Maximising return on investmentThree Big Questions & Three Big Answers
Pre-Conference Workshop at ME-TECH 2015, DubaiMonday, 16 February 2015, 12.30pm – 6.00pm
Steve Beeston: Vice President, Technology,Amec Foster Wheeler
Successful Start-Up of Delayed Coking UnitPetron RMP-2 Project
Effective Project DeliveryThe 4 Rights
2
Petron Corporation► Petron is a private Philippine refiner and retail
station operator► Largest refiner and marketer in the Philippines
► Supplies over one third of the country’s oil requirements
► Owned by San Miguel since Dec 2008► Operates a 180,000 BPSD refinery in Limay,
Bataan► Originally an Exxon refinery► Refinery built by Foster Wheeler over 50 years ago
3 © Amec Foster Wheeler 2015. All rights reserved.
Petron’s Bataan Refinery
Petron RMP-2 Project: The Right Project► Project vision
► Make the Bataan Refinery one of the most modern integrated oil refining and petrochemical complexes in Asia
► Help Filipino nation-building► Existing refinery constraints
► Throughput constrained by fuel oil production► Limited petrochemicals production
► Project objectives► Install residue conversion to increase white oils
production► Increase petrochemicals production► Increase the refinery’s competitiveness in S.E. Asia
4 © Amec Foster Wheeler 2015. All rights reserved.
Petron’s Bataan Refinery
Petron Approach: The Right Execution► Aim
► Utilize best technology► Fast track project implementation► Meet aggressive budget
5 © Amec Foster Wheeler 2015. All rights reserved.
Petron Execution Approach► Technology Selection
► Review of technology market► Focused ITB► Rapid evaluation of licensor proposals
6 © Amec Foster Wheeler 2015. All rights reserved.
Petron RMP-2 Project Licensor signing ceremony
RMP-2 Major Units: The Right Technology
7 © Amec Foster Wheeler 2015. All rights reserved.
Sources: Licensor press releases
8
Why Refiners Select Amec Foster Wheeler for Delayed CokingExperience
► Most installed units (> 60%)► Wide range of feedstocks► Extensive heavy crude experience► All coke types► Full range of unit sizes► Multiple repeat clients
Technical Resources► In-house experience & expertise► Vendor and 3rd party support► Operations support
High on stream factors and reliability► Safe operation► Long run lengths► Over 5 years between turnarounds► Minimal environmental impact
Innovative design► Proprietary double fired heater► Forged ring coke drum design► Total automation concept► Modular construction► Process integration
© Amec Foster Wheeler 2015. All rights reserved.
9
Amec Foster Wheeler DCU Experience2005 - 2014
Number of units awarded Capacity (BPSD)
© Amec Foster Wheeler 2015. All rights reserved.
10
Amec Foster Wheeler DCU Experience2005 - 2014
© Amec Foster Wheeler 2015. All rights reserved.
11
Recent DCU AwardsClient Location Capacity
(BPSD)Award Date
Petrourica Venezuela 109,415 2014
Bashneft Russia 36,300 2014
Petrobicentenario Venezuela 172,464 2014
DRPIC Oman 52,000 2014
Omsk Russia 34,500 2013
Axion Argentina 35,000 2012
Petromiranda Venezuela 103,700 2012
Confidential Europe 50,000 2012
Client Location Capacity (BPSD)
Award Date
Takreer Abu Dhabi 29,500 2011
PDVSA Venezuela 50,000 2011
Petrochina (2) China 52,500 2011
Petrobras (3) Brazil 65,000 2010
Antipinsky Russia 24,000 2010
RDP Ecuador 93,000 2010
Petron Philippines 45,000 2010
STRAS Turkey 40,000 2010
© Amec Foster Wheeler 2015. All rights reserved.
PetrocedeñoUpgraderDelayed Coker
12
Foster Wheeler SYDECSM Process► Leading Delayed Coking technology► Proprietary Terrace WallTM double-fired
furnace► Maximum liquid product yields
► Low pressure► Ultra low recycle
► Designed in safety and reliability► Large coke drums► Unique fractionator design► Environmentally friendly► Total automation capability► Operations support
Innovative
design leads to
superior technology
and operations
© Amec Foster Wheeler 2015. All rights reserved.
13
Terrace-Wall Double Fired HeaterFeatures► High average heat flux► Reduced coil volume► High in-tube velocities► Independent pass control► Sloped wall design for even flux► On-line spalling & piggingBenefits► Process difficult feeds► Provides feedstock flexibility► Longer run lengths► More profitable operations
The Terrace-Wall heater provides true management of the heat flux for optimal performance
© Amec Foster Wheeler 2015. All rights reserved.
