tender doc_tas at bhatinda.pdf
TRANSCRIPT
-
8/19/2019 Tender Doc_TAS at bhatinda.pdf
1/237
HINDUSTAN PETROLEUM CORPORATION
LIMITEDTERMINAL AUTOMATION PROJECT
1 | 2 3 8
HINDUSTAN PETROLEUM CORPORATION LIMITED
ENGINEERING & PROJECTS
GRESHAM HOUSE ( 2 ND FLOOR),
SIR P. M. ROAD, FORT,
MUMBAI -400 001.
TENDER DOCUMENT
FOR
TERMINAL AUTOMATION SYSTEM PROJECT
AT
BHATINDA TERMINAL, PUNJAB
-
8/19/2019 Tender Doc_TAS at bhatinda.pdf
2/237
HINDUSTAN PETROLEUM CORPORATION
LIMITEDTERMINAL AUTOMATION PROJECT
2 | 2 3 8
SPECIAL CONDITIONSOF
CONTRACT
(SCC)
-
8/19/2019 Tender Doc_TAS at bhatinda.pdf
3/237
HINDUSTAN PETROLEUM CORPORATION
LIMITEDTERMINAL AUTOMATION PROJECT
3 | 2 3 8
SPECIAL CONDITIONS OF CONTRACT
1. Completion period: 7 months from the date of issue of LOI / Work order .
This excludes the stabilization period.
2.
Water required for construction purposes, if any, would be made available if
possible, by HPCL within the Installation at one source, free of cost, the
vendor shall be responsible for taking the same to the place of work as
required. In case of interruption in availability of construction water, vendor
shall make his own arrangements for progressing with the works and no
claim for additional work/time can be made on this account.
3. Power required for the project works shall be arranged by the vendor at
his own cost either thru‘ a temporary power connection from the local
Electric Supply Authority or by means of a DG Set of required capacity.
4.
The contract shall be executed on a unit rate basis. The unit rates shall
remain firm except otherwise if stated specifically in the General Terms &
Conditions of the tender.
5.
The Contractor shall provide and maintain at his own expenses all lights,guards, fencing and watching when and wherever deemed necessary by
the site-in-charge for protection of the work, equipments, instruments,
accessories or for safety and convenience of those employed on the works
or public.
6. The Contractor shall provide and maintain proper temporary sheds of
adequate capacity for storage of all materials and his own store in good
and water tight conditions at site. Any damage / loss of materials in the
contractor‘s custody will be to his account and will be recovered from his
running bills.
7. TERMS OF PAYMENT :
Subject to the provisions under the General Terms & Conditions of the
Contract for deduction of taxes at source, retention money, Liquidated
Damages etc. the following payment terms shall prevail;
-
8/19/2019 Tender Doc_TAS at bhatinda.pdf
4/237
HINDUSTAN PETROLEUM CORPORATION
LIMITEDTERMINAL AUTOMATION PROJECT
4 | 2 3 8
7.1 For Supply items:
7.1.1 80% of the quoted rates shall be paid on receipt of the material at site based
on the certification of HPCL/PMC along with submission of the following
documents;
a)
Copies of invoices showing goods description, quantity, unit
price and total amount.
b) Railway receipt / Lorry Receipt / delivery challan duly
acknowledged by the Consignee.
c) Manufacture‘s Guarantee Certificate
d) Inspection Certificate and dispatch clearance issued by the
nominated Inspection Agency and supplier‘s factory
inspection report.
7.2 10% of the quoted rates shall be paid on completion of erection and
successful commissioning (SITE ACCEPTANCE TEST).
7.2.1
Balance 10% of the quoted rates shall be on completion of the
Stabilisation Period.
7.2 For Erection Items
7.2.1 80% of the quoted rates shall be paid basis on physical progress of work
certified by Site Engineer of HPCL / PMC as per the approved billing
schedule and upon submission of the following documents.
a)
Copies of invoices
b)
Copy of certified progress of work
c) Proof of payment of ESI and deposition of EPF etc.
d) Wage Sheet
-
8/19/2019 Tender Doc_TAS at bhatinda.pdf
5/237
HINDUSTAN PETROLEUM CORPORATION
LIMITEDTERMINAL AUTOMATION PROJECT
5 | 2 3 8
e)
Certified time sheet
7.2.2 10% of the quoted rates shall be paid on completion of erection and
successful commissioning (SITE ACCEPTANCE TEST)
7.2.3
Balance 10% of the quoted rates shall be on completion of the
Stabilization Period
8 For Testing and commissioning Items : 100 % of the quoted rates shall
be paid on completion of erection and successful commissioning (SITE
ACCEPTANCE TEST)
Successful commissioning is defined as compliance of all SAT punch points
by bidder and accepted by HPCL
8.2 For Training Items : 100 % of the quoted rates shall be paid on
completion of Training
For Comprehensive Annual Maintenance Contract ( 5 years ): The CAMC
charges shall be quoted in absolute amount (not in %).However the CAMCcharges for 5 years shall be at least 10 % of the total Capital cost to ensure
that the system is maintained throughout the CAMC period as envisaged. If
the Vendor quotes less than 10% as AMC charges, minimum of 10% of the
total capital cost for 5 years period shall be considered as AMC charges,
keeping the total cost (Total capital cost + CAMC) as quoted by the vendor.
In case the vendor quotes higher amount of CAMC, the quoted amount shall
be retained. The composite rate quoted by vendor for 5 years CAMC period
shall be split year wise in the following percentage for payment purpose
Year 1 : 10% of CAMC cost of 5 years
Year 2 : 15% of CAMC cost of 5 years
Year 3 : 20% of CAMC cost of 5 years
Year 4 : 25% of CAMC cost of 5 years
Year 5 : 30% of CAMC cost of 5 years
-
8/19/2019 Tender Doc_TAS at bhatinda.pdf
6/237
HINDUSTAN PETROLEUM CORPORATION
LIMITEDTERMINAL AUTOMATION PROJECT
6 | 2 3 8
9 Bidders are required to accept the payment terms given above without
any deviations. In case of deviations, Bidders will be given one opportunityto withdraw the same without any revision in prices failing which the offer is
liable to be rejected.
10
Receipt of unconditional acceptance of order and security deposit as per
GTC is a pre-condition for release of any payments.
11
The final payment will be made on completion of all the work and on
fulfillment by the contractor of all his liabilities under the contract duly
backed up by a completion & no claim certificate.
12 ―Site ― shall mean the Bhatinda Terminal project site.
13 Form C/D, Road Permits, Entry Permits etc. will not be issued by HPCL.
14 DEFECT LIABILITY PERIOD/Warranty Period
In addition to clause No.11 & 5n of GTC, the entire system including all
supplied materials shall be warranted for another 12 months. Thus the
total period of warranty/guarantee will be for 24 months starting fromdate of acceptance of the system (ie date of compliance of punch points
of SITE ACCEPTANCE OF THE SYSTEM by HPCL). During warranty period
the contractor shall be liable to replace / rectify any item/ equipment
found defective. All spares and consumables required during the warranty
period shall be under the scope of the contractor. However printer
cartridge and stationery will be outside the scope of warranty
replenishment.
15 Bids will be evaluated taking into account the charges towards CAMC for 5
years. However HPCL reserves the right to award the CAMC contract
subsequently at the end of the warranty period or earlier.
16 In case of deviations, Bidders will be given one opportunity to withdraw the
same without any revision in prices, failing which offer shall be liable to be
rejected.
-
8/19/2019 Tender Doc_TAS at bhatinda.pdf
7/237
HINDUSTAN PETROLEUM CORPORATION
LIMITEDTERMINAL AUTOMATION PROJECT
7 | 2 3 8
17
The above Special conditions shall be read in conjunction with General
Conditions of Contract and Instructions to bidders. If any provision inthese special conditions is at variance with that of the aforesaid
documents, the Special Conditions shall be deemed to take precedence
there over.
18
No conditions should be mentioned in the price bid. Conditional price bid
shall be liable for rejection.
19. CONFIDENTIALITY:
The Bidders are requested to handle/respond the tender in utmost
confidentiality and shall not copy documents/information of the
Corporation and shall not divulge/distribute/share any
documents/information or knowledge of things or process which Bidder
comes to know or acquires during the tendering/execution process. HPCL
also reserves the right to initiate appropriate legal action against Bidder
for breach of this condition or any copy right or infringement of
intellectual property of HPCL disclosed to Bidder during the
tendering/execution process.
18 General :
No idle time charges shall be payable by HPCL ,in any case what so ever.
In the absence of any specifications covering any material, design of work
(s) the same shall be performed / supplies / executed in accordance with
Standard Engineering Practice as per the instructions / directions of the
Engineer-in-Charge, which will be binding on the bidder. These have to be
completed at no extra cost to HPCL.
It is the clear understanding of the bidder that the complete scope as
defined or as may be required for the intended objective of this tender is
included in the quoted price. No extra payment apart from the quoted
price will be made in order to achieve the intended objectives. Reasons
-
8/19/2019 Tender Doc_TAS at bhatinda.pdf
8/237
HINDUSTAN PETROLEUM CORPORATION
LIMITEDTERMINAL AUTOMATION PROJECT
8 | 2 3 8
like, bidder having not envisaged / considered a particular activity or
element of cost required to be carried out for achieving the intended
objective or some activity not specifically mentioned in the tender
enquiry/tender but required to be carried out for achieving the intended
objective, will not form basis for considering extra payments.
No extra payments will be made for working on extended hours /
Saturdays / Sundays / Holidays to meet the committed/required time
schedules.
