system protection department - … 2.0 activities of system protection department : the system...

115
1 INFORMATION OF THE SYSTEM PROTECTION DEPARTMENT B.E.S. & T. UNDERTAKING [ Information mandatory under Section 4 of Chapter II of Right to Information Act, 2005]

Upload: truongdien

Post on 04-May-2018

236 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

1

INFORMATION OF THE

SYSTEM PROTECTION DEPARTMENT

B.E.S. & T. UNDERTAKING

[ Information mandatory under Section 4 of Chapter II of Right to Information Act, 2005]

Page 2: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

2

4.(b) (i)} The particulars of the department, functions and duties

Name of the Department System Protection Department

Address 2

nd Floor, Technical Training Centre Bldg., BEST Wadala

Depot, Wadala, Mumbai- 400 031.

Contact No. 022-24186301, 24186304

E-mail [email protected]

[email protected]

1.0 Formation of System Protection Department

The erstwhile Meters and Relays Department was carrying out three major functions viz.,

Meters, Relays and HV metering. In the advent of the Electricity Act, 2003, a need was

felt to restructure the Electric Supply Branch to segregate the activities as Field Operating

establishment, Customer Care establishment, Planning Establishment and Ancillary

Establishment for smooth working and flexibility in horizontal mobility of the personnel

for better utilization. Accordingly while restructuring the supply branch the Meters &

Relays Department was bifurcated into two departments as Meters Department under

Customer Care establishment (Supply Business) and System Protection Department

under Field Operating establishment (Wire Business) vide Administrative Order no. 359

dated 07.09.2011. The System Protection Department has been kept under the direct

control of Chief Engineer (Maint. / Work). System Protection department has started its

functioning from 22nd October 2011 and its office is located at 2nd

floor, T.T.C. building,

Wadala Depot.

1.1 Organization of the department:

The department set up is shown in the attached organization chart. Please refer

Annexure- I. The activities of the department are mainly related with five O & M

Divisions. Hence each zone of O & M Divisions is assigned to five Assistant Engineers.

Page 3: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

3

2.0 Activities of System Protection Department :

The System Protection department is responsible for carrying out activities of testing and

maintenance of all the relays installed in various Receiving stations for the protection of

our 110 kV, 33 kV and 11 kV network. The discriminative tripping is the backbone of

any distribution system since it helps in isolating the exact fault area and thus avoids the

unnecessary revenue loss which otherwise would have incurred if the healthy network

also would have tripped along with faulty network. At present there are 61 nos. of RSS,

out of which 4 nos. are 110 kV RSS. In addition to the above 9 nos. of new RSS are in

pipeline and are expected to be commissioned in the recent future. Besides tripping

messages are also attended by the System Protection Department for investigation and for

taking corrective measures, if any.

The Functions and duties of department

I) Technical Functions

1.0 The System Protection Department carries out following major functions

i) Setting and testing of Relays & other equipments prior to commissioning of new RSS

ii) Setting and testing of Relays & other equipments prior to replacement of equipments

in existing RSS

iii) Routine maintenance which includes inspection, testing and attending defects of CT,

PT and Relays

iv) Tripping investigations and remedial actions

v) Trip coil testing of DSS Breakers at Distribution Workshop, Kussara

vi) Study of drawings of various equipments received from manufacturers

vii) To adopt proper protection system

viii) To derive the relay setting for adopted protection system.

1.2 The above functions consists of following activities

a) Routine Testing

i) Outgoing Feeder Relay testing

Page 4: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

4

ii) Capacitor Feeder Relay testing

iii) Transformer Relay testing

iv) OCB overhauling

v) AVR inspection and overhauling

b) Tripping

i) Transformer tripping investigation

ii) Feeder tripping investigation

iii) Defective AVR repairs / replacement

iv) Defective CT & PT replacement

v) Defective Relay replacement

c) New commissioning and replacement jobs

i) Noting of details & rough drawings

ii) HV CT and NCT testing

iii) LV CT testing

iv) HV & LV PT testing

v) Through testing

vi) RD & REF Stability testing

vii) Report & maintaining Fair History book

viii) RVT testing

ix) Conventional relay replacement by Numerical Relay in South Zone.

d) Commissioning of new SCADA System

i) HV, LV and NCT testing

ii) HV & LV PT testing

iii) Through testing

iv) RD & REF Stability testing

v) Report & maintaining Fair History book

vi) Commissioning of AREVA make relays on feeder.

Page 5: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

5

e) Miscellaneous

i) Materials arrangement

ii) Office work

II) Establishment and Administrative Section Function

1.0 Activities :

1.1 Establishment:

i. Maintaining staff position

ii. Initiating various proposals relating to Establishment matters

iii. Keeping staff record, file, register etc.

1.2 Administrative :

1.2.1 Procurement of stationary & material

1.2.2 Arranging various payments

1.2.3 House-keeping

1.2.4 Initiating various proposals relating to Administrative matter

1.2.5 Keeping records

2.0 Records and Registers

2.1 Registers

2.1.1 Establishment

2.1.1 Staff Record, Bus Token

2.1.2 Staff position, Superannuation

2.1.3 Final Dues Payment

2.1.4 Service Record File Movement

2.2 Dispatch:

Inwards/Outward/File movement/Tenders & Inspection Forms/Purchase Forms

2.3 Administration :

Bill Voucher, Deputation, Brief-case, Verification of Registration of Motor cars,

Computer repairing & servicing, Inventory, Overtime, Sunday working, Purchase Form,

Issue of Napkins/ Soap, Leave, Attendance, Zerox copy records, Imprest Cash, Annual

Maintenance Contract of Computer/ Printers, Casual Labour Attendance & Payment, etc..

Page 6: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

6

2.4 Files:

2.4.1 Establishment & Administration

2.4.2 Technical data

2.4.3 Receiving S/ Stations

2.4.4 Miscellaneous

4.(b)(ii)} The powers and duties of System Protection Department

Officers and Employees

Designation Grade Schedule

Strength

On Roll Staff

i) Officers

Superintendent A-4 1 1

Assistant Engineer A-5 5 5

Foreman General P1/T-8 6 4

Asst. Admin. Officer A/GVIII 1 1

ii) Technical Staff

Foreman P1/T7 5 5

Asst. Foreman P1/T6 4 3

Tradesman P1/T3 1 1

Nawghany P1/T1 5 5

M.V. Driver P2/G3 1 --

iii) Administrative Staff

Clerk {Supervisor (P)} A/GVII 1 1

Shop Recorder {Supervisor (P)} A/GVII 1 1

Sepoy A/GV I 1 1

Page 7: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

7

1.0 The Powers and Duties of Superintendent:

Due to abolition of post of Divisional Engineer System Protection Department,

Superintendent is over all in-charge of System Protection Department. He is directly

reporting to Chief Engineer Maintenance for efficient administration and functioning of

the department and shall be responsible for the following activities:

1.1 He is overall in-charge of the activities mentioned in Technical Manual & work

procedure under para 3.0.

1.1.1 Ensuring smooth and satisfactory working of the department.

1.1.2 To supervise the activities of the department as mentioned in Technical Manual & work

procedure under para 3.0 and guide the officers and staff under his control.

1.1.3 To initiate new methods / developing supportive work atmosphere for economizing and

increasing efficiency of the department.

1.1.4 To control the budget grants.

1.1.5 To prepare proposals for purchase of new equipments considering the new development

in the relay field.

1.1.6 To approve protection system adopted for various R.S.S.

1.1.7 To approve settings adopted for various R.S.S.

1.1.8 To impart satisfactory training of Probationary Engineers. Graduate Apprentices and In-

plant Trainees of 3rd

& 4th

year degree/diploma students from various engineering

colleges.

1.1.9 To visit at work site for ensuring programming of the numerical relays at the time of

commissioning of Receiving Sub Stations and to ensure relay testing, through testing and

stability test of Receiving Sub Stations Transformers.

1.1.10 To attend Tender Committee meeting and different departmental/ outdoor meetings.

1.1.11 To carry out Inspection of new material purchased and clear the Inspection Memo.

1.1.12 To assist Assistant Engineer to offer the comments on specification & drawing of Control

Relay Panel, Primary switchgear, Secondary switchgears & Bus Section switchgears used

in RSS & 11kV switchgears including RMU in DSS.

1.1.13 Complying with Standing Orders/ Service Regulations.

1.1.14 Guiding for preparing MIS/Administrative Report.

1.1.15 Guiding for preparing different proposals/reports.

Page 8: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

8

1.2 Administrative Functions

1.2.1 To sanction Leave Forms of Officers & Staff working in System Protection Department.

1.2.2 To certify the attendance of the officers and staff and to sanction of various types of

Imprest Cash Bills vouchers, Overtime etc.

1.2.3 To approve payment advices of various types of monthly allowances payable to officers

and staff, casual labour payments.

1.2.4 Writing of Confidential reports of Officers & staff working under him.

1.2.5 Supervision of Officers & staff working under him.

1.2.6 Drafting inter-departmental notes and letters.

1.2.7 Recommending tenders for procurement of Materials/equipments.

1.2.8 Attending different inter-departmental/ outdoor meetings.

1.2.9 Complying with Standing Orders/ Service Regulations.

1.2.10 Assisting Assistant Engineers for preparing MIS/Administrative Report.

1.2.11 Assisting Assistant Engineers for preparing different proposals/reports.

1.2.12 Assisting Assistant Engineers for budget provision.

1.2.13 To determine the staff requirement for smooth working of the department. To take up the

matter with higher authorities and concerned panel chairmen for filling up of the vacancy.

2 The Powers and Duties of Assistant Engineers

2.1 Duties & Responsibilities

2.1 There are five posts of Assistant Engineers in the System Protection Department for five

zones i.e. Central North, North East, North West, South & Central South. Assistant

Engineers are responsible to Superintendent Engineer for the major activities mentioned

in Technical Manual & work procedure under para 3.0 and shall carryout:

2.1.1 To derive setting of protective relay for adopted protection system.

2.1.2 Repairs, setting and testing of Protective relays in Receiving Sub-Stations.

2.1.3 Current and Potential transformer testing in Receiving Sub-Stations.

2.1.4 Repairing, setting and testing of AVR‘s i.e. Automatic Voltage Regulating relays.

2.1.5 CT and Trip Coil testing of OCB/VCB/RMU in Distribution Workshop, Kussara.

Page 9: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

9

2.1.6 Procurement of equipment/Instrument, tools and spares for System Protection

Department.

2.1.7 Up-keeping an account of relays, AVR‘s and other equipments / instruments of System

Protection Department.

2.1.8 Carry out pre-commissioning tests on equipments/ instruments of Receiving Sub stations

2.1.9 Carry out pre-commissioning tests on equipments of Distribution Sub stations as and

when required.

2.1.10 Commissioning of new protective relays on trial basis.

2.1.11 Preparing commissioning report of Receiving Sub stations.

2.1.12 Initiating proposals for scrapping of protective relays, equipments/instruments, tools,

auxiliary C.T.‘s etc.

2.1.13 Carrying out tripping investigation in the Receiving Sub Stations & preparing tripping

investigation report.

2.1.14 Inspection of Materials received against Purchase Order.

2.1.15 To sublet satisfactory training of Probationary Engineers. Senior Stipendiary Apprentices

2.1.16 To program the numerical relays at the time of commissioning of equipments in new /

existing Receiving Sub Stations.

2.1.17 To carryout testing of Current and Potential transformers in Receiving Sub-Stations.

2.1.18 To carry out commissioning tests i.e. relay testing, through testing and stability tests of

Transformers in Receiving Sub Stations.

2.1.19 To carry out commissioning tests i.e. relay testing, through testing of feeders in

Receiving Sub Stations.

2.1.20 To offer the comments on specification & drawing of Control, Alarm Relay Panel,

Primary switchgear, Secondary switchgears & Bus Section switchgears used in RSS &

11kV switchgears including RMU in DSS.

2.1.21 To prepare different formats for relay testing and through testing of Outgoing feeders,

Capacitor feeder and Power Transformer to ease testing.

2.1.22 To arrange repairing of protection relays, instruments, AVRs, Auxiliary relay from

Manufacturer and administrative procedure thereof.

Page 10: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

10

2.2 Administrative Functions

2.2.1 Sanction Leave Forms of Staff working in System Protection Department.

2.2.2 Certify the attendance, Taxi Bills, Xerox Bills, and Overtime etc.

2.2.3 Writing of Confidential reports of staff working under him.

2.2.4 Supervision of staff working under him.

2.2.5 Drafting inter-departmental notes and letters.

2.2.6 Recommending tenders for procurement of Materials/equipments.

2.2.7 Attending different departmental/ outdoor meetings.

2.2.8 Complying with Standing Orders/ Service Regulations.

2.2.9 Assisting Sectional Head for preparing MIS/Administrative Report.

2.2.10 Assisting Sectional Head for preparing different proposals/reports.

2.2.11 Forwarding statement of Group Incentive Bonus.

2.2.12 Assisting Sectional Head for budget provision.

3 The Powers and Duties of Foreman General / Charge Engineer (P1/T-8)

3.1 Duties and Responsibilities

Foreman General is responsible to Assistant Engineer for the following activities for the

jobs mentioned in Technical Manual & work procedure under para 3.0.

3.1.1 Arranging testing equipments for relay setting and testing at site.

3.1.2 Repairs and testing of protective relays, Automatic Voltage Regulating relays in

Receiving Sub Stations.

3.1.3 CT and Trip coil testing of RMU/VCB in Distribution Workshop, Kussara.

3.1.4 Procurement of various electrical/electronic items and stationary for the relay testing

crew.

3.1.5 Keeping account of spares parts, relays, auxiliary C.T.‘s etc. pertaining to System

Protection Department.

3.1.6 Maintaining/updating various registers of System Protection Department.

Page 11: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

11

3.1.7 Maintaining different technical drawing, documents of protection system equipments,

testing equipment, instruments etc.

3.1.8 Carrying out Pre-commissioning test of protection system at Receiving Sub Stations.

3.1.9 Carrying out tripping investigations as & when required.

3.1.10 Preparing and forwarding tripping investigation reports.

3.1.11 Attending complaints pertaining to protection system received from concerned

departments.

3.1.12 Supervision of staff working under him.

3.1.13 Writing report after completion of job.

3.1.14 Ensuring that all the jobs/activities assigned to him are carried out in reasonable time.

3.1.15 Ensuring that the quality of the job assigned is maintained.

3.1.16 Assisting SCADA installation crew for checking the healthiness of circuits.

3.1.17 Maintenance of different registers, files associated with Commissioning of Receiving Sub

Stations equipments/ instruments and Routine Relay Testing.

3.1.18 The job completion message shall be lodge in the respective Control.

3.1.19 Ensuring that vehicles and log books are maintained properly.

3.1.20 To maintain the fair history books for each RSS with all technical details and connection

diagrams as per actual wiring carried out.

3.1.21 To carry out activities as mentioned under Technical Manual & work procedure under

para 3.0.

3.1.22 Recommended leave forms of staff working under him.

3.1.23 Assisting SSP/AESP for preparing MIS and Annual Report.

3.1.24 Preparing and forwarding incentive statements to TIE Department.

3.1.25 Maintaining Leave Attendance Register of staff working under him.

3.1.26 Any other work in emergency entrusted by officers.

3.1.27 To arrange repairing of protection relays, instruments, AVRs, Auxiliary relay from

Manufacturer.

3.1.28 To carryout Current and Potential transformer testing in Receiving Sub-Stations.

Page 12: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

12

4 The Duties and Responsibilities of Foreman (P1/T-7)

4.1 Duties and Responsibilities

Foreman is responsible to Foreman General for the following activities and for the jobs

mentioned in Technical Manual & work procedure under para 3.0.

4.1.1 Repairs and testing of protective relays Receiving Sub-Stations.

4.1.2 Repairing and testing of AVR i.e. Automatic voltage Regulating relays in Receiving Sub

Stations.

4.1.3 CT and Trip coil testing of VCB/RMU in Distribution Workshop, Kussara.

4.1.4 To carryout Current and Potential transformer testing in Receiving Sub-Stations.

4.1.5 To maintain electrical/electronic items, tools kit & spares allotted for relay testing.

4.1.6 Maintaining/ Up keeping equipments/instruments pertaining for relay testing.

4.1.7 Ensure that vehicle log book is maintained properly.

4.1.8 Submitting report of defective relays/equipments attended.

4.1.9 Any other work in emergency entrusted by officers.

4.1.10 If called, he shall report in shift duty.

4.1.11 Testing of relays in Receiving Sub Stations and carry out the adjustments to get the

required relay characteristic.

4.1.12 To carry out through testing of transformer and feeders in Receiving Sub Stations.

4.1.13 To carry out stability tests of transformer in Receiving Sub Stations.

4.1.14 To carry out the pre-commissioning tests in case of New/Re-modeling of Receiving

Stations.

4.1.15 To Assist Foreman General / Assistant Engineer to carry out Tripping Investigation in

Receiving Sub Stations.

4.1.16 To carry out activities as mentioned in Technical manual under para D (3.0).

5.0 The Duties and Responsibilities of Assistant Foreman (P1/T-6)

5.1 Duties and Responsibilities

The Assistant Foreman is responsible to Foreman for the following activities and for the

jobs mentioned in Technical Manual & work procedure under para 3.0.

Page 13: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

13

5.1.1 Assisting to Foreman to carry out outdoor/indoor repairing/overhauling of protective

relays/instruments, relay testing set etc.

5.1.2 Attending complaints pertaining to protection system.

5.1.3 Reporting distribution workshop for VCB/RMU testing.

5.1.4 Submitting reports of damaged/repaired relays/instruments etc.

5.1.5 Assisting to Foreman during site testing.

5.1.6 Cleaning of control panels, relays & feeder panels & its associated wiring in the

Receiving Sub Stations.

5.1.7 Assisting to Foreman General/Foreman/Nawghany for material shifting.

5.1.8 If called, he shall report in shift duty.

5.1.9 Any other work in emergency entrusted by officers/supervisor.

5.1.10 Routine inspection of Automatic Voltage Regulating Relay (AVR) & attending AVR

complaints.

5.1.11 Assisting to Foreman for CT & Trip coil testing of Distribution Sub-Station Breaker in

Distribution workshop, Kussara.

5.1.12 Assisting Foreman General/Foreman for Pre-commissioning tests at Receiving Sub

Stations.

5.1.13 Assisting Foreman General/Foreman for repair/replacement and testing of protective

relays.

5.1.14 Cash purchase of electronic/electrical items.

5.1.15 Submitting reports of damaged/repaired relays, AVRs etc. to Foreman General.

5.1.16 Any other job as and when instructed by officers/supervisors.

5.1.17 Assisting testing crew for loading/unloading relay testing equipments/instruments.

6.0 The Duties of Nawghany (P1/T1):

6.1 Duties

6.1.1 Loading/unloading of relay testing & equipments safely.

6.1.2 Assisting testing crew while carrying out relay testing activity.

6.1.3 Cleaning the relay testing set/ instruments before carrying out testing.

Page 14: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

14

6.1.4 He should take initiative for learning different activities carried out in the in the System

Protection Department.

6.1.5 If called, he shall report in the shift duty.

6.1.6 If required, he should dispatch files/reports etc. to other departments.

6.1.7 To guard relay testing set/ instruments.

6.1.8 Cleaning of relay store room

6.1.9 To maintain his day to day diary.

6.1.10 Cleaning of vehicle.

6.1.11 Assisting Officers and Admin. Staff whenever needed.

6.1.12 Intimating to the officer/supervisor if any abnormality/accident occurred.

6.1.13 Cleaning of control/relay panel & feeder panels in the Receiving Sub-Stations.

6.1.14 Any other work as and when instructed by officers/supervisors.

7.0 M.V. Driver (P2/G3)

He shall drive the undertaking‘s all type of vehicles.

8.0 Duties and Responsibilities of Administrative Officers and Staff of System

Protection Department

8.1 The Powers and Duties of Assistant Administrative Officer (A/GVIII)

Assistant administrative officer shall be responsible to Superintendent System Protection

for establishment and administrative matters of the department.

8.1.1 To ensure proper maintenance of Staff Record Files

8.1.2 To ensure proper maintenance of the attendance registers

8.1.3 To ensure proper maintenance of the register for office equipment and furniture

8.1.4 Controlling budget grants

8.1.5 To ensure proper maintenance of the filing system of the department

8.1.6 To ensure proper maintenance of the Imprest Cash account.

8.1.7 Complying with the provisions of various statutory Acts, viz. Factories Act, Payment of

Wages Act, Worker‘s Compensation Act, etc.

8.1.8 Complying with Standing Orders & Service regulation

Page 15: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

15

8.1.9 To assist for preparing deputation allowance, cash advances & JE bills and maintaining

its register

8.1.10 To ensure proper maintenance of Incoming and outgoing papers record (dispatch work)

8.1.11 Putting up notes for filling up vacancies and following them up.

8.1.12 Ensuring that staff records are maintained properly

8.1.13 Ensuring that the attendance sheets/registers are maintained and initiating cases for taking

action against the staff, having irregular attendance

8.1.14 Preparing the establishment schedule and Capital & Revenue budgets

8.1.15 Putting up sanction forms for purchase of dead stock and capital items and maintaining

the register up to date

8.1.16 Ensuring proper maintenance of filing system and ensuring that all the papers are

properly and correctly filed

8.1.17 Compiling administration reports

8.1.18 Ensuring that all procedure regarding administrative matters are properly followed in

accordance with the Service Regulations / Standing Orders

8.1.19 Supervision of clerical staff

8.1.20 Ensuring that all office records are properly maintained

8.1.21 Ensuring that outward bill memos are correctly prepared within a reasonable time

8.1.22 Ensuring that all returns with respect to Employment Exchange, statement of

performance, targets, monthly report of absenteeism, etc are sent in time

8.1.23 Controlling stationary items

8.1.24 Initiating and following up the cases for procurement of materials, timely issue of

monsoon apparels/ uniforms allowance and stitching allowance, diaries, etc.

8.1.25 Initiating notes pertaining to staff matters, such as filling up of post, creation / abolition

of post scholarships, advances, recovery statements, etc and procurement of capital and

dead stock items.

8.1.26 Monitoring timely submission of monthly statements.

Page 16: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

16

8.2 The Duties of Clerk/Supervisor (P) (A/GVII) :

The Clerk/Supervisor (P) is responsible to AAOSP for following duties & functions:

8.2.1 Preparation of monthly statements like tenders & Inspection Forms, pending cases, VIP

statements, etc.

8.2.2 Receiving and sending papers and files, etc.

8.2.3 Initiate various notes & letters regarding establishment and staff matters.

8.2.4 Releasing final bills follow up of Establishment proposals.

8.2.5 Putting up proposals for silver medal and wrist watch on BEST Day.

8.2.6 Issue of Uniform allowance, stitching charges and washing allowance advice etc.

8.2.7 Preparing payment advice for Field Duty, Hazardous and Distribution loss

Allowance/Overtime/Meal Allowance, casual labour payment etc.

