![Page 1: SUBJECT: GEOTECHNICAL INVESTIGATION FOR PAVEMENT ......The following report presents the findings, conclusions, and recommendations of our ... slip faulting associated with the separation](https://reader033.vdocuments.mx/reader033/viewer/2022042202/5ea37d1e3496641c485860e5/html5/thumbnails/1.jpg)
November 25, 2015
Mr. David Aguirre The Holt Group 1601 N. Imperial Ave El Centro, CA 92243
SUBJECT: GEOTECHNICAL INVESTIGATION FOR PAVEMENT IMPROVEMENTS Imperial Avenue, Wake Avenue, and Danenberg Drive El Centro, California
Dear Mr. Aguirre:
The following report presents the findings, conclusions, and recommendations of our
investigation for the proposed pavement improvements to sections of Imperial Avenue, Wake
Avenue, and Danenberg Drive.
1.0 PURPOSE AND SCOPE OF WORK
The purpose of our investigation was to evaluate the existing geotechnical conditions beneath
the area of the proposed road reconstruction, and to provide geotechnical recommendations for
structural pavement sections, and excavation and grading. The recommendations contained
herein are based on a surface reconnaissance, subsurface investigation, laboratory testing,
engineering analysis, and our previous experience in the site vicinity. The scope of services
provided during this investigation was generally as described in our proposal No. EC15-013, dated
March 13, 2015. Our scope of work included the following items:
A visual reconnaissance and subsurface exploration of the site. A Bobcat-mounteddrill rig was used to explore the subsurface conditions at six boring locations. Selectedsoil samples were collected for laboratory testing. Logs of the explorations arepresented in Appendix A.
Laboratory testing of selected samples collected during the subsurface exploration.Testing was intended to assist in characterizing and assessing pertinent engineeringproperties of the on-site soils. Laboratory test results are presented in Appendix B.
![Page 2: SUBJECT: GEOTECHNICAL INVESTIGATION FOR PAVEMENT ......The following report presents the findings, conclusions, and recommendations of our ... slip faulting associated with the separation](https://reader033.vdocuments.mx/reader033/viewer/2022042202/5ea37d1e3496641c485860e5/html5/thumbnails/2.jpg)
Imperial Avenue Extension – The Holt Group November 25, 2015 EC461 Page 2
Engineering analysis of field and laboratory data to make recommendations regarding pavement sections, site preparation, earthwork, and trench backfill.
Preparation of this report summarizing our findings, conclusions and recommendations.
2.0 SITE DESCRIPTION
The site topography is generally flat with a ground surface elevation of approximately minus 27
feet (± 5 feet) Mean Sea Level (MSL). Agricultural fields and residential subdivisions surround the
roadways. Irrigation canals associated with the agricultural fields are aligned with many area
roadways. An Exploration Plan is presented in Figure 1.
3.0 PROPOSED DEVELOPMENT
The planned improvements include South Imperial Avenue between Highway 8 and West
McCabe Road, and will include the currently unpaved portions of Wake Avenue and Danenberg
Drive to the east. It is our understanding that the improvements will include the regrading of the
existing roadways and pavement with asphalt concrete and aggregate base sections. It is
anticipated that grading may involve cuts of up to approximately 5 feet from existing grade.
4.0 GEOLOGY AND SUBSURFACE CONDITIONS
The site is located within the north-central portion of the Salton Trough, a topographic and
structural depression bound to the north by the Coachella Valley and to the south by the Gulf of
California. The trough was created along with the Gulf of California by complex rifting and strike
slip faulting associated with the separation of Baja from mainland Mexico by the East Pacific Rise.
As the rift opened, the trough was filled with sediments derived from the adjacent mountains.
The bottom of the trough is formed by Mesozoic and older metamorphic and crystalline rock.
Tertiary marine and nonmarine deposits make up most of the 15,000 feet of sediment estimated
to overlie the basement. The upper 3,000 feet of the Salton Trough is underlain by Pleistocene
and Holocene-age lacustrine (lake) deposits.
![Page 3: SUBJECT: GEOTECHNICAL INVESTIGATION FOR PAVEMENT ......The following report presents the findings, conclusions, and recommendations of our ... slip faulting associated with the separation](https://reader033.vdocuments.mx/reader033/viewer/2022042202/5ea37d1e3496641c485860e5/html5/thumbnails/3.jpg)
Imperial Avenue Extension – The Holt Group November 25, 2015 EC461 Page 3
Specifically, the site is underlain by lacustrine deposits which may be mantled with a thin layer of
fill. Because the composition and characteristics of the fill are similar, the fill is not differentiated
from the lacustrine deposits for purposes of this report. Generalized descriptions of the
subsurface materials encountered in our explorations are as follows:
4.1 Lacustrine Deposits
Lacustrine deposits were encountered in all six borings. As observed on site, the lacustrine deposits which are anticipated to be present below the asphalt and base course pavement section vary from lean clay (Unified Soil Classification CL), to low plasticity sandy silt (ML). The clays are moderate brown, moist, and stiff. The silts are moderate, fine grained, moist, and stiff in consistency.
