  • 8/2/2019 Testing of Transformers 1

    1/15

    ENGIN

    Transfor

    electrical

    keeping

    inductio

    EERING

    mer is a stat

    power fro

    he frequenc

    .

    (E-M)

    ic device w

    one voltag

    y same by e

    FRONTI

    ich transfor

    e to another

    lectromagn

    R

    ms a.c.

    voltage

    tic

  • 8/2/2019 Testing of Transformers 1

    2/15

    P C P F B R L P G C

    '()*

    ,'

    p

    Ps

    tr

    r

    ISTRIBUT

    OWER TR

    URRENT

    OTENTIA

    URNACE

    OOSTER T

    ECTIFIER

    OCOMOTI

    INING TR

    HASE SHI

    ELDING

    IGH VOL

    ROUNDINONVERTE

    )++)*+)

    '*

    utdoor, Oil

    hase,50HZ

    rimary is de

    condary is

    aturally co

    mongst all

    ansformers

    quired and

    ION TRAN

    NSFORM

    RANSFOR

    TRANSF

    RANSFOR

    RANSFOR

    TRANSFO

    VE TRANS

    ANSFORM

    TING TRA

    RANSFOR

    AGE TES

    G TRANSFR TRANSF

    !"

    "&

    ++)'(+)

    cooled, 3

    lta connecte

    star connect

    led (ONAN

    he types of

    this is the m

    most used t

    FORMER

    R

    MER

    RMER

    MER

    MER

    MER

    FORMER

    ER

    NSFORME

    MER

    ING/SC T

    ORMERSORMER

    #$%&"

    "

    ()++)(++)

    d and

    d.

    type).

    ost

    pe.

    R

    STING TR

    &

    *+).(+)

    F.

    ++)'(+)

    ++)'+++)

    (++

  • 8/2/2019 Testing of Transformers 1

    3/15

    The tranuse a "C

    together

    are wounwound u

    entire as

    steel tanThe min

    on the su

    moisture

    Transforhigh per

    permeabi

    the coremagneti

    path whi

    transforcores co

    prohibiti

    designsconsistinLater de

    layers of

    has remainsulated

    transfor

    The con

    individuthrougho

    insulated

    formers foror "E" sha

    with resin o

    d from enasing a thick

    embly is ba

    which is thral oil help

    rface of the

    that would

    mers typicaleability sil

    ility many ti

    hus serves ting current,

    h closely c

    er developstructed fro

    ve eddy-cur

    itigated thig of bundleigns constr

    thin steel la

    ined in use.from its nei

    er equation

    ucting mat

    l turns musut every tur

    by DPC (D

    these are med core ma

    r banded to

    el coated cribbon of al

    ked to cure

    en filled widissipate h

    oil. The tan

    cause arcin

    ly have coricon steel. T

    mes that of

    o greatly reand confin

    ouples the w

    rs soon realm solid iron

    rent losses,

    s effect witof insulatected the co

    minations,

    Each laminighbors by a

    indicates a

    rial used fo

    be electricn. Here tran

    ouble Paper

    ade much the from lam

    ether with s

    opper wireuminum or

    he resin the

    h high puritat and prot

    is tempora

    and is seal

    s made ofhe steel has

    ree space a

    uce thethe flux to

    indings. Ea

    ized thatresulted in

    nd their

    coresiron wires.

    e by stackin

    principle t

    tion isthin non-c

    minimum c

    the windin

    lly insulateformers are

    Coating) a

    e same wayinations of

    teel straps.

    nd the highopper insul

    n submerge

    y mineral oicts the tran

    rily depress

    d against th

    a

    nd

    a

    ly

    g

    at

    nducting la

    oss-section

    gs depends

    d from eachwound wit

    d Blocks o

    smaller traheet steel st

    he low cur

    current, loated with re

    d in a large

    il, which is isformer fro

    urized to re

    e weather

    er of insula

    l area for t

    pon the ap

    other to ensaluminiu

    pressboard

    sformers aracked and e

    rent, high v

    voltage sesin-impregn

    (usually gra

    nert and nomoisture,

    ove any re

    ith a gasket

    tion. The un

    e core to av

    lication, bu

    ure that theor copper s

    e made. Moither glued

    ltage prima

    ondaries arated paper.

    ) powder c

    -conductivwhich will

    maining

    at the top.

    iversal

    oid saturati

    in all cases

    current travtrip conduct

    st

    ries

    he

    oated

    .loat

    n

    the

    lsors

  • 8/2/2019 Testing of Transformers 1

    4/15

    High temperatures will damage the winding insulation. Small transformers do not generatesignificant heat and are cooled by air circulation and radiation of heat. Power transformers rated

    up to several hundred KVA can be adequately cooled by natural convective air-cooling,

    sometimes assisted by fans. In larger transformers, part of the design problem is removal of heat.Some power transformers are immersed in transformer oil that both cools and insulates the

    windings. The oil is a highly refined mineral oil that remains stable at transformer operating

    temperature. Indoor liquid-filled transformers are required by building regulations in manyjurisdictions to use a non-flammable liquid, or to be located in fire-resistant rooms. Air-cooled

    dry transformers are preferred for indoor applications even at capacity ratings where oil-cooled

    construction would be more economical, because their cost is offset by the reduced building

    construction cost.

