tender doc_tas at bhatinda.pdf

Upload: mehdi

Post on 07-Aug-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/19/2019 Tender Doc_TAS at bhatinda.pdf

    1/237

     

    HINDUSTAN PETROLEUM CORPORATION

    LIMITEDTERMINAL AUTOMATION PROJECT

    1 | 2 3 8  

    HINDUSTAN PETROLEUM CORPORATION LIMITED

    ENGINEERING & PROJECTS

    GRESHAM HOUSE ( 2 ND FLOOR),

    SIR P. M. ROAD, FORT,

    MUMBAI -400 001. 

    TENDER DOCUMENT

    FOR

    TERMINAL AUTOMATION SYSTEM PROJECT

    AT

    BHATINDA TERMINAL, PUNJAB

  • 8/19/2019 Tender Doc_TAS at bhatinda.pdf

    2/237

     

    HINDUSTAN PETROLEUM CORPORATION

    LIMITEDTERMINAL AUTOMATION PROJECT

    2 | 2 3 8  

    SPECIAL CONDITIONSOF

    CONTRACT 

    (SCC)

  • 8/19/2019 Tender Doc_TAS at bhatinda.pdf

    3/237

     

    HINDUSTAN PETROLEUM CORPORATION

    LIMITEDTERMINAL AUTOMATION PROJECT

    3 | 2 3 8  

    SPECIAL CONDITIONS OF CONTRACT

    1.  Completion period: 7 months from the date of issue of LOI / Work order .

    This excludes the stabilization period.

    2. 

    Water required for construction purposes, if any, would be made available if

    possible, by HPCL within the Installation at one source, free of cost, the

    vendor shall be responsible for taking the same to the place of work as

    required. In case of interruption in availability of construction water, vendor

    shall make his own arrangements for progressing with the works and no

    claim for additional work/time can be made on this account.

    3.  Power required for the project works shall be arranged by the vendor at

    his own cost either thru‘ a temporary power connection from the local

    Electric Supply Authority or by means of a DG Set of required capacity.

    4. 

    The contract shall be executed on a unit rate basis. The unit rates shall

    remain firm except otherwise if stated specifically in the General Terms &

    Conditions of the tender.

    5. 

    The Contractor shall provide and maintain at his own expenses all lights,guards, fencing and watching when and wherever deemed necessary by

    the site-in-charge for protection of the work, equipments, instruments,

    accessories or for safety and convenience of those employed on the works

    or public.

    6.  The Contractor shall provide and maintain proper temporary sheds of

    adequate capacity for storage of all materials and his own store in good

    and water tight conditions at site. Any damage / loss of materials in the

    contractor‘s custody will be to his account and will be recovered from his

    running bills.

    7.  TERMS OF PAYMENT :

    Subject to the provisions under the General Terms & Conditions of the

    Contract for deduction of taxes at source, retention money, Liquidated

    Damages etc. the following payment terms shall prevail;

  • 8/19/2019 Tender Doc_TAS at bhatinda.pdf

    4/237

     

    HINDUSTAN PETROLEUM CORPORATION

    LIMITEDTERMINAL AUTOMATION PROJECT

    4 | 2 3 8  

    7.1  For Supply items:

    7.1.1  80% of the quoted rates shall be paid on receipt of the material at site based

    on the certification of HPCL/PMC along with submission of the following

    documents;

    a) 

    Copies of invoices showing goods description, quantity, unit

    price and total amount.

    b)  Railway receipt / Lorry Receipt / delivery challan duly

    acknowledged by the Consignee.

    c)  Manufacture‘s Guarantee Certificate

    d)  Inspection Certificate and dispatch clearance issued by the

    nominated Inspection Agency and supplier‘s factory

    inspection report.

    7.2  10% of the quoted rates shall be paid on completion of erection and

    successful commissioning (SITE ACCEPTANCE TEST).

    7.2.1 

    Balance 10% of the quoted rates shall be on completion of the

    Stabilisation Period.

    7.2 For Erection Items

    7.2.1  80% of the quoted rates shall be paid basis on physical progress of work

    certified by Site Engineer of HPCL / PMC as per the approved billing

    schedule and upon submission of the following documents.

    a) 

    Copies of invoices

    b) 

    Copy of certified progress of work

    c)  Proof of payment of ESI and deposition of EPF etc.

    d)  Wage Sheet

  • 8/19/2019 Tender Doc_TAS at bhatinda.pdf

    5/237

     

    HINDUSTAN PETROLEUM CORPORATION

    LIMITEDTERMINAL AUTOMATION PROJECT

    5 | 2 3 8  

    e) 

    Certified time sheet

    7.2.2  10% of the quoted rates shall be paid on completion of erection and

    successful commissioning (SITE ACCEPTANCE TEST)

    7.2.3 

    Balance 10% of the quoted rates shall be on completion of the

    Stabilization Period

    8  For Testing and commissioning Items : 100 % of the quoted rates shall

    be paid on completion of erection and successful commissioning (SITE

    ACCEPTANCE TEST)

    Successful commissioning is defined as compliance of all SAT punch points

    by bidder and accepted by HPCL

    8.2  For Training Items : 100 % of the quoted rates shall be paid on

    completion of Training

    For Comprehensive Annual Maintenance Contract ( 5 years ): The CAMC

    charges shall be quoted in absolute amount (not in %).However the CAMCcharges for 5 years shall be at least 10 % of the total Capital cost to ensure

    that the system is maintained throughout the CAMC period as envisaged. If

    the Vendor quotes less than 10% as AMC charges, minimum of 10% of the

    total capital cost for 5 years period shall be considered as AMC charges,

    keeping the total cost (Total capital cost + CAMC) as quoted by the vendor.

    In case the vendor quotes higher amount of CAMC, the quoted amount shall

    be retained. The composite rate quoted by vendor for 5 years CAMC period

    shall be split year wise in the following percentage for payment purpose

    Year 1 : 10% of CAMC cost of 5 years

    Year 2 : 15% of CAMC cost of 5 years

    Year 3 : 20% of CAMC cost of 5 years

    Year 4 : 25% of CAMC cost of 5 years

    Year 5 : 30% of CAMC cost of 5 years

  • 8/19/2019 Tender Doc_TAS at bhatinda.pdf

    6/237

     

    HINDUSTAN PETROLEUM CORPORATION

    LIMITEDTERMINAL AUTOMATION PROJECT

    6 | 2 3 8  

    9  Bidders are required to accept the payment terms given above without

    any deviations. In case of deviations, Bidders will be given one opportunityto withdraw the same without any revision in prices failing which the offer is

    liable to be rejected.

    10 

    Receipt of unconditional acceptance of order and security deposit as per

    GTC is a pre-condition for release of any payments.

    11 

    The final payment will be made on completion of all the work and on

    fulfillment by the contractor of all his liabilities under the contract duly

    backed up by a completion & no claim certificate.

    12  ―Site ― shall mean the Bhatinda Terminal project site.

    13  Form C/D, Road Permits, Entry Permits etc. will not be issued by HPCL.

    14  DEFECT LIABILITY PERIOD/Warranty Period 

    In addition to clause No.11 & 5n of GTC, the entire system including all

    supplied materials shall be warranted for another 12 months. Thus the

    total period of warranty/guarantee will be for 24 months starting fromdate of acceptance of the system (ie date of compliance of punch points

    of SITE ACCEPTANCE OF THE SYSTEM by HPCL). During warranty period

    the contractor shall be liable to replace / rectify any item/ equipment

    found defective. All spares and consumables required during the warranty

    period shall be under the scope of the contractor. However printer

    cartridge and stationery will be outside the scope of warranty

    replenishment.

    15  Bids will be evaluated taking into account the charges towards CAMC for 5

    years. However HPCL reserves the right to award the CAMC contract

    subsequently at the end of the warranty period or earlier.

    16  In case of deviations, Bidders will be given one opportunity to withdraw the

    same without any revision in prices, failing which offer shall be liable to be

    rejected.

  • 8/19/2019 Tender Doc_TAS at bhatinda.pdf

    7/237

     

    HINDUSTAN PETROLEUM CORPORATION

    LIMITEDTERMINAL AUTOMATION PROJECT

    7 | 2 3 8  

    17 

    The above Special conditions shall be read in conjunction with General

    Conditions of Contract and Instructions to bidders. If any provision inthese special conditions is at variance with that of the aforesaid

    documents, the Special Conditions shall be deemed to take precedence

    there over.

    18 

    No conditions should be mentioned in the price bid. Conditional price bid

    shall be liable for rejection.

    19. CONFIDENTIALITY:

    The Bidders are requested to handle/respond the tender in utmost

    confidentiality and shall not copy documents/information of the

    Corporation and shall not divulge/distribute/share any

    documents/information or knowledge of things or process which Bidder

    comes to know or acquires during the tendering/execution process. HPCL

    also reserves the right to initiate appropriate legal action against Bidder

    for breach of this condition or any copy right or infringement of

    intellectual property of HPCL disclosed to Bidder during the

    tendering/execution process.

    18 General :

      No idle time charges shall be payable by HPCL ,in any case what so ever.

     

    In the absence of any specifications covering any material, design of work

    (s) the same shall be performed / supplies / executed in accordance with

    Standard Engineering Practice as per the instructions / directions of the

    Engineer-in-Charge, which will be binding on the bidder. These have to be

    completed at no extra cost to HPCL.

      It is the clear understanding of the bidder that the complete scope as

    defined or as may be required for the intended objective of this tender is

    included in the quoted price. No extra payment apart from the quoted

    price will be made in order to achieve the intended objectives. Reasons

  • 8/19/2019 Tender Doc_TAS at bhatinda.pdf

    8/237

     

    HINDUSTAN PETROLEUM CORPORATION

    LIMITEDTERMINAL AUTOMATION PROJECT

    8 | 2 3 8  

    like, bidder having not envisaged / considered a particular activity or

    element of cost required to be carried out for achieving the intended

    objective or some activity not specifically mentioned in the tender

    enquiry/tender but required to be carried out for achieving the intended

    objective, will not form basis for considering extra payments.

     

    No extra payments will be made for working on extended hours /

    Saturdays / Sundays / Holidays to meet the committed/required time

    schedules.