4.2 Groundwater
Piezometers were installed in borings B-1, B-4, and B-6 to monitor stabilized free
groundwater levels. The piezometers were installed and read on October 19, 2015 and
then read again on November 6, 2015. Free groundwater was not observed in any of the
readings. It has been our experience that groundwater levels may fluctuate over time due
to changes in irrigation activity.
5.0 CONCLUSIONS
It is our opinion that the proposed improvements are feasible from a geotechnical standpoint
provided that the following recommendations and appropriate construction practices are
followed. Based on the results of our field investigation, laboratory testing and engineering
analyses, we have developed the following conclusions regarding the pertinent geotechnical
conditions at the site.
• Groundwater was not encountered in the borings during drilling, or in subsequent
readings 18 days later. Although free groundwater was not present, soil moistures in
zones are within the range at which the soils will show plastic behavior resulting in
pumping conditions when worked with equipment. The high moisture will also result in
![Page 4: SUBJECT: GEOTECHNICAL INVESTIGATION FOR PAVEMENT ......The following report presents the findings, conclusions, and recommendations of our ... slip faulting associated with the separation](https://reader033.vdocuments.mx/reader033/viewer/2022042202/5ea37d1e3496641c485860e5/html5/thumbnails/4.jpg)
Imperial Avenue Extension – The Holt Group November 25, 2015 EC461 Page 4
over optimum moisture conditions (relative to the compaction curves) and would require
drying back before placing as compacted fill. The high moisture areas appear in random
areas and are likely the result of perched water conditions. Recommendations for
subgrade stabilization are provided in this report.
• The unpaved shoulders are likely to be underlain by shallow undocumented fill overlying
lacustrine deposits.
• The subgrade soils for the proposed pavement section will consist lean clay and clayey
silt. Laboratory testing indicates an R-Value of 5 would be appropriate for the subgrade
conditions.
• Excavations should be achievable using standard heavy equipment. Excavations may
generate wet soil that will need to be dried prior to placement as compacted fill.
6.0 RECOMMENDATIONS
The remainder of this report presents recommendations regarding earthwork construction and
the geotechnical aspects of the pavement improvements. These recommendations are based on
empirical and analytical methods typical of the standard of practice in southern California. If
these recommendations do not appear to cover a specific feature of the project, please contact
our office for amendments.
6.1 Plan Review
We recommend that Sierra Material Testing and Inspection review improvement plans
prior to finalization in order to evaluate conformance with the intent of the
recommendations contained within this report.
6.2 Excavation and Grading Observation
Sierra Material Testing and Inspection should observe pavement construction, site
grading and trench excavations and backfill. Sierra Material Testing and Inspection should
![Page 5: SUBJECT: GEOTECHNICAL INVESTIGATION FOR PAVEMENT ......The following report presents the findings, conclusions, and recommendations of our ... slip faulting associated with the separation](https://reader033.vdocuments.mx/reader033/viewer/2022042202/5ea37d1e3496641c485860e5/html5/thumbnails/5.jpg)
Imperial Avenue Extension – The Holt Group November 25, 2015 EC461 Page 5
provide observation and testing services continuously during pavement construction,
grading and backfill operations. Such observations are considered essential to identify
field conditions that differ from those anticipated by the preliminary investigation, to
adjust designs to actual field conditions, and to determine that the earthwork is
accomplished in general accordance with the recommendations provided in this report.
Recommendations presented in this report are contingent upon Sierra Material Testing
and Inspection performing such services. Our personnel should perform sufficient testing
of pavement construction, fill and trench backfill to support our professional opinion as
to compliance with the compaction recommendations.
6.3 Earthwork
Pavement construction, grading and earthwork should be conducted in accordance with
the applicable local grading ordinance, Caltrans, and the most recent edition of the
Standard Specifications for Public Works Construction “Greenbook”. The following
recommendations are provided regarding specific aspects of the proposed earthwork
construction. These recommendations should be considered subject to revision based on
field conditions observed by the geotechnical consultant.
6.3.1 General: General site preparation should include the removal of deleterious
materials from the proposed improvement areas. Deleterious materials include
vegetation, trees and roots, trash, construction or demolition debris (such as
asphalt concrete pavements or Portland cement concrete improvements, and
rocks with greatest dimensions in excess of 6 inches. Deleterious materials are
not considered suitable for use in trench backfill, and should be removed from the
site.
Surficial loose fill may be present at existing road shoulders and other areas. Any
loose fill not removed during the planned roadway cuts should be removed to
exposed firm native soil. This should be evaluated by the geotechnical consultant
during grading. The design grade may then be achieved by filling with uniformly
compacted soil.
![Page 6: SUBJECT: GEOTECHNICAL INVESTIGATION FOR PAVEMENT ......The following report presents the findings, conclusions, and recommendations of our ... slip faulting associated with the separation](https://reader033.vdocuments.mx/reader033/viewer/2022042202/5ea37d1e3496641c485860e5/html5/thumbnails/6.jpg)
Imperial Avenue Extension – The Holt Group November 25, 2015 EC461 Page 6
6.3.2 Fill Compaction: All fill and trench backfill to be placed in association with
the proposed improvements should be accomplished at slightly over optimum
moisture conditions using equipment that is capable of producing a uniformly
compacted product. The minimum relative compaction recommended for fill is
90 percent of the maximum dry density based on ASTM D1557. Sierra Material
Testing and Inspection should perform sufficient observation and testing of fill and
backfill so that an opinion can be rendered as to the compaction achieved.
