  • 8/12/2019 Tender Comparision 1409

    1/10

    Sr. No.

    Name of Project Construction & Establishment of Research Center Building at GEER

    Foundation, Gandhinagar under

    Integrated Coastal Zone Management

    Client Government of India

    Type of Contract Item-rate

    A

    1 Bid Issue Dates 03/07/2012 to 03/08/2012

    2 Time Period available for bidding 30 days

    3 Date of Pre-bid meeting 18/07/2012

    4 Bid Submission Date 4/8/2012

    5 Procedure and website details download on 03/07/2012 from www.geciczmp.com

    6 Procedure of bid submission through registered post/speed post

    7 Tender fees Rs. 2000/-

    8 Form of submission hard copy

    9 No. of covers Single Stage Single Envelope sealed

    10 Tender Documents 2

    B

    1 Source of fund International Development Association(WB)

    2 Area/District (Location) Gandhinagar,Gujarat

    3 Type of Work Civil work

    4 Project Implementation Period within 30 days of issue of tender

    5 Earnest Money Deposits (EMD) Rs.1,03,000/-

    6 Scrutiny fees

    7 Submission of physical and technical documents 4/8/2012 at 12 pm

    8 Place and time of bid opening 4/8/2012 at 12:30 pm

    9 Security deposits Rs.1,03,000/-

    9 Performance Security Required 5% of tendered value

    11 Cost estimate of the project Rs.10268941/-

    12 Responsibility of the bidder The Bidder, at the Bidders own responsibility and risk is encouraged to

    visit and examine the Site of works and its surroundings and obtain all

    information that may be necessary for preparing the Bid and entering

    into a

    contract for construction of the Works.

    13 Data and the facility to be made available by the

    client

    Bid documents , tender documents and drawings

    C

    Clause

    NOTICE INVITING TENDER

    CONTRACT DATA

    ELIGIBLE BIDDERS

  • 8/12/2019 Tender Comparision 1409

    2/10

    1 Qualification of bidders To qualify for award of the contract, each bidder in its name and style

    should have in the last five years 2006-07,2007-08,2008-09,2009-10,

    2010-11:

    Similar experience for completion of similar civil works as above.

    2 Experience and Turnover of bidders Achieved, in at least two financial years in last Five years preceding

    31/03/2012, a minimum annual financial turnover in civil engineering

    works Rs. 100 Lacs. 2.Satisfactorily Constructed and

    completed (not less than 90% of contract value), as a prime contractor,

    (or as subcontractor duly certified by the employer/main contractor) at

    least one similar public Building/an office/Laboratory/educationaland/or research Institute Construction work of value not less

    than Rs. 65 lacs. availability the required machineries and personnel

    for the project

    3 Site visit Criteria to visit and examine the Site of works and

    its surroundings and obtain all information that may be necessary for

    preparing the Bid and entering into a

    contract for construction of the Works.

    5 Instructions to bidders The loan / Credit agreement prohibits a withdrawal from the loan /

    Credit account for the purpose of any payment to persons or entities,or for any import of goods, if such payment or import, to the

    knowledge of the Bank, is prohibited by a decision of the United

    Nations Security Council, taken under Chapter VII of the Charter of the

    United Nations.to keep all the documents during bidding

    6 Amendment to bidding documents Applicable

    7 System of bidding [two bid or else] p+2

    8 Modification and withdrawal of bids Bidders may modify or withdraw their bids by giving notice in writing

    before the deadline prescribed in an envelope

    9 Technical evaluation of the bids The available bid capacity will be calculated as under:

    Assessed Available Bid capacity = (A*N*1.5 - B)

    Where

    A = Maximum value of civil work executed in any one year during the

    last five years (updated to 2011-2012

    price level) taking into account the completed as well as works in

    progress.

    N = Number of years prescribed for completion of the works for which

    bids are invited.

    B = Value, at 2011-2012 price level, of existing commitments and on-going works to be completed during

    the next 2 years.