    19.0  SOLE RIGHTS TO TEMPLATES / DOCUMENTATION / PROCESSES

      HPCL will have the sole rights to the templates / documentation /

    processes / solution model etc. developed in the course of implementation

    and the Successful Bidder and/or their partners will not be allowed to use

    them without the explicit prior permission of HPCL in writing.

    20 SUCCESSFUL BIDDER’S RESPONSIBILITY 

     

    Successful Bidder will be wholly and solely responsible and liable for all the

     jobs carried out by them / services provided by them. HPCL acceptance

    having signed off a particular milestone will not exonerate the Successful

    Bidder from his prime responsibilities to have done a correct job as per the

    requirement of the job/contract and as per international practices in the

    first instance itself. If required, Successful Bidder will be required to revisit

    those milestones which are already signed off and will be required tomake suitable corrections at no extra cost to HPCL.

    21. PATENT /COPYRIGHT PROTECTION 

     

    If any third party claims that a Product/Service(s) supplied by the bidder in

  • 8/19/2019 Tender Doc_TAS at bhatinda.pdf

    9/237

     

    HINDUSTAN PETROLEUM CORPORATION

    LIMITEDTERMINAL AUTOMATION PROJECT

    9 | 2 3 8  

    connection with this contract here under infringes a patent or copyright,

    the bidder will defend HPCL against that claim at Bidder‘s expense and pay

    all costs, damages, and attorney‘s fees etc. and it would be the sole

    responsibility of the successful bidder to comply with all instructions that a

    Court finally awards.

     

    If such a claim is made or is likely to be made, Bidder to enable HPCL to

    continue to use, or to modify or replace the Product. If none of these

    alternatives is acceptable to HPCL, the Bidder will give HPCL a credit for

    such Product. as well as for all resultant consequential losses, resulting outof the non-availability of the product for HPCL‘s use.

    22. COMPLIANCE TO TENDER ENQUIRY DOCUMENT 

      Tender quoted should be in compliance to the tender enquiry conditions.

    All Annexure duly filled up along with necessary documentation as

    requested in the tender enquiry and / or required to support Successful

    Bidder‘s claim must be enclosed with the tender in the first instance itself.

     

    Any willful attempts by the Successful Bidder to camouflage the deviations

    by not mentioning them in the prescribed format may render the bid itself

    non responsive. Only the deviations which are mentioned on the format

    attached in tender or in the datasheets will be taken during evaluation and

    remaining offer shall be considered as exact compliance to tender enquiry.

    23.0 Limitation of Liability :

    1) In no event shall either Party to the contract be responsible for orobligated in any manner to pay any special , exemplary, punitive,

    consequential or other indirect damages( whether under tort, negligence

    or strict liability ) in respect of any loss, damage, claim or demand asserted

    by the other Party hereunder, even if the first mentioned Party was

    informed or made aware of the possibility of such damages

  • 8/19/2019 Tender Doc_TAS at bhatinda.pdf

    10/237

     

    HINDUSTAN PETROLEUM CORPORATION

    LIMITEDTERMINAL AUTOMATION PROJECT

    10 | 2 3 8  

    2) The maximum liability of each Party arising from any circumstances

    including negligence, errors & omissions shall be limited to the totalcontract value.

    24.0 Bidders are required to quote the Unit rates in R only.

  • 8/19/2019 Tender Doc_TAS at bhatinda.pdf

    11/237

     

    HINDUSTAN PETROLEUM CORPORATION

    LIMITEDTERMINAL AUTOMATION PROJECT

    11 | 2 3 8  

    SPECIFICATIONS

  • 8/19/2019 Tender Doc_TAS at bhatinda.pdf

    12/237

     

    HINDUSTAN PETROLEUM CORPORATION

    LIMITEDTERMINAL AUTOMATION PROJECT

    12 | 2 3 8  

    INTENT OF SPECIFICATIONS

    Hindustan Petroleum Corporation Limited (HPCL) intent to automate New 8 Bay

    Gantry being constructed at Bhatinda Terminal. The Terminal receives, stores and

    dispatch various grades of . MS, SKO & HSD etc. Presently Bhatinda Terminal is

    operational & has automated operation for Existing 10 Bay Gantry Tank Truck

    Filling, Tank Farm, Product Pump operation, Fire water pump operation interface,

    Valve Control logics including module for Management Information System &

    Reporting and interface with our ERP. M/s Advanced Systek Pvt Ltd (ASPL) has

    done Terminal Automation & provided its software for automated operation of

    aforesaid facilities. The New Gantry, VFD & other allied equipment/instrument

    proposed to be provided in this tender shall be integrated with the existing

    Automation/TAS software. Also existing logics & additional graphics which may

    require to be modified/ added due to addition of new Bays, pumps, VFDs etc

    shall be suitably modified/ added by the Vendor. All functions defined in this

    tender document shall be performed in an integrated cohesive manner. The new

    system shall be seamlessly integrated with the existing TAS which in turn will

    control and monitor the entire terminal.

    Before submitting techno commercial bids, bidders are required to visit and study

    the existing scheme of Automation & other aspects of Plant operations for theterminal. Any job, material, equipment, instrument etc not explicitly mentioned in

    the Schedule of quantity but required to be provided to meet the functional &

    technical requirement as mentioned in this tender shall be in the scope of

    Vendor.

    M/s HPCL may appoint Project Management Consultant (PMC) on their behalf for

    execution & implementation of the entire TAS including Data Sheets approval,

    Site Supervision, Bills Certification, Project monitoring etc. & all related activities

    of automation as covered under this tender. However, inspection of Equipments

    & materials are excluded from the scope of the PMC. Vendor shall get the

    inspection done of the equipments & materials from the approved Third Party

    Inspection agency as stipulated in the scope of Inspection of this document.

    It may be noted that the quantities given in the BOQ are indicative and

    quantities can be revised during execution of the P.O. Change order, if required

    will be issued. Completion period is 7 months excluding stabilization period of

  • 8/19/2019 Tender Doc_TAS at bhatinda.pdf

    13/237

     

    HINDUSTAN PETROLEUM CORPORATION

    LIMITEDTERMINAL AUTOMATION PROJECT

    13 | 2 3 8  

    min. 90 days. The following are the major milestones included in the Completion

    Period

      Datasheet Approval

      Functional Design Specification & Hardware Design Manual which shall

    include all philosophy for integration with the existing TAS

     

    Batch Accuracy Test

      Site Execution

     

    Commissioning & Trial Runs

      Site Acceptance Test including compliance

    Bidders shall visit the site to understand the process, operation, scope of work

    including integration with the existing Automation System. Any further site visits

    required by the Vendor after placement of Purchase Order for understanding the

    process, study the facilities, detail design engineering etc. shall be part of the

    completion period.

  • 8/19/2019 Tender Doc_TAS at bhatinda.pdf

    14/237

     

    HINDUSTAN PETROLEUM CORPORATION

    LIMITEDTERMINAL AUTOMATION PROJECT

    14 | 2 3 8  

    GENERAL

    The major operational areas identified for automation are

    a)  Tank truck loading operation for New 8 Bay Gantry

    b)  Product pump operation (All T/T Loading pumps) including supply &

    integration of the New VFDs

    c)  Integration with existing software including logic modification, wherever

    required and additional graphics

    d)  Management Information System & Reporting

    All these operations shall be logically integrated through existing Servers,Programmable Logic Controller, other field & control room equipments to ensure

    accurate, seamless & secured operation and data exchange.

    Successful Bidder hereafter referred as Vendor shall make sure that

    commissioning of all the instruments / equipment and Site Acceptance Test (SAT)

    shall be completed as per the completion schedule mentioned in Special Terms &

    Condition. Stabilization period is not included in the completion period.

    Control Room location is inside Administrative building.

    As Bhatinda Terminal is an operating Terminal, the Vendor shall carry out day to

    day activity after taking necessary hot/ cold work permits. Vendor shall appoint a

    Safety supervisor, apart from the Work Supervisor, who shall be available

    throughout the working time and shall be responsible for taking permits and

    observing safety and security regulation of the terminal. Vendor shall deploy at

    least one qualified and experienced (1 to 2 yrs)

    instrumentation/electrical/mechanical engineer exclusively at the site during the

    entire execution period as the work supervisor.

    It shall be the endeavor of HPCL to provide work permit beyond normal

    operating hour to the extent possible. However all the work shall be preferably

    planned for completion by the Vendor within the normal working hour. Vendor

    shall be provided suitable area to construct the fabrication yard in the de-

    licensed area within the depot premises to carry out prefabrication job. For works

    which may require total/ part shut down of the Gantry operation or which may

  • 8/19/2019 Tender Doc_TAS at bhatinda.pdf

    15/237

     

    HINDUSTAN PETROLEUM CORPORATION

    LIMITEDTERMINAL AUTOMATION PROJECT

    15 | 2 3 8  

    hamper the normal loading operation, the automation vendor is required to work

    during night hours/ holidays and during such times when it does not hamper theoperation of the terminal. Prior planning & permission from the Terminal

    manager shall be obtained. All hot work shall be planned (min. 21 days in

    advance for Gantry/ header job) and discussed with the Terminal manager and

    shall be carried out on Sundays / holidays to cause minimum impact on the

    regular operation on working days. All Work shall be planned without

    interruption to terminal normal working. No extra claim shall be admissible for

    night working, holiday working or extra hours working if permission for the same

    is given by HPCL.

    The mechanical job can be carried out during any day/ Sundays/ holidays,

    Vendor shall mobilize its mechanical personnel immediately after placement of

    order to carry out modification job in such a manner that all jobs like header

    modification for BAE installation, are completed by the time supply of these

    equipments & instruments are expected. The modification shall be complete in

    all respect after providing spool pieces, valves etc. as required so that equipment,

    instruments can be mounted immediately on receipt Only those modification like

    metering system which may require actual measurement or instruments

     /equipments at site may be taken up after receipt of those equipments,

    instruments

    The Vendor shall ensure all the safety procedures are followed during the above

    activity. The safety procedures to be followed are as listed elsewhere in the

    specification & as per the Oil Industry norms. Vendor shall submit the fortnightly

    safety report along with the work progress report. 

