×
Log in
Upload File
Most Popular
Study
Business
Design
Technology
Travel
Explore all categories
The top documents tagged [beambeam separation]
Sat/Sun 26/27 th March Sat 18h20: Stable beams. Fill #1653. Sun 10h02: Stable beams continued. vdM scans. Length calibrations. 16h59: Beam dump. Delivered
222 views
LHC Technical Committee, 23/05/20071 LHC Commissioning Phases Squeeze presented by Massimo Giovannozzi on behalf of the LHCCWG Particular thanks to S
213 views
Working Group 2 Closing Summary
40 views
LHC PIC performance and aspects related to the injectors
41 views
Sat/Sun 26/27 th March
25 views
IT BPM tolerances for HL-LHC orbit correction
55 views