task 1.1: support for the wrfvar component of the cwb operational system

47
1 2010 CWB Project Annual Review Principal Investigator: Y-H. Kuo 1,2 Y.-R. Guo 1 (WRF-Var lead) H. Liu 3 (WRF-EnKF lead) J. Braun 2 (Ground-based GPS lead) Fei Chen 4 and Mike Barlage 4 (HRLDAS) Jim Bresch 1 (WRF lead) CWB Visitors: Ya-Ting Tsai, Eric Chiang, Elmy Chen, Ling-Feng Hsiao, Mei-Yu Chang, Chi Pan 1 NCAR/MMM, 2 UCAR/COSMIC, 3 CISL/iMage, and 4 NCAR/RAL 1 December 2010

Upload: clinton-mcneil

Post on 01-Jan-2016

17 views

Category:

Documents


4 download

DESCRIPTION

- PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Task 1.1: Support for the WRFVar component of the CWB operational system

1

2010 CWB Project Annual Review

Principal Investigator: Y-H. Kuo1,2

Y.-R. Guo1 (WRF-Var lead)H. Liu3 (WRF-EnKF lead)

J. Braun2 (Ground-based GPS lead)Fei Chen4 and Mike Barlage4(HRLDAS)

Jim Bresch1 (WRF lead)

CWB Visitors: Ya-Ting Tsai, Eric Chiang, Elmy Chen, Ling-Feng Hsiao, Mei-Yu Chang, Chi Pan

1NCAR/MMM, 2UCAR/COSMIC, 3CISL/iMage, and 4NCAR/RAL

1 December 2010

Page 2: Task 1.1: Support for the WRFVar component of the CWB operational system

2

Task 1: Support for the WRFVar component of the CWB operational system (OP2) and the improvement of the performance of WRFVar V3 (Y.-R. Guo, Ted Iwabuchi, Pei-Yu Chen, Eric Chiang, Ya-Ting Tsai, Mei-Hsin Chen)

Performance Period: a. Provide support for WRFVar 01/01/10 – 11/30/10

b. Improve performance of WRFVar V3 01/01/10 - 11/30/10

c. Improve GPSRO assimilation 01/01/10 - 11/30/10

d. Training and consultation 01/01/10 – 11/30/10

Deliverables: 1. Observation operators, tangent and adjoint code training 04/30/10

2. CV3 outer-loop code 11/30/10

3. Report on the assimilation of GPSRO data with WRFVar 11/30/10

Page 3: Task 1.1: Support for the WRFVar component of the CWB operational system

Task 1.1: Support for the WRFVar component of the CWB operational system

Frequent exchange of progress through the e-mails and teleconference between CWB and UCAR. Many problems were discussed and solved including CV3 BE tests, EC bogus data assimilation, GPSRO assimilation, and GSI system, etc. One interesting item is that most of the GPSPW data in NCEP prepBUFR data files are from Taiwan:

Staff visits between CWB and UCAR:

From CWB to UCAR: Elmy Chen, Eric Chiang, Chi Pan, Ling-Feng Hsiao, Der-Song Chen, J.-S. Hong, and C.-T. Fong

From UCAR to CWB: Yong-Run GuoThe main activities:

a)Exchange progresses reports for the 2010 project for both CWB and UCAR b)CWB presentations on WRFVarc)Discussion with CWB staff.

Page 4: Task 1.1: Support for the WRFVar component of the CWB operational system

Task 1.2: Improve the performance of WRFVar V3

1.2.1 Implementation of outer-loops with CV3 BES

• Single obs --- GPSRO tests with CV3 BES and 5 outer-loops:

REF = 10 Nunit, ERR= 2.5 Nunit, Location = (111, 64,20), η = 0.55, h = 4.86km km

Out# Int#. J Jb Jo

1 0.100E-01 0 8.000 0.000 8.000 0.000 1 0.100E-01 1 3.699 1.989 1.711 0.000 2 0.100E-01 0 3.704 1.989 1.715 0.000 2 0.100E-01 1 3.704 1.973 1.731 0.000 2 0.100E-01 2 3.704 1.979 1.725 0.000 3 0.100E-01 0 3.704 1.979 1.725 0.000 3 0.100E-01 1 3.704 1.978 1.726 0.000 3 0.100E-01 2 3.704 1.978 1.726 0.000 4 0.100E-01 0 3.704 1.978 1.726 0.000 4 0.100E-01 1 3.704 1.978 1.726 0.000 4 0.100E-01 2 3.704 1.978 1.726 0.000 5 0.100E-01 0 3.704 1.978 1.726 0.000 5 0.100E-01 1 3.704 1.978 1.726 0.000 5 0.100E-01 2 3.704 1.978 1.726 0.000

After the 3rd outer-loop, J, Jb, and Jo are not changed.

