BIEN DONG PETROLEUM OPERATING COMPANY BIEN DONG-1 PROJECT EPCI OF HAI THACH PQP, HAI THACH WHP AND PIPELINES CONTRACTOR: PETROVIETNAM TECHNICAL SERVICES CORPORATION M & C SUB CONTRACTOR: ALPHA ECC Alpha ECC Chemical Cleaning Standard Operating Procedure Document No.: E1001-ALPHAECC-0023 PTSC M&C/ALPHA ECC BDPOC PREPARED BY SUB APPROVED BY SUB REVIEWED BY PTSC APPROVED BY PTSC REVIEWED BY APPROVED BY REV DATE NAME SIGN DATE NAME SIGN DATE NAME SIGN DATE NAME SIGN DATE NAME SIGN DATE NAME SIGN DATE B1 09-02- Khang 09-02- Quang 09-02- 12 T.L 12 P.V 12

Upload: vovantamktcn

Post on 22-Oct-2014

48 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Test

BIEN DONG PETROLEUM OPERATING COMPANY BIEN DONG-1 PROJECT

EPCI OF HAI THACH PQP, HAI THACH WHP AND PIPELINES CONTRACTOR:

PETROVIETNAM TECHNICAL SERVICES CORPORATION M & C

SUB CONTRACTOR: ALPHA ECC

Alpha ECC Chemical Cleaning Standard Operating Procedure

Document No.: E1001-ALPHAECC-0023

PTSC M&C/ALPHA ECC BDPOC

PREPARED BY SUB APPROVED BY SUB REVIEWED BY PTSC APPROVED BY PTSC REVIEWED BY APPROVED BYREV DATE

NAME SIGN DATE NAME SIGN DATE NAME SIGN DATE NAME SIGN DATE NAME SIGN DATE NAME SIGN DATE

B1 09-02- Khang 09-02- Quang 09-02-12 T.L 12 P.V 12

Page 2: Test

PTSC M&CBIEN DONG PETROLEUM OPERATING COMPANY

BIEN DONG-1 PROJECTEPCI OF HAI THACH PQP, HAI THACH WHP AND PIPELINES

Document No.:

BD POC

E1001-ALPHAECC-0023

Revision No.: B1

Alpha ECC - Standard Procedure forChemical Cleaning Page 2 of

20

Date:

REVISION RECORD SHEET

No. Rev. No. Content of revision Date of Revision

1 B1 Issued for Review 09-02-2012

Page 3: Test

PTSC M&CBIEN DONG PETROLEUM OPERATING COMPANY

BIEN DONG-1 PROJECTEPCI OF HAI THACH PQP, HAI THACH WHP AND PIPELINES

Document No.:

BD POC

E1001-ALPHAECC-0023

Revision No.: B1

Alpha ECC - Standard Procedure forChemical Cleaning Page 3 of

20

Date:

TABLE  OF  CONTENTS

SECTION  DESCRIPTION PAGE

1.0 PURPOSE …………………………………………………………………………………..4

2.0 SCOPE……………………………………………………………………………………... .4

3.0 REFERENCE………………………………………………………………………………. .5

4.0 DEFINITIONS…………………………………………………………………………….. ..5

5.0 PROCEDURE……………………………………………………………………………… 6

5.1 General Requirement 65.2 Documentation 65.3 Chemical cleaning equipment and connection work 75.4 Preparation for chemical cleaning 85.5 Chemical cleaning steps 95.6 Specific steps for leak test & water flushing 105.7 Specific steps for degreasing 125.8 Specific steps for pickling with acid 145.9 Specific steps for passivation/ neutralization 165.10 Nitrogen purging and preservation 18

6.0 INSPECTION………………………………………………………………………………..19

7.0 SPECIAL REQUIREMENT………………………………………………………………...19

7.1 Disposal of waste liquids 197.2 Safety requirement for chemical cleaning 19

8.0 RECORD …………………………………………………………………………………….20

APPENDICES Appendix 1: Chemicals - MSDS and Data Sheets. Appendix 2: Cleaning Equipment Layout Diagram Appendix 3: Reporting Forms Appendix 4 : Organizational Chart

Page 4: Test

PTSC M&CBIEN DONG PETROLEUM OPERATING COMPANY

BIEN DONG-1 PROJECTEPCI OF HAI THACH PQP, HAI THACH WHP AND PIPELINES

Document No.:

BD POC

E1001-ALPHAECC-0023

Revision No.: B1

Alpha ECC - Standard Procedure forChemical Cleaning Page 4 of

20

Date:

1.0 PURPOSE

This procedure covers the methods of cleaning and protection of the internal surfaces of steel offshore piping systems to acceptable levels of cleanliness for a successfully start-up and operation.

It will only be used for piping systems, specified by project specifications and identified on AFC (approved for construction) drawings for chemical cleaning.

2.0 SCOPE This procedure includes the preparation and execution of chemical cleaning (leak test & water flushing, degreasing, acid pickling, neutralization / passivation, and nitrogen blanket application) to the internal surface of carbon or stainless steel piping systems to remove loose scale, rust, foreign matter, grease, etc. During the chemical cleaning operations, care shall be taken to prevent direct contact of chemicals with items that are identified on the isometric drawings for chemical cleaning:

• Piping systems with copper alloy materials,

• Vessels,

• Pumps,

• All bolted/screwed valves and instruments.

The chemical cleaning process shall be accomplished by using chemical agents (degreasing, pickling, neutralization and passivation agents) in the system and circulating the chemical solutions for specified periods of time. It also addresses environment regulation compliance and personnel safety aspects of the work to be done.

Page 5: Test

PTSC M&CBIEN DONG PETROLEUM OPERATING COMPANY

BIEN DONG-1 PROJECTEPCI OF HAI THACH PQP, HAI THACH WHP AND PIPELINES

Document No.:

BD POC

E1001-ALPHAECC-0023

Revision No.: B1

Alpha ECC - Standard Procedure forChemical Cleaning Page 5 of

20

Date:

3.0 REFERENCE

ISO 4406:1999:

ANSI / ASME B3l.3-2010:

ASTM A380 - 96:

ASTM A 967-05:

4.0 DEFINITIONS

BD POC:

PTSC:

ALPHA ECC:

P&ID:

Hydraulic fluid power - Fluids - Method for coding the level ofcontamination by solid particles

Code for Pressure Piping - Process Piping

Standard Practice for Cleaning, Descaling, and Passivation of Stainless Steel Parts, Equipment, and Systems. ASTM Committee A-1 on Steel, Stainless Steel, and Related Alloys

Standard Practice for Chemical Passivating Treatments for Stainless Steel.

BIEN DONG PETROLEUM OPERATING COMPANY

PETROLEUM TECHNICAL SERVICES COMPANY.

SOUTHERN PETROLEUM CONSTRUCTION J.S COMPANY

PIPING AND INSTRUMENTATION DIAGRAM

Page 6: Test

PTSC M&CBIEN DONG PETROLEUM OPERATING COMPANY

BIEN DONG-1 PROJECTEPCI OF HAI THACH PQP, HAI THACH WHP AND PIPELINES

Document No.:

BD POC

E1001-ALPHAECC-0023

Revision No.: B1

Alpha ECC - Standard Procedure forChemical Cleaning Page 6 of

20

Date:

5.0 PROCEDURE

5.1 Gen eral Requirements

5.1.1. Lines  to  be  chemical  cleaned  shall  be  clearly  identified  on  the  P  &  IDs  or  isometricdrawings,  and  Line  Index,  and  submitted  to  BD  POC  representative  for  approval.

5.1.2. Systems  to  be  treated  shall  have  been  hydrostatically  tested  (water)  which  has  beenaccepted  by  BD  POC.

5.1.3. All  supports  shall  be  installed  ready  to  receive  variable  loading  and  expansion  during  thecleaning  process.

5.1.4. In line‐   components  such  as  orifice  plates,  check  valve,  control  valves,  flow  meterelements  and  relief  valves  shall  be  removed  and  replaced  with  temporary  spools(supplied  by  the  client).

5.1.5. All  removed  equipment  shall  be  shown  on  each  test  pack  and  highlighted  on  drawings.

5.1.6. The  supply  inlet  into  the  system  shall  be  fitted  with  a  temporary  isolation  valve  (chemicalresistance  type)  for  safety  purposes.

