team china lift 1 concerns - alta vista...

24
9/21/2009 1 Team China Lift 1 Concerns 1 September 22, 2009 VT Acceptable Sec. 6.26.1, AWS D1 5 Indication Defect Crack Rejectable per Code Verify by visual means NDT Required Defect Acceptable RT AWS D1.5 Repair Defect Acceptable Sec. 6.26.2, AWS D1.5 Repair MT SPs, Sec. 8-3 SPs, 10-1.59 2 Requires Further Evaluation Defect Repair UT Sec. 6.26.3, AWS D1.5 Table 6.3, AWS D1.5 Table 6.4, AWS D1.5

Upload: duongphuc

Post on 18-Feb-2018

218 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Team China Lift 1 Concerns - Alta Vista Solutionsaltavistasolutions.com/content/uploads/2014/02/Appendix-M.pdf · Team China Lift 1 Concerns 1 September 22, 2009 VT Acceptable Sec

9/21/2009

1

Team ChinaLift 1 Concerns

1

September 22, 2009

VTAcceptableSec. 6.26.1,

AWS D1 5

Indication Defect CrackRejectable per Code

Verify by visual means

NDT Required

Defect

Acceptable

RT

AWS D1.5Repair

Defect

AcceptableSec. 6.26.2, AWS D1.5

RepairMT

SPs,Sec. 8-3

SPs,10-1.59

2

Requires Further

Evaluation

Defect Repair

UT Sec. 6.26.3, AWS D1.5

Table 6.3,AWS D1.5

Table 6.4,AWS D1.5

Page 2: Team China Lift 1 Concerns - Alta Vista Solutionsaltavistasolutions.com/content/uploads/2014/02/Appendix-M.pdf · Team China Lift 1 Concerns 1 September 22, 2009 VT Acceptable Sec

9/21/2009

2

VTAcceptableSec. 6.26.1,

AWS D1 5

Indication Defect CrackRejectable per Code

Verify by visual means

NDT Required

Defect

Acceptable

RT

AWS D1.5Repair

Defect

AcceptableSec. 6.26.2, AWS D1.5

RepairMT

SPs,Sec. 8-3

SPs,10-1.59

3

Requires Further

Evaluation

Defect Repair

UT Sec. 6.26.3, AWS D1.5

Table 6.3,AWS D1.5

Table 6.4,AWS D1.5

For any welding, the Engineer may perform or direct the Contractor to perform NDT that is in addition to the visual inspection or NDT specified in the AWS welding codes, in the Standard Specifications, or in these special provisions to verify that the welds are free of

Special Provisions,Section 8-3.01 Welding

Potential issues that may affect Engineer’s decision to go down this path:

Should any welding defects be discovered by this additional NDT, all costs associated with the repair of the deficient area, including NDT of the weld repair and any delays caused by the repair shall be at the

provisions to verify that the welds are free of defects as defined by the AWS codes specified in this contract.

g p

• Unqualified Welders• Unapproved Welding

Procedures• Unusual NDT results• Defects observed during in-

process checks

4

caused by the repair shall be at the Contractor’s expense.

Page 3: Team China Lift 1 Concerns - Alta Vista Solutionsaltavistasolutions.com/content/uploads/2014/02/Appendix-M.pdf · Team China Lift 1 Concerns 1 September 22, 2009 VT Acceptable Sec

9/21/2009

3

VTAcceptableSec. 6.26.1,

AWS D1 5

Indication Defect CrackRejectable per Code

Verify by visual means

NDT Required

Defect

Acceptable

RT

AWS D1.5Repair

Defect

AcceptableSec. 6.26.2, AWS D1.5

RepairMT

SPs,Sec. 8-3

SPs,10-1.59

5

Requires Further

Evaluation

Defect Repair

UT Sec. 6.26.3, AWS D1.5

Table 6.3,AWS D1.5

Table 6.4,AWS D1.5

The extent of non-destructive examination is specified below, unless specified elsewhere in these special provisions.