• Eric Chang conducted two-week (2009121712Z to 2009122912Z) period tests for 4 experiments: 1) CV3, 2) CV3-TUNE, 3) CV3-TUNE+OUTER-LOOP, and 4) CV3-TUNE+DFI. Degraded results were obtained with the CV3-TUNE+OUTER-LOOP (without variable tuning factors for different outer-loops).

Anomaly correlation for 4 experiments verified against NCEP analyses.

Page 5: Task 1.1: Support for the WRFVar component of the CWB operational system

Task 1.2 Improve the performance of WRFVar V3 (Cont.)1.2.2 Tuning for CV3 BES

• Conducted literature reviews on CV3 BES: e.g. Purser et al. (2003)

• Reviewed the CV3 related code in WRFVar and GSI BE codes: rdgstat_reg.f90, prewgt_reg.f90, berrorf90, etc.

Setup of CV3 BES in WRFVar: “da_setup_be_ncep_gfs.inc”Utilization of CV3 BE in WRFVar: “da_transform_vtox.inc”

• Develop the code for the different outer-loops with the variable tuning factors.

In the setup CV3 stage, there are 3 steps:1) read in BE file and transfer to 3-D WRF grid; 2)compute the filter coefficients based the specified parameters; 3)Scale the vertical and horizontal scale-lengths based on the factors, and

normalized the standard deviation.

The tuning factors are only related to step 3).

Single GPSREF test was conducted with the new codes, which was posted on the web page on 17 October 2010:

http://box.mmm.ucar.edu/people/guo/individual_guo/CWB/CWB_Project_2010.html

Page 6: Task 1.1: Support for the WRFVar component of the CWB operational system

Task 1.2 Improve the performance of WRFVar V3 (Cont.)

1.2.2 Tuning for CV3 BE

The formulation for normalization of the standard deviation is

σ norm _ k =σ k × as1 × samphlk × vk,k × M fac

where σnorm_k is the normalized standard deviation and will be used in the transformation of the control variables. σk is the input standard deviation, as1 is the tuning factor for standard deviation, hlk is the tuned horizontal scale-length, vk,k depends on the tuned vertical scale-length, Mfac is the map factor, and Samp is a factor by which the amplitude at the second sweep is normalized. Samp is determined by the filter characteristics. The subscript k denotes the model level k.

So the normalized standard deviation σnorm_k will be obtained by the combined effect from all tuning factors (as1) for variance, (as2) for horizontal and (as3) vertical scale-lengths. Caution must be taken to set the proper tuning factors to get reasonable increments from each of the outer-loops.

Page 7: Task 1.1: Support for the WRFVar component of the CWB operational system

Task 1.2 Improve the performance of WRFVar V3 (Cont.)

1.2.3 Technical consultation on improving the utilization of operationally available observations

Eric Chiang and Yong-Run Guo worked together to carefully review the WRFVar surface data (U10, V10, T2, and Q2) assimilation code: da_sfc_wtq.inc and WRF code: module_sf_sfclay/SFCLAY1D. We made the WRFVar code consistent with the WRF code, and developed the corresponding tangent-linear and adjoint codes, which passed correctness checks. From the case (2009060818Z) study and whole month (June 2009) tests, the results showed minor but positive impact.

Task 1.3: Improve the GPSRO data assimilation for CWB regional application

Main problems:

1.High level (above 10km) GPSREF data caused significant GPSREF and moisture increments at low levels (below 2km);

1.Systematic positive bias of GPSREF (O-B) above 10km at low latitudes.

Page 8: Task 1.1: Support for the WRFVar component of the CWB operational system

Task 1.3: Improve the GPSRO data assimilation for CWB regional application

Main problems:

1.High level (above 10km) GPSREF data caused significant GPSREF and moisture increments at low levels (below 2km);

1.Systematic positive bias of GPSREF (O-B) above 10km at low latitudes.