8.2.8 Preparing Bill Vouchers towards the payment of Deputation, Medical Reimbursement,

Car Advance, etc.

8.2.9 Verification of Motor Driving Licence

8.2.10 Issue of Service Certificates and general certificates, Identification notes

8.2.11 Sending Monthly, quarterly, half yearly, yearly and occasional statements regarding

establishment matters to various departments.

8.2.12 Checking of various applications like P.F./Society Loan, Medical reimbursement,

Housing Loan Subsidy, Pension and application from Ex-employees children‘s for

employment, etc. for certification.

8.2.13 Filing of Staff Record papers.

8.2.14 Keeping Inward/Outward file movement, Tender & Inspection Forms, Overtime &

Purchase Forms

8.2.15 Compilation of files

8.2.16 Filing of all office file papers

8.2.17 Initiating Brief-case proposals and maintaining its register

8.2.18 Work regarding payment of Scholarship

8.2.19 Any other work entrusted by AAOSP

Page 17: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

17

8.3 The Duties of Shop-Recorder/Supervisor (P) (A/GVII):

The Shop-Recorder/Supervisor (P) is responsible to AAOSP for following duties &

functions:

8.3.1 Attending Administration queries

8.3.2 Initiating proposals like procurement of any material etc.

8.3.3 Maintaining Inventory & related works

8.3.4 To send monthly absentee memos of officers

8.3.5 To send monthly absentee reports

8.3.6 Keeping Imprest cash and maintaining its registers, bills of purchase through Imprest

cash etc.

8.3.7 Follow up of Stores proposals of System Protection Departments

8.3.8 Procurement of material which is a non-stock items

8.3.9 Collecting information for System Protection Department

8.3.10 Sending Work Requisition regarding complaints for civil work and its follow up

8.3.11 Procuring stationary

8.3.12 Assisting AAOSP in preparing Revenue & Capital Budgets

8.3.13 Motor Vehicle Statement and related work

8.3.14 Initiating Purchase Forms and keeping Sanction Forms Register

8.3.15 Preparation of outward Bill Memos and related work

8.3.16 Maintaining attendance, leave record and Keeping LTA records of all staff of the

department

8.3.17 Producing leave record for promotion assessment, silver medals etc.

8.3.18 Preparing absentee memo of ‗A‘ & ‗B‘ grade officers

8.3.19 Preparing daily e-job sheet of casual labours and staff.

8.3.20 Preparing payment advice for Field Duty, Hazardous and Distribution loss

Allowance/Overtime/Meal Allowance, casual labour payment etc.

8.3.21 Preparing bill voucher for payment of hiring charges of vehicle.

8.3.22 Maintaining attendance of Graduate Apprentice / Trainee Apprentice and forwarding

their progress report to DETIE

8.3.23 Filing of all papers of System Protection Departments in their respective files

8.3.24 Any other work entrusted by AAOSP.

Page 18: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

18

8.4 Sepoy (A/G I):

The sepoys will carry out following duties and functions:

8.4.1 Receiving papers, files etc. from various departments/ sections / staff and forwarding the

same to the concerned department/sections/ staff on getting acknowledgment, whenever

it is necessary.

8.4.2 Forwarding dispatch to various offices of the Undertaking and other private parties

whenever required and also collecting the same back from those offices.

8.4.3 To deliver Undertaking‘s letter / Memo at the residence of employees and officers

8.4.4 Collecting the keys of the department to open the department in the morning and

depositing the same to Security post after closing the department in the evening.

8.4.5 To open the department‘s doors, windows in the morning, to clean the tables & chairs of

the staff and closing the same in the evening

8.4.6 To attend bell of cabins and calls of the staff

8.4.7 To make arrangements of tea/coffee

Page 19: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

19

4.(b)(iii)} i) The procedure followed in the decision making process

including channels of supervision and accountability in

case of technical activities

Sr.

No. Decision Making Process

Channels of

Supervision Accountability

1 Commissioning of new RSS & Replacement jobs in

existing RSS SSP AESP

1.1 Derive relay setting for New RSS & replacement job SSP AESP

1.2

Writing a nameplates of switchgears, Breakers,

Current Transformers, Potential Transformers,

CARPs and Power Transformers in rough book &

Fair Book

Charge Engineer /

Foreman General

Foreman / Asst

Foreman

1.3 Drawing of CT & PT circuits in rough book & Fair

Book AESP Foreman

1.4 Testing of Current Transformers by Omicron make

CT Analyser AESP

Charge Engineer /

Foreman General,

AESP

1.5 Testing of Potential Transformer AESP Charge Engineer/

Foreman General

1.6 Setting & testing of relays AESP Charge Engineer/

Foreman General

1.7 Testing of Tap-Change Control Relays Charge Engineer /

Foreman General

Foreman/Asst.

Foreman

1.8 Tightening of all connections Charge Engineer /

Foreman General

Foreman/Asst.

Foreman

1.9 Through testing from CT end as per testing sheet AESP Charge Engineer/

Foreman General

1.10 RD & REF Stability Testing as per testing sheet AESP Charge Engineer/

Foreman General

1.11 Confirmation for tripping of HV Breakers on

different protection and transformer commands AESP

Charge Engineer/

Foreman General

1.12 Prepare a Fair book for each job AESP Charge Engineer/

Foreman General

1.13 Log a message for completion of work at

Supervisory/System Control AESP

Charge Engineer /

Foreman General

1.14 Logging of message from control in the logbook

provided in the dept. AESP

Charge Engineer /

Foreman General

1.15 Co-ordination of System Protection Dept. and

SCADA (T&E Dept.) for SCADA job AESP/SSP

Charge Engineer /

Foreman General

1.16

Co-ordination of System Protection Dept. with

various O&M Divisions for outages for Routine

Testing jobs & Tripping Investigation.

AESP/SSP Charge Engineer /

Foreman General

Page 20: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

20

ii) The procedure followed in the decision making process including

channels of supervision and accountability in case of

administrative activities

The overall in-charge and accountability is with Superintentendent System Protection

Sr.

No. Decision Making Process

Channels of

Supervision Accountability

2.0 Routine relay testing of Transformer AESP/SSP Charge Engineer /

Foreman General

3.0 Routine relay testing of Feeder Charge Engineer /

Foreman General Foreman

4.0 OCB overhauling Foreman Foreman/ Asst.

Foreman

5.0 AVR inspection and overhauling Foreman Foreman/ Asst.

Foreman

6.0 Tripping Investigation AESP/SSP Charge Engineer /

Foreman General

7.0 Replacement of Defective relays, CTs & PTs AESP Charge Engineer /

Foreman General

8.0 To mark attendance of staff and their booking for

outdoor and indoor activity AESP

Charge Engineer /

Foreman General

9.0 Arrangement of vehicle, Transportation of Material

& Tools. AESP/SSP

Charge Engineer /

Foreman General

10.0 Procurement Tools & Equipments for carrying out

Routine Activities AESP/SSP AESP

11.0 Repairing & Scrapping of Tools, Equipments,

Relays AESP/SSP

Charge Engineer /

Foreman General

12.0 Comments on Specifications, Drawings of

Equipments for DSS & RSS AESP/SSP AESP

Sr.

No. Decision Making Process

Channels of

Supervision Accountability

1

As regards to the various administrative functions

carried out by the administrative staff as mentioned

in duties and responsibilities of the administrative

staff, the administrative work is carried out as per

the set procedure /policies/ guidelines issued and

approved by management vide various circulars,

Administrative Order, Procedure Order, S.R. & S.O.

etc.

AAOSP/SSP

The concerned

administrative staff

initiating the work during

the course of duty.

Page 21: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

21

TECHNICAL MANUAL AND WORK PROCEDURES

a ) TERMINOLOGY

1.0 Protective System: is a team of protection relays, circuit breakers, CT‘s, PT‘s,

Secondary control cables, trip circuit, battery system accessories etc.A combination of

protective gear designed to secure under predetermined conditions, usually abnormal, the

disconnection of an element of a power system, or to give an alarm signal or both.

2.0 Protective Scheme: The co-ordination arrangement for the protection of one or more

elements of power system.

3.0 Protective Relay: A relay is designed to initiate disconnection of a part of an electrical

installation or to operate a warning signal, in case of a fault or other abnormal condition

in the installation. A device designed to produce sudden pre-determined changes in one

or more electrical circuits after the appearance of certain conditions in the electrical

circuit controlling it.

3.1 Relays are compact analog, digital and numerical devices that are connected throughout

the power system to detect intolerable or unwanted conditions within an assigned area

such that to maintain a high degree of service continuity and limit the equipment damage.

4.0 Protected Zone: A portion of a power system protected by a given protection system or a

part of that protective system.

5.0 Main Protection: Protection normally expected to take the initiative in case of a fault in

the protection zone.

6.0 Back up Protection: Protection provided to act as substitute for the main protection in

the event of failure or inability of the latter.

Page 22: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

22

6.1 Relay Back-up: An arrangement, which provides an additional relay using the same or

alternate principle of operation from that of the main relay (It is preferable to have

separate C.T. and if necessary separate P.T. for relay backup)

6.1 Circuit Breaker Back-up: An arrangement at the next which provides isolation from

source when circuit breaker nearest to fault fails to open or in case there is failure of the

secondary current or voltage. (It is usually of a time delay relay operated from the main

protection and connected to trip all the incoming feeders.)

6.2 Remote Back-up: An arrangement at the next station in the direction towards source,

which trips after a delayed time if the circuit breaker in the faulty section is not tripped.

7.0 Instantaneous Relay: A relay, which operates and resets with no intentional time delay.

8.0 IDMT Inverse Definite minimum time relay: An inverse time relay having an

operating time that tends towards a minimum definite value with increase in electrical

characteristic quantities.

9.0 Setting: The limiting value of a characteristic or energizing quantity at which the relay is

designed to operate under specified conditions.

9.1 Plug Setting Multiplier (PSM): A range of current setting for varying the relay

operating current provided in the relay.

9.2 Time Setting Multiplier (TMS): A means of adjusting the travel of the disk and thereby

varying the time of operation of the relay for a given value of the fault current.

9.3 Pick-Up (PU): A relay is said to pick-up when it changes from the unenergized position

to the energized position.

9.4 Drop Out: A relay drop out when it moves from energized position to unenergized

position.

10.0 Burden: The loading imposed by the circuits of the relay on the energized power source

or sources, expressed as the product of voltage and current (Volt –amperes or Watts if

PC) for a given condition which may be either at setting or at rated current or voltage.

Page 23: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

23

11.0 Characteristic Curve: The curve showing the operating value of the characteristic

quantity corresponding to various values or combinations of the energizing quantities.

12.0 Residual Current: The algebraic sum of all the currents in a system is Residual Current.

13.0 Residual Voltage: The algebraic sum of all the phase to earth voltages in a system is

Residual Voltage.

14.0 Knee Point Voltage: The sinusoidal voltage of rated frequency applied to secondary

terminals of a current transformer, all other winding being open circulated, which when

increased by 10% Causes the exciting current to increase by 50%.

b) PRINCIPLE OF PROTECTIVE SYSTEM

Every electrical equipment is designed to work under specified normal conditions. In

case of short circuits, earth faults etc. an excessive current will flow the windings of the

connected equipment and cause abnormal temperature rise, which will damage the

winding. Further it may cause total shunt down of unit, which will result in heavy loss of

revenue.

A fault in electrical equipment is defined as a defect in its electric circuit due to which

flow of current is diverted from the intended path. Faults are caused by breaking of

conductors or failure of insulation.

Fault impedance is generally low and fault currents are generally high. During the faults,

the voltages of three phases become unbalanced and the supply to the neighboring circuit

is affected. Fault currents being excessive, they can damage not only faulty equipment

but also the installation through which the fault current flows.

There are several causes of faults occurring in a particular electrical system. Faults can be

minimized by improved system design, improved quality of equipment, better and

adequate protective system, better operation and maintenance etc. however, fault cannot

be eliminated.

c) FUNCTIONS OF PROTECTIVE SYSTEM

1) To sound an alarm, so that the operator may take some corrective action.

Page 24: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

24

2) To close the trip circuit of circuit breaker so as to disconnect a faulty component

during an abnormal fault condition such as overload, under voltage, temperature

rise, unbalanced load, reverse power, under frequency, short circuit etc.

3) To disconnect the faulty parts as quickly as possible as to minimize the damage to

the faulty part and to prevent subsequent faults.

4) To localize the effect of fault by disconnecting the faulty part from healthy parts

causing least disturbances to the healthy system (to improve the system stability

and service continuity.

d) REQUIREMENT OF PROTECTIVE SYSTEM

Protective system should have following qualities

1.0 Selectivity: The protective system should discriminate between abnormal and normal

conditions. It is ability of protective system to determine the point at which the fault

occurred and should isolate the only faulty portion from remaining healthy system to

minimize or no damage to system.

2.0 Speed: Protective system should disconnect a faulty element as quickly as possible, in

order to improve power system stability, minimize the damage and to increase the

possibility of second type of fault development.

Fault Clearing Time = Relay Time + Breaker Time

= Fault Instant (Relay Pick Up) to Closing of relay contact

+ Closing of relay contacts to Final breaker OFF.

The relay time of fast relay is in order of few cycles. Modern protective relay has

operating time of about 1 cycle. For Inverse Definite Minimum Time (IDMT) relays,

relay time can be adjusted between 6 seconds to 60 seconds.

3.0 Sensitivity: It is capability of relay to operate reliably under the actual minimum fault

condition. It is desirable to have the protection as sensitive as possible in order that it

shall operate for low value of actuating quantity.

Page 25: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

25

4.0 Stability: It is quality of protective system so that it remains inoperative and stable for

fault beyond the protective zone.

5.0 Reliability: The protective system should not fail to operate in event of faults in

protected zone. Also there should not be component failure of protective system.

6.0 Adequateness: Protection provided for any equipment should be adequate.

e) RELAY CLASSIFICATION:

1) Protection Relays: which detects defective lines, defective apparatus or other

dangerous conditions on Power system and gives commend to trip one or more

breakers which desired to operate. e.g. O/C, E/F, U/V etc.

2) Auxiliary Relays: This operates in response to operation of parent relays e.g. Master

Trip relay.

3) Monitoring Relays: Which verify the conditions on power system or in protection

system e.g. Trip supervision relay.

4) Regulating Relays: Which are activated when an operating parameter devices from

pre-determined limits e.g. AVR relay.

f) Classification of Relays according to operating Input quantity:

1.0 Relays operate when quantity rises / drops above/below a specified value.

1.1 Current operated relay : O/C for Overload, E/F for Earth fault

1.2 Voltage operated relay: U/V,O/V

1.3 Power operated relay: Directional relay or Reverse power relays

1.4 Pressure operated Relay: PRV

1.5 Frequency operated relay: U/F, O/F, df/dt

1.6 Temperature operated relay: OTI,WTI

Page 26: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

26

g) Classification of Relays according to operating time:

1. Instantaneous relay: operate in negligibly time interval

2. Definite time lag relay: operate after set time lag

3. Inverse Definite Minimum Time (IDMT) relay: operate as per characteristic curve

selected.

TYPICAL CHARASTERISTIC CURVE FOR RELAY

Formula for time of operation of IDMT relays

3 sec Normal Inverse: = (0.14 x TMS) / {(If/In) 0.02

- 1}

1.3 sec Normal Inverse: = (0.06 x TMS) / {(If/In) 0.02

- 1}

0.6 sec Normal Inverse: = (0.028 x TMS) / {(If/In) 0.02

- 1}

Very Inverse: = (13.5 x TMS) / {(If/In) 1 - 1}

Extreme Inverse: = (80 x TMS) / {(If/In) 2 - 1}

h) Classification of Relays according to performance category:

1. Directional relay

2. Distance relay

3. Differential relay

i) Classification of Relays according to operating principle:

1.0 Electromechanical relay

2.0 Static/Solid state relay

3.0 Microprocessor/numerical relay

1.0 Electromechanical Relay:

An electrical relay in which the designed response is developed by the relative movement

elements under the action of a current or voltage input circuit.

Page 27: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

27

2.0 Static/Solid State Relay:

Static relays are those in which the measured AC quantities are manipulated in analog

form and converted in to binary voltages. Logic circuits or microprocessor compare the

phase relationships of binary form to make a trip decision.

3.0 Numeric Relay:

Numeric relays are those in which the measured AC quantities are sequentially sampled

and converted in to numeric data form. A microprocessor performs mathematical and

logical operations on the data to make a trip decision.

Examples of Relay Panels

Old Electromechanical

Microprocessor-

Based Relay

The Numerical relay have data acquisition capabilities and provide useful service data

such as load current, fault current and others parameters, historic data, fault data. These

relays have programmable settings, programmable input and output relay contact and

continuous self-monitoring against any internal failures.

Electromechanical

Static

Comparator I

I0

0/1

I

A

D

C

Memory

CPU 0/1 I

I0

Microprocessor

Page 28: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

28

Advantages of Digital Relays

MultifunctionalCompatibility withdigital integrated systems

Low maintenance(self-supervision)

Highly sensitive,secure, andselective

AdaptiveHighly reliable(self-supervision)

Reduced burden onCTs and VTs

ProgrammableVersatile

Low Cost

Standard device numbers for relay as per ANSI Code:

2 :Timer relay

27 : U/V relay

59 : O/V relay

59N : Neutral displacement relay

50 : Instantaneous O/C relay

51 : I.D.M.T O/c relay

50N : Instantaneous E/F relay

51N : I.D.M.T. E/F relay

67 : Directional O/C relay

67N : Directional E/F relay

64R : Restricted E/F relay

64S : Standby E/F relay

87 : Differential relay

49 : Thermal O/L relay

63 : Transformer Aux Faults (Oil temp, Winding Temp, buchholz, OSR, PRD)

52 : Circuit breaker

52a : Circuit breaker No contact

52b : Circuit breaker NC contact

86 : Master trip/ Inter trip relay

25 : Synchro Check relay

95 : Trip circuit supervision relay

Page 29: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

29

j) Procedural Work:

1.0 Overview

1.1 PROTECTION SYSTEM OF THE B.E.S.T. NETWORK

The BEST Undertaking, on behalf of the BRIHAN MUMBAI MAHANAGARPALIKA

is the licensees for distribution of electric power within the City limits of MUMBAI.

Bulk power at 110 / 33 / 22 kV voltage levels is transmitted from TPC‘s five main

receiving stations at Carnac, Parel, Dharavi, Mahalaxmi and Backbay through

underground cables to BEST's 61 nos. receiving sub stations in BEST System. These are

bifurcated into 5 zones namely North West, North East, Central North Zone, Central

South and South Zones for operational convenience.

110 kV RSS – 4 Nos - Khetwadi (CS), DBA RSS (CN),

Nariman Point (S) & Backbay RSS (S)

33kV HT Room – 4 Nos - Jalan Mill (CN), Penninsula (Dawn Mill) (NW),

Futurex Marathon (CN) & VSNL (NW).

33kV kV DSS – 3 Nos – Parshad (NW), Avighna (NW) & Morarji Mill (NE)

33kV – 22kV / 11kV – 6.6 kV RSS – 50 Nos –

North East Zone – Sion Fort, Wadala, Raoli Hill, Kingsway, KEM Hospital,

Sewree, Swan Mill RSS

North West Zone – Dharavi, PMGP, Mahim Causeway, Mahim, Prabhadevi,

Nestle, Worli, Sitaladevi, Elphinstone Mill, Standard Mill

RSS, Pochkhanwala Road RSS

Central North Zone – Mahalaxmi, Parel, Kussara, Mazgoan Dock, Byculla,

Tardeo, Mumbai Central, Nair Hospital, Love grove,

Lalbaug, Worli Dairy, Simplex Mill, Apollo Mill RSS

Central South Zone – Esplanade, Mumbadevi, Girgaum, Neapean Sea, Nimkar

Marg, Malabar Hill, Masjid, J J Hospital, Grant Road,

Cumballa Hill, Mazgaon Dock Shipyard RSS

South Zone – Navy Nagar, Colaba, G T Hospital, Marine Drive, Apollo,

Hutatma Chowk, Naval Dock, Ballard Estate

Page 30: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

30

The BEST Undertaking has installed 100 MVA (110/33kV, YnYn0), 45 MVA (110/11-

11kV, YnZn11), 16-20 MVA (33/11kV, Dyn1), 16 MVA (33/11kV, Dyn1), 10 MVA

(22/11-6.6 kV, Dyn1) and 3.2 MVA (33kV/415-415Volts, DZn0Zn0) power transformers

with neutral star point solidly earthed. The power transformers are provided with OLTC

gear to regulate and maintain the 6.6 kV or 11kV voltages fairly constant. The typical

single line diagram of RSS is as below

Protection gear comprises of current & potential transformers, relays inter-connecting

wiring, contractors, trip coils etc. Control & Trip circuit of switchgears at 110KV / 33KV

/ 22KV Receiving Sub Stations operate on 110VDC supply. The method of tripping used

is shunt tripping i.e. trip coil is operated separately by 110VDC supply in Receiving

Stations

R PHASE

Y PHASE

B PHASE

CIRCUIT BREAKER CT‘S

TRIP

COIL

O/C,

Inst

o/c

E/F,

Inst

E/F

RELAY

CONTAC

T

110 VDC

Page 31: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

31

The relays current setting and time setting are based on either Definite Minimum Time (DMT)

principle or Inverse Definite Minimum Time (IDMT) depending on the type of relays used.

1.1.1 PROTECTION IN RECEIVING SUBSTATION

At 110kV RSS level, we have adopted following types of protections

a) On HV side of Transformer –Dir & Non Dir O/C & E/F, U/V, O/V.

b) On LV side of Transformer –Dir & Non Dir O/C & E/F, U/V, O/V

c) For Transformer protection – Ratio Differential protection HV

HV Restricted Earth Fault (REF) protection

LV Restricted Earth Fault (REF) protection

Buchholz Relay

Pressure Release Device (PRD)

Oil Surge Relay (OSR)

OTI & WTI Trip

d) For Outgoing Feeder – Non Dir O/C & E/F

At 33kV & 22kV RSS level, we have adopted following types of protections

a) On HV side of Transformer – Non Dir E/F, Non Dir O/C, U/V, O/V.

b) On LV side of Transformer – Non Dir E/F, Non Dir O/C, U/V, O/V

c) For Transformer protection – Ratio Differential protection

LV Restricted Earth Fault (REF) protection

Buchholz Relay

Pressure Release Device (PRD)

Oil Surge Relay (OSR).

d) For Outgoing Feeder – Non Dir E/F, Non Dir O/C

e) For Capacitor Feeder – Non Dir E/F, Non Dir O/C, U/V, O/V, NDR

T

i

m

e

i

n

m

s

e

c Current

Page 32: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

32

1.1.2 PROTECTION IN DISTRIBUTION SUBSTATION

Further, it is step down to 11-6.6 kV voltage levels by distribution transformers

11kV/415 Volts at DSS. 11kV network is connected in ring but operated in radials.

