1 SUMMARY OF ELEVATORS The US Bank complex at 777 Wisconsin Avenue, Milwaukee, Wisconsin, was inspected by Thomas Branham and Steve Rains of Elevator Consulting Services, Inc. on May 18-20, 2016. Tom is certified by NAESA and his QEI number is 1339. Steve is certified by QEITP and his number is E-000470 NAESA is the National Association of Elevator Safety Authorities. We have identified corrective items that in our opinion need to be addressed by the Elevator Contractor. They are free to offer an explanation or dispute any individual item within the report but we can offer a code, specification or reasonable reason for each and every negative evaluation. They are evaluated on and for the ASME 17.2 Code for Inspectors Manual and industry standards for acceptable installation and maintenance procedures. The following are deferred repairs, preventive type maintenance and some testing that is behind. It is normal for the service vendor to have 30 days to complete the punch list. When it comes to Code and State mandated testing that is behind, it should be shortened up to a as soon as possible scenario. However there are several handrails on the escalators, governor rope and some major repairs that may take some additional time.

Upload: truongtu

Post on 25-Aug-2018

217 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SUMMARY OF ELEVATORS - Elevator Consulting … · SUMMARY OF ELEVATORS ... NAESA is the National Association of Elevator Safety Authorities. ... Mid Rise Elevators 1-6 / 500 FPM

1

SUMMARY OF ELEVATORS

The US Bank complex at 777 Wisconsin Avenue, Milwaukee, Wisconsin, was inspected by Thomas

Branham and Steve Rains of Elevator Consulting Services, Inc. on May 18-20, 2016. Tom is certified

by NAESA and his QEI number is 1339. Steve is certified by QEITP and his number is E-000470

NAESA is the National Association of Elevator Safety Authorities. We have identified corrective

items that in our opinion need to be addressed by the Elevator Contractor. They are free to offer an

explanation or dispute any individual item within the report but we can offer a code, specification or

reasonable reason for each and every negative evaluation. They are evaluated on and for the ASME

17.2 Code for Inspectors Manual and industry standards for acceptable installation and maintenance

procedures.

The following are deferred repairs, preventive type maintenance and some testing that is behind. It is

normal for the service vendor to have 30 days to complete the punch list. When it comes to Code and

State mandated testing that is behind, it should be shortened up to a as soon as possible scenario.

However there are several handrails on the escalators, governor rope and some major repairs that may

take some additional time.

Page 2: SUMMARY OF ELEVATORS - Elevator Consulting … · SUMMARY OF ELEVATORS ... NAESA is the National Association of Elevator Safety Authorities. ... Mid Rise Elevators 1-6 / 500 FPM

2

ELEVATION SHEET

C to M : 18’9’’

M to W : 16’0’’

W to L : 17’0’’

L to 3 : 21’0’’

3 to 4 : 26’0’’

4 to 5 : 13’0’’

5 to 6 : 13’0’’

7 to 8 : 13’0’’

8 to 9 : 13’0’’

9 to 10 : 13’0’’

10 to 11 : 13’0’’

11 to 12 : 13’0’’

14 to 15 : 13’0’’

15 to 16 : 13’8’’

16 to 17 : 26’0’’

17 to 40 : 13’0’’ each floor

40 to 41 : 16’0’’

41 to 42 : 13’0’’

41 to Penthouse : 26’0’’

Machine Rooms : Low Rise : 22nd’ 21st’floors

Mid Rise : 34th, 33rd, 32nd floors

High Rise : 41st floor

Rise

Mid Rise Elevators 1-6 / 500 FPM / 3500 LBS / OTIS GEARLESS, C to Lobby, 19 to 30

High Rise Elevators 7-12 / 1000 FPM / 3500 LBS / OTIS 219 HT GEARLESS Fls C to L, 30 to

40

Low Rise Elevators 13-20 / 500 FPM / 4000 LBS / OTIS 155 HT GEARLESS / Fls C to 19

Large freight 21 / 700 FPM / 8000 LB CAP / OTIS 269 HT GEARLESS / Fls C to 41

Small Freight 22 / 700 FPM / 4000 LB CAP / OTIS 219 HT GEARLESS / Fls C to 41

Galleria Elevators 23, 24, 25 / 3500 CAP / 200 FPM BASEMENT TRACTION AT TOP

FLOOR / OTIS 29CT / Six stops

Juneau Elevators 1-3 / 350 FPM / 2500 CAP / OVERHEAD TRACTION / WEST 38

MACHINES / Twelve stops

Page 3: SUMMARY OF ELEVATORS - Elevator Consulting … · SUMMARY OF ELEVATORS ... NAESA is the National Association of Elevator Safety Authorities. ... Mid Rise Elevators 1-6 / 500 FPM

3

General :

Meg out each hoist motor armature. Document each value per elevator. If 800 k to ground or

worse, wash and rebake as a minimum, rewind as needed. Submit values for review.

Low Rise Elevator Bank

Elevator Reading to Ground Date

13

14

15

16

17

18

19

20

Meg out each generator armature. Document each value per elevator. If 800 k to ground or

worse, wash and rebake as a minimum, rewind as needed. Submit values for review.

