FLENDER-GRAFFENSTADEN AFTER SALES SERVICE 19 JANUARY 2012 Compliance Category – C Timing Code - 3 TECHNICAL INFORMATION LETTER DANGERS OF BEARING REFURBISHMENT APPLICATION This TIL applies to all Load and Compressor Gearboxes PURPOSE This TIL is to provide customers with information regarding the dangers of using refurbished bearings in load gearbox or compressor gearbox applications. COMPLIANCE CATEGORY O - Optional Identifies changes that may be beneficial to some, but not necessarily all, operators. Accomplishment is at customer’s discretion M - Maintenance Identifies maintenance guidelines or best practices for reliable equipment operation C - Compliance Required Identifies the need for action to correct a condition that, if left uncorrected, may result in reduced equipment reliability or efficiency. Compliance may be required within a specific operating time. A - Alert Failure to comply with the TIL could result in equipment damage or facility damage. Compliance is mandated with a specific operating time. S - Safety Failure to comply with this TIL could result in personal injury. Compliance is mandated within a specific operating time. TIMING CODE 1 Prior to Unit Startup / Prior to Continued Operation (forced outage condition) 2 At First Opportunity (next shutdown) 3 Prior to Operation of Affected System 4 At First Exposure of Component 5 At Scheduled Component Part Repair or Replacement 6 Next scheduled Outage 7 Optional

Upload: others

Post on 14-Jan-2022

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: TECHNICAL INFORMATION LETTER

FLENDER-GRAFFENSTADENAFTERSALESSERVICE19JANUARY2012ComplianceCategory–CTimingCode-3

TECHNICALINFORMATIONLETTER

DANGERSOFBEARINGREFURBISHMENTAPPLICATIONThisTILappliestoallLoadandCompressorGearboxesPURPOSEThisTIListoprovidecustomerswithinformationregardingthedangersofusingrefurbishedbearingsinloadgearboxorcompressorgearboxapplications.COMPLIANCECATEGORYO - Optional Identifies changes thatmay be beneficial to some, but not

necessarily all, operators. Accomplishment is at customer’sdiscretion

M - Maintenance Identifies maintenance guidelines or best practices forreliableequipmentoperation

C - ComplianceRequired Identifiestheneedforactiontocorrectaconditionthat,ifleftuncorrected,may result in reducedequipment reliabilityorefficiency. Compliance may be required within a specificoperatingtime.

A - Alert Failure to comply with the TIL could result in equipmentdamageor facilitydamage.Compliance ismandatedwith aspecificoperatingtime.

S - Safety FailuretocomplywiththisTILcouldresultinpersonalinjury.Complianceismandatedwithinaspecificoperatingtime.

TIMINGCODE

1 PriortoUnitStartup/PriortoContinuedOperation(forcedoutagecondition)2 AtFirstOpportunity(nextshutdown)3 PriortoOperationofAffectedSystem4 AtFirstExposureofComponent5 AtScheduledComponentPartRepairorReplacement6 NextscheduledOutage7 Optional

Page 2: TECHNICAL INFORMATION LETTER

TechnicalInformationLetter

Page2of7

BACKGROUNDDISCUSSIONFollowingalubricationissueand/orahighvibrationlevel,slidebearingscanbedamaged.Thewhitemetal(Babbitt)beingtheareasufferingfromthedamages.Bearingswillalsowearduetonormaloperation,andneedtobereplacedattherecommendedserviceintervalsasnotedintheusermanualofyourgearbox(ifyoudonothavethismanualpleasecontactFGoryourlocalservicerepresentative)Assumingbearingshavetobereplaced,eitherduetowearafteralongperiodofoperation,orduetoexceptionaldamagesduetopooroilqualityorvibrationissues,therearetwopossibilitiestoputthegearboxbacktooperation:• Toreplacethedamagedbearingbyanew

one• Torepairthebearing(sametechnologyas

theoneusedfortheturbine/generatorbearing)

TECHNICALDISCUSSION–BEARINGDESIGNDuetothehighloadsandhighvelocitiesrequirements,Flender-Graffenstadengearboxesarefittedonlywithhydrodynamicsleevebearings.Thetorquecomingfromthedriving

machineistransmittedviathegearboxtothedrivenmachine.Thisresultsintangential,radialandaxialforcesinthegearteeth,knownasreactionforces.Axialforcesaresupportedeitherbyaxialthrustbearingsorbythetoothingitselffordoublehelicalgearsconfigurations.Tangentialandradialforcesaresupportedbythegearboxradialbearings.These

loadsaremuchhigherthanonlyshaftweightsandtheycanhavevariableamplitudesdependingontheoperatingconditions.Forthisreason,gearboxbearingloadscannotbecomparedtootherrotatingequipmentbearingloadsliketurbinesorgenerators.Someoftheseotherrotatingmachinerybearingsdonotevenreachthehalfoftheallowableloadlimitusedforgearboxes.

RECOMMENDATION

BasedonourexperienceweDONOTRECOMMENDtorepairtheusedordamagedbearings.

Page 3: TECHNICAL INFORMATION LETTER

TechnicalInformationLetter

Page3of7

TECHNICAL DISCUSSION – FAILURE MODES OFREFURBISHMENTThe reasons for this are both technical andpractical.

