technologies overview feb 2014

38
Balfour Beatty Rail Technologies ‘Delivering the benefits of technology to infrastructure asset management’

Upload: balfour-beatty-rail

Post on 08-Aug-2015

32 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Technologies Overview Feb 2014

Balfour Beatty Rail Technologies‘Delivering the benefits of technology to infrastructure asset management’

Page 2: Technologies Overview Feb 2014

Infrastructure Investments

2011 Investments Results

£71m – EUR 84m

Balfour Beatty

� Quoted on the London Stock Exchange

� An international infrastructure business:

� UK plc but with around half the

business now overseas

� Significant operations in the US,

Middle East, Far East and Australia

� Four business areas:

� Professional services

� Construction services

� Support services

� Infrastructure investments

� Lifecycle approach: deliver services

essential to the development, creation

and care of infrastructure assets

� 50,000 employees worldwide

� Acquired Parsons Brinckerhoff in

October 20092011 Revenue £11,035m – EUR 13,210m

NB – Revenues including shares of joint ventures and associates / Exchange rate 31 Dec 2011

Construction services

2011 Revenue

£7,050m – EUR 8,440m

Professional services

2011 Revenue

£1,645m – EUR 1,969m

Support services

2011 Revenue

£1,584m – EUR 1,896m

Page 3: Technologies Overview Feb 2014

The creation and care of tomorrow’s railways

� Balfour Beatty Rail is an international rail infrastructure contractor involved with the design,

supply, installation and maintenance of rail infrastructure assets

� Track

� Power & Electrification

� Signalling

� Asset Management

� Multi-disciplinary projects

High-speed Mainline Commuter Metro Light rail / tram Industry Freight

Page 4: Technologies Overview Feb 2014

High-Speed Milan-Bologna (Italy) Motala - Mjölby (Sweden) Berlin-Brandenburg Int. (Germany)

Heathrow Terminal 5 (UK) Metro do Porto (Portugal) Gotthard Tunnel (Switzerland)

East London Line (UK)

Paisley Corridor (Scotland)

Implementation – Multi-disciplinary projects

Page 5: Technologies Overview Feb 2014

Balfour Beatty Rail Technologies

� Part of the Balfour Beatty Rail UK

� 100+ professional engineering staff

� Core business is the application of

technology to improve infrastructure

asset management

High-speed Mainline Commuter Metro Light rail / tram Industry Freight

Page 6: Technologies Overview Feb 2014

Asset Management Focus

� Innovative solutions that help deliver more

reliable, safer rail infrastructure at reduced

lifecycle cost

� Management systems for condition

visualisation, decision support and

planning

� Service proven measurement and data

acquisition systems

� Applications include track, overhead line,

switches and signaling systems

� Systems developed from knowledge of

being a maintainer

High-speed Mainline Commuter Metro Light rail / tram Industry Freight

Page 7: Technologies Overview Feb 2014

The Commercial Case for Asset Data Management

Page 8: Technologies Overview Feb 2014

What Do We Mean by Rail Infrastructure Asset Management

� Asset management, broadly defined, refers to any system whereby things that are of

value to an entity or group are monitored and maintained.

� A systematic process of operating , maintaining, and upgrading assets cost-effectively

so that the greatest return or best possible service to users is achieved

� Data management is clearly a key part of this

t t t t 30303030----50 years50 years50 years50 years

CCCC

oooo

s s s s

t t t t

ssss

PlanningPlanningPlanningPlanning RealisationRealisationRealisationRealisation, Operation, maintenance , Operation, maintenance , Operation, maintenance , Operation, maintenance RemovalRemovalRemovalRemoval

2 %2 %2 %2 %

65 %65 %65 %65 %

28 %28 %28 %28 %5 %5 %5 %5 %

Page 9: Technologies Overview Feb 2014

Infrastructure Maintenance Costs and Variability

� Harmonised benchmarking results from a range of rail operators in Europe show:

� Average costs of Eur73.9k per km for maintenance

� Split 50/50 renewals and maintenance

� But very variable

� Best practice 50% less!

� Worst 100% more!