19.0 SOLE RIGHTS TO TEMPLATES / DOCUMENTATION / PROCESSES
HPCL will have the sole rights to the templates / documentation /
processes / solution model etc. developed in the course of implementation
and the Successful Bidder and/or their partners will not be allowed to use
them without the explicit prior permission of HPCL in writing.
20 SUCCESSFUL BIDDER’S RESPONSIBILITY
Successful Bidder will be wholly and solely responsible and liable for all the
jobs carried out by them / services provided by them. HPCL acceptance
having signed off a particular milestone will not exonerate the Successful
Bidder from his prime responsibilities to have done a correct job as per the
requirement of the job/contract and as per international practices in the
first instance itself. If required, Successful Bidder will be required to revisit
those milestones which are already signed off and will be required tomake suitable corrections at no extra cost to HPCL.
21. PATENT /COPYRIGHT PROTECTION
If any third party claims that a Product/Service(s) supplied by the bidder in
-
8/19/2019 Tender Doc_TAS at bhatinda.pdf
9/237
HINDUSTAN PETROLEUM CORPORATION
LIMITEDTERMINAL AUTOMATION PROJECT
9 | 2 3 8
connection with this contract here under infringes a patent or copyright,
the bidder will defend HPCL against that claim at Bidder‘s expense and pay
all costs, damages, and attorney‘s fees etc. and it would be the sole
responsibility of the successful bidder to comply with all instructions that a
Court finally awards.
If such a claim is made or is likely to be made, Bidder to enable HPCL to
continue to use, or to modify or replace the Product. If none of these
alternatives is acceptable to HPCL, the Bidder will give HPCL a credit for
such Product. as well as for all resultant consequential losses, resulting outof the non-availability of the product for HPCL‘s use.
22. COMPLIANCE TO TENDER ENQUIRY DOCUMENT
Tender quoted should be in compliance to the tender enquiry conditions.
All Annexure duly filled up along with necessary documentation as
requested in the tender enquiry and / or required to support Successful
Bidder‘s claim must be enclosed with the tender in the first instance itself.
Any willful attempts by the Successful Bidder to camouflage the deviations
by not mentioning them in the prescribed format may render the bid itself
non responsive. Only the deviations which are mentioned on the format
attached in tender or in the datasheets will be taken during evaluation and
remaining offer shall be considered as exact compliance to tender enquiry.
23.0 Limitation of Liability :
1) In no event shall either Party to the contract be responsible for orobligated in any manner to pay any special , exemplary, punitive,
consequential or other indirect damages( whether under tort, negligence
or strict liability ) in respect of any loss, damage, claim or demand asserted
by the other Party hereunder, even if the first mentioned Party was
informed or made aware of the possibility of such damages
-
8/19/2019 Tender Doc_TAS at bhatinda.pdf
10/237
HINDUSTAN PETROLEUM CORPORATION
LIMITEDTERMINAL AUTOMATION PROJECT
10 | 2 3 8
2) The maximum liability of each Party arising from any circumstances
including negligence, errors & omissions shall be limited to the totalcontract value.
24.0 Bidders are required to quote the Unit rates in R only.
-
8/19/2019 Tender Doc_TAS at bhatinda.pdf
11/237
HINDUSTAN PETROLEUM CORPORATION
LIMITEDTERMINAL AUTOMATION PROJECT
11 | 2 3 8
SPECIFICATIONS
-
8/19/2019 Tender Doc_TAS at bhatinda.pdf
12/237
HINDUSTAN PETROLEUM CORPORATION
LIMITEDTERMINAL AUTOMATION PROJECT
12 | 2 3 8
INTENT OF SPECIFICATIONS
Hindustan Petroleum Corporation Limited (HPCL) intent to automate New 8 Bay
Gantry being constructed at Bhatinda Terminal. The Terminal receives, stores and
dispatch various grades of . MS, SKO & HSD etc. Presently Bhatinda Terminal is
operational & has automated operation for Existing 10 Bay Gantry Tank Truck
Filling, Tank Farm, Product Pump operation, Fire water pump operation interface,
Valve Control logics including module for Management Information System &
Reporting and interface with our ERP. M/s Advanced Systek Pvt Ltd (ASPL) has
done Terminal Automation & provided its software for automated operation of
aforesaid facilities. The New Gantry, VFD & other allied equipment/instrument
proposed to be provided in this tender shall be integrated with the existing
Automation/TAS software. Also existing logics & additional graphics which may
require to be modified/ added due to addition of new Bays, pumps, VFDs etc
shall be suitably modified/ added by the Vendor. All functions defined in this
tender document shall be performed in an integrated cohesive manner. The new
system shall be seamlessly integrated with the existing TAS which in turn will
control and monitor the entire terminal.
Before submitting techno commercial bids, bidders are required to visit and study
the existing scheme of Automation & other aspects of Plant operations for theterminal. Any job, material, equipment, instrument etc not explicitly mentioned in
the Schedule of quantity but required to be provided to meet the functional &
technical requirement as mentioned in this tender shall be in the scope of
Vendor.
M/s HPCL may appoint Project Management Consultant (PMC) on their behalf for
execution & implementation of the entire TAS including Data Sheets approval,
Site Supervision, Bills Certification, Project monitoring etc. & all related activities
of automation as covered under this tender. However, inspection of Equipments
& materials are excluded from the scope of the PMC. Vendor shall get the
inspection done of the equipments & materials from the approved Third Party
Inspection agency as stipulated in the scope of Inspection of this document.
It may be noted that the quantities given in the BOQ are indicative and
quantities can be revised during execution of the P.O. Change order, if required
will be issued. Completion period is 7 months excluding stabilization period of
-
8/19/2019 Tender Doc_TAS at bhatinda.pdf
13/237
HINDUSTAN PETROLEUM CORPORATION
LIMITEDTERMINAL AUTOMATION PROJECT
13 | 2 3 8
min. 90 days. The following are the major milestones included in the Completion
Period
Datasheet Approval
Functional Design Specification & Hardware Design Manual which shall
include all philosophy for integration with the existing TAS
Batch Accuracy Test
Site Execution
Commissioning & Trial Runs
Site Acceptance Test including compliance
Bidders shall visit the site to understand the process, operation, scope of work
including integration with the existing Automation System. Any further site visits
required by the Vendor after placement of Purchase Order for understanding the
process, study the facilities, detail design engineering etc. shall be part of the
completion period.
-
8/19/2019 Tender Doc_TAS at bhatinda.pdf
14/237
HINDUSTAN PETROLEUM CORPORATION
LIMITEDTERMINAL AUTOMATION PROJECT
14 | 2 3 8
GENERAL
The major operational areas identified for automation are
a) Tank truck loading operation for New 8 Bay Gantry
b) Product pump operation (All T/T Loading pumps) including supply &
integration of the New VFDs
c) Integration with existing software including logic modification, wherever
required and additional graphics
d) Management Information System & Reporting
All these operations shall be logically integrated through existing Servers,Programmable Logic Controller, other field & control room equipments to ensure
accurate, seamless & secured operation and data exchange.
Successful Bidder hereafter referred as Vendor shall make sure that
commissioning of all the instruments / equipment and Site Acceptance Test (SAT)
shall be completed as per the completion schedule mentioned in Special Terms &
Condition. Stabilization period is not included in the completion period.
Control Room location is inside Administrative building.
As Bhatinda Terminal is an operating Terminal, the Vendor shall carry out day to
day activity after taking necessary hot/ cold work permits. Vendor shall appoint a
Safety supervisor, apart from the Work Supervisor, who shall be available
throughout the working time and shall be responsible for taking permits and
observing safety and security regulation of the terminal. Vendor shall deploy at
least one qualified and experienced (1 to 2 yrs)
instrumentation/electrical/mechanical engineer exclusively at the site during the
entire execution period as the work supervisor.
It shall be the endeavor of HPCL to provide work permit beyond normal
operating hour to the extent possible. However all the work shall be preferably
planned for completion by the Vendor within the normal working hour. Vendor
shall be provided suitable area to construct the fabrication yard in the de-
licensed area within the depot premises to carry out prefabrication job. For works
which may require total/ part shut down of the Gantry operation or which may
-
8/19/2019 Tender Doc_TAS at bhatinda.pdf
15/237
HINDUSTAN PETROLEUM CORPORATION
LIMITEDTERMINAL AUTOMATION PROJECT
15 | 2 3 8
hamper the normal loading operation, the automation vendor is required to work
during night hours/ holidays and during such times when it does not hamper theoperation of the terminal. Prior planning & permission from the Terminal
manager shall be obtained. All hot work shall be planned (min. 21 days in
advance for Gantry/ header job) and discussed with the Terminal manager and
shall be carried out on Sundays / holidays to cause minimum impact on the
regular operation on working days. All Work shall be planned without
interruption to terminal normal working. No extra claim shall be admissible for
night working, holiday working or extra hours working if permission for the same
is given by HPCL.
The mechanical job can be carried out during any day/ Sundays/ holidays,
Vendor shall mobilize its mechanical personnel immediately after placement of
order to carry out modification job in such a manner that all jobs like header
modification for BAE installation, are completed by the time supply of these
equipments & instruments are expected. The modification shall be complete in
all respect after providing spool pieces, valves etc. as required so that equipment,
instruments can be mounted immediately on receipt Only those modification like
metering system which may require actual measurement or instruments
/equipments at site may be taken up after receipt of those equipments,
instruments
The Vendor shall ensure all the safety procedures are followed during the above
activity. The safety procedures to be followed are as listed elsewhere in the
specification & as per the Oil Industry norms. Vendor shall submit the fortnightly
safety report along with the work progress report.
