TECHNOCOMMERCIAL OFFER FOR VAPOURABSORPTION MACHINE BASED
SYSTEM
OFFER NO: MPL-32-UTV-001-OFFER
TENDER REFRENCE NO.: MPL-32-UTV-001
Submitted to
M/s MADHUCON PROJECTS LTD.SPSR NELLORE, ANDHRA PRADESH
Submitted by
C & H Cooling Division.www.thermaxindia.com.
Phone : +91 20 66122123 , 9765565211Fax : +91 20 27475907
PDF created with pdfFactory Pro trial version www.pdffactory.com
http://www.thermaxindia.com/http://www.pdffactory.com/http://www.pdffactory.com/http://www.pdffactory.com/http://www.thermaxindia.com/ -
7/28/2019 Technical Offer From Thermax on 13.05.10
2/32
-------------------------------------------------------------------------------------------------------------Techno commercial proposalRev :00 Page No. 2 of 32 Date : 10th May 2010
Offer No: MPL-32-UTV-001-OFFERDate: 13/05/2010
M/s MADHUCON PROJECTS LTD.
SPSR NELLORE,ANDHRA PRADESH
Kind Attn: -- Mr. CH. RAJA RAO
Dear Sir,
Sub: Offer for Vapour Absorption Machine based Air-Conditioning System.
This has a reference to the Tender No. MPL-32-UTV-001 regarding the captionedsubject.
Thank you very much for inviting us to participate in this prestigious project.
We are pleased to submit our techno commercial proposal for this project as perthe following options:
Our offer consists of the following;
1. Salient Features of Thermax System2. System description3. Technical Specifications of VAM4. Technical Specifications for Balance of Plant5. Scope of supply6. Exclusion
7. Feeder List8. Plot Plan9. Client inputs10. Commissioning and Performance testing11. Vendor list12. Notes and Deviations:13. Price schedule14. Terms and conditions of Sale
We hope our proposal shall meet your expectations and expect your esteemedorder. In case any further clarifications are required, please contact the
undersigned. Thanking you and assuring you of our best attention at all times.
FOR THERMAX LTD.
Mohsin H. Pathan.Cooling SBUContact : 9866159311Email: [email protected]
PDF created with pdfFactory Pro trial version www.pdffactory.com
mailto:[email protected]://www.pdffactory.com/http://www.pdffactory.com/http://www.pdffactory.com/mailto:[email protected] -
7/28/2019 Technical Offer From Thermax on 13.05.10
3/32
-------------------------------------------------------------------------------------------------------------Techno commercial proposalRev :00 Page No. 3 of 32 Date : 10th May 2010
1) SALIENT FEATURES OF THERMAX SYSTEM
1] Two stage evaporation ensuring Lowest steam consumption : Thermax
GNxtChill VAHPs comes with two stage evaporation technology which
ensures the lowest specific steam consumption as compared to other
contemporary VAHPs making them the most efficient VAHPs in their
category. The specific steam consumption is as low as 3.7 kg/TR/hr for small
to medium capacity range and 3.5 kr/TR/hr for large capacity range.
This results in substantial benefits to the customer during the entire Life
Cycle of the VAHP in the following ways: Lowest operating cost throughout the life cycle of the VAHP
Lowest water consumption in cooling tower resulting in savings of the
precious water
2] Online concentration measurement and control: Thermax GNxtChill
series is equipped with the state of the art Real-time Online Concentration
measurement which is displayed continuously on the control panel. This
feature is unique to Thermax GNxtChill series VAHPs. This concentration is
continuously compared with the Crystallization Concentration and correctiveactions are taken by the PLC immediately whenever there is any
discrepancy thereby virtually eliminating the Crystallization phenomenon.
This feature is distinctly different from the auto de-crystallization feature
which is Common for all VAHP manufacturers. Please note that this auto
decrystallisation is only a reactive safety (will come into effect only after the
crystallization phenomenon has started) and not a proactive control.
3] Advanced Series flow Technology: Vapor Absorption Technology has got
only 2 major threats Corrosion and Crystallization. Thermax GNxtChill
series comes with the Advanced Series flow technology which ensures that
Crystallization is completely eliminated and corrosion is minimized to the
maximum possible extent. This is mainly possible due to
PDF created with pdfFactory Pro trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/http://www.pdffactory.com/ -
7/28/2019 Technical Offer From Thermax on 13.05.10
4/32
-------------------------------------------------------------------------------------------------------------Techno commercial proposalRev :00 Page No. 4 of 32 Date : 10th May 2010
Crystallization : Measurement of concentration online through our unique
Real-time Online Concentration Measurement as explained in point no.2
Corrosion: Corrosion depends on the Lithium bromide concentration and
temperature and leakages. Corrosion rate increases exponentially when
high temperature and high concentration occurs simultaneously. Thermax
has carefully selected Advanced Series Flow Technology (after absorbing
the technical knowhow from Kawasaki and supplying more than 400
machines in Parallel flow and Reverse flow VAHPs) so that highest
temperature of Lithium bromide and highest concentration never occurs
simultaneously. The below table will illustrate the same clearly :
Table below shows comparison of series and para flow for HTG & LTG
Parameter for HTG Unit Para flow
Advanced
Series flow
HTG temperature C 162 155
LiBr concentration % 64-65 60.5
Parameter for LTG Unit Para flow
Advanced
Series flow
LTG temperature C 88 90
LiBr concentration % 62-64 63
Also, the spraying Lithium bromide concentration in the absorber has to be
63% irrespective of the cycle. At 63% concentration the corresponding
crystallization temperature is 34C.
In Advanced Series Flow technology, the Spray solution lithium bromide
temperature (@ outlet of LTHE) is >48C. This wide temperature differential
between operating temperature and crystallization temperature (app. 14C)
ensures that the machine is always far away from the crystallization zone.
This difference is always maintained as we measure the concentration and
strong solution temperature.
In Para flow technology, Spray solution lithium bromide temperature (@
outlet of LTHE) is 40-41C. The temperature differential is very less (only 6-
PDF created with pdfFactory Pro trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/http://www.pdffactory.com/ -
7/28/2019 Technical Offer From Thermax on 13.05.10
5/32
-------------------------------------------------------------------------------------------------------------Techno commercial proposalRev :00 Page No. 5 of 32 Date : 10th May 2010
7C) between the operating temperature and the crystallization temperature
as compared to the Advanced Series Flow Technology. So, when the
cooling water inlet temperature to the VAHP goes low or if there is any
fluctuation in the load, the Spray solution lithium bromide temperature @
outlet of LTHE reduces thereby making Para flow VAHPs more susceptible
to crystallization.