At DSS level, OCB/VCB of outgoing feeder has combined overload protection for

Overload on R & B Phase and earth fault on neutral circuit. OCB/VCB of transformer

feeder has combined overload protection for Overload on R & B Phase but earth fault

protection is kept without T/L fuse on neutral circuit for instantaneous Earth fault.

The method of tripping in DSS is ―Series tripping‖ i.e. the trip coils are operated directly

by CT‘s current. DSS breakers are normally provided with two O/L trip coils in R & B

phase and one earth fault trip coil in return neutral of three star connected CT‘s secondary

circuit. The time lag (T/L) fuses are connected across these trip coils, O/L trip coil and

earth trip coils are of size of 5 amps and 2 amps respectively.

Due to overload or short circuit or earth fault in network, 5 Amps / 2 Amps or more

current flows through the T.L. fuses of overload trip coil / E/F trip coil respectively. TL

fuse blows and current starts flowing through O/L / E/F trip coil which causes tripping of

circuit breaker.

SERIES TRIPPING IN DSS OUTGOING FEEDER SWITCHGEAR

O/L TRIP

COIL

O/L

TRIP

COI

L

E/F

TRIP

COI

L

T/L

FUSE

(5A)

T/L

FUSE

(2A)

R PHASE

Y PHASE

PHPHASEP

HASE B PHASE

CIRCUIT

BREAKER

Page 33: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

33

1.1.3 PROTECTION IN LV NETWORK

Transformer secondary is connected to LV bus bar through copper links and transformer

breaker protects HV side of transformer.

Distributors are provided with 315 Amps HRC fuses at LV boards and LV pillars which

provide protections against faults on distributors.

At service position, 400A / 200A fuse base are provided with 400A and 200A HRC

fuses. At large LV installations, switch fuse unit of appropriate size is provided.

Re-wirable fuses in branch cutouts of 100A, 63A, 32A, 16A are provided at branches

feedings meters. These branch cutouts are provided on Meter Boards to protect the meter

against fault in the consumer‘s installation.

1.1.4 PROTECTION OF 33kV/22kV CABLES:

a) UNDER VOLTAGE RELAY :

Any fault occurring on 33KV/22KV cable operates protection gear at TATA‘s Receiving

Stations. When 33KV/22KV supply fails we get the indication at the Receiving Station

and Supervisory/ System Control Room. At Receiving Station, we are having under

voltage relay which gives indication of supply failure on 33KV/22KV side.

b) DIRECTIONAL OVER CURRENT & EARTH FAULT RELAY :

Normally B.E.S.T. network is radial right from Tata‘s transformer up to LV network.

But, when carrying out operation for load transfer, we keep power transformers in

parallel either of the same Receiving Station or of different Receiving Stations. In the

said circumstances if a fault occurs on 33kV / 22kV cable, then the affected bus section

will be reverse fed by other power transformer (after switchgear at the TATA‘s

Receiving Station has tripped). To avoid this, we use Directional over current and earth

fault relay, which operates (indicating power flow is reverse i.e. from 11kV to 22/33 kV

side). This protection scheme is typically employed on110kV & 33kV sides in 110kV

RSS.

Page 34: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

34

Directional Overcurrent ProtectionBasic Principle

F2

Relay

F1

Forward Fault (F1)Reverse Fault (F2)

V

IV

I

IV

1.1.5 PROTECTION OF POWER TRANSFORMERS:

a) OVER CURRENT AND EARTH FAULT RELAY (O/C+E/F):

CTs

VTs

Relay

CB

Control

Protected

Equipment

Three-Phase Diagram of the Protection Team

Transformer is protected by Non Directional IDMT & Instantaneous type 3-phase over

current and Earth fault relay on 33KV/ 22KV side and by Non Directional IDMT type 3-

phase over current and Earth fault relay on 11KV side.

Page 35: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

35

b) RESTRICTED EARTH FAULT RELAY : (REF RELAY)

Restricted Earth Fault (REF) Relay operates on the Merz-Price Circulation current

principle with CTs of identical ratio and ratings in LV CT and NCT. This relay operates

only when fault occurs between secondary of the power transformer up to 11KV bus bar

and neutral of transformer which is protection zone for REF relay. The relay is connected

across the parallel combination of CTs in High Impedance mode.

a. DIFFERENETIAL RELAY

Differential Protection Principle

Internal

Fault

IDIF > ISETTING

CTR CTR

87

Relay Operates

Protected

Equipment

Page 36: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

36

Differential relay is used to detect any internal fault on HV or LV winding of the

transformer. This relay operates on the Merz-Price Circulation current principle. As long

as there is no fault in the transformer then current on 33kV / 22kV and 11kV side is the

same. So there is no current in the differential relay.

Due to fault in the transformer (Internal Faults), there is an imbalance between primary

current and secondary current, which operates the relay. Thereby, cause tripping of 33 kV

/ 22 kV and 11 kV breakers to isolate power transformer.

Protection gear of differential relay is designed with due care of No load current, Inherent

phase shift in winding of transformers and Change of turns and so current ratio due to

OLTC operations.

During External Faults: when there is external fault in network of transformer, fault

current flows in both HV as well as LV side CT‘s causing resulting zero current in

operating coil of differential relay.

Page 37: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

37

c) BUCHHOLZ RELAY :

Buchholz relay is fitted between the transformer main tank and conservator. If any fault

e.g. core bolt insulation failure, short circuit in laminations, loss of oil due to heavy

leakage occurs in the HV or LV winding of transformer resulting in local heating of oil

and gas formation, then these gases is trapped in the Buchholz relay. It cause operation of

upper float and gives an alarm, which give some idea of nature of fault.

If serious nature of fault inside the transformer due to short circuit between phases,

winding earth faults, bushing failure it operate both floats provided in buchholz relay and

gives the trip command to primary & secondary breakers of transformer.

d) PRESSURE RELEASE DEVICE : (PRD)

This device operates during excessive pressure developed in the transformer main tank

due to internal fault occurred in it & it will give the direct tripping command to primary

& secondary circuit breakers.

e) OIL SURGE RELAY : ( OSR)

This relay is fitted between the OLTC & Conservator. If any fault occurs in the OLTC of

transformers resulting in local heating of oil and gas formation, then these gases is

Page 38: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

38

trapped in the OSR & it will give the direct tripping command to primary & secondary

circuit breakers.

Trip commands of Buchholz relay, PRD and OSR are wired up through Ratio Differential

relay to get disturbance recordings at time of fault.

DIFFERENT TRANSFORMER PROTECTION

Fault Type Needed Protection

Phase-Phase faults Differential, Over current

Phase-Earth faults Differential, Earth Fault, Restricted Earth Fault

Inter-turn Faults Differential, Buchholz

Core Faults Differential, Buchholz

Tank Faults Differential, Buchholz, Tank Earth Fault

Over Heating Thermal Overload

1.2 INSTRUMENT TRANSFORMERS

The magnitude of current and voltage in a power system are usually too high to be

handled by the secondary equipments like measuring instruments and relays, control

circuits. Therefore, the instruments produce a scaled down replica of the primary input

quantities within the accuracy. The measuring instruments and protective relays are

connected in secondary circuit of instrument i.e. current and voltage transformers.

1.3 CURRENT TRANSFORMERS (CT)

Primary current is not controlled by condition of secondary circuit in current transformer.

Hence, primary current is dominant factors in the operation of current transformer. The

performance requirements of the instrument transformers depend upon their applications.

CTs classified into three basic types.

Page 39: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

39

a) Measuring Current Transformer: Measuring Current transformers used for

measurement handle steady current closed to rated values. Ammeters, Energy Meters etc

are connected in measuring CT circuit.

Measuring CTs are specified in term of Accuracy Class, rated VA Burden and Instrument

Safety Factor (ISF).

Instrument Safety Factor:

It is the ratio of instrument limit primary current to the rated primary current. Instrument

limit current of a metering current transformer is a maximum value of primary beyond

which current transformer core becomes saturated.

Accuracy Class –0.1, 0.2, 0.5S, 0.5, 1, 3

VA Burden – 5, 10, 15, 30

ISF – 5, 10

For metering core, we have adopted 0.5 class for outgoing feeders and 0.5S for HV & LV

side CTs with ISF = 5.

b) Protection Current transformers: Protection current transformers used for protection

handle fault quantities in multiple of rated values. Protection relays, trip are connected in

protection CT circuit. Current transformers step down current high value to low value.

Protection CTs are specified in term of Class, rated VA Burden and Accuracy Limit

Factor (ALF). Standard errors are specified at rated current and ALF times rated current

with rated burden connected. For given CT, VA and ALF are inversely related. If

connected burden is less than rated, ALF would increase.

Standard Error Class - 5P, 10P, 15P

ALF - 5, 10, 15, 20, 30

VA Burden – 5, 10, 15, 30

For protection core, we have adopted 5P20 class, 15 VAfor outgoing feeders, HV & LV

side CTs. This means that CT will have a Composite Error (difference between Ideal Sec

Page 40: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

40

current and actual sec current) of +/- 5% at 20 times rated current and a ratio error of +/-

1% at rated current with rated connected burden of 15VA.

c) Protection CTs for Special Application: For balanced protections like Differential,

REF, where balance is required between the associated CTs with close tolerance.

For such applications, CTs of class PS are used which are specified in term of Knee Point

voltage (Vk), Magnetising current (Im) at Vk and at Vk/2, CT secondary resistance (Rct).

For class PS CTs, the turn ratio errors are limited to 0.25% which helps in maintaining

balance between the protection systems during the fault condition.

Specification / Name plate of PS class core:

CT ratio = 300/5

Vk>= = 104 Volts

Im at Vk/2 = 50 mA

RCT at 750C = 0.3 ohm

Magnetizing Characteristic of CT: the magnetizing characteristic of a CT is a plot

between secondary applied voltage the corresponding magnetizing current taken by the

CT.The excitation curve can be divided into Ankle point, linear region, Knee point and

saturation.

The knee point is defined as a point on the excitation curve where a 10% increase in the

secondary voltage would cause 50% increase in exciting current.

Exciting current

Exci

ting v

olt

age

Ankle Point

Knee Point

Saturation

Knee Point

Voltage

Page 41: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

41

1.4 EFFECTS OF SECONDARY OPEN CIRCUIT:

The primary current of CT is independent of its secondary loading. With shorted

secondary (directly or through the connected burden), the counter flux produced by the

secondary keeps the core flux below the saturation level.

Load current in electrical system always flows through CT primary. If the secondary gets

open circuited with the primary carrying current, the entire primary current will behave as

excitation current and is spent in magnetizing the core, producing high core flux. This

results in increased secondary voltage. This develops extremely high pulses of voltage

which may not be measured by voltmeter. But this voltage may breakdown the CT

insulation and may cause accident to personnel. That is why CT secondary should not

be kept open and should always be shorted.

1.5 CURRENT TRANSFORMER DETAILS:

We are using different types of CTs in systems from 110kV to 11kV voltage level. CTs

are specified for Insulation level, rated primary current and Short Circuit Withstand

current.

Service Voltage: System Voltage in which CT is to be installed e.g. 11kV, 22kV, 33kV

and 110kV etc.

Rated primary current: It is value of rated current of equipment at CT location which CT

should carry continuously.

Rated Secondary current: Rated secondary current is specified as 1A or 5A. It is preferred

to use 5A as secondary current for indoor panels where internal wiring length is short and

1A where wiring length i.e. control cable length is long. It is value of rated current of

equipment at CT location which CT should carry continuously.

Short Time Withstand Current: It is maximum fault current value which CT can

withstand for short time rated. A current transformer is overloaded while system short

circuit currents are flowing and will be short-time rated. Normally system fault current is

considered as value of STC even though real fault current is less.

Page 42: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

42

Standard times for which the CT must be able to carry rated short-time current (STC) are

0.25, 0.5, 1.0, 2.0 or 3.0 seconds. Specified values for STC are 18.4 KA for 3 Sec for

11kV CT and 26.3KA for 3 Sec for 33 kV CT.

1.6 CURRENT TRANSFORMER TESTING

CT is tested for Ratio, Polarity and Knee Point Voltage. Earlier CT testing is carried out

by Conventional method i.e. using primary injection set, dimmer, energy meter, voltmeter

and ammeter. This method involves typical connection of many conventional instruments

and manual calculations.

Recently, Omicron make CT Analyser set was purchased. Voltage and current is injected

from secondary side of CT. Values of current and voltage is sensed at Primary and

secondary terminals of CT. Final results are derived from these values in CT Analyser.

1.6.1 CT RATIO AND POLARITY TEST:

1.6.2 CT KNEE POINT VOLTAGE TEST:

Page 43: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

43

1.7 POTENTIAL TRANSFORMERS (PT)

Whenever the values of voltage in a power circuit are too high to permit convenient

direct connection of measuring instruments or relays, coupling is made through voltage

transformers. Voltage transformers are much like small power transformers, differing

only in details of design that control ratio accuracy over the specified range of output.

The performance requirements of the instrument transformers depend upon their

applications. PTs classified into three basic types.

a) Measuring Voltage Transformer: Measuring VTs used for measurement handle steady

voltages closed to rated values. Voltmeters, Energy Meters etc are connected in

measuring VT circuit.

Measuring VTs are specified in term of Voltage Ratio, Accuracy Class, Rated VA

Burden and Rated Voltage Factor.

Accuracy Class –0.1, 0.2, 0.5, 1, 3

VA Burden – 5, 10, 15, 30

Voltage factors, with the permissible duration of the maximum voltage is 1.2 continuous

& 1.5 for 30 sec between line and earth in an effectively earthed network.

Rated Voltage Factor (Vf): The voltage factor (Vf) is an upper limit of operating voltage,

expressed in per unit of rated voltage. This is important for correct relay operation and

operation under unbalanced fault conditions on unearthed or impedance earthed systems,

resulting in a rise in the voltage on the healthy phases.

For metering core, we have adopted 0.5 class for HV & LV side VTs with Voltage factor

= 1.2 continuous & 1.5 for 30 sec. This means that VT will have a % Ratio Error of +/-

0.5% at 80% to 120% of rated voltage with rated connected burden of 50VA.

Protection Voltage transformers: Protection VTs used for protection to handle fault

quantities in multiple of rated values. Protection relays are connected in protection VT

circuit. VTs step down high voltage value to low voltage value.

Page 44: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

44

For protection purposes, accuracy of voltage measurement may be important during fault

conditions, as the system voltage might be reduced by the fault to a low value.

Protection VTs are specified in term of Voltage Ratio, Accuracy Class, Rated VA Burden

and Rated Voltage Factor.

Accuracy Class –3P, 6P

VA Burden – 5, 10, 15, 30

Voltage factors, with the permissible duration of the maximum voltage is 1.2 continuous

& 1.5 for 30 sec between line and earth in an effectively earthed network.

For protection core, we have adopted 3P class, 50 VA for HV & LV side VTs. This

means that VT will have a % Ratio Error of +/- 3% at 5% to 1.2 times rated voltage with

rated connected burden of 50VA.

1.8 CAPACITOR BANK PROTECTION

1.8.1 Under-Voltage protection:

During power failure, it is essential that capacitor bank should trip and should not be re-

energized till it discharges to safe value of 50 Volts or less. This is reason for providing 5

minutes delays for capacitor feeder in closing circuit when capacitor switched OFF or

Tripped.

This relay should be instantaneous type with low voltage setting. Voltage setting value is

decided to 80% of normal voltage.

1.8.2 Over-Voltage protection:

Over voltage protection is provided for tripping capacitor bank when system voltage

exceeds the maximum permissible voltage i.e. 110% of the rated voltage. This relay

should be instantaneous type.

1.8.3 Neutral Displacement Protection:

This type of protection is required I case of a single star connected capacitor bank.

Primary winding of the Residual Voltage Transformer (RVT) is connected in Delta to

Page 45: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

45

capacitor bank and the secondary winding of RVT is connected in open delta. Two

secondary terminals of RVT are wired up to NDR relay.

Under balanced condition of the capacitor bank, voltage across the open delta terminals is

almost Zero. But in event of failure of one or partial unit in a capacitor bank, neutral is

shifted and this is reflected on the open delta terminals. This unbalanced voltage value is

specified value depends on numbers of units in capacitor bank. A setting for NDR is

selected as 5 Volts for 1 Sec.

The modern Numerical relay does not require open delta voltage from RVT. But this

relay requires 3phase, 4wires voltage of Star connected secondary winding of RVT and

this relay derive Open Delta Voltage internally.

2.0 TESTING AND MAINTENACE OF PROTECTION RELAYS

Unlike other equipment, the protection relays remain without any operation until a fault

develops. For a reliable service and to ensure that the relay is always vigilant, proper

maintenance is must and must be carried out periodically.

2.1 MAINTENANCE TESTS:

Maintenance tests are done in field periodically. The performance of relay is ensured by

better maintenance. Basic requirement of sensitivity, selectivity, reliability and stability

can be satisfied by proper maintenance.

Due to operating conditions in substation, dirt and dust may accumulate on relays, relay

contacts. To avoid this relays are to be cleaned periodically.

Loose electrical connection can cause extra and may result in false operation of relay. To

avoid this, all the relay connections are to be tightened every now and then.

To confirm that relay operation at the particular setting under particular conditions for

which the relay is meant for operation, we should perform number of tests on relays

periodically (ROUTINE RELAY TESTING).

To confirm the breaker operation by closing of relay contacts by operating relay for

particular protection (THROUGH TESTING).

Secondary injection tests i.e. relay testing, tripping tests are to be carried out at least once

in a year.

Page 46: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

46

2.2 SECONDARY CURRENT INJECTION TEST SET

Secondary current injection set is used to carry out secondary injection tests, is used to

inject current in CT secondary circuit to checks operation of relays and tripping of

breaker. It comprises calibrated variable current and voltage supplies and timer devices

which used for relay testing and obtaining their characteristics.

Secondary injection does not check overall system including CT‘s. It is rare occasion for

fault in CT, secondary test is sufficient for routine testing.

In System Protection Dept, there are 4 nos of 1 phase conventional type secondary

current injection set. There are 3nos(Doble – 1 no &Ponova – 2 nos) of laptop operated 3

phase secondary current injection sets with 3 phase current and 3 phase voltage outputs.

2.3 PRIMARY CURRENT INJECTION TEST SET

Protection relays is fed from a CT‘s secondary in the switchgear to be protected. Primary

current injection testing checks all parts of the protection circuit by injecting the test

current through primary circuit of CT‘s. Primary current injection set comprise current

supply unit, control unit and other accessories. Test set can give variable output current

Page 47: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

47

by means of built-in auto transformer. Set is connected to AC single phase supply. The

output is connected to primary circuit of CT and can be varied by control unit of the set.

Using the primary current injection set, relay pickup and tripping of relays can be

checked. This test set is used for carrying out Stability tests for Restricted Earth Fault

(REF) test.

2.4 ROUTINE RELAY TESTING:

Steps to be followed in Routine Relay Testing

Cleaning of protection Relay, Auxiliary relays

All the connections from CT & PT end to relay terminals are to be tightened

Setting of relay is checked for assigned values and parameter as per testing sheet.

Testing of individual relay for each protection function

Through Testing from CT end to check relay operation for its each protection function.

Confirm tripping of breaker as per tripping scheme.

2.5 COMMISSIONING TESTS:

Commissioning tests are field tests to prove the performance of relays circuit in actual

service while carrying out new commissioning jobs and replacement jobs.

Steps to be followed in commissioning tests

Checking wiring on basis of the circuit diagram / drawing

Current Transformer (CT) testing for CT ratios, Polarity, Knee point voltage.

Potential Transformer (PT) testing for PT ratios, Polarity, Phasing.

Relay setting and individual relay testing by secondary current injection set.

Checking secondary circuit by injecting current by secondary current injection set and

confirm tripping of the breaker by operating relay for particular protection (THROUGH

TESTING).

Stability tests for Ratio Differential (RD) test by energizing primary side at reduced

voltage i.e. from 415 Volts, 3 phase source.

Stability tests for Restricted Earth Fault (REF) test by primary current injection test set.

Page 48: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

48

2.6 RATIO DIFFERENTIAL (RD) STABILITY TEST

RD Stability test is carried out at time of commissioning, replacement jobs and tripping

of transformer on RD & REF relay indication.

Material required – 3 core copper cable

Confirm that HV and LV circuit breakers are OFF and Isolated and Tap position of

OLTC at tap no 5 (Normal tap).

While carrying RD Stability test, Secondary side of power transformer is shorted before

Circuit breaker and after LV CT‘s.

Remove the 33/22kV Incoming cable in HV Breaker and connect 415 Volts, 3 phase, 3

wire, 50 Hz supply through 63/100Amps ICTP in HV switchgear to charge power

transformer. Take HV breaker at Service position and check On & OFF operation of HV

Breaker from Control panel.

Check Ph-Ph & Ph-N voltage at ICTP. Insert fuses and switch ON ICTP. Check Phase-

Phase & Phase-N supply at connection in HV breaker. Switch ON HV Breaker which

will charge the transformer.

As per RD Stability format for particular relay, note down reading for HV & LV side

currents on HV, LV relays and Multi Function Meters and HV & LV side currents,

Operating currents (Differential / Spill currents), Restraining currents and REF current on

RD relay.

Page 49: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

49

Confirm that primary value of HV, LV side currents shall be match with calculated value

for particular MVA capacity and CT ratio.

2.7 RESTRICTED EARTH FAULT (REF) STABILITY TEST

REF Stability test is carried out at time of commissioning, replacement jobs and tripping

of transformer on REF relay indication.

Material required – Single core copper welding cable, Primary current injection set, Tong

Tester, Multimeter

Confirm that HV and LV circuit breakers are OFF and Isolated.

While carrying REF Stability test, connect current cables of primary current injection set

as per drawing for R phase NORMAL connection i.e. POWER FLOW Condition as per

Power Flow so that LV CT and NCT should be in current circuit.

Inject 50 Amps current and confirm that primary value of current of LV side & NCT side

shall be same.

Increase Injected current by primary injection set up to 300 Amps and As per REF

Stability format for particular relay, note down reading for LV side currents on LV relays

and Multi-Function Meters and LV side & NCT side currents, Operating current (REF

Differential current) on RD relay.

Page 50: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

50

Confirm that Operating (REF Differential) current in RD relay should be Zero and there

is no tripping on REF relay.

SHORT the Stabilizing Resistor and Repeat the above procedure in Normal condition.

Repeat the above procedure for Y & B Phase in Normal condition.

NOTE: While carrying out above REF Stability current, as we are injecting 300 amps

current in LV side of transformer there is tripping of RD relay. Thus we can confirm the

operation of RD relay by primary injection testing.

Interchange P1 & P2 connection either at NCT or Line CT to create for FAULT

condition i.e. ABNORMAL Connection.

