Page 1 North Queensland Regional Office Floor 4, Verde Building, 445 Flinders Street, PO Box 5666 Townsville Qld 4810 Our reference: SDA-0916-033347 Your reference: MI16/0025 2520018 05 July 2017 Townsville City Council PO Box 1268 Townsville QLD 4810 Dear Ms Phillipa Galligan Concurrence agency response—with conditions 206-210 Nathan Street – Aitkenvale, Townsville City – QLD – Lot 28 on RP716469; Lot 29 on RP716469 and Lot 30 on RP716469 – Development Permit for Material Change of Use for Service Station and Food and Drink Outlet (Given under section 285 of the Sustainable Planning Act 2009) The referral agency material for the development application described below was received by the Department of Infrastructure, Local Government and Planning under section 272 of the Sustainable Planning Act 2009 on 7 September 2016. Applicant details Applicant name: A & A Martin C/- BNC Planning Applicant contact details: PO Box 5493 Townsville QLD 4810 [email protected] Site details Street address: 206-210 Nathan Street - Aitkenvale, Townsville City - QLD Lot on plan: Lot 28 on RP716469; Lot 29 on RP716469 and Lot 30 on RP716469 Local government area: Townsville City Application details Proposed development: Development Permit for Material Change of Use for Service Station and Food and Drink Outlet

Upload: hoangngoc

Post on 04-Apr-2018

216 views

Category:

Documents


3 download

TRANSCRIPT

Page 1North Queensland Regional OfficeFloor 4, Verde Building,445 Flinders Street,PO Box 5666 Townsville Qld 4810

Our reference: SDA-0916-033347Your reference: MI16/0025 2520018

05 July 2017

Townsville City CouncilPO Box 1268Townsville QLD 4810

Dear Ms Phillipa Galligan

Concurrence agency response—with conditions206-210 Nathan Street – Aitkenvale, Townsville City – QLD – Lot 28 on RP716469; Lot 29 on RP716469 and Lot 30 on RP716469 – Development Permit for Material Change of Use for Service Station and Food and Drink Outlet (Given under section 285 of the Sustainable Planning Act 2009)

The referral agency material for the development application described below was received by the Department of Infrastructure, Local Government and Planning under section 272 of the Sustainable Planning Act 2009 on 7 September 2016.

Applicant details

Applicant name: A & A Martin C/- BNC Planning

Applicant contact details: PO Box 5493Townsville QLD [email protected]

Site details

Street address: 206-210 Nathan Street - Aitkenvale, Townsville City - QLD

Lot on plan: Lot 28 on RP716469; Lot 29 on RP716469 and Lot 30 on RP716469

Local government area: Townsville City

Application detailsProposed development: Development Permit for Material Change of Use for Service

Station and Food and Drink Outlet

SDA-0916-033347

Department of Infrastructure, Local Government and Planning Page 2

Aspects of development and type of approval being soughtNature of

DevelopmentApproval

TypeBrief Proposal of

DescriptionLevel of

AssessmentMaterial Change of Use

Development permit

Service station and drive through restaurant

Impact Assessment

Referral triggers

The development application was referred to the department under the following provisions of the Sustainable Planning Regulation 2009:

Referral trigger Schedule 7, Table 3 Item 1—State-controlled Road

ConditionsUnder section 287(1)(a) of the Sustainable Planning Act 2009, the conditions set out in Attachment 1 must be attached to any development approval.

Reasons for decision to impose conditionsUnder section 289(1) of the Sustainable Planning Act 2009, the department must set out the reasons for the decision to impose conditions. These reasons are set out in Attachment 2.

Relevant period The relevant period for any development approval is to be in accordance with section 287(1)(d) of the Sustainable Planning Act 2009.

Further adviceUnder section 287(6) of the Sustainable Planning Act 2009, the department offers advice about the application to the assessment manager—see Attachment 3.

Approved plans and specificationsThe department requires that the following plans and specifications set out below and in Attachment 4 must be attached to any development approval.

Drawing/Report Title Prepared by Date Reference no.

Version/Issue

Aspect of development: Development Permit for Material Change of Use for Service Station and Food and Drink OutletSite Development Plan GVD Building

Design07.06.16 15106AM A

Section 5 of the Engineering Report

Steve McKenzie Consultant Engineer

July 2016 16388AM/R01 A

A copy of this response has been sent to the applicant for their information.

For further information, please contact Catherine Hobbs, Principal Planning Officer, SARA North

SDA-0916-033347

Department of Infrastructure, Local Government and Planning Page 3

QLD on 4758 3412, or email [email protected] who will be pleased to assist.

Yours sincerely

Brett NancarrowManager (Planning)

cc: A & A Martin C/- BNC Planning, [email protected]: Attachment 1—Conditions to be imposed

Attachment 2—Reasons for decision to impose conditionsAttachment 3—Further adviceAttachment 4—Approved Plans and Specifications

SDA-0916-033347

Department of Infrastructure, Local Government and Planning Page 4

Our reference: SDA-0916-033347Your reference: MI16/0025 2520018

Attachment 1—Conditions to be imposed

No. Conditions Condition timing

Development Permit for Material Change of Use for Service Station and Food and Drink Outlet

Schedule 7, Table 3 Item 1—State-controlled Road—Pursuant to section 255D of the Sustainable Planning Act 2009, the chief executive administering the Act nominates the Director-General of the Department of Transport and Main Roads to be the assessing authority for the development to which this development approval relates for the administration and enforcement of any matter relating to the following condition(s):

1. The development must be carried out generally in accordance with the following plans: Site Development Plan, prepared by GVD Building Design,

dated 07.06.16, reference 15106AM and revision A

Prior to the commencement of use and to be maintained at all times

2. (a) A Construction Management Plan must be prepared by a suitably qualified and experienced expert and given to [email protected] of the Department of Transport and Main Roads.

(b) The Construction Management Plan must demonstrate that there will be no disruption to Nathan Street during the course of construction.

(c) The construction of the development must be undertaken in accordance with the Construction Management Plan in particular, the plan shall consider construction impacts on road condition

comparing pre and post construction stage; ensure the safety and operation of the state

controlled road network is maintained throughout construction; and

manage the potential impact of debris on Nathan Street associated with cartage of fill and other construction material

(a) and (b)Prior to obtaining development approval for building work or operational work, whichever occurs first(c) At all times during the construction of the development

3. (a) The existing vehicular property access located between Lot 30 RP716469, Lot 29 RP716469 and Lot 28 RP716469 and Nathan Street must be permanently closed and removed.

(b) The kerb and channelling and footpath between the pavement edge and the property boundary must be reinstated in accordance with Townsville City Council Standards at no cost to the Department of Transport and Main Roads’.

Prior to the commencement of use

4. (a) The development must be carried out generally in accordance with Section 5 of the Engineering Report prepared by Steve McKenzie Consultant Engineer dated July 2016, reference 16388AM/R01 and revision A, in particular: The development shall be undertaken generally in

(a) At all times(b) Prior to the commencement of use

T13

SDA-0916-033347

Department of Infrastructure, Local Government and Planning Page 5

No. Conditions Condition timingaccordance with the following plans submitted with the applicant’s information requests:o Stormwater Drainage Management Plan

prepared by Steve McKenzie Consultant Engineer, dated 2/02/2017, drawing number C06 revision B, as amended in red.

o Nathan Street Stormwater Drainage Works – connection to existing prepared by Steve McKenzie Consultant Engineer, dated 19/04/2017, drawing number C10 revision A, as amended in red.

Design of stormwater infrastructure internal and external to the development site, shall be undertaken in accordance with TMR’s standard drawings and specifications, the Road Drainage Manual and the Queensland Urban Drainage Manual.

(b) RPEQ certification with supporting calculations must be provided to [email protected] within the Department of Transport and Main Roads’, confirming that the development has been constructed in accordance with part (a) of this condition.

5. (a) The road access location, are to be located generally in accordance with Site Development Plan, prepared by GVD Building Design, dated 07.06/16, reference 15106AM and revision A.