The vendor shall train operating personnel from the location in the following
areas so as to make them fully familiar with the system and its day to day
operation:-
General design & system Engineering.
All related MMI & logics
Design criterion, specification, testing, functional aspects & installation
of equipment.
Operational & preventive maintenance of individual equipment
-
8/19/2019 Tender Doc_TAS at bhatinda.pdf
16/237
HINDUSTAN PETROLEUM CORPORATION
LIMITEDTERMINAL AUTOMATION PROJECT
16 | 2 3 8
Trouble shooting for all the individual equipment. Operational &
preventive maintenance of individual equipment & overallsystem(excluding the existing System)
Trouble shooting for all the supplied equipment/instruments under this
tender.
The above training shall be conducted at the site during handing over of the
system & during the Warranty period. Two such trainings shall be held every year
in the Warranty Period. Each training module shall be of minimum 2 days.
The TT crews are also required to be familiarized with the operation of the TLF
equipments for which HPCL shall organize the program and the vendor shall
demonstrate the T/T operation.
-
8/19/2019 Tender Doc_TAS at bhatinda.pdf
17/237
HINDUSTAN PETROLEUM CORPORATION
LIMITEDTERMINAL AUTOMATION PROJECT
17 | 2 3 8
SCOPE OF WORK
This document serves as detailed specification for the Vendor as minimum
requirement for automating the specified operations at the Terminal. Vendor
shall execute the work on turnkey basis & shall design, supply, install, commission
& stabilize the system as per the deliverables listed in this document.
Notwithstanding the sub divisions of the tender document into several sections
and volumes, every part of each shall be deemed to be supplementary of every
other part and shall be read with and into the contract.
Vendor‘s scope of work is divided into Four Major categories viz .Overall Scope of
Work, scope of work for the New 8 Bay Gantry & Scope of work required for
Integration with the existing System.
A. Overall Scope of Work shall include but not limited to the following:
Complete design and system engineering required for the sub-system &
its interfacing with the existing Terminal Automation System to ensure the
deliverables are achieved in line with technical & functional requirement
laid down in this tender document.
Supply, installation, testing & commissioning of all equipment/instruments, material etc complete as stipulated in the schedule of
quantities along with its allied hardware. Balance items which are not
explicitly spelt out in the Schedule of quantities but are required for the
completeness of the work like structural steels, foundation work & other
civil works, fittings, gaskets, nut bolts, any other hardware required,
consumables etc. shall also be deemed to be included under the
respective items. No separate payment shall be made for such items.
Third party inspection of the bought out item, Trial run of the system, Site
acceptance test, system stabilization and acceptance of the complete
system.
Packing, forwarding, transportation, custom clearance, insurance, storage
etc.
-
8/19/2019 Tender Doc_TAS at bhatinda.pdf
18/237
HINDUSTAN PETROLEUM CORPORATION
LIMITEDTERMINAL AUTOMATION PROJECT
18 | 2 3 8
Supply, fabrication, welding/ nut bolting, erection, painting of any steel
structural required for installation of equipment, panels, junction boxes,instruments, etc. including any other free issue items, as required & as per
site engineer‘s instructions.
Supply, fabrication, welding/ nut bolting, erection, painting of any
structural steel required for installation of Cable Trays.
Supply & installation of all Erection materials including consumables &
non consumables as galvanized and perforated cable trays with cover,
cable racks, conduits, junction boxes, pull boxes, clamps, compression
fitting, cable glands, all instrument supports, electrodes and othermaterials for completeness of erection. The erection materials shall also be
suitable to the hazardous area classification.
Supply of Pipes, Bends, reducer, expander, flanges, matching/companion
Flanges, Gaskets, jumper clip, other pipe fittings etc as required for direct
mounting or for re-routing the existing pipe in order to facilitate mounting
of the instruments & equipments including fabrication, welding, erection,
hydro testing, painting testing and commissioning. All these pipes &
fittings shall be part of the respective instruments, equipment and shall
not be paid separately.
Construction of Cable trench in soft soil, hard soil, rocky strata, RCC etc
including supply & laying of NP 2 Hume pipes below all road crossing, GI
conduit inside tank farm, as required
The spare available in the existing cables, JBs & other hardware can be
used. Any additional cable, JBs & hardware required for the new
equipment shall be supplied by the Vendor
Supply, Fabrication and installation of sunshields 18 gauge GI Sheet/
aluminum canopy for field mounted equipments, instruments such aspressure transmitters, density meters etc. Dimension of such canopy shall
be such on all sides of the equipment adequately.
Any modification required in the existing pipeline, loading platform,
loading arms for mounting of instruments & equipments like Metering
system, Header line equipments etc. inclusive of supply of pipes, fittings,
-
8/19/2019 Tender Doc_TAS at bhatinda.pdf
19/237
HINDUSTAN PETROLEUM CORPORATION
LIMITEDTERMINAL AUTOMATION PROJECT
19 | 2 3 8
valves etc. In case it is not possible to modif y 3‖/ 1½― existing pipeline,
Vendor shall fabricate, erect, lay new 3‖/1½ ― pipeline including supply ofpipes, fittings, valves etc & painting from existing tapping onwards at the
Gantry. The limit of modification/laying of new 3‖/ 1½‖ pipeline for
Metering system shall start downstream from the 3‖ / 1½― tapping
provided on the header line inside the Gantry. The vendor scope shall also
include draining & collecting the oil safely from the pipeline, flushing,
degassing, hydro-testing, painting etc. All these modification job,
dismantling, re-installation etc. including supply of pipes, fittings,
consumable, hardware material etc. shall be part of respective instruments
& equipment. No separate payment shall be made for these items.
Submission of all data sheets along with OEM‘s confirmation on Product
life cycle, his support for Backup engineering & spares
Sealing of cables / tube entries into the control room after laying and
testing of all tubes, cables etc.,
Preparation & submission of all the required Documents including as-
built drawings, documents as per the execution of work at site and
submission to HPCL
Providing training to HPCL operation team and T/T Crew member as per
the scope defined in the tender,
Execution of Warranty, Comprehensive Annual Maintenance Contract, etc.
Supply of special tools, test equipments, consumables required for
installation, testing, calibration and commissioning of the system. All
commissioning and start-up spares required up to commissioning, system
acceptance and handing over of the system to the HPCL shall be in the
vendor‘s scope.
Certification from the OEM for correct installation & its terminations, if
applicable, at each site for all of the following equipment, instruments
o Metering System
o DCV
-
8/19/2019 Tender Doc_TAS at bhatinda.pdf
20/237
HINDUSTAN PETROLEUM CORPORATION
LIMITEDTERMINAL AUTOMATION PROJECT
20 | 2 3 8
o Loading Arm
o Densitometer
o BAE
o VFD
o Batch Controller
Proper installation and alignment of line / vessels / equipment mounted
instruments like valve, PD meters, etc.
Drilling holes on all panels, power distribution panel, control panels, etc.
for cables / glands.
Any other instrument/ equipment/ service, which is not explicitly
mentioned in this document or in the Schedule of Quantity/ price bid but
deemed necessary for the successful operation of the system complete in
all respects, shall be in vendor‘s scope.
The functional & operational requirements as specified in this tendermight undergo revisions as per the location requirement during detail
design engineering, functional design specification or during execution.
The vendor must ensure that all these changes are incorporated &
demonstrated during Site Acceptance Test.
All Civil works required for execution of TAS including supply of all materials
required like foundation for mounting of instruments and equipment
supplied by Vendor and those given as free issue items, Road cutting , laying
of Hume pipes, re-asphalting the roads, wherever required etc.
All mechanical, electrical jobs required for TAS shall be in Vendor‘s scope.
Calibration & Verification of all equipments & instruments
W&M Stamping of the Electronic metering system. Any other instruments,
equipments which may require stamping as per statutory law shall also be in
-
8/19/2019 Tender Doc_TAS at bhatinda.pdf
21/237
HINDUSTAN PETROLEUM CORPORATION
LIMITEDTERMINAL AUTOMATION PROJECT
21 | 2 3 8
the Vendor‘s scope.
All documentations, drawings & test procedure
Construction of temporary Storage Shed for storing the all the equipment,
material, instruments etc & dismantling the same after completion of work.
Third Party Inspection of the instruments, equipments & materials as per the
approved QAP.
All road permits from Sales Tax authorities for importing/movement of all
these equipment, instruments, material.
The vendor shall be fully responsible for proper selection of equipment‘s,
engineering, performance and successful operation of the complete
system including all bought out equipment, subsystems supplied by them
when integrated with the overall Automation System meeting the
functional requirements.
Vendor shall offer the services of the competent installation team which
would install the equipment / instruments, lay the interconnecting cabling,
check out, testing and commissioning the system.
All technical personnel assigned to the site by the Vendor shall be fully
conversant with the supplied system and software package, and shall have
both hardware and software capability to bring the system on line quickly
and efficiently with a minimum interference with other concurrent
construction and commissioning activities.
Strict adherence to HPCL‘s Safety, Health & Environment policy
B.
Scope of Work in the New 8 Bay Gantry & existing Gantry shall include butnot limited to the following:
Supply, installation, testing & commissioning of the Electronic Metering
System, RIT, Card Reader, earthing relay, RTD, Loading arms, JBs, Cables,
all allied hardware, instruments equipment etc complete required for
Gantry Automation
-
8/19/2019 Tender Doc_TAS at bhatinda.pdf
22/237
HINDUSTAN PETROLEUM CORPORATION
LIMITEDTERMINAL AUTOMATION PROJECT
22 | 2 3 8
Supply, installation, testing & commissioning of Online Densitometer on
the product header line.
