PETITION FOR ANNUAL REVENUE REQUIREMENT

And

TARIFF PROPOSAL FOR THE FINANCIAL YEAR 2006-2007

Submission of Text and Affidavit

To

Assam Electricity Regulatory Commission

By

Upper Assam Electricity Distribution Company Limited Bijulee Bhawan, Paltanbazar

Guwahati-781 001

BEFORE THE ASSAM STATE ELECTRICITY REGULATORY

COMMISSION, GUWAHATI.

Petition No. – Case No.

(to be filed by the Office) IN THE MATTER OF Filing of Annual Revenue Requirement Proposal for the year 2006-2007

AND Petition for Determination of Tariff For the year 2006-2007

AND IN THE MATTER OF Upper Assam Electricity Distribution Company Limited Bijulee Bhawan, Paltanbazar, Guwahati-781 001. Petitioner I, _________________________________________ son of Shri _________________________ aged _______ years residing at _________________________ do solemnly affirm and say as follows: I am the ___________________________ of Upper Assam Electricity Distribution Company Limited, the petitioner in the above matter and am duly authorized by the said Petitioner to make this affidavit for and on behalf of Upper Assam Electricity Distribution Company Limited. The Statement made in the Petition based on information received from official records and I believe them to reflect truly and nothing materials has been concealed from the statements so made or documents or supporting data etc. attached. Solemnly affirm at Guwahati on ___________th day of __________ 2005 that the contents of this affidavit are true to may knowledge, no part of it is false or nothing material has been concealed therefore and misleading material included therein. Place: Guwahati Date _________

Deponent

By order of the Commission

Secretary of the Commission

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 3 of 95

TABLE OF CONTENTS

T1: Legal and Regulatory Framework..................................................................................................11

T2: Annual Revenue Requirement for FY 2006-07..............................................................................11

SALES FORECAST FY 2006-07.............................................................................................................11

Distribution Loss Levels .....................................................................................................................14

Collection Efficiency...........................................................................................................................14

Aggregate Technical & Commercial (AT&C) Losses ........................................................................14

BASIS FOR PROJECTION OF THE ANNUAL REVENUE REQUIREMENT FOR FY 2006-07........................15

Power Purchase Cost .........................................................................................................................16

Employee Expenses.............................................................................................................................16

Repair and Maintenance Expenses.....................................................................................................18

Administrative and General Expenses................................................................................................19

Depreciation .......................................................................................................................................20

Interest & Financing Charges ............................................................................................................21

TERM LOANS AND INTEREST ON TERM LOANS ...................................................................................21

Provision for Bad and Doubtful Debts ...............................................................................................22

Return on Equity .................................................................................................................................22

Other Income ......................................................................................................................................23

T3: Investment Plan for FY 2006-07 ....................................................................................................24

Accelerated Power Development and Reform Program (APDRP) ....................................................24

Non Lapsable Central Pool of Resources (NLCPR)...........................................................................25

Rural Electrification ...........................................................................................................................26

Rural Electrification (Minimum Needs Program) ..............................................................................26

Prime Minister Gramudyog Yojana (PMGY) .....................................................................................26

Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) ....................................................................26

Tribal Sub Plan (TSP) ........................................................................................................................27

Scheduled Caste Component Plan (SCCP) ........................................................................................27

ADB Financed Schemes......................................................................................................................27

Counter Part Fund for ADB Funded Schemes ...................................................................................27

STATE PLAN FUND...............................................................................................................................27

Distribution Line and Sub Station Augmentation ...............................................................................27

Disaster Management.........................................................................................................................27

T4: EFFICIENCY IMPROVEMENT INITIATIVES .......................................................................................28

Energy accounting –Installation of electronic meters at 11kV feeders ..............................................28

Efforts for controlling 11 kV Interruption ..........................................................................................28

Loss Management ...............................................................................................................................28

Customer Care Processes...................................................................................................................35

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 4 of 95

Performance Incentive Scheme...........................................................................................................35

T5: Revenue from Charges and Proposal for Tariff Revision ..............................................................37

Revenue from Existing Charges .........................................................................................................37

Tariff Revision Proposal.....................................................................................................................38

Revenue from existing tariff insufficient to cover costs ......................................................................38

Facilitating New Investments .............................................................................................................38

Tariff Philosophy ................................................................................................................................38

EXPECTED REVENUE FROM PROPOSED CHARGES ...............................................................................39

T6: Proposed Tariff...............................................................................................................................40

PROPOSED REVISION IN TARIFFS .........................................................................................................40

PROPOSAL FOR REVISED TARIFFS .......................................................................................................40

LT Category-I: Domestic A (including Jeevan Dhara - to be merged with LT Domestic A) .............40

LT Category-II: LT Domestic B..........................................................................................................41

LT Category-III: LT Commercial .......................................................................................................41

LT Category-IV: LT General Purpose Supply....................................................................................41

LT Category-V: LT Public Lighting ...................................................................................................41

LT Category-VI: LT Agriculture.........................................................................................................42

LT Category-VII: LT Small Industries................................................................................................42

LT Category-VIII: Temporary Supplies.............................................................................................42

HT Category-I: HT Domestic ............................................................................................................42

HT Category-II: HT Commercial ......................................................................................................43

HT Category-III: HT Public Water Works ........................................................................................43

HT Category-IV: HT Bulk Supply......................................................................................................43

HT Category-V (A): HT Small Industries ..........................................................................................43

HT Category-V (B): HT-I Industries .................................................................................................44

HT Category –V(C): HT-II Industries ...............................................................................................44

HT Category-VI: Tea, Coffee and Rubber.........................................................................................45

HT Category-VII: Oil and Coal..........................................................................................................45

HT Category-VIII: HT Agriculture....................................................................................................46

Fuel Adjustment Surcharge (FAS) ..............................................................................................................46

Import Adjustment Surcharge (IAS) ...........................................................................................................47

Delayed Payment Surcharge (DPS) ............................................................................................................49

Power Factor Rebate or Penalty ..................................................................................................................49

Statutory levies ............................................................................................................................................49

T7: Progress on Commission’s Previous Directives.............................................................................49

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 5 of 95

LIST OF ANNEXURES

Annexure I: Employee Cost – Additional Information ...............................................................................56

Annexure II: Gross Fixed Assets.................................................................................................................57

Annexure III: Depreciation .........................................................................................................................58

Annexure IV: Net Fixed Assets...................................................................................................................59

Annexure V: Revenue from Sale of Power .................................................................................................60

Annexure VI: Category wise Revenue from Sale of Power........................................................................61

Annexure VII: Existing and Proposed Tariff ..............................................................................................64

Annexure VIII: Proposed Schedule of Tariff ..............................................................................................68

Annexure IX: Government of Assam::Notification ....................................................................................83

Annexure X: Profit and Loss Account ........................................................................................................93

Annexure XI: Other Debits .........................................................................................................................94

Annexure XII: Status of Hon’ble Commission’s format.............................................................................95

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 6 of 95

LIST OF TABLES

Table 1: Growth rates in sales for major categories of consumers............................................................................. 13

Table 2: UAEDCL’s Sales Projection (MU) for the Ensuing Year 2006-07 .............................................................. 13

Table 3: Projected Annual Revenue Requirement for FY 2006-07 ............................................................................ 15

Table 4: Power Purchase Cost.................................................................................................................................... 16

Table 5: Employee Expenses ...................................................................................................................................... 18

Table 6: Repair and Maintenance Expenses................................................................................................................ 19

Table 7: A & G Expenses ........................................................................................................................................... 19

Table 8: Fixed Asset Details ....................................................................................................................................... 20

Table 9: Break-up of Depreciation.............................................................................................................................. 21

Table 10: Interest and Finance Charges for FY 2006-07 ............................................................................................ 22

Table 11: Other Income .............................................................................................................................................. 23

Table 12: Proposed Plan Outlay for UAEDCL under APDRP for FY 2006-07 ......................................................... 25

Table 13: Key NLCPR Schemes................................................................................................................................. 25

Table 14: RE (MNP) Scheme ..................................................................................................................................... 26

Table 15: PMGY Schemes.......................................................................................................................................... 26

Table 16: Electrification under RGGVY Scheme....................................................................................................... 27

Table 17: Feeder Metering Status ............................................................................................................................... 28

Table 18: Category-wise Revenue based on Existing Tariff...................................................................................... 37

Table 19: Category-wise revenue based on proposed tariff ....................................................................................... 39

Table 20: Percentage Contribution of major categories to Total Sales and Revenue................................................. 40

Table 21: Replies to AERC Directives ....................................................................................................................... 50

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 7 of 95

Glossary Acronym Full form A&G Administrative and General ABC Aerial Bunched Conductors ABT Availability Based Tariff ADB Asian Development Bank AEGCL Assam Electricity Generating Corporation Limited AERC Assam Electricity Regulatory Commission AMR Automated Meter Reading APDRP Accelerated Power Development and Reforms Program APERC Andhra Pradesh Electricity Regulatory Commission APGCL Assam Power Grid Corporation Limited APTRANSCO Andhra Pradesh Transmission Company ARR Annual Revenue Requirement ASEB Assam State Electricity Board AT&C Aggregate Technical and Commercial BST Bulk Supply Tariff CAEDCL Central Assam Electricity Distribution Company Limited CAGR Compounded Annual Growth Rate CEO Chief Executive Officer CMRI Common Meter Reading Instrument CT/PT Current Transformer/Potential Transformer DPS Delayed Payment Surcharge DTRs Distribution Transformers EE Executive Engineer FAS Fuel Adjustment Surcharge FY Financial Year GEC Guwahati Electrical Circle GoA Government of Assam GoI Government of India GPRS General Packet Radio Service GSM Global System for Mobile Communication HHM Hand Held Machines HT High Tension HVDS High Voltage Distribution System IAS Import Adjustment Surcharge IRCA Industrial Revenue Collection Area KV Kilo Volt KVA Kilo Volt Ampere KW Kilo Watt KWH Kilo Watt Hour LAEDCL Lower Assam Electricity Distribution Company Limited LT Low Tension MCAGR Modified Compounded Annual Growth Rate MCBS Miniature Circuit Breaker MIS Management Information Systems MMSCMD Measured Million Standard Cubic Meter per day MOU Memorandum of Understanding MRI Meter Reading Instruments MU Million Unit NERLDC North East Region Load Despatch Centre

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 8 of 95

Acronym Full form NLCPR Non-Lapsable Central Pool Reserve O/H Over Heads PGCIL Power Grid Corporation of India Limited ph Phase PIS Performance Incentive Scheme PLC Power Line Carriers PLF Plant Load Factor PMGY Prime Minister Gramudyog Yojana PSTN Public Switch Telephone Network R&M Repairs and Maintenance RE Rural Electrification MNP Minimum Needs Program RGGVY Rajiv Gandhi Grameen Vidyutikaran Yojana Rs Rupees RST Retail Supply Tariff RTU Remote Terminal Unit SBM Spot Billing Machine SC Scheduled Caste SCCP Scheduled Caste Component Plan SDE Sub-Divisional Engineer SEBs State Electricity Boards SMEC Snowy Mountains Engineering Corporation Limited ST Scheduled Tribe T&D Transmission and Distribution T.C. Transportation Cost TCS Tata Consultancy Services Limited TOU Time of Use TSP Tribal Sub-Plan UAEDCL Upper Assam Electricity Distribution Company Limited UoM Unit of Measurement US United States V Volt YOY Year-on-Year

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 9 of 95

BEFORE THE HON’BLE ASSAM ELECTRICITY REGULATORY COMMISSION

FILING NO. ………………..

CASE NO. ………………….

IN THE MATTER OF:

A Petition for the approval of the Annual Revenue Requirement for the period for FY 2006-07 and for the approval of the proposal for revision of the retail supply tariffs for the Upper Assam Electricity Distribution Company Limited (UAEDCL)

AND

IN THE MATTER OF:

Upper Assam Electricity Distribution Company Limited incorporated under the provisions of the Companies Act, 1956 and having its registered office in the State of Assam

THE HUMBLE APPLICANT ABOVE NAMED MOST RESPECTFULLY SHEWETH:

1 That the Upper Assam Electricity Distribution Company Limited, hereinafter named as UAEDCL, is a successor corporate entity, formed in pursuant to the notification of the Government of Assam, notified under sub-sections (1), (2), (5), (6) and (7) of Section 131 and Section 133 of the Electricity Act 2003 (Central Act 36 of 2003), for the purpose of transfer and vesting of functions, properties, interests, rights, obligations and liabilities, along with the transfer of Personnel of the Board to the successor corporate entities.

2 That the Upper Assam Electricity Distribution Company Limited, is a company incorporated with the main object of undertaking electricity distribution and retail supply in the areas of Dibrugarh, Jorhat, N. Lakhimpur and Sibsagar circles of the State.

3 That the Upper Assam Electricity Distribution Company Limited is a deemed licensee under the provisions laid down in Section 14 Proviso 5, read with Section 131 (2) of the Electricity Act 2003.

4 That the licensee is now filing the petition for the approval of its Annual Revenue Requirement for the financial year 2006-2007 and proposal for the revision of the retail supply tariffs.

5 That the Government of Assam vide notification no. PEL.151/2003/Pt/349 dated 16th August, 2005 (Annexure IX) issued orders to give effect to the reorganization of the Assam State Electricity Board and the finalization of the provisional transfers effected as per the provisions of the Electricity Act, 2003 and the Transfer Scheme.

(a) The opening balance sheets as per Schedule III to this order has been prepared based on the approved accounts of Assam State Electricity Board as on 31st March, 2004 and such opening balance sheet shall all be subject to all consequential adjustments on the update, finalization and audit of accounts of Assam State Electricity Board as on 31st March, 2005.

(b) The Government of Assam shall pass separate orders in terms of the Transfer Scheme in regard to the transfer and absorption of personnel of Assam State Electricity Board in the five companies, namely: Assam Power Generating Corporation Limited, Assam Electricity Grid corporation Limited, Upper Assam Electricity Distribution Company Limited, Central Assam Electricity Distribution Company Limited and Lower Assam Electricity Distribution Company Limited

(PETITIONER)

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 10 of 95

NOTES:

In this petition:

Previous Year is defined as the Financial Year (FY) 2004-2005

Current Year is defined as the Financial Year (FY) 2005-2006

Ensuing Year is defined as the Financial Year (FY) 2006-2007

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 11 of 95

T1: Legal and Regulatory Framework

1.1 Under the provisions of the Electricity Act, 2003 the Assam Electricity Reforms First Transfer Scheme, 2004 (hereafter “Transfer Scheme) was notified by Government of Assam on 10th December 2004. Under Section 5 (3) of the transfer scheme the functions and undertakings as set out in schedule-C of the transfer scheme stands transferred to Upper Assam Electricity Distribution Company Limited (UAEDCL).

1.2 Section 131 (1) and (2) of the Electricity Act 2003 mandates that any property, interest in property, rights and liabilities vested with the Board will be re-vested in a Government company or companies. Also Section 14 provides “…Provided that any person engaged in the business of transmission or supply of electricity under the provisions of the repealed laws or any Act specified in the Schedule on or before the appointed date shall be deemed to be a licensee under this Act…” Hence, UAEDCL is the deemed licensee to distribute power in the above specified area.

1.3 Section 62 of the Electricity Act 2003 requires the licensee to furnish details as may be specified by the Commission for determination of tariff.

1.4 Section 7 of A. E. R. C. (Terms and conditions for determination of Tariff) Regulations 2005 lays down the following:

The licensee and generating company may file a tariff petition annually with the Commission to determine changes to the current tariff by not later than 1st December unless an extension is granted by the Commission upon application.

In the tariff petition, the licensee and generating company shall submit information for the purpose of calculating expected revenue and expenditure and for furnishing information for tariff determination in formats that will be issued separately by the Commission

The tariff petition shall be accompanied by financial and performance information in forms specified by the Commission for the previous year/years, current year and the ensuing year. The information for the previous year should be based on audited accounts and in case audited accounts for previous year are not available, audited accounts for the latest proceeding previous year should also be filed along with unaudited accounts for all the succeeding year.

If a person holds more than one licensee and /or is deemed to be licensee for more than one area of distribution or transmission, he shall submit separate petitions in respect of each licensee or area of transmission or distribution.

1.5 UAEDCL has come into being on 10th December 2004. The petitioner has now prepared the ARR and Tariff proposal for FY 2006-07 and submits the same to AERC.

1.6 The status of the various data formats and forms, as required by the Hon’ble Commission, is furnished in Annexure XII.

T2: Annual Revenue Requirement for FY 2006-07

SALES FORECAST FY 2006-07

2.1 For the purpose of sales forecast, UAEDCL has analyzed the sales pattern of month-wise and category-wise sale of electricity for the last five years (from FY01 to FY05) and the actual sales data for the first 3 months of FY06 (Apr 05 – Jun 05). These sales patterns have been used in estimating the sales for the balance period of the current year FY06 and forecasting the sales for FY07.

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 12 of 95

2.2 The sales projections have been done separately for each consumer category for the ensuing year. The slab-wise break-up of sales for the new categories, that were introduced by the Commission vide its 2005-06 Tariff Order (e.g. Domestic), have been arrived at based on the breakup used by the Commission in its 2005-06 Tariff Order, suitably modified where necessary in line with boundary conditions. This has been done due to non-availability of actual sales data for the new Tariff Categories at the time of preparation and submission of the petition.

2.3 To arrive at the revenue figures (based on both the existing as well as proposed tariff), it was necessary to estimate the intra-category sales. For example, within Domestic A category, there are three slabs - (a) up to 120 units per month, (b) between 121 and 240 units per month and, (c) above 240 units per month – all of which have different associated rates. In the absence of historical data, UAEDCL has accepted intra-category sales breakup suggested by AERC at the level of ASEB as a whole – modified as indicated in the earlier paragraph.

2.4 For the purpose of sales forecasting for the ensuing year, the following methodology has been adopted –

a. The Compounded Annual Growth Rate (CAGR) has been calculated for the 5-year period from FY01 to FY05.

b. The Year-on-Year (YOY) growth rates for the first 3 months of FY06 over FY05 have been computed.

c. The long term CAGR has then been fine-tuned to incorporate the sales trend as reflected by the short-term growth rates to arrive at the Modified CAGR (MCAGR).

d. The Modified CAGR for each category has then been used to project the sales growth for the respective category. However, for a few categories where the MCAGR was found to be greater than 10%, it has been capped at 10%. Similarly, where it has shown a negative growth, the growth rate has been taken at 0%.

e. The sales projections have been projected for each category (and also the slabs, wherever applicable) separately, based on historical data available.

f. The number of consumers and connected load has been projected based on historical data available for ASEB as a whole.

g. In the absence of detailed and validated data for each of the distribution companies, the number of consumers and connected load for each distribution company has been estimated based on the proportion of sales for the respective distribution company.

h. The aforesaid steps have been followed keeping in mind the boundary conditions for each category (and if applicable, each slab). Wherever required, the figures have been sanitized to eliminate apparent anomalies and logical inconsistencies (e.g. number of HT Domestic and HT Commercial consumers being 17,000 and 12,000 approximately as per Tariff Order 2005-06 for ASEB as a whole, average connected load for Jeevan Dhara consumers being 0.76 KW etc.)

Under APDRP and ADB schemes, UAEDCL is putting in massive efforts towards strengthening the transmission and distribution network with a view to improving the overall system reliability. Coupled with the vigorous initiatives that have been taken to improve the PLF of APGCL’s thermal power stations as well as the necessary arrangements to import energy during the lean hydro season, this is expected to significantly reduce the impact of suppressed sales due to energy shortage and/or network outages.

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 13 of 95

In recognition of these welcome developments, the projected sales for FY 2005-06 for ASEB as a whole has been taken to be 75 MU higher than that computed based on actual sales for Apr-Jun 2005 and historical sales figures and growth rates for the balance 9 months. In respect of UAEDCL, the corresponding adjustment on account of reduction of suppressed sales works out to about 23 MU. Similarly, for FY 2006-07, it is estimated that there will a further reduction of 75 MU of suppressed sales for ASEB as a whole and a further 23 MU for UAEDCL.

Table 1: Growth rates in sales for major categories of consumers (After considering the impact of aforesaid reduction in suppressed sales)

Category Projected Growth Rate

Domestic 11.0% Commercial 10.6% General Purpose Supply 13.6% Public Lighting 12.2% Public Water Works 9.5% Agriculture 3.3% Industrial 4.1% Bulk Government and Educational Institutions 6.0% Others 6.6% Category - IX : Tea, Coffee and Rubber 3.3% Category - X : Oil & Coal 9.8% Overall 7.8%

2.5 Based on methodology detailed in the earlier paragraphs, UAEDCL’s forecast in the growth in number of consumers, connected load and sales for the Ensuing Year, have been detailed in the following tables:

Table 2: UAEDCL’s Sales Projection (MU) for the Ensuing Year 2006-07

UAEDCL Category

2004-05 2005-06* 2006-07

Domestic 223.60 247.43 274.67 Commercial 48.60 53.85 59.58 General Purpose Supply 12.27 13.98 15.88 Public Lighting 1.33 1.50 1.68 Public Water Works 5.13 5.64 6.17 Agriculture 1.24 1.29 1.33 Industries Rural 5.10 5.81 6.61 Urban 67.38 69.81 72.11 Bulk Supply Bulk Government Educational Institutions 2.93 3.11 3.30 Others 55.30 59.11 63.00 Tea, Coffee and Rubber 161.10 166.91 172.41 Oil & Coal 39.48 43.46 47.71 Temporary Supply 0.06 0.06 0.07 Sales to UAEDCL consumers 623.51 671.95 724.51 Employees consumption 0.96 1.59 1.67 Board’s establishment 0.23 0.26 0.32 Total Sales 624.69 673.80 726.50 Note: The above figures have been regrouped wherever necessary to make them comparable * 2005-06 data is based on first 3 months actuals and projections for remaining 9 months

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 14 of 95

2.6 Hence, to summarize, the total energy sales for UAEDCL is projected to be 727 MU for the ensuing year.

EFFICIENCY PARAMETERS

Distribution Loss Levels

2.7 The distribution network inherited by UAEDCL from the parent company is aged and highly overloaded and inadequate to meet the future demands. The management has envisaged several plans for the augmentation of the existing system and has proposed several capital investment programs to meet the growth in demand in the future. This implies substantial investment is required in the sector. As discussed later in Section 3, UAEDCL has envisaged a substantial network augmentation and strengthening program, the details of which are furnished in the Investment Plan for FY 2006-07 Section under APDRP, NLCPR, ADB and State Plan schemes etc.

