terrazyme - a cost efficient alternate for gsb and wmm for ...€¦ · gsb and wmm roads....

6
TerraZyme - A Cost Efficient alternate for GSB and WMM for roads.

Upload: others

Post on 19-Oct-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

  • TerraZyme - A Cost Efficient alternate for GSB and WMM for roads.

  • Manibhadra Earthmovers is a civil engineering rm established

    in 1996. We specialize in the eld of road work, lling work,

    basement and all infra-related work. Our belief in strong work

    ethics of providing highest quality standards and our non-

    negotiable policy for the health & safety of our workers have

    majorly contributed to our rm’s success. We are successful

    today, not only because our knowledge, expertise & experience

    but also because of our talent pool of qualied employees that

    work on-site and off-site to achieve goals without compromising

    on quality of work.

    We have experience types of work- & expertise in following

    ABOUT US

    Ÿ Bituminous, RCC and Paver Road

    Ÿ Government road Ÿ Eco friendly / All weather

    road

    Ÿ Mass Excavation & Earth Filling

    Ÿ Commercial, Industrial and Residential Projects

    Ÿ Land Stabilization

    With changing pace and time, considering the climatic and environmental impact, we have been continuously innovating. This is our mission behind introducing and promoting TerraZyme, an eco-friendly product. We at Manibhadra Earthmovers in association with Avijeet Agencies (P) Ltd (distributors of TerraZyme in India for past 19 years) have taken up exclusive rights for Western India Region for TerraZyme. This product is manufactured by Nature Plus Inc, USA. The vast experience of 30 years in road work of Manibhadra Earthmovers and their expertise has lead has lead to this synergy of interests in promoting TerraZyme.

    TerraZyme is an excellent replacement for GSB and WMM. The use of TerraZyme leads to a saving upto10% to 30% - per Sq.mt in road construction. TerraZyme is a biodegradable product made from plant and vegetable extracts. It helps in the workability of soil by improving the engineering properties of the soil like CBR value, ITS, Density. It also helps in reducing OMC, plasticity index of soil and its permeability.

    A COST-EFFICIENT & ECO FRIENDLY ALTERNATE FOR

    GSB AND WMM ROADS

  • Templating And Leveling

    Compaction Road Ready To Use

    Scarifying The Surface

    Adding TerraZyme To Water Tank

    Spraying The TerraZyme

    Mixing The TerraZyme

    As per IRC 37 – 2011 (MSA 20 and CBR 6%)

    Elastic modulus of subgrade, E = 17.6 x (CBR ) 0.64 MPasg sgElastic modulus of granular sub-base, E = 0.2E x (h ) 0.45 MPagsb sg gsbh is the thickness granular sub base.gsbElastic modulus of granular base, E = 0.2 E x (h + h ) 0.45 MPagb sg gsb gbh is the thickness granular base.gb

    *For stabilized material, E= 1000 UCS Mpa

    UCS for stabilized material = 1000kPa

    CALCULATION

    Poisson’s Ratio varied from 0.5 to 0.4E value for each layer was taken from the above table.Loading – single axle single tyre

    KENPAVE ANALYSIS

    From the above Tables it can be observed that, the vertical stress at centre line of loading is 560 KPa (at vertical coordinate of 0). When the depth of the

    pavement increases the stress reduces and it become 28.399 KPa at the point just above the subgrade. This stress level has to be kept as the bench mark.

    When the conventional layers are replaced by the enzyme stabilized soil the stress levels have to be lesser than that of the standard cases. Trial and error

    method was adopted to find out the minimum thickness of the stabilized material. Similar observation can be made in terms of vertical displacement.

