tender document: c-2(b)/rc/0700/4469/2017 … document_7.pdfcentral electronics limited ......

30
Tender Document: C-2(b)/RC/0700/4469/2017 FORMAT NO. : CEL/FR/MMD/03(01) CENTRAL ELECTRONICS LIMITED (A Public Sect or Ent erprise) TENDER DOCUMENT for “Supply of Balance of System, Installation (Erection), Testing, Commissioning, including Warranty for a period of 5 years of 10 KWp Off-Grid SPV Power Plant in Gurugram, Haryana” Tender Notice No.C-2(b)/RC/0700/4469/2017 dated 14 th November, 2017 Assistant General Manager (Materials) Materials Management Division Central Electronics Limited, 4, Industrial Area, Saur Urja Marg, Sahibabad – 201 010 (UP) INDIA Tel. No. 0091-120-2895145 Fax No. 0091-120-2895148 Email: [email protected] Website: www.celindia.co.in Page 1 of 30.

Upload: vanthuan

Post on 31-Mar-2018

218 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Tender Document: C-2(b)/RC/0700/4469/2017 … Document_7.pdfCENTRAL ELECTRONICS LIMITED ... Escalation in price (except where price variation clause is applicable), ... Supply of Power

Tender Document: C-2(b)/RC/0700/4469/2017

FORMAT NO. : CEL/FR/MMD/03(01)

CENTRAL ELECTRONICS LIMITED

(A Public Sector Enterprise)

TENDER DOCUMENT

for

“Supply of Balance of System, Installation (Erection), Testing,

Commissioning, including Warranty for a period of 5 years of 10 KWp

Off-Grid SPV Power Plant in Gurugram, Haryana”

Tender Notice No.C-2(b)/RC/0700/4469/2017 dated 14th

November, 2017

Assistant General Manager (Materials) Materials Management Division Central Electronics Limited, 4, Industrial Area, Saur Urja Marg, Sahibabad – 201 010 (UP) INDIA Tel. No. 0091-120-2895145 Fax No. 0091-120-2895148 Email: [email protected] Website: www.celindia.co.in

Page 1 of 30.

Page 2: Tender Document: C-2(b)/RC/0700/4469/2017 … Document_7.pdfCENTRAL ELECTRONICS LIMITED ... Escalation in price (except where price variation clause is applicable), ... Supply of Power

Tender Document: C-2(b)/RC/0700/4469/2017

FORMAT NO. : CEL/FR/MMD/03(01)

CENTRAL ELECTRONICS LIMITED (A Public Sector Enterprise) 4, Industrial Area, Saur Urja Marg, Sahibabad – 201 010 (UP) INDIA

Tel. No. 0091-120-2895145 Fax No. 0091-120-2895148 Email: [email protected] Website: www.celindia.co.in

TENDER NOTICE

Tender notice no.C-2(b)/RC/0700/4469/2017 14th

November, 2017 Central Electronics Limited invites sealed bids (Technical & Financial) from eligible bidders which

are valid for a minimum period of 90 days from the date of opening for “Supply of Balance of

System, Installation (Erection), Testing, Commissioning, including Warranty for a

period of 5 years of 10 KWp Off-Grid SPV Power Plant in Gurugram, Haryana”

Scope of Work Supply of Balance of System, Installation (Erection), Testing,

Commissioning, including Warranty for a period of 5 years of 10 KWp Off-

Grid SPV Power Plant in Gurugram, Haryana

Earnest Money

Deposit

Rs. 19,600/- (Rupees Nineteen Thousand Six Hundred Only)

Interested parties may view and download the tender document containing the

detailed terms & conditions, free of cost from the website www.eprocure.gov.in and

www.celindia.co.in

Please see document control Sheet at Annexure-1

For CENTRAL ELECTRONICS LIMITED

Sd-

Assistant General Manager (Materials)

Materials Management Division

Page 2 of 30.

Page 3: Tender Document: C-2(b)/RC/0700/4469/2017 … Document_7.pdfCENTRAL ELECTRONICS LIMITED ... Escalation in price (except where price variation clause is applicable), ... Supply of Power

Tender Document: C-2(b)/RC/0700/4469/2017

Annexure-1

Document Control Sheet & Important dates

Tender Reference No. C-2(b)/RC/0700/4469/2017

Name of Organization Central Electronics Limited

Tender Type (Open/Limited/EOI/Auction/Single)

Limited

Tender Category (Services/Goods/works) Goods

Type/Form of Contract (Work/Supply/ Auction/Service/Buy/Empanelment/Sell)

Buy

Payment Mode (Online/Offline) Offline

Date of Issue/Publishing 14/11/2017 (18:00 Hrs)

Document Download/Sale Start Date 14/11/2017 (18:00 Hrs)

Document Download/Sale End Date 25/11/2017 (15:00 Hrs)

Bid submission Start Date 14/11/2017 (18:00 Hrs)

Last Date and Time for Submission of Bids 25/11/2017 (15:00 Hrs)

Date and Time of Opening of Bids 25/11/2017 (15:30 Hrs)

ELIGIBILITY CRITERIA

In order to be eligible to participate in the tender, the bidder must fulfill the following eligibility

criteria. Any discrepancy or departure from the same shall make the bidder ineligible for

participating in the tender:

Sr. No. Eligibility Criteria Complied / Not

Complied

01. The bidder must be approved vendor with CEL. (Copy of

document to be submitted with bid)

02. The bidder must be company registered under GST. All

compliance of GST is to made by vendors. Copy of the certificate

to be enclosed.

03. The bidder must submit the Manufacturer’s Authorization

Certificate from OEM of PCU & Batteries for this tender as per

the sample format enclosed.

Page 3 of 30.

Page 4: Tender Document: C-2(b)/RC/0700/4469/2017 … Document_7.pdfCENTRAL ELECTRONICS LIMITED ... Escalation in price (except where price variation clause is applicable), ... Supply of Power

Tender Document: C-2(b)/RC/0700/4469/2017

Note:

1. Each page of the technical specification of tender submitted should be signed by the legally

empowered and designated person of the tenderer otherwise tender shall be treated as invalid and

rejected.

2. The purchaser reserves the right for verifications of any original documents of the Tender

submitted.

3. Deviations or exceptions if any must be clarified mentioned and submitted along with

technical bid.

4. If bidder wants to visit the site, bidder can visit the site before submitting the bid.

Page 4 of 30.