The existing header line of the existing gantry (HSD-10‖, MS & SKO-6‖) will
be dismantled by HPCL & new line of size HSD-14‖, MS-10‖ & SKO-8‖ will
be laid by HPCL independently for both new & existing Gantry. It is
tentatively planned to use existing 10‖ HSD BAE for new 10‖ MS line,
existing 6‖ SKO BAE for new 8‖ SKO & existing 6‖ MS for new Ethanol line
along with other header line equipment like PT, DT, TRV etc. The
dismantling of the header line equipment & re-installation on the new
header line will be in the scope of the vendor along with required fittings
like bends, flanges, expander reducer etc, gaskets, nut-bolts etc completerequired for successful erection of the equipment. Foundation for
equipment as per the requirement shall be in the scope of Vendor. New
Triple offset Butterfly valve (TOBV) with electric actuator shall be supplied
& installed with the existing BAE & the same shall be part of re-installation
item. TRV shall be provided on the BAE & on the downstream of TOBV.
TRVs shall be connected to the U/G Tank through 1‘‘ line or shall be
connected to the unloading line, if available, with NRV or shall be
connected at the pump house on the suction line with NRV. All
modification in the pipeline as per the requirement including supply of allrequired hardware, fittings like valves, expander, reducer, flanges etc &
pipes.
Rerouting of cables, JBs, providing additional cables, cable tray etc for
reinstallation of header line equipment. This will be part of cable item.
Rerouting & realignment of existing SS additive line over the proposed
trestle up to the existing Gantry along with supply of required SS Pipe,
bends fittings, gasket nut bolts etc. No separate payment will be made for
this item
Supply & installation of new BAE along with TOBV, DT, PT, orifice plate etc
on the header line including modification in the pipeline required for
installation of these equipments. Supply of all required hardware, pipes,
fittings like valves, flanges, bends etc.
Earthing of all the equipment, instruments to the existing earth pit.
-
8/19/2019 Tender Doc_TAS at bhatinda.pdf
23/237
HINDUSTAN PETROLEUM CORPORATION
LIMITEDTERMINAL AUTOMATION PROJECT
23 | 2 3 8
The existing Fire Engine Automation shall be extended to include One No
ESD & One No MCP shall be provided at the New Gantry.
As the pipeline is being laid new, the layout shall be made to facilitate
installation of TAS equipment. However any further modification required
in the existing pipeline from the existing tapping onwards available at the
Gantry for both Main product & secondary product to suit mounting of
Automation equipment. Supply if pipes, fittings, gaskets, nut bolts & all
allied hardware etc shall be included in the scope of Vendor‘s job.
Dismantling & reinstallation of any Valve, hardware etc. if required shall be
included in the scope of work.
C.
Integration with the existing Terminal Automation System : The existing System
is supplied & maintained by M/s Advanced Systek Pvt Ltd, Vadodara. Vendor
shall get the access authority required for modification/ up-gradation of the
existing TAS (hardware and software) from M/s Advanced Systek Pvt Ltd,
Vadodara. Vendor to submit the same to HPCL in un-priced bid along with
undertaking from TAS integrator regarding non- dilution of warranty of
existing TAS system.Scope of Work for integration with the existing TASshall include but not limited to the following:
o Modification, up-gradation, additional graphics as required in the existing
TAS software to seamlessly integrate the new system.
o Modification/ up-gradation of the existing equipment/ instruments,
material or any hardware including all supplies as required for seamlessly
interfacing with the existing Terminal Automation System to meet the
specified technical & functional requirement.
o
Integration of header line TOBV to the existing TAS including modificationin the logic & allied graphics
o The MMI/ GUI for all the new items, equipment, instruments shall be same
as the existing one.
-
8/19/2019 Tender Doc_TAS at bhatinda.pdf
24/237
HINDUSTAN PETROLEUM CORPORATION
LIMITEDTERMINAL AUTOMATION PROJECT
24 | 2 3 8
o All the existing reports shall be modified to include the reports required
for the new equipment, instruments & shall be available to the user in acombined format.
o All alarm, events etc available in the existing system shall be extended for
the new system.
o Any change in the existing TAS logic due to inclusion on new Gantry like
Bay allocation logic, EDU logic etc
o The Spare DI, DO, AI, AO available in the existing PLC may be used. Any
additional I/Os required for integration shall be supplied along with itsallied hardware. Change in ladder logic shall also be incorporated to suit
the requirement of the new equipment/ instruments.
o The spares available in the existing networking component like Terminal
Server etc may be used. In case the same is not sufficient, new networking
components in same configuration along with all its allied hardware shall
be supplied, installed, commissioned integrated by the Vendor
o All the newly supplied equipment/ instruments shall be powered through
the existing parallel redundant UPS. In case the existing UPS capacity is notsufficient to power up the new equipment/ instruments then same
specification UPS of suitable capacity shall be supplied by the Vendor to
power up the new equipment/ instruments at no extra cost. Any cabling,
hardware etc required powering up the new equipment shall be included
in the cabling item & will not be paid separately.
o Modification/ Up-gradation of the existing Power Distribution panel shall
or alternatively supply of New MCB panel for supply of Power to the new
equipment/instruments. Individual MCB shall be provided for each parent
equipment & instrument so that the same can be powered off as & when
required for maintenance purpose.
o Supply, laying, testing & termination of all additional Power, Control,
Signal cables & all other type of special/ regular, cables required for
modification & integration with the existing TAS.
o The existing Product pumps are either controlled though Motor Control
Center (MCC) or through Variable Frequency Drive (VFD) or combination
-
8/19/2019 Tender Doc_TAS at bhatinda.pdf
25/237
HINDUSTAN PETROLEUM CORPORATION
LIMITEDTERMINAL AUTOMATION PROJECT
25 | 2 3 8
of MCC & VFD. These are currently integrated with the TAS such that the
pumps are started based on the Pump demand & are run based on thepressure on the header line. Because of new Gantry, the existing pumps
are being upgraded to higher capacity pumps by HPCL along with new
VFDs which are part of this tender. These new Pumps & VFD shall be
integrated with the existing TAS by the Vendor so that the new as well as
existing Gantry comes in the purview of the Pump automation & the
pumps are operated automatically based on the pump demand. HPCL
scope will be limited to providing the Pumps & MCC in working condition.
Any changes required in the ladder logic or TAS software shall be
developed & incorporated to complete the VFD Interface with the existing
TAS. All software, hardware etc. required for VFD interfacing with the
existing TAS including development of graphics, modification in the logic
will be in Vendor‘s scope. Existing cables hardware etc available at site may
be utilized, if suitable.
o
Modification in the existing Control Room Cable Trench, if required.
o Any licenses required for due to up-gradation/ modification in the existing
system shall be provided by the Vendor
o
All items required for integration, though not specifically mentionedabove, of the new equipment/ instruments are deemed to be included
under integration item only unless otherwise specified.
-
8/19/2019 Tender Doc_TAS at bhatinda.pdf
26/237
HINDUSTAN PETROLEUM CORPORATION
LIMITEDTERMINAL AUTOMATION PROJECT
26 | 2 3 8
HPCL’s SCOPE OF WORKS.
HPCL shall provide the following to the successful vendor:
o Gantry Structure for installation of metering system
o Existing Terminal Automation System in proper working condition.
o Cable trenches, Hume pipes if available & having sufficient space
o Cabling from Pumps to the MCC.
o All free issue items in standalone working condition.
-
8/19/2019 Tender Doc_TAS at bhatinda.pdf
27/237
HINDUSTAN PETROLEUM CORPORATION
LIMITEDTERMINAL AUTOMATION PROJECT
27 | 2 3 8
DESIGN CRITERIA
Vendor shall note the following minimum requirement for designing the facilities.
These shall be read in conjunction with the function & technical requirements as
specified elsewhere in this document
The system is required to be designed for following broad parameters:
Maximum temperature : 55 Degree centigrade.
Minimum temperature:
0 Degree centigrade
Maximum Relative humidity:
95 %.
Petroleum products to be
loaded
: MS & HSD
Products Characteristics:
As given below
Flow rate:
Normal flow rate 150 to 1200 LPM at each
Loading point. Maximum Header Flow Rate
will be when all the pumps for that particular
product are operating & minimum Headerflow rate when the smallest capacity pump
for that particular product is operating.
Working pressure:
1 Kg/ Sq cm to 10 Kg/ Sq Cm
Design pressure:
15 Kg./Sq.Cm
PRODUCT CHARACTERSTICS
PARAMETERS MS SKO HSD
Specific Gravity 0.7-0.75 0.75-0.8 0.8-0.9
Viscosity @38Deg C 1.1CST 1.2CST 2.54-4.0 CST
-
8/19/2019 Tender Doc_TAS at bhatinda.pdf
28/237
HINDUSTAN PETROLEUM CORPORATION
LIMITEDTERMINAL AUTOMATION PROJECT
28 | 2 3 8
SYSTEM RESPONSE TIME: Vendor shall design the System so as to have thefollowing minimum response time.
ACTIVITY MAX. RESPONSE
TIME
Time for transferring of change of status of equipment
and alarms of the entire terminal
: 5 Sec
Time for updating of any hardware analogue variable : 2 sec
Remote command from Operator station to action has
taken place via hardware I/O
: 2 Sec
For BATCH Controller and RIT communication with LRC : 2 Sec
Time taken between card flashing & corresponding
batch controller message appearance
: 4 Sec
Other system responses required for driver interaction
such as card validation, RIT lamp sequences, down
loading of data etc.
: 4 Sec
-
8/19/2019 Tender Doc_TAS at bhatinda.pdf
29/237
HINDUSTAN PETROLEUM CORPORATION
LIMITEDTERMINAL AUTOMATION PROJECT
29 | 2 3 8
APPLICAPABLE CODES & STANDARDS
The components of instrumentation and control system shall be designed,
manufactured, assembled and tested in accordance with the latest standards of
the Standards Institution, Instrument Society of America, Institute of Electrical
Engineers and Manufacturer's association of the country where they are
manufactured / country of principals. They shall also confirm to the relevant
latest standards of the Bureau of Indian Standards (BIS) wherever available, so
that specific aspects under Indian conditions are taken care of.
The equipment shall also conform to the latest Indian Electricity Rules, OISD,
PESO & petroleum rules as regards safety, earthing and other essential
provisions specified there in for the installation and operation of electrical plants.
The equipment in the hazardous area shall have CMRI, CCOE approvals. OEM
shall have BIS approval.
All painting shall be done in accordance with the General Specification forPainting.
All equipment shall comply with the statutory requirements of the Government
of India and the State Government of respective states.
The Vendor shall execute the job to comply with the requirements of the
relevant regulations or acts in force in the area together with design
specifications with respect to:
Indian Electricity rule
Indian Factories act
Regulations laid down by chief electrical inspector
Regulations laid down by Factory Inspector of state Indian Standard
Specifications
-
8/19/2019 Tender Doc_TAS at bhatinda.pdf
30/237
HINDUSTAN PETROLEUM CORPORATION
LIMITEDTERMINAL AUTOMATION PROJECT
30 | 2 3 8
Oil Industries safety directorate norms.
International Organization of Legal Metrology.
Regulations relevant to explosion hazardous areas
Petroleum & Explosive Safety Organisation norms & regulations
The equipment supplied shall be designed in accordance with the requirement of
all internationally &locally applicable standards/specifications listed below.
American National Standards Institute (ANSI)
American Society for Testing and Materials (ASTM)
National Electrical Manufacturers Association (NEMA)
American Society of Mechanical Engineers (ASME)
American Petroleum Institute (API)
Institute of Electrical electronic Engineers (IEEE)
National Fire Protection Agency (NFPA)
International Electro-technical Commission (IEC)
International Standard Organisation (ISO)
Open Software Foundation (OSF)
Bureau of Indian Standards (BIS)
The following codes as a minimum shall be applicable in designing the system.
These codes (Latest edition) shall be produced as & when required by HPCL/
PMC for checking the systemCode / Standard Description
AMSE B1.20.1
AMSE B16.5
AMSE B16.20
ASME SEC VIII
Pipe thread
Steel Pipe flanges and flanged fittings
Ring-Joint gaskets and grooves for steel flanges
Boiler & pressure vessel code rules.
ANSI/ISA 575-01 Control valve sizing , capacity test procedures, face to face
-
8/19/2019 Tender Doc_TAS at bhatinda.pdf
31/237
HINDUSTAN PETROLEUM CORPORATION
LIMITEDTERMINAL AUTOMATION PROJECT
31 | 2 3 8
dimensions, leakage
RP 520 Fire sizing of safety and control valveRP 598 Control valve leakage
OIML standard R
117
(Measuring systems for liquids other than water)
ISA RP SS-1
S 62-01, S82-02
S8-03, S18.1
Instrument Society of America standard and codes
IEC 801/EN
50081/82
Electromagnetic compatibility
IEC 79.10/BS 4683/IS 2148
Hazardous area classification
IEC-529/IS 2147/
NEMA
For execution of Inst. Enclosures
OISD
recommendations
For storage, handling and safety systems and
transportation
API MP MS Ch 21 Flow measurement using Electronic Metering System
ISO/TC28/Section
3
Terms relating to calculation of oil quantity
ISO 4266 Petroleum and liquid petroleum products – Measurement
of level and temperature in storage tanks by automatic
methods.
OIML R85 Automatic level gauges for measuring the level of liquid in
fixed storage tanks.
IS 2801 PD meter Accuracy
BASEEFA/PTB/KEM
A/FM/ATEX/ TUV/
PESO/CMRS/ IBR/
RDSO/W&M
Statutory standards
BS 5308 Part-I Instrumentation Cable
ISA –S5.1 Instrument Symbol & Identification
ISA- S 5.2 Graphical symbol for Process Operators
IS 2148 Flame proof , enclosure for electrical apparatus
IS 3043 Cod of Practice for Earthing
-
8/19/2019 Tender Doc_TAS at bhatinda.pdf
32/237
HINDUSTAN PETROLEUM CORPORATION
LIMITEDTERMINAL AUTOMATION PROJECT
32 | 2 3 8
DESIGN CRITERIA FOR TANK TRUCK LOADING FACILITIES
Tank Trucks are loaded on a volumetric basis in the filling Gantry. New 8 Bay
Gantry is constructed to load MS & HSD at each bay which shall be filled
simultaneously, if required, through two different loading arms. Each loading
Point shall be capable of filling multiple variant of the same product
depending on the infrastructure available.
Each loading point shall be provided with a 3‖ Positive displacement meter,
dedicated strainer cum air eliminator and digital control valve. In case of MS,
additional 1½‖ Positive displacement meter, dedicated strainer cum air
eliminator and digital control valve shall be provided for Ethanol blending. All
variants of particular product shall be handled by same loading arm. Same
Tank truck may have different variant of the same product loaded into
different compartment. The variants of the particular products could be any of
the following:
o Base product
o Base product with blending.
o Base product with one additive.
o Base product with Two additives
o
Base product with blending and one additive
o Base product with blending and two additives.
Vendor is required to specify the total pressure drop across complete
metering assembly. Maximum allowable pressure drop shall be limited to 1.3
kg/cm2 across metering; strainer, air separator cum eliminator, PD Meter &
-
8/19/2019 Tender Doc_TAS at bhatinda.pdf
33/237
HINDUSTAN PETROLEUM CORPORATION
LIMITEDTERMINAL AUTOMATION PROJECT
33 | 2 3 8
DCV. The pressure drop will be required to be demonstrated during SAT.
Necessary arrangement on the metering assembly/ piping to be provided bythe vendor. After successful demonstration of the pressure drop, the same to
be plugged.
Each loading points shall be provided the Batch Controller as per the technical
specification. This Batch Controller shall control the digital control valves of
the base products, secondary product being used for blending and the
additives. These loading points shall be operated through batch controller as
per the batch downloaded from LRCS. The Batch Controller shall send the
Pump demand to the existing PLC to start/ stop the pumps ( Main Product,
Secondary Product, Additive as the case may be) as per the requirement
RTD shall be provided at each loading point .
Each loading point shall be provided with a Remote interaction terminal (RIT).
Each RIT will have emergency stop push button to shut down filling operation
in case of emergency.
Intrinsically safe proximity card reader shall be provided at each bay
Each bay shall be provided with Earthing device which shall be interlockedwith the manual earthing, apart from other suitable interlocks as defined in
the technical specifications.
Each product pipeline entering into TLF shall be provided with a densitometer
with Orifice plate arrangement for measuring ambient & standard density of
product. Density for the blended product shall be calculated by the
application software based on the density input of individual product as the
blending is done at point. The existing software shall be modified to monitor
& record density for each truck compartment and communicate it to ERP for
printing on the invoice. Orifice plate shall be designed to ensure that theproduct flow through the densitometer all the time during loading of that
particular product. In case the product is not flowing through densitometers
during loading of that particular product then ―Error‖ message shall be
displayed instead of last healthy reading
Pressure transmitters shall be installed required to be installed in all the
delivery header lines to TLF. The pressures in the header lines are to be
-
8/19/2019 Tender Doc_TAS at bhatinda.pdf
34/237
HINDUSTAN PETROLEUM CORPORATION
LIMITEDTERMINAL AUTOMATION PROJECT
34 | 2 3 8
transmitted to PLC / LRC. If pressure in the delivery pipeline header exceeds
specified value or reduced below specified value, alarm should be transmittedto PLC panel from pressure transmitter for stopping the Batch Controller or
starting/ stopping the pump.
-
8/19/2019 Tender Doc_TAS at bhatinda.pdf
35/237
HINDUSTAN PETROLEUM CORPORATION
LIMITEDTERMINAL AUTOMATION PROJECT
35 | 2 3 8
DOCUMENTATION
LEGEND : I – Information ,A- Approval F – Final delivery of equipment,
SN Description For
Information
Approval
Final Docu -
mentation
1.0 GENERAL
1.1 Vendor engineering and service
personnel organization chart including
set up for this project.
