the erase project - phytosudoe · quickexecution»stopleachingprocess asap; redundancy simple,...
TRANSCRIPT
Projecto ERASE 1
The Erase Project
Porto, April 17, 2018
Diogo Almeida Santos
Remediation of an industrial site
Projecto ERASE 2
Air view of the Chemical Complex of Estarreja
Projecto ERASE 3
Process integration at CCE
Hydrochloric gas
Chlorine CausticAniline
MD
I
Market
Benzene
Ammonia
Salt
Electricity
Natural Gas
Formaldehyde
Vynil chloride
PVC
Market
5© 2018 CUF. All rights reserved
Aniline
Nitrobenzene
Chlor-alcalis
6
Modern technologies
Automation & control systems
Efficiency of the operations
Productivity
Expansion
New methods of organization & management
BAT in the industrial operations
SQE management systems
Vinil 2010- voluntary commitment
CAP (PACOPAR)
Clean technologies
Reduction of emissions
Effluents out to SIMRIA
High purity raw materials
Recyclings & recoveries
Erase project
Economic developmentEnvironment care
Responsible Care
Projecto ERASE 4
7
The past (from 60 years ago)
� ammonia
� sulphuric acid
� ammonium sulphate
� fertilizers compounds
Fertilizers industry :
Chlor-alkali industry :
� chlorine & caustic soda
� hydrochloric acid
� sodium hypochlorite
PVC industry :
� vinyl chloride
� PVC polymer
ashes & pyrites sludges +
contaminated soils 115
Industrial wastes 103 m3
brine sludges
+ contaminated soils 166
PVC wastes
+ lime sludges 32
313 Total :
8
Phase I
Environmental remediation of
accumulated historical industrial
wastes
Projecto ERASE 5
9
Objectives of the Erase project
� to stop the contamination of soil and water table,resulting from the leaching process;
Minimization of environmental impacts associated with the
historical industrial wastes accumulated on site, in order :
� to recover the areas used for the landfill of thewastes.
10
Main points in the design concept
� Guarantee of effective impermeabilization of theconfinement structure to eliminate the leachingprocess;
� Quick execution » stop leaching process asap;
� redundancy
� Simple, effective solution
� Not to affect sensible places with population oragriculture land;
� Inside the industrial area and previously used for disposal of wastes
� Stability of the underground base;
� Sandy, homogeneous soil, 10 to 15 m height, over a natural shale formation
Projecto ERASE 6
PEAD # 1,5
PEAD # 2
construction scheme
12
pyrites wastes and contaminated soils
Projecto ERASE 7
13
impermeabilization of the base (hdpe #2 mm)
14
deposition of layers of pyriteswastes and contaminated soils
Projecto ERASE 8
152004 8 17
deposition of mercury contaminated wastesover a lime+sand layer
landfill of mercury contaminated wastes(before remediation)
Projecto ERASE 9
landfill of mercury contaminated wastes(after remediation)
18
Impermeabilization of the cover
(bentonite membrane)
Projecto ERASE 10
19
final works
Air view of the Chemical Complex of Estarreja
Projecto ERASE 11
21
Monitoring wells network
22
monitoring well
Projecto ERASE 12
23
24
Projecto ERASE 13
25
Phase II
Environmental remediation of
hydraulic ditch (vala de S. Filipe)
26
(hydraulic ditches)
Projecto ERASE 14
27
Lay-out of
vala de S. Filipe
28
Projecto ERASE 15
29
30