Page 5: Tender Document: C-2(b)/RC/0700/4469/2017 … Document_7.pdfCENTRAL ELECTRONICS LIMITED ... Escalation in price (except where price variation clause is applicable), ... Supply of Power

Tender Document: C-2(b)/RC/0700/4469/2017

Important Instructions: - 1. The following documents/Annexures are part of tender document:

a. Tender notice b. Document Control Sheet Annexure -1 c. Detailed Specifications & Drawings Annexure ‘A’ d. Price bid format given in Annexure ‘A’ e. Commercial Terms & Conditions Annexure ‘B’ f. Format for submission of Vendor Data Annexure ‘C’ g. Tender acceptance letter Annexure ‘D’

2. Quotations shall be liable to be rejected if there is/are any deviation(s) from the specifications. 3. Escalation in price (except where price variation clause is applicable), deviation from delivery schedule,

terms and conditions will not be permitted in your quotation. Statutory Taxes & Duties should be shown separately from the price.

4. Bidder who is Micro & Small Enterprise should enclose copy of valid Certificate of Registration with DIC or KVIC or KVIB or Coir Board or NSIC or DHH or any other body specified by Ministry of Micro, Small and Medium Enterprises, Govt. of India to avail benefits under the “Public Procurement Policy for Micro & Small Enterprises (MSEs) Order 2012”.

5. Catalogue, literature, specification details should accompany the quotation. Incomplete quotations are liable to be rejected.

6. Any deviations whether technical or commercial stated anywhere in the bid shall not be taken into account and may render the bid non-responsible and liable to be rejected.

7. Vendor Data should be submitted in the Format for submission of Vendor Data as per annexure C. 8. Quotation should be submitted in Single bid system. 9. Bulk quantity of material shall be procured from approved vendor as per list available with CEL. In case of

quotation of un-approved vendor being lowest, an educational order for the sample quantity may be placed for vendor development purpose.

10. Quotation should be submitted in sealed envelope. There will be Single sealed covers/envelops in the quotation and following are to be submitted in your quotation:

i. Earnest Money Deposit demand draft /RTGS or TT acknowledgement or the documents for exemption from submission of EMD.

ii. Technical catalogue, literature and approval/registration certificate, if any, required as per eligibility criteria given in the tender.

iii. Filled up Format for Submission of Vendor Data as per format at Annexure C. iv. Tender acceptance letter as per format at Annexure D v. This must contain only the Price Bid on company’s letter head as per Price Bid format given in

Annexure A.

Page 5 of 30.

Page 6: Tender Document: C-2(b)/RC/0700/4469/2017 … Document_7.pdfCENTRAL ELECTRONICS LIMITED ... Escalation in price (except where price variation clause is applicable), ... Supply of Power

Tender Document: C-2(b)/RC/0700/4469/2017

Annexure-A Enquiry for Supply of Balance of system, Installation (Erection), Testing, Commissioning,

including Warranty for a period of 5 years of 10 kWp Off-Grid SPV Power Plant in Gurugram,

Haryana.

S No.

Description Qty.

01. Supply of Balance of system, Installation (Erection), Testing,

Commissioning, including Warranty for a period of 5 years of 10kWp

Off-Grid SPV Power plant at “The Earth Saviours Foundation Gurukul”

in Gurugram, Haryana

1 Set

02. Installation & commissioning of the above 1 Job

03. AMC for 5 years 1 Job

* All the supplied material should be warranted for a period of 5 years from the date of

Handing over. Vendor has to submit detailed (activity wise) execution time schedule along-

with the technical bid.

Eligibility Criteria

In order to be eligible to participate in the tender, the bidder must fulfill the following eligibility

criteria. Any discrepancy or departure from the same shall make the bidder ineligible for

participating in the tender:

Note:

1. Each page of the technical specification of tender submitted should be signed by the legally

empowered and designated person of the tenderer otherwise tender shall be treated as

invalid and rejected.

2. The purchaser reserves the right for verifications of any original documents of the Tender

submitted.

3. Deviations or exceptions if any must be clarified mentioned and submitted along with

technical bid.

4. If bidder wants to visit the site, bidder can visit the site before submitting the bid.

Sr.

No.

Eligibility Criteria Complied / Not

Complied

01. The bidder must be approved vendor with CEL. (Copy of

document to be submitted with bid)

02. The bidder must be company registered under GST. All

compliance of GST is to made by vendors. Copy of the certificate

to be enclosed.

03. The bidder must submit the Manufacturer’s Authorization

Certificate from OEM of PCU & Batteries for this tender as per the

sample format enclosed.

Page 6 of 30.

Page 7: Tender Document: C-2(b)/RC/0700/4469/2017 … Document_7.pdfCENTRAL ELECTRONICS LIMITED ... Escalation in price (except where price variation clause is applicable), ... Supply of Power

Tender Document: C-2(b)/RC/0700/4469/2017

BILL OF QUANTITIES OF 10 KWp OFF-GRID (Hybrid) SPV POWER PLANT

Sr. No. Description Qty

1. Supply of MS Galvanized Module Mounting Structures along with

necessary hardware (Structure drawings along with layout plan are to

be submitted before execution with all the calculations & Stadd pro

analysis)

01 set

2. Supply of Array Junction Box consisting of blocking diodes, fuse base

with fuse (12 Amp) in each string, SPD (suitable rating) The AJB must be

of IP 65 protection of Hensel Make or equivalent.

01 set

3. Supply of Battery Bank 120V, 600AH @C/10, Sealed Maintenance Free

Tubular Gel VRLA with MS stand and accessories as per attached

specifications (Make: NED/HBL/Exide or reputed make as approved by

CEL/MNRE)

01 set

4. Supply of Power Conditioning Unit 120V, 10KW (MPPT) & 10 KVA,

Single Phase (Inverter) as per attached specifications (Make:

Enertech/Consul-Neowatt or reputed make as approved by CEL/MNRE)

01 set

5. Supply of copper cable PVC insulated, Flexible multi-strand, annealed

copper conductor un-armoured 1100V grade, conforming to relevant

IEC/IS of required sizes as per site requirement along with the

necessary voltage drop calculations. The voltage drop should be within

the specified limits as mentioned in cable details.

As per

final

design and

site

conditions.

6. Supply of DCDB & ACDB (As per Final Design) suitable for 10 kW power

plant with all glands etc. (Make Hensel or equivalent)

01 set

7. Supply of earthing systems (Maintenance free earthing) for complete

array field, DCDB, ACDB, inverters etc. as per relevant IS:3043-1987

including using suitable GI strip (Min.25x3 mm).

(Make of materials & Drawings for the earthing layout/location must

be got approved from CEL before start of work)

01 job

8. Supply of Lightning arrestor system as per relevant IEC - 62305

including separate earthing using suitable GI strip.

(Make & Drawings for the Lightning arrestors locations along with

earthing layout/ location must be got approved from CEL before start

of work)

01 job

10. Other Misc. work like cleaning, painting, white wash etc. related to

installation and commissioning of Power Plant. Testing &

Commissioning of system of the whole system prior to hand over of the

system.

01 job

*Note: Size and quantity of items may vary according to the actual site conditions. Any item,

which is not specifically mentioned but necessary for making the Solar Power Plant

fully functional, shall be deemed to be included in the scope of work of the contractor

and shall be supplied and installed by the successful bidder without any extra cost to

CEL. All the materials supplied by contractor should be warranted for a period of 5

Page 7 of 30.