Figure1:Slidingofwhitemetal

Figure2:Damagetowhitemetal

Figure3:FailedrefurbishedBearing

When refurbishingabearing you canonlydo sowhentheinnerpartofthebearingisdamagedandthe outer diameter being in the requiredtolerances(intherangeof0,05mm)Thedifferentstepsfortherepairarethefollowing:

• Removalofthewhitemetalbymachining• Preparationofthesurface(innerdiameter)–

Babbitting.• MachiningoftheinnerdiameterDuringtheaboveoutlinedoperationsthebearingis machined, heated up, cooled down andmachinedagainwhichhas theconsequenceofabuildupinternalstressinthesteelofthebearingsurface.The metal body of the bearing goes throughdeformation and gets twisted i.e. the outerdiameterisstillwithinthedimensionaltolerances,butitwillfailitsgeometricaltolerances.ThebearinggeometrydefinedbyFlender-Graffenstadenensuresappropriateoilfilmthicknessaswellasproperstiffnessanddampingcharacteristicsrequiredandcalculatedforthegooddynamicalbehaviorofthegeartrain.Thelastmachiningoperationdoesn’tallowthebearingtoremainwithinthetolerancesfortheconcentricityANDtheparallelism.Atthetimeofputtingarefurbishedbearing intoplace inside the casing, theouterdiameter goesback to its previous position, leading to adeformationoftheinnerdiameter.Asaconsequence,thecontactpatternoftheshaftinsidethebearingispartialandwouldleadtoasignificantdisturbanceofthedynamicbehaviorofthebearinggenerating:• Riskofdamageatthestartup• Riskofdamageofthebearingareaofthe

shaft• Riskofunsatisfactorytoothcontactpattern

withpossiblecompletebreakdownofthegearbox.

Page 4: TECHNICAL INFORMATION LETTER

TechnicalInformationLetter

Page4of7

CONSEQUENCESThepracticalconsequenceofrefurbishingbearingsisnotjustthereplacementofthebearing–thisisabestcasescenario.Thefinaldamagescanrangefromdamagestotheshaftjournals,aswellasthetoothingofthegearsnecessitatingreplacementoftheentiregearset.

Figure4:Damagetothejournalareaafterfailureofrefurbishedbearings

Figure5:DamagetotheteethafterrefurbishedbearingfailureFromaninitialtimeand/ormoneysaving,financialimpactmightbedisastrousconsideringthecostfornewsparessupply,andabovethattheextendeddowntimeduetotheirlongleadtime.Worstcasemightbeacatastrophicfailurethatleadstothetotaldestructionoftheinstallation,injuredpersonnelorevendeathofpersonnel.

BelowexamplesarefromasiteinSaudiArabiawhichrequiredourinterventionandRCA.

Figure6:Gearboxexplosionduetofailureofbearingatload

Figure7:Totaldestructionofthegearbox

Figure8:HighDamagetosurroundingequipment

Page 5: TECHNICAL INFORMATION LETTER

TechnicalInformationLetter

Page5of7

PLANNINGINFORMATIONCompliance• ComplianceCategory:C• TimingCode:3ManpowerSkillsN/APartsN/ASpecialToolingN/AReferenceDocuments• GearboxUserManual• FGM003GearboxMaintenanceSchedulePreviousModificationsN/AScopeofWorkN/AContactyourlocalFGServiceRepresentativeforassistanceoradditionalinformationNOTE:IfyouwouldliketoreceivefutureTILsbyemail,contactyourlocalFGServiceRepresentativeforassistance

Page 6: TECHNICAL INFORMATION LETTER

TechnicalInformationLetter

Page6of7

TILCOMPLIANCERECORDCompliancewiththisTILmustbeenteredinlocalrecords.FGrequeststhatthecustomernotifyFGuponcomplianceoftisTILCompletethefollowingTILComplianceRecordandemailitto:TILComplianceflencomm@flender-graff.comTILCOMPLIANCERECORDForinternalrecordsonly#SiteName: CustomerName:CustomerContactInformation FGContactInformationContactName: ContactName:Address: Address: Email: Email:Phone: Phone:Fax: Fax:INSTALLEDEQUIPMENT TILCompletedDate 100%TILCompleted Description:UniteNumbers PartDescription PartNumber DrawingNumber Comments

Page 7: TECHNICAL INFORMATION LETTER

TechnicalInformationLetter

Page7of7

USERSATISFACTIONSURVERYFGvaluesyouropinionsandcomments.FGrequeststhatyoucompletetheUserSatisfactionSurveybelowtohelpusbetterserveyouwithaccurateandtimelyinformationonyourequipment.CompletethefollowingSatisfactionSurveyandemailitto:[email protected]

USERSATISFACTIONSURVERY

SerialNumber Date

1.HowmanydaysafterTILissuesdidyoureceivethisTIL?

1–5days 6–10days 10+days

Ratethefollowingbasedonascaleof1to5,where1isExcellentand5isPoor

2.Pleaseratehowwellthisdocumentinformedyouofthetechnicalissue

1 2 3 4 5

3.PleaseratetheoveralleffectivenessofthisTIL

1 2 3 4 5

Comments/Suggestions: