    TECHNOCOMMERCIAL OFFER FOR VAPOURABSORPTION MACHINE BASED

    SYSTEM

    OFFER NO: MPL-32-UTV-001-OFFER

    TENDER REFRENCE NO.: MPL-32-UTV-001

    Submitted to

    M/s MADHUCON PROJECTS LTD.SPSR NELLORE, ANDHRA PRADESH

    Submitted by

    C & H Cooling Division.www.thermaxindia.com.

    Phone : +91 20 66122123 , 9765565211Fax : +91 20 27475907

    PDF created with pdfFactory Pro trial version www.pdffactory.com

    http://www.thermaxindia.com/http://www.pdffactory.com/http://www.pdffactory.com/http://www.pdffactory.com/http://www.thermaxindia.com/
  • 7/28/2019 Technical Offer From Thermax on 13.05.10

    2/32

    -------------------------------------------------------------------------------------------------------------Techno commercial proposalRev :00 Page No. 2 of 32 Date : 10th May 2010

    Offer No: MPL-32-UTV-001-OFFERDate: 13/05/2010

    M/s MADHUCON PROJECTS LTD.

    SPSR NELLORE,ANDHRA PRADESH

    Kind Attn: -- Mr. CH. RAJA RAO

    Dear Sir,

    Sub: Offer for Vapour Absorption Machine based Air-Conditioning System.

    This has a reference to the Tender No. MPL-32-UTV-001 regarding the captionedsubject.

    Thank you very much for inviting us to participate in this prestigious project.

    We are pleased to submit our techno commercial proposal for this project as perthe following options:

    Our offer consists of the following;

    1. Salient Features of Thermax System2. System description3. Technical Specifications of VAM4. Technical Specifications for Balance of Plant5. Scope of supply6. Exclusion

    7. Feeder List8. Plot Plan9. Client inputs10. Commissioning and Performance testing11. Vendor list12. Notes and Deviations:13. Price schedule14. Terms and conditions of Sale

    We hope our proposal shall meet your expectations and expect your esteemedorder. In case any further clarifications are required, please contact the

    undersigned. Thanking you and assuring you of our best attention at all times.

    FOR THERMAX LTD.

    Mohsin H. Pathan.Cooling SBUContact : 9866159311Email: [email protected]

    PDF created with pdfFactory Pro trial version www.pdffactory.com

    mailto:[email protected]://www.pdffactory.com/http://www.pdffactory.com/http://www.pdffactory.com/mailto:[email protected]
  • 7/28/2019 Technical Offer From Thermax on 13.05.10

    3/32

    -------------------------------------------------------------------------------------------------------------Techno commercial proposalRev :00 Page No. 3 of 32 Date : 10th May 2010

    1) SALIENT FEATURES OF THERMAX SYSTEM

    1] Two stage evaporation ensuring Lowest steam consumption : Thermax

    GNxtChill VAHPs comes with two stage evaporation technology which

    ensures the lowest specific steam consumption as compared to other

    contemporary VAHPs making them the most efficient VAHPs in their

    category. The specific steam consumption is as low as 3.7 kg/TR/hr for small

    to medium capacity range and 3.5 kr/TR/hr for large capacity range.

    This results in substantial benefits to the customer during the entire Life

    Cycle of the VAHP in the following ways: Lowest operating cost throughout the life cycle of the VAHP

    Lowest water consumption in cooling tower resulting in savings of the

    precious water

    2] Online concentration measurement and control: Thermax GNxtChill

    series is equipped with the state of the art Real-time Online Concentration

    measurement which is displayed continuously on the control panel. This

    feature is unique to Thermax GNxtChill series VAHPs. This concentration is

    continuously compared with the Crystallization Concentration and correctiveactions are taken by the PLC immediately whenever there is any

    discrepancy thereby virtually eliminating the Crystallization phenomenon.

    This feature is distinctly different from the auto de-crystallization feature

    which is Common for all VAHP manufacturers. Please note that this auto

    decrystallisation is only a reactive safety (will come into effect only after the

    crystallization phenomenon has started) and not a proactive control.

    3] Advanced Series flow Technology: Vapor Absorption Technology has got

    only 2 major threats Corrosion and Crystallization. Thermax GNxtChill

    series comes with the Advanced Series flow technology which ensures that

    Crystallization is completely eliminated and corrosion is minimized to the

    maximum possible extent. This is mainly possible due to

    PDF created with pdfFactory Pro trial version www.pdffactory.com

    http://www.pdffactory.com/http://www.pdffactory.com/http://www.pdffactory.com/
  • 7/28/2019 Technical Offer From Thermax on 13.05.10

    4/32

    -------------------------------------------------------------------------------------------------------------Techno commercial proposalRev :00 Page No. 4 of 32 Date : 10th May 2010

    Crystallization : Measurement of concentration online through our unique

    Real-time Online Concentration Measurement as explained in point no.2

    Corrosion: Corrosion depends on the Lithium bromide concentration and

    temperature and leakages. Corrosion rate increases exponentially when

    high temperature and high concentration occurs simultaneously. Thermax

    has carefully selected Advanced Series Flow Technology (after absorbing

    the technical knowhow from Kawasaki and supplying more than 400

    machines in Parallel flow and Reverse flow VAHPs) so that highest

    temperature of Lithium bromide and highest concentration never occurs

    simultaneously. The below table will illustrate the same clearly :

    Table below shows comparison of series and para flow for HTG & LTG

    Parameter for HTG Unit Para flow

    Advanced

    Series flow

    HTG temperature C 162 155

    LiBr concentration % 64-65 60.5

    Parameter for LTG Unit Para flow

    Advanced

    Series flow

    LTG temperature C 88 90

    LiBr concentration % 62-64 63

    Also, the spraying Lithium bromide concentration in the absorber has to be

    63% irrespective of the cycle. At 63% concentration the corresponding

    crystallization temperature is 34C.

    In Advanced Series Flow technology, the Spray solution lithium bromide

    temperature (@ outlet of LTHE) is >48C. This wide temperature differential

    between operating temperature and crystallization temperature (app. 14C)

    ensures that the machine is always far away from the crystallization zone.

    This difference is always maintained as we measure the concentration and

    strong solution temperature.

    In Para flow technology, Spray solution lithium bromide temperature (@

    outlet of LTHE) is 40-41C. The temperature differential is very less (only 6-

    PDF created with pdfFactory Pro trial version www.pdffactory.com

    http://www.pdffactory.com/http://www.pdffactory.com/http://www.pdffactory.com/
  • 7/28/2019 Technical Offer From Thermax on 13.05.10

    5/32

    -------------------------------------------------------------------------------------------------------------Techno commercial proposalRev :00 Page No. 5 of 32 Date : 10th May 2010

    7C) between the operating temperature and the crystallization temperature

    as compared to the Advanced Series Flow Technology. So, when the

    cooling water inlet temperature to the VAHP goes low or if there is any

    fluctuation in the load, the Spray solution lithium bromide temperature @

    outlet of LTHE reduces thereby making Para flow VAHPs more susceptible

    to crystallization.