    The vendor shall train operating personnel from the location in the following

    areas so as to make them fully familiar with the system and its day to day

    operation:-

     

    General design & system Engineering.

     

    All related MMI & logics

      Design criterion, specification, testing, functional aspects & installation

    of equipment.

      Operational & preventive maintenance of individual equipment

  • 8/19/2019 Tender Doc_TAS at bhatinda.pdf

    16/237

     

    HINDUSTAN PETROLEUM CORPORATION

    LIMITEDTERMINAL AUTOMATION PROJECT

    16 | 2 3 8  

     

    Trouble shooting for all the individual equipment. Operational &

    preventive maintenance of individual equipment & overallsystem(excluding the existing System)

      Trouble shooting for all the supplied equipment/instruments under this

    tender.

    The above training shall be conducted at the site during handing over of the

    system & during the Warranty period. Two such trainings shall be held every year

    in the Warranty Period. Each training module shall be of minimum 2 days.

    The TT crews are also required to be familiarized with the operation of the TLF

    equipments for which HPCL shall organize the program and the vendor shall

    demonstrate the T/T operation.

  • 8/19/2019 Tender Doc_TAS at bhatinda.pdf

    17/237

     

    HINDUSTAN PETROLEUM CORPORATION

    LIMITEDTERMINAL AUTOMATION PROJECT

    17 | 2 3 8  

    SCOPE OF WORK

    This document serves as detailed specification for the Vendor as minimum

    requirement for automating the specified operations at the Terminal. Vendor

    shall execute the work on turnkey basis & shall design, supply, install, commission

    & stabilize the system as per the deliverables listed in this document.

    Notwithstanding the sub divisions of the tender document into several sections

    and volumes, every part of each shall be deemed to be supplementary of every

    other part and shall be read with and into the contract.

    Vendor‘s scope of work is divided into Four Major categories viz .Overall Scope of

    Work, scope of work for the New 8 Bay Gantry & Scope of work required for

    Integration with the existing System.

    A.  Overall Scope of Work shall include but not limited to the following:

      Complete design and system engineering required for the sub-system &

    its interfacing with the existing Terminal Automation System to ensure the

    deliverables are achieved in line with technical & functional requirement

    laid down in this tender document.

     

    Supply, installation, testing & commissioning of all equipment/instruments, material etc complete as stipulated in the schedule of

    quantities along with its allied hardware. Balance items which are not

    explicitly spelt out in the Schedule of quantities but are required for the

    completeness of the work like structural steels, foundation work & other

    civil works, fittings, gaskets, nut bolts, any other hardware required,

    consumables etc. shall also be deemed to be included under the

    respective items. No separate payment shall be made for such items.

      Third party inspection of the bought out item, Trial run of the system, Site

    acceptance test, system stabilization and acceptance of the complete

    system.

     

    Packing, forwarding, transportation, custom clearance, insurance, storage

    etc.

  • 8/19/2019 Tender Doc_TAS at bhatinda.pdf

    18/237

     

    HINDUSTAN PETROLEUM CORPORATION

    LIMITEDTERMINAL AUTOMATION PROJECT

    18 | 2 3 8  

     

    Supply, fabrication, welding/ nut bolting, erection, painting of any steel

    structural required for installation of equipment, panels, junction boxes,instruments, etc. including any other free issue items, as required & as per

    site engineer‘s instructions. 

      Supply, fabrication, welding/ nut bolting, erection, painting of any

    structural steel required for installation of Cable Trays. 

     

    Supply & installation of all Erection materials including consumables &

    non consumables as galvanized and perforated cable trays with cover,

    cable racks, conduits, junction boxes, pull boxes, clamps, compression

    fitting, cable glands, all instrument supports, electrodes and othermaterials for completeness of erection. The erection materials shall also be

    suitable to the hazardous area classification.

      Supply of Pipes, Bends, reducer, expander, flanges, matching/companion

    Flanges, Gaskets, jumper clip, other pipe fittings etc as required for direct

    mounting or for re-routing the existing pipe in order to facilitate mounting

    of the instruments & equipments including fabrication, welding, erection,

    hydro testing, painting testing and commissioning. All these pipes &

    fittings shall be part of the respective instruments, equipment and shall

    not be paid separately.

      Construction of Cable trench in soft soil, hard soil, rocky strata, RCC etc

    including supply & laying of NP 2 Hume pipes below all road crossing, GI

    conduit inside tank farm, as required

      The spare available in the existing cables, JBs & other hardware can be

    used. Any additional cable, JBs & hardware required for the new

    equipment shall be supplied by the Vendor

      Supply, Fabrication and installation of sunshields 18 gauge GI Sheet/

    aluminum canopy for field mounted equipments, instruments such aspressure transmitters, density meters etc. Dimension of such canopy shall

    be such on all sides of the equipment adequately.

      Any modification required in the existing pipeline, loading platform,

    loading arms for mounting of instruments & equipments like Metering

    system, Header line equipments etc. inclusive of supply of pipes, fittings,

  • 8/19/2019 Tender Doc_TAS at bhatinda.pdf

    19/237

     

    HINDUSTAN PETROLEUM CORPORATION

    LIMITEDTERMINAL AUTOMATION PROJECT

    19 | 2 3 8  

    valves etc. In case it is not possible to modif y 3‖/ 1½― existing pipeline,

    Vendor shall fabricate, erect, lay new 3‖/1½ ― pipeline including supply ofpipes, fittings, valves etc & painting from existing tapping onwards at the

    Gantry. The limit of modification/laying of new 3‖/ 1½‖ pipeline for

    Metering system shall start downstream from the 3‖ / 1½― tapping

    provided on the header line inside the Gantry. The vendor scope shall also

    include draining & collecting the oil safely from the pipeline, flushing,

    degassing, hydro-testing, painting etc. All these modification job,

    dismantling, re-installation etc. including supply of pipes, fittings,

    consumable, hardware material etc. shall be part of respective instruments

    & equipment. No separate payment shall be made for these items.

      Submission of all data sheets along with OEM‘s confirmation on Product

    life cycle, his support for Backup engineering & spares

      Sealing of cables / tube entries into the control room after laying and

    testing of all tubes, cables etc., 

      Preparation & submission of all the required Documents including as-

    built drawings, documents as per the execution of work at site and

    submission to HPCL

      Providing training to HPCL operation team and T/T Crew member as per

    the scope defined in the tender,

     

    Execution of Warranty, Comprehensive Annual Maintenance Contract, etc.

      Supply of special tools, test equipments, consumables required for

    installation, testing, calibration and commissioning of the system. All

    commissioning and start-up spares required up to commissioning, system

    acceptance and handing over of the system to the HPCL shall be in the

    vendor‘s scope. 

     

    Certification from the OEM for correct installation & its terminations, if

    applicable, at each site for all of the following equipment, instruments

    o  Metering System

    o  DCV

  • 8/19/2019 Tender Doc_TAS at bhatinda.pdf

    20/237

     

    HINDUSTAN PETROLEUM CORPORATION

    LIMITEDTERMINAL AUTOMATION PROJECT

    20 | 2 3 8  

    o  Loading Arm

    o  Densitometer

    o  BAE

    o  VFD

    o  Batch Controller

      Proper installation and alignment of line / vessels / equipment mounted

    instruments like valve, PD meters, etc.

      Drilling holes on all panels, power distribution panel, control panels, etc.

    for cables / glands.

     

    Any other instrument/ equipment/ service, which is not explicitly

    mentioned in this document or in the Schedule of Quantity/ price bid but

    deemed necessary for the successful operation of the system complete in

    all respects, shall be in vendor‘s scope. 

     

    The functional & operational requirements as specified in this tendermight undergo revisions as per the location requirement during detail

    design engineering, functional design specification or during execution.

    The vendor must ensure that all these changes are incorporated &

    demonstrated during Site Acceptance Test.

      All Civil works required for execution of TAS including supply of all materials

    required like foundation for mounting of instruments and equipment

    supplied by Vendor and those given as free issue items, Road cutting , laying

    of Hume pipes, re-asphalting the roads, wherever required etc.

      All mechanical, electrical jobs required for TAS shall be in Vendor‘s scope. 

      Calibration & Verification of all equipments & instruments

     

    W&M Stamping of the Electronic metering system. Any other instruments,

    equipments which may require stamping as per statutory law shall also be in

  • 8/19/2019 Tender Doc_TAS at bhatinda.pdf

    21/237

     

    HINDUSTAN PETROLEUM CORPORATION

    LIMITEDTERMINAL AUTOMATION PROJECT

    21 | 2 3 8  

    the Vendor‘s scope.

      All documentations, drawings & test procedure

      Construction of temporary Storage Shed for storing the all the equipment,

    material, instruments etc & dismantling the same after completion of work.

      Third Party Inspection of the instruments, equipments & materials as per the

    approved QAP.

      All road permits from Sales Tax authorities for importing/movement of all

    these equipment, instruments, material.

      The vendor shall be fully responsible for proper selection of equipment‘s,

    engineering, performance and successful operation of the complete

    system including all bought out equipment, subsystems supplied by them

    when integrated with the overall Automation System meeting the

    functional requirements.

      Vendor shall offer the services of the competent installation team which

    would install the equipment / instruments, lay the interconnecting cabling,

    check out, testing and commissioning the system. 

      All technical personnel assigned to the site by the Vendor shall be fully

    conversant with the supplied system and software package, and shall have

    both hardware and software capability to bring the system on line quickly

    and efficiently with a minimum interference with other concurrent

    construction and commissioning activities. 

      Strict adherence to HPCL‘s Safety, Health & Environment policy 

    B. 

    Scope of Work in the New 8 Bay Gantry & existing Gantry shall include butnot limited to the following:

     

    Supply, installation, testing & commissioning of the Electronic Metering

    System, RIT, Card Reader, earthing relay, RTD, Loading arms, JBs, Cables,

    all allied hardware, instruments equipment etc complete required for

    Gantry Automation

  • 8/19/2019 Tender Doc_TAS at bhatinda.pdf

    22/237

     

    HINDUSTAN PETROLEUM CORPORATION

    LIMITEDTERMINAL AUTOMATION PROJECT

    22 | 2 3 8  

     

    Supply, installation, testing & commissioning of Online Densitometer on

    the product header line.