(b) Road access works comprising industrial driveway access , ‘no standing area (signage and line marking) and green painted cycle lane, (at the road access location) must be provided generally in accordance with Site Development Plan, prepared by GVD Building Design, dated 07.06/16, reference 15106AM and revision A.

(c) The road access works must be designed and constructed in accordance with Driveway access Industrial Standard Drawing Ref: SD-031 G, Transport and Main Roads: Road Planning and Design Manual (RPDM) and Manual of uniform traffic control devices (MUTCD).

(a) At all times(b) and (c): Prior to the commencement of use

SDA-0916-033347

Department of Infrastructure, Local Government and Planning Page 6

Our reference: SDA-0916-033347Your reference: MI16/0025 2520018

Attachment 2—Reasons for decision to impose conditions

The reasons for this decision are: To ensure the development is carried out generally in accordance with the plans of

development submitted with the application. To ensure the development does not compromise the safe and efficient operation and

integrity of state transport infrastructure during construction. To maintain the safety and efficiency of the state-controlled road by reducing the

number of road access. To ensure that the impacts of stormwater events associated with development are

minimised and managed to avoid creating any adverse impacts on the state transport corridor.

To ensure the road access location to the state-controlled road from the site does not compromise the safety and efficiency of the state-controlled road.

T13

SDA-0916-033347

Department of Infrastructure, Local Government and Planning Page 7

Our reference: SDA-0916-033347Your reference: MI16/0025 2520018

Attachment 3—Further advice

General advice

1. Stormwater Infrastructure Works Condition 4 requires the construction of stormwater infrastructure within the Nathan Street road reserve. Under Section 50(2) and Schedule 6 of the Transport Infrastructure Act 1994 (TIA) and Part 5 and Schedule 1 of the Transport Infrastructure (State-Controlled Roads) Regulation 2006, you must have written approval to carry out ancillary works and encroachments on a state-controlled road. These development conditions do not constitute such an approval. You will need to contact the Department of Transport and Main Roads on [email protected] to make an application for a Road Corridor Permit under section 50(2) of the TIA to carry out ancillary works and encroachments. Ancillary works and encroachments include but are not limited to advertising signs or other advertising devices, paths or bikeways, buildings/shelters, vegetation clearing, landscaping and planting.

2. Road Access Works ApprovalCondition 5 (Vehicular Access) requires crossover construction. Under sections 33 of the Transport Infrastructure Act 1994, written approval is required from the Department of Transport and Main Roads to carry out road (including installation of signage and access works) on a state-controlled road. Please contact the Department of Transport and Main Roads via [email protected] to make an application for road works approval. This approval must be obtained prior to commencing any works on the state-controlled road reserve. The approval process may require the approval of engineering designs of the proposed works, certified by a Registered Professional Engineer of Queensland (RPEQ). Please contact Transport and Main Roads as soon as possible to ensure that gaining approval does not delay construction.

3. Road Access Approval

Under sections 62 of the Transport Infrastructure Act 1994, written approval is required from the Department of Transport and Main Roads before legal access associated with the proposed use can occur.

Please contact the Department of Transport and Main Roads via [email protected] to make an application for permitted access approval. This approval must be obtained prior access to the state-controlled road reserve for the use occurs.

4. Compliance

Pursuant to section 255D of the Sustainable Planning Act 2009, the Department of Transport and Main Roads has been nominated by the Chief Executive of the Department of Infrastructure Local Government and Planning as the entity responsible for the administration and enforcement of concurrence agency conditions within TMR’s area of interest. The developer should obtain a letter from TMR detailing satisfaction of compliance prior to commencement of use. The developer is advised an application for compliance assessment can be made to the Corridor Management Team within the Department of Transport and Main Roads via [email protected] or call (07) 4421 8702 (Please quote TMR16-018159).

T13

SDA-0916-033347

Department of Infrastructure, Local Government and Planning Page 8

Our reference: SDA-0916-033347Your reference: MI16/0025 2520018

Attachment 4—Approved plans and specifications

T13

lmbrook
Text Box
Permitted Road Access Locations
lmbrook
Polygon
lmbrook
Polygon
lmbrook
Line
lmbrook
Line
lmbrook
Line
lmbrook
Text Box
- The width of the road access locations must be able to accommodate the turn paths for a 19m articulated fuel tanker

smceREV DESCRIPTION DRAWN DATE

TASK PROJECT NUMBER REVISION

SIGNED:

DRAWING NUMBER BY DATEINITIAL

DRAWNDESIGNREVIEW

STATUS SCALE

ORIGINALSHEET

SIZE

CONTRACTORCOPYRIGHT

PROJECT

CLIENT DRAWING NAME

18 Ingham RdWest End Qld 4810

RPEQ No. DATE:

PO Box 1011Townsville City Qld 4810

T (07) 4724 4551 F (07) 47241187E [email protected]

ACN 092 705 130 206- 210 NATHAN STREETAITKENVALE

MIXED USE DEVELOPMENT & FAST FOOD

A. MARTIN

TBC

16388AM C06

STORMWATER DRAINAGE MANAGEMENTPLAN

B

ISSUED FOR APPROVAL

NOTED

A1

lmbrook
Polygon
lmbrook
Text Box
Right angle connection required

smceREV DESCRIPTION DRAWN DATE

TASK PROJECT NUMBER REVISION

SIGNED:

DRAWING NUMBER BY DATEINITIAL

DRAWNDESIGNREVIEW

STATUS SCALE

ORIGINALSHEET

SIZE

CONTRACTORCOPYRIGHT

PROJECT

CLIENT DRAWING NAME

18 Ingham RdWest End Qld 4810

RPEQ No. DATE:

PO Box 1011Townsville City Qld 4810

T (07) 4724 4551 F (07) 47241187E [email protected]

ACN 092 705 130 206- 210 NATHAN STREETAITKENVALE

MIXED USE DEVELOPMENT & FAST FOOD

A. MARTIN

TBC

16388AM C10

NATHAN STREET STORMWATER DRAINAGEWORKS- CONNECTION TO EXISTING

A

ISSUED FOR APPROVAL

NOTED

A1

lmbrook
Text Box
The construction method for the new stormwater line within the Nathan Street road reserve is to be underboring
lmbrook
Line
lmbrook
Line
lmbrook
Line
lmbrook
Text Box
A TMR Road Corridor Permit is required prior to commencing works within the Nathan Street road reserve.

1

Naomi White

From: [email protected]: Thursday, 10 August 2017 3:51 PMTo: Andrea McPhersonSubject: RE: MI16/0025 Extension to DMP

Hi Andrea,  On behalf of the applicant, please take this email as formal expectance of an extension to the decision making period of 40 business days for development application MI16/0025.  Kind regards,  Benjamin Collings Director  BNC Planning Pty Ltd (Australia) 18 Ingham Road Townsville QLD 4810 PO Box 5493 Townsville QLD 4810 Ph: 4724 4551 Mb: 0438789612 E: [email protected]  W: www.bncplanning.com.au   

 Plan Right Accredited ‐ talk to us today about 5 business day development approvals    

From: Andrea McPherson [mailto:[email protected]]  Sent: Thursday, 10 August 2017 3:45 PM To: [email protected] Subject: MI16/0025 Extension to DMP  Hi Ben,  As the extension to the DMP will be for longer than the 20bd under the Planning Act can you please email confirming acceptance of a 40bd extension.  Kind regards,   

Andrea McPherson  Officer ‐ Planning  Planning and Community Engagement P 07 4727 9448  F 07 4727 9052  E [email protected]  W www.townsville.qld.gov.au  

2

Townsville City Council 143 Walker Street PO Box 1268 Townsville QLD 4810  

  

TOWNSVILLE CITY COUNCIL

PAGE >> 1 OF 1 REFERENCE >> MI16/0025 - 2520018 ABN >> 44 741 992 072

MCUImpact No PD0101-049 14965009 PD0101-049

TOWNSVILLE CITY COUNCIL

103 WALKER STREET

PLANNIING

PO BOX 1268, TOWNSVILLE

QUEENSLAND 4810

TELEPHONE >> 1300 878 001

FACSIMILE >> 07 4727 9052

[email protected]

www.townsville.qld.gov.au

Date >> 14 August 2017

1301011001110212002222320313231030213

A Martin C/- BNC Planning PO Box 5493 TOWNSVILLE QLD 4810 Via email: [email protected] Dear Sir/Madam SUBJECT >> Further Extension of time to the Decision Making Period Application type: Material Change of Use (Impact) Application no: MI16/0025 Property address: 206-210 Nathan Street AITKENVALE QLD

4814 Legal description: Lot 28, 29 and 3 RP 716469 Description: Service Station & Food and Drink Outlet Applicant reference: DA033-16 Please be advised that the decision making period is extended by 40 business days. The first 20 business days as permitted by s.318(2) of the Sustainable Planning Act 2009 and also the further agreed extension of 20 business days, as permitted by s.318(4) of the Sustainable Planning Act 2009. The decision making period will now end on 13 October 2017.

