    SYSTEMIMPLEMENTATION,MAINTETNACE AND

    REVIEW

    INSTALLATIONAND

    IMPLEMENTATIONTESTING TRAINING DOCUMENTATION

    FILECONVERSION

    ANDCHANGEOVER

    SYSTEMMAINTENANCE

    SYSTEMPERFORMANCE

    POSTIMPLEMENTATION

    REVIEWWHAT CAN GO

    WRONG

  • 8/8/2019 SYSTEM IMPLEMENTATION, MAINTENANCE AND REVIEW

    3/38

    Select location / siteStep 1

    Choose and order hardwareStep 2Design and write software or purchase off the shelf Step 3

    Program testingStep 4

    Staff trainingStep 5

    Produce user documentationStep 6

    Produce systems documentationStep 7File conversionStep 8

    Testing (including user acceptance testing)Step 9

    System changeover (and further testing and training required)Step 10

  • 8/8/2019 SYSTEM IMPLEMENTATION, MAINTENANCE AND REVIEW

    4/38

    Pearson Education Limited, 2004 4

    Process of running the database system withthe intent of finding errors.

    Use carefully planned test strategies and realisticdata.Testing cannot show absence of faults; it can showonly that software faults are present.

    Demonstrates that database and applicationprograms appear to be working according torequirements.

  • 8/8/2019 SYSTEM IMPLEMENTATION, MAINTENANCE AND REVIEW

    5/38

    Testers usually try to "break the system" byentering data that may cause the system to

    malfunction or return incorrect information.

    For example, a tester may put in a city in a

    search engine designed to only accept states,to see how the system will respond to theincorrect input.

  • 8/8/2019 SYSTEM IMPLEMENTATION, MAINTENANCE AND REVIEW

    6/38

    Testing system logicUse of flowcharts and structured diagrams to test the logicdevised by the system analyst

    Pr og ra m testingInvolves processing test through all programsFully documented to use if modifications are required

    Cover the following areas:Input validity checksProgram logic functioningInterfaces with related modules / systems

    Output format and validity

  • 8/8/2019 SYSTEM IMPLEMENTATION, MAINTENANCE AND REVIEW

    7/38

    Types of Pr og ra mTestingU nit testing

    Functional and reliability testing in an Engineering environment. Producingtests for the behavior of components of a product to ensure their correctbehavior prior to system integration.The primary goal of unit testing is to take the smallest piece of testablesoftware in the application, isolate it from the remainder of the code, anddetermine whether it behaves exactly as you expect. Each unit is testedseparately before integrating them into modules to test the interfacesbetween modules. Unit testing has proven its value in that a large

    percentage of defects are identified during its use.U nit integ ra tion testingTesting in which modules are combined and tested as a group. Modules aretypically code modules, individual applications, client and serverapplications on a network, etc. Integration Testing follows unit testing andprecedes system testing, that is, It occurs after unit testing and before

    system testing

  • 8/8/2019 SYSTEM IMPLEMENTATION, MAINTENANCE AND REVIEW

    8/38

    S ystem testingTesting conducted on a complete, integrated system toevaluate the system's compliance with its specifiedrequirements. Wider focus than program testing. Systemtesting falls within the scope of black box testing, and assuch, should require no knowledge of the inner design of the code or logic.

    Input documentation and practicalities of inputFlexibility to allow amendmentsAbility to produce timely informationAbility to cope with peak system requirementsViability of operating procedures

    Occurs both before and after implementation

  • 8/8/2019 SYSTEM IMPLEMENTATION, MAINTENANCE AND REVIEW

    9/38

  • 8/8/2019 SYSTEM IMPLEMENTATION, MAINTENANCE AND REVIEW

    10/38

    Performance testingPerformance testing can be applied to understand your application orWWW site's scalability, or to benchmark the performance in an

    environment of third party products such as servers and middlewarefor potential purchase. This sort of testing is particularly useful toidentify performance bottlenecks in high use applications.Performance testing generally involves an automated test suite as thisallows easy simulation of a variety of normal, peak, and exceptionalload conditions.Evaluate compliance of a system or component with specifiedperformance requirements

  • 8/8/2019 SYSTEM IMPLEMENTATION, MAINTENANCE AND REVIEW

    11/38

    U sab ility testingTechnique used to evaluate a product by testing it on users. This can be seen as anirreplaceable usability practice, since it gives direct input on how real users use thesystem. Establishment of users satisfaction.

    The aim is to observe people using the product to discover errors and areas of improvement. Usability testing generally involves measuring how well test subjectsrespond in four areas: efficiency, accuracy, recall, and emotional response. The resultsof the first test can be treated as a baseline or control measurement; all subsequenttests can then be compared to the baseline to indicate improvement.