Low Rise Elevator Bank

Elevator Reading to Ground Date

13

14

15

16

17

18

19

20

Page 4: SUMMARY OF ELEVATORS - Elevator Consulting … · SUMMARY OF ELEVATORS ... NAESA is the National Association of Elevator Safety Authorities. ... Mid Rise Elevators 1-6 / 500 FPM

4

Mid Rise Elevator Bank

Meg out each hoist motor armature. Document each value per elevator. If 800 k to ground or

worse, wash and rebake as a minimum, rewind as needed. Submit values for review.

Elevator Reading to Ground Date

1

2

3

4

5

6

Meg out each generator armature. Document each value per elevator. If 800 k to ground or

worse, wash and rebake as a minimum, rewind as needed. Submit values for review.

Elevator Reading to Ground Date

1

2

3

4

5

6

High Rise Elevator Bank

Meg out each hoist motor armature. Document each value per elevator. If 800 k to ground or

worse, wash and rebake as a minimum, rewind as needed. Submit values for review.

Elevator Reading to Ground Date

7

8

9

10

11

12

Page 5: SUMMARY OF ELEVATORS - Elevator Consulting … · SUMMARY OF ELEVATORS ... NAESA is the National Association of Elevator Safety Authorities. ... Mid Rise Elevators 1-6 / 500 FPM

5

Meg out each generator armature. Document each value per elevator. If 800 k to ground or

worse, wash and rebake as a minimum, rewind as needed. Submit values for review.

Elevator Reading to Ground Date

7

8

9

10

11

12

Freight Elevators

Meg out each hoist motor armature. Document each value per elevator. If 800 k to ground or

worse, wash and rebake as a minimum, rewind as needed. Submit values for review.

Elevator Reading to Ground Date

21

22

Meg out each generator armature. Document each value per elevator. If 800 k to ground or

worse, wash and rebake as a minimum, rewind as needed. Submit values for review.

Elevator Reading to Ground Date

21

22

Page 6: SUMMARY OF ELEVATORS - Elevator Consulting … · SUMMARY OF ELEVATORS ... NAESA is the National Association of Elevator Safety Authorities. ... Mid Rise Elevators 1-6 / 500 FPM

6

Galleria Elevators

Meg out each hoist motor armature. Document each value per elevator. If 800 k to ground or

worse, wash and rebake as a minimum, rewind as needed. Submit values for review.

Elevator Reading to Ground Date

23

24

25

Meg out each generator armature. Document each value per elevator. If 800 k to ground or

worse, wash and rebake as a minimum, rewind as needed. Submit values for review.

Elevator Reading to Ground Date

23

24

25

Juneau Elevators

Meg out each hoist motor armature. Document each value per elevator. If 800 k to ground or

worse, wash and rebake as a minimum, rewind as needed. Submit values for review.

Elevator Reading to Ground Date

1

2

3

Meg out each generator armature. Document each value per elevator. If 800 k to ground or

worse, wash and rebake as a minimum, rewind as needed. Submit values for review.

Elevator Reading to Ground Date

1

2

3

Page 7: SUMMARY OF ELEVATORS - Elevator Consulting … · SUMMARY OF ELEVATORS ... NAESA is the National Association of Elevator Safety Authorities. ... Mid Rise Elevators 1-6 / 500 FPM

7

US BANK MILWAUKEE

ELEVATORS 1-6

MAINTENANCE CORRECTIVE ITEMS

The following minimum items need corrective action taken. Documentation on completion

is required.

State ID 1- 14692 5 Yr. Test 1- 3-27-14 ANLT 1- 3-27-14 Due

2- 14693 2- 3-28-14 2- 3-28-14 Due

3- 14694 3- 4-15-14 3- 4-15-14 Due

4- 14695 4- 4-21-14 4- 4-21-14 Due

5- 14696 5- 4-23-14 5- 4-23-14 Due

6- 14697 6- 4-25-14 6- 4-25-14 Due

STARTS

DATE ELEV 1 ELEV 2 ELEV 3 ELEV 4 ELEV 5 ELEV 6

Est 1994 0 0 0 0 0 0 5-19-16 42,595 6,974,926 6,764,115 5,873,796 6,097,030 5,642,822

ELEVATOR ONE

1. Clean all hoist motor brush riggings.

Completion Date____________ Initial_____

2. Perform annual brake maintenance. This includes pulling the cores, cleaning and lubricating,

dropping the shoes and checking the lining for wear and lubing all the pins. Provide a picture

of core and shoes removed during teardown. Date, tag and complete documentation.

Completion Date____________ Initial_____

3. Perform the annual no load test as required by ASME 17.1. Properly tag and provide a copy

of the test for review.

Completion Date____________ Initial_____

4. Clean all deflector sheaves.

Completion Date____________ Initial_____

5. Provide governor cable installation tag.

Completion Date____________ Initial_____

6. Clean all entrance door tracks and door equipment.

Completion Date____________ Initial_____

Page 8: SUMMARY OF ELEVATORS - Elevator Consulting … · SUMMARY OF ELEVATORS ... NAESA is the National Association of Elevator Safety Authorities. ... Mid Rise Elevators 1-6 / 500 FPM

8

ELEVATOR TWO

7. Clean all hoist motor brush riggings.

Completion Date____________ Initial_____

8. Perform annual brake maintenance. This includes pulling the cores, cleaning and lubricating,

dropping the shoes and checking the lining for wear and lubing all the pins. Provide a picture

of core and shoes removed during teardown. Date, tag and complete documentation.

