The Big Five Tunnel ProjectLong-Term Lessons
Jim Gusek
Golder Associates, Lakewood
Tom Wildeman
Colorado School of Mines, Golden, CO
![Page 2: The Big Five Tunnel Project Long-Term Lessons Jim Gusek Golder Associates, Lakewood jgusek@Golder.com Tom Wildeman Colorado School of Mines, Golden, CO](https://reader035.vdocuments.mx/reader035/viewer/2022062518/56649e865503460f94b89951/html5/thumbnails/2.jpg)
Outline
• Project Startup – Roger Olsen– Ed Bates
• Fumbling Around– Different configurations– Getting to the core of treatment
• Principles Uncovered
![Page 3: The Big Five Tunnel Project Long-Term Lessons Jim Gusek Golder Associates, Lakewood jgusek@Golder.com Tom Wildeman Colorado School of Mines, Golden, CO](https://reader035.vdocuments.mx/reader035/viewer/2022062518/56649e865503460f94b89951/html5/thumbnails/3.jpg)
Big Five Tunnel, Idaho Springs
![Page 4: The Big Five Tunnel Project Long-Term Lessons Jim Gusek Golder Associates, Lakewood jgusek@Golder.com Tom Wildeman Colorado School of Mines, Golden, CO](https://reader035.vdocuments.mx/reader035/viewer/2022062518/56649e865503460f94b89951/html5/thumbnails/4.jpg)
In the Front Range Mineral Belt
&Part of the Central
City – Idaho Springs Super Fund
Site
![Page 5: The Big Five Tunnel Project Long-Term Lessons Jim Gusek Golder Associates, Lakewood jgusek@Golder.com Tom Wildeman Colorado School of Mines, Golden, CO](https://reader035.vdocuments.mx/reader035/viewer/2022062518/56649e865503460f94b89951/html5/thumbnails/5.jpg)
Big Five ARD
Constituent mg/L Constituent mg/L
pH 2.6 Zn 10
Al 18 Cu 1.6
Fe 50 Cd 0.03
Mn 32 Pb 0.01
SO4= 2100 As 0.02
![Page 6: The Big Five Tunnel Project Long-Term Lessons Jim Gusek Golder Associates, Lakewood jgusek@Golder.com Tom Wildeman Colorado School of Mines, Golden, CO](https://reader035.vdocuments.mx/reader035/viewer/2022062518/56649e865503460f94b89951/html5/thumbnails/6.jpg)
What Roger Did
• CDM in charge of Super Fund site assessment for EPA Region VIII
• Wanted to assess “Constructed Wetlands” as a treatment option
• In 1987, chose Colorado School of Mines (CSM) to start a wetlands assessment project.
• Roger is an alumnus of CSM and Chemistry & Geochemistry
![Page 7: The Big Five Tunnel Project Long-Term Lessons Jim Gusek Golder Associates, Lakewood jgusek@Golder.com Tom Wildeman Colorado School of Mines, Golden, CO](https://reader035.vdocuments.mx/reader035/viewer/2022062518/56649e865503460f94b89951/html5/thumbnails/7.jpg)
Why CSM?
• Reputation for Applied Research
• Collegial & Interdisciplinary– John Emerick – Plant Ecologist– Ron Cohen – Environmental Engineer– Ron Klusman – Geochemist– Dave Updegraff – Applied Microbiology– Tom Wildeman – Herder of Cats
![Page 8: The Big Five Tunnel Project Long-Term Lessons Jim Gusek Golder Associates, Lakewood jgusek@Golder.com Tom Wildeman Colorado School of Mines, Golden, CO](https://reader035.vdocuments.mx/reader035/viewer/2022062518/56649e865503460f94b89951/html5/thumbnails/8.jpg)
Roger Also Selected Geotechnical Engineering Support
• Gormley Consultants– John Gormley– Jim Gusek
![Page 9: The Big Five Tunnel Project Long-Term Lessons Jim Gusek Golder Associates, Lakewood jgusek@Golder.com Tom Wildeman Colorado School of Mines, Golden, CO](https://reader035.vdocuments.mx/reader035/viewer/2022062518/56649e865503460f94b89951/html5/thumbnails/9.jpg)
First Lesson
• Need broad expertise in sciences & geotechnical engineering to understand & design passive treatment systems.
• Have to think broadly, not deeply
• Have to apply engineering “loosely,” not rigidly.
![Page 10: The Big Five Tunnel Project Long-Term Lessons Jim Gusek Golder Associates, Lakewood jgusek@Golder.com Tom Wildeman Colorado School of Mines, Golden, CO](https://reader035.vdocuments.mx/reader035/viewer/2022062518/56649e865503460f94b89951/html5/thumbnails/10.jpg)
What Ed Bates Did
• In 1988, awarded funding through the Emerging Technologies Program of the EPA Superfund Innovative Technology Evaluation (SITE) Program. Ed was program manager.
• Immediately banned us from our site for two months.We had no OSHA training and we had to
write a Quality Assurance Project Plan (QAPP)
![Page 11: The Big Five Tunnel Project Long-Term Lessons Jim Gusek Golder Associates, Lakewood jgusek@Golder.com Tom Wildeman Colorado School of Mines, Golden, CO](https://reader035.vdocuments.mx/reader035/viewer/2022062518/56649e865503460f94b89951/html5/thumbnails/11.jpg)
What Ed Really Did
• Introduced us to the “real world”– Mandatory Project meetings where the
students gave progress reports.– Progress & final reports– “Applied Conferences” where the
industry became familiar with the technology.• Talks • “Gray literature”
![Page 12: The Big Five Tunnel Project Long-Term Lessons Jim Gusek Golder Associates, Lakewood jgusek@Golder.com Tom Wildeman Colorado School of Mines, Golden, CO](https://reader035.vdocuments.mx/reader035/viewer/2022062518/56649e865503460f94b89951/html5/thumbnails/12.jpg)
![Page 13: The Big Five Tunnel Project Long-Term Lessons Jim Gusek Golder Associates, Lakewood jgusek@Golder.com Tom Wildeman Colorado School of Mines, Golden, CO](https://reader035.vdocuments.mx/reader035/viewer/2022062518/56649e865503460f94b89951/html5/thumbnails/13.jpg)
Outline
• Project Startup – Roger Olsen– Ed Bates
• Fumbling Around– Different configurations– Getting to the core of treatment
• Principles Uncovered
![Page 14: The Big Five Tunnel Project Long-Term Lessons Jim Gusek Golder Associates, Lakewood jgusek@Golder.com Tom Wildeman Colorado School of Mines, Golden, CO](https://reader035.vdocuments.mx/reader035/viewer/2022062518/56649e865503460f94b89951/html5/thumbnails/14.jpg)
![Page 15: The Big Five Tunnel Project Long-Term Lessons Jim Gusek Golder Associates, Lakewood jgusek@Golder.com Tom Wildeman Colorado School of Mines, Golden, CO](https://reader035.vdocuments.mx/reader035/viewer/2022062518/56649e865503460f94b89951/html5/thumbnails/15.jpg)
Original Configuration
• Three cells 10 x 20 ft– Pennsylvania constructed wetlands
criterion of 200 square ft /gal/min.
• Cell One: Mushroom compost– Success with this in Pennsylvania
• Cell Two: Peat/cow manure/saw dust
• Cell Three: Same as two but with a layer of limestone on the bottom.