Terrace-Wall Heater
14 © Amec Foster Wheeler 2015. All rights reserved.
Terrace-Wall Heater
15 © Amec Foster Wheeler 2015. All rights reserved.
Coke Drum Design► Single thickness wall► Skirt-shell connection
► Hot box► Weld build up / Forged ring
► 1¼ Chrome steel with cladding ► Proprietary FW plate chemistry,
welding and finishing specifications ► Long life (>8,000 cycles) with
forged ring design
16
Better design for longer life
© Amec Foster Wheeler 2015. All rights reserved.
Large Coke Drums► Amec Foster Wheeler pioneered large coke drum designs► First to commercialize 9.8 m diameter drums► Ability to optimize unit costs
17 © Amec Foster Wheeler 2015. All rights reserved.
Amec Foster Wheeler Coke Drum Life Monitoring Program
18 © Amec Foster Wheeler 2015. All rights reserved.
Petron Delayed Coking Unit
► Install additional thermocouples on drum
► Monitor temperature gradients► Optimize quench and heat up
rates► Coke drum life estimation► Proactive maintenance
prevents costly shutdowns
Amec Foster Wheeler DCU Training ServicesProtecting the investment► Conventional classroom training► KnowledgeWeb and KnowledgeWeb+
► Web based training can be combined with simulator
► 24/7 real time access anywhere, anytime with the internet and a browser
► Customized: unit / site specific► Helps to maximize yields by applying the
knowledge of the unit designers► Helps to improve reliability by incorporating the
knowledge and maintenance procedures of the different process equipment.
19
Petron DCU Overview► 45,000 BPSD Arab Medium VR► 4 drums
► 7.4 m diameter, 30.1 m F-F
► 2 x 3 pass Terrace-Wall heaters► Low pressure► Ultra low recycle► Max liquid yields
20 © Amec Foster Wheeler 2015. All rights reserved.
Petron Delayed Coking Unit
Petron Project Execution► The DCU contains very specialized equipment
► Amec Foster Wheeler proprietary heaters► Coke drums► Unheading devices► Coke cutting system
► Petron preselected key equipment items
21 © Amec Foster Wheeler 2015. All rights reserved.
Coke Drums► Sumitomo
22
Petron Delayed Coking UnitSumitomo’s Saijo fabrication facilities
Unheading Devices► Zimmerman & Jansen
23
Petron was the first to buy an electric actuated BUD
© Amec Foster Wheeler 2015. All rights reserved.
Petron Delayed Coking Unit TUD
Motiva Port Arthur Delayed Coking Unit BUD
Remote & Automated Coke Cutting► Flowserve
24
Safety First: Coke cutting from remote shelter, off the structure
© Amec Foster Wheeler 2015. All rights reserved.
Petron Delayed Coking Unit
RMP-2 Major Units
25 © Amec Foster Wheeler 2015. All rights reserved.
Sources: Licensor press releases
RMP-2 Project IntegrationPetron engaged Axens Performance Programs (P2) to:
26
► Optimize and integrate the units► Determine offsite and utilities
requirements► Provide a basis for basic
engineering► Enable fast track execution
© Amec Foster Wheeler 2015. All rights reserved.
View of RMP-2 Project
RMP-2 Project Timeline
27
“Projects of similar magnitude usually take about 60 months to complete but Petron was able to complete the project in just 44 months, from inception to completion. The construction phase was completed in just 21 months” Lubin Nepomuceno, President Petron (Petron Media Release)
Fast track project
© Amec Foster Wheeler 2015. All rights reserved.
Petron Project Execution► EPC
► Project management by Petron► Utilized known contractor for EPC – Daelim
► Reimbursable conversion to lump sum
► Foster Wheeler awarded lump sum EPs (detailed engineering & procurement services) scope for the DCU► Experienced in detail design of Delayed Coking Units► Schedule advantage► Ensure operable and maintainable unit
28 © Amec Foster Wheeler 2015. All rights reserved.
Why EPs by Amec Foster Wheeler?► Recent start-ups of Foster Wheeler DCUs, where Foster Wheeler
was not the EPC contractor, have shown significant issues relating to:► Safety► Operability► Ergonomics► Maintainability
29 © Amec Foster Wheeler 2015. All rights reserved.
