the critical path energy system decarbonization stephen stretton research associate, cambridge...

22
The Critical Path Energy System Decarbonization Stephen Stretton Research Associate, Cambridge Centre for Climate Change Mitigation Research (4CMR) http://www.4cmr.org Founder, Cambridge Zero Carbon Society http://www.zerocarbonnow.org 2 nd June 2009

Upload: maud-harrington

Post on 28-Dec-2015

227 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: The Critical Path Energy System Decarbonization Stephen Stretton Research Associate, Cambridge Centre for Climate Change Mitigation Research (4CMR)

The Critical PathEnergy System Decarbonization

Stephen StrettonResearch Associate, Cambridge Centre for Climate Change Mitigation Research (4CMR) http://www.4cmr.org

Founder, Cambridge Zero Carbon Societyhttp://www.zerocarbonnow.org

2nd June 2009

Page 2: The Critical Path Energy System Decarbonization Stephen Stretton Research Associate, Cambridge Centre for Climate Change Mitigation Research (4CMR)

2 of 15

ContentsEnergy System Decarbonization

• Why?

• Terminology

• Carbon

• Rough Numbers for UK (Physics)

• Land

• Cost

• Rough Numbers for UK (Economics)

• The Critical Path

Page 3: The Critical Path Energy System Decarbonization Stephen Stretton Research Associate, Cambridge Centre for Climate Change Mitigation Research (4CMR)

3 of 15

Why?

Page 4: The Critical Path Energy System Decarbonization Stephen Stretton Research Associate, Cambridge Centre for Climate Change Mitigation Research (4CMR)

Why? Energy demand is rising rapidly

* In agreement with the recommendations from the Royal Commission for Environmental PollutionSources: Reference Scenario, IEA (2004) World Energy Outlook; A1T Scenario IEA (2003) Energy to 2050

-

5,000

10,000

15,000

20,000

25,000

30,000

35,000

40,000

45,000

1990 2000 2010 2020 2030 2040 2050

Year

En

erg

y D

eman

d (

GW

)

Reference Scenario

Fast Economic Growth - A1T

Notes• All energy (not just electricity) is expressed in terms of GigaWatts (GW)*.• 1 Gigawatt = 0.75 Million Tonnes of Oil Equivalent per year = 8.8 Terawatt-Hours per Year• 1 Gigawatt is the usual size of a nuclear power station or large coal power plant

Page 5: The Critical Path Energy System Decarbonization Stephen Stretton Research Associate, Cambridge Centre for Climate Change Mitigation Research (4CMR)

5 of 15

World Energy Consumption By Fuel

Page 6: The Critical Path Energy System Decarbonization Stephen Stretton Research Associate, Cambridge Centre for Climate Change Mitigation Research (4CMR)

6 of 15

World Electricity By Fuel Type

Page 7: The Critical Path Energy System Decarbonization Stephen Stretton Research Associate, Cambridge Centre for Climate Change Mitigation Research (4CMR)

7 of 15

Why?

Page 8: The Critical Path Energy System Decarbonization Stephen Stretton Research Associate, Cambridge Centre for Climate Change Mitigation Research (4CMR)

8 of 15

Carbon: Terminology

Carbon Emissions Per Person Per Year (tonnes CO2eq)

High Carbon ~10

Lower Carbon 4

Low Carbon 2

Ultra-low Carbon 1

Zero Carbon 0

Negative Carbon <0

*Imports of embodied energy not included

Page 9: The Critical Path Energy System Decarbonization Stephen Stretton Research Associate, Cambridge Centre for Climate Change Mitigation Research (4CMR)

9 of 15

Technology: Terminology

Technology LCA

gCO2eq/kwh

High Carbon Coal ~1000

Lower Carbon

Gas ~400

Low Carbon CCS ~150

Ultra-low Carbon

Renewables & Nuclear? ~5 to ~50

Zero Carbon (Decarbonize Lifecycle Costs) ~0

Negative Carbon

Reforestation

Biomass with CCS

Air capture

<0

Page 10: The Critical Path Energy System Decarbonization Stephen Stretton Research Associate, Cambridge Centre for Climate Change Mitigation Research (4CMR)

10 of 15

Source: Parliamentary Office of Science and Technology

Carbon: All Electricity Technologies

Page 11: The Critical Path Energy System Decarbonization Stephen Stretton Research Associate, Cambridge Centre for Climate Change Mitigation Research (4CMR)

11 of 15

CSD

‘Low-Carbon’Tech.

Page 12: The Critical Path Energy System Decarbonization Stephen Stretton Research Associate, Cambridge Centre for Climate Change Mitigation Research (4CMR)

12 of 15

Physics Rough Numbers

Total Per Person

Carbon Emissions 600million tCO2/yr + Imports

10 tCO2/yr

Energy Consumption

300GW 5kW

Electricity Consumption

~45GW 1kW

Page 13: The Critical Path Energy System Decarbonization Stephen Stretton Research Associate, Cambridge Centre for Climate Change Mitigation Research (4CMR)

13 of 15

Land

Energy Source

Density

MWavg/km2

Biomass ~0.5

Wind ~2-3

CSP ~15

See

www.withouthotair.com

Page 14: The Critical Path Energy System Decarbonization Stephen Stretton Research Associate, Cambridge Centre for Climate Change Mitigation Research (4CMR)

14 of 15

Do Everything… to Save the Planet!