Page 8: Tender Document: C-2(b)/RC/0700/4469/2017 … Document_7.pdfCENTRAL ELECTRONICS LIMITED ... Escalation in price (except where price variation clause is applicable), ... Supply of Power

Tender Document: C-2(b)/RC/0700/4469/2017

years. (Drawing of Structure, Foundations, Layout & BOM of AJB, DCDB, make of

Battery & PCU must be got approved by CEL before manufacturing)

Job Work:

1. Construction of pedestals (RCC 1:2:4 or PCC) for each of the module mounting structures

as well as fixing of the above structure at the roof top including supply of civil foundation

materials. Drawings for Mounting structures and civil foundation design must get

approved from CEL before start of the work for which design details approved by

charted engineer shall be submitted. The support structure, design and foundation

shall be designed to withstand wind speed upto 170 Kmph.

The installation of SPV modules should not impact the waterproofing of the existing

terrace structure. The contractor shall be responsible for restoring the waterproofing to

its original condition and for provision of additional waterproofing in the areas where

RCC blocks are secured onto the terrace.

2. Mounting & fixing of SPV Modules(supplied by CEL at site upto store) on the above

installed structure. (The entire fixed module should be aligned systematically)

3. Mounting of all the junction boxes with suitable arrangement as required for the power

plant.

4. Interconnection of modules in series-parallel combinations as per following:

a) Each source-circuit to have suitable number of modules in series using suitable size

wires (Interconnects supplied with modules and cables interconnection is to be carried

out using UV conduit pipe/cable trays)

b) Output of series connected modules to be taken to AJB’s using suitable size wires.

(Cables interconnection is to be carried out using UV conduit pipe/cable trays)

c) Output from AJB is to be connected to DCDB (solar), DCDB (S) to PCU, PCU to DCDB

(Battery) and DCDB (B) to battery bank using suitable size wires as per approved BOM.

Output from PCU to ACDB and LT side of building, LT Panel to PCU is to be connected

using suitable cables as per approved BOM. (All the cables interconnection is to be

carried out using UV conduit pipe/cable trays as per the site conditions.)

Cables of appropriate size to be used in the system shall have the following

characteristics:

i. Shall meet IEC 60227/IS 694, IEC 60502/IS1554 standards

ii. Temp. Range: –10°C to +80°C.

iii. Voltage rating 660/1000V

iv. Excellent resistance to heat, cold, water, oil, abrasion, UV radiation

v. Flexible

vi. Sizes of cables shall be so selected to keep the voltage drop (power loss) of the

entire solar system to the minimum. The cables (as per IS) should be insulated with

a special grade PVC compound formulatedfor outdoor use.

vii. Cable Routing/ Marking: All cable/wires are to be routed in a UV conduit pipe/ UV

cable trays/GI cable tray and suitably tagged and marked with proper manner by

good quality ferule or by othermeans so that the cable easily identified.

viii. Bidder to indicate size and length as per system design requirement. All the cables

required for the plant is to be provided by the bidder. Any change in cabling sizes if

desired by the bidder/approved after citing appropriate reasons is to be Page 8 of 30.

Page 9: Tender Document: C-2(b)/RC/0700/4469/2017 … Document_7.pdfCENTRAL ELECTRONICS LIMITED ... Escalation in price (except where price variation clause is applicable), ... Supply of Power

Tender Document: C-2(b)/RC/0700/4469/2017

incorporated. All cable schedules / layout drawings must be approved from CEL

prior to installation.

ix. Multi Strand, Annealed high conductivity copper conductor PVC type ‘A’ pressure

extruded insulation or XLPE insulation. UV protected Armoured cable must be used

for underground layingwith PVC/XLPE insulation. All cable trays including covers to

be provided. All cables conform to latest edition of IEC/ equivalent BIS Standard.

x. The size of each type of DC cable selected shall be based on minimum voltage drop

however; the maximum drop shall be limited to 2%.

xi. The size of each type of AC cable selected shall be based on minimum voltage drop

however; the maximum drop shall be limited to 2 %.

5. Installation and commissioning of battery bank in control room.

6. Installation and commissioning of Inverters with suitable cable tray etc. along-with the

cabling.

7. Installation of earthing and lightning arrestor system as per relevant IS:3043-1987 & IEC-

62305 for the entire PV array field & Inverter etc.

8. Training and handing over of system to the concerned department.

9. Other Misc. work like Plastering, cleaning, painting, white wash etc. related to installation

and commissioning of Power Plant. Testing & commissioning of system of the whole

system prior to hand over of the system.

SCOPE OF WORK:

The broad scope of the work includes supply of balance of system, installation, testing

&commissioning, warranty for 5 years for a complete / composite work of Off-Grid Solar

Power plant (Hybrid) adhering to the standardized norms / BIS /MNRE specification.

a) Bidders must conduct detailed site survey after issue of purchase order along with CEL

official and submit the design with relevant calculations & drawings, layout plan,

complete bill of materials with makes and execution schedule as per tender conditions

within one week.

b) Bidder must start the work at site within 15 days from the date of issue of purchase

order.

c) Contactor has to prepare all required site drawings and the same are to be got approved

from concerned CEL officials after award of order.

d) To arrange for pre-dispatch inspection by CEL officials.

e) To deliver the materials at CEL’s project site.

f) Contractor shall make his own arrangement for safe storage of their as well as CEL

material (Which will be supplied to him by CEL) at site.

g) To co-ordinate with CEL officials for verification of completed works along-with all the

required documentation.

h) Materials, wherever supplied, shall be provided with fresh quality. Workmanship shall be

neat & clean without any blemish. In case of any observation by CEL official regarding

materials & workmanship, the same have to replaced and/or repaired to the satisfaction

of CELofficial.

To update CEL regarding performance of the installed systems on quarterly basis as per

the following requirement and submit report in this respect till the end of Maintenance

period of 5 Years.

• Number of complaint received during the period of reporting. Page 9 of 30.

Page 10: Tender Document: C-2(b)/RC/0700/4469/2017 … Document_7.pdfCENTRAL ELECTRONICS LIMITED ... Escalation in price (except where price variation clause is applicable), ... Supply of Power

Tender Document: C-2(b)/RC/0700/4469/2017

• Numbers of complaint attended during the period of reporting.

• Major cause of failure, as observed.