The above points clearly prove that the claim of Para flow technology
being less prone for crystallization is not true.
4] Invertor control for absorbent pump: Thermax GNxtChill series VAHPs
come with AC drive for the absorbent pumps which ensures that at part
loads, the COP of the VAM improves thereby resulting in improvedperformance of the VAM.
5] Multi stage level control at different locations: It has been proven
worldwide that for efficient and foolproof control of any CRITICAL application
Level controls are a must. Thermax GNxtChill series come with Multi stage
level sensing electrodes in High temperature generator (HTG) , Absorber
and Evaporator.
Advantages of Multistage level control are:
Increase life of solution pumps (absorbent and refrigerant pumps) by
avoiding dry running at any point of time
Ensures excellent and precise control of LiBrand refrigerant,
especially uring fluctuating part load conditions thereby increasing the
COP of the machine under partload.
Crystallization prevention at fluctuating load and low cooling water
inlet temperatures
Most of the other VAM manufacturers opt for mechanical float type control or
level control in HTG and / or Evaporator which is not very accurate and at
fluctuating part load conditions requires frequent resetting.
PDF created with pdfFactory Pro trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/http://www.pdffactory.com/ -
7/28/2019 Technical Offer From Thermax on 13.05.10
6/32
-------------------------------------------------------------------------------------------------------------Techno commercial proposalRev :00 Page No. 6 of 32 Date : 10th May 2010
6] Vacuum seal Isolation valves for abs/ref Pumps: Thermax GNxtChill
VAHPs are provided with unique Vacuum Seal Isolation valves at the
inlet/outlet of absorbent and refrigerant pumps which ensures that there is
no vaccum breakage required for any maintenance/replacement of the
pumps. With the above valves, any maintenance activity (including
replacement) of the absorbent and refrigerant pumps can be done within
hours.
Other VAM manufacturers provide normal isolation valves (butterfly or gate
type) which are not vacuum seal type. Hence for any maintenance activity
on the absorbent/refrigerant pump, the LiBr has to be removed, the
suction/.discharge line has to be cut to remove the pump, LiBr recharging,
etc which will require 3-4 days time period.
7] Cooling water up to 10 deg C: Thermax GNxtChill VAHPs can operate
even when the cooling water inlet temperature goes as low as 10 deg C.
This is mainly possible only due to Real-time Online Crystallization
measurement.
Controls & Safeties:
1 Anti freeze protection 13 Refrigerant pump overload relay trip
2 Chilled water DP switch 14 Refrigerant pump not responding
3 Chilled water flow switch 15 Crystallization prevention control
through concentration measurement
4 Chilled water L cut control 16 Cavitation protection for refrigerant
pump
5 Chilled water low / no flow
interlock with cooling water flow
17 Cavitation protection for absorbent
pump
6 Fixed ramp rate of loading for
thermal shock prevention
18 Vacuum pump overload relay trip
7 Absorbent pump overload relay
trip
19 Cooling water low inlet temperature
(less than 10C) safety
8 HTG high temperature safety 20 Temperature sensors errors
9 HTG high vapor temperature
safety
21 CT fan control on cooling water inlet
temperature
PDF created with pdfFactory Pro trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/http://www.pdffactory.com/ -
7/28/2019 Technical Offer From Thermax on 13.05.10
7/32
-------------------------------------------------------------------------------------------------------------Techno commercial proposalRev :00 Page No. 7 of 32 Date : 10th May 2010
10 HTG level control 22 Chilled water pump run/trip interlock
11 SCV control on HTG and chilled
water outlet temperatures
23 Cooling water pump start / stop
permissive contact
12 Solution pump AC drivemodulation
24 Cooling tower fan start / stoppermissive contact
PDF created with pdfFactory Pro trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/http://www.pdffactory.com/ -
7/28/2019 Technical Offer From Thermax on 13.05.10
8/32
-------------------------------------------------------------------------------------------------------------Techno commercial proposalRev :00 Page No. 8 of 32 Date : 10th May 2010
2) SYSTEM DESCRIPTION
Introduction:
Madhucon Projects Limited Are the EPC Contractor for setting up of 2 x150 MW Phase#1, Thermal Power Plant at tamminapatnam, Nellore Dist, AP forSimhapuri Energy Private Limited. This offer contains Vapour Absorption Machine& Accessories part of the same.
Operating Philosophy:
The purpose of the Vapor absorption machine is to produce chilled water,utilizing the Steam available in the plant. Chilled water thus produced from VAMwill be circulated along the AHUs of the Plant rooms, thus cooling the air flowing
through the AHUs & providing the required Air-Conditioning.. There will be raise intemperature when it comes out of the AHUs. This water will be again taken to theVAM for cooling the water again with the help of refrigerant. As the refrigerantbecomes dilute it loses its capacity to absorb Water Vapor. It thus needs to be re-concentrated using a Heat Source.
Total 3 nos. of Vapour Absorption Machines, 260 TR each (2 Working & 1Standby) are provided to fulfill the requirement of the Air-Conditioning.
The external circuits for the Proposed Vapour Absorption System are asfollows;;
1) Chilled Water piping system:
Chilled water coming out from the Chilled water return storage tank of willbe fed in to the Vapour Absorption System. The temperature of the chilled watercoming in to the system is considered as 14 deg.C & will be coming out at 7deg.C, at a flow rate of 112 m3/hr, which will be stored in Chilled water supplystorage tank. For this circulation 2 Working & 1 Standby pump will be used.
7 deg.C chilled water in the Chilled water supply storage tank will besupplied to the AHUs & chilled water coming out of the AHUs will be supplied to
the Chilled water return storage Tank. For this circulation also 2 Working & 1Standby pump will be used.
Chilled water circuit consists of chilled water pumps and associated pipingsystem (valves, piping, instruments etc).
PDF created with pdfFactory Pro trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/http://www.pdffactory.com/ -
7/28/2019 Technical Offer From Thermax on 13.05.10
9/32
-------------------------------------------------------------------------------------------------------------Techno commercial proposalRev :00 Page No. 9 of 32 Date : 10th May 2010
2) Cooling Water Circuit:
2 Working & 1 Standby Cooling Towers will be provided to serve the
Cooling water requirement of the Vapour Absorption Machines.Also, a suitably designed pumping system, associated piping system &Valves, Instrumentation, etc will be provided.
