technical assistance consultant’s report · figure 2. s summary figure 3. s figure 4. y figure 5....

212
Technical Assistance Consultant’s Report This consultant’s report does not necessarily reflect the views of ADB or the Government concerned, and ADB and the Government cannot be held liable for its contents. (For project preparatory technical assistance: All the views expressed herein may not be incorporated into the proposed project’s design. Project Number: 42249 May 2015 Bangladesh: Capacity Building for Disaster Risk Finance Financed by the Japan Fund for Poverty Reduction Prepared by: Air Worldwide Corporation San Francisco, USA For Ministry of Food and Disaster Management – Disaster Management and Relief Division

Upload: others

Post on 15-May-2020

11 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

Technical Assistance Consultant’s Report

This consultant’s report does not necessarily reflect the views of ADB or the Government concerned, and ADB and the Government cannot be held liable for its contents. (For project preparatory technical assistance: All the views expressed herein may not be incorporated into the proposed project’s design.

Project Number: 42249 May 2015

Bangladesh: Capacity Building for Disaster Risk Finance Financed by the Japan Fund for Poverty Reduction

Prepared by:

Air Worldwide Corporation

San Francisco, USA

For Ministry of Food and Disaster Management – Disaster Management and Relief Division

Page 2: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10
Page 3: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

CapaBang

Draft F

May 1

acity Bglades

Final Re

2, 2015

Buildinsh (ADB

port Sub

g for DB TA-8

bmitted to

 

Disaste8144)

o the Asi

er Risk

ian Deve

k Finan

elopmen

nce in

t Bank

 

Page 4: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

Table

Executive 

1  Intro

1.1  Lim

2  Proje

3  Haza

3.1  Tr

3.1.1 

3.1.2 

3.1.3 

3.1.3.1 

3.1.3.2 

3.1.3.3 

3.1.3.4 

3.1.3.5 

3.1.3.6 

3.1.3.7 

3.1.3.8 

3.2  Flo

3.2.1 

3.2.2 

3.2.3 

3.2.3.1 

3.2.3.2 

3.2.3.3 

  

of Cont

Summary ......

oduction .........

mitations ........

ect Scope and 

ards in Bangla

ropical Cyclon

Historical Tro

Tropical Cycl

Significant an

The 1970 B

The 1991 B

Tropical Cy

Tropical Cy

Tropical Cy

Tropical Cy

Tropical Cy

Tropical Cy

ood ..................

Historical Flo

Flood Conseq

Significant an

The 1988 F

The 1998 F

The 2004 F

tents

.........................

.........................

.........................

Outline ..........

adesh ...............

ne ......................

opical Cyclone

lone Conseque

nd Recent Trop

Bhola Cyclone .

Bangladesh Cy

yclone Sidr (2

yclone Rashm

yclone Bijli (20

yclone Aila (2

yclone BOB 01

yclone Mahas

.........................

ood Informatio

quence .............

nd Recent Floo

loods ..............

loods ..............

loods ..............

 

........................

........................

........................

........................

........................

........................

e Information 

ence ................

pical Cyclone 

........................

yclone .............

007) ................

mi (2008) ..........

009) ................

009) ................

1 (2012) ..........

en (2013) .......

........................

on ....................

........................

od Events .......

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

Events ...........

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

Final Repo

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

ort on Capacity BuFinance in Ban

SF13-

.........................

.........................

.........................

.........................

.........................

.........................

.........................

.........................

.........................

.........................

.........................

.........................

.........................

.........................

.........................

.........................

.........................

.........................

.........................

.........................

.........................

.........................

.........................

.........................

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

er Risk A-8144)

3 051215

...... 16 

...... 19 

...... 20 

...... 21 

...... 23 

...... 24 

...... 26 

...... 29 

...... 36 

...... 36 

...... 38 

...... 39 

...... 41 

...... 42 

...... 43 

...... 45 

...... 46 

...... 47 

...... 47 

...... 50 

...... 55 

...... 55 

...... 56 

...... 57 

Page 5: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

3.2.3.4 

3.3  Ea

3.3.1 

3.3.2 

3.3.3 

3.3.3.1 

3.3.3.2 

3.3.3.3 

3.3.3.4 

3.3.3.5 

3.3.3.6 

3.4  Se

3.4.1 

3.4.2 

3.4.3 

3.4.3.1 

3.4.3.2 

3.5  Ot

4  Econ

4.1  Tr

4.2  Flo

4.3  Ea

4.4  Se

4.5  Su

5  Prob

  

The 2007 F

arthquake ........

Historical Ear

Earthquake C

Significant an

The 1762 A

The 1897 A

The 1918 S

The 1997 C

The 1999 M

The 2003 B

vere Storm .....

Historical Sev

Severe Storm 

Significant an

The 1989 D

The April 2

ther Natural P

nomic Impact 

ropical Cyclon

ood ..................

arthquake ........

vere Storm .....

ummary ...........

babilistic Tropi

loods ..............

.........................

rthquake Infor

Consequence ...

nd Recent Eart

Arakan Earthqu

Arakan Earthqu

rimangal Eart

Chittagong Ear

Maheshkhali Is

Borkol Earthqu

.........................

vere Storm Inf

Consequence

nd Recent Seve

Daulatpur–Satu

2004 Tornado 

Perils ................

of Major Disas

ne ......................

.........................

.........................

.........................

.........................

ical Cyclone R

 

........................

........................

rmation ..........

........................

thquake Event

uake ...............

uake ...............

thquake ..........

rthquake ........

sland Earthqu

uake ................

........................

formation .......

e .......................

ere Storm Even

uria Tornado 

in North‐Cen

........................

sters Since 200

........................

........................

........................

........................

........................

Risk Modeling

........................

........................

........................

........................

ts .....................

........................

........................

........................

........................

ake .................

........................

........................

........................

........................

nts ..................

........................

tral Banglades

........................

00 ....................

........................

........................

........................

........................

........................

g .......................

Final Repo

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

sh ....................

........................

........................

........................

........................

........................

........................

........................

........................

ort on Capacity BuFinance in Ban

SF13-

.........................

.........................

.........................

.........................

.........................

.........................

.........................

.........................

.........................

.........................

.........................

.........................

.........................

.........................

.........................

.........................

.........................

.........................

.........................

.........................

.........................

.........................

.........................

.........................

.........................

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

er Risk A-8144)

4 051215

...... 58 

...... 60 

...... 62 

...... 67 

...... 71 

...... 71 

...... 71 

...... 72 

...... 73 

...... 74 

...... 74 

...... 77 

...... 77 

...... 79 

...... 81 

...... 81 

...... 81 

...... 82 

...... 83 

...... 83 

...... 87 

...... 89 

...... 92 

...... 93 

...... 97 

Page 6: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

5.1  Lo

5.2  AI

5.3  Sto

5.4  Lo

5.5  Ex

5.5.1 

5.5.2 

5.5.3 

5.5.4 

5.5.5 

5.5.6 

5.5.7 

5.5.8 

5.5.9 

5.6  Da

5.7  M

5.8  Co

5.9  Va

6  Trop

7  Fund

7.1  Da

7.2  Ec

7.3  Fu

7.3.1 

7.3.2 

  

oss Evaluation

IR Tropical Cy

ochastic Catal

ocal Hazard In

xposure Datab

Population D

Developing th

Data Sources 

Occupancy Ty

Construction 

Replacement 

Validating th

Exposure Dat

Summary of t

amage Estimat

odeled Loss Su

onsideration o

alidation on H

pical Cyclone a

ding Gap Ana

ata Collection 

conomic Impac

unding .............

Funding for R

Humanitarian

n Methodology

yclone Model f

og (Simulated

ntensity Calcul

base ..................

Database ...........

he Exposure D

........................

ype ..................

Type ..............

Values ............

e Industry Exp

tabase Limitat

the Exposure D

tion .................

ummary .........

of the Effect of 

Historical Even

and Flood Risk

alysis ................

Methodology

ct from Disast

.........................

Recovery and 

n Aid ...............

 

y ......................

for Bangladesh

d Event Genera

lation ..............

........................

........................

Database of Bu

........................

........................

........................

........................

posure Databa

tions ................

Database of Bu

........................

........................

Storm Surge .

nts ....................

k Profile of Ba

........................

y and Sources .

ters ..................

........................

Rehabilitation

........................

........................

h Overview ...

ation) ..............

........................

........................

........................

uildings ..........

........................

........................

........................

........................

ases .................

........................

uildings .........

........................

........................

........................

........................

angladesh .......

........................

........................

........................

........................

n Projects ........

........................

Final Repo

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

ort on Capacity BuFinance in Ban

SF13-

.........................

.........................

.........................

.........................

.........................

.........................

.........................

.........................

.........................

.........................

.........................

.........................

.........................

.........................

.........................

.........................

.........................

.........................

.........................

.........................

.........................

.........................

.........................

.........................

.........................

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

er Risk A-8144)

5 051215

...... 98 

...... 99 

.... 101 

.... 104 

.... 106 

.... 106 

.... 112 

.... 112 

.... 114 

.... 114 

.... 117 

.... 118 

.... 119 

.... 120 

.... 124 

.... 126 

.... 129 

.... 132 

.... 133 

.... 135 

.... 135 

.... 138 

.... 138 

.... 138 

.... 140 

Page 7: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

7.3.3 

7.3.4 

7.4  Fu

8  The 

8.1  Ce

8.1.1 

8.1.2 

8.1.3 

8.2  Fin

8.2.1 

8.2.1.1 

8.2.1.2 

8.2.2 

8.2.3 

8.2.4 

8.2.4.1 

8.2.4.2 

8.3  Ba

9  Disa

  167 

9.1  Na

9.2  Op

9.2.1 

9.2.2 

9.2.3 

  

Foreign Aid o

Total Availab

unding Gap ....

Institutional F

entral Governm

Department o

Fiscal Divisio

Economic Rel

nancial Marke

Money Marke

Bangladesh

Financial In

Capital Mark

Insurance Sec

Informal Sect

MFIs and N

MFIs, NGO

angladesh Sov

aster Risk Fina

atural Catastro

perational Asp

Risk Assessm

Managing Bu

Reduction of 

on Disaster‐Re

ble Funding ....

.........................

Framework for

ment ................

of Disaster Ma

on, Ministry of

lations Divisio

et ......................

et .....................

h Bank ............

nstitutions ......

et .....................

ctor ..................

tor ....................

NGOs ..............

Os and PKSF I

ereign Rating 

ncing Options

ophe Risk Man

pects of Sovere

ment and Quan

udget Volatility

the Overall Li

 

elated Emerge

........................

........................

r Disaster Risk

........................

anagement, Mi

f Finance ........

on (ERD), Min

........................

........................

........................

........................

........................

........................

........................

........................

Involvement w

.......................

s for Banglade

nagement for 

eign Disaster R

ntification of C

y .....................

iabilities .........

ncy Response

........................

........................

k Managemen

........................

inistry of Disa

........................

nistry of Financ

........................

........................

........................

........................

........................

........................

........................

........................

with Disaster M

........................

esh: Internation

Sovereign Sta

Risk Financing

Contingent Lia

........................

........................

Final Repo

e .......................

........................

........................

nt and the Fina

........................

aster Managem

........................

ce ....................

........................

........................

........................

........................

........................

........................

........................

........................

Management ..

........................

nal Market Re

ates ..................

g ......................

ability ..............

........................

........................

ort on Capacity BuFinance in Ban

SF13-

.........................

.........................

.........................

ancial Market i

.........................

ment ................

.........................

.........................

.........................

.........................

.........................

.........................

.........................

.........................

.........................

.........................

.........................

.........................

eview and App

.........................

.........................

.........................

.........................

.........................

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

........................

........................

........................

in Bangladesh

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

praisal of Opt

........................

........................

........................

........................

........................

er Risk A-8144)

6 051215

.... 142 

.... 143 

.... 144 

h .. 146 

.... 146 

.... 146 

.... 147 

.... 148 

.... 148 

.... 149 

.... 150 

.... 152 

.... 153 

.... 156 

.... 160 

.... 161 

.... 162 

.... 165 

tions

.... 167 

.... 168 

.... 169 

.... 169 

.... 171 

Page 8: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

9.3  Di

9.4  Ca

9.4.1 

9.4.2 

9.4.3 

9.5  Op

9.5.1 

9.5.2 

9.5.3 

9.6  Pr

9.6.1 

9.6.2 

10  Refe

11  App

About AIR

About Asi

 

  

isaster Risk Fin

ase studies of D

Sovereign Lev

Meso‐Level In

Micro‐Level I

ptions for Ban

Review of Re

Analyzing Ri

Breaking dow

actical Implem

Sovereign Op

Non‐Sovereig

rences .............

pendix ..............

R Worldwide C

ian Disaster Pr

nancing in the

DRF Initiative

vel DRF Initia

nsurance Prog

Insurance Prog

gladesh ..........

lated Insuranc

sk and Identif

wn the funding

mentable Solut

ptions ...............

gn Options ......

.........................

.........................

Corporation ...

reparedness C

 

e International

es Relevant to 

atives ...............

grams ..............

grams .............

........................

ce Activities in

fying Needs ...

g gap ..............

tions ...............

........................

........................

........................

........................

........................

Center (ADPC)

l Developmen

Bangladesh ...

........................

........................

........................

........................

n Bangladesh .

........................

........................

........................

........................

........................

........................

........................

........................

) .......................

Final Repo

nt Context .......

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

ort on Capacity BuFinance in Ban

SF13-

.........................

.........................

.........................

.........................

.........................

.........................

.........................

.........................

.........................

.........................

.........................

.........................

.........................

.........................

.........................

.........................

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

er Risk A-8144)

7 051215

.... 172 

.... 173 

.... 173 

.... 176 

.... 177 

.... 179 

.... 179 

.... 180 

.... 181 

.... 187 

.... 187 

.... 193 

.... 196 

.... 205 

.... 211 

.... 211 

Page 9: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

Table

Figure 1. G

Figure 2. S

Summary 

Figure 3. S

Figure 4. Y

Figure 5. M

Figure 6. N

2008 TC R

Figure 7. N

Sidr, 2008 

Figure 8. S

Figure 9. M

Figure 10. 

Figure 11. 

Figure 12. 

Figure 13. 

Wikipedia

Figure 14. 

Figure 15. 

Figure 16. 

Figure 17. 

Figure 18. 

Figure 19. 

Figure 20. 

Figure 21. 

  

of Figu

General Tropic

Summary of th

Storm Inform

Storm Tracks f

Yearly Storm F

Monthly Storm

Number of Liv

Rashmi, 2009 T

Number of Peo

TC Rashmi, 2

Satellite Image

Mortality Rate

Storm Surge V

Satellite Imag

Satellite Imag

Satellite Imag

a) ......................

Satellite Imag

Satellite Imag

Tropical Cycl

Satellite Imag

Satellite Imag

Flood Prone A

Normalized R

Countrywide

res

cal Cyclone Ri

he Data Qualit

mation of Each 

from Tropical 

Frequency Der

m Frequency D

ves Lost by Dis

TC Bijli, 2009 T

ople Affected 

009 TC Bijli, 2

e and Meteoro

e by Union for 

Values (in Fee

ge and Meteor

ge and Meteor

ge and Meteor

.........................

ge and Meteor

ge and Meteor

lone Aila Area

ge and Meteor

ge and Meteor

Areas in Bang

Reported Floo

e Exceedance P

 

isk in Banglad

ty of the Tropi

Given Storm i

Cyclone Histo

rived from the

Derived from t

strict from Six

TC Aila, 2012 T

by District fro

009 TC Aila, 2

logical Histor

the 1970 Bhol

et) for the 1970

ological Histo

ological Histo

ological Histo

........................

ological Histo

ological Histo

as Affected wi

ological Histo

ological Histo

ladesh (Source

ds Losses Ver

Probability Cu

desh (Source: S

ical Cyclone H

in the Databas

orical Databas

e Tropical Cyc

the Tropical C

x Recent Tropi

TC BOB 01, an

om Six Recent 

2012 TC BOB 0

y of the 1970 B

la Cyclone (So

0 Bhola Cyclon

ory of the 1991

ory of 2007 Tro

ory of 2008 Tro

........................

ory of 2009 Tro

ory of 2009 Tro

th Surface Wa

ory of 2012 Tro

ory of 2013 Tro

e: BARC/UND

sus Percent of

urve of Floods 

Final Repo

SPARRSO) ......

Historical Data

se .....................

se by Peak Inte

clone Historica

Cyclone Histor

ical Cyclones i

nd 2013 TC Ma

Tropical Cycl

01, and 2013 T

Bhola Cyclone

ource: Sommer

ne (Source: Fra

 Bangladesh C

opical Cyclone

opical Cyclone

........................

opical Cyclone

opical Cyclone

ater as of May 

opical Cyclone

opical Cyclone

DP/FAO, 2000)

f Bangladesh A

Losses ...........

ort on Capacity BuFinance in Ban

SF13-

.........................

abase – Each M

.........................

ensity ..............

al Database (18

ical Database 

in Bangladesh

ahasen) ............

lones in Bangl

TC Mahasen) ...

e (Source: Wik

r and Mosley, 

ank and Husa

Cyclone (Sour

e Sidr (Source:

e Rashmi (Ima

.........................

e Bijli (Source:

e Aila (Source:

27th, 2009 (Sou

e BOB 01 (Sou

e Mahasen (So

) .......................

Affected by Fl

.........................

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

........................

Marker Repres

........................

........................

877‐2013) .......

(1877‐2013) ...

h (2007 TC Sidr

........................

adesh (2007 T

........................

kipedia) ..........

1972) .............

in, 1971) ........

ce: Wikipedia

: Wikipedia) ..

age Source: 

........................

 Wikipedia) ..

: Wikipedia) ..

urce: WFP) ....

rce: Wikipedia

ource: Wikiped

........................

loods ...............

........................

er Risk A-8144)

8 051215

...... 25 

sents 

...... 27 

...... 28 

...... 29 

...... 29 

r, 

...... 34 

...... 35 

...... 36 

...... 37 

...... 37 

) .... 38 

...... 39 

...... 41 

...... 42 

...... 43 

...... 44 

a) .. 45 

dia) 46 

...... 49 

...... 53 

...... 54 

Page 10: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

Figure 22. 

Figure 23. 

Voluntary

Figure 24. 

Figure 25. 

..................

Figure 26. 

Figure 27. 

Figure 28. 

Figure 29. 

Greater th

Figure 30. 

Banglades

Figure 31. 

Figure 32. 

Figure 33. 

Figure 34. 

Earthquak

Figure 35. 

Figure 36. 

Figure 37. 

2005 (Sour

Figure 38. 

between 1

Figure 39. 

Figure 40. 

Figure 41. 

  

Flood Affecte

Flood Affecte

y Services) .......

2004 Flood In

2007 Flood A

.........................

Seismic Haza

Seismic Zonin

The Historica

Cumulative N

han 5.0 (left im

Magnitude Re

sh Borders.......

The Epicenter

Historic Shak

Seismic Inten

Five‐story Re

ke (Source: Al‐

USGS ShakeM

Brick Masonr

Geographical

rce: Yamane et

The Distribut

967 and 1996 

Reported Tro

Reported Tro

Reported Seis

ed Areas from 

ed Areas from 

.........................

ntensity Based 

ffected Areas 

.........................

ard in Banglad

ng Map from t

al Earthquake 

Number of Eve

mage) and 6.0 (r

ecurrence Plot

.........................

rs of Some Sig

keMap of the 1

nsity Distributi

inforced Conc

‐Hussaini, 201

Map of the 200

ry Damage in K

l Distribution 

t al., 2010) .......

tion of the Ave

(Source: Ono, 

opical Cyclone

opical Cyclone

smicity in Ban

 

the 1988 Floo

the 1998 Floo

........................

on Water Lev

 (Source: Left 

........................

desh (Source: G

the 2006 Bang

Database Dev

ents in the Fin

right image). .

t of Reported M

........................

gnificant Event

1897 Assam Ea

ion of the 1918

crete Frame Bu

1) ....................

03 Borkol Earth

Kolabunia afte

of 2,324 Sever

........................

erage Tornado

2001) .............

 Activity in th

 near Banglad

ngladesh from 

ds (Source: Ba

ds (Source: Ri

........................

vel (Source: CP

Image – DMIC

........................

GSHAP, ASC) 

ladesh Nation

veloped for the

nal Historical E

........................

Mainshock Ev

........................

ts in the Earth

arthquake (Sou

8 Srimangal Ea

uilding Collap

........................

hquake ...........

er the 2003 Bo

e Local Conve

........................

o Occurrence p

........................

he Bay of Beng

desh from 2000

2000 to End o

Final Repo

anglapedia) ....

ight Image – B

........................

PD‐IRBD, 2004

C/CDMP, 2007

........................

........................

nal Building C

e Bangladesh R

Earthquake Da

........................

vents from 191

........................

hquake Conseq

urce: Hough e

arthquake (So

pse in Chittago

........................

........................

orkol Earthqua

ective Storms i

........................

per 10,000 Squ

........................

gal from 2000 t

0 to End of 201

of 2013 .............

ort on Capacity BuFinance in Ban

SF13-

.........................

BARC; Left Im

.........................

4) .....................

7; Right Image

.........................

.........................

Code .................

Region ............

atabase with M

.........................

13 to 2013 With

.........................

quence Databa

et al., 2003) ......

ource: Sabri, 20

ong after the 1

.........................

.........................

ake (Source: A

in Bangladesh

.........................

uare Miles in B

.........................

to End of 2013

13 .....................

.........................

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

........................

age – Internat

........................

........................

e – UNOSAT, 

........................

........................

........................

........................

Magnitude (M

........................

hin 50 km of 

........................

ase ..................

........................

001) .................

1997 Chittagon

........................

........................

Al‐Hussaini, 20

h from 1990 an

........................

Bangladesh 

........................

3 .......................

........................

........................

er Risk A-8144)

9 051215

...... 55 

tional 

...... 57 

...... 58 

2007)

...... 59 

...... 61 

...... 61 

...... 64 

Mw) 

...... 65 

...... 66 

...... 70 

...... 72 

...... 73 

ng 

...... 74 

...... 75 

011) 76 

nd 

...... 78 

...... 78 

...... 85 

...... 86 

...... 90 

Page 11: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

Figure 42. 

Figure 43. 

Figure 44. 

Figure 45. 

Figure 46. 

of the Stoc

Landfall) .

Figure 47. 

Banglades

Figure 48. 

Banglades

Figure 49. 

Figure 50. 

Figure 51. 

Figure 52. 

Figure 53. 

Figure 54. 

Figure 55. 

Figure 56. 

Figure 57. 

Figure 58. 

Figure 59. 

Figure 60. 

Figure 61. 

Model ......

Figure 62. 

Tropical C

  

Estimated Eco

Estimated Peo

Estimated Lif

AIR Catastrop

Distribution o

chastic Catalog

.........................

Comparison o

sh – Location o

Comparison o

sh .....................

Probabilistic T

Map of Admi

Estimated 201

Gridded Popu

General appr

Percent of Ho

Percent of Ku

Modeled Urb

Gridded Repl

Share of Dwe

Share of Resid

Share of Non‐

Damage Func

.........................

Damage Func

Cyclone Model

onomic Impac

ople Affected 

fe Loss from Si

phe Risk Evalu

of Simulated T

g. The Intensit

.........................

of the Historic

of Landfall Seg

of the Historic

.........................

Tropical Cyclo

inistrative Reg

14 Population 

ulation of Ban

oach for devel

ouseholds by T

utcha Househo

banicity for the

lacement Cost

ellings by Cons

dential Exposu

‐Residential E

ctions for Trop

.........................

ctions for Floo

l .......................

 

ct from Signifi

from Significa

ignificant Disa

uation Framew

Tropical Cyclo

ty at First Land

........................

cal and Simula

gments Shown

cal and Simula

........................

one Wind Haz

gions of Bangl

by Subdistric

ngladesh .........

loping the Ban

Type per Subd

olds by Constr

e Exposure Da

t Map of All M

struction per D

ure Value by C

Exposure Value

pical Cyclone I

........................

oding from Tro

........................

cant Disasters

ant Disasters i

asters in Bang

work ...............

one Tracks Aff

dfall is Indicat

........................

ated Annual L

n on the Right

ated Annual L

........................

zard for Select

adesh .............

t ......................

........................

ngladesh expo

district (Derive

ruction Type (

atabase ............

Modeled Build

Division .........

Construction p

e by Construc

Induced Wind

........................

opical Cyclone

........................

Final Repo

s in Banglades

in Bangladesh

gladesh from 2

........................

fecting Bangla

ted (N/A Refe

........................

Landfall Frequ

t .......................

Landfall Frequ

........................

t Cities in Bang

........................

........................

........................

osure database

ed from the 20

Derived from

........................

ings ................

........................

per Division ...

ction per Divis

d used in the B

........................

e Induced Pre

........................

ort on Capacity BuFinance in Ban

SF13-

sh from 2000 to

h from 2000 to 

2000 to 2013 ....

.........................

adesh Sampled

ers to Storms N

.........................

uency by Land

.........................

uency by Land

.........................

gladesh ...........

.........................

.........................

.........................

e of buildings .

011 Census) ....

m the 2010 SVR

.........................

.........................

.........................

.........................

sion ..................

Bangladesh Tr

.........................

cipitation used

.........................

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

o 2013 ............

2013 ...............

........................

........................

d from 1,000 Y

Not Making 

........................

fall Segment i

........................

fall Strength in

........................

........................

........................

........................

........................

........................

........................

RS) ...................

........................

........................

........................

........................

........................

ropical Cyclon

........................

d in the Bangl

........................

er Risk A-8144)

10 051215

...... 94 

...... 94 

...... 95 

...... 99 

Years 

.... 102 

in 

.... 103 

.... 103 

.... 105 

.... 107 

.... 110 

.... 111 

.... 112 

.... 115 

.... 116 

.... 118 

.... 121 

.... 122 

.... 122 

.... 122 

ne 

.... 125 

ladesh 

.... 125 

Page 12: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

Figure 63. 

Figure 64. 

Figure 65. 

for Bangla

Figure 66. 

Figure 67. 

Figure 68. 

Results Co

Figure 69. 

Figure 70. 

Figure 71. 

Investmen

Figure 72. 

OCHA) ....

Figure 73. 

(Source: U

Figure 74. 

External R

2013) ........

Figure 75. 

Figure 76. 

Figure 77. 

Figure 78. 

Figure 79. 

Figure 80. 

Figure 81. 

disaster co

  

Tropical Cycl

Tropical Cycl

Tropical Cycl

adesh by Distr

General Storm

Inferred Storm

Normalized A

onsidering the

Tropical Cycl

Qualitative R

Funding for R

nt Program, Pl

Humanitarian

.........................

Humanitarian

UN‐OCHA) .....

Foreign Aid o

Resources in Ba

.........................

Total Availab

Funding Gap

Layered Disa

Time Dimens

Cost Dimensi

Superimpose

Relative share

osts. .................

lone Modeled 

lone Modeled 

lone Modeled 

ict ....................

m Surge Risk i

m Surge Risk i

Average Annu

e Effect of Stor

lone Sidr – Rep

Risk Profile of B

Recovery and 

anning Comm

n Aid into Ban

.........................

n Aid by Dono

.........................

on Disaster‐Re

angladesh, Ec

.........................

ble Funding of

 of Catastroph

ster Risk Finan

sion of Risk Fin

ion of Risk Fin

d Funding Ga

e of governme

.........................

 

Loss Risk Pro

Aggregate‐Ba

Aggregate‐Ba

........................

in Bangladesh

in Bangladesh

ual Loss by Dis

m Surge (Righ

ported Impact

Bangladesh ...

Rehabilitation

mission) ..........

ngladesh 2000‐

........................

ors for the 200

........................

elated Emerge

onomic Relati

........................

f Catastrophes

hes in Banglad

ncing Approa

nancing Instru

nancing Instru

ap Results Sum

ent and non‐go

........................

ofile for Bangla

ased Average A

ased Average A

........................

 from SPARRS

h .......................

strict – Results

ht Image) .......

t (Left Image) 

........................

n Projects in Ba

........................

‐2013 (Source:

........................

04 Floods and 

........................

ncy Response

ions Division –

........................

s in Bangladesh

desh 2000‐2013

ach (Source: Gh

uments (Sourc

uments (Source

mmary with Ri

overnment, an

........................

Final Repo

adesh ..............

Annual Loss f

Annual Loss, 

........................

SO (left image

........................

s Directly from

........................

and Modeled 

........................

angladesh 200

........................

: Financial Tra

........................

2007 Tropical 

........................

e into Banglade

– Data are Not

........................

h 2000‐2013 ...

3 ......................

hesquiere & M

ce: Ghesquiere

e: Ghesquiere 

isk Financing 

nd short‐, med

........................

ort on Capacity BuFinance in Ban

SF13-

.........................

for Bangladesh

Normalized b

.........................

e) and IWM (ri

.........................

m the Model (L

.........................

Impacted (Rig

.........................

00‐2013 (Sourc

.........................

acking Service

.........................

Cyclone Sidr 

.........................

esh 2000‐2013

t Available for

.........................

.........................

.........................

Mahul, 2010) ...

e & Mahul, 201

& Mahul, 201

Options .........

dium‐ and lon

.........................

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

........................

h by District ..

by Exposure V

........................

ight image) ...

........................

Left Image) an

........................

ght Image) ....

........................

ce: Annual 

........................

s of the UN‐

........................

in Bangladesh

........................

 (Source Flow

r 2000, 2001, a

........................

........................

........................

........................

10) ..................

10) ...................

........................

g‐term post‐

........................

er Risk A-8144)

11 051215

.... 127 

.... 128 

Value, 

.... 128 

.... 130 

.... 131 

nd 

.... 131 

.... 132 

.... 134 

.... 140 

.... 141 

.... 142 

w of 

and 

.... 143 

.... 144 

.... 145 

.... 169 

.... 170 

.... 171 

.... 181 

.... 186 

Page 13: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

Figure 82. 

relative to 

Figure 83. 

modeled n

Figure 84. 

marked fo

Figure 85. 

elements o

 

 

  

Share of gove

estimated fun

Exceedance p

national loss. ..

Exceedance p

or both Cyclon

Payout curve

of the curves a

ernment and n

nding gap. ......

probability cur

.........................

probability cur

ne and Flood p

s for Cyclone 

are labelled for

 

 

non‐governme

........................

rves for ‘Gover

........................

rves for ‘Gover

perils. ..............

and Flood cov

r Cyclone only

ent, and short‐,

........................

rnment respon

........................

rnment respon

........................

verage with ch

y; the same str

Final Repo

‐, medium‐ and

........................

nse costs’, rep

........................

nse costs’, wit

........................

haracteristics d

ructure is true 

ort on Capacity BuFinance in Ban

SF13-

d long‐term p

.........................

presenting 25%

.........................

th 10‐ and 100‐

.........................

described in th

 for Flood also

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

post‐disaster co

........................

% of the full 

........................

‐year loss leve

........................

he text. Note th

o. .....................

er Risk A-8144)

12 051215

osts 

.... 186 

.... 190 

els 

.... 191 

hat 

.... 192 

Page 14: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

List o

Table 1. Li

Table 2. G

Table 3. H

Table 4. N

– 2013) .....

Table 5. A

of Bengal 

Table 6. Co

Table 7. D

Table 8. D

TC Rashm

Table 9. D

of Banglad

Table 10. S

Banglades

Table 11. D

Report issu

Table 12. D

issued MO

Table 13. D

Report issu

Table 14. S

EHCO, 20

Table 15. D

Situation R

Table 16. D

Mahasen U

  

f Tables

ist of Major Ha

eneral Hazard

Historical Tropi

Number of Rep

.........................

verage Yearly

(1877 – 2013) ..

onsequence D

ecadal Summa

istrict‐Wide C

mi, 2009 TC Bijl

istrict‐Wide C

desh, 2008) .....

Sector‐Wide D

sh, 2008) ..........

District‐Wide C

ued MON‐30‐

District‐Wide C

ON‐20‐APR‐20

District‐Wide C

ued MON‐20‐

Sector‐Wide C

09) ...................

District‐Wide C

Report issued 

District‐Wide C

Update Issue 1

s

azards in Bang

d Consequence

ical Cyclone D

ported Storms 

.........................

y Number of R

.........................

Database of Tro

ary of the Trop

Consequence D

li, 2009 TC Ail

Consequence D

.........................

Damage and Lo

.........................

Consequence 

‐OCT‐2008:120

Consequence 

009:1200) .........

Consequence 

‐APR‐2009:120

Consequence D

.........................

Consequence 

MON‐22‐OCT

Consequence 

1 May 20, 2013

 

gladesh ..........

e in Banglades

Database Summ

from the Histo

........................

Reported Storm

........................

opical Cyclone

pical Cyclone 

Data for Six Re

la, 2012 TC BO

Data for 2007 T

........................

oss Estimates 

........................

Data for 2008 

00) ...................

Data for 2009 

........................

Data for 2009 

00) ...................

Data for 2009 T

........................

Data for 2012 

T‐2012:1450) ..

Data for 2013 

3) .....................

........................

sh (Source: EM

mary for the B

orical Tropical

........................

ms from the Hi

........................

e Events in Ban

Consequence

ecent Tropical 

OB 01, and 201

Tropical Cyclo

........................

for 2007 Tropi

........................

Tropical Cycl

........................

Tropical Cycl

........................

Tropical Cycl

........................

Tropical Cyclo

........................

Tropical Cycl

........................

Tropical Cycl

........................

Final Repo

........................

MDAT) ............

Bay of Bengal S

l Cyclone Dat

........................

istorical Tropi

........................

ngladesh ........

e Database ......

Cyclones in B

13 TC Mahasen

one Sidr (Sourc

........................

ical Cyclone S

........................

lone Rashmi (S

........................

lone Bijli (Sour

........................

lone Aila (Sou

........................

one Aila (Sourc

........................

lone BOB 01 (S

........................

lone Mahasen 

........................

ort on Capacity BuFinance in Ban

SF13-

.........................

.........................

Sub‐Basin .......

tabase for the B

.........................

ical Cyclone D

.........................

.........................

.........................

Bangladesh (20

n) .....................

ce: DMIC/DM

.........................

Sidr (Source: G

.........................

Source: DMIC

.........................

rce: DMIC/DM

.........................

urce: DMIC/DM

.........................

ce: the MOFD

.........................

Source: DMIC

.........................

(Source: CDM

.........................

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

........................

........................

........................

Bay of Bengal 

........................

Database for th

........................

........................

........................

007 TC Sidr, 20

........................

MB and Govern

........................

Government of

........................

C/DMB Situatio

........................

MB Situation R

........................

MB Situation 

........................

M reported in

........................

C/CDMP/MDM

........................

MP/MDMR Cy

........................

er Risk A-8144)

13 051215

...... 24 

...... 24 

...... 26 

(1877 

...... 28 

he Bay 

...... 28 

...... 31 

...... 33 

008 

...... 33 

nment 

...... 40 

...... 40 

on 

...... 41 

Report 

...... 42 

...... 43 

...... 44 

MR 

...... 45 

yclone 

...... 46 

Page 15: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

Table 17. Y

Table 18. C

Table 19. F

Table 20. F

Table 21. 1

2002) ........

Table 22. S

Table 23. S

Table 24. S

Table 25. D

Table 26. N

Table 27. E

Table 28. D

Table 29. N

Table 30. C

Table 31. R

Table 32. D

Table 33. C

Table 34. P

Table 35. N

Table 36. C

Table 37. S

Table 38. E

Table 39. S

Table 40. S

  

Yearly Flood A

Consequence D

Flood Consequ

Flooded area o

1988 Floods Re

.........................

Sector‐Wise 19

Sector‐Wise 20

Sector‐Wise 20

Disaggregation

Number of Re

Earthquake Co

Decadal Summ

Notable Severe

Consequence D

Reported Trop

Detailed Conse

Consequence D

Preferred Cons

Number of Re

Consequence D

Severe Storm C

Estimated Disa

Summary of A

Summary of th

Affected Area 

Database of Fl

uence Databas

of Bangladesh 

ehabilitation a

.........................

998 Flood Dam

004 Flood Dam

007 Flood Dam

n of Original M

ported Events

onsequence Da

mary of the Ea

e Storm Conse

Database of D

pical Cyclone E

equence Data 

Database of Fl

sequence Data

ported Events

Database of Si

Consequence D

aster Consequ

Administrative

he Population 

 

in Bangladesh

loods in Bangl

se – Preferred 

for different r

and Reconstru

........................

mages (Source:

mages (Source:

mages (Source:

Magnitude Un

s in the Histori

atabase ..........

rthquake Con

equence Datab

rought, Extrem

Events Making

of Significant 

loods from 200

a of Floods fro

s in the Histori

ignificant Eart

Data from 200

uence in Bangl

e Regions of Ba

Database by D

h (Source: BWD

ladesh .............

Loss Estimate

return periods

ction Program

........................

: Climate Chan

: CPD‐IRBD R

: GOB, 2007) ..

nits in the Full

ical Earthquak

........................

nsequence Data

base.................

me Temperatu

g Landfall in B

Tropical Cycl

00 to End of 20

om 2000 to End

ical Earthquak

thquakes from

00 to End of 20

adesh from 20

angladesh ......

District ...........

Final Repo

DB, 2014) .......

........................

es .....................

s .......................

m (Source: UN

........................

nge Cell, 2009

Rapid Assessm

........................

l Historical Ca

ke Database ...

........................

abase ..............

........................

ure, and Lands

Bangladesh fro

lones from 200

013 ..................

d of 2013 ........

ke Database fr

m 2000 to End o

013 ...................

000 to End of 2

........................

........................

ort on Capacity BuFinance in Ban

SF13-

.........................

.........................

.........................

.........................

DP/GOB, 1988

.........................

9) ......................

ment of Flood a

.........................

atalog ...............

.........................

.........................

.........................

.........................

slides (Source

om 2000 to En

00 to End of 20

.........................

.........................

rom 2000 to En

of 2013 ............

.........................

2013 .................

.........................

.........................

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

........................

........................

........................

........................

8; Benson and

........................

........................

and World Ban

........................

........................

........................

........................

........................

........................

: EMDAT) .....

nd of 2013 .......

013 .................

........................

........................

nd of 2013 ......

........................

........................

........................

........................

........................

er Risk A-8144)

14 051215

...... 48 

...... 52 

...... 53 

...... 54 

 Clay, 

...... 56 

...... 56 

nk) 58 

...... 59 

...... 63 

...... 66 

...... 68 

...... 70 

...... 80 

...... 82 

...... 84 

...... 84 

...... 88 

...... 88 

...... 89 

...... 91 

...... 92 

...... 96 

.... 107 

.... 109 

Page 16: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

Table 41. C

Table 42. H

Table 43. A

see Section

Table 44. B

Table 45. N

Table 46. T

Table 47. R

Table 48. D

Table 49. Q

Table 50. D

Table 51. S

Table 52. B

Table 53. K

 

 

  

Construction C

Height Classes

Average Const

n 5.5.3) ............

Bangladesh Ex

Number of Dw

Tropical Cyclo

Relative Storm

Definition of S

Qualitative Ris

Disaster Relate

Summary of C

Breakdown of 

Key characteri

Classes Consid

s Considered i

truction Costs

.........................

xposure Summ

wellings and R

one Modeled L

m Surge Risk E

Surge Risk Ind

sk Profile of B

ed Economic I

Cyclone Sidr da

Cyclone Sidr 

istics of possib

 

dered in the Ba

in the Banglad

s per Dwelling

........................

mary Statistics 

Replacement V

Loss Risk Profi

Exposure by Di

dex and Associ

angladesh .....

Impact and Fu

amage and los

damage and l

ble parametric 

angladesh Exp

desh Exposure

g in BDT (Sour

........................

(2014) ............

Value per Distr

ile for Banglad

istrict..............

iated Loss Fac

........................

unding Gap in 

ss estimates by

loss to soverei

insurance pro

Final Repo

posure Databa

e Database of B

rce: Various In

........................

........................

rict ..................

desh ................

........................

ctors .................

........................

n Bangladesh f

y sector. .........

ign and non‐so

oducts for Ban

ort on Capacity BuFinance in Ban

SF13-

ase of Building

Buildings ........

nformation Sy

.........................

.........................

.........................

.........................

.........................

.........................

.........................

from 2000‐2013

.........................

overeign sourc

ngladesh. All v

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

gs ....................

........................

nthesized by A

........................

........................

........................

........................

........................

........................

........................

3 (Million USD

........................

ces. .................

values are USD

er Risk A-8144)

15 051215

.... 116 

.... 116 

AIR – 

.... 117 

.... 120 

.... 123 

.... 127 

.... 130 

.... 130 

.... 134 

D) 137 

.... 184 

.... 185 

D. 191 

Page 17: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

Execu

Banglades

hazards, su

often resul

cities, regi

that can le

The Asian

building fo

catastroph

rehabilitat

analysis fo

workshop

During the

with the st

Report pre

modeling,

of Banglad

The risk p

(fast‐onset

Banglades

solutions i

historical i

notable an

While the 

consequen

2000 to 201

of recent e

Banglades

sudden‐on

least 10.8 b

floods and

  

utive Su

sh, a country lo

uch as floodin

lt in significan

ons, and the c

ead to long term

n Development

or disaster risk

hes. The TA’s e

tion. The proje

or disaster resp

s on disaster r

e course of the

takeholders in

esents a detail

 and provides

desh’s current 

rofiling of Ban

t) type. Tropic

sh, and further

in Bangladesh

information an

nd recent even

general risk p

nce informatio

13, in which co

events and to p

sh include the 

nset natural ha

billion USD in

d tropical cyclo

mmary

ocated on the 

ng, tropical cyc

nt casualties, p

country as a w

m negative co

t Bank (ADB) 

k finance (DRF

expected even

ect outputs inc

ponse, (iii) con

risk finance. 

e study, prelim

n the form of re

ed description

s the final outc

market situat

ngladesh focus

cal cyclone, flo

rmore, are con

h. Risk profile i

nd data, repor

nts. 

profile synthes

on. As such, a m

onsequence da

provide input 

2004 floods, th

azard events in

n economic imp

ones. 

 

Ganges‐Brahm

clones, severe 

property and a

whole typically

onsequences fo

has implemen

F) in Banglade

ntual impact is

clude: (i) catas

nceptual set of

minary, interm

eports, focuse

n of hazards in

comes of the ob

tion, and poten

ses on hazards

ood, earthquak

nsidered suitab

information fo

rted consequen

izes available 

more rigorous

ata is inferred

to the funding

he 2007 floods

n Bangladesh 

pact (damage 

maputra delta 

storms, and e

agriculture dam

y sustain adver

or the affected

nted a Technic

esh to help the

 improved go

trophe risk pr

f risk finance s

mediate, and fin

d meetings, p

n Bangladesh, 

bjectives of th

ntial disaster r

s that are natu

ke, and severe 

ble candidates

or these four m

nce of historic

information, d

s assessment is

 when not rep

g gap analysis

s, and tropical 

from 2000 to e

and losses to 

Final Repo

 in South Asia

earthquakes, a

mage, and mo

rse socio‐econ

d region. 

cal Assistance 

e Government

vernment pre

rofiling of Ban

solutions, and

nal outputs ar

resentations, a

outlines the p

he TA, such as 

risk financing 

urally occurrin

storm are ide

s for assessing

major perils is

cal events, and

data gaps are 

s carried out f

ported to prov

s. During these

 cyclone Sidr i

end of 2013 ar

all sectors), of

ort on Capacity BuFinance in Ban

SF13-

a, is exposed to

among others. 

onetary losses.

nomic impacts 

(TA‐8144) tow

t of Banglades

eparedness for

ngladesh, (ii) a 

 (iv) knowledg

re to be shared

and workshop

probabilistic tr

the funding g

options. 

ng and are of t

entified as the 

g the developm

made availab

d further in‐de

noted in the a

for major disas

vide a robust v

e years, the m

in 2007. Overa

re estimated to

f which more t

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

o a multitude 

These hazard

. Furthermore,

from these ha

wards capacity

h better prepa

r disaster relief

 funding gap 

ge‐sharing 

d and discusse

ps. This Draft F

ropical cyclone

gap analysis, r

the catastrophi

four major pe

ment of DRF 

le through 

epth descriptio

available repor

ster events fro

view of the imp

major events in 

all, significant 

o have caused 

than 95% is du

er Risk A-8144)

16 051215

 

of 

azards 

are for 

f and 

ed 

Final 

e risk 

eview 

ic 

rils in 

ons of 

rted 

om 

pacts 

at 

ue to 

Page 18: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

Many DRF

as the und

Banglades

example fo

risk mode

assessed u

A country

both tropi

probabilis

from an an

billion USD

risk profile

financial im

from flood

A funding

expenditu

which maj

without m

over the 14

billion USD

billion USD

rehabilitat

foreign aid

Banglades

analyzed t

expected t

enough to

small; how

insurance 

reinsuranc

currently i

(SBC) also

disaster ris

catastroph

microfinan

  

F options curr

derlying basis 

sh in support o

or quantitative

l and model o

using a simplif

‐wide risk pro

cal cyclones an

tic catastrophe

nalysis of the h

D on average 

e also provide

mpact from cy

ds will exceed 

g gap analysis,

ure associated w

jor catastrophe

major catastrop

4‐year period 

D disaster‐rela

D available fu

tion and preve

d. Only around

sh’s institution

to assess its ca

that the size of

 be able to pla

wever, it could

solution throu

ce support can

implemented 

o has crop insu

sk financing a

hes. These orga

nce networks a

ently impleme

of each solutio

of a future pot

e catastrophe 

utputs are pro

fied approach.

ofile, which qu

nd floods in B

e risk model th

historical reco

per year due t

es exceedance 

yclones will ex

12.4 billion U

, considered fo

with catastrop

es occur. Alth

phes, the long‐

from 2000 to 2

ated damage a

unding that ha

ention projects

d one‐third of

nal framework

apacity and po

f the domestic

ay an effective 

d have the fina

ugh a consorti

n be a viable op

in the country

urance experie

as they offer a n

anizations can

and better flow

 

ented worldw

on’s financial t

tential DRF so

risk analysis in

ovided. The im

.  

uantifies the po

Bangladesh. Th

hat was devel

rd. Overall, Ba

to cyclone and

probability (E

xceed 7.2 billio

SD next year. 

or the years 20

phes. Overall, 

ough the coun

‐term funding 

2013. This fun

and loss is cov

s been reliably

s, 0.68 billion U

f the total avai

k for disaster ri

otential role in 

 money marke

role in disaste

ancial capacity

ium of domest

ption as illustr

y. In addition, 

ence. Financial

number of ser

n also help imp

w of informati

wide typically r

terms. In orde

lution, the tro

n Bangladesh.

mpact of storm

otential econo

he tropical cyc

oped as part o

angladesh is e

d flood (or abo

EP) losses. For 

on USD next y

 

000 to 2013, inv

Bangladesh ex

ntry runs smal

gap is substan

ding deficit ar

vered by availa

y identified, 2.

USD from hum

lable funding 

isk manageme

terms of disas

et and capital 

er risk financin

y with internat

tic insurance p

rated by an ex

the general in

l NGOs and C

rvices, which c

prove targetin

ion among the

Final Repo

require probab

er to quantify t

opical cyclone 

. A detailed de

m surge is not e

omic impact of

clone risk prof

of this project. 

expected incur

out 2.2% of the

example, ther

year, and a 1%

volved collect

xperiences siz

ll funding defi

ntial, amounti

rose because o

able funding i

.6 billion USD

manitarian aid

was generate

ent and curren

ster risk finan

market in Ban

ng. The insura

tional reinsura

providers with

xample of “me

nsurance provi

Cooperative can

can help client

ng of relief pro

eir members.

ort on Capacity BuFinance in Ban

SF13-

bilistic catastro

the risk of a se

hazard was se

escription of t

explicitly mod

f future events

file is derived 

 The flood risk

r a financial im

e 2014 GDP). T

re is a 1% chan

 chance that th

ting data on na

zeable funding

icits or surplu

ing to around 

only around ha

in the said per

D came from re

d, and 1.78 bill

d domestically

nt domestic fin

cing. In curren

ngladesh is no

ance sector on 

ance support. A

h a strong inte

eso” level flood

ider, Sadharan

n also play an

ts in coping w

ograms throug

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

ophe risk mod

elected hazard

elected as the p

the tropical cyc

deled, howeve

s, is presented

from the robu

k profile is der

mpact of about

The quantitativ

nce that the 

he financial im

ational revenu

g gaps in years

uses in the year

5.5 billion USD

alf of the 10.8 

riod. Of the 5.1

ecovery, 

lion USD from

y. 

nancial marke

nt conditions, 

ot large or stron

 its own is also

A “meso” leve

ernational 

d insurance 

n Bima Corpor

n important rol

with the impact

gh their 

er Risk A-8144)

17 051215

deling 

d for 

pilot 

clone 

er, is 

d for 

ust 

rived 

t 3.2 

ve 

mpact 

ue and 

s in 

rs 

et is 

it is 

ng 

o too 

el 

ration 

le in 

t of 

Page 19: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

The final s

assessmen

previously

sovereigns

tools at the

Based on t

include an

penetratio

foundation

These solu

with maxi

Capacity d

national st

and suppo

Implemen

stakeholde

availability

Disaster M

relevant d

would be b

TA, but al

need to wo

Governme

 

 

  

section of the r

nt, identificatio

y described. In

s, case studies

e macro, meso

the internation

n option for dir

on in Banglade

ns for specific 

utions are thos

mum benefici

development f

takeholders. T

ort provided b

ntation Agency

ers including m

y of data has b

Management w

ata sets reque

beneficial to id

so serves as an

ork closely wi

ent. 

report concent

on of risk finan

n addition to d

 with relevanc

o and micro lev

nal context and

rect sovereign

esh as a vehicle

implementab

se which the te

ial impact on d

for disaster ris

The quality of t

by these stakeh

y, i.e., the Mini

ministries, fina

been limited. I

work closely to

sted by the co

dentify a senio

n internal cham

th the consult

 

trates on risk f

ncing needs, a

describing the 

ce to Banglade

vels, all releva

d precedent, s

n risk transfer 

e to develop ri

le solutions ar

eam believes w

developing ris

sk financing re

the deliverable

holders. The co

istry of Disast

ancial instituti

It is particularl

ogether, play a

onsultants, esp

or level individ

mpion for the 

ant team and 

financing optio

and the status 

types of risk f

esh are presen

ant to managin

pecific option

and an option

isk financing f

re laid out, to b

will be the mos

sk financing fo

equires tremen

es associated w

onsultant team

ter Manageme

ions, technical

ly important t

an active role i

pecially as the p

dual in both m

implementati

facilitate data 

Final Repo

ons for Bangla

of national ris

financing tools

nted, demonstr

ng sovereign e

ns are then iden

n utilizing the 

for the low‐inc

be expanded i

st appropriate

or Bangladesh

ndous support

with the TA is

m has been wo

ent, and reache

l organization

that the Minist

in the project, 

project approa

ministries who

ion of the TA o

 access and de

ort on Capacity BuFinance in Ban

SF13-

adesh in the co

sk financing m

s available to d

rating the imp

exposure to ca

ntified for Ban

extensive mic

come populat

in the final ph

e to bring to m

t and involvem

s directly influ

orking closely 

ed out to seve

ns and others.  

try of Finance

and provide t

aches decision

o is not only re

outputs. This i

ecision making

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

ontext of the r

mechanisms 

developing wo

plementation o

atastrophe risk

ngladesh. Thes

ro‐finance 

ion. The 

hase of project 

market quickly

ment from var

uenced by the 

with the 

ral other natio

In general, th

 and Ministry

timely access t

n‐making stag

esponsible for 

individual wo

g within the 

er Risk A-8144)

18 051215

risk 

orld 

of 

k. 

se 

work. 

 and 

rious 

data 

onal 

he 

 of 

to 

es. It 

this 

ould 

Page 20: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

1 Intr

Banglades

hazards, su

result in si

regions, an

can lead to

To help th

requested 

The expec

rehabilitat

disaster re

disaster ris

To accomp

� Ta

� Ta

� Ta

� Ta

� Ta

During the

with the p

Final Repo

necessary 

The Interim

meeting m

December

Gupta, Dr

Anisur Ra

from the c

and variou

Managem

                  1 The term “

disasters t

  

roductio

sh, a country lo

uch as floodin

ignificant casu

nd the country

o long term ne

he Governmen

a Technical A

ted eventual i

tion. The TA o

esponse, (iii) co

sk finance. 

plish the goals

ask A: Collect

ask B: Hazard

ask C: Exposu

ask D: Develo

ask E: Design 

e course of the

project partner

ort presents a b

to build capac

m Working Gr

minutes and att

r 8, 2014 (see A

. C. Marc Ram

ahman and Kh

consultant team

us officials fro

ent and Relief

                        disaster” is usedtriggered by natu

on

ocated on the 

ng, tropical cyc

ualties, proper

y as a whole ty

egative conseq

nt of Banglades

Assistance (TA‐

mpact of the T

outputs includ

onceptual set o

s outlined in th

ion and mana

d model develo

ure data collect

opment of peri

of parametric

e study, prelim

s in the form o

brief descripti

city for DRF so

roup Mission 

tendees). The 

Appendix for m

mirez and Dr. I

hondoker Gola

m; Ms. Mayum

m the Govern

f, Mr. Mesbah 

                   d interchangeablyural hazard even

 

Ganges‐Brahm

clones, severe 

rty and agricul

ypically sustai

quences for the

sh better prep

‐8144) of capa

TA is improve

e (i) catastroph

of risk finance

he terms of ref

agement of los

opment 

tion and vulne

il‐specific cata

 indices for fin

minary, interm

of reports, focu

ion of hazards

olutions. 

took place in D

Interim Work

meeting minut

Ivan Gomez fr

am Tawhid fro

mi Ozaki, Ms. 

nment of Bangl

ul Alam, Add

y with the term “nts. 

maputra delta 

storms, earthq

lture damage, 

in adverse soc

e affected regi

are for such ev

acity building f

ed government

he risk profilin

e solutions, an

ference (ToR), 

s and econom

erability asses

strophic risk p

nancial transac

mediate, and fin

used meetings

s in Bangladesh

Dhaka, Bangla

king Group Mi

tes and attend

rom AIR Worl

om ADPC; Mr

Charlotte Ben

ladesh includi

ditional Secreta

“catastrophe” thr

Final Repo

 in South Asia

quakes and dr

 and monetary

cio‐economic im

ion. 

vents, the Asia

for disaster1 ri

t preparednes

ng of Banglad

nd (iv) knowled

 the process in

mic impact data

ssment 

profiles for Ban

ctions 

nal outputs ar

s, presentation

h and outlines

adesh on Dece

ission took pla

dees). The atten

ldwide; Dr. Pe

. Moslehuddin

nson, and Mr. B

ing the Secreta

ary Mr. Golam

roughout this rep

ort on Capacity BuFinance in Ban

SF13-

a, is exposed to

rought. These 

y losses. Furth

mpacts from t

an Developme

isk finance (DR

ss for disaster 

desh, (ii) fundi

dge‐sharing w

nvolves five p

a from natural

ngladesh 

re to be shared

ns, and worksh

s the proposed

ember 8, 2014 

ace in Dhaka, 

ndees include

eeranan Towas

n Ahmed and 

Bruno Carrasc

ary of the Min

m Mustafa, Mr

port; this term ge

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

o a multitude 

hazards often

hermore, cities

these hazards 

ent Bank (ADB

RF) in Banglad

relief and 

ing gap analys

workshops on 

rimary tasks:

l catastrophes

d and discusse

hops. This Dra

d scope of wor

(see Appendi

Bangladesh on

d Dr. Akshay 

shiraporn, Mr

Dr. Simon Yo

co  from the A

nistry of Disast

r. Abdu Wazed

enerally refers to

er Risk A-8144)

19 051215

 

of 

s, 

that 

B) 

desh. 

sis for 

ed 

aft 

rk 

x for 

r. 

oung 

ADB; 

ter 

d, 

Page 21: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

Director G

Director o

presented 

anticipated

The organ

� Se

� Se

� Se

� Se

20

� Se

� Se

� Se

� Se

in

� Se

� Se

� Se

1.1 Lim

The study 

them with

implemen

understan

The scope 

and any re

herein are 

opinion, en

and data a

accordanc

  

General of Dep

f TA‐8144. Du

to the stakeho

d completion o

nization of the 

ection 1 introd

ection 2 summ

ection 3 gives 

ection 4 presen

000 to 2913; 

ection 5 outlin

ection 6 outlin

ection 7 descri

ection 8 descri

n Bangladesh; 

ection 9 discus

ection 10 lists 

ection 11 has a

mitations

summarized 

h the process o

ntation of mark

nding of the lim

of services pe

e‐use of (or fai

at the sole ris

ngineering ex

available in the

e with current

partment of Di

uring the interi

olders. The ov

of the study ar

report is as fo

duces the proje

marizes the pro

a detail outlin

nts an assessm

nes probabilist

nes the tropica

ibes and summ

ibes the institu

sses disaster ri

select referenc

an Appendix w

in this report 

of understandi

ket‐ready DRF

mitations of bo

erformed durin

ilure to use) th

k of the user. O

perience and j

e literature an

t standards of 

 

isaster Manage

im mission, th

erall timeline 

round the end

ollows: 

ect and the lay

oject scope; 

ne of the variou

ment of the eco

tic tropical risk

l cyclone and 

marizes the fun

utional framew

isk financing o

ces; 

with meeting m

is intended fo

ng the risk fro

F strategies. Pr

oth the scope a

ng this assessm

his report or th

Our conclusio

judgment, ana

d those provid

professional p

ement, Mr. Sa

he bulk of the t

for the study 

d of March 201

yout of the rep

us hazards in 

onomic impact

k modeling; 

flood risk pro

nding gap ana

work for disas

options for Ba

minutes and li

r use by the G

om disasters in

roper applicati

and methodol

ment may not 

he findings, co

ons and recom

alyses conduct

ded by ADB a

practice.

Final Repo

atya Brata Saha

technical work

is planned to b

15.   

port; 

Bangladesh;

t of major disa

ofile for Bangla

alysis for the y

ter risk manag

angladesh; 

ist of attendee

Government of

n Bangladesh f

ion of this stud

ogy of the ent

adequately ad

onclusions, or 

mmendations a

ted during the

and various loc

ort on Capacity BuFinance in Ban

SF13-

a Joint Secreta

k and interim 

be about 13 m

asters in Bangl

adesh; 

years 2000 to 2

gement and th

es of the Interi

f Bangladesh a

for possible de

dy requires re

tire study. 

ddress the nee

recommendat

are based on ou

e course of the

cal agencies, a

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

ary and Project

conclusions w

months, with th

ladesh for the 

2013; 

he financial ma

m Workshop.

and ADB to as

evelopment an

ecognition and

eds of other us

tions presente

ur professiona

e study, inform

and are derive

er Risk A-8144)

20 051215

was 

he 

years 

arket 

 

ssist 

nd 

sers, 

al 

mation 

ed in 

Page 22: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

2 Pro

The expec

� O

id

th

na

ea

pr

an

pr

th

ri

� O

qu

ex

da

(d

ex

� O

ex

th

th

ow

m

� O

an

ef

m

fin

ri

th

to

m

  

oject Sc

ted outputs of

Output 1: Catas

dentifies risks 

hat are catastro

aturally occur

arthquake, and

rototype for q

nd developme

roject, as discu

he natural haz

sk profile will

Output 2: Quan

uantitative ris

xplore DRF so

ata and ancilla

d) quantificatio

xposure assets

Output 3: Fund

xpenditure ass

he perils of tro

he funding gap

wn responsibi

may exist to res

Output 4: Deve

nd internation

ffective use of 

management in

nancing optio

sk financing n

he types of risk

o Bangladesh w

micro levels, all

ope and

f the project in

strophe risk p

across the con

ophic versus s

rring catastrop

d severe storm

quantitative pr

ent of conceptu

ussed in later s

ard for detaile

l also be devel

ntitative risk a

k assessment, 

olutions based 

ary, (b) collect

on of the haza

s, and (f) devel

ding gap analy

sociated with 

opical cyclone,

p analysis will

ilities after a d

spond to such 

elopment of d

nal financial an

each DRF opt

n Bangladesh a

ns are discuss

needs, and the

k financing too

will be presen

l relevant to m

 

d Outline

nclude: 

profiling of Ba

ntinuum of dis

slowly on‐setti

phic‐type peril

m. The output 

robabilistic risk

ual disaster ris

sections of thi

ed assessment 

loped for flood

assessment ‐ U

this analysis w

on its results.

tion of exposu

ard using a sto

lopment of a n

ysis ‐ This out

disasters. Base

 flood, earthqu

l consider the 

disaster event t

disasters. 

disaster risk fi

nd insurance in

tion under con

and the curren

sed for Bangla

 status of natio

ols available to

ted, demonstr

managing sove

e

angladesh ‐ A

saster events a

ing. The risk p

ls in Banglades

will inform th

k assessment (

sk financing so

s report, the p

within this stu

d based on inf

Using the peri

will quantify t

 This output w

re data, (c) dev

ochastic catalog

national risk p

tput will invol

ed on the anal

uake, and seve

time dimensio

to arrive at an 

inance solutio

nstitutions an

nsideration. Th

nt Bangladesh 

desh in the co

onal risk finan

o developing w

rating the imp

ereign exposur

Final Repo

A qualitative ri

affecting Bangl

profile will inv

sh, in particul

he selection of 

(Output 2), fun

olutions (Outp

peril of tropica

tudy. A simpli

formation from

il of tropical cy

the economic r

will involve (a

velopment of 

g, (e) characte

profile.  

lve collection o

lyses of the his

ere storm dur

on and stated 

overall assess

ons ‐ This outp

nd regulatory f

he institutiona

financial mar

ontext of the ri

ncing mechani

world soverei

plementation o

re to catastrop

ort on Capacity BuFinance in Ban

SF13-

isk profile will

ladesh and (b)

volve an assess

lar tropical cyc

major perils t

nding gap ana

put 4). At this 

al cyclones has

ified country‐w

m the historica

yclones as an e

risk due to na

a) collection of 

an industry e

erization of the

of data on nat

storical record

ing the period

intention of th

sment of the fu

put will involv

framework to 

al framework f

rket will be an

isk assessment

isms. In additi

igns, case stud

of tools at the m

phe risk. Based

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

l be created th

) identities risk

sment of majo

clone, flood, 

o be used as a

alysis (Output

stage of the 

s been selected

wide quantita

al record. 

example for 

atural hazards 

historical haz

xposure datab

e vulnerability

ional revenue 

d, in particular

d from 2000 to

he governmen

unding gap th

ve research on

understand 

for disaster ris

alyzed. Risk 

t, identification

ion to describi

dies with relev

macro, meso a

d on the 

er Risk A-8144)

21 051215

 

hat (a) 

ks 

or 

t 3), 

d as 

tive 

and 

zard 

base, 

y of 

 and 

r for 

 2013, 

nt s 

hat 

n local 

sk 

n of 

ing 

vance 

and 

Page 23: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

in

an

pe

fo

re

� O

to

di

w

m

 

  

nternational co

n option for di

enetration in B

oundations for

esults of the di

Output 5: Know

o present proje

isaster risk fin

well as meeting

markets. 

ontext and pre

irect sovereign

Bangladesh as

r specific impl

isaster risk pro

wledge sharin

ect progress an

nance, which s

gs to discuss p

 

ecedent, specif

n risk transfer 

s a vehicle to d

ementable dis

ofiles, will be p

ng ‐ Several wo

nd results. At 

pecifically add

potential publi

fic options are 

and (b) an op

develop risk fin

saster risk fina

proposed. 

orkshops will 

the conclusion

dresses needs 

c‐private links

Final Repo

 then identifie

ption utilizing 

nancing for th

ancing solution

be conducted

n of the projec

and potential

s with internat

ort on Capacity BuFinance in Ban

SF13-

ed for Banglad

the extensive 

he low‐income

ns, which will

d throughout t

ct, an in‐countr

l solutions, wil

tional reinsure

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

desh, including

micro‐finance

e population. T

l leverage the 

the project tim

ry workshop o

ll be conducte

ers and capita

er Risk A-8144)

22 051215

g (a) 

The 

meline 

on 

ed, as 

al 

Page 24: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

3 Ha

Banglades

population

basin. Ban

earthquak

catastroph

do the cor

hazards th

financing s

Interim Re

affect Bang

number of

impact (as

both flood

smaller eff

been relati

While seve

Specificall

on‐setting,

contamina

property d

phenomen

The four m

considered

provides a

major hist

 

  

zards in

sh is one of the

n density, low

ngladesh is reg

kes, severe stor

hic versus slow

responding ec

hat affect Bang

solutions, a pr

eport (e.g., see

gladesh. Flood

f people affect

s indicated by 

d and tropical c

fect on Bangla

ively low, the 

eral perils occu

ly, viable optio

, and suitable 

ation and extre

damage, on wh

non that does n

major perils id

d suitable cand

a general risk p

orical events t

n Bangla

e most at‐risk 

w‐lying deltaic 

gularly expose

rms, and other

wly on‐setting 

conomic and s

gladesh, with t

reliminary qua

e Table 2). In g

d has been sho

ted), while trop

the reported n

cyclone. Sever

adesh as a who

potential for c

ur in Banglade

ons for DRF in

for accurate q

eme temperatu

hich typical D

not considerab

entified in the

didates for ass

profile of thes

that have impa

 

 

adesh

countries in th

geography, an

ed to several d

rs (e.g., see Tab

hazards. The 

social impact. I

the ultimate go

alitative risk r

general, floods 

own to affect c

pical cyclone h

number of peo

re storms, whi

ole. Although 

catastrophic d

esh, not all pe

nclude perils th

quantification t

ure, although 

DRF solutions a

bly affect the c

e Interim Repo

sessing the dev

e four perils, i

acted Banglad

he world to na

nd location wi

ifferent hazard

ble 1). These h

severity, frequ

In order to ass

oal of evaluati

anking of peri

and tropical c

considerably m

has been show

ople killed). Th

ile very freque

the frequency

amage and de

rils are equall

hat are natura

through mode

can severely a

are built. Othe

country as a w

ort, tropical cy

velopment of 

including an a

desh. 

Final Repo

atural hazards

ithin an active

ds, including t

hazards can be

uency, and loc

sess the severi

ing the need a

ils affecting Ba

cyclones have 

more people (a

wn to have a h

he majority of 

ent, are typical

y of damaging 

estruction is ve

ly suitable for 

ally occurring, 

eling. Some pe

affect the popu

er perils, such 

whole. 

yclone, flood, e

DRF solutions

assessment of f

ort on Capacity BuFinance in Ban

SF13-

s, mainly due t

e monsoon and

tropical cyclon

e generally gro

cation of these

ity and impact

and viability o

angladesh was

been shown t

as indicated by

higher intensity

f reported econ

lly local event

earthquakes i

ery high. 

disaster risk f

catastrophic r

erils, such as a

ulation, do no

as landslide, a

earthquake, an

s in Banglades

financial and s

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

to its high 

d tropical cycl

nes, floods, 

ouped into 

e hazards vary

t of the variou

of disaster risk 

s carried out i

to most advers

y the reported

y of populatio

nomic loss is d

ts and have a 

in Bangladesh

financing (DRF

rather than slo

arsenic 

t generally lea

are typically lo

nd severe storm

sh. This section

societal impac

er Risk A-8144)

23 051215

 

lone 

y, as 

us 

n the 

sely 

on 

due to 

h has 

F). 

owly 

ad to 

ocal 

m, are 

cts of 

Page 25: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

3.1 Tro

Banglades

Bay of Ben

tropical cy

of at least 

within Ban

May, June

The impac

winds, tor

bathymetr

are typical

coastline f

storm surg

storm surg

                  2 Does not in3 Includes co

transport/

(403,188 r

  

Tropic

Ear

Seve

Extreme

D

Buildin

La

Arsenic C

River B

Saltwa

Clima

Table

Trop

Sev

Ea

opical Cyc

sh is situated w

ngal sub‐basin

yclones with at

34 knots) occu

ngladesh bord

e, October, and

ct of tropical cy

rrential rain, fl

ry, and cyclon

lly associated 

from Patuakha

ge heights of a

ge heights of a

                        nclude 500 millio

ollapse, drought,/industrial/misce

reported killed an

Table

Peril

cal Cyclone

Flood

rthquake

ere Storm

Temperature

Drought

Fire

ng Collapse

andslide

Contamination

Bank Erosion

ter Intrusion

ate Change

2. General Ha

Peril

Flood

ical Cyclone

vere Storm

arthquake

Other3

clone

within the acti

n. The historica

t least tropical

ur in the Bay o

ders. Tropical c

d November. 

yclones in Ban

looding, storm

e characteristi

with severe st

ali to Chittagon

about 13 meter

about 5 meters

                   on USD damage r, extreme temper

ellaneous accidennd 3,042,429 repo

 

e 1. List of Ma

Type

Catastrophi

Catastrophi

Catastrophi

Catastrophi

Catastrophi

Catastrophi

Catastrophi

Catastrophi

Catastrophi

Slowly On-Set

Slowly On-Set

Slowly On-Set

Slowly On-Set

azard Conseq

People Killed(Percent Total)

7%

89%

1%

<1%

2%

ve North Indi

al record (e.g.,

l storm streng

of Bengal sub‐b

cyclone activit

ngladesh can l

m surge, and la

ics (e.g., refer D

torm surge. Hi

ng are most vu

rs, while other

s. Figure 1 illu

reported for the rature, significannts. Does not incorted affected) 

ajor Hazards i

Potentia

ic H

ic H

ic H

ic Mo

ic L

ic H

ic L

ic L

ic L

tting N

tting N

tting N

tting N

quence in Ba

People Affe(Percent T

75%

18%

1%

<1%

6%

an Ocean trop

 IBTrACS, 201

th (e.g., storm

basin every ye

ty in Banglade

lead to many h

andslides. Prim

Dube et al., 19

istorical record

ulnerable for s

r coastline area

strates the gen

2004 Indian Ocent fire disasters, lalude the 1943 Be

Final Repo

in Banglades

al Severity R

High

High

High

derate

Low

High

Local

Local

Local

N/A

N/A

N/A

N/A

angladesh (So

ected Total)

Estim(Pe

pical cyclone b

14) indicates th

ms with maxim

ear, with abou

esh is typically

hazards, inclu

marily due to i

997 and Khan, 

ds (e.g., SAAR

storm surges, 

as are also vul

neral tropical c

ean Earthquake aandslides, comp

engal Famine (1,9

ort on Capacity BuFinance in Ban

SF13-

sh

Relative Freque

High

High

Low

High

Moderate

Moderate

Moderate

Low

Low

N/A

N/A

N/A

N/A

ource: EMDA

mated Damage ercent Total)

68%

27%

5%

-2

-

basin, and mor

hat an average

mum 10‐minute

ut one per year

y higher durin

ding but not l

its low‐lying d

1991), cyclone

RC, 1998) have

having maxim

lnerable with 

cyclone risk in

and Tsunami lex disasters, and900,000 reported 

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

ncy

AT)

re locally with

e of about five

e sustained wi

r passing direc

ng the months 

limited to high

deltaic geograp

es in Banglade

e shown that t

mum reported

maximum rep

n Bangladesh. 

d significant killed) or epidem

er Risk A-8144)

24 051215

hin the 

inds 

ctly 

of 

phy, 

esh 

the 

ported 

 

mics 

Page 26: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

According

world sinc

tropical cy

Cyclone w

(1991 USD

significant

loss was le

Banglades

This sectio

cyclones. I

summariz

the social a

and econo

Banglades

  

g to the Interna

ce 1900 occurr

yclone ever rec

was also one th

D) in economic

t economic im

ess than 5,000 

sh (e.g., disaste

on provides an

In addition, a 

ed and discus

and economic

omic losses. A 

sh are also disc

Figure 1

ational Disaste

ed in Banglad

corded, with s

he most devast

c impact and o

pact, estimate

people, illustr

er shelters, ear

n overview an

consequence d

ssed in this sec

c consequences

selection of no

cussed in furth

. General Tro

 

er Database (E

desh. For exam

some estimates

tating storms o

over 138,000 de

ed at about 1.7

rating the succ

rly warning sy

d summary of

database of his

ction. A conseq

s of past event

otable and rec

her detail. 

opical Cyclon

EMDAT, 2014)

mple, the 1970 B

s indicating ov

on record glob

eaths. More re

7 to 3.8 billion 

cess of recent a

ystems, and tim

f the collection

storical tropic

quence databa

ts, such as the 

ent tropical cy

ne Risk in Ban

Final Repo

), 5 of the 10 d

Bhola Cyclone

ver 500,000 pe

bally, causing 

ecently, Tropic

(2007 USD) in

advancement 

mely evacuati

n of historical 

al cyclones ha

ase is a collecti

 number of fat

yclone events 

ngladesh (So

ort on Capacity BuFinance in Ban

SF13-

deadliest tropic

e is considered

eople killed. Th

an estimated 

cal Cyclone Si

n economic im

in disaster ma

ions). 

hazard data fo

as been develo

ion of reporte

talities, people

that have sign

 

ource: SPARR

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

cal cyclones in

d to be the dea

he 1991 Bangl

1.8 to 3.0 billio

dr in 2007 cau

pact, although

anagement in 

or tropical 

oped and is 

d information

e affected, dam

nificantly impa

RSO)

er Risk A-8144)

25 051215

n the 

adliest 

adesh 

on 

used 

h life 

n on 

mage, 

acted 

Page 27: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

3.1.1 H

The Intern

the histori

endorsed I

Specificall

4, 2013. Al

data from 

data and p

contained 

more agen

tropical sto

reporting 

priority ra

Ta

Priority

1

2

3

4

5

6

7

8

9

10

11

12

 Figure 2 preported p1970s, mos

either clasknots, or “to 1970 are

                  4 The termin

the Atlant

  

Historical T

national Best T

ical tropical cy

IBTrACS as an

ly, the data is e

ll storms that e

1877 to 2012. 

preliminary re

in IBTrACS fo

ncy may repor

orm activity fo

agency. The se

anking listed in

able 3. Histor

y

Global TroIn

Global TroIn

Global Conso

Joint

Joint

Chi

rovides a sumpeak maximum

st of the reporsified as “Trop“Hurricane” we not known. I

                        nology used for trtic‐based termino

Tropical Cy

Tracks Archive

yclone databas

n official archi

extracted from

entered the Ba

For the 2013 s

ports from the

or this region i

rt data for the s

or the region, 

election proce

n Table 3. 

rical Tropical

Reporting Agenc

opical Cyclone "Besntensity Data “UCA(North Indian Oce

opical Cyclone "Besntensity Data “UCA

(Western Pacific

olidated Tropical C

Typhoon Analogs (

Typhoon Warning (Indian Ocean

Typhoon Warning (Western Pacific

RSMC New Del

na Meteorological AShanghai Typhoo

RSMC Tokyo,

Hong Kong Obs

JTWC Best Tra

IMD Preliminary

Bay of Bengal S

mmary of the dm sustained wrted storm intepical Depressiwith winds 64 kIn recent years

                   ropical cyclone iology is typically

 

yclone Info

e for Climate S

se for Banglad

iving and distr

m Version v03r

ay of Bengal su

eason, data fro

e IMD (India M

is derived from

same storm. In

a single set of 

ss was based o

Cyclone Data

cy Source

st Track" Position aAR ds824.1” ean Basin)

st Track" Position aAR ds824.1” c Basin)

yclone Data (DSI-9

(DSI-9635)

Center “JTWC” Basin)

Center “JTWC” c Basin)

hi, India

Administration on Institute

Japan

servatory

ck Data

Reports

Sub-Basin Total

data quality of winds of each inensities were gion” with wind

knots or greats, storm monit

ntensity classificy used.     

ormation

Stewardship (I

esh. The Worl

ribution resou

r05 of the “IBT

ub‐basin are in

om the JTWC

Meteorologica

m several agen

n order to pro

storm data fo

on data availa

abase Summ

Abbrevi

and UCAR ds

and UCAR ds

9636) DSI-96

DSI-96

JTW

JTW

IMD

CMA

JMA

HKO

JTW

IMD

the historical ndividual storgiven default vds less than 34er)4. Thus, thetoring in the re

cation is different

Final Repo

IBTrACS) proj

ld Meteorolog

urce for tropica

TrACS‐All”, w

ncluded in the

(Joint Typhoo

al Department

ncies outlined

ovide a single a

or each given s

ability and qua

ary for the Ba

iation Year Start

s824.1 1877

s824.1 1877

636 1877

635 1952

WC 1945

WC 1945

D 1990

A 1951

A 1952

O 1961

WC 2013

D 2013

1877

tropical cyclorm by year andvalues based o4 knots, “Trope actual storm egion has imp

t for the differen

ort on Capacity BuFinance in Ban

SF13-

ject was select

gical Organiza

al cyclone best

which was rele

e database. Th

on Warning Ce

t) were used. T

d in Table 3. No

and homogeni

storm was extr

ality, and gene

ay of Bengal

Year End

Numbof stor

in IBTrA

1980 1,15

1980 25

1989 1,25

1975 21

2012 536

2012 54

2012 144

2006 51

2006 48

2006 48

2013 0

2013 0

2013 N/A

one database. Td reporting agon qualitative pical Storm” wintensities forproved, resulti

nt regions of the w

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

ted as the basi

tion (WMO) h

t track data. 

ased on Nove

his dataset inclu

enter) best tra

The storm data

ote that one or

ized view of 

racted from on

erally follows 

Sub-Basin

ber rms

ACS

Number ostorms in

final database

52 1,152

22

50 97

0

6 89

19

4 67

0

0

0

6

3

A 1,455

The Figure plogency. Prior todescriptions (

with winds 34 tr most storms ing in better d

world. In this rep

er Risk A-8144)

26 051215

s of 

has 

ember 

udes 

ack 

ne 

the 

of n

e

ots the o the (e.g., to 63 prior 

data.  

port, 

Page 28: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

Figure

Figure 3 psub‐basin peak reporpeak categBased on tstorm” strone “tropiconsistent Note that tcontributin

sustained is on the oactivity by

ki

  

e 2. Summary

Represen

lots the reportand a zoomed

rted sustainedgory reached dthe data indicaength tropicalical storm” strwith other estthese metrics ng agencies ofwind speeds. order of 10%‐15y year and mon

0

20

40

60

80

100

120

140

160

1870

Peak

 Maxim

um

 Sustained

 Winds (knots)

N/A 

y of the Data Q

nts Summary

ted storm tracd‐in area around wind speed, during the durated in Table 5l cyclones (e.gength tropicaltimates foundare derived frf IBTrACS useThe relative d5% (e.g., refer nth are shown

0 1890

JTWCUCAR dsIMDDSI‐963

 

Quality of the

Storm Inform

ks from the hind Bangladeshis shown in Tration of the tr5, the entire Ba., reported peal cyclone enterd in the literatuom the reporte different averdifference in noHarper et al.,

n in Figure 4 a

1910 1

s824.1

6

e Tropical Cyc

mation of Eac

istorical tropich. The number

able 4 and Tabropical cycloneay of Bengal suak sustained wrs Bangladeshure (e.g., Ali, 1ed wind speedraging periodormalized sus 2009). Plots ilnd Figure 5. 

