TRI ORIGIN MINERALS LTD.
TECHNICAL REPORT ON THEWOODLAWN TAILINGSRETREATMENT PROJECT,NEW SOUTH WALES, AUSTRALIA
NI 43-101 Report
Authors:Richard J. Lambert, P.E.Wayne W. Valliant, P.Geo.Holger Krutzelmann, P.Eng.
December 15, 2009
SCOTT WILSON ROSCOE POSTLE ASSOCIATES INC.
Scott Wilson Mining
Report Control Form Document Title Technical Report on the Woodlawn Tailings Retreatment
Project, New South Wales, Australia
Client Name & Address
Tri Origin Minerals Ltd.
Document Reference
Project #1453
Status & Issue No.
Version
Issue Date December 15, 2009 Lead Author Wayne W. Valliant
(name)
Peer Reviewer
(name)
Project Manager Approval Wayne W. Valliant
(name)
Project Director Approval Richard J. Lambert
(name)
Report Distribution Name No. of Copies Client Scott Wilson RPA Filing 1 (project box)
1 (project file) Scott Wilson Roscoe Postle Associates Inc.
55 University Avenue, Suite 501 Toronto, Ontario M5J 2H7
Canada Tel: +1 416 947 0907
Fax: +1 416 947 0395 [email protected]
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page i
TABLE OF CONTENTS PAGE
1 SUMMARY ................................................................................................................ 1-1 Executive Summary ................................................................................................ 1-1 Technical Summary ................................................................................................ 1-9
2 INTRODUCTION ....................................................................................................... 2-1
3 RELIANCE ON OTHER EXPERTS ........................................................................... 3-1
4 PROPERTY DESCRIPTION AND LOCATION .......................................................... 4-1
5 ACCESSIBILITY, CLIMATE, LOCAL RESOURCES, INFRASTRUCTURE AND PHYSIOGRAPHY ........................................................................................................ 5-1
6 HISTORY .................................................................................................................. 6-1
7 GEOLOGICAL SETTING .......................................................................................... 7-1 Regional Geology ................................................................................................... 7-1 Local Geology ........................................................................................................ 7-5 Property Geology.................................................................................................... 7-7
8 DEPOSIT TYPES ...................................................................................................... 8-1
9 MINERALIZATION .................................................................................................... 9-1
10 EXPLORATION ..................................................................................................... 10-1
11 DRILLING .............................................................................................................. 11-1
12 SAMPLING METHOD AND APPROACH .............................................................. 12-1
13 SAMPLE PREPARATION, ANALYSES AND SECURITY ..................................... 13-1
14 DATA VERIFICATION ........................................................................................... 14-1
15 ADJACENT PROPERTIES ................................................................................... 15-1
16 MINERAL PROCESSING AND METALLURGICAL TESTING ............................... 16-1 Plant Background ................................................................................................. 16-1 Metallurgical Testwork .......................................................................................... 16-2 Retreatment Plant Process Description ................................................................ 16-3
17 MINERAL RESOURCE AND MINERAL RESERVE ESTIMATES ......................... 17-1 Mineral Resources ................................................................................................ 17-1 Mineral Reserves.................................................................................................. 17-8
18 OTHER RELEVANT DATA AND INFORMATION ................................................. 18-1
19 ADDITIONAL REQUIREMENTS ........................................................................... 19-1 Mining Operations ................................................................................................ 19-1 Mineral Processing ............................................................................................... 19-9 Markets .............................................................................................................. 19-10 Contracts ............................................................................................................ 19-12
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page ii
Environmental Considerations ............................................................................ 19-13 Taxes ................................................................................................................. 19-15 Capital and Operating Cost Estimates ................................................................ 19-15 Economic Analysis ............................................................................................. 19-17
20 INTERPRETATION AND CONCLUSIONS ............................................................ 20-1
21 RECOMMENDATIONS ......................................................................................... 21-1
22 REFERENCES ...................................................................................................... 22-1
23 DATE AND SIGNATURE PAGE ............................................................................ 23-1
24 CERTIFICATE OF QUALIFIED PERSON ............................................................. 24-1
LIST OF TABLES PAGE
Table 1-1 Recommended Work Program ................................................................... 1-3 Table 1-2 Income Statement ...................................................................................... 1-5 Table 1-3 After-tax Cash Flow Summary .................................................................... 1-6 Table 1-4 Sensitivity Analyses .................................................................................... 1-8 Table 1-5 Mineral Resources ................................................................................... 1-13 Table 1-6 Mineral Reserves ..................................................................................... 1-14 Table 6-1 Historic Production (1978-1998) ................................................................. 6-2 Table 9-1 Size Fraction Analysis - North Dam ............................................................ 9-6 Table 9-2 Size Fraction Analysis - South Dam ........................................................... 9-6 Table 9-3 Size Fraction Analysis - West Dam ............................................................. 9-6 Table 11-1 Drilling Summary ..................................................................................... 11-1 Table 13-1 ALS Chemex Assay Methods ................................................................. 13-2 Table 14-1 Standard Reference Sample Specifications ............................................ 14-1 Table 14-2 Duplicate Samples.................................................................................. 14-7 Table 14-3 Twinned Holes - South Tailings Dam – Denehurst ................................. 14-9 Table 14-4 Twinned Holes - South Tailings Dam – Tri Origin ................................. 14-10 Table 14-5 Twinned Holes - West Tailings Dam – Tri Origin .................................. 14-11 Table 16-1 Woodlawn Plant Metallurgical Balance 1993 .......................................... 16-1 Table 16-2 Tailings Retreatment Plant Metallurgical Balance 1993 .......................... 16-2 Table 17-1 Mineral Resources.................................................................................. 17-1 Table 17-2 Raw Assay Statistics .............................................................................. 17-2 Table 17-3 Density ................................................................................................... 17-5 Table 17-4 Block Model Dimensions ........................................................................ 17-6 Table 17-5 Block Model Statistics ............................................................................. 17-6 Table 17-6 Grade Interpolation Parameters .............................................................. 17-7 Table 17-7 Validation Block Model – December 2008 .............................................. 17-8 Table 17-8 Mineral Reserves ................................................................................... 17-9 Table 19-1 Ore Loss and Dilution Factors ................................................................ 19-7 Table 19-2 Life of Mine Production ........................................................................... 19-8 Table 19-3 Major Equipment List .............................................................................. 19-9 Table 19-4 Average Process Recoveries ............................................................... 19-10 Table 19-5 Operating Costs ................................................................................... 19-16
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page iii
Table 19-6 Overall Capital Costs ............................................................................ 19-17 Table 19-7 Income Statement ................................................................................ 19-19 Table 19-8 After-tax Cash Flow Summary .............................................................. 19-20 Table 19-9 Sensitivity Analyses .............................................................................. 19-22 Table 21-1 Recommended Work Program ............................................................... 21-1
LIST OF FIGURES PAGE
Figure 1-1 Sensitivity Analysis .................................................................................... 1-8 Figure 4-1 General Location Map ............................................................................... 4-4 Figure 4-2 Property Map............................................................................................. 4-5 Figure 4-3 Mineral Lease Location ............................................................................. 4-6 Figure 4-4 Site Map .................................................................................................... 4-7 Figure 7-1 Regional Geology ...................................................................................... 7-3 Figure 7-2 Stratigraphic Column ................................................................................. 7-4 Figure 7-3 Local Geology ........................................................................................... 7-6 Figure 7-4 Property Geology ...................................................................................... 7-9 Figure 9-1 Mineralization – Schematic Cross Section ................................................. 9-3 Figure 9-2 Mineralization – Schematic Longitudinal Section ....................................... 9-4 Figure 11-1 Drill Hole Location Map ......................................................................... 11-2 Figure 14-1 Standard Sample BML - Cu ................................................................... 14-2 Figure 14-2 Standard Sample BML - Pb ................................................................... 14-3 Figure 14-3 Standard Sample BML – Zn .................................................................. 14-3 Figure 14-4 Standard Sample BMH – Cu ................................................................. 14-4 Figure 14-5 Standard Sample BMH – Pb ................................................................. 14-4 Figure 14-6 Standard Sample BMH – Zn .................................................................. 14-5 Figure 14-7 Standard AuS- Au ................................................................................. 14-5 Figure 14-8 Blank Samples ...................................................................................... 14-6 Figure 14-9 Duplicate Samples – Cu ........................................................................ 14-7 Figure 14-10 Duplicate Samples – Pb ...................................................................... 14-8 Figure 14-11 Duplicate Samples – Zn ...................................................................... 14-8 Figure 16-1 Retreatment Plant Flowsheet ................................................................ 16-4 Figure 16-2 Woodlawn Retreatment Plant Layout .................................................... 16-6 Figure 17-1 Histogram – Cu ..................................................................................... 17-2 Figure 17-2 Histogram – Pb ..................................................................................... 17-3 Figure 17-3 Histogram – Zn ...................................................................................... 17-3 Figure 17-4 Histogram – Ag ..................................................................................... 17-4 Figure 19-1 Tailings Areas ....................................................................................... 19-2 Figure 19-2 Upper and Lower Surfaces for Tailings Volume ..................................... 19-3 Figure 19-3 Mining Method ....................................................................................... 19-4 Figure 19-4 Tracked Monitor (Fraser Alexander) ...................................................... 19-5 Figure 19-5 Final Tailings Reclamation .................................................................. 19-14 Figure 19-6 Sensitivity Analysis .............................................................................. 19-22
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 1-1
1 SUMMARY EXECUTIVE SUMMARY
INTRODUCTION Scott Wilson Roscoe Postle Associates Inc. (Scott Wilson RPA) was retained by Robert
Valliant, Chief Executive Officer of Tri Origin Minerals Ltd. (Tri Origin), to prepare an
independent Technical Report on the Woodlawn Tailings Retreatment Project (the
Project), near the village of Tarago, New South Wales (NSW), Australia. The purpose of
this report is to support the first time disclosure of mineral resources and mineral
reserves for the Project. This Technical Report conforms to NI 43-101 Standards of
Disclosure for Mineral Projects (NI 43-101). Scott Wilson RPA visited the property on
November 10, 2009.
Tri Origin is an Australian publicly traded company (ASX:TRO) with exploration projects
in the Lachlan Fold Belt, NSW, Australia, including the Woodlawn Tailings Retreatment
Project, the Woodlawn underground project, and the Lewis Ponds project. Tri Origin
Minerals Ltd. is 48% owned by Tri Origin Exploration Ltd. (TSX-V:TOE).
CONCLUSIONS ADEQUACY OF PROCEDURES Scott Wilson RPA and various other firms and independent consultants have reviewed
the methods and procedures utilized by Tri Origin and Denehurst Limited (Denehurst),
the previous operator, at the Project to gather geological and assaying information and
found them reasonable and meeting generally accepted industry standards for a
property.
ADEQUACY OF DATA Scott Wilson RPA believes that Tri Origin and Denehurst have conducted exploration
and development sampling and analysis programs using standard practices, providing
generally reasonable results. Scott Wilson RPA believes that the resulting data can
effectively be used in the subsequent estimation of resources and reserves.
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 1-2
ADEQUACY OF STUDY This Technical Report is based on the Feasibility Study prepared by Intermet
Engineering Pty Ltd. (Intermet) for the Project. Scott Wilson RPA believes that these
data and the supporting documents were prepared using standard industry practices and
provide reasonable results and conclusions.
COMPLIANCE WITH CANADIAN NI 43-101 STANDARDS Scott Wilson RPA believes that the current drill hole database is sufficient for generating
a resource model for use in resource and reserve estimation. Recovery and cost
estimates are based upon sufficient data and engineering to support a reserve
statement. Economic analysis using these estimates generates a positive cash flow,
which supports a reserve statement.
Measured and indicated resources for all areas, are 11.65 Mt of material grading 2.3%
zinc, 1.4% lead, 0.5% copper, 0.3 g/t gold, and 32.0 g/t silver. After applying modifying
factors and meeting the economic criteria, the entire mineral resource is converted to
proven and probable mineral reserves. The estimated proven and probable mineral
reserves for the Project total 11.2 Mt of material grading 2.2% zinc, 1.3% lead, 0.5%
copper, 0.3 g/t gold, and 31.1 g/t silver.
Scott Wilson RPA believes that the mineral resource and mineral reserve estimates have
been created utilizing acceptable methodologies. Scott Wilson RPA is also of the
opinion that the classification of measured and indicated resources, stated in Table 1-5,
and proven and probable reserves, stated in Table 1-6, meet the definitions as stated by
NI 43-101, Form 43-101F1, and Companion Policy 43-101CP dated December 23,
2005.
RECOMMENDATIONS Scott Wilson RPA presents the following recommendations. The cost of the
recommended work is $6.12 million as summarized in Table 1-1.
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 1-3
TABLE 1-1 RECOMMENDED WORK PROGRAM Tri Origin Minerals Ltd. - Woodlawn Tailings Retreatment Project
Item Cost
($ 000s) Metallurgy
Optimize both grind and regrind design, using Deswik technology including studying existing Deswik installations to confirm operating performance parameters.
Continue study copper lead separation parameters including determining appropriate design criteria that will provide the flexibility for in-service optimization of copper lead separation.
Undertake further confirmatory work on potential to scalp off course non-sulphide gangue from tailings, i.e., define optimal size for removing oversize material, talcs and sheet silicates.
Review Feasibility Study and Addendum and undertake a comprehensive Gap Analysis to identify areas that have not been adequately studied and could result in a fatal flaw being designed into the process.
Subtotal 250 Mineral Resource Estimate Run mineral resource block model using unfolding feature 30 Use composite length approximately equal to sample length 10 Subtotal 40 Environmental Assessment
Complete plans to meet Director General's Requirements for Environmental Approval of the Project
Optimize and cost plans for rehabilitation of the Project Site 200 Permitting
Satisfy any Department of Planning conditions imposed as conditions for the transfer of SML 20 to Tri Origin
500 Engineering Prepare mine plan consistent with the actual monitoring operating
procedure 30 Proceed with detailed design 5,000 Subtotal 5,030 Concentrate Marketing 100 Total 6,120
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 1-4
ECONOMIC ANALYSIS The economic project evaluation is based on estimated operating costs supplied to Scott
Wilson RPA. This project evaluation work includes an economic summary, discounted
cash flow analysis, as well as capital and operating cost estimates. The mine plan for
this analysis is based on Exoro Mining Services’ mine planning work.
Based on the costs in the Feasibility Study and Addendum, Scott Wilson RPA created an
economic analysis. The economic analysis shows that at long-term metal prices of
$0.80/lb zinc, $2.50/lb copper, $0.60/lb lead, $975/oz gold and $13/oz silver, the Project
has a pre-tax net present value (NPV) at a 5% discount rate of $29.0 million and an
after-tax NPV at a 5% discount rate of $17.2 million. Total pre-tax undiscounted cash
flow is $57.6 million and after-tax cash flow is $40.2 million.
A preliminary income statement and cash flow are presented as Table 1-2 and Table
1-3, respectively.
Over the mine life, the Internal Rate of Return is 12.0% after tax, with a payback period
of 4.8 years after tax.
The cash operating cost per pound of zinc produced is $0.35 after by-product credits.
When capital costs are added, total cash and non-cash costs (fully loaded) are $0.59 per
pound of zinc after by-product credits.
ECONOMIC CRITERIA REVENUE
• Nominal 1.5 million tonnes per year. • Metal price: US$0.80 per pound zinc, US$2.50 per pound copper, US$0.60 per
pound lead, US$975 per ounce gold and US$13.00 per ounce silver. • Net Smelter Return includes smelting, refining, transport, and insurance costs. • Revenue is recognized at the time of concentrate shipment. • Operating costs in AUD converted to USD at US$0.80 per A$1.00.
COSTS
• Mine life: 7.7 years. • Life-of-mine production plan as summarized in Table 19-2 of this report. • Mine life capital totals $65.5 million. • Average operating cost over the mine life is $28.25 per tonne ore processed.
November 2009 Feasibility Study$0.80 Zn $0.60 Pb $2.50 Cu $13.00 Ag $975.00 AuAnnual Income Summary (in US$ millions)
Year -2 Year -1 Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 TOTAL
REVENUEZinc 0.0 0.0 29.3 32.5 31.3 24.6 25.6 29.0 31.4 17.3 0.0 0.0 220.9Copper 0.0 0.0 15.3 17.3 16.2 23.4 21.6 16.6 14.8 7.5 0.0 0.0 132.6Lead 0.0 0.0 3.6 3.9 3.6 5.0 5.0 4.9 4.2 2.9 0.0 0.0 33.0Gold 0.0 0.0 1.4 1.5 1.5 2.8 3.8 3.8 2.0 1.3 0.0 0.0 17.9Silver 0.0 0.0 3.1 3.5 3.2 5.0 5.8 6.0 5.4 4.0 0.0 0.0 36.1
Net Revenue 0.0 0.0 52.6 58.7 55.8 60.8 61.8 60.2 57.8 32.9 0.0 0.0 440.6
CASH COST OF SALESMining 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Process Plant 0.0 0.0 13.0 15.0 15.0 15.0 15.0 15.0 15.0 9.5 0.0 0.0 112.6General & Administrative 0.0 0.0 1.6 1.3 1.3 1.3 1.3 1.3 1.3 0.9 0.0 0.0 10.0Refining 0.0 0.0 17.9 19.8 19.0 17.0 17.4 18.8 19.4 11.1 0.0 0.0 140.4Refining 0.0 0.0 3.4 3.7 3.6 3.6 3.6 3.6 3.6 2.0 0.0 0.0 26.9Royalties 0.0 0.0 0.7 0.8 0.7 1.0 1.0 0.9 0.7 0.4 0.0 0.0 6.0Reclamation 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.4 2.4
Subtotal Cash Costs 0.0 0.0 36.5 40.6 39.5 37.8 38.2 39.5 40.0 23.8 0.0 2.4 298.3
NON-PRODUCTION COST OF SALESDepreciation 0.0 0.0 6.8 11.7 11.6 12.9 7.8 7.9 4.2 2.7 0.0 0.0 65.5Amortized Development Costs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Amortization of Transaction fee 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proceeds on Equipment Sales 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Write-down - Book Value @ Project End 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Subtotal Non-Production Costs 0.0 0.0 6.8 11.7 11.6 12.9 7.8 7.9 4.2 2.7 0.0 0.0 65.5
Net Income Before Tax (EBIT) 0.0 0.0 9.3 6.4 4.7 10.2 15.7 12.8 13.6 6.4 0.0 -2.4 76.8
Net Income After Tax 0.0 0.0 7.1 4.5 3.3 7.1 11.0 9.0 9.5 4.5 0.0 -2.4 53.6
TABLE 1-2 INCOME SUMMARYTri Origin Minerals Ltd. - Woodlawn Tailings Retreatment Project SC
OTT W
ILSON
RPA
w
ww
.scottwilson.com
Tri Origin M
inerals Ltd. – Woodlaw
n Tailings Retreatm
ent Project Technical R
eport NI 43-101 – D
ecember 15, 2009
Page 1-5
November 2009 Feasibility Study$0.80 Zn $0.60 Pb $2.50 Cu $13.00 Ag $975.00 AuAnnual Cash Flow Summary (in US$ millions)
Year -3 Year -2 Year -1 Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 Year 11 TOTALSOURCESRevenue 0.0 0.0 0.0 52.6 58.7 55.8 60.8 61.8 60.2 57.8 32.9 0.0 0.0 0.0 440.6Costs (inc Tax & Int) 0.0 0.0 0.0 45.5 54.2 52.5 53.7 50.8 51.2 48.3 28.4 0.0 2.4 0.0 387.0Net Income - After Tax 0.0 0.0 0.0 7.1 4.5 3.3 7.1 11.0 9.0 9.5 4.5 0.0 -2.4 0.0 53.6
Depreciation & Amort 0.0 0.0 0.0 6.8 11.7 11.6 12.9 7.8 7.9 4.2 2.7 0.0 0.0 0.0 65.5From Eq Sale 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0FROM OPNS. 0.0 0.0 0.0 13.9 16.2 14.9 20.0 18.8 16.8 13.7 7.2 0.0 -2.4 0.0 119.1
From Banks 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Repayment 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
FROM FINANCING 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
SOURCES 0.0 0.0 0.0 13.9 16.2 14.9 20.0 18.8 16.8 13.7 7.2 0.0 -2.4 0.0 119.1
USES:Capex 0.0 0.0 60.2 1.4 3.6 0.0 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 65.5Working Cap. 0.0 0.0 1.9 3.6 0.5 -0.3 0.8 0.1 -0.3 -0.4 -1.8 -4.2 -0.2 0.2 0.0
USES 0.0 0.0 62.1 4.9 4.1 -0.3 1.2 0.1 -0.3 -0.4 -1.8 -4.2 -0.2 0.2 65.5
NET C.F. 0.0 0.0 -62.1 9.0 12.1 15.2 18.8 18.7 17.1 14.0 8.9 4.2 -2.2 -0.2 53.6
CUMULATIVE C.F. 0.0 0.0 -62.1 -53.1 -41.0 -25.8 -7.0 11.7 28.9 42.9 51.8 56.0 53.8 53.6
TABLE 1-3 AFTER-TAX CASH FLOW SUMMARYTri Origin Minerals Ltd. - Woodlawn Tailings Retreatment Project
SCO
TT WILSO
N R
PA
ww
w.scottw
ilson.com
Tri O
rigin Minerals Ltd. – W
oodlawn Tailings R
etreatment Project
Technical Report N
I 43-101 – Decem
ber 15, 2009 Page 1-6
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 1-7
SENSITIVITY ANALYSIS Sensitivity analyses were performed for zinc price, copper price, lead price, silver price,
capital cost, operating cost, and exchange rate. The sensitivity analyses indicate that
Project economics are most heavily influenced by the operating costs, zinc price, copper
price, and capital costs. A 10% change in operating costs results in a ± $17 million
change in the after-tax NPV at a 5% discount rate. A 10% change in zinc price results in
a ± $11 million change in the after-tax NPV at a 5% discount rate. A 10% change in
copper price results in a ± $6 million change in the after-tax NPV at a 5% discount rate.