2.8 However, reduction in Technical and Commercial losses cannot be achieved immediately and would require a transition period for materializing. The Commission in earlier Tariff Order has clearly mentioned that, “It is true that the T&D loss is very high. However, it is also true that this cannot be reduced suddenly. In considering the allowable T&D loss consideration has to be given to the starting levels as well as the nature of the grid.”

2.9 The licensee has come into being from 10 December 2004. The transmission & distribution loss level for FY 2004-05 in respect of ASEB as a whole has been reported to be 38.94% (as against 36.29% for FY 2003-04) as per the Annual Statement of Accounts for that year. Assuming that the transmission loss for FY 2004-05 was 8.55% as was permitted by the Hon’ble Commission for FY 2005-06, the distribution loss for FY 2004-05 works out to 33.23% for the erstwhile ASEB. UAEDCL has envisaged an overall distribution loss of 29.90% in the Ensuing Year, keeping in mind the capital investment earmarked for the year and the various measures being taken to reduce the technical and commercial losses. This is also in line with the directive issued by the AERC in its Tariff Order for FY 2005-06.

2.10 As detailed above, the total sales for the year FY 2006-07 is estimated to be 727 MU. Based on an overall distribution loss of 29.90%, the input requirement of energy for UAEDCL at the Distribution network is projected to be 1036 MU.

Collection Efficiency

2.11 Collection Efficiency is defined as the ratio of the total revenue collected to the total revenue billed for the corresponding period. In case of UAEDCL, the collection efficiency in FY 2004-05 has been reported to be about 95%. This total cash collected also includes the quantum of cash collected from debtors and past arrears. For the purpose of tariff computation, UAEDCL has estimated the collection efficiency to be 97.5% for the Ensuing Year as per the Commission’s direction in the Tariff Order for FY 2005-06. However, it fully realizes that this level of collection efficiency that unlikely to be achieved in full during the Ensuing Year. Thus, it prays to the Hon’ble Commission that it grant UAEDCL some leeway in this respect and allow a higher collection loss (of 5% instead of 2.5%) while computing the Annual Revenue Requirement for the FY 2006-07.

Aggregate Technical & Commercial (AT&C) Losses

2.12 Distribution Losses have traditionally been used to measure the efficiency of distribution systems. Distribution losses are computed in terms of the difference between the energy input and the energy billed, as a percentage of the total energy input. This ratio does not reflect collection efficiency achieved by the distribution licensees. This limitation is addressed by using Aggregate Technical & Commercial (AT&C) loss as a measure of efficiency.

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 15 of 95

AT&C loss is defined as the difference between energy against which payment has been collected and energy delivered as a percentage to the total energy delivered.

The performance of the licensee should be measured with respect to firm benchmarks i.e cost of energy delivered and collection, which are neatly captured in AT&C loss.

AT&C losses are computed as follows:

Units Billed Revenue Collected AT & C Loss % = 1 – Units Input x Revenue Billed x 100 %

2.13 Many State Regulatory Commissions have already adopted AT&C losses as the definitive efficiency benchmark. The Government of India also has adopted AT&C loss as an efficiency benchmark for utilities to qualify for the incentive component under the APDRP scheme. UAEDCL would humbly submit to the Hon’ble Commission to move towards an AT&C benchmark in its future tariff orders.

Basis for Projection of the Annual Revenue Requirement for FY 2006-07

2.14 The approved annual accounts for the FY 2004-05 and the actual data for the first five months of FY 2005-06 (April 2005-August 2005) have been used as the basis for the projection of the expense elements of the Annual Revenue Requirement. The estimated Annual Revenue Requirement for the Ensuing Year FY 2006-07 is presented in the following table:

Table 3: Projected Annual Revenue Requirement for FY 2006-07

(Rs crores)

ARR Element Amount

Power Purchase Cost 292.02

Adjusted Power Purchase Cost 313.89

Employees Cost 64.33

Repair & Maintenance Cost 5.61

Administration & General Expenses 5.75

Interest & Financing Charges

Interest on Term Loans & Bank Charges 12.66

Interest on Working Capital 3.37

Depreciation 12.58

Provision for Bad & Doubtful Debts 8.55

Interest on Security Deposit 1.75

Total Expenditure with Uniform BST 406.62

Total Expenditure with Differential BST 428.49

Less Misc. Receipts 18.19

Less Income from Trading -

Less: Capitalized 6.31

Net Expenditure with Uniform BST 382.12

Net Expenditure with Differential BST 403.99

Return on Equity -

Annual Revenue Requirement with Uniform BST 382.12

Net Annual Revenue Requirement with Differential BST 403.99

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 16 of 95

2.15 UAEDCL requests Hon’ble Commission to consider Adjusted Power Purchase Cost, based on Differential Bulk Supply Tariff (BST) for the purpose of ARR. The Uniform Bulk Supply Tariff has been computed with a view to examining the tariff that would have been applicable to UAEDCL had the principle of Uniform BST and Differential retail tariff been followed. It is envisaged that with the flux of time, this will be the ultimate destination of a fully reformed and restructured power sector in the State of Assam.

2.16 Each ARR expense element has been discussed in detail in the following paragraphs.

Power Purchase Cost

2.17 As a result of the unbundling of the ASEB, and the formation of successor entities, the Transfer Scheme notified by the Government of Assam mandates that the ASEB (after separation of the successor entities) would carry out the function of power procurement and bulk supply to the Distribution companies. As a result, the cost of power purchase by the Distribution companies from the ASEB would be affected through a Bulk Supply Tariff (BST).

2.18 Broadly, the Bulk Supply Tariff can be determined on the basis of two broad principles, namely:

(i) Uniform Bulk Supply Tariff: The bulk supply tariff can be treated as equivalent to the Average cost of supply to the relevant distribution company i.e. Bulk Supply Cost divided by total number of units handled by the bulk supplier.

(ii) Differential Bulk Supply Tariff: The bulk supply tariff can be determined on the basis of the paying capacity of the relevant distribution company. This approach is usually followed if uniform retail tariffs have to be maintained throughout the State.

2.19 In order to keep the retail tariff the same for each category of consumers across the State of Assam, UAEDCL prays to the Hon’ble Commission to fix the Bulk Supply Tariff for each Distribution company based on the capacity of the Distribution companies to pay to ASEB as power purchase costs after meeting all revenue expenses, including return on equity capital (although in respect of FY 2006-07, it has not been claimed for the purpose of tariff computation) in deference to the Commission’s directions spelt out in its Tariff Order for FY 2005-06.

2.20 The total Power Purchase cost for UAEDCL is then computed by multiplying the total energy projected to be drawn from ASEB by the BST rate applicable for UAEDCL.

Table 4: Power Purchase Cost

Power Purchase (MU) 1036

Power Purchase Cost (Rs Crores)

- With Uniform BST (@ 282 paise / KWh) 292

- With Differential BST (@ 303 paise / KWh) 314

Employee Expenses

2.21 The Employee costs have been estimated after considering the approved annual accounts of FY 2004-05 and the trend of actual expenses for the first 5 months of FY 2005-06, i.e., the current financial year and the projected manpower rationalization for FY 2006-07. The figures mentioned in the table above include the impact of terminal benefits as per actuarial valuations.

2.22 The erstwhile Board has taken a number of steps towards rationalization of manpower in the

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 17 of 95

company, by the redeployment of all excess manpower to areas where they are considered necessary. The board has also taken the assistance of consultants to look at current HR policies and suggest changes in HR policies and manpower deployment strategies. The details of manpower rationalization are attached in Annexure I.

2.23 As mentioned earlier, a significant component of the employee costs have been the terminal benefits including leave encashment. The State Electricity Boards (SEBs), constituted under Section 5 of the Electricity (Supply) Act, 1948 were not required to create a separate fund or trust to meet the pension liabilities of the personnel working in the SEBs. Like the State Governments, the SEBs has been meeting the pension and other terminal liabilities from the revenue earnings on a year-to-year basis, without creating or maintaining a Corpus. In other words, the actual pension outflows for the retired personnel of SEBs were being managed from the revenues earned in the year.

2.24 It is proposed that to relieve the new companies of the burden on account of past liabilities, the cash outflows on account of unfunded past liabilities will be met by a combination of Government of Assam support, a special charge on Bulk Supply Tariff and Electricity Duty. In this regard, a charge on BST will be proposed by the Bulk supplier i.e. ASEB.

2.25 From FY 2005-06, the companies have discontinued the practice of paying from current revenues. In view of this, the actuarial study was carried out as on 9

December 2004 to estimate the unfunded terminal liabilities of its existing employees, pensioners and family pensioners.

2.26 The terminal liabilities on account of the future services rendered by the existing employees, the new companies will contribute to the Pension Fund. The Actuarial Valuation carried out by ASEB has estimated the contribution to be at 22.79% of the Total Basic + DA expenses every month.

2.27 In pursuance of Board Resolution No. 18 dated 11-04-05, Chairman, ASEB has constituted the “Board of Trustees of ASEB Employees’ Pension Fund Investment Trust” with 11 Trustees including Chairman ASEB/successor companies as President of the Trust. AEGCL shall act as nodal agency for dealing with all matters relating to pension. Head of Finance, AEGCL shall be the Member and Chief Executive and shall have the authority for all operational activities of the Trust.

In a meeting held on 03-11-05 with Member (Finance), discussions on the following issues have taken place:

1. Drawal of monthly pension and family pension by the existing pensioners and family pensioners who were drawing their pension from consolidated Board.

2. Procedure for payment of pension and setting up of Pension Cell under Finance wing of each successor company to administer and monitor the benefits of operation at the company’s end.

3. Recovery of administrative cost from successor companies.

4. Plan for funding terminal benefits.

5. Creation of GPF trust fund.

Actions are being undertaken on the above issues.

2.28 The total employee expenses proposed for approval in this ARR petition, including provisioning for terminal benefits is Rs. 64.33 crores for UAEDCL for FY 2006-07. The following table shows the total estimated employee expenses including funding for terminal benefits for the year FY 2006-07.

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 18 of 95

Table 5: Employee Expenses

(Rs crores) ASEB

Consolidated Figures

UAEDCL

2004-05 2005-06 2005-06 2005-06 2006-07 Employee Cost Element Approved Accounts

1st 5 months Actuals*

Next 7 months Estimate

Total Projected

Salaries 139.15 13.12 18.73 31.85 31.53 Overtime 0.78 - 0.18 0.18 0.18 Dearness Allowance 57.84 6.67 9.53 16.20 16.04 Other Allowances 21.44 2.13 2.98 5.10 5.05 Bonus 0.06 - 0.02 0.02 0.02 Medical Allowances 0.83 0.07 0.08 0.15 0.15 Leave Travel Concession 0.28 - 0.43 0.43 0.43 Earned Leave Encashment 5.05 - - - - Workmen Compensatory Payment 0.13 - 0.04 0.04 0.04

Staff Welfare Expenses 0.23 - 0.06 0.06 0.06 Terminal Benefit 63.76 7.05 3.90 10.95 10.84 Less Capitalization 1.50 - - - -

Total 288.03 29.04 35.95 64.98 64.33

* Based on actual figures as received for the first 5 months

2.29 Due to the geographical terrain, the employee costs for a utility operating in hilly terrain would be higher and cannot be compared with those in the plains, as it requires more number of employees to service its consumers. In spite of these constraints, UAEDCL has embarked on major manpower rationalization program (natural attrition with essential recruitment) and the results are already beginning to flow in. Anticipating a continuance of this trend, it has been estimated that there will be a net 7.5% reduction in the total employee strength. This is reflected in reduced employee costs in the Ensuing Year even after considering an inflationary impact of about 6% (as was allowed by the Hon’ble Commission through its Tariff Order for FY 2005-06)

Repair and Maintenance Expenses

2.30 UAEDCL has inherited aged assets from ASEB which calls for more Repairs & Maintenance (R&M) Expenses. In addition, Assam being a hilly terrain, upkeep of the distribution network and essential consumer services demands comparatively more R&M expenses than other States. In addition to these, the actual expenses incurred in the past have been severely constrained by the acute cash deficit situation faced by the erstwhile Board. Although a significant increase in R&M expenses was allowed by the Commission, UAEDCL still has a fair way to go in this respect. Under these circumstances, using a historical base or trend runs the risk of restricting R&M expenses for the Ensuing Year, when there is a genuine need of continuing to step up R&M expenses to keep the current asset base in good condition and strive to significantly improve the level of consumer services.

2.31 It is therefore prayed that the R&M expense asked for by UAEDCL be allowed in full to help maintain the momentum that has been gathered towards improving the quality of assets, reliability of the distribution network and quality of consumer services.

2.32 Going by the above principles, the R&M expenses for the ensuing year has been estimated at Rs. 5.61 crores as per the following details:

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 19 of 95

Table 6: Repair and Maintenance Expenses

(Rs crores) ASEB

Consolidated Figures

UAEDCL

2004-05 2005-06 2005-06 2005-06 2006-07 Repair &

Maintenance expenses

Approved Accounts

1st 6 months Actuals

Next 6 months

Estimated Total Projected

Plant & Machinery 4.71 0.27 0.27 0.54 0.70

Buildings 1.09 0.02 0.02 0.03 0.04

Civil Works 0.08 - - - -

Hydraulic Works 0.13 0.01 0.01 0.02 0.02 Lines & Cable Networks 8.82 1.56 1.56 3.12 4.37

Vehicles 0.81 0.13 0.13 0.26 0.34

Furniture & Fixture 0.20 0.05 0.05 0.09 0.10

Office Equipment 0.14 0.02 0.02 0.04 0.04

Total 15.98 2.05 2.05 4.10 5.61

Administrative and General Expenses

2.33 The Hon’ble Commission in its Tariff Order for FY 2005-06 has allowed a sum of Rs 3.27 crores towards Administrative and General Expenses, after considering an increase of 6% that comprised an increase of 5% on account of inflation and 1% cushion to take care of other additional items of expenditure. The total A&G expenses proposed for approval in this ARR petition for UAEDCL for FY 2006-07 is Rs 5.75 crores. Table 7 gives the break-up of the total A&G costs under various heads.

Table 7: A & G Expenses

(Rs crores) ASEB

Consolidated Figures

UAEDCL

2004-05 2005-06 2005-06 2005-06 2006-07 Administrative & General Expenses

Approved Accounts

1st 6 months Actuals

Next 6 months

Estimated Total Projected

Rent, Rates & Taxes 0.86 0.11 0.11 0.22 0.24 Insurance 0.15 0.02 0.01 0.03 0.03 Telephone charge 0.98 0.15 0.14 0.29 0.33 Post and Telegram 0.87 0.11 0.10 0.21 0.24 Legal charge 0.56 0.08 0.08 0.16 0.24 Audit Fee 0.06 0.02 0.02 0.04 0.04 Consultancy charges 0.29 0.06 0.06 0.12 0.13 Technical Fee 0.11 0.03 0.03 0.06 0.07 Conveyance and Travel charge including vehicle hiring 3.35 0.81 0.81 1.63 2.44 Other Expenses 2.95 0.44 0.44 0.88 0.97 Freight 0.91 0.05 0.06 0.11 0.12 Outsourcing of billing & meter reading - 0.18 0.18 0.37 0.44 Other purchase related Exp. 1.42 0.20 0.21 0.41 0.45 Less Capitalised 0.40 - - - - Total 12.11 2.26 2.26 4.52 5.75

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 20 of 95

2.34 There has been a substantial increase in expenditure under the head ‘Conveyance and Travel including vehicle hiring charges’. Due to acute shortage of vehicles, normal repairs & maintenance work of distribution network and consumer services spread across hilly terrain was being severely hampered. UAEDCL has therefore formulated and implemented a policy of substantially increasing the availability of vehicles through hiring for the aforesaid routine maintenance and repair work. The company is also exploring the feasibility of hiring mini trucks with hydraulic ladders. In order to support the financial implications of these initiatives, additional resources shall be earmarked to enable hiring of such vehicles with hydraulic ladders for a period of 1 year, to be extended on the performance of the vehicle.

Fixed Assets

2.35 The following table gives the category-wise details of assets for UAEDCL.

Table 8: Fixed Asset Details

(Rs crores) UAEDCL

As on 31-03-2005 As on 31-03-2006 As on 31-03-2007 Particulars of

Asset Classes Gross Block

Accumulated Depreciation

Net Fixed

Assets Gross Block

Accumulated Depreciation

Net Fixed

Assets

Projected Gross Block

Land & Rights 2.77 - 2.77 2.77 - 2.77 2.77

Buildings 13.75 5.26 8.49 13.75 5.91 7.84 13.75 Hydraulic works 2.53 1.18 1.36 2.53 1.27 1.26 2.53

Other Civil Works 6.60 1.28 5.32 6.60 1.39 5.21 6.60

Plant & Machinery 59.08 29.40 29.68 59.08 32.67 26.40 59.08

Lines & Cable Networks 146.31 105.61 40.69 146.31 113.84 32.47 146.31

Vehicle 3.16 2.37 0.80 3.16 2.58 0.59 3.16 Furniture & Fixtures 3.52 3.26 0.27 3.52 3.26 0.27 3.52

Office Equipments 0.63 0.39 0.24 0.63 0.42 0.22 0.63

Total 238.36 148.74 89.61 238.36 161.32 77.04 238.36

Depreciation

2.36 Depreciation has been computed on the opening Gross Fixed Assets for each class of assets individually for approval as part of the Annual Revenue Requirement for FY 2006-07. For the purpose of depreciation calculation, it has been ensured that the residual Net Block Value for each asset category should normally not be less than 10% of the Gross Block Value. In case the Net Block Value in respect of a particular asset category is already less than or equal to 10% of the Gross Block Value, no further depreciation has been charged. Based on this philosophy, the total depreciation expenditure charged for UAEDCL for FY 2006-07 is estimated to be Rs. 12.58 crores. The category wise average rates of depreciation together with the depreciation provision for 2006-07 are given in the following table:

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 21 of 95

Table 9: Break-up of Depreciation (Rs. crores)

Category of Assets Average Rate of Depreciation Depreciation for 2006-07

Land & Land Rights 0% - Buildings 4.71% 0.65 Hydraulic Works 3.59% 0.09 Other Civil Works 1.58% 0.10 Plant & Machinery 5.55% 3.28 Lines & Cable Network 5.62% 8.22 Vehicles 6.58% 0.21 Furniture & Fixtures 7.3% - Office Equipment 4.18% 0.03 Total Depreciation Charges 5.28% 12.58

The details of Gross Fixed Assets, Depreciation and Net Fixed Assets, as per the Hon’ble Commission’s formats, are attached in Annexures II, III and IV.

Interest & Financing Charges

2.37 The interest component proposed to be charged and submitted as part of the Annual Revenue Requirement for FY 2006-07 is on account of loans taken for the purpose of capital investments.

2.38 Interest on working capital has been assumed to be Rs 3.37 crores as per the norms approved by the Hon’ble Commission in its Tariff Order for FY 2005-06.

Term Loans and Interest on Term Loans

(a) Allocation of term loans to UAEDCL has been made on an individual basis for various sources of financing based on the capital investments being proposed to be undertaken by UAEDCL. The detail of capital expenditure planned to be undertaken by UAEDCL for FY 2006-07 has been discussed in the section for capital investments subsequently in this petition.

(b) Public Bonds has been allocated to the utility as per the transfer scheme notified by the Government of Assam.

(c) The total amount of term loans and interest computed to be charged on these term loans, based on the proposed capital investment plan, for each individual financing source is given in Table 10.

(d) In this connection, it will be noted that finance and interest charges in respect of those capital assets that will be commissioned during FY 2007-08 or thereafter has been capitalized as interest during construction in terms of the relevant provisions of The Electricity Act, 2003.

(e) In respect of those capital assets that will be commissioned during FY 2006-07, interest and finance charges incurred up to the date of commissioning will be capitalized as interest during construction.

(f) In respect of those capital assets that are likely to be commissioned not later than 31st March, 2006, the interest and finance charges have been claimed to be a permissible item of revenue expenditure and hence, recoverable through tariff

(g) The total interest and financing charges for UAEDCL on term loans proposed to be charged as part of the Annual Revenue Requirement for FY 2006-07 is Rs. 6.35 crores.

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 22 of 95

Table 10: Interest and Finance Charges for FY 2006-07

(Rs crores)

Sl. No.

Name of the Institution

Opening Balance 2006-07

Amount received during

the year

Amount redeemed during the

year

Closing Balance 2006-07

Rate of interest

Interest charge

1 State Govt. 65.18 16.25 1.61 79.82 10.50% 7.61

2 Bond 29.80 - - 29.80 11.56% 3.45

3 Bank Charges - - - - - 1.60

4 Less: Capitalised - - - - - 6.31

5 Total 94.98 16.25 1.61 109.62 - 6.35

Provision for Bad and Doubtful Debts

2.39 It is a prudent commercial practice to provide for an amount from the receivables added during the year, which ultimately, may turn bad. The present collection efficiency of UAEDCL is estimated to be of the tune of 95%, i.e., there is an addition to the debtors every year, all of which may not be recoverable in the future and would necessarily have to be provided for and subsequently written off. This is also mandated as per Rule 4.2 of Annexure V of the Electricity (Supply) (Annual Account) Rules, 1985.

2.40 The provision towards Bad Debts proposed in this Annual Revenue Requirement is 2.5% on the total expected revenue billed for FY 2006-07 as allowed by the Hon’ble Commission in its Tariff Order for FY 2005-06. However, given the ground realities, it does not appear likely that UAEDCL will be able to achieve this high level of collection efficiency, especially given its consumer profile, past track record and inhospitable terrain. It is therefore, prayed that the Hon’ble Commission permits UAEDCL a higher level of provision for Bad Debts of 5%. The Commission will appreciate that while higher collection efficiencies will continue to be targeted by UAEDCL, achieving them can come only through a gradual change process.

2.41 The erstwhile ASEB has been providing for Bad and Doubtful debt in the past accounts. UAEDCL will continue to make such provisions as required every year. However, the writing off of such arrears demands time and effort and each debtor has to be individually dealt with and accounted for separately. Moreover, if provisioning for bad debts is not being done regularly on an accrual basis, the actual write-off in any future year will, in all likelihood, result in a huge impact on tariff. Hence, UAEDCL requests the Commission to allow a provision that is higher than the sum of Rs. 8.55 crores claimed in the ARR for FY 2006-07 as bad and doubtful debts. It is also making efforts at the field level to ensure regular write offs from this accumulated provision in the future.

Return on Equity

2.42 The Electricity Act, 2003 lays down the financial principles by which the finances of the licensee would be determined, including the return to be allowed to the licensee as part of its annual revenue requirement.