Cross section plot of refractivity increments with real COSMIC refractivity data assimilation (point near 20oN and 150oE) for the 18 UTC 8 June 8 2009 case. Horizontal and vertical axes show model grid number for the east-west direction and vertical direction, respectively. Note that the refractivity profile below 6 km is rejected due to QC, but significant increments still occur in the lower levels.

Problem 1:

Page 9: Task 1.1: Support for the WRFVar component of the CWB operational system

Problem 2:

O-B statistics of absolute refractivity between COSMIC (O) and NCEP GFS (B) for CWB test period from 00Z of April 24, 2010 to 18Z of Mar 9 2010. The left and right panels show standard deviation and biases. The red curve is for the original WRFVar code, green curve is for the modified one, and the blue curve is for an additional modification using logarithmic vertical interpolation of refractivity.

Problem 1 is solved by ignoring the P-perturbation in TL/AD code

Problem 2 is solved by converting geometric height of the GPSREF data to geopotential height.

Updated code has been passed to CWB, and results are improved.

Page 10: Task 1.1: Support for the WRFVar component of the CWB operational system

Task 1.4: Training and technical consultation

1.4.1 Consultation on CWB ZTD data assimilation

Yating Tsai, CWB, conducted a set of the experiments for a SoWMEX period, 2008060100~2008060600 with OP211, CV3-CTRL, CV3-PWV, CV3-ZTD, CV5-PWV, and CV5-ZTD. UCAR staff reviewed and discussed the results with CWB staff. Preliminary conclusions:

Ground-based data assimilation has a positive impact on the short-range QPF.PWV assimilation performs better than ZTD assimilationCV5 performs better than CV3 because CV3 BES have not been tuned for the

5-km domain3, but CV5 has the special BES for 5-km domain3.

Yating Tsai proposed a new strategy for ZTD assimilation with a one-way nested approach. With this ZTD assimilation, the PW in near and over Taiwan is increased, and the short-term rainfall forecast is also improved.

Based on these preliminary positive results, and a good GPS receiver network available in Taiwan, we suggest that CWB consider operational use of the GPSPW/ZTD data in NWP.

Page 11: Task 1.1: Support for the WRFVar component of the CWB operational system

1.4.2 Provide guidance to CWB visitors at UCAR

• Eric Chiang: surface observation operator: da_sfc_wtq.inc

• Elmy Chen:

ported the OP211 system to the NCAR IBM (bluefire.ucar.edu) NCAR IBM: power6, xlf version 12 compiler CWB IBM : power5, xlf version 10 compiler After 3 days of cycling the differences are significant. EC-bogus experiment GPSRO tests

Ling-Feng Hsiao: discussions to further improve 3DVAR in TWRF. (Variable tuning factors in CV3 outer-loops.

Page 12: Task 1.1: Support for the WRFVar component of the CWB operational system

1.4.3 Technical consultation on general data assimilation issues

Conducted experiments using WRFVar and GSI with identical observations from the NCEP prepBUFR file for conventional data and the BUFR file for GPSRO at 2009060818Z.

Only 40% of the GPSRO data is assimilated by GSI as compared to WRFVar. The wind analysis is not sensitive to the GPSRO data, or the assimilation system (WRFVar or GSI), but the temperature and moisture are very sensitive to the GPSRO data used, and the assimilation system used.

Our experiences in running GSI were provided to CWB staff (Eric Chiang).

Page 13: Task 1.1: Support for the WRFVar component of the CWB operational system

1) WRFVar code development: Tangent linear and adjoint code

2) WRFVar code development: Observation operators for GPSRO, GPSZTD, and surface observations, 2-m T, Q, 10-m wind, and Psfc

3) Formulation for wrf_to_xb and xa_to_wrf: Diagnose the pressure and geopotential height

All of the presentations have been posted on the web site, and passed to CWB.