Inject 50 Amps current in R phase in abnormal condition & WITHOUT shorting

Stabilizing resistor. Note down reading for LV side currents on LV relays and Multi-

Function Meters and LV side & NCT side currents, Operating current (REF Differential

current) on RD relay.

Ramp up current slowly and observe REF differential current on RD relay. Confirm that

when REF differential current about to set value of REF setting, there is tripping of REF

relay.

SHORT the Stabilizing Resistor and Repeat the above procedure for R phase in abnormal

condition.

Take HV & LV breakers at TEST position and check tripping of both breakers through

Master Trip relays on operation of REF relay by injecting current in ABNORMAL

condition without shorting the Stabilizing resistor.

Page 51: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

51

3.0 DETAILS OF THE WORK CARRIED OUT WHILE PERFORMING FOLLOWING JOBS

I) REPLACEMENT OF PRIMARY SWITCHGEAR

i Writing of Switchgear and Breaker nameplates in rough book.

ii Writing of Current transformers nameplates along with drawing in rough book.

iii Drawing of CT current circuit up to Terminal block in LV compartment in rough book

showing CT Terminals, CT Ferrules and Terminals Blocks.

iv Pictorial diagram of CT showing P1 & P2, CT Terminal Block, Location of S1, S2 & S3)

showing actual location in switchgear.

v Writing of Potential transformers nameplates along with drawing in rough book.

vi Drawing of PT current circuit up to Terminal block up to LV compartment in rough book

showing PT Terminals, PT Ferrules and PT Terminals Blocks.

vii Pictorial diagram of PT showing Primary Terminals, PT Terminal Block, Location of a, a1

& n) showing actual location in switchgear.

viii Testing of Current transformers by Omicron make CT Analyser from Terminal Blocks in

current circuit

ix Testing of Potential transformers for Ratio Test after removing PT from switchgear.

x Testing of Potential transformers for Ratio test for both ratio while PT is at service position

in switchgear. Check voltage at Terminal Blocks in LV compartment.

xi Transformer Relay setting by respective relay software through Laptop if required.

xii Relay testing by 3 phase current injection set (Doble/PONOVO) as per testing sheet.

xiii As per CT polarity and Power flow, finalise of CT Star point on HV side for O/C+E/F &

RD protection

xiv Tightening of all connection.

xv Through testing from CT end as per testing sheet.

xvi RD Stability Testing as per testing sheet

xvii Confirmation for tripping of HV Breakers on different protections and transformer

commands.

xviii Confirmation of HV & LV voltage on relay display and Terminal blocks.

xix Fair work of all Nameplate, CT & PT Diagrams and CT & PT circuits from CT & PT

terminal to Relay terminals.

xx Log a message for completion of work at Supervisory / System Control.

Page 52: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

52

II) REPLACEMENT OF BUS SECTION

i Writing of Switchgear and Breaker nameplates of Incomer, Outgoing and Capacitor feeders

in rough book.

ii Writing of Current transformers nameplates of Incomer, Outgoing and Capacitor feeders

along with drawing in rough book.

iii Writing of Serial Numbers of all CTs in rough book.

iv Drawing of CT current circuit up to Terminal block in LV compartment of Incomer,

Outgoing and Capacitor feeders in rough book showing CT Terminals, CT Ferrules and

Terminals Blocks.

v Pictorial diagram of CT showing P1 & P2, CT Terminal Block, Location of S1, S2 & S3)

showing actual location in switchgear.

vi Writing of Potential transformer nameplates (PT Unit & PT Assembly) along with drawing

in rough book.

vii Drawing of PT current circuit up to Terminal block up to LV compartment in rough book

showing PT Terminals, PT Ferrules and PT Terminals Blocks.

viii Pictorial diagram of PT showing Primary Terminals, PT Terminal Block, Location of a, a1

& n) showing actual location in Incomer switchgear.

ix Testing of Current transformers by Omicron make CT Analyser from Terminal Blocks in

current circuit

x Testing of Potential transformers for Ratio Test after removing PT from switchgear.

xi Testing of Potential transformers for Ratio test for both ratio while PT is at service position

in switchgear. Check voltage at Terminal Blocks in LV compartment.

xii Collection of all data required for calculation of Relay setting

xiii Calculation of relay setting and its tabulation

xiv Bus section Relay setting by respective relay software through Laptop.

xv Bus section Relay testing by 3 phase current injection set (Doble/PONOVO) as per testing sheet.

xvi Transformer Relay setting by respective relay software through Laptop if required.

xvii Transformer Relay testing by 3 phase current injection set (Doble/PONOVO) as per testing sheet.

xviii As per CT polarity and Power flow, finalise of CT Star point on HV side for O/C+E/F &

RD protection

xix Tightening of all connections.

xx Through testing from CT end as per testing sheet.

xxi REF Stability Testing as per testing sheet

xxii RD Stability Testing as per testing sheet

xxiii Confirmation for tripping of HV & LV Breakers on different protections and transformer

commands.

xiv Confirmation of HV & LV voltage on relay display and Terminal blocks.

Page 53: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

53

xxv Fair work of all Nameplate, CT & PT Diagrams and CT & PT circuits from CT & PT

terminal to Relay terminals.

xxvi Log a message for completion of work at Supervisory / System Control.

III) REPLACEMENT OF CONTROL, RELAY & ALARM PANELS

i Writing of CARP nameplates, Relay details (Make, Models, Sr Nos) in rough book.

ii Collection of all data required for calculation of Relay setting

iii Calculation of relay setting and its tabulation

iv Relay setting by respective relay software through Laptop.

v Relay testing by 3 phase current injection set (Doble/PONOVO) as per testing sheet.

vi As per CT polarity and Power flow, finalise of CT Star point for O/C+E/F, RD, REF protection

vii After installation of CARP, Drawing of CT current circuit up to relay terminal in rough book

showing Terminals Blocks with ferrules.

vii Drawing of PT voltage circuit up to relay terminal in rough book showing Terminals Blocks

with ferrules.

ix Tightening of all connections.

x Through testing from CT end as per testing sheet.

xi REF Stability Testing as per testing sheet

xii RD Stability Testing as per testing sheet

xiii Checking of all transformer commands from marshalling box.

xiv Confirmation for tripping of HV & LV Breakers on different protections and transformer

commands.

xv Confirmation of HV & LV voltage on relay display and Terminal blocks.

xvi Fair work of all Nameplate, CT & PT Diagrams and CT & PT circuits

xvii Log a message for completion of work at Supervisory / System Control.

IV) REPLACEMENT OF POWER TRANSFORMER

i Writing of power transformer nameplates in rough book.

ii Collection of all data required for calculation of Relay setting for new transformer

iii Calculation of relay setting and its tabulation

iv Relay setting by respective relay software through Laptop.

Page 54: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

54

v Relay testing by 3 phase current injection set (Doble/PONOVO) as per testing sheet.

vi Change the HV, LV & NCT CT ratio as per setting sheet

vii As per CT polarity and Power flow, finalise of CT Star point for O/C+E/F, RD, REF

protection

viii After installation of CARP, Drawing of CT current circuit up to relay terminal in rough book

showing Terminals Blocks with ferrules.

ix Change the PT ratio as per new transformer ratio.

x Drawing of PT voltage circuit up to relay terminal in rough book showing Terminals Blocks

with ferrules.

xi Tightening of all connections.

xii Through testing from CT end as per testing sheet.

xiii REF Stability Testing as per testing sheet

xiv RD Stability Testing as per testing sheet

xv Checking of all transformer commands from marshalling box.

xvi Confirmation for tripping of HV & LV Breakers on different protections and transformer

commands.

xvii Confirmation of HV & LV voltage on relay display and Terminal blocks.

xviii Fair work of all Nameplate, CT & PT Diagrams and CT & PT circuits

xix Log a message for completion of work at Supervisory / System Control.

V) COMMISSIONING OF NEW RECEIVING SUBSTATION

a) Commissioning of Primary Breaker

i Writing of Switchgear and Breaker nameplates in rough book.

ii Writing of Current transformers nameplates along with drawing in rough book.

iii Drawing of CT current circuit up to Terminal block in LV compartment in rough book

showing CT Terminals, CT Ferrules and Terminals Blocks.

iv Pictorial diagram of CT showing P1 & P2, CT Terminal Block, Location of S1, S2 & S3)

showing actual location in switchgear.

v Writing of Potential transformers nameplates along with drawing in rough book.

vi Drawing of PT current circuit up to Terminal block up to LV compartment in rough book

showing PT Terminals, PT Ferrules and PT Terminals Blocks.

vii Pictorial diagram of PT showing Primary Terminals, PT Terminal Block, Location of a, a1 &

n) showing actual location in switchgear.

Page 55: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

55

viii Testing of Current transformers by Omicron make CT Analyser from Terminal Blocks in

current circuit

ix Testing of Potential transformers for Ratio Test after removing PT from switchgear.

x Testing of Potential transformers for Ratio test for both ratio while PT is at service position in

switchgear. Check voltage at Terminal Blocks in LV compartment.

xi Fair work of all Nameplate, CT & PT Diagrams and CT & PT circuits

b) Commissioning of Secondary Bus Section

i Writing of Switchgear and Breaker nameplates of Incomer, Outgoing and Capacitor feeders

in rough book.

ii Writing of Current transformers nameplates of Incomer, Outgoing and Capacitor feeders

along with drawing in rough book.

iii Writing of Serial Numbers of all CTs in rough book.

iv Drawing of CT current circuit up to Terminal block in LV compartment of Incomer,

Outgoing and Capacitor feeders in rough book showing CT Terminals, CT Ferrules and

Terminals Blocks.

v Pictorial diagram of CT showing P1 & P2, CT Terminal Block, Location of S1, S2 & S3)

showing actual location in switchgear.

vi Writing of Potential transformer nameplates (PT Unit & PT Assembly) along with drawing in

rough book.

vii Drawing of PT current circuit up to Terminal block up to LV compartment in rough book

showing PT Terminals, PT Ferrules and PT Terminals Blocks.

viii Pictorial diagram of PT showing Primary Terminals, PT Terminal Block, Location of a, a1 &

n) showing actual location in Incomer switchgear.

ix Testing of Current transformers by Omicron make CT Analyser from Terminal Blocks in

current circuit

x Testing of Potential transformers for Ratio Test after removing PT from switchgear.

xi Testing of Potential transformers for Ratio test for both ratio while PT is at service position in

switchgear. Check voltage at Terminal Blocks in LV compartment.

xii Collection of all data required for calculation of Relay setting and its tabulation.

xiii Bus section Relay setting by respective relay software through Laptop.

xiv Relay testing by 3 phase current injection set (Doble/PONOVO) as per testing sheet.

xv Fair work of all Nameplate, CT & PT Diagrams and CT & PT circuits for Outgoing &

Capacitor Feeders

Page 56: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

56

c) Commissioning of Power Transformer

i Writing of power transformer nameplates in rough book.

ii Change the HV, LV & NCT CT ratio as per setting sheet

iii As per CT polarity and Power flow, finalise of CT Star point for O/C+E/F, RD, REF

protection

iv After installation of CARP, Drawing of CT current circuit up to relay terminal in rough book

showing Terminals Blocks with ferrules.

v Change the PT ratio as per new transformer ratio.

vi Drawing of PT voltage circuit up to relay terminal in rough book showing Terminals Blocks

with ferrules.

vii Fair work of all Nameplate of transformer.

d) Commissioning of Control, Relay and Alarm Panels

i Writing of CARP nameplates, Relay details (Make, Models, Sr Nos) in rough book.

ii Collection of all data required for calculation of Relay setting

iii Calculation of relay setting and its tabulation

iv Relay setting by respective relay software through Laptop.

v Relay testing by 3 phase current injection set (Doble/PONOVO) as per testing sheet.

vi As per CT polarity and Power flow, finalise of CT Star point for O/C+E/F, RD, REF

protection

vii After installation of CARP, Drawing of CT current circuit up to relay terminal in rough book

showing Terminals Blocks with ferrules.

viii Drawing of PT voltage circuit up to relay terminal in rough book showing Terminals Blocks

with ferrules.

ix Tightening of all connections.

x Through testing from CT end as per testing sheet.

xi REF Stability Testing as per testing sheet

xii RD Stability Testing as per testing sheet

xiii Checking of all transformer commands from marshalling box.

xiv Confirmation for tripping of HV & LV Breakers on different protections and transformer

commands.

xv Confirmation of HV & LV voltage on relay display and Terminal blocks.

xvi Fair work of all Nameplate, CT & PT Diagrams and CT & PT circuits

xvii Log a message for completion of work at Supervisory / System Control.

Page 57: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

57

4.0 TRIPPING INVESTIGATION:

4.1 Whenever there is any tripping of Transformers and outgoing feeders in system reported

by O&M Departments. Such as Power Transformer tripping, feeder tripping, Power

Transformer tripping along with feeder tripping, tripping without relay indication,

tripping of feeder breaker for downward fault, etc. The tripping investigation is carried

out to ascertain the correct operation of protection relays, analysis of operation of relays,

type of fault in the system.

4.2 For carrying out tripping investigation, outage of transformer/feeder is taken.

4.3 Initially, we carry out through testing without disturbing protection system. Then relay

characteristic is verified by secondary current injection method. For proper co-ordination,

suitable action like increase/decrease TMS setting value etc. is done. For finding out the

cause of tripping, the necessary data such as SCADA report, fault report, fault event data

recorded in the relay and disturbance recorder data is analyzed. If setting is changed,

same is kept under observation.

4.4 The tripping investigation report is lodged in respective Controls and forwarded to

concerned O&M Department.

5.0 PROCEDURE IN RESPECT OF TESTING OF TAP-CHANGE CONTROL

RELAYS

5.1 General:

All Power Transformers installed in our Receiving Sub Stations are provided with on-

load tap-change gear i.e. the taps of transformer can be changed when the transformer is

on load. This tap change gear can be operated manually by checking or electrically by

remote control or automatic control.

5.2 All the automatic voltage regulating relays (AVR) are inspected for the correct operation

of OLTC. The automatic operation of tap-change control can be described as follows:

5.2.1 Automatic Voltage regulating relay, which is sensitive to change in voltages, is connected

across secondary side of Potential Transformer installed on 110kV side of Power

Page 58: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

58

transformer. Whenever the Secondary voltage of Power Transformer increases or

decreases by 150 Volts, the secondary voltage of Potential Transformer will increase or

decrease by approx.1.5voltage (P.T. ratio 11000/110 Volts). This change in voltage starts

the voltage regulating relay which immediately gives impulse to a timing relay. If the

system voltage remains in this condition for more than 60 seconds, timer completes and

an electrical impulse is given to operate on load tap change gear (OLTC) to lower or raise

the tap to maintain voltage within permissible limit.

4.(b)(iv)) The norms set for discharge of functions

1) The monthly group incentive bonus scheme for the employees of the erstwhile Meters

and Relays Department working in the ‗Testing and Repairs Section‘ was in existence till

31.03.2010 who are required to carry out the work of overhauling and testing of meters as

well as relays, punch clocks, other measuring instruments, minor gadgets, etc. under the

approved I.B. Scheme no. 51 for the group no. 518 & 519.

The purpose of implementation of this scheme was to improve efficiency at a minimum

cost and

i) To maintain reliability of operation and accuracy of performance of various types of

energy meters,

ii) Ensuring that the protective, indicating and regulating relays operate at the required

settings with proper indication,

iii) Ensuring that all protective and testing equipments that are procured complies with

the requirements of the specification.

Before the establishment of System Protection Department in the year 2011 the Relay

testing activity was under erstwhile Meters and Relays Department. Under the scheme

no. 51 activities carried out by System Protection Department are given at sr. no. 29 to

32, 45, 46, 56, 60, 61, 72 & 75 under the head Activity Description (Appendix I) and the

standard man minutes required in Appendix II of the scheme enclosed as Annexure – II.

The same is summarized below.

Page 59: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

59

Activities of System Protection Department and Standard Man- Minutes required for

measured activities and output per month

Sr.

No.

Sr. No. as per GIB

Scheme no.51 Activity Description

Std. Man-

Minutes

Avg. Output

per month

1) 29 Relay Testing in RSS with annunciation relay

a) On outgoing feeders

i) Conventional Relay 287 40

ii) Numerical Relay 145 18.23

b) On Capacitor Panel

i) Conventional Relay 305 6.38

ii) Numerical Relay 241 2.69

c) On Transformer control panel for 33/22 kV

i) Conventional Relay 960 8.21

ii) Numerical Relay 0 0

d) On transformer Control Panel for 110 kV

i) Conventional Relay 1027 3.38

ii) Numerical Relay 0

2) 30 Relay testing in DSS 480

3) 31 OCB testing in

a) Distribution workshop 240 27.13

b) Substation 480 0

4) 32) Inspection of Tap change control panels in

RSS 130 26.46

5) 45) Relay overhauling in RSS while testing

a) On outgoing feeders

i) Conventional Relay

ii) Numerical Relay

b) On capacitor panel

i) Conventional Relay

ii) Numerical Relay

Page 60: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

60

Sr.

No.

Sr. No. as per GIB

Scheme no.51 Activity Description

Std. Man-

Minutes

Avg. Output

per month

c) On Transformer control panel for 33/22 kV

i) Conventional Relay

ii) Numerical Relay

d) On transformer Control Panel for 110 kV

i) Conventional Relay

ii) Numerical Relay

6) 46 Relay overhauling in DSS while testing

7) 56)

Attending to relay complaints (investigation

of mal-operation of relays in Receiving Sub-

Stn)

8) 60) Work in connection of new relay/ new relay

panels

9) 61) Attending to complaints of AVR

10) 72)

Attending to relay complaints (investigation

of mal-operation of relays in Receiving Sub-

Station)

11) 75) Work in connection of new relay/ new relay

panels

4.(b)(v) The rules, regulations, instructions, manuals and records

held and used by employees of the department for

discharging functions

Please refer Annex- III

4.(b)(vi) The statement of the categories of documents that are held

by department or under its control

Please refer Annex- IV

4.(b)(vii)) The particulars of any arrangement that exists for

consultation with or representation by the members of

the public in relation to the formulation of its policy or

implementation thereof :-

Not applicable to System Protection Department

Page 61: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

61

4.(b)(viii)) A statement of the boards, councils, committees and other

bodies consisting of two or more persons constituted as its

part or for the purpose of its advice and as to whether

meeting of those boards, councils, committees and other

bodies are open to the public or the minutes of such

meetings are accessible for public :-

Not applicable to System Protection Department

4.(b)(ix)) A directory of its officers and employees:-

Sr.

No

.

Name of Officer/Staff Designation Grade Ch.No. P.S.No

1 Shri S.N.Pawar Superintendent A-4 214129 163/02

2 Shri. G. R. Bains Asst. Engineer A-5 215166 163/02

3 Shri. S.S. Kulkarni Asst. Engineer A-5 215301 163/02

4 Shri. R. B. Zope Asst. Engineer A-5 215410 163/02

5 Shri. S.D. Joglekar Asst. Engineer A-5 215591 163/02

6 Shri. M. M. Shaikh Asst. Engineer A-5 215557 163/02

7 Shri H.K.Patil Charge Engineer T-8 403780 163/02

8 Shri A.K.Hajare Foreman General T-8 403821 163/02

9 Shri. K. C. Thakur Foreman General T-8 403815 163/02

10 Shri V.D.Tawde Foreman General T-7 403832 163/02

11 Shri R.V.Manjalkar Foreman T-7 403830 163/02

12 Shri J.N.Patil Foreman T-7 403874 163/02

13 Shri P.P.Redij Foreman T-7 403883 163/02

14 Shri S.R.Satkar Foreman T-7 403884 163/02

15 Shri. M. V. Katkar Foreman T-7 404182 163/02

16 Shri V.R.Borate Assistant Foreman T-6 403867 163/02

17 Shri V.M.Shelar Assistant Foreman T-6 407340 163/02

18 Shri. K. L Pardhi Assistant Foreman T-6 409885 163/02

19 Shri S.G.Wairkar Tradesman T-3 408767 463/02

20 Shri P.S.Chavan Nawghany T-1 410680 463/02

21 Shri A.B.Pawar Nawghany T-1 411102 463/02

22 Shri D.B.Gamare Nawghany T-1 411177 463/02

23 Shri S.M.Shirke Nawghany T-1 413322 463/02

24 Shri Z.S.Jadhav Nawghany T-1 413401 463/02

25 Shri S.R.Surve Asst.Admin. Officer A/G VIII 212492 163/02

26 Smt. T.M.Velankar Supervisor(P) A/G VII 212801 163/02

27 Shri M.K.Bhosle Supervisor(P) A/G VII 211220 163/02

28 Smt. S.A. Kirte Sepoy A/G I 280756 163/02

Page 62: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

62

4.(b)(x)) The monthly remuneration received by each of its officers

and employees including the system of compensation as

provided in its regulations: -

Sr.

No. Name of Officer/Staff Designation

Basic Pay

(Rs.)

Monthly Remuneration

(Basic+Allowances)

1 Shri S.N.Pawar Superintendent 27345/- 83801/-

2 Shri. G. R. Bains Asst. Engineer 21935/- 60370/-

3 Shri. S.S. Kulkarni Asst. Engineer 20270/- 63566/-

4 Shri. R. B. Zope Asst. Engineer 20270/- 62302/-

5 Shri. S.D. Joglekar Asst. Engineer 20270/- 62302/-

6 Shri. M. M. Shaikh Asst. Engineer 20825/- 65953/-

7 Shri H.K.Patil Charge Engineer 18785/- 57413/-

8 Shri A.K.Hajare Foreman General 17055/- 47202/-

9 Shri. K. C. Thakur Foreman General 16660/- 51638/-

10 Shri V.D.Tawde Foreman General 16265/- 45378/-

11 Shri R.V.Manjalkar Foreman 15785/- 46396/-

12 Shri J.N.Patil Foreman 14530/- 42453/-

13 Shri P.P.Redij Foreman 14285/- 41818/-

14 Shri S.R.Satkar Foreman 14285/- 43707/-

15 Shri. M. V. Katkar Foreman 12260/- 35328/-

16 Shri V.R.Borate Assistant Foreman 14050/- 41196/-

17 Shri V.M.Shelar Assistant Foreman 15275/- 44984/-

18 Shri. K. L Pardhi Assistant Foreman 12905/- 38208/-

19 Shri S.G.Wairkar Tradesman 12475/- 37625/-

20 Shri P.S.Chavan Nawghany 11255/- 30350/-

21 Shri A.B.Pawar Nawghany 10875/- 32657/-

22 Shri D.B.Gamare Nawghany 10875/- 29398/-

23 Shri S.M.Shirke Nawghany 8730/- 26628/-

24 Shri Z.S.Jadhav Nawghany 6305/- 19785/-

25 Shri S.R.Surve Asst.Admin. Officer 19775/- 58590/-

26 Smt. T.M.Velankar Supervisor(P) 15020/- 41890/-

27 Shri M.K.Bhosle Supervisor(P) 15785/- 42338/-

28 Smt. S.A. Kirte Sepoy 11060/- 32153/-

Page 63: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

63

4.(b)(xi)) The budget allocated to each of its agency, indication the

particulars of all plans, proposed expenditures and

reports on disbursement made:-

No direct budget allocation is proposed by department for capital expenditure.