All welds shall receive 100% visual inspection.

SPs, Sec. 10-1.59 Steel Structures, Inspection and

Testing, Pg. 330

Contract Requirements

Transverse splice welds 5% RT 100% UT

NDT Tables specify amount of NDT testing required for each weld type.

6

Page 4: Team China Lift 1 Concerns - Alta Vista Solutionsaltavistasolutions.com/content/uploads/2014/02/Appendix-M.pdf · Team China Lift 1 Concerns 1 September 22, 2009 VT Acceptable Sec

9/21/2009

4

VTAcceptableSec. 6.26.1,

AWS D1 5

Indication Defect CrackRejectable per Code

Verify by visual means

NDT Required

Defect

Acceptable

RT / MT

AWS D1.5Repair

Defect

AcceptableSec. 6.26.2, AWS D1.5

Repair

7

Requires Further

Evaluation

Defect Repair

UT Sec. 6.26.3, AWS D1.5

Table 6.3,AWS D1.5

Table 6.4,AWS D1.5

SPs, Sec. 10-1.59 Steel Structures, Inspection and

Testing, Pg. 330

SPs, Sec. 10-1.59 Steel Structures, Shop Welding, Pg. 325

Contract Requirements

Except as specified herein, welding, welder qualifications, and inspection of welding work shall conform to the requirements of AWS D1.5

8

Page 5: Team China Lift 1 Concerns - Alta Vista Solutionsaltavistasolutions.com/content/uploads/2014/02/Appendix-M.pdf · Team China Lift 1 Concerns 1 September 22, 2009 VT Acceptable Sec

9/21/2009

5

VTAcceptableSec. 6.26.1,

AWS D1 5

Indication Defect CrackRejectable per Code

Verify by visual means

NDT Required

Defect

Acceptable

RT / MT

AWS D1.5Repair

Defect

AcceptableSec. 6.26.2, AWS D1.5

Repair

9

Requires Further

Evaluation

Defect Repair

UT Sec. 6.26.3, AWS D1.5

Table 6.3,AWS D1.5

Table 6.4,AWS D1.5

6.26.3 UT6.26.3.1 Welds that are subject to UT

in addition to visual inspection shall be acceptable if they meet the following

SPs, Sec. 10-1.59 Steel Structures, Inspection and

Testing, Pg. 330

SPs, Sec. 10-1.59 Steel Structures, Shop Welding, Pg. 325

Contract Requirements

requirements:(1) Welds subject to tensile stress

under any condition of loading shall conform to the requirements of Table 6.3.

(2) Welds subject to compressive stress shall conform to the requirements of Table 6.4.

AWS D1.5-02, Sec. 6.26.3 UT, Pg. 151

10

Page 6: Team China Lift 1 Concerns - Alta Vista Solutionsaltavistasolutions.com/content/uploads/2014/02/Appendix-M.pdf · Team China Lift 1 Concerns 1 September 22, 2009 VT Acceptable Sec

9/21/2009

6

VTAcceptableSec. 6.26.1,

AWS D1 5

Indication Defect CrackRejectable per Code

Verify by visual means

NDT Required

Defect

Acceptable

RT / MT

AWS D1.5Repair

Defect

AcceptableSec. 6.26.2, AWS D1.5

Repair

11

Requires Further

Evaluation

Defect Repair

UT Sec. 6.26.3, AWS D1.5

Table 6.3,AWS D1.5

Table 6.4,AWS D1.5

SPs, Sec. 10-1.59 Steel Structures, Inspection and

Testing, Pg. 330

SPs, Sec. 10-1.59 Steel Structures, Shop Welding, Pg. 325

Contract Requirements

AWS D1.5-02, Sec. 6.26.3 UT, Pg. 151

SPs, Sec. 10-1.59 Steel Structures, Inspection and

Testing, Acceptance, Pg. 333

12

For purposes of acceptance, all CJP welds shall be considered to sustain tension, except for those otherwise shown on the plans.