1.4.4 Provide WRFVar training course at CWB: 3 presentations

Page 14: Task 1.1: Support for the WRFVar component of the CWB operational system

14

Task 1: Support for the WRFVar component of the CWB operational system (OP2) and the improvement of the performance of WRFVar V3

Performance Period: a. Provide support for WRFVar 01/01/10 –

11/30/10Completed

b. Improve performance of WRFVar V3 01/01/10 - 11/30/10 Completed

c. Improve GPSRO assimilation 01/01/10 - 11/30/10 Completed

d. Training and consultation 01/01/10 – 11/30/10

Completed

Deliverables: 1. Observation operators, tangent and adjoint code training

04/30/10 Delivered 04/30/10

2. CV3 outer-loop code 11/30/10 Delivered 09/30/10

3. Report on the assimilation of GPSRO data with WRFVar

11/30/10 Delivered 11/30/10

Page 15: Task 1.1: Support for the WRFVar component of the CWB operational system

15

Task 2: Test and Develop WRF/DART Ensemble Data Assimilation System for Typhoon Forecasts (Hui Liu, Jeff Anderson, and Yun-Tien Lin)

Performance Period: a. Modify and tune WRF/DART for 6-hourly cycling 01/01/10 – 11/30/10

b. Evaluate the performance of WRF/DART for SoWMEX and winter cases

01/01/10 - 11/30/10

c. Provide support and training for WRF/DART at CWB 01/01/10 - 11/30/10

Deliverables: 1. An improved version of WRF/DART code and name_lists as well as ensemble verification tools

11/30/10

2. Report on the the evaluation of the performance of WRF/DART for SoWMEX and winter cases

11/30/10

3. Documentation and tutorials on ensemble filters and DART 11/30/10

Task 2

Page 16: Task 1.1: Support for the WRFVar component of the CWB operational system

Task 2.1: Modify and test WRF/DART to run in CWB’s 6-hour cycling operation

• Only observations within +/-1.5 hour of analysis times are used and compared with use of all of the observations within each analysis time.

• Tested various ensemble adaptive inflations for the new 6-hourly observation sets; Optimal values of 0.6/0.6/0.9 are found.

• Tested sensitivity of various horizontal and vertical localizations. 1200km and 5km cutoff is determined for CWB domain.

• Fixed analysis update to surface vertical velocity near high terrain, which may cause model blow-up in long period assimilation. • Point observations (PILOT, and radiosonde) near TC center (within 250 km) are excluded because of model representativeness errors.

• Tuned observation error of SATEM thickness.

Longer spin-up period (3-5 days) is needed for adaptive inflation for cold start.

• The track and intensity of the analyses are reasonable (around 50km at later stages of the typhoons).

Page 17: Task 1.1: Support for the WRFVar component of the CWB operational system

Task 2.2: Detailed evaluation of WRF/DART performance for SOWMEX and 2008 December case

• Assimilation experiments with COSMIC data for SOWMEX and 2008 December period have finished successfully. The runs shows that the new system is stable.

• The RMS errors of WRF/DART analyses are comparable to NCEP analyses.

• Did an extra assimilation run using all of the observations within every 6-hour analysis time window (+/- 3 hours) for SOWMEX period. The results show that the analyses and 6-hour forecasts RMS errors against radiosondes temperature and winds are very close.

Page 18: Task 1.1: Support for the WRFVar component of the CWB operational system

Analyses T U V

850hPa 1.270 1.254 2.374 2.282 2.215 2.108

500hPa 0.769 0.724 2.463 2.487 2.303 2.353

300hPa 0.696 0.735 2.841 2.978 2.695 2.745

24h fcst T U V

850hPa 1.525 1.475 3.003 2.815 2.869 2.692

500hPa 0.927 0.842 3.031 2.900 2.849 2.792

300hPa 0.891 0.898 3.937 3.707 3.731 3.578

48h fcst T U V

850hPa 1.674 1.684 3.533 3.413 3.363 3.231

500hPa 1.068 0.978 3.644 3.485 3.440 3.632

300hPa 1.124 1.126 4.939 4.751 4.790 4.679

72h fcst T U V

850hPa 1.840 1.893 3.930 3.863 3.763 3.689

500hPa 1.204 1.138 4.294 4.165 4.006 4.000

300hPa 1.344 1.333 5.826 5.745 5.725 5.668

Analyses Analyses and and

ForecastsForecastsRMSE RMSE ScoreScore

2.2 Detailed evaluation of WRF/DART performance for SOWMEX

CWB staff compared the DART and 3dvar analyses and forecasts against NCEP analyses for SOWMEX period. Results shows that WRF/DART analyses and forecasts are comparable to 3dvar.