Design / Construction Issues Seen► Coke drums
► Coke chute size: 1m x 1m► 3 sided coke chutes► No allowance for drum expansion
► Coker structure► Insufficient egress in an emergency► Vibration
► Coke fines filters undersized► Minimum distances not followed► And many more………
30
Why EPs by Amec Foster Wheeler?► Recent start-ups of Amec Foster Wheeler DCUs, where Amec Foster Wheeler
was not the EPC contractor, have shown significant issues relating to:► Safety► Operability► Ergonomics► Maintainability
► Amec Foster Wheeler’s Solution:► Offer EPs to ensure a correctly designed DCU (Coker Island & Gas Plant)
31 © Amec Foster Wheeler 2015. All rights reserved.
32
DCU Detailed Design Issues► The DCU is a highly complex unit; more
so than the average refinery unit due to:► Vertical design► High loads► Hot systems► Cyclic operations► Density of steel and piping
► As a result, estimating hours based on standard equipment count metrics do not apply to the complex DCU
► Metrics show that the DCU requires approximately 30% more effort than the average refinery unit.
© Amec Foster Wheeler 2015. All rights reserved.
BP Whiting Delayed Coking Unit: 3D model
33
Why Amec Foster Wheeler EPs?► Experience and track record
► FW has performed EPC scope services for over 50% of it’s licensed Cokers since 1995, more than any other EPC
► Close relationships with key equipment suppliers
► Templated designs resulting in significant cost savings and schedule improvement
© Amec Foster Wheeler 2015. All rights reserved.
Amec Foster Wheeler switch deck layout
EPs Scope► Detailed engineering and procurement services for Coker
Island and Gas Plant► Deliverables:
► Detailed design► Technical procurement activities including technical bid
tabulation preparation (vendor selection and actual procurement by EPC)
► Amec Foster Wheeler scope stops at IFC documentation
► Foster Wheeler and Daelim produced a comprehensive DOR to ensure project integrity and smooth execution
► Foster Wheeler also provided construction support
34 © Amec Foster Wheeler 2015. All rights reserved.
Petron Delayed Coking Unit
EPs Execution► Optimal use of Amec Foster Wheeler’s
High Value Engineering Center in India► Coker Island – Houston (with India
support)► Gas Plant – India (with Houston
supervision) to control costs and ensure execution efficiency
► Houston DCU design experts design the key elements of the DCU
35 © Amec Foster Wheeler 2015. All rights reserved.
Petron Delayed Coking Unit; fired heaters
Amec Foster Wheeler EPs for Cokers► Amec Foster Wheeler’s EPs
approach provides clients with a show case, state of the art DCU incorporating:► Safe and ergonomic layouts► Enhanced operability and
maintainability► Amec Foster Wheeler experience
and lessons learned
► Petron DCU recently started-up
36 © Amec Foster Wheeler 2015. All rights reserved.
Petron Delayed Coking Unit
Petcoke Disposal Options► Coke sales
► Coke sells for about $80 / MT
► Are there other options?
37
Generate powerProduce hydrogenProduce Synthetic Natural Gas (SNG)Produce chemicals
© Amec Foster Wheeler 2015. All rights reserved.
Local Power GenerationAnother option for coke
► For new refineries and complexes consider burning coke for on-site power generation
► Saves purchasing power and generation is local► Attractive for remote locations► Attractive for areas with unreliable electric power
► Excess power can be exported to the grid► Attractive for developing areas
► Additional revenue source for the refiner
38
The solution is PetroPowerSM
© Amec Foster Wheeler 2015. All rights reserved.
PetroPowerSM
39
An integrated solution to generate liquid fuels and power from residue feedstocks
© Amec Foster Wheeler 2015. All rights reserved.
ENAP Refinery, Chile
PetroPower
40
► Proven integration of a DCU with power generation
► Utilizes a Circulating Fluid Bed Boiler (CFB) for HP steam production
► Potential for complete petcoke disposal► PetroPower can be a third party operation
© Amec Foster Wheeler 2015. All rights reserved.
ENAP Refinery, Chile
CFB Advantages► Widest fuel flexibility
► Flameless low temperature burning technology► Wide variety of fuels
► Very clean burning► Sulfur captured in furnace using limestone► Dry process: no water► High combustion efficiency► Low burning temperature reduces NOx
► Low maintenance► No ash slagging► Minimal corrosion and fouling
► Highly reliable
41 © Amec Foster Wheeler 2015. All rights reserved.
