protection Systems.

In summary we ensure the facts and details are correct so that

the project’s/program’s deliverables will meet the needs of the

stakeholders, legislation, policies, standards, and best practices.

FEED /ConceptualEngineering

BasicEngineering

DetailedEngineering Pre-Operation Operation De-

commisioning

Page 3: the experts for your integrated fire protection systems · Geoman Consulting Pty PIPENET Schematic Wednesday, January 29, 2020 Page 1 of 1 DELUGE VALVE 791-DXV-0019 L-601-P-001 L-601-V-004

Maintenance Engineering

PREVENTIVE MAINTENANCE

Planned and meticulous maintenance of facility assets,

equipment and infrastructure is the key component to

continuous and sustained operations in the field.

Incos Engineering Programmed Service & Maintenance

provides assurances to the customer that all is being

done to provide continuous uninterrupted operation by

maximising functional reliability and effectiveness of the

safety critical Firewater system.

SAFETY, SAFETY, SAFETY!

Potential hazards in the oil and gas industry are well-

documented. Accidents lead to safety incidents and loss of

production that can damage entire regions. Safety must be

an integral element in every facet of industry operation.

Common sense tells us that proper maintenance of oil

and gas processing facilities is key, in today’s tight energy

market, to ensure continuous, uninterrupted operation.

PLANT RELIABILITY

Ensuring minimal damage to the environment is caused as a result of oil and gas operations. Reliability and safety go hand-in-hand,

making sure that major incidents with the potential to affect the workforce and wider community occur as infrequently as possible.

Poor plant reliability also causes uncertainty among both investors and customers, ultimately impacting on the bottom line.

www.incos-e.com

+61 8 6252 [email protected] Ernest Clark RoadCanning Vale, Western Australia, 6155

ABN: 91 629 733 508 | Trading as: INCOS EngineeringOffshore Oil & Gas, Onshore Petrochemical Industries and Marine Support

the experts for your integrated fire protection systems