Page 7: Team China Lift 1 Concerns - Alta Vista Solutionsaltavistasolutions.com/content/uploads/2014/02/Appendix-M.pdf · Team China Lift 1 Concerns 1 September 22, 2009 VT Acceptable Sec

9/21/2009

7

SPs, Sec. 10-1.59 Steel Structures, Inspection and

Testing, Pg. 330

SPs, Sec. 10-1.59 Steel Structures, Shop Welding, Pg. 325

Contract Requirements

AWS D1.5-02, Sec. 6.26.3 UT, Pg. 151

SPs, Sec. 10-1.59 Steel Structures, Inspection and

Testing, Acceptance, Pg. 333

Contract Plans General Notes No 4

13

Contract Plans, General Notes No. 4, Sheet 426 of 1204

14

Page 8: Team China Lift 1 Concerns - Alta Vista Solutionsaltavistasolutions.com/content/uploads/2014/02/Appendix-M.pdf · Team China Lift 1 Concerns 1 September 22, 2009 VT Acceptable Sec

9/21/2009

8

VTAcceptableSec. 6.26.1,

AWS D1 5

Indication Defect CrackRejectable per Code

Verify by visual means

NDT Required

Defect

Acceptable

RT / MT

AWS D1.5Repair

Defect

AcceptableSec. 6.26.2, AWS D1.5

Repair

15

Requires Further

Evaluation

Defect Repair

UT Sec. 6.26.3, AWS D1.5

Table 6.3,AWS D1.5

Table 6.4,AWS D1.5

20mm

70 °

16

• For indications that remain on the display as the search unit is moved, see 6.26.3.2

Page 9: Team China Lift 1 Concerns - Alta Vista Solutionsaltavistasolutions.com/content/uploads/2014/02/Appendix-M.pdf · Team China Lift 1 Concerns 1 September 22, 2009 VT Acceptable Sec

9/21/2009

9

SPs, Sec. 10-1.59 Steel Structures, Inspection and

Testing, Pg. 330

SPs, Sec. 10-1.59 Steel Structures, Shop Welding, Pg. 325

Contract Requirements

(1) Indications of discontinuities that remain on the screen as the search unit is moved towards and away from the

AWS D1.5-02, Sec. 6.26.3 UT, Pg. 151

SPs, Sec. 10-1.59 Steel Structures, Inspection and

Testing, Acceptance, Pg. 333

Contract Plans General Notes No 4

17

is moved towards and away from the discontinuity … may be indicative of planar discontinuities with significant flaw height dimension.AWS D1.5-02, Table 6.3,

Pg. 144

Contract Plans, General Notes No. 4, Sheet 426 of 1204

AWS D1.5-02,Sec. 6.26.3.2, Pg. 151

Contract RequirementsSPs, Sec. 10-1.59 Steel

Structures, Inspection and Testing, Pg. 330

SPs, Sec. 10-1.59 Steel Structures, Shop Welding, Pg. 325

AWS D1.5-02, Sec. 6.26.3 UT, Pg. 151

(3) When indications that exhibit these

SPs, Sec. 10-1.59 Steel Structures, Inspection and

Testing, Acceptance, Pg. 333

Contract Plans General Notes No 4

18

( )planar characteristics are present … a more detailed evaluation of the discontinuity by other means may be required (e.g., alternate UT techniques, RT, grinding, or gouging for visual inspection, etc.).