5.1.7. The  systems  to  be  cleaned  shall  have  high  and  low  point  vents  and  drains  installed.  The system  filling  point  shall  be  the  lowest  point  in  the  system.  A  high  point  vent  shall  be utilized  as  secondary  return  line  and  vent.

5.1.8. Maximum  temperature  used  during  the  operations  of  chemical  cleaning  shall  not  exceed maximum  design  temperature  for  the  systems  as  listed  in  the  Line  Index.

5.1.9. Acceptance  criteria  for  chemical  cleaning  shall  be  according  to  ISO  4406:1999.  The  endresults  shall  be  a  clean  surface.For  all  synthetic  lube  oil  and  mineral  lube  oil  piping  systems,  ISO  4406:1999   grade 17/15/12  (equivalent  to  NAS  1638  class  6)  shall  be  the  acceptance  criteria. Acceptance  criteria  for  all  compressed  gas  piping  systems  shall  be  ISO  4406:1999  grade 17/15/12  (equivalent  to  NAS  1638  class  6).

5.2 Documentation

5.2.1. The  compliance  to  specified  ISO  4406:1999  requirements  shall  be  documented.

Page 7: Test

PTSC M&CBIEN DONG PETROLEUM OPERATING COMPANY

BIEN DONG-1 PROJECTEPCI OF HAI THACH PQP, HAI THACH WHP AND PIPELINES

Document No.:

BD POC

E1001-ALPHAECC-0023

Revision No.: B1

Alpha ECC - Standard Procedure forChemical Cleaning Page 7 of

20

Date:

5.3 Chemical cleaning equipment and connection work

The table of equipment / instruments listed below is indicative only. The actual equipment shall bedetermined during the project phase and approved by PTSC and BD POC. As a minimum, the followingequipment/instruments shall be used to facilitate testing:

No Equipment Q’ty Original Remakes1. Chemical circulating tank 5000 liters 03 NAACO

Material: Composite Việt namVolume: 5m3

protection framework and gutters to collect chemicals2. Chemical batching tank 500 liters 06 NAACO

Material: Plastic corrosion-resistant Việt namVolume: 0.5m3

Protection framework and gutters to collect chemicals 3. Chemical pumping station 02 USA

- Sandpiper Model S1F - Working pressure : 7 bar - Flow: 50 m3/h Include 05 diaphragm pump

4. Waste water pumping station 01 USA- Sandpiper Model S1F - Working pressure : 7 bar - Flow: 10 m3/h

Include 02 diaphragm pumps 5. pH measurement 02 Japan

6. Hose connection QME R1AT " QME FlexMaterial: Rubber with steel mesh ItaliaPressure max: 80 bar Technology

7. Flexible hose, corrosion-resistant …meters

8. Laser Particle Analyzer LasPaCII-P / or equivalent 01 Stauff®,Germany

9. Thermometer 01

10. Pressure gauge for nitrogen 01

Connection  work  shall  be  as  follows:

• Connection and bypass have to implement how to make sure cleaning chemical will not contact with all the equipment (or instrument) were installed on the piping system. (control valve, cylinder, pump, sensor…)

• Typical layout diagram of the flushing equipment system is enclosed in Appendix 2.

Page 8: Test

PTSC M&CBIEN DONG PETROLEUM OPERATING COMPANY

BIEN DONG-1 PROJECTEPCI OF HAI THACH PQP, HAI THACH WHP AND PIPELINES

Document No.:

BD POC

E1001-ALPHAECC-0023

Revision No.: B1

Alpha ECC - Standard Procedure forChemical Cleaning Page 8 of

20

Date:

5.4 Preparation for chemical cleaning

As a minimum, the following technical aspects shall be checked for completion before commencement of the chemical operations:

• Flushing equipment chemically cleaned, • System drained and dry before chemical cleaning, • Marked up drawings (P&IDs) attached, • System equipment bypassed and blinded, • Analysis certificate copy attached, • System/equipment labeled, • Preservation carried out, • System/equipment reinstated, • System/equipment blinded off.

As a minimum, the following safety aspects shall be addressed for completion before commencement of the chemical operations: • In preparation position, tank chemical containers are placed absorbent pads lined with chemicals, chemical

equipment collection when the problem occurred:

a. Chemical cleaning acid,

b. Tank fresh water tap emergency exhaust.

c. Acid absorbent plate.

• At work site, MSDS of all chemicals to be used , and a portable eye wash station shall be located and available at all time in the zone of utilization.

• Personal Protective Equipment (PPE) for operators:

a. Corrosion- resistant clothing

b. Gas mask

c. Face seal

d. Rubber gloves.

2. Leak check and accident prevention:

a. Upon completion of the temporary installation, the system shall be water tested to check for leaks The test pressure shall be maximum pump head discharge pressure with continuous flow.

b. PTSC Safety officer shall witness the testing of the temporary facilities.

c. Upon satisfactory completion of the test, PTSC Safety Officer will endorse the permit to work with corrosive material.

Page 9: Test

5.5.2  Brief  description  of  the  process

PTSC M&CBIEN DONG PETROLEUM OPERATING COMPANY

BIEN DONG-1 PROJECTEPCI OF HAI THACH PQP, HAI THACH WHP AND PIPELINES

Document No.:

BD POC

E1001-ALPHAECC-0023

Revision No.: B1

Alpha ECC - Standard Procedure forChemical Cleaning Page 9 of

20

Date:

5.5 Chemical cleaning steps

5.5.1  Main  steps

Main steps of chemical cleaning are shown below:

1 LEAK TEST & WATER FLUSHING

Brief  description  of  the  process

2 DEGREASING WITH ALKALINE

WATER RINSING

3 PICKLING WITH ACID

WATER RINSING

4 PASSIVATION/ NEUTRALIZATION

WATER FLUSHING

DRYING / NITROGEN PURGING

• See Appendix 2 for a typical layout diagram for connecting a test pack with the chemical cleaning equipment system.

• DRYING / NITROGEN BLANKET PPLICATION: a nitrogen blanket shall be applied to all chemically cleaned lines and shall be kept at a positive nitrogen pressure until ready for start-up. This positive pressure shall be 10 psig.

Page 10: Test

PTSC M&CBIEN DONG PETROLEUM OPERATING COMPANY

BIEN DONG-1 PROJECTEPCI OF HAI THACH PQP, HAI THACH WHP AND PIPELINES

Document No.:

BD POC

E1001-ALPHAECC-0023

Revision No.: B1

Alpha ECC - Standard Procedure forChemical Cleaning Page 10 of

20

Date:

5.6 Specific steps for LEAK TEST & WATER FLUSHING

1-1 LEAK TEST & WATER FLUSHING

1-2 CLEANING CIRCUIT FILLING

1-3 CIRCULATION LEAK TEST

NO1-4 WATER FLUSHING COMPLETE/

PUMP STRAINER CLEAN ?

YES

1-5 PREPARE FOR DEGREASINGSTEP 2

a. Flow velocity check b. Leakage check

5.6.1 Leak test & water flushing control parameters

Circulation leak check: checking / recording leakage at cleaning system connection points.

Flow velocity check: 90 - 150 cm/s

5.6.2 Leak test & water flushing acceptance criteria

Leakage: no leakage at system connection points at the end of Step 1 LEAK TEST& WATER FLUSHING.

Page 11: Test

PTSC M&CBIEN DONG PETROLEUM OPERATING COMPANY

BIEN DONG-1 PROJECTEPCI OF HAI THACH PQP, HAI THACH WHP AND PIPELINES

Document No.:

BD POC

E1001-ALPHAECC-0023

Revision No.: B1

Alpha ECC - Standard Procedure forChemical Cleaning Page 11 of

20

Date:

5.6.3 Leak test & water flushing description - Step 1 • LEAK TEST & WATER FLUSHING is the first step in preparation for chemical cleaning, to ensure that

the system to be treated is leak free after water flushing and prior to degreasing. It will also removes heavy deposits of oils, greases, soils or foreign matter other than mill scale, rust, or rust scale from internal surfaces of the piping system.