A 10% change in capital costs results in a ± $4 million change in the after-tax NPV at a
5% discount rate. The Project is least affected by changes in exchange rate, lead price,
and silver price. A 10% change in the exchange rate, lead price, or silver price results in
a less than ± $2 million change in the after-tax NPV at a 5% discount rate.
Results of the price sensitivity analyses are shown in Figure 1-1 and Table 1-4.
Reserve estimates were based on prices of US$0.80 per pound zinc, US$2.50 per
pound copper, US$0.60 per pound lead, US$975 per ounce gold, and US$13.00 per
ounce silver. Results from the economic analysis at these prices are shown in Table
1-3. Since an after-tax total cash flow of $40.2 million is achieved, the economic criteria
for the reserve statement are met and the resources can be properly classified as proven
and probable mineral reserves.
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 1-8
FIGURE 1-1 SENSITIVITY ANALYSIS
TABLE 1-4 SENSITIVITY ANALYSES Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project
Parameter Variables Units -20% -10% Base +10% +20%
Zinc Price US$/lb 0.64 0.72 0.80 0.88 0.96 Copper Price US$/lb 2.00 2.25 2.50 2.75 3.00 Lead Price US$/lb 0.48 0.54 0.60 0.66 0.72 Silver Price US$/oz 10.40 11.70 13.00 14.30 15.60
Operating Cost $millions 254 286 318 349 381 Capital Cost $millions 52 59 65 72 79
Exchange Rate AUD/USD 0.64 0.72 0.80 0.88 0.96
NPV @ 5% Units -20% -10% Base +10% +20% Zinc Price $millions (4) 7 17 28 38
Copper Price $millions 5 11 17 23 30 Lead Price $millions 14 16 17 19 20 Silver Price $millions 14 16 17 19 20
Operating Cost $millions 48 33 17 2 (16) Capital Cost $millions 26 21 17 13 9
Exchange Rate $millions 22 20 17 15 12
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 1-9
TECHNICAL SUMMARY
PROPERTY DESCRIPTION AND LOCATION The Project is located at the past producing Woodlawn Mine, at Latitude 35°04’ South
and Longitude 149°35’ East in New South Wales, approximately 250 km southwest of
Sydney and 50 km northeast of the Australian capital of Canberra. It can be accessed
by Highway 52 from Canberra through Queanbeyan approximately 25 km north to
Bungendore and turning off at Bungendore on the Tarago Road for 26 km north to the
Woodlawn access road. It is approximately seven kilometres on the Woodlawn access
road to the site. A location map for the Project is presented in Figure 4-1.
LAND TENURE Tri Origin holds 100% interest in the mineral rights of Special Mining Lease 20 (SML 20),
subject to some exclusions near the existing open pit and underground mining areas.
This interest was acquired on January 12, 1999, when Tri Origin purchased the mineral
exploration rights and all exploration and mining data relating to the Woodlawn Mine
from the administrators of Denehurst. Denehurst is now subject to a deed of company
arrangement but is still currently the legal title holder of the lease. Several private
agreements provide the mechanism for Tri Origin to become the registered legal title
holder prior to, or when, a project development decision is made. SML 20 expires on
November 16, 2014. Tri Origin expects the lease to be renewed upon application.
Veolia Environmental Services (Veolia), an independent environmental resource
company, previously Collex Pty Limited (Collex), obtained surface rights in the SML 20
area after the mine closed. Veolia operates a bioreactor and waste management facility
within the old open pit mine. Consequently, a further agreement was entered into
between Tri Origin and the Administrators of Denehurst on October 25, 2000, reaffirming
Tri Origin’s right to obtain mineral title over SML 20 and accommodating Veolia’s
operational requirements.
INFRASTRUCTURE Currently, the major assets and facilities associated with the Project are:
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 1-10
• Tailings in three dams: North Tailings Dam (TDN), South Tailings Dam (TDS), and West Tailings Dam (TDW), created by mining and processing polymetallic ore from 1978 to 1998.
• Facilities providing basic infrastructure to the mine, including electric power, heat,
water treatment and supply, and sewage treatment.
• Access by highway and secondary paved roads.
The region is well populated. A labour force and wide range of services are available
from the city of Canberra (pop. 350,000) and the towns of Queanbeyan (pop. 34,000)
and Bungendore (pop. 3,000).
Power will be purchased from the existing NSW electricity grid, after installation of
appropriate substation requirements. A purchasing agreement will be entered between
Tri Origin and either an energy retailer or wholesaler (from the National Energy Market).
This organization will provide energy into the local distribution system, which is owned by
Country Energy.
Water will be obtained from the Willaroo bore field (about four kilometres west of site)
under the terms of a sublease agreement with Veolia and the landowner. The Company
will develop other basic infrastructure such as workshops, warehouse, fuel storage and
dispensing, offices, ablution blocks, sewage works, etc. By arrangement with Veolia, the
Project will also use certain previous Woodlawn mine facilities. The site will be a zero
discharge facility for any contaminated water sources.
HISTORY Woodlawn was discovered in 1970 by Jododex Australia Pty Ltd., a joint venture of St
Joseph International Explorations and Phelps Dodge Exploration Corporation. Open pit
mining commenced in 1978.
In 1985, the Project was acquired by Australian Mining and Smelting Ltd. (AMS), a
subsidiary of Conzinco Rio Tinto Australia Ltd. (CRA). CRA continued production from
the open pit and developed the underground mine.
In August 1987, Denehurst purchased the Project. Underground mining continued
through to March 1998 when the mine was closed. Open pit production totalled 8.1 Mt
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 1-11
grading 8.3% Zn, 1.6% Cu, 3.1% Pb, 82 g/t Ag, and 0.5 g/t Au. Underground production
was estimated at 5.3 Mt grading 9.9% Zn, 1.6% Cu, 4.3% Pb, 95 g/t Ag, and 0.5 g/t Au.
During 1991 to 1995, Denehurst reprocessed 1.67 Mt of tailings from the TDN grading
1.78% Zn, 0.34% Cu, 1.13% Pb, 30.45% Ag, and 0.24% Au. A minor amount of tailings
from the TDS was retreated, however, production records are not available. The
majority of the retreated tailings were returned to the same dam.
In March 1998, Denehurst was bankrupt and placed into administration, with a Receiver-
Manager appointed.
In late 1999, Collex (now Veolia) purchased the Woodlawn site. This included freehold
land on SML20 and large areas of surrounding property. Veolia lodged a Development
Application to construct and operate the Woodlawn Bioreactor, and this operation has
been running successfully since 2004. The bioreactor involves backfilling the open cut
with putrescible waste and extracting the methane gas for power generation.
Tri Origin Australia, a subsidiary of Tri Origin Exploration Ltd. of Canada and precursor
to Tri Origin Minerals Ltd., acquired the mineral rights to SML20 and associated
technical data in 1999. Tri Origin, at that stage, held exploration licences surrounding
Woodlawn and also acquired the exploration licences held by Denehurst.
GEOLOGY The Woodlawn Project is located near the eastern margins of the Lachlan Fold Belt
(LFB). The LFB is a major north-northwest trending orogenic belt that was created by
convergence of the Australian craton and the proto-Pacific Ocean which occurred from
the Cambrian through to the Carboniferous. The LFB extends from northeastern
Tasmania into Victoria and through much of New South Wales.
The Woodlawn deposit lies in a structurally defined zone of lineaments, termed the
Woodlawn Corridor, within the LFB. The corridor is believed to represent a major
northwest trending palaeogeographic feature that influenced deposition of fine-grained
volcanoclastic sediments and rhyolitic domes adjacent to the deposit. The Woodlawn
deposit is hosted by regionally metamorphosed (greenschist facies) fine and coarse
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 1-12
grained felsic volcanic–pyroclastic rocks, volcanogenic sedimentary rocks, and
carbonaceous shale, informally known as the Woodlawn Group, deposited in the Silurian
(410 Ma).
The Woodlawn polymetallic deposit is a volcanic hosted, massive sulphide deposit
(VMS) associated with late Silurian felsic volcanic and sedimentary rocks. Mineralization
is contained within a series of subparallel lenses dipping moderately to steeply
westwards. The main Woodlawn deposit occupies a series of generally fault-bounded
stratiform packages, enclosed by slate and quartz eye tuff wall rocks and intruded by
dolerite.
Mineralization mined from the open pit and underground, from which the tailings were
derived, is polymetallic, and the predominant minerals extracted in the past were copper,
lead, and zinc, with accessory silver and gold. The mineralization is strictly within lens-
shaped lodes, subparallel to each other, occurring in a repetitious geometry and dipping
to the northwest.
MINERAL RESOURCES AND MINERAL RESERVES Mineral resources were estimated by GeoRes effective May 2008 and reviewed by Scott
Wilson RPA. Scott Wilson RPA generally concurs with the GeoRes estimate, however,
in Scott Wilson RPA’s opinion, the inferred mineral resources as estimated by GeoRes
should be reclassified as indicated mineral resources. The mineral resources as revised
by Scott Wilson RPA are summarized in Table 1-5.
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 1-13
TABLE 1-5 MINERAL RESOURCES Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project
Dam Classification Tonnes (Mt)
Grade Cu Pb Zn Ag Au (%) (%) (%) (%) (%)
South Measured 2.43 0.48 1.19 2.60 24.60 0.22 (TDS) Indicated 2.07 0.48 1.19 2.39 23.50 0.22 Meas + Ind 4.50 0.48 1.19 2.50 24.10 0.22 West Measured 2.05 0.60 1.46 2.00 35.66 0.39 (TDW) Indicated 2.02 0.60 1.50 1.91 36.17 0.39 Meas + Ind 4.07 0.60 1.48 1.95 35.91 0.39 North - Treated Measured 0.56 0.36 1.07 1.77 28.60 0.27 (TDNU) Indicated 1.11 0.33 1.16 1.78 31.41 0.23 Meas + Ind 1.67 0.34 1.13 1.78 30.47 0.24 North - Untreated Measured 0.27 0.58 2.17 3.54 49.70 0.33 (TDNL) Indicated 1.14 0.47 1.63 3.06 45.92 0.32 Meas + Ind 1.41 0.49 1.73 3.15 46.65 0.32 All Dams Measured 5.31 0.52 1.33 2.33 30.57 0.30 Indicated 6.34 0.49 1.36 2.25 32.96 0.29 Meas + Ind 11.65 0.50 1.35 2.29 31.87 0.30
Notes:
1. CIM definitions were followed for mineral resources. 2. Mineral resources were estimated at a zero cut-off grade. 3. Mineral resources are inclusive of mineral reserves. 4. Mineral resources were estimated using bulk density of 1.7 t/m3 for TDS, 1.85 t/m3 for
TDW, 1.6 t/m3 for TDNU, and 1.35 t/m3 for TDNR. 5. Columns and rows may not add exactly due to rounding.
The review of the resource block model identified some blocks that would not be
recoverable by the proposed hydraulic mining method. The block model was modified to
exclude these blocks. The resource block model was then adjusted to allow for dilution
and recovery. The remaining mineralization comprised an economically viable life of
mine plan and, in Scott Wilson RPA’s opinion, constitutes mineral reserves as
summarized in Table 1-6.
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 1-14
TABLE 1-6 MINERAL RESERVES Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project
Dam Classification Tonnes Grade
Cu Pb Zn Ag Au (Mt) (%) (%) (%) (%) (%)
South Proven 2.43 0.47 1.15 2.52 23.89 0.21 Probable 1.86 0.47 1.15 2.32 22.86 0.21 Prov + Prob 4.29 0.47 1.15 2.43 23.44 0.21 West Proven 2.05 0.59 1.42 1.94 34.63 0.36 Probable 1.88 0.59 1.46 1.85 35.08 0.36 Prov + Prob 3.93 0.59 1.44 1.90 34.85 0.36 North Proven 0.83 0.42 1.39 2.28 34.89 0.27 Probable 2.20 0.39 1.37 2.36 37.69 0.26 Prov + Prob 3.02 0.40 1.38 2.34 36.92 0.26 All Dams Proven 5.31 0.52 1.33 2.33 30.57 0.30 Probable 5.94 0.49 1.36 2.25 32.96 0.29 Prov + Prob 11.24 0.49 1.31 2.22 31.05 0.28
Notes:
1. CIM definitions were followed for mineral reserves. 2. Mineral reserves are estimated at a zero cut-off grade. 3. Mineral resources were estimated using bulk density of 1.7 t/m3 for TDS, 1.85 t/m3 for
TDW, 1.6 t/m3 for TDNU, and 1.35 t/m3 for TDNR. 4. Columns and rows may not add exactly due to rounding.
MINING OPERATIONS The Project will be an open cut hydraulic mining operation to recover previously
processed mineralized tailings. Hydraulic mining will progress using a top-down
approach with a channel feeding back to a sump.
The operation will commence in the TDS with a floating pontoon fitted with two
submersible pumps to remove the standing water. After the tailings area is dewatered,
an initial “slot” of tailings will be removed using the monitor to establish the reclaim
drainage channel, and the pumping station will be installed. From the sump, a feed
channel will be cut across each mining cell and monitoring will develop the feed channel
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 1-15
to the outside edges of the tailings. The working face will be developed in a series of 20
m to 30 m en-echelon cuts advancing toward the sump and the dam.
Monitoring will commence from a single track-mounted monitor working on top of the
tailings along the crest of the main drainage slot where a working face will be developed.
The slurry will then drain along the slot at a 1% grade back to the reclaim sump for
pumping to the thickener. The working face will then be mined back to the sump.
Monitoring operations will be on a 24-hour, 7-day per week basis at a nominal rate of
190 tonnes per hour. Slurries developed by the monitors are anticipated to be 55% to
60% solids.
MINERAL PROCESSING Mineral processing is a conventional flotation milling circuit, with primary grinding using
two Deswik 2000L vertical mill units to get a P80 of 30 μm.
The flotation circuit will consist of the sequential flotation of talc, copper, lead and zinc
concentrates. The flotation conditions will be controlled by reagent addition to achieve
good mineral separation. Following flotation, the copper, lead, and zinc concentrates will
be separately thickened in high-rate thickeners, with the underflows being pumped to
separate agitated storage tanks. The three concentrates will then be batched through
three dedicated vertical plate and frame filters discharging into stockpiles (copper and
zinc) or a feed bin (lead).
The concentrates will be loaded into lined standard 20 ft shipping containers and trucked
to Port Botany container terminal.
ENVIRONMENTAL CONSIDERATIONS An Environmental Assessment (EA) is being prepared by consultants Parsons
Brinckerhoff for submission to the NSW Department of Planning in fulfillment of the
project development approval process. A preliminary EA was prepared in March 2008,
which found that five key areas should be addressed to mitigate environmental risks.
The June 2008 Feasibility Study and preliminary design has addressed each of these
items.
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 1-16
The closure and reclamation plan for the Project has been designed based on re-
establishing vegetation on the surface of the redisposed tailings. Total closure costs are
estimated to be $12.0 million prior to taking the salvage value of the assets into account.
CAPITAL AND OPERATING COST ESTIMATES The initial capital cost is estimated at $60.2 million plus sustaining capital of $5.3 million.
Operating costs are estimated at $28.25 per tonne processed.
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 2-1
2 INTRODUCTION Scott Wilson Roscoe Postle Associates Inc. (Scott Wilson RPA) was retained by Robert
Valliant, Chief Executive Officer of Tri Origin Minerals Ltd. (Tri Origin), to prepare an
independent Technical Report on the Woodlawn Tailings Retreatment Project (the
Project), near the village of Tarago, New South Wales (NSW), Australia. The purpose of
this report is to support the first time disclosure of mineral resources and mineral
reserves for the Project. This Technical Report conforms to NI 43-101 Standards of
Disclosure for Mineral Projects (NI 43-101). Scott Wilson RPA visited the property on
November 10, 2009.
Tri Origin is an Australian publicly traded company (ASX:TRO) with exploration projects
in the Lachlan Fold Belt, NSW, Australia, including the Woodlawn Tailings Retreatment
Project, the Woodlawn underground project, and the Lewis Ponds project. Tri Origin
Minerals Ltd. is 48% owned by Tri Origin Exploration Ltd. (TSX-V:TOE).
Currently, the major assets and facilities associated with the Project are:
• Tailings in three dams: North Tailings Dam (TDN), South Tailings Dam (TDS), and West Tailings Dam (TDW), created by mining and processing.
• Facilities providing basic infrastructure to the mine, including electric power, heat,
water treatment and supply, and sewage treatment.
• Access by highway and secondary paved roads.
Scott Wilson RPA has had no prior involvement in the Project.
SOURCES OF INFORMATION Site visits were carried out by Richard Lambert, P.E., Principal Mine Engineer, and
Wayne Valliant, P.Geo., Principal Geologist, Scott Wilson RPA.
Discussions were held with personnel from Tri Origin:
• Robert Valliant, CEO, Tri Origin • Jeff Quartermaine, CFO, Tri Origin • Alan Snowden, Director, Tri Origin
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 2-2
• Robin Rankin, Geology Consultant, GeoRes • Rodney Elvish, Consultant Metallurgist, B E Enterprises • Dave Hobby, District Geologist NSW, Tri Origin • Bob Cotton, Consulting Geologist
Richard Lambert prepared parts of items 1, 16, 17, 18, 19, and 20. Wayne Valliant
prepared Items 2 through 15 inclusive and parts of items 1, 17, 20, and 21. Holger
Krutzelmann prepared Item 16 and parts of items 1, 18, 19, and 20.
The documentation reviewed, and other sources of information, are listed at the end of
this report in Section 22, References.
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 2-3
LIST OF ABBREVIATIONS Units of measurement used in this report conform to the SI (metric) system. All currency
in this report is US dollars (US$) unless otherwise noted.
