The Case of a Failed TransformerCase #1 - GSU
James W. GrahamAlliant Energy
![Page 2: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/2.jpg)
161kV GrY – 22.8kV Delta720/806.4 MVA 55/65CShell Form circa 1980Isophase Secondary BusDirect Connection to Unit13,900 gallons of oil762,200 lbs. total weight
Transformer Data
![Page 3: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/3.jpg)
First Steps
Inspection Damage AssessmentReview Known DataSystem Impact
![Page 4: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/4.jpg)
Initial Inspection & Damage Assessment
Field TestsWinding damage confirmedArresters OKBushings OK
![Page 5: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/5.jpg)
Oil leak due to broken piping
![Page 6: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/6.jpg)
Minor Tank Deformation - Upper Section
![Page 7: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/7.jpg)
Minor Tank Deformation – Lower Section
![Page 8: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/8.jpg)
Typical DETC Switch
![Page 9: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/9.jpg)
AØ DETC Dislocated
![Page 10: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/10.jpg)
Arc Damage Across Active DETC Tap - AØ
![Page 11: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/11.jpg)
DETC Leads Disengaged
![Page 12: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/12.jpg)
Insulation Debris on top of the phase pack
![Page 13: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/13.jpg)
Review Known Data
No system fault prior to failurePre-fault DGA samples normalOil test data normalWinding temperature normalOil temperature normalHistory indicated some overloading
![Page 14: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/14.jpg)
Loss of Sales RevenueCost of Replacement PowerLoss of Voltage SupportSystem Reliability ReducedScheduled Transmission Outages DeferredOther Unit Maintenance Outages Deferred
Impact On the System
![Page 15: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/15.jpg)
Two System Connection Options
Short Term Solutions
161kV - Procure Isophase bus adapter- Install temporary transformer
345kV - Build 3-terminal bus- Procure Isophase bus adapter- Build temporary transmission line- Install temporary transformer
Locate Possible SparesSelect Option & Execute
![Page 16: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/16.jpg)
Transformer OptionsSpare from InventorySpare from Other UtilityTransformer Broker/DealerRewind ShopsInternet Bulletin Boards
3 Possible Spares Located345-23kV 830 MVA161-20.9kV 535 MVA146-20kV 874 MVA
Locate Possible Spares
![Page 17: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/17.jpg)
Select Option & Execute
161kV Option SelectedMinimizes construction coordination No major substation equipment requiredShortest completion scheduleLowest total cost
146.8-20kV Transformer EvaluatedOverexcitation limited < 5%Generator limited to ~96% output161kV Bus Voltage reduced 2.5%
![Page 18: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/18.jpg)
146.8-20kV transformer purchasedTransportation ArrangedFailed Transformer RemovedTemporary Transformer InstalledSystem Operation Changes Required
GSU DETC set at +5% (154kV)Main Auxiliary transformer DETC set at –5.0%Reserve Auxiliary transformer DETC set at –2.5%345kV tie transformer DETC set at +2.5%(effectively reduces 161kV bus voltage)
Select Option & Execute
![Page 19: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/19.jpg)
Transformer Disassembly – 4 days
![Page 20: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/20.jpg)
One of 5 semi-truck loads of accessories
![Page 21: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/21.jpg)
Transformer Accessories – On Site
![Page 22: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/22.jpg)
Transformer Unit Train
![Page 23: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/23.jpg)
Rail Car Assembly
![Page 24: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/24.jpg)
Transformer Loading – 2 days
![Page 25: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/25.jpg)
Staley Bridge
![Page 26: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/26.jpg)
Temporary GSU in Service – 81 days after failure
![Page 27: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/27.jpg)
Long Term Solutions
161kV OptionReplace temporary GSU transformer or reuseReuse existing 161kV tie line
345kV OptionBuild 345kV 3-terminal busBuild 345kV tie line back to plantReplace GSU transformerDesign new isophase bus interfaceAdd 2nd 346/161kV system tie transformer
![Page 28: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/28.jpg)
Transformer Options
Purchase new 345-24kV transformer
Purchase new 161-24kV transformer
Repair failed 161-24kV transformer
Leave temporary transformer in place
![Page 29: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/29.jpg)
Which Transformer Option is Best?