• This pre-cleaning shall be carried out by circulation method, using tap (potable) water. See Appendix 2 for typical layout of the system. During Step 1, no chemical shall be injected into the system.

• Piping to be cleaned will be disconnected or blanked off from mechanical equipment to prevent circulation of chemicals through bearings, cylinders, oil filter cartridges, instruments, screens and filters.

• Valves and equipment may be included in the circulation system, provided that their materials are resistant to chemical solutions involved and prior approval by customer (PTSC & BD POC) is obtained.

• During flushing, the system shall be packed with the water and no air shall be present in high points.

• Use naked eyes to check connection points in the circulation system and look for water leakage (step 1-3). The work shall be immediately suspended to correct any found leaking point. Soap water, dry cloth or similar aids may be used from outside connection points to assist leakage detection. During the flushing operation, if any leak is observed, remedial action shall be taken to stop the leak and flushing shall be continued until the visual inspection of outlet water indicates it has the same appearance of inlet water.

• During flushing, water flow velocity shall be kept within the range of 90 to 150 cm/s (3 to 4 ft/s), prefererably at 150 cm/s.

Page 12: Test

PTSC M&CBIEN DONG PETROLEUM OPERATING COMPANY

BIEN DONG-1 PROJECTEPCI OF HAI THACH PQP, HAI THACH WHP AND PIPELINES

Document No.:

BD POC

E1001-ALPHAECC-0023

Revision No.: B1

Alpha ECC - Standard Procedure forChemical Cleaning Page 12 of

20

Date:

5.7 Specific steps for DEGREASING

LEAK TEST & WATER FLUSHING COMPLETE

2-1 FLUSHING CIRCUIT WITH WATER

2-2 WATER CIRCULATION (40 - 60 oC)

2-3 ALKALINE CLEAN WITH CIRCULATION OF ALCA SOLUTION FOR 4 HOURS (MAX.)

NO

2-4 ALKALINE CLEANNING COMPLETE ?ALL PARAMETERS STABLE ?

YES

2-5 NEUTRALIZE pH TO 7- 9. (ADD ALCA)

2-6 DRAIN OUT. SEND TO NEUTRALIZED TANK

2-7 RINSING WITH WATER

2-8 PREPARE TO PICKLE WITH ACIDSTEP 3

5.7.1 Degreasing control parameters

Temperature: 40 - 60 oC

Flow velocity: 90 - 150 cm/s

Circulation period: 4 hours

pH: 7 - 9.

5.7.2 Degreasing acceptance criteria

Cleanliness: pH < 8.5 (steps 2-7 only).

a. pH checkb. Wipe testc. Temperature check d. Flow velocity check

a. pH check < 8.5

Page 13: Test

PTSC M&CBIEN DONG PETROLEUM OPERATING COMPANY

BIEN DONG-1 PROJECTEPCI OF HAI THACH PQP, HAI THACH WHP AND PIPELINES

Document No.:

BD POC

E1001-ALPHAECC-0023

Revision No.: B1

Alpha ECC - Standard Procedure forChemical Cleaning Page 13 of

20

Date:

5.7.3 Degreasing description - Step 2

• DEGREASING WITH ALKALINE is the second step of chemical cleaning, to ensure that any remaining oil, or grease in the internal of the piping system (the test pack) is cleaned before Step 3 is commenced. All particles are further removed.

• The chemical used for degreasing has a mild foaming action, adapted to circulation treatment.

• After flushing the system and chemical bath tank with normal tap water (for carbon piping systems) or clean water of max. 20 ppm of chloride (for stainless steel piping systems), the temperature of the circulation water shall be raised by exchanging heat with a hot oil circuit to 40 - 60oC. This temperature shall be maintained throughout the treating process.

• Degreasing chemical shall be mixed into chemical tank (5 - 7%) and circulated through the system to remove grease and oil.

• Degreasing chemical: ALCA is a mixture of 10 - 25% potassium hydroxide (KOH), 2.5 - 10% diethanolamide of fat acids, 2.5 - 10% trisodium phosphate (MSDS and Data Sheets attached in Appendix)

• Treating duration shall be 2 - 4 hours

• A sample of the degreasing solution sample shall be tested every 30 minutes at the entrance and exit of the system. PTSC and BD POC representative(s) shall witness the analysis.

• Visual check: examination will be done by white light or using ultraviolet instrument and supplemented by wipe measure. The solvent will illuminate if it contains oil or grease (with ultraviolet).

• Step 2-5: neutralization to achieve pH 7 - 9 shall be by adding ALCA.

• Wipes will be kept as an evidence of the progress of the degreasing step.

• When the wipe test shows no traces of oil, the degreasing process is deemed completed.

Page 14: Test

PTSC M&CBIEN DONG PETROLEUM OPERATING COMPANY

BIEN DONG-1 PROJECTEPCI OF HAI THACH PQP, HAI THACH WHP AND PIPELINES

Document No.:

BD POC

E1001-ALPHAECC-0023

Revision No.: B1

Alpha ECC - Standard Procedure forChemical Cleaning Page 14 of

20

Date:

5.8 Specific steps for PICKLING WITH ACID

DEGREASING COMPLETE

3-1 FILLING CIRCUIT WITH WATER

a. Temperature check3-2 HOT WATER CIRCULATION (40 - 50 oC)

3-3 ACIDS + INHIBITOR FEED (ADD ARA 400).CIRCULATION (40 - 50 oC) UNTIL IRON STABLE

NO

3-4 PICKLING COMPLETE ?ALL PARAMETERS STABLE ?

YES

3-5 NEUTRALIZE pH TO 7-9 (ADD ALCA)

3-6 DRAIN OUT. SEND TO NEUTRALIZED TANK

3-7 RINSING WITH WATER

3-8 PREPARE TO PASSIVATIONSTEP 4

5.8.1 Pickling control parameters

c. Leak check

a. Cleanliness check,acc. to ISO 4406:1999

b. pH checkc. Fe ++ion check (+/- 10% Fe ion

readings after 3 consecutive readings means iron removal is completed)

a. Cleanliness check,ISO 4406:1999

b. pH check 7-9

Cleanliness: checking / recording in accordance with ISO 4406:1999 (steps 3-4 only)

Temperature: 40 - 50 oC

Flow velocity: 90 - 150 cm/s

Fe ion content: 600 - 2500 ppm (step 3-4)

pH: 3.5 - 4.5 (steps 3-4); 7 - 9 (step 3-7)

5.8.2 Pickling acceptance criteria

Cleanliness: Code 17/15/12, ISO 4406:1999 (equiv. NAS 1638 class 6) for the pipingsystems (step 3-7 only).

Page 15: Test

PTSC M&CBIEN DONG PETROLEUM OPERATING COMPANY

BIEN DONG-1 PROJECTEPCI OF HAI THACH PQP, HAI THACH WHP AND PIPELINES

Document No.:

BD POC

E1001-ALPHAECC-0023

Revision No.: B1

Alpha ECC - Standard Procedure forChemical Cleaning Page 15 of

20

Date:

5.8.3 Pickling description - Step 3

• PICKLING WITH ACID is the third step of chemical cleaning, to ensure cleaning of rust and scale without causing any damage to the circuit and specially valves, more sensitive to acid than the pipes.

• Prior to adding acid cleaning chemical, heated water shall be circulated (steps 3-1 and 3-2) in the system to re-check for any leakage on the flanges, temporary bypass hook-ups and all hose connections. All solutions during the recirculation sequence shall be filtered. Full flow filters or equipment shall be equipped with corrosion-resistant screens capable of removing particles that are 4 micrometers or more in diameter.

• Acid chemical must be tested on samples of pipes to see effectiveness of cleaning and protective againstfurther corrosion.

• Carbon steel piping systems: The chosen pickling product is ARA 400 (MSDS and Manufacturer Data Sheets attached in Appendix 1). ARA 400 consists of 2% glycolic acid, 2.5% citric acid, and 40% phosphoric acid. This product has a mild corrosive action, enough to remove remaining rust and scale without damaging pipe internal part. It also include a corrosion inhibitor (0.5%) and 1% non-ionic surfactant in order to ease the effect of the acids. Water used for Step 3 shall be clean tap water. Acid concentration is maintained from 5 to 7%. Neutralization to pH 7 - 9 shall be by adding ALCA (Step 3-5) of 2% concentration.