    Vertical Coordinate

    VerticalDisplacement

    VerticalStress

    VerticalStrain

    RadialStress

    RadialStrain

    TangentialStress

    TangentialStrain

    0

    4

    13

    38

    64 0.0466

    560

    519.783

    311.81

    81.792

    28.399

    -6.54E-04

    1.81E-04

    1.03E-03

    5.78E-04

    3.62E-04

    1672.149

    212.87

    -238.148

    -34.177

    -29.306

    3.27E-04

    -9.03E-05

    -5.46E-04

    -2.78E-04

    -2.15E-04

    1672.149

    212.87

    -238.148

    -34.177

    -29.306

    3.27E-04

    -9.03E-05

    -5.46E-04

    -2.78E-04

    -2.15E-04

    BC

    DBM

    WMM

    GSB

    0.08721

    0.09047

    0.08311

    0.05857

    Vertical Coordinate

    VerticalDisplacement

    VerticalStress

    VerticalStrain

    RadialStress

    RadialStrain

    TangentialStress

    TangentialStrain

    0

    7.5

    22.5

    32.5

    47.5

    62.5

    560

    499.39

    222.758

    107.409

    27.789

    15.175

    -1.81E-04

    1.57E-04

    2.21E-04

    1.51E-04

    1.65E-04

    1.94E-04

    722.094

    231.725

    2.622

    -54.248

    -171.534

    -25.473

    9.06E-05

    -7.87E-05

    -8.75E-05

    -7.55E-05

    -1.14E-04

    -1.17E-04

    722.094

    231.725

    2.622

    -54.248

    -171.534

    -25.473

    9.06E-05

    -7.87E-05

    -8.75E-05

    -7.55E-05

    -1.14E-04

    -1.17E-04

    BC&DBM

    WMM

    Soil + TZA + 30% metal

    Soil + TZA+ 20% metal

    Mod. SG

    0.04336

    0.04561

    0.04119

    0.03938

    0.03723

    0.03427

    Design Comparison CBR 6, MSA 20, As per IRC 37

    Conventional Design thk in mm

    GSB

    WMM

    DBM

    BC

    260

    250

    90

    40

    TOTAL 640

    TerraZyme Design thk in mm

    Subgrade improved with TZ

    Exisiting Soil + TZA + Metal 20%

    Good Soil+ TZA + Metal 30%

    WMM

    150

    150

    100

    150

    TOTAL 625

    DBM

    BC

    50

    25

    IRC 37Standard

    case

    TerraZymeModified

    case

    APPLICATION PROCEDURE

    Contact Radius of circular loaded areas, CR – 17cmContact Pressure on circular loaded areas, CP – 560kPaOne Radial Coordinate was considered, at the loading point (RC at 0cm)

  • Fig 16. Change of CBR over time for various samples

    0

    5

    10

    15

    20

    25

    30

    35

    40

    45

    50

    Sample week 0 week 1 week 2 week 4 week 6 week 8

    Time

    CB

    R(%

    )

    CL

    OH

    CH

    CI

    SX

    UNIVERSITY OF BANGALORE UCS RESULTS – NITK SURATHKAL

    Improvement in Soak CBR Lab (Pondicherry Soil)

    14

    10.3

    4.19

    0

    2

    4

    6

    8

    10

    12

    14

    16

    Untreated 2 4Curing in Weeks

    CB

    R%

    Improvement in ITS (Pondicherry Soil)

    146

    137

    114

    86

    0

    20

    40

    60

    80

    100

    120

    140

    160

    Untreated 2 3 4Curing in weeks

    ITS

    in

    KP

    a

    Improvement in Fatigue Life

    3506532325

    17851

    8076

    0

    5000

    10000

    15000

    20000

    25000

    30000

    35000

    40000

    Untreated 2 4 7Curing in weeks

    cycle

    s

    0

    200

    400

    600

    800

    1000

    1200

    0 2 4 6 8Curing Period In Weeks

    Laterite Soil

    Dosage 2

    0

    200

    400

    600

    800

    0 2 4 6 8

    Curing Period (Weeks)

    Black Cotton Soil

    Dosage 2

    IMPROVEMENT BLACK COTTON SOIL

    Variation Of Percent Reduction In Swell Potential With Curing Period Variation Of Percent Reduction In Swell Pressure With Curing Period

    PERMEABILITY TEST RESULTS

    -51.786 X 10

    -51.786 X 10

    -61.787 X 10

    -71.809 X 10

    -7

    1.793 X 10

    -91.635 X 10

    -8

    1.578 X 10

    -71.543 X 10

    -71.512 X 10

    -71.487 X 10

    Shedi soilPermeability in(cm/sec)

    Lateritic soilPermeability in(cm/sec)

    Dosage(% of Enzyme)

    0

    2

    4

    6

    8

    CRRI

  • USES OF TERRAZYME

    TerraZyme can be used anywhere where GSB and WMM are used in construction as it replaces them.

