testimony of tim culbertson, secretary-manager columbia...

5
Testimony of Tim Culbertson, Secretary-Manager Columbia Basin Hydropower Before the U.S. House of Representatives Committee on Natural Resources Subcommittee on Water, Power, and Oceans Legislative Hearing on Discussion Draft H.R. ______ “Bureau of Reclamation Pumped Storage Hydropower Development Act” Tuesday, April 4, 2017 Chairman Lamborn, Ranking Member Huffman: Good morning. My name is Tim Culbertson, and I am the Secretary-Manager for Columbia Basin Hydropower. Thank you for the opportunity to be here with you this morning to provide testimony regarding the Discussion Draft to amend the Reclamation Project Act of 1939 to authorize pumped storage hydropower development utilizing multiple Bureau of Reclamation reservoirs. Columbia Basin Hydropower is a separate legal entity created by the three irrigation districts (East, Quincy, and South Columbia Basin Irrigation Districts) that make up the Columbia Basin Project which delivers water to approximately 700,000 acres in central Washington State and has an economic value in excess of $3 billion dollars annually. The Districts own and Columbia Basin Hydropower manages 7 hydroelectric projects ranging in size from 2 MW to 95 MW with a total capacity of 150 MW. All of our projects are located on canals that are owned by the Bureau of Reclamation. The Districts have the operation and maintenance responsibility for those canals. The foundation for energy supply in the Northwest has historically been hydroelectric generation. My career spans 47 years in the region and I have witnessed the construction and decommissioning of the Trojan Nuclear Power Plant in Oregon and the construction of most of the coal plants in the region. I am now witnessing the agreements that will provide for decommissioning of at least five of the coal plants in the Northwest by the early to mid-2020’s. As a result, the generation landscape in the Northwest is changing significantly. Over the past 10 years there has been over 7,000 MW of renewable generation constructed in our area. One of the primary reasons for wind development in the Northwest has been to have access to the flexibility that hydroelectric system can provide. It has been a good marriage of the two generation resource technologies; however the flexibility of the federal hydro system is nearly exhausted. 457 1 st Avenue NW P.O. Box 219 Ephrata, WA 98823 Bus: (509) 754-2227 Fax: (509) 754-2425 cbhydropower.org Generation from Irrigation

Upload: truongdung

Post on 20-May-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

Testimony of Tim Culbertson, Secretary-Manager Columbia Basin Hydropower

Before the U.S. House of Representatives Committee on Natural Resources

Subcommittee on Water, Power, and Oceans

Legislative Hearing on Discussion Draft H.R. ______

“Bureau of Reclamation Pumped Storage Hydropower Development Act”

Tuesday, April 4, 2017

Chairman Lamborn, Ranking Member Huffman:

Good morning. My name is Tim Culbertson, and I am the Secretary-Manager for Columbia Basin Hydropower.

Thank you for the opportunity to be here with you this morning to provide testimony regarding the Discussion

Draft to amend the Reclamation Project Act of 1939 to authorize pumped storage hydropower development

utilizing multiple Bureau of Reclamation reservoirs.

Columbia Basin Hydropower is a separate legal entity created by the three irrigation districts (East, Quincy, and

South Columbia Basin Irrigation Districts) that make up the Columbia Basin Project which delivers water to

approximately 700,000 acres in central Washington State and has an economic value in excess of $3 billion

dollars annually.

The Districts own and Columbia Basin Hydropower manages 7 hydroelectric projects ranging in size from 2 MW

to 95 MW with a total capacity of 150 MW. All of our projects are located on canals that are owned by the

Bureau of Reclamation. The Districts have the operation and maintenance responsibility for those canals.

The foundation for energy supply in the Northwest has historically been hydroelectric generation. My career

spans 47 years in the region and I have witnessed the construction and decommissioning of the Trojan Nuclear

Power Plant in Oregon and the construction of most of the coal plants in the region. I am now witnessing the

agreements that will provide for decommissioning of at least five of the coal plants in the Northwest by the early

to mid-2020’s. As a result, the generation landscape in the Northwest is changing significantly.

Over the past 10 years there has been over 7,000 MW of renewable generation constructed in our area. One of

the primary reasons for wind development in the Northwest has been to have access to the flexibility that

hydroelectric system can provide. It has been a good marriage of the two generation resource technologies;

however the flexibility of the federal hydro system is nearly exhausted.

457 1st Avenue NW P.O. Box 219

Ephrata, WA 98823

Bus: (509) 754-2227 Fax: (509) 754-2425 cbhydropower.org

Generation from Irrigation

States in the west continue to enact increased renewable energy portfolio standards, which necessitates

another resource to provide back-up generation and grid integration services. Most of the planning by utilities

to provide those services is through the use of either simple cycle or combined cycle combustion turbines. They

do not however provide the same flexibility that a hydro resource can, nor is the life cycle as long as a

hydroelectric resource. Additionally hydro resources have a significantly lower carbon footprint than

combustion turbines.