2.43 In view of the poor performance of ASEB as a whole, the Hon’ble Commission in its Tariff Order for FY 2005-06 had not allowed any return on equity. In view of the operational standards that UAEDCL is yet to achieve in terms of system reliability, flexibility, operational efficiency and consumer services, no return on equity has been claimed in this tariff petition. However, UAEDCL prays that the Hon’ble Commission grant at least a part of the return on equity (14%) that it would have been entitled to (Rs 8.73 crores) as it will go a long way in generating internal accruals that are so necessary to finance major distribution and consumer welfare schemes. This becomes all the more critical as UAEDCL is unlikely to receive any significant financial support from the Government of Assam and thus, will need to take care of its financial health by itself.

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 23 of 95

2.44 A component of return is important for the newly formed companies to bring in a sense of commercial orientation in the licensee, which under the Board setup had its tariff adjusted automatically to allow a net 3% return on the Net Fixed Assets as per Section 59 of the Electricity (Supply) Act, 1948.

2.45 The Andhra Pradesh Electricity Regulatory Commission (APERC), in its Tariff Order has clearly stated that foregoing reasonable return was neither in the interest of the licensee nor with the consumers.

APERC in Para 707 of its Tariff Order for FY05 has viewed that, “the Commission allowed the Reasonable Return as, in the opinion of the Commission; it was not in the interest of either the consumer or the Licensee to forego the Reasonable Return. The Commission wish to emphasize that one of the prime objectives of Reforms undertaken by the State in the Electricity Sector is to bring in a Commercial Orientation in the methods of operation as well as in the general approach to management decisions by the unbundled entities. The Commission considers it necessary to provide for the Reasonable Return in the calculation of the Revenue Requirement to reinforce this commercial orientation and hopes that this would act as a motivating factor and a morale booster at all levels leading to more operational efficiency all round.”

UAEDCL would like to mention that in case of AP, even though APTRANSCO didn’t ask for a reasonable return, APERC allowed reasonable return on the above grounds.

Other Income

2.46 Other income for the purpose of calculation of the Annual Revenue Requirement includes meter rental, delayed payment surcharge, miscellaneous charges from consumers as well as income on account of interest on loans & advances to employees and investments in the form of fixed deposits.

2.47 Other Income for UAEDCL for FY 2005-06 has been estimated based on information received in respect of that year. Other Income has been projected as Rs. 18.19 crores for UAEDCL for the Ensuing Year FY 2006-07. The detailed break-up of estimated Other Income is as shown in the following table:

Table 11: Other Income

(Rs crores) ASEB

Consolidated Figures

UAEDCL

2004-05 2005-06 2006-07 Other Income Approved Accounts Estimated Projected

Interest on staff loans and advances 0.01 0.01 0.01 Income from investment 7.46 0.90 0.95 Interest on loan & advances to licensees - - - Delayed payment charges from consumers 5.51 1.46 1.54 Rental from meters 8.16 2.41 2.52 Interest from banks (other than on fixed deposit - - -

Income from trading - - - Reconnection / Disconnection Charges 2.14 1.56 1.64 De-pooling of PGCIL Transmission Charges 11.22 - - Miscellaneous receipts 0.94 0.04 0.04 Miscellaneous Recoveries (Transformer etc.) 27.75 10.95 11.49

Total 63.19 17.32 18.19

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 24 of 95

T3: Investment Plan for FY 2006-07 3.1 UAEDCL is making critical and urgently needed investments in its distribution network to

strengthen an overloaded system and to enhance its reliability to meet contingencies. This proposal for approval of the Annual Revenue Requirement for FY 2006-07 also envisages recovery of these planned and on-going investments.

3.2 The following section deals in detail with the various capital investment programs ongoing at UAEDCL and those proposed for the Ensuing Year FY 2006-07.

Accelerated Power Development and Reform Program (APDRP)

3.3 The APDRP scheme was introduced by GoI to achieve reduction of T&D loss, improve reliability and quality of power and to increase net power availability. It aims at strengthening and improving the sub-transmission and distribution network by setting up of new 33/11 KV sub-stations, augmentation of Distribution transformers, replacement of conductors, up-gradation of feeders, system metering, 100% consumer metering and computerization of billing, capacity building etc.

3.4 The APDRP project is designed to address to the above mentioned issues with the ultimate objective of reducing losses and improving quality of power supply. Improvements of Sub-Transmission & Distribution System will emphasize on

• Reducing Losses and bringing viability to the State Electricity Board

• 100% metering & energy audit

• Improvement in the quality of supply

• Application of Information Technology in Revenue & Operation

• Outsourcing of Distribution Activities

Government of Assam, Ministry of Power has allotted fund to Assam in a very generous manner. They provide 100% fund (of which 90% is grant and 10% loan) for whole of APDRP schemes. Works under the schemes cover 14 Electrical circles of Assam.

3.5 In the Year 2006-07, an amount of Rs. 371.34 crores under APDRP program is proposed as the outlay for all the Distribution companies. Out of the total proposed outlay of FY 2006-07, Rs. 88.11 crores have been earmarked for UAEDCL, out of which the Grant element is Rs 79.30 crores and the loan is Rs 8.81 crores. Table 12 below provides a snapshot of the proposed APDRP funding in UAEDCL.

As per the Tariff Order issued by the Hon’ble Commission, all unmetered consumers are to be converted to metered categories immediately. However, all the meters cannot be purchased under the APDRP schemes therefore a sum of Rs. 1.16 crores is required separately to purchase the meters. This amount has not been included in the ARR for the ensuing year. It is therefore prayed to the Hon’ble Commission to grant the above amount so that meters can be procured immediately to convert unmetered consumers to metered category under UAEDCL.

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 25 of 95

Table 12: Proposed Plan Outlay for UAEDCL under APDRP for FY 2006-07

(Rs lacs) TOTAL UAEDCL

Development Schemes Funding Agency / Source of

Funds Grant Loan Total Grant Loan

Sibsagar (Single package S.I) APDRP 2,262 251 2,514 2,262 250 Lakhimpur APDRP 2,110 235 2,345 2,110 235 For Jorhat & Dibrugarh

- Feeder Augmentation APDRP 468 52 520 312 35 - R&M of 33/11 KV sub. Stations APDRP 1,211 135 1,345 807 90 - R&M of Distribution Transformers APDRP 1,380 153 1,533 920 101

Consumer metering For Sibsagar APDRP 45 5 50 8 1 For APDRP 45 5 50 15 2 For Lakhimpur APDRP 189 21 210 95 11

Computerization of Billing For Sibsagar, Lakhimpur APDRP 54 6 60 10 1 Computerization of billing (Data entry, Indexing, training, customization) For Sibsagar & Lakhimpur APDRP 225 25 250 41 5 ASEB's scope of work procurement of land for new S/S, renovation and repairing of 33/11 KV control rooms, land filling, construction of approach road, procurement of oil; filtration machines, T&P etc. APDRP 4,050 450 4,500 1,350 150 Total APDRP Schemes 12,039 1,338 13,377 7,930 881

Non Lapsable Central Pool of Resources (NLCPR)

3.6 The NLCPR fund outlay is being used for critical augmentation of the 33/11 kV Sub Stations, construction of 33 kV lines, and for construction and augmentation of distribution Sub Stations. For the ensuing year, an amount of Rs. 100.09 crores under NLCPR program is proposed as the outlay of FY 2006-07 for the whole of Assam, out of which Rs. 12.94 crores (Grant component Rs 11.65 crores and loan Rs 1.29 crores) is the proposed outlay for UAEDCL for the Ensuing Year. Some of the important schemes for FY 2006-07 are shown in the following table:

Table 13: Key NLCPR Schemes

(Rs lacs) TOTAL UAEDCL

Development Schemes Funding Agency / Source of

Funds Grant Loan Total Grant Loan

33 KV L/C Tower Line from 132 KV Gormur S/S to 11 KV Jorhat S/S using Wolf Conductor including terminal equipment Line Length of 10 Km NLCPR 192 21 213 192 21 33 KV Steel Tubular Double Pole Structure Suspension Type line with Wolf Conductor from 132 KV Nazira S/S to 33/11 KV Demev S/S via 33/11 KV Moran S/S NLCPR 973 108 1,081 973 108 Total NLCPR Schemes 1,165 129 1,294 1,165 129

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 26 of 95

Rural Electrification

3.7 As per 1991 census, there are 24,685 numbers of villages in the State of Assam out of which 19,163 numbers of villages (77.63%) have been electrified as on 31 August 2004. This leaves 5,522 numbers of villages yet to be electrified. Of this, however, only 3,003 numbers of villages can be accessed by grid electricity. Electrification of these villages, termed as non-remote villages, are being taken up under two major schemes of the Central Govt., namely PMGY and RE (MNP), which are already under implementation.

Rural Electrification (Minimum Needs Program)

3.8 RE (MNP) scheme in Assam was initiated in the year 2000-01, with a target of covering 398 villages for intensification in that year, with an outlay of Rs. 13.26 crores. Since the start of this scheme in FY01, electrification of a total of 92 virgin villages and intensification of 1,755 villages has been covered under RE (MNP) schemes so far. In FY2006-07, an amount of Rs. 60 crores is proposed as outlay under RE (MNP) Scheme towards Rural Electrification for the entire State of Assam as a whole, out of which Rs. 18 crores is proposed to be allocated to UAEDCL. The details are as shown in the following table.

Table 14: RE (MNP) Scheme

(Rs crores)

RE (MNP) schemes Amount

Electrification of virgin villages 2.14

Intensification of Electrified villages 15.86

Total 18.00

Prime Minister Gramudyog Yojana (PMGY)

3.9 A total amount of Rs. 15.50 crores is proposed as outlay for the Annual plan 2006-07 for Rural Electrification works for the State of Assam as a whole under this scheme, as the total project cost for electrification of Rs 4.88 crores towards virgin villages and intensification of Rs 10.62 crores for electrified villages. In the areas of UAEDCL, an amount of Rs 1.46 crores has been earmarked towards electrification of virgin villages and intensification for Rs 3.19 crores. The details are shown in the following table.

Table 15: PMGY Schemes

(Rs crores)

PMGY schemes No of Villages Amount

Electrification of virgin villages 22 1.46

Intensification of Electrified villages 48 3.19

Total 70 4.65

Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY)

3.10 An outlay of Rs 120 crores has been proposed to be earmarked for village electrification under RGGVY for FY 2006-07 out of which Rs 39 crores (Grant Rs 35.10 crores and Loan Rs 3.90 crores) has been envisaged for UAEDCL. The details are mentioned in the following table

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 27 of 95

Table 16: Electrification under RGGVY Scheme

District No. of Villages No. of Habitations

Tinsukia 382 949

Jorhat 315 827

Total Villages / Habitation 697 1,776

Tribal Sub Plan (TSP)

3.11 The approved allocation for TSP in the 10th Plan is Rs. 8.25 crores for all the Distribution companies put together. An amount of Rs. 1.38 crores is proposed for the Annual Plan FY2006-07 for electrification of Scheduled Tribe (ST) villages in whole Assam, out of which Rs. 0.41 crores has been earmarked for electrification of villages in UAEDCL.

Scheduled Caste Component Plan (SCCP)

3.12 The approved allocation under the SCCP in the 10th Plan is Rs. 3.60 crores for all the Distribution companies in the State. An amount of Rs 1.08 crores is proposed for the Annual plan 2006-07 for electrification of SC villages for the whole of Assam, out of which Rs. 0.32 crores has been earmarked for electrification of SC villages in UAEDCL.

ADB Financed Schemes

3.13 The total allocation for ADB for FY2006-07 is Rs. 51.44 crores (11.22 million dollars) for Distribution Schemes. An amount of Rs 14.83 crores (3.23 million dollars) is being proposed for UAEDCL for 33/11 kV substation augmentation, and for putting in place metering and communication systems.

Counter Part Fund for ADB Funded Schemes

3.14 For the year 2006-07, an amount of Rs. 88.80 crores (19.37 million dollars) is proposed to be included in the Annual Plan as the State’s counterpart fund for the ADB schemes, out of which the share for UAEDCL is Rs 7.98 crores (1.74 million dollars)

STATE PLAN FUND

Distribution Line and Sub Station Augmentation

3.15 UAEDCL’s existing Distribution network demands massive modernization work to provide quality, uninterrupted and reliable power to consumers. In the past, due to severe paucity of funds, the works carried out have been very insignificant. The APDRP program alone cannot meet the capital investment requirements and there is still an urgent need of fund for Normal Development works, System Improvement and Augmentation of the system, which is a continuous process in the distribution sector to meet the increasing demand from consumers. These works need to be implemented with the support from the State Plan Fund. An amount of Rs 1.96 crores has been envisaged for above distribution system strengthening as a loan under State Plan Scheme.

Disaster Management

3.16 Natural calamities like flood and storm cause heavy damage to the electricity transmission network and to the distribution lines and sub-stations, which is more frequent in Assam when compared to other States. There is an urgent requirement of funds in the form of plan assistance for the restoration of these lines and sub-stations. A total outlay of Rs. 0.56 crores

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 28 of 95

is proposed for this purpose for the Annual Plan 2006-07, out of which Rs 0.16 crores are planned for UAEDCL.

T4: Efficiency Improvement Initiatives

Energy accounting –Installation of electronic meters at 11kV feeders

4.1 In the UAEDCL, there are a total of 204 11kV feeders. UAEDCL has taken initiatives in installing electro static meters at 11 kV feeders for proper energy accounting. To supplement these efforts, the existing electronic meters are being checked for accuracy and information content. Accurate estimates for Technical and Commercial losses are the initial steps for loss reduction. With the electronic meters in place in all the feeders, accurate estimates for energy losses in the system can be made. The present estimates show that 91.66 % of the 11 kV feeders in UAEDCL are equipped with electronic meters. UAEDCL plans to move towards 100% feeder metering in a phased approach in the Ensuing Year.

Table 17: Feeder Metering Status

UAEDCL No of 11kV feeders in the Circle

With electronic meters

Without Electronic meters

Dibrugarh 73 69 4 Jorhat 75 75 - Sivasagar 37 24 13 N Lakhimpur 19 19 - Total 204 187 17

Efforts for controlling 11 kV Interruption

4.2 Interruptions in the distribution feeders particularly to that of Industrial consumers cause revenue loss to the utility. These consumers are being billed above the average cost of supply and hence it is mandated that these consumers are given proper quality of power. The objective behind reforms is not limited to financial viability of the sector and the licensees only, but also in providing quality power at affordable prices. This is also envisaged in the Power Policy 2003 for Assam.

4.3 The interruptions at 11 kV feeders of the UAEDCL are mainly triggered by grid mis-management or by breakdowns incumbent on the feeders. It is crucial that such interruptions should exclude industrial feeders. Industrial consumers invariably cite frequent interruptions of power as the major reason that force them to move to their own captive generation. The licensee is convinced that it is essential to ensure uninterrupted and quality power to these high value consumers and in doing so, would not only be fulfilling its obligations under the license condition, but would also increase its revenue without any significant investments. As an initial step towards fulfilling this objective, UAEDCL is monitoring and analyzing all feeder trippings in its system.

Loss Management

4.4 While high distribution, metering and pilferage losses are general malaise of power distribution systems; the problems need to be dealt with in a systematic, prioritized and phased manner. This will ensure that the ‘low hanging fruits’ can be picked and concrete results are achieved at the earliest.

4.5 The objective is to analyze the relative impact of specific loss reduction initiatives on the loss numbers, lessons learnt and be able to arrive at detailed cost-benefit estimates for the eventual rollout of selected loss reduction initiatives across ASEB.

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 29 of 95

There are number of loss reduction steps to be tried out in the selected sub-division, few of them are as follows:

4.6 Introduce a rotation procedure for meter readers to reduce the possibility of connivance with the consumers:

All Distribution Companies have already introduced this system.

4.7 Implement procedure for validation or sample checks of meter readings:

This is also being implemented by each Distribution Company.

4.8 Replacement of electro-mechanical meters by electronic meters is an ongoing program:

These meters, in conjunction with CMRI (Common Meter Reading Instruments), are significant tools to reduce commercial loss due to theft.

i. Increasing appreciation of the full potential of the data that can be downloaded from electronic meters. This will need to be supported by a focused and well-structured training program, the details of which may be worked out in consultation with relevant officials of ASEB and the meter suppliers.

ii. Proper analysis of the data downloaded to unearth information about the consumer that may not be obvious at first glance. Active participation of the IRCA concerned will be required to determine the various business rules and algorithms that can be used in this respect. This is particularly important in analyzing the possible tampering efforts made by the industrial consumer, as interpreted by the electronic meter.

iii. Standardization of meter reading instruments and software with a view to demonstrating the following benefits of the same:

a. Data capture

b. Ease of data download

c. Uniformity of data download

d. Consequential ease of analysis

e. Capacity building

f. Pilferage detection

g. Reduction of time required for metering, billing and collection (billing cycle)

h. Reduction in Aggregate Technical & Commercial (AT&C) losses

iv. UAEDCL is replacing conventional electromechanical meters with Static Programmable meters, funded under various APDRP and ADB schemes. In addition to improving the accuracy and facilitating direct meter reading for the purpose of billing, these meters can be used to analyze the consumption patterns of the consumers, CT/PT reversal, monitoring quality of supply and most significantly, detect any tampers. These meters, in conjunction with Meter Reading Instruments (MRI), are an important tool to reduce commercial loss on account of theft.

v. UAEDCL expects to roll out the process of MRI downloads and its analysis for HT consumers in its entire area of supply in a phased manner. Through this initiative it expects not only to reduce commercial loss but also improve

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 30 of 95

efficiency in distribution processes, thus providing better service to its customers.

4.9 The load on distribution transformers should not exceed 80% of the transformer capacity to provide a safe operating margin:

In case it is exceeded, the load should be transferred to adjacent distribution transformers that are under-loaded. If it is not possible, then either a new transformer near the load center of higher capacity should be installed or the capacity of existing transformer should be augmented to meet the existing and future load demand. Therefore, regular checking of load on the distribution transformer is a must in order to reduce the incidence of burnt-out distribution transformers. Discoms are taking care of these problems being faced by the field staff.

4.10 Maintain and adhere to a regular schedule for transformer oil test, oil filtration and top-up, and overall maintenance of distribution transformers:

Preventive maintenance and augmentation of Distribution Transformers (DTRs) is critical to provide quality supply to the consumers. UAEDCL has approximately 4,614 DTRs and their failure and subsequent maintenance leads to not only additional repair expenses, but also, more significantly, potential revenue loss.

The major tasks that are to be carried are outlined below:

a) Identify the various classes of distribution transformers.

b) Define a scientific asset numbering scheme that will be used to identify uniquely every asset.

c) The distribution transformers need to be checked for inspection and maintenance purposes at suitable intervals:

• Oil level and condition

• Temperature rise of oil / winding

• Breather’s silica gel – especially after the rains

• Cooling system

• Supports

• Earth resistance

• Rod gaps cleaning and surface checking

• Condition of lightning arrestors

d) Prepare a Maintenance History Register showing the following details in respect of asset:

• Asset identification number (in line with a pre-determined asset numbering scheme. Until the asset numbering scheme is not finalized, this may be left blank)

• Date of acquisition of the asset

• Date when Maintenance Task 1 was last carried out

• Date when Maintenance Task 1 is due to be carried out next

• Date when Maintenance Task n was last carried out

• Date when Maintenance Task n is due to be carried out next

• Probable causes of failure of distribution transformers

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 31 of 95

Cause Suggested remedy Overload Reduce load; or take permanent measures to augment

capacity if continuous overloading is involved Low oil level Fill to proper level Dirty oil Filter oil to remove dirt, sludge or carbon; or replace

dirty oil with fresh oil. Clean core, coils and terminal board with filtered oil

Short circuited core Test for exciting current and no load loss; if high, inspect core, remove and repair; check core bolts, clamps and tighten; check insulation between laminations; if welded together, send to repair shop for repair or replacement

Metallic part ungrounded, loose connection

Check clamps, core and other parts normally grounded for loose or broken connection, bolts fallen out etc., tighten loose clamps, bolts, and nuts; replace missing ones.

Lightning Check lightning protection; arrestors, connecting lugs, earthings etc.

Dirty bushing Clean porcelain; check source of dirt

Action Plan for Preventive Maintenance of Distribution Transformers in Mirza Electrical Sub-Division has been prepared and proposed to be implemented by February, 06. After its successful implementation, this activity will be rolled out in other Sub-Divisions of Discoms.

4.11 Improve quality of repaired transformers by ensuring that vendors have proper equipment and tools required for quality repair and testing:

This is being done by each Distribution Company.

4.12 Upgrade/modify distribution network to LT-less distribution network:

• As per the present practice consumers of various categories are by and large fed by LT distribution network at 400/230 V level. Overtime with the growth of power system the major investments were made in power generation and then in transmission system, with the result the distribution network became weak and archive. The poor quality of electricity supply, low voltage and breakdown etc has become the day to day problem of power utility.

• To get rid from this problem, augmentation of distribution network is imperative. In order to supply quality electricity to consumers with proper voltage and frequency, reduce distribution loss as well as prevent theft of electricity, LT less distribution network system is required to be adopted. This system is also called High Voltage Distribution System (HVDS).

• In this system single phase or three phase 11 KV lines are laid in place of LT lines and same size of 1 phase or 3 ph Distribution Transformer (DTR) (15 KVA to 75 KVA/11/0.4 KV) are installed at suitable places depending upon load density. From LT side (400V or 230V) of distribution transformers service connection to different categories of consumers (domestic, commercial, industrial etc.) can be given The cluster of consumers (domestic, commercial etc.) fed from this small size of DTR shall be made responsible for checking their industrial loads by putting Miniature Circuit Breaker (MCBS) and being vigilant in monitoring the loading (or overloading) of their transformer.

• By this method, the incidence of burnt out transformers shall be reduced, proper voltage will be maintained and the unscrupulous consumers cannot tap or take direct connections from overhead LT Lines, thereby reducing theft of electricity.

• Hence HVDS system is technologically inevitable for the distribution companies to sustain and grow in era of Liberalization and Globalization. Making the distribution companies

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 32 of 95

modern, globally competitive and commercially viable organization will depend largely on the new technological innovations, modern & effective preventive maintenance practices of distribution system.

• Implementation of LT less distribution network/High Voltage Distribution System will help in supply of uninterrupted and improved quality of power supply to the consumers, which in turn will reduce loss (Technical & Commercial) and subsequent revenue increase to the company on one hand and on the other hand it will reduce the huge maintenance cost of the LT distribution. All these cost advantages and revenue enhancements will over a period of time make the distribution company a commercially viable unit.