Completion Date____________ Initial_____

9. Provide hoist cable installation tag.

Completion Date____________ Initial_____

10. Perform the annual no load test as required by ASME 17.1. Properly tag and provide a copy

of the test for review.

Completion Date____________ Initial_____

11. Clean all entrance door tracks and door equipment.

Completion Date____________ Initial_____

ELEVATOR THREE

12. Clean all hoist motor brush riggings.

Completion Date____________ Initial_____

13. Perform annual brake maintenance. This includes pulling the cores, cleaning and lubricating,

dropping the shoes and checking the lining for wear and lubing all the pins. Provide a picture

of core and shoes removed during teardown. Date, tag and complete documentation.

Completion Date____________ Initial_____

14. Perform the annual no load test as required by ASME 17.1. Properly tag and provide a copy

of the test for review.

Completion Date____________ Initial_____

15. Clean all entrance door tracks and door equipment.

Completion Date____________ Initial_____

ELEVATOR FOUR

16. Remove orange stick holding the SMG relay up in the controller.

Completion Date____________ Initial_____

17. Clean all hoist motor brush riggings.

Completion Date____________ Initial_____

Page 9: SUMMARY OF ELEVATORS - Elevator Consulting … · SUMMARY OF ELEVATORS ... NAESA is the National Association of Elevator Safety Authorities. ... Mid Rise Elevators 1-6 / 500 FPM

9

18. Perform annual brake maintenance. This includes pulling the cores, cleaning and lubricating,

dropping the shoes and checking the lining for wear and lubing all the pins. Provide a picture

of core and shoes removed during teardown. Date, tag and complete documentation.

Completion Date____________ Initial_____

19. Clean all entrance door tracks and door equipment.

Completion Date____________ Initial_____

20. Perform the annual no load test as required by ASME 17.1. Properly tag and provide a copy

of the test for review.

Completion Date____________ Initial_____

ELEVATOR FIVE

21. Clean all hoist motor brush riggings.

Completion Date____________ Initial_____

22. Perform annual brake maintenance. This includes pulling the cores, cleaning and lubricating,

dropping the shoes and checking the lining for wear and lubing all the pins. Provide a picture

of core and shoes removed during teardown. Date, tag and complete documentation.

Completion Date____________ Initial_____

23. Perform the annual no load test as required by ASME 17.1. Properly tag and provide a copy

of the test for review.

Completion Date____________ Initial_____

24. Provide governor cable installation tag.

Completion Date____________ Initial_____

25. Clean all entrance door tracks and door equipment.

Completion Date____________ Initial_____

ELEVATOR SIX

26. Clean all hoist motor brush riggings.

Completion Date____________ Initial_____

27. Perform annual brake maintenance. This includes pulling the cores, cleaning and lubricating,

dropping the shoes and checking the lining for wear and lubing all the pins. Provide a picture

of core and shoes removed during teardown. Date, tag and complete documentation.

Completion Date____________ Initial_____

Page 10: SUMMARY OF ELEVATORS - Elevator Consulting … · SUMMARY OF ELEVATORS ... NAESA is the National Association of Elevator Safety Authorities. ... Mid Rise Elevators 1-6 / 500 FPM

10

28. Perform the annual no load test as required by ASME 17.1. Properly tag and provide a copy

of the test for review.

Completion Date____________ Initial_____

29. Provide governor cable installation tag.

Completion Date____________ Initial_____

30. Install car top railing.

Completion Date____________ Initial_____

31. Clean all entrance door tracks and door equipment.

Completion Date____________ Initial_____

Page 11: SUMMARY OF ELEVATORS - Elevator Consulting … · SUMMARY OF ELEVATORS ... NAESA is the National Association of Elevator Safety Authorities. ... Mid Rise Elevators 1-6 / 500 FPM

11

US BANK MILWAUKEE

ELEVATORS 7-12

MAINTENANCE CORRECTIVE ITEMS

The following minimum items need corrective action taken. Documentation on completion

is required.

State ID 7- 14676 5 Yr. Test 7- 5-9-14 ANLT 7- 11-2015

8- 14677 8- 5-13-14 8- 11-2015

9- 14678 9- 5-12-14 9- 11-2015

10- 14679 10- 2-4-10 10- 11-2015

11- 14680 11- 1-28-10 11- 11-2015

12- 14681 12- 1-22-10 12- 11-2015

STARTS

DATE ELEV 7 ELEV 8 ELEV 9 ELEV 10 ELEV 11 ELEV 12

Est 1994 0 0 0 0 0 0 5-18-2016 7,663,609 606,952 6,990,867 6,518,200 6,093,591 5,653,878

ELEVATOR SEVEN

32. Clean all hoist motor brush riggings.

Completion Date____________ Initial_____

33. Perform annual brake maintenance. This includes pulling the cores, cleaning and lubricating,

dropping the shoes and checking the lining for wear and lubing all the pins. Provide a picture

of core and shoes removed during teardown. Date, tag and complete documentation.