• Stainless steel piping systems: ARA 400 is also chosen for pickling of the stainless piping systems. Waterused for Step 3 shall be clean de-mineralized water containing maximum 20 ppm of chloride. The acidconcentration is maintained from 7 to 20%. Neutralization to pH 7 - 9 shall be by adding ALCA of 2%concentration (Step 3-5).

• Treating duration: 4 hours for carbon steel piping systems; 2 hours for stainless steel piping systems.

• Check frequency (Step 3-4): every 30 minutes.

• A sample coupon shall be placed inside the chemical mixing bath tank to evaluate the effectiveness of thecleaning process. Sample coupons shall be inspected after completion of each stage of the cleaning process.

1. The descaling solution sample shall be analyzed every hour. PTSC and BD POC representative shall witness the analysis process.

2. Check sample coupon effectiveness of cleaning.

• Wipes will be introduced at key areas in order to verify effectiveness of the descaling and de-rusted process. After one hour, 1 hour and half, two hours, three and four if necessary.

• Inspection of the test pack at the end of pickling process (Step 3-7) should look for the following indication of acceptance criteria for cleanliness at location of re-entry into pickling tank: cleanliness of 17/15/12 scale, ISO 4406:1999 (equiv. NAS 1638 class 6) for the treated piping systems. To confirm the effectiveness of the cleaning, the first test pack will be chemically cleaned with a pipe coupon installed (representing the actual pipe of the test pack). At step 3-7, this coupon will be removed from the cleaning circuit for checking of internal surface cleanliness.

• Important note: If iron content difference between beginning and during the pickling process (when testing is carried out, Step 3-4) exceeds 5,000 ppm (or 5,000 mg/L), the pickling shall immediately be stopped and the acid mixture be drained from the system followed by proper rinsing until pH of 7 - 8 is reached. Then the type and concentration of acids and inhibitor shall be changed. Approval of the change by customer representative shall be obtained prior to resumption of acid pickling. This situation rarely happens in practice with new piping systems.

Page 16: Test

PTSC M&CBIEN DONG PETROLEUM OPERATING COMPANY

BIEN DONG-1 PROJECTEPCI OF HAI THACH PQP, HAI THACH WHP AND PIPELINES

Document No.:

BD POC

E1001-ALPHAECC-0023

Revision No.: B1

Alpha ECC - Standard Procedure forChemical Cleaning Page 16 of

20

Date:

5.9 Specific steps for passivation/ neutralization

PICKLING COMPLETE

4-1 FILLING CIRCUIT WITH WATER

a. Temperature check4-2 HOT WATER CIRCULATION (40 - 50 oC)

4-3 ADD ALCA TO PASSIVATE

4-4 PASSIVATION COMPLETE.ALL PARAMETERS STABLE

4-5 MAINTAIN PARAMETERSpH > 9.2

4-6 PASSIVATION COMPLETE`

5.9.1 Passivation / Neutralization control parameters

Temperature: 40 - 50 oC (Step 4-2)

Flow velocity: 90 - 150 cm/s

pH: 9 - 10 (Step 4-3)

Circulation time: 4 hours

5.9.2 Passivation / Neutralization acceptance criteria

pH: > 9.2 (Step 4-5)

b. Flow velocity check

a. pH check

a. pH checkb. Temperature check

a. pH check

Page 17: Test

PTSC M&CBIEN DONG PETROLEUM OPERATING COMPANY

BIEN DONG-1 PROJECTEPCI OF HAI THACH PQP, HAI THACH WHP AND PIPELINES

Document No.:

BD POC

E1001-ALPHAECC-0023

Revision No.: B1

Alpha ECC - Standard Procedure forChemical Cleaning Page 17 of

20

Date:

5.9.3 Passivation / Neutralization description - Step 4

• PASSIVATION / NEUTRALIZATION is the fourth step of chemical cleaning, to ensure:

1. That traces of chemicals used in previous steps are removed from internal surface of carbon steelpiping systems, or

2. That a passive protective layer of chromium oxide is re-created on the internal surface of stainlesssteel piping systems

• For carbon steel piping systems: ALCA of 2% is used to neutralize the remaining chemicals on the internal surface of the pipes.

• For stainless steel piping systems: As the passivation chemical, ALCA of 12 - 40% shall be used. This concentration is especially designed to passivate stainless steel.

Page 18: Test

PTSC M&CBIEN DONG PETROLEUM OPERATING COMPANY

BIEN DONG-1 PROJECTEPCI OF HAI THACH PQP, HAI THACH WHP AND PIPELINES

Document No.:

BD POC

E1001-ALPHAECC-0023

Revision No.: B1

Alpha ECC - Standard Procedure forChemical Cleaning Page 18 of

20

Date:

5.10 Nitrogen purging and preservation

Inert  gas  purging  and  preservation  shall  be  carried  out  as  follow.  The  inert  gas  utilized  shall normally  be  nitrogen.

5.7.1 Isolate  the  system  by  closing  the  identified  valves,  blinds,  etc.  These  will  be  identified  onsystem  P  &  ID  or  isometric  drawing.

5.7.2 Determine  one  or  more  connections  to  be  used  for  the  introduction  of  nitrogen  into  the system.  Nitrogen  (slightly  lighter  than  air)  should  be  introduced  at  a  lower  elevation  to promote  mixing  with  the  air.  Multiple  injection  locations  should  be  considered  for  complex systems.

5.7.3 Introduce  nitrogen  into  the  system  and  pressure  the  system  to  approximately  50  psig.  Thispressure  should  be  maintained  for  one  to  three  hours  to  allow  mixing  of  the  inert  gas  and  airto  take  place.

5.7.4 Open  one  or  more  blow  down  valves  to  depressurize  the  system  to  ambient  conditions.Blow  down  valves  should  also  be  located  at  low  points  in  the  system  to  promote  the  removalof  free  water  and  stratified  air.  Blow  down  valve  locations  should  be  different  frompressurization  locations  if  possible.

5.7.5 Re pressure‐   the  system  to  10  psig.  Isolate  and  seal  the  system.

5.7.6 Periodically  monitor  the  system  pressure.  A  positive  system  pressure  should  be  maintained.Re pressure‐   the  system  if  necessary.

5.7.7 PTSC  /  BD  POC  Representative  shall  witness  the  purging  process  and  daily  to  ensure  thepositive  system  pressure  is  maintained.

5.7.8 Preservation  lines  which  contain  preservation  Nitrogen  shall  be  identified  with  warning  tag.

Page 19: Test

PTSC M&CBIEN DONG PETROLEUM OPERATING COMPANY

BIEN DONG-1 PROJECTEPCI OF HAI THACH PQP, HAI THACH WHP AND PIPELINES

Document No.:

BD POC

E1001-ALPHAECC-0023

Revision No.: B1

Alpha ECC - Standard Procedure forChemical Cleaning Page 19 of

20

Date:

6.0 INSPECTION

6.10 The sample coupons will be the inspected to evaluate the effectiveness of the chemical.

6.11 The pipe opens ends, where treatment accessible shall be visually inspected and the pipeinternal surfaces checked to ensure they are free from any trace of contamination.

7.0 SPECIAL REQUIREMENT

7.1 Disposal of waste liquids

7.1.1 The  waste  liquids  used  shall  be  treated  in  accordance  with  the  environmental  regulationsonly waste‐   water  with  a  pH  6 9‐   may  be  disposed  to  the  designated  drain  pit.

7.1.2 Connect  the  neutralization  pump  outlet  to  the  waste  discharge  outlet.

7.1.3 Inject  the  neutralization  chemical  into  waste  chemical  discharge  line  to  mix  with  the  wastechemical  before  discharge  to  drain  pit.

7.1.4 Monitor  the  pH  value  and  adjust  the  pH  value  to  7  at  discharge  point.  The  pH  value  will  bewitnessed  by  PTSC  Safety  officer.

7.2 Safety requirement for chemical cleaning

7.2.1 The  cleaning  area  shall  be  barricaded  off  to  unauthorized  personnel  and  a  warning  notice  ‐"Danger Chemical‐   Cleaning  In  Progress Keep‐   Out"  must‐   be  displayed  at  all  approaches  tothe  area  of  operations.