• Major replacement made during the reporting period.

i) No extra transportation charges shall be paid during the period of contract.

j) No escalation shall be applicable on the quoted prices.

k) In case of any losses, theft or damage of material (CEL’s & their own), the contractor shall

alone be responsible to make alternate arrangement for completion/handing over of the

project within contractual quoted price. The purchaser shall in no way, whatsoever,

responsible to compensate the contractor in this account till completion of project.

l) Contractor shall arrange all the utilities required to complete the work. No payment on

this account shall be paid by CEL.

m) While implementing the project the physical condition of the area on roofs should be

taken into consideration for installation of Solar Module.

n) There should not be any damage what so ever on the roof top due to installation of the

solar systems, if so any the same shall be the responsibility of the contractor.

o) While cabling care must be taken to ensure that no loose cables lie anywhere related to

the works.

p) To co-ordinate with CEL officials for verification of completed works.

q) Inspection: - All the materials shall be inspected by CEL officials before dispatch to site.

Minimum one week notice is to be given in writing to CEL about readiness of materials

for inspection.

r) Bidder must provide proper branding on the installed system. Bidder has to confirm the

details from CEL after award of contract.

s) Any other work as required on the site for completion of the project.

Weekly progress report:

The contractor shall furnish on first day of every week, a progress report showing progress of

finalization of designs and drawings, materials received at site and the works carried out

during the preceding weeks and plan for the next week. As far as possible the presentation

shall be neat and should be in tabulated form accompanied by colored diagram wherever

applicable. Beside this bidder has to submit monthly progress report.

O&M Manual/Maintenance Manual:

The supplier shall provide easy-to-use illustrated installation and operation manual (4

copies) in English and local language for easy installation and trouble-free usage. Manual

shall contain complete system details such as array layout, schematic of the system, working

principle, clear instructions on regular maintenance, trouble shooting of the system and

emergency shutdown procedures.

During Warranty/AMC, contractor has to perform the following duties:

1. Contractor is fully responsible for the trouble-free maintenance and is liable to rectify /

remove any defect noticed within the aforesaid period free of cost for the materials

supplied by them.

2. The Contractor and CEL should jointly impart training to the users on day to day repair

and maintenance of the systems.

3. This includes repair/ replacement of all sparesand consumable supplied by Contractor

during the Warranty period. Page 10 of 30.

Page 11: Tender Document: C-2(b)/RC/0700/4469/2017 … Document_7.pdfCENTRAL ELECTRONICS LIMITED ... Escalation in price (except where price variation clause is applicable), ... Supply of Power

Tender Document: C-2(b)/RC/0700/4469/2017

4. The Contractor shall undertake the periodical maintenance work of complete Solar

Power plant on the 10th of every succeeding quarter which also includes cleaning of all

the equipment and submit report to CEL countersigned by the concerned officials of

beneficiary.

5. The Contractor should be in readiness to attend to the defects of any system, as and

when required by the beneficiary and ensure rectification of defects and restore

functionality within three working days of lodging the complaints. The Contractor shall

furnish the status report after the maintenance work are over, which shall invariably bear

the signature of the beneficiaries.

6. Separate bills/invoices in triplicate are to be submitted by the contractor for effecting

payment after end of each year from the date of maintenance of the systems along-with

quarterly report.

7. It will be the liberties of the CEL to cross check the system maintained by the contractor.

Random verification of the maintenance may be carried out by the CEL wherever

necessary.

Payment terms: Payment shall be made back to back as per the following terms:

1. 70% of the supply value of systems with full taxes / duties will be made after receipt of

the system in good condition at site.

2. 20% of the supply and 90% installation & commissioning value along with taxes towards

Installation & commissioning will be made after successful commissioning of the system.

3. Balance 10% of PO value shall be made after submission of PBG of equivalent value valid

for 5 years or till completion of the contract.

4. Payment towards AMC shall be released yearly basis on submission of quarterly reports

duly signed by concerned beneficiaries.

Taxes & Duties: The prices quoted are inclusive of loading, unloading, transportation to site,

insurance, and other costs incidentals to delivery. GST (IGST/CGST/UGST) will be as per the

Government rates where the supply is made and will be paid extra to the vendor. Vendor

should mandatorily register themselves with respective sales tax department of particular

state, where the supply is going to be made. Any other charges/cost/TA/DA is also included

in the contract prices.

Security Deposit:

(a) The successful Bidders will be required to pay an amount equivalent to 2% of the Order

value including taxes and duties as a Security Deposit within seven working days after

placement of PO along with Pert Chart for complete project. The security deposit will

be released after handing over of system to end user.

(b) In case bidder fails to submit the security deposit within one week then 10% of the

order value will be deducted from the first payment and the same shall be released

after handing over the system.

Completion Time: The supply of the materials shall be made within 8 weeks and

installation/commissioning has to be completed within 2 weeks. Total work has to be

completed within 10 weeks after release of PO.

Page 11 of 30.

Page 12: Tender Document: C-2(b)/RC/0700/4469/2017 … Document_7.pdfCENTRAL ELECTRONICS LIMITED ... Escalation in price (except where price variation clause is applicable), ... Supply of Power

Tender Document: C-2(b)/RC/0700/4469/2017

Liquidated Damages: In the event of delay in affecting the delivery within agreed period, a

reduction in the price shall be levied @ 1% of the total order value per week or part there of

subject to maximum of 10% of the total order value.

Applicability of Labour Laws: The Bidder shall ensure payment of minimum wages as per

labour laws, and shall comply with all labour laws applicable to it under Indian law. You shall

ensure all safety guidelines, rules and regulations, labour laws etc. You will indemnify CEL

for any incident, injury met by your labour, employee or any other person working for you.

Any compensation sought by your labour, employee or any other personworking for you

shall be solely paid by you as per settlement. CEL has no role to play in this matter.

Force Majeure: In no event shall either Party have any liability for failure to comply with this

Agreement, if such failure results directly from the occurrence of any contingency beyond

the reasonable control of the Party, including, without limitation, strike or other labor

disturbance, riot, major power failure, war, natural calamities including but not limited to

floods, earthquakes, fire, volcanic eruptions, epidemics, National Emergency, interference

by any government or governmental agency, embargo, seizure, or enactment or abolition of

any law, statute, ordinance, rule, or regulation (each a " Force Majeure Event"). In the event

that either Party is unable to perform any of its obligations under this Agreement because

of a Force Majeure Event, the Party who has been so affected shall as soon as may be, after

coming to know of the Force Majeure Event, inform the other Party and shall take

reasonable steps to resume performance as soon as may be after the cessation of the Force

Majeure Event. If the period of nonperformance due to a Force Majeure Event exceeds

thirty (30) days, the Party whose ability to perform has been so affected may, by giving

written notice, terminate this Agreement.

SPECIAL CONDITIONS

a) The contractor/bidder shall not display the photographs & content of the work and also

will not take advantage through publicity of the work without written permission of CEL.

Noncompliance to this may result in removal from the EPC list and the contractor will be

blacklisted.

b) Service level agreement has to be signed on 100/- stamp paper after award of PO.

Page 12 of 30.