Should you require any further information on this matter, please do not hesitate to contact Andrea McPherson on telephone (07) 4727 9448 or email [email protected]. Yours faithfully

For Assessment Manager Planning Services

1

Naomi White

From: [email protected]: Friday, 13 October 2017 7:44 AMTo: Andrea McPhersonCc: Development AssessmentSubject: RE: MI16/0025 Request to extend the Decision Making Period

Hi Andrea,  Please take this email as a formal agreement to a further extension to the Council decision making period for MI16/0025 through until the 4 December 2017. I have copied the ‘development assessment’ email address to formalise lodgement.   Kind regards,  Benjamin Collings Director  BNC Planning Pty Ltd (Australia) 18 Ingham Road Townsville QLD 4810 PO Box 5493 Townsville QLD 4810 Ph: 4724 4551 Mb: 0438789612 E: [email protected]  W: www.bncplanning.com.au   

 Plan Right Accredited ‐ talk to us today about 5 business day development approvals    

From: Andrea McPherson [mailto:[email protected]]  Sent: Thursday, 12 October 2017 5:52 PM To: [email protected] Subject: MI16/0025 Request to extend the Decision Making Period  Hi Ben,   Further to my email below I note that we had previously agreed upon an extension to the Decision making period until the 13/10/2017. I would like to request a further extension to hopefully resolve the issues below and also to accommodate the date for the next full council meeting. As stated council is supportive of the application we just need to ensure that the development can be accommodated within the Medium Density Residential zone without adversely impacting on the surrounding residents.  The next full council meeting is scheduled for the 28 November so to accommodate administration functions an extension to the 4/12/2017.  Look forward to hearing from you in the morning, 

TOWNSVILLE CITY COUNCIL

PAGE >> 1 OF 1 ABN >> 44 741 992 072 PS1053.00

TOWNSVILLE CITY COUNCIL

ADMINISTRATION BUILDING

103 WALKER STREET

PO BOX 1268, TOWNSVILLE

QUEENSLAND 4810

TELEPHONE >> 1300 878 001

[email protected]

www.townsville.qld.gov.au

17 October 2017

1301011001110212002222320313231030213

A Martin, A Martin C/- BNC Planning PO Box 5493 TOWNSVILLE QLD 4810 Via email: [email protected] Dear Sir/Madam SUBJECT >> Further Extension of time to the Decision Making Period Application type: Material Change of Use (Impact) Application no: MI16/0025 Property address: 206-210 Nathan Street AITKENVALE QLD

4814 Legal description: Lot 28 RP 716469

Lot 29 RP 716469 Lot 30 RP 716469

Description: Service Station & Food and Drink Outlet Please be advised that the decision making period is further extended as agreed and as permitted by s.318(4) of the Sustainable Planning Act 2009. The decision making period will now end on 4 December 2017. Should you require any further information on this matter, please do not hesitate to contact Andrea McPherson on telephone (07) 4727 9448 or email [email protected]. Yours faithfully

For Assessment Manager Planning Services

Brisbane

Sunshine Coast

Gold Coast

Townsville

Cairns

Byron Bay

Toowoomba

Phone: +61 7 3036 2317

Mobile: +61 4 3428 9997

Email: [email protected]

ABN: 67909058720

NOISE IMPACT ASSESSMENT

MATERIAL CHANGE OF USE – SERVICE STATION

& FOOD AND DRINK OUTLET

206-210 Nathan Street, Aitkenvale (Lot 28, 29 & 30 on RP716469)

2

Document Control Page

Document Title: A174 – 206-210 Nathan St Aitkenvale – Noise Impact Assessment

(Rev 1)

Date: 23 October 2017

Prepared by: Craig O‟Sullivan, BEng (Mech) MAAS

Revision History

Date Revision Description Authorised

Name/Position Signature

19/09/2017 0 Draft for client

review

Craig O‟Sullivan

Director

23/10/2017 1 Revised report Craig O‟Sullivan

Director

DISCLAIMER

This report by Dedicated Acoustics is prepared for a particular client and is based on the

agreed objective, scope, conditions and limitations as may be stated in the Executive

Summary. The report presents only the information that Dedicated Acoustics believes, in its

professional opinion, is relevant and necessary to describe the issues involved. The report

should not be used for anything other than the intended purpose and should not be

reproduced, presented or reviewed except in full. The intellectual property of this report

remains with Dedicated Acoustics.

The client is authorised, upon payment to Dedicated Acoustics of the agreed report

preparation fee, to provide this report in full to any third party. Recommendations made in

this report are intended to resolve acoustical problems only. We make no claim of expertise

in other areas and draw your attention to the possibility that our recommendations may not

meet the structural, fire, thermal, or other aspects of building construction

We encourage clients to check with us before using materials or equipment that are

alternative to those specified in our Acoustical Report.

The use of contractors that are experienced in acoustic construction and the use of materials

and equipment that are supported by acoustic laboratory test data are encouraged.

3

Dedicated Acoustics: Noise Impact Assessment

Contents

EXECUTIVE SUMMARY ......................................................................................................................................... 4

1. INTRODUCTION .............................................................................................................................. 7

2. EXISTING NOISE ENVIRONMENT ............................................................................................. 11

3. NOISE CRITERIA .......................................................................................................................... 15

3.1 TOWNSVILLE CITY PLAN 2014 .................................................................... 15

3.2 ENVIRONMENTAL PROTECTION (NOISE) POLICY ...................................... 16

3.3 ENVIRONMENTAL PROTECTION ACT 1994 ................................................. 17

4. NOISE IMPACT ASSESSMENT ................................................................................................... 18

4.1 POTENTIAL IMPACTS.................................................................................. 18

4.2 EXISTING SENSITIVE RECEPTORS............................................................. 19

4.3 POTENTIAL MULTIPLE STOREY DEVELOPMENT RECEPTORS ................... 20

4.4 BARRIER TREATMENT ................................................................................ 23

4.5 CONTINUOUS NOISE SOURCES ................................................................. 24

4.6 NON-CONTINUOUS NOISE SOURCES ......................................................... 26

4.7 SERVICE VEHICLES .................................................................................... 28

4.8 FORECAST NOISE LEVELS ......................................................................... 29

4.8.1 FORECAST NOISE LEVELS – EXISTING RECEPTORS ................................. 29

4.8.2 FORECAST NOISE LEVELS – POTENTIAL MULTI-STOREY DEVELOPMENT 32

5. DISCUSSION ................................................................................................................................. 38

6. RECOMMENDATIONS AND CONCLUSION .............................................................................. 39

APPENDIX A – DEVELOPMENT PLANS ............................................................................................................ 42

APPENDIX B – AMBIENT NOISE TRACES ........................................................................................................ 44

APPENDIX C – GLOSSARY OF ACOUSTIC TERMS ....................................................................................... 48

4

EXECUTIVE SUMMARY

This report details a noise impact assessment report undertaken for a proposed

material change of use (service station & food and drink outlet) at 206-201 Nathan St

Aitkenvale QLD 4814 (Lot 28, 29 & 30 on RP716469).

