×
Log in
Upload File
Most Popular
Study
Business
Design
Technology
Travel
Explore all categories
The top documents tagged [ir upgrade]
Longitudinal Matching, or How to move things around by a hairs-width at the speed of light…
218 views
Accelerator Summary 1/22/2004 K. Oide (KEK). Accelerator Session: PEP-II IR Upgrade M. Sullivan (SLAC) Super KEKB Optics & IR Y. Ohnishi(KEK) Super-PEP-II
226 views
1 Optics and IR design for SuperKEKB Y.Ohnishi 1/19-22, 2004 Super B Factory Workshop in Hawaii
219 views
Accelerator Summary
35 views
Micro Bunching Instability Damage
40 views