  • 8/12/2019 Tender Comparision 1409

    3/10

    10 Clarification of price proposal and contacting the

    employer

    A prospective bidder requiring any clarification of the bidding

    documents may notify the Employer in writing or

    by cable (hereinafter "cable" includes telex and facsimile) at the

    Employer's address indicated in the invitation to

    bid. The Employer will respond to any request for clarification which he

    received earlier than 15 days prior to the

    deadline for submission of bids. Copies of the Employer's response will

    be forwarded to all purchasers of the

    bidding documents, including a description of the enquiry but without

    identifying its source.

    11 Correction of errors The amount stated in the Bid will be adjusted by the Employer inaccordance with the above procedure for the correction of errors and,

    with the concurrence of the Bidder, shall be considered as binding

    upon the Bidder. If

    the Bidder does not accept the corrected amount the Bid will be

    rejected, and the Bid security may be forfeited

    12 Award of contract lowest evaluated Bid Price,

    D

    1 Preliminary In the event that Pre-qualification of potential bidders has been

    undertaken, only bids from prequalified bidders will be considered for

    award for Contract. These qualified bidders should submit with their

    bids any information updating their original prequalification

    applications or, alternatively, confirm in their bids that the originally

    submitted prequalification information remains essentially correct as

    of date of bid submission.

    2 Managment meetings The Engineer shall record the business of management meetings and is

    to provide copies of his record to

    those attending the meeting and to the Employer

    3 Unforseeable difficulties To be disussed with the engineer-in-charge

    4 Staff and labours' to be as per the schedule provided by the client, if not then client's

    engineer has the authority to remove the personnel from the

    contractor's office

    5 Electricity, water and Gas

    7 VARAITIONS AND MODIFICATIONS The Contractor shall provide the Engineer with a quotation (with

    breakdown of unit rates) for carrying out the Variation when

    requested to do so by the Engineer. The Engineer shall assess the

    quotation, which shall be given within seven days of the request or

    within any longer period stated by the Engineer and before the

    Variation is ordere If the work in the Variation corresponds with an

    item description in the Bill of Quantities and if, in the

    opinion of the Engineer, the quantity of work above the limit stated or

    the timing of execution do not cause the cost per unit of quantity to

    change, the rate in the bill of Quantities shall be used to calculate the

    value of the Variation. If the cost per unit of quantity changes, or if the

    nature or timing of the work in the Variation does not correspond with

    items in the Bill of Quantities, the quotation by the Contractor shall be

    in form of new rates for the relevant items of work. If the Contractor's

    quotation is unreasonable (or if the contractor fails to provide the

    Engineer with a quotation within a reasonable time specified by the

    engineer in accordance with Clause 40.1), the Engineer may order the

    Variation and make a change to the Contract Price which shall be

    based on Engineers own forecast of the effects of the Variation on the

    Contractor's costs. If the Engineer decides that the urgency of varying

    the work would prevent a quotation being given and

    considered without delaying the work, no quotation shall be given and

    the Variation shall be treated as a Compensation Event.The Contractor

    shall not be entitled to additional payment for costs that could have

    been avoided by giving early warning.

    GENERAL CONDITIONS OF CONTRACT

  • 8/12/2019 Tender Comparision 1409

    4/10

  • 8/12/2019 Tender Comparision 1409

    5/10

    6 Taxes All quarry fees and royalties shall be paid by the contractor. All octroi

    taxes shall also be paid by the contractor according to the Municipal

    rules in force at the time.