AWS D1.5-02, Table 6.3, Pg. 144

Contract Plans, General Notes No. 4, Sheet 426 of 1204

AWS D1.5-02,Sec. 6.26.3.2, Pg. 151

Page 10: Team China Lift 1 Concerns - Alta Vista Solutionsaltavistasolutions.com/content/uploads/2014/02/Appendix-M.pdf · Team China Lift 1 Concerns 1 September 22, 2009 VT Acceptable Sec

9/21/2009

10

VTAcceptableSec. 6.26.1,

AWS D1 5

Indication Defect CrackRejectable per Code

Verify by visual means

NDT Required

Defect

Acceptable

RT / MT

AWS D1.5Repair

Defect

AcceptableSec. 6.26.2, AWS D1.5

Repair

19

May Require Further

Evaluation

Defect Repair

UT Sec. 6.26.3, AWS D1.5

Table 6.3,AWS D1.5

Table 6.4,AWS D1.5

• How do we move forward with the cracks in the Lift 1OBG Segment Splices?

20

Page 11: Team China Lift 1 Concerns - Alta Vista Solutionsaltavistasolutions.com/content/uploads/2014/02/Appendix-M.pdf · Team China Lift 1 Concerns 1 September 22, 2009 VT Acceptable Sec

9/21/2009

11

Possible Path Forwardto be Agreed Upon JointlyRemove, repair, and re-weld Lift 1 segment splices

Change fabrication process by implementing recommended fabrication improvements

Jointly agree on UT procedure w/ ABFgoing forward with Lift 2 and future segments

What do we do with Lifts 3 and 4?• Option 1: Recommend ABF assure the Department that Lifts 3 - 4

do not have similar defects

21

do not have similar defects• Option 2: Pick a representative portion and re-examine by agreed

upon acceptance criteria• Option 3: Do nothing

From an engineering perspective, Team China recommends Option 2

Sequence of Events

22

Page 12: Team China Lift 1 Concerns - Alta Vista Solutionsaltavistasolutions.com/content/uploads/2014/02/Appendix-M.pdf · Team China Lift 1 Concerns 1 September 22, 2009 VT Acceptable Sec

9/21/2009

12

Meeting with ABF, August 19, 2009

Sequence of Events

23

Meeting with ABF – August 19, 2009

Discussion of transverse defects

CT inquired about Lift 1 Segment Splice incident

McQuaid suggested ABF/CT corroborate on approach to identify potential defectsPerpendicular DeviationAlternate scanning patternsGrinding weld surfaces flush / Scanning Pattern D

24

Page 13: Team China Lift 1 Concerns - Alta Vista Solutionsaltavistasolutions.com/content/uploads/2014/02/Appendix-M.pdf · Team China Lift 1 Concerns 1 September 22, 2009 VT Acceptable Sec

9/21/2009

13

Meeting with ABF, August 19, 2009

ABF / CT Joint

Sequence of Events

Investigation

25

August 25 Joint Investigation of Lift 1 Transverse Splices

• ABF and CT identified transverse indications at transverse segment splices using a 70 ° transducer

• ABF performed a “more detailed evaluation of the discontinuity” with a 45 and 60 degree transducer

• Verbal agreement made by ABF and CT to excavate areas of concern

• ZPMC removed areas of concern without notification / or presence by ABF or CT

26

Page 14: Team China Lift 1 Concerns - Alta Vista Solutionsaltavistasolutions.com/content/uploads/2014/02/Appendix-M.pdf · Team China Lift 1 Concerns 1 September 22, 2009 VT Acceptable Sec

9/21/2009

14

Meeting with ABF, August 19, 2009

ABF / CT Joint

Sequence of Events

Investigation

Incident Report #754

27

UT indications later identified as Cracks by grinding

• QC discovered rejectable UT indication

• During repair of Class A defect, two additional UT indications were found to be cracks

• After QC acceptance of backgouged area, QA performed a routine MT inspection the backgouge

28

Page 15: Team China Lift 1 Concerns - Alta Vista Solutionsaltavistasolutions.com/content/uploads/2014/02/Appendix-M.pdf · Team China Lift 1 Concerns 1 September 22, 2009 VT Acceptable Sec

9/21/2009

15

UT indications later identified as Cracks

• QC discovered rejectable UT indication

• After QC acceptance of backgouged area, QA performed a routine MT inspection of backgouged