7.2.2 Cleaning  personnel  must  know  how  to  stop  cleaning  operations  immediately  in  case  of  anyemergency.

7.2.3 Cleaning  agents,  inhibitors  and  other  chemicals  shall  be  transported  in  closed  markedcontainers.

7.2.4 All  personnel  engaged  in  chemical  cleaning  shall  wear,  as  appropriate,  protective  gloves,goggles,  boots,  chemically  resistant  suit,  a  face  mask  and  suitable  respiratory  protection.  .

7.2.5 A  supply  of  eye  wash  solution  shall  be  available  in  a  prominently displayed  cabinet.

7.2.6 A  supply  of  running  water  shall  be  available  for  immediate  use.

7.2.7 Arrangements  for  the  safe  and  legal  disposal  of  cleaning  agents  shall  be  made.

7.2.8 The  cleaning  circuit  shall  be  tested  for  leaks  before  any  cleaning  agent  is  introduced.

7.2.9 Before  any  chemical  is  introduced  into  the  cleaning  circuit,  an  adequate  supply  ofneutralizing  agent,  where  appropriate,  shall  be  at  hand  for  emergency  use.

7.2.10  Provisions  for  complete  draining  of  equipment  must  be  provided.

7.2.11  Dead leg‐   which  would  prevent  neutralization  must  be  catered  for  before  introduction  of cleaning  fluid.

Page 20: Test

PTSC M&CBIEN DONG PETROLEUM OPERATING COMPANY

BIEN DONG-1 PROJECTEPCI OF HAI THACH PQP, HAI THACH WHP AND PIPELINES

Document No.:

BD POC

E1001-ALPHAECC-0023

Revision No.: B1

Alpha ECC - Standard Procedure forChemical Cleaning Page 20 of

20

Date:

8.0 RECORD

8.1 A Chemical cleaning package identifying the piping system to be chemically treated shallcontain the following:

8.1.1 Marked  up  P  &  IDs  /  isometrics  identifying  the  boundary  limit  of  the  systems  to  be  treated.All  or  blinds,  fill  and  drain  points  shall  be  identified.

8.2 The Chemical Cleaning Report shall be made up as follow:

8.2.1 Leak  Test  &  Water  Flushing  Records.

8.2.2 Degreasing  Records.

8.2.3 Acid  Pickling  Records.

8.2.4 Neutralization  /  Passivation  Records.

8.2.5 Nitrogen  Blanket  Pressure  Check  Record.

Page 21: Test

APPENDIX 1

CHEMICALS MSDS & DATA SHEETS

Page 22: Test

Page : 1

MATERIAL SAFETY DATA SHEET Revision nr : 3

Date : 1 / 26 / 2009

Supersedes : 12 / 7 / 2007

ALCA 11.033

CC - Corrosive

1. Identification of the product and the company

Trade name

Type of productf

Company identification

: ALCA

:é Streamlining for cleanings heavy scheme it in high pressure. See product bulletin for detailed information.

: Société CaralB.P. N° 452F-27204 VERNON CEDEX FranceTel : +33 (0) 2 32 52 42 60 - Fax: +33 (0) 2 32 52 26 74 Mail : [email protected]

2. Hazards identification

Risk Phrases : Causes severe burns.

3. Information on ingredients

This product is considered to be hazardous and contains hazardous components.Substance name Value(s) CAS nr EINECS nr EC index Classification

Potassium hydroxide : 10 to 25 % 1310-58-3 215-181-3 019-002-00-8 Xn; R22C; R35

Diéthanolamide d'acides gras : 2.5 to 10 % ----- ----- ----- Xi; R38-41

Trisodium phosphate, 12 H2O : 2.5 to 10 % 7601-54-9 231-509-8 E 339 III Xi; R36/38

Potassium cocoate : < 2.5 % 61789-30-8 263-049-9 ----- Xi; R36/38

Nitrilotrimethylenetris(phosphonic : < 2.5 % 6419-19-8 229-146-5 ----- Xi; R36/38acid)

Other informationf :é Free from ethoxylate nonylphenol.

4. First aid measures

- Skin contact : Take off contaminated clothing. Immediately flush the contact area with plenty ofwater. If soreness persists or if contamination is wide, consult a doctor.

- Eye contactf :é Rinse immediately with plenty of water. Contactophthalmologist immediately.

- Ingestion : Rinse mouth. Do not neither get to drink nor induce vomiting. Notify immedialtely adoctor. If possible show this sheet, if not available show packaging or label.

5. Fire - fighting measures

Flammable class : Not flammable.

If product is involved in a fire : All extinguishing media can be used.Do not enter fire area without proper protective equipment, including respiratory protection. Collect extinguishing water, do not drain it off in sewer pipe or natural waterways.

Société Caral B.P. N° 452 F-27204 VERNON CEDEX France Tel : +33 (0) 2 32 52 42 60 - Fax: +33 (0) 2 32 52 26 74 Mail : [email protected]

Page 23: Test

Page : 2

MATERIAL SAFETY DATA SHEET Revision nr : 3

Date : 1 / 26 / 2009

Supersedes : 12 / 7 / 2007

ALCA 11.033

6. Accidental release measures

Personal precautions

Environmental precautions

After spillage and/or leakage

Cleaning method

: Wear suitable personal protection equipment.

: Prevent entry to sewers and public waters. Notify authorities if product enters sewers or public waters.

: Mop up liquid with inert absobent material and dipose of contaminated material as waste in accordance with §13.

: Finish by flushing residue with large amount of water. If necessary, neutralize with diluted acidic aqueous solution.

7. Handling and storage

Handling : Inform personnel of product risks and cares to be enforced. Avoid skin or eyescontacts. Do not smoke, drink or eat during the use. Beware of dripping and spilling which can make the ground sliding.

Storage : Store in dry, cool, well-ventilated area. Store well away from strong Acids Localesfloor should be waterprof and should constitute a retention basin in order to holddown possible outflow.

Wrapping material : Polyethylene

8. Exposure controls / personal protection

Personal protection

- Hand protection

- Eye protection

- Others

Industrial hygiene

Occupational Exposure Limits

8 = @: Use rubber gloves.: Safety glasses.

: Protection clothes

: Emergency eye wash fountains and safety showers should be available in theimmediate vicinity of any potential exposure. Local exhaust and general ventilation must be adequate to meet exposure standards.

: Potassium hydroxide : VLE [mg/m3] : 2(2-methoxymethylethoxy)propanol : VME [mg/m3] : 308

9. Physical and chemical properties

Physical state : Liquid

Colour : Dark

Odour : Odourless

pH value (concentrated product) : 14

pH value in distilled water : solution à 10% : 13,3

Initial boiling point [°C] : 100

Density : 1.20

Solubility in water : Complete

Flash point [°C] : Not applicable.

10. Stability and reactivity

Stability : Stabile product in normal use and storage conditions.

Risk of violent reactions : In case of mixing with Strong acids .

Materials to avoidf :é Aluminium (Al) - Attack with clearing of inflammable gaseous hydrogen.

Société Caral B.P. N° 452 F-27204 VERNON CEDEX France Tel : +33 (0) 2 32 52 42 60 - Fax: +33 (0) 2 32 52 26 74 Mail : [email protected]

Page 24: Test

Page : 3

MATERIAL SAFETY DATA SHEET Revision nr : 3

Date : 1 / 26 / 2009

Supersedes : 12 / 7 / 2007

ALCA 11.033

11. Toxicological information

On product

- Skin contact : Risk of serious local caustic injuries if decontamination is not quickly done.

- Eye contactf :é Oculomotor attacks can be particularly serious (iritis, glaucoma, or even of disabling aftereffects).

- Fortuitous ingestion : Can lead to hepato-digestive reaches and serious respiratory problems.

12. Ecological information

On product : Contained phosphate ions (less than 5 %) capable of developping enrichment ofwater.

On ingredients : Surfactant(s) easily biodegradable, according to CE regulation n°648/2004.• Potassium hydroxide : CL50-fish [mg/l] : 80 • Nitrilotrimethylenetris(phosphonic acid) : CL50-fish [mg/l] : > 250

13. Disposal considerations

Disposal : Dispose in a safe manner in accordance with local/national regulations. Avoidrelease to the environment. Before waste pipe disposal, neutralise effluents at 5.5<pH<8.5.