µ micron kPa kilopascal °C degree Celsius kVA kilovolt-amperes °F degree Fahrenheit kW kilowatt µg microgram kWh kilowatt-hour A ampere L litre a annum L/s litres per second bbl barrels m metre Btu British thermal units M mega (million) C$ Canadian dollars m2 square metre cal calorie m3 cubic metre cfm cubic feet per minute min minute cm centimetre MASL metres above sea level cm2 square centimetre mm millimetre d day mph miles per hour dia. diameter MVA megavolt-amperes dmt dry metric tonne MW megawatt dwt dead-weight ton MWh megawatt-hour ft foot m3/h cubic metres per hour ft/s foot per second opt, oz/st ounce per short ton ft2 square foot oz Troy ounce (31.1035g) ft3 cubic foot oz/dmt ounce per dry metric tonne g gram ppm part per million G giga (billion) psia pound per square inch absolute Gal Imperial gallon psig pound per square inch gauge g/L gram per litre RL relative elevation g/t gram per tonne s second gpm Imperial gallons per minute st short ton gr/ft3 grain per cubic foot stpa short ton per year gr/m3 grain per cubic metre stpd short ton per day hr hour t metric tonne ha hectare tpa metric tonne per year hp horsepower tpd metric tonne per day in inch US$ United States dollar in2 square inch USg United States gallon J joule USgpm US gallon per minute k kilo (thousand) V volt kcal kilocalorie W watt kg kilogram wmt wet metric tonne km kilometre yd3 cubic yard km/h kilometre per hour yr year km2 square kilometre
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 3-1
3 RELIANCE ON OTHER EXPERTS This report has been prepared by Scott Wilson RPA for Tri Origin. The information,
conclusions, opinions, and estimates contained herein are based on:
1. Information available to Scott Wilson RPA at the time of preparation of this report,
2. Assumptions, conditions, and qualifications as set forth in this report, and
3. Data, reports, and other information supplied by Tri Origin and other third party sources.
For the purpose of this report, Scott Wilson RPA has relied on ownership information
provided by Tri Origin. Scott Wilson RPA has not researched property title or mineral
rights for the Project and expresses no opinion as to the ownership status of the
property.
Scott Wilson RPA has relied on Tri Origin for guidance on applicable taxes, royalties,
and other government levies or interests, applicable to revenue or income from the
Project.
Except for the purposes legislated under provincial securities laws, any use of this report
by any third party is at that party’s sole risk.
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 4-1
4 PROPERTY DESCRIPTION AND LOCATION The Project is located at the past producing Woodlawn Mine, at Latitude 35°04’ South
and Longitude 149°35’ East in New South Wales, approximately 250 km southwest of
Sydney, and 50 km northeast of the Australian capital of Canberra. It can be accessed
by Highway 52 from Canberra through Queanbeyan approximately 25 km north to
Bungendore and turning off at Bungendore on the Tarago Road for 26 km north to the
Woodlawn access road. It is approximately seven kilometres on the Woodlawn access
road to the site. A location map for the Project is presented in Figure 4-1.
The Project survey control is based on a local mine coordinate grid, rotated 11º0’25”
clockwise from the Australian Map Grid (AMG) to approximately magnetic north and
centred on a point 10,000 East and 20,000 North. The mine coordinate grid reduced
level (RL) elevation adds 2,000 m to the MASL. The coordinate grid before rotation is
based on the Universal Transverse Mercator (UTM) coordinate system. It is based on
the Zone 55 East projection, using the Australian Map Grid 1966 (AMG’66) datum. The
UTM coordinates place the Woodlawn Tailings Project at 734,540E, 6,117,180N at an
elevation of 800 MASL.
The Project comprises one Special Mining Lease, SML 20, which covers 2,368 ha in the
immediate area of the Woodlawn Mine (Figure 4-2). Details of the property tenure were
provided by Tri Origin and validated by independent mineral tenure specialists
Hetherington Exploration & Mining Title Services Pty Ltd., September 9, 2009. The limits
of SML 20 are illustrated in Figure 4-3, and the aerial photo in Figure 4-4 illustrates the
location of the open pit and the tailings ponds.
LAND TENURE Tri Origin holds 100% interest in the mineral rights to SML 20, subject to some
exclusions near the existing open pit and underground mining areas. This interest was
acquired on January 12, 1999, when Tri Origin purchased the mineral exploration rights
and all exploration and mining data relating to the Woodlawn Mine from the
administrators of Denehurst Limited (Denehurst), the previous mine operator. Denehurst
is now subject to a deed of company arrangement but is still currently the legal title
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 4-2
holder of the lease. Several private agreements provide the mechanism for Tri Origin to
become the registered legal title holder prior to, or when, a project development decision
is made. SML 20 expires on November 16, 2014. Tri Origin expects the lease to be
renewed upon application.
Veolia Environmental Services (Veolia), a large international environmental resource
company, previously Collex Pty Limited (Collex), obtained surface rights in the SML 20
area after the mine closed. Veolia operates a bioreactor and waste management facility
within the old open pit mine. Consequently, a further agreement was entered into
between Tri Origin and the Administrators of Denehurst on October 25, 2000, reaffirming
Tri Origin’s right to obtain mineral title over SML 20 and accommodating Veolia’s
operational requirements.
On September 29, 2006, Tri Origin entered into an agreement with Collex (now Veolia)
which provided for the transfer of SML 20 and certain lands to Tri Origin prior to or upon
achieving approval for the development of the Project. On October 13, 2006, the
administrators of Denehurst, Collex, and Tri Origin entered into a tripartite agreement
which novated to Collex the obligations of Denehurst to transfer the right to minerals
within SML 20 to Tri Origin. Upon the transfer of the right to minerals within SML 20, Tri
Origin would assume the environmental liabilities relating to the previous mining
activities which are outside Veolia’s area of operations. On completion of a feasibility
study, and potentially project funding arrangements, Tri Origin will request that Veolia
transfer to it registered title to SML 20 and relevant land. The existing mining lease
conditions will be negotiated with the government at the time of transfer.
In November 2008, Tri Origin finalized commercial negotiations with Veolia with regard
to various development aspects for the Woodlawn Project. The execution of
documentation by Veolia and Tri Origin establishes a framework for the future
independent operation of both businesses on the Woodlawn site by promoting mutual
cooperation. The following agreements have been signed by the two companies:
• Deed to Assign Special Mining Lease (SML 20) to Tri Origin including an agreement to lease land from Veolia.
• Option Agreement granting Tri Origin the right to acquire land from Veolia.
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 4-3
• Cooperation Deed between Veolia and Tri Origin relating to various infrastructure and services sharing.
These latter agreements provide for Tri Origin to operate all mining facilities connected
with the retreatment, underground, and other projects that could be developed, without
interfering with the ongoing waste management and bioreactor operations of Veolia.
SURVEY The SML was surveyed prior to being granted in 1973. At that time, the boundary was
surveyed in accordance with the Mining Act.
ENVIRONMENTAL An Environmental Assessment (EA) is being prepared by consultants Parsons
Brinckerhoff for submission to the NSW Department of Planning, in fulfillment of the
project development approval process. A preliminary EA was prepared in March 2008,
which found that five key areas should be addressed to mitigate environmental risks.
The June 2008 Feasibility Study and preliminary design has addressed each of these
items.
New Guinea
TimorJava
Borneo
Celebes
SouthIsland
NorthIsland
New Caledonia(France)
Indian Ocean
Pacific Ocean
IndianOcean
Solomon Sea
Gulf ofCarpentaria
Great Australian Bight
Timor Sea
Tasman Sea
Coral Sea
Arafura SeaJava Sea
Banda Sea
Vanuatu
Solomon Islands
PapuaNew Guinea
New Zealand
Australia
Indonesia
Timor Leste(East Timor)
WesternAustralia
NorthernTerritory
SouthAustralia
Queensland
New South Wales
Victoria
Tasmania
A.C.T.
Roma
Northam
Murwillumbah
Mount Isa
Monto
Maryborough
Longreach
Kalgoorlie
Hughenden
Geraldton
Cooktown
Bunbury
Bowen
Barcaldine
Alice Springs
Charters Towers
Tual
Nelson
Greymouth
Kupang
Turangi
Timaru
Kaitaia
Raba
Wodonga
Wilcannia
Cairns
Bathurst
Albany
Vinefera
Townsville
Tamworth
Rockhampton
Port Hedland
NorsemanNarrandera
Moree
Miles
Mackay
Katherine
Horsham
Grafton
Esperance
Emerald
Cloncurry
Charleville
Dubbo
Coonabarabran
Kerema
Invercargill
Gisborne
Ambon
Hobart
Darwin
ParepareLae
MadangMount Hagen
Hamilton
Dunedin
Christchurch
Banjarmasin
Whyalla
Mount Gambier
Mildura Sydney
Surabaja
Perth
Brisbane
Auckland
Adelaide
Melbourne
DiliPort Moresby
Port-vila
Wellington
Honiara
Canberra
WOODLAWN PROJECT
140°
140°
170°
170°
120°
10°
160°
160°
150°
150°
20°
30°
10°
20°
30°
40°
180°
National Capital
Legend:
Roads
Cities
0
0 245 490 KM
490 Miles245
N
December 2009General Location Map
Tri Origin Minerals Ltd.
New South Wales, Australia
Woodlawn Tailings Retreatment Project
Figure 4-1
130°
130°
SC
OT
TW
ILS
ON
RP
A
4-4
ww
w.sco
ttwilso
n.co
m
LAKE
GEORGE
LakeBathurst
Feder
al
Fede
ral
Bra
idw
ood
Hume
Hw
y
Hw
y
Road
Hwy
A.C.T.
WOODLAWN PROPJECT
149°3
0'
35°00' 35°00'
Canberra
WOODLAWN
Brisbane
Kalgoorlie
Melbourne
Hobart
AUSTRALIA
Alice Springs
Broken Hill
Adelaine
Rockhampton
Townsville
Cairns
Sydney
Wyndham
Daly Waters
Derby
Dampier
Geraldton
Albany
Esperance
Perth
Highways
Mount Fairy
Boro
Tarago
Sutton
Currawang
CowleyHills
SML20
Collector
Breadalbane
Gundaroo
Bungendore
Cunning
“Pylara”“Intemodal”
GOULBURN
CANBERRA
QUEANBEYAN
Legend:
Minor Roads
Main Roads
Railways
0 250 1000
Kilometres
500 750
N
December 2009
Woodlawn Tailings Retreatment Project
Property Location Map
Tri Origin Minerals Ltd.
New South Wales, Australia
Figure 4-2
4-5
SCOTT WILSON RPA www.scottwilson.com
0 1 5
Kilometres
2 3 4
N
December 2009 Source: Tri Origin Minerals Ltd., 2009.
Woodlawn Tailings Retreatment Project
Mineral Lease Location
Tri Origin Minerals Ltd.
New South Wales, Australia
Figure 4-3
4-6
SCOTT WILSON RPA www.scottwilson.com
December 2009 Source: Tri Origin Minerals Ltd., 2009.
Woodlawn Tailings Retreatment Project
Site Map
Tri Origin Minerals Ltd.
Australia
Figure 4-4
4-7
SCOTT WILSON RPA www.scottwilson.com
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 5-1
5 ACCESSIBILITY, CLIMATE, LOCAL RESOURCES, INFRASTRUCTURE AND PHYSIOGRAPHY ACCESSIBILITY The Project is located at the past producing Woodlawn Mine, in New South Wales,
Australia, 250 km southwest of Sydney, and 50 km northeast of the city of Canberra as
illustrated in Figure 4-1. The Property is accessed by paved highways and secondary
roads using Highway 52 from Canberra through Queanbeyan approximately 25
kilometres north to Bungendore and turning off at Bungendore on the Tarago Road for
26 kilometres north to the Woodlawn access road. It is approximately seven kilometres
on the Woodlawn access road to the site. Canberra has a domestic airport with regular
commuter service to Sydney and Melbourne.
CLIMATE The climate of the Woodlawn region is cool temperate, with seasonal climatic variations
ranging from hot summers (December–March) to cool winters (June–August). The
average daily maximum temperature ranges from 27.5ºC in January to 11.5ºC in July.
The average annual rainfall is 685 mm. October is the wettest month, on average with
70.6 mm of rain, and July is the driest, with 46.6 mm. There is occasional snow in the
winter.
Annual evaporation for the site ranges from 938 mm to 1,983 mm resulting in, on
average, an excess of evaporation over rainfall. The nearest meteorological station with
long term continuous rainfall data is Lake Bathurst (Station 070036 - Somerton), which is
approximately 10 km northeast of the Woodlawn mine site. The station has recorded
data from 1931 to present day of which only one year (1931) has less than 365 days of
data. Key points in the meteorological data set include:
• Average annual rainfall from Lake Bathurst is 685 mm. • Highest rainfall year in the data set is 1950, with 1,305 mm. • The highest recorded single rainfall event on site occurred on March 15, 1989,
when 161 mm of rainfall occurred with a 24-hour period.
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 5-2
LOCAL RESOURCES The region is well populated. A labour force and wide range of services are available
from the city of Canberra (pop. 350,000) and the towns of Queanbeyan (pop. 34,000),
and Bungendore (pop. 3,000).
INFRASTRUCTURE Power will be purchased from the existing NSW electricity grid, after installation of
appropriate substation requirements. A purchasing agreement will be entered into
between Tri Origin and either an energy retailer or wholesaler from the National Energy
Market. This organization will provide energy into the local distribution system, which is
owned by Country Energy.
Water will be obtained from the Willaroo bore field, about four kilometres west of site,
under the terms of a sublease agreement with Veolia and the landowner. Tri Origin will
develop other basic infrastructure such as workshops, warehouse, fuel storage and
dispensing, offices, ablution blocks, sewage works, etc. By arrangement with Veolia, the
Project will also use certain previous Woodlawn mine facilities. The site will be a zero
discharge facility for any contaminated water sources.
PHYSIOGRAPHY The local physiography comprises rolling hills. The mean elevation at the Project is
approximately 800 masl, with local variations of approximately 100 m.
Vegetation in the area is characteristic of Australian dry eucalypt forest or bush. Much of
the forest has been cleared and is now open grassland used for grazing stock. Some of
the surrounding hills have been reforested with fir trees. Areas of the Project site that
have not been previously disturbed by mining activity consist predominantly of cleared
pastoral land and small isolated patches of native vegetation.
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 6-1
6 HISTORY OWNERSHIP HISTORY Woodlawn was discovered in 1970 by Jododex Australia Pty Ltd., a Joint Venture of St
Joseph International Explorations and Phelps Dodge Exploration Corporation. Open pit
mining commenced in 1978.
In 1985, the Project was acquired by Australian Mining and Smelting Ltd. (AMS), a
subsidiary of Conzinco Rio Tinto Australia Ltd (CRA). CRA continued production from
the open pit and developed the underground mine.
In August 1987, Denehurst purchased the Project. Underground mining continued
through to March 1998 when the mine was closed. Denehurst primarily treated
underground ore from the Woodlawn Mine, but also lesser amounts of material from two
other underground sources, Currawang and Cowley Hills, as well as minor amounts of
open pit remnant and some higher grade tailings material. In March 1998, Denehurst
was bankrupt and placed into administration, with a Receiver-Manager appointed.
In late 1999, Collex (now Veolia) purchased the Woodlawn site. This included freehold
land on SML20 and large areas of surrounding property. Veolia lodged a Development
Application to construct and operate the Woodlawn Bioreactor, and this operation has
been running successfully since 2004. The bioreactor involves backfilling the open cut
with putrescible waste and extracting the methane gas for power generation.
Tri Origin Australia, a subsidiary of Tri Origin Exploration Ltd. of Canada and precursor
to Tri Origin Minerals Limited, acquired the Mineral Rights to SML 20 and associated
technical data in 1999. Tri Origin at that stage held exploration licences surrounding
Woodlawn and also acquired the exploration licences held by Denehurst.
EXPLORATION HISTORY In 1988, Denehurst drilled 25 core holes for a total of 178.2 m in the North and South
tailings dams to study the feasibility of retreating the tailings. In 1995, Denehurst drilled
an additional 15 core holes for a total of 168.5 m in the South Tailings Dam.
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 6-2
PRODUCTION HISTORY Tri Origin’s compilation of historical production data indicates that open pit production
totalled 8.1 Mt grading 8.3% Zn, 1.6% Cu, 3.1% Pb, 82 g/t Ag, and 0.5 g/t Au.
Underground production was estimated at 5.3 Mt grading 9.9% Zn, 1.6% Cu, 4.3% Pb,
95 g/t Ag, and 0.5 g/t Au.
Tailings were produced over the entire 20-year period and stockpiled in three dams:
Tailings Dam North (TDN), Tailings Dam South (TDS), and Tailings Dam West (TDW).
Although the general sequence of tailings placement was TDN, then TDS, and finally
TDW, at times material was placed in different locations on a limited basis.
During 1991 to 1995, Denehurst reprocessed 1.67 Mt of tailings from the TDN grading
1.78% Zn, 0.34% Cu, 1.13% Pb, 30.45% Ag, and 0.24% Au. A minor amount of tailings
from the TDS was retreated, however, production records are not available. The
majority of the retreated tailings were returned to the same dam.
The overall mine production at Woodlawn was a nominal 13.4 million tonnes over the 20-
year life. Table 6-1 shows the historic mine production figures.
TABLE 6-1 HISTORIC PRODUCTION (1978-1998) Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project
Area / Ore Type
Ore Mined
Cu Grade
Pb Grade
Zn Grade
Au Grade
Ag Grade
(Mt) (%) (%) (%) (g/t) (g/t) OPEN PIT MINE Copper Ore 3.09 1.50 0.50 1.70 0.60 63.00 Complex Ore 4.95 1.60 4.70 12.50 0.50 88.00 Gossan Ore 0.02 0.00 4.12 0.00 0.00 570.87 Supergene Ore 0.04 11.40 6.50 0.00 0.00 513.00 Subtotal Open Pit 8.10 1.61 3.10 8.29 0.53 81.63 UNDERGROUND 5.29 1.60 4.30 9.90 0.50 95.00 Total / Avg Woodlawn 13.39 1.60 3.58 8.93 0.52 86.91
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 7-1
7 GEOLOGICAL SETTING The following description of the geology of the Project relate to the mineralization from
which the tailings were derived. The descriptions were taken for the most part from a
report entitled “Woodlawn Exploration Project Technical Report NI 43-101” prepared by
Robin Rankin for Tri Origin and dated October 9, 2009.
REGIONAL GEOLOGY The Woodlawn Project is located near the eastern margins of the Lachlan Fold Belt
(LFB). The LFB is a major north-northwest trending orogenic belt that was created by the
convergence of the Australian craton and the proto-Pacific Ocean which occurred from
the Cambrian through to the Carboniferous. The LFB extends from northeastern
Tasmania into Victoria and through much of New South Wales. The northern, western,
and eastern boundaries are masked by younger sedimentary basin cover. The LFB is
divided into numerous strato-tectonic zones commonly referred to as anticlinorial and
synclinorial zones. The boundaries between these zones are marked by regional faults,
thrusts, igneous bodies, unconformities as well as lithological, metallogenic, and tectonic
contrasts. In the Project area, the synclinorial zones consist of Siluro-Devonian
volcanics and sediments. These are bounded by anticlinorial zones consisting of deep
marine Ordovician sediments generally intruded by Siluro-Devonian granites.
The Woodlawn Project is located in the Captains Flat-Goulburn Synclinorial Zone
(CFGSZ), which developed during the Early to Mid-Silurian following uplift and extension
of basement Ordovician strata. The CFGSZ is a relatively narrow belt of volcanic and
sedimentary rocks that extends for over 300 km north to south. The CFGSZ is one of
several fault-bounded Silurian to Devonian aged basins that host a range of base metal
and gold occurrences in New South Wales.
In the Woodlawn area, Late Silurian rocks of the Mt Fairy Group unconformably overlie
Ordovician basement of the Molong Rise which consists of quartz-rich flysch sediments
(Birkenburn Beds). The boundary between these terranes is marked by a major thrust.
The Mt Fairy Group rocks are mostly acid to basic volcano-sedimentary sequences and
represent deformed fill of the Ngunawal Basin, which is part of the CFGSZ. Early
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 7-2
Devonian, shallow to deep water sediments unconformably overlie the Mt Fairy Group.
The whole sequence is highly deformed, regionally metamorphosed to lower greenschist
facies and intruded by syn- and late kinematic Early Devonian granites. Early Devonian
dolerites intrude the entire sequence.
East–west compression has produced a series of north plunging, overturned
anticline/syncline pairs with west dipping axial planes and associated west dipping
meridional thrust faults. The Currawang Anticlinorium in the west and Mulwaree
Synclinorium in the east are the major fold structures in the area with the Woodlawn
Syncline and Pylara Anticline interpreted as major subsidiary folds.