• Two transverse cracks were visually discovered after QC acceptance

• Cracks were identified by UT but not

29

• Cracks were identified by UT but not rejectable per the code

Meeting with ABF, August 19, 2009

ABF / CT Joint

Sequence of Events

Investigation

Inspection Request No 004185

Incident Report #754

30

ZPMC requests “Green Tag” inspection of OBG Lift 1E Segment Splices on 9/7/09

No. 004185

Page 16: Team China Lift 1 Concerns - Alta Vista Solutionsaltavistasolutions.com/content/uploads/2014/02/Appendix-M.pdf · Team China Lift 1 Concerns 1 September 22, 2009 VT Acceptable Sec

9/21/2009

16

“Caltrans Quality Assurance Inspector (QA) disco ered nineteen (19) class “A” rejectable

Meeting with ABF, August 19, 2009

ABF / CT Joint

Sequence of Events

discovered nineteen (19) class “A” rejectable Transverse Linear Indications…”Investigation

Inspection Request No 004185

Incident Report #754

31

No. 004185

70 °

14 db more than required to be rejectable per the code

32

Page 17: Team China Lift 1 Concerns - Alta Vista Solutionsaltavistasolutions.com/content/uploads/2014/02/Appendix-M.pdf · Team China Lift 1 Concerns 1 September 22, 2009 VT Acceptable Sec

9/21/2009

17

Meeting with ABF, August 19, 2009

ABF / CT Joint

Sequence of Events

“The indications exhibited planar characteristics with significant flaw height dimension as the search unit was moved toward and away from the indications and were not detectable during scanning patterns parallel to the weld axis.”

Investigation

Inspection Request No 004185

Incident Report #754

33

No. 004185

34

• For indications that remain on the display as the search unit is moved, see 6.26.3.2

Page 18: Team China Lift 1 Concerns - Alta Vista Solutionsaltavistasolutions.com/content/uploads/2014/02/Appendix-M.pdf · Team China Lift 1 Concerns 1 September 22, 2009 VT Acceptable Sec

9/21/2009

18

Meeting with ABF, August 19, 2009

ABF / CT Joint

Sequence of Events

Investigation

Inspection Request No 004185

Incident Report #754

35

(3) When indications that exhibit these planar characteristics are present… a more detailed evaluation of the discontinuity by other means may be required …

No. 004185

Additional transverse indications have also been detected in the welds that do not exceed the threshold of the code for rejection, but are characteristic of crack indications nonetheless.

Meeting with ABF, August 19, 2009

ABF / CT Joint

Sequence of Events

The Department would like to collaborate with ABF to jointly examine and confirm that these welds do not contain cracks.

“Please provide grinders to excavate portions of the welds … as directed by the Engineer”

Investigation

Inspection Request No 004185

Incident Report #754

36

No. 004185

Team China Letter #28

Page 19: Team China Lift 1 Concerns - Alta Vista Solutionsaltavistasolutions.com/content/uploads/2014/02/Appendix-M.pdf · Team China Lift 1 Concerns 1 September 22, 2009 VT Acceptable Sec

9/21/2009

19

Additional Events

37

Meeting with ABF, August 19, 2009

ABF / CT Joint

Sequence of Events

CT inspectors identify portions of the weld for the Contractor to excavate and grind.

Investigation

Inspection Request No 004185

Incident Report #754

38

No. 004185

Team China Letter #28

Incident Report

Page 20: Team China Lift 1 Concerns - Alta Vista Solutionsaltavistasolutions.com/content/uploads/2014/02/Appendix-M.pdf · Team China Lift 1 Concerns 1 September 22, 2009 VT Acceptable Sec

9/21/2009

20

September 15, 2009• After CT Inspectors identified portions of the

weld, ZPMC personnel began gouging out the area from underneath the weld.