3) Steam Circuit:
The steam available in the plant will be utilized in Vapour AbsorptionMachine as a Heat Source.
A suitably designed PRDS alongwith necessary piping, valves,Instrumentation, etc will be provided.
4) Condensate Circuit:
Condensate coming out of the Vapour Absorption Machines will be put in tothe Condensate Tank. The same Condensate will be utilized as Spray Water forPRDS & remaining will be going back to the Boiler.
Suitable pumping system will be provided to pump the Condensate to thePRDS.
PDF created with pdfFactory Pro trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/http://www.pdffactory.com/ -
7/28/2019 Technical Offer From Thermax on 13.05.10
10/32
-------------------------------------------------------------------------------------------------------------Techno commercial proposalRev :00 Page No. 10 of 32 Date : 10th May 2010
3) TECHNICAL SPECIFICATIONS OF VAM
Input Parameters for the Design of the Vapor Absorption Machine:
DESCRIPTION UOM QUANTITY
Steam Available Kg/hr2500 @ 220 250 deg.C at 12- 15Bar(g)
Capacity required TR520 TR ( 260 TR * 2 no working +260 TR * 1 no standby)
Chilled water temperature profile Deg.CInlet 14 deg.COutlet 7 deg.C
VAM Specifications per VAM :
Description Unit Cooling Mode
Capacity ( + 3 %) : TR 260.0
A Chilled Water Circuit :
1. Chilled water flow m/hr 112
2. Chilled water inlet temperature C 14.0
3. Chilled water outlet temperature C 7.0
4. Chilled water circuit pressure drop mLC 3.7
5. Chilled water Connection diameter DN 150
6. Maximum working pressure kg/cm(g) 8
B Cooling Water Circuit:
1. Cooling water flow m/hr 165
2. Cooling water inlet temperature C 32.0
3. Cooling water outlet temperature C 30.3
4. Absorber / Condenser passes No. 2+2/1
5.Cooling water circuit pressuredrop
mLC 10.2
6.Cooling water connectiondiameter
DN 200
7. Maximum working pressure kg/cm(g) 8
PDF created with pdfFactory Pro trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/http://www.pdffactory.com/ -
7/28/2019 Technical Offer From Thermax on 13.05.10
11/32
-------------------------------------------------------------------------------------------------------------Techno commercial proposalRev :00 Page No. 11 of 32 Date : 10th May 2010
C Steam Circuit :
1. Steam pressure kg/cm(g) 8.0
2. Steam consumption kg/hr 1000
3. Condensate drain temperature C 80 - 1004. Maximum working pressure kg/cm(g) 10.5
D Electrical Data :
1. Power supply415 V( 10%), 50 Hz(5%), 3 Phase+N
2. Power consumption kVA 9.1
3. Absorbent pump rating kW (A) 3.0 (8.0)
4. Refrigerant pump rating kW (A) 0.3 (1.4)
5. Vacuum pump rating kW (A) 0.75 (1.8)
E Physical Data :
1. Length mm 4390
2. Width mm 2300
3. Height mm 2910
4. Operating weight ton 10.50
5. Tube cleaning space mm 4100
Notes:
1. The capacity & heat consumption given above are for insulated machine.The capacity & Heat consumption for non-insulated machine shall be 98%& 102% of their rated values respectively.
2. Ambient condition: 5 to 45 0C ; Relative Humidity : 30 to 75 % is considered
for system design.
3. All Nozzle connections suitable to ASME B16.5 Class 150.
PDF created with pdfFactory Pro trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/http://www.pdffactory.com/ -
7/28/2019 Technical Offer From Thermax on 13.05.10
12/32
-------------------------------------------------------------------------------------------------------------Techno commercial proposalRev :00 Page No. 12 of 32 Date : 10th May 2010
4) TECHNICAL SPECIFICATIONS FOR BALANCE OF PLANT
CHILLED AND COOLING WATER PUMP
Specifications:Type Centrifugal pumps
Application water
Temperature of fluid;
- Chilled water 5 - 30 deg.C
- Cooling water 20 - 45 deg.C
Material of Construction:
Body CI
Impeller CI
Shaft SS
Packing Gland Packing
CONDENSATE PUMP
Specifications:
Type Centrifugal pumps
Application Hot water
Temperature of fluid 60 - 99 deg.C
Material of Construction:
Body CI
Impeller CI
Shaft SS
Packing Mechanical Seal
MOTORS FOR PUMPS
TypeTotally Enclosed Fan Cooled Squirrel CageInduction Motor : Foot mounted type
Method of Starting Direct Online
Class of Duty Type S1, continuous duty, of IS: 325-1978Type of Protection IP55
Supply Voltage 415 V (+/- 10%)
Frequency 50 Hz (+/- 5%)
No. Phases 3
No of poles 4
RPM 1500 / 3000
PDF created with pdfFactory Pro trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/http://www.pdffactory.com/ -
7/28/2019 Technical Offer From Thermax on 13.05.10
13/32
-------------------------------------------------------------------------------------------------------------Techno commercial proposalRev :00 Page No. 13 of 32 Date : 10th May 2010
Type of Insulation Class F
VALVES
1) BUTTERFLY VALVE
Type: Lug Wafer Type
Pressure Rating: PN 10
Ends Flanged
Material Of Construction: -
Body CI
Disc Ductile Iron
Stem Carbon Steel: BS 970,
Seat- EPDM Food Grade
Bush Acetal
2) CHECK VALVE
Valve Type: Self acting Non-return valves
Description:Single Plate Wafer type Swing CheckValve
Body Type: Short Pattern Wafer Type
Disc Type: With Integral hinge pin
Pressure Rating: PN10
Ends Flanged
Material Of Construction: -Body CI
Disc CI
Seat- EPDM Food Grade
3) GATE VALVE 50 NB ANDABOVE
Body & Bonnet: ASTM A216 WCB
Type: OS & Y Type, Bolted Bonnet
Ends Flanged
4) GATE VALVE 40 NB ANDBELOW
Body & Bonnet: ASTM A105
Type: OS & Y Type, Bolted Bonnet
PDF created with pdfFactory Pro trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/http://www.pdffactory.com/ -
7/28/2019 Technical Offer From Thermax on 13.05.10
14/32
-------------------------------------------------------------------------------------------------------------Techno commercial proposalRev :00 Page No. 14 of 32 Date : 10th May 2010
Valve Testing: API 598
Ends Socket Welded
5) STRAINER
Type : Y strainer
End Connection: Flanged
Body : CI
Cover : CI
Filter SS
Guide vanes : CI
PIPES
Chilled & cooling water IS 1239 / IS 3589, MS ERW Pipe
Steam & Condensate SA106, Seamless
INSULATION
Cold insulationThermocole insulation + 24 G Aluminumcladding
Hot insulationLight resin Bonded Insulation + 24 G
Aluminium Cladding
COOLING TOWER FOR 260 TR VAM
Design Wet Bulb Temp. 28 C (customer to confirm)
Specifications
Type Counter / Cross Flow,
Induced/Forced Draft
No. of Towers 1 No.