Completion Date____________ Initial_____

34. Clean all deflector sheaves.

Completion Date____________ Initial_____

35. Clean all entrance door tracks and hardware.

Completion Date____________ Initial_____

ELEVATOR EIGHT

36. Clean all hoist motor brush riggings.

Completion Date____________ Initial_____

Page 12: SUMMARY OF ELEVATORS - Elevator Consulting … · SUMMARY OF ELEVATORS ... NAESA is the National Association of Elevator Safety Authorities. ... Mid Rise Elevators 1-6 / 500 FPM

12

37. Perform annual brake maintenance. This includes pulling the cores, cleaning and lubricating,

dropping the shoes and checking the lining for wear and lubing all the pins. Provide a picture

of core and shoes removed during teardown. Date, tag and complete documentation.

Completion Date____________ Initial_____

38. Clean all deflector sheaves.

Completion Date____________ Initial_____

39. Clean all entrance door tracks and hardware.

Completion Date____________ Initial_____

ELEVATOR NINE

40. Clean all hoist motor brush riggings.

Completion Date____________ Initial_____

41. Perform annual brake maintenance. This includes pulling the cores, cleaning and lubricating,

dropping the shoes and checking the lining for wear and lubing all the pins. Provide a picture

of core and shoes removed during teardown. Date, tag and complete documentation.

Completion Date____________ Initial_____

42. Clean all deflector sheaves.

Completion Date____________ Initial_____

43. Clean all entrance door tracks and hardware.

Completion Date____________ Initial_____

ELEVATOR TEN

44. Clean all hoist motor brush riggings.

Completion Date____________ Initial_____

45. Perform annual brake maintenance. This includes pulling the cores, cleaning and lubricating,

dropping the shoes and checking the lining for wear and lubing all the pins. Provide a picture

of core and shoes removed during teardown. Date, tag and complete documentation.

Completion Date____________ Initial_____

46. Perform Category 5 test. Last date on the governor is 2010.

Completion Date____________ Initial_____

47. Clean all deflector sheaves.

Completion Date____________ Initial_____

Page 13: SUMMARY OF ELEVATORS - Elevator Consulting … · SUMMARY OF ELEVATORS ... NAESA is the National Association of Elevator Safety Authorities. ... Mid Rise Elevators 1-6 / 500 FPM

13

48. Clean all entrance door tracks and hardware.

Completion Date____________ Initial_____

49. Monitor high crown wear on hoist ropes.

Completion Date____________ Initial_____

50. Clean car top.

Completion Date____________ Initial_____

ELEVATOR ELEVEN

51. Clean all hoist motor brush riggings.

Completion Date____________ Initial_____

52. Perform annual brake maintenance. This includes pulling the cores, cleaning and lubricating,

dropping the shoes and checking the lining for wear and lubing all the pins. Provide a picture

of core and shoes removed during teardown. Date, tag and complete documentation.

Completion Date____________ Initial_____

53. Perform Category 5 test. Last date on the governor is 2010.

Completion Date____________ Initial_____

54. Clean all deflector sheaves.

Completion Date____________ Initial_____

55. Clean all entrance door tracks and hardware.

Completion Date____________ Initial_____

56. Replace hoist cables. Undersized cable.

Completion Date____________ Initial_____

ELEVATOR TWELVE

57. Clean all hoist motor brush riggings.

Completion Date____________ Initial_____

58. Perform annual brake maintenance. This includes pulling the cores, cleaning and lubricating,

dropping the shoes and checking the lining for wear and lubing all the pins. Provide a picture

of core and shoes removed during teardown. Date, tag and complete documentation.

Completion Date____________ Initial_____

59. Perform Category 5 test. Last date on the governor is 2010.

Completion Date____________ Initial_____

Page 14: SUMMARY OF ELEVATORS - Elevator Consulting … · SUMMARY OF ELEVATORS ... NAESA is the National Association of Elevator Safety Authorities. ... Mid Rise Elevators 1-6 / 500 FPM

14

60. Clean all deflector sheaves.

Completion Date____________ Initial_____

61. Clean all entrance door tracks and hardware.

Completion Date____________ Initial_____

62. Clean car top. May have been caused by water and water proofing material.

Completion Date____________ Initial_____

Page 15: SUMMARY OF ELEVATORS - Elevator Consulting … · SUMMARY OF ELEVATORS ... NAESA is the National Association of Elevator Safety Authorities. ... Mid Rise Elevators 1-6 / 500 FPM

15

US BANK MILWAUKEE

ELEVATORS 13-16

MAINTENANCE CORRECTIVE ITEMS

The following minimum items need corrective action taken. Documentation on completion

is required.

State ID 13- 14683 5 Yr. Test 13-1-14 ANLT 13- 1-14 Due

14- 14684 14-1-14 14- 1-14 Due

15- 14685 15-1-14 15- 1-14 Due

16- 14686 16-1-14 16- 5-16

STARTS

DATE ELEV 13 ELEV 14 ELEV 15 ELEV 16

Est 1994 0 0 0 0 5-19-2016 7,518,472 994,000 8,412,220 7,913,231

ELEVATOR 13

63. Bend down hoistway door gib tabs or provide a fire tab on floors W to 3.

Completion Date____________ Initial_____

64. Replace the top right (OLI) post roller on the counterweight RGA.

Completion Date____________ Initial_____

65. Perform the annual no load test per code. Document on site.

Completion Date____________ Initial_____

ELEVATOR 14

66. Replace the governor rope. All rusty. Blow out all rust filings out of the governor.

Completion Date____________ Initial_____

67. Perform the annual no load test per code. Document on site.

Completion Date____________ Initial_____

ELEVATOR 15

68. Perform the annual no load test per code. Document on site.

Completion Date____________ Initial_____

ELEVATOR 16

Page 16: SUMMARY OF ELEVATORS - Elevator Consulting … · SUMMARY OF ELEVATORS ... NAESA is the National Association of Elevator Safety Authorities. ... Mid Rise Elevators 1-6 / 500 FPM

16

US BANK MILWAUKEE

ELEVATORS 17-20

MAINTENANCE CORRECTIVE ITEMS

The following minimum items need corrective action taken. Documentation on completion

is required.