14. Transport information

Hazard Label(s)

Shipping name :

- UN No. :

- H.I. nr : :

- ADR/RID :

Other :

UN1814 HYDROXYDE DE POTASSIUM EN SOLUTION, 8, II

181480Group : IIClass : 8LQ 22

15. Regulatory information

Labelling : According to working laws.

Symbol(s) : C-Corrosive.

Contains : Potassium hydroxide

R Phrase(s) : R35 : Causes severe burns.

S Phrase(s) : S26 : In case of contact with eyes, rinse immediately with plenty of water and seekmedical advice. S27 : Take off immediately all contaminated clothing. S36/37/39 : Wear suitable protective clothing, gloves and eye/face protection. S45 : In case of accident or if you feel unwell, seek medical advice immediately ( show the label when possible).

16. Other information

Text of R-Phrases in § 2 :R22 : Harmful if swallowed.R35 : Causes severe burns. R36/38 : Irritating to eyes and skin. R38 : Irritating to skin.R41 : Risk of serious damage to eyes.

Société Caral B.P. N° 452 F-27204 VERNON CEDEX France Tel : +33 (0) 2 32 52 42 60 - Fax: +33 (0) 2 32 52 26 74 Mail : [email protected]

Page 25: Test

Page : 4

MATERIAL SAFETY DATA SHEET Revision nr : 3

Date : 1 / 26 / 2009

Supersedes : 12 / 7 / 2007

ALCA 11.033

16. Other information (continued)

Revision date : All section were verified at emission date of this document.

The contents and format of this MSDS are in accordance with EEC Commission Directive 2001/58/EC.

DISCLAIMER OF LIABILITY The information in this MSDS was obtained from sources which we believe are reliable. However, the information is provided without any warranty, express or implied, regarding its correctness. The conditions or methods of handling, storage, use or disposal of the product are beyond our control and may be beyond our knowledge. For this and other reasons, we do not assume responsibility and expressly disclaim liability for loss, damage or expense arising out of or in any way connected with the handling, storage, use or disposal of the product. This MSDS was prepared and is to be used only for this product. If the product is used as a component in another product, this MSDS information may not be applicable.

End of document

Société Caral B.P. N° 452 F-27204 VERNON CEDEX France Tel : +33 (0) 2 32 52 42 60 - Fax: +33 (0) 2 32 52 26 74 Mail : [email protected]

Page 26: Test

TECHNICAL DATASHEET

ALCA DEGREASER FOR HIGH PRESSURE HEAVY CLEANING

REF. 11.033

DESCRIPTION

ALCA is a degreaser for heavy cleaning jobs with high pressure machine. ALCA contains powerful alcalin detergents that eliminates mudd,oil,grease ALCA , over-active, shows an economical dosing. It contains an anti-limescale agent that prevents scaling of the device and chalky deposits on treated surfaces. ALCA contains also a corrosion inhibitor that temporarily protects iron during and after cleaning. ALCA is a bit foaming and is easily rinsed.

MAIN SCOPE OF APPLICATION

All heavy work with high pressure : engines, frames. Degreaser of steel and iron metal sheet before painting Degreasing of floors of garages and workshops Neutralizes acids

PROCEDURE OF USE

Pour ALCA in the product tank and adjust flow and pressure in order to have a 2% concentration at the hose or nozzle. After the cleaning operation, rinse with all with water. ALCA suits all high pressure cleaners :cold or hot water, or even steam.

PHYSICO-CHEMICAL PROPERTIES aspect : dark blue liquidsmell : nonedensity at 20°C : 1,2pH at 2%: 12,5

Not flammable Bio degradable surfactants by over 90%

Contains caustic potassium Nonylphenol ethoxyle free

CARAL Manufacturing in La chapelle Réanville BP452 27204 Vernon cedex FRANCE Tel +33 232 524 260 fax +33 232 522 674

website : www.caral.fr email : [email protected]

04/02

Page 27: Test

Page : 1

MATERIAL SAFETY DATA SHEET Revision nr : 1

Date : 12 / 21 / 2011

Supersedes : 0 / 0 / 0

ARA 400 VIETNAM-2

1. Identification of the substance/mixture and of the company/undertaking

1.1. Product identifier

Trade name : ARA 400

Use : For professional use only.

1.2. Relevant identified uses of the substance or mixture and uses advised against

Type of product : rust cleaner/descaler

1.3. Details of the supplier of the safety data sheet

Company identification

1.4. Emergency telephone number

Emergency phone nr

2. Hazards identification

: Société Caral5 rue du fond du valF-27600 SAINT PIERRE LA GARENNE France Tel : +33 (0) 2 32 52 42 60 - Fax: +33 (0) 2 32 52 26 74

: Centre anti- poison ORFILA 01 45 42 59 59

2.1. Classification of the substance or mixture

Classification EC 67/548 or EC 1999/45

: C; R34

Hazard Class and Category Code Regulation EC 1272/2008 (CLP)

• Health hazards

2.2. Label elements

Labelling EC 67/548 or EC 1999/45

• Symbol(s)

• R Phrase(s)• S Phrase(s)

2.3. Other hazards

None under normal conditions.

: Skin corrosion - Category 1B - Danger (CLP : Skin Corr. 1B)Serious eye damage - Category 1 - Danger

: C-Corrosive.

: R34 : Causes burns.

: S26 : In case of contact with eyes, rinse immediately with plenty of water and seek medical advice.S36/37/39 : Wear suitable protective clothing, gloves and eye/face protection. S45 : In case of accident or if you feel unwell, seek medical advice immediately ( show the label when possible).

3. Composition/information on ingredients

Substance name

TENSIO ACTIF NON IONIQUE :

Phosphoric acid % :

Société Caral

Value(s) CAS nr< 1 % 68439-46-3

< 35 % 7664-38-2

EINECS nr EC index REACH----- ----- -----

231-633-2 015-011-00-6 -----

ClassificationXn; R22Xi; R41

C; R34

Skin Corr. 1B

5 rue du fond du val F-27600 SAINT PIERRE LA GARENNE France Tel : +33 (0) 2 32 52 42 60 - Fax: +33 (0) 2 32 52 26 74

Page 28: Test

Page : 2

MATERIAL SAFETY DATA SHEET Revision nr : 1

Date : 12 / 21 / 2011

Supersedes : 0 / 0 / 0

ARA 400 VIETNAM-2

3. Composition/information on ingredients(continued)

Substance name Value(s) CAS nr EINECS nr EC index REACH Classification

ACIDE HYDROXYACETIQUE :

ACIDE CITRIC :

4. First aid measures

< 5 % 79-14-1 -----

< 5 % 79-14-1 -----

----- ----- Xi; R36/37/38

----- ----- Xi; R36/37/38

4.1. Description of first aid measures

General case : In case of doubt, or lasting symptoms, call the doctor.

- Skin contact : Take off contaminated clothing. Wash with a lot of water for 15 minutes. If sorenesspersists or if contamination is wide, consult a doctor.

- Eye contact : Rinse immediately and abundantly with water by separating anat eyelids during 15minutes at least. Consult specialist.

4.2. Most important symptoms and effects, both acute and delayed No data available.

4.3. Indication of any immediate medical attention and special treatment needed

- massive inhalation- accidental ingestion

5. Fire-fighting measures

5.1. Extinguishing media

Extinguishing media

: Assure fresh air breathing. Allow the victim to rest.: Don't give a drink neither try to sicken. Warn immediately a doctor. If possible show

this sheet, if not available show packaging or label.

: All extinguishing media can be used.

5.2. Special hazards arising from the substance or mixture

If product is involved in a fire

5.3. Advice for fire-fighters

Flammable class

6. Accidental release measures

: Intervening parties will wear self-contained and insulating respiratory protection.Collect extinguishing water, do not drain it off in sewer pipe or natural waterways.

: Not flammable.

6.1. Personal precautions, protective equipment and emergency procedures

Personal precautions

6.2. Environmental precautions

Environmental precautions

Société Caral

: Wear recommended personal protective equipment.

: Prevent entry to sewers and public waters. Notify authorities if product enters sewers or public waters.