6.3.3 Temporary Excavations: Excavations should conform to Cal-OSHA
guidelines. Temporary trench excavations should be observed by Sierra Material
Testing and Inspection in order to identify potentially adverse geologic conditions.
Excavations deeper than 3 feet should be shored or laid back to a 1:1 gradient for
heights up to 10 feet. Excavations that expose seepage or adverse geologic
conditions should be evaluated by our firm for additional recommendations.
Excavations that will be subjected to vehicle or equipment loads within a 1:1 plane
from the bottom of the trench should be engineered by the contractors registered
professional engineer in accordance with OSHA guidelines.
6.3.4 Construction Dewatering: Based on conditions observed during this
investigation, the need for construction dewatering is not anticipated.
6.3.5 Subgrade Stabilization: The bottom of all excavations should be firm and
unyielding prior to placing compacted fill. In areas of saturated and yielding (or
“pumping”) subgrade conditions, the yielding area may be stabilized by placing a
layer of geogrid (such as Tensar BX1200 or approved similar) directly on the
excavation bottom. The geogrid should be installed in accordance with the
product manufacturer’s recommendations. The geogrid should then be covered
with between 12 and 24 inches of minus ¾-inch crushed rock. The thickness of
rock needed to stabilize the excavation bottom may be determined in the field by
trial and error. Our experience suggests that 1 to 2 feet of rock should generally
be sufficient to stabilize most conditions.
![Page 7: SUBJECT: GEOTECHNICAL INVESTIGATION FOR PAVEMENT ......The following report presents the findings, conclusions, and recommendations of our ... slip faulting associated with the separation](https://reader033.vdocuments.mx/reader033/viewer/2022042202/5ea37d1e3496641c485860e5/html5/thumbnails/7.jpg)
Imperial Avenue Extension – The Holt Group November 25, 2015 EC461 Page 7
6.4 Pavements
Pavement section thickness is based in part on the traffic index (TI) assigned to the
roadway, based on the anticipated vehicle volume and loading. Sections for various traffic
indices are provided below. The appropriate traffic index should be determined by the
City’s Department of Public Works.
Testing performed on the subgrade soil collected from our investigation indicated an R-
value of 5. The pavement structural sections were determined using the design criteria of
Caltrans Topic 608.4. Calculations for the various traffic indices are provided in Appendix
C. The pavement design is summarized below:
Traffic Index Asphalt Concrete Class 2 Aggregate Base
5 3 10
6 3 14
7 4 16
8 5 18
9 6 20
10 6 24
Subgrade preparation should be conducted immediately prior to the placement of the
pavement section. The upper 12 inches of pavement subgrade should be scarified,
brought to about optimum moisture content and compacted to at least 90 percent of
maximum dry density based on ASTM D1557 guidelines. Asphalt concrete should be
compacted to at least 95 percent based on the Hveem unit weight.
Asphalt concrete should conform to Section 26 of the Caltrans Standard Specifications or
Section 400-4 of the SSPWC. Aggregate base should conform to the specifications for Class
2 aggregate base as defined in Section 26-1.02A of the Caltrans Standard Specifications
or to crushed aggregate, crushed miscellaneous base, or processed miscellaneous base
as defined in Section 200-2 of the “Greenbook.”
![Page 8: SUBJECT: GEOTECHNICAL INVESTIGATION FOR PAVEMENT ......The following report presents the findings, conclusions, and recommendations of our ... slip faulting associated with the separation](https://reader033.vdocuments.mx/reader033/viewer/2022042202/5ea37d1e3496641c485860e5/html5/thumbnails/8.jpg)
Imperial Avenue Extension – The Holt Group November 25, 2015 EC461 Page 8
7.0 LIMITATIONS
This investigation was performed using the degree of care and skill ordinarily exercised, under
similar circumstances, by reputable geotechnical consultants practicing in this or similar
localities. No warranty, express or implied, is made as to the conclusions and professional
opinions included in this report. The samples taken and used for testing, and the observations
made are believed representative of the project site. However, soil and geologic conditions can
vary significantly between borings. If this occurs, the changed conditions must be evaluated by
the geotechnical consultant and additional recommendations made, if warranted.
The findings of this report are valid as of the present date. However, changes in the condition of
a property can occur with the passage of time, whether due to natural processes or the work of
man on this or adjacent properties. In addition, changes in applicable or appropriate standards
of practice may occur from legislation or the broadening of knowledge. Accordingly, the findings
of this report may be invalidated wholly or partially by changes outside our control. Therefore,
this report is subject to review and should not be relied upon after a period of three years.
***
Sincerely, SIERRA Material Testing & Inspection Alex Rojas Anthony F. Belfast, P.E. Office Manager Senior Engineer
![Page 9: SUBJECT: GEOTECHNICAL INVESTIGATION FOR PAVEMENT ......The following report presents the findings, conclusions, and recommendations of our ... slip faulting associated with the separation](https://reader033.vdocuments.mx/reader033/viewer/2022042202/5ea37d1e3496641c485860e5/html5/thumbnails/9.jpg)
McCabe Road
La B
ruch
erie
Ave
nue
S. C
lark
Roa
d
McCabe Road
8
N. Im
peria
l Ave
.
Wake Avenue Wake Avenue
Cypr
ess
Dr.
PROPOSEDPROJECTLOCATION
La B
ruch
erie
Ave
nue
8
Danenberg DriveNuffer Road
Valleyview Ave.
Manuel Ortiz Ave.
City Limits
City Limits
City Limits
THG Project No. 135.033May 29, 2015
PROJECT LOCATIONMAP
South
8th S
treet
Imperial Avenue Extension South(from I-8 to Mc Cabe Road)
El Centro, CA. 92243
ApproximateBorings Locations
![Page 10: SUBJECT: GEOTECHNICAL INVESTIGATION FOR PAVEMENT ......The following report presents the findings, conclusions, and recommendations of our ... slip faulting associated with the separation](https://reader033.vdocuments.mx/reader033/viewer/2022042202/5ea37d1e3496641c485860e5/html5/thumbnails/10.jpg)
Imperial Avenue Extension – The Holt Group November 25, 2015 EC461 Page 9
APPENDIX A
SUBSURFACE EXPLORATION
Field exploration consisted of a visual reconnaissance of the site, and the drilling of six
exploratory borings on October 19, 2015. The exploratory borings were drilled using an 8-inch
diameter, continuous flight, hollow stem, Bobcat-mounted mounted drill rig. Bulk samples were
collected for laboratory testing. The maximum depth of exploration was 15 feet. Piezometer
standpipes were installed in borings B-1, B-4, and B-6 to permit longer term monitoring of free
groundwater. The approximate locations of the borings are shown on the Exploration Plan,
Figure 2. Logs describing the subsurface conditions encountered are presented in Figures A-1
through A-6.
The borings were located by visually estimating and pacing distances from landmarks shown on
the Exploration Plan. The locations should not be considered more accurate than is implied by
the method of measurement used and the scale of the map. The lines designating the interface
between different soils on the logs may be abrupt or gradational. Further, soil conditions at
locations between the borings may be substantially different from those at the specific locations
explored. It should be recognized that the passage of time could result in changes in the soil
conditions reported in our logs.
![Page 11: SUBJECT: GEOTECHNICAL INVESTIGATION FOR PAVEMENT ......The following report presents the findings, conclusions, and recommendations of our ... slip faulting associated with the separation](https://reader033.vdocuments.mx/reader033/viewer/2022042202/5ea37d1e3496641c485860e5/html5/thumbnails/11.jpg)
Symbol Explanationfree groundwaterperched or confined seepage
DATE DRILLED: Existing Elevation: california samplerLOGGED BY: Proposed Elevation: standard samplerEQUIPMENT: Shelby tube sampler
UN
DIS
T. S
AM
PLE
BU
LK
SA
MPL
E
BL
OW
S/FO
OT
UN
IT W
EIG
HT
(PC
F)M
OIS
TU
RE
CO
NT
EN
T (%
)
Moderate brown, moist, stiff, clayey silt with fine sand(ML)
Moderate brown, moist, stiff, lean clay (CL)
total depth: 10 feet, no groundwater
piezometer installed
EXPLORATIONBORING LOG
LOG OF EXPLORATION BORING A-1
10/19/15OM
DE
PTH
(FE
ET
)
Bobcat-mounted, 8" auger
DESCRIPTION
16.5
14.0
LAB TESTS
Project No. EC-461 Figure A-1
1
2
3
4
8
9
10
11
12
13
14
5
15
6
7
![Page 12: SUBJECT: GEOTECHNICAL INVESTIGATION FOR PAVEMENT ......The following report presents the findings, conclusions, and recommendations of our ... slip faulting associated with the separation](https://reader033.vdocuments.mx/reader033/viewer/2022042202/5ea37d1e3496641c485860e5/html5/thumbnails/12.jpg)
Symbol Explanationfree groundwaterperched or confined seepage
DATE DRILLED: Existing Elevation: california samplerLOGGED BY: Proposed Elevation: standard samplerEQUIPMENT: Shelby tube sampler
UN
DIS
T. S
AM
PLE
BU
LK
SA
MPL
E
BL
OW
S/FO
OT
UN
IT W
EIG
HT
(PC
F)M
OIS
TU
RE
CO
NT
EN
T
Moderate brown, moist, stiff, lean clay (CL)
total depth: 10 feet, no groundwater
EXPLORATIONBORING LOG
LOG OF EXPLORATION BORING A-2
3/6/14AFBBobcat-mounted, 8" auger
DE
PTH
(FE
ET
)
LAB TESTSDESCRIPTION
2
1
4
3
6
5
8
725.9
10
9
12
11
14
13
Project No. EC-461 Figure A-2
15
![Page 13: SUBJECT: GEOTECHNICAL INVESTIGATION FOR PAVEMENT ......The following report presents the findings, conclusions, and recommendations of our ... slip faulting associated with the separation](https://reader033.vdocuments.mx/reader033/viewer/2022042202/5ea37d1e3496641c485860e5/html5/thumbnails/13.jpg)
Symbol Explanationfree groundwaterperched or confined seepage
DATE DRILLED: Existing Elevation: california samplerLOGGED BY: Proposed Elevation: standard samplerEQUIPMENT: Shelby tube sampler
UN
DIS
T. S
AM
PLE
BU
LK
SA
MPL
E
BL
OW
S/FO
OT
UN
IT W
EIG
HT
(PC
F)M
OIS
TU
RE
CO
NT
EN
T
Moderate brown, moist, stiff, clayey silt with fine sand(ML)
Moderate brown, moist, stiff, lean clay (CL)
total depth: 10 feet, no groundwater
EXPLORATIONBORING LOG
LOG OF EXPLORATION BORING A-3
3/6/14AFBBobcat-mounted, 8" auger
DE
PTH
(FE
ET
)
LAB TESTSDESCRIPTION
2
1
4
3
6
5
8
7 14.0
10 20.2
9
12
11
14
13
Project No. EC-461 Figure A-3
15
![Page 14: SUBJECT: GEOTECHNICAL INVESTIGATION FOR PAVEMENT ......The following report presents the findings, conclusions, and recommendations of our ... slip faulting associated with the separation](https://reader033.vdocuments.mx/reader033/viewer/2022042202/5ea37d1e3496641c485860e5/html5/thumbnails/14.jpg)
Symbol Explanationfree groundwaterperched or confined seepage
DATE DRILLED: Existing Elevation: california samplerLOGGED BY: Proposed Elevation: standard samplerEQUIPMENT: Shelby tube sampler
UN
DIS
T. S
AM
PLE
BU
LK
SA
MPL
E
BL
OW
S/FO
OT
UN
IT W
EIG
HT
(PC
F)M
OIS
TU
RE
CO
NT
EN
T (%
)
Brown, moist, stiff, clayey silt (ML)
Brown, moist, stiff, lean clay (CL) `
total depth: 15 feet, no groundwaterpiezometer installed
EXPLORATIONBORING LOG
LOG OF EXPLORATION BORING A-4
3/6/14AFBBobcat-mounted, 8" auger
DE
PTH
(FE
ET
)
LAB TESTSDESCRIPTION
2
1
4
3
67.6 max density/
5
8
7 opt moisture
10 opt moisture
919.2 max density/
12
11
14
1323.1
Project No. EC-461 Figure A-4
15
![Page 15: SUBJECT: GEOTECHNICAL INVESTIGATION FOR PAVEMENT ......The following report presents the findings, conclusions, and recommendations of our ... slip faulting associated with the separation](https://reader033.vdocuments.mx/reader033/viewer/2022042202/5ea37d1e3496641c485860e5/html5/thumbnails/15.jpg)
Symbol Explanationfree groundwaterperched or confined seepage
DATE DRILLED: Existing Elevation: california samplerLOGGED BY: Proposed Elevation: standard samplerEQUIPMENT: Shelby tube sampler
UN
DIS
T. S
AM
PLE
BU
LK
SA
MPL
E
BL
OW
S/FO
OT
UN
IT W
EIG
HT
(PC
F)M
OIS
TU
RE
CO
NT
EN
T
Brown, moist, stiff, lean clay (CL)
total depth: 10 feet, no groundwater
EXPLORATIONBORING LOG
Project No. EC-461 Figure A-5
LOG OF EXPLORATION BORING A-5
3/6/14AFBBobcat-mounted, 8" auger
DE
PTH
(FE
ET
)
LAB TESTSDESCRIPTION
2
1
4
3
6
5
818.4
7
10
9
12
11
14
13
15
![Page 16: SUBJECT: GEOTECHNICAL INVESTIGATION FOR PAVEMENT ......The following report presents the findings, conclusions, and recommendations of our ... slip faulting associated with the separation](https://reader033.vdocuments.mx/reader033/viewer/2022042202/5ea37d1e3496641c485860e5/html5/thumbnails/16.jpg)
Symbol Explanationfree groundwaterperched or confined seepage
DATE DRILLED: Existing Elevation: california samplerLOGGED BY: Proposed Elevation: standard samplerEQUIPMENT: Shelby tube sampler
UN
DIS
T. S
AM
PLE
BU
LK
SA
MPL
E
BL
OW
S/FO
OT
UN
IT W
EIG
HT
(PC
F)M
OIS
TU
RE
CO
NT
EN
T
Moderate brown, moist, stiff, clayey silt with fine sand(ML)
Moderate brown, moist, stiff, lean clay (CL)
total depth: 10 feet, no groundwater
piezometer installed
EXPLORATIONBORING LOG
Bobcat-mounted, 8" auger
DE
PTH
(FE
ET
)
DESCRIPTION LAB TESTS
LOG OF EXPLORATION BORING A-6
3/6/14AFB
2
1
4
3
6
5
8
721.8
10
930.1 R-value
12
11
14
13
Project No. EC-461 Figure A-6
15
![Page 17: SUBJECT: GEOTECHNICAL INVESTIGATION FOR PAVEMENT ......The following report presents the findings, conclusions, and recommendations of our ... slip faulting associated with the separation](https://reader033.vdocuments.mx/reader033/viewer/2022042202/5ea37d1e3496641c485860e5/html5/thumbnails/17.jpg)
Imperial Avenue Extension – The Holt Group November 25, 2015 EC461 Page 10
APPENDIX B LABORATORY TESTING
Laboratory testing was conducted in a manner consistent with that level of care and skill
ordinarily exercised by members of the profession currently practicing under similar
conditions and in the same locality. No warranty, express or implied, is made as to the
correctness or serviceability of the test results, or the conclusions derived from these tests.
Where a specific laboratory test method has been referenced, such as ASTM, Caltrans, or
AASHTO, the reference applies only to the specified laboratory test method and not to
associated referenced test method(s) or practices. The referenced test method referenced
has been used only as a guidance document for the general performance of the test and not
as a “Test Standard.” A brief description of the tests performed follows:
Classification: Soils were classified visually according to the Unified Soil Classification System
as established by the American Society of Civil Engineers. Visual classification was
supplemented by laboratory testing of selected soil samples and classification in general
accordance with the laboratory soil classification tests outlined in ASTM test method D2487.
The resultant soil classifications are shown on the boring logs in Appendix A.
In-Situ Moisture/Density: The in-place moisture content of selected soil samples were determined using bulk samples. The moisture contents are shown on the Boring Logs in Appendix A.
Maximum Density/Optimum Moisture: The maximum dry density and optimum moisture
content of selected soil samples were estimated in general accordance with the laboratory
procedures outlined in ASTM D1557, modified Proctor. The test results are summarized in
Figures B-1 and B-2
Atterberg Limits: The liquid limit, plastic limit, and plasticity index of selected fine-grained soil samples were estimated in general accordance with the laboratory procedures outlined in ASTM test method D4318. The results are given in Figure B-3.
R-Value: R-Value tests were performed on selected pavement area materials in general accordance with the laboratory procedures outlined in California Test Method 301. The results are presented on Figure B-4.
![Page 18: SUBJECT: GEOTECHNICAL INVESTIGATION FOR PAVEMENT ......The following report presents the findings, conclusions, and recommendations of our ... slip faulting associated with the separation](https://reader033.vdocuments.mx/reader033/viewer/2022042202/5ea37d1e3496641c485860e5/html5/thumbnails/18.jpg)
LABORATORY TEST RESULTSProject No. EC-461
Figure B-1
STANDARD TEST METHOD FORMOISTURE - DENSITY RELATIONSHIP(ASTM D1557)
REV Aug 2012
PROJECT: SAMPLE ID:PROJECT NO.: DATE:TESTED BY: CHECKED BY:SAMPLE DESCRIPTION:
A) WATER ADDEDB) MOLD TARE WEIGHTC) WEIGHT OF WET SOIL AND MOLDD) WET SOIL WEIGHT (C - B)E) WET DENSITY (D / V)F) DRY DENSITY (E / [(L/100) + 1])
G) TARE WEIGHTH) WEIGHT OF WET SOIL AND TAREI) WEIGHT OF DRY SOIL AND TAREJ) WEIGHT OF WATER (H - I)K) DRY WEIGHT OF SOIL (I - G)L) MOISTURE CONTENT (J / K * 100)
SIEVENUMBERPERCENTRETAINED
MAXIMUMDENSITY [PCF]
OPTIMUM MOISTURE [%]
16.0285.9267.018.9
251.07.5 9.6 11.6
248.5 237.6percent
1003 Industry Way, Suite A El Centro, CA 92243(760) 337-2067
31.6
16.0277.7246.1
15.9288.3264.423.9
15.9281.1253.527.6
Imperial Ave. ExtensionEC 461
MM
B-4 @ 6'October 26, 2015
3002021.0
1994.0
12.0
1502021.0 2021.03869.01848.0123.3
No.4
<5%
116.0
4 inch
230.113.7
4015.01926.03947.0
1990.0
200 2502021.04011.0
millilitersgramsgramsgrams
gramsgrams
gramsgrams
Clayey Silt
grams
pcfpcf
133.0117.0
132.8118.9114.6 117.2
128.5
MOLD VOLUME CORRECTION (V)
(A,B or C)
MOLDUSED
14.99
A
4 INCH (4-1): V=15.12 pcf/gm4 INCH (EC): V=15.07
METHOD USED
6 inch: V=34.15 pcf/gm6 INCH (EC): V=34.02
110
115
120
125
130
5 10 15 20
DRY
DEN
SITY
(pcf
)
WATER CONTENT (%)
Gs=2.6
Gs=2.7
Gs=2.8
Poly.(Series1)
ZERO AIR VOIDS
![Page 19: SUBJECT: GEOTECHNICAL INVESTIGATION FOR PAVEMENT ......The following report presents the findings, conclusions, and recommendations of our ... slip faulting associated with the separation](https://reader033.vdocuments.mx/reader033/viewer/2022042202/5ea37d1e3496641c485860e5/html5/thumbnails/19.jpg)
LABORATORY TEST RESULTSProject No. EC-461
Figure B-2
STANDARD TEST METHOD FORMOISTURE - DENSITY RELATIONSHIP(ASTM D1557)
REV Aug 2012
PROJECT: SAMPLE ID:PROJECT NO.: DATE:TESTED BY: CHECKED BY:SAMPLE DESCRIPTION:
A) WATER ADDEDB) MOLD TARE WEIGHTC) WEIGHT OF WET SOIL AND MOLDD) WET SOIL WEIGHT (C - B)E) WET DENSITY (D / V)F) DRY DENSITY (E / [(L/100) + 1])
G) TARE WEIGHTH) WEIGHT OF WET SOIL AND TAREI) WEIGHT OF DRY SOIL AND TAREJ) WEIGHT OF WATER (H - I)K) DRY WEIGHT OF SOIL (I - G)L) MOISTURE CONTENT (J / K * 100)
SIEVENUMBERPERCENTRETAINED
MAXIMUMDENSITY [PCF]
OPTIMUM MOISTURE [%]
16.0273.3243.729.6
227.713.0 14.9 17.0
215.8 204.5percent
1003 Industry Way, Suite A El Centro, CA 92243(760) 337-2067
37.3
15.8249.4212.1
15.9263.9231.732.2
16.0255.2220.534.7
Imperial Ave. ExtensionEC 461
MM
B-4 @ 10.0October 26, 2015
3502021.0
1926.0
17.5
2002021.0 2021.03811.01790.0119.4
No.4
<5%
111.0
4 inch
196.319.0
3947.01870.03891.0
1944.0
250 3002021.03965.0
millilitersgramsgramsgrams
gramsgrams
gramsgrams
Clay
grams
pcfpcf
128.5108.0
129.7110.9105.7 108.6
124.7
MOLD VOLUME CORRECTION (V)
(A,B or C)
MOLDUSED
14.99
A
4 INCH (4-1): V=15.12 pcf/gm4 INCH (EC): V=15.07
METHOD USED
6 inch: V=34.15 pcf/gm6 INCH (EC): V=34.02
100
105
110
115
120
10 15 20
DRY
DEN
SITY
(pcf
)
WATER CONTENT (%)
Gs=2.6
Gs=2.7
Gs=2.8
Poly.(Series1)
ZERO AIR VOIDS
![Page 20: SUBJECT: GEOTECHNICAL INVESTIGATION FOR PAVEMENT ......The following report presents the findings, conclusions, and recommendations of our ... slip faulting associated with the separation](https://reader033.vdocuments.mx/reader033/viewer/2022042202/5ea37d1e3496641c485860e5/html5/thumbnails/20.jpg)
STANDARD TEST FOR ATTERBERG LIMITSASTM D 4318
SAMPLE I.D.: B4 @ 6'
Procedure Used:X wet preparation
dry preparationX procedure A
multipoint testprocedure B
one poin test
LIQUID LIMIT (LL): 29PLASTIC LIMIT (PL): 18
PLASTICITY INDEX (PI): 11
SAMPLE I.D.: B4 @ 10'
Procedure Used:X wet preparation
dry preparationX procedure A
multipoint testprocedure B
one poin test
LIQUID LIMIT (LL): 39PLASTIC LIMIT (PL): 18
PLASTICITY INDEX (PI): 21
LABORATORY TEST Project No. EC-461RESULTS
Figure B-3
0
10
20
30
40
50
60
0 10 20 30 40 50 60 70 80 90 100
Plas
ticity
Inde
x (P
I)
Liquid Limit (LL)
CL or OL
CH or OH
MH or OH
ML or OL cl-ml
0
10
20
30
40
50
60
0 10 20 30 40 50 60 70 80 90 100
Plas
ticity
Inde
x (P
I)
Liquid Limit (LL)
CL or OL
CH or OH
MH or OH
ML or OL cl-ml
![Page 21: SUBJECT: GEOTECHNICAL INVESTIGATION FOR PAVEMENT ......The following report presents the findings, conclusions, and recommendations of our ... slip faulting associated with the separation](https://reader033.vdocuments.mx/reader033/viewer/2022042202/5ea37d1e3496641c485860e5/html5/thumbnails/21.jpg)
LABORATORY TEST RESULTSProject No. EC-461
Figure B-4
PROJECT NAME: PROJECT NUMBER: EC 461SAMPLE DESCRIPTION: DATE SAMPLED: 10/20/2015SAMPLE LOCATION: TECHNICIAN: MM