    The above points clearly prove that the claim of Para flow technology

    being less prone for crystallization is not true.

    4] Invertor control for absorbent pump: Thermax GNxtChill series VAHPs

    come with AC drive for the absorbent pumps which ensures that at part

    loads, the COP of the VAM improves thereby resulting in improvedperformance of the VAM.

    5] Multi stage level control at different locations: It has been proven

    worldwide that for efficient and foolproof control of any CRITICAL application

    Level controls are a must. Thermax GNxtChill series come with Multi stage

    level sensing electrodes in High temperature generator (HTG) , Absorber

    and Evaporator.

    Advantages of Multistage level control are:

    Increase life of solution pumps (absorbent and refrigerant pumps) by

    avoiding dry running at any point of time

    Ensures excellent and precise control of LiBrand refrigerant,

    especially uring fluctuating part load conditions thereby increasing the

    COP of the machine under partload.

    Crystallization prevention at fluctuating load and low cooling water

    inlet temperatures

    Most of the other VAM manufacturers opt for mechanical float type control or

    level control in HTG and / or Evaporator which is not very accurate and at

    fluctuating part load conditions requires frequent resetting.

    PDF created with pdfFactory Pro trial version www.pdffactory.com

    http://www.pdffactory.com/http://www.pdffactory.com/http://www.pdffactory.com/
  • 7/28/2019 Technical Offer From Thermax on 13.05.10

    6/32

    -------------------------------------------------------------------------------------------------------------Techno commercial proposalRev :00 Page No. 6 of 32 Date : 10th May 2010

    6] Vacuum seal Isolation valves for abs/ref Pumps: Thermax GNxtChill

    VAHPs are provided with unique Vacuum Seal Isolation valves at the

    inlet/outlet of absorbent and refrigerant pumps which ensures that there is

    no vaccum breakage required for any maintenance/replacement of the

    pumps. With the above valves, any maintenance activity (including

    replacement) of the absorbent and refrigerant pumps can be done within

    hours.

    Other VAM manufacturers provide normal isolation valves (butterfly or gate

    type) which are not vacuum seal type. Hence for any maintenance activity

    on the absorbent/refrigerant pump, the LiBr has to be removed, the

    suction/.discharge line has to be cut to remove the pump, LiBr recharging,

    etc which will require 3-4 days time period.

    7] Cooling water up to 10 deg C: Thermax GNxtChill VAHPs can operate

    even when the cooling water inlet temperature goes as low as 10 deg C.

    This is mainly possible only due to Real-time Online Crystallization

    measurement.

    Controls & Safeties:

    1 Anti freeze protection 13 Refrigerant pump overload relay trip

    2 Chilled water DP switch 14 Refrigerant pump not responding

    3 Chilled water flow switch 15 Crystallization prevention control

    through concentration measurement

    4 Chilled water L cut control 16 Cavitation protection for refrigerant

    pump

    5 Chilled water low / no flow

    interlock with cooling water flow

    17 Cavitation protection for absorbent

    pump

    6 Fixed ramp rate of loading for

    thermal shock prevention

    18 Vacuum pump overload relay trip

    7 Absorbent pump overload relay

    trip

    19 Cooling water low inlet temperature

    (less than 10C) safety

    8 HTG high temperature safety 20 Temperature sensors errors

    9 HTG high vapor temperature

    safety

    21 CT fan control on cooling water inlet

    temperature

    PDF created with pdfFactory Pro trial version www.pdffactory.com

    http://www.pdffactory.com/http://www.pdffactory.com/http://www.pdffactory.com/
  • 7/28/2019 Technical Offer From Thermax on 13.05.10

    7/32

    -------------------------------------------------------------------------------------------------------------Techno commercial proposalRev :00 Page No. 7 of 32 Date : 10th May 2010

    10 HTG level control 22 Chilled water pump run/trip interlock

    11 SCV control on HTG and chilled

    water outlet temperatures

    23 Cooling water pump start / stop

    permissive contact

    12 Solution pump AC drivemodulation

    24 Cooling tower fan start / stoppermissive contact

    PDF created with pdfFactory Pro trial version www.pdffactory.com

    http://www.pdffactory.com/http://www.pdffactory.com/http://www.pdffactory.com/
  • 7/28/2019 Technical Offer From Thermax on 13.05.10

    8/32

    -------------------------------------------------------------------------------------------------------------Techno commercial proposalRev :00 Page No. 8 of 32 Date : 10th May 2010

    2) SYSTEM DESCRIPTION

    Introduction:

    Madhucon Projects Limited Are the EPC Contractor for setting up of 2 x150 MW Phase#1, Thermal Power Plant at tamminapatnam, Nellore Dist, AP forSimhapuri Energy Private Limited. This offer contains Vapour Absorption Machine& Accessories part of the same.

    Operating Philosophy:

    The purpose of the Vapor absorption machine is to produce chilled water,utilizing the Steam available in the plant. Chilled water thus produced from VAMwill be circulated along the AHUs of the Plant rooms, thus cooling the air flowing

    through the AHUs & providing the required Air-Conditioning.. There will be raise intemperature when it comes out of the AHUs. This water will be again taken to theVAM for cooling the water again with the help of refrigerant. As the refrigerantbecomes dilute it loses its capacity to absorb Water Vapor. It thus needs to be re-concentrated using a Heat Source.

    Total 3 nos. of Vapour Absorption Machines, 260 TR each (2 Working & 1Standby) are provided to fulfill the requirement of the Air-Conditioning.

    The external circuits for the Proposed Vapour Absorption System are asfollows;;

    1) Chilled Water piping system:

    Chilled water coming out from the Chilled water return storage tank of willbe fed in to the Vapour Absorption System. The temperature of the chilled watercoming in to the system is considered as 14 deg.C & will be coming out at 7deg.C, at a flow rate of 112 m3/hr, which will be stored in Chilled water supplystorage tank. For this circulation 2 Working & 1 Standby pump will be used.

    7 deg.C chilled water in the Chilled water supply storage tank will besupplied to the AHUs & chilled water coming out of the AHUs will be supplied to

    the Chilled water return storage Tank. For this circulation also 2 Working & 1Standby pump will be used.

    Chilled water circuit consists of chilled water pumps and associated pipingsystem (valves, piping, instruments etc).

    PDF created with pdfFactory Pro trial version www.pdffactory.com

    http://www.pdffactory.com/http://www.pdffactory.com/http://www.pdffactory.com/
  • 7/28/2019 Technical Offer From Thermax on 13.05.10

    9/32

    -------------------------------------------------------------------------------------------------------------Techno commercial proposalRev :00 Page No. 9 of 32 Date : 10th May 2010

    2) Cooling Water Circuit:

    2 Working & 1 Standby Cooling Towers will be provided to serve the

    Cooling water requirement of the Vapour Absorption Machines.Also, a suitably designed pumping system, associated piping system &Valves, Instrumentation, etc will be provided.

