The following agreements between PARC (representing the residential community surrounding the Sherwin Williams project) and the project developer (Lennar) have been negotiated and agreed upon by both parties. The following terms are the result of many good faith meetings between the developer and PARC over the past two years. With these agreements in place, PARC would recommend certification of the EIR by City Council. TERMS OF AGREEMENT 09.02.2016 1. Pass Thru: The Final Development Plan (FDP) for the project shall include a permanent, public pass-through of the existing Building 1-31 (also listed as Building “A” in the EIR). This pass-through shall penetrate the building from east to west, beginning with an opening at the western terminus of 45th Street at Horton Street and shall extend west through Building “A” unimpeded by other structures to the community park and open space on the south and western edges of the project site. The design of the pass-through shall be such that cyclists shall not be required to dismount and are able to move through the space continuously between the park and 45th Street. The pass-through shall be complete prior to the issuance of a final Certificate of Occupancy for Building “A.” and the both parties agree that costs associated with implementing the pass thru should be included under the Flexible Public Benefits category of the City’s Density Bonus program. 2. Car Share: The project FDP shall include ten (10) dedicated car-share parking spaces which shall be in place prior to issuance of a certificate of occupancy. The spaces shall be located both within the project site (7) and on adjacent streets (3) that are publicly accessible so long as the City of Emeryville (City) agrees that 3 existing public parking spaces may be so dedicated. These spaces shall be filled with car-share vehicles as the demand for car-sharing increases. At the outset of occupancy, only two (2) of the on-site dedicated spaces need to be used for car-share purposes. The remaining five (5) on-site spaces must remain dedicated to car-share but can be used for alternative parking purposes until future TDM reports dictate their use. Annual quantifying and reporting of demand and usage of the car-shares shall be made available in the annual TDM reporting and the car-shares shall be adjusted as the demand changes. The overall goal is to provide an adequate number of on-site car share vehicles to assure users that there will always be a vehicle available when they need to reserve one. The remaining three (3) off-site

Upload: eville-eye

Post on 27-Jan-2017

52 views

Category:

Government & Nonprofit


0 download

TRANSCRIPT

Page 1: Terms of agreement   sw final 9 02 16

The following agreements between PARC (representing the residential community surrounding the Sherwin Williams project) and the project developer (Lennar) have been negotiated and agreed upon by both parties. The following terms are the result of many good faith meetings between the developer and PARC over the past two years. With these agreements in place, PARC would recommend certification of the EIR by City Council. TERMS OF AGREEMENT 09.02.2016

1. Pass Thru: The Final Development Plan (FDP) for the project shall include a permanent, public pass-through of the existing Building 1-31 (also listed as Building “A” in the EIR). This pass-through shall penetrate the building from east to west, beginning with an opening at the western terminus of 45th Street at Horton Street and shall extend west through Building “A” unimpeded by other structures to the community park and open space on the south and western edges of the project site. The design of the pass-through shall be such that cyclists shall not be required to dismount and are able to move through the space continuously between the park and 45th Street. The pass-through shall be complete prior to the issuance of a final Certificate of Occupancy for Building “A.” and the both parties agree that costs associated with implementing the pass thru should be included under the Flexible Public Benefits category of the City’s Density Bonus program. 2. Car Share: The project FDP shall include ten (10) dedicated car-share parking spaces which shall be in place prior to issuance of a certificate of occupancy. The spaces shall be located both within the project site (7) and on adjacent streets (3) that are publicly accessible so long as the City of Emeryville (City) agrees that 3 existing public parking spaces may be so dedicated. These spaces shall be filled with car-share vehicles as the demand for car-sharing increases. At the outset of occupancy, only two (2) of the on-site dedicated spaces need to be used for car-share purposes. The remaining five (5) on-site spaces must remain dedicated to car-share but can be used for alternative parking purposes until future TDM reports dictate their use. Annual quantifying and reporting of demand and usage of the car-shares shall be made available in the annual TDM reporting and the car-shares shall be adjusted as the demand changes. The overall goal is to provide an adequate number of on-site car share vehicles to assure users that there will always be a vehicle available when they need to reserve one. The remaining three (3) off-site