• Action Plan for implementation of LT less distribution network utilizing existing 11 KV Garpandu feeder of Jalukbari Sub-Station under jurisdiction of Jalukbari Electrical Sub- Division is under final stage of preparation and will be implemented during FY 2005-06. After its successful implementation, this system will be rolled out in Sub-Division of other Distribution Companies.

4.13 Prioritise disconnection based on amount and/or age of arrears:

Different kinds of disconnection notices are as follows;

a. Normal disconnection notice. These notices are sent to the consumer, regardless of the overdue outstanding amount, as a matter of routine if the records show that the previous month’s bill has not been paid within the prescribed due date. As neither the amount involved is too high nor the age too old, these notices have the lowest priority in terms of active follow-up by the utility.

b. Cut-off month disconnection notice. These notices are sent by the utility to all consumers, regardless of the overdue outstanding amount, whose oldest outstanding bill relates to an accounting month that is older than a pre-determined cut-off month.

c. Special notices. These notices are sent by the utility to all consumers, who satisfy either or both of two criteria – the aggregate overdue outstanding dues are in excess of a specific threshold figure (say Rs 5,000) or whose oldest outstanding bill is prior to a specified month – say March 2005. In view of the large amounts involved and/or the age of the outstanding bills, these notices are accorded the highest priority in terms of active follow-up by the utility.

d. Stay Order from court against disconnection notice. Sometimes, it is found that the large and high value consumer obtain stay from court of law against the disconnection notices, with the results heavy amount of arrears (in lacs of Rs) are kept mounting on them and the SEB has to face revenue loss. Such types of consumer may be dealt keeping in view the legal aspects if the stay is for the disputed bill of particular month or till the settlement with ASEB is accomplished or stay vacated by the ASEB.

e. One-time Settlement: It is generally seen that due to some reason or other the high value consumer could not make the payment of the bill, in that case the payment schedule may be made in installment (2 or 3, depending upon the value) with the approvals from the Management of company. In some cases, they should be exempted from payment of surcharge arrears.

Distribution Companies are attempting to apply the aforesaid guidelines in order to rollout the same across respective areas.

4.14 Ensure that the meter capacity is commensurate with the contracted load to reduce the possibility of erroneous meter registration:

As is well understood, electro-mechanical meters tend to not record the consumer’s energy consumption in full if the current passing through the meter at any point of time is substantially less than rated capacity of the meter. For example, if a current of 2 Amperes is being drawn through a 25 Ampere meter, it is likely that the meter will not register any

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 33 of 95

advance at all – thereby leading to a significant under-registration on the meter if a similar pattern continues for significant periods of time.

a) Identify those consumers whose supply appears to be controlled by meters of unduly large current carrying capacity.

In case of consumers whose consumption is recorded through electro-mechanical meters, this is proposed to be done by using the consumer’s load factor [monthly energy consumption / (contract load * number of hours in the month)] as a surrogate indicator for the actual drawal of current.

In case of consumers whose consumption is recorded through electronic meters, this is proposed to be done based on the consumer’s actual drawal of power as recorded by the meter itself. However, if this data is not made available for analysis due to whatever reason (incomplete download of data from the meter, software incompatibility between the meter and the meter reading instrument, inability of the receiving application to read/analyze the consumer’s consumption pattern etc.), the method outlined in the previous paragraph will be adopted.

b) Prepare look-up tables for different categories of consumers defining what size or capacity of meter should be installed for what range of connected / contract load, as the case may be. Different look-up tables will be required for different consumer categories as not all consumer categories have similar consumption patterns. However, it needs to be understood by all concerned that this table is only an indicative guide and in exceptional cases, individual judgment and discretion will continue to be required.

In this connection, it needs to be mentioned that different look-up tables will need to be prepared in respect of electro-mechanical and electronic meters as the operating boundaries for meters of a similar rated capacity will be appreciably different.

Each Discom is seriously thinking to implement this type of approach to eradicate the possibility of erroneous registration.

4.15 Introduce spot billing for domestic, commercial and small & medium industrial consumers

In this system, Hand Held Machines (HHM) are used to record the consumption of energy consumed through the individual’s energy meters. The bill is generated then and there by HHM and handed over to the respective consumer for payment through cheque and if not possible, then by cash at the collection center within say, 7 days. The recorded meter reading is subsequently downloaded at the respective computerized billing center.

Plagued with the problem of staff shortage engaged in revenue collection, spot billing needs to be carefully implemented to reduce the risk of failure due to undue complications and technical problems in the system. Spot billing system is basically being proposed to be introduced to eliminate differences between the consumption registered on the meter and that reflected in the consumer’s bill, whatever is the reason.

Advantages of HHM

• Reduction of revenue cycle time by combining many activities into one

• Eliminating paper work except the bill to the consumer

• Meter reading, bill generation, bill delivery, cheque collection and cash receipt combined into a simple transaction

• Digital record of bill distribution

• Complete consumer database built anew after survey

• New route mapping incorporated into the database

• Database updated daily

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 34 of 95

Few HHMs have been purchased by the respective Distribution Companies on a trial basis and this system is being introduced gradually in the selected Sub – Divisions.

4.16 Replace conductors by Aerial Bunched Conductors (ABC):

Most of the faults in overhead power supply systems occur due to failure in transmission lines, whether these are HT or LT, resulting in immense loss and inconvenience to consumers. The main weakness of overhead lines are that its power carrying conductors are bare. To overcome the above deficiency, ABC systems have been introduced at many places for both HT and LT systems. Principally, the system is a compromise between insulated power cable systems and bare overhead conductor systems. As far as basic construction goes, there are three or four power carrying conductors suitably insulated and laid around a bare or insulated weight-carrying conductor, which also serves as earth/neutral conductor.

The cable is then hung on transmission poles/towers suitably. Since the cores are insulated the chances of faults is reduced. While it lacks the mechanical strength and safety of underground cables, the very fact that it is hanged overhead enables it to avoid mechanical abuses that an underground cable is normally subjected to. In the ABC system, the insulated aluminum conductors are twisted around a high strength aluminum alloy bear wire, which carries the main weight and also serve as the earth-cum-neutral wire. The phase conductors are not under tension. The insulated phase conductors (with additional street lighting conductor, if provided) shall be twisted around the Bare Aluminum Alloy messenger wire, which shall take all the mechanical stress. The messenger wire shall also serve as the earth-cum neutral wire.

ABC is a novel concept for O/H Power distribution. When compared to the conventional bare conductor over head distribution system, ABC provides higher safety and reliability, lower power losses and ultimate system economy by reducing installation, maintenance and operative cost. This system is ideal for rural distribution and is especially attractive for installation in difficult terrains such as hilly areas, forest areas, coastal areas etc. ABC is also considered to be the best choice for power distribution in congested urban areas with narrow lanes and by-lanes. In developing urban complex, ABC is the better choice because of flexibility for rerouting as demanded by changes in urban development plan.

As this system is very capital intensive, it is proposed to implement this only in a selected Sub-division like Sonapur Electrical Sub-Division. The action plan including cost benefit aspect is under preparation. After its successful implementation, this system will be rolled out in other part of Distribution Companies.

4.17 Introduce Automated Meter Reading to reduce metering errors:

Automated Meter Reading (AMR) is the remote collection of consumption data from the consumer’s power utility meter over telephones lines, radio systems or power line carriers (PLC). For example, Singapore Power uses a telephone line or GSM mobile telephone interface with an Remote Terminal Unit (RTU) that reads the meter (it records and stores pulses generated by the electricity meter) each day. Colorado Springs Utilities deploys AMR using wireless radio transmitter through which the customer meters are read and data transferred into the billing system.

AMR helps to:

• Improve billing efficiency

• Eliminate the need for estimating meter readings

• Shorten the revenue cycle time – from consumption to billing and collection

• Improve load management

• Check tampering and other leakages before it becomes a major problem

• Increase the return on investment on a meter

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 35 of 95

• Provide remote flexible tariff

• Provide capacity to remotely connect or disconnect the power connection

AMR comprises the following three elements:

• Automated reading of meters

• A communication link between the meters and the centralized (or decentralized) billing system

• A centralized (or decentralized) data store in respect of consumption patterns

Each AMR meter is provided with a transmitter / receiver module. It can read meters via a Public Switched Telephone Network (PSTN), switched cellular, General Packet Radio Service (GPRS), Global System for Mobile Communication (GSM), cellular connections etc. All the three services are widely available in the country. About 10% of the AMR devices installed worldwide communicate by telephone and 5% by PLC. Radio, being the least expensive, is used in the remaining 85%.

In the US, the radio band is shared with many users and spread spectrum modulation technique is encouraged. This system has been adopted in India. Certain environmental factors may require special considerations depending upon where the meter is located. There may not be clear path for the radio receivers in handheld computers, vehicles & pole mounted units. Repeaters can be used to supplement such installation and are often needed in apartments, high-rise buildings or density populated city areas.

AMR software can have added value function such as supervision of the meters, operational conditions, detection of fraud attempts, consumer load profiles as per standard: IEC 6206-31-DATA exchange for meter reading, tariff and local control.

Distribution Company is thinking to introduce AMR system as a pilot project during FY 2006-07.

Customer Care Processes

4.18 UAEDCL recognizes that it needs to strengthen the customer orientation and provide better services to its customers. It is crucial to its commercial success as industry reform continues and customer choice is introduced.

4.19 The Hon’ble Commission has already issued the “Guidelines for Redressal of Consumer Grievances”. This provides the licensee with the Commission’s expectations for ASEB/successor entities with regard to the processing, monitoring and escalation of complaints/disputes with consumers.

4.20 In view of the above, UAEDCL has already started review and redesign of its processes (facilities like drop a box for payment through cheque has been initiated in some areas). Some of the key processes that are under review and redesign; handling applications for new connections, handling customer grievances that will satisfy the Commission’s requirements; and improvements to the current payment receiving facilities.

4.21 It also plans to improve the infrastructure capabilities to better respond to customer complaints and put up a system in place to capture the data requirements and to regularly monitor the complaints as per AERC guidelines.

Performance Incentive Scheme

4.22. UAEDCL has commenced a trial Performance Incentive Scheme implemented w.e.f 15 October 2005 for the remaining six months of FY 05-06 (01-10-05 to 31-03-06).The PIS trial has initially been implemented with staff in direct operational business units, at the

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 36 of 95

transmission division/sub-division level. The purpose of this limited trial is to acquaint staff to the nature of the PIS, and to allow senior management to fine-tune this scheme prior to wider implementation.

The rationale of selecting front-line operational staff for this PIS trial is twofold:

• Improved performance in direct operating units will have the most immediate impact on improving overall corporate business performance; and

• Setting performance indicators for such units is relatively easier because of the direct correlation between local performance indicators and overall company performance indicators.

4.23 In order for this trial Performance Incentive Scheme to be implemented by the aforementioned date, and the following aspects have been taken in to consideration

1. Review the recommended performance indicators and their respective weightings, and if so desired, suggest amendments to these indicators/weightings.

2. Set the target for each performance indicator, by Division and Sub-Division. The target for each performance indicator should represent a reasonable improvement on current performance.

3. The maximum achievable result for each performance indicator, by Division and Sub-Division. This should represent the best level of performance that is possible for the remainder of this financial year, given current resource and other constraints.

4.24 This pilot Performance Incentive Scheme is applicable for operational and maintenance personnel only at the sub-division/division level, up to the Superintending Engineer level. These employees will be eligible for an additional incentive payment up to a maximum of 15% of six-month basic salary. Based on the success of this pilot scheme, a wider Performance Incentive Scheme involving a greater proportion of UAEDCL employees may be introduced in the future.

4.25 The pilot Performance Incentive Scheme will be based on performance measured by the following key performance indicators:

Performance Indicator Weight Target Maximum Achievable

Result

Actual Result

% Payable

1. New Service Connections per

Month 20%

2. Billing Efficiency 40% 3. Collection Efficiency 40% Total 100 % Annual Basic Salary (Rs.) Max. Performance Payment (%) Max. Performance Payment (Rs.) ACTUAL PERFORMANCE PAYMENT (Rs.)

The Performance Incentive scheme will be calculated based on the formula below, added for each of the three above performance indicators:

(Actual Result – Target) Weighting % x 6 months 15% (Maximum Achievable Result – Target) x (as above) x Basic Salary x

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 37 of 95

Where:

• Target = the minimum expected performance by the business unit based on the Company Business Plan and Budget.

• Maximum Achievable Result = maximum performance that can be reasonably achieved for this indicator, given the time available and the existing technical and commercial constraints.

• Actual Result = the actual result reported for the period.

Each sub-division/division will have individual targets set, as appropriate for each location. For staff to achieve the performance incentive payment, actual performance must exceed the targets set.

From the 2006-07 financial year it is envisaged that the PIS be based on the complete approach including a weighted average of company and individual performance indicators. The impact of payment of incentive to the eligible employee has not been taken in the ARR submission as this will be off set by the gain due to efficiency improvement in the distribution system.

T5: Revenue from Charges and Proposal for Tariff Revision

Revenue from Existing Charges

5.1 The Retail Supply Tariff (RST) currently being charged by UAEDCL to its consumers was approved by the Assam Electricity Regulatory Commission in its Tariff Order dated 27 May 2005.

5.2 The total revenue expected based on the existing tariff for FY 2006-07 is Rs. 342.01 crores. The category-wise billing of charges, based on the existing tariff and sales projected by UAEDCL for FY 2006-07 is given in the following table.

Table 18: Category-wise Revenue based on Existing Tariff

(Rs crores)

Revenue from Existing Tariff Category

Energy Charges Fixed Charges Total Charges

Domestic 93.22 9.62 102.84 Commercial 25.51 7.47 32.97 General Purpose Supply 6.04 2.05 8.09 Public Lighting 0.67 0.09 0.76 Public Water Works 2.47 0.63 3.10 Agriculture 0.42 0.20 0.61 Industries - Rural 1.42 0.51 1.93 - Urban 23.18 4.58 27.76 Bulk Supply - Government Educational Institutions 1.22 0.21 1.43 - Others 24.89 3.70 28.59 Tea, Coffee & Rubber 66.38 41.07 107.45 Oil & Coal 18.85 7.27 26.12 Temporary Supply - 0.04 0.04 Revenue from sale to UAEDCL consumers 264.27 77.43 341.68

Employees consumption 0.33 - 0.33 Board’s establishment - - - Total Revenue 264.59 77.43 342.01

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 38 of 95

Detailed category wise revenue, from existing tariffs, as per the Hon’ble Commission’s format, is given in Annexures V and VI.

Tariff Revision Proposal

5.3 UAEDCL is filing for an approval of its proposal for revision of tariffs driven by the following concerns:

Revenue from existing tariff insufficient to cover costs

5.4 UAEDCL, with the existing tariff structure approved by AERC in FY 2005-2006, cannot meet its current costs and results in a deficit of Rs 60.10 Crores based on adjusted Power Purchase Cost (i.e. using Differential BST) and Rs 38.20 crores based on Uniform BST.

Facilitating New Investments

5.5 UAEDCL is making critical and urgently needed investments in its distribution network to reinforce an overloaded system and to enhance its reliability to meet contingencies. This proposal for approval of the Annual Revenue Requirement for FY 2006-07 also envisages recovery of these planned and on-going investments.

Tariff Philosophy

5.6 The present tariff petition envisages rationalising the tariff structure through recovery of user charges from consumers based on the average cost of supply. To the extent possible and considered prudent in the present socio-economic scenario, a conscious effort has been made to move towards cost of supply. In this context, it may be mentioned that on an average, the proposed percentage increase in HT rates is lower than that for LT rates.

5.7 An effort has been made to reduce the total number of rates in the tariff structure. For example, at present, the Fixed Charges for LT Domestic A consumers varies between Rs 15 and Rs 30 per KW of connected load per month depending on the consumption slab. This difference in rates has been proposed to be eliminated to increase transparency as well as ease of implementation.

5.8 Jeevan Dhara consumers present a rather vexing problem if the implementation and monitoring of their billing is to be done correctly. As the eligibility of consumers depends on both monthly consumption as well as connected load, consumers (especially those which are marginal) will keep moving in and out of this category. Apart from increasing the difficulty of billing, it makes data analysis and MIS reporting a major administrative problem. It has therefore, been proposed to include the existing Jeevan Dhara consumers within the LT Domestic A category as a separate slab. This will ease administrative issues and increase transparency without removing the protection afforded to these lifeline consumers.

5.9 The tariff has also been proposed to be reviewed in terms of practicability – especially in respect of those consumers whose tariff is currently linked to the average monthly power availability. As in most of these cases, adequate instrumentation and infrastructural facilities do not exist to monitor the same, it is proposed to do away with differential fixed charges till such time that the required metering and monitoring mechanisms are not put in place. This will also go a long way in increasing transparency and reducing drawn out legal disputes arising out of perceived differences in the average monthly power availability factor and allied issues.

5.10 The licensee has also envisaged rationalising the extent of cross-subsidies among the various tariff categories existing today. The average cost of supply has been used to compute the resulting cross-subsidies in each tariff category.

5.11 Wherever applicable and to the extent possible, incentives and penalties have been emphasised.

5.12 The Electricity Act, 2003 provides for tariffs to progressively reflect the cost of supply for the gradual reduction and elimination of cross-subsidies. This proposal for the revision of

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 39 of 95

tariff is in line with the provisions of the Electricity Act 2003, and envisages the reduction of the extent of cross subsidy in the subsidising categories and moving up realisation from the subsidised categories towards the average cost of supply,

5.13 This proposal for approval of the Annual Revenue Requirement for FY 2006-07 and approval of revised tariffs embodies the provisions of the Govt. of Assam Policy 2003 for Power Sector Reform and Restructuring in Assam, namely:

(a) To enable a reasonable and commercially viable tariff structure of electricity supply services, set in a transparent manner through an independent regulator; promoting end use efficiency and commercially viable operation of the entities engaged in provision of electricity supply service , and

(b) To restore financial viability of power sector so that the sector ceases to be a burden on the State Budget, becomes a net generator of resources and is able to attract requisite investment on its own strength.

Expected Revenue from Proposed Charges

5.14 UAEDCL, by this petition for the revision of retail supply tariffs, and by a suitably structured Bulk Supply Tariff to be charged by ASEB, proposes to recover its entire Annual Revenue Requirement for FY 2006-07, ensuring full cost recovery.

5.15 The following table gives the detailed recovery of charges from the proposed tariff from each tariff category for UAEDCL for the FY 2006-07.

Table 19: Category-wise revenue based on proposed tariff

(Rs crores) Revenue from proposed Tariff

Category Energy Charges Fixed Charges Total Charges

Domestic 106.30 19.70 126.00 Commercial 29.79 8.53 38.32 General Purpose Supply 7.94 2.05 9.99 Public Lighting 0.76 0.13 0.88 Public Water Works 2.47 0.75 3.22 Agriculture 0.33 0.25 0.58 Industries - Rural 1.32 1.28 2.60 - Urban 27.94 7.40 35.34 Bulk Supply - Government Educational Institutions 1.35 0.33 1.69

- Others 28.35 4.47 32.82 Tea, Coffee & Rubber 77.59 44.64 122.23 Oil & Coal 21.47 8.08 29.55 Temporary Supply - 0.05 0.05 Revenue from sale to UAEDCL consumers 305.61 97.65 403.26

Employees consumption 0.42 - 0.42 Board’s establishment - - - Total Revenue 306.02 97.65 403.67

Detailed category wise revenue, from proposed tariffs, as per the Hon’ble Commission’s format, is given in Annexures V and VI.

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 40 of 95

Table 20: Percentage Contribution of major categories to Total Sales and Revenue (At Existing and Proposed tariff)

% of Total Revenue based on Category % of Total Sales

Existing Tariff Proposed Tariff

Domestic 37.8 30.1 31.2 Commercial 8.2 9.6 9.5 General Purpose Supply 2.2 2.4 2.5 Public Lighting 0.2 0.2 0.2 Public Water Works 0.8 0.9 0.8 Agriculture 0.2 0.2 0.1 Industries - Rural 0.9 0.6 0.6 - Urban 9.9 8.1 8.8 Bulk Supply - Government Educational Institutions 0.5 0.4 0.4 - Others 8.7 8.4 8.1 Tea, Coffee & Rubber 23.7 31.4 30.3 Oil & Coal 6.6 7.6 7.3 Temporary Supply 0.0 0.0 0.0 Employees consumption 0.2 0.1 0.1 Board’s establishment 0.0 0.0 0.0 Total Revenue 100.0 100.0 100.0

T6: Proposed Tariff

PROPOSED REVISION IN TARIFFS

6.1 UAEDCL has proposed a few changes in the tariff categories and slabs within the existing categories of consumers with a view to improving the ease of administration and implementation. It has also proposed a few additional and modified tariff clauses to rationalize the tariff as well as the associated escalatory clauses. These changes notwithstanding, in this tariff petition, revision in tariffs is essentially limited to changes in the existing fixed charges and the energy charges to allow UAEDCL to recover the proposed Annual Revenue Requirement.

PROPOSAL FOR REVISED TARIFFS

6.2 This petition for the approval of the revised tariffs is built on the philosophy of full cost recovery and proposes to recover the deficit of Rs 61.98 crores, (based on Differential BST to arrive at a Uniform Retail Tariff) as detailed in the previous section. This entails an overall average increase of 18.1% in tariffs. The following section details the tariffs proposed for the various consumer categories. A summarized table of the proposed tariffs is furnished as an Annexure to this petition (Annexure VII)

LT Category-I: Domestic A (including Jeevan Dhara - to be merged with LT Domestic A)

(a) Fixed Charges: The existing tariff for this category of consumers is Rs. 15 per month per connection. UAEDCL proposes to merge the Jeevan Dhara consumers within LT Domestic A category as a separate slab whose monthly consumption does not exceed 30 KWh. It is proposed to revise the fixed charges to Rs 50 per month per KW of connected load across all slabs of ‘LT Domestic A’ category. This will greatly ease the implementation and monitoring processes as it will do away with the need for re-classifying a consumer every month depending on the level of consumption and connected load.

It is also proposed to extend the benefit of the erstwhile Jeevan Dhara subsidised rates only to small domestic consumers and hence, it will only be these consumers who will get migrated to the LT Domestic A category (Slab 0 – 30 units per month).