      The existing header line of the existing gantry (HSD-10‖, MS & SKO-6‖) will

    be dismantled by HPCL & new line of size HSD-14‖, MS-10‖ & SKO-8‖ will

    be laid by HPCL independently for both new & existing Gantry. It is

    tentatively planned to use existing 10‖ HSD BAE for new 10‖ MS line,

    existing 6‖ SKO BAE for new 8‖ SKO & existing 6‖ MS for new Ethanol line

    along with other header line equipment like PT, DT, TRV etc. The

    dismantling of the header line equipment & re-installation on the new

    header line will be in the scope of the vendor along with required fittings

    like bends, flanges, expander reducer etc, gaskets, nut-bolts etc completerequired for successful erection of the equipment. Foundation for

    equipment as per the requirement shall be in the scope of Vendor. New

    Triple offset Butterfly valve (TOBV) with electric actuator shall be supplied

    & installed with the existing BAE & the same shall be part of re-installation

    item. TRV shall be provided on the BAE & on the downstream of TOBV.

    TRVs shall be connected to the U/G Tank through 1‘‘ line or shall be

    connected to the unloading line, if available, with NRV or shall be

    connected at the pump house on the suction line with NRV. All

    modification in the pipeline as per the requirement including supply of allrequired hardware, fittings like valves, expander, reducer, flanges etc &

    pipes.

      Rerouting of cables, JBs, providing additional cables, cable tray etc for

    reinstallation of header line equipment. This will be part of cable item.

      Rerouting & realignment of existing SS additive line over the proposed

    trestle up to the existing Gantry along with supply of required SS Pipe,

    bends fittings, gasket nut bolts etc. No separate payment will be made for

    this item

      Supply & installation of new BAE along with TOBV, DT, PT, orifice plate etc

    on the header line including modification in the pipeline required for

    installation of these equipments. Supply of all required hardware, pipes,

    fittings like valves, flanges, bends etc.

      Earthing of all the equipment, instruments to the existing earth pit.

  • 8/19/2019 Tender Doc_TAS at bhatinda.pdf

    23/237

     

    HINDUSTAN PETROLEUM CORPORATION

    LIMITEDTERMINAL AUTOMATION PROJECT

    23 | 2 3 8  

     

    The existing Fire Engine Automation shall be extended to include One No

    ESD & One No MCP shall be provided at the New Gantry.

      As the pipeline is being laid new, the layout shall be made to facilitate

    installation of TAS equipment. However any further modification required

    in the existing pipeline from the existing tapping onwards available at the

    Gantry for both Main product & secondary product to suit mounting of

    Automation equipment. Supply if pipes, fittings, gaskets, nut bolts & all

    allied hardware etc shall be included in the scope of Vendor‘s job. 

     

    Dismantling & reinstallation of any Valve, hardware etc. if required shall be

    included in the scope of work.

    C. 

    Integration with the existing Terminal Automation System : The existing System

    is supplied & maintained by M/s Advanced Systek Pvt Ltd, Vadodara. Vendor

    shall get the access authority required for modification/ up-gradation of the

    existing TAS (hardware and software) from M/s Advanced Systek Pvt Ltd,

    Vadodara. Vendor to submit the same to HPCL in un-priced bid along with

    undertaking from TAS integrator regarding non- dilution of warranty of

    existing TAS system.Scope of Work for integration with the existing TASshall include but not limited to the following:

    o  Modification, up-gradation, additional graphics as required in the existing

    TAS software to seamlessly integrate the new system.

    o  Modification/ up-gradation of the existing equipment/ instruments,

    material or any hardware including all supplies as required for seamlessly

    interfacing with the existing Terminal Automation System to meet the

    specified technical & functional requirement.

    Integration of header line TOBV to the existing TAS including modificationin the logic & allied graphics

    o  The MMI/ GUI for all the new items, equipment, instruments shall be same

    as the existing one.

  • 8/19/2019 Tender Doc_TAS at bhatinda.pdf

    24/237

     

    HINDUSTAN PETROLEUM CORPORATION

    LIMITEDTERMINAL AUTOMATION PROJECT

    24 | 2 3 8  

    o  All the existing reports shall be modified to include the reports required

    for the new equipment, instruments & shall be available to the user in acombined format.

    o  All alarm, events etc available in the existing system shall be extended for

    the new system.

    o  Any change in the existing TAS logic due to inclusion on new Gantry like

    Bay allocation logic, EDU logic etc

    o  The Spare DI, DO, AI, AO available in the existing PLC may be used. Any

    additional I/Os required for integration shall be supplied along with itsallied hardware. Change in ladder logic shall also be incorporated to suit

    the requirement of the new equipment/ instruments.

    o  The spares available in the existing networking component like Terminal

    Server etc may be used. In case the same is not sufficient, new networking

    components in same configuration along with all its allied hardware shall

    be supplied, installed, commissioned integrated by the Vendor

    o  All the newly supplied equipment/ instruments shall be powered through

    the existing parallel redundant UPS. In case the existing UPS capacity is notsufficient to power up the new equipment/ instruments then same

    specification UPS of suitable capacity shall be supplied by the Vendor to

    power up the new equipment/ instruments at no extra cost. Any cabling,

    hardware etc required powering up the new equipment shall be included

    in the cabling item & will not be paid separately.

    o  Modification/ Up-gradation of the existing Power Distribution panel shall

    or alternatively supply of New MCB panel for supply of Power to the new

    equipment/instruments. Individual MCB shall be provided for each parent

    equipment & instrument so that the same can be powered off as & when

    required for maintenance purpose.

    o  Supply, laying, testing & termination of all additional Power, Control,

    Signal cables & all other type of special/ regular, cables required for

    modification & integration with the existing TAS.

    o  The existing Product pumps are either controlled though Motor Control

    Center (MCC) or through Variable Frequency Drive (VFD) or combination

  • 8/19/2019 Tender Doc_TAS at bhatinda.pdf

    25/237

     

    HINDUSTAN PETROLEUM CORPORATION

    LIMITEDTERMINAL AUTOMATION PROJECT

    25 | 2 3 8  

    of MCC & VFD. These are currently integrated with the TAS such that the

    pumps are started based on the Pump demand & are run based on thepressure on the header line. Because of new Gantry, the existing pumps

    are being upgraded to higher capacity pumps by HPCL along with new

    VFDs which are part of this tender. These new Pumps & VFD shall be

    integrated with the existing TAS by the Vendor so that the new as well as

    existing Gantry comes in the purview of the Pump automation & the

    pumps are operated automatically based on the pump demand. HPCL

    scope will be limited to providing the Pumps & MCC in working condition.

    Any changes required in the ladder logic or TAS software shall be

    developed & incorporated to complete the VFD Interface with the existing

    TAS. All software, hardware etc. required for VFD interfacing with the

    existing TAS including development of graphics, modification in the logic

    will be in Vendor‘s scope. Existing cables hardware etc available at site may

    be utilized, if suitable.

    Modification in the existing Control Room Cable Trench, if required.

    o  Any licenses required for due to up-gradation/ modification in the existing

    system shall be provided by the Vendor

    All items required for integration, though not specifically mentionedabove, of the new equipment/ instruments are deemed to be included

    under integration item only unless otherwise specified.

  • 8/19/2019 Tender Doc_TAS at bhatinda.pdf

    26/237

     

    HINDUSTAN PETROLEUM CORPORATION

    LIMITEDTERMINAL AUTOMATION PROJECT

    26 | 2 3 8  

    HPCL’s SCOPE OF WORKS.

    HPCL shall provide the following to the successful vendor:

    o  Gantry Structure for installation of metering system

    o  Existing Terminal Automation System in proper working condition.

    o  Cable trenches, Hume pipes if available & having sufficient space

    o  Cabling from Pumps to the MCC.

    o  All free issue items in standalone working condition.

  • 8/19/2019 Tender Doc_TAS at bhatinda.pdf

    27/237

     

    HINDUSTAN PETROLEUM CORPORATION

    LIMITEDTERMINAL AUTOMATION PROJECT

    27 | 2 3 8  

    DESIGN CRITERIA

    Vendor shall note the following minimum requirement for designing the facilities.

    These shall be read in conjunction with the function & technical requirements as

    specified elsewhere in this document

    The system is required to be designed for following broad parameters:

    Maximum temperature : 55 Degree centigrade.

    Minimum temperature: 

    0 Degree centigrade

    Maximum Relative humidity: 

    95 %.

    Petroleum products to be

    loaded

    : MS & HSD

    Products Characteristics: 

    As given below

    Flow rate: 

    Normal flow rate 150 to 1200 LPM at each

    Loading point. Maximum Header Flow Rate

    will be when all the pumps for that particular

    product are operating & minimum Headerflow rate when the smallest capacity pump

    for that particular product is operating.

    Working pressure: 

    1 Kg/ Sq cm to 10 Kg/ Sq Cm

    Design pressure: 

    15 Kg./Sq.Cm

    PRODUCT CHARACTERSTICS

    PARAMETERS MS SKO HSD

    Specific Gravity 0.7-0.75 0.75-0.8 0.8-0.9

    Viscosity @38Deg C 1.1CST 1.2CST 2.54-4.0 CST

  • 8/19/2019 Tender Doc_TAS at bhatinda.pdf

    28/237

     

    HINDUSTAN PETROLEUM CORPORATION

    LIMITEDTERMINAL AUTOMATION PROJECT

    28 | 2 3 8  

    SYSTEM RESPONSE TIME: Vendor shall design the System so as to have thefollowing minimum response time.

    ACTIVITY MAX. RESPONSE

    TIME

    Time for transferring of change of status of equipment

    and alarms of the entire terminal

    :  5 Sec

    Time for updating of any hardware analogue variable :  2 sec

    Remote command from Operator station to action has

    taken place via hardware I/O

    :  2 Sec

    For BATCH Controller and RIT communication with LRC :  2 Sec

    Time taken between card flashing & corresponding

    batch controller message appearance

    :  4 Sec

    Other system responses required for driver interaction

    such as card validation, RIT lamp sequences, down

    loading of data etc.