Page 19: Task 1.1: Support for the WRFVar component of the CWB operational system

Task 2.2: Detailed evaluation of WRF/DART performance for SOWMEX and 2008 December case

• Did assimilation experiments with/without COSMIC data for SOWMEX case. It is found that use of COSMIC data reduces water bias and RMS errors against radiosondes. The wind RMS error and bias in the upper troposphere are reduced by use of GPS data.

• 48-hour ensemble forecasts are initialized from June 4 00Z. Use of COSMIC data increases rainfall over Taiwan area.

• Developed an ensemble histogram tool against observations for evaluation of ensemble forecasts.

The new version of obs_diag.f90 now can output histogram distribution for every observation types and any time interval and at the specified vertical layers. The histogram output is in netcdf format and can be viewed using “ncview” command.

• A matlab script is also developed to make the rank histogram plots.

Page 20: Task 1.1: Support for the WRFVar component of the CWB operational system

48-hour forecast of accumulated rainfall (mm) ( 00Z 4-6, June, 2008)

Page 21: Task 1.1: Support for the WRFVar component of the CWB operational system

Task 2.3: WRF/DART training and suport

• Developed extensive training material on WRF/DART for CWB.

• UCAR staff visited CWB April 11-24, 2010 and gave 3-day training on WRF/DART theory at CWB.

• UCAR staff reviewed and revised the near real-time procedures and scripts for CWB operations with CWB staff at CWB. The scripts to generate the ensemble initial and boundary conditions are revised

• Many communications with CWB staff on WRF/DART related questions and issues.

Page 22: Task 1.1: Support for the WRFVar component of the CWB operational system

22

Task 2: Test and Develop WRF/DART Ensemble Data Assimilation System for Typhoon Forecasts

Performance Period: a. Modify and tune WRF/DART for 6-hourly cycling

01/01/10 – 11/30/10 Completed

b. Evaluate the performance of WRF/DART for SoWMEX and winter cases

01/01/10 - 11/30/10 Completed

c. Provide support and training for WRF/DART at CWB

01/01/10 - 11/30/10 Completed

Deliverables: 1. An improved version of WRF/DART code and name_lists as well as ensemble verification tools (histogram tool)

11/30/10 Delivered 11/30/10

2. Report on the the evaluation of the performance of WRF/DART for SoWMEX and winter cases

11/30/10 Delivered 11/30/10

3. Documentation and tutorials on ensemble filters and DART

11/30/10 Delivered 11/30/10

Task 2

Page 23: Task 1.1: Support for the WRFVar component of the CWB operational system

23

Task 3: Support and Improvement of Water Vapor Retrievals using CWB GPS Networks (John Braun)

Performance Period: a. Analysis of CWB GPS Network 01/01/10 – 11/30/10

b. Improved uncertainty parameter in ZTD/PW estimates 01/01/10 - 06/30/10

c. Technical support of GPS analysis 01/01/10 - 11/30/10

Deliverables: 1. New program for ZTD/PW uncertainty computation 11/30/10

2 . Reprocessing of TiMREX/SoWMEX campaign data 9/30/10

3. Documentation for SmosGrd.pl software 11/30/10

4. Configure and port analysis software to CWB blade computers 04/30/10

Page 24: Task 1.1: Support for the WRFVar component of the CWB operational system

Task 3: Development and Support of GPS Water Vapor Remote Sensing Techniques at CWB

Final Report

Task Description: Performance PeriodAnalysis of CWB GPS network 01/01/10 – 12/30/10

Improved uncertainty parameter in ZTD/PW estimates

01/01/10 – 06/30/10

•Reprocess TiMREX/SOWMEX period with improved processing strategy and uncertainty parameters. •Documentation for surface meteorology interpolation program (SmosGrd.pl).•Complete sub-task 2 (uncertainty parameter in ZTD/PW estimates).•Implement 2hr observation sessions in hourly processing.

Page 25: Task 1.1: Support for the WRFVar component of the CWB operational system

2010 Accomplishments

• Transitioned to taccop6g/taccop5g processing machines.

• Test 1 – 6 h processing strategies.– Made multiple adjustments to processing schemes

– Improved ZTD/PW retrievals.