Noise emission from the development has been assessed against:

Townsville City Plan 2014.

Environmental Protection (Noise) Policy 2008.

Environmental Protection Act 1994.

Noise emission from typical use of the proposed development has been forecast to

nearby residential dwellings and potential 5 storey multi-unit developments on

adjoining land parcels. The assessment incorporates a 5m acoustic barrier along the

north, east and south boundaries (i.e. equal to the top of highest windows on the

second storey of houses).

Conclusions and Recommendations

It is concluded that -

The noise environment at the subject site and surrounds is dominated by

emission from Nathan Street during day and evening periods. Night time

periods are substantially quieter but are still punctuated with sporadic car and

truck pass-bys.

Noise emission criteria have been nominated for the development based on

the control of background creep and the acoustic quality objectives within the

Environmental Protection (Noise) Policy 2008, as well as the noise standards

440U and 440V for air-conditioning and refrigeration plant within the

Environmental Protection Act 1994.

Detailed mechanical plant information is not yet available for the entire site.

However a noise emission forecast has been carried out based on plant

selections for a similar project. Noise emission forecasts from general

operation of the site have been based on peak hour usage rates applied for a

similar project.

Mechanical plant associated with the development will require substantial

acoustic treatment to achieve noise emission goals at existing receptors and

potential 5 storey residential development on adjoining residential lots. This

is likely to require these units to be housed in a plant room or full enclosure,

with acoustic treatment to all air intakes and discharge points.

5

Noise emission from general activity at the development can be controlled to

existing sensitive receptors, with open windows, when a 5m acoustic barrier

is located along the development site boundaries that adjoin residential lots.

New multi-storey development on adjoining residential lots is forecast to

achieve noise intrusion criteria at the ground floor and second storey due to

screening provided by the 5m acoustic barrier. Dwellings located on the third

storey and above are expected to be built to a minimum of QDC MP 4.4

Category 1, due to noise exposure from Nathan Street which is a gazetted

transport noise corridor. Category 1 treatment requires a 25 dB reduction

across the building façade, which will adequately control forecast noise

emission from the proposed development.

It is expected that development will be serviced by a prime mover with semi-

trailer for fuel deliveries, a service vehicle for food and stock deliveries, and

an overhead loading garbage truck for refuse collection. The frequency of

visits is not known at this stage. However it is assumed that fuel deliveries

will occur no more than once a week; and that there may be multiple service

vehicle deliveries daily and a refuse collection every couple of days. It is

expected that these impacts can be adequately controlled by limiting service

vehicle access to day time periods only.

We recommend that -

We recommend that continuously operating plant is selected, located, and

attenuated to meet the criteria detailed in Table 3.3 and Table 3.4. It is

expected that plant will be located on the roof, and that substantial acoustic

treatment will be required to meet noise emission goals; due to the small

setback, height of the residential receptor overlooking the potential plant

deck, and the low noise criteria during night time periods. We recommend

that a detailed design of noise emission is carried out before selection and

installation of plant.

A 5.0m high acoustic barrier is constructed along the northern, eastern, and

southern boundaries as nominated by Council and described in Section 4.4.

The access of service vehicles on-site is restricted to day time hours only and

limiting the duration of noise producing activities (e.g. idling) as much as

practicable.

A 15 km/hr speed limit is adopted for the site.

6

The concrete for vehicle movement areas and fuelling points not comprise of

polished or smooth sealed surfaces due to the propensity for wheel squeaks

and chirps. Loose grates, covers or panels should also be avoided.

7

1. INTRODUCTION

This report details a noise impact assessment report undertaken for a proposed

material change of use (service station & food and drink outlet) at 206-201 Nathan St

Aitkenvale QLD 4814 (Lot 28, 29 & 30 on RP716469).

The proposed development consists of a single storey building housing the service

station and fast food outlet shopfronts, covered refuelling area, drive through lane,

parking areas, as well as a water/air service point. A 5m acoustic barrier has been

incorporated along the north, east and south boundaries at the request of Council in

order to be equal to the top of the highest windows on the second storey of houses.

The purpose of this report is to:

Recommend appropriate noise emission criteria for the development.

Present the results of the existing noise survey.

Forecast noise emissions from the development and assess against the

nominated criteria for existing sensitive receptors and potential sensitive

receptors, up to 5 storeys, on adjoining residential lots.

Recommend acoustic treatments to achieve noise emission criteria, as

required.

The site plan is shown in Figure 1.1 with further plans shown in Appendix A. These

plans do not yet show the 5m acoustic barrier along the north, east and south

boundaries as required by Council. Figure 1.2 shows the subject site in relation to

Nathan Street and nearby sensitive receivers. Figure 1.3 shows the subject site as

seen from Nathan Street.

8

Figure 1.1: Site development plan

9

Figure 1.2: Aerial photograph of the site in relation to Nathan Street (Google Earth)

Subject Site

10

Figure 1.3: Subject site as seen from Nathan Street

11

2. EXISTING NOISE ENVIRONMENT

An on-site survey was conducted between 29th August and 4th September, 2017.

The measurement location (ML1) was positioned at a height of 1.5m above ground

level, as shown in Figure 2.1. The measured levels are considered free field. This

location was chosen as it was considered to be representative of noise levels

experienced at the existing dwellings, while being as far removed from Nathan Street

as possible.

Figure 2.1: Aerial photograph showing measurement location ML1 (Google Earth)

All instrumentation used in this assessment holds a current calibration certificate from

a certified NATA calibration laboratory. The following instruments were used to

measure the ambient noise levels-

Noise Sentry environmental noise logger

Rion NC-73 calibrator

Ambient sound pressure levels were measured generally in accordance with

Australian Standard AS1055.1:1997 - „Acoustics-Description and measurement of

environmental noise - Part 1: General procedures‟. Ambient noise levels were

recorded at continuous 125ms periods and post-processed into 15 minute

increments. Photographs of ML1 are shown in Figure 2.2.

A summary of overall measurement results is shown in Table 2.1, with rated

background levels shown in Table 2.2.

ML1

12

Figure 2.2: Photographs of ML1

Table 2.1: Average ambient noise levels recorded at Location ML1, (levels in dB(A),

free field)

Time Measured Noise Level dB(A)

LA01 LA10 LA90 LAeq

Day 7:00am to 6:00pm 61.7 55.7 46.3 53.3

Evening 6:00pm to 10:00pm 60.0 55.1 44.4 52.1

Night 10:00pm to 7:00am 57.4 51.0 301 47.6

Day Max 1-hr 7:00am to 6:00pm 55.6

Night max 1-hr 10:00pm to 7:00am 54.3

CoRTN 6:00am to 12:00am 55.6 45.5

24 hour 59.8 51.0

1. Background level based on R1 Category AS1055.3

Measured data was noted to approach the noise floor of the instrumentation during

the night time which will influence the measured LA90 noise levels.

Average background noise levels for night time periods have been drawn from AS

1055.3-1997 Acoustics – Description and measurement of environmental noise –

Part 3: Acquisition of data pertinent to land use (AS 1055.3); which provides

13

estimated average background levels for different areas containing residences in

Australia, as shown in Table 2.2. An LA90,(10pm-7am) background level of 30 dB(A) has

been used in the assessment to reflect an R1 Category. We consider this to be

suitable due to the sporadic traffic flows observed along Ross River Road during

night time periods.

Table 2.2: Estimated background levels from AS 1055.3

Noise Area Category

Description of Neighbourhood

Average Background A-Weighted Sound Pressure Level, (LA90,T) dB(A)

Day

(7am – 6pm)

Evening

(6pm – 10pm)

Night

(10pm – 7am)

R1 Areas with negligible

transportation 40 35 30

R2 Areas with low

density transportation

45 40 35

R3

Areas with medium density transportation or some commerce

or industry

50 45 40

R4 Areas with

dense transportation

55 50 45

During the day time the attended periods the noise environment at the development

site was controlled by emission from Nathan Street with no other audible noise

sources. During evening and night time periods the noise environment was

controlled by sporadic traffic along Nathan Street and insect noise.