Material
Main Equipment GRP/FRP
PDF created with pdfFactory Pro trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/http://www.pdffactory.com/ -
7/28/2019 Technical Offer From Thermax on 13.05.10
15/32
-------------------------------------------------------------------------------------------------------------Techno commercial proposalRev :00 Page No. 15 of 32 Date : 10th May 2010
5) SCOPE OF SUPPLY
Scope of supply for single Vapour Absorption Machine:
Sr.No. Description Qty1 Lower shell comprising of evaporator and absorber 1
2 Upper shell comprising of low temperature generator and
condenser
1
3 High temperature generator 1
4 Regenerative heat exchangers 1 lot
5 Absorbent pump set 1 lot
6 Refrigerant pump set 1 lot
7 Purge unit with vacuum pump 1 lot
8 PLC based control panel with temperature & TR display 1
9 Temperature sensors 1 Lot
10 Inter connecting piping and wiring 1 Lot
11 Operation maintenance manual 1
12 Pneumatic 2 way Steam control valve with I/P converter and
air filter regulators
1 lot
13 AC drive for absorbent pump 1 no
Scope of supply of liquids
1. Lithium Bromide duly inhibited 1 Lot
2. Refrigerant water with Octyl Alcohol 1 Lot
Technical: Packing :Operational & Maintenance Manual. Thermax standard packing.
PDF created with pdfFactory Pro trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/http://www.pdffactory.com/ -
7/28/2019 Technical Offer From Thermax on 13.05.10
16/32
-------------------------------------------------------------------------------------------------------------Techno commercial proposalRev :00 Page No. 16 of 32 Date : 10th May 2010
Scope of supply for Balance of Plant
Sr. Description Unit Qty
A COOLING WATER CIRCUIT
- 3 No Cooling tower for handling heat rejectionfrom 2 No 260TR VAM ( 2 working + 1 standby cell)
- 3 Nos (2 working + 1 standby) Cooling waterpumps with suitable motor and requiredaccessories.
- Valves, strainers, NRVs, etc in the coolingwater circuit as required
- Interconnecting piping - MS ERW as per IS1239/ IS 3589 with fittings, hard wares,flanges and fitting as required.
- Instrumentation like Flow Transmitters,Pressure gauges, etc as required
Lot 1
B CHILLED WATER CIRCUIT
- 3 No (2 working + 1 standby) Chilled waterpumps with suitable motor and requiredaccessories for supplying chilled water fromReturn Chilled water tank to Vapour
Absorption machine.
- 3 No (2working + 1 standby) Chilled waterpumps with suitable motor and requiredaccessories for supplying chilled water fromSupply Chilled water tank to AHUs.
-1 No. Make up water Storage Tank, Valves,strainers, NRVs, etc in the chilled water circuitas required
- Interconnecting piping - MS ERW as per IS1239/ IS 3589 with fittings, hard wares,flanges and fitting as required.
Lot 1
PDF created with pdfFactory Pro trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/http://www.pdffactory.com/ -
7/28/2019 Technical Offer From Thermax on 13.05.10
17/32
-------------------------------------------------------------------------------------------------------------Techno commercial proposalRev :00 Page No. 17 of 32 Date : 10th May 2010
- Instrumentation like Pressure gauges, FlowTransmitter as required
- Insulation for chilled water piping
C STEAM CIRCUIT
- 1 No. Pressure reducing & De superheatingStation.
- Valves, Steam Trap with strainer, etcas required
- Interconnecting piping SA106 Seamless withfittings, hard wares, flanges and fitting asrequired.
- Instrumentation like Pressure gauges, FlowTransmitter, etc as required
- Insulation for Steam piping
Lot 1
D CONDENSATE CIRCUIT
- 2 Nos. (1Working + 1Standby) Condensatepumps for feeding condensate to the PRDS.
- 1 No. Condensate Tank, Valves, NRVs,strainers, etc as required
- Interconnecting piping SA106 Seamless withfittings, hard wares, flanges and fitting asrequired.
- Instrumentation like Pressure gauges, etc asrequired
- Insulation for Condensate piping
Lot 1
PDF created with pdfFactory Pro trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/http://www.pdffactory.com/ -
7/28/2019 Technical Offer From Thermax on 13.05.10
18/32
-------------------------------------------------------------------------------------------------------------Techno commercial proposalRev :00 Page No. 18 of 32 Date : 10th May 2010
EBasic piping supports including MSchannels, frames, angles, trunnions, etc
Lot 1
F MCC Panel, Power Cables, InstrumentCables, Cable Trays, Terminations, etc.
Lot 1
G Finish painting Lot 1
H VAM Hot and Cold insulation Set 1
Notes :
Sr.
NoNote Tender reference
1All measurement for insulation will bebased as per IS: 14164 1994
2Piping & Components under only C1zone are considered as mentioned inP&ID
Drg. NO. 26298-32-09-UTV-0065
3
Major structural modifications likeconstruction of new pipe racks, etc shallbe extra to client account. All civilpedestals for the structural supports areto be provided by client. The piping
supports provided by us will be basicstructurals & does not include piperacks
4
For Chilled water piping 200 NB headerlength considered from chilled watersupply pumps is 42 mtrs, This will bethe battery limit for chilled water ckt.
Any upward increase in the length shallbe charged extra to Client account @Rs.5036/- Per running meter includinginsulation, structure & erection cost.
