Talbot Associates, Inc. - Guide to the Proper selection of Casting Techniques Print Friendly Version (PDF 163KB) Description Metals Size Range Tolerances * Tooling Costs+ Part Price+ Design Freedom + Surface Finish Minimum Draft Requirements** Normal Minimum Section Thickness+ + Ordering Quantities Normal Lead Time+ ++ Die Casting Molten metal is injected, under pressure, into hardened steel dies, often water or oil cooled. Dies open and castings ejected. Aluminum, Zinc, Lead and Limited Brass Not normally under 2 feet square. Some foundaries capable of larger sizes Al and Mg ± .002”/in. Zinc ± .015”/in. Brass ±.007”/in. Add ± .001” to .016” across parting line depending on size 1 5 4 32-63 RMS Al & Mg: 1 to 3 Zinc: ½ to 2 Brass: 2 to 5 Al: .03” Small parts .06” Medium Parts Mg: .03” Small Parts .045” Medium Parts Zinc: .025” Small Parts .040” Medium Pparts Usually 2,500 and up. Samples: 12- 20 weeks Production: 4-8 weeks A. S.A Permanent Mold Molten metal is gravity poured into steel or cast iron molds, coated with ceramic mold wash. Cores can be metal, sand, sand shell or other. Molds open and Aluminum, Magnesium, Zinc, some Brass, Bronze, H. C. Copper, Lead, and Gray Iron Limitations mainly foundry capabilities. Copper base onces to 100 lbs. Ferrous: 60 lbs. max. Aluminum: basic ± .015”. Add ± .002”/in. If across parting line add ± .010” to ± .030” depending on size. Copper Base: Similar to investment. 2 Non- ferrous 3-4 Ferrous 4 Non- ferrous 3 Ferrous 5 Aluminum: 150-250 RMS Copper Base: 125-200 RMS Ferrous: 200-350 RMS Non-ferrous: Outside: 2 Min. (3 desirable) Inside: 2 Min. (4 desirable) Ferrous: Outide: 1 Inside: 5 Non- ferrous: .100 Small Areas, up to ¼” Large Areas. Ferrous: 3/16” Small Areas, ¼” Normal Minimum One Day’s Run: (100- 1,000, depending on size) Samples: 8- 20 weeks Production: 4-8 weeks A. S.A Talbot Associates, Inc. Talbot Associates, Inc.

Upload: doquynh

Post on 22-Mar-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Talbot Associates, Inc. · PDF fileon metal and quantity) Talbot Associates, Inc. ... semi-solid state, then transferred ... copper alloys Ounces to 5 lbs., some

Talbot Associates, Inc. - Guide to the Proper selection of Casting Techniques

Print Friendly Version (PDF 163KB)

Description Metals Size Range

Tolerances *

Tooling Costs+

Part Price+

Design Freedom

+

Surface Finish

Minimum Draft Requirements**

Normal Minimum Section

Thickness++

Ordering Quantities

Normal Lead Time+

++

Die Casting

Molten metal is injected, under pressure, into hardened steel dies, often water or oil cooled. Dies open and castings ejected.

Aluminum, Zinc, Lead and Limited Brass

Not normally under 2 feet square. Some foundaries capable of larger sizes

Al and Mg ± .002”/in. Zinc ± .015”/in. Brass ±.007”/in.

Add ± .001” to .016” across parting line depending on size

1 5 4 32-63 RMS

Al & Mg: 1 to 3 Zinc: ½ to 2 Brass: 2 to 5

Al: .03” Small parts .06” Medium Parts Mg: .03” Small Parts .045” Medium Parts Zinc: .025” Small Parts .040” Medium Pparts

Usually 2,500 and up.

Samples: 12-20 weeks Production: 4-8 weeks A.S.A

Permanent Mold

Molten metal is gravity poured into steel or cast iron molds, coated with ceramic mold wash. Cores can be metal, sand, sand shell or other. Molds open and

Aluminum, Magnesium, Zinc, some Brass, Bronze, H.C. Copper, Lead, and Gray Iron

Limitations mainly foundry capabilities. Copper base onces to 100 lbs. Ferrous: 60 lbs. max.

Aluminum: basic ± .015”. Add ± .002”/in. If across parting line add ± .010” to ± .030” depending on size. Copper Base: Similar to investment.