    : 4 Sec

  • 8/19/2019 Tender Doc_TAS at bhatinda.pdf

    29/237

     

    HINDUSTAN PETROLEUM CORPORATION

    LIMITEDTERMINAL AUTOMATION PROJECT

    29 | 2 3 8  

    APPLICAPABLE CODES & STANDARDS

     

    The components of instrumentation and control system shall be designed,

    manufactured, assembled and tested in accordance with the latest standards of

    the Standards Institution, Instrument Society of America, Institute of Electrical

    Engineers and Manufacturer's association of the country where they are

    manufactured / country of principals. They shall also confirm to the relevant

    latest standards of the Bureau of Indian Standards (BIS) wherever available, so

    that specific aspects under Indian conditions are taken care of.

      The equipment shall also conform to the latest Indian Electricity Rules, OISD,

    PESO & petroleum rules as regards safety, earthing and other essential

    provisions specified there in for the installation and operation of electrical plants.

      The equipment in the hazardous area shall have CMRI, CCOE approvals. OEM

    shall have BIS approval.

     

    All painting shall be done in accordance with the General Specification forPainting.

      All equipment shall comply with the statutory requirements of the Government

    of India and the State Government of respective states.

      The Vendor shall execute the job to comply with the requirements of the

    relevant regulations or acts in force in the area together with design

    specifications with respect to:

      Indian Electricity rule

      Indian Factories act

      Regulations laid down by chief electrical inspector

      Regulations laid down by Factory Inspector of state Indian Standard

    Specifications

  • 8/19/2019 Tender Doc_TAS at bhatinda.pdf

    30/237

     

    HINDUSTAN PETROLEUM CORPORATION

    LIMITEDTERMINAL AUTOMATION PROJECT

    30 | 2 3 8  

      Oil Industries safety directorate norms.

      International Organization of Legal Metrology.

      Regulations relevant to explosion hazardous areas

      Petroleum & Explosive Safety Organisation norms & regulations

    The equipment supplied shall be designed in accordance with the requirement of

    all internationally &locally applicable standards/specifications listed below.

     

    American National Standards Institute (ANSI)

      American Society for Testing and Materials (ASTM)

      National Electrical Manufacturers Association (NEMA)

      American Society of Mechanical Engineers (ASME)

      American Petroleum Institute (API)

      Institute of Electrical electronic Engineers (IEEE)

      National Fire Protection Agency (NFPA)

      International Electro-technical Commission (IEC)

      International Standard Organisation (ISO)

      Open Software Foundation (OSF)

      Bureau of Indian Standards (BIS)

    The following codes as a minimum shall be applicable in designing the system.

    These codes (Latest edition) shall be produced as & when required by HPCL/

    PMC for checking the systemCode / Standard Description

    AMSE B1.20.1

    AMSE B16.5

    AMSE B16.20

    ASME SEC VIII

    Pipe thread

    Steel Pipe flanges and flanged fittings

    Ring-Joint gaskets and grooves for steel flanges

    Boiler & pressure vessel code rules.

    ANSI/ISA 575-01 Control valve sizing , capacity test procedures, face to face

  • 8/19/2019 Tender Doc_TAS at bhatinda.pdf

    31/237

     

    HINDUSTAN PETROLEUM CORPORATION

    LIMITEDTERMINAL AUTOMATION PROJECT

    31 | 2 3 8  

    dimensions, leakage

    RP 520 Fire sizing of safety and control valveRP 598 Control valve leakage

    OIML standard R

    117

    (Measuring systems for liquids other than water)

    ISA RP SS-1

    S 62-01, S82-02

    S8-03, S18.1

    Instrument Society of America standard and codes

    IEC 801/EN

    50081/82

    Electromagnetic compatibility

    IEC 79.10/BS 4683/IS 2148

    Hazardous area classification

    IEC-529/IS 2147/

    NEMA

    For execution of Inst. Enclosures

    OISD

    recommendations

    For storage, handling and safety systems and

    transportation

    API MP MS Ch 21 Flow measurement using Electronic Metering System

    ISO/TC28/Section

    3

    Terms relating to calculation of oil quantity

    ISO 4266 Petroleum and liquid petroleum products –  Measurement

    of level and temperature in storage tanks by automatic

    methods.

    OIML R85 Automatic level gauges for measuring the level of liquid in

    fixed storage tanks.

    IS 2801 PD meter Accuracy

    BASEEFA/PTB/KEM

    A/FM/ATEX/ TUV/

    PESO/CMRS/ IBR/

    RDSO/W&M

    Statutory standards

    BS 5308 Part-I Instrumentation Cable

    ISA –S5.1 Instrument Symbol & Identification

    ISA- S 5.2 Graphical symbol for Process Operators

    IS 2148 Flame proof , enclosure for electrical apparatus

    IS 3043 Cod of Practice for Earthing

  • 8/19/2019 Tender Doc_TAS at bhatinda.pdf

    32/237

     

    HINDUSTAN PETROLEUM CORPORATION

    LIMITEDTERMINAL AUTOMATION PROJECT

    32 | 2 3 8  

    DESIGN CRITERIA FOR TANK TRUCK LOADING FACILITIES

      Tank Trucks are loaded on a volumetric basis in the filling Gantry. New 8 Bay

    Gantry is constructed to load MS & HSD at each bay which shall be filled

    simultaneously, if required, through two different loading arms. Each loading

    Point shall be capable of filling multiple variant of the same product

    depending on the infrastructure available. 

     

    Each loading point shall be provided with a 3‖ Positive displacement meter,

    dedicated strainer cum air eliminator and digital control valve. In case of MS,

    additional 1½‖ Positive displacement meter, dedicated strainer cum air

    eliminator and digital control valve shall be provided for Ethanol blending. All

    variants of particular product shall be handled by same loading arm. Same

    Tank truck may have different variant of the same product loaded into

    different compartment. The variants of the particular products could be any of

    the following:

    o  Base product

    o  Base product with blending.

    o  Base product with one additive.

    o  Base product with Two additives

    Base product with blending and one additive

    o  Base product with blending and two additives.

      Vendor is required to specify the total pressure drop across complete

    metering assembly. Maximum allowable pressure drop shall be limited to 1.3

    kg/cm2  across metering; strainer, air separator cum eliminator, PD Meter &

  • 8/19/2019 Tender Doc_TAS at bhatinda.pdf

    33/237

     

    HINDUSTAN PETROLEUM CORPORATION

    LIMITEDTERMINAL AUTOMATION PROJECT

    33 | 2 3 8  

    DCV. The pressure drop will be required to be demonstrated during SAT.

    Necessary arrangement on the metering assembly/ piping to be provided bythe vendor. After successful demonstration of the pressure drop, the same to

    be plugged.

     

    Each loading points shall be provided the Batch Controller as per the technical

    specification. This Batch Controller shall control the digital control valves of

    the base products, secondary product being used for blending and the

    additives. These loading points shall be operated through batch controller as

    per the batch downloaded from LRCS. The Batch Controller shall send the

    Pump demand to the existing PLC to start/ stop the pumps ( Main Product,

    Secondary Product, Additive as the case may be) as per the requirement

      RTD shall be provided at each loading point .

     

    Each loading point shall be provided with a Remote interaction terminal (RIT).

    Each RIT will have emergency stop push button to shut down filling operation

    in case of emergency.

     

    Intrinsically safe proximity card reader shall be provided at each bay

     

    Each bay shall be provided with Earthing device which shall be interlockedwith the manual earthing, apart from other suitable interlocks as defined in

    the technical specifications.

      Each product pipeline entering into TLF shall be provided with a densitometer

    with Orifice plate arrangement for measuring ambient & standard density of

    product. Density for the blended product shall be calculated by the

    application software based on the density input of individual product as the

    blending is done at point. The existing software shall be modified to monitor

    & record density for each truck compartment and communicate it to ERP for

    printing on the invoice. Orifice plate shall be designed to ensure that theproduct flow through the densitometer all the time during loading of that

    particular product. In case the product is not flowing through densitometers

    during loading of that particular product then ―Error‖ message shall be

    displayed instead of last healthy reading

      Pressure transmitters shall be installed required to be installed in all the

    delivery header lines to TLF. The pressures in the header lines are to be

  • 8/19/2019 Tender Doc_TAS at bhatinda.pdf

    34/237

     

    HINDUSTAN PETROLEUM CORPORATION

    LIMITEDTERMINAL AUTOMATION PROJECT

    34 | 2 3 8  

    transmitted to PLC / LRC. If pressure in the delivery pipeline header exceeds

    specified value or reduced below specified value, alarm should be transmittedto PLC panel from pressure transmitter for stopping the Batch Controller or

    starting/ stopping the pump.

  • 8/19/2019 Tender Doc_TAS at bhatinda.pdf

    35/237

     

    HINDUSTAN PETROLEUM CORPORATION

    LIMITEDTERMINAL AUTOMATION PROJECT

    35 | 2 3 8  

    DOCUMENTATION

    LEGEND : I – Information ,A- Approval F – Final delivery of equipment,

    SN Description For

    Information

    Approval

    Final Docu -

    mentation

    1.0 GENERAL

    1.1 Vendor engineering and service

    personnel organization chart including

    set up for this project.