Page 13: Tender Document: C-2(b)/RC/0700/4469/2017 … Document_7.pdfCENTRAL ELECTRONICS LIMITED ... Escalation in price (except where price variation clause is applicable), ... Supply of Power

Tender Document: C-2(b)/RC/0700/4469/2017

SPECIFICATIONS OF BATTERY

Specification of Battery

General Terms and Conditions

1. Bidders should submit the make & Model no. of Batteries with technical Bid.

2. Bidder has to confirm the make and submit the layout drawings before installation for approval.

3. Bidder has to submit list of accessories to be supplied with batteries.

Battery (120V, 600AH)

Battery type Tubular GEL Valve Regulated Lead Acid (TGEL-VRLA)

Battery voltage 120 V (60 cells of 2Volts)

Battery capacity @ C/10 600 AH at 25 deg C

Mounting MS Stand (Single Tier)

Accessories 01 set with Battery Bank

No. of Battery Bank 01 set

Page 13 of 30.

Page 14: Tender Document: C-2(b)/RC/0700/4469/2017 … Document_7.pdfCENTRAL ELECTRONICS LIMITED ... Escalation in price (except where price variation clause is applicable), ... Supply of Power

Tender Document: C-2(b)/RC/0700/4469/2017

POWER CONDITIONING UNIT (PCU)

S.No. Description Qty.

1. 240V, 10KW (MPPT based PWM Solar Charge Controller)

240V, 10KVA (Single phase bi-directional inverter-Pure Sine wave)

01 No.

Note : Bidders should submit the make & Model no. of PCU with technical Bid. All the required test reports &

Manufacturer authorization for providing the support with all the spares for 5 years are to be

submitted with the bid.

SPECIFICATIONS OF POWER CONDITIONING UNIT (PCU)

The Power Conditioning unit mainly comprises of MPPT based PWM Solar Charge Controller and a Single

phase bi-directional inverter.

The MPPT Charger is a microprocessor based system designed to provide the necessary DC/DC

conversion to maximize the power from the SPV array to charge the connected battery bank. The charge

controller is equipped with necessary software that allows precise charging of the battery bank. Many

protection features are also included to ensure that no abnormal or out of range charge conditions are

encountered by the battery bank. The system incorporates a front panel LCD display with LEDs and a

switch to indicate the “operational status” and “fault status” of the system, reset system faults and

implement various operating modes.

BASIC SYSTEM OPERATION

‘Full Auto’ mode

• Under defined/light load conditions and with the battery in a “Full State of Charge” the available

solar power will supply the site load via the inverter.

• Under medium and heavy load conditions above the defined load, all available solar power is used

to power the load as well as to charge the battery. The balance of power needed by the site load is

provided/shared by the grid.

• In the event of low solar power being available or Battery Bank reaches at predetermined low level,

the PCU configures itself as a charger and the grid commences charging of the batteries in addition

to supporting the site load.

• Once the batteries have reached a predetermined level of charge all the available renewable energy

will be utilised to power the site load and reduce the power drawn from the grid.

• In the event the grid supply was lost or moved too far out of its nominal range, it will be

disconnected and power to the load will be supplied from the battery and any available renewable

resources.

• Once the grid supply was detected to be back in range and stable, the inverter module connected

back in parallel with the grid supply to power the load.

SYSTEM FEATURES AND OPTIONS

• Full automatic operation with no break to the supply during transitions from inverter+ grid to

inverter only operation.

• Output voltage conditioning when operating in grid interactive mode to ensure stable and reliable

supply to the site loads.

• The Peak load shaving (PLS) feature is available which utilizes batteries based on battery state of

charge (SOC) thus optimising grid usage. PLS feature provides for extending battery life as the

battery is discharged under controlled conditions. Page 14 of 30.

Page 15: Tender Document: C-2(b)/RC/0700/4469/2017 … Document_7.pdfCENTRAL ELECTRONICS LIMITED ... Escalation in price (except where price variation clause is applicable), ... Supply of Power

Tender Document: C-2(b)/RC/0700/4469/2017

• Renewable resources are fed directly to the site load via the inverter as much as possible to

minimise losses due to battery inefficiency.

• Capable of being integrated with renewable/distributed generation sources on both the AC and DC

bus.

• Local LCD (liquid crystal display) and keypad for system control and monitoring instantaneous

system data.

Important features/protections in the PCU:

• MPPT included.

• LCD keypad operator interface menu driven.

• Automatic fault conditions reset for all parameters like voltage, frequency and/or black out.

• MOV type surge arrestors on AC & DC terminals for over voltage protection from lightening induced

surges.

• PCU operation from 0° to 55° C,

• All parameters shall be accessible through an industry standard communication link.

• Over load capacity (for 30 sec.) shall be 150% of continuous rating.

A. Cabling Practice: Cable connections shall be made using PVC Cu cables, as per BIS standards. All

cable connections shall be made using suitable terminations for effective contact.

B. The PCU shall include an easily accessible emergency OFF button located at an appropriate position

on the unit.

C. All doors, covers, panels and cable exits shall be gasketed or otherwise designed to limit the entry of

dust and moisture as per IP 21.

D. In the design and fabrication of the PCU the site temperature 5° to 55°C, incident sunlight and the

effect of ambient temperature on component life shall be considered carefully. Similar

consideration shall be given to the heat sinking and thermal for blocking diodes and similar

components.

Page 15 of 30.

Page 16: Tender Document: C-2(b)/RC/0700/4469/2017 … Document_7.pdfCENTRAL ELECTRONICS LIMITED ... Escalation in price (except where price variation clause is applicable), ... Supply of Power

Tender Document: C-2(b)/RC/0700/4469/2017

Technical Specifications of PCU

OPERATING PARAMETERS INFORMATION

Output Voltage 230 volts

Single phase, 3 Wire output LNE

Nominal voltage can be adjusted by ±5% via system set points

Output Frequency 50Hz ± 0.5% during standalone inverter operation

Inverter to follow grid frequency up to ±3Hz of the nominal output

frequency during parallel operation

Continuous Rating 10KW

Surge Rating 150% of the continuous rating for a maximum of 30 seconds

Battery Voltage (nominal) 120 volts DC

Control Type Voltage source, microprocessor assisted output regulation

Waveform Microcontroller /DSP generated PWM for low THD, sine wave

output

Power Control Pulse Width Modulation (PWM)

THD Less than 4%

Efficiency operating at nominal

Battery volts with UPF loads

>93% (Peak Efficiency)

Efficiency at various loads as per IEC -61683:1999

Internal Protection System

(using electronic detection)

� Inverter continuous overload protection

� Inverter peak current (short circuit) protection

� Heatsink over temperature protection

� Over/under voltage AC voltage protection

� Grid Over/under frequency protection

� Over/under battery voltage protection

� Overcharge protection

� Anti-islanding protection

Alarm Signals Via system fault relay (voltage free contact)

Front Panel Display (LCD) LCD panel with membrane keypad displaying the following:

� Grid and inverter kW, voltage, freq

� Grid and inverter on line status

� Battery voltage, battery current, battery temperature

� Solar charge current and ambient temperature

� Individual power stage heat sink and cabinet temperature

� site kWh summation,

� System set points, event logs and data logs

Front Panel Controls (via keypad) � Auto Mode selections – Equalise Battery

� Manual Mode Selections – Inverter, Grid

Front Panel Controls (discrete) � Grid Auto Manual Bypass Switch

Front Panel Indicators � Inverter On Line and Grid On Line

� System Fault

Circuit Breakers � Grid Input

� Battery Input

� Solar Input & Load

RFI Designed to minimise both conducted and radiated RFI emissions

Earthing Provisions AC bypassing to earth on inverter and DC inputs

CERTIFICATIONS

IEC-61683 Efficiency Measurement

IEC-60068-2 (1,2,14,30) Environmental Standards Page 16 of 30.