The regional geology is illustrated in Figures 7-1 and 7-2.
Tertiary Basalt
Legend:
Silurian Sediments (Covan Creek Formation)
Devonian Granites
Silurian Currawang Basalt
Woodlawn Volcanics
Undifferentiated Silurian Volcanics andOrdovician Sediments
Ordovician Merigan Black Shale
Ordovician Marine Sediments - Turbiditic QuartzoseSiltstone and Sandstone, Minor Chert
0 2 10
Kilometres
4 6 8
N
December 2009 Source: Tri Origin Minerals Ltd., 2009.
Woodlawn Tailings Retreatment Project
Regional Geology
Tri Origin Minerals Ltd.
Australia
Figure 7-1
7-3
SCOTT WILSON RPA www.scottwilson.com
EARLY
DEVONIAN
LATE
LATE
MOUNT
SILURIAN
ORDOVICIAN
FAIRY
GROUP
Lochkovian
Ludlovian
Pridolian
MULWAREE
GROUP
Covan
Formation
Creek
Tarago Conglomerate
Silurian Dolerite
Woodlawn Volcanics/
Currawang Basalt
De Drack Formation
epi-Silurian decollement
Birkenburn Beds
Merigan Black Shale Member
December 2009 Source: Tri Origin Minerals Ltd., 2009.
Woodlawn Tailings Retreatment Project
Stratigraphic Column
Tri Origin Minerals Ltd.
Australia
Figure 7-2
7-4
SCOTT WILSON RPA www.scottwilson.com
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 7-5
LOCAL GEOLOGY The Woodlawn deposit lies in a structurally defined zone of lineaments, termed the
Woodlawn Corridor, within the LFB. The corridor is believed to represent a major
northwest trending palaeogeographic feature that influenced deposition of fine-grained
volcanoclastic sediments and rhyolitic domes adjacent to the deposit. The Woodlawn
deposit is hosted by regionally metamorphosed, greenschist facies, fine- and coarse-
grained felsic pyroclastic rocks, volcanogenic sedimentary rocks, and carbonaceous
shale, informally known as the Woodlawn Group, deposited in the Silurian (410 Ma).
Younger rocks, late Silurian, immediately above this sequence become increasingly
mafic, with a high proportion forming as spilite. In the latter stages of deposition, dolerite
sills intruded the rocks now situated above and below the Woodlawn deposit. Dolerite
sills comprise 50% to 60% of hangingwall rock in the Woodlawn deposit. The local
geology is illustrated in Figure 7-3.
6110000 m
N725000 mE
6115000 m
N730000 mE
6120000 m
N735000 mE
6125000 m
N
15000
mE
15000
mE
10000
mE
5000 mN
10000 mN
15000 mN
10000
mE
5000
mE
0m
E
15000 mN
10000 mN
5000 mN
5000
mE
urr
aw
ang
Basal
De Drack
Sediment
Massive Sulphid
Covan Ck Fm
Merrigan Black
6115000 m
N6120000 m
N6125000 m
N
740000 mE 745000 mE
De Track; Silstone, Sandstone, Rhyolite
Legend:
Sediment; Quartz Siltstone, Shale
Felsic Volcanic; Dacite, Rhyolite
Granite; Granite
Merrigan Black; Black Shale
Covan Creek Formation; Quartzite, Siltstone, Sandstone
Currawang Basal; Basalt
Woodlawn Volcanic; Rhyolite
0 1
Kilometres
2 3 4
N
December 2009 Source: Tri Origin Minerals Ltd., 2009.
Woodlawn Tailings Retreatment Project
Local Geology
Tri Origin Minerals Ltd.
Australia
Figure 7-3
SC
OT
TW
ILS
ON
RP
A
7-6
ww
w.sco
ttwilso
n.co
m
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 7-7
PROPERTY GEOLOGY The primary Woodlawn deposit lies on the eastern limb of the asymmetric north-
northwest plunging Woodlawn syncline. The regional structures trend north-south, with
the local foliation dipping moderately to steeply to the west. Woodlawn is a polymetallic
deposit described as a volcanogenic massive sulphide hosted in Silurian rocks.
Mineralization is contained within a series of subparallel lenses dipping moderately to
steeply westwards. The main Woodlawn deposit occupies a series of generally fault-
bounded stratiform packages, enclosed by slate and quartz eye tuff wall rocks and
intruded by dolerite.
Many of the volcanoclastic rocks at the Project are now laminated, quartz-sericite
bearing tuffaceous shale and chloritic-talc schist. The lower south and west sectors of
the mine volume are dominated by felsic volcanics, while the upper north and east are
dominated by tuffaceous shales. The C Lens is 50% hosted by the lower volcanic units,
while the B Lens is 70% hosted by the upper shales.
Volcanic units interfinger the shales and exhibit complex and rapid facies changes.
Certain volcanic units have been identified as being associated with mineralization and
most of the lenses are in some way in contact with these units.
The mine sequence is folded into an overturned, isoclinal syncline. The Woodlawn
deposit occurs on the eastern limb of the syncline. The syncline axis plunges at
approximately 60° to the north-northwest. The axial plane dips at approximately 60° to
the west and is paralleled by a strong slatey cleavage or more intense schistosity
throughout the mine sequence. The mineralized zones have an average northeast strike
of 30°-40° azimuth and plunge to the north. Numerous parasitic folds are now
recognized as tight isoclinal structures. The Western and Main lenses appear to be
located on opposing limbs of one of these fold structures.
A steeply northwest plunging extension lineation is also recognized which is parallel to
the plunge of the lenses. This extension may control apparent necking and boundinage
features observed in some lenses. This observation may also lead to potential for
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 7-8
boudinaged extensions down plunge of existing lenses, a feature already observed in
the B and C lenses.
Denehurst geologists supported by structural studies recognized that the main A, B, and
C lenses were originally one lens but are now displaced by a series of sinistral and
dextral faults. The existence of these faults is the basis of the current exploration model.
Lenses such as B5 at the northern limit of the mine are wide at their northern fault
termination and invite exploration for extension north of the fault.
The massive sulphide lenses are located within structural packages often less
complicated than the folding. The comparative predictability of these structural packages
is a factor of interest to predict new ore rather than limited extensions of known ore.
Certain packages now defined in the mine are known never to contain ore and thus
significantly reduce the volume to be studied for targets.
Relationships between known lenses and the geometry of their enclosing packages are
being refined in order to further identify controlling factors for the occurrence of
mineralization and assist in the prediction of potential new occurrences.
0 50
Metres
100 150 200
December 2009 Source: Tri Origin Minerals Ltd., 2009.
Woodlawn Tailings Retreatment Project
Typical Cross SectionSection Through ‘E’ and ‘C’ Lenses
Tri Origin Minerals Ltd.
Australia
Figure 7-4
7-9
SCOTT WILSON RPA www.scottwilson.com
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 8-1
8 DEPOSIT TYPES The following description of deposit types refers to the open pit and underground
mineralization from which the tailings were derived. The description is taken for the most
part from a report entitled “Woodlawn Exploration Project Technical Report NI 43-101”
prepared by Robin Rankin for Tri Origin and dated October 9, 2009.
The Woodlawn deposit is a volcanic hosted, massive sulphide deposit (VMS) associated
with late Silurian felsic volcanic and sedimentary rocks. The deposits are usually rich in
zinc, lead, and copper but can also contain appreciable silver and gold.
The primary Woodlawn underground deposit is classified as a zinc-lead-copper, lens or
blanket type, volcanic hosted massive sulphide deposit. Ore is typically stratiform and
located in a favourable horizon usually located between submarine volcanic units. This
style of deposit is well documented in Eastern Australia with larger examples including
Captains Flat, Benambra, Rosebery, Hellyer, and Thalanga.
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 9-1
9 MINERALIZATION IN SITU MINERALIZATION The following description of the mineralization refers to the open pit and underground
mineralization from which the tailings were derived. The description is taken for the most
part from a report entitled “Woodlawn Exploration Project Technical Report NI 43-101”
prepared by Robin Rankin for Tri Origin and dated October 9, 2009.
Mineralization mined from the open pit and underground, from which the tailings were
derived, is polymetallic, and the predominant minerals extracted in the past were copper,
lead, and zinc, with accessory silver and gold. The mineralization is strictly within lens-
shaped lodes, subparallel to each other, occurring in a repetitious geometry, and dipping
to the northwest.
Mineralization in the underground Woodlawn deposit occurs in 10 main lenses, A
through J, and numerous smaller sub-lenses. The lenses are divided into two distinct
groups. The Main, or Eastern, Lenses, which consist of A, B, C, J, and associated sub-
lenses, comprise approximately 93% of the Woodlawn deposit. A smaller Western Lens
system comprising the D to I lenses occurs from 200 m to 500 m into the hangingwall
from the Main Lenses.
There are two major types of mineralization recognized at the Project, termed the
Copper Ore and the Complex Ore.
The Complex Ore comprises fine-grained, typically bedded massive sulphides containing
pyrite, sphalerite, galena, and chalcopyrite. Minor arsenopyrite, tetrahedrite, tennantite,
stannite, bismuthinite, marcasite, pyrrhotite, and electrum are also present. Gangue
minerals associated with the Complex Ore include talc, quartz, chlorite, phlogopite,
muscovite, and barite.
The Copper Ore occurs in a variety of styles as copper-rich mounds and as stockwork
vein-type mineralization with a pyrite-chalcopyrite assemblage together with lesser
sphalerite, galena, and pyrrhotite. Gangue minerals include chlorite, quartz, talc, calcite,
and barite. The copper-rich mounds are massive sulphide-rich zones, up to 80 m wide
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 9-2
and 20 m thick, with a heavily silicified central zone consisting of pervasive silica and
chalcopyrite veinlets. They are flanked by massive chalcopyrite-pyrite-chlorite-rich
mineralization. Beneath the copper-rich zones are zones of chalcopyrite-rich stockwork
mineralization, which are interpreted to represent feeder zones. Copper-rich
mineralization also occurs as stringers with quartz veins along some fault zones.
The massive sulphide lenses at Woodlawn are geochemically and mineralogically
zoned. The Main C Lens is geochemically zoned with higher copper grades at the
southern end of the lens and interfingering over several metres with a gradual change to
zinc, lead, silver, and gold grades to the north with related changes to the proportions of
chalcopyrite, galena, and sphalerite. Similar zonation is also observed, albeit more
locally, in the A and B lenses. This zonation is also apparent across dip with copper-rich
footwall progressing to zinc, lead, and precious metal–rich hanging wall. This zonation
style is typical of VMS deposits.
The zonation associated with the smaller Western lenses appears more complex and in
some cases nonexistent. Many of the Western Lenses also contain higher grades of
silver, gold, and lead when compared to the Main Lenses. The larger D Lens exhibits
similar zoning to the Main Lenses.
The presence of syn-tectonic and post-tectonic mineralization was recognized in parts of
the Woodlawn deposit and suggests late-stage remobilization of pre-existing sulphides
as a minor component to the Woodlawn deposit.
The location and dimensions of the mineralized zones are illustrated in Figures 9-1 and
9-2.
19,0
00m
E
19,2
00m
E
19,8
00m
E
19,6
00m
E
19,4
00m
E
20,0
00m
E2,800mRL
2,600mRL
2,200mRL
2,400mRL
2,000mRL
2,800mRL
Northwest
Southeast
I
D2
J
C1
B1
A
B5
E
D1
FG
H
2,600mRL
2,200mRL
2,400mRL
2,000mRL
0 50 200
Metres
100 150
December 2009
Woodlawn Tailings Retreatment Project
Mineralization Cross Section
Tri Origin Minerals Ltd.
Australia
Figure 9-1
SC
OT
TW
ILS
ON
RP
A
9-3
ww
w.sco
ttwilso
n.co
m
19,0
00m
E
19,2
00m
E
19,8
00m
E
19,6
00m
E
19,4
00m
E
2,800mRL
2,600mRL
2,200mRL
2,400mRL
2,000mRL
2,600mRL
2,200mRL
2,400mRL
2,000mRL
1,800mRL
I
D2
J
C
B1
A
B5
B8
E
D1
F
G H
0 50 200
Metres
100 150
December 2009
Woodlawn Tailings Retreatment Project
Mineralization Longitudinal
Tri Origin Minerals Ltd.
Australia
Figure 9-2
9-4
SCOTT WILSON RPA www.scottwilson.com
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 9-5
TAILINGS MINERALIZATION Mineralization of metals in the tailings material is obviously linked to the source ore from
the mine, predominantly zinc, copper, and lead–rich sulphides. Pyrite is the most
abundant sulphide. Estimated mineral compositions are:
Sphalerite 3-4% Galena 1-2% Chalcopyrite 1-2% Pyrite 30-35%
Other sulphide minerals occurring in minor to trace amounts are arsenopyrite,
tetrahedrite-tennantite, covellite, stannite, bismuthinite, marcasite, pyrrhotite, and
electrum.
Silicate gangue minerals are dominated by chlorite, talc, and micas. Minor quartz, rare
carbonate, magnetite, and barite also occur. The tailings would also contain a small
quantity of grinding media. No detailed information is available on relative percentages
of gangue minerals.
SIZE FRACTION DISTRIBUTION In July 1998, Tri Origin collected 128 samples from 36 drill holes and had them
screened, with the material from the six size fractions analyzed for Cu, Pb, Zn, Fe, Ag,
MgO, and S. The analyses were performed at Optimet Laboratories. The results
demonstrate a lower metal content in the >150 μm size fraction in all the dams. The
results from the TDN, TDS, and TDW are summarized in Table 9-1, Table 9-2, and
Table 9-3, respectively.
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 9-6
TABLE 9-1 SIZE FRACTION ANALYSIS - NORTH DAM Tri Origin Minerals Ltd. - Woodlawn Re-Treatment Project
Size Fraction Wt. % Cu Pb Zn Ag
(μm) (%) (%) (%) (g/t) <38 58.4 0.34 1.76 2.22 41.30
38-53 8.9 0.40 1.09 2.80 26.00 53-75 9.3 0.49 0.94 3.02 23.80
75-106 9.1 0.63 0.76 3.33 21.10 106-150 6.2 0.46 0.38 2.04 10.70
>150 8.1 0.18 0.15 0.47 3.80 100.0 0.38 1.32 2.29 31.54
TABLE 9-2 SIZE FRACTION ANALYSIS - SOUTH DAM Tri Origin Minerals Ltd. - Woodlawn Re-Treatment Project
Size Fraction Wt. % Cu Pb Zn Ag
(μm) (%) (%) (%) (g/t) <38 54 0.38 1.59 2.14 33.70
38-53 11 0.43 1.14 2.48 23.90 53-75 11.8 0.56 1.05 3.08 23.40
75-106 10.3 0.65 0.78 3.32 19.60 106-150 6.7 0.52 0.45 2.40 11.20
>150 7.2 0.19 0.17 0.62 4.40 101.0 0.43 1.23 2.34 26.67
TABLE 9-3 SIZE FRACTION ANALYSIS - WEST DAM Tri Origin Minerals Ltd. - Woodlawn Re-Treatment Project
Size Fraction Wt. % Cu Pb Zn Ag
(μm) (%) (%) (%) (g/t) <38 60.2 0.38 1.76 1.35 39.50
38-53 9.7 0.58 1.19 1.95 29.30 53-75 9.8 0.85 1.15 2.42 29.80
75-106 8.1 1.14 0.93 2.91 26.50 106-150 5.2 0.82 0.46 2.31 14.60
>150 6.9 0.22 0.18 0.60 4.80 99.9 0.52 1.40 1.64 32.78
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 10-1
10 EXPLORATION Exploration on the tailings dams comprised airborne topographic surveys as described in
Item 17, Mineral Resources, and drilling as described in Item 11, Drilling.
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 11-1
11 DRILLING The mineral resource and mineral reserve estimates for the tailings dams are based
exclusively on drilling. Drill hole data used for the resource estimate were collected over
several drilling campaigns that utilized different drilling methods. All available drilling data
have been used for the resource estimate.
Table 11-1 summarizes the various drill campaigns. Figure 11-1 shows the drill hole
location map.
TABLE 11-1 DRILLING SUMMARY Tri Origin Minerals Ltd. - Woodlawn Tailings Retreatment Project
Date Company Hole Type TDN TDS TDW
Total Holes
Total Metres
May-Aug 88 Denehurst Core 21 4 25 178.2 May-95 Denehurst Core 15 15 168.5 Dec-05 Tri Origin Auger 3 2 3 8 44.5 Jan-07 Tri Origin Auger 23 25 48 141 Jan-07 Tri Origin Core 23 36 59 574.8 Dec-07 Tri Origin Core 29 7 36 286.5 Jul-08 Tri Origin Core 31 38 30 99 905.4 Total 84 112 94 290 2,299.4
Notes:
1. TDN - Tailings Dam North 2. TDS - Tailings Dam South 3. TDW - Tailings Dam West
Drilling in all the campaigns was vertical, i.e., at a high angle to the layers of tailings.
The collars were surveyed, but no downhole measurements were taken as the holes
were considered too short to experience significant downhole deviation.
December 2009 Source: Tri Origin Minerals Ltd., 2009.
Woodlawn Tailings Retreatment Project
Drillhole Location
Tri Origin Minerals Ltd.
Australia
Figure 11-1
11-2
SCOTT WILSON RPA www.scottwilson.com
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 11-3
DENEHURST CORE (1988) The 178.2 m of core drilling by Denehurst in 1988 represents approximately 8% of the
total drilling.
The samples were obtained by driving a 50 mm stainless steel tube column through the
tailings. Each tube was two metres m long and lengths were joined by a threaded
stainless steel coupling. A stainless steel cutting bit was attached to the first length.
Venus flytrap type catches were positioned at each joint to enable core recovery. The
column was driven through the tailings by a pulley-mounted 15 kg weight. This was
supported by a three metre apex high quadrapod on a three metre square platform. The
platform was mounted on drums to enable samples to be obtained from holes covered
by water. The core column was retrieved via a winch arrangement.
Survey records for this campaign were not available. The collar locations were digitized
from a Denehurst drill hole location map.
DENEHURST CORE (1995) Coastline Drilling from Queensland were contracted for the 1995 Denehurst program.
The drilling method was similar to the vibratory core method used for the Tri Origin
campaigns.
Only 15 holes of the planned 19 holes were drilled due to access difficulties. The 15
holes were drilled on TDS and ranged from five metres to 14 m deep. The drilling
represents approximately 7% of the total drilling used for mineral resource estimation.
Survey records for this campaign were not available. The collar locations were digitized
from a Denehurst drill hole location map.
TRI ORIGIN AUGER DRILLING (2005, 2007) Auger drilling was contracted to GOS Drilling using a power auger rig mounted on a
Toyota Land Cruiser. Auger holes were 75 mm in diameter. Most of the auger holes
drilled to only three metres. This method of drilling accounted for approximately 8% of
the mineral resource database.
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 11-4
Sample recoveries were estimated by measuring the weight of the sample and
comparing that to the expected weight extracted from the drilled run, based on volume
and average wet densities. This indicated that all samples had greater than 90%
recovery.
Auger holes were either surveyed with a hand-held GPS, or, where they were drilled
adjacent to a Tri Origin cored hole, a constant offset of approximately 1.5 m west and 1.5
m south was used. This was then applied to the Vibracore hole co-ordinates to estimate
the auger hole co-ordinates.
TRI ORIGIN CORE (2007, 2008) Core Drilling for the three Tri Origin campaigns was contracted to Numac Drilling with a
Geoprobe 6620DT rig utilizing the Vibracore method. The hole diameter was 50 mm.
Hole depths ranged from 2.7 m to 18 m. The Vibracore rig was found to be an ideal
machine for drilling the tailings due to the low load bearing capacity of the rig, quality of
sample achieved, and excellent productivity.
The Geoprobe drill used the Dual Tube Sampling System. This is a very efficient
method for collecting continuous soft cores with the added benefit of a cased hole. Dual
tube sampling uses two sets of probe rods to collect continuous core.