930 1950

Year

Final Repo

clone Historic

ch Given Stor

cal cyclone datr of storms in ble 5. The store (not necessaub‐basin expewind speeds 3h borders, on a1999; Islam & Pd as given by s that include stained winds llustrating the

0 1970

ort on Capacity BuFinance in Ban

SF13-

cal Database

rm in the Data

taset for the enthe catalog, asrm category coarily the categoeriences about 34 knots or greaverage per yePeterson, 2009IBTrACS. The1‐, 3‐, and 10‐between these

e frequency of 

1990 2

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

 

e – Each Mark

abase

ntire Bay of Bes classified byorresponds to ory at landfallfive “tropical 

eater), and aboear. This is 9; SAARC, 199e various ‐min averagese averaging petropical storm

010

er Risk A-8144)

27 051215

ker

engal  the the ).  out 

98). 

s of eriods m 

Page 29: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

Table 4

Tro

Trop

Tr

Table 5. A

S

Tropic

Hurr

  

Figure 3. Sto

4. Number of

opical Cyclone Strength

N/A

pical Depression

ropical Storm

Hurricane

Total

Average Year

Storm Type

Any Storm

al Storm Strengtor Stronger

ricane Strength or Stronger

orm Tracks fr

f Reported Sto

PeaSustained W

No

rly Number of

PeSustained

th

 

rom Tropical

orms from th

Benga

k Reported Wind Speed (kno

t Reported

< 34

34 – 63

≥ 64

Any

f Reported St

the Bay of B

eak Reported d Wind Speed (k

Any

≥ 34

≥ 64

Cyclone Hist

e Historical T

al (1877 – 201

ots) Numberin Bay

1

torms from th

Bengal (1877

knots)

AverNumbin Ba

Final Repo

torical Databa

Tropical Cycl

3)

r of Storms of Bengal

85

729

406

235

1,455

he Historical

– 2013)

rage Yearly ber of Storms ay of Bengal

10.6

4.7

1.7

ort on Capacity BuFinance in Ban

SF13-

ase by Peak I

one Database

Number oEntering Bangl

1

8

7

54

21

Tropical Cyc

AveraNumber

Entering Ban

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

Intensity

e for the Bay

of Storms adesh Borders

1

5

2

4

12

clone Databas

ge Yearly r of Storms gladesh Border

1.5

0.9

0.4

er Risk A-8144)

28 051215

 

of

se for

rs

Page 30: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

Figure 4

Figure 5.

3.1.2 T

Disaster co

from majo

sources, bo

inventory 

  

4. Yearly Stor

Monthly Sto

Tropical Cy

onsequence da

or historical tro

oth local and i

of reported tr

Number o

f Storm

s Per Y

ear w

ith

 Reported

 Peak

 Sustained

 Wind

 Speeds 

of34knotsorGreater

Average

 Number o

f Storm

s Per Y

ear 

with

 Reported

 Peak

 Sustained

 Wind

 Speeds o

f 34

 knots

 or G

reater

m Frequency

rm Frequenc

yclone Con

atabases for tr

opical cyclone

international. 

opical cyclone

0

1

2

3

4

5

6

7

8

9

10

11

12

1870 1

of 3

4 knots

 or G

reater

0

0.2

0.4

0.6

0.8

1

1.2

p

Oc

En

 

y Derived from

y Derived fro

nsequence

ropical cyclone

 events occurr

This data was

e (including tr

1890 1910

Occurring in BaEntering Bangl10 Year Movin

ccurring in Bay 

tering Banglad

m the Tropica

om the Tropic

e

es in Banglade

ring in Bangla

s assembled in

ropical storm a

1930 195Year

ay of Bengaladesh

g Average

of Bengal

desh

Final Repo

al Cyclone His

cal Cyclone H

esh are limited

adesh has been

nto a database 

and tropical de

50 1970

ort on Capacity BuFinance in Ban

SF13-

storical Data

Historical Data

d. As such, con

n collected from

and represent

epression) eve

1990 2010

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

base (1877-2

 

abase (1877-2

nsequence dat

m a large vari

ts a comprehe

ents which hav

0

er Risk A-8144)

29 051215

013)

2013)

ta 

ety of 

ensive 

ve 

Page 31: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

had a sign

from a larg

1. A

R

2. B

3. B

A

4. B

5. D

6. D

“S

7. D

Ba

8. EM

Ep

9. G

R

10. G

N

th

11. IF

12. K

Su

13. M

14. M

15. N

M

16. PR

17. R

an

re

em

18. R

Em

19. SA

(S

Th

20. W

  

nificant reporte

ge variety of s

ALI: Ali, A. (19esearch, Vol 1ANGLAPEDI

ILHAM: BilhaAmer. 84(5), 16MD: Data fromDCMU: Data frDMIC: Data anSituation RepoDUBE: Dube, Say of Bengal aMDAT: The Epidemiology oGLIDE: The GLeduction CentGOB: Data andNeeds Assessmhe “In‐depth RFRC: Data andKHAN: Khan, Surge Modellin

MDMR: Data  fMUNICHRE: DNPDM: GovernManagement 20RAMANIK: PRELIEFWEB: Tnd non‐governeports, press remergencies wo

RSOE: Hungar

mergency andAARC: South SMRC) (1998) heir InfluenceWIKIPEDIA: R

ed impact on p

sources, includ

999) “Climate c2: 109‐116 IA: The nationam, R. (1994) “50‐1657 m the Bangladrom the Disastnd reports fromorts” S. K., Rao, A. Dand Arabian SeEmergency Evof Disasters (CLobal IDEntifiter (ADRC) d reports from ment For DisasRecovery Need

d reports fromS.R. (1991) “Cyng, Chittagongfrom the BangDisaster impac

nment of the P010‐2015” DisaPramanik, M.A

The online infonmental organeleases, appeaorldwide rian National Ad Disaster InfoAsian Associa“The Impact oe in the RegionReports and in

 

population an

ding: 

change impact

nal encycloped“The 1737 Calc

desh Meteorol

ter Coordinatim the Disaster

D., Sinha, P. C.ea: The probleents DatabaseCRED) er (GLIDE) nu

the Governmter Recovery ads Assessment

 the Internatioyclone Hazard

g Port Authorigladesh Minist

ct data from MPeople’s Repubaster Managem

A.H. (1994)  Mormation reponizations, goveals, policy docu

Association oformation Serviation for Regioof Tropical Cyn”, SMRC No. nformation coll

d assets in Ban

ts and adaptat

dia of Bangladcutta Earthqua

ogical Departmion and Monit

r Management

., Murty, T. S.,em and its pree (EMDAT), m

umber databas

ment of Bangladand Reconstrut of Cyclone Aonal Federatiod in Bangladesty Report, revtry of DisasterMunichRe blic of Bangladment Bureau, 

May Cyclone ofsitory “ReliefWernments, reseuments, analy

Radio Distresice (EDIS) onal Cooperatclones on the 1 lected from W

Final Repo

ngladesh. Dat

tion assessmen

desh ake and Cyclo

ment toring Unit of t Information C

, and Bahulayadiction,” Mau

maintained by t

se, maintained

desh, includinuction” for 200Aila Affected Aon of Red Crossh,” in Backgrvised by Dame

r Management

desh (2010) “NDisaster Mana

f BangladeshWeb,” which search institutioysis and maps 

ss‐Signalling a

tion (SAARC) Coastal Regio

Wikipedia 

ort on Capacity BuFinance in Ban

SF13-

ta was collecte

nt in Banglade

one Evaluated

Bangladesh Centre of Ban

an, N. (1997) “usam 48, 283–3the Centre for

d by the Asian

ng the report “07 Cyclone SidAreas” ss and Red Creround informa

en, M. t and Relief 

National Plan agement & Re Seisan‐Kenkyscans websites

ons and the mrelated to hum

and Infocomm

 Meteorologic

ons of SAARC 

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

ed and process

esh” Climate 

d,” Bull. Seism.

ngladesh, inclu

“Storm surge i304  Research on t

n Disaster 

“Damage, Lossdr and data fro

escent Societieation on the St

for Disaster elief Divisionyu, Vol 46, No

s of internationmedia for news

manitarian 

munications (R

cal Research CCountries and

er Risk A-8144)

30 051215

sed 

. Soc. 

uding 

in the 

the 

s and om 

es torm 

o 10 nal s, 

RSOE) 

Centre d 

Page 32: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

Table 6 prcontains incorrespond

historical ddwellings listed. For sectors), thvalues aretropical cyexample, i

Overall, av1.23 millio

and non‐trcostliest trreported ewhich sughave each and 1991. consequen

lost. 

IBTrACS ID  Year  Day

Star

N/A  1582  N/AN/A  1699  N/AN/A  1737  N/AN/A  1767  N/AN/A  1789  334

N/A  1822  151

N/A  1831  303

N/A  1870  273

N/A  1872  273

N/A  1876  299

1897294N14096  1897  294

1898125N13095  1898  125

1904326N13089  1904  326

1909288N14094  1909  288

1911105N14087  1911  105

1912302N08089  1912  302

1913286N18086  1913  286

1917121N10084  1917  121

1917297N11093  1917  297

1919266N15089  1919  266

1923122N14085  1923  122

1926139N09085  1926  139

1941142N13095  1941  142

1942287N17090  1942  287

1947288N21090  1947  288

1948137N15093  1948  137

1955295N16086  1955  295

1958136N16088  1958  136

1958295N19090  1958  295

1959191N21090  1959  191

1960148N20089  1960  148

1960273N13117  1960  282

1960302N08090  1960  302

1961125N11096  1961  125

1961147N15095  1961  147

1962299N10094  1962  299

  

esents the evenformation fording IBTrACSdatabase prevdestroyed, dwlife loss (deathe minimum a not trended ayclone consequit is noted that

vailable reporton lives lost, 61rending of valropical cycloneeconomic impa

ggests a larger been reportedThe 1970 evenntly one of the

Table 6.

y rt 

IBTrACS Storm Name 

Dwellings Damaged 

A  N/A A  N/A A  N/A A  N/A 4  N/A 1  N/A 3  N/A 3  N/A 3  N/A 9  N/A 4  NOT NAMED 5  NOT NAMED 6  NOT NAMED 8  NOT NAMED 5  NOT NAMED 2  NOT NAMED 6  NOT NAMED 1  NOT NAMED 7  NOT NAMED 6  NOT NAMED 2  NOT NAMED 9  NOT NAMED 2  NOT NAMED 7  NOT NAMED 8  15B 7  03B 5  10B 6  02B 5  08B 1  08B 8  01B 2  10B  62,725  B

2  09B 5  04B:WINNIE 7  05B 9  10B 

ent‐by‐event sur 93 tropical cyS ID which canviously discusswellings dama

ths plus missin

and maximum

and corresponuence records,t many landfal

ts indicate tha1.6 million peolues mentioned

es on record aracts of 3.78 anrelative finand to cause 100,nt is the event  world’s dead

. Consequenc

Source  Dwellings Destroyed 

8,000 

BANGLAPEDIA 568,161  BAN

 

ummary of theyclone events n be joined wit

sed. Table 7 praged, people ang people) andm values as repd to year‐of es, and many knlling storms d

at tropical cyclople affected, d earlier, the are TC Sidr in 2d 3.00 billion Ucial impact for,000 or more liwith the high

dliest natural h

ce Database o

Source  People Affected 

25,000 SAARC 

100,000 NGLAPEDIA

e consequencespanning fromth the storm presents a decadffected, and ind economic losported by the dstimates. In genown events ao not have rep

lone events in and 4.7 to 9.0 bactual historica2007 and the 1USD, respectivr the older 199ives lost: evenest reported hhazard event in

of Tropical Cy

Source  Injuries  Sou

SAARC 

12  SAA

SAARC 

Final Repo

e database of tm 1582 to 2013parameters derdal summary njuries, typicalss (generally tdifferent sourceneral, there arare missing conported conseq

Bangladesh sibillion USD inal impact is ex1991 Bangladevely. Note tha91 event. At lents in 1582, 187human life tolln history) with

yclone Event

urce Life Loss Min 

Source

200,000 SAARC

50,000  SAARC

30,000  SAARC

20,000  MUNICHR

40,000  DCMU

215,000 MUNICHR

270  KHAN

100,000 DCMU

14,000  BANGLAPED

175,000 DCMU

143  BANGLAPED

172  SAARC

120,000 KHAN

40,000  ALI 500  BANGLAPED

70,000  KHAN

432  BANGLAPED

3,500  SAARC

606  KHAN

5,000  SAARC

61,000  EMDAT

500  SAARC

1,200  BANGLAPED

1,700  MUNICHR

ARC  870  BANGLAPED

500  SAARC

14,000  MUNICHR

106  KHAN

3,000  EMDAT

5,149  SAARC

11,466  DUBE

10,466  KHAN

1,000  BANGLAPED

ort on Capacity BuFinance in Ban

SF13-

tropical cyclon3. Most of the erived from theof the conseqully the largest the financial imces are listed. Nre several datansequence infoquence data. 

ince 1900 haven damages. Duxpected to be mesh cyclone, wi

at these numbe

east 8 tropical 70, 1876, 1897, l in Bangladeshh estimates of 

ts in Banglad

Life Loss Max 

Source 

300,000 BILHAM 

RE 50,000  SAARC 22,000  SAARC 

RE 

400,000 KHAN DIA 175,000 KHAN 

DIA

698  BANGLAPEDIA

DIA

DIA

40,000  KHAN 

2,700  SAARC 7,000  KHAN 

DIA

RE DIA

12,000  KHAN RE 

11,446  KHAN 10,000  MUNICHRE 11,468  DCMU 

DIA 50,000  KHAN 

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

ne events. Theevents have a e tropical cyclouence databasreported valumpact for all Note that the a gaps in availormation. For 

e resulted in 0ue to the data more severe.  Tith maximum ers are untrencyclone event1898, 1911, 19h (and up to 500,000 

desh

Econ Loss Min (M USD) 

Source  Lo

 (M

63  MUNICHRE

er Risk A-8144)

31 051215

e table 

one se. For ue is 

lable  

0.75 to gaps The 

nded, s 970, 

 lives 

Econ oss Min

M USD)Source 

Page 33: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

IBTrACS ID  Year  Day

Star

1963144N09090  1963  144

1963291N09092  1963  291

1964278N21091  1964  278

1965129N14085  1965  129

1965146N15089  1965  146

1965340N05092  1965  340

1966270N10090  1966  270

1966341N08088  1966  341

1967293N09090  1967  293

1969282N18087  1969  282

1970122N10089  1970  122

1970291N14085  1970  291

1970312N12086  1970  312

1971271N20089  1971  271

1973339N07088  1973  339

1974225N22089  1974  225

1974327N11088  1974  327

1975125N13096  1975  125

1975155N16087  1975  155

1977129N08084  1977  129

1981321N12092  1981  321

1981339N11089  1981  339

1983282N09155  1983  282

1983309N10091  1983  309

1985143N16088  1985  143

1985288N19089  1985  288

1986313N22089  1986  313

1987150N13095  1987  150

1988291N15095  1988  291

1988327N06100  1988  327

1989143N17090  1989  143

1990280N18091  1990  280

1990348N04087  1990  348

1991113N10091  1991  113

1991150N14091  1991  150

1994117N07096  1994  117

1995323N05097  1995  323

1996122N08092  1996  122

1996296N09093  1996  296

1997133N03092  1997  133

1997263N14084  1997  263

1998133N04086  1998  133

1998320N10102  1998  320

2000300N14093  2000  300

2002314N12083  2002  314

2003206N21089  2003  206

2004136N15090  2004  136

2006264N23087  2006  264

2007133N15091  2007  133

2007314N10093  2007  314

2008168N21090  2008  168

2008298N16085  2008  298

2009104N13088  2009  104

2009143N17089  2009  143

2010280N18085  2010  280

2012285N21091  2012  285

N/A  2013  135

Due to the

issued by 

events. Ta

cyclones th

Bijli, 2009 

and Bargu

significant

presented 

 

  

y rt 

IBTrACS Storm Name 

Dwellings Damaged 

4  03B 1  10B 8  11B 9  01B 6  02B 0  12B  35,636 0  08B  249,000 1  17B 3  12B 2  10B 2  03B 1  12B 2  15B  400,000  B

1  11B 9  14B 5  06B 7  12B 5  03B   5  05B 9  01B 1  NOT NAMED 9  NOT NAMED 2  KIM 9  NOT NAMED 3  NOT NAMED  34,611 8  NOT NAMED 3  NOT NAMED  3,446 0  NOT NAMED 1  NOT NAMED 7  NOT NAMED  863,837 3  NOT NAMED  20,008 0  NOT NAMED 8  NOT NAMED  63,562 3  NOT NAMED  882,750 0  NOT NAMED  20,274 7  NOT NAMED  62,677 3  NOT NAMED  44,664 2  NOT NAMED  15,976 6  NOT NAMED  30,000 3  NOT NAMED  452,886 3  NOT NAMED  163,352 3  NOT NAMED  9,945 0  NOT NAMED 0  NOT NAMED  3,000 4  NOT NAMED  1,000 6  NOT NAMED  67,727 6  NOT NAMED  18,438 4  NOT NAMED 3  AKASH  845 4  SIDR  957,110 8  NOT NAMED 8  RASHMI  12,404 4  BIJLI  5,991 3  AILA  369,702 0  NOT NAMED 5  NOT NAMED  16,330 5  MAHASEN  114,396 

e availability o

the DMIC/DM

ble 8 and Figu

hat have affec

TC Aila, 2012 

una have been 

t reported imp

in the next se

Source  Dwellings Destroyed 

376,332  BAN

SAARC SAARC  60,000 

BANGLAPEDIA 

2,300    

2,000 SAARC  90,915 

MDMR  1,116 

MDMR  788,715 MDMR  12,173 

MDMR  75,085 MDMR  819,608 MDMR  34,791 SAARC  45,000 MDMR  22,395 MDMR  15,868 SAARC MDMR  290,320 MDMR  51,435 

RELIEFWEB  3,178  R

BMD BMD MDMR  4,980 MDMR  19,535 

IFRC  205 GOB  564,967 

DMIC  4,360 DMIC  1,460 DMIC  242,882 

DMIC  8,050 DMIC  21,736 

of more detaile

MB, a more det

ure 6 and  Figu

ted Banglades

TC BOB 01, an

most impacte

pact. More det

ction. 

 

 

Source  People Affected 

NGLAPEDIA

60,000  E

SAARC  1,500,000 

40,000 4,700,000 

SAARC    

2,000,000  E

5,000  E

SAARC SAARC  1,810,000  E

MDMR  238,600 

MDMR  10,568,860 E

MDMR  346,087 13,870  E

MDMR  1,015,866 SAARC  15,438,849 E

MDMR  121,229 SAARC  500,000 MDMR  305,953 MDMR  81,162 

 MDMR  3,784,916 MDMR  2,015,669 ELIEFWEB  650,000  RE

121,000  E

MDMR  312,817 MDMR  116,269 

9,135  E

IFRC  80,000 GOB  8,923,259 

DMIC  321,839 DMIC  92,558 DMIC  4,826,630 

DMIC  133,688 DMIC  1,328,237 

ed records in r

tailed account

ure 7 illustrate

sh over the las

nd 2013 TC M

ed, as expected

tails on these r

Source  Injuries  Sou

EMDAT SAARC 

SAARC SAARC 

50  SAA

   

EMDAT 

EMDAT 

EMDAT 

MDMR 

430  SAA

EMDAT MDMR   EMDAT MDMR   EMDAT  1,390,540 BM

MDMR SAARC  4,850  SAA

MDMR MDMR   

 MDMR  9,663  SAA

MDMR  2,396  BM

ELIEFWEB 504  RELIEF

EMDAT 

MDMR   MDMR   EMDAT RSOE GOB  55,282  GO

DMIC DMIC  16  DM

DMIC  7,103  DM

DMIC  183  DM

DMIC  1,766  DM

recent years, p

t of tropical cy

e the reported 

st decade, nam

Mahasen. In gen

d. However, in

recent cyclones

Final Repo

urce Life Loss Min 

Source

11,520  DCMU

79  EMDAT

196  DUBE

17,279  BMD 12,000  KHAN

870  KHAN

500  MUNICHR

850  BMD 41  EMDAT

175  KHAN

18  KHAN

200  SAARC

200,000 BMD 11,000  BANGLAPED

101  DCMU

600  BANGLAPED

ARC  20  DCMU

  5  DCMU

0  SAARC

13  EMDAT

1,000  EMDAT

2  DCMU

43  DCMU

0  SAARC

4,264  SAARC

71  EMDAT

12  MDMR

12  EMDAT

ARC  31  EMDAT

1,000  EMDAT

  573  MDMR

150  KHAN

  132  MDMR

MD  138,866 EMDAT

76  MDMR

ARC  134  MDMR

91  MDMR

  545  MDMR

9  SAARC

ARC  111  EMDAT

MD  67  SAARC

FWEB 14  BMD 40  RELIEFWE

3  BMD 2  BMD 

  11  MDMR

  89  MDMR

115  EMDAT

3  IFRC OB  3,406  GOB 

31  WIKIPEDI

7  DMIC

MIC  5  DMIC

MIC  190  DMIC

17  WIKIPEDI

MIC  36  DMIC

MIC  17  DMIC

particularly tho

yclone consequ

consequence, 

mely 2007 TC S

neral, coastal d

nland districts

s, as well as th

ort on Capacity BuFinance in Ban

SF13-

Life Loss Max 

Source 

22,000  SAARC 

19,280  MUNICHRE 

2,873  SAARC RE  850  SAARC 

270  SAARC 

300  EMDAT 500,000 SAARC 

DIA

1,000  SAARC DIA 2,500  MUNICHRE 

300  SAARC    

50  SAARC 

72  SAARC 1,043  KHAN 300  DCMU 

15,000  EMDAT 

50  SAARC 

300  SAARC 11,708  KHAN 

   370  EMDAT 

   150,000 BANGLAPEDIA

300  SAARC 400  BANGLAPEDIA

650  BANGLAPEDIA

   2,009  SAARC 155  SAARC 1,067  SAARC 114  BMD 

EB  200  EMDAT 253  BMD 182  BMD 

      

90  RSOE 4,407  GOB 

A 13  DMIC 7  EMDAT 

500  MUNICHRE A 

108  DMIC    

ose from the S

uence is availa

by District, fo

Sidr, 2008 TC R

districts such 

s such as Gopa

he 1970 and 19

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

Econ Loss Min (M USD) 

Source  Lo

 (M50  MUNICHRE

58  MUNICHRE

22  EMDAT 

63.0  MUNICHRE

   

50  MUNICHRE

310  MUNICHRE

   

   A  1,780  EMDAT 

A  131  SAARC A 

   

      

1,675  GOB 

270  MUNICHRE

200  GOB 

Situation Repo

able for recent 

or six major tro

Rashmi, 2009 T

as Bhola, Bage

alganj also hav

991 cyclones, a

er Risk A-8144)

32 051215

Econ oss Min

M USD)Source 

86.4  EMDAT 

   

   

   3,000  MUNICHRE

200  PRAMANIK

   

      

3,775  MUNICHRE

1,149  GOB 

orts 

opical 

TC 

erhat, 

ve 

are 

Page 34: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

Decade  N

of

Pre‐1900s 1900s 1910s 1920s 1930s 1940s 1950s 1960s 1970s 1980s 1990s 2000s 2010s Total 

Ta

(2007

  

Table 7.

Number f Events 

Dwel

Dama

12 

 2   6   2   ‐   4   4  

 16    347 10    400 11    921 12    1,746 11    1,436 3    13093   4,982

able 8. Distric

7 TC Sidr, 2008

. Decadal Sum

llings aged 

Dwellin

Destroy

   

 8,000   

,361    1,004,4,000    2,300,902    894,96,086    1,357,66,217    838,38,726    29,782,292    4,135,5

t-Wide Conse

8 TC Rashmi,

District 

Bhola Bagerhat Barguna Noakhali Patuakhali Pirojpur Khulna Jhalokati Satkhira Barisal 

Madaripur Shariatpur Narsingdi Gopalganj Jessore 

Chandpur Faridpur Chittagong Munshiganj Cox's Bazar Lakshmipur Comilla 

Narayanganj Narail 

Kishoreganj Dhaka 

Manikganj Rajbari 

Maulvibazar Feni 

 

mmary of the

ngs yed 

People

Affected

 

0   25,000

493   1,660,00

0   4,740,00

19   14,968,5

680   24,048,5

89   14,682,5

86   1,461,92

567   61,586,4

equence Data

2009 TC Bijli,

People Affecte

2,009,692

1,718,824

1,648,845

1,465,698

1,395,721

1,319,829

1,082,246

827,671

776,916

653,260

595,000

423,023

306,538

257,354

223,608

175,579

154,540

114,413

102,322

86,705

82,672

70,527

57,998

35,024

18,140

15,180

4,200

3,775

755

156

Tropical Cyc

e d  Injuries

 

12 00 00  50 47  430 14  1,407,953

07  62,401 25  1,802 93  1,472,648

a for Six Rece

2009 TC Aila,

ed  Damaged/D

Househ

185,20

306,17

283,90

28,80

325,69

177,38

199,17

147,78

173,98

141,77

12,50

82,31

5,304

109,13

700

25,78

38,63

16,07

8,352

6,239

11,90

4,218

5,632

9,806

2,683

3,05

2,120

4,544

149

345

Final Repo

clone Conseq

Life Loss Min 

844,270 

315 234,432 606 

67,700 17,070 74,697 211,957 7,008 

3  140,235 3,862 142 

8  1,602,294 

ent Tropical C

, 2012 TC BOB

estroyed olds  Liv

05

75

03

09

98

85

73

82

86

78

00

18

4

33

0

85

35

72

2

9

08

8

2

6

3

1

0

4

9

5

ort on Capacity BuFinance in Ban

SF13-

quence Datab

Life Loss Max 

1,637,270 

841  270,932  2,700  

 69,700  28,570  152,059  515,186  30,129  155,942  5,698  142  

2,869,169  

Cyclones in B

B 01, and 2013

ves Lost 

101

814

1,310

65

692

913

75

47

80

108

41

18

3

35

3

6

19

121

8

54

12

‐14

1

‐6

‐1

2

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

base

Econ LossMin 

(M USD) 

E

(

      

 63   130   63  

 360   1,911   1,945   200  

 4,672  

Bangladesh

3 TC Mahasen

er Risk A-8144)

33 051215

con LossMax 

(M USD) 

 

63 130 86 360 3,200 4,924 200 8,963 

n)

Page 35: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

Figu

(2007 T

 

  

ure 6. Numbe

C Sidr, 2008 T

er of Lives Lo

TC Rashmi, 2

 

st by District

2009 TC Bijli,

t from Six Rec

2009 TC Aila

Final Repo

cent Tropical

a, 2012 TC BO

ort on Capacity BuFinance in Ban

SF13-

l Cyclones in

OB 01, and 20

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

Bangladesh

013 TC Mahas

er Risk A-8144)

34 051215

sen)

Page 36: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

Figure

(2007 T

 

  

e 7. Number o

C Sidr, 2008 T

of People Affe

TC Rashmi, 2

 

ected by Distr

2009 TC Bijli,

rict from Six R

2009 TC Aila

Final Repo

Recent Tropi

a, 2012 TC BO

ort on Capacity BuFinance in Ban

SF13-

cal Cyclones

OB 01, and 20

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

s in Banglade

013 TC Mahas

er Risk A-8144)

35 051215

esh

sen)

Page 37: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

3.1.3 S

3.1.3.1

The 1970 B

Figure 8). 

readings; d

Pakistan (n

cyclone m

than 64 kn

world’s de

Figure 9), 

low‐lying 

damaged/

   

  

Significant

The 1970 B

Bohla Cyclone

A moderate st

detailed repor

now Banglade

ade landfall o

not sustained w

eadliest catastr

primarily as a

islands of the 

destroyed 400

Figure 8. S

and Recen

Bhola Cyc

e was a tropica

trength tropic

rted intensity i

esh). An area o

n the Banglad

winds). It rem

rophe in mode

a result of high

Ganges Delta

0,000 househol

Satellite Imag

 

nt Tropical

lone

al cyclone duri

al cyclone (pe

is not availabl

of low pressur

desh coast on N

ains the deadl

ern times. Up 

h tide and stor

a (e.g., see Figu

lds. 

  

ge and Meteo

(Sour

l Cyclone E

ing the 1970 N

ak strength of

e from IBTrAC

re formed with

November 12 w

liest tropical cy

to 500,000 peo

rm surge (reac

ure 10). The sto

orological His

rce: Wikipedia

Final Repo

Events

North Indian O

f SSHS Catego

CS), it caused

hin the Bay of 

with hurrican

yclone ever re

ople lost their 

ching up to 20 

orm reportedly

story of the 19

a)

ort on Capacity BuFinance in Ban

SF13-

Ocean cyclone 

ory 2 or 3 as re

catastrophic i

Bengal on No

ne force intensi

ecorded global

lives in the st

feet) that floo

y affected 4.7 

970 Bhola Cy

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

season (e.g., s

eported by ship

mpacts in Eas

ovember 7 and

ity (i.e., greate

lly, and one of

orm (e.g., see 

ded much of t

million people

yclone

er Risk A-8144)

36 051215

see 

st 

d the 

er 

f the 

the 

e and 

 

Page 38: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

Figure

  

F

e 10. Storm Su

Figure 9. Mor

(S

urge Values (i

 

rtality Rate by

Source: Som

n Feet) for the

y Union for th

mer and Mos

e 1970 Bhola C

Final Repo

he 1970 Bhola

sley, 1972)

Cyclone (Sour

ort on Capacity BuFinance in Ban

SF13-

 

a Cyclone

rce: Frank and

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

 

d Husain, 197

er Risk A-8144)

37 051215

1)

Page 39: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

3.1.3.2

The 1991 B

Gorky) wa

powerful c

An area of

knots sust

made land

record, wi

significant

affected ov

(1991 USD

  

F

 

  

The 1991 B

Bangladesh cy

as a tropical cy

cyclone (peak 

f low pressure

ained winds) 

dfall on the Ba

ith estimates a

t factor with w

ver 15.4 millio

D) in damage. 

Figure 11. Sa

Banglades

yclone (JTWC d

yclone during 

strength of SS

e formed withi

on April 29, an

ngladesh coas

as high as 150,0

wave heights u

on people, dam

tellite Image

 

sh Cyclone

designation: 0

the 1991 Nort

SHS Category 

in the Bay of B

nd slightly do

st later that da

000 lives lost. 

up to 20 feet re

maged/destroy

  

and Meteoro

(Sour

e

02B, also know

th Indian Ocea

5), it caused c

Bengal on Apr

owngraded in 

ay. The storm i

As with the 19

eported inland

yed over 1.7 m

logical Histor

rce: Wikipedia

Final Repo

wn as Super Cy

an cyclone sea

catastrophic da

ril 22. The stor

strength (135 

is one of the d

970 Bhola Cyc

d over a wide a

million househo

ry of the 1991

a)

ort on Capacity BuFinance in Ban

SF13-

yclonic Storm 

ason (e.g., see F

amage and de

m reached a p

knots sustaine

deadliest tropic

clone, storm su

area. The storm

olds, and caus

1 Bangladesh

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

BOB 01 or Cy

Figure 11). A v

eath in Banglad

peak intensity 

ed winds) as i

cal cyclones on

urge was a 

m reportedly 

sed 1.8 to 3 bil

h Cyclone

er Risk A-8144)

38 051215

yclone 

very 

desh. 

(140 

lion 

 

Page 40: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

3.1.3.3

Cyclone Si

during the

strength o

from an ar

mbar centr

926‐948 m

reports fro

about 1.5 m

economic 

MunichRe

DMIC/DM

(issued by

are listed i

 

 

 

  

Tropical C

idr (JTWC des

e 2007 North In

f SSHS Catego

rea of low pres

ral pressure) o

bar central pre

om the Govern

million househ

impact from d

e) are as high a

MB) and the “D

y the GOB) is li

in Table 10. 

Figure 12. S

Cyclone Sid

signation: 06B,

ndian Ocean c

ory 5), it was o

ssure on Nove

on November 

essure) as it m

nment of Bang

holds, and res

damage and lo

as 3,775 million

Damage, Loss 

isted in Table 

Satellite Image

 

dr (2007)

, also known a

cyclone season

one of the wor

ember 10 and 

14, and slightl

made landfall o

gladesh, the sto

ulted in 4,407

oss is about 1,6

n USD. Distric

and Needs As

9. Sector‐wide

  

e and Meteor

(Sour

as Very Severe

n (e.g., see Figu

rst catastrophe

reached its pe

ly downgrade

on the Banglad

orm affected a

lives lost. Off

675 million (20

ct‐wide conseq

ssessment For 

e economic da

rological Histo

rce: Wikipedia

Final Repo

e Cyclonic Sto

ure 12). A very

e in Banglades

eak intensity (1

ed in intensity

desh coast on N

about 8.9 milli

ficial governm

007 USD), whi

quence data fr

Disaster Reco

amage and los

ory of 2007 T

a)

ort on Capacity BuFinance in Ban

SF13-

orm Sidr), was 

y strong tropi

sh in recent tim

140 knots sust

y (100‐130 knot

November 15

ion people, de

ment estimates 

ile other estim

rom Situation 

overy and Rec

ss estimates iss

Tropical Cyclo

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

a tropical cyc

ical cyclone (p

mes. Sidr form

tained winds; 

ts sustained w

. Based on offi

estroyed/dama

of the total 

mates (i.e., from

Reports (issue

onstruction” r

sued by the GO

one Sidr

er Risk A-8144)

39 051215

clone 

eak 

med 

918 

winds; 

icial 

aged 

ed by 

report 

OB 

 

Page 41: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

District 

Num

o

Affe

Upa

Bagerhat Barguna Barisal  1

Bhola Chandpur Chittagong Comilla  1

Cox's Bazar Dhaka Faridpur Feni 

Gopalganj Jessore Jhalokati Khulna 

Kishoreganj  1

Lakshmipur Madaripur Manikganj Maulvibazar Munshiganj 

Narail Narayanganj Narsingdi Noakhali Patuakhali Pirojpur Rajbari Satkhira Shariatpur 

Total  2

 

  

Table

mber of ected azilla 

Number of Affected People 

9  1,221,788 5  846,076 10  147,718 7  843,669 8  175,579 5  15,295 16  70,527 8  8,555 5  15,180 8  154,540 6  156 5  257,354 8  223,608 4  763,211 9  525,616 13  18,140 5  55,695 4  595,000 7  4,200 3  755 6  102,322 3  35,024 4  57,998 6  306,538 5  217,300 7  611,125 7  1,011,359 4  3,775 7  212,133 6  423,023 

200  8,923,259 

Table 10. Se

Sect

Hous

Agricu

Transport InfOther Infra

Educa

Indu

Commerce

Health andEnviron

Tot

9. District-Wi

(Source: DM

Damaged Crops 

(Acres) Full 

58,215 227,403 45,275 22,350 6,550 1,976 2,500 245 

 23,200 87 

8,958 103 

117,308 12,464 4,500 18,500 3,330 6,807 

 3,080 7,615 6,889 2,350 3,125 60,440 72,963 3,200 2,858 20,536 742,827  1

ector-Wide D

(Sou

tor (m

sing

ulture frastructure astructure ation stry

e/Tourism d Nutrition nment tal 

 

de Conseque

IC/DMB and G

Damaged Crops (Acres) Partial 

Damage

Househo

Full 

237,483  118,899

83,202  95,412

223,563  41,470

148,862  15,389

19,301  10,342

4,989  603 30,104  806 1,276  40 9,114  15 75,542  1,000

263  45 34,248  24,133

2,008  295 67,908  69,685

78,292  17,323

16,087  55 127,483  1,479

9,460  4,991

42,622  750 80  60 

6,553  2,804

21,656  3,629

1,297  476 34,301  24 19,625  980 254,835  53,291

81,909  63,896

9,359  3,789

45,460  5,293

43,235  27,993

1,730,117  564,967

Damage and L

urce: Governm

Damage

million 2007 USD)839.3

21.3

116.0

106.5

62.5

3.8

‐2.4

6.1

1,158.0

ence Data for

Government

ed lds 

Damaged Households  

Partial 

9  130,675 2  96,245 0  92,242 9  20,300 2  15,443 

5,181 3,412 1,499 3,036 37,635 300 

3  85,000 405 

5  76,108 3  67,011 

2,628 6,652 7,509 1,370 89 

5,548 6,177 5,156 5,280 2,200 

1  132,369 6  80,315 

755 12,245 

3  54,325 7  957,110 

Loss Estimate

ment of Bang

) Loss

(million 2007‐

416.3

25.0

5.9

6.0

29.5

19.1

15.0

‐516.9

Final Repo

r 2007 Tropica

of Banglades

Number of 

Deaths 

Number of 

Missing People 

810   1,277  26 97   42  14 5   21  92 

   7   6   16  3 

   35   1  2 47   18   

   2  1 41   

   2   8   1   12   3   1   

457  221 400  511 1   20  1 17   

3,347  871 

es for 2007 Tr

gladesh, 2008

7 USD)  (million

1

ort on Capacity BuFinance in Ban

SF13-

al Cyclone Si

sh, 2008)

Affected Roads (Km) 

Affec

Embank

(km

1,234  25

1,908  67

   112   40  2

100  34

   21  30

         46   

   1,808  62

78  43

               23   

         

150  8

838   1,642  73

   75  19

   8,075  1,8

ropical Cyclo

)

Total

n 2007 USD)  P

839.3

437.6

141.0

112.4

68.5

33.3

19.1

17.5

6.1

1,674.9 1

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

idr

cted kments m) 

Affected Institution Infrastructu

59  2,070 79  2,696 

4,434 990 

2  333 4  9 

98 0  9 

2 34 

 588 

 2  1,604 3  497 

5 133 128 

  43 48 35 48 

8   1,373 

39  2,804  

9  149 511 

75  18,641 

one Sidr

Percent 

50.1% 26.1% 8.4% 6.7% 4.1% 2.0% 1.1% 1.0% 0.4% 

100.0% 

er Risk A-8144)

40 051215

/ re 

Number of 

Injured People 

11,428 16,310 

 61 

    2   20 7 

16,206 173 

 1 

119   18 

  5 35 

8,500 1,161 

 4 

1,232 55,282 

Page 42: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

3.1.3.4

Cyclone R

was a trop

a fairly we

India. Form

intensity (

on Octobe

destroyed/

consequen

 

F

 

District 

Barisal

Bhola Chandpu

Khulna

Lakshmip

Narayang

Noakha

Patuakha

Shariatpu

Total 

  

Tropical C

Rashmi (IMD d

pical cyclone d

eak tropical cy

ming as an are

45 knots susta

er 26. Based on

/damaged abo

nce data from 

Figure 13. Sat

Table 11

(Sour

Number of 

Affected Upazilla 

Nu

Aff

Pe

6  21

7 ur  1   3  10

pur   anj  1 li  1 ali  7  98

ur  1 27  32

Cyclone Ra

designation: BO

during the 2008

yclone (peak st

ea of low press

ained winds; 9

n official repor

out 17,000 hou

Situation Repo

tellite Image a

. District-Wid

rce: DMIC/DM

umber of fected eople 

Damaged Crops (Acres) Full 

3,437         

0,000  725          

8,402  50    

1,839  775 

 

ashmi (200

OB 05, JTWC d

8 North Indian

trength of Tro

sure within th

989 mbar centr

rts from DMIC

useholds, and r

orts (issued by

  

and Meteorol

(Image S

de Consequen

MB Situation R

Damaged Crops (Acres) Partial 

Damaged Households

Full 

8,044  252   1,578      750       

100   9,878  1,780 

   18,022  4,360 

8)

designation: 0

n Ocean cyclo

pical Storm C

he Bay of Beng

ral pressure) a

C/DMB, the sto

resulted in 13 

y DMIC/DMB

ogical Histor

ource: Wikip

nce Data for 2

Report issued

s Damaged Households  

Partial 

Nu

De

720 2,905 

 1,055 

   

7,724  

12,404 

Final Repo

04B, also know

one season (e.g

ategory), it ca

gal on October

as it made land

orm affected a

lives lost in B

B) is listed in T

ry of 2008 Tro

edia)

2008 Tropical

d MON-30-OC

umber of eaths 

Number of 

Missing People 

Aff

R

(

   2   1      1  1 2        3 1   7  4  2

ort on Capacity BuFinance in Ban

SF13-

wn as Cyclonic

g., see Figure 1

aused damage 

r 24, Rashmi re

dfall on the Ba

about 322,000 p

angladesh. Di

Table 11.     

opical Cyclon

l Cyclone Ras

CT-2008:1200

ffected Roads (Km) 

Affected Embankments 

(km) 

92  6                   

120  22    

212  28 

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

c Storm Rashm

13). Although 

in Bangladesh

eached its pea

angladesh coas

people, 

istrict‐wide 

ne Rashmi

shmi

0)

Affected Institution / Infrastructure 

Num

o

Inju

Peo

84 1      22 

 107 

er Risk A-8144)

41 051215

mi) 

it was 

h and 

ak 

st late 

mber of ured ople 

          

Page 43: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

3.1.3.5

Cyclone B

2009 North

(peak stren

Storm Bijli

sustained 

on the Ban

92,500 peo

wide cons

 

 

District 

N

A

Bhola Chittagong Cox's Bazar Noakhali Total 

  

Tropical C

ijli (JTWC des

h Indian Ocea

ngth of Tropic

i formed from

winds; 985 mb

ngladesh coast

ople, destroyed

equence data 

Figure 14. S

Table 1

(Sour

Number of 

Affected Upazilla 

Number of 

Affected People 

4   9  14,408 6  78,150 5   24  92,558 

Cyclone Bij

signation: 01B,

an cyclone seas

cal Storm Cate

m an area of low

bar central pre

t on April 17. B

d/damaged ab

from Situation

Satellite Image

12. District-W

rce: DMIC/DM

Damaged Crops (Acres) Full 

Dama

Cro

(Acr

Par

320  21

  88

  3,7

   320  4,8

 

jli (2009)

, also known a

son (e.g., see F

egory), it cause

w pressure on 

essure) on Apr

Based on offic

bout 7,500 hou

n Reports (issu

 

e and Meteor

(Sour

Wide Consequ

MB Situation R

aged ops res) tial 

Damaged Households 

Full 

14  186 85  448 716  826 

 815  1,460 

as Cyclonic Sto

Figure 14). Alth

ed damage in 

April 14. Bijli 

ril 16 and mai

cial reports fro

useholds, and r

ued by DMIC/

rological Hist

rce: Wikipedia

uence Data fo

Report issued

Damaged Households  

Partial 

Num

of

Deat

 2,117  1

3,874  3

  1

5,991  5

Final Repo

orm Bijli), was

though it was 

Bangladesh, I

i reached its fir

intained a sim

om DMIC/DM

resulted in 5 li

/DMB) is listed

tory of 2009 T

a)

or 2009 Tropic

d MON-20-AP

mber f ths 

Number of 

Missing People 

Aff

R

(

          

5   

ort on Capacity BuFinance in Ban

SF13-

s a tropical cyc

a fairly weak t

India, and My

rst peak inten

ilar intensity a

B, the storm a

ives lost in Ba

d in Table 12. 

Tropical Cyclo

cal Cyclone B

PR-2009:1200

fected Roads (Km) 

Affected Embankmen

(km) 

        7      7 

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

clone during t

tropical cyclon

anmar. Cyclon

sity (50 knots 

as it made lan

affected about 

ngladesh. Dis

    

one Bijli

Bijli

0)

ts Affected 

Institution / Infrastructure 

15 22 69 

 106 

er Risk A-8144)

42 051215

the 

ne 

nic 

dfall 

trict‐

 

Number of 

Injured People 

 12 4  16 

Page 44: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

3.1.3.6

Cyclone Aduring thestrength o(e.g., see Fits peak inIndian coamillion peTotal econin ECHO, Table 13. S

District 

Bagerhat Barguna Barisal Bhola 

Chittagong Khulna 

Lakshmipur Noakhali Patuakhali Pirojpur Satkhira Total 

 

  

Tropical C

Aila (JTWC dese 2009 North Inf SSHS CategoFigure 16). Sevntensity (65 knast just east of eople, destroyenomic impact r2009). DistrictSector‐wide ec

Figure 15. S

Table 1

(Sour

Number of 

Affected Upazilla 

Number of Affected People 

5  497,036 5  284,079 10  292,105 7  584,970 3  13,630 6  546,630 4  17,071 3  1,163,071 7  615,785 7  248,470 7  563,783 64  4,826,630 

Cyclone Ail

signation: 02B,ndian Ocean cory 1), it causevere Cyclonic Snots sustained Bangladesh. Bed/damaged aranges from 27t‐wide consequconomic cost e

Satellite Image

13. District-W

rce: DMIC/DM

Damaged Crops (Acres) Full 

Damag

Crop

(Acres

Partia

3,095  5,491

36,620  52,66

0  15,59

7,960  22,02

235  234 3,146  6,036

350  8,633

127  1,373

14,262  83,73

  55,10

2,045  1,205

67,840  252,09

 

la (2009)

, also known acyclone seasoned extensive dStorm Aila forwinds; 974 mb

Based on officiabout 610,000 h70 million USDuence data froestimates are li

  

e and Meteor

(Sour

Wide Consequ

MB Situation R

ged s s) al 

Damaged Households 

Full 

1  3,691 60  3,920 92  368 23  28,667 

673 6  58,721 3  810 3  3,499 36  34,061 07  2,705 5  105,767 90  242,882 

as Severe Cycln (e.g., see Figuamage in Indimed from an abar central preial reports fromhouseholds, anD (Munich Reom Situation Risted in Table 

rological Hist

rce: Wikipedia

uence Data fo

Report issued

Damaged Households  

Partial 

Number of 

Deaths 

52,910  4 19,658   6,726  11 80,351  18 1,638  1 54,313  57 2,488  7 5,912  24 70,695  8 24,380  1 50,631  59 369,702  190 

Final Repo

lonic Storm Aiure 15). A mo

ia and Bangladarea of low pressure) on Ma

m DMIC/DMB

nd resulted in) to 1,149 milli

Reports (issued14.

tory of 2009 T

a)

or 2009 Tropic

d MON-20-AP

Number of Missing People 

Affect

Road

(Km

  1,03

  373

  692

  1,63

  178

  999

  37

  140

  135

  926

  279

  6,42

ort on Capacity BuFinance in Ban

SF13-

ila), was a tropderate tropicadesh, particularessure on Ma

ay 25 as it mad

B, the storm afn 190 lives lost ion USD (the Md by DMIC/DM

Tropical Cyclo

cal Cyclone A

PR-2009:1200

ted ds m) 

Affected Embankments 

(km) 

3  85 3  78 2  25 5  219 8  38 9  597 

1 0  63 5  301 6  33 9  292 27  1,733 

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

pical cyclone al cyclone (peaarly due to floay 22 and reachde landfall on tffected about 4in BangladeshMOFDM repoMB) is listed i

one Aila

Aila

0)

Affected Institution / Infrastructure 

Num

o

Inju

Peo

632 262 274  12

659  20

42  10

587  54

20  6

64  25

26  61

252 465  5,3

3,283  7,1

er Risk A-8144)

43 051215

ak ooding hed the 4.8 h. orted in 

 

mber of red ople 

21 01 0 43 6 55 10 

57 03 

Page 45: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

Figure 16

 

 

  

6. Tropical Cy

Table

yclone Aila A

14. Sector-W

(Sourc

Are

Cluster houRecon

Construct

Reconstru

Restor

Funding supRestoration

 

Areas Affected

ide Conseque

ce: the MOFD

eas of Assistance 

uses for landless pstruction of housetion of cyclone sheuction of embankm

ration of livelihoodport for displacedn of water supply s

Total

d with Surface

ence Data for

DM reported i

Esti

(millio

people

es

elter

ment

d

 peoplesystem

Final Repo

e Water as of

r 2009 Tropic

n EHCO, 200

mated Coston 2009 USD)  P

435

381

200

62

56

12

3

1,149

ort on Capacity BuFinance in Ban

SF13-

f May 27th, 20

cal Cyclone A

09)

Percent 

37.9%

33.2%

17.4%

5.4%

4.9%

1.0%

0.3%

100.0%

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

009 (Source: W

Aila

er Risk A-8144)

44 051215

 

WFP)

Page 46: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

3.1.3.7

Cyclone B

during the

depression

Banglades

October 10

on the Ban

about 134,

Banglades

in Table 15

F

 

District 

Bhola Chittagon

Cox's BazaFeni 

Lakshmipu

Noakhali

Total 

 

  

Tropical C

OB 01 (IMD d

e 2012 North In

n (peak streng

sh, causing ext

0, reached its p

ngladesh coast

,000 people, de

sh. District‐wid

5. 

Figure 17. Sat

Table 15

(Source:

Number of 

Affected Upazilla 

Num

Affe

Pe

2  66

g  4  16

ar  2 1 

ur  1  1

i  5  50

15  133

Cyclone BO

designation: BO

ndian Ocean c

gth of Tropical

tensive damag

peak intensity

t on October 1

estroyed/dam

de consequenc

tellite Image a

. District-Wid

DMIC/CDMP/

mber of ected ople 

Damaged Crops 

(Acres) Full 

,687  272 ,785         

16   ,200  18,000 3,688  18,272 

 

OB 01 (201

OB 01, also kn

cyclone season

 Depression C

ge. Deep Depr

y (30 knots sus

1. Based on of

aged about 24

ce data from S

  

and Meteorol

(Sour

de Consequen

/MDMR Situat

Damaged Crops (Acres) Partial 

Damage

Househo

Full 

667  3,015

            

18,020  5,035

18,687  8,050

2)

nown as Deep 

n (e.g., see Figu

Category), it br

ession BOB 01

tained winds;

fficial reports f

4,500 househol

Situation Repo

ogical Histor

rce: Wikipedia

nce Data for 2

tion Report is

ed lds 

Damaged Households  

Partial 

Nu

De

8,468 3,357 

   

4,505 16,330 

Final Repo

Depression BO

ure 17). Altho

rought high w

1 formed from

 1002 mbar ce

from DMIC/D

lds, and result

orts (issued by

ry of 2012 Tro

a)

2012 Tropical

ssued MON-2

umber of eaths 

Number of 

Missing People 

Affe

Ro

(K

12  9  7

4   2  42       

18  21 36  72  7

ort on Capacity BuFinance in Ban

SF13-

OB 01), was a 

ough it was a w

winds and heav

m an area of low

entral pressure

DMB/MDMR, t

ted in 108 live

y DMIC/CDMP

opical Cyclon

l Cyclone BO

22-OCT-2012:

ected oads Km) 

Affected Embankments 

(km) 

75                  

75   

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

tropical cyclo

weak tropical 

vy rains to mu

w pressure on

e) as made lan

the storm affe

es lost in 

P/MDMR) is li

ne BOB 01

OB 01

1450)

Affected Institution / Infrastructure 

Numb

of Injure

Peop

103  43

  9

     9

  1

151  121

254  183

er Risk A-8144)

45 051215

one 

uch of 

ndfall 

ected 

isted 

 

ber 

ed le 

  

Page 47: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

3.1.3.8

Cyclone M

during the

strength o

flooding. C

intensity (

as it made

affected ab

Banglades

(Aon Benf

listed in T

Fi

 

Distric

Bargun

Bhola

Chittago

Jhaloka

Lakshmi

Noakh

Patuakh

Pirojpu

Satkhi

Tota

  

Tropical C

Mahasen (JTWC

e 2013 North In

f Tropical Stor

Cyclonic Storm

45 knots susta

e landfall on th

bout 1.3 millio

sh. The econom

field, 2013). Th

able 16.    

igure 18. Sate

Table 16.

(Sour

ct 

Number of 

Affected Upazilla 

Num

Aff

Pe

na  6  51

a  7  51

ong  4  54

ati  4  64

pur  4  9

ali  5  35

hali  8  70

ur  7  60

ra  2  1

l  47  1,3

Cyclone Ma

C designation

ndian Ocean c

rm Category),

m Mahasen for

ained winds; 9

he Bangladesh

on people, dest

mic losses to cr

he District‐wid

ellite Image a

District-Wide

rce: CDMP/MD

mber of fected eople 

Damaged Crops (Acres) Full 

18,690  44,395 14,366  9,965 4,295   4,460   9,890   5,127  250 0,409   0,000   1,000   28,237  54,610 

 

ahasen (20

n: 01B, also kno

cyclone season

 it caused dam

rmed from an 

989 mbar centr

h coast on May

troyed/damag

rops and fishe

de consequenc

  

and Meteorolo

(Sour

e Consequen

DMR Cyclone

Damaged Crops (Acres) Partial 

Damaged Households

Full 

30,468  6,856 37,619  4,957 

  50 2,929  55 

  120 1,400  1,710 

  7,540   448    

72,416  21,736 

013)

own as Cyclon

n (e.g., see Figu

mage in Bangla

area of low p

ral pressure) o

y 16. Based on 

ged about 136,

eries were repo

ce data from Si

ogical History

rce: Wikipedia

ce Data for 2

e Mahasen Up

s Damaged Households  

Partial 

Num

of

Deat

61,812  7

19,389  4

2,005  2

1,934 359 4,968 18,238  3

5,641  1

50 114,396  17

Final Repo

nic Storm Viya

ure 18). A fair

adesh and My

ressure on Ma

on May 11 and

official report

,000 household

orted at 200 m

ituation Repor

y of 2013 Tro

a)

013 Tropical

pdate Issue 1

mber f ths 

Number of 

Missing People 

Affect

Road

(Km

7    1,27

4    122

2     248

   150

3   1   

 7    1,79

ort on Capacity BuFinance in Ban

SF13-

aru), was a tro

rly weak tropic

yanmar, partic

ay 9. Mahasen

d maintained a

ts from CDMP

ds, and resulte

million USD by

rts (issued by 

pical Cyclone

Cyclone Mah

May 20, 2013

ted ds m) 

Affected Embankments 

(km) 

70  179 2  419 

 8  8 

19 0  1 

  1 

90  627 

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

opical cyclone 

cal cyclone (pe

cularly due to 

n reached its p

a similar inten

P, the storm 

ed in 17 lives l

y the governm

CDMP/MDM

e Mahasen

hasen

3)

Affected Institution / Infrastructure 

Number

of Injured People

1,416  1,679

900  87       3   73   

         

2,392  1,766

er Risk A-8144)

46 051215

eak 

eak 

sity 

lost in 

ment 

MR) is 

Page 48: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

3.2 Flo

Flooding i

and Augu

flash flood

May and S

floods cau

caused by 

exacerbate

meters of m

Brahmapu

Flooding i

cyclones, t

catchment

Banglades

floodwate

indicates a

important 

associated

This sectio

addition, a

this section

discussed 

3.2.1 H

The percen

years since

Statisticall

distributio

flood was 

necessarily

catchment

although f

area (e.g., 

of the coun

  

ood

in Bangladesh

st. While mos

ds caused by o

September to N

used by riverin

storm surges 

ed as Banglade

mean sea leve

utra (Jamuna), 

in Bangladesh

tropical depre

ts, a low flood

sh, and polder

r outside prot

a damaging flo

because norm

d with low agri

on provides an

a consequence

n. A selection 

in further det

Historical F

nt of the total 

e 1954 from th

ly, about 20% 

on in inter‐ann

68% in 1998, a

y the total area

t flows, the loc

flooding risk i

see Figure 19 

ntry may be af

is an annual p

t of the countr

overflowing of

November), (b

ne flooding of 

(e.g., refer DM

esh is a low‐ly

el) and most of

and Meghna 

is the result o

ssions, monso

plain gradient

s (low‐lying tr

tected areas (A

ood, while bor

mal flooding is

icultural prod

n overview an

e database of h

of notable and

ail. 

Flood Infor

area of Bangla

he Bangladesh 

of the country

nual variability

and the smalle

a inundated b

cation and tim

s greatest on t

illustrating th

ffected, as not

 

phenomenon, 

ry is flood pro

f hilly rivers in

b) floods cause

major rivers (t

MB, 2010; Ahm

ying, riverine c

f the country i

Rivers. 

of several facto

oonal depressi

t, congested d

racts of land e

Ahmed and Mi

sha indicates n

s common in B

duction. 

d summary of

historical flood

d recent flood 

mation

adesh affected

Water Develo

y is affected by

y of flood affec

est reported ar

y flood waters

ming of floodin

the coast and a

he general floo

ted in the 1988

with the most

one, four gener

n the eastern a

ed by heavy ra

typically durin

mad et al., 1994

country (e.g., a

s on a delta pl

ors, including 

ons, or other s

rainage chann

nclosed by em

irza, 2000). A d

normal floodin

Bangladesh, an

f the collection

ds has been de

events that ha

d annually by f

opment Board

y floods on ave

cted areas. Sin

rea was 0.2% i

s. Depending 

ng can vary fro

around the Ga

d risk in Bang

8 and 1998 floo

Final Repo

t severe occur

ral types of flo

and northern r

ain and draina

ng June to Sep

4; Ahmad et al

about 50% of t

lain at the con

heavy rainfall

storms), large 

nels, convergen

mbankments) t

distinction of 

ng (Brammer, 

nd a comparat

n of historical 

eveloped and i

ave significant

floods, shown

d (BWDB Annu

erage per year

nce 1954, the la

in 1994. Note t

on rainfall var

om one part of

anges‐Brahma

gladesh). Durin

ods.

ort on Capacity BuFinance in Ban

SF13-

rring during th

ooding occur i

regions (typica

age congestion

ptember), and 

l., 2000). The s

the country is 

nfluence of the

l (either from m

inflow of wat

nce of major r

that increase th

flood is made

1999). This di

tively low floo

hazard data fo

is summarized

tly impacted B

n in Table 17, is

ual Flood Rep

r, although the

argest reporte

that area affec

riability within

f the country t

putra‐Meghna

ng catastrophi

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

he months of J

in Bangladesh

ally during Ap

n, (c) monsoon

(d) coastal flo

situation is 

within seven

e Ganges (Padm

monsoons, tro

ter from upstre

rivers inside 

he intensity of

e in Bengali: bo

istinction is 

od year is typic

or floods. In 

d and discusse

Bangladesh ar

s available for

port, 2014). 

ere is high 

d area affected

ted is not 

n the country 

to another, 

a (GBM) catch

ic floods, over

 

er Risk A-8144)

47 051215

July 

: (a) 

pril to 

oods 

ma), 

opical 

eam 

onna 

cally 

ed in 

re also 

r most 

d by 

and 

hment 

r half 

Page 49: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

  

Table 17. Yearly Floo

 

od Affected A

Year

1954

1955

1956

1957

1958

1959

1960

1961

1962

1963

1964

1965

1966

1967

1968

1969

1970

1971

1972

1973

1974

1975

1976

1977

1978

1979

1980

1981

1982

1983

1984

1985

1986

1987

1988

1989

1990

1991

1992

1993

1994

1995

1996

1997

1998

1999

2000

2001

2002

2003

2004

2005

2006

2007

2008

2009

2010

2011

2012

2013

Area in Bangl

Flood Affected A

(km2) (%

36,800 25

50,500 34

35,400 24

N/A N/A

N/A N/A

N/A N/A

28,400 19

28,800 20

37,200 25

43,100 29

31,000 21

28,400 19

33,400 23

25,700 17

37,200 25

41,400 28

42,400 29

36,300 25

20,800 14

29,800 20

52,600 36

16,600 11

28,300 19

12,500 8

10,800 7

N/A N/A

33,000 22

N/A N/A

3,140 2

11,100 7.5

28,200 19

11,400 8

6,600 4

57,300 39

89,970 61

6,100 4

3,500 2.4

28,600 19

2,000 1.4

28,742 20

419 0.2

32,000 22

35,800 24

N/A N/A

100,250 68

32,000 22

35,700 24

4,000 2.8

15,000 10

21,500 14

55,000 38

17,850 12

16,175 11

62,300 42

33,655 23

28,593 19

26,530 18

29,800 20

17,700 12

15,650 10.

Final Repo

adesh (Sourc

Area

%)

5

4

4

A

A

A

9

0

5

9

1

9

3

7

5

8

9

5

4

0

6

1

9

A

2

A

5

9

9

1

4

9

4

0

2

2

4

A

8

2

4

8

0

4

8

2

1

2

3

9

8

0

2

.6

ort on Capacity BuFinance in Ban

SF13-

ce: BWDB, 20

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

014)

er Risk A-8144)

48 051215

Page 50: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

 

 

  

Figure 19. Flood Prone

 

e Areas in Ba

angladesh (So

Final Repo

ource: BARC

ort on Capacity BuFinance in Ban

SF13-

C/UNDP/FAO,

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

 

2000)

er Risk A-8144)

49 051215

Page 51: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

3.2.2 F

Disaster co

historical f

and intern

reported fl

database d

Banglades

1. A

is

2. C

A

D

(C

3. C

pr

4. D

5. D

O

6. D

“S

7. EM

Ep

8. G

9. M

(M

10. M

11. R

pa

12. W

Pr

13. W

re

Table 18 p

contains in

damaged, 

people), an

as reported

  

Flood Cons

onsequence da

flood events o

national. This d

lood events (e

discussed prev

sh. Data was co

AHMED: “Banssued by the BCDMP: “ConsoAction Plan”, aDisaster Manag

CDMP) CDP: “Rapid Arogramme IndDDM: Data/repDFO: The GlobObservatory (DDMIC: Data anSituation RepoMDAT: The Epidemiology oGOB: Data/repMAJUMDER: “Majumder, 201MDMR: Data/rRAHMAN: “Flaper authoredWB2004: “2004 rogram” reporWORLDBANK

esearch workin

presents the ye

nformation for

typically the l

nd economic l

d by the differ

sequence

atabases of flo

occurring in Ba

data was assem

e.g., those not c

viously) which

ollected and p

ngladesh Clima

angladesh Coolidated Dama

n executive sugement with th

Assessment of Fdependent Revports from thebal Active ArchDFO) nd reports fromorts” Emergency Evof Disasters (Corts from the “The Economi

13) reports  from tlood Managem

d by engineersFloods in Banrt on the 2004 K: “Climate Prng paper issue

ear‐by‐year sum

r major floods

largest reporte

loss (generally

rent sources ar

 

oods in Bangla

angladesh has

mbled into a d

caused by trop

h have had a s

processed from

ate Change Immprehensive Dage and loss Aummary reporhe assistance o

Flood 2004” coview of Banglae Bangladesh Dhive of Large F

m the Disaster

ents DatabaseCRED) Government oics of Early Re

the Bangladeshment in the Flo in the Banglangladesh ‐ Damfloods by the roofing Infrasted by the Wor

mmary of the 

 spanning from

ed value is list

y the financial 

re listed. Note

adesh are limit

 been collected

database and r

pical cyclones;

ignificant repo

m a large varie

mpacts and VuDisaster Mana

Assessment, Lert Disaster Man

of Comprehen

onducted by tadesh’s DevelDepartment ofFlood Events m

r Management

e (EMDAT), m

of Bangladeshesponse and R

h Ministry of Dood Plain of Baadesh Water Dmage and Nee

World Bank aructure in Banrld Bank 

consequence 

m 1954 to 2013

ted. For people

impact for all 

e that the value

Final Repo

ted. As such, c

d from a large

represents a co

; refer to the tr

orted impact o

ety of sources, 

ulnerability” (Aagement Progessons Learnt nagement Burnsive Disaster 

the Centre for lopment (IRBDf Disaster Man

maintained by

t Information C

maintained by t

h Resilience: Ban

Disaster Mana

angladesh” (RDevelopment Beds Assessmen

and the Asian ngladesh” (Wo

database of m

3. For dwellin

e affected, life

sectors), the m

es are not tren

ort on Capacity BuFinance in Ban

SF13-

consequence d

e variety of sou

omprehensive

ropical cyclon

on population

including: 

Ahmed, 2006),gramme from the Flooreau Ministry Management 

Policy DialogD), August 12,nagement y the Dartmou

Centre of Ban

the Centre for

ngladesh Coun

agement and RRahman et al., Board nt and ProposeDevelopment

orld Bank, 201

major flood eve

ngs destroyed a

e loss (deaths p

minimum and

nded and corre

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

data from majo

urces, both loc

 inventory of 

ne consequence

n and assets in 

, a synthesis re

d 2007 and Fuof Food and Programme 

gue (CPD) und 2004 

uth Flood 

ngladesh, inclu

 Research on t

ntry Study” 

Relief 2007)  a resear

ed Recovery t Bank  10), a policy 

ents. The table

and dwellings

plus missing 

d maximum va

espond to yea

er Risk A-8144)

50 051215

or 

cal 

eport 

uture 

der the 

uding 

the 

rch 

alues 

r‐of 

Page 52: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

estimates. 

events are

Table 19 p

These pref

The data e

between th

general, Ba

more of th

year GDP,

The strongrisk due toBanglades

affected ardue to flooestimated year, due tfloods of 1over 60% odetails on 

  

In general, th

 missing conse

presents a sum

ferred loss esti

extracted from

he reported lo

angladesh is s

he country is a

, to account fo

g correlation bo flooding to Bsh as reported rea, the linear oding. For exathat Bangladeto floods. In th1987, 1988, 199of Bangladeshthese floods, a

ere are severa

equence inform

mmary of prefe

imates are sele

m Table 20 is pl

osses due to flo

shown to expe

ffected by floo

r the relative e

between the loBangladesh. Taby the Nation

trend derivedample, a countesh is expectedhe recent deca98, and 2004. Th and causing mas well as the r

 

al data gaps in 

mation. 

erred economic

ected based on

lotted in Figur

ooding (norma

erience the ons

oding. Note th

economic imp

sses due to floable 20 lists thnal Water Man

d in Figure 20 ctry‐wide EP cud to incur 1.5%ades, BangladeThe floods of 1more than 8%recent 2004 an

available floo

c loss estimate

n a review of t

re 20 and a tre

alized by GDP

set of significan

hat the losses d

pact of events o

ood affected arhe approximate

nagement Plancan be used tourve can be inf% GDP (2.2 billesh has experie1988 and 1998  GDP in lossesnd 2007 floods

Final Repo

od consequenc

es extracted fr

the reported v

end is noted: th

P) and the repo

ant losses due t

due to flood ar

over the years

rea can be usee return perion Project (NWM

o infer the appferred as showlion in 2014 Uenced several were particulas (e.g., over 12s, are presente

ort on Capacity BuFinance in Ban

SF13-

ce records, and

om the conseq

values and rep

here is a high 

orted percent 

to floods when

re normalized

s. 

ed to infer the d of flood affeMP, 2000). Givproximate retuwn in Figure 2USD) in losses, devastating flarly catastroph2 billion in 201d in the next s

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

d many known

quence databa

porting agencie

correlation 

of flooded are

n about 17% o

d by the curren

overall economected area for ven the flood urn period of lo1. Overall, it ison average peloods, includinhic, each affec14 USD). More

section.

er Risk A-8144)

51 051215

ase. 

es. 

ea. In 

or 

nt‐

mic 

osses s er ng the cting e 

Page 53: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

 

Year  Dwellings Destroyed  So

1954 1955 1956 1962 1963 1964 1966 1968 1970 1971 1972 1973 1974 1976 1977 1978 1980 1982 1983 1984 1985 1986  196,803  MD

1987 1988  1,151,189  MD

1989  3,203  MD

1990  14,101  MD

1991  306,522  MD

1992 1993  234,393  MD

1994  19,177  MD

1995  898,708  MD

1996  218,275  MD

1997  113,252  MD

1998  984,002  MD

1999 2000  437,050  MD

2001 2002  115,511  MD

2003  109,147  MD

2004  969,161  MD

2005 2006 2007  65,522  MD

2008  11,488  DM

2009 2010 2011  41,594  DM

2012  88,070  D

2013 

 

urce  Dwellings Damaged  Source

DMR  279,212  MDMR

DMR  2,536,408  MDMR

DMR  16,096  MDMR

DMR  58,418  MDMR

DMR  492,452  MDMR

DMR  615,336  MDMR

DMR  31,005  MDMR

DMR  2,014,017  MDMR

DMR  598,818  MDMR

DMR  241,147  MDMR

DMR  2,456,795  MDMR

138,076  MDMR

DMR  309,775  MDMR

DMR  564,527  MDMR

DMR  541,988  MDMR

DMR  3,602,009  MDMR

DMR  919,575  MDMR

MIC  75,565  DMIC

MIC  142,027  DMIC

DM  272,792  DDM 

  

Table 1

e  People Affected Min  Sourc

1,000,000  EMDA

500,000  EMDA

15,889,616  EMDA

10,000,000  EMDA

30,000,000  AHME

4,000,000  EMDA

213,650  EMDA

400,000  EMDA

10,000,000  EMDA

308,000  EMDA

7,160,000  EMDA

20,000,000  AHME

352,800  DFO

R  400,000  EMDA

24,823,376  MDM

R  44,670,060  MDM

R  620,000  DFO

R  1,383,360  MDM

R  2,990,000  EMDA

50,000  DFO

R  11,559,586  MDM

R  395,100  EMDA

R  23,651,000  DFO

R  5,828,319  EMDA

R  900,030  EMDA

R  31,048,653  MDM

R  495,420  EMDA

R  2,667,138  EMDA

251,200  DFO

R  6,020,000  DFO

R  3,520,000  DFO

R  36,000,000  WB20

1,150,000  EMDA

200,000  DFO

R  10,655,564  MDM

600,000  EMDA

500,000  EMDA

575,000  EMDA

1,570,559  EMDA

5,148,475  DDM

415,250  DDM

8. Consequence

ce  People Affected Max  Sou

AT  1,000,000  EMD

AT  500,000  EMD

AT  15,889,616  EMD

AT  10,000,000  EMD

ED  38,000,000  EMD

AT  4,000,000  EMD

AT  213,650  EMD

AT  400,000  EMD

AT  10,000,000  EMD

AT  308,000  EMD

AT  7,160,000  EMD

ED  30,000,000  EMD

O  500,000  EMD

AT  6,715,734  MD

MR  29,700,000  EMD

MR  47,000,000  AHM

O  1,848,389  MD

MR  2,327,777  DF

AT  8,992,759  MD

O  75,200  EMD

MR  15,751,613  EMD

AT  553,467  MD

O  26,197,182  MD

AT  8,106,988  MD

AT  5,008,868  MD

MR  55,000,000  AHM

AT  4,338,372  MD

AT  3,244,576  MD

O  700,000  EMD

O  7,608,837  MD

O  7,874,465  MD

04  40,955,375  MD

AT  1,220,000  DF

O  211,775  EMD

MR  13,851,380  EMD

AT  975,096  DM

AT  500,000  EMD

AT  1,240,000  DF

AT  1,853,000  DM

M  5,398,475  EMD

M  415,250  DD

Database of Floo

urce Life Lost Min 

Source 

112  AHMED 129  AHMED 

117  AHMED 30  EMDAT 

DAT DAT  39  EMDAT DAT  126  AHMED DAT  87  AHMED 

120  AHMED 50  EMDAT 427  EMDAT 

DAT  1,987  AHMED DAT  168  EMDAT DAT  13  EMDAT DAT  17  EMDAT DAT  655  EMDAT DAT DAT  245  EMDAT DAT  553  AHMED DAT  24  DFO MR  30  EMDAT DAT  1,470  MDMR MED  1,621  MDMR MR  23  MDMR FO  41  MDMR MR  97  MDMR DAT  2  DFO DAT  162  MDMR MR  10  MDMR MR  246  MDMR MR  55  EMDAT MR  125  MDMR MED  918  MDMR MR  15  MDMR MR  37  MDMR DAT  9  EMDAT MR  26  MDMR MR  104  MDMR MR  765  MDMR FO  55  EMDAT DAT  105  DFO DAT  594  MDMR MIC  28  EMDAT DAT  6  DFO FO  15  EMDAT MIC  10  EMDAT DAT  13  DDM DM 

Final Report on CaFinanc

ods in Banglades

Life Lost Max 

Source Econ L

Min

(in Mill

112  AHMED  1,20

129  AHMED  1,29

900

117  AHMED  560

30  EMDAT  580

5

39  EMDAT  1

221  EMDAT  199

87  AHMED  1,10

120  AHMED 50  EMDAT 427  EMDAT 1,987  AHMED  579

168  EMDAT 13  EMDAT 17  EMDAT 655  EMDAT  150

245  EMDAT 1,200  EMDAT  4,50

34  EMDAT 57  MDMR 

2,280  EMDAT  1,00

2,440  EMDAT  1,137

203  DFO 231  EMDAT  6

1,039  DFO  150

17  EMDAT 220  DFO 116  EMDAT 822  DFO  200

76  MDMR  10

140  DFO  229

2,709  DFO  2,12

196  EMDAT 81  DFO  500

19  DFO 161  DFO 252  EMDAT 910  DFO  1,86

60  DFO 105  DFO 1,230  EMDAT  1,066

28  EMDAT 16  EMDAT 119  DFO 53  DFO 139  EMDAT 

apacity Building for Disce in Bangladesh (ADB

SF13-1049 FINAL R

sh

Loss in lions) 

Currency  Source

00   BDT  AHMED

90   BDT  AHMED

0   BDT  AHMED

0   BDT  AHMED

0   BDT  AHMED

   USD  EMDAT

   USD  EMDAT

9.4   USD  EMDAT

00   BDT  AHMED

9.2   USD  EMDAT

0   USD  EMDAT

00   BDT  AHMED

00   USD  DFO 7.1   USD  GOB 

   USD  EMDAT

0   USD  EMDAT

0.3   USD  DFO 0   USD  EMDAT

9   USD  EMDAT

28   USD  WORLDBA

0   USD  EMDAT

60   USD  CDP 

6.7   USD  GOB 

saster Risk B TA-8144)

52 REP 051215

Econ Loss Max 

(in Millions) Currenc

D  1,200   BDTD  1,290   BDTD  900   BDTD  560   BDTD  580   BDTT  5   USDT  1   USDT  1,160   BDTD  1,100   BDT

T  936   USD

T  150   USD

D  4,500   BDT

35,000   BDT100,000   BDT

T  6.2   USDT  150   USD

375.3   USDT  15   USDT  229   USDANK  4,300   USD

T  500   USD

2,280   USD

1,100   USD

cy  Source 

AHMED AHMED AHMED AHMED AHMED EMDAT EMDAT AHMED AHMED 

WORLDBANK 

EMDAT 

AHMED 

AHMED AHMED 

DFO EMDAT 

EMDAT DFO 

EMDAT EMDAT 

EMDAT 

WB2004 

WORLDBANK 

Page 54: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

 

Figure

                  5 GDP value6 Percent aff

  

Tabl

Year Perce

Count

Affect

1962  25.0

1963  29.0

1964  21.0

1966  23.0

1968  25.0

1970  29.0

1974  36.0

1980  22.0

1984  19.0

1987  39.0

1988  61.0

1991  19.0

1995  22.0

1996  24.0

1998  68.0

2000  24.0

2004  38.0

2007  21.5

e 20. Normaliz

                        es are obtained frected for the mai

0%

1%

2%

3%

4%

5%

6%

7%

8%

9%

10%

Reported

 Loss

 Norm

alized

 by

 GDP

le 19. Flood C

ent try ted 

Econo

Los

(in Mill

0  560

0  580

0  5.0

0  1.0

0  1,160

0  1,100

0  579

0  150

0  4,500

0  35,00

0  2,13

0  150

0  375

0  15.