![Page 16: The Big Five Tunnel Project Long-Term Lessons Jim Gusek Golder Associates, Lakewood jgusek@Golder.com Tom Wildeman Colorado School of Mines, Golden, CO](https://reader035.vdocuments.mx/reader035/viewer/2022062518/56649e865503460f94b89951/html5/thumbnails/16.jpg)
Assumed Plants Were Important
![Page 17: The Big Five Tunnel Project Long-Term Lessons Jim Gusek Golder Associates, Lakewood jgusek@Golder.com Tom Wildeman Colorado School of Mines, Golden, CO](https://reader035.vdocuments.mx/reader035/viewer/2022062518/56649e865503460f94b89951/html5/thumbnails/17.jpg)
![Page 18: The Big Five Tunnel Project Long-Term Lessons Jim Gusek Golder Associates, Lakewood jgusek@Golder.com Tom Wildeman Colorado School of Mines, Golden, CO](https://reader035.vdocuments.mx/reader035/viewer/2022062518/56649e865503460f94b89951/html5/thumbnails/18.jpg)
![Page 19: The Big Five Tunnel Project Long-Term Lessons Jim Gusek Golder Associates, Lakewood jgusek@Golder.com Tom Wildeman Colorado School of Mines, Golden, CO](https://reader035.vdocuments.mx/reader035/viewer/2022062518/56649e865503460f94b89951/html5/thumbnails/19.jpg)
Things Happened Immediately
Sulfate reduction is a major
removal process
![Page 20: The Big Five Tunnel Project Long-Term Lessons Jim Gusek Golder Associates, Lakewood jgusek@Golder.com Tom Wildeman Colorado School of Mines, Golden, CO](https://reader035.vdocuments.mx/reader035/viewer/2022062518/56649e865503460f94b89951/html5/thumbnails/20.jpg)
Fundamental Concept Picture
Gusek & Bates: Tom, you know nothing about dam construction
![Page 21: The Big Five Tunnel Project Long-Term Lessons Jim Gusek Golder Associates, Lakewood jgusek@Golder.com Tom Wildeman Colorado School of Mines, Golden, CO](https://reader035.vdocuments.mx/reader035/viewer/2022062518/56649e865503460f94b89951/html5/thumbnails/21.jpg)
Problem
• Designed for water to flow across the top.
• Desire to have the water flow through the substrate
![Page 22: The Big Five Tunnel Project Long-Term Lessons Jim Gusek Golder Associates, Lakewood jgusek@Golder.com Tom Wildeman Colorado School of Mines, Golden, CO](https://reader035.vdocuments.mx/reader035/viewer/2022062518/56649e865503460f94b89951/html5/thumbnails/22.jpg)
Second Lesson
• Production of sulfide is the limiting reagent for removal
• Need a volume based removal criterion, not a surface based criterion.
• A reasonable rule of thumb is that 0.3 moles of sulfide will be produced per cubic meter of substrate per day
![Page 23: The Big Five Tunnel Project Long-Term Lessons Jim Gusek Golder Associates, Lakewood jgusek@Golder.com Tom Wildeman Colorado School of Mines, Golden, CO](https://reader035.vdocuments.mx/reader035/viewer/2022062518/56649e865503460f94b89951/html5/thumbnails/23.jpg)
First Try to Get the Water through the Substrate
![Page 24: The Big Five Tunnel Project Long-Term Lessons Jim Gusek Golder Associates, Lakewood jgusek@Golder.com Tom Wildeman Colorado School of Mines, Golden, CO](https://reader035.vdocuments.mx/reader035/viewer/2022062518/56649e865503460f94b89951/html5/thumbnails/24.jpg)
John Gormley: Why not add the water at the top and take it
out at the bottom? DUH!!
![Page 25: The Big Five Tunnel Project Long-Term Lessons Jim Gusek Golder Associates, Lakewood jgusek@Golder.com Tom Wildeman Colorado School of Mines, Golden, CO](https://reader035.vdocuments.mx/reader035/viewer/2022062518/56649e865503460f94b89951/html5/thumbnails/25.jpg)
2nd Try to Have Water flow through Substrate
![Page 26: The Big Five Tunnel Project Long-Term Lessons Jim Gusek Golder Associates, Lakewood jgusek@Golder.com Tom Wildeman Colorado School of Mines, Golden, CO](https://reader035.vdocuments.mx/reader035/viewer/2022062518/56649e865503460f94b89951/html5/thumbnails/26.jpg)
![Page 27: The Big Five Tunnel Project Long-Term Lessons Jim Gusek Golder Associates, Lakewood jgusek@Golder.com Tom Wildeman Colorado School of Mines, Golden, CO](https://reader035.vdocuments.mx/reader035/viewer/2022062518/56649e865503460f94b89951/html5/thumbnails/27.jpg)
Important Picture
Plants are not important
![Page 28: The Big Five Tunnel Project Long-Term Lessons Jim Gusek Golder Associates, Lakewood jgusek@Golder.com Tom Wildeman Colorado School of Mines, Golden, CO](https://reader035.vdocuments.mx/reader035/viewer/2022062518/56649e865503460f94b89951/html5/thumbnails/28.jpg)
Outline
• Project Startup – Roger Olsen– Ed Bates
• Fumbling Around– Different configurations– Getting to the core of treatment
• Principles Uncovered
![Page 29: The Big Five Tunnel Project Long-Term Lessons Jim Gusek Golder Associates, Lakewood jgusek@Golder.com Tom Wildeman Colorado School of Mines, Golden, CO](https://reader035.vdocuments.mx/reader035/viewer/2022062518/56649e865503460f94b89951/html5/thumbnails/29.jpg)
Bacteria are
Important
Tom, you can divide micobiologists into
lumpers and splitters and I am a lumper.