    P erformance -- How much time, and how many steps, are required for people to complete basictasks? (For example, find something to buy, create a new account, and order the item.)A ccuracy -- How many mistakes did people make? (And were they fatal or recoverable with theright information?)R ecall -- How much does the person remember afterwards or after periods of non - use?E motional response -- How does the person feel about the tasks completed? Is the personconfident, stressed?Would the user recommend this system to a friend?

  • 8/8/2019 SYSTEM IMPLEMENTATION, MAINTENANCE AND REVIEW

    12/38

    Au tom a ted Testing toolsProgram testing and fault detection can be aided significantly by testing toolsand debuggers. Testing/debug tools include features such as:Program monitors, permitting full or partial monitoring of program codeincluding:

    Instruction set simulator, permitting complete instruction level monitoring and tracefacilitiesProgram animation, permitting step - by- step execution and conditional breakpoint atsource level or in machine codeCode coverage reports

    Formatted dump or symbolic debugging, tools allowing inspection of program

    variables on error or at chosen pointsAutomated functional GUI testing tools are used to repeat system - level teststhrough the GUIBenchmarks, allowing run - time performance comparisons to be madePerformance analysis (or profiling tools) that can help to highlight hot spotsand resource usage

  • 8/8/2019 SYSTEM IMPLEMENTATION, MAINTENANCE AND REVIEW

    13/38

    Strategy details of the testTechnical testSTRATEGY APPROACH

    WhatWhenUnder which environment

    TEST PLAN

    The logic and reasoningTEST DESIGN

    Detailed proceduresConsistent testing at different time periodPER OR ING TESTS

    Documentation of the results and how to be doneRecord of errorsCorrection of errors procedure

    DOCU ENTATION

    Re- testing procedureRe- testing of all modules and all aspects of the softwareRE-TESTING

  • 8/8/2019 SYSTEM IMPLEMENTATION, MAINTENANCE AND REVIEW

    14/38

    Poor testing process (Bad test plan, Testers are not well trained)

    Inadequate time to test the project

    Future requirements not anticipated

    Inadequate test data (positive and negative data)

    Software changes inadequately tested

  • 8/8/2019 SYSTEM IMPLEMENTATION, MAINTENANCE AND REVIEW

    15/38

  • 8/8/2019 SYSTEM IMPLEMENTATION, MAINTENANCE AND REVIEW

    16/38

  • 8/8/2019 SYSTEM IMPLEMENTATION, MAINTENANCE AND REVIEW

    17/38

    Senior managementMiddle managementOperators

    TRAINING METHODSIndividualClassroomComputer basedCase studiesSoftware reference material

  • 8/8/2019 SYSTEM IMPLEMENTATION, MAINTENANCE AND REVIEW

    18/38

  • 8/8/2019 SYSTEM IMPLEMENTATION, MAINTENANCE AND REVIEW

    19/38

    Wide range of technical and non technicalbooks

    Technical manualInstallation stepsHardware specificationsFlow chartsData dictionary, etc

    User manualSystems set upSecurity proceduresSystem messagesControl procedures

  • 8/8/2019 SYSTEM IMPLEMENTATION, MAINTENANCE AND REVIEW

    20/38

  • 8/8/2019 SYSTEM IMPLEMENTATION, MAINTENANCE AND REVIEW

    21/38

    Converting existing files into suitable format forthe new system. Create new files conform to thenew system

    Existing data filesManual files (input data)Existing computer files (either through automation or coding)Existing data incomplete

    Controls of changes (accuracy of new files)One to oneSample checkingBuil tin validationControl total and reconciliation

  • 8/8/2019 SYSTEM IMPLEMENTATION, MAINTENANCE AND REVIEW

    22/38

    Completeness of dataRemoval of redundant data

    Check originalfiles

    Input forms = data entry screenTranscribe ontoinput forms

    Key in data

    Validation of data and verificationbuilt in in the systemVerify data

    Standing records for a startingpointPrint reports

    Establish

    controlstotal

    Controlstotal

    Controlstotal

    check

    check

  • 8/8/2019 SYSTEM IMPLEMENTATION, MAINTENANCE AND REVIEW

    23/38

    After satisfactory testing, changeover shall takeplaceFour approaches

    Direct changeoverOld system completely replaced

    Parallel runningOld and new system run in parallel within a definite delay

    Pilot operationOne department run the two system in parallel on a pilotbasis. If satisfied, whole changeover

    Phased or staged changeoverSection of the system for a direct changeover over phases