    Termination of contract Fundamental breaches of Contract include, but shall not be limited to

    the following:(a) the Contractor stops work for 28 days when no stoppage of work is

    shown on the current program and the stoppage has not been

    authorized by the Engineer;

    (b) the Engineer instructs the Contractor to delay the progress of the

    Works and the instruction is not withdrawn within 28 days;

    (c) the Employer or the Contractor is made bankrupt or goes into

    liquidation other than for a reconstruction or amalgamation;

    (d) a payment certified by the Engineer is not paid by the Employer to

    the Contractor within 56 days of the date of the Engineer's certificate;

    (e) the Engineer gives Notice that failure to correct a particular Defect

    is a fundamental breach of

    Contract and the Contractor fails to correct it within a reasonable

    period of time determined by

    the Engineer. (f)the Contractor does not maintain a security which is required;

    (g) the Contractor has delayed the completion of works by the number

    of days for which the maximum amount of liquidated damages can be

    paid as defined in the Contract data. If the Contract

    is terminated the Contractor shall stop work immediately, make the

    Site safe and secure and leave the Site as soon as reasonably possible.

  • 8/12/2019 Tender Comparision 1409

    6/10

    Remarks

    1.Construction of Semi-Permanent Shed (G+1) (excluding

    foundation upto plinth work) for boys hostel of IIT Mandi at

    Kamand with eleven rooms & toilet block with four WC and

    four bathrooms on each floor of

    light gauge steel framing prefabricated structure including

    architectural, structural design and construction along with

    all electrical, water supply and sanitary fittings.

    2.Construction of Semi-Permanent 8 no. studio apartments

    (G+1) (excluding foundation upto plinth work) with attached

    kitchen and toilet for boys hostel of IIT Mandi at Kamand oneach floor and two store rooms of light gauge steel framing

    prefabricated structure including architectural, structural

    design and construction along with all electrical, water

    supply and sanitary fittings with staircase upto 1st floor

    complete in all respect.

    Civil work for Landscaping of Hostel No. 4 in

    SVNIT,Surat.

    the

    percentage

    rate

    contract

    follows the

    rules for the

    contract

    given in

    cpwd

    manual.

    The Superintending Engineer, Indian Institute of Technology

    Mandi

    SVNIT,Surat

    Lumpsump Percentage rate

    26/3/2013 16/07/2013 to 30/07/2013.

    15 days 15 days

    4/4/2013

    16/4/2013 05/08/2013 upto 5:00 p.m.

    To be downloaded from the followingwebsitewww.iitmandi.ac.in or www.eprocure.gov.in

    To br obtained from the Institute website, http://www.svnit.ac.in during

    16/07/2013 to 30/07/2013.

    speed post speed post

    Rs.1000/- Rs. 500/-

    hard copy hard copy

    sealed envelope-2 sealed envelope-2

    2 2

    Central government and institution Institution

    IIT Mandi, Himachal Pradesh Surat, Gujarat

    Pre-engineered fabrication and civl works Civil-work

    60 days 3 months inclusive of monsoon period

    1.1,26,000/-

    2.1,38,000

    Rs.49,500/-

    not

    mntioned in

    the

    document

    16-04-2013

    01:00 PM

    05/08/2013 upto 5:00 p.m. in Administrative

    Building

    03:30 PM

    16-04-13 for both the items

    (i) Technical Bid : 06/08/2013 at 3:00 p.m. in

    Office of Dean, Planning & Development, Estate

    Section.

    (ii) Price Bid : 08/08/2013 at 3:00 p.m. in Office of

    Dean, Planning & Development, Estate Section.

    5% of tendered value 10% of Estimated Amount.

    (i) 5% of the S.D.by Cash, Bankers cheque,

    Demand Draft, FDR of Nationalized Bank in favour

    of Director, SVNIT, Surat.