Attended measurements taken at site note:

Levels of 50-55 dB(A) from free flowing traffic and 60-62 dB(A) from truck

pass-bys, measured at the rear of the site.

Levels of 55-60 dB(A) from free flowing traffic and 70 -72 dB(A) from truck

pass-bys, measured at approximately 15m setback from the Nathan Street

kerb (i.e. similar setback to closest receptors to Nathan Street R1 and R5 as

shown in Figure 4.1.

As such the noise environment at the development site and surrounds can be

reasonably considered to be is controlled by emission from Nathan Street during

periods of heavy usage (i.e. day and evening periods). During periods of light usage

14

the environment is controlled by occasional vehicle pass-bys and lulls of distant

traffic and natural sounds.

15

3. NOISE CRITERIA

3.1 TOWNSVILLE CITY PLAN 2014

The development is sited within a Medium Density Residential Zone and is subject to

the Medium Density Residential Zone Code (6.2.1). Noise related performance

outcomes and acceptable outcomes for this code are shown in Table 3.1.

Table 3.1: Noise related performance outcomes and acceptable outcomes for the TCC Neighbourhood Centre Zone Code

Performance Outcomes Acceptable Outcomes

PO12

Development minimises impacts on surrounding land and provides for an appropriate level of amenity within the centre, having regard to:

a) Noise

AO13

No acceptable outcome is nominated.

Any development on the subject site will have an impact on surrounding land uses by

introducing buildings which will provide screening of noise emission from Nathan

Street (the dominant noise source in the area) and by the introduction of mechanical

plant and activity on site.

Noise impacts to neighbouring land uses are considered to be effectively minimised

by compliance with the Environmental Protection (Noise) Policy 2008 (EPP Noise), in

line with the Noise and Vibration Assessment Guidelines (SC6.4.3.15).

16

3.2 ENVIRONMENTAL PROTECTION (NOISE) POLICY

The Environmental Protection (Noise) Policy (EPP Noise) nominates Environmental

Values for residential dwellings (qualities of the acoustic environment conducive to

protecting the amenity of the community) and prescribes Acoustic Quality Objectives

for protecting or enhancing these Environmental Values. These Acoustic Quality

Objectives and Environmental Values are shown in Table 3.2.

Table 3.2: Acoustic Quality Objectives and Environmental Values of EPP Noise

Sensitive Receptor

Time of Day

Acoustic Quality Objectives (Measured at the Receptor) dB(A)

Environmental Value

LAeq,adj,1hr LA10,adj,1hr LA01,adj,1hr

Dwelling (for

outdoors)

Daytime and

evening 50 55 65

Health and wellbeing

Dwelling (for

indoors)

Daytime and

evening 35 40 45

Health and wellbeing

Night time

30 35 40

Health and wellbeing in

relation to the ability to sleep

EPP Noise contains limits to control Background Creep (the progressive increase in

background noise levels due to new activities in an area). These limits are

summarised in Table 3.3 below. These limits apply to overall emission from the

entire site.

Table 3.3: Background Creep criteria of EPP Noise

Noise Source Time Noise Limit Descriptor

Continuous noise

7:00am – 6:00pm

Background + 0 dB(A)

46 + 0 = 46 dB(A)

LA90,T 6:00pm – 10:00pm

44 + 0 = 44 dB(A)

10:00pm – 7:00am

30 + 0 = 30 dB(A)

Noise that varies with time

7:00am – 7:00pm

Background + 5 dB(A)

46 + 5 = 51 dB(A)

LAeq,adj,T 7:00pm – 10:00pm

44 + 5 = 49 dB(A)

10:00pm – 7:00am

30 + 5 = 35 dB(A)

17

3.3 ENVIRONMENTAL PROTECTION ACT 1994

The object of the Environmental Protection Act (EPA 94) is to protect Queensland‟s

environment while allowing for development that improves the total quality of life,

both now and in the future, in a way that maintains the ecological processes on which

life depends.

The Act nominates a series of Noise Standards, which are summarised in Table 3.4.

Table 3.4: Relevant noise standards from EPA 94

Noise Standard

Applicable To Day Time Noise Limit Level

Descriptor

440U Air-Conditioning

Equipment Any day

7:00am – 7:00pm

Background + 5 dB(A)

46 + 5 = 51

dB(A)

LA90,T 7:00pm – 10:00pm

Background + 5 dB(A)

44 +5 = 49

dB(A)

10:00pm – 7:00am

Background + 3 dB(A)

30 + 3 = 33

dB(A)

440V

Refrigeration Equipment (fixed and

vehicle mounted)

Any day

7:00am – 7:00pm

Background + 5 dB(A)

46 + 5 = 51

dB(A)

LA90,T 7:00pm – 10:00pm

Background + 5 dB(A)

44 +5 = 49

dB(A)

10:00pm – 7:00am

Background + 3 dB(A)

30 + 3 = 33

dB(A)

18

4. NOISE IMPACT ASSESSMENT

Noise emission from the development has been forecast using the proprietary

software PEN3D developed by Noise Mapping Australia. PEN3D utilises the General

Prediction Model (GPM) described by Bies and Hansen. The basic equation adopted

by the GPM is:

Lp = Lw – 20Log10R – 10Log104π + AE

Where

Lp is the sound pressure level at an observer

Lw is sound power level of the source

20Log10R – 10Log104π is the distance attenuation (spherical propagation)

AE is the excess attenuation factors (barriers, air absorption)

4.1 POTENTIAL IMPACTS

The proposed development consists of:

A service station with proposed operating hours of 24 hours a day, 7 days a

week; during day, evening and night time periods.

A food and drink outlet with proposed operating hours of 7:00 am to 10:00

pm, 7 days a week; during day and evening periods.

Operation of the development is expected to introduce the following noise emissions:

Mechanical plant providing compressed air, ventilation, air-conditioning and

refrigeration to the development.

Fuel bowsers.

Patron noise (including vehicle movements, door slams, and conversation).

Use of the drive through ordering system (vehicle movements, speaker box

and patron noise emission).

Service vehicles bringing fuel and stocks to the development, as well as

rubbish removal.

19

4.2 EXISTING SENSITIVE RECEPTORS

Sensitive receptors close to the development site are shown graphically in Figure 4.1

and described in Table 4.1. Ground floor receptors have been modelled at 1.8m

above natural ground level, while second storey receptors have been modelled at

4.6m above natural ground level.

Figure 4.1: Sensitive receptors in close proximity to the development site (Google Earth)

Table 4.1: Sensitive receptors close to the development

Receptor Description

R1 Single storey multiple unit dwellings

R2 Double storey dwelling

R3 Single storey dwelling

R4 Double storey dwelling

R5 Double storey dwelling

R6 Double storey dwelling

R1

R2

R6

R3

R5

R4

20

4.3 POTENTIAL MULTIPLE STOREY DEVELOPMENT RECEPTORS

Noise impacts on potential multiple storey developments on adjoining lots have been

considered in the assessment at the request of Council. Receptors have been

assumed to be setback 1m from subject site boundary with the ground floor receptor

height at 1.8m above natural ground level with a floor-to-floor height of 2.8m as

shown in Table 4.2. Receptors locations are shown graphically in Figure 4.2.

Figure 4.2: Assumed sensitive receptors due to multi-storey development (Google Earth)

Table 4.2: Modelled receptor heights for potential multiple storey developments

Floor Modelled Receptor Heights Above Natural Ground

Level(m)

Ground Floor 1.8

Second Storey

4.6

Third Storey 7.4

Fourth Storey

10.2

Fifth Storey 13.0

We note that the development site and surrounds are located within a Transport

Noise Corridor as shown in Figure 4.3. Applicable noise levels for transport noise

corridors are shown in Table 4.3. New residential development built within a

transport noise corridor will require acoustic treatment to mitigate traffic noise

intrusion as shown in Table 4.3.