I
1.2 Training facilities at work I
1.3 Descriptive catalogue / literature I
1.4 Functional Design Specification A F
1.5 Procedure for dismantling existing
instruments, equipments, cabling,
structure etc. wherever applicable
A
1.6 Operational Philosophy A
1.7 Progress report (Fortnightly) I
1.8 Safety Report ( Fortnightly)
1.9 Document Control Sheet (Fortnightly) I
1.10 Payment Control Sheet (Monthly) I
2.0 ENGINEERING DOCUMENTS
2.1 System Architecture A F
2.2 Detailed list of component A F
2.3 Individual data sheet A F
2.4 Power Requirement – KVA A F
2.5 Heat dissipation – Kcal /H I F
2.6 Individual G.A.Drawing
a)
Flow metering system
b)
Densitometer, PT
A F
2.7 SYSTEM CABINETS
a. Arrangement of modules I F
b. Structure, dimension, construction, etc. I F
2.8 AUXILIARY CABINETS
-
8/19/2019 Tender Doc_TAS at bhatinda.pdf
36/237
HINDUSTAN PETROLEUM CORPORATION
LIMITEDTERMINAL AUTOMATION PROJECT
36 | 2 3 8
a. Arrangement of modules A F
b. Structure, dimension, construction etc. I F2.9 Power supply distribution diagram A F
2.10 Cable layout A F
2.11 System drawing (loop
diagrams,reports)
A F
2.12 Wiring diagram A F
2.13 Terminal strip diagram A F
2.14 Hardware Design Module A
2.15 Software Design Manual A
2.16 Interfacing scheme A2.17 MIS Formats A
2.18 Interconnection diagram I F
2.19 Earthing System A F
2.20 As built drawing F
3.0 CERTIFICATES
3.1 Authority approval for
Ex-Proof, IS, Weather Proof ( shall also
be submitted along with Data sheets
for approval)
F
3.2 Vendor‘s guarantee /warranty F
3.3 Original Software Licenses F
3.4 Certification of Installation for
Metering system, Densitometer,
Loading Arms, by the respective OEM
I F
4.0 INSPECTION AND TEST
4.1 Inspection and test report from
Vendor‘s quality control department
F
4.2 Imported shipping documents alongwith test certificate F
4.4 Factory acceptance tests procedure for
Batch accuracy tests
A
4.5 Site Acceptance Test procedure A
4.6 Pre-Power Up Report A
4.7 Pre-commissioning Test & procedure A
-
8/19/2019 Tender Doc_TAS at bhatinda.pdf
37/237
HINDUSTAN PETROLEUM CORPORATION
LIMITEDTERMINAL AUTOMATION PROJECT
37 | 2 3 8
5.0 MANUALS (BOTH FOR VENDOR‘S &
SUB –VENDORS SUPPLY)5.1 Vendor‘s & Sub-vendor‘s test
Procedure
F
5.2 Installation manual F
5.3 Operating manual F
5.4 Maintenance manual F
5.5 HOTO Report covering all the details
of the Project( to be submitted in both
hard form & CD)
A F
7.0 QULAITY ASSURANCE PLAN A FNOTE :
a. The above documents cover the minimum requirements and shall be
supplemented with other requirements listed in the specification, if any. Any
other documents required to understand and maintain the system, as felt
necessary till handing over of the project, shall be supplied by the vendor.
b. All documents shall be supplied in English language as per following.
- Approval/ Information - 4 sets
- Final -4 sets
c. DVD – 2 sets (soft copy)
d. As built drawings shall be laminated and properly bound with index sheet for
preservation and future reference.
(1) All drawing which are submitted for approval, shall be submitted on DVD as
a final document (after approval) along with HOTO Report
-
8/19/2019 Tender Doc_TAS at bhatinda.pdf
38/237
HINDUSTAN PETROLEUM CORPORATION
LIMITEDTERMINAL AUTOMATION PROJECT
38 | 2 3 8
TECHNICAL SPECIFICATION
TECHNICAL SPECIFICATIONS SUPPLY OF NEW INSTRUMENTS/EQUIPMENT
Technical Specifications/ information given in this section serve as the minimum
guidelines to the Bidder. The bidders are requested to visit the location, study its
requirement, design the most suitable system and shall quote accordingly.
The equipment shall be reliable and field proven, High-grade components of
proven quality having high MTBF (at least 10 years minimum ) shall be selected toachieve the desired functions.
-
8/19/2019 Tender Doc_TAS at bhatinda.pdf
39/237
HINDUSTAN PETROLEUM CORPORATION
LIMITEDTERMINAL AUTOMATION PROJECT
39 | 2 3 8
TECHNICAL REQUIREMENT & SPECIFICATION FOR TANK TRUCK GANTRY
AUTOMATION:
Tank Truck Gantry Automation shall include but not limited to the following
o The Vendor shall design the flow metering system to suit different set of
process flow condition (Flow, temperature, pressure etc) such that the
combined accuracy of the flow metering system, after site calibration of
the equipments, shall be +/-0.05% of the Batch. The metering system shall
be checked with reference to the existing Calibrated Mobile Prover Tank of
capacity 2 KL
o Electronic Metering System for primary product (MS, HSD etc) shall
comprise of Batch Controller, Positive Displacement meter, Digital Control
Valve, Strainer cum Air Eliminator shall be provided. The Batch Controller
will control one Loading point & its Blending and dosing operation.
o Blending System comprising of Positive Displacement meter, Digital
Control Valve, Strainer cum Air Eliminator for blending the Secondary
Product like ethanol in the Primary Product. Rate of blending shall be User
configurable. The current rate of blending is 5% which may go up to 20%.The System design shall cater to blending of maximum 20%
o RTD shall be provided at each loading point & its input shall be taken in
the Batch Controller.
o Remote Interaction Terminal for operation by Tank Truck Crew member.
o Earthing Relay for each Bay.
o
Calibration & Weights & Measure (W&M) Stamping : The existing Mobile
Prover Tank is already calibrated & stamped by Weights & Measure
(W&M) Department. The Calibrated & W&M stamped Mobile prover tank
shall be used for calibrating the Flow metering system as per the
Calibration procedure given in this document. W&M stamping shall be
done by the Vendor for the Flow metering system used for the Main
product, Secondary product if the tapping is downstream of the flow
-
8/19/2019 Tender Doc_TAS at bhatinda.pdf
40/237
HINDUSTAN PETROLEUM CORPORATION
LIMITEDTERMINAL AUTOMATION PROJECT
40 | 2 3 8
metering system of the main product i.e. Ethanol Product is blended in
the main product without flowing through the main metering system. ThusW&M Stamping may not be required for Secondary product if the tapping
is upstream of the Main metering system and if such an arrangement is
permitted/approved by statutory rules/Local W&M Department. Batch
Controllers shall also be stamped by W&M & the meter factor/‘K‘ Factor
for all the Products ( Main, Secondary) shall come under W&M
configuration parameter such that these cannot be altered after providing
the W&M sealing. Stamping of these newly supplied equipments, by state
W&M Department & the entire coordination shall be in the scope of the
Vendor during execution as well as in Two year Warranty period & 5 year
Comprehensive AMC period. All liaison & incidental charges shall be borne
by the Vendor. HPCL will reimburse the statutory charges for stamping
during warranty & AMC period against submission of Original receipt in
the name of HPCL. Statutory Charges paid during project execution &
system stabilization shall not be paid separately & shall be in the scope of
Vendor In case the W&M stamping is required before the due date for
reasons not attributable to HPCL, all charges including the statutory fees
shall be paid by the Vendor. If the reasons are attributable to HPCL,
Statutory fees paid shall be reimbursed by HPCL against submission of
Original receipt in the name of HPCL.
o FRLS Cables, Double compression Cable Gland, Flameproof Junction box,
etc. from main JB to respective instrument shall be part of that equipment.
o All these Automation equipments can be mounted on the Gantry Platform
with suitable foundation/ Structural Steel support. Supply, installation &
re-routing of the 3‖ pipeline/ 1.5‖ pipeline and or laying of new 3‖/1.5‖
pipeline including all associated hardware, fittings, gaskets, jumpers
required for mounting these equipments from the header line tapping
onwards at the Gantry shall be in the scope of the Vendor. The new/
modified pipeline shall be painted as per the color coding of HPCL. All
these hardware shall be supplied as per the specification given in the
tender document.
-
8/19/2019 Tender Doc_TAS at bhatinda.pdf
41/237
HINDUSTAN PETROLEUM CORPORATION
LIMITEDTERMINAL AUTOMATION PROJECT
41 | 2 3 8
o All Structural Steel like angles, flats channels beams, brackets etc required
for mounting/ supporting these equipments or any existing equipmentsshall be in the scope of the Vendor.
-
8/19/2019 Tender Doc_TAS at bhatinda.pdf
42/237
HINDUSTAN PETROLEUM CORPORATION
LIMITEDTERMINAL AUTOMATION PROJECT
42 | 2 3 8
SPECIFICATION FOR BATCH CONTROLLER FOR WHITE OIL
Make : Vendor to Specify (from the approved
vendor list)
Model No : Vendor to Specify
Qty : Refer BOQ
Type : Microprocessor based field mounted,
configurable, indicating, Single Channel
(One BC for each Loading Point)
Service : For White Oil Application Area Classification : Zone I, Gr II A/II B , T3
Inputs (from each loading
point)
: Pulse input from pulse transmitter of
main product line meter
Pulse Input from pulse transmitter of
2nd product for blending
Pulse Input from pulse transmitter of
Additive Injection 1st meter
Pulse Input from pulse transmitter of
Additive Injection 2nd meter Start, Stop, Acknowledgement digital
input from RIT
Safety permissive/Interlock inputs like
earthing inputs (bonding &
static),Loading Arm Position, overspill
Temperature input (RTD Pt-100)
Serial input
Manual Call Point
Emergency shut down
Outputs (to each Loading
point)
: Digital control signals to solenoid
valves of set stop valve in Main
Product
Digital control signals to solenoid
valves of set stop valve in Secondary
Product
Digital control signals to 2 nos. of
-
8/19/2019 Tender Doc_TAS at bhatinda.pdf
43/237
HINDUSTAN PETROLEUM CORPORATION
LIMITEDTERMINAL AUTOMATION PROJECT
43 | 2 3 8
additive injection system.