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 41 of 95

(b) Energy Charges: UAEDCL proposes to slightly modify the existing slabs for energy charge. The proposed energy charge for consumption of electricity in the various slabs is given in the following table:

Description Energy Charge (Rs per kWh)

Monthly energy consumption First 30 units (covers existing Jeevan Dhara consumers) 2.00

Next 90 units 3.00 Next 120 units 4.00

Balance units 5.00

LT Category-II: LT Domestic B

(a) Fixed Charges: The proposed fixed charge for this category of consumers is Rs. 60 per KW of connected load per month.

(b) Energy Charges: The proposed energy charge is given in the following table:

Description Energy Charge (Rs per kWh)

Monthly energy consumption For all units 5.00

LT Category-III: LT Commercial

(a) Fixed Charges: The proposed fixed charge for this category of consumers is Rs. 125 per KW of connected load per month.

(b) Energy Charges: The proposed energy charge is given in the following table:

Description Energy Charge (Rs per kWh)

Monthly energy consumption For all units 5.00

LT Category-IV: LT General Purpose Supply

(a) Fixed Charges: The proposed fixed charge for this category of consumers is Rs. 125 per KW of connected load per month.

(b) Energy Charges: The proposed energy charge is given in the following table:

Description Energy Charge (Rs per kWh)

Monthly energy consumption For all units 5.00

LT Category-V: LT Public Lighting

(a) Fixed Charges: The proposed fixed charge for this category of consumers is Rs. 175 per KW of connected load per month.

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 42 of 95

(b) Energy Charges: The proposed energy charge is given in the following table:

Description Energy Charge (Rs per kWh)

Monthly energy consumption For all units 4.50

LT Category-VI: LT Agriculture

(a) Fixed Charges: The proposed fixed charge for this category of consumers is Rs. 50 per KW of connected load per month.

(b) Energy Charges: The proposed energy charge is given in the following table:

Description Energy Charge (Rs per kWh)

Monthly energy consumption For all units 2.50

LT Category-VII: LT Small Industries

(a) Fixed Charges: The proposed fixed charge for this category of consumers is Rs. 75 per KW of connected load per month for both Rural and Urban consumers.

(b) Energy Charges: The proposed energy charges are given in the following table:

Description Energy Charge (Rs per kWh)

Monthly energy consumption For all units - Rural 2.00

For all units – Urban 2.35

LT Category-VIII: Temporary Supplies

(a) Fixed Charges: The proposed fixed charge for this category of consumers is Rs. 80 per KW of connected load per day for Domestic connections and Rs 125 per day per KW of connected load for Non-Domestic connections.

(b) Energy Charges: The proposed energy charges are given in the following table:

Description Energy Charge (Rs per kWh)

Monthly energy consumption Domestic 6.50

Non-Domestic 8.00

The amount payable by the consumer shall be either the fixed charge or variable charge as computed above, whichever is higher.

HT Category-I: HT Domestic

(a) Fixed Charges: The proposed fixed charge for this category of consumers is Rs. 150 per KVA of connected load per month.

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 43 of 95

(b) Energy Charges: The proposed energy charges are given in the following table:

Description Energy Charge (Rs per kWh)

Monthly energy consumption For all units 4.75

HT Category-II: HT Commercial

(a) Fixed Charges: The proposed fixed charge for this category of consumers is Rs. 150 per KVA of connected load per month.

(b) Energy Charges: The proposed energy charges are given in the following table:

Description Energy Charge (Rs per kWh)

Monthly energy consumption For all units 5.00

HT Category-III: HT Public Water Works

(a) Fixed Charges: The proposed fixed charge for this category of consumers is Rs. 150 per KVA of connected load per month.

(b) Energy Charges: The proposed energy charges are given in the following table:

Description Energy Charge (Rs per kWh)

Monthly energy consumption For all units 4.00

HT Category-IV: HT Bulk Supply

(a) Fixed Charges: The proposed fixed charge for both Bulk Government Educational Institutions and Others is Rs. 175 per KVA of connected load per month.

(b) Energy Charges: The proposed energy charges are given in the following table:

Description Energy Charge (Rs per kWh)

Monthly energy consumption For all units – Bulk Government Educational Institutions 4.10

For all units – Others 4.50

HT Category-V (A): HT Small Industries

(a) Fixed Charges: The proposed fixed charge for this category of consumers is Rs. 100 per KVA of connected load per month.

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 44 of 95

(b) Energy Charges: The proposed energy charges are given in the following table:

Description Energy Charge (Rs per kWh)

Monthly energy consumption For all units 2.90

HT Category-V (B): HT-I Industries

(a) Fixed Charges: The proposed fixed charge for this category of consumers is Rs. 150 per KVA of connected load per month.

(b) Energy Charges: The proposed energy charges are given in the following table:

Description Energy Charge (Rs per kWh)

Monthly energy consumption For all units 4.20

Time-Of-The-Day tariff (Optional) for HT-I Industries

Time Slab for consumption Energy Charge (Rs per kWh)

0600 – 1700 hours (Normal) 4.20 1700 – 2200 hours (Peak) 6.25 2200 – 0600 hours (Night) 3.35

HT Category –V(C): HT-II Industries

(a) Fixed Charges: The proposed fixed charge for this category of consumers is Rs. 190 per KVA of connected load per month.

(b) Energy Charges: The proposed energy charges are given in the following table:

Description Energy Charge (Rs per kWh)

Monthly energy consumption For all units 4.40

Time-Of-The-Day tariff (Optional) for HT-II Industries

Time Slab for consumption Energy Charge (Rs per kWh)

0600 – 1700 hours (Normal) 4.40

1700 – 2200 hours (Peak) 6.50

2200 – 0600 hours (Night) 3.50

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 45 of 95

HT Category-VI: Tea, Coffee and Rubber

(a) Fixed Charges: The proposed fixed charge for this category of consumers is Rs. 250 per KVA of connected load per month. It is proposed to delink the Fixed Charge from the total monthly availability, as measurement of the availability of power, in respect of the individual consumer, does not appear to be feasible with the present level of infrastructure and instrumentation.

(b) Energy Charges: The proposed energy charges are given in the following table:

Description Energy Charge (Rs per kWh)

Monthly energy consumption For all units 4.50

Time-Of-The-Day tariff (Optional) for Tea, Coffee & Rubber

Time Slab for consumption Energy Charge (Rs per kWh)

0600 – 1700 hours (Normal) 4.50

1700 – 2200 hours (Peak) 6.10

2200 – 0600 hours (Night) 4.10

Off-season Tariff (Optional)

Energy Charges: The proposed energy charges are given in the following table:

Description Energy Charge (Rs per kWh)

Monthly energy consumption For all units 4.70

HT Category-VII: Oil and Coal

(a) Fixed Charges: The proposed fixed charge for this category of consumers is Rs. 300 per KVA of connected load per month. It is proposed to delink the Fixed Charge from the total monthly availability, as measurement of the availability of power, in respect of the individual consumer, does not appear to be feasible with the present level of infrastructure and instrumentation.

(b) Energy Charges: The proposed energy charges are given in the following table:

Description Energy Charge (Rs per kWh)

Monthly energy consumption For all units 4.50

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 46 of 95

Time-Of-The-Day tariff (Optional) for Oil and Coal

Time Slab for consumption Energy Charge (Rs per kWh)

0600 – 1700 hours (Normal) 4.50

1700 – 2200 hours (Peak) 6.10

2200 – 0600 hours (Night) 4.10

HT Category-VIII: HT Agriculture

(a) Fixed Charges: The proposed fixed charge for this category of consumers is Rs. 50 per KVA of connected load per month.

(b) Energy Charges: The proposed energy charges are given in the following table:

Description Energy Charge (Rs per kWh)

Monthly energy consumption For all units 2.50

The aforesaid rates and charges are proposed to be made subject to the following clauses:

i. Fuel Adjustment Surcharge

ii. Import Adjustment Surcharge

iii. Delayed Payment Surcharge

iv. Power Factor Rebate / Penalty

Fuel Adjustment Surcharge (FAS)

UAEDCL proposes to introduce FAS with a view to protecting itself from intermittent, adverse and unforeseen increase in fuel cost of energy imported from ASEB Trading from time to time. The FAS rate in respect of any financial year shall be equal to the total FAS payable by UAEDCL to ASEB Trading divided by the total quantum of energy billed during the same period and shall be applicable equally on all categories of consumers. FAS shall be levied on a provisional basis from time to time and shall be subject to a final adjustment on completion of audit in respect of each financial year. The detailed FAS clause is furnished in the following paragraphs.

Objectives:

The cost of fuel incurred in respect of energy delivered by UAEDCL is the largest single item of expenditure. At the same time, UAEDCL does not have any control whatsoever on the cost of fuel delivered – basic price, sales tax, royalties, cess, transportation etc. to the power stations from whom energy is purchased through ASEB Trading. Moreover, there is no bar on the fuel suppliers as to how frequently or how much the fuel prices may be increased.

On the other hand, UAEDCL is constrained to make a formal application to Assam Electricity Regulatory Commission for any upward revision of tariff, and that too not more than once a year, to receive their formal approval. Only when this entire process - normally quite lengthy - is gone through, can the power supply agency implement the revised tariff.

It is therefore, proposed to introduce FAS in the Schedule of Rates that will facilitate the following:

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 47 of 95

The distribution company will not need to go through a full tariff revision exercise to neutralize the financial impact of any change in fuel costs (the cost of fuel being deemed to include that of associated taxes, levies, transportation etc. as was defined in the erstwhile Sixth Schedule of The Electricity (Supply) Act, 1948. Instead, any adjustment in the FAS rate(s) applicable for the year shall be given effect to, based on (a) estimates for provisional rates and (b) audited financial statements for final rates.

FAS will be levied on its consumers on a provisional basis and shall be subject to a final adjustment on completion of audit in respect of each financial year. Should the final audited FAS rate be less or more than the provisional FAS rate(s) levied during the year, a corresponding credit or debit adjustment shall be made to the consumers’ accounts.

As there may be a difference between the provisional FAS rate(s) levied in course of a given financial year and the final FAS rate computed in respect of that financial year, the revenue for the year will include a component ‘Fuel Adjustment Surcharge due but not billed’ and shall be equal to the difference between the audited and the provisionally billed FAS rate(s) multiplied by the aggregate quantum of energy sold by ASEB to the distribution companies during that particular financial year.

Salient features of the proposed Fuel Adjustment Surcharge (FAS) clause:

1. FAS shall be constructed in a manner that UAEDCL will not stand to gain or lose due to differences in the actual values of key parameters such as sales mix, distribution losses etc.

2. The impact of any increase in fuel prices in respect of energy imported from ASEB Trading shall be neutralized by a corresponding increase in the FAS to be levied and collected by UAEDCL from its own retail consumers.

3. FAS shall be computed as per the following formula:

Total amount payable by UAEDCL to ASEB Trading in respect of that financial year FAS rate applicable for a financial year =

Total quantum of energy sold in that financial year to all consumers supplied by UAEDCL

Notes:

1. The FAS rate that shall be applicable to their consumers in respect of a particular financial year shall be the total FAS payable by that particular distribution company to ASEB Trader in respect of the energy received from it (ASEB Trader) divided by the aggregate sales to all consumers during that financial year.

2. Should ASEB or AERC desire that in order to maintain total uniformity of retail tariff, the applicable FAS rate should be the same across the distribution companies, the FAS rate that shall be applicable to all consumers in respect of a particular financial year shall be the aggregate FAS payable by all the distribution companies to ASEB Trader in respect of the energy received from it (ASEB Trader) divided by the aggregate sales to all consumers across all the distribution companies during that financial year.

It may be noted that if a uniform FAS rate is made applicable across all the distribution companies, it will result in over-realisation of FAS by certain distribution companies and under-realisation companies by others due to differences in distribution losses.

Import Adjustment Surcharge (IAS)

UAEDCL proposes to introduce an IAS with a view to protecting itself from intermittent, adverse and unforeseen increase in cost of energy imported (other than the fuel cost of energy imported) from ASEB Trading from time to time. The IAS rate in respect of any financial year shall be equal to the total IAS payable by UAEDCL to ASEB Trading divided by the total quantum of energy

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 48 of 95

billed during the same period and shall be applicable equally on all categories of consumers. IAS shall be levied on a provisional basis from time to time and shall be subject to a final adjustment on completion of audit in respect of each financial year. The detailed IAS clause is furnished in the following paragraphs.

Objectives:

In case of UAEDCL, bulk of the energy delivered to it comes from external agencies. Apart from being a major cost item over which UAEDCL has no control, this makes it vulnerable to the risk of large arrears as the tariff of many of these external agencies is finalized by Central Electricity Regulatory Commission. Moreover, there is no bar on how frequently or how much the import prices may be increased by these external agencies. This issue is particularly emphasised in case of energy imported by ASEB Trading from PTC India and other energy traders as it is done through short-term and medium term contracts that are subject to prevalent energy market conditions.

On the other hand, UAEDCL is constrained to make a formal application to Assam Electricity Regulatory Commission for any upward revision of tariff, and that too not more than once a year, to receive their formal approval. Only when this entire process - normally quite lengthy - is gone through, can UAEDCL implement the revised tariff.

It is therefore, proposed to introduce an IAS in the Schedule of Rates that will facilitate the following:

The distribution company will not need to go through a full-blown tariff revision exercise to neutralize the financial impact of any change in import costs (other than fuel costs as that will be taken care of through the Fuel Adjustment Surcharge clause). Instead, any adjustment in the IAS rate(s) applicable for the year shall be given effect to, based on (a) estimates for provisional rates and (b) audited financial statements for final rates.

IAS will be levied on consumers on a provisional basis and shall be subject to a final adjustment on completion of audit in respect of each financial year. Should the final audited IAS rate be less or more than the provisional IAS rate(s) levied during the year, a corresponding credit or debit adjustment shall be made to the consumers’ accounts.

As there may be a difference between the provisional IAS rate(s) levied in course of a given financial year and the final IAS rate computed in respect of that financial year, the revenue for the year will include a component ‘Import Adjustment Surcharge due but not billed’ and shall be equal to the difference between the audited and the provisionally billed IAS rate(s) multiplied by the aggregate quantum of energy sold by ASEB to the distribution companies during that particular financial year.

Salient features of the proposed IAS clause:

1. IAS shall be made applicable equally in respect of all consumers.

2. IAS shall be constructed in a manner that UAEDCL will not stand to gain or lose due to differences in the actual values of key parameters such as distribution loss, sales mix etc.

3. The impact of any increase in import prices (other than fuel prices) in respect of energy imported from ASEB Trading shall be neutralized by a corresponding increase in the IAS to be levied and collected by UAEDCL from own retail consumers.

4. IAS shall be computed as per the following formula:

Total amount payable by UAEDCL as IAS to ASEB Trading in respect of that financial year The IAS rate applicable for a financial year =

Total quantum of energy sold in that financial year to all consumers supplied by UAEDCL

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 49 of 95

Notes:

1. The IAS rate that shall be applicable to consumers of UAEDCL in respect of a particular financial year shall be the total IAS payable by UAEDCL to ASEB Trader in respect of the energy received from it (ASEB Trader) divided by the aggregate sales to all consumers of UAEDCL during that financial year.

2. Should ASEB or AERC desire that in order to maintain total uniformity of retail tariff, the applicable IAS rate should be the same across all the distribution companies, the IAS rate that shall be applicable to all consumers in respect of a particular financial year shall be the aggregate IAS payable by all the distribution companies to ASEB Trader in respect of the energy received from it (ASEB Trader) divided by the aggregate sales to all consumers across all the distribution companies during that financial year.

It may be noted that if a uniform IAS rate is made applicable across all the distribution companies, it will result in over-realisation of IAS by certain distribution companies and under-realisation companies by others due to differences in distribution losses.

Delayed Payment Surcharge (DPS)

The existing clause shall remain unchanged.

Power Factor Rebate or Penalty

(a) Power Factor Penalty: In case the average power factor in a month falls below 85%, a penalty @ 1% for every 1% fall in average power factor from 85% to 60% plus 2% for every 1% fall in average power factor from 60% to 30% plus 3% for every 1% fall in average power factor below 30% shall be levied on the total energy charge. Power factor penalty shall be levied on all consumers equally, irrespective of whether the metering is done through electronic or electro-mechanical devices.

(b) Power Factor Rebate: In case the average power factor in a month is more than 90%, a rebate @ 0.5% for every 1% increase in average power factor from 90% shall be allowed on the total energy charge. Power factor rebate shall be applicable on all consumers equally, irrespective of whether the metering is done through electronic or electro-mechanical devices.

Statutory levies

Any increase in operating costs due to variation or imposition of any statutory levy by the Government of India, Government of Assam or any other competent authority in respect of energy purchased or distributed by UAEDCL shall be recovered from its consumers as a surcharge on the standard rates mentioned in the Schedule of Tariff.

The tariff structure, as per the Hon’ble Commission’s format, is furnished in Annexure VII.

The schedule of tariff, terms and conditions of tariff proposed to be made effective from 1st April, 2006, are furnished in Annexure VIII.

T7: Progress on Commission’s Previous Directives

7.1 The progress achieved on the various directives issued by the Hon’ble Commission as part of its Tariff Order for FY 2005-06, is mentioned in the table below:

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 50 of 95

Table 21: Replies to AERC Directives

AERC Directive – FY05-06 Action Taken To Date or To Be Taken T & D Losses – Guwahati-II, Jorhat and Dibrugarh 8.1 (a) T & D Losses As the APDRP works have commenced in the three circles, namely Guwahati-II, Jorhat and Dibrugarh, the Commission directs that the concerned Discoms make a study of the reduction of losses gained from investments in these circles and submit the same at least one month before the submission of next tariff petition.

APDRP works at Jorhat and Dibrugarh Circles are still under progress. Actual T&D loss reduction can be assessed only after 100% completion of the above work. The details regarding the APDRP Schemes have been furnished in the petition.

Billing Efficiency 8.1 (b) Billing Efficiency The Commission directs the Discoms that Annual Average of monthly Billing Efficiency should not be less than 95%, Where monthly billing efficiency = Number of consumer billed during the month divided by the number of consumers served by the Licensee at the beginning of month. The Commission further directs that the Discoms furnish a quarterly report on the Billing Efficiency achieved with effect from July 2005 indicating the action taken in respect of the units (Circles/Divisions/Sub-divisions) where the Billing Efficiency is lower for informing the consumers the names of the units and of the officers in their charge.

Average monthly billing efficiency of different circles under UAEDCL with effect from are as follows:

Circle July 05 Aug 05 Sep 05 Dibrugarh 96% 96% 100% Sibsagar 96% 96% 96% Jorhat 92% 97% 101% North Lakhimpur

99% 99% 98%

Company has outsourced the billing activities with a view to achieving higher and improved billing percentages as directed by the Hon’ble Commission. Computerization of billing is underway and Billing Efficiency is expected to stabilize after full computerization is done.

Spot billing has been introduced for domestic, commercial and small and medium industrial consumers on a trial basis.

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 51 of 95

AERC Directive – FY05-06 Action Taken To Date or To Be Taken Collection Efficiency 8.1 (c) Collection Efficiency The Commission directs the Discoms that Annual Average of monthly Collection Efficiency should not be less than 95%, Where monthly Collection Efficiency = Amount realized divided by the amount assessed during month. The Commission further directs that the Discoms furnish a quarterly report on the Collection Efficiency achieved with effect from July 2005 indicating action taken in respect of units where the Collection Efficiency is lower for informing the consumers the names of the units and of the officers in their charge.

Average monthly collection efficiency of different circles under UAEDCL with effect from July ’05 are as follows:

Circle July 05 Aug 05 Sep 05 Dibrugarh 93% 104% 90% Sibsagar 74% 98% 97% Jorhat 97% 99% 98% North Lakhimpur

92% 82% 85%

To achieve the collection efficiency as directed by the Hon’ble Commission, the following actions have been undertaken: a) Regular disconnection drive against non-payment of dues is being

made effective. b) Disconnection prioritisation is being based on the amount and/or

age of arrears and accordingly different kinds of notices are being issued to the defaulting consumers.

c) Introduction of spot billing for domestic, commercial and small and medium industrial consumers.

d) Opening time of some Cash Counters have been advanced to 9.00 A.M. during working days.

e) Cheque drop facilities have also been introduced in some locations.

These steps would gradually be extended further and it is expected that these will help in improving the collection efficiency to a great extent. All concerned field units have been directed to take up vigorous disconnection drives and to collect arrears & achieve more than 100% in collection efficiency. Sub Divisional level consumer committees have been formed and communication with consumers has also been improved through setting up of customer care centers.

Security Deposit Register 8.4 C The Commission directs each Company to maintain an up to date Security Deposits Register duly reconciled with their books of accounts ... The Commission directs the licensee should evolve a suitable mechanism for refund the interests accrued on security deposit collected from the consumers and submit a report on the same before the Commission within one month of this order.

Security Deposit Registers at the Subdivision-level have been introduced and are being updated regularly. For payment of interest on security deposit a guideline for the same has been circulated to the offices. An updated status report on this matter will be furnished shortly to the Hon’ble Commission.

Detailed Business Plans for Next 5 Years 11.5 The Commission also requires each of the Licensees to submit detailed business plans for the next 5 years having details of its Capital expenditure and Financing plans as well the future projections of operational performance like losses and collection efficiency.

The work on Business Plans for the next 5 years is underway and it is expected that the same will be completed after the Tariff Filing process for FY 2006-07 is over. Therefore, the utility craves leave to submit the same once they are ready after the Tariff Petition is filed.

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 52 of 95

AERC Directive – FY05-06 Action Taken To Date or To Be Taken Energy Auditing & Distribution Losses 11.10 (a) Energy Auditing and study on Distribution losses – The Discoms are required to take up pilot projects to study the exact nature and causes of losses.

Action is being taken to conduct a study on energy auditing and distribution losses. A pilot project is being implemented. Report on the study would be submitted to the Hon’ble Commission in due course.

Divisional/Sub divisional Accountability for Profit, Losses and Revenue 11.10 (b) Introduce accountability and responsibility within the divisions and subdivisions and hence look at each of these as profit centers and monitor losses and revenue performance of these centers.

The performance of the individual Divisions and Subdivisions is being closely monitored and necessary action is being taken to proceed in line with the Hon’ble Commission’s directive. The process has been initiated to introduce accountability and responsibility at the Division and Sub Division level. MOUs with CEO’s, CEO’s & EE’s of respective Divisions under them, & between respective EE’s and SDEs have been signed / in process and responsibility(s) and accountability as profit center is being fixed. In furtherance to this objective, the company has introduced a Performance Incentive Scheme as well, on a trial basis. The details of this scheme have been furnished in the petition under the head “Performance Incentive Scheme”.