Columbia Basin Hydropower currently holds a FERC preliminary permit, No. 14329 to construct a pumped

storage project in close proximity to Grand Coulee Dam and is known as the Banks Lake Pumped Storage Project.

The project would be 500 MW and cost approximately $800,000,000. The Banks Lake Project would take 8 – 10

years to construct, provide for 1500 – 2000 direct and indirect jobs during construction. After construction it

would provide employment for 100 – 200 full time employees. The surrounding towns and communities would

also receive significant tax revenues, as this project would likely be a public/private partnership.

Operationally, the Banks Lake Pumped Storage Project can provide the much needed capacity, ancillary services,

and storage for the region that will be needed by the mid- 2020’s. Of growing interest to all utility operations is

the subject and value of energy storage. Right now the storage technology is being focused on batteries, but it

is unlikely that battery technology will provide grid scale storage for quite some time. This project would use

two existing Bureau of Reclamation Reservoirs, Lake Roosevelt and Banks Lake that have five million acre feet of

storage and seven hundred thousand acre feet of storage respectively.

One of the challenges we face with this project is a duplicative licensing process that we will have to engage in

absent the legislation that is being proposed and discussed today. Our project would encompass 90% Bureau of

Reclamation facilities, and only a very small portion of the project falls within FERC’s jurisdiction. Thus, we would

also have an obligation to apply for and engage in a Lease of Power Privilege with the Bureau of Reclamation,

and also using the FERC licensing process. While many or most of the requirements under each process are the

same, the schedules and timelines are significantly different, which would add significant cost or require that

FERC and the Bureau of Reclamation agree to a mutually align their processes. While this can be done, we have

been advised by FERC, that when FERC did this with the Army Corps of Engineers it took the better part of two

years to reach agreement on the process.

Having to engage in this duplicative process would certainly add significant costs, certainly delay the timeframe

for construction of our project, and the ability to meet a timeline for projected needs of capacity, ancillary

services, and storage for the utilities of the Northwest. I am hopeful that this draft legislation will clear up any

federal agency confusion and redundancies.

Today’s hearing could not have taken place at a better time. As the Congress and Administration are working

toward a legislative strategy to reinvest in our nation’s infrastructure, it is critical that hydropower development

be included in this conversation.

Again, thank you for your time and the opportunity to provide comments this morning.

Columbia Basin Hydropower (CBHP) provides administration,

operations, and maintenance functions for hydroelectric

generation facilities owned by the three Irrigation Districts of

the Columbia Basin Irrigation Project in Central Washington

State. As a wholesale power supplier, CBHP operates five

hydropower projects on the Columbia Basin Project that

provide electricity to Seattle and Tacoma.

CBHP is proposing the development of a hydroelectric pumped storage project rated up to 500 megawatts. Banks Lake Pumped Storage Project would be located in central Washington State and utilize two existing reservoirs—Banks Lake and Lake Roosevelt—to provide a new source of carbon-free capacity and ancillary services to the Pacific Northwest power grid. The project would be located on the west side of Lake Roosevelt just upstream of Grand Coulee Dam and near the Bureau of Reclamation’s existing Keys pump-generation plant.

The Banks Lake project would be capable of replacing retiring coal-fired generation and provide utilities with the flexibility to better integrate increasing amounts of intermittent generation coming online in the Pacific Northwest, while protecting the reliability of the region’s bulk power system. Due to its location and design, the project also has several unique characteristics that provide additional value beyond that of a typical pumped storage facility, including the ability to conduct energy shifting operations across a weekly timeframe and generate up to 500 megawatts of electricity for 70 continuous hours. The project could be integrated into existing regional hydro coordination operations, and provide an additional source of water that could be released into Lake Roosevelt during periods of high regional electricity demand, creating additional sustained peaking benefits atmultiple downstream dams.

Banks Lake Pumped Storage Project would generate upto 2,600 jobs during the construction phase and about100 permanent jobs upon completion.

500 megawatt generating capacity.

TURBINE TYPE: Two 250 megawatt adjustablespeed pump-generating units.

MAXIMUM TURBINE FLOW: 25,000 cubic feetper second.

POWERHOUSE: Located on the west side of Lake Roosevelt upstream of Grand Coulee Dam, near the Bureau of Reclamation’s existing Keys Plant.

769,600 megawatt hours annual generation.

PROJECTED IN SERVICE DATE: 2025.