    3) Steam Circuit:

    The steam available in the plant will be utilized in Vapour AbsorptionMachine as a Heat Source.

    A suitably designed PRDS alongwith necessary piping, valves,Instrumentation, etc will be provided.

    4) Condensate Circuit:

    Condensate coming out of the Vapour Absorption Machines will be put in tothe Condensate Tank. The same Condensate will be utilized as Spray Water forPRDS & remaining will be going back to the Boiler.

    Suitable pumping system will be provided to pump the Condensate to thePRDS.

    PDF created with pdfFactory Pro trial version www.pdffactory.com

    http://www.pdffactory.com/http://www.pdffactory.com/http://www.pdffactory.com/
  • 7/28/2019 Technical Offer From Thermax on 13.05.10

    10/32

    -------------------------------------------------------------------------------------------------------------Techno commercial proposalRev :00 Page No. 10 of 32 Date : 10th May 2010

    3) TECHNICAL SPECIFICATIONS OF VAM

    Input Parameters for the Design of the Vapor Absorption Machine:

    DESCRIPTION UOM QUANTITY

    Steam Available Kg/hr2500 @ 220 250 deg.C at 12- 15Bar(g)

    Capacity required TR520 TR ( 260 TR * 2 no working +260 TR * 1 no standby)

    Chilled water temperature profile Deg.CInlet 14 deg.COutlet 7 deg.C

    VAM Specifications per VAM :

    Description Unit Cooling Mode

    Capacity ( + 3 %) : TR 260.0

    A Chilled Water Circuit :

    1. Chilled water flow m/hr 112

    2. Chilled water inlet temperature C 14.0

    3. Chilled water outlet temperature C 7.0

    4. Chilled water circuit pressure drop mLC 3.7

    5. Chilled water Connection diameter DN 150

    6. Maximum working pressure kg/cm(g) 8

    B Cooling Water Circuit:

    1. Cooling water flow m/hr 165

    2. Cooling water inlet temperature C 32.0

    3. Cooling water outlet temperature C 30.3

    4. Absorber / Condenser passes No. 2+2/1

    5.Cooling water circuit pressuredrop

    mLC 10.2

    6.Cooling water connectiondiameter

    DN 200

    7. Maximum working pressure kg/cm(g) 8

    PDF created with pdfFactory Pro trial version www.pdffactory.com

    http://www.pdffactory.com/http://www.pdffactory.com/http://www.pdffactory.com/
  • 7/28/2019 Technical Offer From Thermax on 13.05.10

    11/32

    -------------------------------------------------------------------------------------------------------------Techno commercial proposalRev :00 Page No. 11 of 32 Date : 10th May 2010

    C Steam Circuit :

    1. Steam pressure kg/cm(g) 8.0

    2. Steam consumption kg/hr 1000

    3. Condensate drain temperature C 80 - 1004. Maximum working pressure kg/cm(g) 10.5

    D Electrical Data :

    1. Power supply415 V( 10%), 50 Hz(5%), 3 Phase+N

    2. Power consumption kVA 9.1

    3. Absorbent pump rating kW (A) 3.0 (8.0)

    4. Refrigerant pump rating kW (A) 0.3 (1.4)

    5. Vacuum pump rating kW (A) 0.75 (1.8)

    E Physical Data :

    1. Length mm 4390

    2. Width mm 2300

    3. Height mm 2910

    4. Operating weight ton 10.50

    5. Tube cleaning space mm 4100

    Notes:

    1. The capacity & heat consumption given above are for insulated machine.The capacity & Heat consumption for non-insulated machine shall be 98%& 102% of their rated values respectively.

    2. Ambient condition: 5 to 45 0C ; Relative Humidity : 30 to 75 % is considered

    for system design.

    3. All Nozzle connections suitable to ASME B16.5 Class 150.

    PDF created with pdfFactory Pro trial version www.pdffactory.com

    http://www.pdffactory.com/http://www.pdffactory.com/http://www.pdffactory.com/
  • 7/28/2019 Technical Offer From Thermax on 13.05.10

    12/32

    -------------------------------------------------------------------------------------------------------------Techno commercial proposalRev :00 Page No. 12 of 32 Date : 10th May 2010

    4) TECHNICAL SPECIFICATIONS FOR BALANCE OF PLANT

    CHILLED AND COOLING WATER PUMP

    Specifications:Type Centrifugal pumps

    Application water

    Temperature of fluid;

    - Chilled water 5 - 30 deg.C

    - Cooling water 20 - 45 deg.C

    Material of Construction:

    Body CI

    Impeller CI

    Shaft SS

    Packing Gland Packing

    CONDENSATE PUMP

    Specifications:

    Type Centrifugal pumps

    Application Hot water

    Temperature of fluid 60 - 99 deg.C

    Material of Construction:

    Body CI

    Impeller CI

    Shaft SS

    Packing Mechanical Seal

    MOTORS FOR PUMPS

    TypeTotally Enclosed Fan Cooled Squirrel CageInduction Motor : Foot mounted type

    Method of Starting Direct Online

    Class of Duty Type S1, continuous duty, of IS: 325-1978Type of Protection IP55

    Supply Voltage 415 V (+/- 10%)

    Frequency 50 Hz (+/- 5%)

    No. Phases 3

    No of poles 4

    RPM 1500 / 3000

    PDF created with pdfFactory Pro trial version www.pdffactory.com

    http://www.pdffactory.com/http://www.pdffactory.com/http://www.pdffactory.com/
  • 7/28/2019 Technical Offer From Thermax on 13.05.10

    13/32

    -------------------------------------------------------------------------------------------------------------Techno commercial proposalRev :00 Page No. 13 of 32 Date : 10th May 2010

    Type of Insulation Class F

    VALVES

    1) BUTTERFLY VALVE

    Type: Lug Wafer Type

    Pressure Rating: PN 10

    Ends Flanged

    Material Of Construction: -

    Body CI

    Disc Ductile Iron

    Stem Carbon Steel: BS 970,

    Seat- EPDM Food Grade

    Bush Acetal

    2) CHECK VALVE

    Valve Type: Self acting Non-return valves

    Description:Single Plate Wafer type Swing CheckValve

    Body Type: Short Pattern Wafer Type

    Disc Type: With Integral hinge pin

    Pressure Rating: PN10

    Ends Flanged

    Material Of Construction: -Body CI

    Disc CI

    Seat- EPDM Food Grade

    3) GATE VALVE 50 NB ANDABOVE

    Body & Bonnet: ASTM A216 WCB

    Type: OS & Y Type, Bolted Bonnet

    Ends Flanged

    4) GATE VALVE 40 NB ANDBELOW

    Body & Bonnet: ASTM A105

    Type: OS & Y Type, Bolted Bonnet

    PDF created with pdfFactory Pro trial version www.pdffactory.com

    http://www.pdffactory.com/http://www.pdffactory.com/http://www.pdffactory.com/
  • 7/28/2019 Technical Offer From Thermax on 13.05.10