    (ii) Remaining 5% shall be deducted from the

    Running bills.

    depends

    upon the

    tender price

    5% of tendered value 5% of tendered value 5% of

    tender value

    1. Rs.63,00,000/

    2.69,00,000/-

    Rs.24,74,300/-

    To visit the site and make obsevations properly, so that

    tender documents are filled up properly

    Contractor must submit the document required

    duly attested by Gazetted Officer / Notary valid

    on the date fixed for the receipt of tender.

    drawings to be provided The detailed bill of quantities and the drawings

    for the same

  • 8/12/2019 Tender Comparision 1409

    7/10

    Approved and eligible Contractors of class 2 enlisted with

    CPWD, BSNL, I&PH and HPPWD etc. dealing with

    construction of pre-engineered building

    Registered Contractors of E1 -and above category

    engaged in PWD/CPWD/MES/Municipal

    Corporation/ Semi Government Organization

    a. Should have satisfactorily completed the works as

    mentioned below during the last Seven

    years ending last day of the month March, 2013.

    Three similar works each costing not less than Rs. 25.20 lac

    for Sr. No. 1 & Rs. 27.60 for Sr. No. 2 OR two similar works

    each costing not less than Rs. 37.80 lac for Sr. No. 1 & Rs.41.40 lac for Sr. No. 2 OR one similar work costing not less

    than Rs. 50.40 lac for Sr. No. 1 & Rs. 55.20 lac .

    For Sr. No. 2. Similar work would means "the works of

    exclusively construction of semi-permanent buildings with

    composite unit of rooms, toilet, WC etc. in total plinth area

    more than 300 Sq Mtr using LGSF." The value of executed

    works shall be brought to current costing level by enhancing

    the actual value of work at simple rate of 7% per annum;

    calculated from the date of completion to last date of

    receipt of applications for tenders. (Scanned copies of

    work experience certificates meeting to this criteria shall be

    uploaded by the agency).

    b. Should have a solvency of Rs 16.00 lac for Sr. No. 1 & Rs.

    18.00 lac for Sr. No. 2.

    1.Details of Similar three Works/ Projects (Civil

    works) completed 40% of work put to

    tender over last five years or details of two

    similar work of 50% of work put to

    tender or Details of one similar project completed

    costing not less than 80% of costput to tender in Government/ Semi Government/

    Large Corporate entity with work completion

    certificate. 2.For Government /

    Semi Government subletted work carried out by

    contractor only

    50% of such work will be considered for their

    experience, if prior permission is obtained from

    competent authorities for subletting such work.

    Private subletted work will not be considered for

    their experience.

    The form and nature of the site, the means of

    access to the site, the accommodation they may require and

    shall themselves obtain all necessary information as to risks,

    contingencies and other circumstances which may influence

    or affect their tender.

    To carefully examine the drawings,

    conditions and specifications of the work and

    fully acquainted themselves with

    all details of the site, the conditions of rock and

    its joints, pattern, river, weather

    characteristics labour conditions and in general

    with all the necessary information

    and data pertaining to the work, before quoting

    prior tendering for the work.

    The bidder should not be a distant relative of any gazetted

    officer at IIT,Mandi and an office of ministry of urbandevelopment

    The work is to be completed within the time

    limit.Rates to be quoted for the tender in form ofboth figures and nummbersand to be be taken as

    applicable to all leads, lifts

    and taxes

    NA NA

    two bid two bid

    If any tenderer withdraws his tender before the said period

    or issue of letter of acceptance, whichever is earlier, or

    makes any modifications in the terms

    and conditions of the tender which are not acceptable to

    the department, then the Government shall, without

    prejudice to any other right or remedy, be at liberty to

    forfeit 50% of the said earnest money.

    The tenders which do not fulfill the conditions of

    the notification and the general rules and

    directions for the guidance to contractor in the

    agreement form or are

    incomplete in any respect are likely to be rejected

    without assigning any reason

    thereof.

    Superintending Engineer will evaluate the bid Done by the director of the institute. And the

    director has all right to reject atender without

    giving a reason.

  • 8/12/2019 Tender Comparision 1409

    8/10

    Shall be conveyed to superintending engineer or Engineer in

    charge for minor works

    Done by the director of the institute.