• TIMREX Reprocessing– Implemented improved processing strategy and uncertainty

parameters to processing of TIMREX results

• Documentation of surface meteorology interpolation program (SmosGrd.pl).

• Improve uncertainty characteristics in PW estimates.

Page 26: Task 1.1: Support for the WRFVar component of the CWB operational system

Improvements of Hourly ProcessingObjectives:• Tune hourly processing strategy so that hourly data products approach quality of daily products and

implement these improvements into the operational strategy

Actions:• Tested session lengths between 1 and 6 hours to determine if increased observational length improves

ZTD/PW retrievals.

Program Change Comments

MAUPRP Modified L1/L2 observation noise from 0.0015 to 0.001

RESRMS Modified L1/L2 observation noise from 0.0015 to 0.001

GPSEST (Tropo) Changed relative troposphere weighting in network GPSEST  run from 0.005 to 0.010 (PID 060 in DP).

GPSEST (QIF) Changed Narrow Lane Resolution from 0.03 to 0.05

Strategy Change Improvement

Original vs New Analysis (ZTD RMS) 1.7579 (mm)

Outcomes• Improvements implemented in current processing system• Near real-time ZTD/PW products should agree with daily products to ~2mm (PW) rms.• As an example, the Jan/Feb coordinate results are 2mm North/East and ~5mm Up. In August these are

closer to 3mm/5mm/12mm

Page 27: Task 1.1: Support for the WRFVar component of the CWB operational system

27

Task 3: Support and Improvement of Water Vapor Retrievals using CWB GPS Networks

Performance Period:

a. Analysis of CWB GPS Network 01/01/10 – 11/30/10 Completed

b. Improved uncertainty parameter in ZTD/PW estimates

01/01/10 - 06/30/10 Completed

c. Technical support of GPS analysis 01/01/10 - 11/30/10 Completed

Deliverables: 1. New program for ZTD/PW uncertainty computation 11/30/10 Delivered 11/30/10

2 . Reprocessing of TiMREX/SoWMEX campaign data

9/30/10 Delivered 09/30/10

3. Documentation for SmosGrd.pl software 11/30/10 Delivered 11/30/10

4. Configure and port analysis software to CWB blade computers

04/30/10 Delivered 04/30/10

Page 28: Task 1.1: Support for the WRFVar component of the CWB operational system

28

Task 4: Support the Installation and Testing of the UCAR High-Resolution Land Data Assimilation System (HRLDAS) (Mike Barlage, Fei Chen, and Chia-Ling Tsai)

Performance Period: a. Up-to-date HRLDAS-WRF system with one-week testing 01/01/10 – 04/30/10

b. Retrospective testing and parameter improvement 05/01/10 - 08/31/10

c. HRLDAS initial testing at CWB 08/01/10 - 09/30/10

d. HRLDAS transfer to CWB parallel operational system 10/01/10 - 11/30/10

e. Assist in the development of MODIS climatology 01/01/10 – 11/30/10

Deliverables: 1. Up-to-date coupled HRLDAS-WRF system (WRFV3.1) 04/30/10

2. New CWB-specific land surface model parameters 8/31/10

3. Final report documenting the preliminary results of HRLDAS performance

11/30/10

Page 29: Task 1.1: Support for the WRFVar component of the CWB operational system

Task 4.1 Up-to-date HRLDAS system with one-week testing

• HRLDAS updated to be consistent with WRF v3.1

• Simulations completed over operational domains for a 17-day period beginning 15 May 2008 and ending 31 May 2008

• Major differences due to snow model changes and soil infiltration

• CWB should see only small effects after upgrade to v3.1

• Additionally, CWB requested and was delivered HRLDAS consistent with WRF v3.2 and a single point driver for the Noah land surface model

29

Page 30: Task 1.1: Support for the WRFVar component of the CWB operational system

Task 4.2: Retrospective testing and parameter improvementComparison to Taiwan observations

• From university collaborators, CWB provided flux tower and soil observations at several sites: Puli, Chiayi (rice and urban), Taipei

• Flux tower data at all sites had errors, namely unrealistic magnitudes and inability to close energy balance

• Sites do have quality soil temperature data for significant periods.

• Ran two-week simulation to compare to observations. Red and black lines are the observed soil temperatures

• Blue, green, purple and orange lines are the model soil temperature at 5cm, 25cm, 70cm and 150cm.