    I

    1.2 Training facilities at work I

    1.3 Descriptive catalogue / literature I

    1.4 Functional Design Specification A F

    1.5 Procedure for dismantling existing

    instruments, equipments, cabling,

    structure etc. wherever applicable

    A

    1.6 Operational Philosophy A

    1.7 Progress report (Fortnightly) I

    1.8 Safety Report ( Fortnightly)

    1.9 Document Control Sheet (Fortnightly) I

    1.10 Payment Control Sheet (Monthly) I

    2.0 ENGINEERING DOCUMENTS

    2.1 System Architecture A F

    2.2 Detailed list of component A F

    2.3 Individual data sheet A F

    2.4 Power Requirement – KVA A F

    2.5 Heat dissipation – Kcal /H I F

    2.6 Individual G.A.Drawing

    a) 

    Flow metering system

    b) 

    Densitometer, PT

    A F

    2.7 SYSTEM CABINETS

    a. Arrangement of modules I F

    b. Structure, dimension, construction, etc. I F

    2.8 AUXILIARY CABINETS

  • 8/19/2019 Tender Doc_TAS at bhatinda.pdf

    36/237

     

    HINDUSTAN PETROLEUM CORPORATION

    LIMITEDTERMINAL AUTOMATION PROJECT

    36 | 2 3 8  

    a. Arrangement of modules A F

    b. Structure, dimension, construction etc. I F2.9 Power supply distribution diagram A F

    2.10 Cable layout A F

    2.11 System drawing (loop

    diagrams,reports)

    A F

    2.12 Wiring diagram A F

    2.13 Terminal strip diagram A F

    2.14 Hardware Design Module A

    2.15 Software Design Manual A

    2.16 Interfacing scheme A2.17 MIS Formats A

    2.18 Interconnection diagram I F

    2.19 Earthing System A F

    2.20 As built drawing F

    3.0 CERTIFICATES

    3.1 Authority approval for

    Ex-Proof, IS, Weather Proof ( shall also

    be submitted along with Data sheets

    for approval)

    F

    3.2 Vendor‘s guarantee /warranty F

    3.3 Original Software Licenses F

    3.4 Certification of Installation for

    Metering system, Densitometer,

    Loading Arms, by the respective OEM

    I F

    4.0 INSPECTION AND TEST

    4.1 Inspection and test report from

    Vendor‘s quality control department

    F

    4.2 Imported shipping documents alongwith test certificate F

    4.4 Factory acceptance tests procedure for

    Batch accuracy tests

    A

    4.5 Site Acceptance Test procedure A

    4.6 Pre-Power Up Report A

    4.7 Pre-commissioning Test & procedure A

  • 8/19/2019 Tender Doc_TAS at bhatinda.pdf

    37/237

     

    HINDUSTAN PETROLEUM CORPORATION

    LIMITEDTERMINAL AUTOMATION PROJECT

    37 | 2 3 8  

    5.0 MANUALS (BOTH FOR VENDOR‘S &

    SUB –VENDORS SUPPLY)5.1 Vendor‘s & Sub-vendor‘s test

    Procedure

    F

    5.2 Installation manual F

    5.3 Operating manual F

    5.4 Maintenance manual F

    5.5 HOTO Report covering all the details

    of the Project( to be submitted in both

    hard form & CD)

    A F

    7.0 QULAITY ASSURANCE PLAN A FNOTE : 

    a. The above documents cover the minimum requirements and shall be

    supplemented with other requirements listed in the specification, if any. Any

    other documents required to understand and maintain the system, as felt

    necessary till handing over of the project, shall be supplied by the vendor.

    b. All documents shall be supplied in English language as per following.

    - Approval/ Information - 4 sets

    - Final -4 sets

    c. DVD – 2 sets (soft copy)

    d. As built drawings shall be laminated and properly bound with index sheet for

    preservation and future reference.

    (1)  All drawing which are submitted for approval, shall be submitted on DVD as

    a final document (after approval) along with HOTO Report

  • 8/19/2019 Tender Doc_TAS at bhatinda.pdf

    38/237

     

    HINDUSTAN PETROLEUM CORPORATION

    LIMITEDTERMINAL AUTOMATION PROJECT

    38 | 2 3 8  

    TECHNICAL SPECIFICATION

    TECHNICAL SPECIFICATIONS SUPPLY OF NEW INSTRUMENTS/EQUIPMENT

    Technical Specifications/ information given in this section serve as the minimum

    guidelines to the Bidder. The bidders are requested to visit the location, study its

    requirement, design the most suitable system and shall quote accordingly.

    The equipment shall be reliable and field proven, High-grade components of

    proven quality having high MTBF (at least 10 years minimum ) shall be selected toachieve the desired functions.

  • 8/19/2019 Tender Doc_TAS at bhatinda.pdf

    39/237

     

    HINDUSTAN PETROLEUM CORPORATION

    LIMITEDTERMINAL AUTOMATION PROJECT

    39 | 2 3 8  

    TECHNICAL REQUIREMENT & SPECIFICATION FOR TANK TRUCK GANTRY

    AUTOMATION:

    Tank Truck Gantry Automation shall include but not limited to the following

    o  The Vendor shall design the flow metering system to suit different set of

    process flow condition (Flow, temperature, pressure etc) such that the

    combined accuracy of the flow metering system, after site calibration of

    the equipments, shall be +/-0.05% of the Batch. The metering system shall

    be checked with reference to the existing Calibrated Mobile Prover Tank of

    capacity 2 KL

    o  Electronic Metering System for primary product (MS, HSD etc) shall

    comprise of Batch Controller, Positive Displacement meter, Digital Control

    Valve, Strainer cum Air Eliminator shall be provided. The Batch Controller

    will control one Loading point & its Blending and dosing operation.

    o  Blending System comprising of Positive Displacement meter, Digital

    Control Valve, Strainer cum Air Eliminator for blending the Secondary

    Product like ethanol in the Primary Product. Rate of blending shall be User

    configurable. The current rate of blending is 5% which may go up to 20%.The System design shall cater to blending of maximum 20%

    o  RTD shall be provided at each loading point & its input shall be taken in

    the Batch Controller.

    o  Remote Interaction Terminal for operation by Tank Truck Crew member.

    o  Earthing Relay for each Bay.

    Calibration & Weights & Measure (W&M) Stamping : The existing Mobile

    Prover Tank is already calibrated & stamped by Weights & Measure

    (W&M) Department. The Calibrated & W&M stamped Mobile prover tank

    shall be used for calibrating the Flow metering system as per the

    Calibration procedure given in this document. W&M stamping shall be

    done by the Vendor for the Flow metering system used for the Main

    product, Secondary product if the tapping is downstream of the flow

  • 8/19/2019 Tender Doc_TAS at bhatinda.pdf

    40/237

     

    HINDUSTAN PETROLEUM CORPORATION

    LIMITEDTERMINAL AUTOMATION PROJECT

    40 | 2 3 8  

    metering system of the main product i.e. Ethanol Product is blended in

    the main product without flowing through the main metering system. ThusW&M Stamping may not be required for Secondary product if the tapping

    is upstream of the Main metering system and if such an arrangement is

    permitted/approved by statutory rules/Local W&M Department. Batch

    Controllers shall also be stamped by W&M & the meter factor/‘K‘ Factor

    for all the Products ( Main, Secondary) shall come under W&M

    configuration parameter such that these cannot be altered after providing

    the W&M sealing. Stamping of these newly supplied equipments, by state

    W&M Department & the entire coordination shall be in the scope of the

    Vendor during execution as well as in Two year Warranty period & 5 year

    Comprehensive AMC period. All liaison & incidental charges shall be borne

    by the Vendor. HPCL will reimburse the statutory charges for stamping

    during warranty & AMC period against submission of Original receipt in

    the name of HPCL. Statutory Charges paid during project execution &

    system stabilization shall not be paid separately & shall be in the scope of

    Vendor In case the W&M stamping is required before the due date for

    reasons not attributable to HPCL, all charges including the statutory fees

    shall be paid by the Vendor. If the reasons are attributable to HPCL,

    Statutory fees paid shall be reimbursed by HPCL against submission of

    Original receipt in the name of HPCL.

    o  FRLS Cables, Double compression Cable Gland, Flameproof Junction box,

    etc. from main JB to respective instrument shall be part of that equipment.

    o  All these Automation equipments can be mounted on the Gantry Platform

    with suitable foundation/ Structural Steel support. Supply, installation &

    re-routing of the 3‖ pipeline/ 1.5‖ pipeline and or laying of new 3‖/1.5‖

    pipeline including all associated hardware, fittings, gaskets, jumpers

    required for mounting these equipments from the header line tapping

    onwards at the Gantry shall be in the scope of the Vendor. The new/

    modified pipeline shall be painted as per the color coding of HPCL. All

    these hardware shall be supplied as per the specification given in the

    tender document.

  • 8/19/2019 Tender Doc_TAS at bhatinda.pdf

    41/237

     

    HINDUSTAN PETROLEUM CORPORATION

    LIMITEDTERMINAL AUTOMATION PROJECT

    41 | 2 3 8  

    o  All Structural Steel like angles, flats channels beams, brackets etc required

    for mounting/ supporting these equipments or any existing equipmentsshall be in the scope of the Vendor.

  • 8/19/2019 Tender Doc_TAS at bhatinda.pdf

    42/237

     

    HINDUSTAN PETROLEUM CORPORATION

    LIMITEDTERMINAL AUTOMATION PROJECT

    42 | 2 3 8  

    SPECIFICATION FOR BATCH CONTROLLER FOR WHITE OIL

    Make : Vendor to Specify (from the approved

    vendor list)

    Model No : Vendor to Specify

    Qty : Refer BOQ

    Type : Microprocessor based field mounted,

    configurable, indicating, Single Channel

    (One BC for each Loading Point)

    Service : For White Oil Application Area Classification : Zone I, Gr II A/II B , T3

    Inputs (from each loading

    point)

    :   Pulse input from pulse transmitter of

    main product line meter

      Pulse Input from pulse transmitter of

    2nd product for blending

      Pulse Input from pulse transmitter of

    Additive Injection 1st meter

      Pulse Input from pulse transmitter of

    Additive Injection 2nd  meter  Start, Stop, Acknowledgement digital

    input from RIT

      Safety permissive/Interlock inputs like

    earthing inputs (bonding &

    static),Loading Arm Position, overspill

      Temperature input (RTD Pt-100)

      Serial input

      Manual Call Point

      Emergency shut down

    Outputs (to each Loading

    point)

    :   Digital control signals to solenoid

    valves of set stop valve in Main

    Product

      Digital control signals to solenoid

    valves of set stop valve in Secondary

    Product

      Digital control signals to 2 nos. of

  • 8/19/2019 Tender Doc_TAS at bhatinda.pdf

    43/237

     

    HINDUSTAN PETROLEUM CORPORATION

    LIMITEDTERMINAL AUTOMATION PROJECT

    43 | 2 3 8  

    additive injection system.