0  4,300

0  500

0  2,280

56  1,06

zed Reported

                   rom the World Bin flood is obtain

y = 0.194x ‐ 0R² = 0.93

0%

Repor

Linea

 

Consequence

omic ss lions) 

Curren

0.0  BDT

0.0  BDT

0  USD

0  USD

0.0  BDT

0.0  BDT

9.2  USD

0.0  USD

0.0  BDT

00.0  BDT

7.0  USD

0.0  USD

5.3  USD

0  USD

0.0  USD

0.0  USD

0.0  USD

6.7  USD

Floods Loss

ank Databank ned from the CDM

0.032

31

20%

Percent of B

rted

r Fit

e Database –

ncy  Source

AHMED

AHMED

EMDAT

EMDAT

AHMED

AHMED

EMDAT

EMDAT

AHMED

AHMED

EMDAT

EMDAT

EMDAT

DFO

EMDAT

EMDAT

WB2004

  GOB 

ses Versus Pe

MP 

40%

Bangladesh Aff

Final Repo

Preferred Lo

GDP5 (current Million USD) 5,081

5,319

5,386

6,440

7,484

8,993

12,459

18,115

19,670

23,781

25,639

30,957

37,940

40,666

44,092

47,125

56,561

68,415 

ercent of Ban

60%

fected by Flood

ort on Capacity BuFinance in Ban

SF13-

ss Estimates

GDP (current Million BDT) 24,391 25,533 25,853 30,911 35,922 43,165 99,674 280,777 489,787 727,711 799,929 1,105,181 1,525,178 1,663,240 2,001,766 2,370,855 3,329,731 4,724,769 

ngladesh Affe

% 8

ds

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

s

Loss Normalized by GDP 

2.30% 2.27% 0.02% 0.00% 3.23% 2.55% 4.65% 0.83% 0.92% 4.81% 8.34% 0.48% 0.99% 0.04% 9.75% 1.06% 4.03% 1.56% 

ected by Floo

80%

er Risk A-8144)

53 051215

ods

Page 55: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

 

 

 

 

 

                  7 2014 GPD e

  

Tab

Retur

(y

Annua

Figure

                        estimated at 147,

0%

2%

4%

6%

8%

10%

12%

Estim

ated

 Loss

 Norm

alized

 by

 GDP

ble 20. Floode

rn Period years) 

Are

(So

2 5 10 20 50 100

500

al Average 

e 21. Countryw

                   ,349 million USD

AAL 2

 

ed area of Ba

ea Affected by Floource: NWMP, 200

20%

30%

37%

43%

52%

60%

70%

wide Exceeda

2 5

Mean R

angladesh for

od 00) 

Los

Normalized

0.68

2.62

3.98

5.14

6.89

8.44

10.38

1.5%

ance Probabi

10 20

eturn Period (

Final Repo

r different ret

ss d by GDP  (cur

8%

2%

8%

4%

9%

4%

8%

%

ility Curve of

50 100

(Years)

ort on Capacity BuFinance in Ban

SF13-

turn periods

Loss rrent million USD)

1,002 3,861 5,862 7,577 10,149 12,436 15,295 2,210 

Floods Loss

0

2

4

6

8

1

1

1

1

0 500

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

 

ses

0

2

4

6

8

10

12

14

16

Estim

ated

 Loss

 (Billion

 USD)

er Risk A-8144)

54 051215

Page 56: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

3.2.3 S

3.2.3.1

The 1988 f

Banglades

country ag

other cities

(Banglape

population

(EMDAT)

1.424 billio

(Ahmed, 2

(UNDP/GO

 

  

Significant

The 1988 F

floods in Bang

sh (see Figure 

ggravated the 

s (such as Sera

dia, 2014). Acc

n). The official

. Reported eco

on USD (Worl

2006). The perc

OB, 1988) is sh

Figure 22

and Recen

Floods

gladesh, which

22). Heavy rai

flood. Eighty‐

ajganj, Gopalg

cording to the

l death toll wa

onomic loss es

d Bank, 2010),

centage of sec

hown in Table

2. Flood Affec

 

nt Flood Ev

h occurred mai

infall together

‐five percent o

ganj, Tangail, R

e MDMR, over

as 1,621 people

timates (in 198

, 2.137 billion U

tor losses from

e 21; note that 

cted Areas fr

vents

inly in August

r with very hig

of Dhaka city w

Ranjbari and F

r 44 million pe

e (MDMR) wh

88 values) ran

USD (EMDAT

m the rehabilit

residential los

rom the 1988

Final Repo

t and Septemb

gh flows of all

was inundated

Faridpurko) w

eople were affe

hile others rep

nge from 1.137

T), to 100 billio

tation and reco

sses are not inc

Floods (Sour

ort on Capacity BuFinance in Ban

SF13-

ber, affected ab

l the three maj

d by the Burig

were under 5 to

ected (about 4

port are as high

7 billion USD (

on BDT (3.151 

onstruction pr

cluded in the 

 

rce: Banglape

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

bout 60% of 

or rivers of th

ganga River, an

o 10 feet of wa

43% of the cou

h as 2,440 peop

(UNDP/GOB, 

 billion USD) 

rogram 

assessment. 

edia)

er Risk A-8144)

55 051215

he 

nd 

ater 

untry 

ple 

1988), 

Page 57: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

3.2.3.2

The 1998 f

100 years. 

Figure 23)

estimated 

Hobiganj, 

Pabna, Raj

occurred f

Lingering 

danger‐lev

from the s

high tides,

flood of 19

In total, of

dwellings 

loss estima

USD) (Ahm

shown in T

 

  

Tab

The 1998 F

floods are rega

In total, 53 of 

; about 50% of

to be up to th

Jamalpur, Kh

jbari, Rajshahi

from about Jul

intensive rain

vel flows of th

ynchronizatio

, and the La N

998. (Climate P

fficial (MDMR

damaged, 31 

ates (in 1998 v

med, 2006), 3.4

Table 22. 

Table 22. S

ble 21. 1988 F

(Source:

Infrastruc

Floods

arded as the lo

the 64 district

f the country w

ree meters. In 

hagrachari, Ku

i, Rangpur, Sh

ly to mid‐Sept

n throughout B

he three major 

on of the peak 

Niña situation h

Proofing Infra

R) impact estim

million people

values) range f

4 billion USD 

Sector-Wise 1

Infrastruc

 

Floods Rehab

UNDP/GOB,

Sector

Residentia

cture (Roads, RailwIndustria

Crop

Non‐Crop Agric

ongest‐lasting 

ts of Banglade

was under wa

particular, Co

rigram, Lalmo

herpur, Sirajan

tember and the

Bangladesh du

rivers (Gange

flow of the th

have been ide

structure in B

mates for the y

e affected (24%

from 2.128 bill

(DFO), to 4.3 b

1998 Flood Da

Sector

Residentia

cture (Roads, RailwIndustria

Crop

Non‐Crop Agric

bilitation and

1988; Benso

al

ways, Institutions)l

culture

and most dev

sh were affect

ter for up to 6

omilla, Chittag

onirhat, Manik

ngj and Tangai

e situation rea

uring July to A

es, Brahmaputr

ree major rive

ntified as the m

angladesh, 20

year were abou

% of the popul

ion USD (Wor

billion USD (E

amages (Sou

al

ways, Institutions)l

culture

Final Repo

Reconstructi

on and Clay, 2

Percent of ToN/A

) 65.4

19.8

10.2

4.6

vastating flood

ted by floods o

67 days, and de

gong, Cox s Ba

kganj, Mymen

il districts wer

ached a critical

August, simult

ra, and Meghn

ers between Se

major contribu

10) 

ut one million 

lation), and 91

rld Bank, 2010

EMDAT). The 

urce: Climate

Percent of To20.4

) 18.2

12.0

42.8

6.6

ort on Capacity BuFinance in Ban

SF13-

ion Program

2002)

otal

d Bangladesh h

of differing m

epth of inund

azar, Faridpur

nsingh, Natore

re severely aff

l peak in early

taneous and co

na), backwate

eptember 7 an

uting factors t

dwellings des

18 lives lost. R

0), 120 billion B

percentage of

Change Cell

otal

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

has experience

agnitude (e.g.

ation was 

r, Feni, Gaiban

e, Nilphamari,

fected. Floodin

y September. 

onstant above

r effects result

d September 9

to the devastat

stroyed, 2.5 m

Reported econo

BDT (2.59 billi

f sector losses 

, 2009)

er Risk A-8144)

56 051215

ed in 

, see 

ndha, 

ng 

ting 

9 and 

ting 

million 

omic 

ion 

is 

Page 58: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

3.2.3.3

The 2004 f

Banglades

reached in

affected by

torrential r

Banglades

areas and 

In total, of

dwellings 

loss estima

(World Ba

shown in T

  

(Source:

The 2004 F

floods in Bang

sh in April from

n late July. In t

y the main floo

rain and high 

sh, but also flo

some of the m

fficial (MDMR

damaged, 41 

ates (in 2004 v

ank, 2004), to 2

Table 23. 

Figure 23.

Right Image

Floods

gladesh comme

m monsoonal 

otal, 39 out of 

ods (e.g., see F

winds over a 

ooding in areas

most productiv

R) impacts for t

million people

values) range f

200 billion BDT

 

. Flood Affect

– BARC; Lef

enced in early

rains. The hig

64 districts an

Figure 24). In m

six‐day period

s not normally

ve agricultural

the year were 

e affected (29%

from 1.86 billio

T (3.36 billion 

ted Areas fro

ft Image – Inte

y July followin

ghest water lev

nd 36 million p

mid‐Septembe

d, bringing ren

y flooded by th

 land. (Disaste

about one mil

% of the popul

on USD (CDP 

USD) (Ahmed

Final Repo

om the 1998 F

ernational Vo

ng early floodin

vels and wides

people (25% o

er, a localized 

newed floodin

he rivers, inclu

er and Emerge

llion dwelling

lation) and 76

– as of Augus

d, 2006). The p

ort on Capacity BuFinance in Ban

SF13-

Floods

oluntary Serv

ng in the north

st extent of the

of the total pop

depression ca

ng to many pa

uding Dhaka a

ency Response

gs destroyed, 3

5 lives lost. Re

st 4, 2004), 2.28

percentage of s

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

vices)

hwest districts

e flood was 

pulation) were

aused continuo

arts of Central 

and other urba

e, 2004) 

3.6 million 

eported econo

8 billion USD 

sector losses is

er Risk A-8144)

57 051215

s of 

ous 

an 

omic 

Page 59: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

3.2.3.4

The 2007 f

initially af

following 

39 districts

  

Figure 24.

(So

Inf

The 2007 F

floods in Bang

ffected Nilpha

days, Rangpu

s were inunda

2004 Flood I

Table

ource: CPD-IR

Se

Resi

rastructure (RoadsInd

C

Non‐Crop

Floods

gladesh came i

amari, Lalmon

ur, Gaibandha,

ated up until a

 

ntensity Base

e 23. Sector-W

RBD Rapid As

ector 

idential

s, Railways, Institudustrial

Crop p Agriculture

n two main w

irhat, Kurigra

, Bogra, and Si

about August 6

ed on Water L

Wise 2004 Flo

ssessment of

Percen

(CPD

3

utions) 3

4

2

3

waves. The first

m, Sherpur, Ja

irajgonj distric

6th. The second

Final Repo

Level (Source

ood Damages

f Flood and W

nt of TotalD‐IRBD) 

Pe

(Wo

32.5

37.2

4.7

22.2

3.4

t wave comme

amalpur, Sylh

ct were also flo

d wave comm

ort on Capacity BuFinance in Ban

SF13-

e: CPD-IRBD,

s

World Bank)

ercent of Total orld Bank, 2004) 

20.4

35.4

15.6

28.6 

enced around 

het, and Sunam

ooded, and su

menced on Sept

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

, 2004)

the 24th of Jul

mgonj districts

ubsequently up

tember 5th and

er Risk A-8144)

58 051215

y and 

s. In 

p to 

Page 60: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

continued

total of 46 

affected ab

In total, of

dwellings 

billion USD

percentage

  

 up until the 1

districts were

bout 32,000 km

fficial (MDMR

damaged, 10.

D (GOB, 2007)

e of sector loss

Ta

(Sourc

15th of Septemb

e affected to va

m2 of Banglade

R) impacts for t

7 million peop

), although it i

ses is shown in

ble 24. Secto

S

Food anH

Infra

Ed

F

ce: Left Imag

 

ber when som

arying degrees

esh. (GOB, 200

the year were 

ple affected an

is unclear if th

n Table 24. 

or-Wise 2007

Sector 

nd AgricultureHealth

astructure

ducation

Total

igure 25. 200

e – DMIC/CDM

me new district

s during both 

07) 

about 66 thou

nd 594 lives los

hese estimates 

Flood Damag

Damage Cost(million BDT) 

45,296

516

25,178

1,544

72,535

7 Flood Affec

MP, 2007; Rig

Final Repo

ts apart from t

flood waves (

usand dwellin

st. Economic l

include losses

ges (Source:

Percent of Tot

62.4%

0.7%

34.7%

2.1%

100%

cted Areas

ght Image – U

ort on Capacity BuFinance in Ban

SF13-

the previous 3

(e.g., see Figur

gs destroyed, 

losses are estim

s to the residen

GOB, 2007)

tal 

UNOSAT, 200

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

9 were floode

re 25). The floo

920 thousand

mated at 1.07 

ntial sector; th

 

07)

er Risk A-8144)

59 051215

d. A 

od 

he 

Page 61: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

3.3 Ea

Devastatin

Banglades

makers tha

of earthqu

Banglades

system (Ba

supervisio

vulnerable

that a mod

of life and

as the 2013

The impac

shaking, li

reported t

geography

ground sh

2006 Bang

east) the se

Dhaka as a

the Wester

seismic ris

                  8 On 24 Apri

Banglade

  

arthquake

ng tropical cyc

sh in recent de

at earthquake 

uake hazard in

sh is surround

anglapedia, 20

on, and lack of

e to earthquak

derate to sever

 property. In t

3 Savar buildin

ct of earthquak

iquefaction, fir

o cause boat c

y, the main ha

haking hazard 

gladesh Nation

eismic hazard

a Seismic Zon

rn United Stat

sk than Dhaka

                        il 2013, an eight‐sh. The search fo

clones and floo

ecades. This ha

is not a major

n Bangladesh h

ed by regions 

014). Inadequa

f enforcement 

kes (Ahmed et 

re earthquake 

the recent past

ng collapse8, m

kes in Banglad

re following e

capsize and dr

zard from ear

in Bangladesh

nal Building C

 is considered

e 3 (out of 4), w

tes and Japan. 

a. 

                   story commercia

or the dead ended

 

ods occur freq

as created a fee

r hazard for Ba

has been relati

of high seism

ate detailed de

of building co

al., 2012). In p

in any of the m

t, some buildin

mainly due to 

desh can lead t

arthquake, gro

owning death

thquakes is gr

h while Figure

ode. In genera

d to be high. Fo

which is on pa

Other major c

al building collapd on 13 May with

quently in Ban

eling of false s

angladesh (Ch

ively neglected

micity with num

esign drawing

odes and regul

particular, ther

major cities of

ngs have colla

poor design a

to many hazar

ound subsiden

hs), and landsl

round shaking

e 27 shows the

al, for many p

or example, th

ar with well‐k

cities such as S

psed in Savar, a sh a death toll of 

Final Repo

ngladesh, but n

security amon

houdhury, 199

d (Benson and

merous active 

gs, poor quality

lations have m

re is a growin

f Bangladesh m

apsed in Dhak

and constructio

rds, including

nce, tsunamis,

lides. Primarily

g.  Figure 26 ill

e seismic zonin

arts of Bangla

he 1997 Unifor

known seismic

Sylhet and Ch

sub‐district in the1,129. (The Guar

ort on Capacity BuFinance in Ban

SF13-

no major earth

ng the public a

93). Furthermo

d Clay, 2002). N

faults, includi

y of constructi

made areas in B

ng apprehensio

may result in a

ka city under g

on practices.  

g but not limite

, seiches (whic

y due to its low

lustrates the g

ng map of Ban

adesh (in parti

rm Building C

cally active loc

ittagong have

e Greater Dhakardian, 2013) 

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

hquake has aff

and some decis

ore, the assessm

Nevertheless, 

ing the Dauki 

ion, lack of pro

Bangladesh 

on in the coun

a devastating l

gravity loads, s

ed to ground 

ch have been 

w‐lying deltai

general earthq

ngladesh from

cular the north

ode (UBC) rat

cations in part

e even a higher

a Area, the capita

er Risk A-8144)

60 051215

fected 

sion 

ment 

Fault 

oper 

ntry 

loss 

such 

ic 

uake 

m the 

h and 

tes 

s of 

al of 

Page 62: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

  

Fig

Figure 27. S

gure 26. Seism

  

Seismic Zoni

 

mic Hazard in

ng Map from

n Bangladesh

the 2006 Ban

Final Repo

h (Source: GS

ngladesh Nat

ort on Capacity BuFinance in Ban

SF13-

SHAP, ASC)

 

tional Buildin

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

g Code

er Risk A-8144)

61 051215

Page 63: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

3.3.1 H

Publically catalogs  ahistorical homogene

catalog for

1. Th

2. Th

3. Th

4. Th

5. Th

6. Th

20

7. Th

8. Th

A

Due to ovewere  consCatalogue

the Unitedagencies  (historically

established

The  existiconsistent

catalogs, tmagnitude

the originDue to lacor Muk – uoriginal mreported in

Note that from  the vfrom agenselected  foSimilarly, 

  

Historical E

available  hisare  neither  coearthquake  ceous catalog for Bangladesh a

he ISC‐GEM Ghe USGS PAGhe EHB Bullethe Internationhe ISC‐GEM Ghe Szeliga et 009 he ISC‐GEM Ghe  India  Eart

Authority (NDM

erlaps betwee

sidered  for  the) include datad  States Geolo(such  as  the y, Bangladeshd in 1954. 

ing  catalogs  w. The most obhe magnitude

e (Mw). Magni

al  catalogs we

ck of data, othunspecified) wmagnitude unitn the desired M

the ISC Bulletvarious  contrincies reportingor  each  eventhe “preferred

Earthquake

storical  earthqomprehensive atalogs were or the entire reare the followi

Global InstrumGER‐CAT cataltin, which covnal Seismologi

Global Histori

al.  (2010) Cat

Global Histori

thquake  CataMA), which co

n the ISC Bullhe  ISC  Bulletina from severalogical  SurveyIndia  Meteor

h has had only

were  not  origbvious  inconsie values assignitude units of ere  convertedher magnitude

were taken as ts in the full hMw unit. 

tin generally ributing agencig Mw and  thost.  The  originad” parameters

 

e Informati

quake  catalognor  fully  conuniformly  pregion. The dating: 

mental Earthqulog which covers the periodcal Centre (ISCcal Earthquakalog of Felt E

cal Earthquakalogue  from  tovers the perio

letin and othern. Note  that l agencies, incly  (USGS),  the rological  Depy one official s

ginally  compil

istency  is  the ned to each evmb (body wav

d  to Mw usinge units (ML ‐ loa one‐to‐one chistorical catalo

reports more ties  that make

se from more al  authors  of s available in 

on

gs  specific  tonsistent with rocessed  and ta sources con

uake Cataloguvers the periodd from 1960 – 2C) Bulletin, wh

ke Catalogue, wEarthquakes  in

ke Archive, wh

the  Governmod from 2474 B

r catalogs, onlsome  of  theseluding the Na

Global Centrpartment  andseismic observ

led  using  thedifference  in 

vent were convve magnitude)

g  empirical gloocal magnitud

conversion  to og. Over 60% 

than one magn

e up  its databprominent agthe  magnitu

the PAGER‐C

Final Repo

Bangladesh one  another. merged  to  o

nsidered for th

ue, which coved 1900 – 20082008 hich covers thwhich covers tn  India, which

hich covers theent  of  India BC – 2008 AD

ly the years froe  catalogs  (e.gational Earthquroid‐Moment‐Tthe  Geologic

vatory, which 

e  same  procedmagnitude scverted to a com) and Ms (surfaobal  relationshde, mB ‐ broadMw. Table 25of the events 

nitude value fase. A more agencies (such ude  value  areCAT database 

ort on Capacity BuFinance in Ban

SF13-

are  limited,  a  To  alleviate obtain  a  relatihe developmen

ers the period 

he period fromthe period 100h covers  the p

e period 1000 –National  Dis

om 1904 to 19g.,  the  ISC  Bu

quake Informa

Tensor  (CMT

cal  Survey  ofis located in C

dures  and  thcale. Before mmmon scale, iace wave mag

hips derived d‐band body‐w5  illustrates  thin the final ca

for each eventappropriate vas  the Globale  indicted  in were selected

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

and  existing these  issues,ively  complet

nt of the earth

1900 – 2009 

m 1904 – 201400 – 1903 period  from 1

– 1903 saster  Manage

960 and 2009 toulletin  and Ntion Center (N

T)  Project,  andf  India).  Note

Chittagong an

hus  are  not  eqmerging  the exin this case mo

gnitude) reporby Scordilis  (wave magnitu

he disaggregatatalog are orig

t in its catalogvalue,  such as l CMT Projectthe  final  datd. For the Szel

er Risk A-8144)

62 051215

global   eight te  and hquake 

762  to 

ement 

o 2014 NDMA NEIC), d  local e  that nd was 

qually xisting oment rted in (2006). ude, M tion of ginally 

g, each those 

t), was tabase. liga et 

Page 64: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

al.  (2010) Furthermo

During thePAGER‐CGlobal Hi

GEM Glob

The  final converted selected foparameter

before the 

The  final mainshock

several  dedependen

Figure 28 s≥ 4.0 that occurred  iestimated largest  ins1950. Coinbeen cause

  

Catalog,  theore, only even

Table 25. D

OriUnit

4.0

4.5

5.0

5.5

6.0

6.5

>

T

e merging of tAT catalog,  fostorical Earthbal Historical E

catalog was mmagnitude M

or inclusion inrs for any giveground motio

merged  catalks  and  fore/ae‐clustering  mt on the input 

shows the epioccurred fromin 825 AD neaMw 8.8 earthqstrumented evncidently, this ed by a non‐su

e  parameters ts with a repo

isaggregation

iginal t Value

M

0-4.5 4

5-5.0 3

0-5.5 13

5-6.0 22

0-6.5 11

5-7.0 1

> 7.0 0

Total 54

the original caollowed by  thquake CatalogEarthquake A

manually  corrMw 4.0 or grean the final histoen event in theon instrument

log  is  de‐clustftershocks.  Thmethodologies

parameters an

centers of the m 825 to 2013. ar  the presentquake that occvent  in  the  finevent is regarubduction eve

 

considered rted magnitud

n of Original

mB M

0 1

0 7

0 0

0 0

0 0

0 0

2 0

2 8

atalogs, the highe EHB Bulletigue,  followed

rchive, and fo

rected  for  duter and epicenorical catalog. e historical cattation period. 

tered  using  thhis  de‐clusteris  are  availablend assumption

5,181 reportedThe oldest ev

t‐day city of Gcurred on Aprnal catalog  is  trded by the Uent. 

are  based  onde value were 

Magnitude U

L MUK Ms

0 1

0 0

0 0

0 25

0 6

1 9

0 5

8 1 46

ghest priority win,  followed bd by  the Szeligollowed by the

plicate  eventsnters within  laIn general, sotalog, especiall

he methodolo

ing  approache  (such  as  Rns selected.  

d earthquakesvent in the daGuwahati,  Indril 2, 1762 nearthe Mw 8.6 As

USGS as the lar

Final Repo

n  the  “Minim

 considered. 

nits in the Fu

mb M

682 1,

679 7

444 2

31 2

1 1

0 3

0 3

1,837 3,

was given to tby  the  ISC Buga  et al.  (2010e NDMA India

s  and  obviousatitude 16.5 toome level of unly for events p

ogy  of Gardnh  is  used mai

Reasenberg,  19

s in the historiatabase is an edia. The  largesr the present‐dssam earthqurgest known i

ort on Capacity BuFinance in Ban

SF13-

mum  Deviati

ull Historical C

Mw Total

,878 2,566

749 1,438

223 680

204 282

113 131

34 45

32 39

233 5,181

the GEM catalulletin,  followe

0) Catalog,  foa Earthquake C

s  errors. Onlyo 31 and  longncertainty is toprior to the 19

ner &  Knopoffinly  for  illustr985)  and  the 

ical earthquakestimated Mw st event  in  theday city of Sittake  that occuinstrumented 

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

ion”  methodo

Catalog

log, followed bed by  the  ISCollowed by  theCatalogue. 

y  earthquakesgitude 84 to 96o be expected 900s which occ

f  (1974)  to  idrative  purposoutcome  is  h

ke database wi

8.0 earthquake  final catalogtwe, Myanma

urred on Auguearthquake to

er Risk A-8144)

63 051215

ology. 

by the C‐GEM e  ISC‐

s with 6.5 are in the curred 

dentify ses,  as highly 

ith Mw 

ke that g  is an ar. The ust 15, o have 

Page 65: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

  

Figure 28. Thhe Historical E

 

Earthquake D

Database Dev

Final Repo

veloped for th

ort on Capacity BuFinance in Ban

SF13-

he Banglades

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

h Region

er Risk A-8144)

64 051215

 

Page 66: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

The  final Instrumen

catalog, 962,925 are fcatalog is afor events 

Figure 2

Table 26 licounts of e100 years, reported wBanglades

records, thBanglades

and 1‐in‐2

 

  

historical  eantal Earthquak68 are from thefrom the NDM

approximately

of magnitude

29. Cumulativ

ists the numbe

events 50 km w1913 to 2013).within 50 km osh borders is phere is about ash borders; for, respectively.

arthquake  catake Catalog,  16e ISC Bulletin,

MA catalog. Coy complete froe 6.0 or greater

ve Number of

(Mw) Great

er of earthquakwithin Bangla Over the last of Bangladesh provided in Figa 1‐in‐50 chancr an Mw 6.0 or  

 

 

alog  includes6  are  from  the, 1,087 are fromompleteness tiom about 1960r (e.g., see Figu

Events in the

ter than 5.0 (le

kes (both main

adesh borders 100 years, a toborders. A mgure 30. In sumce per year thagreater and an

s  5,181  eventse GEM Histor

m the EHB catime in the cata0 for events of ure 29). 

 

e Final Histor

eft image) an

nshocks and to(both during total of 79 earthagnitude recummary, basedat an Mw 7.0 orn Mw 5.0 or gre

Final Repo

s,  of  which rical Catalogutalog, 26 are fralog varies formagnitude 5.

rical Earthqua

nd 6.0 (right im

otal events) inthe entire repohquake eventsurrence plot ofd on 100 years r greater eventeater event, th

ort on Capacity BuFinance in Ban

SF13-

101  are  fromue,  58  are  fromrom the Szeligr different reg0 or greater, a

ake Database

mage).

n the entire catorted history as with Mw 5.0 of mainshock evof instrument

t will occur 50he annual chan

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

m  the  GEM  Gm  the PAGERga et al. catalogions. In generand from abou

e with Magnit

talog, includinand within theor greater wer

vents 50 km wted historical 0 km within nce is about 1‐

er Risk A-8144)

65 051215

Global R‐CAT g, and ral, the ut 1830 

 

tude

ng e last re within 

‐in‐9 

Page 67: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

Figure 30

  

Table 26

Mw

4.0-4

4.5-5

5.0-5

5.5-6

6.0-6

6.5-7

7.0-7

7.5-8

≥8.0

Tota

. Magnitude R

0.0

0.

Cumulative

 Rate

 (Per A

nnum)

6. Number of

w Total

Mainshoc

4.5 284

5.0 320

5.5 295

6.0 149

6.5 58

7.0 30

7.5 19

8.0 7

0 9

al 1,171

Recurrence P

1

1

1

4.5 5

 

Reported Eve

Catalog

ck Total

2,566

1438

680

282

131

45

22

8

9

5,181

Plot of Report

Bangl

5.0 5.5

ents in the Hi

Within 50 kmBanglades

Borders(Entire Reco

Mainshock

38

38

36

21

17

3

5

2

1

161

ted Mainshoc

adesh Borde

6.0

Magnitude (

Final Repo

istorical Earth

m of sh ord)

WitB

(1

Total Main

206 3

106 3

55 2

30 1

20

3

5

2

1

428 1

ck Events from

ers

6.5

(Mw)

ort on Capacity BuFinance in Ban

SF13-

hquake Datab

thin 50 km of Bangladesh

Borders 1913-2013)

shock Tota

32 198

35 101

29 44

15 23

9 9

1 1

2 2

0 0

0 0

23 378

m 1913 to 20

7.0

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

base

l

13 Within 50

7.5

er Risk A-8144)

66 051215

km of

Page 68: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

3.3.2 E

Disaster co

major hist

both local 

inventory 

population

including:

1. A

2. A

3. A

Te

4. A

50

5. B

6. C

Ba

7. D

M

8. EM

Ep

9. EX

10. G

R

11. M

fo

12. N

13. N

Ea

14. PA

15. R

an

re

em

16. R

Em

17. SU

M

  

Earthquake

onsequence da

orical earthqu

and internatio

of reported ea

n and assets in

 

ADRC: DisasteAKHTER: AkhALI: Ali, H. (19echnology TooAMBRASEYS: 06‐508 ANGLAPEDI

CHOUDHURY

angkok DMIC: The BanManagement anMDAT: The Epidemiology oXPO: the USGGLIDE: The GLeduction CentMARTIN: Mar

or 570 EarthquNEWS: News aNGDC: The Na

arthquake DatAGER: the USRELIEFWEB: Tnd non‐governeports, press remergencies wo

RSOE: Hungar

mergency andULTANA: Su

Mitigation in Ba

e Conseque

atabases of ear

uake events oc

onal. This data

arthquakes eve

n Bangladesh. 

er information hter, S.H. (2010998) “Earthquaols for Natura

Ambraseys N

IA: The nationY: Choudhury,

ngladesh Disand Relief Emergency Evof Disasters (CGS EXPO‐CATLobal IDEntifiter (ADRC) rtin, S. and Szeuakes in India articles, such aational Geophtabase and GloSGS PAGER‐CThe online infonmental organeleases, appeaorldwide rian National Ad Disaster Infoltana, S., Rahmangladesh” AR

 

ence

rthquakes in B

curring in Ban

a was assembl

ents (includin

Data was coll

reports issued0) “Earthquakeake Database aal Disaster RiskN. (2004) “Thre

nal encycloped, J.R. (1993) “S

ster Managem

ents DatabaseCRED) T earthquake cer (GLIDE) nu

eliga, W. (2010from 1636 to 2as those issuedysical Data Ceobal Historica

CAT earthquakormation reponizations, goveals, policy docu

Association oformation Serviman, U., and SRPN Journal o

Bangladesh are

ngladesh has b

led into a data

ng tsunami) wh

lected and pro

d by the Asianes of Dhaka” iand Seismic Zk Managemen

ee little known

dia of BangladSeismicity in B

ment Informati

e (EMDAT), m

atalog umber databas

0) “Electronic S2009” Bulletin d by Reuters, thenter / World Dal Tsunami Dake catalog sitory “ReliefWernments, reseuments, analy

Radio Distresice (EDIS) Saika, U. (2013of Earth Scienc

Final Repo

e limited. As s

been collected 

abase and repr

hich have had

ocessed from a

n Disaster Redin Environmen

oning of Bangnt, INCEDE Ren early earthqu

desh Bangladesh” In

ion Center (DM

maintained by t

se, maintained

Supplement ton of the Seismo

the AssociatedData Service (atabase 

Web,” which search institutioysis and maps 

ss‐Signalling a

3) “Earthquakeces, Vol. 2, No

ort on Capacity BuFinance in Ban

SF13-

such, consequ

from a large v

resents a comp

d a significant r

a large variety 

duction Centernt of Capital Dgladesh”, Inforeport 11, Februuakes in India

ncede Report 5

MIC), Ministry

the Centre for

d by the Asian

o a Catalog of ological Societyd Press, and lo(NGDC/WDS)

scans websites

ons and the mrelated to hum

and Infocomm

e, Cause Susceo. 2, June 2013 

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

ence data from

variety of sour

prehensive 

reported impa

of sources, 

r Dhaka rmation uary 1998, Bana” Current Sci.

5, February 19

y of Disaster 

 Research on t

n Disaster 

Felt Intensity y of America

cal agencies ) Significant 

s of internationmedia for news

manitarian 

munications (R

eptibility and R

er Risk A-8144)

67 051215

rces, 

act on 

ngkok ., 86, 

993, 

the 

Data 

nal s, 

RSOE) 

Risk 

Page 69: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

18. U

in

19. U

20. W

Table 27 p

contains in

correspond

discussed.

In summa

buildings 

consequen

significant

data gaps 

consequen

it is noted 

Furthermo

The earthq

in 1997, 19

detail in th

Year  Date 

1548  N/A 

1642  N/A 

1664  N/A 

1762  4/2 

1812  N/A 

1822  4/3 

1842  11/11 

1846  10/18 

1865  12/15 

1869  1/10 

1885  7/14 

                  9 Note that t

than 50; ““LIMITED

million (a

  

USGS: the USGnformation issuUTSU: The UtsWIKIPEDIA: R

presents the ev

nformation for

ding ID which

. Table 28 pres

ry, earthquake

damaged/dest

nce informatio

t events in the

in available ea

nce informatio

that many mo

ore, these num

quakes of 1762

999, and 2003 h

he next section

Latitude  Longitude  M

N/A  N/A  N

N/A  N/A  N

25  90  7

20  93.5  8

N/A  N/A  N

24.32  90.72  7

24  90  6

25.07  90.37  6

22.3  91.05  6

25.5  93  7

24.91  89.43  7

                        the raw datasets “ SOME” = 50 to 1D”  = less than 1 approximately re

GS Significant ued by the USsu Catalog of DReports and in

vent‐by‐event s

r 36 earthquak

h can be joined

sents a decada

e events in Ban

troyed, and ov

on is occasiona

 earthquake co

arthquake con

on. Also, these 

oderate earthq

mbers do not ac

2, 1897, and 19

have caused so

n. 

Table

Mw  Tsunami Building

Damaged/De

N/A     

N/A    FEW 

7.7     

8.8  Yes  VERY MA

N/A    FEW 

7.1     

6.7  Yes   

6.2    MANY

6.8    FEW 

7.3     

7.1     

                   occasionally give100; “ MANY” = million; “ MODE

lated to current U

 

Earthquakes oSGS Damaging Earnformation coll

summary of th

ke events span

d with the eve

al summary of 

ngladesh have

ver 89 million 

ally reported w

onsequence da

nsequence reco

numbers may

quakes in and 

ccount for tren

918 are noted a

ome damage, 

27. Earthqua

gs stroyed  Source  People

Injured

   

BANGLAPEDIA  

   

ANY  AKHTER   

AKHTER   

   

   

Y  AKHTER  SOME

AKHTER   

   

   

e qualitative des100 to 1,000;  anERATE” = 1 to 5 USD values). 

of the World d

rthquakes in thlected from W

he consequenc

nning from 154

nt parameters

the consequen

e reportedly re

USD in dama

with qualitativ

atabase are sh

ords, and man

y not reflect th

around Bangl

nding and cor

as particularly

albeit to a min

ake Conseque

SourceLife

LossSource 

     

     

     

  500 AKHTER 

     

     

     

AKHTER    

     

  0  BANGLAPEDIA

  56 MARTIN 

criptors of consed “VERY MANY

million;  “SEVER

Final Repo

database, as w

he World Wikipedia 

ce database of

48 to 2011. Mo

s in historical e

nce database.

esulted in abo

ages since 1900

ve descriptors)

hown in Figure

ny known larg

he accumulatio

ladesh do not 

rrespond to ye

y damaging ev

nor extent. Th

ence Databas

Damage  Source 

EXTREME  AKHTER 

SEVERE  BANGLAPEDIA

SEVERE  BANGLAPEDIA

EXTREME  WIKIPEDIA 

   

SEVERE  AKHTER 

LIMITED  NGDC 

MODERATE AKHTER 

LIMITED  UTSU 

A SEVERE  CHOUDHURY

SEVERE  AKHTER 

equence. Based oY” = over 1,000. SRE” 5 to 25 millio

ort on Capacity BuFinance in Ban

SF13-

well as reports, 

f earthquake e

ost of the even

earthquake da

out 129 lives lo

0 (note that the

). The epicente

e 31. In genera

ge events are m

on of effects of

have reported

ear‐of estimate

vents. More re

ese events are

se9

Sylhet and Chittagong wof the earthquake and

AMore severe damage oc

were cracked buA Considerable damag

A very destructive andBengal, Arakan, etc., mos

east coast of the Bay reported that no build

escaped either desThe earthquake proved jolted Dhaka violently a

and several Strong shaking felt in Dhawith severe damage rep

A major earthquake including Dhaka; the m

fr

Buildings were destroyMy

No seriousKnown as the Cachar Edamage occurred only i

Caused considerable dampossibly more severe

Myme

on NGDC definitSimilarly, for damon; and  “EXTRE

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

event posters

vents. The dat

nts have a 

atabase previo

ost, over 1,850 

ese are estima

ers of the most

al, there are se

missing 

f smaller even

d consequence

es. 

cently, earthqu

e discussed in

Notes 

were violently shaken; the ded the damage are not availabccurred in Sylhet district. Builut there was no loss of life. ge to settlements in Bangalad violent earthquake felt all ost severely in the north part of Bengal; in Chittagong it wdings or walls built of brick hstruction or serious damage.

violent in Sylhet; the earthqnd damaged a number of hobuildings at Tejgoan. aka and other parts of Banglorts coming in from Mymens

felt over most of Bangladeshmaximum damage was reporrom Pabna. yed in Muktagacha, Sherpur, ymensinghd. s damage occurred. arthquake; in Bangladesh, min the eastern parts of the Sydistrict. 

mage in Sirajganj‐Bogra regioe damage in Jarnalpur‐Sherpuensingh region. 

tions, “FEW” = lemage estimates EME” = more tha

er Risk A-8144)

68 051215

s, and 

tabase 

ously 

ates as 

veral 

nts as 

e data. 

uakes 

more 

etails ble. dings 

. over of the 

was had 

uake ouses 

adesh singh. h, rted 

and 

major ylhet 

on and ur‐

ess 

an 25 

Page 70: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

Year  Date 

1897  6/12 

1918  7/8 

1923  9/9 

1930  7/2 

1934  1/15 

1950  8/15 

1977  5/12 

1988  2/6 

1988  8/6 

1988  8/20 

1989  6/12 

1997  5/8 

1997  11/21 

1999  7/22 

2000  1/3 

2001  12/19 

2002  6/20 

2003  7/26 

2004  12/26 

2006  2/14 

2007  11/7 

2008  1/12 

2008  7/26 

2010  9/10 2011  9/18 

 

 

  

Latitude  Longitude  M

25.5  91  8

24.599  90.853  7

24.937  90.721  6

25.929  90.177  7

25.58  26.885  8

34.65  28.363  8

21.707  92.908  5

24.703  91.579  5

25.049  95.16  7

26.712  86.627  6

21.936  89.773  5

24.976  92.28  5

22.342  92.7  6

21.658  91.933  5

22.223  92.821  4

23.632  90.376  4

25.998  88.931  4

22.867  92.238  5

3.295  95.982  9

27.382  88.388  5

22.15  92.388  5

22.823  92.291  4

24.827  90.451  5

23.4743  90.6689  5

27.73  88.155  6

Mw  Tsunami Building

Damaged/De

8.0    VERY MA

7.2     

6.8     

7.1     

8.0     

8.6     

5.9     

5.8     

7.2     

6.9     

5.8     

5.9    SOME

6.1    FEW 

5.5    700 

4.8    100 

4.9    SOME

4.9    SOME

5.6    500 

9.0  Yes   

5.3     

5.5    FEW 

4.9    SOME

5.1     

5.1     6.9    FEW 

 

gs stroyed  Source  People

Injured

ANY  AKHTER   

  MANY

   

   

   

   

  SOME

  100

  30 

   

  100

E  USGS  SOME

WIKIPEDIA  200

NGDC  200

NGDC   

E  NGDC  100

E  NGDC  55 

NGDC  32 

   

  11 

RSOE  10 

E  NGDC   

  25 

   NEWS  1 

SourceLife

LossSource 

  560 BANGLAPEDIA

Y MARTIN 9  MARTIN 

  50 PAGER 

  1  MARTIN 

     

     

USGS     

NGDC  2  NGDC 

USGS     

  32 MARTIN 

UTSU  1  NGDC 

UTSU  0  UTSU 

NGDC  23 NGDC 

NGDC  6  EMDAT 

     

NGDC  0  UTSU 

NGDC  0  UTSU 

MARTIN 3  MARTIN 

  2  USGS 

MARTIN    

NGDC  0  UTSU 

     

USGS  0  UTSU 

     NEWS     

Final Repo

Damage  Source 

A EXTREME  CHOUDHURY

MODERATE NGDC 

LIMITED  UTSU 

SEVERE  NGDC 

LIMITED  CHOUDHURY

LIMITED  CHOUDHURY

LIMITED  USGS 

MODERATE NGDC 

LIMITED  AKHTER 

LIMITED  MARTIN 

MODERATE NGDC 

LIMITED  UTSU 

MODERATE UTSU 

SEVERE  NGDC 

LIMITED  NGDC 

LIMITED  NGDC 

LIMITED  NGDC 

MODERATE NGDC 

   

LIMITED  USGS 

LIMITED  NGDC 

LIMITED  NGDC 

LIMITED  UTSU 

LIMITED  NGDC LIMITED  USGS 

ort on Capacity BuFinance in Ban

SF13-

Great Indian Earthquanorthern, central and

caused serious damage ain Sylhet town whe

Intense damage occurrebuildings i

The earthquake causedand was felt

Known as the Dhubri Eaonly in the eastern partwas killed at Bishalputhough serious at place

Lalmonirhat,

Known as the Bihar EartBihar, Nepal and Uttar P

of Bangladesh wKnown as the Assam Ethroughout Banglades

water bodies in Dhaka re

Slight damage and some

many buildings in Chnumerous people were 

Two people killed at leaS

The earthquake was wid

The earthquake was wiSeismic seiches were Bangladesh that capsizferry on the Jamuna RBangladesh killing two 

One person killed, at leain the B

Several people injurebuild

The 1997 Chittagong eaearthquake; 23 people building collapsed in H

damaged at AlikadNakhy

Six people killed, over 2damaged or destroye

damage

At least 100 home

At the Dhaka Central Jaistampede; a few older 

repor

Fifty people injured aThakurgaon and some b

A

Known as the Borkol earand nearly thirty‐two inarea of Chittagong Div

reported from Aimacha

and Rangamati while buChittagong, Cox“s BazSonadia; in ChittagonModunaghat Grid Sub

power supply; subsidenwas observ

Known as the Suma

generated devastatingcoasts of most landmass

Bangladesh, two childrecapsized in surging wav

B

In Bangladesh, 11 peopstampedes at Gaibandhin ponds and other wate

in Ten people injured in C

damage occurred aR

Some buildingsAt least 25 students a

injured, some seriouslyfloors of dSlight dam

Minor damage to 

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

Notes 

ake; produced severe damage

d eastern parts of Bangladesand collapse to masonry builre the death toll rose to 545d in Srimangal; caused dama

n Dhaka and Sylhet. d heavy damage at Mymensi

t all over Bangladesh. arthquake; caused major damts of Rangpur district; one per; damage was not widesprees such as Cooch Behar, Dhu, Nilphamari and Tura. thquake; caused great dama

Pradesh but did not affect anyith any degree of severity. Earthquake; the tremor was fsh but no damage was reportemained in a state of agitatioan hour. 

e injuries in southeast Banglaittagong developed cracks aninjured, some after jumping buildings. st 100 injured and damage inylhet area. dely felt in Bangladesh with mdamage. idely felt in much of Bangladreported from several parts zed numerous boats includiniver at Aricha near Manikgan

people and leaving nearly thmissing. 

ast 100 injured and minor daBanaripara area. ed and some damage to oldedings at Sylhet. rthquake, or the 1997 Bandawere killed when a 5‐storey amgerbagh, Chittagong; Houdam, Bandarban, Lama and yaungcharipara, 00 injured, and about 700 hod on Maheshkhali Island; some at Cox's Bazaar. es damaged at Maheshkhali.

il, 100 prisoners were injuredbuildings in old Dhaka city wrted damaged. at Rangpur, 5 people injured uildings damaged at RangpuAlmanagar. rthquake; three people were njured in the Barkhol‐Rangamvision, Bangladesh; damage wra, Barkhol, Boroharina, Lanuildings developed cracks a fzaar, Moheskhali, Kutubdia ang, a small fire occurred at thb‐station temporarily disruptce was reported and liquefaved near Kolabonia. tra Earthquake and Tsunami

g tsunamis that struck along ses bordering the Indian Oceen were killed after a tourist ves; minimal damage observeangladesh. ple were injured in quake‐relaha; seismic seiches were obseer bodies at Dinajpur and RanBangladesh. Chittagong Hill Tracts and mi

t Bandarban, Chittagong andRangamati. s damaged at Rangamati. at Dhaka Dhaka University wey, after jumping out of the updormitories in panic. age at Narayanganj. several buildings in Dhaka.

er Risk A-8144)

69 051215

e in h; ldings . age to 

ingh 

mage erson ead ubri, 

ge in y part 

felt ted; on for 

adesh; nd from 

n the 

minor 

esh. of 

ng a nj in hirty 

mage 

er 

arban RCC uses 

omes me 

d in a were 

at ur and 

killed mati was gadu far as and he ing ction 

i; the an; in boat ed in 

ated erved ngpur 

inor d 

ere pper 

Page 71: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

Figure

  

Table

Decade 

Pre‐1900s 1900s 1910s 1920s 1930s 1940s 1950s 1960s 1970s 1980s 1990s 2000s 2010s Total 

e 31. The Epi

28. Decadal

Number of Events 

E

D

12 0 1 1 2 0 1 0 1 4 3 9 2 36 

centers of So

 

Summary of

Estimated Dwellin

Damaged/Destroy

> 3,050

850

950

50

> 4,900

ome Significa

the Earthqua

ngs

yed Estimate

People Inju100

1,000

100

230

500

233

1

2164

ant Events in

Final Repo

ake Conseque

ed

ured Estimate

Life Loss1,116

9

50

1

35

29

5

1,245

the Earthqua

ort on Capacity BuFinance in Ban

SF13-

ence Databas

ed

s Estimated D

(million > 207

 5 1 26 

1  1 12 31 12 2 

> 298

 

ake Conseque

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

se

Damage USD) 7 

ence Databas

er Risk A-8144)

70 051215

se

Page 72: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

3.3.3 S

3.3.3.1

The 1762 Amoment mIntensity (triggered aliquefactio

had escapekilled. At Dboats. (NG

3.3.3.2

The 1897 A

an estimat

buildings 

tremor wa

Mymensin

damage w

Loss of life

suffered se

property w

 

  

Significant

The 1762 A

Arakan earthqmagnitude of 8MMI) scale. Ta local tsunamon effects suched either destrDhaka, rivers GDC, 2014; Ak

The 1897 A

Arakan Earthq

ted moment m

in Sylhet whe

as felt through

ngh, many pub

was reported fo

e was not high

evere ground 

was heavy and

and Recen

Arakan Ea

quake occurred8.8 and a maxi

The earthquakemi in the Bay oh as sand volcaruction or seriand water bod

khter, 2010) 

Arakan Ea

quake (also kn

magnitude of 8

re the death to

hout Bengal, fr

blic buildings 

or the bridges 

h, but the repo

shaking, espe

d in Tippera, m

 

nt Earthqu

rthquake

d along the noimum estimate

e was associatf Bengal. Chittanoes and grouious damage. Adies were agit

rthquake

nown as the Gr

8.0 (e.g., see Fig

oll rose to 545,

om the south 

were damage

on the Dhaka

orted loss of pr

cially on the e

masonry build

ake Events

orth‐eastern coed intensity ofed with major

tagong was saund fissures, aAt Bar Chara, tated due to se

reat India Eart

gure 32). The e

, mostly due to

Lushai Hills o

ed and very few

‐Mymensingh

roperty was es

eastern side, an

dings and old t

Final Repo

s

oast of the Bayf XI (extreme) r areas of bothaid to have “suand that no bujust north of Ceiches, resultin

thquake), occu

event caused s

o the collapse 

on the east to S

w two‐storied

h railway and 

stimated at fiv

nd 15 persons 

temples were 

ort on Capacity BuFinance in Ban

SF13-

y of Bengal wit

on the Modifi

h uplift and suuffered severeuildings or wa

Cox s Bazar, 2ng in deaths fr

urred in the Sh

serious damag

of masonry bu

Shahbad on th

d brick houses 

traffic was sus

ve million Rup

died. In Dhak

damaged. (Ba

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

th an estimate

ied Mercalli ubsidence and ely” with soil alls built of bri00 people wer

rom capsizing 

hillong Plateau

ge to masonry

uildings. The 

he west. In 

survived. Hea

spended for w

pees. Rajshahi 

ka, damage to 

anglapedia, 20

er Risk A-8144)

71 051215

ed 

ick re 

u with 

avy 

weeks. 

14) 

Page 73: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

Fi

3.3.3.3

The 1918 S

7.2 (e.g., se

and factor

as Sylhet, 

strong gro

destroyed

  

gure 32. Histo

The 1918 S

Srimangal Eart

ee Figure 33). 

ries and killed 

Moulavi Baza

ound shaking t

. (Sarker et al.,

oric ShakeMa

Srimangal

thquake occur

The event dam

at least two p

ar, Habiganj, B

that resulted in

, 2010) 

 

ap of the 1897

Earthquak

rred in the nor

maged or destr

eople (Sabri, 2

Brahmanbaria, 

n many house

7 Assam Eart

ke

rtheast region 

royed many b

2001). Structur

Kishoreganj,

es being displa

Final Repo

thquake (Sou

of Bangladesh

brick buildings

ral damage wa

and Agartala 

aced off their f

ort on Capacity BuFinance in Ban

SF13-

urce: Hough e

h with a mom

s, bridges, hos

as widespread

(India). Sylhe

foundations, d

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

 

et al., 2003)

ment magnitud

spitals, water t

d, extending as

t was subjecte

damaged, or 

er Risk A-8144)

72 051215

de of 

tanks, 

s far 

ed to 

Page 74: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

Sarker et a

parameter

that a futu

thousand 

hospitals, 

of seismic 

3.3.3.4

The 1997 C

Banglades

and 200 w

Banglades

 

  

al. (2010) perfo

rs of the 1918 S

ure repeat of th

deaths, more t

fire stations, o

design in the 

Figure 3

The 1997 C

Chittagong ear

sh‐India‐Myan

were injured wh

sh, more than 

ormed a comp

Srimangal Ear

he 1918 Sriman

than 25 thousa

ordinary build

city.  

33. Seismic In

Chittagong

rthquake, also

nmar border re

hen a five‐stor

100 km away 

 

rehensive eart

thquake as a s

ngal Earthqua

and injuries an

dings, and brid

ntensity Distr

(Sourc

g Earthqua

o known as the

egion with a m

ry reinforced c

(see Figure 34

thquake loss a

scenario event

ake would be c

nd a total econ

dges would su

ribution of the

ce: Sabri, 200

ake

e Bandarban e

moment magn

concrete frame

4) (Akhter, 201

Final Repo

assessment for

t. The results o

catastrophic, p

nomic loss of a

uffer significan

e 1918 Srima

01)

earthquake, oc

nitude of 6.1. T

e building coll

10; USGS, 2014

ort on Capacity BuFinance in Ban

SF13-

r the Sylhet Ci

of the loss asse

possibly result

about 220 mill

nt damage due

 

ngal Earthqu

ccurred on No

Twenty‐three p

lapsed in Chit

4; Al‐Hussaini

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

ity, considerin

essment indica

ting in over 21

lion USD. Scho

e to the genera

uake

vember 21, ne

people were ki

ttagong, 

i, 2011) 

er Risk A-8144)

73 051215

ng the 

ate 

ools, 

al lack 

ear the 

illed 

Page 75: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

Figur

3.3.3.5

A moment

According

destroyed 

3.3.3.6

A moment

upazila, R

homes we

Barkhol, B

Moheskha

temporaril

Szeliga, 20

  

re 34. Five-sto

The 1999 M

t magnitude 5

g to USGS repo

on Maheshkh

The 2003 B

t magnitude 5

angamati dist

re damaged in

Boroharina, La

ali, Kutubdia a

ly disrupting p

010; Ansary & 

ory Reinforce

Chittago

Maheshkh

5.5 earthquake

orts, six peopl

hali Island. Som

Borkol Ear

5.6 earthquake

rict (e.g., see F

n Chittagong a

angadu and Ra

and Sonadia. In

power supply

Sadek; 2006; N

 

ed Concrete F

ong Earthquak

ali Island E

 occurred in th

e were killed, 

me damage w

rthquake

 occurred on J

Figure 35). Thr

and the Chitta

angamati whil

n Chittagong,

y. Subsidence a

NGDC, 2014)

Frame Buildin

ke (Source: A

Earthquake

he southeast r

over 200 were

was also reporte

July 26 (UTC t

ree people wer

agong Hill Tra

le buildings de

 a small fire oc

and liquefactio

Final Repo

ng Collapse in

Al-Hussaini, 2

e

region of Bang

e injured, and 

ed at Cox’s Ba

time) near the

re killed, thirt

acts. Damage w

eveloped crack

ccurred at the

on was observ

ort on Capacity BuFinance in Ban

SF13-

n Chittagong

2011)

gladesh on July

 about 700 hom

azaar.  

Kolabunia un

ty‐two were in

was reported f

ks as far as Co

e Modunaghat

ved near Kolab

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

after the 199

y 22, 1999. 

mes damaged

nion of Barkal 

njured, and 500

from Aimacha

ox’s Bazaar, 

t Grid Sub‐stat

bonia. (Martin

er Risk A-8144)

74 051215

97

d or 

ara, 

tion 

n & 

Page 76: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

 

 

  

Figure 35. U

 

SGS ShakeM

Map of the 200

Final Repo

03 Borkol Ear

ort on Capacity BuFinance in Ban

SF13-

rthquake

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

 

er Risk A-8144)

75 051215

Page 77: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

 

 

  

Figure 36. Brick Mason

 

ry Damage in

(Source: A

n Kolabunia a

Al-Hussaini,

Final Repo

after the 2003

2011)

ort on Capacity BuFinance in Ban

SF13-

3 Borkol Earth

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

 

hquake

er Risk A-8144)

76 051215

Page 78: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

3.4 Se

In addition

to severe s

of severe n

early June

and lightn

circumstan

(DMB, 201

3.4.1 H

Overall, th

year (Yam

occurrence

and torren

newspape

which rep

During thi

Banglades

such a hig

for the mo

 

  

evere Storm

n to weather r

storms, which 

nor’westers us

. Nor’westers 

ning. The avera

nces the wind 

10) 

Historical S

he frequency o

mane et al., 201

e is generally w

ntial perceptio

er reports, Ono

resents an ave

is same time p

sh, which trans

gh death toll at

onth of April is

m

related hazard

are typically l

sually reaches 

are generally 

age wind spee

speed may ex

Severe Sto

of severe storm

0). The majori

well distribute

n, devastating

o (2001) claims

erage of 6.4 tor

period (1967 to

slates to about

ttributable to t

s the highest (3

 

ds such as trop

local thunders

a maximum in

associated wi

ed of a nor’we

xceed 100 km/h

rm Informa

ms in Banglade

ity of severe st

ed throughout

g tornadoes ca

s that Banglad

rnadoes per ye

o 1996), Ono d

t 179 deaths p

tornadic activi

36 percent of a

ical cyclones a

storms known

n April, but th

th squalls (str

ster is typicall

hr. The durati

ation

esh is high, wi

torms have be

t the country (

an spawn durin

desh experienc

ear. Figure 38

etermined the

er year. It is n

ity. Based on O

all activity). 

Final Repo

and floods, Ba

n as nor’wester

hey are known

ong winds), to

ly 40‐60 km/hr

ion of the storm

ith an average

een reported in

(e.g., see Figur

ng severe stor

ced 191 tornad

plots the regio

ere were 5,373 

noted that no o

Ono’s study, th

ort on Capacity BuFinance in Ban

SF13-

angladesh is fr

rs or kal‐baisha

n to occur from

orrential rain, 

r, but in excep

m is generally

e of over 150 ev

n central Bang

re 37). In addit

rms. Based on 

does between 1

onal reported 

 tornado death

other country i

he average nu

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

requently expo

akhi. The frequ

m late Februar

tornadoes, ha

ptional 

y less than an h

vents estimate

gladesh, althou

tion to high w

a review of 

1967 and 1996,

tornado frequ

hs reported in

in the world h

umber of torna

er Risk A-8144)

77 051215

osed 

uency 

ry to 

ail, 

hour. 

ed per 

ugh 

winds 

uency. 

has 

adoes 

Page 79: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

Figure 37

Figure 38

  

. Geographic

8. The Distrib

cal Distributio

an

ution of the A

betw

 

on of 2,324 Se

nd 2005 (Sour

Average Torn

een 1967 and

evere Local C

rce: Yamane e

nado Occurre

d 1996 (Sourc

Final Repo

Convective St

et al., 2010)

 

nce per 10,00

ce: Ono, 2001

ort on Capacity BuFinance in Ban

SF13-

 

torms in Bang

00 Square Mi

1)

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

gladesh from

les in Bangla

er Risk A-8144)

78 051215

m 1990

adesh

Page 80: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

3.4.2 S

Disaster co

major hist

both local 

reported s

population

including:

1. B

Fe

2. D

3. D

M

4. EM

Ep

5. FI

ht

6. G

7. O

8. PA

C

16

U

9. U

10. U

Since 1951

Of these, t

and 1989. 

tornado th

Banglades

thundersto

Banglades

population

damage is

of 50 milli

section.

  

Severe Stor

onsequence da

orical severe s

and internatio

severe storm ev

n and assets in

 

DRCS: Data aederation of RDER:  Data andDMIC: The BanManagement anMDAT: The Epidemiology oINCH: Finch Jttp://banglade

GOB: Data andOCHA: Data anAUL: Paul, B.K

Case for Introd69, Natural Ha

University of CUNDHA: Data UNDRO: Data 

1, at least twen

three events ha

The event in 1

hat occurred in

sh s history wi

orms accompa

sh, which affec

n relative to tr

 a tornado tha

on USD. More

rm Conseq

atabases of sev

storm events o

onal. This data

vents (includi

n Bangladesh. 

and reports froRed Cross and d reports fromngladesh Disand Relief Emergency Evof Disasters (CJ.D. and Dewa

eshtornadoes.o

d reports from nd reports fromK. and Bhuiyaucing Tornadoazards ResearcColorado at Bouand reports frand reports fr

nty severe stor

ave reportedly

1989, also know

n the Manikga

th around 1,30

anied by hailst

cted 750,000 pe

ropical cyclone

at struck Mada

e details on the

 

quence

vere storms in

occurring in Ba

a was assembl

ng tornadoes)

Data was coll

om the BanglaRed Crescent 

m the Disaster aster Managem

ents DatabaseCRED) an, A.M. (2004org/climo/btor

the Governmm the United an, R.H. (2004)o Forecasting ch and Appliculder rom the Uniterom the United

m events in B

y caused 1,000

wn as the Dau

anj District on 

00 lives lost. T

torm and rain 

eople. Most ev

es and floods. 

aripur and Far

e 1989 and the

n Bangladesh a

angladesh has

led into a data

) which have h

lected and pro

adesh Red CreSocieties (IFRand Emergenc

ment Informati

e (EMDAT), m

4) “Tornados inrcli0.htm 

ment of BangladNations Office)  The April 20and Warning cations Inform

d Nations Depd Nations Dis

angladesh hav

0 or more lives

ulatpur–Saturi

April 26 and i

The most sever

on 7 and 8 Jan

vents are very

The most seve

ridpur on Apr

e 2004 tornado

Final Repo

are limited. As

s been collecte

abase and repr

had a significa

ocessed from a

escent Society RC) cy Response (Dion Center (DM

maintained by t

n Bangladesh 

desh e for the Coor004 Tornado inSystems  Qui

mation Center, 

partment of Hsaster Relief O

ve resulted in 

s lost, includin

ia tornado, wa

is considered o

re event in term

nuary 1993 in 

y localized and

ere event in te

ril 1, 1977, with

o in Banglades

ort on Capacity BuFinance in Ban

SF13-

s such, conseq

ed from a large

resents an inve

ant reported im

a large variety 

(BDRCS) and 

DER) Group SMIC), Ministry

the Centre for

and East Indi

rdination of Hu

n North‐Centrick Response RInstitute of Be

Humanitarian AOrganisation 

100 or more re

ng the tornado

as an extremely

one of the dea

ms of people a

the northern r

d thus affect sm

erms of report

h a reported e

sh are presente

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

quence data fro

e variety of sou

entory of majo

mpact on 

of sources, 

the Internatio

Secretariat y of Disaster 

 Research on t

a”, 

umanitarian Aral BangladeshResearch Repoehavioral Scien

Affairs 

eported lives l

oes in 1964, 197

y destructive 

adliest tornado

affected was 

region of 

maller amount

ted economic 

stimated dam

ed in the next 

er Risk A-8144)

79 051215

om 

urces, 

or 

onal 

the 

Affairs h: A ort nce, 

lost. 

73, 

os in 

ts of 

mage 

Page 81: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

 

 

D

5/12

3/19

4/12

4/11

4/14

1/4

4/29

4/12

4/17

4/10

4/11

5/9

4/1

4/2

4/16

4/12

4/17

4/14

4/26

1/12

3/28

4/12

5/13

3/26

4/21

5/4

4/14

3/21

3/4

3/22

 

Date  Location 

2/1951  Faridpur 9/1961  Faridpur, Dhak2/1964  Narail, Jessore1/1968  Madaripur, Farid4/1969  Dhaka, Comill

/1972  Mymensingh

9/1972  Barishal 2/1973  Baliakandi, Farid7/1973  Manikganj 0/1974  Faridpur 1/1974  Bogra /1976  Dhamgarh (near D/1977  Madaripur, Farid/1977  Gopalganj, Farid6/1978  Mymensingh

2/1981  Feni 

7/1981  Kapundi, Erandi, DhRengalbeda 

4/1986  Gopalganj, Piroj6/1989  Manikganj, Dhaka, T

2/1993  Bogra, Noagaon, SunSylhet, Tangail, Jam

8/1994  Mymensingh, Chitt

2/1995  Chittagong, Mada

Munshiganj, Dhaka, Co3/1996  Tangail, Jamalp

6/1999  Panchagarh 1/2000  Netrokona, Rang/2003  Brahmanbaria, Nay4/2004  Mymensingh

1/2005  Gaibandha, Rang/2006  Bagerhat, Khul2/2013  Brahmanbaria, Naogao

  

Table

Buildings Damaged/Destroye

ka e dpur a  

dpur 

haka) dpur pur  

anbeni,  

pur Tangail amganj, 

malpur  10,000 

tagong ripur, ox's Bazar  3,500 

pur  36,420 

gpur yabadi   5,145 gpur na  1,070 on, Natore  8,845 

29. Notable Seve

ed  Source  Lives Lost 

200 210 1,400 141 923 200 300 200 1,000 

100 1 623 111 150 200 

  120 

100 1,300 

UNDHA  31 

40 

UNDHA  100 

GOB  700 2 20 23 

PAUL  111 79 

BDRCS  4 DMIC  38 

ere Storm Conse

Source  People Injured 

FINCH FINCH FINCH FINCH  1,045 FINCH  15,530 EMDAT FINCH FINCH FINCH 

FINCH EMDAT PAUL PAUL PAUL FINCH 

FINCH   EMDAT FINCH 

EMDAT   EMDAT 

UNDHA  1,600 

FINCH  37,248 EMDAT  60 EMDAT  300 EMDAT PAUL  1,500 EMDAT  1,500 EMDAT  549 DMIC  414 

Final Report on CaFinanc

quence Database

Source  People Affected 

EMDAT  15,093 EMDAT  160,000 

25,000 

50,000 

10,000 

   13,000 102,000 

  750,000 

UNDHA  51,500 

GOB  98,550 FINCH  100,000 OCHA  62,800 

400 PAUL  13,000 DER  40,000 

BDRCS  5,899 DMIC  35,930 

apacity Building for Disce in Bangladesh (ADB

SF13-1049 FINAL R

e

Source  Estimated Damage

(Million USD) 

0.25 EMDAT  1.5 EMDAT  8.329 EMDAT 

EMDAT 

0.201 EMDAT  50 

   EMDAT EMDAT  16.2 

EMDAT   2.5 

EMDAT   GOB 

EMDAT EMDAT EMDAT EMDAT DER 

EMDAT DMIC  20 

saster Risk B TA-8144)

80 REP 051215

Source  EMDAT DisNo 

1951‐0036 N/A 

EMDAT  1964‐0024 EMDAT  1968‐0040 EMDAT  1969‐0065 

1972‐0026 N/A 

1973‐0023 1973‐0125 

N/A N/A 

EMDAT  1976‐0133 EMDAT  1977‐0054 

N/A N/A N/A 

  N/A 

1986‐0050 EMDAT  1989‐0016 

  1993‐0001 

EMDAT  1994‐0087 

  1995‐0051 

1996‐0086 1999‐0115 2000‐0211 2003‐0211 2004‐0166 2005‐0130 2006‐0146 

EMDAT  2013‐0085 

Page 82: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

3.4.3 S

3.4.3.1

The Daula

Banglades

killed arou

the cities o

and eventu

uprooted a

destroyed

miles long

(Cerveny, 

3.4.3.2

On the eve

(Mymensi

and compl

formed aro

for about 2

tornado ha

discontinu

minutes at

tornado ex

 

  

Significant

The 1989 D

atpur–Saturia t

sh on April 26,

und 1,300 peop

of Daulatpur a

ually northeas

and almost ev

. The tornado 

g. Approximat

2005; Finch an

The April 2

ening of April

ingh and Netro

letely destroyi

ound 6:30 p.m

25 miles, and b

ad a speed of 

uously, in a sk

t any given loc

xperienced an 

and Recen

Daulatpur–

tornado was a

, 1989. There is

ple, which wo

and Saturia the

st and into Sat

very dwelling w

was estimated

tely 80,000 peo

nd Dewan, 200

2004 Torna

l 14, 2004, a de

okona) of Ban

ing 3,400 hom

m. near Haluag

broke up at 7:3

100 miles per 

ipping manne

cation. Based o

average loss o

 

nt Severe S

–Saturia To

an extremely d

s great uncerta

ould make it th

e most (includ

turia. Damage

within a six sq

d to be approx

ople were left h

04) 

ado in Nor

evastating torn

ngladesh, killin

mes. According

ghat Upazilla i

30 p.m. near N

hour with an 

er, over rural a

on survey dat

of 60,000 BDT

Storm Eve

ornado

destructive tor

ainty about th

he deadliest to

ding poor area

was extensive

quare kilomete

ximately one m

homeless by th

rth-Central

nado swept ov

ng at least 111 

g to the Meteor

in the Mymen

Netrokona Sad

average width

areas of north‐

a after the eve

(about 1,000 U

Final Repo

nts

rnado that occu

he death toll, b

ornado in glob

as and slums), 

e over the area

er area of the t

mile wide, and

he storm, and

Banglade

ver 38 villages 

people, seriou

rological Depa

nsingh district,

dar Upazilla in

h of about half

‐central Bangla

ent, responden

USD). (Paul an

ort on Capacity BuFinance in Ban

SF13-

urred in the M

but estimates in

bal history. The

moving east t

a, as countless

tornado’s path

d had a path th

d 12,000 people

esh

in two north‐

usly injuring m

artment in Dh

, moved in a so

n the Netrokon

f a mile. It trav

adesh, lasting

nt households 

nd Bhuiyan, 20

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

Manikganj Dist

ndicate that it

e tornado affe

through Daula

s trees were 

h was complet

hat was about 

e were injured

‐central distric

more than 1,50

haka, the torna

outheast direc

na district. Thi

veled 

g no more than

affected by th

004) 

er Risk A-8144)

81 051215

trict, 

ected 

atpur 

tely 

50 

d. 

cts 

00, 

ado 

ction 

is 

n five 

he 

Page 83: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

3.5 Ot

Other thanhazards. OTable 30 lireported e

Y

1

1

1

1

1

1

1

1

1

1

1

2

2

2

2

2

2

2

2

2

2

2

T

 

 

  

her Natura

n tropical cycloOf these, drougists the reporteeconomic cons

Table 30. Co

Year  Number oEvents 

1974  1 1979  1 1983  1 1989  1 1990 1991 1994 1995 1996 1997 1998 2000 2001 2002 2003 2005 2007 2008 2009  1 2010 2011 2012 Total  5 

al Perils

one, flood, earght, extreme teed consequencsequence from

onsequence D

Drought of  Lives 

Lost P

 Af

18  2

20,0

5,0

18  25,0

 

rthquake, andemperature, ace from these p

m EMDAT is no

Database of D

(Sou

eople

ffected Numb

Even

2,000 000,000

000,000 2

2

1

1

1

1

1

1

1

1

1

2

2

1

1

2

1

002,000 22

 severe storm,

nd landslides perils as reporot available fo

Drought, Extre

urce: EMDAT)

Extreme Tempera

ber ofnts 

Lives

Lost 

2 170

2 117

1 182

1 29

1 120

1 200

1 33

1 120

1 49

1 6

1 700

2 215

2 100

1 130

1 135

2 62

1 72

2 2,440

Final Repo

, Bangladesh iare among thrted by the EMr any of these 

eme Tempera

)

ature

People

 Affected Nu

E

34,000

2,000

50,000

200

1,000

100,000

50,000

102,000

75,000

414,200

ort on Capacity BuFinance in Ban

SF13-

is exposed to ohe most signifiMDAT databasevents. 

ature, and La

Landslid

umber ofEvents 

Lives Lost 

1 13 

1 66 1 17 

3 96 

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

other natural cantly reportese; note that 

ndslides

e People

 Affected 

50 

55,230

55,280

er Risk A-8144)

82 051215

ed. 

Page 84: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

4 Eco

This sectiohazards) thextracted fresearch operformed

Banglades

later sectio

4.1 T

The report

zoomed‐in

tropical cy

Bengal and

events rea

strength (p

this period

listed in T

assessmen

data. Note

storms tha

economic 

metrics. Fo

formula:   

Where: 

α = a facto

β = a facto

C = the ave

This appro

Needs Ass

Banglades

based on t

  

onomic

on presents a dhat occurred ifrom the histof disaster repod primarily to sh and provideon. 