The budget provision for the individual job undertaken by the department for dead

stock and capital expenditures only is made by the department

The budget allocation :-

The plan proposed:-

Not applicable to System Protection Department

4.(b)(xii)) The manner of execution of subsidy program including

the amount allocated and the details of beneficiaries of

such program: -

Not applicable to System Protection Department

4.(b)(xiii)) Particular of recipients of concessions, permits or

authorization granted by it:-

Not applicable to System Protection Department

4.(b)(xiv)) Details in respect of the information, available to or held

by it, reduced in an electronic form:-

The work of System Protection Department is not directly related with outside

peoples. The information in respect of working procedure in respect of activities

carried out by the department and the information in respect of officers and staff

is available in the electronic form on the Undertaking‘s website

www.bestundertaking.

Page 64: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

64

4.(b)(xv)) The particulars of facilities available to citizens for

obtaining information including the working hours in a

library or reading room, if maintained for public use :-

No such library or reading room is provided.

4.(b)(xvi)) The names, designation and other particulars of the

public information as may be prescribed and thereafter

updated these publications every year:-

Shri. S. N. Pawar

Superintendent System Protection Department

4.(b)(xvii)) Such other information as may be prescribed: - NIL

Page 65: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

65

Annex- I

SYSTEM PROTECTION DEPARTMENT ORGANISATION CHART

SUPERINTENDENT

SYSTEM PROTECTION

AESP-2 SOUTH &

CENTRAL

SOUTH ZONE

AESP-3 COMMISSIONING OF NEW

RSS & REPLACEMENT JOBS

IN EXISTING RSS, BOOKING

OF STAFF / LOGISTICS,

PREPARING OF MIS REPORT

÷

AESP-5 CENTRAL

NORTH ZONE ,

NORTH EAST

ZONE, NORTH

WEST ZONE

AESP-4 CENTRAL

NORTH ZONE ,

NORTH EAST

ZONE, NORTH

WEST ZONE

AESP-1 SOUTH &

CENTRAL

SOUTH ZONE

FOREMAN GENERAL -1

OFFICE

AAOSP FOREMAN

GENERAL-6

FOREMAN

GENERAL -3

FOREMAN

GENERAL -2

FOREMAN

GENERAL -4

FOREMAN

GENERAL -5

Page 66: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

66

Annex- II

SYSTEM PROTECTION DEPARTMENT

Approved Group Incentive Bonus Scheme no. 51

for the group no. 518 & 519

( The document Group Incentive Bonus Scheme no. 51 is re-typed below)

Page 67: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

67

Scheme No. 51

Group No. 518,519

Date: 01.04.2008 to 31.03.2010

GROUP INCENTIVE BONUS SCHEME NO. 51 FOR TESTING AND REPAIRS

SECTION OF THE METERS AND RELAYS DEPARTMENT

1. OBJECTIVES:

1.1 This monthly group incentive bonus scheme for the employees working in the ‗Testing and

Repairs Section ‗ of the Meters and Relays Department, who are carrying out the work of

overhauling and testing of meters as well as relays, punching clock, other measuring

instruments, minor gadgets, etc. is being introduced for the purpose of :

a) Providing an easy way to compute the performance level of each group by relating the

input manpower of the group with its work output.

b) Providing for incentive bonus payments which are related to the improved performance

level maintained by each group, during the month as envisaged under BCR 780 dated

24.10.1977.

1.2 In the end result, it is expected to increase the productivity of these sections by

encouraging greater co-ordinated effort, by reducing absenteeism, and by promoting

better participation by supervisory and other staff engaged in ancillary work and auxiliary

work.

1.3 Specifically, the scheme would achieve the following:-

1.3.1 Maintaining the reliability of operation and accuracy of performance of energy meters,

M.D. meters and Sine meters at a high standard, by proper periodic attention.

1.3.2 Ensuring that the protective, indicating and regulating relays operate at the required

settings with proper indication.

1.3.3 Ensuring that all protective and testing equipment that is procured complies with the

requirements of the specifications.

1.4 In short, the prime objective is to improve efficiency at minimum cost by the payment of

incentive bonus.

Page 68: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

68

2. SCOPE:

2.1 This scheme covers two distinct and separate groups.

2.1.1 Group- ‗A‘

Group ‗A‘ comprises all tradesmen on direct work, indirect work, helpers, tradesmen on

ancillary and auxiliary work and unmeasured work, supervisors and Deputy Engineers

connected with the testing activities.

2.1.2 Group- ‗B‘

Group ‗B‘ comprises all tradesmen on direct work, indirect work, helpers, tradesmen on

ancillary and auxiliary work and unmeasured work, supervisors and Dy.Engineers

working connected with the activities of the Repairs Section and the Instrument Section.

2.1.3 In this scheme total 5 nos. of M.V.drivers who are working in Meters & Relays

Department are included.

3. ACTIVITES

3.1 The activities performed by these sections are listed in Appendix ‗I‘

4. DESIGN OF THE SCHEME :

4.1 Standard Time

4.1.1 Standard times in standard man minutes have been worked out based on : Work

measurement, analysis of past data and analytical estimating or major parts of activities in

the Testing Section and Repairs Section.

4.1.2 The standard times for the various activities carried out in the Testing Section and the

Repairs Section are shown in Appendix IIA and Appendix IIB respectively.

4.2 Allocation of manpower

4.2.1 Average expected monthly outputs for different activities of the groups are worked out

based on past data, modified for future needs and converted into standard man-minutes

(See Appendix IIIA and Appendix IIIB).

4.2.2 In addition to the quantified and measured activities, the section also perform

unmeasured activities. These are listed in Appendix IV.

Page 69: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

69

4.2.3 Manning

4.2.3.1 The number of indirect workers required for a achieving the outputs referred at 4.2.1, is

calculated based on the sections working for 25days a month and 45.25hrs, a week.

Average performance level is assumed to be 135%(See Appendix VA and Appendix VB)

4.2.3.2 The allocation of manpower ( as direct and indirect) for, executing he measured as well

as the unmeasured work and the requirements for leave reserve at 15%, are also shown in

Appendix ‗V‘

4.2.3.3 Manning will be reviewed as and when necessity arises due to addition or reduction of

activities sustained changes in the composition of monthly outputs. Under these

circumstances, addition or reduction to the number of employees allocated on the

permanent basis will be on the recommendations of the Joint Work Study Committee and

the approval of Addl.GM(ES).

4.3 Computing Average Group Efficiency(AGE)

4.3.1 From the output from the various activities in the month, the total standard man-minutes

produced by each of the group will be calculated using the standard time for each

activity. The AGE for each of the group will then be calculated using the formula.

Total std man-min. produced by the group X 100

AGE = ---------------------------------------------------------------

452.5 X Total No. of direct worker days available

during the month

This formula for computing group efficiency is based on the output by the direct workers

in the group whose number is shown in Appendix VA and VB.

4.3.2 The Average Group Efficiency(AGE) shall be used for obtaining the Factor for Incentive

Bonus(GIB) which would be the percentage of basic salary payable as incentive bonus to

each member of the group, subject to other stipulation laid down in Appendix VA and

VB, Appendix VII and in clauses under section 6 relating to quality.

4.4 Payment of Incentive Bonus

The relationship between AGE and FIB is given in Appendix VI. These payments shall

be effected every month. For standard performance, i.e. 115% performance level (or

AGE) the amount of incentive payable is 18% of the basic salary and for 153%

performance level (or AGE) it is 45%. No Incentive Bonus is payable below 115%

performance level.

Page 70: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

70

5. QUANTITY OF PRODUCTION

5.1 The Asst. Engineer or Superintendent with the help of the Dy. Engineer and the

supervisors, is expected to : schedule and plan the activities well in advance, ensure

availability of materials and special equipment for the activities planned, and co-ordinate

transport of men and materials. While every effort shall be made to maximize production,

standards of safety and quality shall be maintained.

6. QUALITY CHECKING

6.1 On Line Quality Checks

The Supervisor shall spot check the work of every Meter Tester once a day and if he

finds that the error is out of limits he shall direct the Meter Tester to repeat the test and

correct the meters which require adjustment.

For the above purpose, the test shall be ―Speed Test at U.P.F. and half load‖ and it shall

be carried out when the meters which require adjustment.

6.1.2 Final Quality Checks :

6.1.2.1 A ‗Dial Test‘ shall be performed on each and every tested meter on a separate bench as

stipulated below :

A. SINGLE PHASE

------------------------------------------- -----------------------------------------------

-

Meter Rating Test Current Permissible Range of Error

Amps. Amps.

------------------------------------------- -----------------------------------------------

40 20 + 1% to + 2.5%

20 20 --do--

10 5 --do--

5 5 --do—

------------------------------------------- -----------------------------------------------

-

B. THREE PHASE

------------------------------------------- -----------------------------------------------

-

Meter Rating Test Current Permissible Range of Error

Amps. Amps.

------------------------------------------- -----------------------------------------------

100 50 + 1% to + 2.5%

50 50 --do--

30 10 --do--

25 & 20 --do--

------------------------------------------- -----------------------------------------------

Page 71: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

71

If any meter gives an error beyond the range stipulated above :

a) The entire batch shall be restricted:

b) The concerned Meter Tester shall lose his FIB 1% for each such instance.

6.1.2.2 C.T. Meters

After the Meter Tester has finished all the tests, the Asst. Engr. Shall ask him to repeat

the ―Speed Test at U.P.F. ½ load‖ and certify the quality as acceptable or not. For the

purpose of incentive scheme only the output certified by the Asst. Engr. is acceptable,

shall be counted. The Asst. Engr. Is authorized to deduct up to a maximum of 5% from

the FIB for the month for any member of the group who produces output of bad quality.

A record of such deduction shall be kept in the department.

6.2 Repair Section

6.2.1 It should be noted that bad quality of output in repaired and overhauled meters will affect

the output of the Testing Section. Hence, the Testing Section will be required to call for

the services of the Repairs Section whenever the meters are to be adjusted beyond the

reasonable means of the Testing Section.

6.2.2 In the above referred circumstances the repairs section will immediately render the

required services/assistance.

6.3 For all other activities bad quality will result in reduction of bonus earned by any member

of the group who produces it as follows :

In case of any detection and reporting of bad quality, the Asst. Engr. is authorized to

deduct up to a maximum of 5% from the FIB for the month, earned by that member, for

each lapse duly confirmed.

7. OTHER RULES GOVERNING THE SCHEME

7.1 Other rules governing the scheme are shown in Appendix VII

8. RECOMMENDED PROCEDURE FOR PAYMENT

8.1 REPORTING OUTPUTS :

monthly input and output statement, in the prescribed format( Appendix VIII ) shall be

submitted, in duplicate, by the division to the JWSC, by the fifth working day of the

following month. This shall include ‗On Roll‘ strength of tradesmen as on the first and

sixteenth of the month. Each pages of this statement should be certified by ‗A‘ grade

officer.

8.2 Joint Work Study Committee shall calculate the AGE and declare the FIB for the group

by the 8th

working day of that month, and forward one copy to the division through the

concerned Deputy Chief Engineer.

Page 72: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

72

8.3 The Divisional Engineer shall then certify the eligibility and extent of bonus payable to

each member of the group according to Clause 4.3.2 and advise SMA by the 12th

working

day of the month.

8.4 Payment of the incentive bonus for the month shall be effected along with the succeeding

month‘s salary

8.5 The above procedure may be reviewed by the JWSC to ensure timely payments.

9.0 RESERVATION CLAUSES

9.1 the modified scheme will be introduced from 1st of April 2008, for a period of 2 years,

and will be extended further after two years. The management reserves the rights to

review, modify alter or cancel this incentive scheme.

9.2 The management also reserves the right to add to or to subtract from the proposed

allocated manpower for reason such as, exigencies of work, seasonal fluctuations, change

in pattern, etc. which may arise in future.

9.3 The management also reserves the right to modify methods, process, standards, etc. work

study of activities affected by such changes shall be carried out by JWSC and the scheme

would be modified to the extent necessary.

10. REVIEW

10.1 Based on the experience gained during its operation, the entire scheme may be reviewed.

If not action to the country is taken, the scheme would continue from month to month.

****************************

Page 73: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

73

Scheme No. 51

Appendix I

Clause 3.1

ACTIVITY OF METER TESTING DEPARTMENT

TESTING AND REPAIRS SECTION

Sr.No. ACTIVITY DESCRIPTION

1. Testing of SP kwh meter on S/A bench (New)

2 Testing of SP kwh meter on conv.bench(New)

3 Testing of SP kwh meter on S/A bench (Repaired)

4 Testing of SP kwh meter on conv. bench (Repaired )

5 Testing of SP BC kwh meter with machanics

6 Testing of SP BC kwh meter without machanics

7 Official testing of sp kwh meter with party/ Laboratory testing of SP kwh

meters

8 Official testing of SP kwh meter without party

9 Testing of SP kwh incoming meters for vendor analysis on S/A bench.

10 Testing of SP kwh incoming meters for vendor analysis on conv. bench.

11 Testing SP prepayment meter on S/A bench

12 Testing SP static meter on S/A bench

13 Testing SP static meter on conv. bench with TVE

14 Diel Test on SP kwh after sealing

15 Testing of PP kwh meter on S/A bench,conv.bench(Rep.)

16 Testing of PP BC kwh meter without mech.

17 Testing of PP static meter on S/A bench with software

18 Testing of PP static meter on S/A bench without software

19 Testing of PP static meter on conv. bench with TVE

20 Testing of PP kwh prepayment meter on S/A bench

21 Testing of incoming PP kwh meter for vendor analysis on S/A bench

22 Testing of incoming PP kwh meter for vendor analysis on Conv. bench

23 Official testing of PP kwh meter with party/ Laboratory testing of PP kwh

meters

24 Official testing of PP kwh meter without party

25 Inspection /Attending to HV metering Installation

26 Testing & Adjusting HV metering installation

27 RSS/RSM Calibration for BEST

28 Reading of R.S.M. with presence of Tata

29 Relay test. In RSS with annouciation relay

a) On outgoing feeders :

I ) Conventional relay

II ) numeric relay

b) On capacitor panel:

I) Conventional relay

II) numeric relay

Page 74: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

74

Sr.No. ACTIVITY DESCRIPTION

c) on Tran.Control panel for 33/22 kv :

I ) Conventional relay

II ) numeric relay

d) On Tran. Control panel for 110kv :

I) Conventional relay

II) numeric relay

30 Relay testing in DSS

31 OCB testing in

a) Distribution Worksop

b) Sub.Station

32 Inspection of Tap change control panel in RSS

33 Overhauling of new SP kwh Meter

34 Overhauling of new SP kwh Meter (when additional inductive loop is

provided)

35 Overhauling of old ok PP kwh Meter

36 Repairing & overhauling of damage SP kwh meter

37 Repairing of terminal block

38 Overhauling of new PP kwh meter

39 Overhauling of old ok PP kwh meter

40 Repairing & overhauling of damage PP meter

41 Inspection & check of damage/stop Meter

42 Salvaging/scrapping of SP/PP meter

43 Breaking Of PP meter cover

44 Jewel checking

45 Relay Overhauling in RSS while testing

a) On outgoing feeders :

I ) Conventional relay

II ) numeric relay

b) On capacitor panel:

I ) Conventional relay

II ) numeric relay

c) On Tran.Control panel for 33/22 kv :

I ) Conventional relay

II ) numeric relay

d) On Tran. Control panel for 110kv :

I) Conventional relay

II ) numeric relay

46 Relay Overhauling in DSS while testing

47 Attending to message stopped punching clock on emergency basis

48 Overhauling of punching clock

49 Routine checking / winding of punching clock

a) Dadar/Wadala/Colaba

b) Site Depot

Page 75: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

75

Sr.No. ACTIVITY DESCRIPTION

50 Repairing/Overhauling of electronic punching clock

51 Overhauling of time winding clock

52 Changing the lift of punching clock

53 Testing and calibration of precision instruments

54 Training

55 Repairing and maintaining, modifying testing panels

56 Attending to relay complaints(investigation of maloperation of relays in RSS)

57 Computer data feeding of all tested meters

58 Making and fixing potential links and helping of bad curve meters

59 Repairing and maintaining, modifying testing panels

60 Work in connection of new relay/ new relay panels

61 Attending to complaints of AVR

62 Accucheck testing, TVE, RSS testing

63 Incoming RSS testing of single phase and three phase

64 Special instruction and check up of H.V. consumers meters

65 Attending complaints of H.V.consumer metering from other departments

66 Keeping accounts of stock of H.V.metering equipments and replenish the stock

67 To carry out remote metering system wiring

68 Maintenance of panel and equipment

69

Repairing and overhauling various types of relays, timers, cable fault burning,

locating equipments, multimeters, meggers and winding coil of differential

relays

70 Inspecting and maintaining stock of new meters

71 Fabricating minor items

72 Attending to relay complaints(Investigation of maloperation of Relays in RSS)

73 Repairing and overhauling of various types of indicator/recording instruments

such as voltmeter, ammeters, wattmeters, power fector meter, tongtester etc.

74 Attending to M.D.Meter and backstopped complaints at site

75 Work in connection of new relays/new relay panels

76 Examination of I/O, I/Q/polyphase meters for ascertaining charecterstics

77 Meter Testing on Intrax Test Bench(Aomi Automatic)

a) 1-phase Conventional Meter(New)

b) 1-phase Conventional Meters (Repaired)

c) 3-Phase Static Meter(New)

d) 3-phase Static Meter(Incoming)

e) 3-phase Conventional Meter(Repaired)

f) Laboratory 3 phase Conventional Meter

g) Laboratory 3 phase Static Meter

Page 76: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

76

Scheme no.51

Group no.518

Appendix II A

(Clause 4.1.2)

STANDARD MAN-MINUTES FOR MEASURED ACTIVITIES OF

TESTING SECTION OF METER & RELAYS DEPARTMENT

SR.NO. ACTIVITY DESCRIPTION STD TIME

Man-Mins Unit

Count A SP KWH METER TESTING :

1 Testing of SP kwh meter on S/A bench (New) 32 Meter

2 Testing of SP kwh meter on conv.bench(New) 45 Meter

3 Testing of SP kwh meter on S/A bench (Repaired) 42 Meter

4 Testing of SP kwh meter on conv. bench (Repaired ) 45 Meter

5 Testing of SP BC kwh meter with machanics 105 Meter

6 Testing of SP BC kwh meter without machanics 157 Meter

7 Official testing of sp kwh meter with party/ Laboratory testing of

SP kwh meters

133 Meter

8 Official testing of SP kwh meter without party 153 Meter

9 Testing of SP kwh incoming meters for vendor analysis on S/A

bench.

32 Meter

10 Testing of SP kwh incoming meters for vendor analysis on conv.

bench.

35 Meter

11 Testing SP prepayment meter on S/A bench 123 Meter

12 Testing SP static meter on S/A bench 30 Meter

13 Testing SP static meter on conv. bench with TVE 35 Meter

14 Diel Test on SP kwh after sealing 9 Meter

B PP Meter Testing Meter

1 Testing of PP kwh meter on S/A bench,conv.bench(Rep.) 110 Meter

2 Testing of PP BC kwh meter without mech. 556 Meter

3 Testing of PP static meter on S/A bench with software 102 Meter

4 Testing of PP static meter on S/A bench without software 121 Meter

5 Testing of PP static meter on conv. bench with TVE 94 Meter

6 Testing of PP kwh prepayment meter on S/A bench 98 Meter

7 Testing of incoming PP kwh meter for vendor analysis on S/A

bench

80 Meter

8 Testing of incoming PP kwh meter for vendor analysis on Conv.

bench

94 Meter

9 Official testing of PP kwh meter with party/ Laboratory testing of

PP kwh meters

140 Meter

10 Official testing of PP kwh meter without party 170 Meter

C H.V.Metering

1 Inspection /Attending to HV metering Installation 83 Install

2 Testing & Adjusting HV metering installation 100 Install

3 Reading of R.S.M. with presence of Tata 450 R.S.M.

Page 77: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

77

D Relay test. In RSS with annouciation relay

1 a) On outgoing feeders :

I ) Conventional relay 287 Panel

II ) numeric relay 145 Panel

b) On capacitor panel:

I ) Conventional relay 480 Panel

II ) numeric relay 241 Panel

c) on Tran.Control panel for 33/22 kv :

I ) Conventional relay 950 Transf.

II ) numeric relay 0 Transf.

d) On Tran. Control panel for 110kv :

I) Conventional relay 1027 Transf.

II ) numeric relay 0 Transf.

2 Relay testing in DSS 480 Sub-stn

3 OCB testing in

a) Distribution Worksop 240 OCB

b) Sub.Station 480 OCB

E Inspection of Tap change control panel in RSS 130 RSS

Meter Testing on Intrax Test Bench(Aomi Automatic)

a) 1-phase Conventional Meter(New) 35 Meter

b) 1-phase Conventional Meters (Repaired) 38 Meter

c) 3-Phase Static Meter(New) 54 Meter

d) 3-phase Static Meter(Incoming) 76 Meter

e) 3-phase Conventional Meter(Repaired) 65 Meter

f) Laboratory 3 phase Conventional Meter 114 Meter

g) Laboratory 3 phase Static Meter 85 Meter

SP : Single Phase S/A : Semi Automatic

PP : Poly Phase RSM : Reference std. Meter

BC : Bad curve RSS : Rotating substandard

S/W : Software

Page 78: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

78

Scheme No.51

Group No. 519

Appendix II B

( Clause 4.1.2)

STANDARD MAN- MINUTES FOR MEASURED ACTIVITY OF

REPAIR SECTION OF METER & RELAYS DEPARTMENT

SR.

NO

ACTIVITY DESCRIPTION

Std. time

Man Mins Unit of Count

A SP Overhaauling /Repairing

1 Overhauling of new SP kwh Meter 32 Meter

2 Overhauling of new SP kwh Meter ( when additional loop is provided) 39 Meter

3 Overhauling of old OK SP kwh Meter 80 Meter

4 Repairing and overhauling of damaged SP kwh meter 120 Meter

5 Repairing of terminal block 120 Meter

6 Inspection & check of SP damaged / stop meter 15 Meter

7 Salvaging/ repairing of SP meter 30 Meter

B PP Overhauling / Rpairing

1 Overhauling of new PP kwh meter 96 Meter

2 Overhauling of old ok PP kwh meter 160 Meter

3 Repairing & overhauling of damaged PP meter 240 Meter

4 Inspection & check of PP damage / stop kwh meter 30 Meter

5 Salvaging / scrapping of PP meter 30 Meter

6 Brazing of PP meter cover 20 Meter

7 Jewel checking 3 Meter

C Relay Overhauling in RSS while testing

1 a) On outgoing feeders:

i) Conventional Relay 287 Panel

ii) Numeric relay 145 Panel

b)On capacitor panel

i) Conventional Relay 305 Panel

ii) Numeric relay 241 Panel

a) On the Control panel for 33 /22 kv

i) Conventional Relay 589 Trans

ii) Numeric relay Trans

b) On the transformer control panel 110 kv

i) Conventional Relay 1027 Trans

ii) Numeric relay Trans

Page 79: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

79

SR.