The method is similar to wire-line diamond core drilling. However, as opposed to rod
rotation, the outer rod string is vibrated by rapid hammering. The drilled sample reports
to a 1.5 m long PVC tube housed in a 1.5 m long sample rod. The sample rod string is
recovered through the outer rod/casing string which remains in the ground until the hole
is completed.
Drill hole collars were set out using a hand-held GPS with an accuracy of approximately
± 5.0 m. After drilling the Vibracore hole, the drill collars were flagged and labelled, and
surveyed by a qualified surveyor using a Differential GPS with an accuracy of 10 cm.
Collar points for three core holes were derived by hand-held GPS as these holes were
missed by the surveyor.
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 12-1
12 SAMPLING METHOD AND APPROACH The various drilling campaigns are described in Item 11, Drilling. The sampling method
and approach for each program is described here. The minimum, maximum, and
average sample lengths for all the programs were 0.4 m, 3.4 m, and 2.0 m, respectively.
DENEHURST CORE (1988) The sample was retrieved from the pipe lengths by ramming a disc down the tube and
laying the core in halved poly pipes. Sections were then collected, typically 1.5 m to 2.5
m long, and placed in plastic buckets. The length of sections was dependent on the total
length recovered. Sample intervals for assay ranged from 0.4 m to 3.4 m. The average
and median sample length was approximately 2.2 m.
Samples from the buckets were then thoroughly mixed using a spade on a clean
concrete surface. A representative sample was collected by quartering and then placed
in an oven. Wet and dry weights were taken to calculate the moisture content. Excess
sample was bagged and stored.
DENEHURST CORE (1995) The sampling procedure was similar to the 1988 program except that the sample interval
was one metre.
TRI ORIGIN AUGER DRILLING (2005, 2007) Sampling was undertaken on nominal three metre intervals with most of the auger holes
drilled to only three metres.
The drilled tailings were regularly collected from around the hole collar as it returned up
the auger flight. Systematic grab samples were gathered and placed into a calico bag for
dispatch to the laboratory. The calico samples typically weighed around two to four
kilograms. The reject sample was placed into a bucket for storage.
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 12-2
TRI ORIGIN CORE (2007, 2008) Sampling intervals comprised two drill rods lengths of 1.2 m each, i.e., 2.4 m, until the
end of the hole was reached. The first sample was 2.7 m due to using a 1.5 m starter
rod.
The PVC tube was extracted from the sample rod and split with a cutter. The exposed
tailings core was halved with a knife and placed in a calico bag. The other half of the
core from the cut tube is placed in a large plastic bucket and sealed with a snap lid. The
bucket and calico sample were weighed together.
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 13-1
13 SAMPLE PREPARATION, ANALYSES AND SECURITY The various drilling campaigns are described in Item 11, Drilling. The sample
preparation and analyses for each program are described here.
DENEHURST CORE (1988) All Denehurst sample preparation and analyses were done by Woodlawn technical staff
and assaying was performed in the onsite laboratory. The laboratory was accredited by
the National Association of Testing Authorities (NATA), Australia’s national laboratory
accreditation authority.
The dried samples were split for sizing and assay. Samples for assay were pulverized
and then analyzed by X-ray fluorescence (XRF) for Cu, Pb, Zn, Fe, and Ag. Non-
sulphide Pb and Zn determinations were made by Ammonium Acetate solubility. Gold
assays, where required, were by fire assay. Size fraction assays were performed to
indicate the distribution of metal values by size. Where sample was not sufficient for
assay by XRF, atomic absorption spectroscopy (AAS) was used.
DENEHURST CORE (1995) Samples from the 1995 drilling program were pulverized and then acid digested for AAS
analysis of Cu, Pb, Zn, and Ag. Au was not determined. Another portion of sample was
compressed for XRF determination for Mg, Fe, and Si.
TRI ORIGIN (ALL) All of Tri Origin’s samples were analyzed by ALS Chemex (ALS) in Orange, NSW.
All samples were weighed upon receipt and dried for 24 hours. The whole sample was
pulverized to 80% passing 75 microns. Assay charges were extracted from a 100 g
pulp.
The pulps were placed in kraft packets and the remaining pulverized bulk residue was
placed back into the original calico bag.
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 13-2
A combination of inductively coupled plasma–atomic emission spectroscopy (ICP-AES)
and fire assay for gold were used. All methods can be considered as total extraction for
the elements requested. The ALS Chemex assay methods are summarized in Table
13-1.
TABLE 13-1 ALS CHEMEX ASSAY METHODS
Tri Origin Minerals Limited – Woodlawn Tailings Retreatment Project
Program Elements and ALS Method ALS Job No.
January 2007
Ag, As, Bi, Cd, Cu, Fe, Pb, S, Sb, Zn, Al, Mg, Ca and Na by ME-OG62 Au by Au-AA25
OR07010065
December 2007
Ag, As, Bi, Cd, Cu, Fe, Pb, S, Sb, Zn, Al, Mg, Ca and Na by ME-OG62 Au by Au-AA25
OR07154119
July 2008
Ag, Cu, Pb, Zn, Fe, S by ME-OG62 Au by Au-AA25 Al2O3, As, CaO, Co, Cr2O3, Cu, Fe2O3, K2O, MgO, MnO, Ni, P2O5, Pb, S, SiO2, TiO2, Zn by ME-ICP81x
OR08098978
ME-OG62 A 0.5 sample undergoes four acid digestion. The mixture is then evaporated to moist
salts, cooled, and leached with concentrated HCL. It is then diluted to 100 mL volume at
20% HCL. Elemental concentrations are then determined by ICP-AES.
AU-AA25 A 30 g sample is fused with fluxes including PbO at 1,100°C. The molten PbO acts as a
collector for Au. The fused mass is cooled and the lead separates from the impurities
and is placed in a cupel in a furnace at 900°C. The lead oxidizes, being absorbed by the
cupel, leaving a bead (prill) of gold, silver (added as a collector) and other precious
metals. The prill is dissolved in aqua regia and gold concentration is determined by flame
AAS.
ME-ICP81X A 0.1 g sample undergoes fusion by sodium peroxide. The fused mass is leached in
water and acidified with hot HCL. The solution is cooled and then analyzed by ICP-AES.
This method was used to primarily obtain some SiO2 data.
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 13-3
DENSITY The method for determining the bulk density of the tailings has varied over several drill
campaigns and has occasional issues. However, the favourable agreement between the
tonnage estimated by block models and the tonnage reported by historical records
indicates that the bulk densities in the block model mineral resource and mineral reserve
estimates are appropriate.
TRI ORIGIN – JULY 2008 The sample was placed into a plastic bucket. The height of the sample was measured
and the volume was calculated knowing the diameter of the bucket. The sample was
weighed on a calibrated electronic scale and the weight was corrected for the weight of
the bucket. The resultant weight/density was the wet density.
Approximately one half of the samples were dried and weighed to estimate the dry
density. The wet weight/dry weight ratio was used to estimate the dry density.
TRI ORIGIN – PRE-JULY 2008 The sample length was measured in the drill tube and the volume was estimated
knowing the diameter of the drill tube. The sample was placed in a bucket and weighed,
and the weight was corrected for the weight of the bucket. The resultant weight/density
was the wet density.
Approximately one half of the samples were dried and weighed to estimate the dry
density. The wet weight/dry weight ratio was used to estimate the dry density.
DENEHURST The method for density determination of the Denehurst is not known.
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 14-1
14 DATA VERIFICATION QUALITY ASSURANCE/QUALITY CONTROL Quality assurance/quality control (QA/QC) consists of evidence to demonstrate that the
assay data has precision and accuracy within generally accepted limits for the sampling
and analytical method(s) used in order to have confidence in the resource estimation. In
general, QA/QC programs are designed to prevent or detect contamination and allow
assaying (analytical) precision (repeatability) and accuracy to be quantified.
The Tri Origin QA/QC program included the insertion of standard reference samples,
blank samples, and duplicate samples into the sample stream. In Scott Wilson RPA’s
opinion, the program was consistent with generally accepted industry standards.
In Scott Wilson RPA’s opinion, the results of the QA/QC program indicate that the data
are reliable and appropriate for mineral resource estimation.
STANDARD SAMPLES Tri Origin used three certified reference samples, purchased from Geostat Pty Ltd.
(Geostat), to check the accuracy of the ALS laboratory. One Au reference was inserted
into the sample stream at the rate of one per twenty samples. One base metal reference
was inserted at the rate of one every ten to twenty samples. The specifications of the
reference samples are summarized in Table 14-1.
TABLE 14-1 STANDARD REFERENCE SAMPLE SPECIFICATIONS Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project
Sample No. Grade Std. Dev
BML 1.48% Cu 0.065 2.67% Pb 0.180 2.04% Zn 0.091
BMH 1.42% Cu 0.052 0.061% Pb 0.0025 5.05% Zn 0.223
AuS 0.50 g/t Au 0.03
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 14-2
The assay results of the standard reference samples should fall within two standard
deviations of the round robin results for the sample. One Zn assay and one Pb assay
were outside the acceptable range. No action was taken as the other elements for the
same sample were in compliance. Scott Wilson recommends that entire batches of
samples should be reassayed when any element is outside the acceptable range.
Considering the very low failure rate, Scott Wilson considers that the results of the
standard reference sample program indicate superior data verification.
The Cu, Pb, and Zn results for standard reference sample BML are illustrated in Figures
14-1, 14-2, and 14-3, respectively.
FIGURE 14-1 STANDARD SAMPLE BML - CU
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 14-3
FIGURE 14-2 STANDARD SAMPLE BML - PB
FIGURE 14-3 STANDARD SAMPLE BML – ZN
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 14-4
The Cu, Pb, and Zn results for standard reference sample BMH are illustrated in Figures
14-4, 14-5, and 14-6, respectively.
FIGURE 14-4 STANDARD SAMPLE BMH – CU
FIGURE 14-5 STANDARD SAMPLE BMH – PB
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 14-5
FIGURE 14-6 STANDARD SAMPLE BMH – ZN
The Au results for standard reference sample AuS are illustrated in Figure 14-7.
FIGURE 14-7 STANDARD AUS- AU
BLANK SAMPLES Certified blank samples, purchased from Geostat, were inserted in the sample stream at
the rate of one per twenty samples to check for drift and contamination in the ALS
laboratory. The assays should not exceed three times the detection limit for the assay
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 14-6
method. Thirty-two blank samples were submitted, with only one sample returning non-
compliant results for Zn. The results of the blank sample program are illustrated in
Figure 14-8.
FIGURE 14-8 BLANK SAMPLES
DUPLICATE SAMPLES Duplicate samples comprise half or quarter core samples taken at the rate of
approximately one per twenty samples for a total of forty samples. The results of the
duplicate samples compare well with the originals. The mean values of the original and
duplicate samples range from 98.9% to 100% agreement, as summarized in Table 14-2.
The R2 values for Cu and Pb are high at approximately 0.95, whereas the R2 value for
Zn is lower at 0.71. In Scott Wilson RPA’s opinion, despite the poor correlation for Zn,
the good agreement of the mean values for Cu, Pb, and Zn and the good correlation for
Cu and Pb indicates superior data verification.
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 14-7
TABLE 14-2 DUPLICATE SAMPLES Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project
Metal Mean
Original Duplicate Dup/Orig R2 (%) (%) (%)
Cu 0.550 0.547 99.5 0.956 Pb 1.657 1.639 98.9 0.947 Zn 2.610 2.610 100.0 0.706
FIGURE 14-9 DUPLICATE SAMPLES – CU
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 14-8
FIGURE 14-10 DUPLICATE SAMPLES – PB
FIGURE 14-11 DUPLICATE SAMPLES – ZN
In Scott Wilson RPA’s opinion, the results of the QA/QC program indicate that the data
are reliable and appropriate for mineral resource estimation.
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 14-9
TWINNED HOLES In 2008, Tri Origin twinned a series of holes to verify the results of historical drilling and
to test the short range grade variation. Twin holes were drilled within one metre to two
metres of previous holes.
SOUTH DAM Four holes were drilled in the TDS by Tri Origin to verify the data from the 15 holes
previously drilled by Denehurst in 1988 and 1995. The Tri Origin holes returned higher
Cu and Ag values but demonstrated excellent agreement for Pb and Zn. The results are
summarized in Table 14-3.
TABLE 14-3 TWINNED HOLES - SOUTH TAILINGS DAM – DENEHURST Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project
Hole Depth Ag Au Cu Pb Zn
(m) (g/t) (g/t) (%) (%) (%) STD080 14.0 16.36 0.39 1.05 2.64 TDS052 14.0 27.21 0.27 0.45 1.18 2.92 Diff (%) 166 N/A 115 113 110
STD023 5.1 36.54 0.50 1.30 2.55 TDS006 9.1 24.55 0.22 0.42 1.05 2.27 Diff (%) 67 N/A 83 81 89
STD068 11.0 26.27 0.49 1.43 2.67 TDS062 10.0 28.55 0.25 0.45 1.36 2.51 Diff (%) 109 N/A 91 95 94
STD074 8.0 15.50 0.42 1.14 2.37 TDS079 5.9 34.31 0.41 0.77 1.27 2.16 Diff (%) 221 N/A 184 112 91
Denehurst 38.1 21.74 0.44 1.21 2.58 Tri Origin 39.0 28.01 0.27 0.49 1.21 2.55 Diff (%) 129 N/A 111 100 99
Notes: 1. STD prefix denotes Denehurst hole. 2. TDS prefix denotes Tri Origin hole.
Three twinned holes were drilled in the TDS to verify data from previous Tri Origin
campaigns and to test the short range grade variation. The 2008 twinned holes show
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 14-10
excellent agreement for Cu, Pb, Zn, and Ag compared to holes drilled in 2007. The
results are summarized in Table 14-4.
TABLE 14-4 TWINNED HOLES - SOUTH TAILINGS DAM – TRI ORIGIN
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project
Hole Depth Ag Au Cu Pb Zn (m) (g/t) (g/t) (%) (%) (%) TDS022-07 12.3 28.61 0.25 0.50 1.19 2.55
TDS081-08 11.5 29.26 0.29 0.50 1.21 2.57 Diff (%) 102 116 99 102 100
TDS014-07 9.6 31.30 0.22 0.42 1.21 2.32
TDS080-08 9.8 33.27 0.35 0.46 1.33 2.54
Diff (%) 106 161 110 110 110
TDS029-07 14.2 33.08 0.26 0.49 1.32 2.73
TDS069-08 14.7 32.52 0.29 0.42 1.24 2.66 Diff (%) 98 113 86 93 98
Tri Origin 07 36.1 31.08 0.24 0.47 1.25 2.56
Tri Origin 08 36.0 31.68 0.31 0.46 1.25 2.60
Diff (%) 102 126 96 100 101 NORTH DAM In the TDN, 13 of the 21 holes previously drilled by Denehurst were twinned, primarily to
ascertain the retreated-untreated boundary. Overall, the twinned holes returned Cu, Pb,
Zn, and Ag values approximately 20% to 30% lower than the original Denehurst holes
drilled prior to retreatment of the upper portion of the dam.
Grades in the lower sections of the holes agreed much better although a precise
comparison was not undertaken.
WEST DAM Six twinned holes were drilled in the TDW to verify data from previous Tri Origin
campaigns and to test the short range grade variation. The 2008 twinned holes show
excellent agreement for Cu, Pb, Zn, and Ag compared to the original drilling. The results
are summarized in Table 14-5.
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 14-11
TABLE 14-5 TWINNED HOLES - WEST TAILINGS DAM – TRI ORIGIN Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project
Hole Depth Ag Au Cu Pb Zn (m) (g/t) (g/t) (%) (%) (%) TDW010 13.5 34.53 0.39 0.70 1.50 1.75 TDW055 13.1 36.81 0.38 0.74 1.55 1.87 Diff (%) 107 96 106 103 107 TDW059 16.5 42.16 0.52 0.54 1.58 2.10 TDW036 18.3 33.62 0.42 0.50 1.31 1.83 Diff (%) 80 80 93 83 87 TDW021 7.5 41.56 0.24 0.72 1.60 2.07 TDW021A 7.5 41.24 0.48 0.76 1.74 2.38 Diff (%) 99 204 106 109 115 TDW053 8.7 35.68 0.27 0.38 1.45 1.74 TDW053A 4.0 32.90 0.28 0.44 1.47 1.56 Diff (%) 92 104 113 102 89 TDW057 12.3 35.46 0.39 0.58 1.45 1.82 TDW057A 11.8 37.34 0.40 0.64 1.50 1.98 Diff (%) 105 100 110 103 109 TDW065 8.4 36.57 0.45 0.59 1.44 1.90 TDW065A 9.9 38.27 0.43 0.64 1.51 1.96 Diff (%) 105 96 108 105 103 Total Original 66.9 37.78 0.40 0.59 1.51 1.90 Total Twinned 64.6 36.50 0.41 0.62 1.48 1.93 Diff (%) 97 102 106 98 102
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 15-1
15 ADJACENT PROPERTIES There are no adjacent properties as defined by NI 43-101.
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 16-1
16 MINERAL PROCESSING AND METALLURGICAL TESTING PLANT BACKGROUND The original process plant at Woodlawn operated from 1978 until early 1998. As well, a
tailings retreatment plant was in operation from 1991 to 1996.
The plant produced three concentrates – copper, lead, and zinc – utilizing crushing,
grinding, and differential flotation at an annual operating rate ranging from 650,000 to 1
million tonnes of ore.
The original tailings retreatment plant was designed to produce only a zinc concentrate.
The plant was shut down in 1996 as there were operating issues related to feed density,
tailings material slumping issues when dredging, as well as consistent failure to meet
grade, recovery, and throughput expectations. Table 16-1 shows a typical metallurgical
balance reported for the plant in 1993. A typical balance for the tailings retreatment plant
in the same year is shown in Table 16-2.
TABLE 16-1 WOODLAWN PLANT METALLURGICAL BALANCE 1993 Tri Origin Minerals Ltd. - Woodlawn Tailings Retreatment Project
Product Grade Recovery (%)
% Cu %Pb %Zn Cu Pb Zn
Feed 1.9 3.9 10.5 100 100 100
Copper Concentrate 20.8 3.9 4.8 69.3 6.3 2.9
Lead Concentrate 0.7 40.0 19.7 1.7 50.2 9.2
Zinc Concentrate 0.5 1.5 50.6 3.8 5.9 74.3
Final Tails 0.6 2.0 1.9 25.2 37.6 13.6
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 16-2
TABLE 16-2 TAILINGS RETREATMENT PLANT METALLURGICAL BALANCE 1993
Tri Origin Minerals Ltd. - Woodlawn Tailings Retreatment Project
Product Grade Recovery (%)
% Cu %Pb %Zn Cu Pb Zn
Feed 0.42 1.30 3.07 100.0 100.0 100.0
Zinc Concentrate 1.81 7.05 43.85 16.0 20.1 52.9
Final Tails 0.37 1.08 1.50 84.0 79.9 47.1
METALLURGICAL TESTWORK The testwork program started in late 2005 and was carried out in four phases at Optimet
Laboratories in South Australia and AMMTEC Limited (AMMTEC) in Perth.
Phase 1 metallurgical testwork was conducted on samples obtained from the TDN, TDS,
and TDW.
This was followed by the Phase 2 testwork during which a circuit very similar to the
original fresh ore circuit, but with fine grinding of the original tailings, was identified as
being capable of producing copper, lead, and zinc concentrates.
Phase 3 optimization testwork concentrated on good copper/lead separation and on
optimizing reagents and their usage.
Phases 2 and 3 were conducted on drilled and blended samples from TDS and TDW.
Phase 4 of the testwork was designed to assess physical parameters using large
samples. This included thickening and filtration tests as well as extra grinding testwork,
including the use of various water sources.
The results of the testwork indicated that a primary grind of 80% passing 30 microns
would be the optimum. It was also determined that a differential flotation circuit, similar to
the original plant producing a talc concentrate (for removal to tailings), a copper
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 16-3
concentrate, and a zinc concentrate, was required, including a concentrate regrind unit
for the lead and zinc flotation circuits.
RETREATMENT PLANT PROCESS DESCRIPTION Based on the metallurgical testwork, the following flowsheet, as shown in Figure 16-1, is
proposed for the tailings retreatment plant.
The hydraulically mined slurry is pumped to a tailings thickener. The thickener underflow
at 60% solids is pumped to a storage tank prior to be ground in a fine grinding mill. The
thickener overflow water is returned to the tailings area for use as medium for the
hydraulic miners.
The fine grinding mill equipment was originally planned to be an ISA mill but
subsequently replaced by a Deswik grinding mill, which is supposedly more economical
to operate as it requires less input power to achieve the P80 30 micron grind than the ISA
mill. Further testwork is required in this area, as the Deswik mill is fairly new to the
market and has had limited commercial use.
The ground mill product then reports to the talc flotation stage to remove a talc
concentrate, which is combined with the final tails and sent to the tailings storage area.
The talc flotation tailings report to the copper flotation area, which produces a copper
concentrate using a roughing stage and two cleaning stages. No regrind is required in
this unit operation. The final copper concentrate is pumped to a thickener and the
underflow is sent to a filter for dewatering and then placed on a concentrate stockpile.
The tailings from the rougher and cleaner stages are pumped to a lead rougher circuit.
The rougher concentrate is sent to a Stirred Media Detritor (SMD) regrind mill, operating
in closed circuit with cyclones. The required grind is a P80 of 15 microns, with a specific
grinding power requirement of 15.7 kWh/t. The cyclone overflow reports to a two stage
lead cleaning circuit. The final lead concentrate is pumped to a thickener and the
underflow is sent to a filter for dewatering and then placed in a concentrate bin, rather
than a stockpile, to minimize health hazards related to potential lead dust in air.
Reclaim Tailings Area
(TDS,TDW,TDN)
Storage Tank
Tailings Thickener
Pb Rougher
Pb RegrindMill (SMD)
Cyclone
Pb Cleaner
Pb Recleaner
Pb Concentrate Filter
Pb ConcentrateThickener
Cu Rougher
Cu Recleaner
Cu Cleaner
Cu Concentrate Filter
Cu ConcentrateThickener
Reclaim Monitors
Regrind Mills(2)(Deswik)
Talc Flotation
Zn Rougher
Zn RegrindMill (SMD)
Cyclone
Zn 1 Cleaner
Zn 2 Cleaner
Zn 3 Cleaner
Zn 4 Cleaner
Zn ConcentrateThickener
Zn Re-treatRougher
Zn Re-treat 3Cleaner
Zn Concentrate Filter
Zn Re-treat 2Cleaner
Zn Re-treat 1Cleaner
New Tails Dam
Zn Concentrate Stockpile
Pb ConcentrateLoadout Bin
st
nd
rd
th
rd
Cu Concentrate Stockpile
nd
st
PB Loadout Bin
Zn/Cu LoadoutBin
Pb
Cu
ConcentrateContainer
Zn
ConcentrateContainer
ConcentrateContainer
To Harbour by TruckContainer Loader
December 2009
Woodlawn Tailings Retreatment Project
Retreatment Plant Flowsheet
Tri Origin Minerals Ltd.
Australia
Figure 16-1
16-4
SCOTT WILSON RPA www.scottwilson.com
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 16-5
The lead rougher tails report to the zinc rougher circuit, while the lead cleaner and
recleaner tails report to the zinc retreat flotation circuit described later.
The concentrate from the zinc rougher circuit goes through four stages of cleaning to
provide a final concentrate. The tails from the first three cleaner stages are sent to a
SMD regrind mill, operating in closed circuit with cyclones. The required grind is a P80 of
15 microns, with a specific grinding power requirement of 20.1 kWh/t. The fourth cleaner
tails are recirculated back to the third cleaner. The cyclone overflow reports to the zinc
retreat circuit as does the lead cleaner and recleaner tails. The circuit is made up of a
roughing stage, followed by three stages of cleaning, operating in closed circuit. The
final concentrate is combined with the concentrate from the cleaner circuit and pumped
to a thickener. The underflow is sent to a filter for dewatering and then placed on a zinc
concentrate stockpile. The tails from the zinc rougher are combined with the talc
concentrate and pumped to a new tailings storage area in the existing tailings area.
Copper and zinc concentrates are reclaimed by front end loader and fed to a container
loader capable of filling standard 20 ft shipping containers. The lead concentrate reports
directly to the loader to minimize handling and lead dust generation. The containers are
stored onsite and periodically shipped by truck to tidewater for shipment to smelters.
A proposed process plant layout is shown in Figure 16-2.
11,000m E
LOADED CONCENTRATE
CONTAINERS
OVERHEAD PIPE RACK
19,7
00m
N19,6
00m
N19,5
00m
N
PORTABLE
WATER TANK
RAW
WATER
TANK
WATER TREATMENT FACILITY
CONCENTRATE
FILTER
BUILDING
11,100m E
PROCESS
WATER DAM
10,800m E 10,900m E
REAGENT
STORE
SWITCH
ROOM
PLANT
MCC
CONTROL
ROOM
FLOTATION
REAGENTS
CHANGE ROOM
& ABLUTIONS
STORE
GATEHOUSE
20 VEHICLE
CAR PARK
PLA
NT
NO
RT
H
PLANT
WORKSHOP
RETREATMENT
THICKENING PIPE RUN
UNDERGROUND
IN CULVERT
CONTAINER
LOADING
AIR SERVICESRETREATMENT
GRINDING
EMPTY
CONCENTRATE
CONTAINERS
19,7
00m
N19,6
00m
N19,5
00m
N
10,800m E 10,900m E
0 20 100
Metres
40 60 80
December 2009 Source: Intermet Engineering, 2009.
Woodlawn Tailings Retreatment Project
Retreatment Plant Layout
Tri Origin Minerals Ltd.
Australia
Figure 16-2
SC
OT
TW
ILS
ON
RP
A
16-6
ww
w.sco
ttwilso
n.co
m
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 17-1
17 MINERAL RESOURCE AND MINERAL RESERVE ESTIMATES MINERAL RESOURCES
SUMMARY Mineral resources were estimated by GeoRes effective May 2008 and reviewed by Scott
Wilson RPA. Scott Wilson RPA generally concurs with the GeoRes estimate, however,
in Scott Wilson RPA’s opinion, the inferred mineral resources as estimated by GeoRes
should be reclassified as indicated mineral resources. The mineral resources as revised
by Scott Wilson RPA are summarized in Table 17-1.
TABLE 17-1 MINERAL RESOURCES Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project
Dam Classification Tonnes Grade Cu Pb Zn Ag Au (Mt) (%) (%) (%) (%) (%)
South Measured 2.43 0.48 1.19 2.60 24.60 0.22 (TDS) Indicated 2.07 0.48 1.19 2.39 23.50 0.22 Meas + Ind 4.50 0.48 1.19 2.50 24.10 0.22 West Measured 2.05 0.60 1.46 2.00 35.66 0.39 (TDW) Indicated 2.02 0.60 1.50 1.91 36.17 0.39 Meas + Ind 4.07 0.60 1.48 1.95 35.91 0.39 North - Treated Measured 0.56 0.36 1.07 1.77 28.60 0.27 (TDNU) Indicated 1.11 0.33 1.16 1.78 31.41 0.23 Meas + Ind 1.67 0.34 1.13 1.78 30.47 0.24 North - Untreated Measured 0.27 0.58 2.17 3.54 49.70 0.33 (TDNL) Indicated 1.14 0.47 1.63 3.06 45.92 0.32 Meas + Ind 1.41 0.49 1.73 3.15 46.65 0.32 All Dams Measured 5.31 0.52 1.33 2.33 30.57 0.30 Indicated 6.34 0.49 1.36 2.25 32.96 0.29 Meas + Ind 11.65 0.50 1.35 2.29 31.87 0.30
Notes: 1. CIM definitions were followed for mineral resources. 2. Mineral resources were estimated at a zero cut-off grade. 3. Mineral resources are inclusive of mineral reserves. 4. Mineral resources were estimated using bulk density of 1.7 t/m3 for TDS, 1.85 t/m3 for TDW, 1.6
t/m3 for TDNU, and 1.35 t/m3 for TDNR. 5. Columns and rows may not add exactly due to rounding.
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 17-2
DATABASE The database for mineral resource estimation is exclusively drilling. The description of
the drilling, sampling, analyses, and data verification is found in items 11, 12, 13, and 14
of this report.
STATISTICS The simple statistics for Cu, Pb, Zn, Ag, and Au in all the dams are summarized in Table
17-2.
TABLE 17-2 RAW ASSAY STATISTICS
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project
Cu (%)
Pb (%)
Zn (%)
Ag (g/t)
Au (g/t)
Maximum 3.32 15.80 13.00 159.00 0.67 Minimum 0.06 0.11 0.24 3.00 0.01
Mean 0.50 1.35 2.44 31.54 0.31 Median 0.47 1.30 2.23 30.00 0.28 Std Dev 0.23 0.73 0.96 15.10 0.13
Coeff Var 0.48 0.56 0.43 0.50 0.46
The grade distribution of Cu, Pb, Zn, and Ag is illustrated in Figures 17-1, 17-2, 17-3,
and 17-4, respectively.
FIGURE 17-1 HISTOGRAM – CU
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 17-3
FIGURE 17-2 HISTOGRAM – PB
FIGURE 17-3 HISTOGRAM – ZN
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 17-4
FIGURE 17-4 HISTOGRAM – AG
CAPPING HIGH GRADE ASSAYS Based on the normal grade distribution, low coefficient of variation, and the coincidence
of mean and median grades, high grade assays did not require capping. Scott Wilson
RPA concurs with this approach.
COMPOSITING Sample lengths were composited to one metre downhole, starting from the collar, for
modelling. However, two metre composites were used for variography. In Scott Wilson
RPA’s opinion, the composite length should be approximately equal to the average
sample length, i.e., two metres. In any case, using a composite length less than the
sample length does not affect the integrity of the model.
DENSITY The density of each domain (individual tailings dam) was modelled based on dry density
data from individual drill hole samples. The resultant average density of each domain is
summarized in Table 17-3.
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 17-5
TABLE 17-3 DENSITY Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project
Dam Density
(t/m3) South 1.70 West 1.85 North - Untreated 1.60 North - Retreated 1.35
CUT-OFF GRADE There was no cut-off grade applied to the mineral resource estimation, as the mining
method is not selective and, with the exception of tailings in local topographic lows at the
bottom of the dams, all the material will be processed.
BLOCK MODEL The mineral resources were estimated using a block model methodology with Minex
geology and mining software. Four individual domains were created: South Dam (TDS),
West Dam (TDW), North Dam – Untreated (TDNL), and North Dam – Retreated (TDNU).
Volumes for the domains are based on the following surfaces:
• Upper surfaces based on September 2004 airborne survey.
• Lower surfaces based on actual topography prior to production.
• North Dam untreated and retreated interface based on interpretation from drilling.
The volumes were filled with blocks and the blocks were designated as either inside or
outside the domain depending on the location of the centroid. The dimensions of the
models and blocks are summarized in Table 17-4.
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 17-6
TABLE 17-4 BLOCK MODEL DIMENSIONS Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project
Parameter Direction
X Y Z Origin (m) 9,660 17,060 2,760 Extent (m) 1,840 1,660 80 Primary Block Size (m) 10 10 1 Sub-blocking factor 1 1 1 Min Sub-block Size 10 10 1 Blocks: Max Primary 184 166 80 Blocks: Actual Primary 73,052 Blocks: Actual Total 73,052 Rotation (deg) 0 0 0
GRADE INTERPOLATION Grade interpolation was by inverse distance squared (ID2). Search distances and
directions were selected based on Zn variography. The grade statistics of the 73,052
blocks in the model are summarized in Table 17-5. The grade statistics of the blocks
compare favourably with the statistics of the raw data (Table 17-2). In Scott Wilson
RPA’s opinion, this agreement validates the integrity of the GeoRes mineral resource
block model.
TABLE 17-5 BLOCK MODEL STATISTICS Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project
Cu Pb Zn Ag Au (%) (%) (%) (g/t) (g/t)
Maximum 2.44 10.55 9.32 115.32 1.08 Minimum 0.22 0.55 1.14 6.81 0.08
Mean 0.49 1.33 2.28 31.4 0.29
MINERAL RESOURCE CLASSIFICATION GeoRes classified the mineral resources based on the distance from a block to the
nearest data point and a minimum number of data points. The parameters are
summarized in Table 17-6.
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 17-7
TABLE 17-6 GRADE INTERPOLATION PARAMETERS Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project
Classification Distance No. of Points
(m) Measured <70 >9 Indicated >70<120 >6<9 Inferred >120 >1<6
GeoRes classified approximately 20% of the blocks as inferred mineral resources, as
they were beneath standing water where drilling was not done. In Scott Wilson RPA’s
opinion, this material should be upgraded to indicated mineral resources. The tonnage
is virtually certain, as it lies within the surveyed surfaces. The total tonnage in the block
model also reconciles well with the tonnage historically reported by mill. The grade of
the tailings is sufficiently homogeneous that grades should be extrapolated over long
distances, i.e., greater than 120 m. Therefore, Scott Wilson RPA has classified the
entire volume of tailings as measured and indicated mineral resources (see Table 17-1).
MINERAL RESOURCE VALIDATION SUPPLEMENTARY BLOCK MODEL In July 2008, Tri Origin drilled an additional 99 holes in an attempt to improve the
understanding of the grade distribution and validate the GeoRes mineral resource
model. In December 2008, using the supplementary drilling, Bob Cotton, Geology
Consultant, estimated mineral resources at the Project using Micromine software and
virtually the same parameters and methodology as the GeoRes estimate. Cotton
classified approximately 15% of the blocks as inferred mineral resources. As per the
previous discussion, Scott Wilson RPA considers this material to be indicated mineral
resources. The Cotton December 2008 mineral resource estimate for all the dams,
including the Scott Wilson RPA reclassification is summarized in Table 17-7.
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 17-8
TABLE 17-7 VALIDATION BLOCK MODEL – DECEMBER 2008 Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project
Classification Tonnes Grade
Cu Pb Zn Ag Au (Mt) (%) (%) (%) (%) (%)
Measured 6.54 0.50 1.35 2.32 33 0.32 Indicated 4.71 0.53 1.33 2.31 31 0.30 Meas + Ind 11.25 0.51 1.34 2.31 32 0.31
Compared to the May 2008 estimate, the December 2008 compares to within 3% of the
tonnes and 1% of the grades. Scott Wilson RPA considers this as acceptable validation
of the official May 2008 estimate.
RECONCILIATION TO PRODUCTION Historical Denehurst mill reports indicate that from 1978 to 1982 inclusive, approximately
2.9 Mt of tailings grading 3.3% Zn were placed in the TDN. The tonnage compares
reasonably well with the current estimate of 3.1 Mt. The current grade of 2.41% Zn is
lower than reported by the mill, as approximately 2.0 Mt of tailings from the TDN were
retreated and redeposited.
The TDS was used for tailings from 1982 to 1989. Tonnage records are slightly
contradictory and range from 4.0 Mt to 4.6 Mt grading 2.51% Zn. The tonnage and
grade agree reasonably well with the current estimate of 4.5 Mt grading 2.50% Zn.
From 1989 through 1998 until the mine closed, approximately 4.0 Mt of tailings were
placed in the TDW. No grade information was available for the TDW. The tonnage
estimate compares well with the current estimate of 4.1 Mt.
MINERAL RESERVES The GeoRes mineral resource model was converted to a Surpac model for mine
planning. The review of the resource block model showed some blocks that would not
be recoverable by the proposed hydraulic mining method. The block model was
modified to exclude these blocks. The resource block model was then adjusted to allow
for dilution and recovery. Mining recovery was based on an average expected loss of 20
cm of tailings material in contact with other material. Additionally, a dilution value
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 17-9
equivalent to 10 cm average vertical gain was added back to the product stream, with no
grade to account for potential contamination from the original ground surface. The
remaining mineralization was included in an economically viable life of mine plan and, in
Scott Wilson RPA’s opinion, constitute mineral reserves as summarized in Table 17-8.
TABLE 17-8 MINERAL RESERVES Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project
Dam Classification Tonnes Grade
Cu Pb Zn Ag Au (Mt) (%) (%) (%) (%) (%)
South Proven 2.43 0.47 1.15 2.52 23.89 0.21 Probable 1.86 0.47 1.15 2.32 22.86 0.21 Prov + Prob 4.29 0.47 1.15 2.43 23.44 0.21 West Proven 2.05 0.59 1.42 1.94 34.63 0.36 Probable 1.88 0.59 1.46 1.85 35.08 0.36 Prov + Prob 3.93 0.59 1.44 1.90 34.85 0.36 North Proven 0.83 0.42 1.39 2.28 34.89 0.27 Probable 2.20 0.39 1.37 2.36 37.69 0.26 Prov + Prob 3.02 0.40 1.38 2.34 36.92 0.26 All Dams Proven 5.31 0.52 1.33 2.33 30.57 0.30 Probable 5.94 0.49 1.36 2.25 32.96 0.29 Prov + Prob 11.24 0.49 1.31 2.22 31.05 0.28
Notes:
1. CIM definitions were followed for mineral reserves. 2. Mineral reserves are estimated at a zero cut-off grade. 3. Mineral reserves estimated using bulk density of 1.7 t/m3 for TDS, 1.85 t/m3 for TDW, 1.6 t/m3 for
TDNU, and 1.35 t/m3 for TDNR. 4. Columns and rows may not add exactly due to rounding.
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 18-1
18 OTHER RELEVANT DATA AND INFORMATION Scott Wilson RPA is not aware of any other relevant data or information that should be
included in this Technical Report.
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 19-1
19 ADDITIONAL REQUIREMENTS MINING OPERATIONS The Woodlawn Retreatment Project will be an open cut hydraulic mining operation to
recover previously processed mineralized tailings, with ore processing by grinding and
flotation to recover three saleable concentrates - zinc, copper, and lead. The primary
goal is to regrind the material to a finer grind size to liberate the contained metals. Mine
production will be a nominal 4,300 tonnes per day of reclaimed tailings that is pumped to
the process plant. The Project is designed as a 1.5 million tonne per year operation with
a 7.5 year mine life.
MINE DESIGN Overall direction for mining the dams was based on relative net smelter metal values in
each area. The order was determined to be TDS, then TDW, then TDN. Also
supporting this order was the replacement of tailings from the processing plant being
better accommodated by the large storage volume available in TDS after the new tailings
pond is filled. TDS has capacity for tailings from both TDW and TDN. TDN is also a
logical choice for treatment last, given the lower values and the material in the top layer
of the dam having been retreated by Denehurst from 1991 to 1996. Figure 19-1 shows
the current tailings area.
A number of mine design factors were considered and applied where necessary to the
resource including dilution and extraction modifying factors. The overall volumes were
obtained from the topographic surfaces before tailings placement and the current
topographic surfaces. The surfaces used are shown in Figure 19-2.
The Feasibility Study is based on a hydraulic mining method using high pressure water
monitors as selected by Exoro Mining Services (Exoro). Hydraulic mining will progress
using a top-down approach with a channel feeding back to a sump. This herringbone
retreat method offers a number of operational advantages. The mining method is shown
in Figure 19-3.
TDN
TDS
TDW
December 2009 Source: Tri Origin Minerals Ltd., 2009.
Woodlawn Tailings Retreatment Project
Tailings Areas
Tri Origin Minerals Ltd.
Australia
Figure 19-1
19-2
SCOTT WILSON RPA www.scottwilson.com
LOWER SURFACE
UPPER SURFACE
December 2009 Source: Tri Origin Minerals Ltd., 2009.
Woodlawn Tailings Retreatment Project
Upper and Lower Surfaces forTailings Volume
Tri Origin Minerals Ltd.
Australia
Figure 19-2
19-3
SCOTT WILSON RPA www.scottwilson.com
Tailings flow
Worked outfloor Clean up 20-30m
behind active face
Active linebeing
monitored
Plan views
Plan view
Section view
45 degrees
1.0m
Not to scale
12 Operation
Starter channel and spindlepump placement
Spindle pump-collection point
December 2009 Source: Tri Origin Minerals Ltd., 2009.
Woodlawn Tailings Retreatment Project
Mining Method
Tri Origin Minerals Ltd.
Australia
Figure 19-3
19-4
SCOTT WILSON RPA www.scottwilson.com
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 19-5
The equipment has been chosen to hydraulic monitor using a “top-down” strategy. This
is seen as the most practical and safest monitoring strategy for the enclosed nature of
the dams. Full drainage of the tailings is unlikely to be achievable in the immediate time
frame and trafficability across the tailings will be difficult at times for heavier equipment.
Monitors will be equipped with hydraulic nozzle positioners to maintain optimum spray
patterns automatically without operator intervention. Water will be sprayed in a narrow
pattern using high pressure (20-25 bar) water. The water for the monitors will be
supplied from a multi-staged pumping array located at the recycle tank. Water will be
reticulated around a high pressure main installed on the dam walls and supplied to the
monitors through large diameter hoses. Standing water currently found on the surface of
the tailings is relatively acidic (pH~2) and equipment will require acid resistance
materials such as stainless steel to minimize wear.
To minimize operator exposure and maintain productivity, consistent feed rate, and
density, the monitors will be a combination of fixed and track-mounted units. Two
companies (Magnum Australia and Fraser Alexander) have provided pricing and
specifications for the monitoring equipment. An example of a track-mounted monitor
arrangement is shown in Figure 19-4.
FIGURE 19-4 TRACKED MONITOR (FRASER ALEXANDER)
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 19-6
MINE PLANNING The overall mine planning strategy was to mine all material accessible using hydraulic
mining in the order TDS, then TDW, then TDN. A cut-off grade parameter was not
determined for hydraulic mining and the assumption has been made that all material
accessible by the mining method will be mined and processed. This decision is also a
function of the low selectivity, low cost of the bulk mining method.
Mining will commence with a floating pontoon fitted with two 11 kW submersible pumps
to be installed in the southern end of TDS on the tailings surface to remove the standing
water volume estimated at 270,000 m3. A dual containment pipeline will be installed to
deliver the water to the evaporation dam. Standing water and drain-down water will be
transferred to the evaporation dam at a nominal rate of 100 m3/hr for a period of
approximately 22 weeks. After the tailings area is dewatered, an initial “slot” of tailings
will be removed using the monitor to establish the reclaim drainage channel and the
pumping station will be installed. From the sump a feed channel will be cut across each
mining cell and monitoring will develop the feed channel to the outside edges of the
tailings. The working face will be developed in a series of 20 m to 30 m echelon cuts
advancing toward the sump and the dam.
Monitoring will commence from a single track-mounted monitor working on top of the
tailings along the crest of the main drainage slot near the northwest corner of the TDS
where a working face will be developed. The slurry will then drain along the slot at a 1%
grade back to the reclaim sump for pumping to the thickener. The working face will then
be mined back to the sump. Monitoring operations will be on a 24-hour, 7-day per week
basis at a nominal rate of 190 tonnes per hour. Slurries developed by the monitors are
anticipated to be 55-60% solids.
Hydraulic mining of TDW involves removing the standing surface water volume
estimated at 45,000 m3 over a four week period and then developing two feed channels.
Mining is based on taking five metre high benches. Some cleanup will occur on each lift
as there will be an amount of natural land surface exposure on each successive lift
around edges away from the dam. The final lift will involve final floor cleanup to the base
of the dam.
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 19-7
Hydraulic mining of TDN involves five cells based on sections delineated by internal
walls constructed during placement of the original tailings. Current standing surface
water volume is estimated at 81,600 m3 and will require about seven weeks to remove.
The five cells will require developing five feed channels and sumps between the internal
walls. During original tailings placement, these internal walls were allowed to overtop
and then had roads re-established on them. The mining design involves leaving these
internal walls in place.
DILUTION AND LOSSES The review of the resource block model showed some blocks that would not be able to
be mined by the proposed hydraulic mining method. The block model was modified to
exclude these blocks. The resource block model was then adjusted to allow for dilution
and recovery. Mining recovery is based on an average expected loss of 20 cm of
tailings material in contact with other material. Additionally, a dilution value equivalent to
10 cm average vertical gain was added back to the product stream with no grade to
account for potential contamination from the original ground surface.
The application of dilution and loss was based on overall surface area for each
impoundment. TDS averages 3.3% overall ore loss and 1.6% overall dilution. TDN
averages 2.2% overall ore loss and 1.1% overall dilution. The same method of
calculation was undertaken for TDN, giving 2.9% overall ore loss and 1.5% overall
dilution. The block volumes and grades have been adjusted to reflect the estimated
recovery and dilution as per Table 19-1.
TABLE 19-1 ORE LOSS AND DILUTION FACTORS Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project
Dam Area Tails Volume Loss Dilution
(m2) (x106 m3) (% at 200 mm) (% at 100 mm) TDS 440,798 2.70 3.3 1.6 TDW 231,853 2.12 2.2 1.1 TDN 301,073 2.10 2.9 1.5
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 19-8
MINE PRODUCTION SCHEDULE The mine production schedule was generated based on reserves within the upper and
lower surfaces using the following parameters:
• Target of a nominal 1.5 million tonnes of ore per annum, or 4,300 tonnes per day.
• Target higher grade material in the earlier phases.
The schedule includes 11.2 million tonnes of proven and probable mineral reserves.
The life of mine production is shown in Table 19-2
TABLE 19-2 LIFE OF MINE PRODUCTION Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project
Ore
Year kTonnes Zn (%) Pb (%) Cu (%) Au (g/t) Ag (g/t) 1 1,298.80 2.55 1.23 0.49 0.22 24.62 2 1,450.00 2.45 1.17 0.48 0.21 24.02 3 1,499.80 2.36 1.07 0.45 0.2 22.07 4 1,499.70 1.86 1.48 0.65 0.32 32.5 5 1,500.60 1.93 1.49 0.6 0.39 36.68 6 1,500.20 2.19 1.45 0.46 0.39 37.48 7 1,499.90 2.37 1.24 0.41 0.25 34.26 8 944.1 2.07 1.37 0.33 0.25 39.09
Total 11,243.10 2.22 1.31 0.49 0.28 31.08 MINE EQUIPMENT Two track-mounted hydraulic monitor guns are planned as the primary earthmoving
units. The track-mounted hydraulic monitors will be supported by smaller fixed hydraulic
monitors that will be used for floor cleanup. A small Caterpillar 950G type wheel loader /
tool carrier will provide concentrate loading and general site services. Table 19-3 lists
the major mine equipment. The planned mine work schedule is two 12-hour shifts per
day, 7 days per week.
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 19-9
TABLE 19-3 MAJOR EQUIPMENT LIST Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project
Equipment Quantity Description
Monitors 15-Gun-01 15-Gun-02
2 2 x 150 mm, 25 bar 1. Fixed static mount equipped with automatic nozzle control to allow variable monitoring patterns. 2. Track mounted to allow remote operation by the operator.
High Pressure Pumps 15–PMP-01 to 04
4
Base-plate mounted horizontal centrifugal pumps – operating in series; 400 m3/h per monitor at nominal 25 bar delivery head
Reclaim Pump 15-PMP-07/08
2 Vertical spindle, slurry pumps mounted on a floating pontoon
General Pumping 15-PMP-13/14 15-PMP-11
2 1
Dam Dewatering Pumps – 100 m3/h General service pumps
Wheel Loader/ Tool Carrier
1 Site Services (concentrate) loader will be used for occasional earthmoving duty. Cat 950G
Crane 1 Site services BHB crane will be used for piping, pumping stations and other equipment movements
Piping Various HDPE HP piping suitable for low pH applications (SS316), suitable to operate in periodic frost conditions
MINERAL PROCESSING Mineral processing is a conventional flotation milling circuit with primary grinding using
two Deswik 2000L vertical mill units to get a P80 of 30 μm. The flotation circuit will
consist of the sequential flotation of talc, copper, lead, and zinc concentrates. The
flotation conditions will be controlled by reagent addition to achieve good mineral
separation. Following flotation, the copper, lead, and zinc concentrates will be
separately thickened in high-rate thickeners, with the underflows being pumped to
separate agitated storage tanks. The three concentrates will then be batched through
three dedicated vertical plate and frame filters discharging into stockpiles (copper and
zinc) or a feed bin (lead). The concentrates will be loaded into lined standard 20 ft
shipping containers and trucked to Port Botany container terminal.
RECOVERABILITY Process recoveries are determined by metallurgical testwork. Each of the five primary
metals (Zn, Cu. Pb, Ag, Au) will have some recovery in each of the concentrates
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 19-10
produced. The process recoveries for the mine reserves and life of mine production plan
are based on the average recoveries shown in Table 19-4.
TABLE 19-4 AVERAGE PROCESS RECOVERIES Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project
Zn (%) in Zn Conc 60.4% Zn (%) in Pb Conc 1.4% Zn (%) in Cu Conc 2.4% Total Zn Recovery 64.2% Cu (%) in Zn Conc 4.0% Cu (%) in Pb Conc 5.1% Cu (%) in Cu Conc 45.7% Total Cu Recovery 54.8% Pb (%) in Zn Conc 4.5% Pb (%) in Pb Conc 18.5% Pb (%) in Cu Conc 6.4% Total Pb Recovery 29.4% Ag (%) in Zn Conc 12.1% Ag (%) in Pb Conc 20.0% Ag (%) in Cu Conc 4.0% Total Ag Recovery 36.1% Au (%) in Zn Conc 10.0% Au (%) in Pb Conc 20.0% Au (%) in Cu Conc 5.0% Total Au Recovery 35.0%
Not all metal values in concentrate are payable. The base metals are payable in their
respective concentrate only. Combined zinc and lead greater than 5% in the copper
concentrate will be penalized. Precious metals are payable in all concentrates, but the
greatest value for silver and gold comes in the lead concentrate
MARKETS The base and precious metal markets are mature global markets with reputable smelters
and refiners located throughout the world.
Zinc, copper, and lead are principal metals traded on the London Metal Exchange (LME)
and have total price transparency. Prices are quoted on the LME for Zinc (99.995%
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 19-11
purity), Electrolytic Copper Cathode Grade A (99.99% purity), and Refined Pig Standard
Lead (99.97% purity) and can be found at www.lme.com.
The average zinc price for the first ten months of 2009 was $0.69 per pound. Current
prices as of November 23, 2009, are US$1.01 per pound. The three-year and five-year
rolling average prices through the end of October 2009 are $1.05 and $1.00 per pound,
respectively.
The average copper price for the first ten months of 2009 was $2.18 per pound. Current
prices as of November 23, 2009, are $3.10 per pound. The three-year and five-year
rolling average prices through the end of October 2009 are $2.83 and $2.58 per pound,
respectively.
The average lead price for the first ten months of 2009 was $0.73 per pound. Current
prices as of November 23, 2009, are $1.07 per pound. The three-year and five-year
rolling average prices through the end of October 2009 are $0.92 and $0.75 per pound,
respectively.
This technical report uses a metal price based on long-term projections from the major
banks. The prices used for the economic analysis are $0.80 per pound for zinc, $2.50
per pound for copper, and $0.60 for lead.
Silver and gold are principal metals traded at spot prices for immediate delivery. The
market for silver and gold trading typically spans 24 hours a day within multiple locations
around the world (such as New York, London, Zurich, Sydney, Tokyo, Hong Kong, and
Dubai). Daily prices are quoted on the New York spot market and can be found on
www.kitco.com.
The average New York spot gold price for the first ten months of 2009 was $941 per troy
ounce. The current New York price, as of November 23, 2009, is $1,164 per troy ounce.
The three-year and five-year rolling average prices through the end of October 2009 are
$819 and $695 per troy ounce, respectively.
The average New York spot silver price for the first ten months of 2009 was $14.04 per
troy ounce. The current New York price, as of November 23, 2009, is $18.58 per troy
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 19-12
ounce. The three-year and five-year rolling average prices through the end of October
2009 are $14.10 and $12.04 per troy ounce, respectively.
This Technical Report uses the long-term price forecasts from the major banks, with a
long-term average price for gold of $975 per troy ounce and an average price for silver of
$13.00 per troy ounce for the economic analysis.
Operations at the Project are expected to produce a nominal 36 million pounds of
payable zinc, 7 million pounds of payable copper, 7 million pounds of payable lead,
360,000 ounces of payable silver, 3,200 ounces of payable gold, annually, over an
estimated mine life of 7.7 years.
CONTRACTS It is too early in the Project to secure concentrate contracts. Three firms have provided
indicative terms for the Woodlawn concentrates and these have been used to estimate
total payable metal.
The zinc concentrates are lower in zinc (46.9%) than typical (50%-60%) zinc producers
but are anticipated to be acceptable to the market. A treatment charge of $300 per dry
metric tonne (dmt) has been used. Other terms include:
• Zn payable: 85% of the Zn content (subject to a min deduction of 8.0 units) • Au payable: Deduct 1 g/dmt and pay 75% of the balance • Ag payable: Deduct 30 g/dmt and pay for 65% of the balance • Fe penalty: $2.00 per 1% >8% • Co penalty: $0.50 per 50 > 100 ppm
The copper concentrates are lower in copper (21.4%) than typical (25-28%) copper
producers but are anticipated to be marketable in the China and India market. A
treatment charge of $50/dmt and refining charge of $0.05/lb have been used. Other
terms include:
• Cu payable: 96.5% of the Cu content (subject to a min deduction of 1.0 unit) • Au payable: Deduct 1 g/dmt and pay 90% of the balance • Ag payable: Deduct 30 g/dmt and pay for 90% of the balance • Au refining: $4.50/oz • Ag refining: $0.40/oz • Penalty: Pb/Zn $2.00 per 1% greater than 5% combined.
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 19-13
The lead concentrates are much lower in lead (35%) than typical (50%-65%) lead
producers but could be good for the Chinese market. A treatment charge of $280/dmt
has been used. Other terms include:
• Pb payable: 95% of the Pb content (subject to a min deduction of 3.0 units) • Au payable: Deduct 1 g/dmt and pay 90% of the balance • Ag payable: Deduct 100 g/dmt and pay for 90% of the balance • Au refining: $5.00/oz • Ag refining: $0.80/oz
Given the quantities being produced, the copper and lead concentrates could be shipped
in 5,000 t lots two to three times per year and zinc could go in 10,000 t lots every two to
three months.
ENVIRONMENTAL CONSIDERATIONS An Environmental Assessment (EA) is being prepared by consultants Parsons
Brinckerhoff for submission to the NSW Department of Planning, in fulfillment of the
project development approval process. A preliminary EA was prepared in March 2008
which found that five key areas should be addressed to mitigate environmental risks.
The June 2008 Feasibility Study and preliminary design has addressed each of these
items.
The closure and reclamation plan for the Project has been designed based on re-
establishing vegetation on the surface of the redisposed tailings. Total closure costs are
estimated to be $12.0 million prior to taking the salvage value of the assets into account.
A schematic drawing of the final tailings reclamation is illustrated in Figure 19-5.
Drain / sumpconstructed todewater tailings
Drain / sumpconstructed todewater tailings
ExistingLand
Surface
SEE DETAILBELOW
DamWall
Revegetation
Compost
DETAIL
Inert material
Inert material
CompactedInert material
200 mm
500 mm
100 mm
500 mm
as requiredfor stability
Compost
Biosolids or equivalent
T A I L I N G S
T A I L I N G S M A T E R I A L
December 2009 Source: Tri Origin Minerals Ltd., 2009.
Woodlawn Tailings Retreatment Project
Final Tailings Reclamation
Tri Origin Minerals Ltd.
Australia
Figure 19-5
19-14
SCOTT WILSON RPA www.scottwilson.com
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 19-15
TAXES Scott Wilson RPA has relied on Tri Origin for guidance on applicable taxes, royalties,
and other government levies or interests, applicable to revenue or income from the
Project. Australian Federal income taxes are 30%. A single ‘ad valorum’ royalty is
payable to the NSW state government at a rate of 4% of the total value of minerals
recovered or the ex-mine value calculated by deducting the direct costs incurred in
upgrading the minerals (after the first stockpile) and bringing it to market, from the gross
value of the minerals at the time of disposal. This is the only royalty that is payable by
Tri Origin.
CAPITAL AND OPERATING COST ESTIMATES OPERATING COSTS Exoro has developed a life of mine production plan (Table 19-2). Scott Wilson RPA
used the production and operating costs based on this life of mine plan. Average mining
cost per tonne over the life of mine is expected to be $1.56 for hydraulic mining.
These mining costs were used in conjunction with processing and general and
administrative (G & A) costs in the life of mine plan. Process operating costs are
expected to average $9.82 per ore tonne over the mine life, and G & A costs are
expected to average $1.31 per ore tonne.
Total Project operating costs are presented in Table 19-5.
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 19-16
TABLE 19-5 OPERATING COSTS Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project
Cost Centre
$/ore tonne $/lb Zn
$/lb ZnEq
Mining 1.56 0.06 0.03 Processing 9.82 0.41 0.20 Administrative 1.31 0.05 0.03 Total Direct Costs 12.69 0.52 0.26 Smelting & Refining 12.49 0.51 0.25 Transportation & Freight 2.40 0.10 0.05 Reclamation 0.21 0.01 0.00 Total Indirect Costs 15.10 0.61 0.31 Royalty 0.46 0.02 0.01 Total Royalties 0.46 0.02 0.01 Total Operating Costs 28.25 1.15 0.58
CAPITAL COSTS Intermet and BE Enterprises have developed the capital costs for the proposed
Woodlawn process plant based on quotes for the major equipment and presented in
2009 US dollars. The plant design which forms the basis of the estimate has been
addressed in Section 16. The overall capital cost for the plant, including the tailings, is
estimated at US$60.2 million, plus $5.3 million in sustaining capital. The details are
shown in Table 19-6.
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 19-17
TABLE 19-6 OVERALL CAPITAL COSTS Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project
Area Initial
$ Sustaining
$ LOM Total
$ Concrete 2,333 0 2,333 Structural 1,539 0 1,539 Platework 1,269 0 1,269 Mechanical 19,449 0 19,449 Pipework 2,203 0 2,203 Electrical 7,608 0 7,608 Buildings 1.216 0 1,216 Earthworks 1,009 0 1,009 Tailings Dam 1,256 0 1,256 Site Costs 4,196 0 4,196 Land Acquisition 1,600 0 1,600 Contingency – Direct Costs 4,345 0 4,345 Design 6,308 0 6,308 Preproduction 1,681 0 1,681 First Fills 20 0 20 Consumable Stocks 814 0 814 Spares 1,732 0 1,732 Contingency – Indirect Costs 644 0 644 Sustaining Capital 0 5,320 5,320 Total Capital Expenditure 60,163 5,320 65,483
ECONOMIC ANALYSIS The economic project evaluation is based on estimated operating costs supplied to Scott
Wilson RPA. This project evaluation work includes an economic summary, discounted
cash flow analysis, as well as capital and operating cost estimates. The mine plan for
this analysis is based on Exoro’s mine planning work.
Based on the costs in the Feasibility Study and Addendum, Scott Wilson RPA created an
economic analysis. The economic analysis shows that at long-term metal prices of
$0.80/lb zinc, $2.50/lb copper, $0.60/lb lead, $975/oz gold, and $13/oz silver, the Project
has a pre-tax net present value (NPV) at a 5% discount rate of $29.0 million and an
after-tax NPV at a 5% discount rate of $17.2 million. Total pre-tax undiscounted cash
flow is $57.6 million and after-tax cash flow is $40.2 million.
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 19-18
A preliminary income statement and cash flow are presented as Table 19-7 and Table
19-8, respectively.
Over the mine life, the Internal Rate of Return is 12.0% after tax with a payback period of
4.8 years after tax.
The cash operating cost per pound of zinc produced is $0.35 after by-product credits.
When capital costs are added, total cash and non-cash costs (fully loaded) are $0.59 per
pound of zinc after by-product credits.
ECONOMIC CRITERIA REVENUE
• Nominal 1.5 million tonnes per year. • Metal price: US$0.80 per pound zinc, US$2.50 per pound copper, US$0.60 per
pound lead, US$975 per ounce gold and US$13.00 per ounce silver. • Net Smelter Return includes smelting, refining, transport, and insurance costs. • Revenue is recognized at the time of concentrate shipment. • Operating costs in AUD converted to USD at US$0.80 per A$1.00.