5 rue du fond du val F-27600 SAINT PIERRE LA GARENNE France Tel : +33 (0) 2 32 52 42 60 - Fax: +33 (0) 2 32 52 26 74

Page 29: Test

6.3. Methods and material for containment and cleaning up

After spillage and/or leakage : Mop up liquid with inert absobent material and dipose of contaminated material in containers specially alloted for this purpose, before later destruction. Cleaning method : Finish by flushing residue with large amount of water. If necessary, neutralize withdi luted basic aqueous solution. In case of important sloughing : Dike for recovery or absorb with appropriate material.

6.4. Reference to other sections No data available.

7. Handling and storage

7.1. Precautions for safe handling Handling : Inform personnel of product risks and cares to be enforced. Avoid skin or eyes contacts. Do not smoke, drink or eat during the use.

7.2. Conditions for safe storage, including any incompatibilities Storage : Close cover tightly after use. Store well away from strong Alkaline . Store in dry, cool, well-ventilated area. Locales floor should be waterprof and should constitute a retention basin in order to hold down possible outflow. Wrapping material : Polyethylene

7.3. Specific end use(s) No data available.

8. Exposure controls / personal protection

8.1. Control parameters Occupational Exposure Limits : Phosphoric acid ...% : VME [mg/m3] : 1 Phosphoric acid ...% : VLE [mg/m3] : 2 Phosphoric acid ...% : Persistence and degradability

8.2. Exposure controls Personal protection - Eye protection : Chemical goggles or face shield with safety glasses.

- Hand protection : Use rubber gloves. - Others : Protection clothes Industrial hygiene : Emergency eye wash fountains and safety showers should be available in the immediate vicinity of any potential exposure. Provide local exhaust or general room ventilation.

9. Physical and chemical properties

9.1. Information on basic physical and chemical properties

• Appearance Physical state : Limpid liquid Colour : clear pink • Odour Odour : Weak • Odour threshold : No data available. • pH pH value (concentrated product) : < 2 • Melting point / Freezing point • Initial boiling point - boiling range • Flash point Flash point [°C] : Not applicable.

Société Caral 5 rue du fond du val F-27600 SAINT PIERRE LA GARENNE France Tel : +33 (0) 2 32 52 42 60 - Fax: +33 (0) 2 32 52 26 74

Page 30: Test

• Evaporation rate : No data available. • Flammability : No data available. • Explosion limits (lower - upper) : No data available. • Vapour pressure : No data available. • Vapour density : No data available. • Relative density Density : 1.29 • Solubility Solubility in water : Complete • Partition coefficient : n-octanol / : No data available. water • Auto-ignition temperature : No data available. • Thermal decomposition : No data available. • Viscosity • Explosive Properties : No data available. • Oxidising properties : No data available.

10. Stability and reactivity

Stabile product in normal use and storage conditions. 10.1 Possibility of hazardous reactions Risk of violent reactions : In case of mixing with Strong alkalis .

10.2 Conditions to avoid Keep away from heat. Protect from freezing.

10.3 Incompatible materials No data available. Materials to avoid : Metals -

10.4 Hazardous decomposition products No data available.

11. Toxicological information

11.1. Information on toxicological effects

- Inhalation : High level concentrations : Irritation of the respiratory tract and the other mucous membranes. - Skin contact : Risk of serious local caustic injuries if decontamination is not quickly done. - Eye contact : Possibility of incapacitating relapses if decontamination is not quickly done. - Fortuitous ingestion : Mouth, sternum and epigastric pains. Bloody vomitings . May cause burns or irritation of the linings of the mouth, throat, and gastrointestinal tract. Undesirable human health effects

12. Ecological information

12.1. Toxicity On product : Outflow in waste pipe and waterway must be avoid. On ingredients : Surfactant(s) easily biodegradable, according to CE regulation n°648/2004. • Phosphoric acid ...% : Persistence and degradability 12.2. Persistence - degradability No data available. 12.3. Bioaccumulative potential No data available. 12.4. Mobility in soil No data available. 12.5. Results of PBT and vPvB assessment No data available. 12.6. Other adverse effects No data available.

Société

Société Caral 5 rue du fond du val F-27600 SAINT PIERRE LA GARENNE France Tel : +33 (0) 2 32 52 42 60 - Fax: +33 (0) 2 32 52 26 74

Page 31: Test

13. Disposal considerations

13.1. Waste treatment methods Disposal : Dispose of this material and its container at hazardous or special waste collection point. Before waste pipe disposal, neutralise effluents at 5.5<pH<8.5. Dispose in a safe manner in accordance with local/national regulations.

14. Transport information

14.1. UN Number General information - UN No. : 3264

14.2. Proper shipping name Shipping name : UN3264 LIQUIDE INORGANIQUE CORROSIF, ACIDE, N.S.A., 8, III, (E) - Proper shipping name : UN3264 LIQUIDE INORGANIQUE CORROSIF, ACIDE, N.S.A., 8, III, (E) - Proper shipping name : CORROSIVE LIQUID, ACIDIC, INORGANIC, N.O.S.

14.3. Transport Hazard Classification Hazard Label(s) : 8

Land transport - ADR/RID : Group : III Class : 8 - H.I. nr : : 80 - ADR Class : 8 Sea transport - IMDG : Class 8 - IMDG-Marine pollution : YES - EMS-Nr : F-A S-B Air transport - ICAO/IATA : Packaging instructions cargo : 820 Packaging instructions passenger: 818 - IATA : 8

14.4. Packing group - ADR Packing group : III LQ 7 IMO Packing group : III IATA Packing group : III

14.5. Environmental hazards voir 14.3 voir 14.3

14.6. Special precautions for user No data available. Other : LQ 7 14.7. Bulk transport - annex II Marpol 73/78 - IBC Not applicable. Not applicable.

Société Caral 5 rue du fond du val F-27600 SAINT PIERRE LA GARENNE France Tel : +33 (0) 2 32 52 42 60 - Fax: +33 (0) 2 32 52 26 74

Page 32: Test

15. Regulatory information

15.1. Safety, health and environmental regulations/legislation specific for the substance or mixture Ensure all national/local regulations are observed. Labelling : According to working laws. Labelling Regulation EC 1272/2008 (CLP) • Hazard pictograms • Signal words : Danger • Hazard pictograms code : SGH05 • Hazard statements : H314 - Causes severe skin burns and eye damage. • Precautionary statements - Prevention : P260 - Do not breathe dust/fume/gas/mist/vapours/spray. P264 - Wash … thoroughly after handling. P280 - Wear protective gloves/protective clothing/eye protection/face protection. - Response : P301+P330+P331+P310+P321 - IF SWALLOWED : Rinse mouth. Do NOT induce vomiting. Immediately call a POISON CENTER or doctor. Specific treatment. P303+P361+P352 - IF ON SKIN (or hair) : Remove immediately all contaminated clothing. Wash with plenty of soap and water. P304+P340+P310+P320 - IF INHALED : Remove to fresh air and keep at rest in a position comfortable for breathing. Immediately call a POISON CENTER or doctor. Specific treatment is urgent. P305+P351+P338+P310+P321 - IF IN EYES : Rinse cautiously with water for several minutes. Remove contact lenses, if present and easy to do. Continue rinsing. Immediately call a POISON CENTER or doctor. Specific treatment. P363 - Wash contaminated clothing before reuse. - Storage : P235 - Keep cool. P405 - Store locked up. - Disposal considerations : P501C - Dispose of this material and its container to hazardous or special waste collection point, in accordance with local, regional, national and/or international regulation.

15.2. Chemical Safety Assessment No data available.

16. Other information

Revision date : All section were verified at emission date of this document. Text of R-Phrases in § 3 : R22 : Harmful if swallowed. R34 : Causes burns. R36/37/38 : Irritating to eyes, respiratory system and skin. R41 : Risk of serious damage to eyes. Text of H-Phrases in § 3 : H314 - Causes severe skin burns and eye damage. Note : Fiche de Sécurité éditée selon réglement UE n° 453/2 010 du 20/05/2010 modifiant le réglement CE n° 1907/2006

EndEnd of document

Société Caral 5 rue du fond du val F-27600 SAINT PIERRE LA GARENNE France Tel : +33 (0) 2 32 52 42 60 - Fax: +33 (0) 2 32 52 26 74

Page 33: Test

TECHNICAL DOCUMENTATION

ARA 400 REF. 11.115 Cleaning STEEL

PRODUCT TYPE ARA 400 is designed for cleaning rust and scale on all kind of steel without mechanical intervention for process that needs acid. ARA 400 takes effect alone, requiring no laborious and armful operations. It is formulated to clean rust and scale on steel even with high grade carbon. It includes a corrosion inhibitor that temporaly protects sensitive surface. It contains additives for fast and total cleaning of oxides, as well as sequestration of dissolved metal ions. ARA is designed to fit internationnal regulation to protect environment, international standards and U.S National Nitrate compliance.