Distribution Losses 11.11 The three Discoms are to submit data regarding the current and future level of Distribution losses for FY 2006-07 including the impact of Distribution network projects on the reduction of losses no later than three months from the issue of his order.

Present average distribution loss under UAEDCL is 37%. After completion of various project works under UAEDCL, distribution losses are expected to reduce by a considerable extent. The details of the various initiatives for reduction of distribution losses have been furnished in the petition under the head “Efficiency Improvement Initiatives”. Following the Directives of the Hon’ble Commission and the ongoing Distribution System strengthening program, the distribution loss for UAEDCL has been estimated as 29.9% for FY 2006-07.

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 53 of 95

AERC Directive – FY05-06 Action Taken To Date or To Be Taken Billing & Management Information Systems 11.12 The Commission recognizes the massive efficiency gains that can result out of effective Computerization of Billing and Management Information Systems (MIS) and wishes the Discoms to submit soon after this order, a status report of the its Billing and MIS being followed by each of the Discoms.

MIS can be generated only after full fledged completion and implementation of computerized billing system. Some of the circles in which Computerized Billing has been implemented are mentioned below :

SL No

Name of Circle Name of Sub Divisions

1 JORHAT Titabor EL S/D Mariani EL SID Jorhat EL S/D Golaghat EL S/D Bokakhat EL S/D 2 DIBRUGARH Dibrugarh EL S/D I Dibrugarh EL S/D II Dibrugarh EL S/D III Tsk EL Supply Doomdooma EL S/D

Efforts are on to implement computerized billing in most of the IRCA divisions – which deal mainly with high value consumers. However, computerized billing is also being introduced in some of the Electrical sub divisions for domestic and commercial consumers. Total computerization will be implemented after the completion of the CMC Billing project.

Interface Metering Points 11.16 The five petitioners are to provide details of interface metering points of the five petitioners for energy accounting, and also the status of accounting as directed by the Commission in the Interim Tariff Order dated 31 March, 2005.

Interface metering between the Discoms and AEGCL is being done. The details regarding the same have been furnished in the petition of Assam Electricity Grid Corporation Limited..

AERC Directive – FY04-05 Action Taken To Date or To Be Taken

Metering Installed at ASEB Premises 8.1 The Commission hereby directs the Board to submit a report on the status of meters installed at offices and premises belonging to ASEB, within two months of the publication of this order.

Action already taken up and completed; field report being awaited. Once the report is received, the same will be filed before the Hon’ble Commission.

Insurance Cover of Assets 8.6 The Commission hereby directs the Board to analyze the economics of taking required insurance cover of assets, risks associated with employees or third party etc. and submit a report on this matter within three months of issue of this tariff order.

The process has been initiated and an in depth study of the tariff of various Insurance Companies including Global Insurers is planned to be undertaken. Besides this staff training is also required for this purpose. The above process is expected to take sometime. The Hon’ble Commission will be kept updated on the status.

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 54 of 95

AERC Directive – FY04-05 Action Taken To Date or To Be Taken Un-metered Consumers 8.8 ASEB is directed to provide on a monthly basis the number of such [un-metered] consumers (existing and new). Further within three months of the issuance of this order ASEB must conduct a comprehensive study to analyze the energy consumption of a typical consumer of this category.

All un-metered consumers are being metered under the APDRP Scheme.

Fixed Charges for Different Consumer Categories 8.10 The Commission has rationalized the fixed charges for the different consumer categories. This rationalisation has been achieved through two methods, increasing the level of fixed charges and by linking the fixed charges to level of availability ... The Commission directs ASEB to submit along with the next tariff proposal ways and means of extending this scheme to other categories. Moreover the ASEB may even analyze the success of this scheme and suggest modifications to improve its effectiveness.

In furtherance to the Hon’ble Commission’s directive, UAEDCL prays to review the Fixed Charges structure introduced by the Hon’ble Commission in terms of its practicability – especially in respect of those consumers whose tariff is currently linked to the average monthly power availability. As in most cases, adequate instrumentation and infrastructural facilities do not exist to monitor availability at individual consumer level, it is proposed to do away with differential fixed charges till such time that the required metering and monitoring mechanisms are not put in place. This will go a long way in increasing transparency and reducing drawn out legal disputes arising out of perceived differences in the average monthly power availability factor and allied issues.

Metering of Consumers 8.11 The Commission believes that metering of consumers must be taken on war footing to improve the revenue generation and achieve loss reduction. The Commission directs the ASEB to provide the quarterly progress reports on the progress on APDRP and ADB funded schemes.

All un-metered consumers are being metered under APDRP scheme

Strategy to Provide Quality Service and Retain Subsidisation 8.12 The Commission directs the Board to formulate a strategy to provide quality service and retain the subsidising (where the average tariff is higher than the cost of supply) set of consumers and submit such strategy to the Commission within three months from the date of this order.

UAEDCL has made an attempt to give a signal of providing quality services despite retaining cross subsidy for the needy consumer categories, through the proposed tariff structure. The proposed tariffs are aimed at protecting the life line consumers through a heavily subsidised tariff rate. At the same time, the contribution of other subsidised categories has been marginally increased so that the burden on the subsiding categories is correspondingly reduced. So whereas on the one hand cross subsidy is continued, on the other hand, the burden of such subsidy on the subsiding categories has been reduced so that the various categories can gradually move towards the average cost of supply. This is in line with the Hon’ble Commission’s objective to ultimately move towards Cost of Supply based tariffs.

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 55 of 95

AERC Directive – FY04-05 Action Taken To Date or To Be Taken MRI Downloads and Analysis for HT Consumers 8.13 The Commission hereby directs ASEB to evolve a suitable process and mechanism and ensure monthly MRI downloads and analysis for all HT consumers from the month of January 2005. A brief monthly report on the following heads should be submitted to the Commission by 25th of the following month:

No of HT consumers No of MRI downloads taken No of cases where discrepancies found Amount of additional bills raised Collection against such bills Action taken to prevent such cases in future

Action is being taken.

Asset Register 8.18 The Commission hereby directs ASEB to build an asset register that should include information on the status of the assets mentioned. Within two months of publication of this tariff order ASEB should inform the Commission about the expected time to be taken to build the asset register.

A physical inventory of assets is currently under preparation. Thereafter, the detailed asset Register shall be prepared.

TOU Charges 8.20 The Commission directs ASEB to submit an action plan within three months that lists out the ground issues for implementation of Time of Use (TOU) charges for categories other than those where such charges are already in force. ASEB should estimate the time and money that will be required to upgrade metering at consumer premises and an ABC analysis based on which the utility can stagger the implementation and thus reduce the initial investment.

The major factors that will influence the decision on whether or not to implement TOU charges are the following –

a) Total quantum of energy consumption as TOU charges will be effective only for large consumers.

b) Perceived ability of the consumer category to be responsive to differential TOU tariff.

c) Estimated benefit to ASEB, of persuading the target consumers to modify their consumption pattern.

Notwithstanding the funds constraint being faced by ASEB, the cost of metering is not likely to be a major constraint as the number of consumers affected will be small and the change-over can be done in a phased manner.

Unmetered Consumers 8.21 The Commission directs the ASEB to report on a quarterly basis the number of un-metered connections and conduct sample load surveys every year of such consumers to check for any increase in connected load/multiple points in their premises. Based on the load survey ASEB must compute a normative level of monthly energy consumption per point beyond which the consumer must shift to the regular metered tariff.

All unmetered consumers are being metered under APDRP scheme

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 56 of 95

Annexure I: Employee Cost – Additional Information

UAEDCL

Sanctioned Working Sanctioned Working Sanctioned Working

1 Board of Directors - - - - - - 2 Chief Engineer &

equivalents2 2 2 2 2 0

3 Superintending Engineers & equivalents

10 9 10 9 10 6

4 Executive Engineers & equivalents

47 42 47 39 47 36

5 Asst Executive Engineers & equivalents

73 62 73 58 73 49

6 Asst Engineers & equivalents

45 30 45 38 45 28

7 All other staff 4792 3095 4792 3002 4792 28968 ACEs & Equivalents 4 4 4 3 4 0 Total 4973 3244 4973 3151 4973 3015

Form-AT6A/T6A/D 6AEmployees Costs - Additional information

Category of employeeSl No

Previous year 04-05 Current year 05-06 Ensuing year 06-07Number Number Number

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 57 of 95

Annexure II: Gross Fixed Assets UAEDCL

1. Land & Rights 2.36 0.41 2.77 2.77 2.77 2. Building 13.74 0.00 13.75 13.75 13.75 3. Hydraulic 2.53 (0.00) 2.53 2.53 2.53 4. Other Civil Works 6.51 0.08 6.60 6.60 6.60 5. Plant & Machinery 58.50 0.58 59.08 59.08 59.08 6. Lines & Cable Net work 145.05 1.26 146.31 146.31 146.31 7. Vehicles 3.12 0.05 3.16 3.16 3.16 8. Furniture& Fixtures 3.50 0.02 3.52 3.52 3.52 9. Office Equipment 0.53 0.10 0.63 0.63 0.63 10. Other items (provide list)

Total 235.85 2.50 - 238.36 - - 238.36 - - 238.36

Repeat the same format to provide voltage class-wise information.

Retirement of assets during the

year

Gross Fixed Assets

Additions during the

year

Retirement of assets during the

year

Balance at the end of the year

Balance at the beginning of the year

Information shall be provided voltage class ( 400 KV, 220 KV, 132 KV, 66 KV, 33 KV, 11 KV and below)

Additions during the

year

Balance at the end of the year

Form-AT15/T15/D15

(Rs crores)

Sl No Particulars of assets

Previous year 2004-05 Ensuing year2006-07Current year 2005-06Additions during the

year

Retirement of assets during the

year

Balance at the end of the year

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 58 of 95

Annexure III: Depreciation

UAEDCL

1. Land & Rights - - - - - - -

2. Building 5.13 0.13 5.26 0.65 5.91 0.65 6.56

3. Hydraulic 1.17 0.01 1.18 0.09 1.27 0.09 1.36

4.

Other Civil Works 1.25 0.03 1.28 0.10 1.39 0.10 1.49

5. Plant & Machinery 27.57 1.83 29.40 3.28 32.67 3.28 35.95

6. Lines & Cable Net work 88.68 16.93 105.61 8.22 113.84 8.22 122.06

7. Vehicles 2.31 0.06 2.37 0.21 2.58 0.21 2.78

8. Furniture& Fixtures 3.12 0.13 3.26 - 3.26 - 3.26

9. Office Equipment 0.36 0.03 0.39 0.03 0.42 0.03 0.44

10.

Other items (provide list)

Grand Total 129.59 19.15 - 148.74 12.58 - 161.32 12.58 - 173.90

Ensuing year 2006-07Balance of

accumulated depreciation at the

beginning of the year

Depreciation provided for the

year

Balance of accumulated

depreciation at the end of the year

Depreciation provided for the

year

Withdrawal of depreciation

Sl No Description of assets

Previous year 2004-05 Current year 2005-06Depreciation

provided for the year

Withdrawal of depreciation

Balance of accumulated

depreciation at the end of theyear

Form - AT8/T8/D8

Withdrawal of depreciation

Balance of accumulated

depreciation at the end of theyear

Depreciation

(Rs crores)

Information shall be provided voltage class ( 400 KV, 220 KV, 132 KV, 66 KV, 33 KV, 11 KV and below)Repeat the same format to provide voltage class-wise information.

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 59 of 95

Annexure IV: Net Fixed Assets

UAEDCL

1 2 3 4 5 6 7 8 9 10 11 12

1. Land & Rights 2.36 0.41 - 2.77 - - 2.77 - - 2.77 2. Building 8.62 0.00 0.13 8.49 - 0.65 7.84 - 0.65 7.19 3. Hydraulic 1.36 (0.00) 0.01 1.36 - 0.09 1.26 - 0.09 1.17 4. Other Civil Works 5.27 0.08 0.03 5.32 - 0.10 5.21 - 0.10 5.11 5. Plant & Machinery 30.93 0.58 1.83 29.68 - 3.28 26.40 - 3.28 23.13 6. Lines & Cable Net work 56.37 1.26 16.93 40.69 - 8.22 32.47 - 8.22 24.25 7. Vehicles 0.81 0.05 0.06 0.80 - 0.21 0.59 - 0.21 0.38 8. Furniture& Fixtures 0.38 0.02 0.13 0.27 - - 0.27 - - 0.27 9. Office Equipment 0.17 0.10 0.03 0.24 - 0.03 0.22 - 0.03 0.19 10. Other items (provide list)

Total 106.27 2.50 19.15 89.61 - 12.58 77.04 - 12.58 64.46

Net Addition of assets during

the year

Balance of written down cost of assets

at the end of the year

Ensuing year 2006-07

Net Depreciation for the Year

Balance of written down cost of assets

at the end of the year

Net Addition of assets during

the year

Net Depreciation for the Year

Balance of writtendown cost of assetsat the beginning ofthe year

Net Addition ofassets during theyear

Net Depreciationfor the Year

Balance of writtendown cost ofassets at the end ofthe year

Form-AT16/T16/D16 Net Fixed Assets

Information shall be provided voltage class ( 400 KV, 220 KV, 132 KV, 66 KV, 33 KV, 11 KV and below)Repeat the same format to provide voltage class-wise information.

(Rs crores)

Sl No Description of assets

Previous year 2004-05 Current year 2005-06

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 60 of 95

Annexure V: Revenue from Sale of Power UAEDCL

Form D2/AT2

No of Installations

Energy Sold (MU)

Revenue (Rs Crs)

Average realisation (Rs/unit)

No of Installations

Energy Sold (MU)

Revenue (Rs Crs)

Average realisation (Rs/unit)

No of Installations

Energy Sold (MU)

Revenue (Rs Crs)

Average realisation (Rs/unit)

I Consumer CategorywiseLow Tension

1 Jeevan Dhara / Domestic A (0-30 units) 13.806 3.64 2.63 15.326 4.26 2.78 2 Domestic A -

0-120 80.445 23.98 2.98 89.299 33.46 3.75 121-240 75.428 30.59 4.06 83.731 39.65 4.74

> 240 43.991 20.71 4.71 48.832 27.63 5.66 3 Domestic B 26.510 11.22 4.23 29.428 16.60 5.64 4 Commercial 223.97 118.08 5.27 50.620 28.68 5.66 55.999 36.15 6.46 5 General Purpose Supply 51.59 19.71 3.82 13.979 7.17 5.13 15.885 9.99 6.29 6 Public Lighting 6.42 3.55 5.53 1.495 0.69 4.59 1.678 0.88 5.26 7 Agriculture 15.89 13.96 8.79 0.010 0.00 3.29 0.010 0.004 4.19 8 Rural Industries 5.813 1.71 2.95 6.606 2.60 3.93 9 Urban Industries 5.352 1.53 2.85 5.528 1.80 3.25 10 Temporary Supply 0.47 0.43 9.15 0.063 0.03 5.00 0.072 0.05

High Tension11 HT Domestic 7.249 2.79 3.85 8.047 4.40 5.47 12 HT Commercial 3.231 1.57 4.87 3.574 2.17 6.06 13 Public Water Works 33.05 22.09 6.68 5.635 2.86 5.08 6.171 3.22 5.22 14 Bulk Supply - Educational 3.111 1.36 4.36 3.299 1.69 5.11 15 Bulk Supply - Others 59.111 26.97 4.56 63.002 32.82 5.21 16 HT Small Industries 13.031 4.02 3.08 13.461 5.46 4.06 17 HT-I Industries 30.948 12.85 4.15 31.969 16.89 5.28 18 HT-II Industries 20.477 8.67 4.24 21.152 11.19 5.29 19 Tea, Coffee and Rubber 166.906 104.41 6.26 172.415 122.23 7.09 20 Oil and Coal 43.463 24.47 5.63 47.710 29.55 6.19 21 HT Irrigation 1.277 0.61 4.81 1.319 0.57 4.36

Total 671.952 320.53 4.77 724.514 403.25 5.57 Employees' Consumption 3.22 1.590 0.32 1.667 0.42 Board's Establishment 0.74 0.261 - 0.315 Grand total 1,984.61 857.29 4.32 673.803 320.85 726.496 403.67 5.56

Sl. No. Particulars

Previous year 2004-05 Current year 2005-06 Ensuing year 2006-07

Revenue from Sale of PowerConsolidated ASEB Figure (as per Approved Accounts)

782.19 221.46

5.97

4.74

4.88

7.69

2.83

25.68

Included above under LT Agriculture

237.94 116.11

293.75 175.47

19.75

146.68 309.70

Included above under LT Domestic Included above under LT Commercial

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 61 of 95

Annexure VI: Category wise Revenue from Sale of Power Category wise Revenue from Sale of Power

UAEDCL 2006-07

Particulars

Rate (Rs)

Amount (Rs.crores)

Total Amount (Rs.crores)

Particulars

Rate (Rs)

Amount (Rs.crores)

Total Amount (Rs.crores)

1 LT 1 Jeevan Dhara 52,288 19,983Fixed Chages-per

connection 15.00 0.94 Fixed Chages - Rs/KW 50.00 1.20upto 5 KW

15.326 Energy Charges 2.00 3.07 Energy Charges 2.00 3.07Total 4.01 0-30 Units 4.26 0.26 6%

Total

2 LT 2 Domestic A Fixed Charges Fixed Chargesupto 5 KW 15.00 upto 5 KW 50.00

111,127 KW 2.00 KW 6.67 upto 5 KW 30.00 upto 5 KW 50.00

102,634 KW 3.69 KW 6.16 upto 5 KW 30.00 upto 5 KW 50.00

53,532 KW 1.93 KW 3.21 Energy Charges Energy Charges

172,475 89.299 0-120 2.75 24.56 31-120 3.00 26.79Units Units

54,611 83.731 121-240 3.60 30.14 121-240 4.00 33.49Units Units

20,176 48.832 Balance Units 4.30 21.00 Balance Units 5.00 24.42Units Units

247,262 Total 83.32 Total 100.74 17.42 21%

3 LT 3 Domestic B 2,632 26,186 Fixed Charges 30 0.94 Fixed Charges 60.00 1.895-20 KW/month 5-20 KW/month

29.428 Energy Charges 3.9 11.48 Energy Charges 5.00 14.71Full Consumption Full Consumption

Total 12.42 Total 16.60 4.18 34%

4 LT 4 Commercial 29,403 54,348 Fixed Charges 110 7.17 Fixed Charges 125.00 8.150.5-20 KW/month 0.5-20 KW/month

55.999 Energy Charges 4.3 24.08 Energy Charges 5.00 28.00Full Consumption Full Consumption

Total 31.25 Total 36.15 4.90 16%

5 LT 5 General Purpose Supply 4,873 13,644 Fixed Charges 125 2.05 Fixed Charges 125.00 2.050-20 KW/month 0-20 KW/month

15.885 Energy Charges 3.8 6.04 Energy Charges 5.00 7.94Full Consumption Full Consumption

Total 8.08 Total 9.99 1.91 24%

6 LT 6 Public Lighting 250 609 Fixed Charges 120 0.09 Fixed Charges 175.00 0.13Rs/KW/month Rs/KW/month

1.678 Energy Charges 4 0.67 Energy Charges 4.50 0.76Full Consumption Full Consumption

Total 0.76 Total 0.88 0.12 16%7 LT 7 Agriculture 7 28 Fixed Charges 30 0.001 Fixed Charges 50.00 0.002

Rs/KW/month Rs/KW/month0.010 Energy Charges 2.15 0.002 Energy Charges 2.50 0.002

Full Consumption Full ConsumptionTotal 0.003 Total 0.004 0.00 32%

Expected Additional Revenue at Proposed Charges

(Rs.crores)

FORM T21/D21

Proposed Percentage Increase (%)

Sl. No.

Tariff Category Type of installation

Charges at Proposed TariffCharges at Existing Tariff

No. of consumers

Connected Load(KW)

Consumption-

Slabwise (MU)

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 62 of 95

Annexure VI contd... UAEDCL 2006-07 FORM T21/D21

Particulars

Rate (Rs)

Amount (Rs. Crs)

Total Amount (Rs. Crs)

Particulars

Rate (Rs)

Amount (Rs. Crs)

Total Amount (Rs. Crs)

8 LT 8(i) Rural Industries 1,210 14,186 Fixed Charges 30 0.511 Fixed Charges 75.00 1.28Rs/kW/month Rs/kW/month

6.606 Energy Charges 2.15 1.42 Energy Charges 2.00 1.32Full Consumption Full Consumption

Total 1.93 Total 2.60 0.67 35%9 LT 8(ii) Urban Industries 365 5,525 Fixed Charges 40 0.265 Fixed Charges 75.00 0.50

Rs/kW/month Rs/kW/month5.528 Energy Charges 2.35 1.30 Energy Charges 2.35 1.30

Full Consumption Full ConsumptionTotal 1.56 Total 1.80 0.23 15%

10 LT 9 Temporary Supply 16 23 Fixed Charges 60 / 100 Fixed Charges 80 / 125Rs/kW/day Rs/kW/day

0.072 Energy Charges 5.00 / 6.00 0.03591 Energy Charges 6.50 / 8.00 0.05Full Consumption Full Consumption

Total 0.04 Total 0.05 0.01 30%

11 HT 1 HT Domestic 132 2,910 Fixed Charges 30 0.12 Fixed Charges 150.00 0.58Rs/kVA/month Rs/kVA/month

8.047 Energy Charges 3.7 2.98 Energy Charges 4.75 3.82Full Consumption Full Consumption

Total 3.09 Total 4.40 1.31 42%

12 HT 2 HT Commercial 88 1,899 Fixed Charges 115 0.29 Fixed Charges 150.00 0.38Rs/kVA/month Rs/kVA/month

3.574 Energy Charges 4 1.43 Energy Charges 5.00 1.79Full Consumption Full Consumption

Total 1.72 Total 2.17 0.45 26%13 HT 3 Public Water Works 243 3,771 Fixed Charges 125 0.63 Fixed Charges 150.00 0.75

Rs/kVA/month Rs/kVA/month6.171 Energy Charges 4 2.47 Energy Charges 4.00 2.47

Full Consumption Full ConsumptionTotal 3.10 Total 3.22 0.13 4%

14 HT 4(i) Bulk Supply - Educational 11 2,043 Fixed Charges 110 0.21 Fixed Charges 175.00 0.33Rs/kVA/month Rs/kVA/month

3.299 Energy Charges 3.7 1.22 Energy Charges 4.10 1.35Full Consumption Full Consumption

Total 1.43 Total 1.69 0.26 18%

15 HT 4(ii) Bulk Supply - Others 97 27,352 Fixed Charges 145 3.70 Fixed Charges 175.00 4.47Rs/kVA/month Rs/kVA/month

63.002 Energy Charges 3.95 24.89 Energy Charges 4.50 28.35Full Consumption Full Consumption

Total 28.59 Total 32.82 4.23 15%

16 HT 5 HT Small Industries 310 11,666 Fixed Charges 40 0.62 Fixed Charges 100.00 1.56Rs/kVA/month Rs/kVA/month

13.461 Energy Charges 2.6 3.50 Energy Charges 2.90 3.90Full Consumption Full Consumption

Total 4.12 Total 5.46 1.34 32%

Proposed Percentage Increase (%)Sl.