• After a short spin-up the top-layer model compares well to observations

• Also have extended processing of MODIS satellite LAI/fPAR globally

ºC

30

Page 31: Task 1.1: Support for the WRFVar component of the CWB operational system

31

Task 4: Support the Installation and Testing of the UCAR High-Resolution Land Data Assimilation System (HRLDAS)

Performance Period: a. Up-to-date HRLDAS-WRF system with one-week testing

01/01/10 – 04/30/10 Completed

b. Retrospective testing and parameter improvement

05/01/10 - 08/31/10 Completed

c. HRLDAS initial testing at CWB 08/01/10 - 09/30/10 Completed

d. HRLDAS transfer to CWB parallel operational system

10/01/10 - 11/30/10 Completed

e. Assist in the development of MODIS climatology

01/01/10 – 11/30/10 Completed

Deliverables: 1. Up-to-date coupled HRLDAS-WRF system (WRFV3.1)

04/30/10 Delivered 4/30/10

2. New CWB-specific land surface model parameters

8/31/10 On-going

3. Final report documenting the preliminary results of HRLDAS performance

11/30/10 Delivered 11/30/10

Page 32: Task 1.1: Support for the WRFVar component of the CWB operational system

32

Task 5: Improvement of WRF model operational performance (Jim Bresch, Priscilla Mooney, Wei Wang, Bao-Jao Chen, Ya-Ting Tsai, Mei-Yu Chang, Chung-Han Lin, and Jing-Shan Hong)

Performance Period: a. Improve model QPF via enhancements to PBL and Convective Parameterization Schemes

01/01/10 – 11/30/10

b. Assist CWB with testing of 20-km grid 01/01/10 - 11/30/10

c. Consult and advise CWB on the operational WRF 01/01/10 - 11/30/10

Deliverables: 1. Code modifications to WRF parameterization schemes 11/30/10

2. Final report on WRF forecast performance 11/30/10

Page 33: Task 1.1: Support for the WRFVar component of the CWB operational system

Task 5.1: Investigate the improvement of model QPF via enhancements to PBL and convective parameterization schemes.

CWB selected the Kain-Fritsch cumulus parameterization for use in WRF, but its performance in the 45-km domain was not good.

850 hPa

500 hPa

300 hPa

2-week SoWMEX WRF test period on domain1 by Bao-Jao Chen

KF

GD

warm bias

Domain-averaged errors

Page 34: Task 1.1: Support for the WRFVar component of the CWB operational system

Task 5.1: Investigate the improvement of model QPF via enhancements to PBL and convective parameterization schemes.

The warm bias is mostly over the ocean where there is an excess of light rainfall.

Solution: Modify the convective trigger function following Ma and Tan (2009)

Parcel temperature perturbation was made a function of temperature and moisture advection rather than vertical velocity.

Page 35: Task 1.1: Support for the WRFVar component of the CWB operational system

6-h 24-h

Blue areas are where the new trigger run is cooler than the standard KF run.

850 hPa850 hPa

Page 36: Task 1.1: Support for the WRFVar component of the CWB operational system

New trigger has the desired effect of reducing areas of light rainfall without altering location of stronger systems.

Page 37: Task 1.1: Support for the WRFVar component of the CWB operational system

In general, typhoon forecasts are little-changed with the new KF trigger, but slightly weaker and slightly slower. The new trigger does not produce a fake vortex (just a weak trough). New trigger function was testing in CWB’s TWRF with favorable results.

fake vortex no fake vortex

Page 38: Task 1.1: Support for the WRFVar component of the CWB operational system

Experiment number

Wall clock

(min)

Initial conditons Cu para

Microphysics PBL Remarks

1 309 GFS cold start KF Thompson YSU

2 362 CWB cycled GD Goddard YSU Operational configuration

3 318 CWB cycled KF Goddard YSU

4 320 CWB cycled KF Goddard YSU No sfc fluxes

5 309 CWB cycled KF Thompson YSU

6 100 CWB cycled No physics

7 314 GFS analysis KF Thompson YSU Forecast LBC’s

8 377 CWB cycled G3 Thompson YSU

9 302 CWB cycled KF Thompson YSU

10 315 GFS analysis KF Thompson YSU Forecast LBCs

11 315 CWB cycled KF Thompson YSU GFS analyzed LBCs

12 315 CWB cycled KF Morrison YSU

13 346 CWB cycled KF Thompson YSU RRTM bug fix

14 333 CWB cycled KF Thompson YSU Old Thompson scheme

Mei-Yu vortex spin-up experiments initialized 00 UTC 2 May 2010

Task 5.2: Assist CWB with testing of 20-km grid

Page 39: Task 1.1: Support for the WRFVar component of the CWB operational system