M1 M2

M6

M3

M5

M4

M7

21

Table 4.3: Noise Categories, related to LA10, 18hr values.

Noise Category

Level of Transport Noise at Building Facade Minimum Transport Noise Reduction

Required to Habitable Rooms Road Traffic (LA10 18hr)

Category 4 > 73 dB(A) 40

Category 3 68 – 72 dB(A) 35

Category 2 63 – 67 dB(A) 30

Category 1 58 – 62 dB(A) 25

Category 0 < 57 dB(A) -

22

Figure 4.3: Transport noise corridor overlay for the site and surrounds

23

4.4 BARRIER TREATMENT

Council have advised that they require a barrier equal to the highest window of the

second level of houses. On this basis a 5m high acoustic barrier has been

incorporated along the north, east and south boundaries of the development site; in

order to be equal to the top of the highest windows on the second storey of houses,

as required by Council. This barrier will be required to be free of gaps and be

constructed with:

A material that has a minimum surface mass of 15 kg/m2, OR

A material that has a sound reduction index (RW)/sound transmission class

(STC) of 28.

Council have advised that wood is an unacceptable material with which to build the

acoustic barrier. Alternate barrier materials should be selected that achieve the

requirements above.

Modelled barrier extents are shown graphically in Figure 4.4.

Figure 4.4: Barrier treatment extents to shield existing receptors

5.0m High Barrier

24

4.5 CONTINUOUS NOISE SOURCES

Detailed mechanical plant information is not yet available for development. A noise

emission forecast has been carried out based on mechanical plant selected for a

similar project. Sound power data used in the assessment is shown in Table 4.5.

This data is indicative only and an acoustic assessment should be carried out based

on the ACTUAL plant selections once these are available, in order to accurately

determine noise control requirements.

Table 4.5: Sound power data for Indicative mechanical plant associated with service stations and fast food outlets

Source Number of Units

Sound Power Level Per Unit, dB Overall Sound Power Level, dB(A)

63 Hz

125 Hz

250 Hz

500 Hz

1 kHz

2 kHz

4 kHz

Air Handling Unit

1 84 84 78 76 74 61 61 78

Refrigeration Pack -

Freezer 2 84 84 78 76 74 61 61 78

Refrigeration Pack - Fridge

2 76 76 70 68 66 53 53 70

Condenser Units

4 73 73 67 65 63 50 50 67

Kitchen Exhaust Fan

1 78 82 75 70 66 66 62 74

Kitchen Supply Fan

1 73 79 71 65 62 60 57 69

Toilet Exhaust Fan

4 48 53 51 58 57 55 52 50

Toilet Supply Air Fan

4 60 59 62 59 63 67 60 70

The location of this plant is not yet known. Assumed locations are shown in

Figure 4.5.

25

Figure 4.5: Assumed location of mechanical plant

Refrigeration, Air-

Conditioning and

Air Handling Plant

Kitchen Fans

Toilet Exhaust Fans

Toilet Exhaust Fans

26

4.6 NON-CONTINUOUS NOISE SOURCES

Noise data used in the assessment is shown in Table 4.6.

Table 4.6: Noise data used within the assessment

Source

Sound Power Level, dB Overall

Sound Power Level, dB(A) 63

Hz 125 Hz

250 Hz

500 Hz

1 kHz

2 kHz

4 kHz

Vehicle Movement

83 90 84 81 84 82 81 90

Vehicle Idling 76 83 77 74 77 78 74 83

Car door close/Car Start

94 96 89 90 82 79 75 90

Patron conversation

58 72 75 78 70 68 65 78

Speaker box 65 79 82 85 77 75 72 85

Vehicle movements have been modelled as a moving point source which follows the

main routes for vehicles within the development, and is weighted for the number of

anticipated movements within a representative time frame (e.g. 1 hour) during day,

evening and night time periods. The assessment is based on the concrete surface

having a low noise finish, such as brushed concrete or asphalt. Polished or smooth

sealed surfaces should be avoided due to propensity for wheel squeaks and chirps.

Loose grates, covers or panels should also be avoided, and have not been

addressed in this assessment.

The assessment has been based on the anticipated peak hour usage rates shown in

Table 4.7, which were provided for a similar development.

Table 4.7: Anticipated use of the development

Use Traffic Generation (vehicles per hour)

Peak day Peak evening Peak Night

Fast food outlet 25 25 0

Service station 43 43 30

Idling vehicles have been used to represent noise emission at bowsers and at drive

through order and collection points. Each vehicle using these points has been

assumed to idle at these locations for 1 minute.

27

Noise emission from patrons (car door close, engine start, conversation) has been

modelled as fixed point sources at representative locations. The dining area of the

restaurant is likely to be enclosed, not orientated towards the closest receptors, and

is expected to adequately contain patron noise. The assessment assumes that

during night time periods cars and patrons will only use areas near the bowsers and

parking spaces close to the service station area.

It is assumed that all traffic generated by the fast food outlet travels through the drive

thru. Noise emission from the speaker box has been modelled as a fixed point and is

assumed to emit noise for approximately 30 seconds for each vehicle using the drive

thru within a representative time frame (e.g. 1 hour). The assumed location of the

speaker box is shown in Figure 4.6.

Figure 4.6: Assumed speaker box location

Assumed speaker

box location

28

4.7 SERVICE VEHICLES

It is expected that development will be serviced by a prime mover with semi-trailer for

fuel deliveries, a service vehicle for food and stock deliveries, and an overhead

loading garbage truck for refuse collection. The frequency of visits is not known at

this stage. However it is assumed that fuel deliveries will occur no more than once a

week; and that there may be multiple service vehicle deliveries daily and a refuse

collection every couple of days. It is expected that these impacts can be adequately

controlled by limiting service vehicle access to day time periods only.

29

4.8 FORECAST NOISE LEVELS

4.8.1 FORECAST NOISE LEVELS – EXISTING RECEPTORS

Noise emission from continuously operating mechanical plant is shown on Table 4.8,

with and without the effect of a 5m acoustic barrier along the north, east and south

boundaries of the development site.

Table 4.8: Forecast noise emission from mechanical plant to existing receptors (free-field)

Receptor

Forecast LAeq dB(A) – No Barrier

Forecast LAeq dB(A) – 5m Barrier

Insertion Loss of Barrier dB

Day & Evening

Night Day &

Evening Night

Day & Evening

Night

R1 41 40 25 24 16 16

R2 – Lower

34 31 31 30 3 1

R2 – Upper

37 36 37 36 0 0

R3 41 41 32 32 9 9

R4 – Lower

27 27 27 27 0 0

R4 – Upper

36 35 36 35 0 0

R5 – Lower

40 40 35 35 5 5

R5 – Upper

42 42 42 42 0 0

R6 – Lower

40 39 34 33 6 6

R6 – Upper

51 50 45 44 6 6

Approximately 14 dB of noise reduction is required to achieve compliance with noise

emission criteria when a 5m acoustic barrier is present along the site boundary. This

is expected to require full enclosure of mechanical equipment along with acoustically

treated openings to air intake and discharge points. Acoustic review of mechanical

plant selections, locations and treatments should be carried out as the mechanical

design is developed.

30

Forecast LAeq noise emission for peak hour operation of the service station and fast

food outlet during day and evening periods, and service station during night time

periods is shown in Table 4.9.

Table 4.9: Forecast LAeq noise emission from peak hour operation of the service station and fast food outlet during day and evening periods, and peak hour operation of the service station only during night time periods to existing receptors (free-field)

Receptor

Forecast LAeq dB(A) – No Barrier

Forecast LAeq dB(A) – 5m Barrier

Insertion Loss of Barrier dB

Day & Evening

Night Day &

Evening Night

Day & Evening

Night

R1 52 50 32 29 20 21

R2 – Lower

46 44 30 27 16 17

R2 – Upper

45 43 32 29 13 14

R3 53 48 34 29 19 19

R4 – Lower

30 25 30 25 0 0

R4 – Upper

35 31 32 28 3 3

R5 – Lower

46 38 30 26 16 12

R5 – Upper

46 37 32 27 14 10

R6 – Lower

52 27 33 24 19 3

R6 – Upper

51 31 37 31 14 0

With the provision of a 5m acoustic barrier along the development site boundaries

adjoining residential lots; noise levels are forecast to comply with Background Creep

Criteria and the internal LAeq Acoustic Quality Objectives, assuming a 5 dB reduction

across a façade with open windows.