No.Tariff

Category Type of installation

Charges at Proposed TariffCharges at Existing TariffNo. of

consumers Connected Load(kW)

Consumption-

Slabwise (MU)

Expected Additional Revenue at Proposed Charges (Rs.Crs)

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 63 of 95

Annexure VI contd... UAEDCL 2006-07 FORM T21/D21

Particulars

Rate (Rs)

Amount (Rs. Crs)

Total Amount (Rs. Crs)

Particulars

Rate (Rs)

Amount (Rs. Crs)

Total Amount (Rs. Crs)

17 HT 5(B) HT-I Industries 248 24,706 Fixed Charges 100 2.31 Fixed Charges 150.00 3.46Rs/kVA/month Rs/kVA/month

31.969 Energy Charges 3.4 10.87 Energy Charges 4.20 13.43Full Consumption Full Consumption

Total 13.18 Total 16.89 3.71 28%18 HT 5 (C) HT-II Industries 41 10,627 Fixed Charges 140 1.39 Fixed Charges 190.00 1.88

Rs/kVA/month Rs/kVA/month21.152 Energy Charges 3.55 7.51 Energy Charges 4.40 9.31

Full Consumption Full ConsumptionTotal 8.90 Total 11.19 2.29 26%

19 HT 6 Tea, Coffee and Rubber 576 191,326 Fixed Charges 230 41.07 Fixed Charges 250.00 44.64 Rs/kVA/month Rs/kVA/month

172.415 Energy Charges 3.85 66.38 Energy Charges 4.50 77.59Full Consumption Full Consumption

Total 107.45 Total 122.23 14.78 14%

20 HT 7 Oil and Coal 103 28,848 Fixed Charges 270 7.27 Fixed Charges 300.00 8.08 Rs/kVA/month Rs/kVA/month

47.710 Energy Charges 3.95 18.85 Energy Charges 4.50 21.47Full Consumption Full Consumption

Total 26.12 Total 29.55 3.43 13%

21 HT 8 HT Agriculture 126 3,673 Fixed Charges 40 0.20 Fixed Charges 50.00 0.24 Rs/kVA/month Rs/kVA/month

1.319 Energy Charges 3.15 0.42 Energy Charges 2.50 0.33Full Consumption Full Consumption

Total 0.61 Total 0.57 -0.04 -6%

340279 710645 Total Fixed Charges 77.39 Total Fixed Charges 97.61724.514 Total Variable Charges 264.29 Total Variable Charges 305.65

Total 341.68 Total 403.25 61.58 18%

Employees Consumption 1.667 2.00 0.33 2.50 0.42 0.09Board's Establishment 0.315 - - -

KW + KVA 726.496 GRAND TOTAL 342.01 GRAND TOTAL 403.67 61.66

Proposed Percentage Increase (%)Sl.

No.Tariff

Category Type of installation

Charges at Proposed TariffCharges at Existing TariffNo. of

consumers Connected Load(kW)

Consumption-

Slabwise (MU)

Expected Additional

Revenue at Proposed Charges (Rs.Crs)

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 64 of 95

Annexure VII: Existing and Proposed Tariff UAEDCL

1 LT 1 Jeevan Dhara Fixed Charges - per connection 15.00 Proposed to be merged with

Energy Charges per unit 2.00 Domestic A ( 0 Units - 30 units slab)

2 LT 2 Domestic A Fixed Charges - Rs/KW/month Fixed Charges - Rs/KW/month0.5 to 5 KW 15.00 upto 5 KW 50.000.5 to 5 KW 30.000.5 to 5 KW 30.00 Energy Charges -Rs/unit

Energy Charges -Rs/unit 0 Units to 30 Units / month 2.000 Units to 120 Units / month 2.75 31 Units to 120 Units / month 3.00

121 Units to 240 Units / month 3.60 121 Units to 240 Units / month 4.00Balance Units above 240 Units / month 4.30 Balance Units above 240 / month 5.00

3 LT 3 Domestic B Fixed Charges - Rs/KW/month Fixed Charges - Rs/KW/month5 KW to 20 KW 30.00 5 KW to 20 KW 60.00

Energy Charges -Rs/unit Energy Charges -Rs/unitAll units 3.90 All units 5.00

4 LT 4 Commercial Fixed Charges - Rs/KW/month Fixed Charges - Rs/KW/month0.5 KW to 20 KW 110.00 0.5 KW to 20 KW 125.00

Energy Charges -Rs/unit Energy Charges -Rs/unitAll units 4.30 All units 5.00

5 LT 5 General Purpose Supply Fixed Charges - Rs/KW/month Fixed Charges - Rs/KW/monthupto 20 KW 125.00 upto 20 KW 125.00

Energy Charges -Rs/unit Energy Charges -Rs/unitAll units 3.80 All units 5.00

6 LT 6 Public Lighting Fixed Charges - Rs/KW/month 120.00 Fixed Charges - Rs/KW/month 175.00Energy Charges -Rs/unit Energy Charges -Rs/unit

All units 4.00 All units 4.50

7 LT 7 Agriculture Fixed Charges - Rs/KW/month Fixed Charges - Rs/KW/monthupto 7.5 hp 30.00 upto 7.5 hp 50.00

Energy Charges -Rs/unit Energy Charges -Rs/unitAll units 2.15 All units 2.50

EXISTING TARIFF AND PROPOSED TARIFF

Sl. No.

Tariff Category Type of installation

Existing Tariff Charges - 05-06 Proposed Tariff Charges - 06-07

PARTICULARS Rates (Rs.)

PARTICULARS Rates (Rs.)

Form T20/D20

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 65 of 95

Annexure VII contd... UAEDCL Form T20/D20

8 LT 8(i) Rural Industries Fixed Charges - Rs/KW/month Fixed Charges - Rs/KW/monthupto 25 KVA 30.00 upto 25 KVA 75.00

Energy Charges -Rs/unit Energy Charges -Rs/unitAll units 2.15 All units 2.00

9 LT 8(ii) Urban Industries Fixed Charges - Rs/KW/month Fixed Charges - Rs/KW/monthupto 25 KVA 40.00 upto 25 KVA 75.00

Energy Charges -Rs/unit Energy Charges -Rs/unitAll units 2.35 All units 2.35

10 LT 9 Temporary Supply - Domestic Fixed Charges - Rs/KW/day 60.00 Fixed Charges - Rs/KW/day 80.00OR OR

Energy Charges -Rs/unit Energy Charges -Rs/unitAll units 5.00 All units 6.50

Temporary Supply - Non Domestic Fixed Charges - Rs/KW/day 100.00 Fixed Charges - Rs/KW/day 125.00OR OR

Energy Charges -Rs/unit Energy Charges -Rs/unitAll units 6.00 All units 8.00

11 HT 1 HT Domestic Fixed Charges - Rs/KVA/month Fixed Charges - Rs/KVA/month30.00 150.00

Energy Charges -Rs/unit Energy Charges -Rs/unitAll units 3.70 All units 4.75

12 HT 2 HT Commercial Fixed Charges - Rs/KVA/month Fixed Charges - Rs/KVA/month115.00 150.00

Energy Charges -Rs/unit Energy Charges -Rs/unitAll units 4.00 All units 5.00

13 HT 3 Public Water Works Fixed Charges - Rs/KVA/month 125.00 Fixed Charges - Rs/KVA/month 150.00Energy Charges -Rs/unit Energy Charges -Rs/unit

All units 4.00 All units 4.00

14 HT 4(i) Bulk Supply - Educational Fixed Charges - Rs/KVA/month Fixed Charges - Rs/KVA/month110.00 175.00

Energy Charges -Rs/unit Energy Charges -Rs/unitAll units 3.70 All units 4.10

15 HT 4(ii) Bulk Supply - Others Fixed Charges - Rs/KVA/month Fixed Charges - Rs/KVA/month145.00 175.00

Energy Charges -Rs/unit Energy Charges -Rs/unitAll units 3.95 All units 4.50

EXISTING TARIFF AND PROPOSED TARIFF

Sl. No.

Tariff Category Type of installation

Existing Tariff Charges - 05-06 Proposed Tariff Charges - 06-07

PARTICULARS Rates (Rs.) PARTICULARS Rates (Rs.)

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 66 of 95

Annexure VII contd... UAEDCL Form T20/D20

16 HT 5 HT Small Industries Fixed Charges - Rs/KVA/month Fixed Charges - Rs/KVA/monthUpto 50 KVA 40.00 Upto 50 KVA 100.00

Energy Charges -Rs/unit Energy Charges -Rs/unitAll units 2.60 All units 2.90

17 HT 5(B) HT-I Industries Fixed Charges - Rs/KVA/month Fixed Charges - Rs/KVA/monthabove 50 KVA and upto 150 KVA 100.00 above 50 KVA and upto 150 KVA 150.00

Energy Charges -Rs/unit Energy Charges -Rs/unitAll units 3.40 All units 4.20

TOD Tariff for Energy Charges TOD Tariff for Energy Charges0600 hours to 1700 hours (Normal) 3.40 0600 hours to 1700 hours (Normal) 4.20

1700 - 2200 hours (Peak) 5.00 1700 - 2200 hours (Peak) 6.252200 - 0600 hours (night) 2.75 2200 - 0600 hours (night) 3.35

18 HT 5 (C) HT-II Industries Fixed Charges - Rs/KVA/month Fixed Charges - Rs/KVA/monthabove 150 KVA 140.00 above 150 KVA 190.00

Energy Charges -Rs/unit Energy Charges -Rs/unitAll units 3.55 All units 4.40

TOD Tariff for Energy Charges TOD Tariff for Energy Charges0600 hours to 1700 hours (Normal) 3.55 0600 hours to 1700 hours (Normal) 4.40

1700 - 2200 hours (Peak) 4.60 1700 - 2200 hours (Peak) 6.502200 - 0600 hours (night) 3.00 2200 - 0600 hours (night) 3.50

19 HT 6 Tea, Coffee and Rubber Fixed Charges - Rs/KVA/month 230.00 Fixed Charges - Rs/KVA/month 250.00Energy Charges -Rs/unit Energy Charges -Rs/unit

All units 3.85 All units 4.50

Availability Based Fixed Charges Availability Based Fixed ChargesAvailability - > 70% 230.00 Availability - > 70%

Availability - > 60% and upto 69% 225.00 Availability - > 60% and upto 69%Availability - > 50% and upto 59% 220.00 Availability - > 50% and upto 59%

Availability - upto 49% 210.00 Availability - upto 49%

TOD Tariff for Energy Charges TOD Tariff for Energy Charges0600 hours to 1700 hours (Normal) 3.85 0600 hours to 1700 hours (Normal) 4.50

1700 - 2200 hours (Peak) 5.25 1700 - 2200 hours (Peak) 6.102200 - 0600 hours (night) 3.60 2200 - 0600 hours (night) 4.10

Off Season Tariff Off Season TariffFixed Charges - Rs/KVA/month Fixed Charges - Rs/KVA/month

(Minimum of 30% of contracted demand (Minimum of 30% of contracted demandduring season period) during season period)

Energy Charges -Rs/unit 4.00 Energy Charges -Rs/unit 4.70

PARTICULARS Rates (Rs.)

Proposed to be abolished

EXISTING TARIFF AND PROPOSED TARIFF

Sl. No.

Tariff Category Type of installation

Existing Tariff Charges - 05-06 Proposed Tariff Charges - 06-07

PARTICULARS Rates (Rs.)

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 67 of 95

Annexure VII contd... UAEDCL Form T20/D20

20 HT 7 Oil and Coal Fixed Charges - Rs/KVA/month 270.00 Fixed Charges - Rs/KVA/month 300.00Energy Charges -Rs/unit Energy Charges -Rs/unit

All units 3.95 All units 4.50

Availability Based Fixed Charges Availability Based Fixed ChargesAvailability - > 70% 270.00 Availability - > 70%

Availability - > 60% and upto 69% 265.00 Availability - > 60% and upto 69%Availability - > 50% and upto 59% 260.00 Availability - > 50% and upto 59%

Availability - upto 49% 255.00 Availability - upto 49%

TOD Tariff for Energy Charges TOD Tariff for Energy Charges0600 hours to 1700 hours (Normal) 3.95 0600 hours to 1700 hours (Normal) 4.50

1700 - 2200 hours (Peak) 5.20 1700 - 2200 hours (Peak) 6.102200 - 0600 hours (night) 3.75 2200 - 0600 hours (night) 4.10

21 HT 8 HT Irrigation Fixed Charges - Rs/KVA/month Fixed Charges - Rs/KVA/monthabove 7.5 hp 40.00 above 7.5 hp 50.00

Energy Charges -Rs/unit Energy Charges -Rs/unitAll units 3.15 All units 2.50

Sl. No.

Tariff Category Type of installation

Existing Tariff Charges - 05-06

PARTICULARS Rates (Rs.) PARTICULARS Rates (Rs.)

Proposed to be abolished

EXISTING TARIFF AND PROPOSED TARIFF

Proposed Tariff Charges - 06-07

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 68 of 95

Annexure VIII: Proposed Schedule of Tariff

PROPOSED SCHEDULE OF TARIFF (Proposed to be made effective from 1st April 2006)

ASSAM STATE ELECTRICITY BOARD

UPPER ASSAM ELECTRICITY DISTRIBUTION COMPANY LTD

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 69 of 95

TABLE OF CONTENTS

LT Supplies ..................................................................................................................................70

L T Category-I: Domestic A .........................................................................................................70

L T Category-II: Domestic-B........................................................................................................71

L T Category-III: LT Commercial ................................................................................................71

LT Category IV: LT General Purpose Supply ..............................................................................71

LT Category V: Public Lighting ...................................................................................................72

LT Category VI: Agriculture.........................................................................................................72

LT Category VII: Small Industries................................................................................................73

LT Category VIII: Temporary Supply ..........................................................................................73

HT Supplies..................................................................................................................................74

HT Category I: HT Domestic........................................................................................................74

HT Category II: HT Commercial ..................................................................................................74

HT Category III: Public Water Works ..........................................................................................75

HT Category IV: Bulk Supply. .....................................................................................................75

HT Category V: HT Small Industries ...........................................................................................76

HT Category V: (B) - HT - I Industries ........................................................................................77

HT Category V: (C) - HT-II Industries .........................................................................................78

HT Category VI: Tea, Coffee and Rubber ....................................................................................79

HT Category VII: Oil and Coal.....................................................................................................80

HT Category VIII: HT Irrigation ..................................................................................................81

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 70 of 95

SCHEDULE OF TARIFF

ASSAM STATE ELECTRICITY BOARD

UPPER ASSAM ELECTRICITY DISTRIBUTION COMPANY LTD

The tariff applicable in the State of Assam starting from the first meter reading date of April 2006

For the purpose of this schedule the consumers are divided into two distinct groups based on consumption and the nature of supply.

LT Supplies Supply Voltage 1 Phase 230V AC and 3 Phase 415V AC

L T Category-I: Domestic A

Applicability

This tariff shall be applicable for supply of power to consumers having connected load up to 5 KW for residential premises, exclusively for domestic purposes only. This shall also include supply of power to occupants of flats in multi-storied buildings, if the premises has not been classified under Domestic B or HT Domestic and receiving bulk power at single point without any individual metering arrangements for domestic purposes.

(a) Tariff:

Energy Charge Fixed Charge

For consumption between 0-1 kWh per day or 0-30 kWh per month Rs. 2.00 / kWh Rs. 50 / KW / month

For consumption between 1-4 kWh per day or 31-120 kWh per month Rs. 3.00 / kWh Rs. 50 / KW / month

For consumption of next 4 kWh per day or 121-240 kWh per month Rs. 4.00 / kWh Rs. 50 / KW / month

Balance kWh per month Rs. 5.00 / kWh Rs. 50 / KW / month

For the purpose of determination of monthly fixed charge, the Connected Load shall be rounded up to next higher KW if the decimal is higher than 0.5 and the nearest lower KW if the decimal is lower than 0.5. However, in case of consumers whose connected load is less than or equal to 0.5 kW, the actual connected load shall be considered while computing the monthly fixed charge.

NOTE:

If any part of the domestic connection is utilised for any use other than dwelling purpose like commercial, industrial etc, the entire consumption shall be treated as the case may be, for corresponding category and the respective tariff shall be applied for the entire consumption.

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 71 of 95

L T Category-II: Domestic-B

Applicability

This tariff shall be applicable for supply of power to consumers having Connected Load above 5 KW and up to 20 KW exclusively for domestic purposes only. This shall also include supply of power to occupants of flats in multi-storied buildings, receiving bulk power at single point with individual metering for domestic purposes.

(a) Tariff:

Energy Charge Fixed Charge

For all consumption Rs. 5.00 / kWh Rs. 60 / KW / month

For the purpose of determination of monthly fixed charge, the Connected Load shall be rounded up to the next higher KW if the decimal is higher than 0.5 and the nearest lower KW if the decimal is lower than 0.5.

NOTE:

If any part of the domestic connection is utilised for any use other than dwelling purpose like commercial, industrial etc, the entire consumption shall be treated as the case may be, for corresponding category and the respective tariff shall be applied for the entire consumption.

L T Category-III: LT Commercial

Applicability

This tariff shall be applicable for supply of power to consumers having Connected Load up to 20 KW to all establishments and institutions of commercial nature and connected with trading activities, including commercial offices, Government and public sector commercial installations, commercial house, optical houses, shops, hotels, restaurants, bars, refreshment stalls, showcases of advertisements, theaters, cinema halls, guest houses, laundries, dry-cleaners, Railway stations, public and private bus stands not covered under any other category of consumers, copy works, X-ray installations, private nursing homes/clinical laboratories, photographic studios., battery charging units, workshop, petrol pumps, factory & printing presses not using motive power in the manufacturing process, private educational and cultural institutions, lodging and boarding houses.

(a) Tariff:

Energy Charge Fixed Charge

For all consumption Rs. 5.00 / kWh Rs. 125 / KW / month

For the purpose of determination of monthly fixed charge, the Connected Load shall be rounded up to the next higher KW if the decimal is higher than 0.5 and the nearest lower KW if the decimal is lower than 0.5. However, in case of consumers whose connected load is less than or equal to 0.5 kW, the actual connected load shall be considered while computing the monthly fixed charge.

LT Category IV: LT General Purpose Supply

Applicability

This tariff shall be applicable for supply of power to consumers having Connected Load up to 20 KW to all non-commercial and non-domestic users of electric power like, Government offices, semi-Government educational and cultural institutions, Government, hospita1s, dispensaries,

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 72 of 95

charitable institutions and Trusts (public or private formed solely for charitable or religious purposes), dharamshalas, non-commercial boarding and lodging houses and other non-commercial institutions.

(a) Tariff:

Energy Charge Fixed Charge

For all consumption Rs. 5.00 / kWh Rs. 125 / kW / month

For the purpose of determination of monthly fixed charge, the Connected Load shall be rounded up to the next higher KW if the decimal is higher than 0.5 and the nearest lower KW if the decimal is lower than 0.5. However, in case of consumers whose connected load is less than or equal to 0.5 kW, the actual connected load shall be considered while computing the monthly fixed charge.

LT Category V: Public Lighting

Applicability

This tariff is applicable to supply of power for street lighting systems in municipalities, Town committees and panchayats etc, signal systems in roads, park lighting in areas of municipality / Town committee, panchayat etc.

(a) Tariff:

Energy Charge Fixed Charge

For all consumption Rs. 4.50 / kWh Rs. 175 / kW / month

For the purpose of determination of monthly fixed charge, the Connected Load shall be rounded up to the next higher KW if the decimal is higher than 0.5 and the nearest lower KW if the decimal is lower than 0.5. However, in case of consumers whose connected load is less than or equal to 0.5 kW, the actual connected load shall be considered while computing the monthly fixed charge.

LT Category VI: Agriculture

Applicability

This tariff is applicable to supply of power for agriculture / irrigation purpose in the agricultural sector for pump sets upto 7.5 HP.

(a) Tariff:

Energy Charge Fixed Charge

For all consumption Rs. 2.50 / kWh Rs. 50 / kW / month

For the purpose of determination of monthly fixed charge, the Connected Load shall be rounded up to the next higher KW if the decimal is higher than 0.5 and the nearest lower KW if the decimal is lower than 0.5. However, in case of consumers whose connected load is less than or equal to 0.5 kW, the actual connected load shall be considered while computing the monthly fixed charge.

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 73 of 95

LT Category VII: Small Industries

Applicability

This tariff is applicable for supply of power for industrial purposes for consumers having Contract Demand / Connected Load up to 25 KVA.

(a) Tariff:

Energy Charge Fixed Charge

Rural Industries-For all consumption Rs. 2.00 / kWh Rs. 75 / kW / month

Urban Industries-For all consumption Rs. 2.35 / kWh Rs. 75 / kW / month

For the purpose of determination of monthly fixed charge, the Connected Load shall be rounded up to the next higher KW if the decimal is higher than 0.5and the nearest lower KW if the decimal is lower than 0.5. However, in case of consumers whose connected load is less than or equal to 0.5 kW, the actual connected load shall be considered while computing the monthly fixed charge.

LT Category VIII: Temporary Supply

Applicability

This tariff will be applicable for electric supply of power that is temporary, in nature for a period not exceeding, one month.

Charges

Domestic Rs. 80 / KW / day or Rs. 6.50 / kWh whichever is higher

Non Domestic Rs. 125 / KW / day or Rs. 8.00 / kWh whichever is higher

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 74 of 95

HT Supplies

Tariff for this group is applicable for those consumers availing power supply at 11 KV or above: Calculations shall be deemed to be in KVA basis for consumers under this part of tariff schedule

HT Category I: HT Domestic

Applicability

This tariff shall be applicable for supply of power to consumers having Connected Load above 25 KVA to resident at premises, exclusively for domestic purposes only. This shall also include supply of power to occupants of flats in multi-storied buildings/residential colony, receiving bulk power at single point with single metering for domestic purposes.