    • Highways

    • All weather rural roads

    • Internal roads in townships

    • Service roads

    • Factory roads

    • Parking Lots and Yard area

    • Sealing of ponds, landfills

    • Temporary access roads

    • Subgrade improvements

    • Floor bases

    • Road shoulders

    • Construction roads

    SUCCESSFUL TESTING OF TERRAZYME IN INDIA

    We have been working with all reputed institutes across India for the past twelve years. Some major institutions that have associated with us are :

    • Central Road Research Institute ( CRRI )- Delhi• IIT Roorkee• IIT - Bhubaneswar• University Of Bangalore - Pavement Engineering Lab• Anna University - Chennai• SASTRA - Tanjore INDIAN CLIENTS AND REFERRALS

    We are proud to state that we have made TerraZyme based and Conventional roads across India, on various soil, climatic and traffic conditions. In every project TerraZyme has proved that it is cheaper than conventional methods and long lasting with a lower maintenance cycle.

    • NH-66 , NH Department (Chennai circle)

    • NH4A, NH Department (Goa)

    • Semac Potentional Consultants

    • Torrent Pharma

    • Godrej Properties Ltd.

    • Shapoorji Palonji

    • JMC Projects

    • Applewoods Township - A’bad

    • Tata Housing

    • Visteon

    • Ennore Port

    • Tata Motors - Sanand

    • HN Safal

    • Arvind Smartspace LLP.

    • Grainspan

    • Renault Nissan

    • Pacifica Group

    • Wipro Ltd

    • Rico Auto India Ltd

    • Mott Mac India

    • Infosys

    • Daimler Trucks

    • KRRDA, Karnataka

    • PRED, Karnataka

    • APRRDA, Andhra Pradesh

    • TSRRDA, Telangana

    • DRDA, Tamil Nadu

    • ORRDA, Orissa

    • CGRRDA, Chattishgarh

    • JRRDA, Jharkhand

    • APWD, Assam

    The main feature of TerraZyme is the cost saving aspect. TerraZyme saves cost upto 30% in comparison to conventional system of road construction and maintenance cost of roads is reduced by 50%• Cuts construction cost by 10% - 30%• Higher CBR value / higher road strength : TerraZyme base structures have a higher CBR value• Lowers the maintenance cost by 30 - 50%• Saves construction time by 50% • The life-cycle of TerraZyme treated roads increase by 200–300%• Pavement thickness can be reduced by up to 30 %, being semi rigid in nature• Environment friendly and bio-degradable product

    ADVANTAGES

    • Pennsylvania Highway Department

    • Canadian PWD

    • Brazil Highway Department

    • Paraguay

    • Equador

    • China

    • Japan

    • Honduras

    • Russia

    • Phillippines

    • Malaysia

    • Uganda

    • USAID Projects

    • World Bank Approved

    INTERNATIONAL APPROVALS

    • NITK - Surathkal• NIT - Calicut• NIT - Trichy• NIT - Warangal• NIT - Jharkhand

  • NH 66 - Tindivanam

    ROADS CONSTRUCTED IN INDIA

    NH 4A - Goa

    Reitzel India Factory

    Arvind Uplands

    Schwing Stetter FactoryOrissa - DRDA Road Torrent Pharma

    Rann of Kutch Applewoods Township A’bad

    Alstom - SanandTATA Motors - Sanand

    Arvind Tata JV Township

    CONTACT US

    MANIBHADRA EARTHMOVERSB-305, Rudra Arcade, 132 Ft Ring Road,Nr. Helmet Cross Road, Drive-in Road,Ahmedabad - 380052PH: 079 - 2745 1106

    CORPORATE OFFICE

    Mr. Amit Shah Mr. Shilin Shah Mr. Anip Shah

    +91 9925 710890+91 9601 787898+91 9925 360890

    [email protected] | www.manibhadraearthmovers.com

    WESTERN INDIA

    [email protected]

    [email protected]