State ID 17- 14688 5 Yr. Test 17- 2-14 ANLT 17- 2-14 DUE

18- 14689 18- 2-14 18- 2-14 DUE

19- 14690 19- 2-14 19- 2-14 DUE

20- 14691 20- 2-14 20- 2-14 DUE

STARTS

DATE ELEV 17 ELEV 18 ELEV 19 ELEV 20

9-26-94 0 0 0 0 5-20-16 7,493,986 6,745,647 775,375 6,534,224

ELEVATOR 17

69. Perform the annual no load test per code. Document on site.

Completion Date____________ Initial_____

ELEVATOR 18

70. Perform the annual no load test per code. Document on site.

Completion Date____________ Initial_____

ELEVATOR 19

71. Perform the annual no load test per code. Document on site.

Completion Date____________ Initial_____

72. Replace the bell crank roller on 18th

floor. Chunk is missing.

Completion Date____________ Initial_____

73. Clean the sludge off the hoist cables so they can be sized. High crown wear. Replace as needed.

Completion Date____________ Initial_____

74. Com has strange burn marks. Move brushes a needed.

Page 17: SUMMARY OF ELEVATORS - Elevator Consulting … · SUMMARY OF ELEVATORS ... NAESA is the National Association of Elevator Safety Authorities. ... Mid Rise Elevators 1-6 / 500 FPM

17

Completion Date____________ Initial_____

75. Replace armature cooling fan. Has bad bearings.

Completion Date____________ Initial_____

ELEVATOR 20

76. Perform the annual no load test per code. Document on site.

Completion Date____________ Initial_____

Page 18: SUMMARY OF ELEVATORS - Elevator Consulting … · SUMMARY OF ELEVATORS ... NAESA is the National Association of Elevator Safety Authorities. ... Mid Rise Elevators 1-6 / 500 FPM

18

US BANK MILWAUKEE

LARGE FREIGHT ELEVATOR 21

MAINTENANCE CORRECTIVE ITEMS

The following minimum items need corrective action taken. Documentation on completion

is required.

State ID 21- 44682 5 Yr. Test 21- 3-13-14 ANLT 21- 12-24-15

STARTS

DATE ELEV 21

9/93 Installed 5/20/2016 1,008,905

77. Clean hoist machine brush rigging.

Completion Date____________ Initial_____

78. Perform annual brake maintenance. This includes pulling the cores, cleaning and lubricating,

dropping the shoes and checking the lining for wear and lubing all the pins. Provide a picture

of core and shoes removed during teardown. Date, tag and complete documentation.

Completion Date____________ Initial_____

79. Clean selector.

Completion Date____________ Initial_____

80. Provide governor cable installation tag.

Completion Date____________ Initial_____

81. Install car top light guard.

Completion Date____________ Initial_____

82. Replace bell crank rubbers on floors 21 and 40.

Completion Date____________ Initial_____

83. Replace missing entrance door gibs on floors 6, 10, 22, 27 and 38.

Completion Date____________ Initial_____

84. Repair *1 floor entrance door gib. Dragging on sill.

Completion Date____________ Initial_____

85. Replace broken site guards on 14th

and 41st floor.

Completion Date____________ Initial_____

Page 19: SUMMARY OF ELEVATORS - Elevator Consulting … · SUMMARY OF ELEVATORS ... NAESA is the National Association of Elevator Safety Authorities. ... Mid Rise Elevators 1-6 / 500 FPM

19

US BANK MILWAUKEE

SMALL FREIGHT ELEVATOR 22

MAINTENANCE CORRECTIVE ITEMS

The following minimum items need corrective action taken. Documentation on completion

is required.

State ID 22- 44691 5 Yr. Test 22- 5-28-15 ANLT 22- 5-28-15 DUE

STARTS

DATE ELEV 22

Est 1994 0 5/20/2016 592,650

86. Perform annual brake maintenance. This includes pulling the cores, cleaning and lubricating,

dropping the shoes and checking the lining for wear and lubing all the pins. Provide a picture

of core and shoes removed during teardown. Date, tag and complete documentation.