Page 15: The Critical Path Energy System Decarbonization Stephen Stretton Research Associate, Cambridge Centre for Climate Change Mitigation Research (4CMR)

17 of 15

Unit Costs p per kWhLevelized Costs pence per kWh

-

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

Coal (PC) Gas Nuclear£2bn/GW

Nuclear -£3bn/GW

Onshore Wind Offshore Wind Coal CCS

Waste & Decommissioning

Carbon Cost

Fuel Cost

O&M Costs

Investment Costs

Page 16: The Critical Path Energy System Decarbonization Stephen Stretton Research Associate, Cambridge Centre for Climate Change Mitigation Research (4CMR)

18 of 15

Economics Numbers

Total Per Person

GDP £1.2trillion/yr £20,000/yr

Public Spending £500billion/yr £8,000/yr

Market Value of Houses etc

£7trillion £100,000

National Debt £700billion £12,000

Other Liabilities

Old nukes / PFI / Pensions / Banks

~£500billion?

£70bn / £100bn / £200bn / £150bn

£9,000

Page 17: The Critical Path Energy System Decarbonization Stephen Stretton Research Associate, Cambridge Centre for Climate Change Mitigation Research (4CMR)

19 of 15

Fiscal Reform

1.Tax ‘bads’

2.Remove tax on ‘goods’

3.Tax ‘rent’

• Fossil fuels are both a ‘bad’ and a ‘rent’

• So “change VAT to CAT”

Page 18: The Critical Path Energy System Decarbonization Stephen Stretton Research Associate, Cambridge Centre for Climate Change Mitigation Research (4CMR)

20 of 15

Investment Cost & Tax Revenue

• UK needs 300GW to sustain current energy use. 1GW costs ~£2bn.

• £600bn cost = 50% of one year’s GDP– UK energy spend ~£100bn on energy each year

– Cost of Trident £40bn total

• £100/tCO2 (10p/kgCO2) would– Add £50 to a barrel of oil

– 4p/kWh on gas

– 10p/kWh on coal

– 23p/litre on petrol

– Raise £60bn/yr initially

– £1000 citizens income or replace VAT

Page 19: The Critical Path Energy System Decarbonization Stephen Stretton Research Associate, Cambridge Centre for Climate Change Mitigation Research (4CMR)

21 of 15

Discussion Points• How do we scale up renewable R&D by a large factor &

coordinate internationally?

• How fast can we build a super-grid with CSP?

• Does doing one technology prevent us from doing another? Are possible supply chain shortages ‘across’ technologies or ‘within’ technologies

• If the cost of high and low carbon are the same, is there any financial limit on what we can do? Does tackling climate change then cost anything at all?

• If new technology costs more, is there a limited ‘pot’ of subsidy to be allocated to most promising technology?

• Can ‘inflexible’ technologies promote a path to electric-car charging, leading to further intermittent renewable power being easily integrated?

• Market Incentives (19th Century Railways) or State Intervention (20th Century Wars) or Both?

Page 20: The Critical Path Energy System Decarbonization Stephen Stretton Research Associate, Cambridge Centre for Climate Change Mitigation Research (4CMR)

22 of 15

Carbonomics meets Freakonomics…

Total Per Person

Carbon Emissions 600million tCO2/yr + Imports 10 tCO2/yr

Energy Consumption 300GW 5kW

Electricity Consumption

~50GW 1kW

Land Area ? ?

GDP £1.2trillion/yr £20,000/yr

Public Spending £500billion/yr

Market Value of Houses etc

£7trillion £100,000

National Debt £700billion £12,000

Other Liabilities

Old nukes / PFI / Pensions / Banks

~£500billion?

£70bn / £100bn / £200bn / £150bn

£9,000

Page 21: The Critical Path Energy System Decarbonization Stephen Stretton Research Associate, Cambridge Centre for Climate Change Mitigation Research (4CMR)

23 of 15

Conclusions: The Critical Path1. Public Understanding and Proposed Policy2. Skills and Capacity Building3. Govt Guarantee Carbon & Electricity Prices4. Secure Finance e.g. with ‘Climate Bonds’5. Start Energy Efficiency Rollout6. Build Energy Infrastructure7. Fiscal Reform: ‘VAT to CAT’8. Strategy transfer around the world9. Switch Transportation10.Complete Decarbonization of Britain and other countries11.Reforest the world12.Permanently avoid fossil fuel extraction

Page 22: The Critical Path Energy System Decarbonization Stephen Stretton Research Associate, Cambridge Centre for Climate Change Mitigation Research (4CMR)

24 of 15

Thanks for your attention!

Contact me:Stephen [email protected]

Links:http://www.4cmr.org

http://www.withouthotair.com http://www.zerocarbonnow.org