31

Forecast LA01 noise emission for peak hour operation of the service station and fast

food outlet during day and evening periods, and service station during night time

periods is shown in Table 4.10.

Table 4.10: Forecast LA01 noise emission from peak hour operation of the service station and fast food outlet during day and evening periods, and peak hour operation of the service station only during night time periods (free-field)

Receptor

Forecast LA01 dB(A) – No

Barrier

Forecast LA01 dB(A) – 5m

Barrier

Insertion Loss of Barrier dB

Day & Evening

Night Day &

Evening Night

Day & Evening

Night

R1 59 59 37 37 22 22

R2 – Lower

50 50 34 34 16 16

R2 – Upper

49 49 35 35 14 14

R3 59 55 39 39 20 16

R4 – Lower

34 34 34 34 0 0

R4 – Upper

39 39 35 35 4 4

R5 – Lower

49 47 33 33 16 14

R5 – Upper

48 47 35 35 13 12

R6 – Lower

65 37 41 34 24 3

R6 – Upper

63 40 43 39 20 1

With the provision of a 5m acoustic barrier along the development site boundaries

adjoining residential lots; noise levels are forecast to comply with the internal LA01

Acoustic Quality Objectives, assuming a 5 dB reduction across a façade with open

windows.

32

4.8.2 FORECAST NOISE LEVELS – POTENTIAL MULTI-STOREY DEVELOPMENT

Noise emission from continuously operating mechanical plant is shown on

Table 4.11, with and without the effect of a 5m acoustic barrier along the north, east

and south boundaries of the development site.

Table 4.11: Forecast LAeq noise emission from peak hour operation of the service station and fast food outlet during day and evening periods, and peak hour operation of the service station only during night time periods to potential multi-storey receptors (free-field)

Receptor Level

Forecast LAeq dB(A) – No

Barrier

Forecast LAeq dB(A) – 5m

Barrier

Insertion Loss of Barrier dB

Day & Evening

Night Day &

Evening Night

Day & Evening

Night

M1

G 40 40 23 23 17 17

2 41 41 34 34 7 7

3 40 40 40 40 0 0

4 39 39 39 39 0 0

5 39 39 39 39 0 0

M2

G 40 40 24 24 17 17

2 41 41 34 34 7 7

3 40 40 40 40 0 0

4 39 39 39 39 0 0

5 39 39 39 39 0 0

M3

G 42 42 27 27 15 15

2 42 42 36 36 6 6

3 41 41 41 41 0 0

4 41 41 41 41 0 0

5 41 41 41 41 0 0

M4

G 41 41 30 30 11 11

2 46 46 40 40 6 6

3 45 45 45 45 0 0

4 45 45 45 45 0 0

5 45 45 45 45 0 0

33

Receptor Level

Forecast LAeq dB(A) – No

Barrier

Forecast LAeq dB(A) – 5m

Barrier

Insertion Loss of Barrier dB

Day & Evening

Night Day &

Evening Night

Day & Evening

Night

M5

G 43 43 32 32 11 11

2 49 49 43 43 6 6

3 48 48 48 48 0 0

4 48 48 48 48 0 0

5 48 48 48 48 0 0

M6

G 41 41 35 35 6 6

2 51 51 45 45 6 6

3 51 51 51 51 0 0

4 51 51 51 51 0 0

5 50 50 50 50 0 0

M7

G 38 38 32 32 6 6

2 48 48 42 42 6 6

3 48 48 48 48 0 0

4 48 48 48 48 0 0

5 48 48 48 48 0 0

Approximately 21 dB of noise reduction is required to achieve compliance with noise

emission criteria when a 5m acoustic barrier is present along the site boundary. This

is expected to require full enclosure of mechanical equipment along with acoustically

treated openings to air intake and discharge points. Acoustic review of mechanical

plant selections, locations and treatments should be carried out as the mechanical

design is developed.

Forecast LAeq noise emission for peak hour operation of the service station and fast

food outlet during day and evening periods, and service station during night time

periods to potential multi-storey receptors is shown in Table 4.12.

34

Table 4.12: Forecast LAeq noise emission from peak hour operation of the service station and fast food outlet during day and evening periods, and peak hour operation of the service station only during night time periods to potential multi-storey receptors (free-field)

Receptor Level

Forecast LAeq dB(A) – No

Barrier

Forecast LAeq dB(A) – 5m

Barrier

Insertion Loss of Barrier dB

Day & Evening

Night Day &

Evening Night

Day & Evening

Night

M1

G 52 50 32 29 21 21

2 52 50 39 37 13 13

3 52 49 52 49 0 0

4 51 49 51 49 0 0

5 51 49 51 49 0 0

M2

G 52 50 32 29 20 21

2 52 50 39 37 13 13

3 51 49 51 49 0 0

4 51 49 51 49 0 0

5 50 49 50 49 0 0

M3

G 53 52 33 30 20 22

2 53 52 40 37 13 14

3 53 51 53 51 0 0

4 52 50 52 50 0 0

5 51 49 51 49 0 0

M4

G 54 50 34 29 20 21

2 54 50 41 37 13 13

3 53 49 53 49 0 0

4 53 49 53 49 0 0

5 52 49 52 49 0 0

M5

G 57 45 37 27 20 19

2 57 45 42 34 15 11

3 56 45 56 45 1 0

4 55 45 55 45 0 0

35

Receptor Level

Forecast LAeq dB(A) – No

Barrier

Forecast LAeq dB(A) – 5m

Barrier

Insertion Loss of Barrier dB

Day & Evening

Night Day &

Evening Night

Day & Evening

Night

5 54 45 54 45 0 0

M6

G 54 27 35 24 19 3

2 53 31 39 31 14 0

3 52 38 47 38 5 0

4 51 42 51 42 0 0

5 51 42 51 42 0 0

M7

G 48 28 32 25 17 3

2 48 31 37 31 11 0

3 49 38 45 38 3 0

4 49 42 49 42 0 0

5 49 44 49 44 0 0

With the provision of a 5m acoustic barrier along the development site boundaries

adjoining residential lots; noise levels are forecast to comply with the internal LAeq

Acoustic Quality Objectives, assuming a 25 dB reduction across the building façade

which is required for dwellings constructed under QDC MP 4.4 Category 1.

Forecast LA01 noise emission for peak hour operation of the service station and fast

food outlet during day and evening periods, and service station during night time

periods to potential multi-storey receptors is shown in Table 4.13.