Intense vortex spins up as in operational cycling run. No vortex when initialized with NCEP GFS

Page 40: Task 1.1: Support for the WRFVar component of the CWB operational system

Task 5.3: Consult and advise CWB on the operational WRF model and provide assistance to CWB visitors to UCAR.

- Modified post-processing programs ripdp and n2d64 to improve calculation of geopotential height

- Investigated geopotential initialization in program real. Results show that errors introduced in real are small.

- Provided nested DFI code to CWB visitor, Ya-Ting Tsai and assisted testing.

Page 41: Task 1.1: Support for the WRFVar component of the CWB operational system

2008060100 SINGLE NESTING NDOWN700hpa Geopotential height

NoDA NoDFI NoDA DFI DA DFI

Page 42: Task 1.1: Support for the WRFVar component of the CWB operational system

Task 5.3: Consult and advise CWB on the operational WRF model and provide assistance to CWB visitors to UCAR.

-Provided guidance to CWB visitor, Mei-Yu Chang, on testing PBL and convective modifications to WRF

Page 43: Task 1.1: Support for the WRFVar component of the CWB operational system

43

Task 5: Improvement of WRF model operational performance

Performance Period: a. Improve model QPF via enhancements to PBL and Convective Parameterization Schemes

01/01/10 – 11/30/10 Completed

b. Assist CWB with testing of 20-km grid 01/01/10 - 11/30/10 Completed

c. Consult and advise CWB on the operational WRF

01/01/10 - 11/30/10 Completed

Deliverables: 1. Code modifications to WRF parameterization schemes

11/30/10 Delivered 11/30/10

2. Final report on WRF forecast performance 11/30/10 Delivered 11/30/10

Page 44: Task 1.1: Support for the WRFVar component of the CWB operational system

44

Task 6: Continued interaction on WRF modeling and data assimilation system (Y.-R. Guo and Jim Bresch)

The web pages for the 2010 UCAR/CWB project were established and updated regularly.

http://www.mmm.ucar.edu/people/guo/individual_guo/CWB/CWB_Project_2010.html

This includes:o Code for WRFVar 3.1o Shell scripts for end-to-end testingo Radiance data assimilation scripto Links to WRF code page

A password-protected web page was maintained at NCAR for the review meeting’s slides http://box.mmm.ucar.edu/individual/bresch/cwb/sep10 The CWB WRF code web page was maintained at NCAR/MMM http://box.mmm.ucar.edu/individual/bresch/cwb/2010/ Data file exchanges between UCAR and CWB use the CWB ftp site: 163.29.179.171 Teleconferences were held regularly throughout the year. 12 March, 5 May, 18 June, 20 August, and

15 November, 2010 Yong-Run Guo, Hui Liu, and Jim Bresch from UCAR visited CWB during 2010. Jim Bresch, NCAR, visited CWB from 1 June to 15 June 2009 for several WRF tasks and again

from 1 December to 10 December for the annual review and WRF tasks.

Page 45: Task 1.1: Support for the WRFVar component of the CWB operational system

45

Task 6: Continued

Beginning in mid-2010 monthly progress reports were provided by UCAR to CWB

CWB visitors to UCAR were described earlier

Page 46: Task 1.1: Support for the WRFVar component of the CWB operational system

46

Task 6: Continued interaction on WRF modeling and data assimilation system

Performance Period: a. Update and maintain CWB and UCAR CWB project web pages

01/01/10 – 11/30/10 Completed

b. Site visit to CWB 01/01/10 - 11/30/10 Completed

c. Teleconferences using Skype or other software 01/01/10 - 11/30/10 Completed

Deliverables: 1. Updated web project web page 11/30/10 Delivered 11/30/10

2. Site visits 11/30/10 Delivered 11/30/10

Page 47: Task 1.1: Support for the WRFVar component of the CWB operational system

47

Thank youEnd