PetroPower – ENAP, Chile► Integrated DCU/CFB/Power production
► 12,000 BPSD Coker► 700 MTD coke production► 59 MW net power production
► Started-up in 1998► Original ownership
► 85% Foster Wheeler► 7.5% ENAP► 7.5% Petrox
► Still operating today
42 © Amec Foster Wheeler 2015. All rights reserved.
ENAP Refinery, Chile
PetroPower - Petron► Petron has previously installed 4 Foster Wheeler CFBs to produce
power from coal and petcoke► Each CFB can produce 35 MW of power
43
CFBs
© Amec Foster Wheeler 2015. All rights reserved.
Petron power plant Petron: view from DCU cutting deck
The PetroPower Advantage
44
Exploits the cost advantage of solid fuels
© Amec Foster Wheeler 2015. All rights reserved.
45
PetroPower Case Study Basis► Middle East location► 100,000 BPSD DCU► 5,750 MTD coke production► 7.4 wt% sulfur in petcoke
► Sulfur stack emissions 200 mg/Nm3
► Supercritical CFB► 2 x 50% steam turbines► No steam export
► Petcoke value $60/t► Limestone $40/t► Lime $75/t
© Amec Foster Wheeler 2015. All rights reserved.
This information is from an internal Amec Foster Wheeler study
46
PetroPower Economics► Power block TIC $1.6 bn
► Power output 890 MW
► Cost of electricity $80 / MWh
© Amec Foster Wheeler 2015. All rights reserved.
This information is from an internal Amec Foster Wheeler study
47
Cost Of Electric Power Production
PetroPower produces electricity from petcoke at less than half the cost of a
HFO boiler
HFO valued at $80/bblPetcoke valued at $60/tonne
© Amec Foster Wheeler 2015. All rights reserved.
This information is from an internal Amec Foster Wheeler study
PetroHyPowerSM
Generate both power and hydrogen from petcoke
48
Can balance power / hydrogen
requirements
© Amec Foster Wheeler 2015. All rights reserved.
PetroHyPower Case Study► Refinery
► Location: Middle East► Configuration: 100,000 BPSD DCU ► 5,750MTD petcoke
► Power production options► HFO (base case)► PetroPower► IGCC► IGCC with Hydrogen production► PetroHyPower
► Pricing basis► HFO $80/bbl► Petcoke $60/tonne► Hydrogen $2,000/tonne
49 © Amec Foster Wheeler 2015. All rights reserved.
This information is from an internal Amec Foster Wheeler study
Heavy Fuel Oil Savings Through PetcokeUtilization
50 © Amec Foster Wheeler 2015. All rights reserved.
This information is from an internal Amec Foster Wheeler study
Economic Comparison
51
Significant incentive to utilize PetroXXXPower
© Amec Foster Wheeler 2015. All rights reserved.
This information is from an internal Amec Foster Wheeler study
PetroSNGTM
► Production of Synthetic Natural Gas from petroleum coke► SNG production attractive where no cheap gas is readily available (e.g. China)► PetroSNG has been developed in conjunction with Clariant utilizing the new
Vesta Process► PetroSNGPower is an option
52
DelayedCoker Gasification
Vesta Process
Acid Gas Removal
SNG
© Amec Foster Wheeler 2015. All rights reserved.
Coke Utilization Options
53 © Amec Foster Wheeler 2015. All rights reserved.
Petron RMP-2 Project Highlights: The Right Result► 44 months from inception to completion► Over 75,000,000 man-hours without a lost
time incident► 17,000 skilled workers at peak► Enables gasoline production to double to
36,000 BPSD► 47,000 BPSD of negative margin fuel oil
converted to valuable products► The Foster Wheeler DCU is a key component
of the Bataan Refinery Modernization Project
54 © Amec Foster Wheeler 2015. All rights reserved.
Source: Petron media release
Summary► Delayed Coking remains the residue upgrading technology of choice► Amec Foster Wheeler is the leading supplier of Delayed Coking technology► Amec Foster Wheeler has leading DCU detailed design capability
► Enhanced safety, operability and maintainability► Schedule improvement through experience and templated designs
► Amec Foster Wheeler has PetroPower options to enhance margins► Power and steam generation► Hydrogen production► SNG and chemicals
► Petron’s RMP-2 project demonstrates the features and benefits of AmecFoster Wheeler’s DCU and PetroPower technologies and execution services
55 © Amec Foster Wheeler 2015. All rights reserved.
Effective Project Delivery
56
Amec Foster Wheelercan help you
deliver
The 4 Rights
connected excellence in all we do