Drg. NO. 26298-32-09-UTV-0064 & Drg. NO.26298-32-09-UTV-0065
5
For Chilled water piping 200 NB headerlength considered for chilled waterreturn to return chilled water storagetank is 42 mtrs, This will be the batterylimit for chilled water ckt. Any upwardincrease in the length shall be charged
Drg. NO. 26298-32-09-UTV-0064 & Drg. NO.26298-32-09-UTV-0065
PDF created with pdfFactory Pro trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/http://www.pdffactory.com/ -
7/28/2019 Technical Offer From Thermax on 13.05.10
19/32
-------------------------------------------------------------------------------------------------------------Techno commercial proposalRev :00 Page No. 19 of 32 Date : 10th May 2010
extra to Client account @ Rs.5036/- Perrunning meter including insulation,structure & erection cost.
6
Max average Chilled water piping lengthconsidered for that is 220 m. Anyupward increase in the length shall becharged extra to Client account @Rs.4830/- Per running meter includinginsulation, structure & erection cost.
7
Storage Water tank location consideredat 10mtrs distance from Cooling towers& its make up water connection at 4mtrs from storage tank. Due to that 50NB make up water line comes as 48mtr. Any upward increase in the lengthshall be charged extra to Client account@ Rs.990/- Per running includingstructure & erection cost.
Drg. NO. 26298-32-09-UTV-0065
8
Max average Cooling water pipinglength considered for that is 150m. Anyupward increase in the length shall becharged extra to Client account @Rs.3131/- Per running includingstructure & erection cost.
9
Steam Connection considered at 4 mtrsfrom PRDS. Thus, Max average steampiping length considered is 50 m. Anyupward increase in the length shall becharged extra to Client account @Rs.3213/- Per running meter includinginsulation, structure & erection cost.
Drg. NO. 26298-32-09-UTV-0065
10
Condensate Line Connection to theboiler is considered at 15 mtrs fromCondensate Tank. Thus, Max averagecondensate piping length considered is42 m. Any upward increase in the lengthshall be charged extra to Client account@ Rs.1445/- Per running meterincluding insulation, structure & erection
Drg. NO. 26298-32-09-UTV-0065
PDF created with pdfFactory Pro trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/http://www.pdffactory.com/ -
7/28/2019 Technical Offer From Thermax on 13.05.10
20/32
-------------------------------------------------------------------------------------------------------------Techno commercial proposalRev :00 Page No. 20 of 32 Date : 10th May 2010
cost.
11MCC Panel is considered near to chillerNo.1 & accordingly cable lengths are
considered.
Drg. NO. 26298-32-09-UTV-0064
BATTERY LIMITS FOR BALANCE OF PLANT
CHILLED WATER : Flanged connection at the end of the C1 at a distancementioned in above point 4 in Notes
COOLING WATER : At the Connection point of Make up water Tank (C1)
STEAM : Flanged connection at the end of the C1 at a distancenot more than mentioned in above point 9 in Notes
CONDENSATE : Flanged connection at the Boiler feed water tankconsidering it is at a distance not more than mentionedin above point 10 in Notes from condensate Tank.
POWER SUPPLY : At the terminal strip of our panel.
PDF created with pdfFactory Pro trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/http://www.pdffactory.com/ -
7/28/2019 Technical Offer From Thermax on 13.05.10
21/32
-------------------------------------------------------------------------------------------------------------Techno commercial proposalRev :00 Page No. 21 of 32 Date : 10th May 2010
6) EXCLUSION / SCOPE OF CUSTOMER
1) Flanged connections at the Hot water header as per System P & ID.
2) All civil work including making and breaking of foundations, walls etc.
3) Chilled water storage tank of Civil construction of approximately 500 m3size, with necessary Vents, Drains, etc.
4) Cooling tower sump as per the requirement.
5) The chiller plant room with necessary sheds etc.
6) Rated electrical supply at the incomer for MCC.
7) Electrical earthing for all the equipments.
8) Clearances for construction / commissioning.
9) BMS / DCS connectivity.
10) Customer to provide Compressed air up to a point near the VAM room.
11) Statutory Approvals if any.
12) Construction power and water
PDF created with pdfFactory Pro trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/http://www.pdffactory.com/ -
7/28/2019 Technical Offer From Thermax on 13.05.10
22/32
-------------------------------------------------------------------------------------------------------------Techno commercial proposalRev :00 Page No. 22 of 32 Date : 10th May 2010
7) FEEDER LIST
Feeder list Inlet Air Cooling of Compressor
Sr.No Description Working standby
1 Chilled water pump primary (2w+1s) 15kW * 2 Nos15 KW * 1
N0
2Chilled water pump secondary ( 2w + 1s)
22 KW * 2 Nos22 KW * 1
No
2 Cooling water pump (2w+1s) 22kW* 2 Nos22 KW * 1
No
3 Condensate transfer pump ( 1w + 1 s) 3.7kW* 1 No
3.7KW * 1
No
4 Cooling tower Fan 5kW* 2 Nos 5KW * 1No
5 VAM.9.1 KVA * 2
Nos9.1KVA * 1
No
PDF created with pdfFactory Pro trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/http://www.pdffactory.com/ -
7/28/2019 Technical Offer From Thermax on 13.05.10
23/32
-------------------------------------------------------------------------------------------------------------Techno commercial proposalRev :00 Page No. 23 of 32 Date : 10th May 2010
9) CLIENT INPUTS
Steam at rated parameters at the battery limits
Clear space along with necessary clearances for positioning the chillers,pumps, cooling tower, piping etc as per layout drawings
Cooling and Chilled water for circulation.
Rated Power supply to our MCC.
Civil work according to the requirements.
10) COMMISSIONING AND PERFORMANCE TESTING
A) COMMISSIONING:
A commissioning procedure shall be submitted to Client during detailing forinformation
Commissioning will be carried out as per the procedure within 15 days ofmechanical completion of the system.
The commissioning of the VAM system shall be taken up at the availableload conditions.
In case commissioning of the system could not be taken up due to lack of
completion of work/ clearances by purchaser within agreed timelines thensupplier shall not be held responsible for the same.
The purchaser shall inform supplier of scheduled completion so that the suppliercan plan his resources accordingly
B) PERFORMANCE TESTING AT SITE:
A performance testing procedure shall be submitted to Client for informationduring detailing.