    14/32

    -------------------------------------------------------------------------------------------------------------Techno commercial proposalRev :00 Page No. 14 of 32 Date : 10th May 2010

    Valve Testing: API 598

    Ends Socket Welded

    5) STRAINER

    Type : Y strainer

    End Connection: Flanged

    Body : CI

    Cover : CI

    Filter SS

    Guide vanes : CI

    PIPES

    Chilled & cooling water IS 1239 / IS 3589, MS ERW Pipe

    Steam & Condensate SA106, Seamless

    INSULATION

    Cold insulationThermocole insulation + 24 G Aluminumcladding

    Hot insulationLight resin Bonded Insulation + 24 G

    Aluminium Cladding

    COOLING TOWER FOR 260 TR VAM

    Design Wet Bulb Temp. 28 C (customer to confirm)

    Specifications

    Type Counter / Cross Flow,

    Induced/Forced Draft

    No. of Towers 1 No.

    Material

    Main Equipment GRP/FRP

    PDF created with pdfFactory Pro trial version www.pdffactory.com

    http://www.pdffactory.com/http://www.pdffactory.com/http://www.pdffactory.com/
  • 7/28/2019 Technical Offer From Thermax on 13.05.10

    15/32

    -------------------------------------------------------------------------------------------------------------Techno commercial proposalRev :00 Page No. 15 of 32 Date : 10th May 2010

    5) SCOPE OF SUPPLY

    Scope of supply for single Vapour Absorption Machine:

    Sr.No. Description Qty1 Lower shell comprising of evaporator and absorber 1

    2 Upper shell comprising of low temperature generator and

    condenser

    1

    3 High temperature generator 1

    4 Regenerative heat exchangers 1 lot

    5 Absorbent pump set 1 lot

    6 Refrigerant pump set 1 lot

    7 Purge unit with vacuum pump 1 lot

    8 PLC based control panel with temperature & TR display 1

    9 Temperature sensors 1 Lot

    10 Inter connecting piping and wiring 1 Lot

    11 Operation maintenance manual 1

    12 Pneumatic 2 way Steam control valve with I/P converter and

    air filter regulators

    1 lot

    13 AC drive for absorbent pump 1 no

    Scope of supply of liquids

    1. Lithium Bromide duly inhibited 1 Lot

    2. Refrigerant water with Octyl Alcohol 1 Lot

    Technical: Packing :Operational & Maintenance Manual. Thermax standard packing.

    PDF created with pdfFactory Pro trial version www.pdffactory.com

    http://www.pdffactory.com/http://www.pdffactory.com/http://www.pdffactory.com/
  • 7/28/2019 Technical Offer From Thermax on 13.05.10

    16/32

    -------------------------------------------------------------------------------------------------------------Techno commercial proposalRev :00 Page No. 16 of 32 Date : 10th May 2010

    Scope of supply for Balance of Plant

    Sr. Description Unit Qty

    A COOLING WATER CIRCUIT

    - 3 No Cooling tower for handling heat rejectionfrom 2 No 260TR VAM ( 2 working + 1 standby cell)

    - 3 Nos (2 working + 1 standby) Cooling waterpumps with suitable motor and requiredaccessories.

    - Valves, strainers, NRVs, etc in the coolingwater circuit as required

    - Interconnecting piping - MS ERW as per IS1239/ IS 3589 with fittings, hard wares,flanges and fitting as required.

    - Instrumentation like Flow Transmitters,Pressure gauges, etc as required

    Lot 1

    B CHILLED WATER CIRCUIT

    - 3 No (2 working + 1 standby) Chilled waterpumps with suitable motor and requiredaccessories for supplying chilled water fromReturn Chilled water tank to Vapour

    Absorption machine.

    - 3 No (2working + 1 standby) Chilled waterpumps with suitable motor and requiredaccessories for supplying chilled water fromSupply Chilled water tank to AHUs.

    -1 No. Make up water Storage Tank, Valves,strainers, NRVs, etc in the chilled water circuitas required

    - Interconnecting piping - MS ERW as per IS1239/ IS 3589 with fittings, hard wares,flanges and fitting as required.

    Lot 1

    PDF created with pdfFactory Pro trial version www.pdffactory.com

    http://www.pdffactory.com/http://www.pdffactory.com/http://www.pdffactory.com/
  • 7/28/2019 Technical Offer From Thermax on 13.05.10

    17/32

    -------------------------------------------------------------------------------------------------------------Techno commercial proposalRev :00 Page No. 17 of 32 Date : 10th May 2010

    - Instrumentation like Pressure gauges, FlowTransmitter as required

    - Insulation for chilled water piping

    C STEAM CIRCUIT

    - 1 No. Pressure reducing & De superheatingStation.

    - Valves, Steam Trap with strainer, etcas required

    - Interconnecting piping SA106 Seamless withfittings, hard wares, flanges and fitting asrequired.

    - Instrumentation like Pressure gauges, FlowTransmitter, etc as required

    - Insulation for Steam piping

    Lot 1

    D CONDENSATE CIRCUIT

    - 2 Nos. (1Working + 1Standby) Condensatepumps for feeding condensate to the PRDS.

    - 1 No. Condensate Tank, Valves, NRVs,strainers, etc as required

    - Interconnecting piping SA106 Seamless withfittings, hard wares, flanges and fitting asrequired.

    - Instrumentation like Pressure gauges, etc asrequired

    - Insulation for Condensate piping

    Lot 1

    PDF created with pdfFactory Pro trial version www.pdffactory.com

    http://www.pdffactory.com/http://www.pdffactory.com/http://www.pdffactory.com/
  • 7/28/2019 Technical Offer From Thermax on 13.05.10

    18/32

    -------------------------------------------------------------------------------------------------------------Techno commercial proposalRev :00 Page No. 18 of 32 Date : 10th May 2010

    EBasic piping supports including MSchannels, frames, angles, trunnions, etc

    Lot 1

    F MCC Panel, Power Cables, InstrumentCables, Cable Trays, Terminations, etc.

    Lot 1

    G Finish painting Lot 1

    H VAM Hot and Cold insulation Set 1

    Notes :

    Sr.

    NoNote Tender reference

    1All measurement for insulation will bebased as per IS: 14164 1994

    2Piping & Components under only C1zone are considered as mentioned inP&ID

    Drg. NO. 26298-32-09-UTV-0065

    3

    Major structural modifications likeconstruction of new pipe racks, etc shallbe extra to client account. All civilpedestals for the structural supports areto be provided by client. The piping

    supports provided by us will be basicstructurals & does not include piperacks

    4

    For Chilled water piping 200 NB headerlength considered from chilled watersupply pumps is 42 mtrs, This will bethe battery limit for chilled water ckt.