NO.

ACTIVITY DESCRIPTION

Std. time

Man Mins Unit of Count

2 Relay Overhauling in DSS while testing 480

3 OCB Testing in

a) Distribution Workshop 240

b) Sub station 480

D Punching Clock Section

1 Attending to message stopped punching clock on emergency basis 140

2 Overhauling of punching clock 3034

3 Routine checking winding of punching clock

c) Dadar /Wadala / Colaba 10

d) Site Depot 85

4 Repairing /Overhauling of electronic punching clock 430

5 Overhauling of Time winding clock 775

6 Changing the lift of punching clock 960

Page 80: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

80

Scheme No.51

Group No. 518

AppendixIII A

( Clause 4.2.1)

AVERAGFE EXPECTED MONTHLY OUTPUT OF

TESTING SECTION OF METER & RELAYS DEPARTMENT

(PERFORMANCE OUTPUT OF THE YEAR APRIL -2006 TO MARCH- 2008)

Sr.

No. ACTIVITY DESCRIPTION

Total Output per Month Avg. o/p

per month (2006-08)

Std.

man mins.

Total man

minutes Grade

2006-2007 2007-

2008

A SP KWH METER TESTING:

1 Testing of SP kwh meter on S/A bench (New) 0 0 0 32 0 T5/T4

2 Testing of SP kwh meter on con. bench (New) 1852.92 1055.22 1454.07 45 65433.15 T5/T4

3 Testing of SP kwh meter on S/A bench (Repaired) 260 0 130 42 5460 T5/T4

4 Testing of SP kwh meter on con. bench (Repaired) 292.8 553.09 422.95 48 19455.47 T5/T4

5 Testing of SP BC kwh meter with mechanics 0 0 0 105 0 T5/T4

6 Testing of SP BC kwh meter without mechanics 85.29 217.81 141.55 157 22223.35 T5/T4

7 Official Testing of SP kwh meter with party / Laboratory

Testing of SPKwh meters 110.42 47.475 79.09 133 10518.87 T5/T4

8 Official Testing of SP kwh meter without party 4.92 7.18 6.05 153 925.55 T5/T4

9 Testing of SP kwh incoming meters for vendor analysis on

S/A bench 7 23.8 15.4 32 422.8 T5/T4

10 Testing of SP kwh incoming meters for vendor analysis on

conv. bench 0 1 0.5 35 17.5 T5/T4

11 Testing of SP prepayment meter on S/A bench 0 0 0 123 0 T5/T4

12 Testing of SP static meter on S/A bench 33.5 7 22.75 30 682.5 T5/T4

13 Testing of SP meter on conv. Bench with TVE 0 0 0 35 0 T5/T4

14 Dial Test on kwh meter after sealing 4580 4363.5 4476.25 9 40293.25 T5/T4

O/P of T5 /T4 125209.38

B PP meter testing:

1 Testing of PP kwh meter on S/A bench/ conv. Bench (rep.) 111.73 117.5 114.62 110 12606.2 T6 /T5

2 Testing of PP BC kwh meter witjhout mech. 26.22 61.08 43.65 556 24269.4 T6 /T5

3 Testing of PP static meter on S/A bench with software 33.25 35.25 34.75 102 3544.5 T6 /T5

4 Testing of PP static meter on S/A bench without software 632.5 217.25 424.88 121 51410.43 T6 /T5

5 Testing of PP static meter on con. Bench with TVE 210.63 0 105.32 94 9900.08 T6 /T5

6 Testing of prepayment meter on S/A bench 0 0 0 98 0 T6 /T5

7 Testing of incoming PP kwh meter for vendor analysis on

S/A bench 0 0 0 80 0 T6 /T5

8 Testing of incoming PP kwh meter for vendor analysis on

conv. bench 0 0 0 94 0 T6 /T5

9 Official testing of PP kwh meter with party /Laboratory

Testing of PP KWH meters 103.09 100.75 101.92 140 14266.8 T6 /T5

10 Official testing of PP kwh meter without party 15.36 20.75 18.06 170 3070.2 T6 /T5

O/P of T6 /T5 119071.7

Page 81: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

81

Sr.

No. ACTIVITY DESCRIPTION

Total Output per Month Avg. o/p

per month (2006-08)

Std.

man mins.

Total man

minutes Grade

2006-2007 2007-

2008

C H.V. METERING

1 Inspection / Attending to HV metering installation 479.5 355.18 422.34 83 35064.22 T6 /T7

2 Testing and Adjusting HV metering installations 13 25.55 20.83 100 2083 T6 /T7

3 Reading of R.S. M. with presence of TATA 13 6.5 9.75 450 4387.5 T6 /T7

O/P of T6 /T7 41524.72

D RELAY TEST IN RSS WITH ANNOUCIATION

RELAY :

1 a) On Outgoing feeders:

I) Conventional relay 42.17 37.83 40 287 11480 T 7

ii) numeric relay 23.29 13.17 18.23 145 2643.35 T 7

b) On capacitor relay

I) Conventional relay 6.92 5.83 6.38 480 3062.4 T 7

ii) numeric relay 2.67 2.7 2.69 241 648.29 T 7

c) On Tran. Control Panel for 33 / 22 kv

I) Conventional relay 8.08 8.33 8.21 960 7881.6 T 7

ii) numeric relay 0 0 0 0 0 T 7

d) On Tran. Control Panel for 110 kv

I) Conventional relay 6.75 1 3.38 1027 3471.26 T 7

ii) numeric relay 0 0 0 0 0 T 7

2 RELAY TESTING IN DSS: 0 0 0 480 0 T 7

O/P of T 7 29186.9

3 OCB TESTING IN:

a) Distribution Workshop 27.17 27.08 27.13 240 6511.2 T 8

b) Substation 0 0 0 480 0 T 8

E Inspection of Tap Change control panel in RSS 21 31.91 26.46 130 3439.8 T 8

O/P of T 8 9951

F S/P Meter Testing on INTRAX Test Bench ( 1 ph

conventional meter NEW) 1337.17 2243.92 1790.54 35 62668.9 T 4/T5

G P/P Meter Testing on INTRAX Test Bench ( 3 ph

conventional meter Repaired) 500 408.92 454.46 65 29539.9 T5/T6

SP : Single Phase S/A : Semi Automatic

PP : Poly Phase RSM : Reference Std. Meter

BC : Bad Curve RSS : Rotating Sub Standard

S/ W: Software

Page 82: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

82

Scheme No.51

Group No. 519

AppendixIII B

( Clause 4.2.1)

AVERAGFE EXPECTED MONTHLY OUTPUT OF

REPAIRS SECTION OF METER & RELAYS DEPARTMENT

(PERFORMANCE OUTPUT OF THE YEAR APRIL -2006 TO MARCH- 2008)

Sr. No.

ACTIVITY DESCRIPTION Total Output per Month Avg. o/p per

month (2006-08)

Std.

man mins.

Total man minutes

Grade 2006-2007 2007-2008

A SP Overhaauling /Repairing

1 Overhauling of new SP kwh Meter 4126.42 2598.45 3362.44 32 107598.08 T-4

2 Overhauling of new SP kwh Meter ( when additional loop is provided)

0.00 0.00 0.00 39 0.00 T-4

3 Overhauling of old SP kwh Meter 896.58 883.20 601.03 80 88282.40 T-4

4 Repairing and overhauling of damaged SP kwh meter 257.25 214.40 240.83 120 28899.60 T-4

5 Repairing of terminal block 0.00 0.00 0.00 120 0.00 T-4

6 Inspection & check of SP damaged / stop meter 1720.00 1531.67 1825.84 15 24387.45 T-4

7 Salvaging/ repairing of SP meter 5653.33 5162.50 5407.92 30 132237.60 T-4

Total 378405.13

B PP Overhauling / Rpairing

1 Overhauling of new PP kwh meter 0.00 0.00 0.00 96 0.00 T-6

2 Overhauling of old PP kwh meter 142.88 251.92 197.60 160 31884.00 T-6

3 Repairing & overhauling of damaged PP meter 59.88 218.73 138.80 240 33312.00 T-6

4 Inspection & check of PP kwh meter 386.63 406.83 396.53 30 11905.00 T-6

5 Salvaging / scrapping of SP/PP meter 639.17 649.00 594.08 30 17822.40 T-6

6 Brazing of PP meter cover 153.44 406.42 279.93 20 5595.60 T-6

7 Jewel checking 558.91 615.25 587.08 3 1761.24 T-6

B8-7= 7350.84

B1-5= 84625.40

C Relay Overhauling in RSS while testing

1 b) On outgoing feeders:

i) Conventional Relay 42.17 37.83 40.00 287 11480.00 T-6

ii) Numeric relay 23.29 13.17 15.23 145 2643.35 T-6

c) On capacitor panel

i) Conventional Relay 6.32 6.85 6.38 500 1645.00 T-6

ii) Numeric relay 2.67 2.70 2.69 241 647.09 T-6

d) On the Control panel for 33 /22 kv

j) Conventional Relay 8.06 8.33 8.21 689 4835.69 T-6

ii) Numeric relay 0.00 0.00 0.00 -- 0.00 T-6

e) On the transformer control panel 110 kv

j) Conventional Relay 2.33 1.00 1.67 1027 1715.09 T-6

ii) Numeric relay 0.00 0.00 0.00 -- 0.00 T-6

C1 23267.12

2 Relay Overhauling in DSS while testing 0.00 0.00 0.00 480 0.00 T-5

3 OCB Testing in

c) Distribution Workshop 27.17 27.08 27.13 240 6511.20 T-5

d) Sub station 0.00 0.00 0.00 480 0.00 T-5

C3= 6511.20

D Punching Clock Section

1 Attending to message stopped punching clock on emergency basis 651.67 657.42 654.55 140 49635.60 T-7 /T-6

2 Overhauling of punching clock 4.50 4.33 4.42 3034 13410.28 T-7 /T-6

3 Routine checking winding of punching clock

e) Dadar /Wadala / Colaba 1542.42 1485.00 1513.71 10 15137.10 T-7 /T-6

f) Site Depot 361.50 301.00 331.25 85 28156.25 T-7 /T-6

4 Repairing /Overhauling of electronic punching clock 9.06 7.33 8.21 430 3530.30 T-7 /T-6

5 Overhauling of Time winding clock 0.00 2.00 1.00 775 775.00 T-7 /T-6

6 Changing the lift of punching clock 3.00 3.00 3.00 960 2880.00 T-7 /T-6

SP : Single Phase PP : Poly Phase

Scheme No.51

Page 83: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

83

Group No. 519

AppendixIV

( Clause 4.2.2)

UNMEASURED WORK Testing Section:

1 Testing and calibration of precision instruments

2 Training

3 Repairing and maintaining, modifying testing panels

4 Attending relay complaints ( Investigation of mal-operation of relays in Receiving

Sub station)

5 Making and fixing potential links and helping in the testing of bad curve meters

6 Repairing and maintaining, modifying testing panels

7 Work in connection of new relay /new relay panels

8 Attending to complaints of AVR

9 Accucheck testing, TVE, RSS testing

10 Incoming RSS testing of single phase and three phase

11 Special instruction and check up of H.V. consumers meters

12 Attending complaints of H. V. consumer metering from other departments

13 Keeping accounts of stock of H.V. metering equipment and replenish the stock

14 To carry out remote metering system wiring

15 Computer data feeding of all tested meters

16 RSS /RSM calibration for BEST

Repairs Section

1 Maintenance of panel and equipment

2 Repairing and overhauling various types of relays, timers, cable fault burning locating

equipments, multimeters, meggers and winding coil of differential relays

3 Inspecting and maintaining stock of new meters

4 Fabricating minor items

5 Attending to relay complaints ( Investigation of mal-operation of relays in Receiving

Sub station)

6 Repairing and overhauling various types of indicators /recording instruments such as

voltmeter, ammeters, wattmeters, power factor meter, tong tester etc.

7 Attending to M.D. meter and back stopped complaints at site

8 Work in connection of new relays / new relay panels

9 Examination of I/O IQ / Polyphase maters forascertaining characterstics

10 Training

Page 84: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

84

Scheme No.51

Group No. 519

AppendixVA

( Clause 4.2.3.1)

ALLOCATION OF MANPOWER FOR TESTING SECTION OF MRE DEPARTMENT

A Requirement of Direct Workers

(Based on Input Man-Minutes of 11313 per man per month)

1 Testing Assistant ‗B‘ & ‗C‘ in grade T5 /T4

(For Single Phase Meter Testing)

Expected output per month in standard man-minutes=Sum (A1 to

A13)

= 125209.4

Therefore no. of men required at

a) 100% performance level = 11.07

b) 135% performance level = 8.20

= 8 say

2 Testing Assistant ‗C‘ in Grade T 4

( For Dial test)

Expected output per month in standard man-minutes=(A14) = 40288.25

Therefore no. of men required at

a) 100% performance level = 3.56

b) 135% performance level = 2.64

= 3 say

3 Assistant Forman in Grade T 6 / T 7

( For H.V.Metering section)

Expected output per month in standard man-minutes=Sum (C1 to C3) = 41534.72

Therefore no. of men required at

a) 100% performance level = 3.67

b) 135% performance level = 2.72

= 3 say

Page 85: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

85

4 Testing Assistant ‗A‘ in grade T6

(For work done outside department)

Expected output per month in standard man-minutes={D3(a) to E) = 9951

Therefore no. of men required at

a) 100% performance level = 0.88

b) 135% performance level = 0.85 =1 say

5 Testing Assistant ‗A‘ & ‗B‘ in Grade T 6 /T 5

( For work done in the department i.e. Testing of polyphase meter)

Expected output per month in standard man-minutes=(B1 to B 10) = 119071.7

Therefore no. of men required at

a) 100% performance level = 10.53

b) 135% performance level = 7.80=8 say

= 8 say 6 Senior Testing Assistant in Grade T 7

( For Relay Testing)

Expected output per month in standard man-minutes=(D1+D2) = 29186.9

Therefore no. of men required at

a) 100% performance level = 2.58

b) 135% performance level = 1.91=2 say

= 2 say O/P of Testing of S/P meters on Intrax =57716.38 ( on mandays lost

basis)

Therefore no. of men required at

a) 100% performance level = 5.10

b) 135% performance level = 3.78=4 say

= 4 say 8 Testing Assistant ‗B‘ in Grade T 5 /T 6

O/P of Testing of S/P meters on Intrax =45589.01 ( on mandays lost

basis)

Therefore no. of men required at

a) 100% performance level = 4.03

b) 135% performance level = 2.96=3 say

= 3 say

Page 86: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

86

Scheme No.51

Group No. 519

AppendixV A

( Clause 4.2.3.2)

B. ALLOCATION OF MANPOWER FOR TESTING SECTION Sr.

No.

Category Staff at Staff at Remarks

100% 135%

1.a) Testing Assistant‘B‘ in grade T4/T5 16 12 Direct testing on testing benches

b) --do-- 2 Indirect including LR @ 15%

c) --do-- 1 Indirect work computer data entry for testing of incoming meters & Record maintaining

Total 15

2.a) Testing Assistant‘A‘ in grade T5/T65 14 12 Direct

b) Asst. Foreman in grade T 6 3 2 Direct ( H. V. Metering)

c) --do-- 2 Indirect including LR @ 15%

d) --do-- 2+4 Indirect work computer data entry for testing of

incoming meters & Record maintaining

e) --do-- 2 Supervision

Total 24

3.a) Sr.Testing Assistant‘A‘ in grade T7 2 2 Direct ( relay testing)

b) Foreman in grade T 7 2 1 Direct ( H. V. Metering)

c) --do-- 1 Indirect including LR @ 15%

Total 4

4 Std. Test Asst. Gr. T-8 1 (Standard Laboratory)- Indirect Unmeasured activities

5 a) Testing Asst. ‗C‘ in grade T 4 4 13 Direct for Dial Test

b) --do-- 1 Indirect including LR @ 15%

Total 15

6 Meter Mechanic, Gr. T-4 2 Indirect unmeasured work for BC meters

Meter Mechanic, Gr. T 5 1 Helping Tester in Bad curve meters

7 Nawghany 10 Indirect helper in measured & un measured working including LR @ 15%

8 Repairs Asst., Gr. T -7 1 Indirect unmeasured work ( maintenance of test bench)

9 Foreman, Gr. T-7 3 Indirect unmeasured work ( Appendix IV) Commissioning of new RSS

10 Foreman Gr. T 7 2+3 Supervision and H. V. Metering installations

11 Foreman General Gr. T8 5+1 Supervision ( Testing & H.V. Metering)

12 Sub Engineer, Gr. G/GV 2 Supervision (Indoor)

13a) Dy. Engineer, Gr. G/GVI 1 Indirect unmeasured work ( meter checking)

b) --do-- 1+2 Supervision (Outdoor)

14 M.V. Driver G 3 3 H.V. Metering Installations & Relay Testing

C Total No. of Direct Workers 32

D Employees strength covered in the scheme 85

Page 87: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

87

Scheme No.51

Group No. 519

AppendixV B

( Clause 4.2.3.1)

ALLOCATION OF MANPOWER FOR REPAIRS SECTION OF MRE DEPARTMENT A Requirement of Direct Workers

(Based on Input Man-Minutes of 11313 per man per month)

1 Meter Mechanic in grade T4

(For Single Phase Meter overhauling & repairing)

Expected output per month in standard man-minutes=Activity A = 378405.13

Therefore no. of men required at

a) 100% performance level = 33.45

b) 135% performance level = 24.78=25 say

=25 say 2 Meter Mechanic in grade T5

( For Poly phase meter & Relay overhauling & repairing)

Expected output per month in standard man-minutes=(B1 to B5 & C3) = 101134.6

Therefore no. of men required at

a) 100% performance level = 8.94

b) 135% performance level = 6.62=7 say

= 7 say Expected output per month in standard man-minutes=Sum (C1 +B6+B7) = 30626.96

Therefore no. of men required at

a) 100% performance level = 2.71

b) 135% performance level = 2.01=2 say

= 2 say

4 Repairs Assistant inGrade T 6 / T 7

( Overhauling /repairing punching clock)

Expected output per month in standard man-minutes=Sum (D1 to

D6)

= 113524.63

Therefore no. of men required at

a) 100% performance level = 10.03

b) 135% performance level = 7.43=7 say

= 7 say

Page 88: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

88

Scheme No.51

Group No. 519

AppendixV B

( Clause 4.2.3.2)

B. ALLOCATION OF MANPOWER FOR REPAIRS SECTION

Sr.

No. Category

Staff at Staff at Remarks

100% 135%

1.a) Meter Mechanic in grade T 4 33 25 Direct

b) --do-- 4 LR @ 15%

Total 29

2.a) Sr. Mechanic /Asst. Foreman/ Repairs

assistant in grade T 6

10 5 Direct

b) --do-- 1 Indirect including LR @ 15%

Total 6

3.a) Meter Mechanic in grade T 5 9 7 Direct

b) --do-- 1 LR @15%

Total 8

4 Repairs Assistant ingrade T 7 4 4 Direct

--do-- 1 Indirect including LR @ 15%

Total 5

5 Nawghany (T1) 21 Indirect helper in measured & unmeasured

work including LR @ 15%

6 Mucadam T3 3 Supervision of nawghanies

7 Painter T3 6 Indirect unmeasured work including

(Appendix-I) LR @ 15%

8 Sr. Painter ( T 4) 3 Indirect unmeasured work including

(Appendix-I) LR @ 15%

9 Asst. Foreman, Gr. T-6 1+3 Indirect unmeasured work

10 Foreman Gr. T 7 1+3 Supervision

11 Foreman General Gr. T8 3+2 Supervision

12 Dy. Engineer, Gr. G/GVI 1 Supervision

13 M.V. Driver G 3 2 Transportation of materials

C Total No. of Direct Workers 41

D Employees strength covered in the scheme 95

Page 89: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

89

Scheme No.51

Group No. 519

AppendixVI

( Clause 4.4)

INCENTIVE BONUS FOR VARIOUS PERFORMANCE LEVELS

Sr. No. Average Group Efficiency ( A.G. E.) % Factor for Incentive Bonus ( F.I. B. **)

1 Below 115.00 0

2 115.00 to 117.00 18

3 117.01 to 119.00 20

4 119.01 to 121.00 22

5 121.01 to 123.00 24

6 123.01 to 125.00 26

7 125.01 to 127.00 28

8 127.01 to 129.00 30

9 129.01 to 131.00 32

10 131.01 to 133.00 34

11 133.01 to 135.00 35

12 135.01 to 137.00 36

13 137.01 to 139.00 37

14 139.01 to 141.00 38

15 141.01 to 143.00 39

16 143.01 to 145.00 40

17 145.01 to 147.00 41

18 147.01 to 149.00 42

19 149.01 to 151.00 43

20 151.01 to 153.00 44

21 Above 153.00 45

** Factor for Incentive Bonus is the percentage of Effective Basic salary ( i.e. Basic salary –

3300/- ) payable as Incentive Bonus to members of the group and compliance with other

rules governing the scheme.

Rs. 3300/- is merged D.A. Of March 96 in the Basic Salary

Page 90: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

90

Scheme No.51

AppendixVII

( Clause 7.1)

OTHER RULES GOVERNING THIS SCHEME

1.0 The employee will be eligible for 100% of declared Factor of Incentive Bonus (FIB) or

part of declared F.I. B. depending on his absenteeism in a calendar month. The eligibility

of the employee for earning bonus as a percentage of declared F.I. B. will be as per the

following table, subject to para 2.0

Percentage of F.I. B. eligible Limit of No. of days absence

out of the declared F.I. B. (not available for duty)

in the month

______________________ ________________________

100% upto 3 days

80% 4, 5 or 6 days

60% 7, 8 days

30% 9, 10 days

0% more than 10 days

______________________ _________________________

2.0 It there is more than one holiday in a month, the limit of no. of days absence ( not

available for duty ) will be increased by as many as the number of additional holidays (

i.e. in excess of one) unless they are called upon to work on one or more of these

holidays.

3.0 Employee transferred from one post carrying bonus to another also carrying bonus will

be governed by the conditions of the second post unless the transfer is effected on the 16th

of the month or there after, in which case, they will be governed by the conditions

applicable to the first post.

4.0 Employees on deputation for training or refresher course, except those which are

organised by the Undertaking, will be treated as not on duty during the period of

deputation for computing the bonus payable.