    Shall be conveyed to superintending engineer or Engineer incharge for minor works

    No corrections shall be made in the tenderdocuments. Any corrections that are to be made

    by crossing the incorrect portion and writing the

    correct portions above shall bear the initials of

    tenderer.

    it mainlydepends

    upon the

    type of

    organisation

    which floats

    the tender

    and the

    amount of

    work to be

    done.

    The EE/SE in charge of major component of the work shall

    issue letter of award on behalf of the Board of Governor.

    Acceptance of tender rest with the Director,

    SVNIT, Surat who reserves the right to reject any

    or all tenders without assigning any reasons.

    not stated in the contract and the bidding document should abide by the stated conditions of contract

    to be attended regularly as called for by the

    management

    Under the scope of bidder Bidder has to Construct the facilities for staff and

    labour cess of 1% to be deducted from the RA

    bills.

    Under the scope of bidder 1% charge deducted if water supplied by

    institution used.for electricity 1% charge in RA bill

    would be added

    Quantities specified in the tender may vary substantially in

    actual execution and

    the contractor shall not claim for compensation of such

    variations & the payment with be made as per the actual

    work executed at site

    If after submission of the tender, the price of

    materials specified in Schedule F increases/

    decreases beyond the price(s) prevailing at the

    time of the last stipulated date for receipt of

    tenders (including extensions, if any) for the

    work, then the amount of the contract

    shall accordingly be varied. The amount of the

    contract shall accordingly be varied for all such

    materials and will

    be worked out as per the formula given below for

    individual material:-

    Adjustment for component of individual material:

    V = P x Q x CI - CIo/ CIo

    where,

    V = Variation in material cost i.e. increase or

    decrease in the amount of rupees to be paid

    or recovered.P = Base Price of material as issued

    under authority of DG(W), CPWD or concerned

    Zonal

    Chief Engineer as indicated in Schedule "F" valid

    at the time of the last stipulated date

    of receipt of tender including extensions, if any.

    Q = Quantity of material brought at site for

    bonafide use in the works since previous bill.

    Clo = Price index for cement, steel reinforcement

    bars and structural steel as issued by the DG(W),

    CPWD as valid on the last stipulated date of

  • 8/12/2019 Tender Comparision 1409

    9/10

    Contract to remain till 12 months after the date of

    completion.

    Shall be conveyed to superintending engineer or Engineer in

    charge for minor works,by the governor of the board of theinstitute

    12 months after completion of contract or till defect liability

    period

    90 months after completion of contract or till

    defect liability period

    0.10%

    EMD money gets transformed to security deposit solvency certficate to be obtained from the bank

    Tobe done by the bidder to be done by the bidder

    To be submitted along with the technical bid WPR,DPR,MPR And materal testing reports for

    the materials used.The contractor shall issue an

    Employment Card in Form XIV of the CL (R&A)

    Central Rules 1971 to each worker within three

    days of the employment of the worker

    On th basis of the quantity of the work done. On the basis of the RA bi ll submitted with the

    approval of the engineer-in charge.

    The bidder to be responsible for payment to subcontractor

    the bidder hires. And the payment to selected to be done by

    the superintending engineer after the bills are appoved by

    him

    Monthly Payment on the basis of RA bills and at

    the end of completion of project by final bill, 90%

    of security deposit to be returned after 6 months

    from completion of project. 10% security deposit

    is kept during monsoon period and returned after

    the checking for leakages and dampness. Price-

    Escalation for materials is not paid to contractor.

    Solvency certificate of a Nationalized Bank/

    Schedule Bank of an amount upto 25% of the

    tender cost plus works on hand still to be

    executed will have to be produced by the

    contractor.

    Three similar works each of value not less than 40% of

    estimated cost or two similar work each of value not less

    than 60% of estimated costone similar work of value not

    less than 80% of estimated cost in last 7 years ending last

    day of the month previous to the one in which the tenders

    are invited.

    Registered contracts of E1-class and above.

  • 8/12/2019 Tender Comparision 1409

    10/10