• CT Inspectors observe linear defects in the

Meeting with ABF, August 19, 2009

ABF / CT Joint

Sequence of Events

• CT Inspectors observe linear defects in the gouged area

• Department’s technical staff believe defects in pictures are cracks and not “fusion type defects” suggested by ABF

Investigation

Inspection Request No 004185

Incident Report #754

39

Crack. A fracture type discontinuity characterized by a sharp tip and high ratio of length and width to opening displacement. See Figure 33.

No. 004185

Team China Letter #28

Incident Report

Meeting with ABF, August 19, 2009

ABF / CT Joint

Sequence of Events

Investigation

Inspection Request No 004185

Incident Report #754

40

No. 004185

Team China Letter #28

Incident Report

6.26.1.1 The weld shall have no cracks.

Page 21: Team China Lift 1 Concerns - Alta Vista Solutionsaltavistasolutions.com/content/uploads/2014/02/Appendix-M.pdf · Team China Lift 1 Concerns 1 September 22, 2009 VT Acceptable Sec

9/21/2009

21

Two Issues• How do we move forward with the cracks in

the Lift 1OBG Segment Splices?• How do we jointly address the cause that

got us here?

41

Talking Points1. Lift 1 segment splices require a more detailed examination2. Team China believes there are cracks in the Lift 1 Segment splices3. The current QC/QA inspection process is not adequate to find such

cracks4 There are cracks in other fabrication work; however the current4. There are cracks in other fabrication work; however, the current

QC/QA inspection process is finding these cracks5. The Department should not re-inspect material that has been “green-

tagged” 6. If concerns are identified with “green-tagged” material, they should

be communicated to ABF and only the “repaired areas” verified by CT QA

7 The Contractor’s QC inspection process is not identifying all of the

42

7. The Contractor s QC inspection process is not identifying all of the current issues

8. The labor subcontractors are not uniformly implementing recommended fabrication improvements

9. If recommended fabrication improvements are not implemented by each labor subcontractor, then Team China recommends a temporary suspension of those operations

Page 22: Team China Lift 1 Concerns - Alta Vista Solutionsaltavistasolutions.com/content/uploads/2014/02/Appendix-M.pdf · Team China Lift 1 Concerns 1 September 22, 2009 VT Acceptable Sec

9/21/2009

22

Technical Material

• 45 Degree Transducer infoDeviation from perpendicular diagramMagnitude of UT readings in Seg SpliceScanning Patterns

• Commentary2008 Commentary

• Team China Letter #20

43

Sound Path and Defect Detection

44

Page 23: Team China Lift 1 Concerns - Alta Vista Solutionsaltavistasolutions.com/content/uploads/2014/02/Appendix-M.pdf · Team China Lift 1 Concerns 1 September 22, 2009 VT Acceptable Sec

9/21/2009

23

45 °As high as 12 db more than required to be rejectable per the most lenient criteria in the code

45

46

Page 24: Team China Lift 1 Concerns - Alta Vista Solutionsaltavistasolutions.com/content/uploads/2014/02/Appendix-M.pdf · Team China Lift 1 Concerns 1 September 22, 2009 VT Acceptable Sec

9/21/2009

24

AWS D1.5 2008 Section C6.26.3.2

Discontinuities that may lead to failure are reliably detected by the prescribed scanning procedures buy may not accurately be identified as rejectable. 

When a defect is normal to the surface of the joint and completely surrounded by sound metal, there is a likelihood that it will be difficult to detect.  Almost all of the sound may be reflected away with essentially non reflected back to the transducer.

47

If there are indications of flaw height, regardless of amplitude, a crack may be present and soundness should be verified by other wedge angles and locations or alternate inspection methods or tests.

Team China Letter #20

“increased incidence of cracks and relevant MT indications found by the Department’s QA METS inspectors on welds previously inspected and approved … by … QC”

• OBG: 63 Missed MT Indication since May 30, 2009• Tower: 22 Missed Indication by QC since April 15, 2009

4848

“Please investigate why these indications have gone undetected during the Magnetic Particle Inspection Procedure, and provide the Department of your findings.”