     

    Pump Demand contacts for MainProduct pump, , Blending product

    pump & Additive Injection pump

      Digital Output to various lamps on

    RIT

      Trip the Pump in case of DCV

    malfunction/ DCV non closure at the

    configurable value above the preset

    quantity. The Output to be

    hardwired to the PLC.

    Alarms   Interlock failure

      Pulse Transmitter failure

      RTD Failure

      Flow Rate out of limits

      Unable to close valve meter

      Communication failure

      Mode Change from Auto to Manual

      Under dosage of Additives

      Over dosage of Additives

     

    Under blending of SecondaryProduct

      Over Blending of Secondary Product

      Auto deletion of memory

    Communication port :   Dual redundant RS 485 Serial link to

    Terminal server

      Maximum of 4 Batch controllers

    shall be multi-dropped on the same

    transmit & receive data lines (i.e

    Single loop) and taken to the control

    room.

      Interface for proximity Card Reader

      The baud rate for communication of

    batch controller shall be capable for

    transmission of min. 19200 bps

    Power requirements : 230 V AC +10% to -15%, 50Hz +/- 5%

    Data entry : Alpha numeric entry pad

  • 8/19/2019 Tender Doc_TAS at bhatinda.pdf

    44/237

     

    HINDUSTAN PETROLEUM CORPORATION

    LIMITEDTERMINAL AUTOMATION PROJECT

    44 | 2 3 8  

    Online Self diagnostics : Required

    Memory capacity & backup : Non Volatile RAM capable of retainingdata. Minimum 200 transactions. All data

    pertaining to One Truck load of 20 KL shall

    be treated as one transaction

    Battery : Internal Lithium battery / flash memory

    shall be provided for data retention.

    Battery Life : Min 8 years

    Meter Linearization : Min 5 point over 10 – 100% flow rating of

    meter by entering "K" factor of meter in

    memoryScan Time : Max 300 m sec

    Display Type : Alpha Numeric, Backlit Two Liquid Crystal

    Display Non Glare / Vacuum florescent, 8

    Character Numeric & 16 Character Alpha

    Numeric. Visibility from at least 2 mtr.

    distance

    Display Parameter (Dynamic) :   Pre Set Quantity

      Loaded Quantity of each

    component(Main product,

    Secondary Product & Additive)

      Balance Quantity

      Flow Rate

      Temperature

      Diagnostic Alarm

      Totaliser reading for Main Product,

    Ethanol & Additive

      Engineering Unit, Control Mode

      3 LEDs for Alarm, Auto Mode and

    permissive power  User selectable data display

    Enclosure : Explosion proof to IS-2148, Gr. II A &

    II B Weather proof to IS-2147, IP-65

    Protection :   Radio Frequency Interference

    Protection

      Electromagnetic Interference

  • 8/19/2019 Tender Doc_TAS at bhatinda.pdf

    45/237

     

    HINDUSTAN PETROLEUM CORPORATION

    LIMITEDTERMINAL AUTOMATION PROJECT

    45 | 2 3 8  

    Protection

     

    Electrical Transient Suppression onall power, communication and data

    input & output to provide

    protection from transient over

    Voltage.

    Approvals /Certification : PESO(CCOE) approved

    Ex Proof to Zone-1, Gr II A & II B

    Weather Proof to IP 65

    W&M Model Approval : OIML approval as

    per R 117 for Custody Transfer

    Batch Accuracy of the

    Electronic Metering system

    : Shall be 0.05% of batch over the full flow

    range

    Functions :   Indication & Totalization

      Batch Control

      Display & Totalizer of Each Product

    (Main Product, Secondary Product

    being blended & Additives) Locally

    as well as on Remote on the TAS

    System

     

    Blending of Two products ( Blending% configurable from TAS System) at

    each loading point

      Additive Injection (Dosing PPM

    configurable from TAS System) with

    2 additives per loading point.

      Meter factor linearization (min. 5

    points over 10-100 % flow rate)

      Dynamic flow display

      Programmable ramp up/down for

    multistage opening/ closure of set

    stop valve

      Batch summary

      Executing local loading (min.200

    Batch to be stored for auto retrieval

    by TAS System when

    communication is established)

  • 8/19/2019 Tender Doc_TAS at bhatinda.pdf

    46/237

  • 8/19/2019 Tender Doc_TAS at bhatinda.pdf

    47/237

     

    HINDUSTAN PETROLEUM CORPORATION

    LIMITEDTERMINAL AUTOMATION PROJECT

    47 | 2 3 8  

    password shall be available for any

    basic database configurationaffecting volume measurement like

    setting of ‗K‘ factor, Separate

    password shall be available for

    operator for various activities like

    alarm acknowledgement & other

    system operation & separate

    password shall be available the

    other for system operation like

    changing the System Mode ( Auto

    to Manual or vice versa).

      A Security code shall be used

    anytime changes/edit are performed

    that will alter the quantity measured

    or deletion of memory

      Changes to any Flow parameter shall

    be captured in the Audit trail as a

    part of event log in the TAS System.

     

    Change in Pulse Security shall belogged in the system with time,

    date, unique ID & the Original and

    revised pulse error defined. TAS

    shall display Pulse security enabled

     /disabled in the Control Room

      Each time a flow parameter

    constant, that affects the calculated

    volume, is changed in the system

    the old & new values along with the

    date, time & unique ID shall be

    logged

      Any time memory/ data is erased it

    shall be recorded along with the

    date, time & unique ID shall be

    logged

      Non-resettable totalizer reading

  • 8/19/2019 Tender Doc_TAS at bhatinda.pdf

    48/237

     

    HINDUSTAN PETROLEUM CORPORATION

    LIMITEDTERMINAL AUTOMATION PROJECT

    48 | 2 3 8  

    shall also be captured

     

    All such changes in Shall begenerated as exception reports.

    Keyboard Type : Touch Sensitive

    Keyboard Function :   Configuration entry

      Operator Data entry

      Display Selection

      Alarm Acknowledgement

      Start/Stop

      When in Auto mode Key Pad shall

    be disabled other than Start/StopButton

    Key Lock : Required ( Through Password)

    Audit Trail :   Any changes affecting the Volume

    reported shall be logged with Date,

    time & unique ID. The Audit Trail

    may consist of Single or multiple

    records.

      Any Change in the Meter

    Factor/ ‘K‘factor shall be logged in

    the TAS System  Mode Change from Auto to Manual

    (either Remote or local) shall be

    logged in the System.

      Totalizer for each Batch Controller

    shall be logged when ―End of Day‖ is

    run & shall be available in the report

    form for reconciliation & it shall be

    send to JDE.

    Salient Features : 

    Each batch controller should be in aposition to operate in standalone

    mode.

      Each batch controller should be able

    to store at least 200 batches in local

    mode which can be retrieved later

    by the automatically by TAS System

  • 8/19/2019 Tender Doc_TAS at bhatinda.pdf

    49/237

     

    HINDUSTAN PETROLEUM CORPORATION

    LIMITEDTERMINAL AUTOMATION PROJECT

    49 | 2 3 8  

    along with Truck Number. Provision

    shall be available in the BatchController for input of Truck No &

    Load No

      Sequential Blending as well as inline

    Blending & dosing

      Meter Factor/‘K‘factor shall be

    available in the MMI of TAS System

      Mode Change from Auto to Manual

    shall be available from remote

    through TAS System. Facility shall be

    provided in the system for the user

    to incorporate the reasons of

    change in the mode. Mode Change

    at local level shall be available only

    when TAS is not operational/

    communication failure

  • 8/19/2019 Tender Doc_TAS at bhatinda.pdf

    50/237

     

    HINDUSTAN PETROLEUM CORPORATION

    LIMITEDTERMINAL AUTOMATION PROJECT

    50 | 2 3 8  

    SPECIFICATION FOR FLOW METER (POSITIVE DISPLACEMENT METER) FOR

    MAIN PRODUCT

    Make  : As per approved vendor list 

    Qty : Refer BOQ 

    Type : Oval gears / tri-rotor design / rotary vanes 

    Casing : Double case 

    Size : 3‖ 

    Service : MS, HSD, SKO etc.

    Power Supply 230V AC +10 % to -15%, 50 Hz +/- 5%

    Materials Body : Carbon Steel ASTM A –  216 Gr. WCB/   IS

    6240 Gr. B Rotor Elements : Anodized aluminum/ Carbon Steel ASTM A – 

    216 Gr. WCB

    Wet parts : Aluminum / SS 304

    Seals : Viton/Buna N

    Outer Housing : Carbon steel

    End connection : 3", class 150#, RF serrated ANSI B 16.5

    Flange : RF Serrated ANSI B 16.5MOC for Rotary Vane / Oval

    Gear / Bi-Rotor/Tri-Rotor 

    : Anodized Aluminum / Carbon Steel

    Bearings:

    SS 316 / Tungsten Carbide / Ni-Resist and

    Carbon (for Naptha)

    Other Parameters

    Minimum Design Pressure : 15 Kg/sq cm

    Normal Working Pressure : 1-10 Kg/Sq Cm

    Operating Temperature : As defined in the design parameter 

    Body Hydro test Pressure : 15Kg/ Sq cm minimum.

    Flow Range : 150 – 1500 LPM

    Linearity : ± 0.1`% of the reading

    Repeatability : ±0.02% over 10:1 flow range

    Rangebility : 100% to 10% of max. flow range

    Mounting & Coupling : Horizontal / Vertical, Magnetic

  • 8/19/2019 Tender Doc_TAS at bhatinda.pdf

    51/237

     

    HINDUSTAN PETROLEUM CORPORATION

    LIMITEDTERMINAL AUTOMATION PROJECT

    51 | 2 3 8  

    Calibration : Meter shall be factory Calibrated & also at

    the Location. Weights & Measure stampingis a must at all Locations irrespective of the

    place of manufacturing

    Direction : Bidirectional. Direction of Flow shall be

    clearly stamped or cast on the body

    NOTE: Total pressure drop across meter assembly – The strainer, Air eliminator,

    PD meter, Shut off valve shall be limited to 1.3 Kg/ Sq cm under all process

    conditions.