Tropical Cy

ted tropical cy

n view over Ba

yclone databas

d 14 of these m

ched hurrican

peak sustained

d are shown in

able 32. The p

nt of available 

e that only 9 of

at did not mak

loss per event

or example, th

    

r that account

r that account

erage replacem

oach is based o

sessment for D

sh. Based on th

taking 30 perce

Impact

detailed assessin Bangladesh orical informat

orts and publidetermine a ce input to the f

yclone

yclone activity

angladesh is sh

se previously d

made landfall 

ne strength (pe

d winds of 34 

n Table 31. Pre

referred data 

information. F

f the 14 landfa

ke direct landf

t. When report

he total econom

ts for the total 

s for the relati

ment cost of a 

on information

Disaster Recov

his report, the 

ent of the estim

 

of Majo

sment of majo

from 2000 to tion and consecally availableomprehensive

funding gap a

y in the Bay of 

hown in Figur

discussed. Ov

in Bangladesh

eak sustained w

knots or great

eferred conseq

is considered 

For example, g

alling storms h

all were repor

ted losses are n

mic loss is infe

∗ ∗economic loss

ive loss due to

dwelling 

n presented in

very and Recon

average repla

mated average

r Disast

r disaster eventhe end of 201equence databe publications.e view of the eanalysis. The fu

Bengal from 2

re 40. Track in

erall, 96 tropic

h over these 14

winds of 64 kn

ter). The summ

quence data of 

the most relia

government re

have associated

rted to cause d

not available, 

erred from rep

_s relative to th

o partially dam

n the “Cyclone

nstruction” rep

acement cost o

e cost of a Sem

Final Repo

ters Sinc

nts (in particu13. Information

ases described. A detailed aseconomic impa

funding gap an

2000 to end of 

nformation is e

cal cyclone ev

4 years. Of the

nots or greater

mary of the ev

f significant ev

able based on t

eports are typi

d reported con

damage. Table

loss estimates

ported dwellin

∗he loss from dw

maged dwellin

e Sidr in Bangl

port prepared

of a typical dw

mi‐Pucca dwel

ort on Capacity BuFinance in Ban

SF13-

ce 2000

ular, suddenly n from recent d above, alongssessment of ract of recent dnalysis will be

2013 is shown

extracted from

ents occurred 

ese 14 landfalli

r), and ten rea

vents that mad

vents during th

the data sourc

ically selected

nsequence dat

e 32 includes e

s are inferred f

ng damage usi

_welling damag

ngs 

ladesh ‐ Dama

d by the Gover

welling is estim

lling (at 100,00

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

onset natural events was g with further recent events idisaster eventse discussed in 

n in Figure 39

m the historical

in the Bay of 

ing events, thr

ached tropical 

de landfall dur

his time period

ce and an 

d as the preferr

ta. In addition

estimates of the

from other rep

ing the followi

 

ge 

age, Loss and 

rnment of 

mated at 44,000

00 BDT) and 70

er Risk A-8144)

83 051215

 

s s in a 

and a 

ree 

storm 

ring 

d are 

red 

n, two 

e total 

ported 

ing 

0 BDT, 

Page 85: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

percent of 

were estim

damage (4

(115,569 m

reported v

For this eq

Table 31

2

2

2

2

2

2

2

2

2

2

2

2

2

Table

IBTrACS ID 

2000300N14093

2002314N12083

2003206N21089

2004136N15090

2007133N15091

2007314N10093

2008298N16085

2009104N13088

2009143N17089

2012285N21091

N/A 

  

the estimated

mated at appro

46,332 million 

million BDT). T

values are not quation, a curr

1. Reported T

IBTrACS  ID 

2000300N14093 2002314N12083 2004281N23087 2007133N15091 2007314N10093 2008168N21090 2008298N16085 2009104N13088 2009143N17089 2010280N18085 2011167N22089 2011290N15090 2012285N21091 

N/A 

e 32. Detailed

Year  Name 

3  2000  NOT NAM3  2002  NOT NAM9  2003  NOT NAM0  2004  NOT NAM1  2007  AKASH

3  2007  SIDR 5  2008  RASHM

8  2009  BIJLI 9  2009  AILA 1  2012  NOT NAM

2013  MAHASE

d average cost 

oximately 50 p

BDT) is about

Thus, the equa

available, is:   2. ∗ ,rency conversi

Tropical Cyclo

Year  Start Dat

2000  October 22002  November 2004  October 02007  May 13 2007  November 2008  June 162008  October 22009  April 142009  May 22 2010  October 02011  June 162011  October 12012  October 12013  May 09 

Consequenc

Dwellings Damaged  So

ED  3,000  B

ED  1,000  B

ED  67,727  M

ED  18,438  M

845  I

957,110  G

I  12,404  D

5,991  D

369,702  D

ED  16,330  D

EN  114,396  D

 

of a Kutcha d

percent of the t

t 40% of the to

ation adopted t

  000 ∗ion of 69 BDT

one Events M

te  Duration (Days) 

25  2.75 09  3 07  1.25 

2.25 10  6 

2.25 24  3.25   4.25 

3.75 07  1.75 

6.75 17  3 10  1 

ce Data of Sig

ource  Dwellings Destroyed 

BMD BMD DMR  4,980 DMR  19,535 FRC  205 GOB  564,967 DMIC  4,360 DMIC  1,460 DMIC  242,882 DMIC  8,050 DMIC  21,736 

welling (at 20,

total cost. Furt

otal estimated i

to infer the eco

_per USD is us

Making Landfa

Name  S

W

NOT NAMED NOT NAMED NOT NAMED 

AKASH SIDR 

NOT NAMED RASHMI BIJLI AILA 

NOT NAMED NOT NAMED 

TWO NOT NAMED MAHASEN 

gnificant Trop

Source  People Affected 15,000 5,000 

MDMR  312,817 MDMR  116,269 IFRC  80,000 GOB  8,923,259 DMIC  321,839 DMIC  92,558 DMIC  4,826,630 DMIC  133,688 DMIC  1,328,237 

Final Repo

,000 BDT). Co

thermore, the 

impact (dama

onomic impac

0. ∗sed as per the 

all in Banglad

Peak Sustained Wind Speed 

(knots) 35  Tr

55  Tr

25  Trop

65 140 25  Trop

45  Tr

50  Tr

65 25  Trop

35  Tr

35  Tr

30  Trop

45  Tr

pical Cyclone

Source  Life Loss

INFERRED  253 INFERRED  182 MDMR  11 MDMR  89 RSOE  3 GOB  4,407 DMIC  13 DMIC  5 DMIC  190 DMIC  108 DMIC  17 

ort on Capacity BuFinance in Ban

SF13-

osts for partiall

estimated cos

age and losses)

ct due to tropi

_Sidr report. 

desh from 200

Strength 

ropical Storm ropical Storm pical Depression Hurricane Hurricane 

pical Depression ropical Storm ropical Storm Hurricane 

pical Depression ropical Storm ropical Storm pical Depression ropical Storm  J

es from 2000 t

Source  Econ

(m

BMD BMD MDMR MDMR IFRC GOB DMIC DMIC DMIC DMIC DMIC 

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

ly damaged h

st of housing 

) of the event 

ical cyclones, w

 

00 to End of 2

Agency Source 

jtwc_io jtwc_io newdelhi jtwc_io jtwc_io newdelhi jtwc_io jtwc_io jtwc_io newdelhi newdelhi jtwc_io newdelhi 

JTWC_2013_BT 

to End of 201

nomic Impact million USD)  Sou

2  INFER

1  INFER

62  INFER

46  INFER

1  INFER

1,675  GO

17  INFER

7  INFER

1,149  GO

26  INFER

276   GOB + IN

er Risk A-8144)

84 051215

ouses 

when 

2013

13

urce 

RRED RRED RRED RRED RRED OB RRED RRED OB RRED NFERRED 

Page 86: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

Figu

  

ure 39. Reporrted Tropical

 

Cyclone Acti

ivity in the Ba

Final Repo

ay of Bengal

ort on Capacity BuFinance in Ban

SF13-

from 2000 to

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

End of 2013

er Risk A-8144)

85 051215

 

Page 87: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

  

Figure 40. Reported Tro

 

opical Cyclon

ne near Bangl

Final Repo

ladesh from 2

ort on Capacity BuFinance in Ban

SF13-

2000 to End o

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

of 2013

er Risk A-8144)

86 051215

 

Page 88: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

4.2 F

The report

year exper

percent of 

is shown i

Table 34 a

economic 

from other

using the f

Where: 

α = a facto

β = a facto

C = the ave

As with th

the “Cyclo

Reconstru

typical dw

total estim

adopted to

For this eq

damage is

it is assum

  

Flood

ted flood affec

rienced some l

the country re

n Table 33. Pr

and includes p

impact caused

r reported met

following form

r that account

r that account

erage replacem

he tropical cycl

one Sidr in Ban

ction” report p

welling is estim

mated loss of th

o infer the ecoquation, a curr

 not available,

med that an eve

cted area in Ba

level of floodin

eported as bei

eferred conseq

preferred value

d by floods eac

trics. For exam

mula:        ts for the total 

s for the relati

ment cost of a 

lone peril (dis

ngladesh ‐ Dam

prepared by th

mated at 44,000

he event based

nomic loss du .0 ∗ ,rency conversi

, the event los

ent causes 100

 

angladesh from

ng; 2004 and 2

ing affected, re

quence data is

es of the numb

ch year. When

mple, the total 

∗ ∗economic loss

ive loss due to

dwelling 

scussed previo

mage, Loss an

he Governmen

0 BDT, but the

d on damage r

ue to floods, w000 ∗ion of 69 BDT 

s is inferred fr

0 USD in dama

m 2000 to end 

2007 were part

espectively. A

s listed in  

ber of people a

n reported loss

economic loss

_s relative to th

o partially dam

ously), this app

nd Needs Asse

nt of Banglade

e estimated cos

eports from th

hen reported v_per USD is us

rom the numb

age per affecte

Final Repo

of 2013 is sho

ticularly flood

A summary of c

affected and li

ses are not ava

s is inferred fr

∗he loss from dw

maged dwellin

proach is base

essment for Di

esh. Again, the

st of housing d

he 1998 and 20

values are not0. ∗sed as per the 

ber of affected 

ed person. 

ort on Capacity BuFinance in Ban

SF13-

own in Table 3

d heavy years,

consequence d

ives lost, as we

ailable, loss es

rom reported d

_welling damag

ngs 

ed on informat

isaster Recove

e average repl

damage is tak

004 floods. Thu

t available, is  _Sidr report. If

people. Based

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

3. Overall, eve

 with 38 and 4

data from each

ell as the total

timates are in

dwelling dam

 

ge 

tion presented

ery and 

lacement cost 

ken as 25% of t

us, the equatio

   

 

f reported buil

d on reported d

er Risk A-8144)

87 051215

ery 

42 

h year 

ferred 

age 

d in 

of a 

the 

on 

lding 

data, 

Page 89: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

 

Y

2

2

2

2

2

2

2

2

2

2

2

2

2

2

Year 

Percent Country Affected (BWDB) 

Num

Of E

2000  24 2001  2.8 2002  10 2003  14 2004  38 2005  12 2006  11 2007  42 

2008  23 

2009  19 2010  18 

2011  20 

2012  12 2013  10.6 

 

EMDAT 

mber vents 

Lives Lost 

People Affected 

3  43  2,667,138 2  9  700,000 1  10  1,500,000 2  252  550,000 3  761  36,871,500 3  55  1,150,000 2  211,775 2  1230  13,851,380 

2  28  600,000 

2  16  500,000 2  15  575,000 

1  10  1,570,559 

2  139  5,398,475 

  

Table 33. Co

Loss (million USD) 

Number Of Events 

500  4 3 4 2 

2,200  3 4 3 

114  2 

  2 

1 4 

  2 

Table 34. Prefe

Year 

Percent

Country Affected (BWDB) 

A

2000  24 3,

2001  2.8 7

2002  10 7,

2003  14 7,

2004  38 40

2005  12 1,

2006  11 2

2007  42 10

2008  23 9

2009  19 5

2010  18 1,

2011  20 1,

2012  12 5,

2013  10.6 4

onsequence Datab

Dartmouth 

Lives Lost 

People Affected 

Lo

(mi

US

81  1,030,000 19  251,200 161  6,020,000 230  3,520,000 910  30,321,500  7,0

60  1,220,000 105  200,000 1197  5,080,000  3

  615,000 

6 119  1,240,000 

53  710,000 

106  102,000 

rred Consequenc

People Affected  Sou

,244,576 MD

700,000 EM

,608,837 MD

,874,465 MD

0,955,375 MD

,220,000 D

211,775 EM

0,655,564 MD

975,096 DM

500,000 EM

,240,000 D

,853,000 DM

,398,475 Disaster R415,250 DDM Rep

base of Floods fr

oss llion SD) 

Dwellings Destroyed 

Dwellin

Damag

437,050  309,77

115,511  564,52

109,147  541,98

000  969,161  3,602,0

92  65,522  919,57

     

     

ce Data of Floods

urce  Life Loss 

DMR 37

DAT 19

DMR 26

DMR 104

DMR 765

FO 60

DAT 105

DMR 594

MIC 28

DAT 16

FO 119

MIC 53

eport 2012 139

port 2013

Final Report on CaFinanc

rom 2000 to End

MDMR 

ngs ed 

Lives Lost 

People Affected 

75  37  3,244,576 

27  26  7,608,837 88  104  7,874,465 009  765  40,955,375 

75  594  10,655,564 

   

   

s from 2000 to En

Source Economic

Impact

(million US

MDMR  500

DFO  70

MDMR  1,015

MDMR  970

MDMR  2,280

DFO  122

DFO  21

MDMR  1,067

EMDAT  126

EMDAT  50

DFO  124

DFO  185

EMDAT  573

42

apacity Building for Disce in Bangladesh (ADB

SF13-1049 FINAL R

of 2013

Dwellings Damaged/Destroyed 

Lives Lost 

4,000,000  747 

1,000,000  1,100 

75,565/11,488  7 

142,027/41,594  2 

272,792/88,070  13 

nd of 2013

D) Source 

EMDAT

INFERRED

INFERRED

INFERRED

WB2004

INFERRED

INFERRED

GOB

INFERRED

INFERRED

INFERRED

INFERRED

INFERRED

INFERRED

saster Risk B TA-8144)

88 REP 051215

Literature 

People Affected 

Loss (million USD) 

36,000,000  2,280 

14,000,000  1,067 

975,096   

1,853,000   5,148,475 415,250 

Source 

World Bank; ADB 

World Bank; CDMP DMIC, DMB 

 WED‐17‐SEP‐2008:1430 

DMIC, DMB  WED‐07‐SEP‐2011:1630 Disaster Report 2012 DDM Report 2013 

Page 90: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

4.3 E

The report

is extracte

4.0 or grea

were Mw 5

of significa

and the to

estimates a

 

Table 35

 

  

Earthquake

ted seismicity 

d from the his

ater have been

5.0 or greater. T

ant events are 

tal economic i

and judgment

5. Number of R

e

in the vicinity

storical earthq

n reported with

The statistics o

listed in Table

impact per eve

t based on oth

Reported Eve

 

y of Banglades

uake database

hin 50 km of B

of the reported

e 36. The Tabl

ent. In general

er reported m

ents in the Hi

Mw B

Ma

4.0-4.5

4.5-5.0

5.0-5.5

5.5-6.0

Total

sh from 2000 to

e previously d

Bangladesh’s b

d number of e

le includes infe

l, these inferre

metrics. 

storical Earth

Within 50kmBangladesh Bo

(2000-2013

ainshock

20

18

4

3

45

Final Repo

o end of 2013 

discussed. Ove

borders over th

events is show

erred values o

ed values are b

hquake Datab

m of orders 3)

Total

131

51

10

3

195

ort on Capacity BuFinance in Ban

SF13-

is shown in Fi

erall, 195 earth

hese 14 years; 

wn in Table 35. 

of the number 

based on uppe

base from 200

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

igure 41. This 

hquake events

13 events of w

Consequence

of people affe

er bound repo

00 to End of 2

er Risk A-8144)

89 051215

data 

Mw 

which 

e data 

ected 

rted 

2013

Page 91: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

      

  

Figuree 41. Reporte

 

d Seismicity

in Banglades

 

Final Repo

sh from 2000

ort on Capacity BuFinance in Ban

SF13-

to End of 201

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

 

13

er Risk A-8144)

90 051215

Page 92: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

 

 

 

Year 

2000 2001 2002 2003 2004 2006 2007 2008 2008 2010 2011 

 

Table

Day  Latitude 

3‐Jan  22.223 19‐Dec  23.632 20‐Jun  25.998 26‐Jul  22.867 26‐Dec  3.295 14‐Feb  27.382 7‐Nov  22.15 12‐Jan  22.823 26‐Jul  24.827 10‐Sep  23.4743 18‐Sep  27.73 

  

e 36. Consequen

Longitude  Mw Dama

92.821  4.8 90.376  4.9 88.931  4.9 92.238  5.6 95.982  9.0 88.388  5.3 92.388  5.5 92.291  4.9 90.451  5.1 90.6689  5.1 88.155  6.9 

nce Database of S

Dwellings aged/Destroyed  Source

100  NGDC

SOME  NGDC

SOME  NGDC

500  NGDC

FEW  RSOE

SOME  NGDC

FEW  BDNEWS

Significant Earthq

e People Affected Inferred 

People

Injured 

C  500 C  500  100 C  500  55 C  2500  32 

0 500  11 250  10 

C  500 500  25 500 

S24  250  1 

Final Report on CaFinanc

quakes from 2000

Source  Life Loss 

NGDC  0 NGDC  0 MARTIN  3 

2 MARTIN NGDC  0 

USGS  0 

BDNEWS24 

apacity Building for Disce in Bangladesh (ADB

SF13-1049 FINAL R

0 to End of 2013

Source  Damage 

LIMITED UTSU  LIMITED UTSU  LIMITED 

MARTIN  MODERATE USGS 

LIMITED UTSU  LIMITED 

LIMITED UTSU  LIMITED 

LIMITED LIMITED 

saster Risk B TA-8144)

91 REP 051215

Source 

Inferred Economic Impact 

(million USD) NGDC  1 NGDC  1 NGDC  1 NGDC  5 

0 USGS  1 NGDC  1 NGDC  1 UTSU  1 NGDC  1 USGS  1 

Page 93: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

4.4 S

Significant

reported e

estimate. F

per affecte

reported p

indices suc

 

  

Severe Stor

t severe storm

events during 

For the rest of 

ed person. Thi

people affected

ch as life loss. 

Tabl

E

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

rm

m events report

this time span

the events, los

s assumption 

d (four events)

e 37. Severe

EMDAT DisNo  Da

000‐0146  5/3/2

000‐0211  21/04

000‐0229  11/4/

000‐0283  27/05

000‐0294  23/05

000‐0631  25/06

001‐0198  11/5/

001‐0202  1/4/2

001‐0273  28/04

001‐0563  5/10/

002‐0211  25/03

002‐0233  22/04

002‐0425  14/07

003‐0190  16/04

003‐0211  4/5/2

003‐0779  20/12

004‐0166  14/04

004‐0286  12/6/

004‐0678  13/05

004‐0679  17/07

005‐0130  20/03

005‐0190  31/03

005‐0259  21/05

005‐0273  14/05

005‐0282  6/5/2

005‐0391  30/06

006‐0146  4/3/2

006‐0737  5/4/2

006‐0738  8/4/2

006‐0739  22/04

008‐0644  22/03

010‐0171  13/04

010‐0205  17/04

010‐0686  1/5/2

011‐0591  4/4/2

012‐0082  6/4/2

013‐0085  22/03

013‐0090  29/03

 

ted by EMDAT

n, only one eve

sses are inferr

is based on in

), a value of 10

Storm Conse

ate  People A

2000  3,05

4/2000  62,8

/2000  7,01

/2000  71,0

/2000  10,000 (a6/2000  2,53

/2001  20

2001  2,50

4/2001  60

/2001  25,4

/2002  1,00

4/2002  100,4

7/2002  10,000 (a4/2003  20

2003  40

/2003  10,000 (a4/2004  13,0

/2004  50

/2004  4,05

7/2004  1,10

/2005  11,5

/2005  10,5

/2005  6

/2005  10

2005  1,50

6/2005  10,000 (a2006  5,89

2006  1,46

2006  1,50

4/2006  15

/2008  20

4/2010  247,1

4/2010  10,0

2010  50

2011  12

2012  55,1

/2013  8,54

/2013  25,0

T from 2000 to

ent (on March 

ed by assumin

nformation fro

0,000 people a

equence Data

Affected  Life L

50 800  20

12 000  36

ssumed)  28

37 00  12

00  193

00  21

450  12

00  32

400  31

ssumed)  10

0  9

00  23

ssumed)  28

000  76

0  153

50  10

00 500  79

500  24

6  10

00  2

00  11

ssumed)  35

99  4

65  9

00  22

0  4

00  12

110  8

000  3

0  15

1  13

121  25

43  31

020  2

Final Repo

o end of 2013 i

22, 2013) had

ng that the tot

m past report

affected is assu

a from 2000 to

Lost  Inferred E(mi

6 8 

2 3 1 2 2 1 0 

3 8 6 3 0 

9 4 0 

1 5 

5 3 5 1  20.0

ort on Capacity BuFinance in Ban

SF13-

is shown in Ta

 a reported ec

tal economic im

ted events. For

umed, primari

o End of 2013

Economic Impact llion USD) 1.5 31.4 3.5 35.5 5.0 1.3 0.1 1.3 0.3 12.7 0.5 50.2 5.0 0.0 0.2 5.0 6.5 0.0 2.0 0.6 5.8 5.3 0.0 0.1 0.8 5.0 2.9 0.7 0.8 0.1 0.1 123.6 5.0 0.0 0.1 27.6 

0 (reported) 12.5 

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

able 37. Of the

conomic loss 

mpact is 500 U

r events witho

ly based on ot

3

er Risk A-8144)

92 051215

e 38 

USD 

out 

ther 

Page 94: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

4.5 S

In general,

that occurr

Reports fo

only 16 oth

drought ev

and affecte

cyclones “

In total, sig

to have aff

8,351 lives

tropical cy

people affe

people affe

cyclones. A

frequently

this time p

The major

economic 

years. The

Year 2006 

about 220,

million US

  

Summary

, the majority 

red from 2000

or other sudde

her significant

vent). Of these

ed 55,230. A su

“TC”, severe st

gnificant sudd

fected 99.7 mil

s lost, and caus

yclones have a

ected, floods c

ected during t

Although the i

y and have con

period. 

r disaster years

impact, about

ese years were 

was the least 

,000 people aff

SD in losses, 7

of major disas

0 to end to 2013

nly onset natu

t events for thi

e, the landslid

ummary of th

torms “SS”, an

denly onset na

llion people (n

sed 10.8 billion

affected Bangla

contribute to th

this time perio

impact of seve

ntributed to ab

s during 2000 

t 20 million or 

characterized

significant in t

fected. Major d

.1 million peo

 

ster events (in 

3 have been fl

ural hazards h

is time period

es in 2010 are 

e estimated co

nd earthquake

atural hazard e

note that the sa

n USD in econ

adesh more th

he majority of

od are due to f

ere storms is le

bout 12% of th

to 2013 are 20

more people a

d by catastroph

terms of major

disasters in Ba

ple affected, a

particular, su

loods, tropical

have been mino

 (12 extreme t

among the mo

onsequence fro

es “EQ”) is list

events in Bang

ame people m

nomic impact (

han the other p

f the conseque

floods. The ma

ess than tropic

he total life loss

07 and 2004, w

affected, and o

hic floods in 20

r disasters, wi

angladesh dur

and 600 lives lo

Final Repo

uddenly onset 

l cyclones, sev

or. For examp

temperature ev

ost notable, w

om the main p

ted in Figure 4

gladesh from 2

may be affected

(damage and l

perils by far. In

ence; 66% of ec

ajority of life lo

cal cyclone an

s. No major ea

with over two 

over 1,000 live

004 and 2007,

ith less than 30

ring 2000 to 20

ost on average

ort on Capacity BuFinance in Ban

SF13-

natural hazar

vere storms, an

ple, the EMDA

vents, 3 landsl

which reported

perils (floods “

42 to Figure 44

2000 to end of 

d one or more 

losses to all se

n terms of econ

conomic impa

oss (63%) is du

nd flood, sever

arthquake has

billion USD in

es lost during 

and 2007 trop

0 million USD

013 have result

e per year. 

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

rds) in Banglad

nd earthquake

AT database re

lide events, an

dly killed 66 pe

“FL”, tropical 

4 and Table 37

2013 are estim

times), resulte

ectors). Floods

nomic impact

act and 83% of

ue to tropical 

re storms occu

s happened du

n estimated 

each of these t

pical cyclone S

D in damages a

ted in about 7

er Risk A-8144)

93 051215

desh 

es. 

ports 

nd 1 

eople 

7.  

mated 

ed in 

s and 

t and 

ur 

uring 

two 

Sidr. 

and 

771 

Page 95: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

Figure

Figure

Economic

 Impact

 (M USD)

People

 Affected

 (Million)

  

42. Estimated

e 43. Estimate

0

500

1,000

1,500

2,000

2,500

3,000

2000

2001

p(

)

0

5

10

15

20

25

30

35

40

45

2000

2001

2002

p(

)

d Economic I

ed People Aff

2002

2003

2004

2005

2006

Y

2003

2004

2005

2006

Ye

 

Impact from S

fected from S

2006

2007

2008

2009

2010

Year

2007

2008

2009

2010

ear

Significant Di

Significant Dis

2011

2012

2013

2011

2012

2013

Final Repo

isasters in Ba

sasters in Ba

SS

EQ

TC

FL

3

Eco

SS

EQ

TC

FL

Peo

ort on Capacity BuFinance in Ban

SF13-

angladesh fro

angladesh fro

30%

0% 4%

onomic Impact 10,795 Million

16%

0% 1%

ople Affected 299.7 Millio

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

om 2000 to 20

om 2000 to 20

66%

2000‐2013n USD

83%

2000‐2013on

er Risk A-8144)

94 051215

 

013

 

13

Page 96: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

Fig

Life

 Loss

  

gure 44. Estim

0

1,000

2,000

3,000

4,000

5,000

6,000

2000

2001

mated Life Lo

2002

2003

2004

2005

2006

Y

 

ss from Sign

2006

2007

2008

2009

2010

Year

ificant Disast2011

2012

2013

Final Repo

ters in Bangla

SS

EQ

TC

FL

0%

ort on Capacity BuFinance in Ban

SF13-

adesh from 2

63%

%12%

Life Loss 20008.4 Thousa

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

2000 to 2013

25%

0‐2013and

er Risk A-8144)

95 051215

 

Page 97: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

 

Year  E

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 Total 

 

 

Flood Economic Impact (million USD) 

Pe

Affe

500  3,24

70  700

1,015  7,60

970  7,87

2,280  40,95

122  1,22

21  211

1,067  10,65

126  975

50  500

124  1,24

185  1,85

573  5,39

42  415

7,145  82,85

 

Tab

ople ected 

Life Loss 

Econ

(m

44,576  37 0,000  19 08,837  26 74,465  104 55,375  765 20,000  60 1,775  105 55,564  594 5,096  28 0,000  16 40,000  119 53,000  53 98,475  139 5,250   52,413  2,065 

  

ble 38. Estimated

Tropical Cycloneomic Impact

illion USD) People

Affected

2  15,000

   1  5,000

62  312,817

46  116,269

      

1,676  9,003,25

17  321,839

1,156  4,919,18

      26  133,688

276  1,328,23

3,262  16,155,29

Disaster Conseq

e  d 

Life Loss 

Economi

(millio

253  1

  1

182  1

7  11  5

9  89    1

59  4,410  1

9  13  2

88  195   1

  1

8  108 37  17 97  5,278  1

quence in Bangla

Earthquake ic Impact

n USD) People Affected 

1  500 1  500 1  500 5  2,500       1  500 1  250 2  1,000    1  500 1  250       14  6,500 

Final Report on CaFinanc

adesh from 2000

Life Loss 

Economic Im(million US

  78   14   56 3  5 2  9   17   5      0      129   0   28   33 5  374 

apacity Building for Disce in Bangladesh (ADB

SF13-1049 FINAL R

to End of 2013

Severe Storm mpact SD) 

People Affected 

Life

Los

156,399  84

28,750  238

111,400  73

10,420  60

18,200  239

33,606  161

9,014  39

 200  12

 257,160  26

121  13

55,121  25

33,563  33

713,954  1,00

saster Risk B TA-8144)

96 REP 051215

e ss 

Economic Impact

(million USD) 4  581 8  85 3  1,073 0  1,042 9  2,335 1  139 9  27 

2,744 2  145 

1,206 6  254 3  186 5  627 3  351 03  10,795 

Total People Affected 

Life Loss 

3,416,475  374 729,250  257 7,725,737  281 8,200,202  178 41,089,844  1,095 1,253,606  221 221,289  144 

19,659,073  5,004 1,298,135  53 5,419,188  211 1,497,660  145 1,853,371  66 5,587,284  272 1,777,050  50 99,728,164  8,351 

Page 98: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

5 Pro

In addition

model was

provide va

catastroph

record. Inf

reported o

they can c

missing or

In addition

which are 

correspond

shape the 

events and

Furthermo

variety of 

assets, infr

The risk m

or after rea

highlights

probability

can also be

providing 

To the bes

modeling 

develop ne

potential D

developed

Banglades

tropical cy

and relativ

  

obabilist

n to analyses o

s developed sp

aluable inform

he events and c

formation deri

observations o

alculate the es

r uncertain val

n to providing

defined in the

ding average r

scope and pri

d their consequ

ore, any uniqu

stakeholders. 

rastructure, an

model can also 

al events, whi

 areas that are

y of occurrenc

e derived, whi

tangible metr

st of our know

for natural ha

ew resources t

DRF solution i

d using risk mo

sh, decided to 

yclone hazard 

ve importance

tic Trop

of historical ev

pecifically for 

mation on the r

consequences,

ived from cata

f past events. 

stimated dama

luations typica

g robust loss m

e following sec

return period 

cing of disaste

uences occurri

ue portfolio of 

For example, 

nd portfolios f

provide haza

ch can be used

e affected to a 

ce; hazard foot

ich can be use

rics for disaste

wledge, industr

azards do not e

to probabilisti

in the future. G

odels as its ba

develop a pilo

was selected b

e of the hazard

 

pical Cyc

vents and repo

the peril of tro

risk of natural

, by computin

astrophe risk m

For example, 

aged over the 

ally associated

metrics (such a

ctions), the pr

of past histori

er risk financin

ing in the futu

assets can be 

these can be p

rom regional i

rd estimates, e

d to inform pla

particular haz

tprints are a h

d to support a

er risk financin

ry catastrophe

exist at the tim

ically quantify

Generally, all s

sis. ADB and 

ot risk model f

based on a com

d (based on inf

clone Ri

orted conseque

opical cyclone

 hazards since

ng loss potentia

models can als

risk models p

entire modele

d with damage

as loss exceeda

obabilistic mo

ical events. Th

ng solutions as

ure.  

analyzed in th

portfolios of sc

insurance and

either in terms

anning or eme

zard (such as w

azard map for

a range of activ

ng transactions

e risk models f

me of this study

y the risk of a s

successful cou

the consultant

for the tropica

mbination of d

formation gath

Final Repo

sk Mode

ence data, a p

e in Banglades

e they quantify

als that go bey

so overcome th

rovide a more

ed hazard foot

e reports.  

ance probabili

odels can estim

his is extremely

s it can estima

he risk model 

chool building

d reinsurance a

s of hazard ma

ergency purpo

wind speeds) f

r single given 

vities, such in

s. 

for Bangladesh

y. An importa

selected hazar

untry catastrop

t team, in agre

al cyclone haza

determining fa

hered in sectio

ort on Capacity BuFinance in Ban

SF13-

eling

probabilistic ca

sh. Probabilist

y the likelihoo

yond the avail

he limitations

e complete pic

tprint and do n

ties and avera

mate the mode

y valuable inf

ate the likeliho

to provide risk

gs, disaster she

agencies.  

aps or hazard 

oses. A hazard

for a given ret

event. Post ev

nforming recov

h that provide

ant objective o

rd for Banglad

phe DRF solut

eement with th

ard as part of t

actors which in

ons 3 and 4), fe

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

atastrophe risk

ic risk models

od of future 

lable historical

 and data gap

cture of the ris

not suffer from

age annual los

eled losses and

formation that

ood of catastro

k perspectives

elters, governm

footprints du

d map is a map

turn period or

vent loss estim

very operation

e probabilistic 

of this project i

desh in suppor

tions have bee

he Governmen

this TA.  The 

ncluded: sever

easibility of D

er Risk A-8144)

97 051215

 

ps of 

k as 

ses, 

t can 

ophe 

s for a 

ment 

ring 

p that 

mates 

ns to 

is to 

rt of a 

en 

nt of 

rity 

RF 

Page 99: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

solutions (

within the

5.1 L

AIR’s meth

remains co

primary m

H

th

m

lik

of

ev

af

pr

Th

in

ab

of

kn

Ex

ca

ca

an

to

on

co

in

st

po

En

in

en

de

de

  

(based on mar

e TA’s timeline

Loss Evalu

hodology for e

onsistent betw

modules to the 

Hazard Modul

he possible eve

models answer

kely to be? An

f computer‐sim

vents. For each

ffected area. F

recipitation; fo

he hazard com

ncluding mete

breast of the sc

f their own. In

nowledge. 

xposure Data 

an be a buildin

an be determin

nd if data is av

o understand i

n the construc

oncrete, or wo

ndustrial comp

tories and roof

otential.  

ngineering M

nformation gen

ngineering‐ba

etermined.  Th

etailed inform

rket acceptanc

e and input fro

ation Meth

evaluating cat

ween AIR’s com

loss evaluatio

e (Event Gene

ents and their 

s the question

nd how freque

mulated catast

h simulated ev

or example, fo

or earthquakes

mponents of ca

orologists, clim

cientific literat

n doing so, the

Module: dete

ng, building co

ned at various

vailable, down

its replacemen

ction type (for 

ood), occupanc

plex), and stru

f type). This in

Module (Dama

nerated in the 

sed componen

he measures o

mation about th

 

e of hazard ris

om ADB and o

hodology

tastrophe loss 

mmercial risk m

on: 

eration and Lo

intensity at th

ns: Where are f

ently are they l

trophes are ge

vent, the mode

or tropical cyc

s, intensity ma

atastrophe mo

mate scientists

ture, evaluate 

ey ensure that 

ermination of m

ontents, infras

s levels of reso

n to the actual 

nt value and it

example, a bu

cy type (for ex

uctural and non

nformation is u

age Estimation

preceding Ha

nt of the evalu

of intensity (pr

he assets that a

sk models), vi

other governm

potentials is i

modeling solu

ocal Intensity

he local asset lo

future events l

likely to occur

enerated, repre

el then calcula

lones, intensit

ay be expresse

odels are built 

s, seismologist

the latest rese

the models in

modeled asset

structure, crop

olution, e.g., fr

individual loc

s vulnerability

uilding’s main

xample, a build

n‐structural ch

used directly t

n): determinati

azard and Exp

uation wherein

rovided by the

are being eval

Final Repo

iability of com

ment stakehold

illustrated in F

utions.  As sho

y Calculation):

ocation. The h

likely to occur

r? Large catalo

esenting the b

ates the intens

ty may be exp

ed in terms of 

by teams of h

ts, geophysicis

earch findings

ncorporate the 

t location and 

ps, or even peo

rom a regional

cation. Inform

y to different p

n construction 

ding can be a h

haracteristics 

to determine t

ion of the pote

posure Data m

n the damagea

e hazard modu

luated. Equatio

ort on Capacity BuFinance in Ban

SF13-

mpleting a relia

ders. 

Figure 45.  Thi

own in Figure 

: probabilistic 

hazard compon

r? How large, 

ogs comprising

road spectrum

ity at each loc

ressed in term

the degree of 

highly‐credenti

sts and hydrol

s, and conduct

most current 

characteristic

ople. Informat

l level to a one

mation for each

perils. This inc

can be of mas

house, comme

(for example, 

the particular 

ential physica

modules.  This m

ability of the v

ule) are applie

ons called dam

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

able risk mode

s methodolog

45, there are f

determination

nent of catastr

or severe, they

g tens of thou

m of plausible 

cation within th

ms of wind spe

ground shakin

ialed scientists

logists—who 

t original resea

scientific 

cs. A modeled 

tion of assets a

e‐kilometer gri

h asset is collec

cludes informa

sonry, reinforc

ercial shop, or

the number o

asset’s damag

l damage give

module reflec

various assets i

ed to highly 

mage function

er Risk A-8144)

98 051215

el 

gy 

four 

n of 

rophe 

y are 

sands 

he 

eed or 

ng. 

s—

keep 

arch 

asset 

at risk 

id, 

cted 

ation 

ced 

 

ge 

en the 

ts the 

is 

ns are 

Page 100: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

de

ch

co

hi

ho

in

su

Fi

in

es

of

be

Fo

on

an

  

5.2 A

The AIR T

flooding fr

based mod

intensity, s

region. In 

intensity a

are based 

includes se

  

eveloped and 

haracteristics s

ontents. For ex

igher relative 

ospital. The m

ncorporate pub

urveys and da

inancial Modu

nformation fro

stimates of mo

f losses, called

e surpassed in

or example, th

ne year, or alte

ny geographic

AIR Tropica

Tropical Cyclon

rom tropical c

del designed f

size, location, 

the local inten

are considered

on total accum

eparate damag

used to comp

such as constru

xample, a low‐

damageability

model’s damag

blished resear

amage reports.

ule (Loss Calc

om the various

onetary loss. P

d an exceedanc

n the coming y

he loss associat

ernatively in o

c resolution—f

Figure 45.

al Cyclone

ne Model for B

yclone induce

for portfolio ri

forward speed

nsity compone

d in order to pr

mulated precip

ge relationship

 

pute the level o

uction materia

‐rise wood‐fra

y potential) to 

ge functions ar

ch, the results

culation): dete

s preceding m

Probabilities ar

ce probability 

year. The prob

ted with a retu

one year out o

for the entire c

AIR Catastro

Model for

Bangladesh ca

ed precipitatio

sk assessment

d and directio

ent of the mod

roperly calcula

pitation, soil ty

ps for wind an

of damage exp

al and differen

ame residence 

tropical cyclo

re developed b

s of laboratory

ermination of t

odules. Estima

re assigned to 

curve, relates

abilities can al

urn period of 2

f twenty, on a

country, for a 

ophe Risk Eva

r Banglade

aptures the eff

on on propertie

t. Wind intens

on, as well as th

del, the effects 

ate damage to

ype, land use/l

nd precipitatio

Final Repo

pected to occur

nt occupancies

is generally m

one winds than

by highly‐train

y testing, and t

the assets’ los

ates of physica

each level of l

the probabilit

lso be express

20 years has a

average. Loss p

particular reg

aluation Fram

sh Overvie

fects of tropica

es in Banglade

sity computati

he underlying

of fill, surface

o properties. Fl

land cover dat

on‐induced flo

ort on Capacity BuFinance in Ban

SF13-

r to buildings 

s, or usages, a

more vulnerab

n a mid‐rise re

ned structural 

the findings fr

s potentials gi

al damage are

loss. This prob

ty that any giv

sed in terms of

a 5% chance of

probabilities c

gion, or for an 

mework

ew

al cyclone indu

esh. It is a fully

ons are based 

g terrain and la

e friction, and 

looding intens

ta, and topogr

ood effects. Th

uilding for Disastengladesh (ADB TA

1049 FINAL REP 0

based on 

s well as to th

ble (e.g., has a 

einforced conc

engineers. Th

rom on‐site da

iven the 

e translated int

bability distrib

ven level of los

f return period

f being exceed

can be provide

individual ass

 

uced winds an

y stochastic, e

on a storm’s 

and use in the

gustiness on w

sity computati

raphy. The mo

hese relationsh

er Risk A-8144)

99 051215

eir 

crete 

hey 

amage 

to 

bution 

ss will 

ds. 

ded in 

ed at 

set. 

nd 

event‐

wind 

ions 

odel 

hips 

Page 101: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

vary by bu

componen

The AIR T

includes st

than 40 mp

It is impor

losses from

average cl

(accumula

storm surg

The develo

forward sp

by the Inte

Departmen

Administr

Typhoon W

Precipitati

between N

rainfall. Ph

from the U

Internation

Storm trac

grid cells (

variations 

km grid ce

(approxim

Shuttle Ra

also used t

a 1 km res

Informatio

to a 5 km r

                  10 Tropical d

  

uilding charac

nts and model 

Tropical Cyclon

torms ranging

ph) to tropical

rtant that tropi

m precipitation

imate conditio

ated runoff). T

ge, a major fac

opment of the

peed, central p

ernational Bes

nt (IMD), the B

ration’s Nation

Warning Cent

ion data is der

NASA and the 

hysical proper

United States G

nal Soil Refere

ck simulation w

(approximatel

in central pre

ells) in the mo

mate 5 km) grid

adar Topograp

the United Sta

olution. Soil d

on Centre (ISR

resolution. 

                        depressions and m

teristics, such 

losses are vali

ne Model for B

g from tropical

l cyclone stren

ical depression

n‐induced floo

ons. The mode

he effects of la

ctor in Banglad

e AIR Tropical 

pressure, storm

t Track Archiv

Bangladesh M

nal Climatic D

ter (JTWC), an

rived from the

Japan Aerosp

rty information

Geological Sur

ence and Infor

was implemen

ly 140 km grid

essure, the par

del domain. T

d. AIR used se

phy Mission (S

ates Geologica

data at a 1 km 

RIC). Friction a

                   monsoon depres

 

as occupancy

idated with th

Bangladesh in

l depression st

ngth (e.g., even

ns are include

oding. This is 

eled perils incl

andslides and 

desh, is discus

Cyclone Mod

m genesis, stor

ve for Climate

Meteorological 

Data Center (N

nd the Univers

 Tropical Rain

pace Exploratio

n, such as land

rvey (USGS), t

rmation Centre

nted using con

d cells) using th

ameters were 

The model calc

everal sources 

SRTM), which 

al Survey (USG

resolution wa

and gust factor

sions are include

y class, constru

he latest availa

ncorporates a 1

trength (e.g., e

nts with sustai

ed10 as these les

a standard cat

lude tropical c

storm surge a

ssed in a later 

del for Banglad

rm track, storm

e Stewardship 

Department (

NCDC), Hurric

ity Corporatio

nfall Measurin

on Agency (JA

d use/land cov

the Shuttle Rad

e (ISRIC), resp

nditional prob

he historical d

estimated for 

culates local ha

to capture sur

contains eleva

GS) land use/la

as obtained fro

rs were develo

ed to the extent a

Final Repo

uction type, an

able data and s

10,000‐year cat

events with su

ined winds of 

ss intense eve

talog that refle

cyclone winds

are not explicit

section below

desh involved

m angle, and d

(IBTrACS), th

(BMD), the Na

cane Satellite D

on for Atmosp

ng Mission (TR

AXA) designed

ver data, eleva

dar Topograp

pectively. 

bability distrib

data available f

each 2.5˚ × 2.5

azard conditio

rface character

ation data at a

and cover (LU

om the Interna

oped at a 1 km

as reported in the

ort on Capacity BuFinance in Ban

SF13-

nd building he

science.  

talog of simul

ustained wind

f generally gre

nts can genera

ects cyclone ri

s and precipita

tly modeled. A

w. 

d many data so

day of year da

he India Meteo

ational Oceani

Data (HURSAT

pheric Researc

RMM), a joint 

d to monitor a

ation, and soil 

phy Mission (S

utions estimat

for each grid c

5˚ grid cells (a

ons on a 0.05˚ 

ristics, includi

a resolution of

ULC) and topo

ational Soil Ref

m resolution, a

e historical recor

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

eight. All mod

lated events th

s of generally 

eater than 75 m

ate significant

sk under curre

ation‐induced 

An assessment

ources. Histori

ata were provi

orological 

ic and Atmosp

T), the Joint 

ch (UCAR). 

space mission

and study trop

data, was obt

SRTM), and the

ted for 1.25˚ × 

cell. To captur

pproximately 

× 0.05˚ 

ing data from 

f 90 meters. AI

graphical data

ference and 

and then scaled

rd. 

er Risk A-8144)

100 051215

del 

hat 

less 

mph). 

ent 

flood 

t of 

ical 

ded 

pheric 

pical 

tained 

1.25˚ 

re 

280 

the 

IR 

a with 

d up 

Page 102: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

5.3 S

The AIR tr

probabilis

stochastic 

Bengal. AI

form of ba

aircraft rec

stochastic 

In

Ba

In

H

Jo

U

Tr

When asse

Cyclone M

a storm’s i

in the regi

terrain, lan

topograph

obtained f

Many othe

of a storm

precipitati

the time an

landfall w

The distrib

stochastic 

strength an

figure sho

necessarily

tropical cy

stochastic 

  

Stochastic

ropical cyclone

tic catalog of s

catalog, which

IR relies on inf

arograph trace

connaissance f

catalog for the

ndia Meteorolo

angladesh Me

nternational BeHurricane Sateloint Typhoon WUniversity Corpropical Rainfa

essing tropical

Model for Bang

intensity, size,

ion. Flooding f

nd use/land co

hic data at a 1 k

from the Intern

er parameters 

’s formation, t

ion rate, and th

nd location of 

with respect to 

bution of simu

catalog is sho

nd less than h

ws only simul

y all simulated

yclone frequen

catalog and h

Catalog (S

e model levera

simulated stor

h represents 1

formation from

es from land st

flight data, rad

e model is spe

ogical Departmeteorological Dest Track Archllite Data (HU

Warning Centporation for Aall Measuring M

l cyclone losse

gladesh are wi

, location, forw

from precipita

over, and soil t

km resolution

national Soil R

are used to ge

track and forw

he storm’s dur

landfall, the s

the coast, and

ulated tropical

wn in Figure 4

hurricane‐stren

lated tropical 

d tropical cycl

ncy by landfall

istorical recor

 

Simulated E

ages data from

rms (known as

0,000 realizati

m agencies tha

tations and shi

dar data, preci

ecifically based

ment (IMD) Department (Bhive for Clima

URSAT) ter (JTWC) Atmospheric RMission (TRM

es, the main en

ind speed and

ward speed, an

ation (accumul

type. The mod

n from the U.S.

Reference and 

enerate stocha

ward speed, ou

ration. Additio

segment of the

 intensity in te

l cyclone track

46. The intens

ngth storms (N

cyclones that r

ones in the Ba

l segment and

d. In general, 

Event Gen

m the historica

s the stochasti

ions of next ye

at gather origi

ips, actual win

ipitation data,

d on historical

BMD) ate Stewardshi

Research (UCAMM) 

nvironmental p

d accumulated 

nd direction, a

lated runoff) i

del’s flood mo

. Geological Su

Information C

astic tropical cy

uter radius and

onal paramete

e coast where l

erms of centra

ks affecting Ban

ity at first land

N/A refers to s

result in mode

ay of Bengal.  F

d landfall stren

the stochastic 

Final Repo

eration)

al tropical cycl

ic catalog). The

ear’s tropical c

inal data on hi

nd records fro

, and other pre

l data from a v

ip (IBTrACS)

AR) 

parameters ne

 runoff. Wind

as well as the u

is computed b

odule relies on

urvey (USGS)

Centre (ISRIC)

yclone events,

d radius of ma

ers are used fo

landfall occur

al pressure (Cp

ngladesh sam

dfall is indicat

torms not mak

eled losses to p

Figure 47 and 

ngth, respectiv

catalog comp

ort on Capacity BuFinance in Ban

SF13-

lone database 

e model consi

cyclone activit

istorical tropic

om weather ser

essure and win

variety of sour

eeded for the A

d intensity is co

underlying ter

based on total e

n land use/land

. Soil data at 1

). 

, including the

aximum wind

or landfalling s

rred, the storm

p). 

mpled from 1,0

ted, which sho

king landfall).

properties in B

Figure 48 com

vely, from the 

pares favorably

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

to create a 

ders a 10,000 y

ty in the Bay o

cal cyclones in

rvice stations,

nd reports. Th

rces, including

AIR Tropical 

omputed base

rrain and land

event precipit

d cover and 

1 km resolution

e date and loca

ds (Rmax), the 

storms, includ

m’s track angle

00 years of the

ows both hurr

. Note that thi

Bangladesh, n

mpare the annu

simulated 

y with the hist

er Risk A-8144)

101 051215

year 

of 

n the 

 

he 

g: 

ed on 

d use 

tation, 

n was 

ation 

ding 

e at 

icane‐

not 

ual 

torical 

Page 103: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

record. No

about less 

Figure 46

Years of

 

  

ote that detaile

than 40 landf

6. Distribution

f the Stochas

ed data from t

alling storms. 

n of Simulated

stic Catalog. T

 

the historical r

 

d Tropical Cy

The Intensity

Mak

record is availa

yclone Tracks

at First Land

king Landfall)

 

Final Repo

able for less th

s Affecting Ba

dfall is Indicat

ort on Capacity BuFinance in Ban

SF13-

han 40 years, c

angladesh Sa

ted (N/A Refe

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

corresponding

 

ampled from

ers to Storms

er Risk A-8144)

102 051215

g to 

1,000

s Not

Page 104: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

Figure 47

Figure 48

 

0.0

0.0

0.1

0.1

0.2

0.2

0.3

0.3

Annual Frequency

  

7. Comparison

in Ba

8. Compariso

00

05

10

15

20

25

30

35

4

Tr

Sim

Hist

0

0

0

0

0

0

0

0

Annual Frequency

n of the Histo

angladesh –

n of the Histo

5

Lan

ropical Cyclmulation

torical

.00

.05

.10

.15

.20

.25

.30

.35

CAT0

T

 

orical and Sim

Location of L

orical and Sim

in B

6

ndfall Segmen

one Freque

CAT1

Land

Tropical Cy

mulated Annu

Landfall Segm

mulated Annu

Bangladesh

 

6

nt

ency

CAT2 CA

dfall Strengt

yclone Fre

Final Repo

 

ual Landfall F

ments Shown

ual Landfall F

7

AT3 CAT4

th (SSHS)

equency

Simu

Hist

ort on Capacity BuFinance in Ban

SF13-

Frequency by

n on the Right

Frequency by

4 CAT5

ulation

orical

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

Landfall Seg

t

 

y Landfall Stre

er Risk A-8144)

103 051215

 

gment

ength

Page 105: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

5.4 L

Tropical cy

The measu

10

Fl

The gener

as a functi

forward sp

Cyclone M

The appro

gradient w

relationshi

applied re

Generation

frictional, 

or fetch. F

from an ar

based on t

winds at h

as it can ea

modulatio

and elevat

In the AIR

fall, and a 

Note that u

intensity a

In the AIR

intensity t

be higher, 

account fo

range), the                  11 Gradient w

earth’s supressure g

  

Local Hazar

yclone damag

ures of intensi

0‐meter, 1‐min

lood (accumul

ation of the lo

ion of intensity

peed and direc

Model for Bang

oach by Hollan

wind speed. Th

ip derived fro

egion‐specific p

n of the local w

and gustiness

or example, w

rea over water

the specific ter

higher terrain h

asily account f

ons of gradient

tion informatio

R Tropical Cyc

separate mod

unlike tropica

and the related

R model, rainfa

o account for v

for example i

or terrain influ

e enhanced ve                        wind is the flighturface no longer igradient force an

rd Intensit

ge to propertie

ty used in the 

nute sustainedlated runoff) d

cal wind field

y, radius of ma

ction, and then

gladesh, the gr

nd (1980) invo

he maximum 1

m North India

parameters de

wind field con

s effects. It also

wind blowing a

r than if it cam

rrain shape sur

heights. Local

for significant 

t wind are bas

on. 

lone Model fo

dule is then use

al cyclone wind

d flood hazard

all is a function

variations in r

n this region, 

uences. In locat

ertical motion c                   t‐level wind, or timparts any effecnd the Coriolis an

 

y Calculat

s is modeled f

AIR Tropical 

d winds in mile

depth in millim

d involves first

aximum wind

n downscaling

radient wind s

lves paramete

1‐minute aver

an Ocean basi

erived from M

ntinues by mod

o accounts for 

across a rough

me from an are

rrounding the

lization is an im

wind speed d

sed on a resolu

or Bangladesh,

ed to determin

ds, which gen

d can actually i

n of the storm

rainfall intensi

in the right fro

tions where w

causes higher 

the wind at the toct on the wind. Tnd centrifugal fo

ion

from local win

Cyclone Mod

es per hour meters 

t computing th

ds, latitude, dis

g the gradient

speed is calcul

ers determined

raged wind sp

n IMD storm d

Mishra and Gup

dulating the g

how these lat

h surface will b

a over an equa

e area in quest

mportant step

differences acr

ution of 5 km a

, the precipitat

ne the spatial d

erally decreas

increase as the

m intensity and

ity in each qua

ont quadrant. 

wind flows sha

rainfall amou

op of the planetaThat is, gradient wrces, in the absen

Final Repo

nd and flood (f

del for Banglad

he gradient wi

stance from th

t wind to the s

lated based on

d by establishi

eed Vmax was c

data. For this 

pta (1976) and

gradient wind 

tter three effec

behave differe

ally rough sur

tion. The eleva

p in determinin

ross very short

and include la

tion module id

distribution o

se as a storm m

e system move

d size. An adju

adrant of the s

Also, the hou

arply upslope (

unts. Converse

ary boundary laywind is the largence of friction eff

ort on Capacity BuFinance in Ban

SF13-

from precipita

desh are: 

ind at each mo

he storm cente

surface11. In the

n the work of H

ing a relations

calculated from

relationship, A

d IMD data. 

for elevation, 

cts are altered b

ently over that

rface. The shel

ation effect acc

ng the wind fi

t distances. Th

and use/land c

dentifies wher

f accumulated

moves inland, 

es inland. 

ustment is mad

storm. Rainfall

urly rainfall pa

(such as along

ely, a reduction

yer, which is the pe‐scale wind fieldfects. 

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

ation) intensiti

odel domain p

er, and storm 

e AIR Tropica

Holland (1980

ship for maxim

m a Cp‐wind 

AIR researche

sheltering, 

by wind direc

t surface if it c

ltering effect is

counts for high

ield at each po

hese local 

cover, terrain, 

re rain is likely

d runoff, or flo

precipitation 

de to the rainfa

l intensity ten

attern is adjust

g a mountain 

n in rainfall oc

point at which thd balanced betwe

er Risk A-8144)

104 051215

ies. 

point 

al 

0). 

mum 

rs 

ction 

ame 

her 

oint, 

slope, 

y to 

ood. 

all 

ds to 

ted to 

ccurs 

he een the 

Page 106: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

where the 

each locati

based on t

For a given

the fact tha

factor. Slow

weak‐win

used to de

After calcu

The redist

determine

fraction w

percolate d

sloped sur

The local h

plots the p

coast (Khu

F

 

  

wind is flowi

ion based on h

the terrain‐ind

n event, the st

at storm total 

w moving sto

d storms can r

etermine accum

ulating precipi

ribution depen

e what fraction

will percolate d

down than in 

rface than on o

hazard intensi

probabilistic w

ulna and Chitt

Figure 49. Pro

2

4

6

8

10

1

Maxim

um

 One

‐Minute

 Sustained

 Wind

 Speed

 (mph)

ng down‐slop

high‐resolution

duced vertical 

torm total rain

rainfall is accu

rms will subje

result in exten

mulated runof

itation totals, t

nds on soil typ

n of the falling

down than if th

an urban envi

one that is flat

ity is calculate

wind hazard fo

tagong) have a

obabilistic Tr

0

20

40

60

80

00

20

25

Probabil

 

pe. The slope in

n digital eleva

motion. 

nfall is determi

umulated over

ect any given l

nsive flooding 

ff. 

the flood mod

pe, land use/la

g precipitation 

he soil is clay. 

ironment. Fina

d at an approx

or select major 

a higher wind 

ropical Cyclo

50 100

Mean Retu

listic Tropi

nformation is 

ation data, wh

ined by accum

r time, the forw

location to rain

if they are also

dule then redis

and cover, and

is absorbed. I

Similarly, if th

ally, all else eq

ximate 5 km g

cities in Bang

hazard than t

ne Wind Haza

0 250

urn Period (Yea

ical Cyclon

Final Repo

determined in

hich is used to 

mulating the ho

ward speed of

nfall over a lon

o slow‐movin

stributes this w

d topography,

If the soil is san

he land is fore

qual, less preci

grid for each ev

gladesh. As exp

the more inlan

ard for Select

500 1,000

ars)

ne Wind Ha

ort on Capacity BuFinance in Ban

SF13-

n eight compa

determine a r

ourly rainfall 

f the storm is a

nger period of

ng. The storm t

water over the

, or slope—all 

ndy, for exam

ested, more pre

ipitation will b

vent. For exam

pected, the cit

nd city of Dhak

t Cities in Ba

0

azard

Dhaka

Chittag

Khulna

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

ass directions f

ainfall adjustm

amounts. Due

also an impor

f time. Thus, e

total rainfall is

e model doma

of which 

mple, a higher 

ecipitation wil

be absorbed o

mple, Figure 4

ties closer to th

ka.  

 

ngladesh

gong

a

er Risk A-8144)

105 051215

for 

ment 

e to 

tant 

even 

s then 

in. 

ll 

n a 

he 

Page 107: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

5.5 E

An integra

database c

and non‐p

height clas

for simula

unfolding 

residential

the econom

database c

disaster em

Banglades

5.5.1 P

A populat

This datab

population

governme

The popul

is the Divi

finest reso

levels of a

District Le

finest reso

database f

Corporatio

Banglades

(“Upazilas

Engineerin

 

  

Exposure D

al part of a cou

containing risk

physical charac

ssification of b

ated events fro

in real time. T

l buildings (st

mic losses sust

can be used as

mergency loss

sh exposure da

Population

tion database h

base serves as 

n database, wh

nt data, includ

lation databas

ision Level (lo

olution, the Sub

dministrative 

evel but is no l

olution admini

for the entire c

ons of Chittag

sh are listed in

s/Subdistricts 

ng Departmen

Database

untry‐wide ris

k counts and th

cteristics of the

buildings.  The

om a stochastic

The modeled e

ructures). This

tained due to 

 a proxy to est

estimates.  Th

atabase of buil

Database

has been deve

a primary inp

hich is produc

ding the 2011 P

e is available o

cally known a

bdistrict Level

divisions: the

longer officiall

istrative divisi

country, it has 

gong, Dhaka, K

n Table 39 and 

of Bangladesh

nt (LGED) of th

 

 

sk assessment 

heir respective

e modeled ass

ese databases p

c catalog, the r

exposure at ris

s database can

physical dama

timate the imp

his section pro

ldings, as well

loped in order

put to the expo

ced in both tab

Population an

on three levels

as bibhag), follo

l (locally know

 Region Level

ly recognized,

ion.  While the

been used for

Khulna, and R

shown in Figu

h (Admin 3)”) 

he Governmen

is the exposur

e replacement

sets at risk, suc

provide a foun

re‐creation of h

sk considered 

n be used, alon

age of buildin

pact on other s

ovides details a

l as its compos

r to spatially i

osure database

ble and GIS for

nd Housing Ce

s of administra

owed by the D

wn as upazila).

l (locally know

, and the Villa

e Village Level

r certain dense

ajshahi. A sum

ure 50. The Su

is obtained fro

nt of Banglade

Final Repo

re database, w

t values, along

ch as occupan

ndation for m

historical even

for this projec

ng with catastr

ngs from natur

sectors, such a

about the met

sition. 

identify the po

e of buildings 

rmat, is develo

ensus of Bangl

ative regions i

District Level (l

 Bangladesh a

wn as anchnal),

age Level (loca

l is not fully co

ely populated 

mmary of adm

ubdistrict Leve

om the GIS un

esh and has a v

ort on Capacity BuFinance in Ban

SF13-

which is a coun

g with informa

ncy type, const

odeled loss es

nts, or for actu

ct is residentia

rophe risk mo

ral hazards. In

as population i

thodology use

opulation at ri

and other mod

oped primaril

ladesh.  

in Bangladesh

locally known

also contains tw

, which is coar

ally known as 

onsidered in t

urban centers

ministrative div

el GIS bounda

nit of Local Go

vintage of 201

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

ntry‐specific 

ation about ph

truction type, 

stimates, whet

ual events 

al and non‐

odels, to estima

n addition, this

impact and po

d to develop t

sk in Banglade

deling efforts.

ly from officia

h.  The coarses

n as zila), and a

wo additional

rser than the 

thana), which 

the population

s, such as the C

visions in 

aries 

overnment and

10. 

er Risk A-8144)

106 051215

hysical 

and 

ther 

ate 

ost‐

the 

esh. 

. The 

al 

t level 

at the 

is the 

City 

Page 108: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

 

 

 

                  12 Includes 4

  

T

                        46 Thanas in City

Table 39. Sum

Figure 50. M

                   y Corporations of

Adm

 

mmary of Adm

Map of Admin

f Chittagong, Dh

inistrative Regio

Division

Region

District

Subdistrict

Village

ministrative R

nistrative Reg

haka, Khulna, and

on Local Na

Bibhag

Anchna

Zila

Upazila

Thana

Final Repo

Regions of Ba

gions of Bang

d Rajshahi 

ame Number

g 7

al 21

64

a 52712

a 4,556

ort on Capacity BuFinance in Ban

SF13-

angladesh

gladesh

r

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

 

er Risk A-8144)

107 051215

Page 109: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

According

The end‐o“adjusted”

1.37 percendensity of about 90 pin the counand approNote that density, hamay be dif

In addition

was also d

(http://ww

using seve

populated

resolution

population

Subdistric

resampled

for this pro

 

 

                  13 “QA/QC” 

  

g to the officialf‐year 2014 po” population ent.  BangladesBangladesh is

people per km2

ntry, with abooximate area fogeographical aave been calcufferent than as

n to the popul

developed for B

ww.worldpop.

eral input GIS 

d places, amon

n. This dataset 

n database des

t matches the 

d to an approx

oject and is pl

                        is quality assura

l government opulation is esestimate (149.8sh is the most s about 1,130 p2 in Bandarbanout 8% of the cor each Districarea values prulated from des obtained from

lation database

Bangladesh. T

org.uk/). Worl

datasets, inclu

ng several othe

was QA/QCed

scribed in the 

value from th

imate one kilo

otted in Figur

 

                   ance and quality 

 

census, the postimated at 1578 million as of densely populpeople per kmn to 9,000 peopcountry’s total ct Level. Figurrovided in the efined polygonm other source

e that is availa

The gridded po

ldPop spatial 

uding land cov

ers. The World

d13 (e.g., errors

sections above

he population d

ometer grid. T

e 52.  

control 

opulation of B7.7 million peoMarch 15, 201lated large cou

m2, but can varyple per km2 inpopulation. T

re 51 plots the database, wh

n area of the Ges, such as tho

able on the Sub

opulation data

datasets are d

ver, nighttime

dPop dataset is

s were identifi

e. Therefore, t

database. The 

The gridded po

Final Repo

angladesh in 2ople, based on11) and yearlyuntry in the wy quite signifin Dhaka. DhakTable 40 lists thestimated 201

hich are used toGIS shapefiles.ose from more

bdistrict Leve

aset was deriv

developed on r

e lights, roads 

s available for

ied and correc

the total gridd

final gridded

opulation data

ort on Capacity BuFinance in Ban

SF13-

2011 was 144.0n the official poy country‐wide

world. The avecantly by Distka is the most phe estimated 214 population o determine th.  As such, the e detailed stud

el, a gridded p

ved primarily f

regression‐bas

data, urban ex

r Bangladesh a

cted) and calib

ded population

d population d

aset for Bangla

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

0 million peopost‐census e growth rate rage populatiotrict, ranging fpopulated Dis2014 populatioby Subdistricthe population actual land ar

dies. 

opulation data

from WorldPo

sed methodolo

xtents, and 

at a 100 meter 

brated with the

n within each 

ataset was 

adesh develop

er Risk A-8144)

108 051215

ple.  

of on from strict on t.  rea 

aset 

op 

ogies 

ped 

Page 110: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

  

D

B

Ba

B

Bra

C

Chapa

Ch

Ch

C

Co

D

F

Ga

G

G

H

J

J

J

Jh

Jo

Kha

Kis

K

K

La

La

M

M

M

Ma

M

Mu

My

N

Na

N

N

Ni

N

Pa

Pa

P

R

Ra

R

S

S

S

S

Su

T

Th

Table 40. Su

District

Bagerhat

andarban C

Barguna

Barisal

Bhola

Bogra

hmanbaria C

Chandpur C

ai Nawabganj

hittagong C

huadanga

Comilla C

ox's Bazar C

Dhaka

Dinajpur

Faridpur

Feni C

aibandha

Gazipur

Gopalganj

Habiganj

amalpur

Jessore

Jhalokati

henaidah

oypurhat

agrachhari C

Khulna

shoreganj

Kurigram

Kushtia

akshmipur C

almonirhat

Madaripur

Magura

Manikganj

aulvibazar

Meherpur

unshiganj

ymensingh

Naogaon

Narail

rayanganj

Narsingdi

Natore

etrokona

ilphamari

Noakhali C

Pabna

anchagarh

atuakhali

Pirojpur

Rajbari

Rajshahi

angamati C

Rangpur

Satkhira

hariatpur

Sherpur

Sirajganj

unamganj

Sylhet

Tangail

hakurgaon

Bangladesh Tot

 

ummary of the

Division Est

Khulna

Chittagong

Barisal

Barisal

Barisal

Rajshahi

Chittagong

Chittagong

Rajshahi

Chittagong

Khulna

Chittagong

Chittagong

Dhaka

Rangpur

Dhaka

Chittagong

Rangpur

Dhaka

Dhaka

Sylhet

Dhaka

Khulna

Barisal

Khulna

Rajshahi

Chittagong

Khulna

Dhaka

Rangpur

Khulna

Chittagong

Rangpur

Dhaka

Khulna

Dhaka

Sylhet

Khulna

Dhaka

Dhaka

Rajshahi

Khulna

Dhaka

Dhaka

Rajshahi

Dhaka

Rangpur

Chittagong

Rajshahi

Rangpur

Barisal

Barisal

Dhaka

Rajshahi

Chittagong

Rangpur

Khulna

Dhaka

Dhaka

Rajshahi

Sylhet

Sylhet

Dhaka

Rangpur

tal

e Population

timated 2014 Popu

1,616,058

425,157

977,437

2,544,711

1,945,276

3,723,355

3,109,843

2,645,114

1,803,745

8,338,559

1,236,072

5,898,128

2,507,134

13,186,030

3,273,662

2,094,363

1,573,668

2,604,865

3,726,682

1,283,587

2,287,088

2,510,073

3,026,690

747,403

1,939,266

1,000,414

672,131

2,538,379

3,188,026

2,265,488

2,131,445

1,893,157

1,375,207

1,276,512

1,005,507

1,524,945

2,101,034

717,539

1,582,742

5,594,846

2,846,713

790,099

3,227,777

2,435,922

1,868,505

2,441,065

2,008,160

3,402,803

2,762,434

1,081,296

1,681,489

1,218,820

1,149,322

2,841,281

652,491

3,154,279

2,174,274

1,265,423

1,487,127

3,391,204

2,701,990

3,759,828

3,946,928

1,521,851

157,702,419

Final Repo

Database by

ulation Approx

ort on Capacity BuFinance in Ban

SF13-

y District

ximate Area (km2)

3,671

4,598

1,304

2,233

2,007

2,922

1,917

1,596

1,684

4,476

1,142

3,095

2,161

1,468

3,453

2,034

904

2,170

1,764

1,467

2,584

2,059

2,585

715

1,966

967

2,885

3,584

2,559

2,250

1,664

1,236

1,229

1,150

1,045

1,395

2,697

717

946

4,338

3,427

982

758

1,165

1,906

2,811

1,650

2,732

2,395

1,400

2,460

1,207

1,139

2,438

5,759

2,310

3,354

1,215

1,320

2,499

3,681

3,420

3,362

1,810

139,832

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

)

er Risk A-8144)

109 051215

Page 111: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

  

Figure 51

 

1. Estimated 2

2014 Populat

Final Repo

ion by Subdi

ort on Capacity BuFinance in Ban

SF13-

strict

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

er Risk A-8144)

110 051215

 

Page 112: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

  

Figu

 

re 52. Gridde

ed Population

Final Repo

n of Banglade

ort on Capacity BuFinance in Ban

SF13-

esh

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

er Risk A-8144)

111 051215

 

Page 113: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

5.5.2 D

The expos

outlined in

papers.  In

associated

modeling 

(specifical

replaceme

pertaining

is used in 

Figu

5.5.3 D

A wide va

data on ris

data and o

various re

exposure d

Risks and

Bangl

2011 P

Popul

  

Developing

ure database o

n Figure 53, us

nformation obt

d statistics (e.g

within Bangla

ly 30 arc‐secon

ent values for a

g to the physic

conjunction w

ure 53. Gener

Data Sourc

ariety of data s

sk counts, buil

other reports.  

gional and glo

database. 

d Attributes 

adesh Bureau 

Population and

lation Census 

g the Expos

of building is 

sing sources su

tained from th

., percentage o

adesh, the exp

nds). After the

all buildings.  

al characterist

with constructi

ral approach

es

sources are use

lding characte

Remotely sen

obal data sets. 

of Statistics 

d Housing Cen

2001, Volume

Gridded Populati

Spatial Cost Adjustment

Non‐Residential BuildiInferred  from ResidenExposure and Other D

 

sure Datab

developed fro

uch as official 

hese sources is

of dwellings b

osure databas

e risk counts a

Additional in

tics of the risk

ion cost estima

for developin

ed to develop 

eristics, and co

nsed data, such

Below is a list

nsus of Bangla

 3, Urban Area

onAve

D

Repper

ngs ntial ata

Exp

base of Bu

om the bottom

censuses, pub

s used to deriv

y construction

se is developed

are derived, a r

nformation obt

s such as floor

ates to derive t

ng the Bangla

the Banglades

onstruction cos

h as gridded p

t of select refe

adesh 

a Report 

rage Number of Dwellings per 

Person

Average placement Cost r Dwelling Floor 

Area

osure Database of Buildings

Final Repo

ildings

m up, following

blically availab

ve risk counts 

n type). To ens

d on an appro

rebuild cost ap

tained from ce

r area, constru

the replaceme

adesh exposu

sh exposure d

sts are obtaine

population esti

rences used in

PerceDwe

Constru

AveragFloor

Constru

ort on Capacity BuFinance in Ban

SF13-

g the general m

ble reports, an

(e.g., number 

sure detailed a

oximate 1 km x

pproach is use

ensus data and

uction type, he

ent values.  

ure database

database of bui

ed from recent

imates, are ob

n the developm

entage of llings by uction Type 

ge Dwelling r Area by uction Type

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

methodology 

nd academic 

of dwellings) 

and consistent

x 1 km grid 

ed to calculate

d other reports

eight, and year

 

of buildings

ildings.  Detai

tly available ce

tained from 

ment of the 

er Risk A-8144)

112 051215

and 

e the 

r built 

iled 

ensus 

Page 114: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

2010 R

Earthq

2009) 

Housi

Housi

Earthq

2008) 

Poten

Seism

Seism

et al., 

Evalu

(Alam

Construct

Earthq

2009) 

Bangl

Cyclon

Recon

A Stud

Scopin

Earthq

2008) 

Evalu

(Alam

Using

Housi

Housi

Housi

Group

Geograph

Gridd

Admi

Gridd

  

Report on Sam

quake Vulnera

ing Report ‐ Si

ing Report ‐ M

quake Resistan

tial Losses for

mic Vulnerabili

mic Loss Assess

2011) 

ation of Build

m et al., 2008) 

ion Costs 

quake Vulnera

adesh House B

ne Sidr in Ban

nstruction (GoB

dy on the Trad

ng Study ‐ The

quake Resistan

ation of Build

m et al., 2008) 

g High Resolut

ing Report ‐ Si

ing Report ‐ M

ing Finance in

ps (Hoek‐Smit

hical Data 

ded population

nistrative regi

ded GDP estim

mple Vital Regi

ability Assessm

ingle‐story bri

Mud house of B

nt Non‐Engine

r Sylhet, Bangl

ty Assessmen

sment of Dhak

ing’s Vulnerab

ability Assessm

Building Finan

ngladesh – Dam

B, 2008) 

ditional Housi

e state of socia

nt Non‐Engine

ing’s Vulnerab

tion Satellite D

ingle‐story bri

Mud house of B

n Bangladesh ‐

t, 1998) 

n data (WorldP

ion map (LGE

mates (NOAA, 

 

istration Syste

ment of Dhaka

ick masonry h

Bangladesh (W

eered Building

ladesh in a Rep

t of Buildings 

ka for Scenario

bility to Earth

ment of Dhaka

nce Corporatio

mage, Loss an

ing Technolog

al housing in B

eered Building

bility to Earth

Data for Identi

ick masonry h

Bangladesh (W

Improving A

Pop, 2013) con

D, 2010) 

2010) 

em (SVRS) 

a, Chittagong 

house (WHE, 2

WHE, 2007) 

g Construction

peat of the 191

of Dhaka City

o Earthquakes

quake in Old 

a, Chittagong 

on 

nd Needs Asse

gy of Banglade

Bangladesh (U

g Construction

quake in Old 

fication of Urb

house (WHE, 2

WHE, 2007) 

ccess to Housi

nditioned on th

Final Repo

and Sylhet Ci

2003) 

n for Rural Ar

18 Srimangal E

y (Sadat et al.,

s Using a Disp

Part of Sylhet 

and Sylhet Ci

essment for Di

esh (Uddin, 20

UNEP, 2013) 

n for Rural Ar

Part of Sylhet 

ban Natural R

2003) 

ing Finance by

he population

ort on Capacity BuFinance in Ban

SF13-

ity Corporatio

rea in Banglad

Earthquake (S

 2010) 

lacement‐Base

and Construc

ity Corporatio

isaster Recove

008) 

rea in Banglad

 and Construc

Risk (Deichman

y Middle and 

n database   

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

n City (CDMP

desh (Alam et a

Sarker et al., 20

ed Method (A

ction Safety Ru

n City (CDMP

ery and 

desh (Alam et a

ction Safety Ru

nn et al., 2011)

Lower Incom

er Risk A-8144)

113 051215

P, 

al., 

010) 

Alam 

ules 

P, 

al., 

ules 

me 

Page 115: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

5.5.4 O

The occup

residential

and apartm

housing). T

industrial,

offices, po

etc.) is not

5.5.5 C

Risk attrib

classificati

building m

modeled l

about the 

main build

for each Su

for each D

conjunctio

In classify

namely co

into a suff

imposed b

The constr

buildings. 

concrete co

occupancy

   

  

Occupancy

pancy classes c

l. The resident

ment units. Th

The non‐resid

, religious, gov

olice and fire se

t included.  