� Huge scope to improve Ref: UIC LICB Benchmarking Study

Page 10: Technologies Overview Feb 2014

The Business Case for Rail Infrastructure Asset Management

� The results show that some of the better performers achieve this through having

better information with which to drive the maintenance process

� Asset management typically costs about 2% to 3% of the cost of maintenance

� Properly implemented it can deliver a 10% to 20% maintenance cost

reduction………….a significant return on investment

Page 11: Technologies Overview Feb 2014

Measurement Systems

Page 12: Technologies Overview Feb 2014

Attended Measurement Systems

Key SystemsKey SystemsKey SystemsKey Systems

� Inertial Track Geometry*

� Running Rail Profile*

� Check Rail Geometry*

� Conductor Rail

Profile/Geometry*

� Corrugation*

� Tunnel Profile(*)

� RFID/GPS based location

� Multi Channel Video (Digital)

� Thermal Imaging

� Ride Quality

� Noise

� Synchronised data display

* = Triangulation measurement

systems

London Underground London Underground London Underground London Underground –––– Tubelines Asset Inspection TrainTubelines Asset Inspection TrainTubelines Asset Inspection TrainTubelines Asset Inspection Train

Queensland Rail Queensland Rail Queensland Rail Queensland Rail –––– Road/Rail VehicleRoad/Rail VehicleRoad/Rail VehicleRoad/Rail Vehicle

Key SystemsKey SystemsKey SystemsKey Systems

� Instrumented Pantograph

� Non-contact OHL

� Mast Detection

� GPS based location

� Inertial Track Geometry

� Versine Track Geometry

� Ballast Profile

� Platform Clearance

� Corrugation

� Contact patch

Page 13: Technologies Overview Feb 2014

Rail Infrastructure Measurement

� A very large part of the UK Network is now measured

with our systems

� Track Geometry Measurement

� TRC

� PLPR 1 & 2

� Overhead Line Measurement

� Soon, as part of Mentor upgrade

� Structure Gauge Measurement

� LaserFlex on SGT1 and soon on SGT2

Page 14: Technologies Overview Feb 2014

Unattended Track Geometry Measurement

� New track geometry measurement equipment

compact and automated for fitment to normal service

trains:

� Dramatically reduced cost

� Much more frequent measurement

� Frequent measurement provides an early indication of

developing faults and a clearer understanding of

deterioration rates and causes

� This allows the right maintenance to be carried out at

the optimum time� Sometimes at an early stage where it can be seen to be cost effective

� Sometimes, where safe, as late as possible to minimise intervention costs

Page 15: Technologies Overview Feb 2014

Unattended Measurement Systems

� Inertial and Optical Geometry System

� Precision GPS based location

� Ride quality

�Automatic data download

� ‘Real-time’ alerts

�Data visualisation and analysis

through DataMapTM

� Inertial and Optical Geometry

System

�GPS and AWS based location

�Automatic data download

� Video survey

� Link node model

�Data visualisation and analysis

through DataMapTM

� Inertial Geometry System

� TAG based location

� Triggered video

� Ride quality

�Automatic download

� “Real-time” alerts

�Data visualisation and analysis throughDataMapTM with synchronised data display

� Proven concept

In addition to dedicated measurement vehicles we provide unattended train-borne measurement systems to a range of customers as highlighted below. These are applied to in-service freight and passenger vehicles and measure a range of parameters including track geometry and ride quality. They offer the advantages of more frequent measurement at lower cost, providing earlier identification of underlying faults, better trend analysis and predictability

QR QR QR QR Cairns Tilt TrainCairns Tilt TrainCairns Tilt TrainCairns Tilt Train NIRNIRNIRNIR LUL LUL LUL LUL ---- MetronetMetronetMetronetMetronet

Page 16: Technologies Overview Feb 2014

Structure Gauge Measurement�Any required platform

�High accuracy integration with track geometry data

Play movie

References�LaserFlex - high speed train based

measurement for Network Rail, TTC,

PATH

�LGV - RRV based measurement

services for Network Rail

�LaserSweep - manual measurement

equipment sales, hire and services

�Output information compatible with industry

standard CAD packages and in-house

databases and clearance analysis

�Supporting the UK’s leading approach to

clearance gauging, giving more space for

vehicle operation than any other method

Page 17: Technologies Overview Feb 2014

Ultrasonic Rail Testing

�Balfour Beatty Rail is working in exclusive partnership

with RTI, one of the leading ultrasonic testing

organisations, to deliver the 8000SX8000SX8000SX8000SXTMTMTMTM testing system.

