the bread line demonstration - rockwell automation -...
TRANSCRIPT
Plant Manager
Maintenance ManagerEnergy Manager
Process EngineerAre we
meeting
OEE targets?
Quality targets?
Batch losses
resolved?
How much
energy are we
using?
Is the weather
affecting my
energy consumption?
Are we reaching
our Sustainable
Initative Goals?
Are some machines
consuming more
energy than others?
Are the Oven
Temps
Optimized?
What machines
are causing
the most issues?
What is my
MTTF?
What
machines
need service
Which recipes
are having quality
issues?
Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved.PUBLIC
The FactoryBread Line 1 – Anaheim, California
MIXER PROOF OVEN PACKAGING
Ingredients
Electricity
Water
Bread
Alarms and
Events
Process
Data
OEE and
Downtime
Energy
Consumption
Batch
Data~10min Batches
1hr Shifts
Production
Data
Weather
Weather
Data
Natural Gas
ConsumablesScrap
FT View SE Server• Server O/S • FT View SE Server• RSLinx Enterprise Server• RSLinx Classic• FT Tag-based Alarm Server• FT Historian SE FTLD Interface• MSSQL Express
FT Directory Server• Server O/S• FT Directory Server• MS SQL Express 3
FT Historian SE Server• Server O/S• Historian SE Server
FT VantagePoint Server• Server O/S• FT VantagePoint Server• FT VantagePoint Mobile• FT VantagePoint Portal• Excel 2013 (32bit)
Engineering Workstation• Workstation O/S• FactoryTalk View Studio
Desktop Clients• Workstation O/S• FT View SE Client
Domain Controller 1
• Server O/S • For the Ctl Sys Domain
Mix Area• ControlLogix
Managed Ethernet Switch for Control System Network (CSN) – FT Live Data & Ctrl to Ctrl Communications
Managed Ethernet Switch for Control System Network (CSN) – FT Live Data & Ctrl to Ctrl Communications
Microsoft SQL Server 2
• Server O/S• SQL Server Standard• SQL Server Reporting
Services
Smart Devices and Tablets 4
• Mobile O/S• Mobile FavoritesWindows 8 KPI
• Windows 8.1
Wireless
Router
Proof Oven• ControlLogix
Packaging Line• ControlLogix
FT Energy Metrix Server• Server O/S• Energy Metrix
FT Metrics Server• Server O/S• ODBC Data Source• FT Metrics3
• Report Expert
Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved.PUBLIC
Unified Production Model (UPM)
Integration of all data sources and reports
Organized by Equipment
Sites, Areas, Lines, Assets
Key Performance Indicators for each Bread Line
Organized by Reporting Role
Energy Manager
Maintenance Manager
Plant Manager
Process Engineer
Modeled equipment for easy access to data from various data sources (FTHistorian, FTMetrics…)
Key Value Propositions – the UPM
Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved.PUBLIC
Portal Content
Themed Portal
Access to the UPM via Menu Link
Access to Role Based Reporting also via Menu
Link
Key Value Propositions – Navigating the Menu
Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved.PUBLIC
Portal Content
Portal Tree organized by as per UPM
Integration of Reports from various Data Sources
FTHistorian, FTMetrics
FTEnergyMetrix and Custom Database
Demonstration of various reporting tools
Dashboards
Trends
Excel Reports
SQL Server Reporting Services
Integration of Mobile Dashboards and Reports
Portal Tree organized by Reporting Roles
Key Value Propositions – the Portal UPM
Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved.PUBLIC
Portal ContentKey Value Propositions – Dashboards
Drill from the Baking Overview
to the Line Overview to the
Equipment Detail Dashboards
Visualize Operation
of the Baking Line,
Performance and
Process Variables
Combine Energy
and Performance on
a single Dashboard
Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved.PUBLIC
Portal ContentKey Value Propositions – Line Reporting with Excel
Current Line Performance
with high level details
Drill through to
current Batch Details
Combined material and
Performance detail on
Batch Details report
Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved.PUBLIC
Portal ContentKey Value Propositions – Trending Process and Performance Variables
Trend of overall
Line Performance:
OEE and Units Produced
Trend of Proof Oven
Temperatures
Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved.PUBLIC
Portal ContentKey Value Propositions – Role Reporting – Plant Manager
Line State (Idle, Slicing…)
based on Packaging Machine, with
ability to filter by Product and State
Provides Performance details
for each Machine in the Line
Provides Performance details
for the Site, with drill down
capabilities
Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved.PUBLIC
Portal ContentKey Value Propositions – Role Reporting – Maintenance Manager
Report on your Top Alarms
by Duration from the Alarms
and Events Database
The Top 10 report provides a
quick overview as to what to
focus on to improve
overall performance
The Faults This Week report
includes Mean Time to Failure and
Mean Time to Repair
Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved.PUBLIC
Portal ContentKey Value Propositions – Role Reporting – Energy Manager
Overall weather conditions at site
- weather has a great affect on overall
Energy consumption at this Site
For the Packaging Machine,
we can monitor and report on
Energy Consumption
Energy analysis based on
BatchID, Product, State or Shift
Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved.PUBLIC
Portal ContentKey Value Propositions – Role Reporting – Process Engineer
Detailed review of
Ingredients used
Alarm Report
Trend of ingredients used
Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved.PUBLIC
Mobile ContentKey Value Propositions