MAIN APPLICATIONS Steel cleaning, rust removal, descaling.

INSTRUCTIONS FOR USE Dilute ARA 400 in water from 5 % to about 20% then spray on and wait till rust and scale has disapear. Renew operation if necessary. Rinse with clear water in order to neutralize PH. By diping, dilution of 7% is normally enough. Visual evalutaion should be done every 15 minutes in order to guaranty good results. Rinse.

PHYSICAL CHEMICAL PROPERTIES aspect : pink liquidodour : mild densityat 20°C : 1.29pH at 20 % : approx. 1.5active ingredient content : 60%surface stress at 20°C : 31 dynes/cm (at 20 % in hard water)

non-flammable - Surface-active agents biodegradable at over 90% - contain phosphoric acid. exempt from hydro-fluoric, hydrochloric and nitric acid

approved for food contact (bylaw of 08/09/99) FREE OF NONYLPHENOLS OR OCTYLPHENOL ETHOXYLATES

Q - Caral is the Trademark of Avco Caral Co., Ltd. All rights reserved. Office: 28Phan Liem Street, Dakao Ward, District 1, HoChiMinh City Tel: 08.38208940 - Fax: 08.38208943 - Email: [email protected]

Factory: Avco Vietnam - Road No.2, Nhon Trach I IP, Nhon Trach Dist, Dong Nai Province. Tel: (84) 613 569 711/12 - Fax: (84) 613 569 713

Page 34: Test

APPENDIX 2

CLEANING EQUIPMENT LAYOUT DIAGRAM

Page 35: Test

F 0 w

0 4-

C

c D n E

a

E L L

E

E

T 0

m cx° a

E a '

w ( wnw!u!Vq

Page 36: Test

APPENDIX 3

REPORT FORMS (RECORDS)

Page 37: Test

LEAK TEST & WATER FLUSHING RECORD

Project Name BIEN DONG-1 Project - EPCI of Hai Thach PQP, Hai Thach WHP and PipelinesClient PTSC M&C / BIEN DONG POC Report number

Job Number Date

Drawing number Page ofTest Pack Number

1. TOTAL WATER VOLUME LITERS PIPE MATERIAL: CS SS (TICK IF APPLICABLE)

2. RECORD ON EVERY 30 MINUTES OF CIRCULATION FOR TWO HOURS, EXCLUDING LEAKAGE CORRECTION TIME, IF ANY.

No. HOURS/MINUTES FLOW VELOCITY [CM/S]] LEAKAGE [Y/N] REMARKS

Prepared By: Witnessed By Witnessed By Approved by

ALPHA ECC PTSC M&C BIEN DONG POC

Name:

Signature:

Date:

Page 38: Test

DEGREASING RECORD

Project Name BIEN DONG-1 Project - EPCI of Hai Thach PQP, Hai Thach WHP and PipelinesClentPTSC M&C / BIEN DONG POCi Report number

Job Number Date

Drawing number Page ofTest Pack Number

1. TOTAL WATER VOLUME LITERS PIPE MATERIAL: CS (TICK IF APPLICABLE)

2. ALCA CHEMICAL WEIGHT KGS PIPE MATERIAL: SS (TICK IF APPLICABLE)

3. RECORD ON EVERY 30 MINUTES OF CIRCULATION OF THE DEGREASING SOLUTION

No. HOURS/MINUTES TEMPERATURE [oC] FLOW VELOCITY [CM/S]] ALKALINITY [pH] OIL TRACE BY WIPE TEST [Y/N] REMARKS

4. LAST pH (step 2-7) AT RINSING WITH WATER IS:

Prepared By: Witnessed By Witnessed By Approved by

ALPHA ECC PTSC M&C BIEN DONG POC

Name:

Signature:

Date:

Page 39: Test

ACID PICKLING RECORD

Project Name BIEN DONG-1 Project - EPCI of Hai Thach PQP, Hai Thach WHP and PipelinesClient PTSC M&C / BIEN DONG POC Report number

Job Number Date

Drawing number Page ofTest Pack Number

1. TOTAL WATER VOLUME LITERS PIPE MATERIAL: CS (TICK IF APPLICABLE)

2. ARA 400 CHEMICAL WEIGHT KGS PIPE MATERIAL: SS (TICK IF APPLICABLE)

3. RECORD ON EVERY 30 MINUTES OF CIRCULATION OF THE PICKLING SOLUTION

No. HOURS/MINUTES TEMPERATURE [oC] FLOW VELOCITY [CM/S]] ALKALINITY [pH] Fe IONS [ppm[ ISO 4406:1999 CODE REMARKS

/ /

/ /

/ /

/ /

/ /

/ /

/ /

/ /

4. LAST ISO 4406:1999 CODE AT RINSING WITH WATER (Step 3-7) IS: / /

Prepared By: Witnessed By Witnessed By Approved by

ALPHA ECC PTSC M&C BIEN DONG POC

Name:

Signature:

Date:

Page 40: Test

NEUTRALIZATION / PASSIVATION RECORD

Project Name BIEN DONG-1 Project - EPCI of Hai Thach PQP, Hai Thach WHP and PipelinesClient PTSC M&C / BIEN DONG POC Report number

Job Number Date

Drawing number Page ofTest Pack Number

1. TOTAL WATER VOLUME LITERS PIPE MATERIAL: CS (TICK IF APPLICABLE)

2. ARA 400 CHEMICAL WEIGHT KGS PIPE MATERIAL: SS (TICK IF APPLICABLE)

3. RECORD ON EVERY 30 MINUTES OF CIRCULATION OF THE NEUTRALIZATION / PASSIVATION SOLUTION

No. HOURS/MINUTES TEMPERATURE [oC] FLOW VELOCITY [CM/S]] ALKALINITY [pH] REMARKS

4. LAST pH AT MAINTAIN PARAMETERS (Step 4-5) IS:

Prepared By: Witnessed By Witnessed By Approved by

ALPHA ECC PTSC M&C BIEN DONG POC

Name:

Signature:

Date:

Page 41: Test

NITROGEN BLANKET PRESSURE CHECK RECORD

Project Name BIEN DONG-1 Project - EPCI of Hai Thach PQP, Hai Thach WHP and PipelinesClient PTSC M&C / BIEN DONG POC Report number

Job Number DatePage of

No. TEST PACK No. LINE No. DATE PRESSURE [PSIG]CHECKED BY PTSC M& C

(SIGNED)CHECKED BY BD POC

(SIGNED)REMARKS

Prepared By: Witnessed By Witnessed By Approved by

ALPHA ECC PTSC M&C BIEN DONG POC

Name:

Signature:

Date:

Page 42: Test

APPENDIX 4

ORGANIZATIONAL CHART

Page 43: Test

BIEN DONG PETROLEUM OPERATING COMPANY - BIEN DONG-1 PROJECT EPCI OF HAI THACH PQP, HAI THACH WHP AND PIPELINES

PTSC M&C/ALPHA ECC

SAFETY OFFICER

L Troy DeFelioe

SITE MANAGERTran Linh Khang

CHEMICAL CLEANING SUPERVISORTrinh Ngoc Nghi

BD POC

QUALITY CONTROLLER Nguyen Gia Phong

CHEMICAL TEAM LEADER EQUIPMENT TEAM LEADERVincent Trias Le Minh Long

IANALYST TREATMENT OFFICER EQUIPMENT OPERATOR EQUIPMENT OPERATOR

Tran Tuan Thanh Tran Quoc Tuyen Nguyen Van Chuc Nguyen Quang Hoa

Page 44: Test

{