� Total Flexibility – service or product offering

� Train borne, RRV or trailer mounted

�Very accurate detection and discrimination of rail

faults - ensuring the highest Probability of Detection

(POD) with the lowest False Call Rate (FCR)

�Survey to survey comparison to assess defect growth

�Proven with some of the most demanding railways in

the world

Page 18: Technologies Overview Feb 2014

Infrastructure Condition Visualisation Software

Page 19: Technologies Overview Feb 2014

� Reduces maintenance costs

� Enables life extension rather than

renewal

� Improves safety management

� Scalable solution from individual

line to national network

� Information access from full

corporate to individual trackside

PDA

� Cost effective audit record of asset

condition

� Identify operational train

performance improvement

� Traction supply

� Video

� Ground Penetrating

Radar

� Thermal imaging

� Ballast profile

DataMap™ supports the visualisation of a complete range of asset condition information

� Track geometry

� Ride quality

� Overhead line

� Lineside structures

� Structure gauging

�Rail profile & wear

�Conductor rail

�Noise

�Corrugation

�Rail flaw

� Enables virtual track walking

� Supports more effective maintenance

�Better utilisation of costly plant

� Reduces unplanned maintenance activity

�Helps the user make sense of measurement

information

� Reduce levels of analysis and management

�More pro-active maintenance monitoring

� Improved planning (tamping, grinding ballast)

�Helps contractor management

� Supports acceptance warranty management for

new lines

Key Benefits of DataMapTM

Page 20: Technologies Overview Feb 2014

20

DataMap™ - The Synchronised View

Page 21: Technologies Overview Feb 2014

� With appropriately aligned video, track walking can be achieved in the comfort and

safety of the office, with all elements of data for the location made available.

DataMap™ - The Synchronised View

Page 22: Technologies Overview Feb 2014

22

A Synchronised View

Page 23: Technologies Overview Feb 2014

Case Studies

�London UndergroundLondon UndergroundLondon UndergroundLondon Underground

DataMap™ is used to reduce maintenance

costs through monitoring geometry, video

imagery, ride quality, and vibration

characteristics.

�Northern Ireland RailwaysNorthern Ireland RailwaysNorthern Ireland RailwaysNorthern Ireland Railways

DataMap™ is used to manage the safety of the

network. Measured parameters include: client

supplied video synchronised with track

geometry data from service train and full

ordnance survey mapping.

�Queensland RailQueensland RailQueensland RailQueensland Rail

Have adopted DataMap™ to make best use of

monitoring technology for improved

maintenance regimes.

Page 24: Technologies Overview Feb 2014

Structure Gauging and Clearance Management Software

Page 25: Technologies Overview Feb 2014

TrackRouteTM

3D Infrastructure Database

�Used to manage all Network Rail gauging measurements

�Developed and hosted by BBRT

�Links various fields such as profile, location, speed & track geometry

�Direct output to ClearRoute for clearance analysis

�Supported by BBRT for over 15 years

Balfour Beatty Rail Technologies

Page 26: Technologies Overview Feb 2014

ClearRouteTM

World Class Clearance Assessment

�Clearances between infrastructure and vehicle and between vehicles

�Static gauging and dynamic gauging with vehicle models

�UIC kinematic gauging

�Platform stepping calculations

�Allows complete route assessment

�Compliant with all relevant standards

Balfour Beatty Rail Technologies

Page 27: Technologies Overview Feb 2014

Gauging ServicesSpecialist Gauging Consultancy

�The consultants’ consultant

�Advanced toolbox

� ClearRoute+ and HyperRoute

�Specialist knowledge

�Proactive project involvement

�Full service – measurement through

to certification

�Involved in all new trains for the UK

since privatisation

Balfour Beatty Rail Technologies

Page 28: Technologies Overview Feb 2014

Remote Condition Monitoring of Signalling Assets

Page 29: Technologies Overview Feb 2014

Remote Monitoring of Signalling Assets

Condition monitoring for a growing range of applications including:Condition monitoring for a growing range of applications including:Condition monitoring for a growing range of applications including:Condition monitoring for a growing range of applications including:

� Relay and SSI Interlockings �Track circuit monitoring � Earth leakage detection

� Points condition monitoring �Power supply monitoring

Event Monitoring Event Monitoring Event Monitoring Event Monitoring –––– AlertAlertAlertAlert’’’’TMTMTMTM range of data loggersrange of data loggersrange of data loggersrange of data loggers� Record & store information relating to all aspects of a rail interlocking – signals, points,

track, level crossings etc.

� Record time stamped information to assist investigations

� Typically used to analyse historic data

� Similar to an aircraft ‘black box’

Intelligent Asset Monitoring Intelligent Asset Monitoring Intelligent Asset Monitoring Intelligent Asset Monitoring –––– AssetViewAssetViewAssetViewAssetViewTMTMTMTM softwaresoftwaresoftwaresoftware� Turns data from loggers into useful information

� In line with UK’s ‘Intelligent Infrastructure Initiative’ and move from ‘Find and Fix’ to

‘Predict and Prevent’ culture

� Uses data in a predictive manner to identify trends and predict performance of assets

� Universal system compatible with all data loggers

� User friendly Web based functionality

Balfour Beatty Rail provides a solution for monitoring a wide range of signalling assets this includes the AlertTM

range of data loggers and AssetViewTM software which turns data from loggers into useful information and

uses data in a predicative manner to drive more efficient and effective maintenance of signalling assets.

Page 30: Technologies Overview Feb 2014

AssetViewTM Signalling Monitoring

� Covers relay and data driven systems such as SSI

� Embedded signalling engineer know-how

� Event replay

� Faster diagnosis, often prognostic

� Business case driven - primarily by delay minute reduction

� Return on investment can be realised very quickly

� Now covers around 30% of the UK network

Page 31: Technologies Overview Feb 2014

AssetViewTM - Installations and Performance Benefits

InstallationsInstallationsInstallationsInstallations�Network Rail

�London Underground

�Milan Metro, Italy

�Jernbanverket, Norway

�MTR, Hong Kong

Equipment Symptom Action Saving

BU track failureFlicking clear

when Occupied

Reduced Signal Fault Inspection as

AssetViewTM proved indication fault£230K

647 points Reverse detection flicking Points adjusted before failure £44K

L124 signal CAT A SPADDriver admitted error when shown

evidence. Minimal SFI testing£162K

Snapshot of Asset View at Network Rail London Bridge:Snapshot of Asset View at Network Rail London Bridge:Snapshot of Asset View at Network Rail London Bridge:Snapshot of Asset View at Network Rail London Bridge:

Page 32: Technologies Overview Feb 2014

XiTRACK®

Polyurethane Ballast Stabilisation

Page 33: Technologies Overview Feb 2014

�Polyurethane, liquid applied, very fast setting

�Means of reinforcing ordinary railway ballast

�Gives vastly superior strength and resilience,

enhancing track support

�Designed for each site to give a calculated

degree of strength

� Ideal for specific problem sites as a ‘one fix

solution’

XiTRACK®

Page 34: Technologies Overview Feb 2014

� Polyurethane provides a

strengthening ‘cage’

� Free draining matrix

� Ballast degradation

eliminated

� Ballast movement eliminated

� Track stiffness consistent

and sustained

Eliminating the Cost of Ballast Maintenance

XiTRACK®

Page 35: Technologies Overview Feb 2014

Lateral End Restraint for

S&C/Curves

Ideal for High Speed with

Crossing Traffic

Maintaining Structure Clearance / Track Geometry

Heavy Haul / High Speed / Light Rail / Metro

No Ballast Maintenance Required

No Tamping of S&C

Control of ballast on

embankments and

reducing dynamic

loads on

embankments

Track Support at Transitions

Examples of Use

Page 36: Technologies Overview Feb 2014

RaiIKonsult

Page 37: Technologies Overview Feb 2014

Consultancy - RaiIKonsult

Balfour Beatty Rail Technologies own specialist consultancy Balfour Beatty Rail Technologies own specialist consultancy Balfour Beatty Rail Technologies own specialist consultancy Balfour Beatty Rail Technologies own specialist consultancy

team for asset management and maintenanceteam for asset management and maintenanceteam for asset management and maintenanceteam for asset management and maintenance

�Planning for maintenance and asset management

�Assessment of current performance - Benchmarking

� Improve efficiency and performance

� Establish new and better processes

� Introduce new technology

� Introduce new skills and competencies to meet changing

demands – including formal and informal training

BenefitsBenefitsBenefitsBenefits

� Improved asset management and maintenance regimes

�More efficient operation

�Reduced costs

Page 38: Technologies Overview Feb 2014

Balfour Beatty Rail Technologies‘Delivering the benefits of technology to infrastructure asset management’