    Any upward increase in the length shallbe charged extra to Client account @Rs.5036/- Per running meter includinginsulation, structure & erection cost.

    Drg. NO. 26298-32-09-UTV-0064 & Drg. NO.26298-32-09-UTV-0065

    5

    For Chilled water piping 200 NB headerlength considered for chilled waterreturn to return chilled water storagetank is 42 mtrs, This will be the batterylimit for chilled water ckt. Any upwardincrease in the length shall be charged

    Drg. NO. 26298-32-09-UTV-0064 & Drg. NO.26298-32-09-UTV-0065

    PDF created with pdfFactory Pro trial version www.pdffactory.com

    http://www.pdffactory.com/http://www.pdffactory.com/http://www.pdffactory.com/
  • 7/28/2019 Technical Offer From Thermax on 13.05.10

    19/32

    -------------------------------------------------------------------------------------------------------------Techno commercial proposalRev :00 Page No. 19 of 32 Date : 10th May 2010

    extra to Client account @ Rs.5036/- Perrunning meter including insulation,structure & erection cost.

    6

    Max average Chilled water piping lengthconsidered for that is 220 m. Anyupward increase in the length shall becharged extra to Client account @Rs.4830/- Per running meter includinginsulation, structure & erection cost.

    7

    Storage Water tank location consideredat 10mtrs distance from Cooling towers& its make up water connection at 4mtrs from storage tank. Due to that 50NB make up water line comes as 48mtr. Any upward increase in the lengthshall be charged extra to Client account@ Rs.990/- Per running includingstructure & erection cost.

    Drg. NO. 26298-32-09-UTV-0065

    8

    Max average Cooling water pipinglength considered for that is 150m. Anyupward increase in the length shall becharged extra to Client account @Rs.3131/- Per running includingstructure & erection cost.

    9

    Steam Connection considered at 4 mtrsfrom PRDS. Thus, Max average steampiping length considered is 50 m. Anyupward increase in the length shall becharged extra to Client account @Rs.3213/- Per running meter includinginsulation, structure & erection cost.

    Drg. NO. 26298-32-09-UTV-0065

    10

    Condensate Line Connection to theboiler is considered at 15 mtrs fromCondensate Tank. Thus, Max averagecondensate piping length considered is42 m. Any upward increase in the lengthshall be charged extra to Client account@ Rs.1445/- Per running meterincluding insulation, structure & erection

    Drg. NO. 26298-32-09-UTV-0065

    PDF created with pdfFactory Pro trial version www.pdffactory.com

    http://www.pdffactory.com/http://www.pdffactory.com/http://www.pdffactory.com/
  • 7/28/2019 Technical Offer From Thermax on 13.05.10

    20/32

    -------------------------------------------------------------------------------------------------------------Techno commercial proposalRev :00 Page No. 20 of 32 Date : 10th May 2010

    cost.

    11MCC Panel is considered near to chillerNo.1 & accordingly cable lengths are

    considered.

    Drg. NO. 26298-32-09-UTV-0064

    BATTERY LIMITS FOR BALANCE OF PLANT

    CHILLED WATER : Flanged connection at the end of the C1 at a distancementioned in above point 4 in Notes

    COOLING WATER : At the Connection point of Make up water Tank (C1)

    STEAM : Flanged connection at the end of the C1 at a distancenot more than mentioned in above point 9 in Notes

    CONDENSATE : Flanged connection at the Boiler feed water tankconsidering it is at a distance not more than mentionedin above point 10 in Notes from condensate Tank.

    POWER SUPPLY : At the terminal strip of our panel.

    PDF created with pdfFactory Pro trial version www.pdffactory.com

    http://www.pdffactory.com/http://www.pdffactory.com/http://www.pdffactory.com/
  • 7/28/2019 Technical Offer From Thermax on 13.05.10

    21/32

    -------------------------------------------------------------------------------------------------------------Techno commercial proposalRev :00 Page No. 21 of 32 Date : 10th May 2010

    6) EXCLUSION / SCOPE OF CUSTOMER

    1) Flanged connections at the Hot water header as per System P & ID.

    2) All civil work including making and breaking of foundations, walls etc.

    3) Chilled water storage tank of Civil construction of approximately 500 m3size, with necessary Vents, Drains, etc.

    4) Cooling tower sump as per the requirement.

    5) The chiller plant room with necessary sheds etc.

    6) Rated electrical supply at the incomer for MCC.

    7) Electrical earthing for all the equipments.

    8) Clearances for construction / commissioning.

    9) BMS / DCS connectivity.

    10) Customer to provide Compressed air up to a point near the VAM room.

    11) Statutory Approvals if any.

    12) Construction power and water

    PDF created with pdfFactory Pro trial version www.pdffactory.com

    http://www.pdffactory.com/http://www.pdffactory.com/http://www.pdffactory.com/
  • 7/28/2019 Technical Offer From Thermax on 13.05.10

    22/32

    -------------------------------------------------------------------------------------------------------------Techno commercial proposalRev :00 Page No. 22 of 32 Date : 10th May 2010

    7) FEEDER LIST

    Feeder list Inlet Air Cooling of Compressor

    Sr.No Description Working standby

    1 Chilled water pump primary (2w+1s) 15kW * 2 Nos15 KW * 1

    N0

    2Chilled water pump secondary ( 2w + 1s)

    22 KW * 2 Nos22 KW * 1

    No

    2 Cooling water pump (2w+1s) 22kW* 2 Nos22 KW * 1

    No

    3 Condensate transfer pump ( 1w + 1 s) 3.7kW* 1 No

    3.7KW * 1

    No

    4 Cooling tower Fan 5kW* 2 Nos 5KW * 1No

    5 VAM.9.1 KVA * 2

    Nos9.1KVA * 1

    No

    PDF created with pdfFactory Pro trial version www.pdffactory.com

    http://www.pdffactory.com/http://www.pdffactory.com/http://www.pdffactory.com/
  • 7/28/2019 Technical Offer From Thermax on 13.05.10

    23/32

    -------------------------------------------------------------------------------------------------------------Techno commercial proposalRev :00 Page No. 23 of 32 Date : 10th May 2010

    9) CLIENT INPUTS

    Steam at rated parameters at the battery limits

    Clear space along with necessary clearances for positioning the chillers,pumps, cooling tower, piping etc as per layout drawings

    Cooling and Chilled water for circulation.

    Rated Power supply to our MCC.

    Civil work according to the requirements.

    10) COMMISSIONING AND PERFORMANCE TESTING

    A) COMMISSIONING:

    A commissioning procedure shall be submitted to Client during detailing forinformation

    Commissioning will be carried out as per the procedure within 15 days ofmechanical completion of the system.

    The commissioning of the VAM system shall be taken up at the availableload conditions.

    In case commissioning of the system could not be taken up due to lack of

    completion of work/ clearances by purchaser within agreed timelines thensupplier shall not be held responsible for the same.