Constructio

butes such as c

ion of risks by

materials, qual

oss estimates. 

characteristics

ding type (e.g.

ubdistrict, and

District are ava

on with these a

ing the buildin

onstruction ma

icient number

by different ha

ruction classes

Construction 

onstruction cla

y class is mode

y Type

considered in t

tial occupancy

his also includ

dential occupan

vernmental (g

ervice, etc.), an

on Type

construction ty

 structural typ

lity, and desig

The starting p

s of the buildin

., jhupri/shacks

d statistics on t

ilable from the

and other data

ng stock, build

aterial, the load

r of distinct cla

azards. 

s shown in Tab

classes other 

ass is further c

eled as mason

 

the Banglades

y consists of dw

es non‐engine

ncy consists o

eneral service

nd educationa

ype and heigh

pe plays an im

gn all have a si

point in develo

ng stock such 

s, kutcha/temp

the break‐dow

e Bangladesh 

a sets to derive

dings are grou

d resisting me

asses that is un

ble 41 below a

than reinforce

categorized by

ry and reinfor

h exposure da

wellings withi

eered and imp

f non‐resident

 and emergen

al establishmen

t are key comp

mportant role in

gnificant impa

oping the cons

as shown belo

porary, semi‐pu

wn (e.g., bamb

Bureau of Stat

e structural typ

uped according

echanism, and

nique in terms

are considered

ed concrete are

y height as pro

rced concrete c

 

 

Final Repo

atabase of buil

in single‐fami

provised housi

tial establishm

ncy service, suc

nts. Infrastruc

ponents of the

n catastrophe 

act on buildin

struction distr

ow in Figure 5

ucka/semi‐perm

oo/wood or m

tistics. Engine

pe, occupancy

g to their main

d height.  This 

s of its structur

d in the Bangla

e classified as 

ovided in Tabl

construction. 

ort on Capacity BuFinance in Ban

SF13-

ldings are resi

ily houses, mu

ing (e.g., slum

ments, such as 

ch as post offi

cture (airports,

e exposure dat

modeling bec

ng vulnerabilit

ribution is gath

54 and Figure 5

manent, and p

mud wall) with

eering expertis

y, and height r

n structural ch

categorizes th

ral response to

adesh exposur

“low‐rise.”  T

le 42 below. T

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

idential and no

ulti‐family hou

ms and rural 

commercial, 

ices, municipa

, bridges, road

tabase.  The 

cause differenc

ty and ultimat

hering inform

55. Statistics o

pucka/permane

hin the kutcha

se is used in 

relationships. 

haracteristics, 

he building sto

o the loads 

re database of 

The reinforced 

The non‐reside

er Risk A-8144)

114 051215

on‐

uses, 

al 

ds, 

ces in 

ely 

mation 

on the 

ent) 

a class 

ock 

ential 

Page 116: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

Fig

  

gure 54. Percent of House

 

eholds by Typ

pe per Subdis

Final Repo

strict (Derived

ort on Capacity BuFinance in Ban

SF13-

d from the 20

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

11 Census)

er Risk A-8144)

115 051215

 

Page 117: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

Figu

Table

C

R

Ta

  

re 55. Percen

e 41. Constru

Construction Cl

Improvised

Bamboo/Woo

Mud Wall

Masonry

Reinforced Conc

able 42. Heigh

nt of Kutcha H

ction Classes

lass Lo

J

d Ku

Ku

Semi-Puand

crete Pu

ht Classes Co

 

Households b

s Considered

ocal Description

Jhupri (shacks)

utcha (temporary

utcha (temporary

ucka (semi-permPucka (permane

ucka (permanent

onsidered in

Height

Low-

Mid-

High-

by Constructi

d in the Bangl

n

Mad

y)

y)

manent) ent)

Wa

t) Made

the Banglade

Class Storie

-rise 1-3

rise 4-7

-rise 8+

Final Repo

ion Type (Der

ladesh Expos

de of jute sticks, rags, thatch, p

Frame made o

Made

alls are made pa(either reinforc

e of reinforced conon-e

esh Exposure

es

3

7

ort on Capacity BuFinance in Ban

SF13-

rived from the

sure Databas

Notes

tree leaves, jute polythene sheets

of bamboo, wood

of mud walls

artially or entirelyced or non-reinfo

oncrete (either enengineered)

e Database of

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

e 2010 SVRS

se of Building

sacks, tin, , etc.

d, etc.

y of bricks rced)

ngineered or

f Buildings

er Risk A-8144)

116 051215

 

)

gs

Page 118: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

5.5.6 R

After the r

values by 

estimates o

cost per sq

for buildin

outlined). 

semi‐puck

cost per dw

for rural a

urbanicity

and is sho

dwellings,

dwellings 

(apartmen

cost associ

The constr

values tha

spatially u

costs. The 

available d

                  14 BDT = Ban

  

Replaceme

risks and attrib

construction t

of dwelling flo

quare foot. Var

ngs of various 

For example, 

ka house and 2

welling by dif

nd urban area

y type (i.e., upp

wn in Figure 5

, which are fou

(concrete/mas

nts) is much hi

iated with non

ruction costs a

at represent the

using gridded 

value of non‐r

data. 

(Sou

Lo

Mi

Hig

                        ngladeshi Taka; 0

nt Values

butes are deriv

type.  The rebu

oor area by av

rious data sou

occupancies, 

the 2007 PDN

20,000 BDT for

fferent constru

as to incorpora

per urban, low

56.  Note that 

und mostly in

sonry). Also n

igher due to th

n‐livable floor 

are combined w

e building exp

GDP estimate

residential bu

Table 43. Ave

rce: Various

Construction

w-Rise Reinforce

d-Rise Reinforce

gh-Rise Reinforc

Masonry

Mud

Bamboo/W

Improvise

                   0.013 USD per BD

 

ved, a rebuild 

uild cost appro

verage constru

urces have bee

heights, and c

NA report on T

r a kutcha hou

uction types us

ate the regiona

wer urban, upp

the kutcha (m

n rural areas, h

note that unit r

he higher cons

area (stairwel

with risk coun

posure in the e

es as a proxy to

ildings is dete

erage Constr

Information S

n Type

ed Concrete

ed Concrete

ced Concrete

y

Wood

ed

DT 

cost approach

oach calculate

uction costs, wh

n leveraged to

construction ty

Tropical Cyclon

use. Table 43 li

sed for the exp

al dwelling siz

per rural, and 

mud or bamboo

have a consider

replacement co

struction costs 

lls, halls, lobby

nts (number of

exposure datab

o account for l

ermined as a fr

uction Costs

Synthesized b

Urban

1,050,000 – 1,3

2,200,000 – 2,7

3,120,000 – 3,7

350,000 – 504

N/A

N/A

5,000 – 6,0

Final Repo

h is used to ge

es replacement

hich are usual

o obtain estim

ypes (e.g., refe

ne Sidr assign

ists the range o

posure databa

ze and cost of 

lower rural) is

o/wood) and jh

rably lower va

ost of mid‐ and

 for higher qu

y, etc.).  

f dwellings) to

base.  These es

local and regio

raction of the 

per Dwelling

by AIR – see

350,000 540,

760,000

744,000

4,000 162,0

27,0

33,7

000 4,5

ort on Capacity BuFinance in Ban

SF13-

enerate buildin

t values by mu

lly expressed i

mates of rebuild

er to the data s

ns a cost of 100

of the average

ase. Different v

construction. 

s based on pop

hupri (improv

alue than the p

d high‐rise dw

uality construc

o calculate bui

stimates are fu

onal variation

residential val

g in BDT14

Section 5.5.3

Rural

,00 – 780,000

N/A

N/A

000 – 252,000

000 - 54,000

750 - 60,000

500 - 6,000

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

ng replacemen

ultiplying ave

in terms of a u

d cost per unit

sources previo

0,000 BDT for a

e unit replacem

values are assi

The modeled 

pulation dens

vised) type 

pucka type 

wellings 

ction and addi

ilding replacem

urther refined 

n in constructio

lue based on 

3)

er Risk A-8144)

117 051215

nt 

rage 

unit 

t area 

ously 

ment 

igned 

sity 

tional 

ment 

on 

Page 119: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

5.5.7 V

Raw data 

and econo

questionab

available, 

study by a

Food and 

(CDMP, 20

Chittagon

informatio

  

Validating t

sets are corrob

omic attributes

ble data.  In Ba

which allowed

a collaboration

Disaster Mana

009).  This stu

g, and Sylhet w

on on hazard, 

Figure 56. M

the Industr

borated agains

s.  When incon

angladesh, sev

d for direct co

n of the Compr

agement (MoF

dy is an earthq

which utilized

exposure (incl

 

Modeled Urba

ry Exposur

st alternative r

nsistencies are 

veral independ

omparisons wi

rehensive Disa

FDM), and the

quake risk ass

d high resoluti

luding the bui

anicity for the

re Databas

regional and g

discovered, a

dent reports co

ith the exposu

aster Managem

e Government 

sessment cond

ion satellite im

ilding stock), a

Final Repo

e Exposure Da

ses

global data set

additional rese

ontaining buil

re database of

ment Program

of the People

ducted in the m

magery, as wel

and vulnerabi

ort on Capacity BuFinance in Ban

SF13-

 

atabase

ts containing r

earch is condu

lding inventor

f buildings.  O

mme (CDMP), 

’s Republic of

major urban ce

ll as ground su

ility. A compa

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

reported build

ucted to verify 

ry data are 

One example is

the Ministry o

f Bangladesh 

enters of Dhak

urveys, to gen

arison focusing

er Risk A-8144)

118 051215

ding 

any 

s a 

of 

ka, 

nerate 

g on 

Page 120: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

rural areas

earthquak

In addition

indicators,

structures 

Bank, 2006

is estimate

Banglades

This comp

exposure d

Another p

power par

(e.g., Jaisw

5.5.8 E

The Bangl

country‐w

damage to

building s

catastroph

used for a 

to develop

deemed va

 

  

s was also con

ke vulnerability

n to checking 

, such as prod

(including inf

6), the produce

ed to increase 

sh (population

pares well to th

database. Note

point of aggreg

rity based), wh

wal and Wald, 

Exposure D

adesh exposu

wide risk assess

o disaster even

tock, but is rat

he modeling m

portfolio‐base

p the exposure

alid on an ave

nducted with d

y assessment o

the input data

duced capital a

frastructure) a

ed capital of B

to about 1,400

n ≈ 158 million

he 150 billion U

e that the prod

gate benchmar

hich is calculat

2011). 

Database L

re database of

sment to natu

nts. The exposu

ther an interpr

methodologies,

ed risk assessm

e database. As 

erage basis.    

 

data collected 

of a rural area

a sets, country

and GDP. Prod

and urban land

Bangladesh wa

0 USD per capi

), the total pro

USD for reside

duced capital e

rking is the rat

ted at about 2.

Limitations

f buildings has

ral hazards, w

ure database d

retation based

, and engineer

ment, certain s

such, the reso

from a study p

a in Bangladesh

‐wide values a

duced capital i

d. Based on es

as 1,007 USD p

ita based on a

oduced capital

ential and non

estimates inclu

tio of the expo

.7. This is in lin

s been develop

with the specifi

does not neces

d on available 

ring judgment

simplifications

olution, scope,

Final Repo

performed by 

h. 

are benchmark

is the total val

stimates from 

per capita in 2

annual trends o

l in 2014 is est

n‐residential s

ude other asse

osure value to 

ine with other 

ped for the pu

ic intent to est

ssarily represe

data, statistica

t. Since the dat

s, aggregation

, and precision

ort on Capacity BuFinance in Ban

SF13-

 Alam et al. (2

ked against va

lue of machine

the World Ban

2005. For the ye

of the same da

timated at abo

tructures deri

ets in addition

the GDP (PPP

studies of bui

urposes of a po

timate econom

ent truth or fac

al techniques, 

tabase has bee

n, and averagin

n of the exposu

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

2008), which w

arious indepen

ery, equipmen

nk (e.g., World

ear 2014, this v

ata. Thus, for 

out 220 billion 

ved from the 

n to structures

P ‐ purchasing

ilding exposur

ortfolio‐based 

mic losses from

ct of the actual

state‐of‐the‐ar

en designed to

ng have been u

ure database a

er Risk A-8144)

119 051215

was an 

ndent 

nt, 

value 

USD. 

re 

rt 

o be 

used 

are 

Page 121: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

5.5.9 S

This sectio

in the Ban

value (Cov

trillion BD

                  15 All values

trend of d

  

Summary o

on provides su

gladesh expos

verage A) only

DT.  

Populat

Capital

Local C

Exchan

GDP

GDP pe

GDP (P

Urban P

Househ

Exposu

Exposu

Exposu

Total Re

Residen

Non-Re

Residen

                        s derived from fodata from the Wo

of the Expo

ummary statist

sure database 

y.  The total re

Table 44. Ban

tion

Currency

nge Rate to USD

er Capita

PP)

Population

holds with Elect

ure Database Sc

ure Vintage

ure Native Reso

eplacement Val

ntial Replacem

esidential Repla

ntial Dwellings

                   or the project, exporld DataBank 

 

osure Data

tics, as well as

of buildings.  

eplacement cos

ngladesh Exp

D

tricity Connectio

cope

lution

ue

ent Value

cement Value

pect GDP, GDP (

base of Bu

s maps showin

The replacem

st of modeled 

posure Summ

on

Reside

(PPP), and urban

Final Repo

uildings

ng the spatial d

ment values pre

buildings in B

mary Statistic

BDT (

11,334

30,805

ential and Non-Re(Cove

0.00833(approxima

11,525

8,261

3,264

n population, wh

ort on Capacity BuFinance in Ban

SF13-

distribution of

esented below

Bangladesh is 

s (2014)15

157,702,4

Dha

(Bangladeshi Ta

0.0

4,503,900,000 B

934 U

5,914,231,679 B

33.6

57.0

esidential Buildinerage A - Structu

End 20

3 Decimal Degreate 1km x 1km gr

5,959,062,475 B

1,929,928,875 B

4,029,133,600 B

35,500,0

hich is inferred fr

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

f exposure val

w include struc

approximatel

419

aka

ka)

013

DT

SD

DT

6 %

0 %

ngs ure)

014

ees rid)

DT

DT

DT

080

rom a 2009‐2013 l

er Risk A-8144)

120 051215

lues 

cture 

ly 11.5 

linear 

Page 122: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

  

Figuure 57. Gridde

 

ed Replaceme

ent Cost Map

Final Repo

p of All Model

ort on Capacity BuFinance in Ban

SF13-

led Buildings

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

s

er Risk A-8144)

121 051215

 

Page 123: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

  

Figure 59

Figure 60. S

Figure 58. Sh

9. Share of Re

Share of Non

 

hare of Dwell

esidential Ex

-Residential

ings by Cons

xposure Value

Exposure Va

Final Repo

struction per

e by Construc

lue by Const

ort on Capacity BuFinance in Ban

SF13-

 

Division

 

ction per Divi

 

truction per D

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

ision

Division

er Risk A-8144)

122 051215

Page 124: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

 

  

Tab

District

Bagerha

Bandarba

Barguna

Barisal

Bhola

Bogra

Brahmanba

Chandpu

Chapai Nawa

Chittagon

Chuadang

Comilla

Cox's Baz

Dhaka

Dinajpur

Faridpur

Feni

Gaibandh

Gazipur

Gopalgan

Habigan

Jamalpu

Jessore

Jhalokat

Jhenaida

Joypurha

Khagrachh

Khulna

Kishorega

Kurigram

Kushtia

Lakshmip

Lalmonirh

Madaripu

Magura

Manikgan

Maulvibaz

Meherpu

Munshiga

Mymensin

Naogaon

Narail

Narayanga

Narsingd

Natore

Netrokon

Nilphama

Noakhal

Pabna

Panchaga

Patuakha

Pirojpur

Rajbari

Rajshah

Rangama

Rangpu

Satkhira

Shariatpu

Sherpur

Sirajgan

Sunamga

Sylhet

Tangail

Thakurgao

Bang

ble 45. Numbe

t Division

at Khulna

an Chittagong

a Barisal

Barisal

Barisal

Rajshahi

aria Chittagong

ur Chittagong

abganj Rajshahi

ng Chittagong

ga Khulna

Chittagong

zar Chittagong

Dhaka

r Rangpur

r Dhaka

Chittagong

ha Rangpur

r Dhaka

nj Dhaka

nj Sylhet

ur Dhaka

e Khulna

ti Barisal

ah Khulna

at Rajshahi

hari Chittagong

Khulna

anj Dhaka

m Rangpur

Khulna

pur Chittagong

hat Rangpur

ur Dhaka

a Khulna

nj Dhaka

zar Sylhet

ur Khulna

anj Dhaka

ngh Dhaka

n Rajshahi

Khulna

anj Dhaka

di Dhaka

Rajshahi

na Dhaka

ari Rangpur

li Chittagong

Rajshahi

arh Rangpur

ali Barisal

r Barisal

Dhaka

hi Rajshahi

ati Chittagong

r Rangpur

a Khulna

ur Dhaka

r Dhaka

nj Rajshahi

anj Sylhet

Sylhet

Dhaka

on Rangpur

ladesh Total

 

er of Dwelling

Number of Dwellings

R

390,933

g 90,011

236,105

567,134

409,088

960,761

g 590,624

g 555,927

392,546

g 1,695,091

305,904

g 1,167,323

g 462,427

3,118,239

789,104

467,153

g 308,130

668,130

915,924

273,641

430,705

620,164

724,609

173,129

464,580

269,439

g 147,656

606,951

690,856

557,189

525,818

g 401,727

318,346

278,021

226,274

356,781

396,237

181,500

347,476

1,277,875

724,478

179,917

743,287

527,361

465,260

525,698

460,891

g 652,823

647,833

250,662

380,424

282,955

260,745

692,858

g 143,134

794,744

517,307

271,197

373,176

789,396

483,181

659,750

959,753

353,722

35,500,080

gs and Replac

ResidentialReplacement Value

(million BDT)

25,847.8

5,164.4

11,022.4

60,699.9

20,804.8

106,264.4

61,139.1

50,927.8

58,847.3

743,766.4

43,348.6

162,451.5

41,377.4

3,954,614.7

75,696.0

42,153.2

51,134.2

44,096.7

224,830.3

17,179.0

30,324.1

38,477.1

116,886.6

12,334.3

58,588.5

22,969.8

7,782.6

207,318.6

61,270.0

27,159.8

70,390.0

31,152.3

17,290.1

20,491.6

17,478.2

22,847.6

42,931.5

27,033.0

41,413.7

100,218.8

56,336.2

12,512.8

357,346.5

68,098.2

40,760.9

25,797.3

39,331.9

56,684.1

66,141.8

13,920.6

20,988.7

16,092.0

17,899.8

152,352.7

8,785.1

86,019.2

58,937.4

14,951.6

23,500.8

63,611.6

34,674.2

159,098.3

65,636.5

26,727.6

8,261,930

Final Repo

cement Value

Non-ResidentiaReplacement Va

(million BDT)

2,127.4

373.9

430.0

12,509.1

1,268.6

21,611.0

8,499.6

5,894.5

11,536.6

329,336.8

5,862.6

35,868.0

7,836.7

2,172,384.6

14,230.5

5,121.7

10,132.8

4,497.8

66,890.7

1,120.8

2,431.9

3,834.9

23,457.4

1,193.8

8,469.1

2,985.1

459.0

83,795.3

9,900.8

1,019.3

13,744.3

2,533.2

775.2

1,866.8

1,583.7

1,311.9

4,953.7

4,167.6

6,892.1

16,059.2

7,837.2

1,183.5

147,132.1

12,317.8

5,021.0

1,526.0

6,116.5

6,088.3

10,566.7

776.4

1,791.0

950.3

1,433.3

55,195.1

652.6

18,302.3

6,770.5

764.6

2,439.5

8,232.5

3,142.6

46,414.8

6,704.0

3,702.3

3,264,029

ort on Capacity BuFinance in Ban

SF13-

e per District

allue

TotalReplacemen

(million B

27,975

5,538.3

11,452

73,209

22,073

127,875

69,638

56,822

70,383

1,073,10

49,211

198,319

49,214

6,126,99

89,926

47,274

61,267

48,594

291,721

18,299

32,756

42,312

140,344

13,528

67,057

25,954

8,241.6

291,113

71,170

28,179

84,134

33,685

18,065

22,358

19,061

24,159

47,885

31,200

48,305

116,278

64,173

13,696

504,478

80,416

45,781

27,323

45,448

62,772

76,708

14,697

22,779

17,042

19,333

207,547

9,437.7

104,321

65,707

15,716

25,940

71,844

37,816

205,513

72,340

30,429

11,525,9

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

nt Value BDT)

.2

3

.4

.0

.4

5.4

.7

.3

.9

03.2

.2

9.5

.1

99.3

.5

.9

.0

.5

1.0

.8

.0

.0

4.0

.1

.6

.9

6

3.9

.8

.1

.3

.5

.3

.4

.9

.5

.2

.6

.8

8.0

.4

.3

8.6

.0

.9

.3

.4

.4

.5

.0

.7

.3

.1

7.8

7

1.5

.9

.2

.3

.1

.8

3.1

.5

.9

959

er Risk A-8144)

123 051215

Page 125: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

5.6 D

In the dam

are superim

The AIR d

accumulat

cost of the

a structure

intensity is

runoff dep

occupancy

In the AIR

on enginee

to wind lo

occupanci

Wind dam

windows. 

In addition

account fo

low‐rise (1

that wind 

rise buildi

other hand

buildings 

materials. 

The dama

event, thu

estimation

location. 

In the AIR

depends o

building is

constructio

is usually 

  

Damage Es

mage estimatio

mposed onto 

damageability 

ted runoff dep

e building and 

e or portfolio o

s defined in te

pth (in mm). T

y, construction

R Tropical Cyc

ering analyses

oads dependin

es, separate da

mage primarily

n, the model’s

or building hei

1‐3 stories), mi

speeds increa

ng may exper

d, while the w

are generally l

ge estimation 

s capturing th

n module captu

R Tropical Cyc

on the depth of

s expected sus

on is expected

restricted to th

stimation

on (vulnerabili

a database of e

relationships,

pth and the me

the replaceme

of structures in

erms of wind s

The model offe

n, and height c

lone Model fo

s of different ty

ng upon their c

amage functio

y affects the no

s damage func

ight. Separate 

id‐rise (4‐7 sto

se with height

rience much lo

wind hazard in

less vulnerabl

module devel

he effects of wi

ures storm du

lone Model fo

f inundation, a

stain more dam

d to be even les

he lower storie

 

ity) componen

exposed prop

 or damage fu

ean damage ra

ent value. Dam

nto monetary 

speed (one‐mi

ers separate wi

classes. 

or Bangladesh,

ypes of buildin

characteristics 

ons were deve

onstructural el

ctions for apart

damage funct

ories), and high

t, and this effe

ower wind spe

creases with h

le since they ar

lops a complet

ind duration a

uration by cons

or Bangladesh,

and building c

mage than a m

ss vulnerable 

es of a buildin

nt of the mode

erties and the 

unctions, repre

atio (MDR). Th

mage function

loss. In the AI

inute sustained

ind and flood 

, wind vulnera

ngs subjected 

such as const

loped for sing

lements of res

tment buildin

tions have bee

h‐rise (8 storie

ect is significan

eeds than the u

height, vulnera

re typically be

te time profile

and peak wind

sidering the co

, the amount o

construction, o

masonry buildi

to flood loads

ng. This means

Final Repo

el, the local int

resulting mon

esent the relati

he MDR is the

ns translate the

IR Tropical Cy

d winds at 10‐

damage funct

ability functio

to wind loads

truction and oc

gle family hom

sidential prope

ngs and comme

en developed f

es and higher)

nt. For a given

upper floors o

ability typicall

etter construct

e of wind spee

d speeds on str

omplete time p

of flood damag

occupancy and

ing for a given

s. From a flood

s that mid‐ and

ort on Capacity BuFinance in Ban

SF13-

tensities of eac

netary damag

ionship betwe

e average ratio

e intensity of t

yclone Model 

‐meter height)

tions for vario

ons have been 

s. Buildings re

ccupancy. In t

mes and apartm

erties, such as 

ercial building

for each of thr

. Wind speed 

n storm at a gi

of a high‐rise b

ly decreases. H

ted and are ma

eds at each loc

ructures. The 

profile of win

ge that a build

d height. For e

n flood depth. 

d hazard persp

d high‐rise bu

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

ch simulated e

e is then calcu

een wind spee

o between the 

the hazard affe

for Banglades

) and accumul

ous combinatio

developed bas

espond differe

terms of reside

ment building

cladding and 

gs explicitly 

ree height rang

profiles indica

ven location, a

building. On th

However, high

ade of better 

ation affected

AIR damage 

d speeds at ea

ding will susta

example, a ku

Concrete 

pective, the im

uildings typica

er Risk A-8144)

124 051215

event 

ulated. 

d or 

repair 

ecting 

sh, 

lated 

ons of 

sed 

ently 

ential 

s. 

 

ges: 

ate 

a low‐

he 

h‐rise 

 by an 

ach 

ain 

tcha 

mpact 

ally 

Page 126: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

experience

of the buil

The flood 

Numerical

Reduction

vulnerabil

vulnerabil

The wind 

shown illu

proprietar

Figure

Figure

  

e a lower dam

lding is affecte

damage funct

l Methods in E

n (GAR). The C

lity functions a

lity functions u

and flood dam

ustratively in F

ry nature of th

61. Damage

62. Damage F

Damage

 Ratio

Damage

 Ratio

mage ratio for a

ed. 

tions are based

Engineering (C

CIMNE metho

aimed at reflec

using referenc

mage function

Figure 61 and 

he damage fun

Functions fo

Functions for

B

Kutcha

Masonry ReLow‐Rise CoMasonry NoLow‐Rise CoMid‐Rise CoHigh‐Rise C

Kutcha

Masonr

Low‐RisMid/Hig

 

a given flood d

d on the Globa

CIMNE, 2013) 

odology consis

cting the most

ce information

s used in the i

Figure 62, resp

nctions.  

or Tropical Cy

Cyc

r Flooding fro

Bangladesh T

Win

esidential

oncrete Resideon‐Residentialoncrete Non‐Roncrete Non‐RConcrete Non‐R

F

ry

se Concretegh‐Rise Concre

depth than low

al Risk Model 

for the Globa

sts of proposin

t important va

n from similar 

in the AIR Tro

pectively. Not

yclone Induce

clone Model

om Tropical C

Tropical Cyclo

nd Speed

ential

Residential

esidential

Residential

lood Depth

ete

Final Repo

w‐rise building

issued by the 

al Assessment 

ng a series of s

ariables. It con

published stu

opical Cyclone

te that plot axe

ed Wind used

Cyclone Induc

one Model

ort on Capacity BuFinance in Ban

SF13-

gs because a sm

International 

Report on Dis

simplified, ind

nsidered some 

udies (e.g., FEM

e Model for Ba

es are remove

d in the Bang

ced Precipita

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

maller propor

Centre for 

saster Risk 

dicative 

indicative flo

MA, 2011). 

angladesh are 

ed to retain the

 

ladesh Tropic

 

ation used in

er Risk A-8144)

125 051215

rtion 

od 

cal

the

Page 127: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

5.7 M

The likelih

simulation

of wind an

where asse

calculated

country ris

of differen

to repair o

To generat

years may

are then ra

on the larg

each mode

dividing th

ranked (hi

0.002 (20/1

loss level e

and 100‐ye

The averag

term meas

all the agg

the numbe

in year tw

Table 46 an

modeled l

precipitati

separate d

exposure v

Banglades

precipitati

years. 

Figure 64 a

sense of th

  

Modeled Lo

hood of future

n approach. Fo

nd flood from 

ets in the expo

 by the damag

sk profile via a

nt severities th

or replace dam

te the EP curv

y have multiple

anked from hi

gest event loss

eled year). Fin

he rank of the

ighest loss) ev

10,000) or 0.40%

equals the inv

ear return per

ge annual loss

sure of loss tha

gregate loss est

er of years the

o and 4 millio

nd Figure 63 s

osses are due 

ion (e.g., the m

discussion on t

value, which g

sh are collectiv

ion exceeding 

and Figure 65 

he geographica

oss Summa

e losses due to 

or each simula

precipitation 

osure database

ge estimation m

an exceedance

hat will occur w

maged/destroye

ve, the loss for 

e events, some

ghest loss to lo

s within each m

nally, EPs corre

 loss year by t

ent would hav

%, the 100th‐r

erse of EP: EP

iods.  

s (AAL) is the 

at, on average,

timates for eac

 catalog consid

on in loss in ye

show the tropi

to damage to 

modeled losses

these topics in

gives a sense o

vely expected t

about USD 2.4

illustrate the 

al distribution

 

ary

tropical cyclo

ated event in th

intensity mea

e are modeled

module. The r

e probability (E

within the nex

ed buildings.

each simulate

e a single even

owest loss, ba

modeled year)

esponding to e

the number of 

ve an EP of 0.0

ranked event a

Ps of 0.01%, 0.2

mean value of

, can be expec

ch year for the

ders. For exam

ear seven, the A

ical cyclone m

buildings from

s presented he

 a later section

of the relative i

to incur an an

4 billion (or ab

modeled aggr

n of the losses t

one events of d

he stochastic c

sures. The inte

.  For each eve

results of this r

EP) curve. The

xt year. The mo

ed event in eac

nt, and some n

sed on loss fig

) or aggregate lo

each loss—occ

years in the c

0001 (1/10,000)

an EP of 0.01 (1

20%, and 1.00%

f a loss exceed

cted to be expe

e events in the

mple, over the 

AAL for this p

modeled loss ri

m tropical cycl

ere do not cons

n). The table al

impact. For ex

nual loss due 

bout 1.6% of th

regate‐based a

throughout Ba

Final Repo

different sever

catalog, the ha

ensity values a

ent, the effects

repeated simu

e risk profile e

odeled losses 

ch modeled ye

no events. The

gures calculate

oss (based on 

currence or ag

atalog. Thus f

) or 0.01%, the

100/10,000) or

%, for example

dance probabil

erienced annu

e stochastic cat

course of 10 y

period would b

sk profile for B

lone induced 

sider storm su

lso shows the 

xample, Table 

to tropical cyc

he total value)

average annua

angladesh. Fig

ort on Capacity BuFinance in Ban

SF13-

rity has been e

azard model co

are then extra

s on modeled a

ulation are the

expresses the l

reflect the esti

ear is calculate

e losses from th

ed for either oc

the sum of all 

ggregate—are 

for a 10,000‐ye

e 20th‐ranked 

r 1.00%. The re

e, correspond 

lity (EP) distri

ally. It is comp

talog and divi

years, if there i

be (1+4)/10 = 0

Bangladesh. N

wind and floo

urge or other s

losses relative

46 shows that

clone wind an

) on average, o

al loss (AAL) b

gure 64, which

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

estimated via a

omputes the f

cted to all loca

assets are 

n assembled i

likelihood of l

imated cost ne

ed. Some mod

he modeled ye

ccurrence loss (

 event losses o

calculated by 

ear catalog, the

event an EP o

eturn period fo

to 10,000‐, 500

ibution. It is a 

puted by sum

ding the total 

is 1 million in 

0.5 million in l

Note that the 

oding from 

sectors – refer 

e to the model

t buildings in 

nd flood from 

once every 100

by District, to g

h plots the abs

er Risk A-8144)

126 051215

fields 

ations 

in the 

osses 

eeded 

deled 

ears 

(based 

of 

e top‐

of 

or a 

0‐, 

long 

ming 

by 

loss 

loss. 

to a 

led 

give a 

solute 

Page 128: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

AAL, show

Khulna). T

AAL norm

along the c

  

ws that large c

This is expecte

malized by exp

coast, as expec

Table

Return Peri(years) 

2 5 10 20 50 100 500 

Average AnnuaNote: Mo

Figur

0

500

1,000

1,500

2,000

2,500

3,000

3,500

4,000

Modeled

 Loss

 (Million

 USD)

Tr

concentrations

ed, as these dis

posure value, s

cted (e.g. refer

e 46. Tropical

iod  Aggreg

Mod

(mill

1

5

9

1

1

2

3

al (AAL)  3

deled loss due to 

e 63. Tropica

AAL

opical Cyclo

Aggrega

Occurre

Note: Model

from tropicafrom precipit

 

s of AAL are in

stricts have lar

shows that the

r Figure 1).  

l Cyclone Mo

gate‐Based deled Loss lion USD) 

Ag

N

E

134.2

539.1

908.9

,302.3

,917.2

,403.1

,652.6

331.4

damage to buildinprecipitat

al Cyclone Mo

2 5

Mea

one Modeled

ate

ence

ed loss due to daml cyclone induced tation (no storm s

n districts with

rge concentrat

e highest relati

deled Loss R

ggregate‐BasedModeled Loss Normalized by Exposure Value 

0.09%

0.36%

0.61%

0.87%

1.28%

1.60%

2.44%

0.22%

ngs from tropical ction (no storm sur

odeled Loss R

 

10 2

n Return Perio

d Loss Risk P

mage to buildings wind and floodingurge)

Final Repo

h major cities 

tions of exposu

ive impact of t

Risk Profile fo

Occurrence‐BaModeled Los(million USD

103.0

403.6

708.3

1,042.7

1,548.1

2,000.6

3,204.1

259.1

cyclone induced wrge). 

Risk Profile fo

0 50

od (Years)

Profile for Ba

ort on Capacity BuFinance in Ban

SF13-

(e.g., Dhaka, C

ure value. Figu

tropical cyclon

or Banglades

ased ss D) 

Occurren

Model

Norma

Exposur

0.0

0.2

0.4

0.7

1.0

1.3

2.1

0.1

wind and flooding f

or Banglades

100 50

angladesh

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

Chittagong, an

ure 74, which

ne risk is situa

h

nce‐Based ed Loss lized by re Value 07% 27% 47% 70% 03% 34% 14% 17% from 

 

sh

0

er Risk A-8144)

127 051215

nd 

plots 

ated 

Page 129: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

Figure 64

Figure 65

  

4. Tropical Cy

5. Tropical Cy

clone Modele

yclone Model

 

ed Aggregate

ed Aggregate

Value, for Ba

e-Based Avera

e-Based Aver

angladesh by

Final Repo

age Annual L

rage Annual L

y District

ort on Capacity BuFinance in Ban

SF13-

Loss for Bang

 

Loss, Norma

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

gladesh by D

lized by Expo

er Risk A-8144)

128 051215

istrict

osure

Page 130: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

5.8 C

Coastal resurge mod

Cyclone Mgeneral risresults of t

To assess toverlaid oSpace Resehistorical cbasis for thwere digitFor the SPare definedbetween 0final analyBhola Distzone.  

For each Dquantify tha “High Rin Table 48calibration

surge. For modeled eto consideBhola is pastorm surg

The effect directly froAAL with

the consid

 

  

Considerat

gions of Bangldeling can takeModel for Bangsk due to stormthe existing tro

the concentratn publically aearch and Remcyclones fromhe geographictized using GISPARRSO map, d by inundatio.5 to 6 meters.

ysis. Results oftrict, over 95%

District, a qualhe general surisk” zone, it is8. These loss fan on past recenexample, a lo

event, the troper the effect of articularly at‐rge risk for each

of these factorom the model

the applicatioderation of stor

ion of the

ladesh are hige several yearsgladesh does nm surge, a seriopical cyclone

tion of assets pvailable stormmote Sensing O 1960 to 2007 fcal distributionS software and“High Risk” aon depths gre. The higher off the GIS analy

% of the modele

itative descriprge risk as shos classified as “actors, which nt events, is aposs factor of 5 hpical cyclone lostorm surge forisk to storm sh District in B

rs on the losse (which does non of the stormrm surge. 

 

Effect of S

ghly exposed ts to develop. Gnot explicitly cies of analysese model. 

potentially expm surge risk mOrganization (from the Bangn of storm surgd were overlaiand “Risk” zoater than 6 me

f the two risk ysis are shown

ed exposure v

ptor (storm surwn in Table 48“Red”. Finallyis based prima

pplied to each has been assigosses (due to wor that Districsurge, as notedangladesh. As

es is shown Fignot include stom surge loss fa

Storm Surg

to storm surgeGiven the scopconsider the efs were perform

posed to stormaps. The tropi(SPARRSO) angladesh Instituge risk (e.g., seid on the expones are self‐deeters and “Riskzone definition in Table 47. Fvalue is in the 

rge risk index 8. Since Bholay, the storm suarily on availaDistrict to inc

gned to Bhola Dwind and prect. A similar prd during the 1s expected, onl

gure 68 – the lorm surge), wactors. As expe

Final Repo

ge

e risk. Due to ipe and timelin

ffect of storm smed using ava

m surge risk, thical cyclone risnd an inundatute of Water Mee Figure 66). osure databaseefined. For thek” zones are dons from theseFor example, t“Risk” zone a

 – red, yellow,

a District has ourge risk indexable historical corporate the eDistrict, which

cipitation) are rocedure is do970 Bhola Cycly coastal area

left image showwhile the right iected, the losse

ort on Capacity BuFinance in Ban

SF13-

its complexity,

ne of this TA, tsurge. In ordeailable public i

he exposure dsk map from ttion risk map gModeling (IWM

These publicae derived for te IWM map, “defined by inue two maps is cthe analysis inand 46% is in th

, or green) is tover 40% of itsx is assigned adata and judgeffects of losseh means that fmultiplied byone for coastal clone. Figure 6as are at risk to

ws the normal

image shows es along the co

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

, explicit stormthe AIR Tropicer to assess theinformation an

atabase was the Bangladeshgenerated fromM) were used aally available mthe current proHigh Risk” zoundation depthconsidered in ndicates that inhe “High Risk

then given to s exposure valua loss factor as gment, as well

es due to stormfor any given y 5 for Bhola DDistrict. Note

67 plots the ino storm surge.

lized AAL comthe normalize

oast are larger

er Risk A-8144)

129 051215

m cal e nd 

h m 18 as the maps oject. ones hs the n k” 

ue in listed l as m 

District e that ferred .  

ming ed r with 

Page 131: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

Figure 66

 

  

6. General Sto

Table

StorRis

Y

G

orm Surge Ri

Table 47. Re

District

Cox's Bazar

Bhola

Chittagong

Barguna

Patuakhali

Noakhali

Lakshmipur

Jhalokati

Pirojpur

Barisal

Feni

Bagerhat

Satkhira

Khulna

Shariatpur

Chandpur

e 48. Definitio

rm Surge sk Index

Red O

Yellow

Green

 

isk in Bangla

elative Storm

Modeled ExpoValue at “Risfor Storm Su

>95%

>95%

>95%

>95%

>95%

>95%

>95%

>95%

>95%

>95%

92%

55%

9%

55%

73%

50%

on of Surge R

Over 40% of Exp

Over 95% of E

Over 25% of E

desh from SP

m Surge Risk E

osure sk”

urge

ModeValue a

for S

Risk Index and

Definition

posure Value in “

Exposure Value i

Exposure Value in

Final Repo

PARRSO (left

Exposure by

led Exposure at “High Risk”

Storm Surge

83%

46%

23%

22%

22%

20%

5%

<5%

<5%

<5%

6%

<5%

<5%

<5%

<5%

<5%

d Associated

High Risk” Zone

n “Risk” Zone

n “ Risk” Zone

ort on Capacity BuFinance in Ban

SF13-

t image) and

District

Storm Surge Risk Index

Red

Red

Yellow

Yellow

Yellow

Yellow

Yellow

Yellow

Yellow

Yellow

Green

Green

Green

Green

Green

Green

d Loss Factor

Loss Facto

e 5

2.5

1.5

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

IWM (right im

rs

or

er Risk A-8144)

130 051215

 

mage)

Page 132: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

Figure 6

  

8. Normalized

and

Figure 67

d Average An

d Results Co

 

7. Inferred Sto

nnual Loss by

nsidering the

orm Surge Ri

  

y District – Re

e Effect of Sto

Final Repo

isk in Bangla

esults Directl

orm Surge (R

ort on Capacity BuFinance in Ban

SF13-

 

desh

ly from the M

Right Image)

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

Model (Left Im

er Risk A-8144)

131 051215

mage)

Page 133: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

5.9 V

In general,Several recfor BanglaRashmi, 20main objecincluding The tropicTRMM.  

Note that texample, ois due to wRashmi, re

Figure 69 sDistrict, ofpopulation

normalize

Figure 6

  

Validation o

, all model comcent historicaladesh. These in009 TC Bijli, 20ctives of the vathe hazard, dacal cyclone eve

the events seleover 95% and wind damage. espectively, is 

shows an examf the reported n) is compared

d the exposur

69. Tropical C

on Historic

mponents andl tropical cyclonclude most o009 TC Aila, 2alidation procamage functioent parameters

ected for the v75% of the mo

On the other hdue to precip

mple validatioimpact (displad with the mo

re value). In ge

Cyclone Sidr –

 

cal Events

d model lossesone events wer

f the recent m2012 TC BOB 0cess was to vetons, and overas necessary for

validation encoodeled loss frohand, over 95%itation induce

on exercise forayed as the redeled impact eneral, the mo

– Reported Im

s are validatedre modeled to

major tropical c01, 2013 TC Ma

t the major comll loss estimat

r model input

ompass both rom the 1991 Ba% and 90% of ed flooding da

 Tropical Cyclported numbe

(displayed as deled results c

mpact (Left Im

Final Repo

d with the lateso validate the Acyclones, such ahasen, and thmponents of thtes, both on a gt are generally

rain‐heavy andangladesh Cycthe modeled l

amage.  

lone Sidr. Theer of people afthe inferred locompare favor

mage) and Mo

ort on Capacity BuFinance in Ban

SF13-

st available daAIR Tropical Cas 2007 TC Sihe 1991 Banglahe catastropheglobal scale any derived from

d wind‐heavyclone and TC loss from the T

e geographicalffected norma

oss considerinrably with the

odeled Impact

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

ata and scienceCyclone Risk Mdr, 2008 TC adesh Cyclonee risk model, nd a regional sm IBTrACS and

 events. For Sidr, respectivTC Aila and T

l variation, by lized by the ng storm surgee reported imp

ted (Right Im

er Risk A-8144)

132 051215

e. Model 

e. The 

scale. d 

vely, TC 

e pact.  

age)

Page 134: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

6 Tro

This sectioTable 49 anBanglades

(see Sectio(TC) Risk 

Since the Tadjustmen

factor of 1coastal Disanalyses othe effect oaccount foproject is rassets (sucmodeled alosses avaiCyclone Rsimplified

important and the infeffects). Nimpact exp

As shown on averagechance thafinancial imother peril

Based on tincurred b2009 Cycloalthough tfloods are 

 

  

opical C

on presents thend Figure 70, sh (aggregate‐bon 3.2.2). The tModel.  

TC model doents are made to.5 to account fstricts are amp

of this amplific

of storm surgeor the effect of residential andch as crops, agassets, the mod

ilable for TropRisk Model is m approach is bto stress the dferred modeled evertheless, thpected in Bang

in Table 49 ane per year dueat the financialmpact from flols (such as sev

the estimated by the 2004 floone Aila, and 2there is large uexpected to b

yclone a

e risk profile orepresents thebased). Recall ropical cyclon

s not explicitlyo the TC mode

for the effect oplified by a faccation on the se. Second, the losses to non‐d non‐residentgriculture, anddeled loss is mpical Cyclone Smultiplied by abased on limite

difference betwloss (which is he inferred mo

gladesh due to

nd Figure 70, Be to cyclone anl impact from oods will excevere storm and

risk profile, thods is expecte2013 Cyclone uncertainty in e greater than

 

 

and Floo

of tropical cycle estimated finthat the flood

ne losses are de

y consider theeled loss. Firstof storm surge.ctor of 1.5, 2.5,simulated evenlosses from th‐modeled assetial buildings. d infrastructuremultiplied by aSidr. Thus, thea factor of 3.0 ed available inween the modea simple ampl

odeled loss is ao tropical cyclo

Bangladesh is nd flood (or abcyclones will eed 12.4 billiond earthquake) 

he flooding in ed to be exceedMahasen, are trending the l

n a 100 year ev

od Risk

lones and floonancial impact

d losses are inferived from th

e effect of stormt, the losses fro. As described, or 5.0 to accont losses, the Ehe modeled EPets. Recall that Due to the pre), were not ma factor of two

e losses from tto considerednformation aneled loss (which

lification of than appropriateone. 

expected incubout 2.2% of thexceed 7.2 biln USD next yeare much less 

2004 is expectded on averagexpected to belosses to curreent, each. 

Final Repo

Profile

ods in Bangladt (due to dama

ferred from anhe detailed pro

m surge and loom the modele

d in a previousount for the imEP curve is “amP curve are mu

the modeled roject scope anmodeled. To aco. This is basedthe EP curve dd non‐modeled

nd has a high dh is based on ahe modeled lose proxy to qua

ur a financial imhe 2014 GDP).lion USD nextear. It is expectsevere than cy

ted to be a 10 yge once every 1e 20, 5, and 2 yent (2014) valu

ort on Capacity BuFinance in Ban

SF13-

of Bang

desh. The risk age and loss) fn analysis of hiobabilistic AIR

osses to non‐bed EP curve as section, the mmpact of stormmplified” by 1ultiplied by a fexposure consnd timeline, otccount for lossd primarily onderived from td effects. Note degree of uncea rigorous probsses to accounantify the over

mpact of abou Furthermore,

t year, and a 1ted that the finyclone and flo

year event (e.g10 years). The year events, reues. The 1991 C

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

gladesh

profile, shown

for all sectors iistorical floodR Tropical Cyc

building assetsre multiplied bmodeled lossesm surge. Based 1.5 to account factor of 2.0 tosidered for thither sectors anses to these non reported sectthe AIR Tropicthat the use o

ertainly. Thus,babilistic mod

nt for non‐mod

rall financial 

ut 3.2 billion U, there is a 1% % chance thatnancial risk froood.  

g., the level of 2007 Cyclone espectively, Cyclone and 1

er Risk A-8144)

133 051215

 

n in in  data clone 

s, two by a s for on for o is nd on‐tor cal of this  it is del) deled 

USD 

t the om 

loss Sidr, 

998 

Page 135: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

 

 

 

 

  

0

0

0

0

Ave

2,00

4,00

6,00

8,00

10,00

12,00

14,00

16,00

18,00

Economic

 Impact

 (M USD)

Table 4

EP 

0.5 0.2 0.1 0.05 0.02 0.01 0.002 rage Annual Lo

Figure 7

0

00

00

00

00

00

00

00

00

00

AAL

Cycl

Floo

 

49. Qualitative

MRP M

2 5  1

10  2

20  3

50  5

100  7

500  1

oss (AAL) 

70. Qualitativ

2 5

Mean Re

lone

od

e Risk Profile

Eco

Cyclone M USD  % G403  0.3

1,617  1.1

2,727  1.9

3,907  2.7

5,752  3.9

7,209  4.9

10,958  7.4

994  0.7

ve Risk Profile

10 20

eturn Period (Y

Final Repo

e of Banglade

onomic Impac

GDP  M US3%  1,002

1%  3,861

9%  5,864

7%  7,574

9%  10,15

9%  12,43

4%  15,29

7%  2,210

e of Banglade

50 100

Years)

ort on Capacity BuFinance in Ban

SF13-

esh

ct Flood 

SD  % GDP 2  0.7% 1  2.6% 4  4.0% 4  5.1% 52  6.9% 36  8.4% 95  10.4% 0  1.5% 

esh

0%

2%

4%

6%

8%

10%

12%

500

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

 

Economic

 Impact

 (% GDP)

er Risk A-8144)

134 051215

Page 136: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

7 Fu

A funding

funding av

availability

in Banglad

when repo

comprised

internation

be shown t

economica

governmen

for the mo

7.1 D

The fundin

together co

2000 to 201

various pu

For both d

multiple p

accuracy. 

The damag

tropical cy

the several

Bank, Mun

consequen

The dama

resulting f

Unfortuna

and privat

public sect

used to inf

  

nding G

g gap is defined

vailable to mee

y of detailed e

desh is limited

orted figures w

d of various com

nal organizatio

to encourage g

ally rational. O

nt under differ

ost appropriate

Data Collec

ng gap analysi

omprehensive

13. The inform

ublicly‐availab

damage and fu

persons, which

ge information

yclones, earthq

l sources as de

nichRE, and se

nce are provide

ge data presen

funding gap co

ately, there is n

te losses specif

tor damage is,

fer the portion

Gap Anal

d as the residu

et those losses

economic loss d

. However, su

were not availa

mponents of fu

ons. Full ident

governments t

Overall, the ass

rent disaster s

e option of disa

ction Metho

is presented in

e damage and f

mation has been

ble sources pub

nding informa

h was also cross

n relates to rep

quakes, storms

escribed previo

everal agencies

ed in Section 4

nted here repr

omputed illus

no reliable dat

fically for Ban

, in general, ap

n of the govern

 

lysis

ual between tot

. An accurate f

data due to na

bstantial effor

able (e.g., refer

unding with d

tification of the

that greater inv

sessments attem

cenarios and e

aster risk man

odology an

n this study rel

funding inform

n compiled by

blished by the

ation, the exten

s‐checked by d

ported moneta

 and floods. Th

ously, includin

s of the Govern

4.  

resents the tota

strates total ga

ta available to 

ngladesh.  Base

pproximated a

nment’s catast

tal annual loss

funding gap an

atural hazards.

rt was allocated

r to the previou

data acquired f

e resources allo

vestment in ex

mpt to identify

explore how sp

agement instru

nd Sources

lies on an exten

mation related

 a meticulous

Government o

nsive library an

different team

ry damages ca

he monetary d

ng EMDAT, th

nment of Bang

al economic lo

p that exists b

provide a clea

ed on the opin

at around 85%

trophe respons

Final Repo

ses incurred as

nalysis is only

. In general, th

d to infer the l

us section). Th

from local gov

ocated to disas

x‐ante disaster

y the level of  c

pending dema

ruments. 

s

nsive data coll

d to catastroph

library and int

of Bangladesh

nd internet sea

members to e

aused by four 

damage inform

he Dartmouth F

gladesh. More

oss sustained b

borne by both p

ar distinction 

nions of some e

% of the total d

sibility.  Howe

ort on Capacity BuFinance in Ban

SF13-

s a consequenc

y possible thro

he availability o

losses of major

he funding  inf

vernment  agen

ster risks is  as

 risk  finance i

contingent liab

ands  need to b

lection which 

hes in Banglade

ternet search w

and internatio

arch has been 

ensure data  re

different types

mation has bee

Flood Observa

 details on the

by all sectors; 

private and pu

of responsibil

experts polled

damage and co

ever, extreme 

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

ce of disasters

ough the 

of this type of

r  catastrophes

formation is 

ncies and 

ssessed, which

nstruments is

bility of the 

be spread ove

has brought 

esh for the per

which covered

onal  organiza

conducted b

eliability and 

s of perils, i.e.,

en compiled fro

atory, the Wor

e disaster 

therefore, the 

ublic sectors.  

ity between pu

d in this study

ould potentiall

caution shoul

er Risk A-8144)

135 051215

 

and 

data 

h can 

r time 

riod 

ations. 

by 

om 

rld 

ublic 

y, the 

ly be 

ld 

Page 137: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

always be 

amount of

The fundinrehabilitat

response. Tfollowing 

A

Fi

(U

Ec

The expencosts of a t

Funding inmade imm

relevant exgovernmen

“funding rdifficulties

allocated tmillion) pecatastroph

example othe Centraemergency

significant

Table 50 ddamages) the fundinaid on disafunding avtotal fundi

  

used when ap

f uncertainty a

ng information

tion projects; iiThe funding insources: 

Annual Develoinancial TrackUN‐OCHA) (hconomic Relat

nditures for rectotal of 55 uniq

nformation wa

mediately afterxpenditures arnt budget, as wreserved for uns associated wi

to this entire buer annum. In thes; for other yf other small pal Bank of Bangy response. Ovt difference to 

displays all thefor flood, seveng amounts foraster‐related evailable to the ing constitutes

pplying any fa

associated with

n is comprised

i) humanitaria

nformation has

pment Prograking Services ohttp://fts.unoch

tions Division,

covery and rehque tenders im

as not availablr the natural pere generally cowell as other smnforeseen incidith isolating a udget item, tohe major disasyears it is not enpockets of avaigladesh), whic

verall, not incothe figures rel

 relevant figurere storm, earthr recovery andmergency respcountry in thes the funding g

 

actor that is no

h this value. 

d of three comp

an aid; and iii)s been obtaine

am of the Plannof the United Nha.org/) , Ministry of F

habilitation promplemented ov

e for some emeril by the Banovered in the “mall pockets odents” could nparticular exp

o be used for anster years, it isntirely clear hoilable fundingch spares 50 morporating thelated to total av

res. Specificallyhquake, and trd rehabilitationponse. The sume case of  catasgap.

ot derived with

ponents of funforeign aid oned for each resp

ning Commiss

Nations Office

Finance 

ojects have beever the period 2

mergency‐respongladeshi gove“funding reservof money availnot be obtainedpenditure in thny unforeseenhighly likely tow much was

in other bureamillion BDT (USafore‐mention

vailable fundin

y, the table conropical cyclonen projects, the hm  of these thrstrophes. Final

Final Repo

h reliable quan

nding: i) expenn assistance dispective fundin

sion, Ministry

e for the Coord

en derived fro2000 to 2013. 

onse expendituernment to aidved for unforelable in bureaud from the Min

he mentioned bn incident, stanthat the full al spent on catasaucratic layersSD 0.71 million

ned small allocng, and hence

nsists of total ae. On the fundhumanitarian

ree funding colly, the dispari

ort on Capacity BuFinance in Ban

SF13-

ntitative data 

nditures made saster‐related ng component 

y of Planning dination of Hu

m the approve

ures (i.e., expend the affected geseen incidentsucratic layers. nistry of Finanbudget item. Tnds at 1 billion llocation was sstrophe‐relates is the  Banglan) every year scations is unlike, for our analy

annual economding side, the aid  into Bang

omponents ma

ity between to

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

as there is a la

on the recoveremergency from the 

umanitarian A

ed  procureme

nditures that agroups). The s” item in theThe data on nce due to variThe total amou

BDT (i.e., USDspent on ed expenses. Aadesh Bank (i.esince 2012 to akely to have aysis.  

mic costs (losstable  docume

gladesh, and foakes up the tottal damage an

er Risk A-8144)

136 051215

arge 

ry and 

Affairs 

ent 

are 

ious unt D 14 

An e., aid 

and ents oreign tal nd 

Page 138: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

 

Ye

 

200

200

200

200

200

200

200

200

200

200

201

201

201

201

TOTA

Note

 

Table 50. Disas

ear Disaster‐REconomic 

00  582 01  85 02  1,072

03  1,042

04  2,335

05  139 06  27 07  2,744

08  145 09  1,206

10  254 11  186 12  626 13  350 AL  10,791

: All figures in the t

  

ster Related Econ

Related Impact  Fundin

rehab

   

 

 

table are rounded t

nomic Impact and

ng for recovery and bilitation projects 

61

67

129

8

60

95

58

73

111

38

52

64

47

34

897

to the nearest integ

d Funding Gap in

Disaster‐Relate

Humanitarian Aid 

5

2

6

4

109

6

12

300

43

37

31

66

32

26

679

ger, and therefore, m

Final Report on CaFinanc

n Bangladesh fro

d Funding 

Foreign Aid onDisaster‐Relate

Emergency Response

 N/A

N/A

0

0

209

0

0

645

186

52

1

0

0.2

N/A

1,093

minor variations in 

apacity Building for Disce in Bangladesh (ADB

SF13-1049 FINAL R

om 2000-2013 (Mi

n ed 

Total Fundin

66

69

135

11

378

101

71

1,018

339

128

84

131

79

60

2,669

the summation are

saster Risk B TA-8144)

137 REP 051215

llion USD)

Funding Gap

 ng 

516

16

937

1,030

1,957

38

‐441,726

‐1941,078

170

55

547

290

8,123

e due to rounding.

Page 139: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

7.2 E

There wer

Tropical CUSD, respeAila), with

experience

damage duBanglades

Among thcaused by billion USDdamages a

7.3 F

Three comrehabilitat

response. Fonly availa

Additiona

early recovinformatio

there was adequately

7.3.1 F

Figure 71 ddrawn fromprojects imconsultant

                  16 Altogether

implemen

multiple yavailable,

in order toof an earli

 

  

Economic I

e two major diCyclone Sidr inectively. Otherh the associateded any major cue to natural psh experienced

e four types offloods and tr

D  and 3.3 billare  caused by

Funding

mponents make

tion projects, iiFunding data iable from 2002

ally, the time dvery and reconon was availabnot enough dey understand 

Funding for

displays the fum the Annual mplemented ovt team to arrive

                        r, 55 unique projntation period, anyears. Some are e the procuremen

o prevent the duier project, that e

mpact from

isaster years dn 2007. The disr significant did economic imcatastrophe sinperils of about d a total disaste

f major perils copical cyclonelion USD due ty floods and tro

e up most of thi) humanitaria

s generally com2 to 2012 due to

dimension of funstruction wer

ble to make a retailed data avthe time dime

r Recovery

unding amoun

Development

ver the period e at the annua

                   jects and three prnd procurement extended year bynt amount was aluplication in the fextension phase w

 

m Disaster

during the studasters of theseisaster years wmpacts standinnce 2010, the p350 million USer‐related dam

considered, byes. Over the peto tropical cyclopical cyclone

he available fuan aid into Banmplete for theo lack of data i

unding flows re considered;reliable evaluavailable on proension of fund

y and Reha

nts for the recot Plan of the Pl2000 to 2013. T

al project costs

roject extensionsamount is used y year if unfinishllocated to the firfunding amounts

was allocated to 

rs

dy period in Bae years generatwere 2002 and 2g near 1 billoneriod 2010 to 2SD. In terms o

mage of about 1

y far the most seriod 2000 to 2lones, meanin

es during the st

nding for catangladesh, and i years 2000 toin these years.

relative to the; however, thiation.  While soject timelines

ding flows with

abilitation

overy and rehaanning Comm

The projects wthat are free o

s were assessed oin order to identhed in the designrst year in which

s. For a few projethe first year it a

Final Repo

angladesh. Thted economic i2003 (floods),n USD. Althou2013 has still wof the total dam10.8 billion US

significant am013, the total d

ng that over 95%tudy period.

astrophes: i) fuiii) foreign aid o2013, except th. 

e timeline of fus type of data some data on ps nor was the dh any confiden

Projects

abilitation (RRmission (Minist

were subjectedof duplication o

over the period 2tify the unique pnated time periodh the project appeects which are exappears.  

ort on Capacity BuFinance in Ban

SF13-

hese were the 2impacts of 2.3 and 2009  (Tr

ugh the  countwitnessed an mage, reports SD over the per

mount of monet

damage due to% of the total d

unding for recoon disaster‐relahat data for for

unding requirewas limited aproject duratiodata compreh

nce. 

R) projects. Thetry of Planningto close scrutiover years.16  

2000‐2013. The prprojects. Some prod. Where the time

ears in the Annuxplicitly mention

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

2004 floods, anand 2.7 billio

ropical Cyclonry has not average annuaindicate that riod  2000 to 2

tary damages

o floods was 7disaster‐relate

overy and ated emergency reign aid figure

ements for reland not enougon was reviewhensive enough

e  information

g) for 55 uniquiny  by the 

roject name, ojects appear in eline of the projeual Development ned as the second

er Risk A-8144)

138 051215

nd on ne 

al 

2013. 

is .1 d 

es are 

lief, gh wed, h to 

is ue 

ect is plan d phase 

Page 140: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

The projeccatastroph

Fl

C

M

se

H

R

O

The total pforeign conInternation

Japan Intertotal finan

Focusing othe major pmost casesfollowing 

The 2010‐2despite thethe recove2013 perio

  

cts cover a varhes, including:

lood rehabilitaCyclone rehabilMaintenance, reecondary, highHouse construcecovery and re

Other emergenc

procurement contributors. Ma

nal Developmrnational Coopnce, with the re

on each year, Fperils of 2002, 2s. An interestia major  disas

2013 period wi

e absence of anry and rehabilod. 

iety of tenders 

ation projects, litation projecehabilitation, aher secondary ction for flood‐estoration projcy cyclone reco

ost of 55 uniquajor foreign conent Agency), Aperation Agenest of the procu

Figure 71 dem2003, 2004, 200ing feature in tster, such as in

itnessed an avny major peril.litation efforts

 

s aimed for re

cts, and restorationschools), and o‐affected landljects for agricuovery and reha

ue projects oventributor organAsian Developncy, and Germa

urement cost b

onstrates that07 and 2009 rethe data is thatn the year 2005

erage funding. The available following the

covery, rehabi

n of flood‐affecother urban iness people, ultural crops, abilitation pro

er 2000‐2013 isnizations inclupment Bank, Jaan KfW. Thesebeing  domesti

the total amou

emained extremt the RR fundin and 2008.  

g allocations ste information oe 2007 Sidr and

Final Repo

ilitation and p

cted educationnfrastructures,

ojects. 

s USD 897 mill

uded the Worl

apan  Overseae  foreign conically financed

unt of RR fundmely modest, ing typically so

tanding at abouon projects sugd 2009 Aila cyc

ort on Capacity BuFinance in Ban

SF13-

prevention pro

nal buildings (

lion. Of all the ld Bank (includas Economic Contributors mad

d. 

ding for the dai.e., below USDoared over the 

ut USD 50 mil

ggest that this clones spilled o

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

ojects relating 

e.g., primary,

 55 projects,  2ding its ooperation Fude up to 61% of

amages causedD 100 per  yeaprevious year 

llion per  yearis because  soover to  the 20

er Risk A-8144)

139 051215

to 

29 had 

nd, f the 

d by ar in 

r ome of 10‐

Page 141: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

Figure 71

7.3.2 H

An import

compiled b

of the hum

Humanita

cooking oi

intravenou

sanitary la

jerry can), 

consisted o

Figure 72 i

period, i.e

is noted th

2007. Othe

                  17 On the obj

real‐time Crescent morganizat

  

1. Funding fo

Humanitaria

tant componen

by Financial T

manitarian aid 

arian aid into B

il, cooking uten

us fluids, essen

atrines, oral reh

shelter, and ot

of safe water a

indicates that t

., almost USD 

hat 2004 and 20

er years, inclu

                        jectives of the Findatabase that recmovement, bilatetions. “ (http://ww

0100

200

300

Fundin

g for

Pro

jects

r Recovery a

Inves

an Aid

nt of available 

Tracking Servic

that flows into

Bangladesh typ

nsils, and othe

ntial drugs), w

hydration salts

ther relief mat

and water puri

the year 2007 w

300 million, fo

007 constitute 

ding the Aila c

                   nancial Trackingcords all reporteeral aid, in‐kind ww.unocha.org/w

200

Fu

 

nd Rehabilita

stment Progra

funding in the

ces of the UN‐O

o Bangladesh i

pically include

er food packag

water and wate

s), clothing (fo

terial for disast

ifiers to preven

witnessed the

ollowed by 200

the major disa

cyclone year 2

g Service, the UNd international haid and private what‐we‐do/hum

02

unding for Reco(

ation Projects

am, Planning

e case of catast

OCHA (http://

is upon catastr

ed food (i.e., ric

ges), medical ai

er purification t

r children and

ter victims. An

nt any disease

highest amou

04, which saw

aster years, du

009, saw relati

N‐OCHA web sitehumanitarian aiddonations). All Fmanitarian‐finan

2006Year

overy and Reha(Millions of USD

Final Repo

s in Banglade

Commission

trophes is hum

/fts.unocha.or

rophes.17  

ce, lentil, whea

id (i.e., medici

tablets, hygien

d adults),  fami

n important am

or epidemics 

unt of humanit

an aid amoun

ue to floods in 2

ively low amo

e reads: “The Find (including that FTS data are provncing/appeals‐sys

2010

abilitation ProjeD)

ort on Capacity BuFinance in Ban

SF13-

esh 2000-2013

n)

manitarian aid

rg) suggests th

at, salt, high en

ine, medical su

ne material (so

ily kits (i.e., ten

mount of hum

in the post‐dis

tarian aid durin

nt of around U

2004 and flood

ounts of human

nancial Tracking for NGOs and thvided by donorsstem) 

201

ects

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

3 (Source: An

. The informat

at more than 9

nergy biscuits,

upplements, 

oap, bleach, 

nt, blanket, ru

anitarian aid

saster period.

ng the study

USD 100 million

d and TC Sidr

nitarian aid. T

Service is a globhe Red Cross/Re or recipient 

14

er Risk A-8144)

140 051215

nnual

tion 

95% 

gs, 

n. It 

in 

The 

bal, d 

Page 142: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

available i

with post‐

correspond

A number

humanitar

make up th

Kingdom t

the highes

 

  

nformation su

2007 average b

ds to a total of

r of donor gove

rian aid efforts

he 90% of the h

tops the list w

t amount with

01

00

200

300

400

Hum

anita

ria

n A

id

uggests that the

being nearly d

f USD 679 mill

ernments and 

s through seve

humanitarian 

ith USD 45 mi

h almost USD 1

Figure 72. H

(Source: F

2002

Human

 

e pre‐2007 hum

doubled, USD 3

ion over the p

international o

eral domestic c

aid for each o

illion worth of

160 million. 

Humanitarian

Financial Trac

itarian Aid in

manitarian aid

37 million per

eriod 2000 to 2

organizations

channels. Figur

of 2004 floods a

humanitarian

n Aid into Ban

cking Service

2006Year

nto Banglade

Final Repo

d average was

annum.  The l

2013. 

 around the w

re 73 presents

and 2007 Sidr c

n aid, while in

ngladesh 200

es of the UN-O

201

esh (Millions

ort on Capacity BuFinance in Ban

SF13-

USD 20.5 mill

long‐term hum

world have con

s the donor gov

cyclone. In 200

2007 Saudi Ar

00-2013

OCHA)

0

s of USD)

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

ion per annum

manitarian aid

tributed to the

vernments tha

04, the United

rabia contribu

 2014

er Risk A-8144)

141 051215

m, 

at 

ted 

Page 143: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

Figu

7.3.3 F

Banglades

world from

among oth

organizati

United Na

Labour Or

(UNIDO). 

110 project

Figure 74 p

2002 and 2

2007 Sidr c

this year in

agreement

                  18 Source: ht

  

ure 73. Human

Foreign Aid

sh receives one

m a number of

hers, the Unite

ions include th

ations Develop

rganization (IL

In the year 20

ts spanning di

portrays the an

2012. It is evide

cyclone witnes

ncluded WB‐ID

t titles are reco

                        tp://www.erd.go

N

S

European Comm

United

Nethe

A

United Ki

nitarian Aid b

d on Disast

e of the highest

f  internationa

d  States, Japa

he Asian  Deve

pment  Program

LO), UN‐  Wom

12 alone,  Ban

iverse  areas.1

nnual foreign a

ent that emerg

ssed more than

DA with USD 

orded to be flo

                   ov.bd/index.php/

0 1Hu

Norway

Sweden

Japan

mission

States

erlands

ustralia

ngdom

Figure 4

2004

 

by Donors for

Bangladesh

ter-Related

t amounts of fo

al  donors and

an, EU, the UK

elopment Bank

mme (UNDP),

men, and the U

ngladesh receiv8  

aid on disaster

gency related f

n USD 600 mil

323 million, A

od relief and

/publications/flo

5 30umanitarian Aid

4a. 2004 Flo

4 Floods and 200

Humanitar

r the 2004 Flo

h (Source: UN

d Emergen

oreign aid on d

aid agencies. I

K, Germany, N

k (ADB), the F

, the Islamic D

United Nations

ved a total amo

r‐related emer

foreign aid is s

llion  worth of

ADB with USD

rehabilitation

w‐of‐external‐re

45

ods

N

Uni

European Co

Sa

07 Sidr Cyclone

rian Aid by D

Final Repo

oods and 2007

N-OCHA)

ncy Respon

disaster‐related 

Its developme

Netherlands, an

ood and Agric

Development B

s Industrial De

ount of USD 5

rgency respons

significant onl

f foreign aid. T

D 125 million, I

n assistance, an

esources  

0 30

Canada

Sweden

Germany

Norway

Italy

etherlands

Kuwait

ited States

ommission

CERF

audi Arabia

Figure 4

(Millions of USD

Donors

ort on Capacity BuFinance in Ban

SF13-

7 Tropical Cy

nse

mmergency re

ent partner cou

nd China. The 

culture Organi

Bank (IDB), the

evelopment O

5,855 million fo

se for Banglad

ly in major dis

The three majo

IDB with USD 

nd several supp

0 60 90 12Humanitarian A

4b. 2007 Sid

)

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

 

yclone Sidr in

esponse  in the

untries include

donor 

ization (FAO),

e International

Organization 

oreign aid thro

desh for  the p

saster years. T

or contributors

 130 million. T

plemental fina

20 150Aid

dr Cyclone

er Risk A-8144)

142 051215

n

e, 

, the 

ough 

eriod 

The 

s in 

The 

ancing 

Page 144: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

for floods a

related for

during 200

The total fo

USD 1,093

not able to

unlikely to

major disa

Figure 7

Flow of

7.3.4 T

Figure 75 b

sum of fun

response. T

that the to

and for for

funding fo

with foreig

country in

  

and municipa

reign aid, whil

02 to 2012 do n

oreign aid on d

3 million. The f

o be obtained d

o make a differ

asters in those 

4. Foreign Ai

External Res

Total Availa

brings togethe

nding amounts

The total long‐

tal funding for

reign aid on di

or  RR projects

gn source is US

n the  case of na

Fore

ign A

id

l services. Tur

le 2008 had US

not indicate si

disaster related

foreign aid figu

due to limited 

rence to the ke

years. 

d on Disaste

sources in Ba

able Fundi

er the three com

s for RR projec

‐run funding o

r RR projects in

isaster‐related

s was from for

SD 2,319 milli

atural perils. 

01

00

200

300

400

500

600

g

2

Disaster

 

ning to the oth

SD 186 million

gnificant forei

d foreign aid in

ures on disaste

data availabili

ey conclusions

r-Related Em

angladesh, Ec

2000, 2

ng

mponents of fu

cts, humanitar

over 14 years f

n the long‐run

 emergency re

reign contribut

on, which corr

2002

r-Related Foreig

her years, the y

n and 2009 had

gn aid in emerg

nto Bangladesh

er‐related eme

ity; however, t

s regarding fun

mergency Res

conomic Rela

2001, and 201

unding that ha

rian aid, and fo

from 2000 to 20

n is USD 897 m

esponse USD 1

tors. This mea

responds to 87

2006Year

gn Aid into Bang

Final Repo

year 2004 saw

d USD 52 milli

gency support.

h over the peri

ergency suppo

the unavailabi

nding gap ana

sponse into B

ations Divisio

13)

ave been cover

oreign aid on di

013 correspond

million, for hum

1,093 million. R

ans that altoget

7% of the total

2010

ladesh (Millions

ort on Capacity BuFinance in Ban

SF13-

 USD 209 milli

ion worth of a

iod 2002 to  20

ort for 2000, 20

ility of the dat

alysis given tha

Bangladesh 20

on – Data are

red so far. It pr

isaster ‐related

ds to USD 2,66

manitarian aid

Recall also tha

ther the total a

available fina

2014

of USD)

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

ion in disaster

aid. Others yea

012 is found to

001 and 2013 w

ta for these yea

at there were n

 

000-2013 (So

Not Available

resents the sim

d  emergency 

69 million. Rec

d  USD 679 mil

at 61% of the 

amount of fund

ancing for the 

er Risk A-8144)

143 051215

ars 

o be 

were 

ars is 

no 

urce

e for

mple 

call 

llion, 

ding 

Page 145: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

Consistent

1,018 milli

339 million

between U

funding.   

7.4 F

With the e

analyzed. 

the countr

respective

standing a

gaps of slig

even nega

those two 

Neverthele

years 2000

change the

  

t with the seve

ion. The year 2

n, respectively

USD 100 millio

Figure 75

Funding Ga

economic impa

Figure 76 docu

ry saw significa

ly. These majo

at USD 937 and

ghtly more tha

tive in 2006 an

years.  

ess, the long‐ru

0, 2001, and 20

e key conclusio

Tota

l F

un

din

g

erity of Tropica

2007 is followe

y. While the ye

on and USD 14

5. Total Avail

ap

act estimates an

uments that co

ant funding ga

or disaster yea

d 1,030 million

an USD 500 m

nd  2008. The c

un funding ga

13 are missing

ons regarding 

02

00

400

600

800

100

0g

2

 

al Cyclone Sid

d by 2004 and

ears 2002, 2005,

40 million, oth

able Funding

nd the total fu

oncomitant wi

aps in those ye

rs are followed

n, respectively.

million each. Th

country experi

ap stands at US

g the foreign ai

the funding g

2002

Total Availab

dr, the year 200

d 2008, with ea

, 2009 and 201

her years saw a

g of Catastrop

unding amoun

ith the sizeable

ears, i.e., in the

d by 2002 and 

. Even the yea

he funding gap

ienced an aver

SD 8,123 millio

id figures, it is

gap. 

2006Year

ble Funding (Mil

Final Repo

07 displays a to

ach year observ

1 had total fun

amounts less th

phes in Bang

nts listed in Tab

e impacts expe

e order of USD

 2003, with the

ars 2000 and 20

p was close to 

rage funding s

on over the per

s unlikely that 

2010

lions of USD)

ort on Capacity BuFinance in Ban

SF13-

otal funding a

ving USD 378 

nding amount

han USD 70 m

ladesh 2000-

ble 50, the fun

erienced in 200

D 1,957, 1,726 a

e amount of fu

012 experience

zero in 2001, 2

surplus of USD

riod 2000‐2013

unavailability

2014

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

mount of USD

million and U

ts that ranged 

million in total 

 

-2013

ding gap can

04, 2007 and  2

and 1,078  mill

unding gap 

ed sizeable fun

2005 and 2011

D 119 million in

3. Even though

y of the data w

er Risk A-8144)

144 051215

USD 

be 

2009, 

lion, 

nding 

1, and 

h the 

would 

Page 146: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

The overal

catastroph

funding de

amounting

arose beca

available f

identified,

aid, and U

available f

 

  

Fig

ll conclusion o

hes in terms of 

eficits or surpl

g to a total of m

ause only aroun

funding in the 

 USD 897 milli

USD 1,093 milli

funding was ge

Fun

din

g G

ap

ure 76. Fund

of the funding 

sizeable fundi

luses in the yea

more than USD

nd a quarter o

said period. O

ion came from

ion from foreig

enerated inter

 

05

00

100

01

50

02

00

0g

p

2

 

ing Gap of Ca

gap analysis in

ing gaps in ma

ars without m

D 8,000 million

of the USD 10,7

Of the USD 2,66

m recovery and

gn aid on disas

rnally. 