HIGHLIGHTS

PROJECT

BENEFITS

ECONOMIC IMPACT

Banks LakePumped StorageProject Site

Grand CouleeDam

Seattle

Olympia

BANKS LAKEPUMPED STORAGE PROJECT (FERC NO. P-14329)

CONTACT:

www.cbhydropower.org

Tim [email protected] ext. 222

Larry ThomasAssistant [email protected] ext. 224

A

1

4

0

0

1

3

5

0

1

4

5

0

1

3

0

0

1

3

0

0

1

3

0

0

1

3

5

0

1

3

5

0

1

3

5

0

1

3

0

0

1

3

0

0

1

3

5

0

1

4

5

0

1

5

0

0

1

5

5

0

1

6

0

0

1

6

5

0

1

7

0

0

1

6

0

0

1

6

5

0

1

7

0

0

1600

1

5

5

0

1

5

0

0

1

5

0

0

1

6

0

0

1

3

0

0

1

3

5

0

1

4

0

0

1

4

5

0

1

5

5

0

1

6

0

0

1

6

5

0

1

6

5

0

1

6

0

0

1

5

5

0

1

5

0

0

1

4

5

0

1

4

0

0

1

3

5

0

1

3

0

0

1

5

0

0

1

4

5

0

COLUMBIA BASIN HYROPOWER

EPHRATA, WA

PR

IN

TE

D:

J:\1823\003\D

raw

ings\W

orking D

raw

ings\B

anks Lake P

um

p S

torage\1823-003 B

anks Lake P

um

p S

torage.dw

gF

eb

. 9

, 2

01

7 - 7

:5

3 A

M

22x34 =

F

ULL S

CA

LE

01

"2

"3

"

Designed: MSP Drawn: RL Reviewd: KAH

300

SCALE IN FEET

3000 600

(2) 35 FT DIA.TUNNELS

GENERATION FLOW

GRAND COULEE

CRECENT BAY LAKE

LAKE ROOSEVELT

FEEDER CANAL

NORT

H DA

M

BANKS LAKE

LOWER INTAKE 192' WIDE

UPPER INTAKE STRUCTUREWITH 300 FT OF 40 FT DEEPTRASHRACK

POWERHOUSE WITH(2) VERTICAL PUMP TURBINESWITH 20' DIA. RUNNERS

60' TUNNEL, 4544' LONG

INTAKE/OUTLET GATESTRUCTURE

FISH SCREEN

300' WIDE CHANNELDOWN TO EL. 1190'

DRAFT BANKS LAKE PUMPED STORAGE

PROJECT PLAN VIEW

TRANSMISSION CORRIDOR

NEW ACCESS ROAD

SUBTERRANEAN SURGE CHAMBER60' WIDE, 500' LONG, 75' HIGH

IMPROVED ACCESSROAD

COLUMBIA BASIN HYROPOWER

EPHRATA, WA

J:\1823\003\D

raw

ings\W

orking D

raw

ings\B

anks Lake P

um

p S

torage\1823-003 B

anks Lake P

um

p S

torage.dw

gF

eb

. 9

, 2

01

7 - 7

:4

4 A

M

22x34 =

F

ULL S

CA

LE

01

"2

"3

"P

RIN

TE

D:

Designed: MSP Drawn: JAO Reviewd: KAH

VERTICAL DATUM IS NGVD 29

A

PROFILE

1:300

300

SCALE IN FEET

3000 600

(2) 35 FT DIA.TUNNELS

GENERATION FLOW

BOTTOM OF CRESCENTLAKE CHANNEL, 300' WIDEDOWN TO EL. 1190'

UPPER INTAKE STRUCTUREWITH 300FT OF 40 FT DEEPTRASHRACK

POWERHOUSE WITH(2) VERTICAL PUMP TURBINESWITH 20' DIA. RUNNERS

SUBTERRANEAN SURGE CHAMBER60' WIDE, 500 LONG, 75' HIGHHORIZONTAL 60' TUNNEL,

4855' LONG

INTAKE/OUTLET192' WIDE WITHTRASHRACKS

INTAKE/OUTLET GATESTRUCTURE INVERT EL. 1500'

ACCESS SHAFT

FISH SCREENOR NET

DRAFT BANKS LAKE PUMPED STORAGE PROJECT SECTION

LAKE ROOSEVELTEL. 1208' TO 1290'

CRESCENT BAY LAKEEL. 1208' TO 1290'

NORMAL PONDEL. 1570'