    The purchaser shall inform supplier of scheduled completion so that the suppliercan plan his resources accordingly

    B) PERFORMANCE TESTING AT SITE:

    A performance testing procedure shall be submitted to Client for informationduring detailing.

    Performance trials will be carried out to demonstrate the capacities of the systemwithin 15 days of commissioning of the system at the available load. In case theload or rated utilities are not available, the unit will be deemed as handed overafter the performance trials are taken on the available parameters.

    Once the inputs mentioned in section 8 are made available e to Thermax for aperiod not less than 72 hours,

    PDF created with pdfFactory Pro trial version www.pdffactory.com

    http://www.pdffactory.com/http://www.pdffactory.com/http://www.pdffactory.com/
  • 7/28/2019 Technical Offer From Thermax on 13.05.10

    24/32

    -------------------------------------------------------------------------------------------------------------Techno commercial proposalRev :00 Page No. 24 of 32 Date : 10th May 2010

    Thermax shall demonstrate the following;

    Rated Cooling capacity under steady load as mentioned in the VAM technicalparameters at the battery limits of chilled water pipeline.

    Rated auxillary power consumption as per given parameters.

    11) VENDOR LIST

    Make of VAM Mounted Components :

    PLC Siemens

    Operator interface Siemens / SchneiderOperators interface Siemens / Schneider

    Level relay Omron (Japan)

    Level Electrodes Omron ( Japan)3 way Control Valve Samson / IL / eq

    Chw flow switch SaginomiyaChW DP switch Switzer

    Temperature sensors GIC / Nutech

    Pressure Guages H Guru / GIC / Gluck / eq

    Manometer Fitzer /TechnoflowAbsorbent pump Teikoku,

    Refrigerant Pump Teikoku

    Purge pump Indowoosang

    I/P convertor Moore Controls / ABB

    Switchgear Siemens / L&TMCB Siemens/ L&TCables Polycab / CCI / Finolex / eq

    Make List for Balance of Plant :

    NoItem

    DescriptionMake as per Tender

    Makes considered for ouroffer

    1 Pumps

    Mather and Platt /Kirloskar

    /KSB/Akay

    Kirloskar / KSB/Mather & Platt/ Flowserve / Flow more /

    ArmStrong

    2Butterflyvalves

    Audco / BDK /Dewrance/KSB /McNeill/Leader / Fouress /J.N. Marshall /Saunders

    Intervalve / Expert/ Delval /Fluidtecq

    PDF created with pdfFactory Pro trial version www.pdffactory.com

    http://www.pdffactory.com/http://www.pdffactory.com/http://www.pdffactory.com/
  • 7/28/2019 Technical Offer From Thermax on 13.05.10

    25/32

    -------------------------------------------------------------------------------------------------------------Techno commercial proposalRev :00 Page No. 25 of 32 Date : 10th May 2010

    3 Gate Valves

    Audco / BDK /Dewrance/KSB /McNeill/Leader / Fouress /J.N. Marshall /Saunders

    Fluidline / Exper /BDK/Intervalve

    4 Globe valvesAudco / BDK /Dewrance/KSB /McNeill/Leader / Fouress /J.N. Marshall /Saunders

    Fluidline / Expert / BDK /Intervalve / Fluidtecq

    5 NRV

    Audco / BDK /Dewrance/KSB /McNeill/Leader / Fouress /J.N. Marshall /Saunders

    Intervalve / Expert /Fluidtecq/BDK

    6 Y-Strainer Not specified

    Fabricated /Gujotofilt / Triveni /LNT Industrial Engineering /BVK / T hermax approved

    vendors

    7 Cooling tower Not SpecifiedPaharpur / Mihir / Advance /Bell / Southern / Spacco /Himgiri

    8 PipesTata Tube /Jindal /RSP/BHEL/ Maharashtra /

    Ajantha Tubes

    Tata / Jindal / Surendra / Indus/ vinayak / MSL

    9PressureGauges

    Guru international /GeneralInstruments /Forbes Marshall/Gauges & Bourdon Limitedor Equivalent

    H Guru / Gluck /GI / Mass

    10TemperatureGauges

    General Instruments / PyroElectric /Goa instrumentsindustries / Altop orEquivalent

    H Guru / Gluck /Waree/ Mass

    11 Level gaugesV automat/Levcon/Techtrol/Chemtrolsor Equivalent

    Levcon / Chemtrol / PuneTechtrol

    12 MotorsABB /Siemens /CGL/Kirloskar /Alstom orEquivalent

    Siemens / ABB / Bharth Bijlee/ Crompton

    13 Insulation Not specified Rock wool/ Thermax approvedvendor

    14 Plate flanges Not specifiedParmar/ Britex/ Alliance/Thermax Approved Vendor

    PDF created with pdfFactory Pro trial version www.pdffactory.com

    http://www.pdffactory.com/http://www.pdffactory.com/http://www.pdffactory.com/
  • 7/28/2019 Technical Offer From Thermax on 13.05.10

    26/32

    -------------------------------------------------------------------------------------------------------------Techno commercial proposalRev :00 Page No. 26 of 32 Date : 10th May 2010

    15 Pipe fittings Not specifiedVinayak/ Excel/ Parmar/Fabricated as per TL drgs.

    16 Tanks Not specified Fabricated as per TL drgs.

    17EletronicPressureTransmitters Not specified Yokogowa / Emerson

    18 Orifice Plates Not specified Starmech / eureka

    19PressureSwitch

    Switzer /General Instrument/Indfos /Schneider orEquivalent

    Indfoss / Switzer

    20Temperature

    Sensor

    Not specifiedNutech / Thermax Apporoved

    Vendor

    21

    LevelSwitches(Float /Displacertype)

    V Automat/PlakaInstrument/Techtrol/Levcon/Chemtrols or equivalent

    Waree/GIC/ Scientific Devices/ pune techtrol

    22ExpanisionJoints(Mettalic)

    Modern Sales

    The makes mentioned above are subject to availability. In the event of non

    availability of material within the stipulated time, Thermax may choose alternatevendors. In that event, prior approval of Client shall be taken before procurementaction.

    PDF created with pdfFactory Pro trial version www.pdffactory.com

    http://www.pdffactory.com/http://www.pdffactory.com/http://www.pdffactory.com/
  • 7/28/2019 Technical Offer From Thermax on 13.05.10

    27/32

    -------------------------------------------------------------------------------------------------------------Techno commercial proposalRev :00 Page No. 27 of 32 Date : 10th May 2010

    12) NOTES AND DEVIATIONS

    Sr.

    No Note Tender reference

    1Routing of Chilled water & Air piping isgoing to be finalised after receipt of AshConveying Piping

    Drg. NO. 26298-32-09-UTL-0010

    2Only C1 piping considered, Yard pipingi.e. C2 not considered

    Drg. NO. 26298-32-09-UTV-0065

    3

    200 NB header length considered fromchilled water supply pumps is 42 mtrs,tThis will be the battery limit for chilledwater ckt.