Performance trials will be carried out to demonstrate the capacities of the systemwithin 15 days of commissioning of the system at the available load. In case theload or rated utilities are not available, the unit will be deemed as handed overafter the performance trials are taken on the available parameters.
Once the inputs mentioned in section 8 are made available e to Thermax for aperiod not less than 72 hours,
PDF created with pdfFactory Pro trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/http://www.pdffactory.com/ -
7/28/2019 Technical Offer From Thermax on 13.05.10
24/32
-------------------------------------------------------------------------------------------------------------Techno commercial proposalRev :00 Page No. 24 of 32 Date : 10th May 2010
Thermax shall demonstrate the following;
Rated Cooling capacity under steady load as mentioned in the VAM technicalparameters at the battery limits of chilled water pipeline.
Rated auxillary power consumption as per given parameters.
11) VENDOR LIST
Make of VAM Mounted Components :
PLC Siemens
Operator interface Siemens / SchneiderOperators interface Siemens / Schneider
Level relay Omron (Japan)
Level Electrodes Omron ( Japan)3 way Control Valve Samson / IL / eq
Chw flow switch SaginomiyaChW DP switch Switzer
Temperature sensors GIC / Nutech
Pressure Guages H Guru / GIC / Gluck / eq
Manometer Fitzer /TechnoflowAbsorbent pump Teikoku,
Refrigerant Pump Teikoku
Purge pump Indowoosang
I/P convertor Moore Controls / ABB
Switchgear Siemens / L&TMCB Siemens/ L&TCables Polycab / CCI / Finolex / eq
Make List for Balance of Plant :
NoItem
DescriptionMake as per Tender
Makes considered for ouroffer
1 Pumps
Mather and Platt /Kirloskar
/KSB/Akay
Kirloskar / KSB/Mather & Platt/ Flowserve / Flow more /
ArmStrong
2Butterflyvalves
Audco / BDK /Dewrance/KSB /McNeill/Leader / Fouress /J.N. Marshall /Saunders
Intervalve / Expert/ Delval /Fluidtecq
PDF created with pdfFactory Pro trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/http://www.pdffactory.com/ -
7/28/2019 Technical Offer From Thermax on 13.05.10
25/32
-------------------------------------------------------------------------------------------------------------Techno commercial proposalRev :00 Page No. 25 of 32 Date : 10th May 2010
3 Gate Valves
Audco / BDK /Dewrance/KSB /McNeill/Leader / Fouress /J.N. Marshall /Saunders
Fluidline / Exper /BDK/Intervalve
4 Globe valvesAudco / BDK /Dewrance/KSB /McNeill/Leader / Fouress /J.N. Marshall /Saunders
Fluidline / Expert / BDK /Intervalve / Fluidtecq
5 NRV
Audco / BDK /Dewrance/KSB /McNeill/Leader / Fouress /J.N. Marshall /Saunders
Intervalve / Expert /Fluidtecq/BDK
6 Y-Strainer Not specified
Fabricated /Gujotofilt / Triveni /LNT Industrial Engineering /BVK / T hermax approved
vendors
7 Cooling tower Not SpecifiedPaharpur / Mihir / Advance /Bell / Southern / Spacco /Himgiri
8 PipesTata Tube /Jindal /RSP/BHEL/ Maharashtra /
Ajantha Tubes
Tata / Jindal / Surendra / Indus/ vinayak / MSL
9PressureGauges
Guru international /GeneralInstruments /Forbes Marshall/Gauges & Bourdon Limitedor Equivalent
H Guru / Gluck /GI / Mass
10TemperatureGauges
General Instruments / PyroElectric /Goa instrumentsindustries / Altop orEquivalent
H Guru / Gluck /Waree/ Mass
11 Level gaugesV automat/Levcon/Techtrol/Chemtrolsor Equivalent
Levcon / Chemtrol / PuneTechtrol
12 MotorsABB /Siemens /CGL/Kirloskar /Alstom orEquivalent
Siemens / ABB / Bharth Bijlee/ Crompton
13 Insulation Not specified Rock wool/ Thermax approvedvendor
14 Plate flanges Not specifiedParmar/ Britex/ Alliance/Thermax Approved Vendor
PDF created with pdfFactory Pro trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/http://www.pdffactory.com/ -
7/28/2019 Technical Offer From Thermax on 13.05.10
26/32
-------------------------------------------------------------------------------------------------------------Techno commercial proposalRev :00 Page No. 26 of 32 Date : 10th May 2010
15 Pipe fittings Not specifiedVinayak/ Excel/ Parmar/Fabricated as per TL drgs.
16 Tanks Not specified Fabricated as per TL drgs.
17EletronicPressureTransmitters Not specified Yokogowa / Emerson
18 Orifice Plates Not specified Starmech / eureka
19PressureSwitch
Switzer /General Instrument/Indfos /Schneider orEquivalent
Indfoss / Switzer
20Temperature
Sensor
Not specifiedNutech / Thermax Apporoved
Vendor
21
LevelSwitches(Float /Displacertype)
V Automat/PlakaInstrument/Techtrol/Levcon/Chemtrols or equivalent
Waree/GIC/ Scientific Devices/ pune techtrol
22ExpanisionJoints(Mettalic)
Modern Sales
The makes mentioned above are subject to availability. In the event of non
availability of material within the stipulated time, Thermax may choose alternatevendors. In that event, prior approval of Client shall be taken before procurementaction.
PDF created with pdfFactory Pro trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/http://www.pdffactory.com/ -
7/28/2019 Technical Offer From Thermax on 13.05.10
27/32
-------------------------------------------------------------------------------------------------------------Techno commercial proposalRev :00 Page No. 27 of 32 Date : 10th May 2010
12) NOTES AND DEVIATIONS
Sr.
No Note Tender reference
1Routing of Chilled water & Air piping isgoing to be finalised after receipt of AshConveying Piping
Drg. NO. 26298-32-09-UTL-0010
2Only C1 piping considered, Yard pipingi.e. C2 not considered
Drg. NO. 26298-32-09-UTV-0065
3
200 NB header length considered fromchilled water supply pumps is 42 mtrs,tThis will be the battery limit for chilledwater ckt.
Drg. NO. 26298-32-09-UTV-0064 & Drg. NO.26298-32-09-UTV-0065
4
200 NB header length considered forchilled water return to return chilledwater storage tank is 42 mtrs, This willbe the battery limit for chilled water ckt.