Table 4.13: Forecast LA01 noise emission from peak hour operation of the service station and fast food outlet during day and evening periods, and peak hour operation of the service station only during night time periods to potential multi-storey receptors (free-field)

Receptor Level

Forecast LA01 dB(A) – No

Barrier

Forecast LA01 dB(A) – 5m

Barrier

Insertion Loss of Barrier dB

Day & Evening

Night Day &

Evening Night

Day & Evening

Night

M1

G 60 60 37 37 22 23

2 59 59 44 44 16 15

3 59 59 59 59 0 0

36

Receptor Level

Forecast LA01 dB(A) – No

Barrier

Forecast LA01 dB(A) – 5m

Barrier

Insertion Loss of Barrier dB

Day & Evening

Night Day &

Evening Night

Day & Evening

Night

4 57 57 57 57 0 0

5 56 56 56 56 0 0

M2

G 59 59 41 41 18 18

2 59 59 46 46 13 13

3 59 59 59 59 0 0

4 58 58 58 58 0 0

5 57 57 57 57 0 0

M3

G 61 61 42 42 19 19

2 61 61 48 47 13 13

3 60 60 60 60 0 0

4 59 59 59 59 0 0

5 57 57 57 57 0 0

M4

G 63 58 40 40 23 18

2 62 57 46 46 16 12

3 60 57 60 57 0 0

4 59 56 59 56 0 0

5 57 56 57 56 0 0

M5

G 62 54 39 38 23 17

2 61 54 44 44 17 11

3 60 54 57 54 3 0

4 58 54 58 54 0 0

5 57 54 57 54 0 0

M6

G 66 37 42 34 24 3

2 64 40 44 39 20 0

3 62 47 56 47 6 0

4 59 47 59 47 0 0

37

Receptor Level

Forecast LA01 dB(A) – No

Barrier

Forecast LA01 dB(A) – 5m

Barrier

Insertion Loss of Barrier dB

Day & Evening

Night Day &

Evening Night

Day & Evening

Night

5 58 49 58 49 0 0

M7

G 63 37 39 34 23 3

2 62 40 42 39 20 0

3 60 47 55 47 5 0

4 59 49 59 49 0 0

5 57 49 57 49 0 0

With the provision of a 5m acoustic barrier along the development site boundaries

adjoining residential lots; noise levels are forecast to comply with the internal LA01

Acoustic Quality Objectives, assuming a 25 dB reduction across the building façade

which is required for dwellings constructed under QDC MP 4.4 Category 1.

38

5. DISCUSSION

The noise environment around the subject site is controlled by vehicle pass-bys

along Nathan Street. This results in reasonably quasi-steady noise level during

periods of heavy traffic flow, and fluctuating levels during lighter flow periods.

A significant barrier has been recommended along the northern, eastern and

southern boundaries to help control noise impacts to the nearest neighbours

The noise forecasts are based on the parameters detailed in Section 4 and provide a

reasonable sample of typical activity on the site. Variations to these conditions (such

as larger vehicles, anti-social behaviour, loud music or warning signals) may lead to

short term exceedance of the criteria.

Sporadic short term noise events are expected at the site, such as fuel and stock

deliveries as well as refuse collection, which may cause some disturbance. These

events should be limited to day time periods, and scheduled with consideration for

the effects on neighbours.

39

6. RECOMMENDATIONS AND CONCLUSION

This report details a noise impact assessment report undertaken for a proposed

material change of use (service station & food and drink outlet) at 206-201 Nathan St

Aitkenvale QLD 4814 (Lot 28, 29 & 30 on RP716469).

The proposed development consists of a single storey building housing the service

station and fast food outlet shopfronts, covered refuelling area, drive through lane,

parking areas, as well as a water/air service point.

Noise emission from the development has been assessed against:

Townsville City Plan 2014.

Environmental Protection (Noise) Policy 2008.

Environmental Protection Act 1994.

Noise emission from typical use of the proposed development has been forecast to

nearby residential dwellings and potential 5 storey multi-unit developments on

adjoining land parcels. The assessment incorporates a 5m acoustic barrier along the

north, east and south boundaries (i.e. equal to the top of highest windows on the

second storey of houses).

Conclusions and Recommendations

It is concluded that -

The noise environment at the subject site and surrounds is dominated by

emission from Nathan Street during day and evening periods. Night time

periods are substantially quieter but are still punctuated with sporadic car and

truck pass-bys.

Noise emission criteria have been nominated for the development based on

the control of background creep and the acoustic quality objectives.

Detailed mechanical plant information is not yet available for the entire site.

However a noise emission forecast has been carried out based on plant

selections for a similar project.

It is expected that development will be serviced by a prime mover with semi-

trailer for fuel deliveries, a service vehicle for food and stock deliveries, and

an overhead loading garbage truck for refuse collection. The frequency of

visits is not known at this stage. However it is assumed that fuel deliveries

will occur no more than once a week; and that there may be multiple service

vehicle deliveries daily and a refuse collection every couple of days. It is

40

expected that these impacts can be adequately controlled by limiting service

vehicle access to day time periods only.

Mechanical plant associated with the development will require substantial

acoustic treatment to achieve noise emission goals at existing receptors and

potential 5 storey residential development on adjoining residential lots. This

is likely to require these units to be housed in a plant room or full enclosure,

with acoustic treatment to all air intakes and discharge points.

Noise emission from general activity at the development can be controlled to

existing sensitive receptors, with open windows, when a 5m acoustic barrier

is located along the development site boundaries that adjoin residential lots.

New multi-storey development on adjoining residential lots is forecast to

achieve noise intrusion criteria at the ground floor and second storey due to

screening provided by the 5m acoustic barrier. Dwellings located on the third

storey and above are expected to be built to a minimum of QDC MP 4.4

Category 1, due to noise exposure from Nathan Street which is a gazetted

transport noise corridor. Category 1 treatment requires a 25 dB reduction

across the building façade, which will adequately control forecast noise

emission from the proposed development

We recommend that -

We recommend that continuously operating plant is selected, located, and

attenuated to meet the criteria detailed in Table 3.3 and Table 3.4. It is

expected that plant will be located on the roof, and that substantial acoustic

treatment will be required to meet noise emission goals; due to the small

setback, height of the residential receptor overlooking the potential plant

deck, and the low noise criteria during night time periods. We recommend

that a detailed design of noise emission is carried out before selection and

installation of plant.

A 5.0m high acoustic barrier is constructed along the northern, eastern, and

southern boundaries as nominated by Council and described in Section 4.4.

The access of service vehicles on-site is restricted to day time hours only and

limiting the duration of noise producing activities (e.g. idling) as much as

practicable.

A 15 km/hr speed limit is adopted for the site.

41

The concrete for vehicle movement areas and fuelling points not comprise of

polished or smooth sealed surfaces due to the propensity for wheel squeaks

and chirps. Loose grates, covers or panels should also be avoided.

42

APPENDIX A – DEVELOPMENT PLANS

43

44

APPENDIX B – AMBIENT NOISE TRACES

45

46

47

48

APPENDIX C – GLOSSARY OF ACOUSTIC TERMS

The following is a brief description of the technical terms used to describe traffic noise to

assist in understanding the technical issues presented in this document.

Event maximum sound pressure level (LA%,adj,T), L01 The L01 level is calculated as the noise level equalled and exceeded for 1% of the measurement time, for example 9 seconds in any 15 minute interval. L01 is an appropriate level to characterise single events, such as from impulsive or distinctive pass-by noise. In this Report, the measured L01 levels for day/evening/night are not averaged but are arranged from low to high in the relevant day/evening/night interval and the value that is found at the 90th percentile (L10 of L01 sample) in the interval is recorded as its “L01” level. The level can be adjusted for tonality or impulsiveness.

Average maximum sound pressure level (LA%,adj, T), L10 The “L10” level is an indicator of “steady-state” noise or intrusive noise conditions from traffic, music and other relatively non-impulsive noise sources. The L10 level is calculated as the noise level equalled and exceeded for 10% the measurement time, for example 90 seconds in any 15 minute interval. The measured L10 time-intervals for day/evening/night are arithmetically averaged to present the “average maximum” levels of the environment for day/evening/night. The level can be adjusted for tonality or impulsiveness.

Background sound pressure level (LA90,T), L90 Commonly called the "L90" or "background" level and is an indicator of the quietest times of day, evening or night. The L90 level is calculated as the noise level equalled and exceeded for 90% the measurement time. The measured L90 time-intervals are arithmetically averaged to present the “average background” levels of the environment for day/evening/night. The level is recorded in the absence of any noise under investigation. The level is not adjusted for tonality or impulsiveness.

Equivalent Continuous or time average sound pressure level (LAeq,T), Leq Commonly called the "Leq" level it is the logarithmic average noise level from all sources far and near. The maximum 1-hour levels within the day/evening/night time intervals are referenced for building design. The level can be adjusted for tonality.

Façade-adjusted level A sound level that is measured at a distance of 1.0 metre from a wall or facade. The level is nominally 2.5 dB higher than the free-field level.

Free-field level A sound level that is measured at a distance of more than 3.5 metres from a wall or facade.