2002

Funding

atastrophes i

n this study is

ajor disaster ye

ajor disasters,

n over the 14‐y

759 million tot

69 million tota

d rehabilitation

ster‐related em

2006Year

g Gap (Millions

Final Repo

in Banglades

s that Banglade

ears. Although

the long‐run f

year period in 2

tal disaster‐rela

al available fun

n projects; USD

mergency resp

2010

of USD)

ort on Capacity BuFinance in Ban

SF13-

sh 2000-2013

esh is vulnerab

h the country r

funding gap is

2000‐2013. Thi

ated damage i

nding that has

D  679 million f

ponse. Only 13

2014

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

 

ble to major 

runs small  

s very substan

is funding def

is  covered by

s  been reliably

from humanit

3% of the total

er Risk A-8144)

145 051215

tial, 

ficit 

y total 

tarian 

Page 147: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

8 TheMa

At a policy

(e.g., ident

economy d

componen

Being pron

framework

coordinati

On the fun

Relations D

Subsequen

role in term

specialist o

institution

solutions a

8.1 C

The institu

composed

other divis

8.1.1 D

The Minist

within the

coordinate

damages a

data collec

(the smalle

unit), whic

data from 

columns to

  

e Instituanageme

y level, availab

tifying the curr

due to natural 

nts of their curr

ne to many dif

k for disaster m

ng the post‐di

nding side, sev

Division) and 

ntly, Banglade

ms of disaster 

on specific cap

ns, and other re

and disaster ri

Central Gov

utional framew

d of the Depart

sions, part of t

Department

try of Disaster

e ministry, is th

e post‐disaster

and losses afte

ction procedur

est administra

ch in turn forw

districts. The 

o collect inform

utional Fent and

ble documenta

rent policies) o

hazards. Curr

rent approache

fferent types o

management. W

isaster activitie

veral divisions 

the Ministry o

esh’s current d

risk financing

pacity develop

elevant institu

isk microinsur

vernment

work for disas

tment of Disas

the Ministry o

t of Disast

 Management

he focal point f

 activities and

r a disaster, w

re takes place i

tive unit in Ba

wards the colla

data collection

mation on hou

 

Framewothe Fina

ation is review

on how the gov

rent practices t

es.  

f natural perils

While the Min

es, many line m

in the Ministr

of Planning ow

domestic finan

g. The main ob

pment and sup

utions for the a

rance.

ter manageme

ster Managem

f Finance: the 

er Manage

t (MDM), in pa

for disaster ma

d actions across

hich occurs m

in a way in wh

angladesh) forw

ated informatio

n procedure is

use damages, h

ork for Dancial M

ed, including t

vernment of B

to deal with su

s, Bangladesh

nistry of Disast

ministries have

ry of Finance (s

wn important re

ncial market is 

bjective is to ad

pport areas to 

adoption of ca

ent in the cent

ment within the

Fiscal Divisio

ement, Min

articular, the D

anagement in 

s the line minis

ainly through

hich the disaste

ward the data

on to the Distri

s based on a ”d

human lives, liv

Final Repo

DisasterMarket in

the relevant le

Bangladesh dea

uch situations

has developed

ter Manageme

e also their ow

such as the Fis

esponsibilities

analyzed to a

dvise the inter

the domestic i

apital market‐l

tral governmen

e Ministry of D

on and the Eco

nistry of Dis

Department of

Bangladesh. D

stries. The DD

h collecting dam

er managemen

to the Upazila

ict level. The D

damage form”

vestock lost, a

ort on Capacity BuFinance in Ban

SF13-

r Risk n Bangla

egislative and p

als with financ

are identified,

d an elaborate

ent is the focal 

wn disaster man

scal Division o

s.  

assess its capac

rnational disas

insurance sect

linked disaster

nt of Banglade

Disaster Mana

onomic Relatio

saster Man

Disaster Mana

DDM’s main ro

DM is mandate

mage data from

nt committees 

a level (which 

DDM headqua

, which curren

and so on.  

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

adesh

policy protoco

cial shocks to t

, as well as the

e institutional

point for 

nagement plan

or Economic 

city and poten

ster risk finan

tor, microfinan

r risk finance 

esh is primaril

agement and tw

ons Division.

nagement

agement (DDM

ole is to    

ed to assess 

m the field. Th

at the Union l

is the second‐t

arters received

ntly has 25  

er Risk A-8144)

146 051215

 

ols 

the 

ns. 

ntial 

ce 

nce 

ly 

wo 

M) 

he 

level 

tier 

d the 

Page 148: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

Although 

DDM are c

factors. Th

procedure

extract mo

“damage f

different v

in restricte

It is sugge

approach w

prevented

to filling in

The institu

concepts. C

clusters in

central gov

clusters.  

8.1.2 F

The Fiscal 

funding ac

Budgetary

financial y

adds up to

come into 

The budge

manageme

1. Disaste

di

2. Emerge

am

3. Fund foW

al

  

rules, regulati

clear, the depa

he missing capa

e. For example,

ore funds from

form” itself ha

versions of the 

ed access to the

sted that satell

would ensure 

. The DDM als

n the damage f

utional framew

Clusters are ac

clude: i) food c

vernment, NG

Fiscal Divis

Division in th

cross different

y matters (inclu

year. In particu

o the central go

effect. In prin

etary system in

ent. Some of th

er Risk Reductisaster risk redency Fund Dismount is confior UnforeseenWhile this fundlmost certain t

ons, and respo

artment’s capa

acity is mainly

, the disaster m

m the authoritie

as been develop

form. In addit

e form.  

lite and GIS m

that reported 

so plans to reb

form accuratel

work also featu

ctivated follow

cluster, ii) edu

GOs, and intern

sion, Minis

he Ministry of 

t governmenta

uding allocati

ular, the Fiscal

overnment bu

nciple, disaster

n Bangladesh 

he identified p

tion (DRR) Fuduction. The asaster Manageirmed to be smn Incidents ‐ Ading can be allthat the whole

 

onsibilities per

city to assess d

y related to ove

management c

es. Also, the da

ped over time

tion, some form

methods could b

damages are m

build the data c

ly.  

ures some clust

wing a disaster

ucation cluster,

national organ

try of Fina

Finance is the

al and non‐gov

ons) are outlin

l division alloc

udget. The cen

r related alloca

involves seve

pockets are as 

und ‐ Introducamount availabement ‐ Allocamall (again, theAvailable each ocated for anye allocation wo

rtaining to disa

damages and l

erstatements a

ommittees at t

amages from s

since 1993, an

ms are comple

be used to incr

more accurate

collection syste

ters defined ar

to support the

 iii) shelter clu

nizations such

ance

e core body tha

vernmental lay

ned in the ann

cates the requi

ntral governme

ations can be id

ral small pock

follows:  

ced 5‐7 years able could not bated to Deputye full amount year in the ory purpose in aould be spent 

Final Repo

aster managem

losses accurate

and inconsisten

the Union leve

some areas ma

nd there is diffe

eted in Bangla

rease the capa

and overstatem

tem by training

round differen

e concerned pe

uster, iv) inform

as the World B

at allocates the

yers.  

nual budget do

ired budget to

ent budget is t

dentified in th

kets of money

ago, the DRR fbe identified, by Commission

could not be irder of one billan ordinary yeon disaster ris

ort on Capacity BuFinance in Ban

SF13-

ment tools adm

ely is crippled 

ncies in the da

el may oversta

ay be under‐rep

erent number 

and some in E

acity to assess t

ments or unde

g people on th

nt disaster man

eople in relief 

mation manag

Bank have mem

e domestic dis

ocument at the

o each line of t

then ratified b

he budget docu

dedicated to d

fund is dedicabut is likely toner at the distridentified). lion BDT (USDear, in the disask reduction. 

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

ministered by t

due to several

ata collection

ate the damage

ported. The 

of columns in

English, resulti

the damages. T

erstatements a

he field in rega

nagement 

activities. The

gement cluster

mbers in  thes

saster‐related 

e beginning of

the ministry, w

by the parliame

ument.  

disaster 

ated specificallo be modest. rict level, the 

D 14.28 million

aster years it is

er Risk A-8144)

147 051215

the 

es to 

 

ing 

This 

are 

rd   

ese 

r.  The 

se 

f each 

which 

ent to 

ly for 

n). s 

Page 149: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

4. Palli Kar

Fi

an

 

8.1.3 E

When ther

initiated. E

bilateral o

Developm

Internation

Departmen

which line

the require

sanitation,

cyclone sh

In contrast

organizati

education,

health.  

8.2 F

Banglades

(1) Mon

bank

secto

(2) Capi

Bang

Chitt

(3) Insur

comp

(4) Infor

Cred

                  19 As part ofNGOs are alBangladesh.

 

  

rma-Sahayak F

inance. Heade

nd participatin

Economic R

re is a domesti

ERD’s role is t

rganizations s

ment Program (

nal Developm

nt for Internat

e ministries ap

ements.19 The 

, healthcare, ed

helters in coast

t to the past, th

ions have their

, and health. F

Financial M

sh’s financial m

ney market secks and non‐banor is regulated ital market secgladesh Securitagong Stock Erance sector: mpanies. This sermal sector: mdit Regulatory 

                        f the shared respolso involved with

.  

oundation (PKSed by the Mini

ng institutions

Relations D

ic funding gap

o mobilize for

such as the Wo

(UNDP), the J

ment (USAID), 

tional Develop

pproach the ER

coverage of fo

ducational sup

tal areas).  

he process of o

r own prioritie

For example, A

Market

market is comp

ctor: made up nk financial inby Bangladesctor: made up ties and ExchaExchange. made up of thector is regulatmade up of theAuthority and

                   onsibility and goh disaster manag

 

SF) also imple

ister, a high levs. Once again t

Division (E

p following ca

reign financing

orld Bank (WB

apan Internati

the Australian

pment of the U

RD for emerge

oreign aid incl

pport projects

obtaining fore

es in meeting t

ADB’s priority

prised of four 

of nationalizenstitutions (e.gsh Bank – the cof listed comp

ange Commiss

e state owned

ted by the Insu financial NGO

d the Registrar

overnance, nowa

gement. Nowada

ements “Climavel committee

the funding am

ERD), Minis

tastrophes, typ

g through dev

B), the Asian D

ional Coopera

n Agency for I

United Kingdo

ency financing

ludes infrastru

; and cyclone 

eign aid is now

the requireme

y is infrastructu

sectors:  

ed commercial

g. leasing bankcentral moneta

panies and corsion and supp

d insurance corurance DeveloOs and the Cor of Cooperati

days each line mays, disasters is a

Final Repo

ate Resiliencee decides on thmount could n

stry of Fina

pically the for

velopment par

Development B

ation Agency (

International D

om (DFID). Th

g, which then a

ucture projects

shelters progr

wadays shorter

ents, such as d

ure, while WB

l banks, privatks, developmen

ary authority. rporations. Thported by the D

rporations andopment and Rooperatives wo

ives regulate t

ministry has its owa cross‐cutting iss

ort on Capacity BuFinance in Ban

SF13-

e Fund” underhe distributionnot be identifie

ance

reign financing

rtners, which a

Bank (ADB), th

(JICA), the U.S

Development 

he process wor

activates bilate

s; procuremen

ram (such as m

r. Nevertheles

developing infr

B’s priority is i

te commercial

nt finance inst his sector is regDhaka Stock E

d the private inRegulatory Autorking in micr

this sector.  

wn disaster actiosue in the institu

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

r the Ministry n of funds to Ned. 

g mechanism 

are multi‐later

he United Nat

S. Agency for 

(AUSAID), an

rks in a way in

eral links to m

nt of food; soci

multipurpose 

ss, aid 

rastructure, 

infrastructure 

l banks, merch

titutions). This

gulated by Exchange and

nsurance thority. rocredit. The M

on plan. As notedutional framewor

er Risk A-8144)

148 051215

of NGOs 

is 

ral or 

tions 

nd the 

meet 

ial, 

and 

hant s 

the 

Micro 

d, even rk of 

Page 150: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

A disaster

bears a sub

there is a c

financial s

implicatio

� The imp

� Post‐dis

� Lax credconsider

According

ranking inefficiency risk of sovranked 50,position of

One prere

for the exi

capital ma

financing f

corporate 

In current 

nor strong

borrowing

on its own

major role

required fo

8.2.1 M

The money

banks, fina

(3,478 bran

branches),

commercia

  

r normally has

bstantial part 

culture of loan

ectors are also

ns after a disa

pact on lendin

saster support

dit discipline inrable addition

g to the 2012 Fn the Financialof the world’s

vereign debt cr, and in terms f Bangladesh i

quisite of havi

sting and pote

arket. Historica

from capital m

bonds is almo

conditions, th

g and may not 

g from the priv

n is also small 

e in the disaste

or disaster risk

Money Mark

y market is re

ancial instituti

nches), 4 state‐

, 9 foreign com

al banks and 3

 financial imp

of any related

n forgiveness b

o encouraged t

aster in Bangla

ng operations s

t required by s

n post‐disastenal credit and d

inancial Devel Development

s leading finanrisis Bangladeof foreign curin the global fi

ing a healthy i

ential borrowe

ally, Banglade

markets throug

ost non‐existen

he size of the d

be able to pla

vate banks and

but with inter

er risk financin

k financing pr

ket

gulated by Ba

ions (FIs) and 

‐owned devel

mmercial bank

3 merchant ban

 

plications in th

d losses. In the 

by the Govern

to do the same

adesh are:  

such as deferm

some of the fin

er period; examdeferment of l

lopment Repot Index, which

ncial systems ash was rankedrrency sovereiinancial marke

investment cli

ers. The two m

esh’s private se

gh the issue of

nt. 

domestic mone

ay an effective 

d Bangladesh 

rnational reins

ng. The inform

roducts. 

angladesh Bank

primary deale

opment banks

ks (55 branches

nks hold prim

he whole count

case of Bangla

nment of Bangl

e. Some of the

ment of loan re

nancial institut

mples can be sloan repaymen

ort by the Wor

h provides a scand capital ma

d 57, in terms oign risk it was et  

imate in an eco

major sources o

ector has alwa

f shares is sma

ey market and

role in disaste

Bank further a

surance suppo

mal sector has t

k – the central

ers. There are 

s (1,440 branch

s), and 56 mer

mary dealers lic

Final Repo

try as the coun

adesh, there a

ladesh, and th

e key issues rel

epayment, loa

tions; 

een after the 1nt. 

rld Economic Fcore and rank arkets, was 57 of local currenranked 50. Th

onomy is the a

of finance in a

ays depended 

all whereas de

d capital mark

er risk financin

aggravates the

ort it could hav

the capacity to

l monetary au

currently 4 sta

hes), 38 privat

rchant banks (5

cense.  

ort on Capacity BuFinance in Ban

SF13-

ntry’s governm

are additional 

he formal and 

lating to the fi

an default, new

1998 flood that

Forum, Banglafor the breadtout of 62 counncy sovereign hese rankings 

availability of 

any country ar

on banks for f

ebt financing th

ket in Banglade

ng. The govern

e situation. Th

ve the financia

o provide supp

uthority – and 

ate‐owned com

te commercial 

56 branches). N

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

ment ultimate

implications a

the informal 

inancial 

w lending etc.;

t saw provisio

adesh’s overalth, depth, andntries. In termrating it was indicate a wea

financing faci

e the banks an

finance. Equit

hrough issuin

esh is neither l

nment’s heavy

he insurance se

al capacity to p

port services 

is comprised o

mmercial bank

banks (3,454 

Note that 12 

er Risk A-8144)

149 051215

ly 

as 

 

on of 

ll d ms of 

ak 

ility 

nd the 

ty 

ng 

large 

ector 

play a 

of 

ks 

Page 151: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

The only a

banks. The

The comm

Tr

Tr

C

co

is

C

un

Ba

an

As of 30 Ju

Ba

C

D

Le

Ba

Ba

N

R

N

Br

M

G

G

In

BD

 

8.2.1.1

Banglades

stability of

manageme

  

active seconda

ere is no secon

monly used mo

reasury bills: Dreasury Bills a

Commercial paorporation to rs traded in the Certificate of denions. ankers’ acceptnd guaranteed

une 2014, the i

ank rate: 5% Call money rateDeposit rate: 8.ending rate: 13ank deposits: ank loans and

Non‐performin

o State‐oo State‐oo Private

o Foreign

eserve money

Narrow money

road money (MMoney in circulGrowth of mon

Government boo From Bo From s

nflation rate: 7DT/USD exch

Banglades

sh Bank (BB) is

f the domestic

ent is related t

ary market is o

ndary market f

oney market in

Debt obligatioare issued in 3,apers: Commer

raise short‐termprimary mark

eposit: These a

tance: These ad by a bank to 

mportant rate

e: 6.2% 1% 3.25% 5,396 billion Bd advances: 4,2ng loans:  owned comme

owned develope commercial bn commercial y: 1,223.6 billioy (M1): 1,319.5 M2): 6,735.7 bilation: 805.2 bney supply: 11orrowing:  Bangladesh Bastate‐owned an7.44% ange rate: 77.6

sh Bank

s the central ba

c economy and

to its environm

 

overnight‐call 

for the treasur

nstruments in 

ons of the Gov, 6, 12 and 24 mrcial papers arm cash, often ket. Opportunare time depos

re short‐term ensure payme

es that indicate

BDT (USD 69,5261.5 billion BD

ercial banks: 23pment financiabanks: 4.6% banks: 3.5% 

on BDT (USD 1billion BDT (Uillion BDT (USillion BDT (US.61% 

ank: 189 billionnd private com

63 

ank of Bangla

d ensuring fina

mental and soc

money marke

ry bills.  

Bangladesh a

ernment usedmonths. They re short‐term uto finance wo

nities for resalesits, commonl

credit investment. 

e the capacity 

509 Million) DT (USD 54,89

3.9% al institutions

15.8 billion) USD 17.0 billioSD 86.8 billionSD 10.4 billion

n BDT (USD 2mmercial bank

desh, which is

ancial sector s

cially responsi

Final Repo

et, which is pa

re:  

d to finance fispay a set rateunsecured prorking capital re in the secondly issued by ba

ments created b

of Bangladesh

95 million) 

: 26.8% 

on) n) n) 

2.4 billion) ks: 1,512.3 billi

s primarily res

stability. The r

ible central ba

ort on Capacity BuFinance in Ban

SF13-

articipated by t

cal deficits. Bae at maturity. omissory noterequirements. dary market aranks, thrift ins

by a non‐finan

h’s money mar

ion BDT (USD

sponsible for m

ole of BB in di

anking approa

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

the commercia

angladesh Ban

s issued by a Commercial pre very limited

stitutions and 

ncial organiza

rket are: 

D 19.5 billion)

maintaining p

isaster 

ach. It issued G

er Risk A-8144)

150 051215

al 

nk 

paper d. credit 

tion 

rice 

Green 

Page 152: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

Banking P

Banking P

Managem

a refinance

green prod

Other than

indirect. 

Direct invo

As a pione

Corporate

the fund. T

projects. T

Indirect inv

BB provid

rehabilitat

to ensure b

Green fina

channels f

BB has pol

environme

risk financ

reduction 

does not a

bailouts fo

Collaborate

To close th

56 comme

fund for d

legal issue

arise becau

regulated 

Within the

amounting

  

Policy covering

Policies at strat

ent Guideline

e scheme for r

ducts and sect

n this objective

olvement 

eering initiativ

e Social Respon

This fund is ut

The fund is mo

volvement 

ed capacity bu

tion (for instan

business conti

ancing require

funds to sector

licy and finan

ental conserva

ce strategy in t

or prevention

also have any m

or state‐owned

ed fund  

he aforementio

rcial banks an

disaster manag

es relating to a

use essentially

by it are plann

e context of th

g, potentially, 

g Green Finan

tegic level of b

s to banks and

reaching credit

tors. It has iden

e, BB’s direct i

ve, BB created 

nsibility Fund

tilized for cap

odest but imm

uilding suppo

nce Sidr and R

inuity during d

ements for ban

rs that conserv

cing mechanis

ation. Notwith

the case of cata

n. BB does not 

micro‐level co

d banks in time

oned gap relat

nd 31 non‐bank

gement and ca

all these   instit

y the superviso

ned to work to

is collaborated

to 4.5 billion B

 

ce, Climate Ri

banks and Fina

d FIs for assess

t to beneficiary

ntified 47 gree

involvement w

a separate fun

’ in 2013‐14; 50

acity building

ediately availa

rt to fire servi

Rana Plaza coll

disasters. 

nks and FIs set

ves environme

sm for sustain

hstanding thes

astrophes, nor

have the capa

mprehensive 

e of crisis, wh

ted to the disa

k financial ins

pacity buildin

tutions being a

or of the bank

ogether in the 

d fund, it is en

BDT (USD 64.

isk Fund, In‐ho

ancial Instituti

sing environm

y level throug

en products fo

with catastroph

nd named ‘Ban

0 million BDT

g in different d

able. 

ces and civil d

lapse) as well 

t by BB has bee

ent and reduce

able agricultu

se involvemen

r does it have 

acity for any sp

initiatives. BB

ich is purely a

aster risk finan

titutions, has v

ng. The govern

able to work to

ing system (i.e

current institu

nvisaged that e

3 million), tha

Final Repo

ouse Environm

ions (FIs). BB i

mental risk in t

gh participator

or this scheme 

hes is minima

ngladesh Bank

T from the ann

disaster manag

defense service

as to set policy

en contributin

es climate risk

ural and SME s

nts, BB does no

any particular

pecialized disa

B’s risk financin

an economic is

nce strategy, th

very recently 

nmental layers

ogether aroun

e., Bangladesh

utional setting

each of 88 inst

at could be ma

ort on Capacity BuFinance in Ban

SF13-

mental Manag

issued Environ

their credit po

ry FIs at lower

and also for b

al. Most of its i

k Disaster Man

nual profit of B

gement and so

es to provide s

y requirement

ng to disaster r

k. 

sectors that als

ot have any pa

r product for d

aster risk finan

ng packages a

ssue.  

he Bangladesh

established a 

s are currently

nd this initiativ

h Bank) and th

g.  

titutions depos

ade available f

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

gement and Gr

nmental Risk 

ortfolio. BB has

r interest rate i

bank financing

involvement is

nagement and

BB is contribut

ocially respons

support in dis

ts for banks an

risk mitigation

so contributes

articular disast

disaster risk 

ncing product

are related to 

h Bank, along w

collaborated t

y trying to reso

ve. The legal is

he bank indust

sit 50 million B

for post‐disast

er Risk A-8144)

151 051215

reen 

s also 

in 

g. 

ted to 

sible 

saster 

nd FIs 

n as it 

s to 

ter 

ts; it 

with 

trust 

olve 

ssues 

try 

BDT, 

ter 

Page 153: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

response, 

8.2.1.2

Banglades

loan disbu

BDT 5.6 bi

A major p

(NPL). The

the supply

policy of a

Although 

concentrat

areas. One

way or ano

in the face

Performan

limited the

banks hav

serious iss

mobilizati

Most of th

creating an

alone cann

network th

private ba

Natural di

owned ban

factors in l

problems 

The prima

interferenc

honest bor

  

disaster risk m

Financial

sh financial ma

ursements by b

illion, which is

roblem in Ban

e NPL problem

y side, it is lim

approving loan

there is a wid

ted in urban a

e of the major 

other, banks, p

e of severe pro

nce of the gove

eir outreach, a

ve shown some

sues affecting t

on, reflecting 

he government

nd monitoring

not measure th

hrough which

nks will not g

isasters and cl

nks, some of w

loan delinquen

arise from oth

ary problem is

ce. Loan write

rrowers. Politi

management a

Institution

arket is domin

banks and fina

s the amount r

ngladesh’s ban

m has several 

miting the recyc

n applications

e area network

reas. Thus, the

problems in th

particularly th

blems. 

ernment‐owne

and overwhelm

e improvemen

their performa

its orientation

t banks are ma

g the security o

he success of th

h they serve a l

o due to lack o

imatic risks ar

whose portfoli

ncies, especial

her sources.  

 in governanc

e‐offs and inter

ical pressure to

 

and capacity bu

ns

nated by a ban

ancial instituti

raised by new

nking sector is 

damaging effe

cling of funds 

 which ultima

k of branches 

ere is an inequ

he financial sy

he government

ed banks has b

ming arrears h

nt as a result o

ance. The gove

n towards cred

aking losses an

of financial tra

he governmen

large number 

of profitability

re often used t

ios are concent

lly in the rural

e. Weak gover

rest remission

o oblige some

uilding.  

nk‐based finan

ions stood at B

w share issues. 

the accumula

ects starting w

and forcing ce

ately makes it 

of state‐owne

uitable transfe

ystem of Bangl

t owned bank

been very poo

have made the

f important st

ernment bank

dit disburseme

nd are technic

ansactions is w

nt banks. Their

of farmers and

y.  

to explain the 

trated in crop 

l areas, and ov

rnance has sub

ns have reward

 privileged bo

Final Repo

ncing system. T

BDT 201 billion

 

ation of huge a

with sub‐optim

ertain banks t

difficult for ne

ed commercial

r of funds from

ladesh is the a

ks, are allowed

or. An inefficie

em unsustaina

teps in recent y

ks have failed t

ent rather than

cally insolvent

weak and ineff

r success lies i

d agribusiness

poor recovery

loans. Though

ver‐exposure t

bjected state‐o

ded delinquen

orrowers and e

ort on Capacity BuFinance in Ban

SF13-

The amount of

n, roughly 36 

amounts of no

mal utilization 

o follow a ver

ew firms to ge

l banks in Ban

m the rural are

absence of an e

d to continue th

ent delivery m

able. Some of t

years. Howev

to appreciably

n financial inte

t. The institutio

ficient. Howev

in their huge r

s. They serve m

y by some of th

h natural disa

to any sector is

owned banks t

nt behavior an

external influe

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

f industrial ter

times higher t

on‐performing

of resources. O

ry conservative

et access to fin

ngladesh, lendi

eas to the urba

exit policy. In 

heir operation

mechanism has 

the state‐owne

er, there rema

y expand savin

ermediation.

onal framewo

ver, profit and

rural branch 

many areas wh

he governmen

asters are signi

s risky, the 

to severe polit

d punished th

ences in decisi

er Risk A-8144)

152 051215

rm‐

than 

g loan 

On 

nance.  

ing is 

an 

one 

n even 

ed 

ain 

ngs 

rk for 

d loss 

here 

nt 

ificant 

tical 

he 

ion‐

Page 154: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

making ha

effective le

lending ba

agricultura

distorted t

incentives

manageme

The rural f

services. T

for short‐t

deposits. F

financing.2

Banglades

8.2.2 C

The capita

banking sy

in to supp

market. W

important 

the source

efficient m

In Banglad

Securities 

2014, there

mutual fun

BDT (USD

As of 30 Ju

these 232 a

6.1 million

Eleven com

                  20 The World

  

ave compound

egal and regul

anks and has s

al loans; it has

the allocation 

, organization

ent and obsole

financial mark

There are very 

erm. They pro

Further, most 20  

sh money mark

Capital Mar

al market main

ystem cannot 

lement it. Com

Well‐functionin

factors for a h

e of external fu

mechanisms for

desh, the gove

and Exchange

e were 536 list

nds, 8 debentu

D 13.3 billion) a

une 2014, the t

are companies

n) and market 

mpanies with 

                        d Bank, 2009; Ban

ded existing sc

latory framew

suppressed fin

s limited the ab

of funds. Othe

nal and structu

ete financial se

kets in Banglad

limited saving

ovide a limited

government o

ket may not b

rket

nly refers to sh

completely me

mpanies and th

ng capital mark

healthy econom

unds for corpo

r financing the

ernment regula

e Commission

ted securities a

ures, 221 treas

and market ca

total number o

s, 41 are mutua

capitalization

IPO amountin

                   ngladesh Rural F

 

creening and e

work to enforce

nancial innova

bility of the go

er problems in

ural weaknesse

ervices and pr

desh are fragm

gs services ava

d range of serv

owned banks c

e able to play 

hare market, st

eet the need fo

he governmen

kets including

my. The impo

orate investme

e private secto

ates the securi

n (BSEC); new 

at the Dhaka S

sury bonds, an

apitalization w

of listed securi

al funds, 3 deb

n was 2,286.7 b

ng to 10.5 billio

Finance 

enforcement p

e contracts and

ation. The third

overnment ow

nclude lack of 

es, poor mana

roducts.  

mented and in

ailable in rura

vices; most no

currently cann

an effective ro

tock market, a

or funding in t

nt can raise fun

g equity and co

rtance of the c

nt but it also e

or. Investment

ities traded on

issues are app

Stock Exchang

nd 3 corporate 

was 2,943.2 bill

ities at Chittag

bentures. Tota

billion BDT (U

on BDT (USD 

Final Repo

problems. The 

d recover loan

d major issue 

wned agricultu

appropriate e

agement system

nadequate to m

al areas and cr

tably they do 

not function w

ole in disaster 

and the bond m

the market eco

nds for long‐te

orporate debt 

capital market

ensures a susta

t and economi

n the capital m

proved and reg

ge (DSE). Of th

bonds. Total i

lion BDT (USD

gong Stock Exc

al issued Capit

SD 29.5 billion

0.135 billion) 

ort on Capacity BuFinance in Ban

SF13-

second proble

ns. This has ha

is the interest 

ure banks to co

employee and 

ms, poor hum

meet the deman

redit are essent

not actively so

without subsidy

risk financing

market of the c

onomy, the ca

erm investmen

markets are o

t lies in the fac

ainable flow o

ic growth are h

market through

gulated by BS

hese 263 are co

issued capital

D 37.9 billion).

change (CSE) 

tal was 470.7 b

n).  

and one mutu

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

em is the lack 

andicapped the

rate ceiling fo

over their cost

borrower 

man resource 

nd for financi

tially available

olicit voluntar

y elements in 

g. 

country. When

apital market s

nts via the cap

one of the mos

ct that it is not 

of funds and 

highly correla

h the Banglade

SEC. As of 30 J

ompanies, 41 a

 was 1,032.1 b

  

stood at 276. O

billion BDT (U

ual fund with 

er Risk A-8144)

153 051215

of an 

or 

ts and 

al 

e only 

ry 

their 

n the 

steps 

pital 

only 

ted.  

esh 

une 

are 

billion 

Of 

USD 

fund 

Page 155: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

amounting

The capita

stock exch

subsequen

not recove

inflation a

for comme

Regulatory

registratio

governanc

and Intern

The standa

very poor.

as politica

The cultur

However, 

due to a la

long‐term 

efficient as

sector.  

There is a 

raising equ

do not feel

unconnect

feels more

markets is

perception

from the s

fundamen

specific fu

momentum

Sharehold

  

g to 1.0 billion

al market in Ba

hanges after th

ntly, it crashed

ered fully since

and started mo

ercial banks po

y reforms intr

on and transfer

ce on complian

net will also pl

ards of corpor

. The regulator

l uncertainties

re of indirect fi

relying exclus

ack of diversifi

and lumpy in

s the cost of ca

dearth of good

uity capital by

l comfortable 

ted to the chan

e comfortable i

s a matter of co

n that high vol

hare market. T

ntals. Investors

undamentals. T

m and join the

ders in the capi

n BDT (USD 0.

angladesh has

he share marke

d once again in

e then. In late 

onetary tighten

ossibly trigger

oduced by the

r of securities,

nce basis migh

lay a transform

rate governanc

rs lack author

s, weak institu

inancing throu

sively on this 

ication in the s

nvestments. Di

apital is marke

d shares in the

y issuing share

in investing in

nges in the eco

in saving with

oncern for inv

latility can lea

The capital ma

s make decisio

The market is s

e bandwagon o

ital market are

 

013 billion) we

 remained ext

et disaster of 1

n late 2010; the

2010, Banglad

ning. Banglade

red the collaps

e regulators, su

 simplification

ht help to rega

mational role in

ce and financi

ity and human

utions, corrupt

ugh banks is f

single source f

sources of fun

irect financing

et determined 

e capital mark

es or for borro

n the capital m

onomy or earn

h banks in fixe

estors, regulat

d to a general

arket is extrem

ons based on r

still dominate

only when the

e either individ

ere listed in th

tremely depres

996. Though t

e market was m

desh Bank beca

esh Bank’s dec

se of the capita

uch as introdu

n of rules and 

ain previous le

n this connect

al disclosures 

n resources. Fr

tion and lack o

airly deep‐ roo

for access to c

nds. Bank‐ base

g through capi

and it insulate

ket. Issuers do 

wing funds by

market instrum

ning forecasts b

d deposit and

tors and broke

erosion of inv

mely inefficien

umors in mos

d by unsophis

e market show

dual sharehold

Final Repo

he stock excha

ssed due to m

the market reg

massively ove

ame concerne

cision to incre

al market.  

uction of autom

regulations, a

evels. The prol

tion.  

of the listed c

rom a macro p

of infrastructu

oted for corpo

apital can be p

ed financing s

ital markets is

es borrowers f

not use the fu

y issuing corp

ments due to u

by the leading

d saving accou

erage firms. Th

vestors’ confid

nt and is driven

st of the cases i

sticated retail 

ws a sustained 

ders or institu

ort on Capacity BuFinance in Ban

SF13-

ange in the fina

mass exodus of 

gained some o

ervalued befor

d about the do

ease cash reser

mated trading

and guidelines

liferation of te

companies in B

perspective, th

ure. 

orate borrower

problematic in

system alone c

s supposed to b

from turmoil i

ull potential of

porate bonds. M

unreasonable u

g companies. T

unts. The volat

his concern ce

dence and flow

n more by spe

instead of ana

investors that

bullish trend.

utional shareho

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

ancial year 201

investors from

of its momentu

re the crash an

ouble‐digit 

rve requiremen

g through elect

s on corporate 

elecommunica

Bangladesh ar

here are issues

rs in Banglade

n terms of liqu

cannot finance

be relatively m

in the banking

f the market fo

Moreover, sav

ups and down

The public rath

tility in share 

enters on the 

w of capital aw

eculation than 

alyzing compa

t are driven by

olders. Institu

er Risk A-8144)

154 051215

13‐14.  

m the 

um 

nd has 

nts 

tronic 

ation 

re 

s such 

esh. 

uidity 

e all 

more 

or 

vers 

s, 

her 

way 

any 

utional 

Page 156: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

shareholde

important 

serious sh

different c

banks, insu

saving sch

Institution

on the ave

not have a

Institution

stability in

stronger th

institution

Banglades

both absol

Most of th

pension fu

it may be s

insignifica

The growt

institution

An import

investmen

participati

held by fo

Banglades

Clearing, s

activating 

friendly an

entice fore

                  21 Syeda See

  

ers are mainly

role in develo

ortages of inst

categories – the

urance compa

hemes, postal l

nal Investment

erage 14.7% in

any institution

nal investment

n the market. T

han the indivi

nal investor is 

sh capital mark

lute and perce

he institutional

unds is very lim

some time bef

ant in size and

th of institutio

nal shareholde

tant class of in

nt amount is ve

ing in Banglad

reign investor

shis in the capi

settlement and

Over‐The‐Cou

nd uninterrup

eign portfolio i

                        ma Mahbub, 201

y different typ

oping and stab

titutional inve

e Investment C

anies, leasing c

life insurance,

t in Banglades

stitutional sha

nal shareholder

t brings long‐t

They are more

dual sharehol

also expected 

ket missed thi

entage terms.  

l investors in B

mited. The ins

fore it can take

 they almost a

onal investmen

rs can hamper

nvestors that is

ery small and 

desh’s stock m

rs as of 30 June

ital market. Po

d depository s

unter (OTC) m

pted online tra

investment. Po

                   14; Institutional S

 

es of business

bilizing the cap

estors. The inst

Corporation o

companies, no

 co‐operative 

sh is negligible

areholding in t

rs in their shar

term commitm

e knowledgeab

ders in protec

to ensure bett

s source of eff

Bangladesh ar

surance indust

e a dominant r

always invest i

nts in capital m

r the overall d

s absent from B

sometimes ne

market. Only 1.

e 2014. In addi

oor market inf

ystem must be

market, reduci

ding system, c

olitical instabi

Shareholders in B

 or non‐busine

pital market b

titutional inve

of Bangladesh,

on‐banking fin

mortgage land

e. As of 30 Jun

their share cap

re capital. 

ment and great

ble compared 

cting their own

ter valuation le

ficiency gains 

re banks. Inves

try is still sma

role as an insti

in bank depos

market has bee

development o

Bangladesh’s 

egative. Nume

4% of total ou

ition, there isn

frastructure al

e developed fu

ing settlement 

creating reliab

ility also sends

Bangladesh 

Final Repo

ess organizati

but the capital 

estors in Bangl

, Bangladesh D

nancial institut

d banks, empl

ne 2014, the com

pital; out of 26

ter focus on th

to individual 

n interest. Furt

evels due to th

as institutiona

stment by the 

all and is at a n

itutional inves

sits and govern

en far below th

of the capital m

stock market 

erous impedim

utstanding sha

n’t a strong pre

lso discourage

urther and rei

t and clearing 

ble credit ratin

s a negative si

ort on Capacity BuFinance in Ban

SF13-

ions. These inv

market of Ban

ladesh’s capita

Development B

tions, pension 

loyee insuranc

mpanies listed

63 companies, 

he fundamenta

shareholders 

thermore, the 

heir special an

al investment 

insurance com

nascent stage o

stor. The pensi

nment bonds. 

he expectation

market.21 

is foreign inve

ments discoura

ares of the liste

esence of non‐

es foreign inve

inforced. Issue

time, introduc

ng culture, etc.

ignal to foreig

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

vestors play a 

ngladesh is fac

al market are o

Bank, schedul

 funds, postal 

ce funds etc. 

d in the DSE h

30 companies

als and, hence,

and are financ

presence of 

nalytical skills

is very small i

mpanies and 

of developmen

ion funds are 

 

n. The shortage

estors. Net for

age them from

ed companies 

‐resident 

estors to invest

es such as 

cing more use

 are required t

n investors an

er Risk A-8144)

155 051215

very 

cing 

of 

led 

have 

s did 

cially 

in 

nt and 

e of 

reign 

was 

t. 

r‐

to 

nd 

Page 157: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

acts as a p

Corporate

market in 

corporate 

interest ra

rates deter

market. Th

corporate 

unattractiv

Banglades

investmen

8.2.3 In

Disasters h

income ho

risky but h

country lik

through ri

According

insurance 

insurance 

Banglades

(general in

insurance 

microinsu

insurance 

of them. M

Sadharan 

insurance 

and the re

                  22 Prashanta23 Ibid

  

sychological d

e bonds can act

Bangladesh is

bond market. 

tes, and banks

r public borrow

he lack of know

bond market r

ve.23  

sh capital mark

nt climate in th

nsurance S

have two majo

ouseholds (LIH

higher return a

ke Bangladesh

isk transfer me

g to the 2012 SI

activity relativ

premium inco

sh insurance m

nsurance) and 

companies als

rance. The mi

– both are pilo

Multinational d

Bima Corpora

market of Ban

maining 50 pe

                        K Banarjee and 

deterrent to fo

t as a complem

s almost non‐e

The governm

s offer quite hi

wings by the c

wledge‐based

remaining ina

ket is still not 

he country and

Sector

or consequenc

Hs); (ii) the LIH

activities. The

h, mechanisms

echanisms. On

IGMA Report

ve to the size o

ome) was only

market is domi

Jibon Bima C

so operate in t

croinsurance p

ot projects lau

donors are sub

ation (SBC) ha

ngladesh. By la

ercent may be 

                   Md. Mohiuddin

 

reign investor

mentary sourc

existent. The h

ment borrows h

igh interest ra

corporate bodi

d trading, even

active. The lack

broad or deep

d may not be a

ces: (i) the seve

Hs may becom

refore, to prev

s should be in 

ne of the optio

, Bangladesh’s

of the econom

y 5.5 USD; both

inated by two 

orporation (lif

this market an

products offer

unched around

bsidizing both

s a market sha

aw SBC is enti

placed with o

Siddiqui, 2010; I

rs.22 

e of financing

high interest ra

heavily throug

tes in competi

ies, thereby th

n for governme

k of innovativ

p enough to pl

able to play an

ere effect of sh

me more risk a

vent sharp incr

place to mitig

ons is insuranc

s Insurance pe

my, was 0.8 per

h ratios are am

state‐owned c

fe insurance).

nd 12 life insur

red by the gen

d two years ag

h projects.  

are of over 20%

itled to 50 per

other insurers 

Investment Clima

Final Repo

g to bank finan

ate in the mone

gh various nati

ition with gov

hwarting the d

ent bonds, is a

e products ha

lay a decisive r

n active role in

hocks accentua

averse and unw

reases in pove

gate the possib

ce.  

enetration, wh

rcent and insu

mongst the low

corporations –

A total of 31 p

rers and 2 gene

neral insurance

go and sufficie

% of the total p

cent of public 

in the country

te in Bangladesh: 

ort on Capacity BuFinance in Ban

SF13-

ncing but the c

ey market is a

ional savings 

vernment secu

development o

an important r

as also kept the

role in creatin

n disaster risk 

ates the povert

willing (or una

erty following 

ble financial an

hich measures 

urance density 

west globally. 

– Sadharan Bim

private life and

eral insurers o

e companies a

ent data is not 

premium inco

 sector busine

y. In practice, w

Enhanced Role of 

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

corporate bond

a barrier to the

schemes at hig

urities. High in

of a corporate b

reason for the 

e market 

ng a friendly 

financing. 

ty of the low‐

able) to engag

 a disaster in a

nd societal imp

the level of 

(per capita 

 

ma Corporatio

d 46 private ge

offer 

are health and 

available on e

ome of the 

ess in Banglade

with agreemen

f the Capital Marke

er Risk A-8144)

156 051215

gh 

nterest 

bond 

ge in 

pacts 

on 

eneral 

flood 

either 

esh 

nt of 

et 

Page 158: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

the Insura

business is

companies

be placed 

2012, the t

The insura

shares of p

sector has 

main focu

individual

products b

people wit

and one fl

low‐incom

The Bangl

period 200

population

during the

insurance 

premiums

However, 

Banglades

insurance 

All the ins

that there 

the growth

situations 

instability 

Religious 

the popul

would be 

  

nce Associatio

s distributed a

s are required 

with any reins

total premium

ance market is

private insuran

concentrated 

s. There is ver

l in Banglades

but insurance 

th high net‐wo

ood insurance

me households

adeshi insuran

08–2012, suppo

n. The loss rat

e review perio

industry, espe

s during the re

a vast majorit

sh. This has res

and a great nu

surance compa

is better scope

h of insurance

often arise du

and inconsist

attitude of the

ation believes

sin to buy insu

on of Banglade

among all the p

by law to plac

surers of their

 income in the

s highly compe

nce companies

in the urban b

ry little culture

sh. Some of the

coverage for p

orth have take

e), none of the 

s. 

nce industry in

orted primaril

ios in all three

od were low. T

ecially in the l

eview period. 

ty of the popu

sulted in lack 

umber of peop

anies are locat

e for business 

e business in th

ue to this and c

tency of politic

e people also s

s  insurance  is 

urance.  

 

esh, SBC unde

private genera

ce 50 percent o

r choice. Accor

e country amo

etitive, with fi

s, and the incr

business only, 

e of insuring b

e insurance co

private homes 

en out such ins

non‐life insur

ncreased at a c

ly by the life in

e insurance seg

The large popu

ife segment, w

lation, especia

of awareness 

ple believe tha

ted in urban ar

in urban areas

he country. Po

causes obstacle

cal courses are

stands against

prohibited  in

erwrites all the

al insurance co

of their reinsu

rding to Bangl

ounted to BDT

ierce competiti

reasing level o

with corporat

building, conte

ompanies offer

(building insu

surance. Excep

rance provider

compound an

nsurance segm

gments – life, n

ulation will con

which accounte

ally in rural ar

among the pe

at insurance is 

reas with a few

s. This “centra

olitical instabil

e to all busine

e serious probl

t development

n  Islam and  th

Final Repo

e public sector

ompanies equ

urance busines

ladesh Insuran

T 81.9 billion (U

ion in the non

of risk being re

te insurance an

ents, personal 

r personal acci

urance) and co

pt for two pilo

rs offer any pr

nnual growth r

ment (16.4%), d

non‐life and p

ntinue to be a 

ed for a 76.9%

reas, is left out

eople. People a

an unnecessa

w branches in 

alization policy

lity is also a m

esses including

lems for the in

t of the insura

hat  the  future

ort on Capacity BuFinance in Ban

SF13-

r business and

ually. All priva

ss with SBC; ot

nce Associatio

USD 1.1 billion

n‐life segment,

etained by insu

nd auto insur

accident or he

ident or health

ontents is alm

ot projects (on

roducts for the

rate (CAGR) o

driven by the 

personal accid

key growth d

% share of gros

tside the insur

are not aware 

ary expenditur

rural areas on

y” has acted a

major problem;

g insurance bu

nsurance secto

ance sector. A 

e  is  in  the han

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

d 50 percent of

ate insurance 

ther 50 percen

on’s Annual Re

n).  

, the rising ma

urers. The non

ance being the

ealth by a priv

h insurance 

most nil. Only a

e health insur

e urban or rur

of 16.0% durin

country’s larg

ent and health

driver for the 

ss written 

rance coverage

of benefits fro

re. 

n the assumpti

as an obstructi

; many disrup

usiness. Politic

or. 

large percent

nds of Allah 

er Risk A-8144)

157 051215

f that 

nt can 

eport 

arket 

n‐life 

eir 

vate 

a few 

ance 

al 

ng the 

ge 

h – 

e in 

om 

ion 

ion for 

tive 

cal 

tage of 

and  it 

Page 159: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

There  is a 

trained  cl

provided b

and does n

considerab

also fails t

Claims ma

of either to

There is a 

companies

Partly due

of high ma

savings m

market is g

There is a 

has not tri

is no attem

individual

The low li

leads one t

rationally 

Low dema

underestim

drastically

insurance 

in the near

Lack of fai

Banglades

potential c

poor. This

Lack of str

practices l

by the life 

  

shortage of t

laims‐adjuster

by Bangladesh

not produce a

ble poaching 

o attract the to

anagement is 

o delay the pa

dearth of new

s seem to copy

e to fall in mon

anagement exp

edium to the g

getting satura

lack of cooper

ed to promote

mpt to raise ins

lly and no one

teracy level is 

to think that th

because they 

and for insuran

mation of risks

y different deg

can also resul

r future, thus l

ith is one of th

sh. At one side

customers are 

s feeling of dis

rict supervisio

ike under‐cutt

insurers etc. T

rained profess

rs,  innovative

h  Insurance A

adequate num

of  trained per

op quality fres

defective. Insu

yment or to re

w products in

y each other’s 

ney value and 

penses and low

general public

ted gradually.

ration amongs

e cooperation w

surance aware

e is promoting

another facto

he insurance i

do not know w

nce in the cou

s, false sense o

grees of risk aw

lt from the unw

leading to adv

he fundamenta

e, insurance bu

dubious abou

trust is very in

on by the regul

ting tariff rate

This does not o

 

sionals  in the 

‐product  dev

Academy,  the 

ber of trained

rsonnel amon

sh graduates to

urance compa

epudiate claim

n the market. V

products. 

partly for the

w investment 

c. Less and less

.  

st the insuranc

within the ind

eness as a who

g the insurance

r that adverse

is deception an

what insuranc

untry can also b

of security, and

wareness and e

willingness of 

verse selection

al reasons for w

usiness is not w

ut its service. P

ntense in the c

lator has enco

s by general in

only destroy t

country; the 

velopers  and 

only  training 

d professionals

gst  the  compa

o join this sect

anies create ob

ms.  

Very little inv

reason of nil o

return, life ins

s people are in

ce companies. 

dustry. Each co

ole. In other w

e industry as a

ely affects the m

nd it has no va

ce is and what 

be attributed t

d myopic visio

estimates of ri

the public to 

n problem. 

which insuran

well known to

Public image a

case of life insu

uraged many 

nsurance comp

he reputation 

Final Repo

insurance  ind

qualified  act

  institute  in  th

s required by 

anies  competi

tor. 

bstacle in the c

vestment is ma

or low bonus 

surance has ce

nterested in lif

The Banglade

ompany prom

words, each com

a whole. 

marketing of i

alue in daily li

 its importanc

to lack of awa

on toward the

isk hazard. In 

purchase insu

nce business d

o the general p

about services 

urance compa

insurance com

panies, creatin

of insurance c

ort on Capacity BuFinance in Ban

SF13-

dustry  lacks sk

tuaries.  The 

he country,  is

the industry. 

ing  in  the ma

claims process

ade in produc

additions to th

eased to look a

fe insurance an

esh Insurance 

motes its own p

mpany is mark

insurance. Lac

ife. Such peop

ce as security f

areness, includ

e future. Peopl

addition, lack

urance unless l

does not have a

people and on 

of insurance c

anies. 

mpanies to fol

ng obstacles in

companies bu

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

killed underw

quality  of  tra

s not very exte

As a result, th

arket.   The  ind

s with the inte

ct developmen

he policy as a 

as an attractiv

nd the urban 

Association al

product, and t

keting itself 

ck of education

ple cannot thin

for the future i

ding 

le at risk can h

k of private sec

losses are expe

a strong positi

the other side

companies is v

llow unethical

n claims proce

ut also creates 

er Risk A-8144)

158 051215

writers, 

aining 

ensive 

here is 

dustry 

ention 

nt and 

result 

ve 

lso 

there 

nk 

is. 

have 

ctor 

ected 

ion in 

e the 

very 

edures 

Page 160: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

negative im

lack traine

insurance 

There hav

tools that p

microfinan

increasing

Robust fin

reducing i

manageme

Microinsu

providing 

allowing t

providing 

Over the la

disaster ris

microcred

by a disast

program in

SEWA offe

While mos

in respons

weather ri

using rive

Index‐base

settlement

schemes h

There is a 

General In

is for the p

levels of p

project wa

Developm

  

mpact in the m

ed personnel a

companies in 

e been recent 

promote resili

nce, social fun

g access to fina

nancing tools c

impacts and lo

ent. This chap

urance has eme

access to post

he poor to pro

immediate liq

ast several yea

sks. As a start

it loans so tha

ter. There are 

n India, which

ers the insuran

st microinsura

ses to specific l

isks for crops u

rbed water lev

ed schemes ar

t of claims. Low

have the poten

“Meso‐level” 

nsurance, PKSF

peak flood per

payout depend

as launched in

ment and Coop

mind of the pe

and even after 

the country. 

developments

ience and redu

nds, microinsu

ancing for disa

can help the po

osses of disaste

pter looks at m

erged as a pote

t‐disaster finan

otect their inve

quidity to the 

ars a number m

ing point man

at borrowers (a

also examples

h allows its me

nce in partner

ance schemes h

losses, new in

using precipit

vel as a physic

re potentially m

w transaction 

ntial to provide

index‐based f

F, Manab Muk

riod (16 Augus

ding on the flo

 2013 and cov

peration (SDC)

 

eople about ins

5 years of exis

s to improve a

uce financial lo

rance, and cat

aster risk mana

oor to break th

er shocks, and

microinsurance

ential solution

ncial resource

estment and re

poor, microin

microinsuranc

ny microfinanc

and the MFIs) 

s of bundling w

embers to save

ship with a re

have used trad

dex‐based sch

ation levels, co

cal trigger. Thi

more transpar

costs can subs

e an option for

flood insuranc

kti Sangstha (a

st to 30 Septem

od water leve

ers 1,661 hous

). The insurers

surance in gen

stence it is not

access among p

osses and suff

tastrophe pool

agement eithe

he poverty cyc

d providing res

 as an option.

n for extending

s in a relativel

etain their fina

surance is also

ce schemes hav

ce institutions 

will not be stu

with savings p

e for insurance

gulated insure

ditional indem

hemes have als

over livestock

is type of insu

rent than tradi

stantially redu

r DRF. 

ce being pilote

an NGO) and 

mber) and max

l and the num

seholds. The p

s have made a 

Final Repo

neral. The regu

t able to fully m

poor and vuln

fering due to d

ls – have gene

er at household

cle by protecti

sources for dis

g insurance co

ly fast, reliable

ancial gains in

o seen as prom

ve also been d

 (MFIs) have b

uck with the d

programs, such

e through fixe

er that underw

mnity insuranc

so emerged. S

k using temper

urance is also c

itional insuran

uce the premiu

ed in Sirajganj 

Swiss Re (re‐i

ximum payou

mber of days th

premium is pai

payout in 201

ort on Capacity BuFinance in Ban

SF13-

ulator’s office 

monitor the op

nerable commu

disasters. Four

erated great in

d, community

ing their devel

saster prevent

overage in poo

e and predicta

n the face of di

moting dignity

developed or e

begun to offer

debt if their bu

h as SEWA’s m

ed deposits in 

writes the poli

ce, which pays

o far these mo

rature level or

called paramet

nce and elimin

um. Index‐bas

area by OXFA

insurers). The 

ut is 8,000 BDT

he water level 

id by Swiss A

14 but details a

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

is understaffe

perations of al

unities to finan

r tools – that is

nterest for use i

y, or national le

lopment gains

tion and risk 

or communitie

able manner an

isasters. By 

y and self‐relia

extended to co

r insurance on 

usiness is dam

microinsuranc

savings accou

icy. 

s insurance cla

ost often cover

r cover flood ri

tric insurance.

nate the length

sed insurance 

AM, Pragati 

insurance cov

T. There are fou

remains high.

gency for 

are not availab

er Risk A-8144)

159 051215

ed, 

ll the 

ncing 

s, 

in 

evels. 

s, 

es – 

nd 

ance.  

over 

maged 

ce 

unts. 

aims 

isks, 

hy 

verage 

ur 

. The 

ble. 

Page 161: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

A few othe

organizati

Other than

insurers in

Of the man

Unlike oth

product a 

need to be

could be h

layer wher

held by eit

(i)

(ii)

(iii)

The Gover

reinsurers

8.2.4 In

The poten

and Coope

rapid grow

clients in c

forgivenes

organizati

better flow

build socia

can also pr

Microcred

1976 and w

number of

BRAC, Gr

                  24 Thiagu Ra

  

er index‐based

ions.  No insur

n the above, no

n Bangladesh. 

ny risks faced

her risks, it affe

unique propo

e adopted; the 

handled by sav

re the insuran

ther of the foll

The internaThe sophisThe multila

rnment can pl

.24 

nformal Se

tially construc

erative) can pl

wth that has oc

coping with th

ss, reschedulin

ions can also h

w of informatio

al capital as ex

rovide explicit

dit in Banglade

was then form

f microfinance

ameen Bank, a

                        anganathan; Micr

d projects/prod

rance compan

o catastrophic

by rural comm

ects the comm

osition. In desi

risks could be

vings and cred

ce companies 

lowing entities

ational reinsurticated capitalateral agencies

ay any of the r

ector

ctive role micr

lay and their v

ccurred in mic

he impact of ca

ng of loan, asse

help improve t

on among thei

xpressed in sp

t and implicit 

esh was pionee

malized in 1983

e institutions (

and Proshika. 

                   rofinance Insight

 

ducts are bein

ies are involve

c insurance/mi

munities globa

munity across t

gning any dis

e divided into 

dit by the comm

hold the risk, 

s:  

rance markets

l markets s or the Gover

roles in this st

rofinance insti

vulnerability in

crocredit. Thes

atastrophes. Th

et replacemen

targeting of re

ir members. A

ecific mitigati

insurance to t

ered by the Gr

3 as a public in

MFIs), particu

 

t 2007; Insurance 

ng piloted/expe

ed in these pro

icroinsurance 

ally, the risk o

the board. Thi

aster insuranc

three layers ‐

munities itself

(c) The third l

rnment or thro

ructure. It cou

tutions (financ

n a disaster ar

se organizatio

he services inc

nt, housing loa

lief programs 

Another impor

on measures i

the household

rameen Bank, 

nstitution. Sinc

ularly in recent

Against Disaster:

Final Repo

erimented by 

ojects/product

schemes/prod

of disaster is p

is makes desig

ce product, inn

(a) the base la

f, (b) the next 

layer is the ca

ough a pool cr

uld be the clien

cial non‐gover

re important is

ons offer a num

clude provisio

ans, and loans 

through their

rtant feature of

in time of disa

ds in disaster‐p

which began 

ce then, there h

nt years. Famou

: Innovating Desig

ort on Capacity BuFinance in Ban

SF13-

donors/intern

ts. 

ducts are being

peculiar in that

gning a disaste

novations like

ayer is a self‐re

layer is the ma

tastrophe laye

reated by insur

nts, the insure

rnmental orga

ssues, particul

mber of service

on of temporar

for starting ne

r microfinance

f microfinance

aster. NGOs an

prone areas.  

operations on

has been rapid

us names in th

gn and Implement

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

national 

g offered by an

t it is systemic

er risk insuran

e risk‐layering 

etention layer 

arket risk‐tran

er which shou

rers.  

ers or the 

anizations (NG

larly in view o

es, which can 

ry loans, loan 

ew activities. T

e networks and

e is its capacity

nd Cooperativ

n a project basi

d growth in th

his sector are A

tation 

er Risk A-8144)

160 051215

ny 

c. 

nce 

may 

that 

nsfer 

ld be 

GOs) 

of the 

help 

The 

y to 

ves 

is in 

he 

ASA, 

Page 162: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

Currently 

have over 

As of May

billion (US

deposits in

Disasters c

million me

funded thr

billion (US

After the 1

(USD 64.40

were given

considered

240,000 fam

amount w

rice in the 

rehabilitat

interest‐fre

386,500) fo

8.2.4.1

Many MFI

alleviate th

case of cat

risks. Mult

household

household

disasters a

microfinan

empowerm

expressed 

                  25 MRA web26 Grameen B27 BRAC Ann28 PROSHIK

  

there are 742 

26.4 million m

y 2014, loans am

SD 1.2 billion)

n excess of BD

can have a pro

embers of Gra

rough loans w

SD 12.9 million

1998 floods, th

0) again, if the

n BDT 2,500 (U

d for the housi

milies for hou

would be mostl

open market 

tion program w

ee loan of 500 

or rice, vegetab

MFIs and

Is/NGOs play 

he burden of t

tastrophes. In 

tiplicity of inc

ds in dealing w

ds. Some of the

are loan forgiv

nce networks, 

ment of wome

in specific mi

                        bsite May 2014 Bank Annual Renual 1998 

KA Annual Repor

financial NGO

members and 1

mounted to BD

. The total num

DT 29.4 billion 

ofound impact

ameen Bank w

were destroyed

n) loan from B

he Grameen Ba

eir houses suff

USD 32.20) tow

ing loan were 

sing to supple

ly used to buy

and sold it at 

worth 50 milli

BDT each (US

bles and winte

NGOs

important rol

the central gov

addition to red

come‐earning o

with disasters b

e other attribu

veness in the a

better flow of

en. An importa

tigation measu

                   

port 1998 

rt 1998 

 

Os registered w

19.7 million bo

DT 257.01 billi

mber of coope

(USD 378.3 m

t on microcred

were affected, o

d and Grameen

Bangladesh Ba

ank members w

fered damages

wards the sam

given a fresh 

ement people s

y construction 

subsidized rat

ion BDT throu

SD 6.44). It als

er crop cultiva

les in disaster 

vernment and 

ducing househ

opportunities 

better. Microfi

utes of microfin

reas affected b

f information a

ant feature of m

ures.

with the Micro

orrowers, serv

ion (USD 3.3 b

eratives was 16

million).25 

dit operations.

of which 0.8 m

n Bank faced s

ank to cope wit

who received 

s. Those memb

me. Other mem

loan to recons

s efforts in rep

or repairing m

tes to group m

ugh which 100,

o supported a

ation.28  

management 

improve peop

hold‐level life 

and asset buil

inance also pr

nance, which a

by disasters, b

among the clie

microfinance i

Final Repo

o Credit Regul

viced by 110,73

billion) and sa

64,536 with ov

. For example,

million were se

severe liquidit

th the after eff

housing loan 

bers who did n

mbers whose h

struct their ho

pairing and reb

materials.27 The

members The P

,000 affected f

a credit progra

in the Banglad

ple’s access to 

 cycle risks, m

lding through

rovides explici

are very helpf

better targeting

entele of micro

is its capacity 

ort on Capacity BuFinance in Ban

SF13-

latory Author

34 staff throug

avings amount

ver 8.6 million 

, during the 19

riously affecte

ty issue and h

fects.26  

before were g

not get housin

houses were de

ouses. BRAC e

building hom

e BRAC purch

Proshika took 

families would

am of BDT 30 m

deshi context. 

the means of 

microfinance al

h microfinance

it and implicit

ful in dealing w

g of relief prog

ofinance organ

to build socia

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

ity. The NGOs

gh 14,674 bran

ted to BDT 94 

members and

998 floods, 1.2

ed. Activities 

had to take BDT

given BDT 5,00

ng loans befor

estroyed but w

xtended loans

es. The loan 

hased 364 tons

up an emerge

d be provided 

million (USD 

Their activitie

livelihood in t

lso reduces dis

e help poor 

t insurance to t

with large‐sca

grams through

nizations, and

al capital as 

er Risk A-8144)

161 051215

nches. 

 

T 1.0 

00 

were 

s to 

s of 

ency 

an 

es 

the 

saster 

the 

ale 

Page 163: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

At the inst

impact of n

payment, 

services at

inherent in

a valuable

Important

Banglades

provides t

manageme

As an exam

A non‐pro

developm

through p

through P

related to 

branches. 

(approxim

promoting

nutshell, P

approache

program s

8.2.4.2

The role o

during the

were overw

Banglades

ensure tha

immediate

members t

repaymen

members a

                  29 Geetha Na

 

  

titutional level

natural disaste

asset replacem

t different stag

n microfinance

e partner in an

t MFIs/NGOs i

sh NGO Found

the NGOs with

ent.  

mple of the wa

ofit organisatio

ent agency, i.e

artner organiz

artner Organi

alleviate pove

The POs inclu

mately 55 millio

g microfinance

PKSF provides

ed the governm

since the netw

MFIs, NGO

f MFIs/NGOs 

e 1998 floods. T

whelming. Th

sh responded t

at weekly cont

e interest‐free 

to withdraw th

nts on their exi

address their i

                        agarajan, 1998; M

l, MFIs/NGOs

ers. These serv

ment and hous

ges of post‐dis

e enables it to 

ny disaster‐man

in Bangladesh

dation, Social 

h financial sup

ay in which M

on established

e., a second‐tie

zations (POs). 

sations (POs),

erty. It is engag

ude Grameen B

on people). Its

e. PKSF has pl

s financial and

ment and the i

ork of its POs 

Os and PK

in responding

The damages 

heir income ge

to the unprece

tacts with all m

consumption 

heir savings, r

sting loans. Th

immediate rel

                   Microfinance in the

 

s offer a numb

vices include p

sing loans, and

aster rehabilit

serve a wide r

nagement sch

h include, but n

Development 

pport by grant

MFIs/NGOs can

d by the Gover

er organization

PKSF has thre

 (b) institution

ged with 200 P

Bank, BRAC, P

s main objectiv

layed key roles

d technical sup

international d

offer a solid in

KSF Involve

g to disaster ri

to the standin

nerating activ

edented situat

members were

loans so that t

reschedule the

hey provided 

ief and consum

e wake of Natural 

er of services,

provision of te

d loans for star

tation: relief, re

range of rehab

heme.29  

not limited to,

Foundation, a

ting funds, and

n be helpful in

nment of Bang

n, which does 

ee programs –

nal developme

POs spread th

Proshika, and 

ves include cre

s in shaping th

pport to poor a

donor agencie

nstitutional ba

ement with

isks was demo

ng crops, livest

vities were alm

ion of floods. 

e maintained. T

the members w

e loan repayme

quick emergen

mption needs.

Disasters: Challen

Final Repo

 which can he

emporary loan

rting new acti

ecovery and r

bilitation need

, PKSF (Palli K

and so on. Typ

d NGOS use s

n disaster man

gladesh in 199

 not work with

– (a) microcred

ent program fo

hroughout the 

ASA. PKSF se

eating employ

he microfinan

and ultra‐poor

es to involve it

ase to working

h Disaster

onstrated very

tock and hous

most suspende

The MFI/NGO

They carried m

would not go 

ents, permitte

ncy loans, ofte

. A number of

nges and Opportun

ort on Capacity BuFinance in Ban

SF13-

elp clients in co

ns, re‐scheduli

ivities. MFIs/N

reconstruction

ds after a disas

Karma‐Sahaya

pically the cen

some of the fu

nagement, take

90, PKSF is an 

th the poor dir

dit for the poor

or POs, and (c

country with 

erves 11 millio

yment, helping

nce operated by

r through part

ts POs in the fl

g the remote a

Manageme

y successfully i

ses of the rural

d. All the MFI

O workers wen

money with th

hungry. They

ed the member

en small in siz

f MFIs/NGOs 

nities

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

oping with the

ing of loan 

NGOs provide

n. The flexibilit

ster and make 

ak Foundation

ntral governme

nds for disaste

e the case of P

apex funding

rectly, but indi

r implemented

c) research pro

several thousa

on households

g the poor, and

y many MFIs.

tners. PKSF al

lood rehabilita

areas of Bangla

ent

in Bangladesh

l landless peop

Is/NGOs in 

nt on boats to 

hem and provi

y allowed the 

rs to delay sev

ze, to help the 

also provided

er Risk A-8144)

162 051215

 these 

ty 

them 

n), 

ent 

er 

PKSF. 

irectly 

ogram 

and 

 In a 

so 

ation 

adesh. 

ple 

ided 

veral 

d loans 

Page 164: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

for econom

 

MFIs and N

Grameen B

program in

BRAC exte

rebuilding

purchased

Proshika t

families w

million BD

In addition

independe

water, mil

would hel

PKSF: 

In addition

disaster m

life, livesto

which it p

Disaster M

amount if 

mitigation

them cope

Bangla) un

prevent th

SAHOS is 

disasters. I

livelihood

                  30 Warren Br

the Microfina31 Dipal C Ba

  

mic recovery a

NGOs: 

Bank set up a 

nvolving new

ended loans to

g homes. The l

d 364 tons of ri

took up an em

were provided 

DT for rice, veg

n to these cred

ent of their cre

lk, and medici

lp the flood‐af

n to supportin

management in

ock, hospital c

rotects those P

Management P

the income‐ea

n approach bec

e with and reco

nder its Disast

hem from sellin

designed to e

It seeks to faci

 restoration in

                        rown and Geetha

ance Industry

arua, 1998; The G

and reconstruc

Disaster Mitig

w loan product

o 240,000 fami

loan amount w

ice in the open

mergency rehab

with an intere

getables and w

dit operations,

edit operations

nes. They also

fected people 

ng microcredit

n several dimen

cash plan and 

POs that do no

Program (a qua

arning person 

cause PKSF’s m

over from disa

ter Manageme

ng advance lab

ensure immedi

ilitate the copi

ncluding repai

                   a Nagarajan; 200

Grameen Strategy 

 

ction of houses

gation Task Fo

s, assistance fo

ilies for housin

would be most

n market and s

bilitation prog

est‐free loan of

winter crop cu

 all the NGOs

s. For example

o agreed to sup

to resume the

t programs, PK

nsions. For ex

paramedic he

ot have any in

asi‐insurance p

in the househ

microcredit pr

asters PKSF ha

ent program to

bor or valuabl

iate financial a

ing and recove

iring of houses

00; Bangladeshi Ex

to Combat the Floo

s.30  

orce, which pre

or housing reh

ng to supplem

tly used to buy

sold it at subsi

ram worth 50 

f 500 BDT each

ultivation, to be

s took up a num

e, they set up m

pport a numbe

eir economic a

KSF is involve

xample, PKSF n

althcare). PKS

surance or rei

program) und

hold is killed d

rograms have 

as created a fu

o provide quic

le assets and e

assistance to su

ery mechanism

s, tube wells a

xperience in Adapt

od of 1998

Final Repo

epared and im

habilitation an

ment people s e

y construction

idized rates to

million BDT t

h. It also supp

e adjusted dur

mber of relief 

medical center

er of activities

activities.  

ed with inclusi

now has 7 mic

SF has set‐up a

insurance cove

der which it wa

due to a disaste

a total outreac

und called SAH

ck financial ass

enable them to

upport the vu

m of poor peop

and latrines; re

ting Financial Ser

ort on Capacity BuFinance in Ban

SF13-

mplemented a 

nd agricultural

efforts in repai

n or repairing 

o group memb

through which

ported a credit

ring the follow

and recovery 

rs, distributed

s in non‐farm s

ive insurance, 

croinsurance p

a Covariant Ri

erage. PKSF h

aives the entir

er. This is an i

ch of 35 millio

HOS (meaning

sistance to the

o find a humbl

ulnerable poor

ple. It is prima

estoring the ex

rvices to Cope with

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

rehabilitation

l production.31

iring and 

materials. It 

bers.  

h 100,000 affec

t program wor

wing yield.  

activities, 

d food, drinkin

sector, which 

covariant risk

programs (cre

isk Fund with 

has also set up 

re outstanding

important risk

on people. To h

g Courage in 

e poor families

le and decent 

r during and p

arily used for t

xisting income

h Floods, Implicati

er Risk A-8144)

163 051215

n 1  

cted 

rth 30 

ng 

ks and 

dit 

g loan 

help 

s, 

life.  

post 

the 

ions for 

Page 165: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

generating

provision 

participati

borrowers

Another p

Foundatio

amongst o

of POs par

3.9 Bn (PK

Other disa

1. St

2. R

3. Pr

D

(in

During the

used in liv

is much lo

improving

The factor

Banglades

MFIs/NGO

quickly to 

fundraisin

the damag

rehabilitat

clients, los

informatio

Good finan

and decisi

                  32 PKSF Web33 Ibid 34 Nina Nay

  

g activities and

of emergency 

ing in this pro

s. Most of the l

program PKSF 

on in Bangla). U

other support, 

rticipating in t

KSF to POs BD

aster mitigatio

topping the loemoving the lroviding cond

Disaster Manag

n 16 years), an

e 2007 cyclone

velihood restor

ower than the m

g incomes of th

s that made ef

sh a success ar

Os with good l

the situation, 

ng to meet the 

ge of affected p

tion strategy o

ss of program 

on, the MFIs/N

ncial and insti

ion‐making, an

                        bsite 8 Feb 2015 

ar and M Faisal, 

d ensuring con

medical servi

gram were 14

loans were ma

has been imp

Under BUNIA

provides capa

this program w

T 1.3 Bn).33 

n measures of

oan recovery dlimit for savingditional grantsgement Fund ond the fund is 

e (Sidr), two bi

ration program

market and w

he poor; the ap

ffective interve

re its capable le

leadership as 

availed of exi

demand for re

people was als

of the MFIs/NG

income as a re

NGOs could pr

itutional mana

nd clarity in ch

                   

1999; Microfinan

 

nsumption cap

ices, water and

9; the POs disb

ade during Sid

plementing for

AD, PKSF prov

acity building 

were 135; the c

f PKSF include

during disastergs withdrawa

 to partner orgof the PKSF haavailable for i

illion BDT has

m. The progra

where repay pe

pproach is gro

ention of some

eadership, com

that of ASA, B

isting disaster 

esources. The 

so very impor

GOs. It provid

esult of potent

roject capital r

agement inclu

hain of comma

nce Survives Bangl

pabilities durin

d sanitation. A

bursed BDT 5

dr (2007) and A

r the ultra poo

vides flexible m

support at the

cumulative len

e:  

r period, and el ganizations (inas accumulate

instant relief a

s been received

am includes co

eriods are long

owth‐based, no

e of the MFIs/

mmitted staff, 

BRAC, Gramee

mitigation fun

involvement o

tant. The close

ded good infor

tial drops in sa

requirements f

uding provision

and were also

ladesh Floods

Final Repo

ng post‐disast

As of June 2014

5.0 Bn (PKSF to

Aila (2009).32 

r people since

microcredit to

e time of disas

nding of POs t

exempting the

n the order of ed more than oactivities.  

d from the cen

onsumer loans

ger. Overall, th

ot market‐bas

/NGOs during

sound manag

en Bank, PKSF

nds, or develo

of committed 

e monitoring o

rmation on the

avings and rep

for loans durin

n of cash reser

o effective in re

ort on Capacity BuFinance in Ban

SF13-

ter period. It a

4 the number 

o POs BDT 4.4

e 2004 is called

o the ultra‐poo

ster. As of Jun

to 640,000 bor

e service fee 

10 million Me

one billion BD

ntral governm

s at the interes

here is heavy e

ed. 

g the previous 

gement and fin

F and PROSH

oped alternativ

field staff that

of the situation

e damage to as

payment. On t

ng the rehabil

rve, flexibility

esponding to t

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

also guarantee

of POs 

4 Bn) to 120,69

d BUNIAD (m

or people and, 

ne 2014 the num

rowers were B

eanwhile, the DT as of June 20

ment, which is t

st rate 0.5‐1%, 

emphasis on 

disasters in 

nancial practic

HIKA responde

ve strategies o

t visited to ass

n was crucial t

ssets and incom

the basis of th

itation period

y in manageme

the crisis.34  

er Risk A-8144)

164 051215

es the 

98 

eans 

mber 

BDT 

014 

to be 

which 

ces. 

ed 

of 

sess 

to the 

me of 

d. 

ent 

Page 166: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

The large M

serious fin

established

income an

newly form

MFIs/NGO

not prepar

MFIs did n

primarily 

infrequent

Microfinan

from the is

reduction 

be address

supported

works pro

requires su

There are 

governme

governme

not just loa

catastroph

The MFIs’

measures. 

scheduling

However, 

diversifica

measures. 

communit

8.3 B

Banglades

                  35 Joan Parke36 Krishna V37 Krishna S.

  

MFIs/NGOs n

nancial impact

d and smaller 

nd shortfall of 

med MFIs/NG

Os did not hav

red to either w

not consider cl

geared to day

t, yet required

nce on its own

ssues of moral

in informal in

sed through in

d in combinatio

ograms, cereal 

upportive serv

also concerns 

ntal organizat

nt or donors, p

an default. Ma

he risk accumu

/NGOs’ interv

Emergency lo

g were some o

microfinance 

ation of asset b

These measur

ties.37 

Bangladesh

sh’s external d

                        er and Geetha NVasta and Frederi. Vatsa; 2000; Mic

named above c

t, because they

MFIs/NGOs f

cash for fresh 

GOs in the disa

ve the liquid fu

weather or resp

lient needs fro

y‐to‐day busine

d significant in

n would have i

l hazard, inad

nsurance arran

nstitutional inn

on with other 

banks, and ev

vices and inpu

that microinsu

tions (NGOs) t

particularly w

any MFIs and 

ulations and st

vention in the 

oans, permissi

of the financial

has the poten

base and housi

res contribute 

h Sovereig

ebts as at 30 Ju

                   agaranjan, 2000; ick Krimgold,; 20crofinance for Dis

 

could respond

y have more th

found it difficu

loans. There a

aster response 

unds to respon

pond to a natu

om an emergen

ess or househo

nstitutional inv

its limitations 

equate monito

ngements prov

novations in m

instruments o

ven public sub

uts in the area 

urance progra

that support th

when the insur

NGOs may la

tay solvent in 

wake of 1998 

ion for withdra

l facilities exte

ntial of suppor

ing improvem

to better disa

gn Rating

une 2014 are a

Can Microfinance000; Financing Diaster Risk Manage

d to the floods 

han two decad

ult to operate 

are several oth

and mitigatio

nd quickly or 

ural disaster si

ncy point of v

old concerns. F

vestment.35 

as a risk man

oring of credit

vided by social

microfinance s

of risk manage

bsidy. Besides,

of education, 

ams may not b

hem without t

ance includes 

ack the capacit

the long run. 

floods was mo

awal of saving

ended to borro

ting ex ante m

ments are some

ster preparedn

as follows:  

e Meet the Poor’s saster Mitigation fement in Banglade

Final Repo

and tropical c

des of operatio

due to the inc

her factors that

on. First, the ne

fully in a disa

ituation. Third

view; rather pr

Fourth, deman

nagement instr

t programs aft

l networks. M

sector. Microfin

ement, which i

, success of mi

health, irrigat

be economicall

the provision 

broader cove

ty and technic

ore in nature o

gs, small adva

ower families f

mitigation mea

e of the examp

ness on part o

Financial Needs infor the Poor esh

ort on Capacity BuFinance in Ban

SF13-

cyclones and w

onal experienc

creased cost of

t limited the r

ewly formed a

aster context. S

d, the newly fo

roducts and se

nd for special 

rument. These

ter large spatia

Many of these s

nance would a

include social 

icrofinance pr

tion, marketin

ly viable for th

of significant 

rage for livelih

cal sophisticati

of the ex post 

ances against s

for coping wit

asures too. Inco

ples of ex ante 

of the househo

n Times of Natura

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

withstand its 

ce. In fact, the n

f delivery, loss

role of small an

and smaller 

Second, they w

ormed and sm

ervices were 

services was 

e limitations ar

al shocks, and 

shortcomings c

also need to b

funds, public

ograms alway

ng, etc.36 

he MFIs or non

subsidies by t

hood impacts 

ion to manage

mitigation 

savings, loan r

th the disaster

ome generatio

mitigation 

olds and 

al Disasters

er Risk A-8144)

165 051215

newly 

s of 

nd 

were 

maller 

rise 

can 

be 

ys 

n‐

the 

and 

e their 

re‐

r. 

on, 

Page 167: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

M

Bi

G

Sh

Banglades

country di

Banglades

500 million

retained a

U

de

W

ex

Th

 

                  38 Internation

  

Multilateral debilateral debt: U

Guarantee provhort‐term deb

sh’s internation

id not have an

sh (GOB) inten

n each with 5 

s the issue ma

US Governmen

emand if floatWarnings by Baxpensive and mhe forthcomin

                        nal Fund for Agric

bt: USD 19.9 bUSD 3.0 billionvided: USD 14t: USD 1.4 bill

nal credit ratin

ny debt default

nded to raise U

percent (intere

anagers. The b

nt issued bondted at that time

angladesh Banmake Bangladng parliamenta

 

                   cultural Developm

 

billion (WB, ADn (China, India43 million lion  

ng by Standar

t or did not re

USD 1 billion t

est rate on cur

ond issue was

ds around the se. nk that it will adeshi export mary election at 

ment 

DB, IFAD38, IDa, Japan, Kore

d & Poor and 

schedule any 

through floatin

rrent external 

s subsequently

same time; it w

affect domesti

more expensivethe end of 201

Final Repo

DB, etc.) ea, Kuwait, etc

Fitch is “BB –

external debts

ng Sovereign B

debt – 1.4 perc

y shelved for a

was felt Bangla

ic money mark

e. 13.  

ort on Capacity BuFinance in Ban

SF13-

c.) 