Completion Date____________ Initial_____

87. Clean selector unit.

Completion Date____________ Initial_____

88. Provide a governor cable installation tag.

Completion Date____________ Initial_____

89. Clean car top.

Completion Date____________ Initial_____

90. Replace bell crank rubber on floors M, 7 and 20 levels.

Completion Date____________ Initial_____

91. Replace or repair spirator on 9th floor to close the doors from any point of travel.

Completion Date____________ Initial_____

92. Replace sight guard on floor 7.

Completion Date____________ Initial_____

93. Clean all entrance door tracks and equipment.

Completion Date____________ Initial_____

94. Replace paper clips on bell crank at 7th floor.

Completion Date____________ Initial_____

Page 20: SUMMARY OF ELEVATORS - Elevator Consulting … · SUMMARY OF ELEVATORS ... NAESA is the National Association of Elevator Safety Authorities. ... Mid Rise Elevators 1-6 / 500 FPM

20

US BANK MILWAUKEE

ELEVATORS 23-25

MAINTENANCE CORRECTIVE ITEMS

The following minimum items need corrective action taken. Documentation on completion

is required.

State ID 23-14698 5 Yr. Test 23- 4-29-15 ANLT 23- 4-29-15 DUE

24-14699 24- 4-30-15 24- 4-30-15 DUE

25-14732 25- 4-29-15 25- 4-29-15 DUE

Starts

DATE ELEVATOR 23 ELEVATOR 24 ELEVATOR 25

04-23-15 367,825 710,322 7,672,690

07-09-15 441,826 780,695 7,748,238

Difference 74,001 in

10 weeks

Difference 70,373 in

10 weeks

Difference 75,548 in

10 weeks

05-20-16 769,965 1,055,411 8,006,503

GENERAL

95. Provide Phase I instructions near the Phase I key switch.

Completion Date____________ Initial_____

96. Provide Phase II instructions near the Phase II key switches in the car.

Completion Date____________ Initial_____

97. Galleria is *ed as the main egress, byt Michigan has the Phase I key switch, confirm the key

switch should not be changed.

Completion Date____________ Initial_____

ELEVATOR TWENTY THREE

98. Perform the annual no load test as required by ASME 17.1. Properly tag and provide a copy

of the test for review.

Completion Date____________ Initial_____

Page 21: SUMMARY OF ELEVATORS - Elevator Consulting … · SUMMARY OF ELEVATORS ... NAESA is the National Association of Elevator Safety Authorities. ... Mid Rise Elevators 1-6 / 500 FPM

21

ELEVATOR TWENTY FOUR

99. Perform the annual no load test as required by ASME 17.1. Properly tag and provide a copy

of the test for review.

Completion Date____________ Initial_____

ELEVATOR TWENTY FIVE

100. Perform the annual no load test as required by ASME 17.1. Properly tag and provide a

copy of the test for review.

Completion Date____________ Initial_____

101. Replace LHC contacts on the selector floor bars due to wear (lowest hall call reverse

contact.)

Completion Date____________ Initial_____

Page 22: SUMMARY OF ELEVATORS - Elevator Consulting … · SUMMARY OF ELEVATORS ... NAESA is the National Association of Elevator Safety Authorities. ... Mid Rise Elevators 1-6 / 500 FPM

22

US BANK MILWAUKEE

JUNEAU SQUARE

ELEVATORS 1-3

MAINTENANCE CORRECTIVE ITEMS

The following minimum items need corrective action taken. Documentation on completion

is required.

State ID 1-12525 5 Yr. Test 1- 4-29-15 ANLT 1- 5-20-16

2-12526 2- 4-30-15 2- 5-20-16

3- 12527 3- 4-29-15 3- 5-20-16

DATE ELEVATOR 1 ELEVATOR 2 ELEVATOR 3

Est 1994 0 0 0

5-19-16 486,270 511,980 619,923

ELEVATOR ONE

102. Blow out generator, regulator and exciter of all carbon build out.

Completion Date____________ Initial_____

103. Perform annual brake maintenance. This includes pulling the cores, cleaning and

lubricating, dropping the shoes and checking the lining for wear and lubing all the pins.

Clean off all filings from the core head. Provide a picture of core and shoes removed during

teardown. Date, tag and complete documentation.

Completion Date____________ Initial_____

104. Seal up machine. Put a bolt with a hole in it to vent the gear box or the OEM filter plug. Clean

up all oil on and around the machine.

Completion Date____________ Initial_____

105. Blow out motor of all carbon build up.

Completion Date____________ Initial_____

106. Replace C6 capacitor in the controller.

Completion Date____________ Initial_____

107. Clean the entrance door tracks of all fuzz and dirt.

Completion Date____________ Initial_____

108. Adjust the cab stabilizer. Too much lateral movement.

Completion Date____________ Initial_____

Page 23: SUMMARY OF ELEVATORS - Elevator Consulting … · SUMMARY OF ELEVATORS ... NAESA is the National Association of Elevator Safety Authorities. ... Mid Rise Elevators 1-6 / 500 FPM

23

ELEVATOR TWO

109. Blow out generator, regulator and exciter of all carbon build out.

Completion Date____________ Initial_____

110. Perform annual brake maintenance. This includes pulling the cores, cleaning and

lubricating, dropping the shoes and checking the lining for wear and lubing all the pins.

Clean off all filings from the core head. Provide a picture of core and shoes removed during

teardown. Date, tag and complete documentation.

Completion Date____________ Initial_____

111. Put a bolt with a hole or the Westinghouse filter plug in the open inspection cover plate to stop the

oil spray from entering the machine room.