Pump Demand contacts for MainProduct pump, , Blending product
pump & Additive Injection pump
Digital Output to various lamps on
RIT
Trip the Pump in case of DCV
malfunction/ DCV non closure at the
configurable value above the preset
quantity. The Output to be
hardwired to the PLC.
Alarms Interlock failure
Pulse Transmitter failure
RTD Failure
Flow Rate out of limits
Unable to close valve meter
Communication failure
Mode Change from Auto to Manual
Under dosage of Additives
Over dosage of Additives
Under blending of SecondaryProduct
Over Blending of Secondary Product
Auto deletion of memory
Communication port : Dual redundant RS 485 Serial link to
Terminal server
Maximum of 4 Batch controllers
shall be multi-dropped on the same
transmit & receive data lines (i.e
Single loop) and taken to the control
room.
Interface for proximity Card Reader
The baud rate for communication of
batch controller shall be capable for
transmission of min. 19200 bps
Power requirements : 230 V AC +10% to -15%, 50Hz +/- 5%
Data entry : Alpha numeric entry pad
-
8/19/2019 Tender Doc_TAS at bhatinda.pdf
44/237
HINDUSTAN PETROLEUM CORPORATION
LIMITEDTERMINAL AUTOMATION PROJECT
44 | 2 3 8
Online Self diagnostics : Required
Memory capacity & backup : Non Volatile RAM capable of retainingdata. Minimum 200 transactions. All data
pertaining to One Truck load of 20 KL shall
be treated as one transaction
Battery : Internal Lithium battery / flash memory
shall be provided for data retention.
Battery Life : Min 8 years
Meter Linearization : Min 5 point over 10 – 100% flow rating of
meter by entering "K" factor of meter in
memoryScan Time : Max 300 m sec
Display Type : Alpha Numeric, Backlit Two Liquid Crystal
Display Non Glare / Vacuum florescent, 8
Character Numeric & 16 Character Alpha
Numeric. Visibility from at least 2 mtr.
distance
Display Parameter (Dynamic) : Pre Set Quantity
Loaded Quantity of each
component(Main product,
Secondary Product & Additive)
Balance Quantity
Flow Rate
Temperature
Diagnostic Alarm
Totaliser reading for Main Product,
Ethanol & Additive
Engineering Unit, Control Mode
3 LEDs for Alarm, Auto Mode and
permissive power User selectable data display
Enclosure : Explosion proof to IS-2148, Gr. II A &
II B Weather proof to IS-2147, IP-65
Protection : Radio Frequency Interference
Protection
Electromagnetic Interference
-
8/19/2019 Tender Doc_TAS at bhatinda.pdf
45/237
HINDUSTAN PETROLEUM CORPORATION
LIMITEDTERMINAL AUTOMATION PROJECT
45 | 2 3 8
Protection
Electrical Transient Suppression onall power, communication and data
input & output to provide
protection from transient over
Voltage.
Approvals /Certification : PESO(CCOE) approved
Ex Proof to Zone-1, Gr II A & II B
Weather Proof to IP 65
W&M Model Approval : OIML approval as
per R 117 for Custody Transfer
Batch Accuracy of the
Electronic Metering system
: Shall be 0.05% of batch over the full flow
range
Functions : Indication & Totalization
Batch Control
Display & Totalizer of Each Product
(Main Product, Secondary Product
being blended & Additives) Locally
as well as on Remote on the TAS
System
Blending of Two products ( Blending% configurable from TAS System) at
each loading point
Additive Injection (Dosing PPM
configurable from TAS System) with
2 additives per loading point.
Meter factor linearization (min. 5
points over 10-100 % flow rate)
Dynamic flow display
Programmable ramp up/down for
multistage opening/ closure of set
stop valve
Batch summary
Executing local loading (min.200
Batch to be stored for auto retrieval
by TAS System when
communication is established)
-
8/19/2019 Tender Doc_TAS at bhatinda.pdf
46/237
-
8/19/2019 Tender Doc_TAS at bhatinda.pdf
47/237
HINDUSTAN PETROLEUM CORPORATION
LIMITEDTERMINAL AUTOMATION PROJECT
47 | 2 3 8
password shall be available for any
basic database configurationaffecting volume measurement like
setting of ‗K‘ factor, Separate
password shall be available for
operator for various activities like
alarm acknowledgement & other
system operation & separate
password shall be available the
other for system operation like
changing the System Mode ( Auto
to Manual or vice versa).
A Security code shall be used
anytime changes/edit are performed
that will alter the quantity measured
or deletion of memory
Changes to any Flow parameter shall
be captured in the Audit trail as a
part of event log in the TAS System.
Change in Pulse Security shall belogged in the system with time,
date, unique ID & the Original and
revised pulse error defined. TAS
shall display Pulse security enabled
/disabled in the Control Room
Each time a flow parameter
constant, that affects the calculated
volume, is changed in the system
the old & new values along with the
date, time & unique ID shall be
logged
Any time memory/ data is erased it
shall be recorded along with the
date, time & unique ID shall be
logged
Non-resettable totalizer reading
-
8/19/2019 Tender Doc_TAS at bhatinda.pdf
48/237
HINDUSTAN PETROLEUM CORPORATION
LIMITEDTERMINAL AUTOMATION PROJECT
48 | 2 3 8
shall also be captured
All such changes in Shall begenerated as exception reports.
Keyboard Type : Touch Sensitive
Keyboard Function : Configuration entry
Operator Data entry
Display Selection
Alarm Acknowledgement
Start/Stop
When in Auto mode Key Pad shall
be disabled other than Start/StopButton
Key Lock : Required ( Through Password)
Audit Trail : Any changes affecting the Volume
reported shall be logged with Date,
time & unique ID. The Audit Trail
may consist of Single or multiple
records.
Any Change in the Meter
Factor/ ‘K‘factor shall be logged in
the TAS System Mode Change from Auto to Manual
(either Remote or local) shall be
logged in the System.
Totalizer for each Batch Controller
shall be logged when ―End of Day‖ is
run & shall be available in the report
form for reconciliation & it shall be
send to JDE.
Salient Features :
Each batch controller should be in aposition to operate in standalone
mode.
Each batch controller should be able
to store at least 200 batches in local
mode which can be retrieved later
by the automatically by TAS System
-
8/19/2019 Tender Doc_TAS at bhatinda.pdf
49/237
HINDUSTAN PETROLEUM CORPORATION
LIMITEDTERMINAL AUTOMATION PROJECT
49 | 2 3 8
along with Truck Number. Provision
shall be available in the BatchController for input of Truck No &
Load No
Sequential Blending as well as inline
Blending & dosing
Meter Factor/‘K‘factor shall be
available in the MMI of TAS System
Mode Change from Auto to Manual
shall be available from remote
through TAS System. Facility shall be
provided in the system for the user
to incorporate the reasons of
change in the mode. Mode Change
at local level shall be available only
when TAS is not operational/
communication failure
-
8/19/2019 Tender Doc_TAS at bhatinda.pdf
50/237
HINDUSTAN PETROLEUM CORPORATION
LIMITEDTERMINAL AUTOMATION PROJECT
50 | 2 3 8
SPECIFICATION FOR FLOW METER (POSITIVE DISPLACEMENT METER) FOR
MAIN PRODUCT
Make : As per approved vendor list
Qty : Refer BOQ
Type : Oval gears / tri-rotor design / rotary vanes
Casing : Double case
Size : 3‖
Service : MS, HSD, SKO etc.
Power Supply 230V AC +10 % to -15%, 50 Hz +/- 5%
Materials Body : Carbon Steel ASTM A – 216 Gr. WCB/ IS
6240 Gr. B Rotor Elements : Anodized aluminum/ Carbon Steel ASTM A –
216 Gr. WCB
Wet parts : Aluminum / SS 304
Seals : Viton/Buna N
Outer Housing : Carbon steel
End connection : 3", class 150#, RF serrated ANSI B 16.5
Flange : RF Serrated ANSI B 16.5MOC for Rotary Vane / Oval
Gear / Bi-Rotor/Tri-Rotor
: Anodized Aluminum / Carbon Steel
Bearings:
SS 316 / Tungsten Carbide / Ni-Resist and
Carbon (for Naptha)
Other Parameters
Minimum Design Pressure : 15 Kg/sq cm
Normal Working Pressure : 1-10 Kg/Sq Cm
Operating Temperature : As defined in the design parameter
Body Hydro test Pressure : 15Kg/ Sq cm minimum.
Flow Range : 150 – 1500 LPM
Linearity : ± 0.1`% of the reading
Repeatability : ±0.02% over 10:1 flow range
Rangebility : 100% to 10% of max. flow range
Mounting & Coupling : Horizontal / Vertical, Magnetic
-
8/19/2019 Tender Doc_TAS at bhatinda.pdf
51/237
HINDUSTAN PETROLEUM CORPORATION
LIMITEDTERMINAL AUTOMATION PROJECT
51 | 2 3 8
Calibration : Meter shall be factory Calibrated & also at
the Location. Weights & Measure stampingis a must at all Locations irrespective of the
place of manufacturing
Direction : Bidirectional. Direction of Flow shall be
clearly stamped or cast on the body
NOTE: Total pressure drop across meter assembly – The strainer, Air eliminator,
PD meter, Shut off valve shall be limited to 1.3 Kg/ Sq cm under all process
conditions.