–” (non‐investm

s. In late 2012,

Bonds in two 

cent). Goldma

a multiple of r

adesh bonds w

ket and make 

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

ment grade). T

, the Governm

tranches of US

an Sachs was 

reasons: 

will have low 

BDT more 

er Risk A-8144)

166 051215

The 

ment of 

SD 

Page 168: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

9 DisInte

Disaster ri

amongst in

of the dev

jurisdictio

In this real

are paid fo

recovery, a

using appr

importanc

procedure

Banglades

For the ben

sovereign 

kinds. Ove

changes as

even clear

This sectio

manageme

practical. I

current sta

mechanism

9.1 N

The impac

perspectiv

preparedn

across mu

very little 

  

saster Rernation

isk has broad s

ndividuals an

eloping world

ns, including B

lity, uninsured

or by domestic

and reconstru

ropriately des

ce to the long‐t

es and, indeed,

sh, with limite

nefit of its citiz

entities shoul

erlay this curr

s well as clima

er. 

on outlines the

ent, and prese

It concludes w

atus of disaste

ms appear eas

Natural Cat

cts of catastrop

ve but also from

ness and reduc

ch of the deve

attention unti

Risk Finanal Mark

social and dev

d businesses a

d. Adequate m

Bangladesh. 

d catastrophe 

c taxpayers or 

ction expense

signed ex ante (

term sustainab

, in many disa

d existing mar

zens and to el

d thus pay du

ent market rea

ate change – an

e rationale for 

ents examples 

with presentati

r risk financin

iest to develop

tastrophe R

phes on develo

m an economi

ction in recent

eloping world,

l recently. 

 

ancing Oket Revie

velopmental im

are spotty at b

market‐based p

losses do not 

international 

s. Closing the 

(before the fac

bility of sovere

aster‐prone cou

rkets to suppo

iminate suffer

ue consideratio

ality on top of

nd the need fo

disaster risk f

of disaster ris

ion of some po

ng and the iden

p. 

Risk Manag

oping states ar

ic perspective.

 years, and co

, preparing for

Options ew and A

mplications. T

est in develop

products simpl

simply dissipa

donors/lende

gap between 

ct) disaster risk

eign disaster r

untries, of dev

ort the proactiv

ring due to ina

on to the aggre

f a moving risk

or a holistic ap

financing as pa

k financing str

otential option

ntified sectors

gement fo

re potentially 

 Despite very 

nsequent redu

r the economic

Final Repo

for BanApprais

Take‐up rates f

ped world con

ly do not exist

ate into thin a

ers in the form

insured and u

k financing m

risk managem

velopment itse

ve transfer of 

adequate or sl

egate economi

k landscape –

pproach to disa

art of holistic s

rategies and a

ns for Banglad

s where the ne

r Sovereig

catastrophic, n

significant str

uction of socia

c consequence

ort on Capacity BuFinance in Ban

SF13-

gladeshsal of Op

for disaster ins

ntexts and abys

t for certain pe

ir after a catas

m of ex post (afte

uninsured cata

echanisms is t

ment plans, pol

elf. This is esp

catastrophe ri

ow ex post los

ic exposure to

affected by so

aster risk man

sovereign disa

actions, both th

desh taking int

eed is greatest 

gn States

not only from

rides in disaste

al impacts (inc

es of catastrop

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

h: ptions

surance produ

smal in many 

erils in many 

strophe, but in

er the fact) rel

astrophe losse

thus of crucial

licies and 

pecially true fo

isk. 

ss funding, 

o catastrophes 

ocio‐economic 

nagement beco

aster risk 

heoretical and

to account the 

and the poten

 a social 

er risk 

cluding loss of

phes had receiv

er Risk A-8144)

167 051215

 

ucts 

parts 

nstead 

lief, 

or 

of all 

omes 

ntial 

f life) 

ved 

Page 169: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

For Bangla

meteorolo

level of res

Added to 

general po

insured, th

the case of

traditional

One of the

manageme

long coast

will inevit

developm

storm surg

melt extrem

2012). 

While clim

Banglades

action. Eff

increasing

Thus sove

and startin

9.2 O

It is genera

1. R

2. M

3. R

us

Each of th

  

adesh, natural

gical hazards,

silience of the 

the high risk i

opulation; acro

hus leaving a h

f Bangladesh, 

l informal mec

e additional ch

ent is that of c

line and/or wh

tably lead to g

ent). While tro

ge and wave d

mes are likely

mate change is 

sh, it will be re

fective risk ma

g risk already b

reign disaster

ng from a very

Operationa

ally recognize

isk assessmen

Managing the beduction of thse of ex ante ri

ese is discusse

l catastrophe r

, including tro

population. 

is the lack of p

oss much of th

huge burden o

formal insuran

chanisms of ri

hallenges whic

climate change

hich are low‐ly

reater impacts

opical cyclone

damage for the

y to increase, so

not responsib

esponsible for 

anagement stra

being felt in ot

 risk financing

y low baseline

l Aspects o

ed that there ar

nt and quantifibudget volatilihe overall liabiisk financing s

ed in more det

 

risk is an outsi

opical cyclones

penetration of 

he developing 

on the governm

nce mechanism

sk‐sharing bre

ch have recent

e. In many pla

ying, such as B

s of hydro‐met

 activity itself 

e same event i

o leading to m

ble for much o

an increasing 

ategies put in 

ther parts of A

g in Banglades

of Soverei

re three pillars

ication of the city caused by cilities throughsolutions. 

tail below. 

ized problem d

s and extreme 

risk financing

world, only a

ment to fund p

ms for catastro

eak down whe

tly come to the

ces around the

Bangladesh, in

teorological ev

may not incre

n the future. F

more extreme (

f the current e

portion of the

place early wi

Asia. 

sh is a significa

gn Disaste

s of disaster ri

contingent liabcatastrophes; a risk mitigatio

Final Repo

due to the hig

high rainfall l

g and insuranc

a few percent o

post‐disaster r

ophes are very

en major natu

e fore in the ar

e world, and p

ncreasing glob

vents (when n

ease, increased

Furthermore, n

(and therefore

exposure to hy

e risk, and sho

ill provide a st

ant undertakin

er Risk Fin

isk financing a

bility on the stand on, lowering o

ort on Capacity BuFinance in Ban

SF13-

gh exposure to

leading to floo

ce mechanisms

of the country’

response and r

y poorly devel

ral catastroph

rea of natural 

particularly in

bal air and oce

normalized for

d sea level wil

non‐cyclonic r

e damaging) fl

ydro‐meteorol

ould therefore 

trong platform

ng, addressing

nancing

at the sovereig

tate; 

of dependence 

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

o multiple hyd

oding, and the

s amongst the

’s assets are 

recovery. Aga

loped, and 

he events occur

catastrophe ri

n countries wit

ean temperatu

r economic 

ll lead to great

rainfall and sn

ood events (C

logical hazard

serve as a call

m for managin

g a major prob

gn level: 

on the state, a

er Risk A-8144)

168 051215

dro‐

e low 

 

ain, in 

r. 

isk 

th a 

ures 

ter 

now‐

CDKN, 

ds in 

l to 

ng the 

blem 

and 

Page 170: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

9.2.1 R

Previous s

been comp

completed

contingent

contingent

In addition

important

generally r

months aft

quick and 

disaster), s

9.2.2 M

The budge

national ri

events var

manageme

protecting

As it is est

risk‐layeri

fiscal balan

risk levels

Fig

  

Risk Asses

sections of this

pleted for Ban

d for historical

t liability, alth

t liabilities. 

n to understan

. Immediate fu

relatively sma

ter the disaste

well‐funded e

some time is u

Managing B

etary impacts 

isk profile as p

rying greatly in

ent strategy ne

g the long‐term

tablished as be

ing approach t

nce. Figure 77

gure 77. Laye

sment and

s report have p

gladesh under

l disaster losse

hough further d

nding the quan

unding is need

all compared t

er. So while im

early recovery

usually availab

Budget Vol

of catastrophe

presented earli

n scale from s

eeds to allow 

m fiscal positio

est practice in 

to match poten

7 illustrates thi

red Disaster

 

d Quantific

provided infor

r this project, a

es. These provi

detailed work

ntum of contin

ded to suppor

o the long‐term

mmediate liqui

y phase can su

ble to mobilize

latility

es are felt over

ier in this repo

mall localized

for rapid relea

on and allowin

the private sec

ntial financial 

is layering app

Risk Financi

cation of Co

rmation on the

and also the fu

ide a good fou

k would be req

ngent liabilitie

t relief and ea

m reconstructi

dity is critical 

bstantially red

e the larger vo

r different time

ort comprises 

d events to maj

ase of funds fo

ng for financin

ctor, a budget

needs with av

proach, identif

ng Approach

Final Repo

ontingent

e preliminary 

unding gap an

undation for id

quired to fully

es, understand

arly recovery, b

ion needs whi

(and there is 

duce the overa

olume of funds

e scales and to

a large numbe

jor national ca

or response an

ng of long‐term

t management

vailability of fu

fying different

h (Source: Gh

ort on Capacity BuFinance in Ban

SF13-

Liability

risk assessme

nalysis which 

dentification o

y quantify and 

ding the timing

but that fundi

ich will emerg

good evidence

all economic im

s required for 

o different deg

er of potential

atastrophes. A

nd early recove

m recovery. 

t strategy need

unds without 

t DRF instrum

hesquiere & M

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

ent work that h

has been 

of sovereign 

categorize the

g of funding is

ing requiremen

ge several to m

e to show that

mpacts of a 

reconstruction

grees of severi

l hazard and lo

An effective bu

ery, while 

ds to incorpora

endangering 

ments for differ

Mahul, 2010)

er Risk A-8144)

169 051215

has 

nt is 

many 

t a 

n. 

ity; a 

oss 

udget‐

ate a 

the 

rent 

Page 171: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

Each of th

particular 

mechanism

Figur

Figure 79 s

and quant

period is m

  

e available ins

layer of risk. F

ms. 

re 78. Time D

shows the diff

tum of dispers

much cheaper 

struments has 

Figure 78 illus

Dimension of

ferent indicativ

sal are key to e

than a large a

 

timing and co

strates the time

Risk Financin

ve costs of ins

effective cost; t

amount of fund

ost implication

e dimension o

ng Instrumen

struments, wit

thus a small am

ding required 

Final Repo

ns that make it

of both post‐di

nts (Source: G

th an over‐ridi

mount of fund

 in a short tim

ort on Capacity BuFinance in Ban

SF13-

t more or less 

isaster and ex 

Ghesquiere &

ing driver bein

ding required 

me window. 

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

suitable for a 

ante financing

& Mahul, 2010

ng that both sp

in a long time

er Risk A-8144)

170 051215

 

0)

peed 

Page 172: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

Figu

9.2.3 R

Reducing 

portion of 

all sectors,

across both

Developm

governme

third party

mechanism

individual

state assist

mandating

  

re 79. Cost D

Reduction o

the overall ris

a country’s ri

, along with in

h public and p

ment of private

nt’s insurance

y, and more w

ms, can lead to

ls and MSMEs

tance. Govern

g coverage for

Dimension of R

of the Ove

sk to catastrop

sk. Implemen

nvestments in 

private sectors

e insurance ma

e of public asse

widespread ins

o developmen

s, for example,

nments can ass

r certain sector

 

Risk Financin

rall Liabilit

hes is almost a

tation of plann

drainage and 

s, thereby redu

arkets can also

ets can reduce

surance penetr

nt of a more pr

, are using risk

sist in market d

rs. 

ng Instrumen

ties

always the mo

ning and build

flood protecti

ucing both exp

o play a positiv

e post‐disaster

ration, through

o‐active risk m

k transfer instr

development t

Final Repo

nts (Source: G

ost cost‐effecti

ding controls t

ion, for examp

plicit and impl

ve role in redu

r financing nee

h both traditio

management l

ruments inste

through incen

ort on Capacity BuFinance in Ban

SF13-

Ghesquiere &

ive means of m

to ensure high

ple, can reduce

licit liabilities.

ucing continge

eds through tr

onal and new 

andscape, wh

ead of relying o

ntivizing mark

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

 

& Mahul, 2010

managing at le

her resilience a

e overall losse

ent liabilities; a

ransferring ris

insurance 

here low‐incom

on post‐disast

ket efficiencies

er Risk A-8144)

171 051215

0)

east a 

across 

es 

k to a 

me 

ter 

s and 

Page 173: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

9.3 D

Disaster ri

disaster ris

reasons fo

Increa

of indinto imrecogn

indivi

progre

Within

been ilower strateg

the Un Increa

establ

The World

Bank have

better und

governme

(re)insuran

At the mes

initiatives 

insurance 

for one rea

private sec

ultimately

Some of th

their client

on catastro

driven fun

middle‐inc

Facility, an

  

Disaster Ris

isk financing (

sk managemen

r this, which i

asing recognitidividual eventsmpacts on devnized for a loniduals and sovess; n the global deidentified as bcapacity to adgies to manag

nited Nations ased understanished internat

d Bank and, to

e taken the lea

derstanding of 

nts, and direc

nce (and capit

so and micro l

around the de

programs for 

ason or anothe

ctor in the pro

y hold most of 

he larger priva

t base in the d

ophe risk (i.e. 

nding platform

come countrie

nd the Munich

sk Financi

DRF) has play

nt (DRM) in a

include: 

ion of the mag

s felt on develveloping world

ng time as unavereigns have 

ebate on clima

eing especiallydapt. Quantifye this increasinFramework Cnding of catastional risk mar

o an increasing

d on DRF at th

natural hazar

tly offering or

tal market equ

levels, bilatera

eveloping wor

low‐income in

er (a.k.a. catas

oject design an

the risk (or th

ate risk market

developing wo

they have con

ms which aim t

es (e.g. the IFC

h Climate Insu

 

ng in the I

yed an increas

an economic de

gnitude of cataoped‐world ecd economies. Wacceptably highonly recently 

ate change, they burdensome

ying such increng risk, includConvention ontrophe risks grketplace to ac

g extent, region

he sovereign l

rds risk, under

r, otherwise, su

uivalents such 

al donors as w

rld, largely foc

ndividuals wh

trophe and/or

nd implementa

hey will once th

t players have

orld independe

ncentrated in li

to support pri

C’s Global Inde

urance Initiativ

nternation

singly importa

evelopment co

astrophe risk gconomies andWhile disasterh, the econombeen recogniz

e increased ime for the develeased impacts

ding through in Climate Changlobally and a ccept risk tran

nal developme

evel and, in th

rtaking DRF st

upporting dev

as catastrophe

well as multilat

cused on deve

ho are not serv

r crop micro‐in

ation phase, an

hey get to scal

e designed and

ent of donor su

ife and health 

ivate micro‐ins

ex Insurance F

ve). 

Final Repo

nal Develop

ant role in the 

ontext in recen

globally, main

d the extrapolar death tolls inmic impacts of zed as an enorm

mpact of hydroloping world ds has started tointernational mnge (UNFCCC

consequent innsferred from t

ent banks such

he developmen

trategy develo

velopment of r

e bonds) and c

terals have sup

elopment and 

ved by traditio

nsurance). Ma

nd all rely on t

le). 

d implemented

upport, but fe

 coverage). Th

surance marke

Facility, the IL

ort on Capacity BuFinance in Ban

SF13-

pment Con

overall discus

nt years. There

nly through theation of similar

n the developinthose same dimous drag on

o‐meteorologic

due to higher o play a role inmechanisms uC); and ncreased willin

the developing

h as the Asian

nt context, thr

opment alongs

risk financing 

contingent cre

pported a vari

implementati

onal indemnity

any of these ini

the private ris

d their own st

ew if any of the

here are also se

et expansion i

O’s Microinsu

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

ntext

ssion around 

e are a numbe

e economic imr hazardous evng world haveisasters on n development

cal hazards havulnerability n developing under discussio

ngness within g world. 

n Developmen

rough support

side sovereign

tools includin

edit. 

iety of DRF 

on of index‐ba

y insurance to

itiatives includ

sk markets to 

trategies to exp

ese have focus

everal donor‐

in developing 

urance Innova

er Risk A-8144)

172 051215

er of 

mpacts vents e been 

as and 

on at 

the 

nt 

ting 

ng 

ased 

ools 

de the 

pand 

sed 

and 

tion 

Page 174: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

9.4 C

This sectio

particular 

all are sup

9.4.1 S

The Carib

2007 follow

Th

Th

an

Pr

ca

Th

th

Th

(in

ca

Q

While som

operations

(and the a

play in dev

technical s

supporting

FONDEN

decades in

was incorp

previously

(Sistema N

Mexico Ci

                  39 www.ccrif40 World Ban

  

Case studie

on summarize

relevance to B

pported by the

Sovereign L

bean Catastro

wing 18 month

he multi‐natiohe setting up ond the use of irovision of anatastrophe (eqhe use of a parhe rapid payouhe simultaneo

nitially via a satastrophe bonQuantification 

me of these inn

s and technica

ssociated broa

veloping meso

support and, p

g pilot phases

40 is the name 

nto one of the m

porated into th

y comprised o

Nacional de Pr

ty earthquake

                        f.org nk (2012) “FOND

es of DRF I

s internationa

Bangladesh. A

e international 

Level DRF

ophe Risk Ins

hs of developm

onal nature of of a private ininnovative me

 insurance tooquivalent in sorametric indexuts); ous accessing osimple ISDA swnd with multip

and pricing of

novations are c

al work that ar

ad base of glob

o and micro le

potentially, ris

 and covering

given to the M

most compreh

he existing nat

f a formal syst

rotección Civil

e in 1985 and s

                   

DEN: Mexico’s N

 

Initiatives

l best‐practice

All of the case‐s

risk markets.

Initiatives

urance Facilit

ment managed

the pool; nsurance comp

echanisms to aol to provide rme ways to a x and then a m

of both traditiowap via World

ple investors) f risk for a gro

clearly not rele

e of interest, in

bal market par

evel solutions 

k‐taking (with

g lower, more f

Mexican Natio

hensive and in

tional (‘Federa

tem of proced

l, SINAPROC)

served to instit

Natural Disaster F

Relevant t

e in sovereign 

studies are fro

s

ty (CCRIF)39 is

d by the World

pany, operatinallow effective apid liquiditybusiness intermodelled loss a

onal (via indemd Bank Treasucovering the s

oup of exposed

evant to Bangl

n particular, th

rticipants) and

for low‐incom

h the goal of “c

frequently exp

onal Disaster F

nnovative sove

al’ in Mexico) 

ures and agen

). This system 

tutionalize DR

Fund – A Review

Final Repo

to Banglad

DRF though p

om developing

s a multination

d Bank. Key in

ng as a not‐for‐ capitalizationy to governmen

rruption policyapproach to qu

mnity reinsurury to large reisame underlyid developing s

ladesh, there a

he accessing o

d the explorati

me and vulnera

crowding in”

posed risk laye

Fund, which h

ereign DRF pr

DRM strategy

ncies operating

was develope

RM practices fe

w” The World Ba

ort on Capacity BuFinance in Ban

SF13-

desh

presentation o

g or middle‐in

nal risk‐pool l

nnovations inc

‐profit, to undn of the compa

nts following y used in the puantifying los

rance) and capinsurers but ming policies; anstates. 

are several asp

of multiple typ

ion by CCRIF 

able populatio

the private ris

ers).. 

has evolved ov

rograms in the

y in the mid‐19

g at all levels o

ed largely in re

ederally. 

ank, Washington,

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

of case‐studies 

ncome countrie

aunched in Ju

clude: 

derwrite the risany by donor fa major naturaprivate sector)sses (allowing 

pital markets most recently and 

pects of CCRIF

pes of risk mar

of the role it c

ons through 

sk markets by 

ver the past sev

e world. FOND

990s, which w

of governmen

esponse to the

, DC. 

er Risk A-8144)

173 051215

 with 

es and 

une 

sk funds; al ); for 

as a 

rkets 

can 

veral 

DEN 

was 

Page 175: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

FONDEN 

response. 

of no less t

Fund for N

over‐year 

transfer so

FONDEN 

parametric

World Ban

includes a

intermedia

FONDEN 

partners to

overall. Fo

To

FO

su

In

as

FO

sy

The Turki

earthquak

in Turkey 

creating a 

the World

properties

private sec

accesses th

catastroph

While man

of around 

that the go                  41 www.tcip42 Figures as

  

itself was dev

It was and rem

than 0.4 perce

Natural Disast

(and given on

ome of its disa

currently util

c solution is im

nk while the in

 comprehensiv

ated risk trans

utilizes a vari

o increase inde

or instance: 

o encourage thONDEN has euffering repean order to be essessment; andONDEN subsiystems.  

ish Catastroph

kes in 1999, in w

were covered

huge burden 

 Bank, the Tur

s in urban area

ctor companie

he internationa

he bonds. 

ny aspects of T

29% (37% in M

overnment wil

                        .gov.tr s of end of 2012 p

veloped to cov

mains financed

nt of the annu

ter, CADENA)

nly a limited ab

aster risk using

izes both para

mplemented v

ndemnity prog

ve public‐sect

sfer to a panel 

iety of mechan

ependently th

he use of apprestablished rult losses if theyligible for fund idizes the maj

he Insurance P

which more th

d by earthquak

on the govern

rkish Governm

as, and TCIP w

es and using th

al risk market

TCIP have bee

Marmara Regi

ll support rebu                   

per TCIP Annual

 

ver gaps in SIN

d primarily th

ual federal bud

). To better ma

bility to conse

g insurance an

ametric and in

via a catastroph

gram is under

or asset datab

of mainstream

nisms to incen

heir disaster re

ropriate privatles which limi

y remain uninsnds to support 

ority of the co

Pool (TCIP)41 

han 15,000 peo

ke insurance, s

nment to assist

ment mandate

was created to 

he existing pri

s through both

en successful, e

ion)42. A major

uilding if an e

Report 2012. 

NAPROC relat

rough a Feder

dget be made a

anage the high

rve unused fu

nd capital mark

ndemnity risk t

he bond utiliz

rpinned by a ri

base) and impl

m global reinsu

ntivize its State

siliency and th

te catastropheit the amount osured after a srisk mitigatio

ost for states to

was formed in

ople died. At t

severely impac

t in rebuilding

d the compuls

underwrite th

vate insurance

h conventiona

earthquake in

r control on pe

arthquake occ

Final Repo

ted to both dis

ral Budget Law

available to FO

hly variable de

unds year‐on‐y

kets mechanis

transfer soluti

zing the MultiC

isk assessmen

lemented via c

urers. 

e (i.e. provinci

herefore the su

e insurance forof coverage avsecond or thirdon projects, sta

o develop inte

n the aftermath

that time, less 

cting on the pa

g. With technic

sory purchase

he risk. TCIP i

e providers fo

al and alternat

nsurance penet

enetration is th

curs (despite t

ort on Capacity BuFinance in Ban

SF13-

saster prepare

w which requi

ONDEN (plus

emand on its c

year), FONDE

sms (excluding

ions to protect

Cat platform c

nt platform (R‐

conventional r

al) and Munic

ustainability o

r first‐party puvailable from Fd event; ates must first 

grated risk ma

th of the devas

than 5% of res

ace of econom

cal and financ

e of insurance 

s a public com

or distribution

tive mechanism

tration still on

he continued p

the repealing o

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

dness and 

ires that an am

s the Agricultu

capital base ye

EN is allowed t

g debt). 

t its resources.

created by the 

‐FONDEN, wh

reinsurance‐br

cipal agency 

of FONDEN 

ublic assets FONDEN for 

complete a fu

anagement 

stating Marma

sidential prop

mic recovery an

ial assistance f

for all residen

mpany, operate

n of policies. TC

ms, including 

nly achieves a r

public percept

of the law whi

er Risk A-8144)

174 051215

mount 

ural 

ear‐

to 

. The 

hich 

roker 

assets 

ull risk 

ara 

perties 

nd 

from 

ntial 

ed by 

CIP 

rate 

tion 

ich 

Page 176: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

mandated

supported

provided d

despite su

In the cont

market de

However, 

the state (a

The object

Project for

and gover

as influenc

market act

sovereigns

analytics a

program a

focused on

benefits of

will reduc

While the 

Banglades

robustness

Two other

Assessme

which may

modelled 

Food Prog

for 15 Paci

the countr

Both of the

implemen

                  43 www.euro44 www.afric45 pcrafi.sop

  

 such support

d by governme

despite the lac

ubstantial inve

text of Bangla

velopment, pa

the need to en

and therefore 

tive of the Sou

r Europe and C

rnment agencie

ced by climate

tivities, in this

s, and the desi

as well as man

also includes s

n agricultural 

f multi‐nationa

ce the post‐disa

highly technic

sh context, the

s of the domes

r catastrophe r

nt and Financ

y be applicabl

loss parametri

gramme, while

ific islands, fol

ries using a mo

ese schemes u

nted at the sove

                        opa‐re.com canriskcapacity.o

ac.org 

t simultaneous

ent actions; for

ck of legal requ

stment by TCI

desh, the role 

articular for m

nact and enfor

incentivize up

uth East Europ

Central Asia43 

es to financial

e change. Like

s case through 

ign and imple

ny other aspect

support for dev

risks. Through

al pooling, SE

aster burden o

cal nature of th

 associated reg

stic insurance 

risk pools, the 

cing Initiative

le to Banglade

ic approach ba

e the PCRAFI 

llowed by a ri

odelled loss pa

use brand new 

ereign level, a

                   

org 

 

s with the crea

r example, afte

uirement to do

IP in public ed

that TCIP has

middle‐income

rce policy chan

ptake of insura

pe and Caucas

is to help incr

 protection fro

 TCIP, it is lar

support for re

mentation of a

ts of traditiona

velopment of 

h reducing the

EC‐CRIF aims

on the state. 

he SEEC‐CRIF

gulatory deve

marketplace.

African Risk 

e (PCRAFI)45 a

sh. ARC cover

ased on an exi

pilot has invo

sk transfer pro

arametric instr

modelling pla

and both also e

ation of TCIP).

er two recent e

o so. Lack of a

ducation. 

s played in und

 sectors of the

nges to reduce

ance products)

sus Catastroph

rease access of

om losses caus

gely focused o

egulatory dev

an innovative 

al indemnity i

index‐based w

e administrativ

s to catalyze ex

F project may n

lopments are 

Capacity (AR

are worthy of m

rs sovereign d

isting drought

lved a compre

ogram for eart

rument. 

atforms as the

extend the CC

Final Repo

. The public pe

earthquakes, g

awareness of r

derpinning pr

e population, s

e dependence 

) is clear if suc

he Risk Insur

f homeowners

sed by geologi

on enhancing 

velopment, ma

underwriting

insurance und

weather insura

ve cost of und

xpansion of th

not be particu

also importan

RC)44 and the P

mention as eac

drought risk in

t response cos

ehensive risk a

thquake and t

e basis for para

RIF experienc

ort on Capacity BuFinance in Ban

SF13-

erception cont

government su

risk has also im

rivate catastro

serves as a val

on post‐disast

ch solutions ar

rance Facility (

s, farmers, the 

ical and clima

the existing p

andating of ins

g platform whi

derwriting. Ho

ance markets, 

derwriting and

he private mar

ularly relevant

nt to increase t

Pacific Catastr

ch has aspects

n sub‐Saharan 

st model devel

assessment an

tropical cyclon

ametric model

ce in terms of e

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

tinues to be 

upport was 

mpeded penet

ophe insurance

luable lesson. 

ter assistance 

re to be sustain

(SEEC‐CRIF)

enterprise sec

atological haza

rivate insuran

surance by 

ich includes ri

owever, the 

particularly 

d leveraging th

rkets, which in

t at this time in

the role and 

rophe Risk 

s of innovation

Africa, using 

loped by the W

nd modelling p

ne risk for up t

lled‐loss solut

engaging with

er Risk A-8144)

175 051215

ration 

from 

nable. 

ctor 

ards 

nce 

isk 

he 

n turn 

n the 

World 

phase 

to 6 of 

tions 

Page 177: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

multiple s

also access

market, ac

9.4.2 M

A number

population

generally f

little infras

The growt

financial N

to the low

catastroph

clients def

been obtai

microfinan

outstandin

insurance 

level in Ba

yet not eve

The Micro

provider f

Capitalize

conceptua

microinsu

‘basis risk’

parametric

particularl

such client

payout an

offer indem

most of th

quickly). 

                  46 https://ww

  

overeign partn

ses both the gl

chieving very l

Meso-Level

r of innovation

ns in developi

found to be la

structure gene

th of the micro

NGOs and coo

‐income client

he exposure to

faulting simult

ined because o

nce sector serv

ng loans in exc

to this sector o

angladesh is w

en recognized

oinsurance Ca

for innovative 

d by donors a

alization allow

rance product

’ portfolio (wh

c instrument a

ly at the low‐in

ts do not have

d their immed

mnity coverag

e risk (in para

                        ww.mercycorps.o

ners to share m

lobal tradition

low risk transf

l Insurance

ns are underw

ing countries. 

cking in terms

erally exists to

ofinance sector

operatives) has

t base to includ

o the MFIs them

taneously afte

of the microfin

ves around 26 

cess of USD 3.

of the populat

widespread and

d let alone pro‐

atastrophe Ris

catastrophe in

and social inve

wed for the tran

ts into a param

hich MiCRO re

and actual loss

ncome end of 

e the capacity t

diate need). M

ge to clients at 

ametric form) t

                   org/tags/micro 

 

mutual benefit

nal reinsurance

fer costs. 

e Program

ay globally to 

Traditional in

s of an ability 

o aggregate suc

r (here referre

s acted as a tri

de insurance, 

mselves due to

er a natural cat

nance lending.

million low‐in

3 billion; it can

tion. Experien

d useful but th

‐actively mana

sk Organisatio

nsurance prog

estors and ope

nsformation of

metric portfolio

etained). Basis

ses on the grou

the spectrum,

to manage bas

MiCRO’s key in

an affordable

to the internat

ts of pooling w

e market as we

s

address the g

ndemnity insur

to reach a larg

ch risk and act

d to genericall

gger to expan

while also lea

o the possibilit

tastrophe even

. As outlined e

ncome and na

n thus play a c

ce with credit/

he catastrophe

aged. 

on (MiCRO)46

grams offered b

erating fully w

f simple ‘fixed

o (which is rea

s risk is the dif

und. When de

, the basis risk

sic risk (i.e. to 

nnovation was

 price, with M

tional markets

Final Repo

while not requ

ell as the insur

gap in insuran

rance mechan

ge portion of t

t as a delivery

ly as ‘MFIs’ w

nd the range of

ading to the id

ty for large po

nt, thus wipin

earlier in this r

atural‐disaster 

critical role in 

/life protection

e exposure of t

 was formed i

by microfinan

within the priva

d‐benefit’ or ot

adily transfera

fference betwe

elivering insur

k of parametric

cope with a sh

s to allow MFI

MiCRO facilitat

s (thereby allow

ort on Capacity BuFinance in Ban

SF13-

uiring cross‐su

rance linked s

ce penetration

nisms for natur

the low‐incom

y channel for in

which in Bangl

f financial serv

entification of

ortions of their

g out livelihoo

report, in Bang

vulnerable pe

channeling th

n at the indivi

the national M

in 2011 to act a

nce institutions

ate sector, MiC

ther types of i

able to the glo

een the payou

rance products

c products bec

hortfall betwe

Is and other ris

ting the necess

wing schemes

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

ubsidization. E

securities (ILS)

n to low‐incom

ral catastrophe

me population, 

nsurance prod

adesh include

vices being off

f natural 

r highly vulne

od gains that h

gladesh the 

eople, holding

he benefits of 

idual MFI clien

MFI loan book 

as a reinsuranc

s, initially in H

CRO’s initial 

ndemnity 

bal markets) a

ut due under a

s to individua

comes critical 

een a parametr

sk aggregators

sary transfer o

s to get to scale

er Risk A-8144)

176 051215

Each 

me 

es are 

and 

ducts. 

es 

fered 

erable 

have 

nt 

is as 

ce 

Haiti. 

and a 

 

als, 

as 

ric 

s to 

of 

Page 178: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

While MiC

below), th

been prov

insurance 

providers 

The CLIM

vehicle in 

nationally

by coopera

their client

the cooper

coverage. 

The CLIM

enabled un

underlying

bringing b

The area o

as providi

state. For e

Caribbean

is aimed a

creditors o

9.4.3 M

While mic

growth ha

to become

challenges

key costs d

meaning t

premium p

Innovation

                  47 www.clim48 www.clim49 www.micr

  

CRO has faced

e technical con

en, and this ha

tools to cost‐e

with whom th

MBS catastroph

the Philippine

. The natural c

atives to hedg

ts. Under the C

rative, and eac

MBS program w

niform pricing

g hazards. The

both technical 

of portfolio ins

ng the best op

example, altho

n being implem

t providing pa

of the low‐inco

Micro-Leve

croinsurance h

as been in cred

e established a

s is the high co

do not reduce 

hat fixed adm

price as the in

ns have concen

                        mbs.coop mate‐insurance.orroensure.com 

d challenges in

ncept of transf

as created spa

effectively mee

hey interact. 

he insurance p

es to deliver p

catastrophe pr

ge against their

CLIMBS progr

ch individual m

was triggered a

g to be offered

e CLIMBS pro

capacity and f

surance for pro

pportunity for 

ough not yet in

mented by the 

arametric loan

ome populatio

l Insurance

has achieved ra

dit/life and hea

s a viable and

ost of administ

in step with th

ministrative cos

nsurance is sold

ntrated somew

                   

rg 

 

n its initial imp

forming the ‘u

ace for further 

et the needs of

program47, whi

arametric port

rogram covere

r exposure to c

ram, benefits f

member contr

at fixed‐event 

d across the en

ogram was und

financial susta

oviders of low

moving respo

n the market, 

Munich Clim

n portfolio cov

on in the regio

e Program

apid growth a

alth insurance 

sustainable o

tering indemn

he reduction i

sts become an 

d to lower inc

what on reduc

plementation (

uninsurable’ liv

innovation in

f low‐income p

ich was launch

tfolio insuranc

ed wind and ra

catastrophes w

from the hedg

ributed to the p

probabilities r

tire program e

derwritten by 

ainability to th

w‐income credi

onsibility for lo

a product dev

ate Insurance 

verage for deve

n). 

ms

across many pa

and related p

ffering to low

nity programs

in asset values

increasingly l

ome populatio

cing the cost of

Final Repo

(via the Kore W

velihood risk 

n the combinat

populations an

hed in 2010, u

ce to a large n

ainfall risk at 

which cause a 

ge had to be pa

premium paid

rather than fix

even in areas o

a major globa

he program. 

it is rapidly ev

ow‐income liv

veloped as par

Initiative (MC

elopment ban

arts of the dev

products. Catas

w‐income popu

either for pro

s being insured

large portion o

ons to cover lo

f claims proce

ort on Capacity BuFinance in Ban

SF13-

W program of

of low income

tion of parame

nd the financi

utilized an exis

number of coop

the portfolio l

spike in defau

assed to indiv

d by the coope

xed hazard pa

of different ex

al reinsurance 

volving, havin

velihood risk a

rt of a larger p

CII)48, CCRIF a

nks and credit 

veloping world

strophe micro

ulations. One o

operty or agric

d in the low‐in

of the required

ower values of

essing in partic

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

f Fonkoze, see 

e individuals h

etric and indem

ial service 

sting insurance

peratives 

level, so was u

ult rate on loan

vidual member

erative for the 

arameters, whi

xposure to the 

company, so 

ng been identif

away from the

roject in the 

and MicroEnsu

unions (the m

d, most of the 

oinsurance has

of the key 

cultural insura

ncome sector, 

d risk‐based 

f assets. 

cular, but main

er Risk A-8144)

177 051215

has 

mnity 

used 

ns to 

rs of 

ich 

fied 

ure49 

main 

s still 

ance; 

nly 

Page 179: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

they have 

derived pa

The Kore W

innovative

described 

micro‐entr

described 

through w

the writing

the one in 

While Kor

innovation

very high 

strategies 

sufficiently

A large nu

particularl

expanded 

interesting

manageme

The Caribb

wind risk 

livelihood

Internation

as possible

product. In

valuable in

                  50 http://fonk51 http://www52 http://www

  

focused on in

arameters of a

W product50 d

e loss adjustm

above for MiC

repreneurs, wh

broadly, suffi

which they wer

g‐off of the ou

force when th

re W faced som

ns that should

exposure to ca

to tie the insu

y to make pre

umber of catas

ly innovative e

to Senegal. R4

g and innovati

ent projects (s

bean project m

as a simple he

s (the Caribbe

nal Food Polic

e by automate

n both cases, i

n further testin

                        koze.org/innews/

w.oxfamamerica

w.climate‐insura

ndex‐based pro

a given hazard

developed by F

ent mechanism

CRO.) Kore W

hich provided

ciently impact

re generating f

utstanding loan

he event happe

me significant 

 encourage fu

atastrophe eve

rance product

miums afford

strophe microi

example is the

4 is at heart a r

ive features, in

uch as irrigati

mentioned abo

edge for low‐in

ean Livelihood

cy Research In

ed payout calcu

it is too early t

ng the value p

                   /fonkozenews/31

a.org/static/medi

ance.org/front_co

 

oduct develop

d event rather t

Fonkoze (an M

m and the use

W was a compu

d a fixed benef

ted the individ

funds to repay

n balance, plu

ened. 

challenges an

rther testing o

ents of all Hait

t directly to ris

able and the s

insurance pilo

e R4 initiative

rainfall index 

ncluding the a

ion), and the li

ove is investiga

ncome individ

d Protection Po

nstitute (IFPRI)

ulation system

o claim succes

proposition for

16‐kore‐w‐naturaa/files/r4‐rural‐reontent.php?idart

pment, where p

than on actual

MFI in Haiti) an

 of parametric

ulsory catastro

fit on the occur

dual so that th

y their loans. T

us the borrowe

nd is currently 

of similar tools

tians, and the 

sk reduction e

scheme sustain

ots have concen

e51 which began

product focus

ability for farm

ink to an exist

ating the use o

duals against t

olicy)52. A sim

) in Africa. In 

ms and utilizat

ss, but again th

r catastrophe m

al‐catastrophe‐inesilience‐initiativt=3639 

Final Repo

payouts are ca

l losses. 

nd MiCRO is 

c instruments 

ophe coverage 

rrence of a nat

hey could not c

The fixed bene

er had access t

undergoing a

s. The challeng

Kore W stake

efforts, as the l

nable. 

ntrated on agr

an as HARITA

sed on drough

mers to pay for

ting national p

of a pure param

the impact of c

milar program i

both cases, th

tion of existing

he innovation

micro‐insuran

nsurance‐one‐yeave.pdf 

ort on Capacity BuFinance in Ban

SF13-

alculated base

an example of

to manage the

for all of Fonk

tural catastrop

continue to tra

efit included a

o a new loan a

a redesign, the

ges are largely

eholders are cu

atter are requi

ricultural risk 

A in Ethiopia an

ht risk; howeve

r premiums by

productive safe

metric instrum

catastrophe ev

is also being p

he cost of cover

g channels to d

ns in and of the

nce. 

ar‐evaluation.htm

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

d upon extern

f both the use 

e risk transfer 

koze’s ~60,000

phe which, 

ansact the bus

a cash paymen

at the same rat

ere are many u

y attributable t

urrently devel

ired to lower r

in Africa. A 

nd is now 

er, it has sever

y working on r

ety net progra

ment for rain a

vents on their 

piloted by the 

rage is kept as

distribute the 

emselves are 

ml 

er Risk A-8144)

178 051215

nally‐

of an 

(as 

siness 

nt and 

te as 

useful 

to the 

oping 

risk 

ral 

risk 

am. 

and 

s low 

Page 180: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

9.5 O

9.5.1 R

Experience

In Banglad

continued

constraint 

Since the c

and Prosh

loans for d

cover duri

loan amou

reinsuranc

Disaster R

The Buro‐T

the institu

incapacita

supplemen

more than

Banglades

following 

C

R

In

Lo

Lo

N

A

                  53 World Ban

The Worl54 World Ban

Implemen55 Nagarajan

Practices. 56 Rockefelle

and Creat

  

Options for

Review of R

e with Agricu

desh the state 

 until 1995 wh

appears to ha

collapse of the

hika, have imp

dairy cattle and

ing the two to 

unt. The MFIs 

ce protection54

Risk Financing 

Tangail Fund 

tion to deal w

ted, the fund c

ntal loans to b

n six months ov

sh Rural Adva

loan policies a

Clients can with

egular loan renterest rates caoans can be reoans can be re

New loans are oAn option of di                        nk (2010) “Agricud Bank, Washing

nk (2012) “Advanntation. Volume n, G. (1998) “Micr

The World Banker, J. (2010) “Disating Value with M

r Banglade

Related Ins

ltural Insuran

insurer SBC im

hen it ceased d

ave been that S

e SBC agricultu

lemented sma

d water buffal

three year loa

operate their o4. 

in the MFI Se

is a contingen

with smaller ch

can be used to

borrowers whe

verdue, the re

ancement Com

and credit cha

hdraw savingsepayments canan be reduced estructured forefinanced for coffered for proisbursement in                   ultural insurancegton, DC. ncing Disaster Ri2: Technical Approfinance in the Wk, Washington, Daster Managemen

Microfinance. Th

 

esh

surance Ac

nce 

mplemented a

due to heavy u

SBC was unab

ural insurance

all‐scale livesto

lo livestock pr

an repayment 

own internal l

ctor 

ncy fund which

hallenges. For e

o write off the 

en their produ

eserve fund can

mmittee (BRAC

aracteristics to 

s up to a specin be suspendedsignificantly fr clients with mclients with higoductive assetn the form of s

e in Bangladesh: 

isk Financing anpendices.” The WWake of Natural

DC. nt: Preparing for he World Bank, W

ctivities in

a pilot multi‐p

underwriting l

le to charge ac

e program, sev

ock micro‐insu

roducers. Typi

period and th

livestock indem

h acts as a rese

example, if a b

outstanding d

uctive assets ar

n be applied t

C), a leading M

deal with floo

ific pre‐establid for a period;for up to two mmarginal disasgh disaster lost replacement seeds, animals

Promoting acces

nd Insurance in AWorld Bank, Was

l Disasters: Chall

the Worst” ChapWashington, DC.

Final Repo

Banglades

eril crop insur

losses (loss rat

ctuarially corr

veral leading M

urance progra

ically the insu

he sum insured

mnity funds w

erve for major

borrower dies 

debt. Also, the

re damaged or

to the balance5

MFI, has made

od disasters56:

ished amount;

; months; ster losses; sses; of up to 12 mo

s, and other in

ss to small and m

ASEAN Member shington, DC. lenges and Oppo

pter 7 in: Goldbe. 

ort on Capacity BuFinance in Ban

SF13-

sh

rance program

tio of ~500%); t

rect rates for cr

MFIs, includin

ams to protect 

urance provide

d is fixed in ac

without any fo

r disaster even

or becomes p

e fund can be u

r stolen. Finall55. 

 specific adjus

onths at 15 pen‐kind materia

marginal farmers

States: Framewo

ortunities” Micro

erg, M and Pallad

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

m in 1977 whic

the major 

rop insurance

ng Grameen Ba

their investme

es all risk mort

ccordance with

orm of catastro

nts but also he

ermanently 

used to provid

ly, when a loa

stments in the 

rcent interest;ls is available.

s” Draft Final Rep

ork and Options 

oenterprise Best 

dini, E. Managin

er Risk A-8144)

179 051215

ch 

e53. 

ank 

ent 

tality 

h the 

ophe 

lps 

de 

an is 

 and . 

port. 

for 

ng Risk 

Page 181: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

Index‐Base

There hav

In addition

Corporatio

pilot/expe

In

th

in

di

Th

in

co

O

ai

vu

pr

de

W

Th

9.5.2 A

Initial risk

formulatin

analysis, a

For the ma

Banglades

long time 

averaged a

large even

significant

around 8‐9

                  57 Ahmed, T

Report: 2058 http://ccre59 http://insig60 http://oxfa

  

ed Insurance 

e been a numb

n to initiatives

on which are y

rimental phas

n February 201he first phase ondex‐based insistricts of Banghe Internationn Bogra, offerinollaborating wOxfam have beims to design ulnerable, targrone areas. Oxesign and dev

Water Modelin

he scheme wil

Analyzing R

k assessment re

ng ideas about

also presented 

ain hydro‐met

sh, the nationa

period, catastr

around 5% sin

nts, although th

tly to the over

9% of GDP an

                        . (2013) “Scoping013‐38. esearchbanglades

ghts.ifpri.info/20

amblogs.org/ban

ber of recent in

s by the Asian 

yet to reach th

ses as describe

13, the Internaof their index‐surance instrugladesh58. nal Food Policyng index‐base

with an NGO cen piloting ana commerciall

geted to sensitxfam is workin

velop a Meso‐lg (IWM) Bangll be implemen

Risk and Id

esults for Bang

t the quantum

earlier, provid

teorological ris

al annual avera

rophes are eat

nce 1980 in rea

he frequency o

all losses. The

nd for tropical 

                   g report: current 

sh.org/ongoing‐r011/10/insurance‐gladesh/wp‐cont

 

nitiatives spec

Development

he product laun

ed below. 

ational Center ‐based insuranuments that are

y Research Insed insurance agcalled Palli Karn index‐based ily pragmatic ctize meso‐leveng with the Ceevel Catastropgladesh has bunted in Sirajgo

dentifying

gladesh were 

m of risk that re

des insight int

sks, which rep

age loss (AAL

ting up around

al terms). In re

of flood losses

e 100‐year loss 

cyclone aroun

status of index‐b

research.php?res

‐in‐bangladesh‐wtent/uploads/201

cifically in the 

t Bank and the

nch stage, thre

for the Improv

nce project, wh

e responsive to

stitute (IFPRI) gainst droughrma‐Sahayak Finsurance projcatastrophic floel investors wh

enter for Insurphic Flood Insuilt the Flood Honj district by 

Needs

presented earl

equires manag

to potential ris

present the vas

L) is between 2

d half of Bang

ality, catastrop

s in Banglades

(a loss expect

nd 5% of GDP.

based insurance 

earch_id=6 what‐do‐farmers

13/08/Project‐OX

Final Repo

area of index‐

e World Bank 

ee other projec

vement of Ma

hich was to deo the needs of

 is currently coht for the aman

Foundation (Pject since the sood insuranceho are working

rance & Risk Msurance SchemHazard Mode

Manab Mukti

lier in this rep

gement and fin

sk financing st

st majority of 

2 and 2.5% of G

gladesh’s annu

phe losses ten

sh is high so th

ted to happen 

in Bangladesh” W

s‐want/ XFAM‐Brochure‐0

ort on Capacity BuFinance in Ban

SF13-

‐based insuran

Group’s Inter

cts have reach

aize and Whea

esign and evaluf maize farmer

onducting an n rice crop. ThPKSF) to imple

second half ofe scheme for thg in pro‐poor Management (me in Bangladel used to genei Sangstha (MM

port; these pro

nancing. The f

tructures. 

all catastrophe

GDP. Thus wh

ual GDP growt

nd to be cluster

hat annual floo

once every 10

WorldFish, Pena

02.pdf 

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

nce in Banglad

rnational Finan

hed initial 

at (CIMMYT) buate weather rs in the coasta

experimental hey are ement the pilof 2013. The prohe poor and river basin flo(CIRM) to reseesh. The Instituerate flood datMS)60. 

vide the basis

financial gap 

e risk in 

hen averaged o

th (which has 

red into a few

od losses contr

00 years) for fl

ang, Malaysia. Pr

er Risk A-8144)

180 051215

desh57. 

nce 

began 

al 

study 

ot59. oject 

ood earch, ute of ta. 

 for 

over a 

w very 

ribute 

ood is 

roject 

Page 182: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

While it sh

thus the am

penetratio

for catastr

With refer

the year 20

In Figure 8

and reserv

million. O

requiring a

individual

fall largely

sort of risk

contingent

F

9.5.3 B

While we 

portion of 

gap numb

  

hould be noted

mount of risk 

on rate of indiv

ophes). 

rence to Figure

000, one can d

80, the red sha

ve mechanism

nce every 2 to

an alternative 

l or portfolio l

y on the state. 

k transfer mech

t credit mecha

Figure 80. Su

Breaking do

have quantifie

the burden of

bers to identify

d that these lo

which ultimat

vidual and bus

e 76 earlier in t

differentiate di

aded area cove

s; in some yea

o 5 years, a mo

risk financing

evel, could als

Then finally o

hanism as the

anisms. Such r

perimposed F

own the fu

ed the funding

f that funding 

y, as far as is p

 

sses are estim

tely may need

siness insuran

this report, wh

fferent levels o

ers the funding

ars there is a fu

ore significant 

g mechanism s

so contribute t

once every 5 to

 quantum of l

risk transfer ca

Funding Gap

unding gap

g gap and iden

gap, this secti

possible, both w

ated at the nat

d to be finance

nce and the lac

hich illustrates

of need and be

g gap which is

unding surplu

funding gap o

such as contin

to financing ri

o 10 years or m

osses will be t

an be in both th

p Results Sum

p

ntified in gene

ion drills a litt

where and wh

Final Repo

tional level, th

d by the state 

ck of alternativ

s the results o

egin to target 

s best manage

us and in other

occurs (i.e. gre

ngent credit. M

isk in this laye

more, major di

too large to be

he public and

mmary with R

eral terms that

tle deeper into

hen the fundin

ort on Capacity BuFinance in Ban

SF13-

he sovereign re

is large (given

ve financial co

f the funding 

suitable finan

ed through int

rs a gap of up 

eater than USD

Micro‐insuranc

er, which woul

isaster events w

e financed thro

d private sector

Risk Financing

t the sovereign

o the loss / dam

ng gap actually

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

esponsibility a

n the low 

oping mechani

gap analysis s

ncing mechanis

ternal budgeta

to USD 250 

D 250 million),

ce, either at the

ld otherwise l

will require so

ough reserve o

rs. 

 

g Options

n bears a large

mage and fund

y plays out. In

er Risk A-8144)

181 051215

and 

isms 

since 

sms. 

ary 

ikely 

ome 

or 

ding 

Page 183: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

considerin

identificat

of that nee

Unfortuna

post‐disas

identifying

Banglades

a snapshot

The follow

evidence a

sectorial b

immediate

i)

The sovere

basis for th

estimate a

loss as the

approxima

Before inv

post‐disas

variable in

informatio

the results

‘best estim

post‐disas

Commissi

Sidr repor

are for trop

An alterna

project. Hi

                  61 Governme

and Recon62 www.emd63 http://www

  

ng financial dis

tion of specific

ed post‐disaste

ately, at the na

ter needs is di

g the timing o

sh, we have id

t of the sectori

wing summariz

and research, o

reakdown of t

e, medium‐ an

Relationsh

eign funding g

he total ‘cost’ o

nd some non‐

e basis for the s

ately equal so 

vestigating this

ter losses in ge

n quality. The 

on for disaster

s of individual

mate’ is challen

ter economic i

on for Latin A

rt referenced a

pical cyclones

ative view of lo

istorically cata

                        ent of Bangladeshnstruction. dat.be w.undp.org/cont

saster risk man

c tools / produ

er. 

ational level, ev

ifficult; in Ban

f post‐disaster

entified only o

ial breakdown

zes the availab

on three relate

total national i

nd long‐term f

hip of modelle

gap analysis u

of an event, hi

sovereign imp

sovereign gap

cancel each ot

s assumption, 

eneral. Histori

EM‐DAT data

s globally ove

l events; publi

nging. The UN

impact and ne

America and th

bove but almo

s in the Caribb

osses can be o

astrophe risk m

                   h. April 2008. Cy

tent/brussels/en/

 

nagement opt

cts include bo

ven in develop

ngladesh’s case

r fund flow is 

one comprehe

n of impacts. 

ble informatio

ed topics: the r

impact, includ

inancing need

ed loss to total

uses the model

ighlighting tha

pacts are inclu

p analysis is th

ther out. 

it is worth bri

ical data on di

abase62 provide

er recent decad

shed estimate

N and partners

eeds assessmen

he Caribbean (

ost all other ev

bean. 

obtained throu

modelling has

yclone Sidr in Ba

/home/partnersh

tions, the facto

oth the sector h

ped economie

e, it is almost i

extremely diff

ensive post‐dis

on, both from B

relationship of

ding sovereign

ds. 

l national imp

lled losses pre

at some know

uded. The assu

at the missing

iefly comment

isaster losses a

es a compilati

des, but does n

es for the same

s63 are graduall

nt (PDNA) me

(UN‐ECLAC);

vents with asse

ugh catastroph

not been desi

ngladesh: Dama

hips_initiatives/re

Final Repo

ors impacting 

having financi

es, identificatio

impossible. As

ficult except in

saster loss and

Bangladesh an

f modelled los

n share; and th

pact and sover

esented in sect

wn costs are mi

umption inher

g costs and add

ting on the est

at the national

ion of publishe

not provide an

e event often v

ly adopting a 

ethodology de

; this methodo

essments base

he modelling s

igned or imple

age, Loss and Nee

esults/EU‐UNDP

ort on Capacity BuFinance in Ban

SF13-

on strategy de

ial response ne

on of the sourc

s described in 

n a few indivi

d needs analys

nd from releva

ss to total natio

he breakdown

reign share 

tions 5 and 6 o

issing from the

ent in using th

ditional non‐s

timation of sov

l level is spars

ed impact asse

ny review of, o

vary widely so

uniform appr

eveloped by th

ology is the ba

ed on the ECLA

such has been 

emented to pr

eds Assessment 

P‐PDNA.html 

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

esign and 

eed and the tim

ce and timing 

Section 7 abo

dual cases, an

sis61 which pro

ant global emp

onal impact; th

n of impacts in

of this report a

e modelled los

he full modelle

overeign costs

vereign / natio

se and highly 

essments and 

or commentary

o getting to a s

oach based on

he UN Econom

sis for the Cyc

AC methodolo

undertaken fo

rovide accurat

for Disaster Reco

er Risk A-8144)

182 051215

ming 

of 

ve, 

nd for 

ovides 

pirical 

he 

nto 

s a 

ss 

ed 

s are 

onal 

other 

y on 

single 

n a 

mic 

clone 

ogy 

or this 

e loss 

overy 

Page 184: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

analysis fo

probabilis

risks with 

sovereign 

and at the 

a ‘modelle

individual

Rationaliz

complex a

the un

the es

neithe

With this c

calibrated,

understoo

economic 

billion, no

USD 1.320

other, both

The cost o

above the 

PDNA (US

taking into

tropical cy

states so m

scales, ten

The non‐so

detailed an

impact on 

theory the

rebuilding

let alone a

moral obli

  

or individual e

tic view of risk

particular kno

risk pools, mo

national level

ed loss’ param

l event at the n

ing the overal

and further dis

ncertainty in b

timates alway

er actual nor m

commentary in

, at least in pa

od and most co

impact from C

t including em

0 billion, also e

h estimates ha

f immediate e

loss and dama

SD 240m) plus

o account pled

yclone impacts

may not be par

ding to be rela

overeign share

nalysis presen

the share of to

e legal obligati

g phases, the fa

across a range 

igations of the

events nor at t

k over a long t

own character

odels are now 

l; both the Car

metric policy fo

national level. 

ll ‘cost’ of an e

scussion is bey

both estimation

ys count differe

modelled estim

n mind, we no

rt, against the 

omplete assess

Cyclone Sidr a

mergency resp

excluding eme

ave a significan

mergency resp

age estimate, b

s Government

dges not delive

s elsewhere in

rticularly relev

atively smaller

e of the total d

nted in the Cyc

otal damage a

ons of a sover

act is that such

of events. And

e state after a d

 

he national lev

time horizon a

ristics. Howev

being develop

ribbean and Pa

orm, in which p

event to a sove

yond the scope

n types is large

ent things acro

mates are neces

ote that the tro

economic imp

sment of the im

according to th

onse costs. Th

ergency respon

nt level of unc

ponse for Cyc

based on the a

t of Banglades

ered or not spe

 the world (th

vant) and we b

r the larger the

damage and lo

clone Sidr PDN

and loss attribu

reign nation co

h data is simpl

d any such ana

disaster which

vel; models ha

and for portfo

ver, with the ad

ped and imple

acific sovereig

payouts are lin

ereign nation b

e of this report

e; 

oss different ti

ssarily better o

opical cyclone 

pact assessmen

mpacts of a na

he PDNA base

he loss obtaine

nse costs. Whi

certainty. 

lone Sidr was 

amount of pled

h and externa

ent. This estim

hough notably,

believe is a rea

e overall impa

oss estimate is 

NA. The natur

utable to the s

ould be identif

ly not availabl

alysis would a

h, due to both h

Final Repo

ave been built

olios with a nu

dvent of param

emented whic

gn risk transfer

nked directly 

between these

t; however, it 

ime periods; a

or worse in an

modelling pr

nt for Cyclone

atural disaster 

ed on the ECLA

ed from the mo

ile these value

 likely in the o

dged emergen

al NGO inputs

mate is consiste

, most of those

asonable estim

act of an event

also difficult 

re of each indi

tate even if all

fied and track

le for any sing

also miss the s

humanitarian 

ort on Capacity BuFinance in Ban

SF13-

t primarily to p

umber of ident

metric insuran

ch are valid for

r programs de

to loss modell

e two alternativ

can be said th

and 

ny particular si

resented in this

e Sidr, given th

in Bangladesh

AC methodolo

odel develope

es align relativ

order of an ad

ncy support in

s of approxima

ent with empi

e are for small

mate across a ra

t. 

to tie down ev

ividual event h

l else is equal.

ked in the recov

gle disaster ev

share attributa

and political (

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

provide a 

tified individu

nce products a

r individual ev

escribed above

led for an 

ve views is 

hat: 

ituation.

s report is 

hat it is the be

h. The total 

ogy is USD 1.6

ed for this proj

vely well with 

ditional 10 to 

n Table 7 of the

ately USD 35m

irical evidence

l‐island develo

ange of disast

ven with the 

has a significa

 And while in

very and 

vent in Banglad

able to meeting

(as well as ma

er Risk A-8144)

183 051215

ual 

and 

vents 

e use 

est 

675 

ject is 

each 

15% 

m, but 

e from 

oping 

er 

ant 

desh, 

g the 

any 

Page 185: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

other) fact

both natio

Despite th

rebuilding

Table 1 in 

‘damage’ i

long term 

table, usin

infrastruct

Infrastru

Infrast

Soc

Product

Prod

Env

Two of the

is highly li

agricultura

can attemp

insurance 

The privat

non‐life in

and comm

insurance.

catastroph

average an

responsibi

The other 

in the orig

Furthermo

as describe

                  64 Swiss Re S

  

tors, tend to be

onal and intern

hese caveats, th

g costs in Bang

the PDNA rep

in this context

economic imp

ng the USD val

ture sub‐total 

Table 5

Sector ucture‐Housing ructure‐Other cial Sectors tive‐Agriculture uctive‐Other vironment 

e sectors are as

ikely that the v

al sectors after

pt to quantify 

penetration d

te sector partic

nsurance penet

mercial insuran

. If premium r

he‐exposed are

nnualized natu

ility for housin

source of poss

ginal financing

ore, the NGO/

ed above, so th

                        Sigma No 3/2012

e higher than e

national respon

he following o

gladesh, based

port provides 

t is physical da

pact of the dam

lues and ident

is incorrect in 

51. Summary

Dama

$8

$2

$6

$2

$

$

ssigned to bot

vast majority o

r natural disas

the possible n

ata. 

cipation in cov

tration rate in 

nce so we assu

ates are a mul

eas) then cove

ural disaster lo

ng sector dam

sible housing r

g of a particula

MFI sector is a

hat even if the

                   , World insuranc

 

even conserva

nse.) 

outlines our es

d on Cyclone S

a sectorial bre

amage to build

mage (through

tifying soverei

Table 1 of the

of Cyclone S

age (USD) 39.3 22.5 65.0 21.3 3.8 6.1 

th sovereign an

of the econom

sters can reaso

non‐sovereign 

vering damage

Bangladesh, u

ume only 0.1%

ltiple of 3 over

red average lo

oss rate is estim

age is coverin

replacement fi

ar dwelling bu

active in lendi

e sector holds l

ce in 2011 ‐ Non‐

ative estimates

timate of the s

Sidr data. 

eakdown of da

dings, infrastru

h, for example,

ign and non‐so

e PDNA repor

idr damage a

Loss (USD)$0.0

$30.9

$21.1

$416.3

$48.6

$0.0

nd non‐sovere

mic burden of d

onably be assig

participation 

e in the housin

using 2011 figu

 of GDP is spe

r average loss 

oss is just 0.035

mated at 2.5%

ng only ~2% of

inancing is the

ut not have tha

ing for repairs

little of the ris

‐life ready for tak

Final Repo

s would imagi

sovereign shar

amage and los

ructure, crops 

, loss of use). T

overeign secto

rt in the USD c

and loss estim

Tot

$8

$2

$8

$4

$

$

eign categorie

damage and lo

gned to the sta

in these secto

ng sector appe

ures64, is 0.23%

ent on persona

(the low end o

5% of GDP. A

%, so insurance

f the risk. 

e NGO/MFI se

at participation

s and rebuildin

sk, it will play 

ke‐off, Statistical 

ort on Capacity BuFinance in Ban

SF13-

ine (and this fa

re of the total 

ss estimates (n

etc., while los

Table 51 below

ors (it is noted

column for Da

mates by sect

tal (USD) 839.3

253.4

86.1

437.6

52.4

$6.1

s. From a gene

oss in both hou

ate in the Bang

rs by looking 

ears to be extre

%. This include

al/household b

of the typical p

As indicated ab

e that could of

ector, which m

n covered by p

ng after natura

a role in finan

appendix, upda

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

actor applies t

recovery and 

noting that 

s is the mediu

w summarizes

d that the 

amage). 

tor.

Sov / Non‐Both

Sovereign

Sovereign

Both

Non‐sovereiSovereign

eral perspectiv

using and 

gladesh case. W

at the private 

emely limited

es auto insura

building/conte

premium ratin

bove, the natio

fset governme

may be a partic

private insura

al disaster eve

ncing rebuildin

ate January 2013.

er Risk A-8144)

184 051215

to 

um to 

s that 

Sov 

n

n

gn

n

ve, it 

We 

d; the 

ance 

ents 

ng for 

onal 

ent 

cipant 

ance. 

ents, 

ng 

Page 186: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

costs, offse

to the NGO

For the sak

through in

For agricu

given the a

will play a

this role is

damage an

Given thes

into gover

Table

Inf

In

Pr

As can be 

the ‘missin

financing g

disaster. 

ii)

Building o

governme

further spl

timeframe

the minim

financing i

the private

response i

  

etting state sup

O/MFI sector a

ke of conserva

nsurance, 15% 

ultural damage

almost total la

a role by writin

s likely to be m

nd loss in the a

se assumption

rnment and no

52. Breakdow

Sector frastructure‐Hounfrastructure‐Ot

Social Sectorsoductive‐AgricuProductive‐OthEnvironment 

Total 

seen, the non‐

ng’ emergency

gap analysis is

Sectorial b

on the analysis

nt sectors to th

lit into emerge

e is generally t

mum time gene

institutions. N

e sector covers

s included in t

pport. Howev

at preferential

atism, we assu

through NGO

e and loss, we 

ack of penetrat

ng off or resch

much smaller t

agriculture sec

ns, Table 52 pr

on‐governmen

wn of Cyclon

using ther s lture er 

‐government s

y response cos

s robust in usi

breakdown an

s above, in Fig

he 1 in 100‐yea

ency (i.e. imm

aken as the tra

erally taken to 

NGO/MFI dam

s both medium

the governme

 

ver, state supp

l rates post dis

ume that priva

O/MFI lending

estimate that 

tion of agricul

heduling loans

han in the hou

ctor is reasona

ovides an esti

nt shares, an es

e Sidr damag

Total (m USD)839.3

253.4

86.1

437.6

52.4

6.1

1,674.9

share of losses

sts. We thus fe

ing the full mo

d timing of fi

gure 81 we sho

ar cyclone loss

mediate), mediu

ansition from 

mobilize rebu

mage and loss i

m and long ter

nt emergency

ort is still indi

saster. 

te means are c

g), leaving 80%

the private se

tural insuranc

s to small agric

using sector, a

able assignable

mate of the br

stimate we bel

ge and loss to

Sove

8

s included in m

el that these tw

odelled loss in

inancing need

ow the relative

s estimate from

um term (up to

recovery to lo

uilding financi

is addressed p

rm response. N

 response pot.

Final Repo

irectly involve

covering 20% 

% in the hands

ctor share in d

ce in Banglade

cultural produ

and we estima

e to the non‐so

reakdown of th

lieve is reason

o sovereign a

ereign share 80%

100%

100%

90%

0%

100%

84.2%

modelled estim

wo reasonably

n assessing gov

ds 

e contribution 

m the cyclone 

o 6 months) an

ong‐term rebui

ing from the in

predominantly

Note that the N

ort on Capacity BuFinance in Ban

SF13-

ed through its 

of the housing

s of the state. 

damage and lo

esh. Again the

ucers which w

ate that a maxi

overeign sour

he national los

nable for most 

and non-sove

Non‐so

mates of nation

y offset each o

vernment fina

of governmen

model. Gover

nd long‐term.

ilding phases,

nternational d

y in medium‐t

NGO/MFI role

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

wholesale len

g damage (5%

oss is very sma

e NGO/MFI se

will offset losse

mum of 10% o

rces. 

ss for Cyclone

disaster even

ereign source

overeign share20% 0% 0% 10% 100% 0% 

15.8% 

nal loss is simi

other, and the 

ancing needs p

nt and non‐

rnment losses 

 The 6‐month 

, and coincides

development 

erm response 

e in emergency

er Risk A-8144)

185 051215

nding 

all 

ctor 

es, but 

of the 

e Sidr 

ts. 

es.

ilar to 

post‐

are 

s with 

while 

Page 187: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

Figure 81

As can be 

financing i

Taking thi

would be m

emergency

Figure 82 p

that the fu

Figure 82

This analy

and the ne

  

. Relative sha

seen, around h

is needed for m

is analysis a st

manifested in 

y response cos

provides the r

unding gap is 5

2. Share of go

ysis suggests th

eeds of the NG

are of govern

half of the fina

medium‐term

tep further, we

each of the fiv

sts and include

relative breakd

50% of the tota

overnment an

cos

hat the fundin

GO/MFI sector

 

nment and no

dis

ancing is requ

m recovery inve

e have made e

ve sector/time

ed non‐govern

down of the to

al modelled lo

nd non-govern

sts relative to

ng gap is predo

r, also in the m

on-governmen

aster costs.

uired for long‐t

estment. 

estimates of th

frame categor

nment costs fo

otal funding ga

oss. 

nment, and s

o estimated fu

ominantly focu

medium term. T

Final Repo

nt, and short-

term rebuildin

he relative port

ries identified 

or consistency 

ap for a 1 in 10

short-, medium

unding gap.

used on the m

This suggests 

ort on Capacity BuFinance in Ban

SF13-

 

-, medium- an

ng, while arou

tion of the fun

above. We ha

 with the over

00‐year cyclon

 

m- and long-t

medium‐term s

that risk finan

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

nd long-term

und 30‐35% of 

nding gap that

ave excluded 

rall gap analys

ne event, assum

term post-dis

sovereign need

ncing solution

er Risk A-8144)

186 051215

post-

sis. 

ming 

saster

ds 

s in 

Page 188: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

the sovere

appropriat

Before bui

emphasizi

reconstruc

better in te

considerab

respond ra

9.6 P

9.6.1 S

Two sover

in Banglad

credit wou

while para

frequent) a

being man

were avail

9.6.1.1

Given Ban

Developm

borrower f

DDO) pro

through co

available u

response f

associated

Tying cont

developm

A continge

product (s

                  65 http://trea

  

eign and NGO

te to consider.

ilding on these

ing that early r

ction needs. Si

erms of timing

bly, possibly s

apidly and sub

Practical Im

Sovereign O

reign disaster 

desh’s case, na

uld be deploye

ametric risk tra

and could pro

naged would l

lable. 

Contingen

ngladesh’s cur

ment Associatio

from the Worl

duct65 offered 

ontingent cred

using a ‘soft’ tr

funds set aside

d with internat

tingent credit 

ent of pre‐agr

ent credit line 

see below), wh

                        sury.worldbank

O/MFI realms a

e conclusions i

recovery actio

imply by addr

g), the long‐ter

several times o

bstantially afte

mplementa

Options

risk financing

amely continge

ed to complem

ansfer would 

ovide rapid liq

ikely be small

nt Credit

rent difficulty

on (IDA) rathe

ld Bank (maki

by IBRD), opt

dit will be sma

rigger (e.g. de

e as budget co

tional donor‐d

to capacity bu

eed contingen

would provid

hich would on

                   .org/bdm/pdf/Ha

 

and operating 

in identifying 

ons have a sub

ressing the me

rm gap (which

over. This prov

er disaster stri

ble Solutio

g options are m

ent credit and

ment internal b

deal with less

quidity to supp

l, but the risk t

y in raising com

er than Interna

ing it ineligible

tions for contin

all. However, a

eclaration of em

ontingencies at

driven emergen

uilding in disa

ncy plans, wou

de greater flex

ly trigger for s

andouts_Finance

in the 1 to 6 m

practical, imp

stantial additi

edium‐term res

h is substantia

vides addition

ikes. 

ons

most practical f

 parametric tr

budgetary mec

 frequent even

port early reco

transfer option

mmercial sove

ational Bank fo

e for the Catas

ngent credit a

a contingent cr

mergency) cou

t the national l

ncy response m

aster preparedn

uld incentivize

ibility for resp

specific perils 

e/CatDDO_Produ

Final Repo

months post‐di

plementable so

ional benefit in

sponse financ

ally larger in ac

nal emphasis o

for exploration

ransfer of cyclo

chanisms for r

nts (e.g. 1 in 10

overy. In both 

n could be sca

ereign debt an

or Reconstruc

strophe Deferr

are limited and

redit line on p

uld provide a u

level, and wou

mechanisms.

ness and early

e better risk m

ponse than a p

and at specifi

uct_Note.pdf 

ort on Capacity BuFinance in Ban

SF13-

isaster period 

olutions, it is w

n reducing lon

cing gap (and t

ctual terms) is

on financing to

n over the sho

one and/or flo

response to mo

0 annualized p

cases, the init

aled up quickly

d its status as 

tion and Deve

red Drawdow

d the amount o

pre‐agreed term

useful comple

uld reduce the

y warning, inc

management. 

pure parametri

ic intensity of i

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

are the most 

worth re‐

ng‐term 

the earlier the 

s likely to shrin

ools which can

ort to medium

ood risk. Conti

ore frequent e

probability an

ial quantum o

y if premium f

an Internation

elopment (IBR

wn Option (CA

of risk manage

ms made rapid

ement to emer

e uncertainty 

cluding 

ic insurance 

impact. Altho

er Risk A-8144)

187 051215

nk 

m term 

ingent 

events 

nd less 

of risk 

funds 

nal 

RD) 

AT‐

eable 

dly 

rgency 

ugh 

Page 189: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

there is cu

indicated i

The key lik

Struct

risk m

Pre‐ag

Cap oBangl

these tropic

Could

Up‐froremain

WB punkno

Loan t

Given the 

relatively 

must be as

IDA or ID

events, the

developm

9.6.1.2

Parametric

the main c

sustained 

sufficient t

modelled‐

Caribbean

surroundi

Transfer o

risk, and d

possible to

externally‐

  

urrently no con

its willingness

kely elements 

tured as a conmanagement. 

greed trigger –

on contingent cadesh effectivtogether coulcal cyclone dis

d include pre‐a

ont arrangeme

ning balance a

roduct  is for 3own. 

terms (grace/m

status of Bang

quick mobiliz

ssessed in ligh

A‐like terms w

e full long‐term

ent programs 

Parametri

c transfer of so

constraint to co

basis. For trop

to support a p

‐loss parametr

n/Central Ame

ng appetite an

of parametric f

due to the fact 

o use the existi

‐sourced rainf

ntingent credit

s to discuss su

of a contingen

tingent extens

– usually quali

credit amount

ve capacity  in d cover arounaster (Figure 8

agreed spendi

ent fee (WB anafter partial di

3 year period 

maturity/rate) 

gladesh’s sove

ation of recov

ht of the specif

will be more fi

m cost of conti

– must be ass

c Sovereig

overeign risk i

ompleting a tr

pical cyclone r

parametric tran

ric program co

erica CCRIF an

nd pricing for 

flood risk wou

that few prece

ing work as pr

fall data (e.g. m

 

t product avai

uch a mechanis

nt credit line w

sion of a norm

itative (e.g. de

t – a USD 250mthe  form of rnd half of  the 82). Partial dra

ng plan for fu

nd JICA produisbursal and / 

with up  to fo

‐ JICA 10/40/0

ereign credit ra

ery funding to

fic terms that m

inancially effic

ingent credit –

essed for the p

gn Risk Tra

into the intern

ransaction bein

risk, the model

nsaction, and w

ould be develo

nd the Pacific P

such a deal. 

uld be much m

edents exist fo

resented earlie

modelled or sa

lable to Bangl

sm with the Ba

would be: 

mal funding w

eclaration of em

m credit facilitreserve  funds funding gap awdown woul

unds before dis

ucts have 0.5%or, for WB, ren

our renewals 

0.01%, WB var

ating and othe

o add to liquid

may be offered

cient than risk

– particularly i

particular cond

ansfer

national marke

ng the availab

l described pr

with a relative

oped and a pro

PCRAFI progr

more challengin

or transfer of s

er as a basis fo

atellite‐based r

Final Repo

ladesh, the As

angladesh gov

window, likely 

mergency by n

ty would apprand budget rfor medium‐tld be allowabl

sbursal. 