Page 17: Tender Document: C-2(b)/RC/0700/4469/2017 … Document_7.pdfCENTRAL ELECTRONICS LIMITED ... Escalation in price (except where price variation clause is applicable), ... Supply of Power

Tender Document: C-2(b)/RC/0700/4469/2017

OPERATING PARAMETERS INFORMATION

IEC-60529 Ingress Protection (IP-21)

ENVIRONMENTAL

Operating Temp. Range 0-55 degrees Celsius

Humidity 0-90% non-condensing

Enclosure Rated for IP21

SOLAR CHARGE CONTROLLER

Control type Single channel PWM (pulse width modulated) with MPPT control

MPPT Range 165-250V

Maximum DC Link Voltage 300V

Capacity 10 KW peak (83 amps max at the nominal battery volts)

GRID SPECIFICATIONS

Capacity As per Inverter capacity

Nominal Voltage & Frequency 230 volts, 50Hz, 3 wire (LNE)

Page 17 of 30.

Page 18: Tender Document: C-2(b)/RC/0700/4469/2017 … Document_7.pdfCENTRAL ELECTRONICS LIMITED ... Escalation in price (except where price variation clause is applicable), ... Supply of Power

Tender Document: C-2(b)/RC/0700/4469/2017

MANUFACTURERS' AUTHORIZATION CERTIFICATE

Ref. No. ____________ dated________

To

M/s. Central Electronics Limited

4, Industrial Area

Sahibabad-201010 (UP)

Tender No.:

Dear Sir:

We who are established and reputable manufacturers of ________________________ (name &

descriptions of goods offered) having factories at ___________________(address of factory) do hereby

authorize M/s ____________________________ (Name and address of Agent) to submit a bid, and sign

the contract with you for the goods manufactured by us against the above tender.

We hereby extend our full guarantee and warranty as per the General Conditions of

Contract for the goods and services offered for supply by the above firm against this tender directly to

your company.

Yours faithfully,

(Name)

(Name of manufacturers)

Note: This letter of authority should be on the letterhead of the manufacturer and should be signed by a

person competent to legally bind the manufacturer. It should be included by the Bidder in its bid.

Page 18 of 30.

Page 19: Tender Document: C-2(b)/RC/0700/4469/2017 … Document_7.pdfCENTRAL ELECTRONICS LIMITED ... Escalation in price (except where price variation clause is applicable), ... Supply of Power

Tender Document: C-2(b)/RC/0700/4469/2017

PRICE BID-A

SPV POWER PLANT (10KWp)

Sr.

No.

Particulars Qty.

(Nos.)

Unit Price (Rs.)

FOR Gurugram

Total Price (Rs.)

1. Supply of Balance of

system, as per BOQ for 10

KWp including on-site

warranty for a period of 5

years of SPV Power plant in

Gurugram.

01 set

2 GST on Sr. No. 1

3 Total Supply Price (1+2)

4 Installation, commissioning,

testing of all component to

make functional of 10kW

Power plant.

01 job

5 GST on Sr. No. 4

6 Total I &C Charges (4+5)

7 AMC Charges for above

system for 5 years

01 job

8 GST on Sr. No. 7

9 Total AMC Charges (7+8)

10 Grand Total (3+6+9)

*Note: If AMC offered is less than 1.5% then it shall be taken as 1.5% of Sr. no. 3 above for evaluation of

offers.

(Signature of Bidder with Seal)

Page 19 of 30.

Page 20: Tender Document: C-2(b)/RC/0700/4469/2017 … Document_7.pdfCENTRAL ELECTRONICS LIMITED ... Escalation in price (except where price variation clause is applicable), ... Supply of Power

SAHIBABAD

- 201010 (U.P.)

SOLAR

PHO

TOVO

LTAIC G

RO

UP

CH

ECKED

APPRO

VED

DESIG

NED

DR

AWN

ELECTR

ON

ICS LIM

ITED.R

EPRO

DU

CTIO

N,U

TILISATIO

N O

R

NO

S.OF C

ELLS =12x6=72 NO

S.N

OTE; C

ELL SIZE =156x156 MM

Page 20 of 30.

Page 21: Tender Document: C-2(b)/RC/0700/4469/2017 … Document_7.pdfCENTRAL ELECTRONICS LIMITED ... Escalation in price (except where price variation clause is applicable), ... Supply of Power

To D

CD

B

+ve

-ve

X1

X2

PV

str

ing

arr

ay

(+ve

)

SLD

of

Arr

ay

Ju

nct

ion

Bo

x (

AJB

) fo

r 1

0 K

Wp

So

lar

Po

we

r P

lan

t

X3 X4

X5

Dio

de

, D

1

Dio

de

, D

2

Dio

de

, D

3

Dio

de

, D

4

Dio

de

, D

3

Fu

se,

F1

Fu

se,

F2

Fu

se,

F3

Fu

se,

F4

Fu

se,

F5

-ve

X5

Y1

Y2 Y3

Y4

Y5

Fu

se,

F5

Fo

r re

fere

nce

on

ly

CE

NT

RA

L E

LE

CT

RO

NIC

S L

IMIT

ED

, S

AH

IBA

BA

D

Drw

g.

No. A

01501000302-5

Pre

pare

d B

yA

ppro

ved B

y

10

KW

p P

OW

ER

PL

AN

T

SL

D o

f A

JB

fo

r 1

20

V S

yste

m

Page 21 of 30.

Page 22: Tender Document: C-2(b)/RC/0700/4469/2017 … Document_7.pdfCENTRAL ELECTRONICS LIMITED ... Escalation in price (except where price variation clause is applicable), ... Supply of Power

SLD

of

DC

DB

fo

r 1

0 K

Wp

Po

we

r P

lan

t

+ve

+ve

Fro

m A

JBTo

PC

U

Iso

lato

r 6

3 A

-ve

-ve F

or

refe

ren

ce o

nly

CE

NT

RA

L E

LE

CT

RO

NIC

S L

IMIT

ED

, S

AH

IBA

BA

D

Drw

g.

No. A

01501000302

Pre

pare

d B

yA

ppro

ved B

y

10

KW

p P

OW

ER

PL

AN

T

SL

D o

f D

CD

B f

or

10

KW

pP

ow

er

Pla

nt

Page 22 of 30.

Page 23: Tender Document: C-2(b)/RC/0700/4469/2017 … Document_7.pdfCENTRAL ELECTRONICS LIMITED ... Escalation in price (except where price variation clause is applicable), ... Supply of Power

SLD

of

DC

DB

(Ba

tte

ry)

for

10

KW

pP

ow

er

Pla

nt

+ve

+ve

Fro

m B

att

ery

To P

CU

12

5 A

SF

U

-ve

-ve

Fo

r re

fere

nce

on

lyC

EN

TR

AL

EL

EC

TR

ON

ICS

LIM

ITE

D, S

AH

IBA

BA

D

Drw

g.

No. A

01501000303

Pre

pare

d B

yA

ppro

ved B

y

10

KW

p P

OW

ER

PL

AN

T

SL

D o

f D

CD

B (

Ba

tte

ry)

for

10

KW

pP

ow

er

Pla

nt

Page 23 of 30.

Page 24: Tender Document: C-2(b)/RC/0700/4469/2017 … Document_7.pdfCENTRAL ELECTRONICS LIMITED ... Escalation in price (except where price variation clause is applicable), ... Supply of Power

SIN

GLE

PH

AS

E A

CD

B –

10

KW

pS

OLA

R P

OW

ER

PLA

NT

Fo

r re

fere

nce

on

ly

CE

NT

RA

L E

LE

CT

RO

NIC

S L

IMIT

ED

, S

AH

IBA

BA

D

Drw

g.

No. A

01501000304

Pre

pare

d B

yA

ppro

ved B

y

10

KW

p P

OW

ER

PL

AN

T

SL

D o

f A

CD

B f

or

10

KW

pP

ow

er

Pla

nt

Page 24 of 30.

Page 25: Tender Document: C-2(b)/RC/0700/4469/2017 … Document_7.pdfCENTRAL ELECTRONICS LIMITED ... Escalation in price (except where price variation clause is applicable), ... Supply of Power

Tender Document: C-2(b)/RC/0700/4469/2017

Annexure B

Commercial Terms and Conditions:

1. Only empanelled EPC contractors are eligible to quote in this tender as described in the Eligibility Criteria. Quotations having deviation from our specifications, terms & conditions would be rejected.

2. Basis of price: The offer should clearly indicate units and rates. Prices should be submitted on FOR CEL sites basis and the scope of work described in Annexure A. The quotations submitted with basis of price other than the above will be rejected.

3. GST: GST is to be clearly mentioned, if applicable, as per the columns mentioned in the price bid.

4. Delivery schedule. As given in Annexure-A.

5. Payment:

1. Payment will be made on back-to-back basis as per the following terms: a. 70% of the supply value of systems with full taxes / duties will be made after receipt of the system

in good condition at site. b. 20% of the supply and 90% installation & commissioning value along with taxes towards

Installation & commissioning will be made after successful commissioning of the system. c. Balance 10% of PO value shall be made after submission of PBG of equivalent value valid for 5

years or till completion of the contract.

d. Payment towards AMC shall be released yearly basis on submission of quarterly reports duly

signed by concerned beneficiaries. Security Deposit:

(a) The successful Bidders will be required to pay an amount equivalent to 2% of the Order value including taxes and duties as a Security Deposit within seven working days after placement of PO along with Pert Chart for complete project. The security deposit will be released after handing over of system to end user.

(b) In case bidder fails to submit the security deposit within one week then 10% of the order value will be deducted from the first payment and the same shall be released after handing over the system.

6. Warrantee period: As given in Annexure ‘A’.

7. Performance bank guarantee (PBG): PBG of 10% of total P.O. value valid for 63 months from the date of installation & commissioning of the systems. In case, PBG is not submitted by the bidder, 10% of total PO value shall be retained by CEL for the above period. Partial or part PBG will not be accepted.

8. Price reduction for delayed delivery: In the event of delay in affecting the delivery within agreed period, a reduction in the price shall be levied @ 0.5% of the total order value per week or part thereof subject to maximum of 5% of the total order value.

9. Inspection: As given in Annexure ‘A’.

10. Price variation Clause: Price variation would not be permitted and quotations having Price variation

clause would be rejected.

11. Validity of offer: The quotation/tender/bid submitted by the bidder/supplier shall be valid for a minimum period of 90 days from date of opening.

12. Any corrections/alterations in the tender/quotation/bid are to be duly signed by the bidder. CEL does not

take any responsibility for delay in receipt or non-receipt or loss of tender(s) in transit.

13. Earnest money: An amount of ₹19,600/- in the form of demand draft favoring Central Electronics Limited, payable at Delhi and valid for 3 months to be submitted along with the technical bid. No interest shall be payable on the earnest money deposited by bidder/ tenderer. The earnest money may be deposited through TT/SWIFT into CEL’s account with Syndicate Bank. The details of account are as below:

Beneficiary Name: Central Electronics Limited Beneficiary Account Number/IBAN: 87761250000014

Page 25 of 30.

Page 26: Tender Document: C-2(b)/RC/0700/4469/2017 … Document_7.pdfCENTRAL ELECTRONICS LIMITED ... Escalation in price (except where price variation clause is applicable), ... Supply of Power

Tender Document: C-2(b)/RC/0700/4469/2017

Beneficiary Bank SWIFT Address/BIC: SYNBINBB161 Beneficiary Bank Name: Syndicate Bank (IFSC: SYNB0008776) Beneficiary Bank Address: Sahibabad Branch, CEL Complex, Plot No. 1, Site 4, Sahibabad 201010 INDIA

The earnest money (after deduction of bank charges, if any) of unsuccessful bidders/ tenderers will be refunded within one month of finalization of tender. The earnest money of successful bidder would be converted into security deposit and would be returned (after deduction of bank charges, if any) to the bidder after two months of successful completion of work. In case the successful bidder is exempted for submitting the EMD as described below, 2% of total order value (including taxes & duties) shall be deposited by the successful bidder within seven days of receipt of purchase order through email, failing which, 10% of the order value will be deducted from the first payment and the same shall be released after handing over the systems.

Exemption from submission of EMD: Micro & Small Enterprise registered with DIC or KVIC or KVIB or Coir Board or NSIC or DHH or any other body specified by Ministry of Micro, Small and Medium Enterprises, Govt. of India are exempted from submission of EMD subject to submission of valid registration certificate with technical bid.