Completion Date____________ Initial_____

112. Replace GR3 relay. Has broken mature spring.

Completion Date____________ Initial_____

113. Properly mounter timer/counter on back of controller.

Completion Date____________ Initial_____

114. Clean the entrance door tracks of all fuzz and dirt.

Completion Date____________ Initial_____

115. Replace the top left (OLI) post roller on the counterweight.

Completion Date____________ Initial_____

116. Clean and adjust 2nd

floor door lock. Lock assembly is hanging up. Replace leading washer on

pick up assembly.

Completion Date____________ Initial_____

ELEVATOR THREE

117. Blow out generator, regulator and exciter of all carbon build out.

Completion Date____________ Initial_____

118. Perform annual brake maintenance. This includes pulling the cores, cleaning and

lubricating, dropping the shoes and checking the lining for wear and lubing all the pins.

Clean off all filings from the core head. Provide a picture of core and shoes removed during

teardown. Date, tag and complete documentation.

Completion Date____________ Initial_____

Page 24: SUMMARY OF ELEVATORS - Elevator Consulting … · SUMMARY OF ELEVATORS ... NAESA is the National Association of Elevator Safety Authorities. ... Mid Rise Elevators 1-6 / 500 FPM

24

119. Replace the worm seal.

Completion Date____________ Initial_____

120. Mount the light fixture in the back of the controller or replace with a trouble cord assembly.

Completion Date____________ Initial_____

121. Replace C6 capacitor in the controller.

Completion Date____________ Initial_____

Page 25: SUMMARY OF ELEVATORS - Elevator Consulting … · SUMMARY OF ELEVATORS ... NAESA is the National Association of Elevator Safety Authorities. ... Mid Rise Elevators 1-6 / 500 FPM

25

US BANK MILWAUKEE

JUNEAU SQUARE

ELEVATORS 4 & 5

MAINTENANCE CORRECTIVE ITEMS

The following minimum items need corrective action taken. Documentation on completion

is required.

State ID 4-12242 5 Yr. Test 4- 10-13 ANLT 4- 5-20-16

5-12243 5- 10-13 5- 5-20-16

DATE ELEVATOR 4 ELEVATOR 5

Est 1994 0 0

5-19-2016 511,980

ELEVATOR 4

122. Secure the door gib on the 1st floor hoistway door. Gib is backing off.

Completion Date____________ Initial_____

123. Secure the door gib on the 4th

floor hoistway door. Gib is backing off.

Completion Date____________ Initial_____

124. Replace the bottom right post roller guide on the counterweight.

Completion Date____________ Initial_____

125. Clean all hoistway door track of all fuzz and dirt.

Completion Date____________ Initial_____

126. Make the cooling fan on top of the controller for the drive unit operational. Needs a switch,

properly wire it.

Completion Date____________ Initial_____

127. Pull the brake core. Lube, check the sleeve for wear. Replace sleeve as needed.

Completion Date____________ Initial_____

128. Straighten out bottom final limit bracket.

Completion Date____________ Initial_____

Page 26: SUMMARY OF ELEVATORS - Elevator Consulting … · SUMMARY OF ELEVATORS ... NAESA is the National Association of Elevator Safety Authorities. ... Mid Rise Elevators 1-6 / 500 FPM

26

129. Provide a controller data tag identifying the code in effect at the time of the installation.

Completion Date____________ Initial_____

130. Perform the annual no load test as required by ASME 17.212 Properly tag and provide a copy of

the test for review.

Completion Date____________ Initial_____

131. Provide and install fire tabs on each hoistway door.

Completion Date____________ Initial_____

ELEVATOR 5

132. Secure the door gib on the 2nd

floor hoistway door. Gib is backing off.

Completion Date____________ Initial_____

133. Pull the brake core. Lube, check the sleeve for wear. Replace sleeve as needed.

Completion Date____________ Initial_____

134. Replace the 3rd

floor button bezel. The number is crossed out by a Sharpie.

Completion Date____________ Initial_____

135. Provide a controller data tag identifying the code in effect at the time of the installation.

Completion Date____________ Initial_____

136. Secure the top facia, no anchors to the wall.

Completion Date____________ Initial_____

137. Provide and install fire tabs on each hoistway door.

Completion Date____________ Initial_____

Page 27: SUMMARY OF ELEVATORS - Elevator Consulting … · SUMMARY OF ELEVATORS ... NAESA is the National Association of Elevator Safety Authorities. ... Mid Rise Elevators 1-6 / 500 FPM

27

US BANK MILWAUKEE

WEST ALISS

ELEVATOR 1

MAINTENANCE CORRECTIVE ITEMS

The following minimum items need corrective action taken. Documentation on completion

is required.

State ID 1- 20947 ANLT 1- 6/8/2015

138. Provide MSDS sheets of the hydraulic oil in the machine room. Provide a plastic insert

on the tank unit or controller cover and place the sheets in it.

Completion Date____________ Initial_____

139. Provide light bulb and light guards on pit light.

Completion Date____________ Initial_____

Page 28: SUMMARY OF ELEVATORS - Elevator Consulting … · SUMMARY OF ELEVATORS ... NAESA is the National Association of Elevator Safety Authorities. ... Mid Rise Elevators 1-6 / 500 FPM

28

US BANK MILWAUKEE

ESCALATORS

MAINTENANCE CORRECTIVE ITEMS

The following minimum items need corrective action taken. Documentation on completion

is required.