345kV option ruled out
Temporary transformer ruled outPerformance is better than expectedGenerator operates at less than 100%161kV System bus operating at –2.5% nominal voltageTemporary transformer retained as back-up
Purchase new 161-24kV transformer?Repair failed 161-24kV transformer ?
![Page 30: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/30.jpg)
Prepare SpecificationsIssue RFP’s – Repair & New OptionsEvaluate Proposals
Compare Total Evaluated CostsSchedule – Critical lead times may drive a decisionManufacturer Reliability
Select Proposal
Issue Request for Proposals
![Page 31: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/31.jpg)
Repair vs. Replacement
Advantages• Lower first cost• Shorter lead time• No physical restrictions
Disadvantages• Actual Cost Uncertain• Higher reliability risk • Limited upgrading• Fewer manufacturers• Warranty limitations
![Page 32: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/32.jpg)
Rule of Thumb
Repairing a transformer may be viable if the repair cost is 50-75% of a comparable new transformer.The upper limit is dependent on your company’s
risk management policy and good engineering judgment.
![Page 33: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/33.jpg)
Why Should A Repair Be Less than A New Transformer?
Repair Proposals Are EstimatesGreater Than Expected Damage Increases CostExtensive Core Damage Increases Cost Perception - Repairs Are Less ReliableScope Creep – additions & refurbishment add upTwo-way transportation costsThere is a risk the transformer is not repairable
![Page 34: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/34.jpg)
Scope of WorkTransportation to/from plantTear Down & Failure ReportCapacity Increase/DecreaseVoltage ChangesAccessory Replacement/RefurbishmentInsulating FluidAdditional Monitoring
Repair Cost vs New CostRepair Schedule vs. New ScheduleSalvage Value of Failed Transformer
Repair Considerations
![Page 35: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/35.jpg)
Factory Tear Down Core Removal
Top 2 Tank Sections Removed
![Page 36: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/36.jpg)
Core & CoilsHV Side (Segment 3)
![Page 37: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/37.jpg)
Core Removal in Progress
![Page 38: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/38.jpg)
AØ Winding Damage Visible
![Page 39: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/39.jpg)
AØ Winding Damage Visible – A Better View
![Page 40: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/40.jpg)
411,000 lbs Core Steel22,000 lbs. Replaced
![Page 41: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/41.jpg)
Factory Tear Down – Phase Pack
Phase Pack - AØ Bottom
![Page 42: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/42.jpg)
Phase Pack - AØ Top
![Page 43: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/43.jpg)
Low Voltage Coil Removal
![Page 44: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/44.jpg)
High Voltage Coil Removal(Undamaged Section)
![Page 45: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/45.jpg)
Typical Insulation Washer & Spacers
![Page 46: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/46.jpg)
LV Coil Removal(Undamaged Section)
![Page 47: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/47.jpg)
LV Coil Removal(Undamaged Section)
![Page 48: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/48.jpg)
First DamagedHigh Voltage Coil
![Page 49: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/49.jpg)
High Voltage CoilSevere Coil Deformation
![Page 50: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/50.jpg)
Short Circuit Forces cause coils to roll over & collapse to the center core
![Page 51: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/51.jpg)
Rift created by coil movement is 6” wide x 30” long x 10” deep
![Page 52: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/52.jpg)
High Voltage Coil Distortion
![Page 53: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/53.jpg)
Damaged High Voltage Coil Removal
![Page 54: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/54.jpg)
High Voltage Conductor Burned Through
![Page 55: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/55.jpg)
DETC Tap 3 & 4 Studs Burned - AØ
![Page 56: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/56.jpg)
DETC Tap 3 Terminals - AØ
![Page 57: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/57.jpg)
Spade lug
Spring Washer Missing
![Page 58: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/58.jpg)
Evidence of Localized Heating in HV Coil(Not Failure Related)
![Page 59: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/59.jpg)
Case #1 Failure Summary
Test Data Prior to Failure Normal Some Core Damage EvidentMinor Tank Damage due to fault pressureAΦ HV Winding Failure – one sectionHeavy Distortion in HV CoilsLV Coils – Mechanical Damage OnlyDETC Terminals DisconnectedDETC Tap 3 Terminals & Contacts BurnedDETC Leads Prone to Loosen
![Page 60: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/60.jpg)
Case #1 Cause of Failure?