Drg. NO. 26298-32-09-UTV-0064 & Drg. NO.26298-32-09-UTV-0065
5
Storage Water tank location consideredat 10mtrs distance from Cooling towers& its make up water connection at 4 mtrsfrom storage tank. Due to that 50 NBmake up water line comes as 48 mtr
Drg. NO. 26298-32-09-UTV-0065
6Steam Connection considered at 4 mtrsfrom PRDS.
Drg. NO. 26298-32-09-UTV-0065
7Condensate Line Connection to theboiler is comsidered at 15 mtrs fromCondensate Tank.
Drg. NO. 26298-32-09-UTV-0065
8MCC Panel is considered near to chillerNo.1 & accordingly cable lengths areconsidered
Drg. NO. 26298-32-09-UTV-0064
PDF created with pdfFactory Pro trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/http://www.pdffactory.com/ -
7/28/2019 Technical Offer From Thermax on 13.05.10
28/32
-------------------------------------------------------------------------------------------------------------Techno commercial proposalRev :00 Page No. 28 of 32 Date : 10th May 2010
DEVIATIONS:
Sl Deviation Tender Reference
1Butterfly Valves considered for Chilled &Cooling water circuits instead of GateValves
Drg. NO. 26298-32-09-UTV-0065
2As per provided P&ID 2 Nos.Condensate Pumps (1W+1St) will beprovided.
Drg. NO. 26298-32-09-UTV-0065, & Point 5,Table-1, Page No. 33 ofMPL-32-UTV-001
3Chilled water & Cooling water pumps willbe CI Impeller
Design basis, Point 7.2.Page No. 31 On MPL-32-UTV-001
452 m3, RCC, Chilled water returnstorage tank & Chilled water supplystorage tank will be in Customer scope
Point 7.6, Page No. 31 ofMPL-32-UTV-001
PDF created with pdfFactory Pro trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/http://www.pdffactory.com/ -
7/28/2019 Technical Offer From Thermax on 13.05.10
29/32
------------------------------------------------------------------------------------------------------------Technical l proposalRev :00 Page No.29 of 32 Date : 11th May 2010
13) PRICE SCHEDULE
Sr.
No.Description Qty Price
1
Price for design and supply of Steamdriven Vapour absorption machines of260 TR capacity as per the technicalspecifications attached, ex works
3 Nos.Rs.3850000/- (Rupees thirtyeight lakhs fifty thousandonly) (each).
2Price for supply of accessories as perthe offer, ex-works
1 Lot
1,05,31,575 (Rupees onecrore, five lakhs thirty onethousand five hundred andseventy five only)
3Price for Erection and commissioning of
the system1 Lot
16,12,593 (Rupees sixteenlakhs twelve thousand five
hundred and ninety threeonly)
Price Basis : The price quoted above is ex-works, Pune.
- The above supply prices are ex-our vendor / our works, Pune.- Packing and forwarding charges extra at 3 %.- Excise duty & education cess extra, wherever applicable.- Value Added Tax/2 % CST against form C shall be extra at actual.- Service tax shall be extra at actual, wherever applicable.- Octroi / State entry tax extra at actual, if applicable.
- Freight, transit insurance, unloading of equipment by purchaser.- Any other taxes, duties other than the above, if applicable at
the time of delivery shall be borne by Purchaser.
(Note : Any variation or imposition of new taxes & duties at the time ofdelivery shall be borne by Purchaser)
Terms of payment :
Item 1 and 2
40% advance along with PO. Balance against proforma invoice prior to dispatch on prorata basis
Item 3
40% advance along with PO.
55% Balance against mechanical completion on prorata basis.
5% against commissioning at available load.
PDF created with pdfFactory Pro trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/http://www.pdffactory.com/ -
7/28/2019 Technical Offer From Thermax on 13.05.10
30/32
------------------------------------------------------------------------------------------------------------Technical l proposalRev :00 Page No.30 of 32 Date : 11th May 2010
Delivery :8 months from the date of order and advance.
Warranty :The above shall be covered under standard warranty for a period of 12 monthsfrom the date of commissioning or 18 months from the date dispatch, whichever isearlier.
For THERMAX LTD.
Mohsin H. Pathan.Cooling SBUContact : 9866159311Email: [email protected]
PDF created with pdfFactory Pro trial version www.pdffactory.com
mailto:[email protected]://www.pdffactory.com/http://www.pdffactory.com/http://www.pdffactory.com/mailto:[email protected] -
7/28/2019 Technical Offer From Thermax on 13.05.10
31/32
------------------------------------------------------------------------------------------------------------Technical l proposalRev :00 Page No.31 of 32 Date : 11th May 2010
14) TERMS AND CONDITIONS OF SALE
1. ORDER CONFIRMATION
All orders placed on us directly or through ourRegional Offices or through our authorised salesrepresentatives will be binding on us only after our
Head Office in Pune has issued an order confirmation.
2. SPECIFICATIONS,ETC.
Specifications, dimensions, description, shadesof paints,etc. are not binding on us in minute details
and are subject to reasonable alterations withoutnotice.
3. PRICES
All prices are ex-works, Chinchwad, Poona/ex-our
supplier's works in case of part of the goods to be
manufactured at their works, and are exclusive oftransit insurance, all taxes, excise and other duties
and levies as applicable at the time of delivery, whichshall be charged separately. Freight and octroi, if any,shall be borne by the purchaser. The purchasers
registered under the Sales Tax Act are advised to sendsales tax registration number and date and alsoconcessional sales tax form alongwith the purchase
order. Otherwise, the State/Central Tax reduction willnot be made.
While every effort will be made to adhere to thecontract price, in the present conditions we cannotguarantee that the contract prices will hold good when
the order is executed. The prices of this quotation arebased on the prevailing costs of raw materials,boughtout components and wages etc. If between the
date of the contract and its completion, variationsoccur in these costs, our prices may stand revised andthe ex-works price ruling at the time of delivery will be
applicable. In the normal course we do not anticipateany revisions of ex-works prices to exceed 10% overthe contract price of deliveries upto 8 months.
4. MODE OF DELIVERY
All deliveries will be ex-our works, Chinchwad/ex-our suppliers works. The goods may be despatchedin one or separate lots at our option. If we arerequired to despatch the goods on behalf of thepurchaser, we can arrange to do so by road transportonly to a destination named by the purchaser, onfreight-to pay basis, on the understanding that no
liability is attached to us. The freight chargescontracted by us on behalf of the purchaser will betreated as negotiated under the purchaser's authority
and shall therefore be final.