![Page 30: The Big Five Tunnel Project Long-Term Lessons Jim Gusek Golder Associates, Lakewood jgusek@Golder.com Tom Wildeman Colorado School of Mines, Golden, CO](https://reader035.vdocuments.mx/reader035/viewer/2022062518/56649e865503460f94b89951/html5/thumbnails/30.jpg)
Third Lesson
• Use bacteria found in typical aquatic environments because :
• 1) Require the products of bacterial activity more than enzymatic use of the metals.
• 2) A consortium of bacteria rather than a single species are generating the products.
![Page 31: The Big Five Tunnel Project Long-Term Lessons Jim Gusek Golder Associates, Lakewood jgusek@Golder.com Tom Wildeman Colorado School of Mines, Golden, CO](https://reader035.vdocuments.mx/reader035/viewer/2022062518/56649e865503460f94b89951/html5/thumbnails/31.jpg)
Fourth Lesson
• Not designing “a thing”
• Designing a process– Lab studies– Bench-Scale Studies– Pilot-Scale Projects– Full-Scale systems
![Page 32: The Big Five Tunnel Project Long-Term Lessons Jim Gusek Golder Associates, Lakewood jgusek@Golder.com Tom Wildeman Colorado School of Mines, Golden, CO](https://reader035.vdocuments.mx/reader035/viewer/2022062518/56649e865503460f94b89951/html5/thumbnails/32.jpg)
John Gormley: “Proof of Principle” Studies
![Page 33: The Big Five Tunnel Project Long-Term Lessons Jim Gusek Golder Associates, Lakewood jgusek@Golder.com Tom Wildeman Colorado School of Mines, Golden, CO](https://reader035.vdocuments.mx/reader035/viewer/2022062518/56649e865503460f94b89951/html5/thumbnails/33.jpg)
Aerobic Lab Studies
![Page 34: The Big Five Tunnel Project Long-Term Lessons Jim Gusek Golder Associates, Lakewood jgusek@Golder.com Tom Wildeman Colorado School of Mines, Golden, CO](https://reader035.vdocuments.mx/reader035/viewer/2022062518/56649e865503460f94b89951/html5/thumbnails/34.jpg)
Crowning Achievement: 1200 gpm for removal of Pb
![Page 35: The Big Five Tunnel Project Long-Term Lessons Jim Gusek Golder Associates, Lakewood jgusek@Golder.com Tom Wildeman Colorado School of Mines, Golden, CO](https://reader035.vdocuments.mx/reader035/viewer/2022062518/56649e865503460f94b89951/html5/thumbnails/35.jpg)
Summary
• Geochemical principles have been established and have changed little since the early 90’s.
• Microbial ecosystem concept has worked well (especially for novices such as I). The ecosystem is very hardy but can be killed.
• The engineering can be tricky and development benefited considerably through failures.
• The on-site development has to go through bench- and/or pilot-scale studies. One of the primary reasons for this is because on most sites people do not know the chemistry of the MIW and how it changes with the seasons.
![Page 36: The Big Five Tunnel Project Long-Term Lessons Jim Gusek Golder Associates, Lakewood jgusek@Golder.com Tom Wildeman Colorado School of Mines, Golden, CO](https://reader035.vdocuments.mx/reader035/viewer/2022062518/56649e865503460f94b89951/html5/thumbnails/36.jpg)
Questions or Comments