5.0 For easy computation and payment of bonus to employees, the amount of Rs. 0.50 or less

will be ignored and Rs. 0.51 and above will be rounded off to Rs. 1/-

6.0 An amount of Rs. 20/- per punishment (censure and above) imposed during the calendar

month and Rs. 20/- per day of absence ( no leave granted) during the calendar month will

be deducted from the bonus. However, deductions will not be carried forward to the next

month.

Page 91: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

91

Scheme No.51

AppendixVIII

( Clause 8.1)

PART B : INPUT

B-1 EMPLOYEES ALLOCATED UNDER ITEMS MARKED IN APPENDIX- V

SR. NO. NAME CHECK

NO

CATEGORY ON ROLL ON ATTENDA

NCE IN

DAYS GRADE DESIGN 1ST 16TH

B-2 EMPLOYEES ALLOCATED UNDER ITEMS NOT MARKED IN APPENDIX- V

SR. NO. NAME CHECK

NO

CATEGORY ON ROLL ON ATTENDA

NCE IN

DAYS GRADE DESIGN 1ST 16TH

Page 92: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

92

Scheme No.51

Group no. 518

AppendixVIIIA

( Clause 8.1)

PART- A:- OUTPUT

OUTPUT AND INPUT STATEMENT OF TESTING SECTION OF METERS AND

RELAYS DEPOARTMENT FOR THE MONTH OF

SR.

NO.

ACTIVITY DESCRIPTION

Std. time Output (Qty.) Std. Man mins.

produced Man Mins Unit of

Count

A SP KWH METER TESTING:

1 Testing of SP kwh meter on S/A bench (New) 32 Meter

2 Testing of SP kwh meter on con. bench (New) 45 Meter

3 Testing of SP kwh meter on S/A bench (Repaired) 42 Meter

4 Testing of SP kwh meter on con. bench (Repaired) 46 Meter

5 Testing of SP BC kwh meter with mechanics 105 Meter

6 Testing of SP BC kwh meter without mechanics 157 Meter

7 Official Testing of SP kwh meter with party / Laboratory Testing

of SPKwh meters

133 Meter

8 Official Testing of SP kwh meter without party 153 Meter

9 Testing of SP kwh incoming meters for vendor analysis on S/A

bench

32 Meter

10 Testing of SP kwh incoming meters for vendor analysis on conv.

bench

35 Meter

11 Testing of SP prepayment meter on S/A bench 123 Meter

12 Testing of SP static meter on S/A bench 30 Meter

13 Testing of SP meter on conv. Bench with TVE 35 Meter

14 Dial Test on kwh meter after sealing 9 Meter

B PP meter testing:

1 Testing of PP kwh meter on S/A bench/ conv. Bench (rep.) 110 Meter

2 Testing of PP BC kwh meter witjhout mech. 556 Meter

3 Testing of PP static meter on S/A bench with software 102 Meter

4 Testing of PP static meter on S/A bench without software 121 Meter

5 Testing of PP static meter on con. Bench with TVE 94 Meter

6 Testing of prepayment meter on S/A bench 98 Meter

7 Testing of incoming PP kwh meter for vendor analysis on S/A bench

80 Meter

8 Testing of incoming PP kwh meter for vendor analysis on conv.

bench

94 Meter

9 Official testing of PP kwh meter with party /Laboratory Testing

of PP KWH meters

140 Meter

10 Official testing of PP kwh meter without party 170 Meter

C H.V. METERING

1 Inspection / Attending to HV metering installation 83 Installation

2 Testing and Adjusting HV metering installations 100 Installation

3 Reading of R.S. M. with presence of TATA 450 RSM

Page 93: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

93

SR.

NO.

ACTIVITY DESCRIPTION

Std. time Output (Qty.) Std. Man mins.

produced Man Mins Unit of

Count

D RELAY TEST IN RSS WITH ANNOUCIATION RELAY :

1 a) On Outgoing feeders:

I) Conventional relay

ii) numeric relay

b) On capacitor relay

I) Conventional relay

ii) numeric relay

c) On Tran. Control Panel for 33 / 22 kv

I) Conventional relay

ii) numeric relay

d) On Tran. Control Panel for 110 kv

I) Conventional relay

ii) numeric relay

2 RELAY TESTING IN DSS:

3 OCB TESTING IN:

a) Distribution Workshop

b) Substation

E Inspection of Tap Change control panel in RSS

F Meter Testing on INTRAX Test Bench

a) 1-Phase Conventional Meter ( New)

b) 1-Phase Conventional Meter ( Repaired)

c) 3- Phase Static Meter ( New)

d) 3- Phase Static Meter ( Incoming)

e) 3- Phase Conventional Meter ( Repaired)

f) Laboratory 3- Phase Conventional Meter

g) Laboratory 3- Phase Static Meter

SP : Single Phase S/A : Semi Automatic

PP : Poly Phase RSM : Reference Std. Meter

BC : Bad Curve RSS : Rotating Sub Standard

S/ W: Software

Page 94: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

94

SYSTEM PROTECTION DEPARTMENT

Annex - III

The rules, regulations, instructions, manuals and

records held and used by employees of the department

for discharging functions

Sr

No DESCRIPTION

1 11O / 33kV, 110/11kV EQUIPMENTS DRAWINGS

2 33 kV EQUIPMENTS DRAWINGS

3 11 kV EQUIPMENTS DRAWINGS

4 OTHER EQUIPMENTS DRAWINGS

5 CATALOGUE FILE

6 SPECIFICATION FILE

7 DOCUMENTS

8 EQUIPMENTS

9 GENERAL

10 RSS

11 RELAY ORDER FILES

12 ESTABLISHMENT FILES *

13 STORES FILES *

14 ADMINISTRATIVE FILES *

15 TRAINING FILES *

16 STATSTICAL FILES *

17 STUDY FILES *

18 STAFF SERVICE RECORDS FILES *

* Please refer Annex- IV

Page 95: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

95

11O / 33kV, 110/11kV EQUIPMENTS DRAWINGS

Sr

No FILE NAME DESCRIPTION Category

1 SP/PROT/EQ.DRG.A1 110 kV GIS Breaker TOSHIBA Make of KHETWADI

RSS C

2 SP/PROT/EQ.DRG.A2 110/11 kV UE Make CP/RP of NARIMAN PT. RSS D

3 SP/PROT/EQ.DRG.A3 110 kV GIS BKR AEG Make of NARIMAN POINT

RSS C

4 SP/PROT/EQ.DRG.A4 110 kV GIS NISSIN Make of BACKBAY RSS B

5 SP/PROT/EQ.DRG.A5 110/33 kV ABB Make CP/RP of BACKBAY RSS B

6 SP/PROT/EQ.DRG.A6 110 kV ABB Make Out Going Panel For NP1 & NP2 Of

BACKBAY RSS B

7 SP/PROT/EQ.DRG.A7 110/33/11 kV ABB Make ANNUNCIATION Panel Of

BACKBAY RSS B

8 SP/PROT/EQ.DRG.A8 110 kV ABB Make CP/RP For 110KV Incomer 1,2,3 of

BACKBAY RSS ABB Volume 3c B

9 SP/PROT/EQ.DRG.A9 110/11-11 kV CP/RP 45 MVA of BACKBAY RSS B

10 SP/PROT/EQ.DRG.A10 Backbay RSS Bus Transfer & Disconnector Panel &

CP/RP Bus Transfer Scheme B

11 SP/PROT/EQ.DRG.A11 Metering Panel of 110 kV BACKBAY RSS B

12 SP/PROT/EQ.DRG.A12 Disturbance Recorder, Busbar Protection & Mosaic

Mimic Board of 110 kV Backbay RSS C

13 SP/PROT/EQ.DRG.A13 145 kV GIS LOCAL CONTROL PANEL Of

KHETWADI RSS C

14 SP/PROT/EQ.DRG.A14 110 kV GIS ABB Switchgear BACKBAY RSS Drawing

Volume 3A B

15 SP/PROT/EQ.DRG.A15 TATA's GRANT ROAD Drawing For 110 kV

KHETWADI RSS C

16 SP/PROT/EQ.DRG.A16 Drawing For Areva Make CARP at Nariman Point RSS. B

17 SP/PROT/EQ.DRG.A17 ABB Make Alarm & Warning Panel For Khetwadi RSS

Type CAP B

18 SP/PROT/EQ.DRG.A18 ABB Make Control & Relay Panel For Khetwadi RSS

Type KRTA - 1 B

19 SP/PROT/EQ.DRG.A19 33kV Incoming Feeder C & R PANEL Easan Reyrolle. B

Page 96: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

96

33 kV EQUIPMENTS DRAWINGS

Sr

No FILE NAME DESCRIPTION Category

1 SP/PROT/EQ.DRG.B1 33 kV Voltas SF6 Breaker Drawing C

2 SP/PROT/EQ.DRG.B2 33 kV ABB SF6 Breaker Drawing Nair Hosp. RSS B

3 SP/PROT/EQ.DRG.B3 33 kV Siemens GIS Breaker Drawing Dharavi RSS D

4 SP/PROT/EQ.DRG.B4 33 kV ABB GIS Breaker Drawing Backbay RSS C

5 SP/PROT/EQ.DRG.B5 33 kV Siemens VCBs at 110 kV Khetwadi RSS D

6 SP/PROT/EQ.DRG.B6 33 kV CP/RP Panels (Numerical) Siemens Drawing B

7 SP/PROT/EQ.DRG.B7 33 kV Sw/Gr Drawing Jyoti Make D

8 SP/PROT/EQ.DRG.B8 33/22 kV ABB Make SF6 Sw/Gr Drawing Malbar Hill

RSS D

9 SP/PROT/EQ.DRG.B9 33/22 kV ABB Make Primary Switchgear Drawing D

10 SP/PROT/EQ.DRG.B10 33 kV Siemens Make CP/RP Drawing D

11 SP/PROT/EQ.DRG.B11 33 kV ABB Make 1500 MVA SF6 Sw/Gr Drawing D

12 SP/PROT/EQ.DRG.B12 33/11 kV CP/RP Areva Make B

13 SP/PROT/EQ.DRG.B13 33/22/11 kV CP/RP Areva Make New Updated Drawing B

14 SP/PROT/EQ.DRG.B14 33 kV, 1500 MVA, VCB, Indoor, Sw/Gr Areva Make

Drawing B

15 SP/PROT/EQ.DRG.B15 33/22/11 kV Transformer CP/RP Type DTRCR Easun

ReyRolle Make Drawing C

16 SP/PROT/EQ.DRG.B16

33 kV ER MAKE CP/RP FOR 33 KV POWER

TRANSFORMER (REV-B Dtd. 18.04.07 (NEW ER

PANEL)

B

17 SP/PROT/EQ.DRG.B17 Siemens Make 36 kV GIS at 33 kV Receiving Substation

(Compact RSS) D

18 SP/PROT/EQ.DRG.B18 ER Make CARP (CSPC Relay) at Grant Road 33 kV

Receiving Substation (Drg No ER 1360) D

19 SP/PROT/EQ.DRG.B19 ER Make CARP (CSPC Relay) at Various 33 kV

Receiving Substation (Drg No ER 1463) D

20 SP/PROT/EQ.DRG.B20 ABB Make 33 kV, 1500 MVA, SF6, Indoor, Sw/Gr

Drawing (Year 2009), ML-1, Colaba-3, Tardeo-2,3 B

21 SP/PROT/EQ.DRG.B21 ER make CARP for 33kV Radially connected DSS

(Morarji Mill 33kV / 415 Volts) Drg No 1601 B

22 SP/PROT/EQ.DRG.B22 ABB Make 33 kV, 1500 MVA, SF6, Indoor, RMU,

Motorised B

23 SP/PROT/EQ.DRG.B23 CGL make VCB, 1500MVA, Switchgears B

24 SP/PROT/EQ.DRG.B24 36KV GIS SWGR Schneider Electric B

Page 97: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

97

11 kV EQUIPMENTS DRAWINGS

Sr

No FILE NAME DESCRIPTION Category

1 SP/PROT/EQ.DRAWING.D1 11 kV Siemens VCB Breaker Drawing. D

2 SP/PROT/EQ.DRAWING.D2 11 kV Biecco VCB Breaker Drawing D

3 SP/PROT/EQ.DRAWING.D3 11 kV C & G VCB Breaker Drawing. B

4 SP/PROT/EQ.DRAWING.D4 11 kV Jyoti VCB Breaker Drawing.(ABB Relay) D

5 SP/PROT/EQ.DRAWING.D5 11 kV Jyoti VCB Breaker Drawing.(L & T Relay) D

6 SP/PROT/EQ.DRAWING.D6 11 kV GEC VCB Breaker Drawing. D

7 SP/PROT/EQ.DRAWING.D7 11 kV S & S VCB Breaker Drawing. D

8 SP/PROT/EQ.DRAWING.D8 11 kV Jyoti VCB Breaker Drawing.(With Static

Jyoti Relay) D

9 SP/PROT/EQ.DRAWING.D9 11 kV Voltas VCB Breaker Drawing. D

10 SP/PROT/EQ.DRAWING.D10 11 kV RMU Drawing. D

11 SP/PROT/EQ.DRAWING.D11 11 kV, 250 MVA Alstom DSS Sw/Gr VMX

Drawing

12 SP/PROT/EQ.DRAWING.D12 11 kV, 350 MVA, Alstom RSS Sw/Gr A To D

Drawing B

13 SP/PROT/EQ.DRAWING.D13 11 kV OCB BY VCB Sw/Gr VMX Alstom

Drawing B

14 SP/PROT/EQ.DRAWING.D14 11 kV Jyoti Sw/Gr Wiring Diagram, Argus Relay B

15 SP/PROT/EQ.DRAWING.D15 11 kV, 350 MVA, VCB Areva Make Switchgear

Drawing D

16 SP/PROT/EQ.DRAWING.D16 11 kV, 350 MVA, VCB Alstom Make Switchgear

Drawing with Areva Relay B

17 SP/PROT/EQ.DRAWING.D17 11 kV, 350 MVA, VCB Bieeco Make Switchgear

Drawing with Areva Relay B

18 SP/PROT/EQ.DRAWING.D18 11 kV, 350 MVA, VCB Siemens Make Switchgear

Drawing with Siemens Relay D

19 SP/PROT/EQ.DRAWING.D19 ER Make 11 kV, 350 MVA Switchgear Drawing

(Dharavi) C

20 SP/PROT/EQ.DRAWING.D20 ER Make 11 kV 350 MVA Switchgear Drawing

(Worli Dairy RSS) B

21 SP/PROT/EQ.DRAWING.D21 Schneider Make 11 kV, 350 MVA Swgr Drawing

(Nariman Point RSS) B

22 SP/PROT/EQ.DRAWING.D22 11kV ERL make VCB switchgear Drawing

(Nimkar Marg, Girgaum) B

23 SP/PROT/EQ.DRAWING.D23 11 KV VCB Control Panel STELMEC B

Page 98: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

98

OTHER EQUIPMENT DRAWINGS

Sr

No FILE NAME DESCRIPTION Category

1 SP/PROT/EQ.DRAWING.E1 AVR B

2 SP/PROT/EQ.DRAWING.E2 Primary And Secondary Injection Set B

3 SP/PROT/EQ.DRAWING E3 OLTC Internal Wiring Diagram D

4 SP/PROT/EQ.DRAWING.E4 EE Make Relay (Internal Wiring Diagram) D

5 SP/PROT/EQ.DRAWING.E5 INTERNAL CIRCUIT OF RELAY TYPE B-3

Reyrolle Make D

6 SP/PROT/EQ.DRAWING.E6 Internal Circuit Of Relay Reyrolle O/C, E/F D

7 SP/PROT/EQ.DRAWING.E7 Areva Make Frequency Relay Panel Drawing B

8 SP/PROT/EQ.DRAWING.E8

SCADA Drawing under Areva SCADA Project

(Wadala, Sitaladevi, Dharavi, KEM BS No 2,

Nestle, Sewree)