The post-fault inspection and results of the tear down indicate one or both of the active DETC leads fell open, subjecting the high voltage winding to a severe overvoltage condition. The winding failure probably started as a turn to turn or disk to disk failure.
Since the GSU was directly connected to the generator, the fault levels were extremely high and persisted for a significant period of time. This helps explain the coil distortions.
![Page 61: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/61.jpg)
The Case of a Failed TransformerCase #2 – Main Auxiliary #102
![Page 62: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/62.jpg)
24kV D – 7.2kV-7.2kV GrY35/39.2 MVA 55/65CCore Form circa 1979Isophase HV BusNon-segregated LV Bus3,765 gallons of oil106,050 lbs. total weight
Transformer Data
![Page 63: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/63.jpg)
Situation Assessment
No indication of problems prior to failurePreventative maintenance recently completed Twin Main Aux. Xfmr still available for serviceTest data confirmed winding damage2nd Failure at plant in 8 months Concern - is this failure related to GSU failure?
![Page 64: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/64.jpg)
Execute the Plan
Buy a new transformerScrap the failed transformerAssess risk to surviving Main Aux. Xfmr Coordinate installation with GSU installation
A tear down was done on site to determine the cause of failure.
![Page 65: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/65.jpg)
Core & Coils – Segment 1
![Page 66: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/66.jpg)
Core & Coils – Segments 2 & 4
![Page 67: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/67.jpg)
Core & Coils – Segment 3
![Page 68: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/68.jpg)
Melted Copper Debris - AØ
![Page 69: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/69.jpg)
Melted Copper Debris - AØ
![Page 70: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/70.jpg)
Tear Down - AØLV Winding
![Page 71: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/71.jpg)
Coil Deformation
![Page 72: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/72.jpg)
Tear Down - AØHV Winding
![Page 73: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/73.jpg)
Heat Damage - AØ HV Winding
![Page 74: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/74.jpg)
Heat Damage - AØ HV Winding
![Page 75: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/75.jpg)
Conductor Damage - HV Disk #25 AØ
![Page 76: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/76.jpg)
Conductor Damage - HV Disk #25 AØ
![Page 77: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/77.jpg)
Key Spacer Heat Damage
![Page 78: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/78.jpg)
Conductor Damage - HV Disk #26 AØ
![Page 79: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/79.jpg)
Conductor Damage -HV Disk #26 AØ
![Page 80: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/80.jpg)
Outer LV Winding Tube Damage - AØ
![Page 81: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/81.jpg)
HV Winding Tube – Minor Carbonization
![Page 82: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/82.jpg)
Tear Down Complete
![Page 83: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/83.jpg)
Case #2 Failure Summary
Predictive maintenance completed within 6 mos. Test Data Prior to Failure Normal AØ HV Winding Damage primarily in 2 disksNo damage in either LV Coil of AØNo damage in BØ or CØNo core damageHeating damage indicated high currentsRelays did not detect high current flow
![Page 84: The Case of Failed Transformer](https://reader038.vdocuments.mx/reader038/viewer/2022102819/563db845550346aa9a922492/html5/thumbnails/84.jpg)
Case #2 Cause of Failure?
The results of the tear down indicate a turn to turn failure in the AØ high voltage winding. The heat damage and coil deflections observed indicates localized high current flow within the winding, which is consistent with this type of fault. This current was not detected until the conductor burned through and a more serious fault developed. At that point the differential relay operated followed by the sudden pressure relay.
This failure appeared to be random and not related to the earlier GSU failure.