ESCALATOR 1/ UP

City Number 1 – 432 Category 1 Testing: 1 – 2-23-15 DUE

140. Vacuum out the handrail tracks. Monitor right side. A lot of minor tears on the inside throat.

(Not pinch points).

Completion Date____________ Initial_____

141. Creaking noises are constant. Check the bottom carriage, free up. (Sounds like steps are

twisting.)

Completion Date____________ Initial_____

142. Perform category 1 testing.

Completion Date____________ Initial_____

143. Provide and post a code data tag on the controller identifying the installation code.

Completion Date____________ Initial_____

ESCALATOR 2/ DN

City Number 2 – 433 Category 1 Testing: 2 – 2-23-15 DUE

144. Vacuum out the handrail tracks in the incline. High Cleaning, high rouge. Check for internal

core damage.

Completion Date____________ Initial_____

145. Creaking noises are constant. Check the bottom carriage, free up. (Sounds like steps are

twisting.)

Completion Date____________ Initial_____

146. Perform category 1 testing.

Completion Date____________ Initial_____

147. Provide and post a code data tag on the controller identifying the installation code.

Completion Date____________ Initial_____

Page 29: SUMMARY OF ELEVATORS - Elevator Consulting … · SUMMARY OF ELEVATORS ... NAESA is the National Association of Elevator Safety Authorities. ... Mid Rise Elevators 1-6 / 500 FPM

29

ESCALATOR 3/ UP

City Number 3 – 434 Category 1 Testing: 3 – 2-16-15 DUE

148. Provide and post a code data tag on the controller identifying the installation code.

Completion Date____________ Initial_____

149. Perform category 1 testing.

Completion Date____________ Initial_____

150. Adjust handrail tension. Right handrail is a lot faster than left side. Heavy Cleaning.

Completion Date____________ Initial_____

ESCALATOR 4/ DN

City Number 4 – 435 Category 1 Testing: 4– 2-16-15 DUE

151. Provide and post a code data tag on the controller identifying the installation code.

Completion Date____________ Initial_____

152. Perform category 1 testing.

Completion Date____________ Initial_____

153. Adjust handrail tension. Right handrail is a lot faster than left side. Heavy Cleaning.

Completion Date____________ Initial_____

154. Right handrail very jerky. Adjust or replace handrail drive chains. Replace handrail as needed.

Completion Date____________ Initial_____

155. Handrail squealing. Adjust handrail inlet as needed to eliminate the squeals.

Completion Date____________ Initial_____

ESCALATOR 5/UP

City Number 5 – 436 Category 1 Testing: 5 – 2-23-15 DUE

156. Provide and post a code data tag on the controller identifying the installation code.

Completion Date____________ Initial_____

157. There is a minor leak at the inspector’s plate of the gear box. Clean up the oil and seal up

machine.

Completion Date____________ Initial_____

158. Perform category 1 testing and document the test with the tag.

Completion Date____________ Initial_____

159. Provide and post a code data tag on the controller identifying the installation code.

Completion Date____________ Initial_____

Page 30: SUMMARY OF ELEVATORS - Elevator Consulting … · SUMMARY OF ELEVATORS ... NAESA is the National Association of Elevator Safety Authorities. ... Mid Rise Elevators 1-6 / 500 FPM

30

ESCALATOR 6/DN

City Number 6 – 437 Category 1 Testing: 6 – 2-23-15 DUE

160. Provide and post a code data tag on the controller identifying the installation code.

Completion Date____________ Initial_____

161. Perform category 1 testing and document the test with the tag.

Completion Date____________ Initial_____

162. The right handrail has a shimy or stutter. Adjust or replace drive chain.

Completion Date____________ Initial_____

163. Provide and post a code data tag on the controller identifying the installation code.

Completion Date____________ Initial_____

ESCALATOR 7/UP Clybourn to Michigan

City Number 7 – 438 Category 1 Testing: 7 – 2-24-15 DUE

164. Provide and post a code data tag on the controller identifying the installation code.

Completion Date____________ Initial_____

165. Left handrail is slower than right side. Adjust tension as needed.

Completion Date____________ Initial_____

166. Replace the left handrail. Internal damage to steel belt.

Completion Date____________ Initial_____

167. Perform category 1 testing.

Completion Date____________ Initial_____

168. The balustrade trip piece at the bottom left curve is protruding out and is a catch hazard. Redo the

trim to eliminate catch point.

Completion Date____________ Initial_____

ESCALATOR 8/DN Michigan to Clybourn

City Number 8 – 439 Category 1 Testing: 8 – 3-17-15 DUE

169. Provide and post a code data tag on the controller identifying the installation code.

Completion Date____________ Initial_____

170. Replace left handrail. Split coming up outside throat that is a pinch point.

Completion Date____________ Initial_____

171. Perform category 1 testing.

Completion Date____________ Initial_____

Page 31: SUMMARY OF ELEVATORS - Elevator Consulting … · SUMMARY OF ELEVATORS ... NAESA is the National Association of Elevator Safety Authorities. ... Mid Rise Elevators 1-6 / 500 FPM

31

172. Repair top demarcation lighting to proper working order.

Completion Date____________ Initial_____

173. Repair bottom demarcation lighting to proper working order.

Completion Date____________ Initial_____

174. The middle handrail tension roller on the right side is ticking. Clean or replace the roller to get

rid of the noise.

Completion Date____________ Initial_____