AutoCAD SHX Text
Elevation
AutoCAD SHX Text
Elevation
AutoCAD SHX Text
Station
AutoCAD SHX Text
Station
AutoCAD SHX Text
750
AutoCAD SHX Text
800
AutoCAD SHX Text
850
AutoCAD SHX Text
900
AutoCAD SHX Text
950
AutoCAD SHX Text
1000
AutoCAD SHX Text
1050
AutoCAD SHX Text
1100
AutoCAD SHX Text
1150
AutoCAD SHX Text
1200
AutoCAD SHX Text
1250
AutoCAD SHX Text
1300
AutoCAD SHX Text
1350
AutoCAD SHX Text
1400
AutoCAD SHX Text
1450
AutoCAD SHX Text
1500
AutoCAD SHX Text
1550
AutoCAD SHX Text
1600
AutoCAD SHX Text
1650
AutoCAD SHX Text
1700
AutoCAD SHX Text
1750
AutoCAD SHX Text
1800
AutoCAD SHX Text
1850
AutoCAD SHX Text
750
AutoCAD SHX Text
800
AutoCAD SHX Text
850
AutoCAD SHX Text
900
AutoCAD SHX Text
950
AutoCAD SHX Text
1000
AutoCAD SHX Text
1050
AutoCAD SHX Text
1100
AutoCAD SHX Text
1150
AutoCAD SHX Text
1200
AutoCAD SHX Text
1250
AutoCAD SHX Text
1300
AutoCAD SHX Text
1350
AutoCAD SHX Text
1400
AutoCAD SHX Text
1450
AutoCAD SHX Text
1500
AutoCAD SHX Text
1550
AutoCAD SHX Text
1600
AutoCAD SHX Text
1650
AutoCAD SHX Text
1700
AutoCAD SHX Text
1750
AutoCAD SHX Text
1800
AutoCAD SHX Text
1850
AutoCAD SHX Text
-2+50
AutoCAD SHX Text
0+00
AutoCAD SHX Text
2+50
AutoCAD SHX Text
5+00
AutoCAD SHX Text
7+50
AutoCAD SHX Text
10+00
AutoCAD SHX Text
12+50
AutoCAD SHX Text
15+00
AutoCAD SHX Text
17+50
AutoCAD SHX Text
20+00
AutoCAD SHX Text
22+50
AutoCAD SHX Text
25+00
AutoCAD SHX Text
27+50
AutoCAD SHX Text
30+00
AutoCAD SHX Text
32+50
AutoCAD SHX Text
35+00
AutoCAD SHX Text
37+50
AutoCAD SHX Text
40+00
AutoCAD SHX Text
42+50
AutoCAD SHX Text
45+00
AutoCAD SHX Text
47+50
AutoCAD SHX Text
50+00
AutoCAD SHX Text
52+50
AutoCAD SHX Text
55+00
AutoCAD SHX Text
57+50
AutoCAD SHX Text
60+00
AutoCAD SHX Text
62+50
AutoCAD SHX Text
65+00
AutoCAD SHX Text
67+50
AutoCAD SHX Text
70+00
AutoCAD SHX Text
72+50
AutoCAD SHX Text
75+00
AutoCAD SHX Text
77+50
AutoCAD SHX Text
80+00
AutoCAD SHX Text
82+50
AutoCAD SHX Text
85+00
AutoCAD SHX Text
87+50
AutoCAD SHX Text
-2+50
AutoCAD SHX Text
0+00
AutoCAD SHX Text
2+50
AutoCAD SHX Text
5+00
AutoCAD SHX Text
7+50
AutoCAD SHX Text
10+00
AutoCAD SHX Text
12+50
AutoCAD SHX Text
15+00
AutoCAD SHX Text
17+50
AutoCAD SHX Text
20+00
AutoCAD SHX Text
22+50
AutoCAD SHX Text
25+00
AutoCAD SHX Text
27+50
AutoCAD SHX Text
30+00
AutoCAD SHX Text
32+50
AutoCAD SHX Text
35+00
AutoCAD SHX Text
37+50
AutoCAD SHX Text
40+00
AutoCAD SHX Text
42+50
AutoCAD SHX Text
45+00
AutoCAD SHX Text
47+50
AutoCAD SHX Text
50+00
AutoCAD SHX Text
52+50
AutoCAD SHX Text
55+00
AutoCAD SHX Text
57+50
AutoCAD SHX Text
60+00
AutoCAD SHX Text
62+50
AutoCAD SHX Text
65+00
AutoCAD SHX Text
67+50
AutoCAD SHX Text
70+00
AutoCAD SHX Text
72+50
AutoCAD SHX Text
75+00
AutoCAD SHX Text
77+50
AutoCAD SHX Text
80+00
AutoCAD SHX Text
82+50
AutoCAD SHX Text
85+00
AutoCAD SHX Text
87+50
AutoCAD SHX Text
1.000
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
DH_ANBAU1