    Drg. NO. 26298-32-09-UTV-0064 & Drg. NO.26298-32-09-UTV-0065

    4

    200 NB header length considered forchilled water return to return chilledwater storage tank is 42 mtrs, This willbe the battery limit for chilled water ckt.

    Drg. NO. 26298-32-09-UTV-0064 & Drg. NO.26298-32-09-UTV-0065

    5

    Storage Water tank location consideredat 10mtrs distance from Cooling towers& its make up water connection at 4 mtrsfrom storage tank. Due to that 50 NBmake up water line comes as 48 mtr

    Drg. NO. 26298-32-09-UTV-0065

    6Steam Connection considered at 4 mtrsfrom PRDS.

    Drg. NO. 26298-32-09-UTV-0065

    7Condensate Line Connection to theboiler is comsidered at 15 mtrs fromCondensate Tank.

    Drg. NO. 26298-32-09-UTV-0065

    8MCC Panel is considered near to chillerNo.1 & accordingly cable lengths areconsidered

    Drg. NO. 26298-32-09-UTV-0064

    PDF created with pdfFactory Pro trial version www.pdffactory.com

    http://www.pdffactory.com/http://www.pdffactory.com/http://www.pdffactory.com/
  • 7/28/2019 Technical Offer From Thermax on 13.05.10

    28/32

    -------------------------------------------------------------------------------------------------------------Techno commercial proposalRev :00 Page No. 28 of 32 Date : 10th May 2010

    DEVIATIONS:

    Sl Deviation Tender Reference

    1Butterfly Valves considered for Chilled &Cooling water circuits instead of GateValves

    Drg. NO. 26298-32-09-UTV-0065

    2As per provided P&ID 2 Nos.Condensate Pumps (1W+1St) will beprovided.

    Drg. NO. 26298-32-09-UTV-0065, & Point 5,Table-1, Page No. 33 ofMPL-32-UTV-001

    3Chilled water & Cooling water pumps willbe CI Impeller

    Design basis, Point 7.2.Page No. 31 On MPL-32-UTV-001

    452 m3, RCC, Chilled water returnstorage tank & Chilled water supplystorage tank will be in Customer scope

    Point 7.6, Page No. 31 ofMPL-32-UTV-001

    PDF created with pdfFactory Pro trial version www.pdffactory.com

    http://www.pdffactory.com/http://www.pdffactory.com/http://www.pdffactory.com/
  • 7/28/2019 Technical Offer From Thermax on 13.05.10

    29/32

    ------------------------------------------------------------------------------------------------------------Technical l proposalRev :00 Page No.29 of 32 Date : 11th May 2010

    13) PRICE SCHEDULE

    Sr.

    No.Description Qty Price

    1

    Price for design and supply of Steamdriven Vapour absorption machines of260 TR capacity as per the technicalspecifications attached, ex works

    3 Nos.Rs.3850000/- (Rupees thirtyeight lakhs fifty thousandonly) (each).

    2Price for supply of accessories as perthe offer, ex-works

    1 Lot

    1,05,31,575 (Rupees onecrore, five lakhs thirty onethousand five hundred andseventy five only)

    3Price for Erection and commissioning of

    the system1 Lot

    16,12,593 (Rupees sixteenlakhs twelve thousand five

    hundred and ninety threeonly)

    Price Basis : The price quoted above is ex-works, Pune.

    - The above supply prices are ex-our vendor / our works, Pune.- Packing and forwarding charges extra at 3 %.- Excise duty & education cess extra, wherever applicable.- Value Added Tax/2 % CST against form C shall be extra at actual.- Service tax shall be extra at actual, wherever applicable.- Octroi / State entry tax extra at actual, if applicable.

    - Freight, transit insurance, unloading of equipment by purchaser.- Any other taxes, duties other than the above, if applicable at

    the time of delivery shall be borne by Purchaser.

    (Note : Any variation or imposition of new taxes & duties at the time ofdelivery shall be borne by Purchaser)

    Terms of payment :

    Item 1 and 2

    40% advance along with PO. Balance against proforma invoice prior to dispatch on prorata basis

    Item 3

    40% advance along with PO.

    55% Balance against mechanical completion on prorata basis.

    5% against commissioning at available load.

    PDF created with pdfFactory Pro trial version www.pdffactory.com

    http://www.pdffactory.com/http://www.pdffactory.com/http://www.pdffactory.com/
  • 7/28/2019 Technical Offer From Thermax on 13.05.10

    30/32

    ------------------------------------------------------------------------------------------------------------Technical l proposalRev :00 Page No.30 of 32 Date : 11th May 2010

    Delivery :8 months from the date of order and advance.

    Warranty :The above shall be covered under standard warranty for a period of 12 monthsfrom the date of commissioning or 18 months from the date dispatch, whichever isearlier.

    For THERMAX LTD.

    Mohsin H. Pathan.Cooling SBUContact : 9866159311Email: [email protected]

    PDF created with pdfFactory Pro trial version www.pdffactory.com

    mailto:[email protected]://www.pdffactory.com/http://www.pdffactory.com/http://www.pdffactory.com/mailto:[email protected]
  • 7/28/2019 Technical Offer From Thermax on 13.05.10

    31/32

    ------------------------------------------------------------------------------------------------------------Technical l proposalRev :00 Page No.31 of 32 Date : 11th May 2010

    14) TERMS AND CONDITIONS OF SALE

    1. ORDER CONFIRMATION

    All orders placed on us directly or through ourRegional Offices or through our authorised salesrepresentatives will be binding on us only after our

    Head Office in Pune has issued an order confirmation.

    2. SPECIFICATIONS,ETC.

    Specifications, dimensions, description, shadesof paints,etc. are not binding on us in minute details

    and are subject to reasonable alterations withoutnotice.

    3. PRICES

    All prices are ex-works, Chinchwad, Poona/ex-our

    supplier's works in case of part of the goods to be

    manufactured at their works, and are exclusive oftransit insurance, all taxes, excise and other duties

    and levies as applicable at the time of delivery, whichshall be charged separately. Freight and octroi, if any,shall be borne by the purchaser. The purchasers

    registered under the Sales Tax Act are advised to sendsales tax registration number and date and alsoconcessional sales tax form alongwith the purchase

    order. Otherwise, the State/Central Tax reduction willnot be made.

    While every effort will be made to adhere to thecontract price, in the present conditions we cannotguarantee that the contract prices will hold good when

    the order is executed. The prices of this quotation arebased on the prevailing costs of raw materials,boughtout components and wages etc. If between the

    date of the contract and its completion, variationsoccur in these costs, our prices may stand revised andthe ex-works price ruling at the time of delivery will be

    applicable. In the normal course we do not anticipateany revisions of ex-works prices to exceed 10% overthe contract price of deliveries upto 8 months.