% arrangemen

newal of cred

allowable. JIC

riable on all bu

er related facto

dity from reser

d. While it is li

k transfer for fi

is it may offse

ditions preval

ets is certainly

bility of premiu

reviously in th

ely small addit

oduct structur

rams significa

ng due to the 

sovereign floo

or developmen

rain data), suc

ort on Capacity BuFinance in Ban

SF13-

ian Developm

vernment. 

a loan for inv

national gover

roximately ma

re‐allocations term recoveryle. 

nt fee) and addit facility (0.25

CA duration a

ut less favorab

ors, contingen

rves and budg

ikely that cont

inancing more

et lending at so

lent at the time

y possible for B

um funds, bot

his report is clo

tional investm

red. Precedent

antly reduce th

complexity of

d risk. Howev

nt of a weathe

ch as was recen

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

ment Bank has 

vestment in di

rnment). 

atch Governm(see Figure 80y for a 1  in 100

ditional fixed 5% in both cas

and extension 

ble.

nt credit for 

get reallocation

tingent credit 

e frequent disa

oft rates for ot

e. 

Bangladesh, w

th initially and

ose to being 

ment, a full 

ts from the 

he uncertainty

f the hazard an

ver, it may be 

er hedge based

ntly launched

er Risk A-8144)

188 051215

isaster 

ment of 0) and 0‐year 

fee on ses).  

terms 

ns 

on 

aster 

ther 

with 

d on a 

 

nd 

d on 

d as 

Page 190: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

part of the

commercia

flood‐footp

parametric

Example o

The target

to 3 month

example w

separately

event. Thi

of risk tran

For simpli

alone polic

constraint

model. It s

above, the

will be sev

Given the 

to 25% of t

term recov

Cyclone u

  

e CCRIF progr

al models com

print mapping

c flood model 

of Sovereign P

t for a risk tran

hs after a disas

we have the in

y) and payouts

s is a typical s

nsfer but also 

icity, the two p

cies and stand

s to such an of

should also be

ere is currently

veral, perhaps 

stated target f

the total losses

very phase (se

sed as a basis 

ram. Regional 

mpleted in the 

g technology i

for Banglades

Parametric Insu

nsfer product w

ster. It would b

surance policy

s will increase 

tructure for a 

allowing for a

perils addresse

d‐alone pricing

ffering being a

e noted that wh

y no sovereign

many years b

for a sovereign

s, which appro

e Figure 81). F

for structurin

 

precedents do

two years afte

is also develop

sh in the next 

urance Policy 

would be to co

be available o

y trigger set at

pro‐rata with

sovereign par

a payout proba

ed, flood and 

g. While there 

available in th

hile flood cove

n level parame

before one is d

n risk transfer 

oximates the p

Figure 83 show

g the risk tran

o exist for nati

er the floods in

ping rapidly an

few years. 

for Banglades

over early pos

nly for relativ

t the 1 in 10‐ye

h losses until th

rametric produ

ability accepta

cyclone, are tr

may be efficie

he near‐term m

er is addressed

etric flood mod

eveloped and 

product, the f

portion of loss

ws the full exce

nsfer product, 

Final Repo

ional level hyd

n Thailand in l

nd may be sui

sh 

st‐disaster reco

vely infrequent

ear loss level (

he coverage lim

uct, maximizin

able at the poli

reated as indep

encies in a com

make this two‐p

d here based o

del in existenc

 accepted by t

full national lo

ses requiring fi

eedance proba

with this dow

ort on Capacity BuFinance in Ban

SF13-

drological floo

late‐2011), and

itable for unde

overy needs in

t, but large‐im

(for each of the

mit is paid ou

ng the relative

itical level. 

pendent perils

mbined covera

policy approa

on the risk pro

ce anywhere in

the markets an

oss profile has

inancing durin

ability curves 

wnscaling appl

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

od models (e.g

d satellite‐base

erpinning a 

n the period fr

mpact events; in

e covered peri

t for a 1 in 100

e cost‐effective

s and have sta

age, the practic

ach a reasonab

ofile presented

n the world an

nywhere. 

s been downsc

ng the medium

for Flood and

lied. 

er Risk A-8144)

189 051215

g. 

ed 

rom 1 

n this 

ils 

0‐year 

eness 

and‐

cal 

ble 

nd it 

caled 

m‐

Page 191: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

Figure 8

Figure 84 s

Cyclone an

  

83. Exceedan

shows just the

nd Flood mark

ce probability

e lower return 

ked. 

 

y curves for ‘

full mode

period portio

‘Government

eled national

on of the full E

Final Repo

t response co

loss.

EP curve, with 

ort on Capacity BuFinance in Ban

SF13-

osts’, represe

10 and 100‐ye

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

 

enting 25% of

ear loss levels 

er Risk A-8144)

190 051215

f the

for 

Page 192: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

Figure 84

The charac

Table 53.

Fu

Stan

Att

Exh

E

Esti

Est

In this exa

and USD 3

any event 

curves for 

parametric

  

4. Exceedanc

cteristics of th

Key charact

 ll Expected Lossndard Deviationtachment (10‐yr haustion (100‐yr 

Premium Estimated cedingmated coveragetimated rate on 

ample, premiu

357m for cyclo

which trigger

both perils fo

c insurance pr

ce probability

levels m

e example risk

eristics of po

 (EL) of EL loss) loss) 

g % e limit limit 

um has been fix

one. Doubling 

rs the policy (i

or policies with

roducts for Ban

 

curves for ‘G

marked for bo

k transfer prod

ossible param

$2

$3

$6

$1

$

$3

xed at USD 20

premium will

.e. losses great

h the character

ngladesh. All 

Government r

oth Cyclone a

duct are provi

metric insuran

USD.

Cyclone 245,312,249

379,169,894

680,054,512

,787,772,876

$20,000,000

32.18%

356,511,344

5.61%

0m per peril, g

l double the co

ter than the at

ristics shown i

values are US

Final Repo

response cos

and Flood per

ided in Table 5

nce products

giving a covera

overage limit 

ttachment poin

in Table 53. Ke

SD. 

ort on Capacity BuFinance in Ban

SF13-

sts’, with 10-

rils.

53.  

for Banglade

$551

$679

$1,44

$3,01

$20,

2

$340

5

age limit of US

and will doub

nt.) Figure 85 

ey characteris

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

 

and 100-year

esh. All value

Flood 1,061,357 9,478,383 48,552,328

17,403,814

,000,000 1.69% 0,349,435 5.88% 

SD 340m for fl

ble the payout

shows the pay

stics of possibl

er Risk A-8144)

191 051215

r loss

es are

lood 

t for 

yout 

Page 193: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

Pricing is a

1.5. That a

risk transf

pricing for

For a fixed

the covera

coverage a

consistent 

 

Figure 8

Note th

Actual pri

constraine

above is fe

  

assumed to be

assumption is i

fer programme

r transferred r

d premium, pr

age limits in Ta

at the lower en

across both p

85. Payout cu

hat elements

cing of a prod

ed only once a 

elt to be reason

e a simple mul

in the middle 

es, taking into

isk from those

ricing differen

able 53 for a re

nd of the pricin

erils. 

urves for Cyc

of the curves

duct will depen

product is de

nably stable – 

 

ltiple of expec

of a range of p

o account assum

e programmes

nce leads to a c

easonable rang

ng range and 

clone and Floo

s are labelled

nd on a variety

veloped and p

certainly in th

cted loss, and f

publicly‐availa

mptions abou

s which operat

change in cedin

ge of pricing m

~USD 25m les

od coverage

for Cyclone

also.

y of structurin

placement con

he coming few

Final Repo

for the estimat

able data for n

ut primary poli

te as risk pool

ng percentage

multiples (1.25

ss coverage at 

with characte

only; the sam

ng and market

nsidered. How

w years – and t

ort on Capacity BuFinance in Ban

SF13-

tes in Table 53

non‐peak para

icy pricing aga

ls. 

e and coverage

5 to 1.75) is ~U

the top of the 

eristics desc

me structure i

t factors which

wever, the prici

there is high co

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

3, is assumed t

ametric sovere

ainst risk mark

e limit; the ran

USD 35m more

pricing range

 

ribed in the t

is true for Flo

h can be better

ing range utili

onfidence of g

er Risk A-8144)

192 051215

to be 

eign 

ket 

nge on 

e, 

ext.

ood

ized 

global 

Page 194: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

market ap

model is w

9.6.2 N

Helping th

when disa

developed

developm

weather in

Banglades

Building o

the portfol

micro‐insu

experience

process. A

coverage, 

Substantia

of this risk

a major di

MFI client

The MFI s

disaster ris

credit/life 

Breaking t

sticks (e.g.

carrots (e.g

portfolios)

Portfolio p

would ena

capital infl

generating

markets, n

Haiyan in 

                  66 Personal c

  

petite for sove

well‐understoo

Non-Sovere

he population 

aster strikes. Tr

d in Banglades

ent. However,

ndex insurance

sh. 

on the micro‐fi

lio level shoul

urance produc

e from around

A more direct r

of portfolios o

al natural catas

k provides dua

saster, while a

ts so that they 

ector in Bangl

sk financing, a

or health insu

the existing sta

. requiring cat

g. provision of

). 

protection for M

able not only r

lux through ex

g economic act

not by‐pass the

late‐201366 sug

                        communication t

ereign risk fro

od and accepte

eign Optio

to help thems

raditional pro

sh and appear 

, the relatively

e, are likely to

inance platform

ld be primary 

cts such as Oxf

d the world de

route to suppo

of micro‐loans 

strophe risk re

al benefits; it p

also potentially

can participat

ladesh already

although the “

urance (which 

atus‐quo of M

astrophe expo

f technical sup

MFIs would b

re‐structuring 

xisting channe

tivity and allo

em. Recent, as

ggests that the

                   o the author by S

 

m countries su

ed and the pro

ns

selves is a high

operty / catastr

unlikely to sc

y strong micro

o be most appr

m, index‐base

targets for sup

fam’s index‐ba

monstrates th

orting large po

for example.

esides in the lo

protects agains

y catalyzing e

te in the rebuil

y has an establ

“catastrophe” 

are the predom

FIs not explici

osure of MFI lo

pport for risk a

bring a rapid in

of existing loa

els to existing 

owing the long

s yet unpublish

e appetite for a

Stewart McCullo

uch as Banglad

oduct is structu

hly efficient w

rophe and agri

cale up quickly

ofinance sector

ropriate tools f

ed weather pro

pport. While p

ased flood ins

hat reaching sc

ortions of the l

oan portfolios 

st low income 

conomic activ

lding process.

lished insuran

exposure of M

minant forms 

itly recognizin

oan portfolios

assessment, su

nflux of new l

ans but, more 

(good) MFI cl

g‐term reconst

hed work in th

and repaymen

och, Global Insur

Final Repo

desh, assumin

tured appropri

way of reducing

icultural insur

y, even with in

r means that m

for expanding

oducts at both

piloting and ev

surance progra

cale and econo

low‐income po

of the MFI sec

 individuals sl

vity through p

 

nce element an

MFIs must be m

of insurance c

ng their catastr

s to be quantifi

ubsidizing pre

iquidity after 

importantly, d

lients has a lar

truction financ

he Philippines

nt rates on new

rance Director at 

ort on Capacity BuFinance in Ban

SF13-

ng that the und

iately. 

g the burden o

rance markets

nvestment in m

micro‐insuranc

g private insur

h the individua

ventual expan

am are worthy

omic sustainab

opulation is th

ctor. Appropr

liding into gre

roviding addi

nd can thus be 

managed very

currently offer

rophe exposur

ied and active

emiums for ins

major loan‐str

distribution of

rge multiplyin

cing to run thr

s in areas impa

w loans among

VisionFund Inte

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

derlying param

on the governm

s are not well 

market 

ce, and particu

rance markets 

al and especial

nsion of indivi

y of support, 

bility is a long 

hrough meso‐l

riate managem

eater hardship

itional financin

a strong partn

y differently to

red by MFIs). 

re will require

ely managed) a

suring loan 

ressing events

f new loans. N

ng effect in 

rough local 

acted by Cyclo

gst existing M

ernational, 2014.

er Risk A-8144)

193 051215

metric 

ment 

ularly 

in 

lly at 

dual 

level 

ment 

p after 

ng to 

ner in 

e both 

and 

s. This 

New 

one 

MFI 

Page 195: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

clients are

process. 

Using inte

As describ

these mech

unreliable

dependen

sector’s ex

demonstra

Governme

As describ

executed b

its partner

CRF is thu

portfolios.

no plans fo

for genera

The level o

limited; in

to cover th

provides a

which cou

NGO/MFI

by an up‐s

based wea

Scoping A

As previou

Assuming

national an

exposure o

5% for Cyc

                  67 NGO Expe

Executive

resource/P

  

 both very hig

ernational risk 

bed previously

hanisms tend 

. The financial

t on ex‐post fi

xpansive respo

ates the substa

ent and at leas

bed earlier in t

by the ADB, ha

r organizations

us effectively a

. The DIISP is 

or developme

al livelihood pr

of covariant ri

ndeed, PKSF h

he needs of its 

an ideal vehicl

uld start with t

Is. Each deal co

scaled CRF wh

ather insuranc

Analysis 

usly stated, th

g a national dis

nd regional N

of USD 3.15b. 

clone and alm

                        eriences in Imple

e Director of the IPDF/20140704/2_

gh and the ava

markets to sc

y, while the NG

to be ad‐hoc in

l underpinnin

nancing and o

onse to natural

antial role that

st starting to p

this report, PK

as set up a Co

s (POs) in the 

acting as a rein

also supportin

nt of weather 

rotection.  

sk to the healt

as thus far fun

POs in the ev

le for developi

the offering of

ould be fronte

hich itself coul

e portfolio risk

he total outstan

stribution of th

NGO/MFIs) and

The national m

most 8.5% for fl

                   ementing InsuranInstitute of Micro

_IGES‐UMK_sem

 

ailability of suc

cale up PKSF C

GO/MFI secto

n nature, and 

ng of these disa

on the Govern

l disasters also

t can be played

ass responsibi

KSF, under the 

variant Risk F

event of majo

nsurer to the p

ng developme

index insuran

th and life mic

nded the CRF 

vent of a major

ing a broad ca

f a generic loan

ed by a local in

ld access the g

k. 

nding loan bal

hese outstandi

d assuming th

modelled loss 

lood. Taking in

nce Products in Aofinance, 5 July 2minar_Presentati

ch new financ

Covariant Risk

or certainly has

are therefore 

aster response

ment (includin

o – such as pre

d by the NGO

ility for disaste

Developing In

Fund (CRF), th

r covariant los

pool of POs an

ent of a livesto

nce under this 

croinsurance p

itself and estim

r covariant sho

atastrophe mic

n portfolio cov

nsurer if neces

global reinsura

lance in the NG

ing loans (whi

hat 90% of the 

rate relative t

nto account th

Agriculture in Ba2014, Malaysia. hon‐BK.pdf. 

Final Repo

cing has signifi

k Fund progra

s mechanisms

inherently ine

e mechanisms 

ng the Bangla

eviously descr

O/MFI sector in

er risk manag

nclusive Insur

he aim of whic

sses to their m

nd their credit/

ock insurance p

program, eith

programs bein

mates that onl

ock67. Howeve

croinsurance m

verage which c

ssary but with

ance markets a

GO/MFI secto

ich in turn ass

loans are clim

to GDP for a 1 

he relatively hi

angladesh. Presehttp://www.iges.

ort on Capacity BuFinance in Ban

SF13-

icantly enhanc

am 

s in place for d

efficient and p

is also weak, b

adesh Bank.) H

ribed for the 1

n alleviating th

gement to indiv

rance Sector P

ch is to provid

microinsurance

/life and health

program, but t

her specifically

ng developed u

ly USD 6m is r

er, it is recogni

marketplace in

could be picke

h the risk ultim

as a pool of NG

or is around US

sumes constru

mate‐exposed, w

 in 100‐year ev

igher vulnerab

entation by Prof. or.jp/files/resear

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

ced the recove

disaster respon

potentially 

being highly 

However, the 

998 floods –  

he burden on 

viduals. 

Project (DIISP)

de risk capacity

e programs. Th

h microinsura

there appear t

y for agricultu

under DIISP is

required in ca

ized that PKSF

n Bangladesh, 

ed up by indiv

mately borne m

GO/MFI index

SD 3.5 billion.

uction of a poo

we have an ov

vent is just un

bility of NGO/

M A Baqui Khalrch/natural‐

er Risk A-8144)

194 051215

ery 

nse, 

y to 

he 

ance 

to be 

ure or 

apital 

vidual 

mainly 

x‐

ol of 

verall 

nder 

/MFI 

lily, 

Page 196: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

clients aga

‘loss’ or im

comprise a

Taking the

assumes a

NGO/MFI

a rate of ar

Even from

particularl

for such a 

Comp

a simp

A simgeogr

risk an

A con

Capita

Techn

risk tr

The DIISP

critical com

globally (e

program w

 

  

ainst national e

mpairment aga

around 60% of

e average rate 

a similar cover

I pool as for th

round 60 basis

m this simple a

ly compared t

scheme to be 

pulsory participle risk assessm

mple parametri

aphic distribunalysis. 

nstant rating st

alization of the

nical assistanceransfer are pas

P and Covarian

mponents of a

e.g. CLIMBS p

was sustainabl

exposure, a lo

ainst the nation

f the identified

on limit from

age structure 

he national los

s points per do

nalysis, it is cl

o prevalent re

viable, includ

ipation for all ment process 

ic product struution of the loa

tructure and an

e risk pool. 

e program andssed on to clien

nt Risk Fund w

a portfolio mic

program in the

le in the mediu

 

 

ss rate of 10%

nal NGO/MFI

d funding gap

 the analysis a

for a loan port

ses, USD 315m

ollar of climate

lear that the m

epayment rates

ing: 

NGO/MFIs wto identify and

ucture at the Nan portfolio ca

n efficient veh

d required connts.

would appear 

roinsurance p

e Philippines) w

um‐ to long‐te

for a 1 in 100‐

I loan portfolio

p for the MFI/N

at the sovereig

tfolio coverag

m coverage wo

e‐exposed loan

marginal cost o

s. However, a 

with climate‐exd quantify the

NGO/MFI levan be captured

hicle to underw

ntingency plan

to provide a s

pool, although 

would need to

erm. 

Final Repo

‐year event se

o of USD 315m

NGO sector (se

gn level presen

ge and a simila

ould cost just u

an value per ye

on each individ

a number of ele

xposed loan pe covariant we

vel, such that td but without 

write cover an

nning for NGO

significant hea

experience fro

o be closely in

ort on Capacity BuFinance in Ban

SF13-

ems reasonab

m. If fully cove

ee Figure 82). 

nted above, an

ar shape of risk

under USD 20

ear. 

dual loan doll

ements would

ortfolios, imp

eather risk of e

the particularthe need for d

nd pool the risk

O/MFIs to ens

ad‐start on a nu

om elsewhere

nvestigated to e

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

le, leading to a

ered, this wou

nd noting that 

k profile for an

0m. This equat

ar is very sma

d need to be in

lemented aloneach NGO/MF

r vulnerabilitiedetailed (and c

k. 

sure that bene

umber of thes

e in the region 

ensure that an

er Risk A-8144)

195 051215

uld 

this 

tes to 

all – 

n place 

ngside FI. 

es and costly) 

efits of 

se 

and 

ny 

Page 197: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

10 Re

Ahmad, Q

Banglades

Dhaka, 134

Ahmad, Q

University

Ahmed A.Cell, Depa

Ahmed Z.Industry oPaper 41, I

Ahmed, A

Reference 

S.H. Imam

Ahmed, S.

Paper No:

Initiatives 

27th ‐ 30th

Akhter, S.H

Air Water 

Alam M.J.

for Rural AEarthquak

Alam, M.J

Earthquak

Science, Vo

Alam, M.S

Using a DiVol. 11, No

Al‐Hussai

Science an

  

ferences

Q.K., Ahmad, N

sh with Particu

4 p. 

Q.K., Chowdhu

y Press Limited

.U. (2006) “Banartment of Env

, Siddiquee S.of Bangladesh”ID 96, July 4‐6

A.U., and Mirz

to Flood ’98: N

m, M. Sarker (E

. (2000) “Copin

05, To be pres

in Grassroots

h November 20

H. (2010) “Ear

and Earthqua

, Ahsan R., AkArea in Banglake Engineering

.B., Ansery, Mke in Old Part ol. 19, No. 3, p

S., Sakib, N., anisplacement‐Bo. 5  

ni T.M. (2011)nd Technology

s

N., and Rashee

ular Reference

ury, A.K.A., Im

d (UPL), Dhak

ngladesh Climvironment, Co

A., Khan S., (2” Third Interna6, 2012, Bangko

a, M.M.Q. (200

National Persp

Eds.), The Univ

ng With Disas

sented at the A

 Development

000 

rthquakes of D

ake. Ed: M.A. I

khter F., Paul Aadesh” Paper Ng (14WCEE), B

M.A., and Chowof Sylhet and age 33‐43 

nd Mumtaz, MBased Method”

) “Ground Mo

y Conference, V

 

ed, K.B.S. (Eds

e to the Gange

mam, S.H., and

ka, 142 p. 

mate Change Imomprehensive 

2012) “Reliabilational Conferenok, Thailand

00) “Review o

pectives” Persp

versity Press L

ster in Banglad

Asian regional

t – Current Iss

Dhaka,” In: En

Islam, Asiatic 

A. (2008) “EarNo. 1747, ProcBeijing, China,

wdhuary, R.KConstruction 

M. (2011) “Seis” International 

otion Studies foVienna, June 8

s.) (1994) “Res

s, Brahmaputr

d Sarker M. (E

mpacts and VuDisaster Mana

lity and Constnce on Construc

of Causes and 

pectives on Floo

Limited, Dhak

desh: PKSF Ex

l conference “T

sues and Asian

nvironment of 

Society of Ban

rthquake Resisceedings of th 2008  

. (2008) “EvaluSafety Rules” 

smic Loss AsseJournal of Civi

or Critical Site8‐10, 2011 

Final Repo

sources, Enviro

ra and Meghn

Eds.) (2000) “P

ulnerability –agement Prog

truction Practiction In Develo

Dimensions o

od 1998, Q.K. A

ka, pp.142 

xperience of Fl

The Potential 

n Experiences

Capital Dhaka

ngladesh, p.40

stant Non‐Enghe Fourteenth W

ution of Build IUST Internat

essment of Dhil & Environme

es in North‐We

ort on Capacity BuFinance in Ban

SF13-

onment and D

na Basins”, Aca

Perspectives on

A Synthesis” gramme, July 2

ices in Buildinoping Countries

of Floods with 

Ahmad, A.K.A

lood 1998 and

and Limitatio

”, Rajendrapu

a ‐ Plants Wild

01‐426 

gineered BuildWorld Confer

ding’s Vulnerabtional Journal of

haka for Scenaental Engineeri

est Banglades

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

Development i

ademic Publis

n Flood 1998”,

Climate Chan2006 

ng Constructios (ICCIDC–III)

Particular 

A. Chowdhury

 Microcredit,”

ons of Econom

ur, Bangladesh

dlife Gardens 

ding Constructence On 

bility to of Engineering 

ario Earthquakng (IJCEE‐IJEN

h” presentatio

er Risk A-8144)

196 051215

 

in 

shers, 

, The 

nge 

on ), 

y, 

” 

mic 

h,  

Parks 

tion 

kes NS), 

on in 

Page 198: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

Al‐Hussai

Provisions

Ali, A. (19

109‐116 

Ali, H. (19Natural D

Ambrasey

Ansary MConference

Aon Benfi

Banglades

Organizat

Informatio

Banglades

Report” M

Banglades

Ministry o

Banglades

Dhaka 

Banglades

Banglades

Centre, Ba

Benson, C

Managem

Bilham, R.America, 84

Brammer, 

Dipal C Ba

CDKN (20Climate an

  

ni T.M. (2011)s” Meeting on 

99) “Climate c

998) “Earthquaisaster Risk M

ys N. (2004) “T

.A., and Sadek on Earthquake

eld (2013) “M

sh Agriculture

ion (2000) “Ut

on System for 

sh Bureau of SMinistry of Plan

sh Bureau of Sof Planning, Go

sh Bureau of S

sh Bureau of S

sh Water Deve

angladesh Wat

., and Clay, E.

ent Facility, Th

. (1994) “The 14(5), 1650‐1657

H. (1999) “Ag

arua, 1998; The

012) “Managin

nd Developme

) “Seismicity aSeismic Haza

change impact

ake Database aManagement, IN

Three little kno

k A. (2006) “Ae Engineering, S

ay 2013 Globa

e Research Cou

tilization of Ag

Agricultural D

tatistics (2008)nning, Dhaka 

tatistics (2011)overnment of 

tatistics (2012)

tatistics (2014)

elopment Boar

ter Developme

 (2002) “Bangl

he World Ban

1737 Calcutta E7 

gricultural disa

e Grameen Stra

ng Climate Extent Knowledg

 

and Seismic Ha

ard in Asia ICT

ts and adaptat

and Seismic ZoNCEDE Repor

own early eart

ssessment of 2San Francisco

al Catastrophe

uncil, United N

gro‐Ecological

Development, 

) “Population 

) “Report on SBangladesh, D

) “Bangladesh

) http://www.b

rd (2014) “Ann

ent Board 

ladesh: Disast

nk, November 

Earthquake an

aster managem

ategy to Combat

tremes and Dige Network, Lo

azard AssessmTP, Trieste, De

tion assessmen

oning of Bangrt 11, February

thquakes in In

2003 Rangama

e Recap” 

Nations Devel

l Zones (AEZ)

Bangladesh” 

Census‐2001, 

Sample Vital RDhaka, Octobe

h population an

bbs.gov.bd/ 

nual Flood Rep

ters and Public

2002 

nd Cyclone Ev

ment in Bangla

t the Flood of 19

isasters in Asiaondon 

Final Repo

ment in Banglaec. 4‐8, 2006  

nt in Banglade

gladesh”, Infory 1998, Bangk

ndia” Current S

ati earthquake

lopment Progr

) Database and

BGD/95/006

National Serie

Registration Syer 2011  

nd housing ce

port 2013” Flo

c Finance” Wo

valuated” Bulle

adesh” Dhaka:

998 PKSF Web

a: Lessons from

ort on Capacity BuFinance in Ban

SF13-

adesh: Referen

esh,” Climate R

rmation Technkok 

Science, 86(4), 5

e, Bangladesh”

ram, Food and

d Installation o

es, Volume‐3: 

ystem‐2010” St

ensus 2011” M

ood Forecastin

orking Paper Se

etin of the Seism

: University Pr

bsite 8 Feb 201

m the IPCC SR

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

nce to Code 

Research, 12(2‐3

nology Tools f

506‐508 

” in 8th US Na

d Agriculture 

of Geographic

Urban Area 

tatistics Divisi

Ministry of Plan

ng and Warnin

eries No. 6, Dis

mological Socie

ress. 

15 

REX Report” 

er Risk A-8144)

197 051215

3), 

for 

tional 

ion, 

nning, 

ng 

aster 

ty of 

Page 199: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

CDMP (20City” Min

CDMP (20Corporatio

Centre for

Dialogue (

Cerveny, R

Weather S

Choudhur

Pacific RegBangkok 

Climate Ch

Environm

Dhaka 

Comprehe

Mahasen U

Comprehe

Managem

by Shamal

Comprehe

Ministry o

Deichman

Urban Nat

and Recov

Disaster an

Report” Ba

Disaster MManagem

Disaster MManagem

Situation R

  

009) “Report oistry of Food a

009) “Report oon City” Minis

r Policy Dialog

(CPD) under t

R. (2005) “Frea

Stories” Thund

ry, J.R. (1993) “gion, Meguro,

hange Cell (20

ent, Ministry o

ensive Disaste

Update” Issue

ensive Disasteent Informatio

l Zahid issued

ensive Disaste

of Food and Di

nn W., Ehrlich tural Risk” Euvery (GFDRR),

nd Emergency

angladesh Dis

Management Bent and Relief

Management Inent (2008) “CyReport issued 

n Earthquake and Disaster M

n Earthquake stry of Food a

gue (2004) “Ra

the programm

aks of the Stor

erʹs Mouth Pre

“Seismicity in  K. and Katay

009) “Crop ins

of Environmen

r Managemen

e 1, May 20, 20

r Managemen

on Centre (200d THU‐17‐MAY

r Managemen

isaster Manag

D., Small C., Zuropean Comm

, Institute for t

y Response (20

saster & Emerg

Bureau (DMB) f Division, Apr

nformation Ceyclonic Storm MON‐30‐OCT

 

Risk AssessmManagement, D

Vulnerability

nd Disaster M

apid Assessme

me Independen

rm: From Flyin

ess ISBN 1‐560

Bangladesh” yama, T. (edito

surance as a ris

nt and Forests

nt Program, M

013 

nt Program, M07) “Tropical SY‐2007:1400 

nt Programme 

gement, Gover

Zeug G. (2011)mission Joint Rthe Protection

004) Monsoon

gency Respon

(2010) “Natio

ril 2010 

entre, Disasterover North EaT‐2008:1200 

ment of Dhaka,Dhaka 

y Assessment oManagement, D

ent of Flood 20

nt Review of B

ng Cows to Ste

25‐801‐2 

in Seismic Risors), Proc. WSS

sk manageme

s, Government

inistry of Disa

inistry of FoodStorm “Akash”

(2009) “Time‐

rnment of Bang

) “Using High

Research Centrn and Security 

n Floods 2004 ‐

nse, DER Sub‐G

nal Plan for D

r Management

ast Bay ‐ Summ

Final Repo

, Chittagong a

of Dhaka, ChitDhaka 

004” conducte

angladesh’s D

ealing Thunde

sk Managemen

SI Workshop,

ent strategy in 

t of the People

aster Managem

d and Disaster”” Situation R

‐Predictable Fa

gladesh, June 

h Resolution Sare (JRC), Globof the Citizen

‐ Post‐Flood N

Group, Dhaka

Disaster Manag

t Bureau, Mini

mary of Tropic

ort on Capacity BuFinance in Ban

SF13-

and Sylhet City

ttagong and S

d by the Centr

Development (

er: The World

nt for Countripp 31‐76, Febr

Bangladesh” 

e’s Republic of

ment and Relie

r Managemen

Report No: 070

ault Modeling

2009 

atellite Data fobal Facility for n (IPSC), World

Needs Assessm

gement 2010‐2

istry of Food acal Storm “Ra

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

y Corporation

ylhet City 

re for Policy 

(IRBD) 

s Strangest Tr

ies of the Asia ruary 8 to 11, 

Department o

f Bangladesh, 

ef (2013) “Cyc

nt, Disaster 0517‐A1 prepa

g of Banglades

or IdentificatioDisaster Redud Bank (WB)

ment Summary

2015” Disaster

and Disaster shmi” Damag

er Risk A-8144)

198 051215

rue 

1993, 

of 

clone 

red 

sh” 

on of uction 

ge” 

Page 200: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

Disaster MManagem

Disaster MManagem

Disaster MManagem

Disaster Mon Monso

Dube, S. K

and Arabi

ECHO (20Internation

GB and SaOctober 20

ESDU, “M

FEMA (20

Finch J.D.,

http://www

Food and 

http://www

Frank, N.L

Meteorolog

Gardner, Jremoved, 

Geetha Na

Ghesquier

Washingto

Governme

Flood 2007

  

Management Inent (2008) “Su

Management Inent (2009) “Su

Management Inent (2007) “Su

Management Inon Depression

K., Rao, A. D., S

an Sea: The pr

009) “In‐depth nal agencies (Aave the Childre009 

Mean wind spe

11) “Multi‐haz

, and Dewan A

w.bangladesh

Agriculture O

w.apipnm.org

L., and Husain

gical Society, Vo

J. K., and KnopPoissonian?” B

agarajan, 1998

re, F. and Mah

on, DC. 

ent of Banglad

7 and Future A

nformation Ceummary of Cy

nformation Ceummary of Cy

nformation Ceummary of Cy

nformation Cen” Situation Re

Sinha, P. C., M

roblem and its

Recovery Nee

ActionAid, Coen‐UK) curren

eds over hills 

zard Loss Esti

A.M. (2004) “T

htornadoes.org

Organization (2

g/swlwpnr/rep

n, S.A. (1971) “

ol. 52, No 6, pp

poff, L. (1974) Bulletin of the S

; Microfinance

hul, O. (2010) “

desh (2007) “C

Action Plan” D

 

entre, Disasterclonic Storm “

entre, Disasterclonic Storm “

entre, Disasterclonic Storm “

entre, Ministry

eport issued M

Murty, T. S., an

s prediction,” M

eds Assessmen

oncern WorldW

ntly involved i

and other top

imation Metho

Tornados in Ba

g/climo/btorcli

2004) “Gatewa

ports/y_sa/z_b

“The deadliest

p. 438‐444 

“Is the sequenSeismological S

e in the wake o

“World Bank P

onsolidated D

Disaster Mana

r Management

“Bijli”” Situati

r Management

“AILA”” Situa

r Management

“SIDR”” Situa

y of Food and MON‐22‐OCT‐

nd Bahulayan,

Mausam 48, 2

nt of Cyclone Wide, DanChuin Aila respon

pography,” ESD

odology Flood

angladesh and

i0.htm 

ay to Land and

bd/bd.htm 

t tropical cyclo

nce of earthquSociety of Ameri

of Natural Dis

Policy Researc

Damage and Lo

gement Burea

Final Repo

t Bureau, Mini

ion Report issu

t Bureau, Mini

ation Report is

t Bureau, Mini

ation Report is

Disaster Man

‐2012:1450 

, N. (1997) “Sto

283–304 

Aila Affected urchAid, Musl

nse programm

DU 91043. 

d Model HAZU

d East India” 

d Water Inform

one in history?

uakes in southeica, 64(5), 1363

sasters: Challe

ch Working Pa

oss Assessmen

au, Dhaka 

ort on Capacity BuFinance in Ban

SF13-

istry of Food aued MON‐20‐

istry of Food assued SUN‐07

istry of Food asued SUN‐09‐

agement (2009

orm surge in t

Areas” CondlimAid, Islam

me funded by E

US‐MH 2.1” T

mation – Bang

?” Bulletin of th

ern California3‐1367 

enges and Opp

aper 5429” The

nt, Lessons Le

uilding for Disastengladesh (ADB TA

11049 FINAL REP 0

and Disaster APR‐2009:120

and Disaster 7‐JUN‐2009:163

and Disaster ‐DEC‐2007:180

9) “Situation R

the Bay of Ben

ucted by mic Relief, OxfaECHO, 25‐31 

Technical Man

gladesh” 

he American 

a, with aftersho

portunities 

e World Bank,

earnt from the 

er Risk A-8144)

199 051215

00 

30 

00 

Report 

ngal 

am‐

nual 

ocks 

Page 201: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

Governme

Disaster RInternation

Harper, B.Periods in

Hoek‐Smi

Lower IncDevelopm

Holland, G

Review, 10

Hough, Bihttp://pasa

Ian O’DonManageme

India Mete

in the Bay 

Available 

Internation

S.A. (2013)

Paper prep

Islam, T., aNatural Ha

Jain, M. K

Model Inc

Jaiswal, KGeological 

Joan ParkeDisasters 

Kaplan, J. Winds Aft

Khan, S.R.

Chittagon

  

ent of BangladRecovery and Rnal Developm

.A., Kepert J.Dn Tropical Cycl

t M. (1998) “Home Groups” 

ment and Co‐op

G. J. (1980) “An

8, 1212‐1218 

ilham, and Amadena.wr.usgs

nnell, ProVentint 

eorological De

of Bengal and

at: http://www

nal Centre for 

) “Probabilisti

pared for the G

and Peterson, azards 48(1), 11

., S. K. Mishra

orporating Sto

.S. and Wald, Survey Open‐F

er and Geetha 

and M. DeMa

ter Landfall” J

. (1991) “Cyclo

g Port Author

desh (2008) “CyReconstruction

ment Communi

D., Ginger J.D. lone Condition

Housing FinanPrepared for peratives and 

n Analytic Mo

mbraseyes (200s.gov/office/ho

ion Consortiu

epartment, Reg

d the Arabian 

w.imd.gov.in/s

Numerical M

ic Modelling o

Global Assessm

R.E. (2009) “C15‐135 

, P. S. Babu, K

orm Duration 

D.J. (2011) “RaFile Report 2011

Nagaranjan, 2

aria (1995) “A J. Appl. Meteoro

one Hazard in

rity Report, rev

 

yclone Sidr inn” A Report Prity with Finan

(2009) “Guidens” World Me

ce in BangladeThe GovernmUNDP/UNCH

odel of the Win

03) “The 1897 ough/assam.ht

m; March 200

gional Meteor

Sea 1891‐2007

section/nhac/d

Methods in Eng

of Natural Risk

ment Report o

Climatology of

K. Venugopal, 

and a Nonline

apid estimatio

1–1116, 47 p.

2000; Can Micr

Simple Empir

ol., 34, 2499‐25

n Bangladesh,”

vised by M. D

n Bangladesh –repared by thencial Support f

elines for Conveteorological O

esh ‐ Improvin

ment of BangladHS (Habitat), D

nd and Pressu

Assam Earthqtml 

9; Practice Rev

rological Centr

7” India Meteo

dynamic/eatla

gineering (CIM

ks at the Globa

on Disaster Ris

f landfalling tr

and V. P. Sing

ear Ia‐S Relati

on of the econo

rofinance Meet 

rical Model for512 

” in Backgroun

amen 

Final Repo

– Damage, Lose Government

from the Europ

verting Betwe

Organization (

ng Access to Hdesh Ministry

December 199

ure Profiles in 

quake” Fall Am

view onInnova

re (2008) “Trac

orological Dep

as.pdf 

MNE), ITEC S.

al Level: Globa

sk Reduction 2

ropical cyclone

gh (2006) “Enh

ion” J. Hydrol. 

omic conseque

the Poor’s Fina

r Predicting th

nd information

ort on Capacity BuFinance in Ban

SF13-

ss and Needs At of Bangladespean Commis

een Various W(WMO), July 2

Housing Finany of Local Gov8 

Hurricane” M

merican Geoph

ations in Financ

cks of Cyclone

partment, Chen

A.S., INGENI

al Risk Model

2013, March 2

es in Banglade

hanced Runoff

Eng, 11, 631‐6

ences of globa

ancial Needs in

he Decay of Tr

n on the Storm

uilding for Disastengladesh (ADB TA

21049 FINAL REP 0

Assessment fosh Assisted byssion, April 20

Wind Averagin2009 

nce by Middle ernment, Rura

Monthly Weathe

hysical Union

ce for Disaster R

es and Depres

nnai, India. 

AR LTDA., EA

l” Background

2013 

esh 1877–2003

f Curve Numb

635 

al earthquakes

n Times of Natu

ropical Cyclon

m Surge Mode

er Risk A-8144)

200 051215

or y the 08 

ng 

and al 

er 

n, 

Risk 

ssions 

AI 

3” 

ber 

s” U.S. 

ural 

ne 

elling, 

Page 202: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

Krayer, W

73, 613‐617

Krishna V

Krishna S.

Local GovLocal Gov

Majumder

of Early Re

Martin, S. in India fr

Mishra, D

Indian Sea

Mooley, D

Coast Aro

National C

Available 

National ODerived frhttp://ngd

National W

Water Res

Nina Naya

Ono, Y. (20

Banglades

Paul, B.K. Introducin

Hazards Rat Boulder

Pramanik,

  

W. R., and R. D.

asta and Fred

 Vatsa; 2000; M

vernment and Evernment and E

r, S. (2013) “Thesponse and R

and Szeliga, Wom 1636 to 20

. K., and G. R.

as” Mausam, 27

D. A., and C. M

und the Bay o

Center for Atmos

at: http://ncar

Oceanic and Arom Satellite Dc.noaa.gov/eo

Water Manage

sources Planni

ar and M Faisa

001) “Design a

sh” An unpubl

and Bhuiyan,ng Tornado FoResearch and Ar 

, M.A.H. (1994

. Marshall (199

erick Krimgol

Microfinance fo

Engineering DEngineering D

he Economics Resilience (TEE

W. (2010) “Elec09” Bulletin o

 Gupta (1976) 

7, 285‐290 

M. Mohile (1983

of Bengal” Mau

spheric Researc

.ucar.edu/hom

Atmospheric AData” National

og/dmsp/down

ement Plan Pro

ng Organisati

al, 1999; Microf

and Adoption

lished Ph.D. D

 R.H. (2004)  Torecasting andApplications In

4)  May Cyclon

 

92) “Gust Fact

ld,; 2000; Finan

or Disaster Risk

Department (2Department (L

of Early RespoERR) Series  

ctronic Supplef the Seismolo

“Estimation o

3) “A Study of

usam, 34, 139–

ch (NCAR) 201

me 

Administration

l Geophysical nload_gdp.htm

oject (2000) “D

ion, Ministry o

ofinance Surviv

n of Household

Dissertation, K

The April 2004d Warning Systnformation Ce

ne of Banglad

tors Applied to

ncing Disaster M

k Management i

010) “BangladLGED) of the G

onse and Resil

ement to a Catogical Society o

of Maximum S

f Cyclonic Sto

152 

2. University C

n (2010) “An EData Center, ml 

Draft Developm

of Water Resou

ves Bangladesh F

d Tornado She

Kent State Univ

4 Tornado in Ntems  Quick Renter, Institute

esh  Seisan‐Ke

Final Repo

o Hurricane W

Mitigation for t

in Bangladesh

desh: 2010 DivGovernment of

lience: Bangla

talog of Felt Inof America 

Speed in Tropi

orms Incident o

Corporation f

stimate of Gro

ment Strategy

urces 

Floods 

elters to Mitiga

versity, Kent, O

North‐Central Response Resee of Behaviora

enkyu, Vol 46

ort on Capacity BuFinance in Ban

SF13-

Winds” Bull. A

the Poor 

vision Boundarf Bangladesh  

adesh Country

ntensity Data f

ical Cyclones 

on the Differe

for Atmospher

oss Domestic P

y” Vol. 2: Main

ate the Tornad

Ohio 

 Bangladesh: Aearch Report 1al Science, Uni

6, No 10 

uilding for Disastengladesh (ADB TA

21049 FINAL REP 0

Amer. Meteor. S

ries” GIS unit 

y Study” Econo

for 570 Earthq

Occurring in 

nt Sections of 

ric Research. 

Product (GDP

n Report, Dhak

do Hazard in 

A Case for 69, Natural iversity of Col

er Risk A-8144)

201 051215

Soc., 

of 

omics 

quakes 

the 

P) 

ka: 

lorado 

Page 203: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

Prashanta 

Capital Ma

Rahman, MProceedin

Challenge

Shibpur, In

Rainfall Ar

Administr

Reasenber

Research, 9

Sabri S.A. 

Engg Thes

Sadat, M.R

Journal of C

Sarker, J.K

a repeat of

Scordilis, ESeismology

Shrestha, Minfluence i1998, 329 p

Simui, E., 

Singh, O. Pthe North 

Singh, O. PNorth Ind

Singh, O. Pthe Bay of Banglades

Sommer Adisaster as

  

K Banarjee an

arket 

M., Hossain, Ags of the Inters, CENeM‐200ndia,  Vol. IV,

rchives: 3‐hourl

ration (NASA)

rg, P. (1985) “S90, 5479‐5495 

(2001) “Earthq

sis, BUET, Dha

R., Huq, M.S., Civil Engineerin

K., Ansary, M.A

f the 1918 Srim

E. M. (2006) “Ey, 10(2), 225‐23

M.L. (ed) (199in the region” pp. 

and R. H. Scan

P., A T. M. KaIndian Ocean

P., A. T. M. Khian Ocean,” M

P., and T. M. ABengal and th

sh. 

A., and Mosley

ssessment” La

nd Md. Mohiu

A., and Bhattacrnational Conf07150, year an pp. 2713‐2719

ly TRMM and 

). Available at

Second‐order m

quake intensit

aka. 

Ansary M.A. ng (IEB), 38(2)

A., Islam, M.R

mangal earthqu

Empirical glob36 

8) “The impac

SMRC No. 1, 

nlon 1996, Win

hn, S. and Rahn?” Current Sci

han, and S. RaMeteorology an

A. Khan (1999)he Arabian Sea

y, W.H. (1972) ncet 1(7759):1

 

uddin Siddiqui

charya, A.K. (2ference on Civnniversary con9 

Other Rainfall 

: http://disc2.n

moment of cen

ty‐attenuation

(2010) Seismic

): 159‐172 

R., and Safiulla

uake,” Environ

bal relations co

ct of tropical cySAARC Meteo

nd Effects on S

hman 2001, “Hience, 80, 575‐

ahman 2000, “Cnd Atmospher

) “Changes in a,” SAARC M

“East Bengal 029–1036 

i, 2010; Investm

2008) “Flood Mvil Engineeringnference at Ben

Estimate (3B42

nascom.nasa.g

ntral Californi

n relationship f

c Vulnerability

ah, A.M.M. (20

nmental Econom

onverting M S

yclones on theorological Res

Structures. Joh

Has the Freque580. 

Changes in theric Physics, 75,

the Frequencieteorological R

cyclone of No

Final Repo

ment Climate in

Management ig in the New Mngal Engineeri

2 V6) 2012. Na

gov/Giovanni/

ia seismicity, 1

for Bangladesh

y Assessment 

010) “Potential

mics, Volume 

S and m b to m

e coastal regiosearch Centre,

hn Wiley & So

ency of Intense

e Frequency o, 11‐20.  

ies of CyclonicResearch Cent

ovember 1970. 

ort on Capacity BuFinance in Ban

SF13-

n Bangladesh: E

in the flood plMillennium: Oing and Scienc

ational Aerona

/tovas/TRMM_

1969‐82” Journ

h and its surro

of Buildings o

l losses for Syl

1, Issue 1, 201

moment magni

ons of SAARC  DHA, Bangla

ons, 688. 

e Tropical Cyc

of Tropical Cyc

c Storms and Dtre (SMRC), R

Epidemiologi

uilding for Disastengladesh (ADB TA

21049 FINAL REP 0

Enhanced Role o

lain of BangladOpportunities ce University, 

autics and Spa

_V6.3B42.shtm

nal of Geophysic

ounding regio

of Dhaka City”

lhet, Banglade

itude” Journal 

countries andadesh, October

clones Increas

clones over th

Depressions oReport 2, Dhak

ical approach 

er Risk A-8144)

202 051215

of the 

desh” and 

ace 

ml 

cal 

on” M. 

” 

esh in 

of 

d their r 

sed in 

he 

over ka, 

to 

Page 204: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

Srivastav, Their Inten

Sujata, K. MUnion, 7, 5

Sultana, S.Banglades

Syeda Seem

Swiss Age2010‐2012”

The GuardSaturday 2

Thiagu RaImplementa

Uddin, N.

Knowledge,

Unanwa, Cfor Buildin

United Na

Sustainabl

Warren BrFloods, Imp

World BanBank for R

World BanInland Mo

Environm

World BanAssessmen

Bank to th

World Ho

M.,  ReporEngineerin

  

A. K., K. C. Sinsification Ov

M, U. V. Bhid53‐58. 

., Rahman, U.,sh” ARPN Jou

ma Mahbub, 2

ency for Devel” Directorate o

dian (2013) “B22 June 2013 

anganathan; Mation 

 (2008) “A stu, Vol. 7(3), July

C. O., J. R. McD

ngs,” J. Wind E

ations Environle Social Hous

rown and Geeplications for th

nk (2006) “Wh

Reconstruction

nk (2010) “Climonsoon Flood Dent and Energ

nk and the Asint and Proposhe Governmen

using Encyclort 91, Earthquang (IAEE) 

inha Ray, and ver Indian Sea,

e 2003, “A Stu

, and Saika, U.rnal of Earth S

2014; Institutio

opment and Cof Humanitari

angladeshi fac

Microfinance In

dy on the trady 2008, pp. 494

Donald, K. C. Eng. Ind. Aerod

nment Programsing Initiative 

tha Nagarajan

he Microfinance

here is the Wea

n and Develop

mate ProofingDamage” Poligy Team, Nove

ian Developmsed Recovery Pnt of Banglades

opedia (2003) “ake Engineerin

 

U. S. De 2000,,” Mausam, 51

udy of Decreas

. (2013) “EarthSciences, Vol. 

onal Sharehold

Cooperation (2ian Aid and SH

ctory deaths sp

nsight 2007; In

ditional housin4‐500 

Mehta, and Ddyn., 84, 119‐14

mme (2013) “S(SUSHI) 

n; 2000; Banglae Industry 

alth of Nations

pment, The Wo

g Infrastructureicy Research Wember 2010 

ment Bank (200Program” A Josh, January 5, 

“Housing Repng Research In

, “Trends in th1, 113‐118.  

sing Storm Fre

hquake, Cause2, No. 2, June 

ders in Bangla

2010) “DisasterHA 

park action am

nsurance Agains

ng technology

D. A. Smith 20049. 

Scoping Study 

adeshi Experienc

s? Measuring orld Bank, Wa

e in BangladesWorking Paper

05) “2004 Floodoint Report by2005 

port ‐ Single‐stnstitute (EERI)

Final Repo

he Frequency o

equency Over 

e Susceptibility2013 

adesh 

r Risk Reducti

mong high‐stre

st Disaster: Inn

y of Bangladesh

00, “The Deve

‐ The state of 

ce in Adapting 

Capital for theashington D.C

sh ‐ The Incremr 5469, Develo

ds in Bangladey the World Ba

tory brick mas

), Internationa

ort on Capacity BuFinance in Ban

SF13-

of Cyclonic Di

Bay of Bengal

y and Risk Mi

ion Programm

eet clothing ch

novating Design

h” Indian Journ

elopment of W

social housing

Financial Serv

e 21st Century. 

mental Cost oopment Resear

esh ‐ Damage ank and the As

sonry house (Eal Association 

uilding for Disastengladesh (ADB TA

21049 FINAL REP 0

isturbances an

l,” J. Ind. Geop

tigation in 

me for Banglad

hains” Sarah B

n and 

nal of Tradition

Wind Damage B

g in Banglades

vices to Cope wi

y” The Interna

of Limiting Futrch Group, 

and Needs sian Developm

EMSB1)” Ansafor Earthquak

er Risk A-8144)

203 051215

nd 

phys. 

desh 

Butler, 

nal 

Bands 

sh” 

ith 

ational 

ture 

ment 

ary ke 

Page 205: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

World Ho

J., Hoque NAssociatio

WorldPop

http://www

Yamane, Y

I. Climatol

 

  

using EncycloN., Ansary M.

on for Earthqu

p (2013) Griddew.worldpop.o

Y., Hayashi, T.

logy” Atmosph

opedia (2007) “., Report 143, Eake Engineeri

ed populationorg.uk/ 

., Dewan, A.M

heric Research 9

 

 

“Housing RepEarthquake Ening (IAEE) 

n data for Bang

M., and Akter, F

95(4), 400‐406

port – Mud Ho

ngineering Re

gladesh, Alpha

F. (2010) “Seve

Final Repo

ouse of Banglasearch Institut

a Version, Sep

ere local conv

ort on Capacity BuFinance in Ban

SF13-

adesh” Das A.,te (EERI), Inte

ptember 2013, 

ective storms 

uilding for Disastengladesh (ADB TA

21049 FINAL REP 0

, Islam M.S., Aernational 

in Bangladesh

er Risk A-8144)

204 051215

Alam 

h: Part 

Page 206: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

11 Ap

 

1.0 The

8th Man

atte

part

 2.0 The

Proj

who

wor

 

3.0 Mr. pres

Md

Dep

  

Prese

 4.0 The

Foca

was

pres

the busi

sug

of fi 

5.0 Tea

proj

The

DFR

asse

  

pendix

e Interim work

December,  2nagement andnded  by  repticipants can b

e meeting startject  and  Joint o attended therkshop. 

Bruno Carrassented the ope. Golam Most

partment of Di

entation 

e  technical sesal Point, Asians presented bysented the dirconsequences

iness  and  gogested three kiscal risk, stren

m  Leader, Drject  summary

e disaster profiR  can minimi

essing  it and k

Capacity Bu

Meet

Ven

kshop on Capa2014.  The  chid Relief of  theresentatives  fbe found below

ted with the wSecretary, M

e meeting. The

sco, Director, ening remarks

tofa, Additionisaster Manag

sion started wn Developmen

y Charlotte Berect and indires for governme

overnance  levekey points to thngthen financi

r. Akshay Gu. He  introducile for Bangladize  the GDP  lknowing how

 

uilding for Di

TA‐81

ting Minutes 

Date: 8t

nue: Conferen

acity Buildingief  guest  wa

e Government

from  differenw).  

welcome addrMinistry  of Disen he briefed a

Public Manag

s. The inaugunal Secretary, Mement (DDM)

with  the brief nt Bank. “Theenson from ADect losses and ent for risk finel.  Sovereign he governmen

ial planning fo

upta, AIR Wo

ced primary  sdesh was presloss. He  also 

w much should

saster Risk Fi

144 (42249‐013

of the “Interimth December 2

ce Room, CIR

g for Disaster s  Mr.  Mesba

t of  the Peoplnt  governmen

ress by Mr. Sasaster Manage

about the over

gement, Finanral session wa

MoDMR, Mr. )  and chief gu

on  the projec case for EnhaDB, Manila. Shcritical role o

nancing, identiinstruments 

nt‐anticipate thor disaster. 

rldwide  introteps  for develsented and a cmentioned  th

d be  transferre

Final Repo

inance in Bang

3) 

m Workshop”

2014 

RDAP, Dhaka

Risk Finance ah  ul  Alam, le’s Republic ont  and  non‐go

atya Brata Sahement  and Rerall objectives

ncial Sector, aas ended folloMohammed 

uest Mr. Mesba

ct backgroundanced Financihe Pointed ouof disaster riskified some riskfor  disaster he disaster ris

oduced  the  teloping DRF  (Dcomparative anhat  it  is  veryed  to  the mar

ort on Capacity BuFinance in Ban

SF13-

gladesh 

” 

 

in BangladeshSecretary,  Mof Bangladeshovernment  ag

ha the Project Delief. He  thanks of the project

and Trade Divowing the speeAbdul Wazed

ah ul Alam Se

d by Ms. Mayu

al Managemen

ut the GDP losk financing. Shk financing oprisk  were  al

sk, identificatio

am members Disaster Risk nalysis was shy  important  torket. A brief d

uilding for Disastengladesh (ADB TA

21049 FINAL REP 0

h (TA‐8144) heMinistry  of  Dih. The meetin

gencies  (the  l

Director of theked  all partict and the aim 

vision, ADB Mech of speciald, Director Gecretary, MoDM

umi Ozaki, Mnt of Disaster sses due to dishe also empha

ptions at houseso  mentioned

on the manage

and  presenteFinance)  solu

howed that hoo  quantify  thediscussion wa

er Risk A-8144)

205 051215

 

eld on isaster ng was list  of 

e DRF ipants of the 

Manila  guest eneral, MR. 

Mission Risk” saster, asized ehold, d.  She ement 

ed  the utions. ow the e  risk, s held 

Page 207: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

afte

was

 6.0 In h

fina

shou

 7.0 Dr. 

prof

mod

Eng

prep

surg

 8.0 Fun

opti

betw

Ban

 9.0 Insu

exp

He eof m 

10.0 In thdisc

fina

 Discu

 

11.0 Afte

aske

that

man

add

 12.0 Mr. 

Cro

utili

 13.0 Mr 

fina

forg

ban

from

  

r this session s discussed. 

his presentatioancing. He me

uld be transfe

Ivan Ricardo file of Bangladdel was run fogineering and pared. Damag

ge risk was pr

nding gap analions  for  reduween  2000  anngladesh. 

urance aspect lained that mo

emphasizes thmicrofinance in

he last sessioncussed about  tancing in Bang

ussion 

er the session ed about who t a  fundament

ny countries aded that we can

Muslehuddin

re  taka  for diized. 

Asif  Iqbal, Dancing. Mr. Mgive  loans of  tnks, governme

m all the sector

and issues lik

on Dr. Simon Yentioned  that rred to the ma

Gomez, AIR Wdesh and men

or  tropical cycFinancing. Thge  estimation esented. 

lysis was presucing  fundingd  2014 were 

of the risk finoney market ohat insurance fnstitutions we

n Dr. Simon Ythe biggest fugladesh. 

a general discwill pay the ital pricing  rulare already payn use the reser

n Ahmed fromsaster  loss. Bu

Deputy DirectoMuslehuddin Athe victims ofent and donorrs to participa

 

ke which mode

Young discussif  the  risk  caarket. 

Worldwide prntioned that thclone as pilot he  local Intenswas done  rel

sented by Dr. gap  were  dmentioned. H

nancing projector capital mark

from the inforere also discuss

oung presenteunding gaps, o

cussion was hinsurance premle  can be  set ying more tharve from socia

m ADPC ment

ut  if  the gover

or, BangladeshAhmed  from f disaster. He r–all are  sufferate in paying th

el was used, w

sed about the an  be  quantifi

resented risk mhe model was

example. Thesity calculationlating  to  the  i

Carlos Ramire

iscussed.  TheHe  also presen

t was coveredket does not prmal sectors shsed in his sess

ed three case soptions for Ba

held and particmium and howto pay  the mi

an the averageal safety net pr

tioned that thernment can ar

h Bank  askedADPC  said  talso mention

ring  from  thehe premium fo

Final Repo

what is the fun

concepts and ied  then  it wi

modeling for s focused on the simulation wn and countryintensity of  th

ez, AIR World

e  funding  gapnted  the pros 

d by Mr. Musle

provide any sohould be conssion. 

studies on Me

angladesh and

cipants providw much they winimum amou

e loss as risk programs for di

e government rrange a risk 

d  about  the  rothat  the  comm

ned  that micro

e  impact of a or risk fund. 

ort on Capacity BuFinance in Ban

SF13-

nding gap and

development

ill  be  easier  to

hazard. He dehe catastrophiwas done on  ty specific expohe hazard  and

dwide. Fundinp  analysis  of and  cons of 

ehuddin Ahmolutions in termidered in the D

exico, Caribbed what might 

ded their feedwill pay. Dr. Sunt. He also gpremium. Oneisaster risk pre

 is already pafund  for disa

ole  of  comme

mercial  banksofinance  institdisaster. So  it

uilding for Disastengladesh (ADB TA

21049 FINAL REP 0

d disaster freq

ts of options foo  know  how 

escribed the hic disaster. Ththree stage‐ haosure databasd  analysis  of 

ng data sourcedisasters  occex‐post optio

med from ADPms of risk finaDRF solutions

an and Turkeybe possible fo

back. QuestioSimon Young gave  some exae of the particemium.  

aying more thaaster  it will be

rcial  banks  fos  can  reschedututions,  comm

t can be consi

er Risk A-8144)

206 051215

quency 

or risk much 

hazard he risk azard, se was storm 

es and curred ns  for 

PC. He ncing. s. Role 

y. The or risk 

on was stated ample ipants 

an 100 e more 

or  risk ule  or mercial idered 

Page 208: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

 14.0 The

She of B

 Decis

 15.0 Inte

disc

best

 16.0 Dra

feed

 17.0 Trai

cons

 18.0 Afte

it in

 

  

e plan of ADB replied that A

Bangladesh AD

sion 

erim  Report  wcussion with ct suited in the 

aft Final Repodback, final rep

ining  and  capsultation with

er the complet

n their website

to back up thADB cannot pDB can help to

will  be  submi

consultants thecontext of Ban

rt will be  subport will be su

pacity  buildinh the MoDMR 

tion of the proe to make it acc

 

 

he insurance foprovide fundino find the optim

itted  (first  we

e government ngladesh and 

bmitted  (first wubmitted durin

ng  part  under and ADB.   

oject the consucessible to all.

or the Bangladng for ever. Bumum solution

eek  of  Januarwill take deciwho would pa

week of Marc

ng last week o

the  project w

ultants will han

 

Final Repo

desh governmut with the con for disaster ri

ry  2015)  to  thision about wh

ay the premiu

ch 2015)  to  thof March 2015.

will  be  accom

nd over the d

ort on Capacity BuFinance in Ban

SF13-

ment was askedollaboration wisk financing. 

he  governme

hich risk finanum for risk ins

he governmen

mplished  by  F

ata to ADB an

uilding for Disastengladesh (ADB TA

21049 FINAL REP 0

d to Mayumi Owith the govern

nt  and  after ncing option wurance. 

nt and based o

ebruary  2015 

nd ADB will u

er Risk A-8144)

207 051215

Ozaki. nment 

detail will be 

on  the 

upon 

upload 

Page 209: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

Sl. 

10 

11 

12 

13 

14 

15 

16 

17 

18 

19 

20 

21 

22 

23 

  

No.  Name of P

Mesbah ul 

Golam Mo

Md. Abdul

Mr. Satya B

Martin D. J

Charlotte B

Carlos Ram

 

Akshay Gu

Dr. Peerana

 

Ivan Gome

Mosleh Ah

Mayumi O

Mohamme

Dr. V. Hari

 

Md. Anisur

 

Abdul Azim

Netai Dey 

Md. Abdur

Shamim A

Carsten Sch

Dr. Alamg

Naima Beg

Md. Manir

Participant 

Alam 

stafa 

l Wazed 

Brata Saha 

Jensen 

Benson 

mirez 

upta 

an Towashiraporn

ez 

hmed 

Ozaki 

ed Ahsan Ullah 

Prasad

Rahman

m Chowdhury 

Sarker 

r Rahman 

hmed Choudhury 

hwensen 

ir Safiul Alam 

gum 

rul Haq 

 

List ofName of A

Secretary, M

Manageme

Additional

DG, DDM

Joint Secre

ADB 

ADB 

AIR  World

AIR  World

ADPC 

AIR  World

AIR  World

ADB 

ADPC 

ADPC 

ADPC 

Joint Chief

AD (GIS), D

CA Firm 

FAO, Natio

FAO, Int. C

Dept. of liv

MoDMR 

MoDMR 

f ParticipanAgency and Design

Ministry of Disaste

ent and Relief 

l Secretary, MoDM

tary, MoDMR 

dwide 

dwide 

dwide 

dwide 

f, Planning Commis

DDM 

onal Consultant 

Consultant 

ve stocks, Director

Final Repo

nts nation Mob

er  Mob

e‐ma

MR Mob

e‐ma

Mob

e‐ma

Mob

e‐ma

Mob

e‐ma

Mob

e‐ma

Mob

e‐ma

Mob

e‐ma

Mob

e‐ma

Mob

e‐ma

Mob

e‐ma

Mob

e‐ma

Mob

e‐ma

Mob

e‐ma

Mob

e‐ma

ssion Mob

e‐ma

Mob

e‐ma

Mob

e‐ma

Mob

e‐ma

Mob

e‐ma

Mob

e‐ma

Mob

e‐ma

Mob

e‐ma

ort on Capacity BuFinance in Ban

SF13-

bile and e‐mail Ad

bile: 

ail: 

bile: 

ail: 

bile: 

ail: 

bile: 

ail: 

bile: 

ail: 

bile: 

ail: 

bile: 

ail: 

bile: 

ail: 

bile: 

ail: peeranan@adpc

bile: 

ail:igomez@airworl

bile: 

ail:mosleh_ahmed@

bile: 

ail:[email protected]

bile: 0194531873 

ail: [email protected]

bile: 01964268260 

ail: [email protected] 

bile: 01711443485 

ail: [email protected]

bile: 01714299937 

ail: azimchow2000@

bile: 01552331433 

ail:[email protected]

bile: 01726094618 

ail: 

bile: 01970921085 

ail: 

bile: +4525334354 

ail:[email protected]

bile: 01712722840 

ail: 

bile: 01741229453 

ail: naimauq@yaho

bile: 01914948948 

ail: 

uilding for Disastengladesh (ADB TA

21049 FINAL REP 0

ddress 

c.net 

ldwide.com 

@yahoo.com 

t

@yahoo.com 

oo.com 

er Risk A-8144)

208 051215

Page 210: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

Sl. 

24 

25 

26 

27 

28 

29 

30 

31 

32 

33 

34 

35 

36 

37 

38 

39 

40 

41 

42 

43 

44 

45 

46 

  

No.  Name of P

Sk. Mizanu

Muhamme

Sultan‐ul‐a

Bruno Carr

Hiranya M

Manoj M. M

Asif Iqbal 

Md. Mahbu

Md. Hasan

Md. Golam

Md. Ataur 

Md. Harun

Rashada A

Swarna Ka

Staven 

Salma Jaha

Md. Monir

Shyamal C

Partha Prat

Md. Majed

Md. Rasha

Md. Mahbu

Maria Haq

Participant 

ur Rahman 

ed Mazedul Haque

abedine molla 

rasco Garcia 

Mukhopadhay 

Mitra 

ubul Alam Majumd

nuzzaman 

m Mortaza 

Rahman 

n Or Rashid 

Akhter 

azi 

an 

ruzzaman 

Chendrashil 

tim Deb 

dur Rahman 

adul Alam 

ub Alam 

que 

 

Name of A

MoDMR 

 Micro Cred

Deputy Di

IDRA, Mem

Director, A

ADB 

Joint SecreRelief 

Bangladesh

der  Senior Ass

Sr. Asst. Ch

ADB 

SIRDAP 

BFID 

Deputy Sec

Disaster Ri

Bank 

DRM Anal

MoDMR 

MoDMR 

Account O

Joint Secre

Assistant C

Com. Oper

MoDMR 

ADPC 

Agency and Design

dit Regulatory Auth

rector 

mber 

ADB 

tary, M/O Director

h Bank, Deputy Dir

tt. Secretary, MoDM

hief, MoDMR 

cretary, M/O Agric

isk Mgmt Specialis

lyst, World Bank 

Office (CBDRF) 

tary, MoDMR 

Chief, MoDMR, 

r, MoDMR 

Final Repo

nation Mob

Mob

e‐ma

thority,  Mob

e‐ma

Mob

e‐ma

Mob

e‐ma

Mob

e‐ma

r MGMT&  Mob

e‐ma

rector Mob

e‐ma

MR Mob

e‐ma

Mob

e‐ma

Mob

e‐ma

Mob

e‐ma

Mob

e‐ma

culture Mob

e‐ma

st, World Mob

 

e‐ma

Mob

e‐ma

Mob

e‐ma

Mob

e‐ma

Mob

e‐ma

Mob

e‐ma

Mob

e‐ma

Mob

e‐ma

Mob

e‐ma

Mob

e‐ma

 

ort on Capacity BuFinance in Ban

SF13-

bile and e‐mail Ad

bile: 01552331191 

ail: mizan61@gmail

bile: 01711948253 

ail: mmazedh@gma

bile: 01713190796 

ail: sultan7864@hot

bile: 

ail: bcarrasco @adb

bile: 

ail: hmukhopadhay

bile: 

ail: mmmitra02@gm

bile: 01712532158 

ail:[email protected]

bile: 01767493115 

ail: shovon2907@ya

bile: 01712620744 

ail: 

bile: 01715622366 

ail: 

bile: 01718523742 

ail: 

bile: 01715025566 

ail: hrashid68@yah

bile: 01715078026 

ail: 

bile: 

ail:skazi@worldban

bile: 

ail: skubinyi@world

bile: 01715180192 

ail: jahansalma60@y

bile: 01710358758 

ail:zamanmodmr@y

bile: 01766312382 

ail: amitsen14098@g

bile: 01711434105 

ail:ppdeb4835@gm

bile: 01712980413 

ail:majed_ju@yahoo

bile: 01728620056 

ail: 

bile: 01920531645 

ail: 

bile: 01717570388 

ail:[email protected]

uilding for Disastengladesh (ADB TA

21049 FINAL REP 0

ddress 

l.com 

ail.com 

tmail.com 

b.org 

y @adb.ord 

mail.com 

g.bd 

ahoo.com 

oo.com 

nk.org 

dbank.or 

yahoo.com 

yahoo.com 

gmail.com 

ail.com 

o.com 

er Risk A-8144)

209 051215

Page 211: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

Sl. 

47 

48 

49 

50 

51 

52 

53 

54 

55 

56 

57 

58 

59 

60 

61 

62 

63 

64 

65 

66 

 

  

No.  Name of P

Syeda Bush

Dr. Md. Sa

ABM Hass

Md. Mokte

Mohamme

Farazi 

Satya Brata

AM Nasir U

Mahmuda 

Sobiah Bec

Tanzeba A

Md. Sultan

Moniruzza

Md. Shafiu

Md. Reaz U

Khandoker

Md. Hasan

Nasima Pa

Kazi Sharif

Mohamme

Dr. V. Hari

 

Participant 

hra Binte Amin 

ajidur Rahman 

sain Ahmed 

er Hossain 

ed Tasharuf Hossai

a Saha 

Uddin 

Masum 

cker 

A. Haq 

nul Islam 

aman Khan 

ur Rahman 

Uddin Khan 

r Golam Twahod 

n Faisal 

arvin 

f Ahmed 

ed Ahsan Ullah 

Prasad

 

Name of A

ADPC 

BRAC Uni

Shafiq Miz

Chartered 

Ref. Soc‐Ge

n Deputy Ch

Joint Secre

Deputy Ma

ActionAid 

Assistant C

Munich Cl

UNU‐EHS

Head, Disa

climate cha

Programm

Director, C

Administra

Lecturer, B

ADPC 

ADPC 

ADPC 

CIRDAP 

ADPC 

ADPC 

Agency and Design

versity 

zan Rahman & Ang

Accountnt 

en 

hief, MoDMR and D

tary, MoDMR 

anager, CC&DM, 

Bangladesh 

Chief, MOFL 

limate Insurance 

 

aster Environment 

ange, BRAC 

me Manager, DECC,

C3ER, BRAC Unive

ation Office, MoDM

BRAC University 

Final Repo

nation Mob

Mob

e‐ma

Mob

e‐ma

gustine Mob

e‐

mail

Mob

e‐ma

D.P.D. Mob

e‐ma

Mob

e‐ma

Mob

e‐ma

 

Mob

e‐ma

Mob

e‐ma

and  Mob

e‐ma

, BRAC Mob

e‐ma

ersity Mob

e‐ma

MR Mob

e‐ma

Mob

e‐ma

Mob

e‐ma

 

Mob

e‐ma

 

Mob

e‐ma

Mob

e‐ma

Mob

e‐ma

Mob

e‐ma

ort on Capacity BuFinance in Ban

SF13-

bile and e‐mail Ad

bile: 01911321394 

ail:syeda.bushra28@

bile: 01921487934 

ail: sajid_ra@yahoo

bile: 01966534389 

l:Ahmed.Hussain78

bile: 01677040227 

ail: 

bile: 01733954743 

ail: farazi_1965@ya

bile: 

ail: sbs.bipul@gmai

bile: 01711205260 

ail: nasir.uddin@ac

bile: 01716827775 

ail: masum.ridi@gm

bile: 01733390977 

ail:[email protected]

bile: 01713063258 

ail: tanzeba@hotma

bile: 01964298920 

ail: sultanul.islam@

bile: 01816471766 

ail: moniruzzaman

bile: 01937859672 

ail: 

bile: 01712945400 

ail: reaz@ bracu.ac.

bile: 01711112374 

ail:[email protected]

bile: 01678138035 

ail:[email protected] 

bile: 01713081501 

ail:nparvin2000@gm

bile: 01943779188 

ail: 

bile: 0194531873 

ail: [email protected]

bile: 01964268260 

ail: [email protected] 

uilding for Disastengladesh (ADB TA

21049 FINAL REP 0

ddress 

@gmail.com 

o.com 

[email protected] 

ahoo.com 

il.com 

ctionaid.org 

mail.com 

u.edu 

ail.com 

@brac.net 

n@ bracu.ac.bd 

bd 

et 

mail.com 

er Risk A-8144)

210 051215

Page 212: Technical Assistance Consultant’s Report · Figure 2. S Summary Figure 3. S Figure 4. Y Figure 5. M Figure 6. N 2008 TC R Figure 7. N Sidr, 2008 Figure 8. S Figure 9. M Figure 10

 

 

  

About

AIR World

software a

the risk fro

reinsuranc

manageme

agricultura

companies

more infor

About

As a leadin

realization

Since its in

promoting

manageme

Institute o

Office of th

Humanita

provided b

internation

conceived 

region in f

  

t AIR Wo

dwide Corpor

and consulting

om natural cat

ce, financial, co

ent, insurance

al risk manage

s and is headq

rmation, pleas

t Asian

ng regional re

n of disaster re

nception in 198

g disaster awa

ent and mitiga

f Technology 

he United Nat

arian Affairs) a

by the United 

nal assistance 

for the center

formulating th

orldwide

ration (AIR) is 

g services. AIR

tastrophes and

orporate and g

e‐linked securi

ement, and pr

quartered in Bo

se visit www.a

Disaster

source center,

eduction for sa

86, ADPC has 

reness and the

ation policies. 

after a feasibil

tions Disaster 

and the World

Nations Deve

to strengthen 

r was mandate

heir policies an

 

e Corpo

the scientific l

R founded the 

d terrorism in 

government cl

ities, detailed s

roperty replace

oston with add

air‐worldwide

r Prepar

, Asian Disaste

afer communit

been recogniz

e developmen

ADPC was or

lity study cond

Relief Coordin

d Meteorologic

elopment Prog

their national

ed by an expre

nd developing

oration

leader and mo

catastrophe m

more than 50 

lients rely on A

site‐specific w

ement cost val

ditional office

e.com.

redness

er Preparedne

ties and sustai

zed as the maj

nt of local capa

riginally estab

ducted jointly

nator (current

cal Organizatio

gram in respon

l disaster man

essed need to a

g their capabili

Final Repo

ost respected p

modeling indu

countries. Mo

AIR software 

wind and seism

luation. AIR is

es in North Am

s Center

ess Center (AD

inable develop

jor independe

abilities to fost

blished as an o

y by two agenc

t the UN Offic

on in January 

nse to requests

nagement syste

assist countrie

ities in all aspe

ort on Capacity BuFinance in Ban

SF13-

provider of ris

ustry in 1987 an

ore than 400 in

and services f

mic engineerin

s a member of

merica, Europe

(ADPC)

DPC) works to

pment in Asia

ent center in th

ter institutiona

outreach center

cies of the Uni

ce for the Coor

1986. Funding

s from countri

ems. Thus, the

es of the Asia a

ects of disaste

uilding for Disastengladesh (ADB TA

21049 FINAL REP 0

sk modeling 

nd today mod

nsurance, 

for catastrophe

ng analyses, 

f the ISO famil

e and Asia. Fo

)

owards the 

a and the Pacif

he region for 

alized disaster

r of the Asian 

ited Nations, t

rdination of 

g for the study

ies in the regio

e initial role 

and the Pacific

er managemen

er Risk A-8144)

211 051215

dels 

e risk 

ly of 

or 

fic. 

the 

y was 

on for 

nt.