5. PACKING
Packing for despatch, whenever necessary will be inaccorance with our standard practice and packing
charges @ 1.5 % of the total value of the order.
6. INSPECTION
If necessary, the goods will be offered for visualinspection only at our works/our supplier's works. The
date of inspection will be intimated by us about 15days in advance and confirmed by the purchaseraccordingly. If inspection is not carried out on the
date so advised, we shall be free to despatchconsignment as per terms of delivery.
7. DELIVERY PERIOD
The goods will be ready for delivery
approximately months from the final confirmation byour Head Office of the Purchaser`s Order alongwiththe requisite advance and with all technical and
commercial points duly clarified. Deliveries subject to
"Force Majeure" as defined in clause 12 hereof.
8. INSURANCE
Transit Insurance has to be covered by the
purchaser. We shall convey the despatch particularsas soon as possible after actual despatch to enablethe purchaser to arrange insurance.
9. PAYMENT TERMS
40% advance with the order and balance paymentprior to delivery against proforma invoice. We shallsend proforma invoice inclusive of all taxes and
incidental charges about the time the ordered materialsare ready for delivery in full or in part and if payment isnot made within 15 days of date of proforma invoice,
we reserve the right to divert the ordered materials.We will give a fresh delivery period at the time ofdiversion which will be binding on the purchaser and
the contract cannot be rendered void on this account.
If the goods cannot be diverted, charges will be madefor storage, insurance and interest at the rate of 1%of the invoice value for each week or part thereofcommencing 15 days from the date of proforma
invoice.
10. ADVANCES
Advances paid against an order shall not be subject toany interest. We shall have the right to adjust againstsuch advances any payments which might become due
because of delay in lifting the ordered equipment orbecause of any incidental expenses we may incur onthe purchaser's behalf. The advance shall be forfeited
in case request for cancellation of order is accepted byus.
11. GENERAL LIEN
We shall be entitled to general lien on goods in
our possession or despatched for all money due tous by the purchaser, both under this contract or anyother account and we shall also be entitled to apply
PDF created with pdfFactory Pro trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/http://www.pdffactory.com/ -
7/28/2019 Technical Offer From Thermax on 13.05.10
32/32
any money in our hands under any contract due tous under any other contract or contracts.
12. FORCE MAJEURE
The offer is subject to force majeure by which it meanscause beyond our reasonable control such as warinvasion, civil disobedience, government orders or
restrictions, strikes, lockouts, riots, fire,materials wagons, shipping space or any otherearthquakes, floods, accident, breakdown of
machinery, delay or inability to obtain labour, rawcauses whatsoever beyond our reasonable contro,affecting us or our subcontractors, suppliers, etc.
13. WARRANTY
All our equipment are thoroughly inspected/testedbefore despatch and therefore, can be depended uponfor long and trouble free service. We undertake to
make good by replacement or repair defects arisingour of faulty design, materials or workmanship within12 months of the date of despatch, providing that if
we so require, the parts in respect of which a claim ismade, must be sent at purchaser's expense to our
works before liability can be entertained under thisclause. Such expense will be refunded if our liabilityis admitted. It is advised that the purchaser enters in toannual maintenance contract with Thermax immediately
after commissioning of equipment.
Boughtout components are guaranteed by us only to
the extent of guarantees given to us by oursuppliers. Electrical components, such as heaters,motors, contractors, AC Drive etc. rubber components,
consumables such as Lithium Molybdate , Octyl Alcoholetc. and instruments such as pressure gauges,thermometers, combistats, etc, are however, not
covered under this warranty.This warranty is validsubject to installation having been completed within3 months of despatch of the equipment; - the
supply/installation having been formally accepted asper the Handing Over clause (No.15 below);- the equipment or part thereof not being subject
to accident,alteration, abuse or misuse;- the installation having been made in proper manneras per our installation instructions;
- the equipment being operated and maintained asper our Operation and Maintenance instructions.
14. COMMISSIONING
Commissioning service offered at the rate and termsmentioned below covers a reasonable number of
visits/meeting to:- discuss arrangement for the safe unloading of theconsignment on receipt at destination by the buyer;
- discuss installation details in terms of
physical/technical requirements;- make the user conversant with statutory requirements,
if any;- discuss details of requirements in respect of powersupply, feed water, fuel systems etc;
- ensure the installation has finally been made asrecommended;- commission the unit for a short run from the point of
view of mechanical working and to set various controlsas necessary;
- conduct demonstration for the purpose of user'seducation for equipment operation and maintenance.
Commissining Charges and Terms of Payment:- Commissioning charges As specified in the quotation.- Terms of Payment 100% payment within 10 days of
commissioning of the unit.15. HANDING OVER
Unless otherwise specified in the order and accepted,handing over of the equipment and/or installation wouldbe considered as completed anda formal completion
certificate shall be issued by the buyer/user if:(a) the material has been supplied as per terms ofscope of supply or with agreed deviations, if any;
(b) erection, if involved, has been completedgenerally as per terms of order or with unavoidabledeviations;
(c) the equipment has been commissioned, ifapplicable generally as agreed;(d) the equipment and/or installation has been
put to commercially use either with or without help ofour engineer.
The buyer/user is expected to put the equipment tocommercial use only after issuing a formal
completion certificate. Our responsibility in terms ofwarranty shall cease straightaway if the equipment isput to use without formal taking over.
16. CANCELLATION
Order received and acknowledged by us shall not be
subject to cancellation, either wholly or partly for anyreason whatsoever without our consent.
17. JURISDICTION
All contracts between purchasers and ourselves are
deemed to be entered into at Pune and aretherefore, subject to the jurisdiction of courts at Pune.
18. VALIDITY
While every effort will be made to keep our quotation
valid for acceptance for a period of 30 days from thedate hereof, we may be constrained to modify thisoffer within this period due to circumstances beyond
our control.
19. GENERAL
Any condition or other matters relating to thisquotation not expressly stipulated will be a matter ofmutual discussion and agreement at the time of
accepting the order. If this quotation is accepted andan order placed allthe above conditions of sale standautomatically accepted by the buyer.
ForTHERMAX LIMITED,Sagar Kamble