  • 8/19/2019 Tender Doc_TAS at bhatinda.pdf

    52/237

     

    HINDUSTAN PETROLEUM CORPORATION

    LIMITEDTERMINAL AUTOMATION PROJECT

    52 | 2 3 8  

    SPECIFICATION FOR DUAL PULSE TRANSMITTER FOR MAIN PRODUCT

    Make  : As per approved vendor list. 

    Qty : Refer BOQ

    Application : To convert volumetric flow to pulse

    Operating Range : Upto 1500 LPM

    Type : Opto- Electric, serrated disc type/ Inductive

    type / Magnetic Inductor type/ Approved

    OEM standard 

    Max Pulse frequency : Up to 2 Khz

    Pulse Resolution : Min. 100 pulse per revolution of the

    Calibrator output shaft for pulse security

    conforming to Level A as per IP 252 / 76. 

    Output : Dual pulse stream to Batch Controller, each

    pulse shifted by 90 deg. with each other.

    Confirms to pulse security level A as per IP-

    252/76, ISO 6551 and API chapter 5 

    Materials 

    Body : Aluminum Alloy LM 25 TF

    Operating torque : To suit the P.D meter

    Mounting : On the O/P shaft of the PD meter

    Power Supply : From the Batch Controller

    Shaft Rotation : Bi-directional

    Pulse security To be provided through verification pulse

  • 8/19/2019 Tender Doc_TAS at bhatinda.pdf

    53/237

     

    HINDUSTAN PETROLEUM CORPORATION

    LIMITEDTERMINAL AUTOMATION PROJECT

    53 | 2 3 8  

    : generated through additional grid element.

    Supply current : MFR STD

    Allowable vibration : 1 G‘s at 10-150 Hz,

    Supply Voltage : 8-24V DC

    Power Supply : From Batch Controller

    Enclosure : Intrinsic Safe or Ex-proof to Zone 1 , T3 Gas

    Group IIA / IIB as per IS –2148

    Weather proof to IP 65 as per IS 2147 

    Signal Transmission : 20M From counting instrument

    Housing : Explosion Proof

    Approval : PESO(CCOE), CMRI, CENELEC

    Cable Entry : ‗1/2" NPT (F) or as per design

  • 8/19/2019 Tender Doc_TAS at bhatinda.pdf

    54/237

     

    HINDUSTAN PETROLEUM CORPORATION

    LIMITEDTERMINAL AUTOMATION PROJECT

    54 | 2 3 8  

    SPECIFICATION FOR AIR ELIMINATOR CUM STRAINER (FOR POSITIVE

    DISPLACEMENT METER OF MAIN PRODUCT)

    Make : As per approved vendor list

    Qty : Refer BOQ

    Type : Wire Mesh Basket type

    Size : 3‖ 

    Mounting : Pipeline

    Service : White Oil

    Design : As per ASME Section VIII

    Design Pressure : 15 Kg/cm2

    Working Pressure : 1.5 to 10 Kg /cm2

    Materials 

    Mesh : 60 mesh of SS 304 for White Oil

    Body : Carbon steel as per ASTM A 216 Gr. WCB

    Seal : Viton/Buna N

    Flange : Carbon Steel

    Float : Float actuated pilot operated

    Float & Reed Material : Stainless Steel 304

    Basket : CS Reinforcement sheet / SS 304

    Differential Pressure Gauge : Required with ½‖ Tapping 

    Air Release Body : Carbon steel to ASTM A 216 Gr. WCB

    Drain Connection : ¾‖ NPT, 150# Flange end with CS Drain

    Valve

  • 8/19/2019 Tender Doc_TAS at bhatinda.pdf

    55/237

     

    HINDUSTAN PETROLEUM CORPORATION

    LIMITEDTERMINAL AUTOMATION PROJECT

    55 | 2 3 8  

    Vent : ¾‖ NPT (F) 

    End Connection :

    Inlet : 3" ANSI 150 Flanged :RF serrated

    Outlet : 3" ANSI 150# Flanged, RF serrated`

    Reed switch: Required. It shall be capable of giving

    output signal so that the batch can be

    suspended. In case of differential

    pressure across the suction side and

    discharge side of SAE is greater than 1kg/cm2 then the loading for that point

    shall be suspended with an alarm in TAS

    software as well as at batch controller.

    Alarm description shall be termed as

    ―Strainer choked‖. 

  • 8/19/2019 Tender Doc_TAS at bhatinda.pdf

    56/237

     

    HINDUSTAN PETROLEUM CORPORATION

    LIMITEDTERMINAL AUTOMATION PROJECT

    56 | 2 3 8  

    SPECIFICATION FOR DIFFERNTIAL PRESSURE GAUGE ACROSS STRATINER

    FOR MAIN PRODUCT

    Type : Direct

    Make Model No:

    As per approved Vendor list

    Model No:

    Vendor to specify

    Mounting:

    Local across strainer

    Dial Size:

    6‖(150mm)  White Color with black

    graduation

    Material : Cast aluminum

    Bezel ring:

    Press fit

    Window Material:

    Toughened glass

    Enclosure:

    Weatherproof to IP 65

    Element material & Type: SS 316, diaphragm /Piston

    Socket material:

    SS 316

    Zero Adjustment

    :

    Micrometer pointersConnection

    :½‖ / ¼ ―NPT (M), 2 nos. 

    Connection location:

    Bottom

    Accuracy:

    ± 2% of FSD

    Over range protection:

    As per IS 3624

    Blow out protection:

    As per IS 3624

    Range:

    0-2 Kg / Sq.Cm

    Maximum Static Pressure : 15 Kg / Sq.Cm

    Accessories:

    3 way manifold- SS 304

  • 8/19/2019 Tender Doc_TAS at bhatinda.pdf

    57/237

     

    HINDUSTAN PETROLEUM CORPORATION

    LIMITEDTERMINAL AUTOMATION PROJECT

    57 | 2 3 8  

    SPECIFICATION FOR DIGITAL CONTROL VALVE FOR MAIN PRODUCT

    Make  : As per approved vendor list 

    Model : Vendor to Specify

    Type : Diaphragm type digital control with

    linear characteristics , Electrically

    actuated hydraulically operated.

    Alternatively piston type DCV is also

    acceptable.

    Size : 3‖ (80 mm) Type of Body : Globe

    Qty : Refer BOQ

    Service : White Oil

    Flow Range : 1500 LPM (Maximum) ,200-1200 LPM

    (Normal Flow Range )

    Max. working pressure : 15 Kg/sq. cm

    Test Pressure : 1.5 times the Design pressure i.e. 22.5

    Kg/Sq cm

    Operating Pressure : 1.0Kg/Sq cm -4 Kg Sq cm

    Mounting : Horizontal, Downstream of PD meter

    End connection : 3" ANSI 150# Flanged, RF serrated for

    Main Product & 1.5‖ ANSI 150#

    Flanged, RF serrated for secondary

    product

    Leakage Class : Class VI

    Failure Position : Close

    Materials 

    Valve body  : Carbon steel A 216 WCB / SS 304

    Valve cover : Cast steel A 216 WCB

    Spring  : Stainless steel AISI 304

    Internal parts : Stainless steel AISI 304 / CS

    Needle Valve/ Ball Valve : SS 316 body & needle/ball, tubed

    through compression type fittings, 2

    Nos ( One at upstream & one at

    downstream)

  • 8/19/2019 Tender Doc_TAS at bhatinda.pdf

    58/237

     

    HINDUSTAN PETROLEUM CORPORATION

    LIMITEDTERMINAL AUTOMATION PROJECT

    58 | 2 3 8  

    Tubing & Pipe : SS 316

    Diaphragm material : Viton/ NBR-LSTrim : SS 316

    Seals : Viton

    Body type : Inline

    Solenoid Valve

    Type : 1 No. Normally Open (NO) &

    1 No. Normally Close (NC)

    SOV Make : ASCO

    Body : Stainless Steel

    Trim : SS 304Mounting : On Digital Control valve

    Max. working pressure : 15 Kg/sq. cm

    Test Pressure : 1.5 times the Design pressure i.e. 22.5

    Kg/Sq cm

    Elec. Connection : Min ‗1/4" NPT (F)

    Limit switches : Single for closed position indication,

    explosion proof, class I, Gr IIA & IIB

    Enclosure : Explosion proof class 1, Group II A &II B,

    T3 & Weather proof to IP 65Power Supply : 230V +10% to -15% AC , 50 Hz +/-5%

    Coil Insulation : F Type

    Approval/Certification for

    Digital Control Valve

    : CCOE

    Features Required :   Fail Safe

      Bubble Tight Shut off

      No reverse flow

      Valve close on Power Failure

      Adjustable rate of opening &

    closing of Valve.

      Low Pressure Drop

  • 8/19/2019 Tender Doc_TAS at bhatinda.pdf

    59/237

     

    HINDUSTAN PETROLEUM CORPORATION

    LIMITEDTERMINAL AUTOMATION PROJECT

    59 | 2 3 8  

    SPECIFICATION FOR POSITIVE DISPLACEMENT FLOW METER FOR

    SECONDARY PRODUCT ( Max Blending 20% V/V) :

    One Set of Flow metering System (PD Meter, Strainer Cum Air Eliminator, Set

    Stop Valve, Pulsar) is required for each MS Point for Blending of Ethanol. The Size

    of metering system shall be min. 1 1/2 inch. The actual size may vary based on the

    design & detailed Engineering by the Vendor. The Current Blending of Ethanol in

    MS is 5% v/v. However, it may go up to maximum 20% v/v in future stage wise.

    Facility shall be provided in the TAS Software (password protected) with the User

    for changing the blending proportion. Change in the blending proportion shall

    be logged with time, Date, Unique ID, previous blend ratio & the new blend ratio.

    The specification for Flow Metering System (PD Meter, Strainer Cum Air

    Eliminator, Set Stop Valve, Pulsar) required for Ethanol will be same, except the

    size which shall be min 1 1/2  inch, as for the main product unless otherwise

    specified

    Flow meter type : PD meter, Double case, SS 316 wetted

    parts

    Size : Suitable for tapping of 1 ½‖, expander/

    reducer suitable for site Installation shall be

    in the Vendor‘s scope. 

    End Connection : ANSI class 150#, RF serrated ANSI B 16.5

    Service : Ethanol

    Flow rate : 40 LP