B

CATALOGUE FILE

Sr

No FILE NAME DESCRIPTION Category

1 SP/Prot/Cat - 1 Ashida Relay Numeric Protection Relay Protection for

Power System and Master Mind D

2 SP/Prot/Cat - 2 Siemens Relay D

3 SP/Prot/Cat - 3 L & T Relay D

4 SP/Prot/Cat - 4 GEC Alstom Numeric Relay D

5 SP/Prot/Cat - 5 Jyoti Static Relay D

6 SP/Prot/Cat - 6 Easun ReyRolle Electromechnical Relay and Other

catalogues D

7 SP/Prot/Cat - 7 Easun ReyRolle Numerical Relay C

8 SP/Prot/Cat - 8 DuoBais Auxilliary Argus-8 Relay C

9 SP/Prot/Cat - 9 SEG Relay for DSS C

10 SP/Prot/Cat - 10 ABB Relay for DSS C

11 SP/Prot/Cat - 11 ABB SPACOM Relay VOLUME 1 C

12 SP/Prot/Cat - 12 ABB RE Series Relay CPRP RELAY C

13 SP/Prot/Cat - 13

ABB Relay SPAEC 538C & 531C, SPAJ 115C,

SPAD346, KAD(SBHA& SS) RAICA RXCSF and PSU

14, TSR ICM21, Transformer Terminal

C

Page 99: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

99

Sr

No FILE NAME DESCRIPTION Category

14 SP/Prot/Cat - 14 ABB relay SPAEC (010, 011) SACO, SPAF(140C &

340C) D

15 SP/Prot/Cat - 15 ABB Buyers SUTOR (1991 - 9L) D

16 SP/Prot/Cat - 16 ABB make Numerical Meter Protection relay type SPEM

14(7) D

17 SP/Prot/Cat - 17 ABB make Protection Relay in Theory and Application D

18 SP/Prot/Cat - 18 ABB make SPAEC-310C, SPAC 312C Feeder Terminal D

19 SP/Prot/Cat – 19 ABB make meters / Transducers / Disturbance Recorder

other relays Volume II D

20 SP/Prot/Cat - 20 ABB make 110kV Backbay RSS Operation Manual

Volume III D

21 SP/Prot/Cat - 21 ABB make SPAJ-160C D

22 SP/Prot/Cat - 22 Protection / Aux. CT PT & Core Balance CT D

23 SP/Prot/Cat - 23 Safety Manual for Electrical system B

24 SP/Prot/Cat - 24 Multimeter, Tong Testor, Variac, Timers B

25 SP/Prot/Cat – 25 Primary & Secondary Current Injection set (Doble) B

26 SP/Prot/Cat – 26 Transducers B

27 SP/Prot/Cat - 27 HRC Fuse Characteristics B

28 SP/Prot/Cat – 28 Doble Protest User Guide B

29 SP/Prot/Cat – 29 A.V.R. B

30 SP/Prot/Cat - 30 Annunciation Panels of RSS B

31 SP/Prot/Cat – 31 11kV Switchgear of Different makes D

32 SP/Prot/Cat - 32 3-phase circuit breaker Analyser D

33 SP/Prot/Cat – 33 Gas Operated Relays for Transformers D

34 SP/Prot/Cat – 34 List of Publications of CBIP D

35 SP/Prot/Cat – 35 Software Manual for Spec. Relay D

36 SP/Prot/Cat – 36 Cable fault location technique ROBOTRON (M/s. PCI

Ltd.) D

37 SP/Prot/Cat – 37 Areva MICOM over current Relay P-111 Theory

Application P-128 and 124, 121 B

38 SP/Prot/Cat – 38 Alstom MICOM P-125 / P-126 / P-127 Dir & Non-Dir.

Relay B

39 SP/Prot/Cat – 39 SIEMENS make multi-functional Protective relay with Bay

Controller (SIPROTECH 7SJ-62 V4-2) B

Page 100: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

100

Sr

No FILE NAME DESCRIPTION Category

40 SP/Prot/Cat – 40 Siemens make Differential Protection Relay for Transformer

Generator for Motor Bus Bar SIPROTECH 7UT612 V4-0 B

41 SP/Prot/Cat – 41 Ashida Electronics Pvt.Ltd. Operation Manual for OC/EF

Protection Relay B

42 SP/Prot/Cat – 42 Areva training on MICOM Master Class B

43 SP/Prot/Cat – 43 Doble India - Power System Prot. Notes Steady State

Automated Relay testing & Dynamic Relay testing B

44 SP/Prot/Cat – 44 Easun Reyrolle Ltd. Hosur (Transmission & Distribution) B

45 SP/Prot/Cat – 45 VATECH REYROLLE Technical Duobias-M

Transformer Protection B

46 SP/Prot/Cat – 46 ABB Feeder Terminal SPAEC-310C SPAC 312-C C

47 SP/Prot/Cat – 47 Multi-function meter RISHAB make C

48 SP/Prot/Cat – 48 CSPC PL-300 Multi-function Protection B

49 SP/Prot/Cat – 49 MICOM P631, P632 & P634 Transformer Differential

Protection Panel B

50 SP/Prot/Cat – 50 Operation Manual (Cat) for multi-function meter

(SATEC) Meter used in Easun Reyrolle (CPRP) D

51 SP/Prot/Cat – 51 Product Selection Guide Selec D

52 SP/Prot/Cat - 52 MICOM- P921 / P922 / P923 Voltage & Frequency

Relays Areva make (Technical Guide) B

53 SP/Prot/Cat - 53 Catalogue and O & M Manual for Areva make CPRP at

Nariman Point RSS B

54 SP/Prot/Cat - 54 Integrated Catalogue and O & M Manual for Areva make

CPRP at Nariman Point RSS B

55 SP/Prot/Cat – 55 Micom P127, P632, MVAAM21, MVAJM25,

MVAXM25 Areva Relay B

56 SP/Prot/Cat – 56 Catalogue and Manual for ER make CPRP (CSPC Relay)

at Grant Road RSS B

57 SP/Prot/Cat – 57 Catalogue and Manual for OMICRON make CT Analyser B

58 SP/Prot/Cat – 58 Manual for ABB make 33kV 1500MVA SF6 switchgears B

59 SP/Prot/Cat – 59 Manual for PONOVA make 3 phase Current Injection Set B

60 SP/Prot/Cat – 60 Megger Catalogue for Current Injection Set B

61 SP/Prot/Cat – 61 ELSPEC Product Catalogue C

62 SP/Prot/Cat – 62 BENDER product catalogue C

63 SP/Prot/Cat - 63 MICOM P141/ P142 / P143 Feeder Management Relay

Tech. Manual C

Page 101: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

101

SPECIFICATION FILE

Sr

No FILE NAME DESCRIPTION Category

1 SP/Prot/Sp - 1 145kV GIS SW.GR. C

2 SP/Prot/Sp - 2 11kV, 350 MVA VCB SW/GR. C

3 SP/Prot/Sp - 3 CP/RP for 33/11kV RSS C

4 SP/Prot/Sp - 4 36kV GIS SW/GR. 110kV BACKBAY RSS SP.NO.1220395 C

5 SP/Prot/Sp - 5 110/33kV CP/RP and Metering Panel for 110kV BACKBAY RSS

SP.NO.A-440195 C

6 SP/Prot/Sp - 6 110V DC, Portable Power Supply SP.NO.9802 B

7 SP/Prot/Sp - 7 Primary Current Injection set B

8 SP/Prot/Sp - 8 Secondary Current Injection set B

9 SP/Prot/Sp - 9 Variac, Single Phase SP.NO.9804 C

10 SP/Prot/Sp - 10 AVR B

11 SP/Prot/Sp - 11 Digital Time Interval Meter (Timer) B

12 SP/Prot/Sp - 12 Digital Tong Tester and Multimeter B

13 SP/Prot/Sp - 13 33kV, SF-6 Sw/Gr. SP.NO.1220181 C

14 SP/Prot/Sp - 14 11kV, 2300 MVA Cap. Bank 11kV Reactor C

15 SP/Prot/Sp - 15 11kV 250 MVA Sw/Gr. for DSS C

16 SP/Prot/Sp - 16 High Speed Tripping Relay for SP.NO.9902 C

17 SP/Prot/Sp - 17 O/C. + E/F Relay C

18 SP/Prot/Sp - 18 Capacitor Protection Relay C

19 SP/Prot/Sp - 19 Differential & RE/F Relay C

20 SP/Prot/Sp - 20 Bus Bar Protection C

21 SP/Prot/Sp - 21 Auto Transformer Protection B

22 SP/Prot/Sp - 22 Under/Over Voltage Protection B

23 SP/Prot/Sp - 23 Motor Protection C

24 SP/Prot/Sp - 24 R.M.U. B

25 SP/Prot/Sp - 25 Distribution Transformer B

26 SP/Prot/Sp - 26 11kV 250 MVA VCB for DSS Automation B

Page 102: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

102

Sr

No FILE NAME DESCRIPTION Category

27 SP/Prot/Sp - 27 Core Balance C.T. C

28 SP/Prot/Sp - 28 HRC Fuses B

29 SP/Prot/Sp - 29 DC Supply unit B

30 SP/Prot/Sp - 30 For 90 MVA Power Transformers B

31 SP/Prot/Sp - 31 For 400 kV CP for MSEB C

32 SP/Prot/Sp - 32

Supply, installation, testing commissioning & maintenance of 11kV 350 MVA

Indoor VCB Switchgear with local SCADA, SPEC. NO. 1250102 Part -I B

Supply, installation, testing commissioning of 11kV, 350 MVA, Indoor, VCB

Switchgear SPEC.NO.1250109. (DGMES Approved) Part - II B

33 SP/Prot/Sp - 33 36kV GIS SW/GR. For SENAPATI BAPAT MARG RSS B

34 SP/Prot/Sp - 34 Control, Relay Alarm and Metering Panel for Dr. B. Ambedkar

RSS, SPEC No 440605 B

35 SP/Prot/Sp - 35 145 kV GIS for Dr. B. Ambedkar RSS SPEC No 440605 B

36 SP/Prot/Sp – 36 Frequency Relay Panel B

37 SP/Prot/Sp - 37 HP Compaq make Laptop Computer C

38 SP/Prot/Sp - 38 11kV, 350 MVA, Indoor, VCB Switchgear (Spec no 1250107) B

39 SP/Prot/Sp - 39 Control, Relay and Alarm Panel for Nariman Point 110kV RSS B

40 SP/Prot/Sp - 40 Control, Relay and Alarm Panel for 33kV Radial (Open Ring)

Operated Network (Compact RSS) (Spect No 044B00009) C

41 SP/Prot/Sp - 41 36kV GIS at 33kV Receiving Substation (Compact RSS) (Spect No

1390006) B

42 SP/Prot/Sp - 42 Control, Relay and Alarm Panel for 110kV Khetwadi RSS and

33kV Grant Road RSS (Spect No 0440008) B

43 SP/Prot/Sp - 43 Portable Single Phase Secondary Current Injection Set for Relay

Testing B

44 SP/Prot/Sp - 44 33kV SF6 Insulated Metal Enclosed Indoor Extensible RMU with

VCB, Spec No 1350010 B

45 SP/Prot/Sp - 45 11 KV 350 MVA Indoor VCB SP No. 1250013 (Comments) B

46 SP/Prot/Sp - 46 11 KV 250 MVA Indoor VCB SP No. 1390112 B

47 SP/Prot/Sp - 47 11 KV 250 MVA Indoor VCB SP No. 1390113 ( Horizontal Type) B

48 SP/Prot/Sp - 48 33 KV 1500 MVA Indoor SF 6 VCB Switch Board Panel Set

SP No. 122B0013 B

49 SP/Prot/Sp – 49 33 KV 1500 MVA VCB SW. GR. Bus Coupler For Futurex,

Peninsula & Elphinston Order No. 4200968672 ABB B

50 SP/Prot/Sp - 50 11 kV 350 MVA VCB Indoor for 18 RSS B

Page 103: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

103

DOCUMENT

Sr

No FILE NAME DESCRIPTION Category

1 SP/Prot/Doc - 1 Fault Level Calculation B

2 SP/Prot/Doc - 2 Steady State / Transient / Dynamic Relay Testing B

3 SP/Prot/Doc - 3 BEST Protection System B

4 SP/Prot/Doc - 4 CT/PT B

5 SP/Prot/Doc - 5 Cable Fault locating technique B

6 SP/Prot/Doc - 6 Feeder Protection B

7 SP/Prot/Doc - 7 Power Transformer Protection B

8 SP/Prot/Doc - 8 Bus Bar Protection B

9 SP/Prot/Doc - 9 Oil Filled Cables B

10 SP/Prot/Doc - 10 SCADA B

11 SP/Prot/Doc - 11 Capacitor & Reactor Protection B

12 SP/Prot/Doc - 12 Distribution Transformer Protection B

13 SP/Prot/Doc - 13 Motor Protection B

14 SP/Prot/Doc - 14 Tata Fault Level & Relay Settings 2 B

15 SP/Prot/Doc - 15 Earth Mat B

16 SP/Prot/Doc - 16 Electro Static Discharge & Control B

17 SP/Prot/Doc - 17 IE Rule and Act B

18 SP/Prot/Doc - 18 Distance Protection B

19 SP/Prot/Doc - 19 Thermal Overload Protection B

20 SP/Prot/Doc - 20 Harmonics B

21 SP/Prot/Doc - 21 Communication Protocol B

22 SP/Prot/Doc - 22 Integrated Protection Control and Communication Benefits and

C.B.I.P. B

23 SP/Prot/Doc - 23 AVR Document B

24 SP/Prot/Doc - 24 Transformer Protection Guide B

25 SP/Prot/Doc - 25 Core Balance CT B

26 SP/Prot/Doc - 26 Indian Electricity Rules 1937 B

Page 104: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

104

Sr

No FILE NAME DESCRIPTION Category

27 SP/Prot/Doc - 27 Instrumentation & Control B

28 SP/Prot/Doc - 28 Electricity Bill 2003 B

29 SP/Prot/Doc - 29 Protection, Measurement & Control B

30 SP/Prot/Doc - 30 O&M Manual for C&G make 16 MVA 33/11kV Transformer for

Ballard RSS B

31 SP/Prot/Doc - 31 Seminar Documents B

32 SP/Prot/Doc - 32 NPTI Power System Protection Manual, Bangalore B

33 SP/Prot/Doc - 33 Training Program on Power System Protection at ESCI,

Hyderabad B

34 SP/Prot/Doc - 34 Technical Data version Jan 2008 IEC 61850/103, Protocol, Tap

Charger Control & Transformer Monitoring System B

35 SP/Prot/Doc - 35 Training Program on Power System Protection, Selection &

Application of Numerical Relays at ESCI, Hyderabad B

EQUIPMENTS

Sr

No FILE NAME DESCRIPTION Category

1 SP/Prot/Eq - 40 SCADA System for RSS (AREVA SCADA Project File) B

2 SP/Prot/Eq - 44 CP/RP for 33/11kV Power Transformer C

3 SP/Prot/Eq - 44A Frequency Relay Panel B

4 SP/Prot/Eq - 52 11kV 250 MVA VCB to DSS Automation & Distribution

Automation B

5 SP/Prot/Eq - 103 Core Balance (Split Core) CT / Protection C

6 SP/Prot/Eq - 107 Potential Transformer / RVT / NDR B

7 SP/Prot/Eq - 122 33kV, 1500 MVA, VCB / SF6 Switchgear B

8 SP/Prot/Eq - 125 11kV, 350 MVA, VCB RSS Switchgear B

9 SP/Prot/Eq - 128 OCB for DSS / VCB Testing in Workshop B

10 SP/Prot/Eq - 134 11kV R.M.U. at DSS B

11 SP/Prot/Eq - 135 33kV R.M.U. at 33kV DSS / HT Room B

12 SP/Prot/Eq - 139 11kV, 250 MVA, VCB DSS Switchgear B

13 SP/Prot/Eq - 141 Distribution Transformer B

Page 105: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

105

Sr

No FILE NAME DESCRIPTION Category

14 SP/Prot/Eq - 201 Primary & Secondary Current Injection Set B

15 SP/Prot/Eq - 202 AVR Correspondence B

16 SP/Prot/Eq - 203 Auxiliary Current Transformer B

17 SP/Prot/Eq - 204 Repairing of defective Relays from outside parties B

18 SP/Prot/Eq - 205 PC correspondence B

19 SP/Prot/Eq - 206 Procurement of equipment / instrument / tools ( Copies of Doble

proposal Secondary Current Injection Set) B

20 SP/Prot/Eq - 207 Procurement of relays / AVRs B

21 SP/Prot/Eq - 208 Repairing of equipment / instrument / tools B

22 SP/Prot/Eq - 209 Scrapping of equipment / instrument / tools B

23 SP/Prot/Eq - 210 Scrapping of relays B

24 SP/Prot/Eq - 212 Relay correspondence B

25 SP/Prot/Eq - 213 Relay connection details for Relay testing B

26 SP/Prot/Eq - 216 Relay for Capacitor protection B

27 SP/Prot/Eq - 217 Measurement of Switchgears Operation timings B

28 SP/Prot/Eq - 218 Testing equipments / instrument Inventory B

29 SP/Prot/Eq - 219 List of defective relays B

30 SP/Prot/Eq - 221 Compact Sub-station B

31 SP/Prot/Eq - 222 Distribution Automation in North Zone B

GENERAL

Sr

No FILE NAME DESCRIPTION Category

1 SP/Prot/Relay - 1 Statistical data of Relay Section A

2 SP/Prot/Relay - 2 Trial installation of Relay C

3 SP/Prot/Relay - 3 DSS SW/GR Test Reports / Relay Testing C

4 SP/Prot/Relay - 4 MIS of Relay section B

5 SP/Prot/Relay - 5 Stores Correspondence / Stores Procedures B

6 SP/Prot/Relay - 6 11kv changeover B

Page 106: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

106

Sr

No FILE NAME DESCRIPTION Category

7 SP/Prot/Relay - 7 Coordination meeting with TPC (TATA Coordination) B

8 SP/Prot/Relay - 8 SCADA correspondence B

9 SP/Prot/Relay - 9 Routine Relay testing programme / Relay Retrofitting Schedule /

Outage Schedule B

10 SP/Prot/Relay - 10 ISI specification ETDC B

11 SP/Prot/Relay - 11 Tripping investigation messages B

12 SP/Prot/Relay - 12 Tender Recommendations Secondary Current Injection Set B

13 SP/Prot/Relay - 13 E-mails received & sent B

14 SP/Prot/Relay - 14 Tender for comments B

15 SP/Prot/Relay - 15 Classified list of Indian Standards B

16 SP/Prot/Relay - 16 General – Monsoon Booking B

17 SP/Prot/Relay - 17 TATA Correspondence B

18 SP/Prot/Relay - 18 KLG ISSUES RELATED RSS B

19 SP/Prot/Relay - 19 Schedule of Estimates & Schedule of Charges B

20 SP/Prot/Relay - 20 Drawings for comments B

21 SP/Prot/Relay - 21 Drawing for comments SBM 36kV GIS B

22 SP/Prot/Relay - 22 Drawing for comments SBM 36kV GIS Sw/Gr. B

23 SP/Prot/Relay - 23 Drawing for comments CP/RP 33/22/11kV Areva B

24 SP/Prot/Relay -

R24

Drawing for comments CP/RP 33/22/11kV Transformer

Protection B

25 SP/Prot/Relay -

R25 Drawing for comments 110kV SBM RSS CP/RP B

26 SP/Prot/Relay -

R26 Drawing on comments 110kV Nariman Point RSS CARP AREVA B

27 SP/Prot/Relay -

R27

Comments on Drawing of Areva make 11kV 350MVA VCB

Switchgears B

28 SP/Prot/Relay -

R28

Comments on Specification of 11kV, 350 MVA VCB Switchgears

(Nariman Point RSS) B

29 SP/Prot/Relay -

R29 Comments for 33kV 1500MVA ABB make SF6 switchgear B

30 SP/Prot/Relay –

R30

Comments on drawings of ER make Control Relay & Alarm

Panels for various RSS – Suitability of protection relays B

31 SP/Prot/Relay –

R31

Comments on Drawing 11kv VCB FOR NARIMAN POINT

RSS-AREVA MAKE B

Page 107: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

107

Sr

No FILE NAME DESCRIPTION Category

32 SP/Prot/Relay –

R32

Comments on drawing on relay based SCADA in N & CN ZONE

by M/S Areva. B

33 SP/Prot/Relay –

R33

Comments on drawing submitted by M/S.CGL for 11kV VCB

Swgr for DSS(2011) B

34 SP/Prot/Relay –

R34

Comments on drawing submitted by M/S.EASUN REYROLL for

11kV VCB for RSS. B

35 SP/Prot/Relay –

R35

Comments on drawing submitted by M/S.EASUN REYROLL for

CARP B

36 SP/Prot/Relay –

R36

Comments on drawing submitted by M/S. CGL for 33kV VCB

Switchgear for RSS. B

37 SP/Prot/Relay – R

37

Comments on drawing of 11kV VCB for N P RSS submitted by

M/S. AREVA B

38 SP/Prot/Relay – R

38

Comments on drawing submitted by M/S. CGL for 33kV VCB for

RSS. B

39 SP/Prot/Relay – R

39

Comments on drawing of Indoor, 33kV RMU submitted by M/S.

ABB B

RELAY ORDER FILES

Sr

No FILE NAME DESCRIPTION Category

1 SP/Prot/Order/0-1 Easun Rey Rolle Relay (Part – I, II & III) B

2 SP/Prot/Order/0-2 Doble USA make 3-Phase Secondary current injection Set B

3 SP/Prot/Order/0-3 Siemens Relay B

4 SP/Prot/Order/0-4 L & T Relay B

5 SP/Prot/Order/0-5 Areva (Alstom) Relay (Part - I & II) B

6 SP/Prot/Order/0-6 Motawani Instruments B

7 SP/Prot/Order/0-7 ABB Relay B

8 SP/Prot/Order/0-8 Accord Enterprises B

9 SP/Prot/Order/0-9 Ashida Electronics B

10 SP/Prot/Order/0-10 Bieeco Lawriee C

11 SP/Prot/Order/0-11 Omicron CT Analyser (Datalock) B

12 SP/Prot/Order/0-12 EMCO make AVR B

13 SP/Prot/Order/0-13 PONOVA make 3 Phase Current Injecting Set - SCOPE B

14 SP/Prot/Order/0-14 Aplab SCR Pre-regulated Bench Rack B

Page 108: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

108

Sr

No FILE NAME DESCRIPTION Category

15 SP/Prot/Order/0-15 Crompton Greaves B

16 SP/Prot/Order/0-16 Sifang B

17 SP/Prot/Order/0-17 Schneider B

18 SP/Prot/Order/0-18 Predeep Sales & Service AVR B

19 SP/Prot/Order/0-19 Single Phase Secondary Current Injection set B

20 SP/Prot/Order/0-20 STELMEC B

CATEGORY WISE PERIOD: A - INDEFINITE PERIOD B - 5 YEARS C – 3 YEARS D - 1 YEAR

Page 109: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

109

DETAILS OF VARIOUS REGISTERS

Sr. No. Description Classification

1 Despatch Inward Register C

2 Despatch Outward Register C

3 Peon Despatch Book C

4 Inventory Register A

5 Sunday / Holiday Working Register B

6 O. T. Register B

7 Permanent Staff Register A

8 Attendance Register (Muster) Permanent Staff B

9 Attendance Register ( Muster) Casual Labour B

10 Daily Booking Register B

11 Imprest Cash Book Register B

12 Reimbursement of Taxi Fare Register B

13 Tea Bill Register C

14 Casual Labour Jobsheet Book C

15 Service Termination Book B

16 Leave Register ( A & B Grade Officers) B

17 Leave Register ( Staff ) B

18 Issue of Napkin & Soap Register D

19 S. R. File movement Register A

20 Trainee / Apprentices Attendance Register B

21 P. F. Book C

22 P. F. Register B

23 D. L. Book C

24 Material Requisition Book D

25 Material Despatch Book C

26 L.T. A. Register C

CATEGORY WISE PERIOD: A - INDEFINITE PERIOD B - 5 YEARS C – 3 YEARS D - 1 YEAR

Page 110: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

110

SYSTEM PROTECTION DEPARTMENT

Annex- IV

The statement of the categories of

documents that are held by or under

department’s control

Page 111: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

111

Sr.

No. File No Description Category

1

All files as

mentioned

in Annex-

III

The rules, regulations, instructions, manuals and records

held and used by employees of the department for

discharging functions as per the list attached in Annex-

III, However These files will be scrapped after 5 year

when the equipment is obsolete or taken out of service.

A

ESTABLISHMENT FILES

2 Est.1 Establishment Schedule- staff strength A

3 Est.2 Creation of post(proposals) A

4 Est.3 Revalidation of Post A

5 Est.4 Appointment A

6 Est.5 Probation/Confirmation B

7 Est.6 Promotion-Promotion policy B

8 Est.7 Reversion B

9 Est.8 Transfer B

10 Est.9 Separation A

11 Est.10 Trade Test B

12 Est.10A Representation to B.C. B

13 Est.11 Grading of Staff A

14 Est.12 Seniority List B

15 Est.13 Acting Arrangement B

16 Est.14 Deputation B

17 Est.15 Loan Arrangement C

18 Est.16 Attendance B

19 Est.17 Leave B

20 Est.18 Working Hours C

21 Est.19 Discipline & Disciplinary Action B

22 Est.20 Standing Orders A

23 Est.21 Service Regulation A

24 Est.22 Fidelity Insurance B

Page 112: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

112

Sr.

No. File No Description Category

25 Est.23 Overtime/Holiday Working B

26 Est.24 Meal Allowance C

27 Est.25 Other allowance C

28 Est.26 Payment & Recoveries B

29 Est.27 ID/BT(Bus Pass) C

30 Est.28 Uniforms - Clothing B

31 Est.29 Periodical Returns(Ex.Employee) C

32 Est.30 Festival Advance C

33 Est.31 Grains C

34 Est.32 Quarters B

35 Est.33 Scholarship C

36 Est.34 PF/SF/EMF/FP Scheme & Gratuity C

37 Est.35 Welfare C

38 Est.36 Certificates - Circular for issue of certificates, copies of

certificates issued to employees C

39 Est.37 Civil Defence C

40 Est.38 Accident & Assaults (Except Ele. Acc) C

41 Est.39 Medical C

42 Est.40 Residential Address C

43 Est.41 Voluntary Subscription D

44 Est.42 Qualification & Experience for post A

45 Est.43 Employees State Insurance C

46 Est.44 Incentive Bonus Scheme B

STORES

47 Stores - 1 Stores matters & Procedures A

48 Stores - 2 Specification ISI A

49 Stores -3 Literature Technical Data B

50 Stores - 4 Stores Material Catalogue A

Page 113: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

113

Sr.

No. File No Description Category

51 Stores - 5 Stock position of vital item C

52 Stores -6 Requirement of Material C

53 Stores - 7 Annual Contract B

54 Stores - 8 Material Test Report/Inspection Report B

55 Stores - 19 Scrapping & disposal B

56 Stores - 26 Purchase form/Tender/Quotation B

ADMINISTRATIVE FILES

57 Adm.1 Vehicles C

58 Adm.2 Telephones & Telecomm. C

59 Adm.3 Office Building C

60 Adm.4 Office Accommodation A

61 Adm.5 Locks & Keys B

62 Adm.6 Office Furniture & Equip- Capital A

63 Adm.7 Office Furniture & Equip- Dead Stock A

64 Adm.8 Tools & Equip Capital A

65 Adm.9 Tools & Equip Dead Stock A

66 Adm.10 Stationary & Printing D

67 Adm.11 Capital Inventory A

68 Adm.12 Departmental Manual A

69 Adm.13 Administrative Report A

70 Adm.14 BEST Committee & Corporation matters B

71 Adm.15 Circulars B

72 Adm.16A Procedure Orders-Guidelines A

73 Adm.17 Delegation of powers A

74 Adm.18 Administrative Orders A

75 Adm.19 Confidential Papers A

76 Adm.20 Security Arrangement B

77 Adm.21 Theft & Properties B

Page 114: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

114

Sr.

No. File No Description Category

78 Adm.22 Strikes C

79 Adm.23 Records Classification A

80 Adm.24 Audit queries B

81 Adm.25 Accounts matters B

82 Adm.27 Budget Estimates B

83 Adm.28 Budget Control B

84 Adm.31 Supply Branch Conference A

85 Adm.34 Stores & Engineering Conference B

86 Adm.40 Union Matters B

87 Adm. 41 Public Relations. C

88 Adm.45 Canteen C

89 Adm.46 Imprest Cash B

90 Adm.48 Meeting of Other Departments B

91 Adm.49 Reports on visits & inspection C

92 Adm.52 Awards/Rewards to employee B

93 Adm.58 Instruction given by AGMS/CES A

TRAINING

94 Trg.1 Training - Policy & Suggestions. C

95 Trg.2 Training - in outside institutions. C

96 Trg.3 Training - Prob Engr./SSA/Engg. Student. C

97 Trg.5 Training in M.V. Driving. C

98 Trg.9 Technical Lectures and Visits C

99 Trg.11 Workers Education Scheme C

STUDY

100 Study - 11 Computerization B

101 Study - 15 I.B. Scheme & Operational Efficiency. A

Page 115: SYSTEM PROTECTION DEPARTMENT - … 2.0 Activities of System Protection Department : The System Protection department is responsible for carrying out activities of testing and

115

Sr.

No. File No Description Category

STATISTICS

102 Stat - 28 Management Information. A

103 Stat - 29 System Coincide KVA Maximum Demand (MD). C

104 Stat - 36 Monthly Statistical Returns of Electric Supply A

105 Stat - 53 Schemes - Monthly Reports of Pending Cases. C

STAFF RECORDS

106

Service Record Files of the Officers & Staff A

CATEGORY WISE PERIOD: A - INDEFINITE PERIOD B - 5 YEARS C – 3 YEARS D - 1 YEAR