14. CEL reserves the right to reject any or all tenders/quotations/bids received or accept any or all tenders/quotation/bids wholly or in part. Further, CEL reserves the right to order a lesser quantity without assigning any reason(s) thereof. CEL also reserves the right to cancel any order placed on the basis of this tender in case of strike, accident or any other unforeseen contingencies causing stoppage of production at CEL or to modify the order without liability for any compensation and or claim of any description.

15. Submission of Tender: Tender/Quotation/Bid in sealed cover super-scribing the tender notice no., name

of the item and due date should be delivered at the Office of the Asstt. General Manager, Materials

Management Division, Central Electronics Limited, 4, Industrial Area, Saur Urja Marg, Sahibabad –

201010 (U.P), INDIA. Last date of receiving of tenders/quotations is 25/11/2017 up to 15:00 hrs IST. The

offer shall be submitted in Single sealed envelopes as detailed below:

i. Earnest Money Deposit demand draft /RTGS or TT acknowledgement or the documents for exemption from submission of EMD.

ii. Technical catalogue, literature and approval/registration certificate, if any, required as per eligibility criteria given in the tender.

iii. Filled up Format for Submission of Vendor Data as per format at Annexure C. iv. Tender acceptance letter as per format at Annexure D v. This must contain only the Price Bid on company’s letter head as per Price Bid format given

in Annexure A.

16. Opening of Tenders: Technical Bids/Quotations/tenders will be opened on 25/11/2017 at 1530 hrs (IST). The date for opening of price bids would be fixed after evaluation of the technical bids, usually within a week of opening of technical bids. Price bid of only those bidders would be opened who qualify the technical bid. The date of price bid opening would be intimated to the eligible bidders (qualified in the technical evaluation) at least 1 day in advance.

17. Technical Clarifications: Bidders desiring any technical clarification may contact Assistant General Manager, MMD, Central Electronics Limited, 4, Industrial Area, Sahibabad – 201010 Phone no. 0120-2895145 Fax: 0120-2895148 email: [email protected] between 1000 hrs to 1600 hrs on any working day. However, the tender submission and opening dates would remain unchanged.

18. In case an order placed by the CEL based on the quotation/bid/tender submitted by the bidder/supplier is not executed by the supplier/bidder, CEL may buy the ordered goods from elsewhere and recover the additional amount that CEL may have to spend in procuring the stores plus 10% to cover the overhead & incidental expenses.

Page 26 of 30.

Page 27: Tender Document: C-2(b)/RC/0700/4469/2017 … Document_7.pdfCENTRAL ELECTRONICS LIMITED ... Escalation in price (except where price variation clause is applicable), ... Supply of Power

Tender Document: C-2(b)/RC/0700/4469/2017

19. Replacement of Rejected Material: Any material supplied against order placed on the basis of this tender and found to be defective on inspection or differing from approved samples or make or specifications will be replaced by the supplier free of cost or full refund made for the amount paid by Central Electronics Limited including freight and insurance and other incidental charges at CEL’s discretion.

20. Arbitration: Any disputes, difference controversies/ difference of opinions, breach and violation arising from or related to this agreement/contract/work order etc. between the parties shall be resolved by mutual discussion/reconciliation in good faith. If disputes, difference controversies/difference of opinions, breach and violation arising from or related to this agreement/contract/work order etc. cannot be resolved within 30 days of commencement of reconciliations/ discussions then the matter shall be referred to the Sole arbitrator, nominated by CMD, CEL for this purpose and his decision shall be final and binding on both the parties. There will be no objection to any such appointment on the grounds that the Arbitrator is an employee of CEL and no appeal on any order passed by the Arbitrator for this purpose shall be filed in any Court of Law on such ground.

21. In case of any ambiguity in the terms & conditions mentioned here-above and Annexure A of the tender, clause defined in Annexure-A shall supersede.

Page 27 of 30.

Page 28: Tender Document: C-2(b)/RC/0700/4469/2017 … Document_7.pdfCENTRAL ELECTRONICS LIMITED ... Escalation in price (except where price variation clause is applicable), ... Supply of Power

Tender Document: C-2(b)/RC/0700/4469/2017

Annexure-C

Format for submission of Vendor Data

1. Name of vendor

2. Registered Address

Phone No.

Fax No.

Name of Proprietor/ CEO/Chairman

Phone/Mobile No.

Email id

3. Factory Address

Phone No.

Fax No.

Email id

4. Delhi/NCR Address (if any)

Phone No.

Fax No.

Email id

5. Correspondence Address

6.

Name of Contact Person

Designation

Phone/Mobile no.

Fax No.

Email id

7. Website

Page 28 of 30.

Page 29: Tender Document: C-2(b)/RC/0700/4469/2017 … Document_7.pdfCENTRAL ELECTRONICS LIMITED ... Escalation in price (except where price variation clause is applicable), ... Supply of Power

Tender Document: C-2(b)/RC/0700/4469/2017

I certify that the information given herein is correct to the best of my knowledge and belief. Signature of Proprietor/CEO/Chairman Seal of the company/concern

9. Income Tax related information

PAN No.

PAN reference no. (in case PAN applied for)

PAN Status (in case PAN applied for)

10. GST related information

GST No.

Address

State

11. Registration No. with Directorate of Industries

12. SSI Reg. No. (if Small Scale Industrial Unit)

13. Bank related information

Bank name

Branch name

Bank address

Bank phone no.

Bank fax no.

Bank MICR Code (9 digit)

RTGS-IFC Code

Account type

Account no.

Swift Code

Page 29 of 30.

Page 30: Tender Document: C-2(b)/RC/0700/4469/2017 … Document_7.pdfCENTRAL ELECTRONICS LIMITED ... Escalation in price (except where price variation clause is applicable), ... Supply of Power

Tender Document: C-2(b)/RC/0700/4469/2017

Annexure – D TENDER ACCEPTANCE LETTER

(To be given on Company Letter Head)

Date:

To,

Sub: Acceptance of Terms & Conditions of Tender.

Tender Reference No:

Name of Tender / Work: -

Dear Sir,

1. I/ We have downloaded / obtained the tender document(s) for the above mentioned ‘Tender/Work’ from the web site(s) namely:

as per your advertisement, given in the above mentioned website(s).

2. I / We hereby certify that I / we have read the entire terms and conditions of the tender documents from Page No. to (including all documents like annexure(s), schedule(s), etc .,), which form part of the contract agreement and I / we shall abide hereby by the terms / conditions / clauses contained therein.

3. The corrigendum(s) issued from time to time by your department/ organization too have also been taken into consideration, while submitting this acceptance letter.

4. I / We hereby unconditionally accept the tender conditions of above mentioned tender document(s) /corrigendum(s) in its totality / entirety.

5. In case any provisions of this tender are found violated , then your department/ organisation shall without prejudice to any other right or remedy be at liberty to reject this tender/bid including the forfeiture of the full said earnest money deposit absolutely.

Yours Faithfully,

(Signature of the Bidder, with Official Seal)

Page 30 of 30.