(a) Tariff:

Energy Charge Fixed Charge

For all consumption Rs. 4.75 / kWh Rs. 150 / KVA / month

For the purpose of determination of Monthly fixed charge, the Connected Load shall be rounded up to the next higher KW if the decima1 is higher than 0.5 and the nearest lower KW if the decimal is lower than 0.5.

For supply at voltages higher than as applicable to the consumers as per section 2.2 of the AERC Electricity Supply Code and related matters. Rebate @ 3% shall be applicable on energy charge for each higher level of voltage.

In case, metering is done on the L.T side of the distribution transformer, then for the purpose of billing, an additional energy consumption on account of transformer loss computed @ 3% on the consumer's energy charge shall be added.

NOTE:

If any part of the domestic connection is utilised for any use other than dwelling purpose like commercial, industrial etc, the entire consumption shall be treated as the case may be, for corresponding category and the respective tariff shall be applied for the entire consumption.

HT Category II: HT Commercial

Applicability

This tariff shall be applicable for supply of power to consumers having Connected Load above 25 KVA to all establishments and institutions of commercial nature and connected with trading activities, including commercial offices, Government and public sector commercial installations, commercial houses, political houses, shops, restaurants, hotels, bars, refreshment stalls, showcases of advertisements, theatres, cinema halls, guest houses, laundries, dry-cleaners, Railway stations, public and private bus-stands not covered under any other category of consumers, copy works, X-ray installations, private nursing homes/clinical laboratories, photographic studios, battery charging units, workshop, petrol pumps, factory & printing presses not using motive power in the manufacturing process, private educational and cultural institutions, lodging and boarding houses.

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 75 of 95

(a) Tariff:

Energy Charge Fixed Charge

For all consumption Rs. 5.00 / kWh Rs. 150 / KVA / month

For the purpose of determination of monthly fixed charge, the Connected Load shall be rounded up to the next higher KW if the decimal is higher than 0.5 and the nearest lower KW if the decima1 is lower than 0.5.

For supply at voltages higher than as applicable to the consumers as per section 2.2 of the AERC Electricity Supply Code and related matters. Rebate @ 3% shall be applicable on energy charge for each higher level of voltage.

In case, metering is done on the L.T side .of the distribution transformer, then for the purpose of billing an additional energy charge on account of transformer loss computed @ 3% on the consumer's energy charge shall be added.

HT Category III: Public Water Works

Applicability

This tariff is applicable for public water supply maintained by Government or Government corporations, municipalities, town committees and panchayats.

(a) Tariff:

Energy Charge Fixed Charge

For all consumption Rs. 4.00 / kWh Rs. 150 / KVA / month

For the purpose of determination of monthly fixed charge, the Connected Load shall be rounded up to the next higher KW if the decimal is higher than 0.5 and the nearest lower KW if the decimal is lower than 0.5.

For supply at voltages higher than as applicable to the consumers as per section 2.2 of the AERC Electricity Supply Code and related matters. Rebate @ 3% shall be applicable on energy charge for each higher level of voltage.

In case, metering is done on the L.T side of the distribution transformer for a group of consumers receiving power, than for the purpose of billing an additional energy consumption on account of transformer loss computed @ 3% on the consumer's energy charge shall be added.

HT Category IV: Bulk Supply.

Applicability

This tariff is applicable to Bulk consumers with a Connected Load not less than 25 KVA provided that the consumers not covered by any other category such as any domestic connection, industries, tea etc and who make their own internal distribution arrangement at their own cost and receive power at the point of supply at high or extra high voltage. This is further classified as under.

(i) Government educational institution-like universities, engineering colleges, medical colleges with residential facilities and

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 76 of 95

(ii) Others

N.B. - Any existing "General Purpose" Category consumer whose Connected Load is above 25 KVA will automatically be converted to 'Bulk Other' Category.

(a) Tariff:

(i) Bulk Government educational institutions

Energy Charge Fixed Charge

For all consumption Rs. 4.10 / kWh Rs. 175 / KVA / month

(ii) Others

Energy Charge Fixed Charge

For all consumption Rs. 4.50 / kWh Rs. 175 / KVA / month

For supply at voltages higher than as applicable to the consumers as per section 2.2 of the AERC Electricity Supply Code and related matters. Rebate @ 3% shall be applicable on energy consumption for each higher level of voltage.

In case, metering is done on the LT side of the distribution transformer, then for the purpose of billing an additional energy charge on account of transformer loss computed @ 3% on the consumer's energy charge shall be added

(c) Contract Demand: The Contract Demand shall be between 70% to 105% as declared by the consumer of the Connected Load converted to KVA at 0.85 power factor. In case declaration option is not made by the consumer within the stipulated time, 100% of the Connected Load converted to KVA shall per the Contract Demand.

(d) Billable Demand: Billing demand shall be 100% of Contract Demand of Recorded Demand, whichever is higher. In case the meters remain defective in a month, Billing Demand shall be considered on the average Billing Demand of the last three months when the meter was in order.

(e) Overdrawal Penalty: If the Recorded Demand is higher than the Contract Demand in a month, then fixed charge based on Contract Demand shall be levied at three times the normal rate for the portion of demand exceeding the Contract Demand.

HT Category V: HT Small Industries

Applicability

This tariff is applicable for supply of power for industrial purposes for consumers with Connected Load above 25 KVA and up to 50 KVA irrespective of location of the industry in rural area or urban area.

(a) Tariff:

Energy Charge Fixed Charge

For all consumption Rs. 2.90 / kWh Rs. 100 / KVA / month

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 77 of 95

For the purpose of determination of monthly fixed charge, the Connected Load shall be rounded up to the next higher KW if the decimal is higher than 0.5 and the nearest lower KW if the decimal is lower than 0.5.

For supply at voltages higher than as applicable to the consumers as per section 2.2 of the AERC Electricity Supply Code and related matters. Rebate @ 3% shall be applicable on energy charge for each higher level of voltage.

In case, metering is done on the L.T side of the distribution transformer, then for the purpose of billing, an additional energy charge on account of transformer loss computed @ 3% on the consumer's energy charge shall be added.

HT Category V: (B) - HT - I Industries

Applicability

This tariff is applicable for supply of power to consumers at a single point for industrial purposes with Contract Demand / Connected Load above 50 KVA to 150 KVA.

(a) Tariff:

Energy Charge Fixed Charge

For all consumption Rs. 4.20 / kWh Rs. 150 / kVA / month

Time-Of-The-Day (TOD) tariff

T.O.D. tariff for HT - I. Industries

Fixed Charge: Rs 150 / kVA / month

Energy Charge

Description Energy Charge

Time

0600-1700 hrs (normal) Rs 4.20 / kWh

1700-2200 hrs (peak) Rs 6.25 / kWh

2200-0600 hrs (night) Rs 3.35 / kWh

For supply at voltages higher than as applicable to the consumers as per section 22 of the AERC Electricity Supply Code and related matters. Rebate @ 3% shall be applicable on energy charge for each higher level of voltage.

In case, metering is done on the L.T side of the distribution transformer, then for the purpose of billing, an additional energy charge on account of transformer loss computed @ 3% on .the consumer’s Energy Charge shall be added.

(c) Contract Demand: The Contract Demand shall be between 70% to 105% of the Connected Load as declared by the consumer converted to KVA at 0.85 power factor. In case

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 78 of 95

declaration / option is not made by the consumer within the stipulated time, 100% of the Connected Load converted to KVA shall be the Contract Demand.

(d) Billable Demand: Billing demand shall be 100% of Contract Demand of Recorded Demand, whichever is higher. In case the meters remain defective in a month, Billing Demand shall be considered on the average Billing Demand of the last three months when the meter was in order.

(e) Overdrawal Penalty: If the Recorded Demand is higher than the Contract Demand in a month, then fixed charge based on Contracted Demand shall be levied at three times the normal rate for the portion of demand exceeding the Contracted Demand.

HT Category V: (C) - HT-II Industries Applicability

This tariff is applicable for supply of power at single point for industrial purposes where the Contract Demand / Connected Load is above 150 KVA.

(a) Tariff:

Energy Charge Fixed Charge

For all consumption Rs. 4.40 / kWh Rs. 190 / KVA / month

Optional Time-Of-The-Day (T.O.D) tariff

T.O.D. tariff for HT - II Industries

Fixed charge: Rs 190 / kVA / month

Energy Charge

Description Energy Charge

Time

0600-1700 hrs (normal) Rs 4.40 / kWh

1700-2200 hrs (peak) Rs 6.50 / kWh

2200-0600 hrs (night) Rs 3.50 / kWh

For supply at voltages higher than as applicable to the consumers as per section 2.2 of the AERC Electricity Supply Code and related matters. Rebate @ 3% shall be applicable on energy charge for each higher level of voltage.

In case, metering is done on the L.T side of the distribution transformer, then for the purpose of billing an additional energy charge on account of transformer loss computed @ 3% on the consumer's energy charge shall be added.

(c) Contract Demand: The Contract Demand shall be between 70% to 105% of the Connected Load as declared by the consumer converted to KVA at 0.85 power factor. In case declaration / option is not made by the consumer within the stipulated time, 100% of the Connected Load converted to KVA shall be the Contract Demand.

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 79 of 95

(d) Billable Demand: Billing demand shall be 100% of Contract Demand of Recorded Demand, whichever is higher. Incase the meters remain defective in a month, Billing Demand shall be considered on the average Billing Demand of the last three months when the meter was in order.

(e) Overdrawal Penalty: If the Recorded Demand is higher than the Contract Demand in a month, then fixed charge based on Contract Demand shall be levied at three times the normal rate for the portion of demand exceeding the Contract Demand.

HT Category VI: Tea, Coffee and Rubber

Applicability

This tariff is applicable for tea, coffee and rubber, plantation / production by utilisation of electrical power in factory, irrigation / lighting etc. in the Estate.

(a) Tariff

(i) Seasonal Tariff (April to November)

Energy Charge Fixed Charge

For all consumption Rs. 4.50 / kWh Rs. 250 / KVA month

Time-Of-The-Tariff (T.O.D) tariff applicable

T.O.D. tariff for Tea, Coffee & Rubber (for the whole year)

Fixed Charge: Rs 250 / kVA / month

Energy Charge

Description Energy Charge

Time

0600-1700 hrs (normal) Rs 4.50 / kWh

1700-2200 hrs (peak) Rs 6.10 / kWh

2200-0600 hrs (night) Rs 4.10 / kWh

Off-Season Tariff (December to March)

Off-Season energy charge for Tea, Coffee & Rubber Rs 4.70/kwh

Consumer under this category shall have the option to select any continuous 4 (four) months period between September to March in lieu of -normal off-season of December to March. Such option must be exercised on or before 31st August2006 for the financial year of 2006-07.

Off-Season fixed charge for Tea, Coffee, & Rubber minimum 30% of contracted demand during season period.

No benefit of T.O.D tariffs can be availed by consumers if they opt for the off-season tariff option.

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 80 of 95

For supply at voltages higher than as applicable to the consumers as per section 2.2 of the AERC Electricity. Supply Code and related matters. Rebate @ 3% shall be applicable on energy charge for each higher level of voltage.

In case, metering is done on the L.T side of the distribution transformer, then for the purpose of billing, and additional energy charge on account of transformer loss computed @3% on the consumer's energy charge shall be added.

(c) Contract Demand: The Contract Demand shall be between 70% to 105% of the Connected Load as declared by the consumer converted to KVA at 0.85 power factor. In case declaration / option is not made by the consumer within the stipulated time, 100% of the Connected Load converted to KVA shall be the Contract Demand.

(d) Billable Demand: Billing demand shall be 100% of Contract Demand of Recorded Demand, whichever is higher. In case the meters remain defective in a month, Billing Demand shall be considered on the average Billing Demand of the last three months when the meter was in order.

(e) Overdrawal Penalty: If the Recorded Demand is higher than the Contract Demand in a month, then fixed charge based on Contract Demand shall be levied at three times the normal rate for the portion of demand exceeding the Contract Demand.

HT Category VII: Oil and Coal

Applicability

This tariff shall be applicable for supply of power to consumers at a single point for coal and oil installations.

(a) Tariff

Energy Charge Fixed Charge

For all consumption Rs. 4.50 / kWh Rs. 300 / KVA / month

(i) Time-Of-The-Day (T.O.D.) tariff

T.O.D. tariff for Oil & Coal

Fixed Charge: Rs 300 / kVA / month

Energy Charge:

Description Net Energy charge

Time

0600-1700 hrs (normal) Rs 4.50 / kWh

1700-2200 hrs (peak) Rs 6.10 / kWh

2200-0600 hrs (night) Rs 4.10 / kWh

For supply at voltages higher than as applicable to the consumers as per section 2.2 of the AERC Electricity Supply Code and related matters. Rebate @ 3% shall be applicable on energy charge for each higher level of voltage. .

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 81 of 95

In case, metering is done on the L.T side of the distribution transformer, then for the purpose of billing an additional energy consumption on account of transformer loss, computed @ 3% on the consumers energy charge shall be added.

(c) Contract Demand: The Contract Demand shall be between 70% to 105% of the Connected Load as declared by the consumer converted to KVA at 0.85 power factor. In case declaration / option is not made by the consumer within the stipulated time, 100% of the Connected Load converted to KVA shall be the Contract Demand.

(d) Billable Demand: Billing demand shall be 100% of Contract Demand of Recorded Demand, whichever is higher In case the meters remain defective in a month, Billing Demand shall be considered to be the average Billing Demand of the last three months when the meter was in order.

(e) Overdrawal Penalty: If the Recorded Demand is higher than the Contract Demand in a month, then fixed charge based on Contract Demand shall be levied at three times the normal rate for the portion of demand exceeding the Contract Demand.

HT Category VIII: HT Irrigation

Applicability

This tariff shall be applicable for electricity supply for agriculture / irrigation purpose in the agricultural sector where the Connected Load exceeds 7.5 HP and for whom power has been supplied at 11 KV or above.

(a) Tariff

Energy Charge Fixed Charge

For all consumption Rs. 2.50 / kWh Rs. 50 / KVA / month

For supply at voltages higher than as applicable to the consumers as per section 2.2 of the AERC Electricity Supply Code and related matters. Rebate @ 3% shall be applicable an energy charge for each higher level of voltage.

In case, metering is done an the L.T side of the distribution transformer, then for the purpose of billing, an additional energy charge on account of transformer less computed @ 3% an the consumer’s energy charge shall be added.

The above rates and charges shall be subject to the following clauses:

i. Fuel Adjustment Surcharge (FAS) The above rates and charges shall be subject to Fuel Adjustment Surcharge (FAS). The FAS rate in respect of any financial year shall be equal to the total Fuel Adjustment Surcharge payable by the distribution company to ASEB Trading divided by the total quantum of energy billed during the same period and shall be applicable equally on all categories of consumers. FAS shall be levied on a provisional basis from time to time and shall be subject to a final adjustment on completion of audit in respect of each financial year.

ii. Import Adjustment Surcharge (IAS) The above rates and charges shall be subject to Import Adjustment Surcharge (IAS). The IAS rate in respect of any financial year shall be equal to the total Fuel Adjustment Surcharge payable by the distribution company to ASEB Trading divided by the total quantum of energy billed during the same period and shall be applicable equally on all categories of consumers. IAS shall be levied on a provisional basis from time to time and

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 82 of 95

shall be subject to a final adjustment on completion of audit in respect of each financial year.

iii. Delayed Payment Surcharge (DPS) Delayed Payment Surcharge (DPS) shall be levied on the total amount of the electricity bill @ 1.5% per month or part thereof at simple interest if full payment is not made on or before the due date of the bill. In case payment is made by cheque and the cheque is subsequently dishonoured, DPS shall be levied from the due date of the original bill. In addition, payment in respect of the dishonoured amount shall need to be made only in cash or through Demand Draft but not through cheque payment. This shall be in addition to any other rights that the distribution company may have under the law and as specified in the terms and conditions of supply.

iv. Power Factor Rebate or Penalty (b) Power Factor Penalty: In case the average power factor in a month falls below 85%, a

penalty @ 1% for every 1% fall in average power factor from 85% to 60% plus 2% for every 1% fall in average power factor below 60% to 30% plus 3% for every 1% fall in power factor below 30% shall be levied on the total energy charge. Power factor penalty shall be levied on all HT consumers, irrespective of whether the metering is done through electronic or electro-mechanical devices.

(c) Power Factor Rebate: In case the average power factor in a month is more than 90%, a rebate @ 0.5% for every 1% increase in average power factor from 90% shall be applicable on the total energy charge. Power factor rebate shall be applicable on all HT consumers, irrespective of whether the metering is done through electronic or electro-mechanical devices.

v. Statutory Levies Any increase in operating costs due to variation or imposition of any statutory levy by the

Government of India, Government of Assam or any other competent authority in respect of energy purchased or distributed by the distribution company shall be recovered from its consumers as a surcharge on the standard rates mentioned in this Schedule of Tariff.

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 83 of 95

Annexure IX

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 84 of 95

Annexure IX contd..

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 85 of 95

Annexure IX contd..

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 86 of 95

Annexure IX contd..

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 87 of 95

Annexure IX contd.. SCHEDULE – I

ASSAM POWER GENERATION CORPORATION LIMITED

OPENING BALANCE SHEET AS ON APRIL 01st, 2005

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 88 of 95

Annexure IX contd.. SCHEDULE – II

ASSAM ELECTRICITY GRID CORPORATION LIMITED

OPENING BALANCE SHEET AS ON APRIL 01st, 2005

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 89 of 95

Annexure IX contd.. SCHEDULE – III

UPPER ASSAM ELECTRICITY DISTRIBUTION COMPANY LIMITED

OPENING BALANCE SHEET AS ON APRIL 01st, 2005

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 90 of 95

Annexure IX contd.. SCHEDULE – IV

CENTRAL ASSAM ELECTRICITY DISTRIBUTION COMPANY LIMITED

OPENING BALANCE SHEET AS ON APRIL 01st, 2005

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 91 of 95

Annexure IX contd.. SCHEDULE – V

LOWER ASSAM ELECTRICITY DISTRIBUTION COMPANY LIMITED

OPENING BALANCE SHEET AS ON APRIL 01st, 2005

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 92 of 95

Annexure IX contd.. SCHEDULE – VI

ASSAM STATE ELECTRICITY BOARD

OPENING BALANCE SHEET AS ON APRIL 01st, 2005

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 93 of 95

Annexure X: Profit and Loss Account Form-A1

(Rs in Crs)Ref

Form-No PARTICULARS

Transmission Distribution ASEB Trader Transmission Distribution ASEB Trader Transmission Distribution ASEB TraderAT1/T1/D1 ENERGY AVAILABLE (MU) 3281.06 3010.37 3281.06 3560.63 3293.58 3560.63AT2/T2/D2 ENERGY SOLD (MU) 3010.37 2162.13 3281.06 3293.58 2354.98 3560.63

T & D LOSS (%) 8.25% 28.18% 0.00% 7.50% 28.50% 0.00%INCOME

D2 REVENUE FROM SALE OF POWER 56.14 967.87 719.35 49.81 1,244.66 928.03 AT3/T3/D3 REV SUBSIDIES & GRANTS * 49.00 AT4/T4/D4 OTHER INCOME 8.94 47.01 25.00 9.39 49.36 59.62

TOTAL 65.08 1014.88 793.35 59.20 1294.02 987.65EXPENDITURE

AT1/D1 PURCHASE OF POWER - 719.35 719.35 - 928.04 832.25 AT5/T5/D5 REPAIRS & MAINTENANCE 5.90 16.22 - 7.75 22.14 - AT6/T6/D6 EMPLOYEES COSTS 43.61 225.29 1.25 43.17 223.03 1.30 AT7/T7/D7 ADM & GENERAL EXPENSES 2.07 15.03 0.75 2.63 19.22 0.85 AT8/T8/D8 DEPRECIATION AND RELATED DTS 3.54 23.47 - 0.93 40.78 - AT9/T9/D9 INTEREST & FINANCE CHARGES 9.96 41.90 7.99 20.89 50.25 10.33

SUB-TOTAL 65.08 1041.26 729.34 75.37 1283.46 844.73T10/D10 LESS: EXPENSES CAPITALISED:

-INTEREST & FINANCE CHARGES CAPITALISED - 0.00 - 16.16 20.23 - -OTHER EXPENSES CAPITALISED

SUB-TOTAL 0.000 0.000 0.000 16.160 20.230 0.000AT11/T11/D11 OTHER DEBITS - 28.91 53.86 - 30.81 142.92 AT12/T12/D12 EXTRAORDINARY ITEMS

TOTAL EXPENDITURE 65.08 1070.17 783.20 59.21 1294.04 987.65PROFIT (LOSS) BEFORE TAXPROVISION FOR INCOME TAXPROFIT (LOSS) AFTER TAX

AT13/T13/D13 NET PRIOR PERIOD CREDITSSURPLUS/DEFICIT(-) 0.00 -55.29 10.15 -0.01 -0.01 0.00

AT17/T17/D17 NET ASSETS AT THE BEGINNING OF THE YEAR 27.31 239.73 - 26.23 198.96 -RATE OF RETURN

Note 1Note 2 FY 2005-06 figures are based on latest revised estimates.Note 3 Data for 2004-05 is not available for individual entities.

Details of Other Debits for ASEB Trader for FY 2005-06 and 2006-07are provided in the petition of ASEB Trader in Format D11.

PROFIT & LOSS ACCOUNT

2004-05 2005-06 2006-07

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 94 of 95

Annexure XI: Other Debits

UAEDCL

(Rs in Crs)Sl No Particulars 2004-05 2005-06 2006-07

1 Provision for Doubtful Debts 8.02 8.55 2 Interest on Security Deposit 1.75 1.75

Grand Total 9.77 10.30

Note: 2004-05 data not available

Other Debits Form-AT11/T11/D11

Petition for Approval of ARR and Revision of Tariff for FY 2006-07

Upper Assam Electricity Distribution Company Limited

Page 95 of 95

Annexure XII: Status of Hon’ble Commission’s format

List of Hon’ble Commission’s formats for which data has been furnished in

the Tariff Petition for FY 2006-07

As applicable for Transmission, Distribution Companies and ASEB Trader

Formats for which data has been submitted

A1, D1, D2, D4, D5, D6, D6A, D7, D8, D9, D10, D11, D15, D16, D20, D21

Formats for which data was not readily available

A2, A3, A4, D14, D17, D18, D18A, D19A, D23

Formats which are found not to be relevant

D3, D9A, D12, D13, D22, D24