2 Non-ferrous 3-4 Ferrous 4

Non-ferrous 3 Ferrous 5

Aluminum: 150-250 RMS Copper Base: 125-200 RMS Ferrous: 200-350 RMS

Non-ferrous: Outside: 2 Min. (3 desirable) Inside: 2 Min. (4 desirable) Ferrous: Outide: 1 Inside: 5

Non-ferrous: .100 Small Areas, up to ¼” Large Areas. Ferrous: 3/16” Small Areas, ¼” Normal

Minimum One

Day’s Run: (100-1,000, depending on size)

Samples: 8-20 weeks Production: 4-8 weeks A.S.A

Talbot Associates, Inc.Talbot Associates, Inc.

Page 2: Talbot Associates, Inc. · PDF fileon metal and quantity) Talbot Associates, Inc. ... semi-solid state, then transferred ... copper alloys Ounces to 5 lbs., some

Talbot Associates, Inc. - Guide to the Proper selection of Casting Techniques

castings ejected. New Low Pressure Perm Mold method pressure pours with up to 15 p.s.i.

Iron: ± .03” Basic

Investment (Lost Wax)

Metal mold makes wax or plastic replica. These are sprued, then surrounded with investment material, baked out, and metal poured in resultant cavity. Molds broken to remove castings.

Most castable metals

Fraction of an once to 150 lbs.

± .003” to ¼” ± .004” to ½” ± .005” per in. To 3”

± .003” for each additional inch

3 1 1 63-125 RMS

None .030” Small Areas .060” Larger Areas

Aluminum: usually under 1,000. Other metals: all quantities

Samples: 5-16 weeks (depending on complexity).

Production: 4-12 weeks A.S.A (depending on subsequent operations)

Plaster Mold

Plaster slurry is poured onto pattern halves, allowed to set, then mold is removed from pattern, baked, assembled, and metal is poured into resultant

Aluminum, Magnesium, Zinc, Limited Copper Base

Up to 500 square inch area. Copper Base much smaller

One side of parting line ± .005” up to 2”.

Over 2” add ± .002”/in. Across parting line add ± .010”

4 1 2 63-125 RMS

External: 0 to ½ Internal: ½ to 2

.070” Usually low. Often used to prototype for die castings. Average: 50-250 pieces

Samples: 2-6 weeks Production: 2-4 weeks A.S.A

Talbot Associates, Inc.Talbot Associates, Inc.

Page 3: Talbot Associates, Inc. · PDF fileon metal and quantity) Talbot Associates, Inc. ... semi-solid state, then transferred ... copper alloys Ounces to 5 lbs., some

Talbot Associates, Inc. - Guide to the Proper selection of Casting Techniques

cavity. Molds broken to remove castings.

Ceramic Mold

Ceramic slurry poured over cope and drag patterns, allowed to set, then molds removed from pattern, baked at 1800°F, producing hard, stable molds. Molds assembled with or without cores and metal poured into resultant cavity. Molds broken to remove castings.

Most castable metals

5lbs. to 350 lbs.

One side of parting line ± .005” up to 2”.

Over 2” add ± .004”/in. Across parting line add ± .010”. (Assumes Epoxy or Metal patterns)

Wood 5 Epoxy or Metal 4

1 3 80-125 RMS

0 to ½ 1/8” Low to medium. Often used for tooling for other casting methods

Samples: 3-8 weeks (depending on complexity) Production: 2-8 weeks A.S.A (depending on metal and quantity)

Talbot Associates, Inc.Talbot Associates, Inc.

Page 4: Talbot Associates, Inc. · PDF fileon metal and quantity) Talbot Associates, Inc. ... semi-solid state, then transferred ... copper alloys Ounces to 5 lbs., some

Talbot Associates, Inc. - Guide to the Proper selection of Casting Techniques

Graphite Mold

Same as Permanent Mold, except no ceramic mold wash is needed, since Graphite molds are used. Core pins are usually steel.

Presently limited to Zinc alloys ZA12, ZA27

One once to 10 lbs. Currently 12” by 14” with a depth of 7”

First inch: ± .005 Additional inces ± .002”/in. Across parting line add ± .005”

4 3 4 63-125 RMS

2 .100” (can go to .06 for very small areas)

Usually 300 and up

Samples: 6-10 weeks Production: 4 weeks A.S.A

Resin Shell Mold

Resin-coated sand is poured onto hot metal patterns, curing into shell-like mold halves. These are removed from pattern, assembled with or without cores. Metal is poured into resultant cavities. Molds broken to remove castings.