-
8/19/2019 Tender Doc_TAS at bhatinda.pdf
52/237
HINDUSTAN PETROLEUM CORPORATION
LIMITEDTERMINAL AUTOMATION PROJECT
52 | 2 3 8
SPECIFICATION FOR DUAL PULSE TRANSMITTER FOR MAIN PRODUCT
Make : As per approved vendor list.
Qty : Refer BOQ
Application : To convert volumetric flow to pulse
Operating Range : Upto 1500 LPM
Type : Opto- Electric, serrated disc type/ Inductive
type / Magnetic Inductor type/ Approved
OEM standard
Max Pulse frequency : Up to 2 Khz
Pulse Resolution : Min. 100 pulse per revolution of the
Calibrator output shaft for pulse security
conforming to Level A as per IP 252 / 76.
Output : Dual pulse stream to Batch Controller, each
pulse shifted by 90 deg. with each other.
Confirms to pulse security level A as per IP-
252/76, ISO 6551 and API chapter 5
Materials
Body : Aluminum Alloy LM 25 TF
Operating torque : To suit the P.D meter
Mounting : On the O/P shaft of the PD meter
Power Supply : From the Batch Controller
Shaft Rotation : Bi-directional
Pulse security To be provided through verification pulse
-
8/19/2019 Tender Doc_TAS at bhatinda.pdf
53/237
HINDUSTAN PETROLEUM CORPORATION
LIMITEDTERMINAL AUTOMATION PROJECT
53 | 2 3 8
: generated through additional grid element.
Supply current : MFR STD
Allowable vibration : 1 G‘s at 10-150 Hz,
Supply Voltage : 8-24V DC
Power Supply : From Batch Controller
Enclosure : Intrinsic Safe or Ex-proof to Zone 1 , T3 Gas
Group IIA / IIB as per IS –2148
Weather proof to IP 65 as per IS 2147
Signal Transmission : 20M From counting instrument
Housing : Explosion Proof
Approval : PESO(CCOE), CMRI, CENELEC
Cable Entry : ‗1/2" NPT (F) or as per design
-
8/19/2019 Tender Doc_TAS at bhatinda.pdf
54/237
HINDUSTAN PETROLEUM CORPORATION
LIMITEDTERMINAL AUTOMATION PROJECT
54 | 2 3 8
SPECIFICATION FOR AIR ELIMINATOR CUM STRAINER (FOR POSITIVE
DISPLACEMENT METER OF MAIN PRODUCT)
Make : As per approved vendor list
Qty : Refer BOQ
Type : Wire Mesh Basket type
Size : 3‖
Mounting : Pipeline
Service : White Oil
Design : As per ASME Section VIII
Design Pressure : 15 Kg/cm2
Working Pressure : 1.5 to 10 Kg /cm2
Materials
Mesh : 60 mesh of SS 304 for White Oil
Body : Carbon steel as per ASTM A 216 Gr. WCB
Seal : Viton/Buna N
Flange : Carbon Steel
Float : Float actuated pilot operated
Float & Reed Material : Stainless Steel 304
Basket : CS Reinforcement sheet / SS 304
Differential Pressure Gauge : Required with ½‖ Tapping
Air Release Body : Carbon steel to ASTM A 216 Gr. WCB
Drain Connection : ¾‖ NPT, 150# Flange end with CS Drain
Valve
-
8/19/2019 Tender Doc_TAS at bhatinda.pdf
55/237
HINDUSTAN PETROLEUM CORPORATION
LIMITEDTERMINAL AUTOMATION PROJECT
55 | 2 3 8
Vent : ¾‖ NPT (F)
End Connection :
Inlet : 3" ANSI 150 Flanged :RF serrated
Outlet : 3" ANSI 150# Flanged, RF serrated`
Reed switch: Required. It shall be capable of giving
output signal so that the batch can be
suspended. In case of differential
pressure across the suction side and
discharge side of SAE is greater than 1kg/cm2 then the loading for that point
shall be suspended with an alarm in TAS
software as well as at batch controller.
Alarm description shall be termed as
―Strainer choked‖.
-
8/19/2019 Tender Doc_TAS at bhatinda.pdf
56/237
HINDUSTAN PETROLEUM CORPORATION
LIMITEDTERMINAL AUTOMATION PROJECT
56 | 2 3 8
SPECIFICATION FOR DIFFERNTIAL PRESSURE GAUGE ACROSS STRATINER
FOR MAIN PRODUCT
Type : Direct
Make Model No:
As per approved Vendor list
Model No:
Vendor to specify
Mounting:
Local across strainer
Dial Size:
6‖(150mm) White Color with black
graduation
Material : Cast aluminum
Bezel ring:
Press fit
Window Material:
Toughened glass
Enclosure:
Weatherproof to IP 65
Element material & Type: SS 316, diaphragm /Piston
Socket material:
SS 316
Zero Adjustment
:
Micrometer pointersConnection
:½‖ / ¼ ―NPT (M), 2 nos.
Connection location:
Bottom
Accuracy:
± 2% of FSD
Over range protection:
As per IS 3624
Blow out protection:
As per IS 3624
Range:
0-2 Kg / Sq.Cm
Maximum Static Pressure : 15 Kg / Sq.Cm
Accessories:
3 way manifold- SS 304
-
8/19/2019 Tender Doc_TAS at bhatinda.pdf
57/237
HINDUSTAN PETROLEUM CORPORATION
LIMITEDTERMINAL AUTOMATION PROJECT
57 | 2 3 8
SPECIFICATION FOR DIGITAL CONTROL VALVE FOR MAIN PRODUCT
Make : As per approved vendor list
Model : Vendor to Specify
Type : Diaphragm type digital control with
linear characteristics , Electrically
actuated hydraulically operated.
Alternatively piston type DCV is also
acceptable.
Size : 3‖ (80 mm) Type of Body : Globe
Qty : Refer BOQ
Service : White Oil
Flow Range : 1500 LPM (Maximum) ,200-1200 LPM
(Normal Flow Range )
Max. working pressure : 15 Kg/sq. cm
Test Pressure : 1.5 times the Design pressure i.e. 22.5
Kg/Sq cm
Operating Pressure : 1.0Kg/Sq cm -4 Kg Sq cm
Mounting : Horizontal, Downstream of PD meter
End connection : 3" ANSI 150# Flanged, RF serrated for
Main Product & 1.5‖ ANSI 150#
Flanged, RF serrated for secondary
product
Leakage Class : Class VI
Failure Position : Close
Materials
Valve body : Carbon steel A 216 WCB / SS 304
Valve cover : Cast steel A 216 WCB
Spring : Stainless steel AISI 304
Internal parts : Stainless steel AISI 304 / CS
Needle Valve/ Ball Valve : SS 316 body & needle/ball, tubed
through compression type fittings, 2
Nos ( One at upstream & one at
downstream)
-
8/19/2019 Tender Doc_TAS at bhatinda.pdf
58/237
HINDUSTAN PETROLEUM CORPORATION
LIMITEDTERMINAL AUTOMATION PROJECT
58 | 2 3 8
Tubing & Pipe : SS 316
Diaphragm material : Viton/ NBR-LSTrim : SS 316
Seals : Viton
Body type : Inline
Solenoid Valve
Type : 1 No. Normally Open (NO) &
1 No. Normally Close (NC)
SOV Make : ASCO
Body : Stainless Steel
Trim : SS 304Mounting : On Digital Control valve
Max. working pressure : 15 Kg/sq. cm
Test Pressure : 1.5 times the Design pressure i.e. 22.5
Kg/Sq cm
Elec. Connection : Min ‗1/4" NPT (F)
Limit switches : Single for closed position indication,
explosion proof, class I, Gr IIA & IIB
Enclosure : Explosion proof class 1, Group II A &II B,
T3 & Weather proof to IP 65Power Supply : 230V +10% to -15% AC , 50 Hz +/-5%
Coil Insulation : F Type
Approval/Certification for
Digital Control Valve
: CCOE
Features Required : Fail Safe
Bubble Tight Shut off
No reverse flow
Valve close on Power Failure
Adjustable rate of opening &
closing of Valve.
Low Pressure Drop
-
8/19/2019 Tender Doc_TAS at bhatinda.pdf
59/237
HINDUSTAN PETROLEUM CORPORATION
LIMITEDTERMINAL AUTOMATION PROJECT
59 | 2 3 8
SPECIFICATION FOR POSITIVE DISPLACEMENT FLOW METER FOR
SECONDARY PRODUCT ( Max Blending 20% V/V) :
One Set of Flow metering System (PD Meter, Strainer Cum Air Eliminator, Set
Stop Valve, Pulsar) is required for each MS Point for Blending of Ethanol. The Size
of metering system shall be min. 1 1/2 inch. The actual size may vary based on the
design & detailed Engineering by the Vendor. The Current Blending of Ethanol in
MS is 5% v/v. However, it may go up to maximum 20% v/v in future stage wise.
Facility shall be provided in the TAS Software (password protected) with the User
for changing the blending proportion. Change in the blending proportion shall
be logged with time, Date, Unique ID, previous blend ratio & the new blend ratio.
The specification for Flow Metering System (PD Meter, Strainer Cum Air
Eliminator, Set Stop Valve, Pulsar) required for Ethanol will be same, except the
size which shall be min 1 1/2 inch, as for the main product unless otherwise
specified
Flow meter type : PD meter, Double case, SS 316 wetted
parts
Size : Suitable for tapping of 1 ½‖, expander/
reducer suitable for site Installation shall be
in the Vendor‘s scope.
End Connection : ANSI class 150#, RF serrated ANSI B 16.5
Service : Ethanol
Flow rate : 40 LP