Page 2: Terms of agreement   sw final 9 02 16

spaces shall be placed elsewhere within the Park Avenue District in coordination with the City of Emeryville to help accomplish the goal of reducing parking throughout the neighborhood. 3. Bike Share/ Bike Lockers: Prior to issuance of a final certificate of occupancy for the building located closest to the bike sharing station, the project shall include a permanent, subsidized public bike-share station with an expandable capacity. The goal is to provide an adequate number of on-site bike shares as the demand changes and to provide enough bike shares that there will always be a bike available when there is demand. The vendor for bike-shares shall be the same vendor that provides bike-sharing opportunities at West Oakland BART, which is currently Bay Area Bike Share. Annual quantifying and reporting of demand and usage of the biker-shares shall be made available in the annual TDM reporting and the bike-shares shall be adjusted as the demand changes. A subsidy program to encourage residents/employees to become bike-share members shall be 50% subsidized by the developer and future owners of the project. The Developer and future owners shall maintain a minimum of thirty (30) lockable, enclosed bike lockers for residents and employees. The lockers shall be provided by the developer and no fee shall be charged for their use by project residents and employees. Annual quantifying and reporting of demand and usage of the bike lockers shall be made available in the annual TDM reporting and the number of bike lockers shall be adjusted as the demand changes. No less than 50% of these bike lockers shall be sized to accommodate “cargo bikes” and employees/residents shall be able to charge electric bikes within the lockers while being stored. 4. Public Art Gallery The developer shall provide a permanent Art Gallery space, consisting of not less than 2,000 sq. ft. of a publicly accessible indoor space that is designed to serve as an art gallery. The space shall include an office and shall be made available as a meeting room for residents and the local community. No fees of any kind shall be charged for use of this space. The Emeryville Celebration of the Arts shall be granted 24-hours access to the space. Both parties agree that costs associated with implementing the public art gallery and community-meeting room should be included under the Flexible Public Benefits category of the City’s Density Bonus program. 5. TDM, Shared Parking & Parking Management: Prior to approval of the FDP, the developer shall produce a TDM that estimates a 30% reduction in traffic based on the addition of transit-oriented incentives and mitigations. This obligation does not require that the developer prove a 30% reduction in traffic upon

Page 3: Terms of agreement   sw final 9 02 16

completion of the project but that the traffic mitigations in the TDM have the potential to achieve this level of traffic mitigation. The developer agrees to not seek City approval of the current TDM and to submit a revised and enhanced TDM for approval with the PDP that is consistent with these goals. Additionally, the developer agrees to create and provide a shared parking plan that will optimize parking capacity by allowing varying uses within the project to share spaces, reducing segregated and unused parking. Public parking shall be included in this plan. Finally, the developer agrees to work with the City to provide parking management services for time-restricted parking to assist in facilitating the use of street and other parking for small businesses in the neighborhood and to contribute financially to the enforcement of those parking restrictions. 6. GreenTrip: The developer shall achieve an equivalent compliance to the GreenTrip “Platinum” certification (without seeking such a certification) from TransForm prior to the final certificate of occupancy for the final residential building of the project, excepting only that the developer shall not have to meet the 0.5 parking spaces per unit standard required for “Platinum” certification. Qualifying Traffic Reduction Strategies (TRS) shall include Shuttle Service to West Oakland BART. 7. West Oakland BART Shuttle: The developer shall provide a private shuttle service between the project site and West Oakland BART. A bus stop that is within 500 feet of the project site is sufficient for being considered “within” the project site. The developer agrees that the service shall commence within 60 days after occupancy of fifty percent (50%) of the total residential units for the project and shall endure for a period of five years. Both parties agree that costs associated with implementing the shuttle for the first five years should be included under the Flexible Public Benefits category of the City’s Density Bonus program. If, prior to the onset of the developer’s obligation to provide private shuttle service to West Oakland BART, or at any time subsequent to the commencement of such service but prior to the expiration of the five year period of service the developer has negotiated the provision of transit services from any other existing transit provider that provides the same or similar frequency, route and stops as the service provided by the developer, this obligation shall cease and any community benefits not expended shall be returned to the city in the form of payment. The private shuttle service shall be provided without cost to residents/employees at the project site and residents of Emeryville. 8. Park Avenue District Overlay: The developer shall comply with the Park Avenue District overlay and associated guidelines, including but not limited to the requirements for shared parking, a special emphasis on the use of building materials and aesthetics that comply with the overlay’s

Page 4: Terms of agreement   sw final 9 02 16

attention to the historic and industrial roots of the community and a fine grain street layout that is pedestrian and bicycle-friendly, among others. 9. Construction Parking: The developer shall provide off-street parking for construction workers during all phases of construction. All construction deliveries shall be within the project and not offloaded from delivery vehicles on public streets with limited exceptions for site and construction work done on buildings and infrastructure along the perimeter streets of the project site. 10. Public Process for Park Design: Working with the City and its bodies and processes, the developer shall engage the community in a public process that shall include facilitated community workshops related to design of the parks, bike and pedestrian paths, streetscape and other public programming. 11. Sidewalks and undergrounding of utilities: The developer agrees to install or to fund City installation of the following infrastructure improvements for the neighborhood prior to issuance of the final Certificate of Occupancy for the final residential structure on the site:

(1) Install curb and sidewalk and underground all utilities on the east side of Hubbard Street between Sherwin Street to the north and Park Avenue to the south;

(2) Underground all utilities on the east side of Horton Street between the intersection of the proposed 46th Street to the north and Park Avenue to the south;

(3) Install curb and sidewalk along the south side of Sherwin Street between Horton Street to the east and Hubbard Street to the west.

The developer’s intent is to install the improvements listed above concurrent with the project unless the City deems it more efficient or favorable to have the City perform the improvements

Both parties agree that costs associated with implementing the improvements above should be included under the Public Improvements category of the City’s Density Bonus program. The following term of agreement could not be finalized or agreed upon. We are including it for information purposes: Home ownership: Prior to granting of the first certificate of occupancy, the developer shall designate not less than 20% of the project housing units as for-sale units.