  • 8/8/2019 SYSTEM IMPLEMENTATION, MAINTENANCE AND REVIEW

    24/38

    ME THOD ADVANA TGE S DISADVAN TA GE S

    Direct changeover Quick at minimal costMinimises workload

    RiskyPossible disruptions of operationsFailure - costly

    Parallel running Safe, built in safetyWay to verify results of changes

    Costly and Time consumingAdditional work load

    Pilot operations ess risky than direct changeover

    ess costly than complete parallelrunning

    ong time to achieve total

    changeess safe than parallel running

    Phased changeover ess risky than single directchangeoverProblems in one section does notaffect others

    ong time to changeUnpractical - Interfacesbetween parts of system -

  • 8/8/2019 SYSTEM IMPLEMENTATION, MAINTENANCE AND REVIEW

    25/38

  • 8/8/2019 SYSTEM IMPLEMENTATION, MAINTENANCE AND REVIEW

    26/38

    Features of maintenanceFlexibility and adaptability

    Types of maintenanceCorrective

    Reaction to system failure

    PerfectiveProcess of making the software perfect

    AdaptiveTake account of changing environment

  • 8/8/2019 SYSTEM IMPLEMENTATION, MAINTENANCE AND REVIEW

    27/38

    27

    ErrorsChanges in requirementsPoor documentation

    Maintenance is only for a period of timewhereby redevelopment will benecessary due to various newrequirements and changes inenvironment

  • 8/8/2019 SYSTEM IMPLEMENTATION, MAINTENANCE AND REVIEW

    28/38

  • 8/8/2019 SYSTEM IMPLEMENTATION, MAINTENANCE AND REVIEW

    29/38

    INDIRECT MEASURESSignificant task relevance (observe the results of

    system use, earlier or late)Willingness to pay

    Pay as you satisfy

    System logsUser information satisfaction

    A survey of users on several criteria

    Adequacy of documentation

  • 8/8/2019 SYSTEM IMPLEMENTATION, MAINTENANCE AND REVIEW

    30/38

    Performance reviews vary from organisation toorganisation. The main issues however would be :

    Growth rateClerical manpowerIdentification of delaysEfficiency of security proceduresCheck of error ratesUse of output for good purposeOperational running costs

  • 8/8/2019 SYSTEM IMPLEMENTATION, MAINTENANCE AND REVIEW

    31/38

    COMPUTER SYSTEMS EFFICIENCY AUDITSOutput from a computer system

    More outputs with same input (e.g more transaction, oreManagement info, availability of the system to more users)Elimination of Output of little value

    Frequency of reports, and its distribution and bulkinessBetter timing of outputs and timely accessibility tomanagementReasons that restricts better output (access to informationthat needs a database or network, method of data processingused that is batch or real time or type of equipment used thatis stand alone pc or client /server system)

  • 8/8/2019 SYSTEM IMPLEMENTATION, MAINTENANCE AND REVIEW

    32/38

    Cost benefit analysisBased on clear objectives and factors

    Efficiency and effectivenessOutput greater than inputProductivity improvement

    Accuracy of dataMeasurement of achievement of objectivesMetrics

  • 8/8/2019 SYSTEM IMPLEMENTATION, MAINTENANCE AND REVIEW

    33/38

    Quantified measurement to measure performanceResponse time, no of transactions process per minute, no of bugsper hundred lines of codes, no of system crashes per week

    Three methods usedHardware monitors

    Measurement of electrical signal in selected circuits, idle andlevel of activity

    Software monitors

    Programs that interrupt the application in use and record dataabout it

    System logsJ ob start and finish, Variations in job running, Down time

  • 8/8/2019 SYSTEM IMPLEMENTATION, MAINTENANCE AND REVIEW

    34/38

  • 8/8/2019 SYSTEM IMPLEMENTATION, MAINTENANCE AND REVIEW

    35/38

  • 8/8/2019 SYSTEM IMPLEMENTATION, MAINTENANCE AND REVIEW

    36/38

  • 8/8/2019 SYSTEM IMPLEMENTATION, MAINTENANCE AND REVIEW

    37/38

    Conflicting demandsTime, cost, quality, resources

    Appointment of project managersGood manager but good specialist

    Other factorsUnrealistic deadlineNon - existent planning (fail to plan is plan to fail)Poor time table and resourcingInexistence controlChanging requirements

  • 8/8/2019 SYSTEM IMPLEMENTATION, MAINTENANCE AND REVIEW

    38/38

    Definite objectivesApprove projects

    Recommend projectsEstablishing priority projectsEstablish company guidelines

    Coordination and controlEvaluationSystem review after implementation