    4. MODE OF DELIVERY

    All deliveries will be ex-our works, Chinchwad/ex-our suppliers works. The goods may be despatchedin one or separate lots at our option. If we arerequired to despatch the goods on behalf of thepurchaser, we can arrange to do so by road transportonly to a destination named by the purchaser, onfreight-to pay basis, on the understanding that no

    liability is attached to us. The freight chargescontracted by us on behalf of the purchaser will betreated as negotiated under the purchaser's authority

    and shall therefore be final.

    5. PACKING

    Packing for despatch, whenever necessary will be inaccorance with our standard practice and packing

    charges @ 1.5 % of the total value of the order.

    6. INSPECTION

    If necessary, the goods will be offered for visualinspection only at our works/our supplier's works. The

    date of inspection will be intimated by us about 15days in advance and confirmed by the purchaseraccordingly. If inspection is not carried out on the

    date so advised, we shall be free to despatchconsignment as per terms of delivery.

    7. DELIVERY PERIOD

    The goods will be ready for delivery

    approximately months from the final confirmation byour Head Office of the Purchaser`s Order alongwiththe requisite advance and with all technical and

    commercial points duly clarified. Deliveries subject to

    "Force Majeure" as defined in clause 12 hereof.

    8. INSURANCE

    Transit Insurance has to be covered by the

    purchaser. We shall convey the despatch particularsas soon as possible after actual despatch to enablethe purchaser to arrange insurance.

    9. PAYMENT TERMS

    40% advance with the order and balance paymentprior to delivery against proforma invoice. We shallsend proforma invoice inclusive of all taxes and

    incidental charges about the time the ordered materialsare ready for delivery in full or in part and if payment isnot made within 15 days of date of proforma invoice,

    we reserve the right to divert the ordered materials.We will give a fresh delivery period at the time ofdiversion which will be binding on the purchaser and

    the contract cannot be rendered void on this account.

    If the goods cannot be diverted, charges will be madefor storage, insurance and interest at the rate of 1%of the invoice value for each week or part thereofcommencing 15 days from the date of proforma

    invoice.

    10. ADVANCES

    Advances paid against an order shall not be subject toany interest. We shall have the right to adjust againstsuch advances any payments which might become due

    because of delay in lifting the ordered equipment orbecause of any incidental expenses we may incur onthe purchaser's behalf. The advance shall be forfeited

    in case request for cancellation of order is accepted byus.

    11. GENERAL LIEN

    We shall be entitled to general lien on goods in

    our possession or despatched for all money due tous by the purchaser, both under this contract or anyother account and we shall also be entitled to apply

    PDF created with pdfFactory Pro trial version www.pdffactory.com

    http://www.pdffactory.com/http://www.pdffactory.com/http://www.pdffactory.com/
  • 7/28/2019 Technical Offer From Thermax on 13.05.10

    32/32

    any money in our hands under any contract due tous under any other contract or contracts.

    12. FORCE MAJEURE

    The offer is subject to force majeure by which it meanscause beyond our reasonable control such as warinvasion, civil disobedience, government orders or

    restrictions, strikes, lockouts, riots, fire,materials wagons, shipping space or any otherearthquakes, floods, accident, breakdown of

    machinery, delay or inability to obtain labour, rawcauses whatsoever beyond our reasonable contro,affecting us or our subcontractors, suppliers, etc.

    13. WARRANTY

    All our equipment are thoroughly inspected/testedbefore despatch and therefore, can be depended uponfor long and trouble free service. We undertake to

    make good by replacement or repair defects arisingour of faulty design, materials or workmanship within12 months of the date of despatch, providing that if

    we so require, the parts in respect of which a claim ismade, must be sent at purchaser's expense to our

    works before liability can be entertained under thisclause. Such expense will be refunded if our liabilityis admitted. It is advised that the purchaser enters in toannual maintenance contract with Thermax immediately

    after commissioning of equipment.

    Boughtout components are guaranteed by us only to

    the extent of guarantees given to us by oursuppliers. Electrical components, such as heaters,motors, contractors, AC Drive etc. rubber components,

    consumables such as Lithium Molybdate , Octyl Alcoholetc. and instruments such as pressure gauges,thermometers, combistats, etc, are however, not

    covered under this warranty.This warranty is validsubject to installation having been completed within3 months of despatch of the equipment; - the

    supply/installation having been formally accepted asper the Handing Over clause (No.15 below);- the equipment or part thereof not being subject

    to accident,alteration, abuse or misuse;- the installation having been made in proper manneras per our installation instructions;

    - the equipment being operated and maintained asper our Operation and Maintenance instructions.

    14. COMMISSIONING

    Commissioning service offered at the rate and termsmentioned below covers a reasonable number of

    visits/meeting to:- discuss arrangement for the safe unloading of theconsignment on receipt at destination by the buyer;

    - discuss installation details in terms of

    physical/technical requirements;- make the user conversant with statutory requirements,

    if any;- discuss details of requirements in respect of powersupply, feed water, fuel systems etc;

    - ensure the installation has finally been made asrecommended;- commission the unit for a short run from the point of

    view of mechanical working and to set various controlsas necessary;

    - conduct demonstration for the purpose of user'seducation for equipment operation and maintenance.

    Commissining Charges and Terms of Payment:- Commissioning charges As specified in the quotation.- Terms of Payment 100% payment within 10 days of

    commissioning of the unit.15. HANDING OVER

    Unless otherwise specified in the order and accepted,handing over of the equipment and/or installation wouldbe considered as completed anda formal completion

    certificate shall be issued by the buyer/user if:(a) the material has been supplied as per terms ofscope of supply or with agreed deviations, if any;

    (b) erection, if involved, has been completedgenerally as per terms of order or with unavoidabledeviations;

    (c) the equipment has been commissioned, ifapplicable generally as agreed;(d) the equipment and/or installation has been

    put to commercially use either with or without help ofour engineer.

    The buyer/user is expected to put the equipment tocommercial use only after issuing a formal

    completion certificate. Our responsibility in terms ofwarranty shall cease straightaway if the equipment isput to use without formal taking over.

    16. CANCELLATION

    Order received and acknowledged by us shall not be

    subject to cancellation, either wholly or partly for anyreason whatsoever without our consent.

    17. JURISDICTION

    All contracts between purchasers and ourselves are

    deemed to be entered into at Pune and aretherefore, subject to the jurisdiction of courts at Pune.

    18. VALIDITY

    While every effort will be made to keep our quotation

    valid for acceptance for a period of 30 days from thedate hereof, we may be constrained to modify thisoffer within this period due to circumstances beyond

    our control.

    19. GENERAL

    Any condition or other matters relating to thisquotation not expressly stipulated will be a matter ofmutual discussion and agreement at the time of

    accepting the order. If this quotation is accepted andan order placed allthe above conditions of sale standautomatically accepted by the buyer.

    ForTHERMAX LIMITED,Sagar Kamble

    Cooling SBUContact : 9765565211, 020-66122125Email: [email protected]