    Construction of oil-filled transformers requires that the insulation covering the windings bethoroughly dried before the oil is introduced. There are several different methods of drying.

    Common for all is that they are carried out in vacuum environment. For distribution

    transformers, which are smaller and have a smaller insulation weight, resistance heating can beused. This is a method where current is injected in the windings to heat the insulation. The

    benefit is that the heating can be controlled very well and it is energy efficient.

    Very small transformers will have wire leads connected directly to the ends of the coils, and

    brought out to the base of the unit for circuit connections. Larger transformers may have heavybolted terminals, bus bars or high-voltage insulatedbushings made of polymers or porcelain. Alarge bushing can be a complex structure since it must provide careful control of the electric field

    gradient without letting the transformer leak oil.

  • 8/2/2019 Testing of Transformers 1

    5/15

    /- 0- --

    -

    -----

    -

    0 - - 0

    0 -

    0-

    0 /

    0

  • 8/2/2019 Testing of Transformers 1

    6/15

    TRANS-TECH ENGINEERING

    Testing of Transformer is done to determine their electrical, thermal and mechanical suitabilityfor the system where they will be used or applied. Most of the tests performed on thetransformers are defined in national or international standards created by IEEE, NEMA and

    ANSI, whose purpose is to define uniform set of tests recognized by both the manufacturer and

    user.

    Here !"#$$%$'(')*

    Measurement of winding resistance Measurement of insulation resistance Separate source voltage withstand test (High Voltage tests on HV & LV) Induced Over voltage Withstand test (DVDF test) Measurement of voltage ratio Measurement of NO LOAD LOSS & current. Measurement of LOAD LOSS & IMPEDENCE.(EFFICIENCY & REGULATION) Oil BDV test.

    +#$#$$%&!,!!$#!-$.$-+

    *

    All routine tests Additionally following tests are included in type tests1. Lightening Impulse test.2. Temperature rise test

  • 8/2/2019 Testing of Transformers 1

    7/15

    S

    $1 !65

    .

    A contincomplet

    path. If

    resistanc

    flow of t

    Measurebetween

    - Recomm

    dditional I

    hort circuit

    easurementeasurement

    easurementagnetic bal

    !"

    uity test iscircuit). A

    electron flo

    e, the circui

    e current.

    s the insulatiLV & HV

    ended Valu

    pulse test

    est

    of zero Phaof acoustic

    of harmoniance test.

    2"$3 "7%4

    he checkincontinuity

    w is inhibit

    t is!open.

    ion resistancinding.

    s are

    se sequencenoise level.

    s of the no

    "#!34

    of an electtest is perf

    ed by brok

    Insulation r

    e of HV &

    00

    Impedance

    load current

    26

    ric circuit trmed by pl

    en conduct

    sistance is t

    V winding

    test.

    .

    "1

    o see if curacing a sm

    rs, damage

    he resistanc

    s with respe

    %4$5

    ent flows (tll voltage a

    d compone

    e offered ra

    ct to earth (

    hat it is incross the c

    ts, or exce

    ially to the

    ody) and

    act aosen

    ssive

    axial

  • 8/2/2019 Testing of Transformers 1

    8/15

    Turns rat

    correspo

    transfortransfor

    electrical

    tested to

    This test

    V1/V2 =

    The volt

    measure

    be correc

    859

    This not

    d.c volta

    windingwindings

    resistanc

    This is n

    a must f

    the polar

    polaritieas shown

    V1, V2 alocations

    connecti

    and endsecondar

    A1 A2

    the voltathe prim

    from a1

    more secpresent d

    io test is ve

    nding on its

    er is subjecer is balanc

    properties

    verify that t

    measures th

    N1/N2

    ge ratio is

    with the h

    t.

    5

    ing but the

    ge to the

    resistance,a resistanc

    by applyin

    eded for id

    r poly phas

    ities of the i

    . The transfin the fig s

    nd V3 are nare correct

    n shown).

    f the primay may then

    and a1 a2

    ge rises frory, at any i

    o a2 in the

    ondaryterue to taps t

    y important

    rated voltag

    ted to turnse. The prop

    f its windin

    heir electric

    e voltage ra

    qual to the t

    lp of a turn

    :

    resistance m

    inding and

    more come-bridge me

    g skin effec

    ntifying th

    connection

    nduced emf

    ormer is coupply volta

    oted. V1: V(for the

    he beginni

    ry andbe marked b

    espectively.