COSTS
• Mine life: 7.7 years. • Life of mine production plan as summarized in Table 19-2 of this report. • Mine life capital totals $65.5 million. • Average operating cost over the mine life is $28.25 per tonne ore processed.
November 2009 Feasibility Study$0.80 Zn $0.60 Pb $2.50 Cu $13.00 Ag $975.00 AuAnnual Income Summary (in US$ millions)
Year -2 Year -1 Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 TOTAL
REVENUEZinc 0.0 0.0 29.3 32.5 31.3 24.6 25.6 29.0 31.4 17.3 0.0 0.0 220.9Copper 0.0 0.0 15.3 17.3 16.2 23.4 21.6 16.6 14.8 7.5 0.0 0.0 132.6Lead 0.0 0.0 3.6 3.9 3.6 5.0 5.0 4.9 4.2 2.9 0.0 0.0 33.0Gold 0.0 0.0 1.4 1.5 1.5 2.8 3.8 3.8 2.0 1.3 0.0 0.0 17.9Silver 0.0 0.0 3.1 3.5 3.2 5.0 5.8 6.0 5.4 4.0 0.0 0.0 36.1
Net Revenue 0.0 0.0 52.6 58.7 55.8 60.8 61.8 60.2 57.8 32.9 0.0 0.0 440.6
CASH COST OF SALESMining 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Process Plant 0.0 0.0 13.0 15.0 15.0 15.0 15.0 15.0 15.0 9.5 0.0 0.0 112.6General & Administrative 0.0 0.0 1.6 1.3 1.3 1.3 1.3 1.3 1.3 0.9 0.0 0.0 10.0Refining 0.0 0.0 17.9 19.8 19.0 17.0 17.4 18.8 19.4 11.1 0.0 0.0 140.4Refining 0.0 0.0 3.4 3.7 3.6 3.6 3.6 3.6 3.6 2.0 0.0 0.0 26.9Royalties 0.0 0.0 0.7 0.8 0.7 1.0 1.0 0.9 0.7 0.4 0.0 0.0 6.0Reclamation 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.4 2.4
Subtotal Cash Costs 0.0 0.0 36.5 40.6 39.5 37.8 38.2 39.5 40.0 23.8 0.0 2.4 298.3
NON-PRODUCTION COST OF SALESDepreciation 0.0 0.0 6.8 11.7 11.6 12.9 7.8 7.9 4.2 2.7 0.0 0.0 65.5Amortized Development Costs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Amortization of Transaction fee 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proceeds on Equipment Sales 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Write-down - Book Value @ Project End 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Subtotal Non-Production Costs 0.0 0.0 6.8 11.7 11.6 12.9 7.8 7.9 4.2 2.7 0.0 0.0 65.5
Net Income Before Tax (EBIT) 0.0 0.0 9.3 6.4 4.7 10.2 15.7 12.8 13.6 6.4 0.0 -2.4 76.8
Net Income After Tax 0.0 0.0 7.1 4.5 3.3 7.1 11.0 9.0 9.5 4.5 0.0 -2.4 53.6
TABLE 19-7 INCOME SUMMARYTri Origin Minerals Ltd. - Woodlawn Tailings Retreatment Project
SCO
TT WILSO
N R
PA
ww
w.scottw
ilson.com
Tri O
rigin Minerals Ltd. – W
oodlawn Tailings R
etreatment Project
Technical Report N
I 43-101 – Decem
ber 15, 2009 Page 19-19
November 2009 Feasibility Study$0.80 Zn $0.60 Pb $2.50 Cu $13.00 Ag $975.00 AuAnnual Cash Flow Summary (in US$ millions)
Year -3 Year -2 Year -1 Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 Year 11 TOTALSOURCESRevenue 0.0 0.0 0.0 52.6 58.7 55.8 60.8 61.8 60.2 57.8 32.9 0.0 0.0 0.0 440.6Costs (inc Tax & Int) 0.0 0.0 0.0 45.5 54.2 52.5 53.7 50.8 51.2 48.3 28.4 0.0 2.4 0.0 387.0Net Income - After Tax 0.0 0.0 0.0 7.1 4.5 3.3 7.1 11.0 9.0 9.5 4.5 0.0 -2.4 0.0 53.6
Depreciation & Amort 0.0 0.0 0.0 6.8 11.7 11.6 12.9 7.8 7.9 4.2 2.7 0.0 0.0 0.0 65.5From Eq Sale 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0FROM OPNS. 0.0 0.0 0.0 13.9 16.2 14.9 20.0 18.8 16.8 13.7 7.2 0.0 -2.4 0.0 119.1
From Banks 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Repayment 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
FROM FINANCING 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
SOURCES 0.0 0.0 0.0 13.9 16.2 14.9 20.0 18.8 16.8 13.7 7.2 0.0 -2.4 0.0 119.1
USES:Capex 0.0 0.0 60.2 1.4 3.6 0.0 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 65.5Working Cap. 0.0 0.0 1.9 3.6 0.5 -0.3 0.8 0.1 -0.3 -0.4 -1.8 -4.2 -0.2 0.2 0.0
USES 0.0 0.0 62.1 4.9 4.1 -0.3 1.2 0.1 -0.3 -0.4 -1.8 -4.2 -0.2 0.2 65.5
NET C.F. 0.0 0.0 -62.1 9.0 12.1 15.2 18.8 18.7 17.1 14.0 8.9 4.2 -2.2 -0.2 53.6
CUMULATIVE C.F. 0.0 0.0 -62.1 -53.1 -41.0 -25.8 -7.0 11.7 28.9 42.9 51.8 56.0 53.8 53.6
TABLE 19-8 AFTER-TAX CASH FLOW SUMMARYTri Origin Minerals Ltd. - Woodlawn Tailings Retreatment Project
SCO
TT WILSO
N R
PA
ww
w.scottw
ilson.com
Tri O
rigin Minerals Ltd. – W
oodlawn Tailings R
etreatment Project
Technical Report N
I 43-101 – Decem
ber 15, 2009 Page 19-20
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 19-21
SENSITIVITY ANALYSIS Sensitivity analyses were performed for zinc price, copper price, lead price, silver price,
capital cost, operating cost, and exchange rate. The sensitivity analyses indicate that
Project economics are most heavily influenced by the operating costs, zinc price, copper
price, and capital costs. A 10% change in operating costs results in a ± $17 million
change in the after-tax NPV at a 5% discount rate. A 10% change in zinc price results in
a ± $11 million change in the after-tax NPV at a 5% discount rate. A 10% change in
copper price results in a ± $6 million change in the after-tax NPV at a 5% discount rate.
A 10% change in capital costs results in a ± $4 million change in the after-tax NPV at a
5% discount rate. The Project is least affected by changes in exchange rate, lead price,
and silver price. A 10% change in the exchange rate, lead price or silver price results in
a less than ± $2 million change in the after-tax NPV at a 5% discount rate.
Results of the price sensitivity analyses are shown in Figure 19-6 and Table 19-9.
Reserve estimates were based on prices of US$0.80 per pound zinc, US$2.50 per
pound copper, US$0.60 per pound lead, US$975 per ounce gold, and US$13.00 per
ounce silver. Results from the economic analysis at these prices are shown in Table
19-8. Since an after-tax total cash flow of $40.2 million is achieved, the economic
criteria for the reserve statement are met and the resources can be properly classified as
proven and probable mineral reserves.
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 19-22
FIGURE 19-6 SENSITIVITY ANALYSIS
TABLE 19-9 SENSITIVITY ANALYSES Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project
Parameter Variables Units -20% -10% Base +10% +20%
Zinc Price US$/lb 0.64 0.72 0.80 0.88 0.96 Copper Price US$/lb 2.00 2.25 2.50 2.75 3.00 Lead Price US$/lb 0.48 0.54 0.60 0.66 0.72 Silver Price US$/oz 10.40 11.70 13.00 14.30 15.60
Operating Cost $millions 254 286 318 349 381 Capital Cost $millions 52 59 65 72 79
Exchange Rate AUD/USD 0.64 0.72 0.80 0.88 0.96
NPV @ 5% Units -20% -10% Base +10% +20% Zinc Price $millions (4) 7 17 28 38
Copper Price $millions 5 11 17 23 30 Lead Price $millions 14 16 17 19 20 Silver Price $millions 14 16 17 19 20
Operating Cost $millions 48 33 17 2 (16) Capital Cost $millions 26 21 17 13 9
Exchange Rate $millions 22 20 17 15 12
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 20-1
20 INTERPRETATION AND CONCLUSIONS ADEQUACY OF PROCEDURES Scott Wilson RPA and various other firms and independent consultants have reviewed
the methods and procedures utilized by Tri Origin and Denehurst at the Project to gather
geological and assaying information and found them reasonable and meeting generally
accepted industry standards for a property.
ADEQUACY OF DATA Scott Wilson RPA believes that Tri Origin and Denehurst have conducted exploration
and development sampling and analysis programs using standard practices, providing
generally reasonable results. Scott Wilson RPA believes that the resulting data can
effectively be used in the subsequent estimation of resources and reserves.
ADEQUACY OF STUDY This Technical Report is based on the Feasibility Study prepared by Intermet for the
Project. Scott Wilson RPA believes that these data and the supporting documents were
prepared using standard industry practices and provide reasonable results and
conclusions.
COMPLIANCE WITH CANADIAN NI 43-101 STANDARDS Scott Wilson RPA believes that the current drill hole database is sufficient for generating
a resource model for use in resource and reserve estimation. Recovery and cost
estimates are based upon sufficient data and engineering to support a reserve
statement. Economic analysis using these estimates generates a positive cash flow,
which supports a reserve statement.
Measured and indicated resources for all areas, are 11.65 Mt of material grading 2.3%
zinc, 1.4% lead, 0.5% copper, 0.3 g/t gold, and 32.0 g/t silver. After applying modifying
factors and meeting the economic criteria, the entire mineral resource is converted to
proven and probable mineral reserves. The estimated proven and probable mineral
reserves for the Project total 11.2 Mt of material grading 2.2% zinc, 1.3% lead, 0.5%
copper, 0.3 g/t gold, and 31.1 g/t silver.
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 20-2
Scott Wilson RPA believes that the mineral resource and mineral reserve estimates have
been created utilizing acceptable methodologies. Scott Wilson RPA is also of the
opinion that the classification of measured and indicated resources, stated in Table 17-1,
and proven and probable reserves, stated in Table 17-8, meet the definitions as stated
by NI 43-101, Form 43-101F1, and Companion Policy 43-101CP dated December 23,
2005.
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 21-1
21 RECOMMENDATIONS Scott Wilson RPA presents the following recommendations. The cost of the
recommended work is $6.12 million as summarized in Table 21-1.
TABLE 21-1 RECOMMENDED WORK PROGRAM Tri Origin Minerals Ltd. - Woodlawn Tailings Retreatment Project
Item Cost
($ 000s)
Metallurgy
Optimize both grind and regrind design, using Deswik technology including studying existing Deswik installations to confirm operating performance parameters.
Continue study copper lead separation parameters including determining appropriate design criteria that will provide the flexibility for in-service optimization of copper lead separation.
Undertake further confirmatory work on potential to scalp off course non-sulphide gangue from tailings, i.e., define optimal size for removing oversize material, talcs and sheet silicates.
Review Feasibility Study and Addendum and undertake a comprehensive Gap Analysis to identify areas that have not been adequately studied and could result in a fatal flaw being designed into the process.
Subtotal 250
Mineral Resource Estimate Run mineral resource block model using unfolding feature 30
Use composite length approximately equal to sample length 10
Subtotal 40
Environmental Assessment
Complete plans to meet Director General's Requirements for Environmental Approval of the Project
Optimize and cost plans for rehabilitation of the Project Site
200
Permitting
Satisfy any Department of Planning conditions imposed as conditions for the transfer of SML 20 to Tri Origin
500
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 21-2
Item Cost
($ 000s)
Engineering Prepare mine plan consistent with the actual monitoring operating
procedure 30
Proceed with detailed design 5,000
Subtotal 5,030
Concentrate Marketing 100
Total 6,120
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 22-1
22 REFERENCES Cotton, R. R. (2008): Woodlawn Re-Treatment Project, JORC Compliant Resource
Estimate of Woodlawn Tailings, prepared for Tri Origin Minerals Ltd., by R. R. Cotton, December 2008.
Hobby, David (2009): Woodlawn Tailings Dam Drill Program (Draft), internal report to Tri
Origin, 2009. Intermet Engineering Pty. Ltd. (2008): Woodlawn Retreatment Project, Bankable
Feasibility Study, prepared for Tri Origin Minerals Ltd., by Intermet Engineering Pty. Ltd., June 2008.
Rankin, R. (2008): Woodlawn Re-Treatment Project (WRP) Mineral Resources,
prepared for Tri Origin Minerals Ltd., by GeoRes, May 29, 2008. Rankin, R. (2009): Woodlawn Exploration Project Technical Report (NI43-101),
prepared for Tri Origin Minerals Ltd., by GeoRes, October 9, 2009.
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 23-1
23 DATE AND SIGNATURE PAGE This report titled “Technical Report on the Woodlawn Tailings Retreatment Project, New
South Wales, Australia” prepared for Tri Origin Minerals Ltd. and dated December 15,
2009, was prepared and signed by the following authors:
(Signed & Sealed) Dated at Toronto, Ontario December 15, 2009 Richard J. Lambert, P.E. Principal Mining Consultant (Signed & Sealed) Dated at Toronto, Ontario December 15, 2009 Wayne W. Valliant, P.Geo. Principal Geologist (Signed & Sealed) Dated at Toronto, Ontario December 15, 2009 Holger Krutzelmann, P.Eng. Principal Metallurgist
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 24-1
24 CERTIFICATE OF QUALIFIED PERSON RICHARD J. LAMBERT I, Richard J. Lambert, P.E., as an author of this report entitled “Technical Report on the
Woodlawn Tailings Retreatment Project, New South Wales, Australia” prepared for Tri
Origin Minerals Ltd. and dated December 15, 2009, do hereby certify that:
1. I am Principal Mining Consultant with Scott Wilson Roscoe Postle Associates Inc. of Suite 501, 55 University Ave Toronto, ON, M5J 2H7.
2. I am a graduate of Mackay School of Mines, University of Nevada, Reno, with a
Bachelors of Science degree in Mining Engineering in 1980, and Boise State University, with a Masters of Business Administration degree in 1995.
3. I am a Registered Professional Engineer in the state of Wyoming (#4857), the
state of Idaho (#6069), and the state of Montana (#11475). I have been a member of the Society for Mining, Metallurgy, and Exploration (SME) since 1975, and a Registered Member (#1825610) since May 2006. I have worked as a mining engineer for a total of 29 years since my graduation. My relevant experience for the purpose of the Technical Report is: • Review and report as a consultant on numerous mining projects for due
diligence and regulatory requirements • Mine engineering, mine management, mine operations and mine financial
analyses, involving copper, gold, silver, nickel, cobalt, uranium, oil shale, phosphates, coal and base metals located in the United States, Canada, Zambia, Madagascar, Turkey, Bolivia, Chile, Brazil, Serbia, Australia, Russia and Venezuela.
4. I have read the definition of "qualified person" set out in National Instrument
43-101 (NI43-101) and certify that by reason of my education, affiliation with a professional association (as defined in NI43-101) and past relevant work experience, I fulfill the requirements to be a "qualified person" for the purposes of NI43-101.
5. I visited the Woodlawn Property on November 10, 2009.
6. I am responsible for the preparation of Sections 1 through 6, and Sections 18
through 23.
7. I am independent of the Issuer applying the test set out in Section 1.4 of National Instrument 43-101.
8. I have had no prior involvement with the property that is the subject of the
Technical Report.
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 24-2
9. I have read National Instrument 43-101, and the Technical Report has been prepared in compliance with National Instrument 43-101 and Form 43-101F1.
10. To the best of my knowledge, information, and belief, the Technical Report contains all scientific and technical information that is required to be disclosed to make the technical report not misleading.
Dated this 15th day of December 2009 (Signed & Sealed) Richard J. Lambert, P.E.
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 24-3
WAYNE W. VALLIANT I, Wayne W. Valliant, P.Geo., as an author of this report entitled “Technical Report
on the Woodlawn Tailings Retreatment Project, New South Wales, Australia” prepared
for Tri Origin Minerals Ltd. and dated December 15, 2009, do hereby certify that:
1. I am Principal Geologist with Scott Wilson Roscoe Postle Associates Inc. of Suite
501, 55 University Ave Toronto, ON, M5J 2H7.
2. I am a graduate of Carleton University, Ottawa, Ontario, Canada in 1973 with a Bachelor of Science degree in Geology.
3. I am registered as a Geologist in the Province of Ontario (Reg.# 1175). I have
worked as a geologist for a total of 36 years since my graduation. My relevant experience for the purpose of the Technical Report is:
• Review and report as a consultant on more than thirty mining operations and projects around the world for due diligence and resource/reserve estimation
• General Manager of Technical Services for corporation with operations and mine development projects in Canada and Latin America
• Superintendent of Technical Services at three mines in Canada and Mexico
• Chief Geologist at three Canadian mines
4. I have read the definition of "qualified person" set out in National Instrument 43-101 ("NI 43-101") and certify that by reason of my education, affiliation with a professional association (as defined in NI 43-101) and past relevant work experience, I fulfill the requirements to be a "qualified person" for the purposes of NI 43-101.
5. I visited the Woodlawn Project on November 10, 2009.
6. I am responsible Sections 7–15 and 17 of the Technical Report.
7. I am independent of the Issuer applying the test set out in Section 1.4 of NI 43-101.
8. I have had no prior involvement with the property that is the subject of the Technical Report.
9. I have read NI 43-101, and the Technical Report has been prepared in compliance with NI 43-101 and Form 43-101F1.
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 24-4
10. To the best of my knowledge, information, and belief, the Technical Report contains all scientific and technical information that is required to be disclosed to make the technical report not misleading.
Dated this 15th day of December 2009
(Signed & Sealed)
Wayne W. Valliant, P. Geo.
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 24-5
HOLGER KRUTZELMANN I, Holger Krutzelmann, as an author of this report entitled “Technical Report on the
Woodlawn Tailings Retreatment Project, New South Wales, Australia” prepared for Tri
Origin Minerals Ltd. and dated December 15, 2009, do hereby certify that:
1. I am Principal Metallurgist with Scott Wilson Roscoe Postle Associates Inc. of Suite
501, 55 University Ave Toronto, ON, M5J 2H7. 2. I am a graduate of Queen’s University, Kingston, Ontario, Canada in 1978 with a
B.Sc. degree in Mining Engineering (Mineral Processing). 3. I am registered as a Professional Engineer with Professional Engineers Ontario
(Reg.# 90455304). I have worked as a metallurgist for a total of 30 years since my graduation. My relevant experience for the purpose of the Technical Report is:
• Reviews and reports as a metallurgical consultant on a number of mining operations and projects for due diligence and financial monitoring requirements
• Senior Metallurgist/Project Manager on numerous gold and base metal studies for a leading Canadian engineering company.
• Management and operational experience at several Canadian and U.S. milling operations treating various metals, including copper, zinc, gold and silver.
4. I have read the definition of "qualified person" set out in National Instrument 43-101
(NI 43-101) and certify that by reason of my education, affiliation with a professional association (as defined in NI 43-101) and past relevant work experience, I fulfill the requirements to be a "qualified person" for the purposes of NI 43-101.
5. I have not visited the Woodlawn Project. 6. I am responsible for preparation of Section 16 of the Technical Report. 7. I am independent of the Issuer applying the test set out in Section 1.4 of NI 43-101. 8. I have had no prior involvement with the property that is the subject of the Technical
Report. 9. I have read NI 43-101, and the Technical Report has been prepared in compliance
with NI 43-101 and Form 43-101F1.
SCOTT WILSON RPA www.scottwilson.com
Tri Origin Minerals Ltd. – Woodlawn Tailings Retreatment Project Technical Report NI 43-101 – December 15, 2009 Page 24-6
10. To the best of my knowledge, information, and belief, the Technical Report contains all scientific and technical information that is required to be disclosed to make the technical report not misleading.
Dated this 15h day of December 2009
(Signed & Sealed)
Holger Krutzelmann, P.Eng.