Most Castable metals

Normal maximum 550 square inches usable mold area. Depends on equipment at each foundry

Non-Ferrous: ± .008”/in. Decreasing with size. Ferrous: ± .010”/in.

Add ± .005” to .010” across parting line

2 2 2 Non-Ferrous: 125-200 RMS Ferrous: 200-350 RMS

Outside: ½ to 1 Inside ½ to 2

Non-Ferrous: 3/32 Ferrous: 1/8

Non-ferrous usually 100 and up. Ferrous usually 1,000 and up.

Samples: 12-16 weeks Production: 6-10 weeks A.S.A

Talbot Associates, Inc.Talbot Associates, Inc.

Page 5: Talbot Associates, Inc. · PDF fileon metal and quantity) Talbot Associates, Inc. ... semi-solid state, then transferred ... copper alloys Ounces to 5 lbs., some

Talbot Associates, Inc. - Guide to the Proper selection of Casting Techniques

Sand Casting

Tempered sand is packed onto wood or metal pattern halves, removed from pattern, assembled with or without cores, and metal is poured into resultant cavities. Various core materials can be used. Molds broken to remove castings. Specialized Binders now in use can improve tolerances and surface finish.

Most castable materials

Limitation mainly foundry capabilities. Onces to many tons

Non-Ferrous: ± 1/32” to 6” Add ± .003” for each aditional inch. Ferrous: ± 1/32” to 3”, ± 3/64” from 3” to 6”.

Across parting line add ± .020” to ± .090” depending on size (Assumes metal Patterns)

Wood: 5 Aluminum: 4 Iron: 2

3-4 2 Non-ferrous: 150-350 RMS Ferrous: 300-700 RMS

1 to 5 Cores: 1 to 1 1/2

Non-ferrous: 1/8” to ¼” Gray Iron: 1/8” D.I. & Steel: 3/16”

All quantities

Samples: 2-10 weeks Production: 2-4 weeks A.S.A

Talbot Associates, Inc.Talbot Associates, Inc.

Page 6: Talbot Associates, Inc. · PDF fileon metal and quantity) Talbot Associates, Inc. ... semi-solid state, then transferred ... copper alloys Ounces to 5 lbs., some

Talbot Associates, Inc. - Guide to the Proper selection of Casting Techniques

Semi-Solid Metal (SSM)

Specially prepared metal slugs are gradually heated to a semi-solid state, then transferred to forming machine, where ram injects (squeezes), under pressure, the metal into die. Die opens and part is ejected.

Aluminum, magnesium, and some copper alloys

Ounces to 5 lbs., some processors capable of larger sizes

Al and Mg ± .002”/in. Brass ± .007 Add ± .001 to ± .010 across parting line depending on size.

1 4 3 32-63 RMS

1 preferred ½ possible

.030” 2,500 pieces and up (usally 50,000 pieces and up)

Samples: 10-15 weeks Production:6-8 weeks A.S.A

Metal Injection Molding

Very fine metal powder, combined with binder material, is injected

Primarily ferrous alloys limited Copper Base

.0005 lbs. to .22 lbs.

± 005”/in. 2 1 1 45 RMS 1/4 .015” Small areas

Usally 10,000 and up

Samples: 10-16 weeks Production: 4-6 weeks A.S.A

Talbot Associates, Inc. Post Office Box 440 11 Cleveland Place Springfield, NJ 07081-0440 Phone: (973) 376-9570 Fax: (973) 376-7617 www.metalbot.com E-Mail: [email protected]

The above are generalities and should be used only as a rough guide. When in doubt, check with your TAI Sales Engineer. Often you will wish to evaluate two or more processes for a given part. He can elaborate on the above information as applied to your specific parts.

Copyright 2009 Talbot Associates Inc.

A.S.A. After Sample Approval * These are for critical dimensions and should not

be specified where not necessary. ** draft Requirements inversely affected by depth

of draw. + 1-Most. 5-Least. ++ Size and surface area influence this

considerably +++ This will vary widely depending on business

conditions and foundry load.

Availability of CAD files and New Rapid Prototyping processes can cut sampling time in half or less.