    A1 to A2 istant itdoeecondary. I

    inals areken from th

    in order to

    e in primar

    ratio test wr operation

    gs. To ensu

    al propertie

    tio as per th

    urns ratio i

    ratio meter

    easurement

    measuring

    only feasithod can b

    corrections

    primary an

    s. Both a.c.

    . The dot m

    nected to ae Vs is appl

    2 gives the t

    g

    y

    If

    ns so

    e

    find out that

    and secon

    en each phof a transfo

    re continue

    have not c

    customer

    a transfor

    . If it is corr

    of the windi

    the current

    ble with hiused. Fro

    d secondar

    and d.c met

    ethod discu

    low voltageied to the p

    urns ratio. I

    the transfo

    ary. For ex

    se has equarmer relies

    proper ope

    anged from

    requireme

    er. Using t

    ect, then th

    ngs by appl

    through th

    gh voltagethe d.c re

    phasor pol

    hods can be

    ssed earlier

    a.c. sourceimary and t

    V3 reads

    mer has the

    mple, three

    l turns ratiolmost entir

    ration, trans

    design spec

    t.

    is principle,

    voltage rati

    ying a small

    e same. Th

    windings.sistance on

    rities. It is

    used for de

    is used to in

    with the conhe readings

    1V2 then

    right ratio

    phase

    then thely on the

    ormers are

    ifications.

    the turns ra

    o is assume

    ratio give

    For low vcan get th

    ecting

    dicate the

    nections mof the voltm

    assumed do

    tio is

    d to

    s the

    ltagea.c.

    deeters

    t

  • 8/2/2019 Testing of Transformers 1

    9/15

    winding

    towards lFig. 18(

    secondar

    correct. I

    .

    The Ope

    determin

    .0

    The secoapplied tvery sma

    the excit

    Current,

    power fa

    The iron

    433V su

    load is th

    E

    frequenc

    account.

    859

    they can b

    arger ones i) shows the

    y voltage sh

    f the meter

    n circuit tes

    e the imped

    ndary windio the primarll compared

    tion branch

    voltage and

    ctor angle.

    losses and

    ply & the 1

    e no load lo

    ffect of actu

    y must be ta

    5

    labeled as

    n each windD.C. metho

    ows a positi

    icks back t

    !

    , or "no-loa

    ance in the

    ngs of the try winding.to that of t

    .

    power are

    o load curr

    1KV windi

    ss in the tra

    al

    ken into

    :

    3, a4, a5, a

    ing. The sad of testing

    ve reading,

    e assumed

    #%

    test", is on

    xcitation br

    ansformer aince the ime excitation

    easured at

    nt are meas

    g is left op

    sformer.

    . It is the v

    e thing holthe polarity.

    with a movi

    polarity is

    /

    e of the met

    anch of a re

    re left openpedance ofbranch, all

    he primary

    ured in this

    n .The pow

    ltage rising

    ds good ifWhen the s

    ng coil met

    rong.

    *

    hods used i

    al transform

    circuited whe series wiof the input

    winding to

    test. The 43

    er consume

    from small

    ore secondwitch S is c

    r, the assu

    electrical

    er.

    hile a full-randing of thvoltage is d

    scertain the

    V winding

    by the tran

    r number

    ries are prelosed if the

    ed polarity

    ngineering

    ted voltagetransforme

    ropped acro

    admittance

    is charged

    sformer at n

    sent.

    is

    o

    isr isss

    and

    t

    o

  • 8/2/2019 Testing of Transformers 1

    10/15

    The pur

    circuit. ameasure

    respectivusually

    current

    and henccopper l

    absorbed

    For carr

    test on p

    Itr

    s

    Rj

    df

    S E

    Analys

    I I

    i

    ose of shor

    s the namekeeping t

    ely. The suery small a

    hich is onl

    e is neglecosses in pri

    by the leak

    ing short ci

    wer transf

    olate the po

    ansformer f

    rvice.emove HV/

    mps and

    isconnect nom earth/gr

    hort LV ph

    nergise HV

    easure curr

    s

    neutral curneutral cur

    open

    t circuit tes

    uggests, ine secondar

    pply voltagnd is of the

    1% or les

    ed. The shmary and

    age reactanc

    rcuit

    rmer:

    wer

    rom

    LV

    utralound.

    ses and con

    side by LV

    ent in neutr

    rent is near trent is highe

    is to deter

    his test priterminals

    required torder of a

    even at rat

    nt branch iecondary p

    e of the tw

    nect these s

    supply.

    l, LV line v

    o zero transr or equal t

    mine the se

    ary appliedshort circuit

    o circulatefew percen

    ed voltage

    s thus assuut together.

    windings.

    ort circuite

    oltages, HV

    former winline curren

    ries branch

    voltage, thed. Let the

    rated currenof the no

    ecomes ne

    ed to be aThe reacti

    d terminals

    voltage an

    ings are opt between L

    parameters

    current ane values be

    t through tinal voltag

    ligibly sma

    bsent. Wsc ive power c

    o neutral

    HV line cu

    rational.V phase one

    of the equi

    power inpVsc, Isc an

    e transfor. The excit

    ll during thi

    s the sumonsumed is

    rrents.

    of the wind

    alent

    t areWsc

    er isation

    s test

    f thethat

    ing

  • 8/2/2019 Testing of Transformers 1

    11/15

    .#%/.%!*--!,/$"!

    Load Test helps to determine the total loss that takes place, when the transformer

    is loaded. Unlike the tests described previously, in the present case nominal voltage is appliedacross the primary and rated current is drown from the secondary. Load test is used mainly

    1. To determine the rated load of the machine and the temperature rise2. To determine the voltage regulation and efficiency of the transformer.

    This test measures the power consumed by the transformer when the 433V winding is short

    circuited and the rated current is passed through the 11KV winding.

    85915!:

    This test checks the insulation property between Primary to earth, Secondary to earth andbetween Primary & Secondary.

    $%&:"#$#

    %&'()*#++*#+

    -&$%&:$#"#

    %&',*#+

    85915!:High Voltage tester (100KV & 3KV)

  • 8/2/2019 Testing of Transformers 1

    12/15

    This test is made to prove that the transformer insulation will withstand voltage surges whichmay be caused by lightning or switching; this includes insulation to ground, insulation between

    turns and windings, and the flashover value of the associated bushings. A high-voltage wave of

    standard values, and approximating a lightning surge, is imposed on the unit to be tested. Thesurge generator usually consists of a number of capacitors connected so that they be charged inparallel from a relatively low-voltage source and discharged in series to give a high voltage

    across the test piece. A standard impulse wave is illustrated below;

    The standard wave reaches its peak voltage value in 1.5 microseconds and reduces to half the

    voltage value in 40 microseconds. The value of the voltage applied depends on the rating of the

    insulation, and may vary from 5 to 30 times the voltage rating of the insulation. Since ratherelaborate and costly equipment is needed, impulse tests are usually performed only on large

    station-type power transformers, and rarely made after they leave the factory.

    0

    ."This test setup is generally used to perform induced voltage test on the transformers. This set up

    consists of the used motor and generator combination to develop the required voltage and

    frequency. It is used to find the insulation breakdown of the conductors from turns to

    turns and layers to layers. It is an insulation test for the transformers.For an 11KV/433V

    transformer, 866 Volts are applied at the 433V winding with the help of a Generator for 1

    minute. This induces 22KV on 11KV side. The frequency of the 866V supply is also increased to

    100HZ.

    85915!:

  • 8/2/2019 Testing of Transformers 1

    13/15

    0

    I C

    u

    Oil brea

    100 mm

    500ml O

    Spherica

    6$1

    859

    1

    put to mot

    utput volta

    utput frequapacity : Dnder test Tr

    irection of t

    immer stat:

    down volta

    L X 70 mm

    il sample.

    l electrodes

    1!!

    5

    r: 415 V thr

    e: 100 to 9

    ncy : Doubpending upnsformer

    he motor: S

    Apply dim

    ge is checke

    B X 80 mm

    with gap of

    %5:*+

    :

    ee phase, 5

    0 V AC.

    le of Inputn KVA rati

    hould be cl

    er stat to t

    d as per IS-

    Ht. glass p

    2.5 mm

    1

    Hz.

    Frequencyng of the

    ckwise.

    e generator

    35.

    t.

    terminals.

  • 8/2/2019 Testing of Transformers 1

    14/15

    #10'234#556*788340Resistance Test

    H.T. Side

    129.7

    129.1

    130.0

    L.T. Side 55.3m

    55.3m

    56.7m

    High Voltage Test

    Side Voltage Given Time period of Observation

    H.T. Side 21 KV (75% of 28 KV) 1 min

    L.T. Side 2250 V (75% of 3 KV) 1 min.

    DVDF Test

    Voltage Given Frequency given Time period of Observation

    866V (2x433 V) 100 HZ (2x50 HZ) 1 min.

    Turns Ratio TestRatio=1:44

    Deviation (0.5%) Centridian (0.1%)

    -0.2 0.04

    -0.29 0.07

    -0.09 0.08

    No-Load Test

    V(Volt) I(Ampere) W1(Watt) W2(Watt) mf433 V 0.2 A 32 W 8 W 2x2

    Load Test

    V1(H.V.) V2(L.V) I1(H.V.) I2(L.V.) W1 W2 mf

    500 V 1.31 V 0.65A 33.3 A 0 W 70 W 4x2