SAMPLE NUMBER:
TEST SPECIMEN a b cMOISTURE AT COMPACTION % 19.1 19.7 20.2HEIGHT OF SAMPLE, Inches 2.49 2.47 2.45DRY DENSITY, pcf 112.9 113.3 113.8COMPACTOR AIR PRESSURE, psi 100 75 50EXUDATION PRESSURE, psi 368 282 200EXPANSION, Inches x 10exp-4 85 65 40STABILITY Ph 2,000 lbs (160 psi) 143 145 148TURNS DISPLACEMENT 3.74 3.79 3.83R-VALUE UNCORRECTED 7 6 5R-VALUE CORRECTED 7 6 5R-VALUE BY EXUDATION
DESIGN CALCULATION DATA a b cGRAVEL EQUIVALENT NEEDED ft. 1.49 1.50 1.52TRAFFIC INDEXSTABILOMETER THICKNESS, ft. 0.93 0.94 0.95EXPANSION PRESSURE THICKNESS, ft. 2.83 2.17 1.33
EXPANSION PRESSURE CHART EXUDATION PRESSURE CHART
R-VALUE BY EXPANSION: 5R-VALUE BY EXUDATION: 6EQUILIBRIUM R-VALUE: 5
R-VALUE TEST RESULTS
Imperial ave ExtensionHeavy ClayB-7
6
5.0
0
10
20
30
40
50
60
70
80
90
0100200300400500600700800
R-V
ALU
E
EXUDATION PRESSURE (psi)
0.00
0.50
1.00
1.50
2.00
2.50
3.00
3.50
4.00
0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00
COVER THICKNESS BY EXPANSION in feet
CO
VER
TH
ICKN
ESS
BY S
TABI
LOM
ETER
in fe
et
![Page 22: SUBJECT: GEOTECHNICAL INVESTIGATION FOR PAVEMENT ......The following report presents the findings, conclusions, and recommendations of our ... slip faulting associated with the separation](https://reader033.vdocuments.mx/reader033/viewer/2022042202/5ea37d1e3496641c485860e5/html5/thumbnails/22.jpg)
Imperial Avenue Extension – The Holt Group November 25, 2015 EC461 Page 11
APPENDIX C PAVEMENT DESIGN
![Page 23: SUBJECT: GEOTECHNICAL INVESTIGATION FOR PAVEMENT ......The following report presents the findings, conclusions, and recommendations of our ... slip faulting associated with the separation](https://reader033.vdocuments.mx/reader033/viewer/2022042202/5ea37d1e3496641c485860e5/html5/thumbnails/23.jpg)
R-Value (S.G.): 5 FOR THE FOLLOWING STREETS:R-Value (A.B.): 78Safety Factor: 0.2
Gf (A.B.): 1.1 [ft] Gf (A.S.): 1.0 [ft]
CALCULATIONS RECOMMENDEDTraffic Index: 5.0 PAVEMENT SECTIONGf (A.C.): 2.54 [ft]GE (Total): 1.52 [ft]GE (A.C.): 0.35 [ft]GE (A.C.) + S.F.: 0.55 [ft]T (A.C.): 0.22 [ft] UseT (A.C.): (Rounded 0.05) 0.20 [ft] 2.4 [in] 3GE (A.C.): (Actual) 0.64 [ft] inches asphalt concreteGE ( A.B.): 0.89 [ft] overT (A.B.): 0.80 [ft] = 9.7 [in] 10GE (A.B.): (Actual) 0.92 [ft] inches of aggregate baseGE (Act. Tot): 1.55
CALCULATIONS RECOMMENDEDTraffic Index: 6.0 PAVEMENT SECTIONGf (A.C.): 2.32 [ft]GE (Total): 1.82 [ft]GE (A.C.): 0.42 [ft]GE (A.C.) + S.F.: 0.62 [ft]T (A.C.): 0.27 [ft] UseT (A.C.): (Rounded 0.05) 0.25 [ft] 3.0 [in] 3GE (A.C.): (Actual) 0.58 [ft] inches asphalt concreteGE ( A.B.): 1.24 [ft] overT (A.B.): 1.13 [ft] = 13.6 [in] 14GE (A.B.): (Actual) 1.28 [ft] inches of aggregate baseGE (Act. Tot): 1.86
CALCULATIONS RECOMMENDEDTraffic Index: 7.0 PAVEMENT SECTIONGf (A.C.): 2.14 [ft]GE (Total): 2.13 [ft]GE (A.C.): 0.49 [ft]GE (A.C.) + S.F.: 0.69 [ft]T (A.C.): 0.32 [ft] UseT (A.C.): (Rounded 0.05) 0.30 [ft] 3.6 [in] 4GE (A.C.): (Actual) 0.71 [ft] inches asphalt concreteGE ( A.B.): 1.41 [ft] overT (A.B.): 1.29 [ft] = 15.4 [in] 16GE (A.B.): (Actual) 1.47 [ft] inches of aggregate baseGE (Act. Tot): 2.18
PAVEMENT SECTIONDESIGN
FIGURE C-1
Imperial Ave,. Wake Ave,Danenberg Dr.
PAVEMENT CALCULATION SHEET(Based On CalTrans Topic 608.4)
Project No. EC-461
![Page 24: SUBJECT: GEOTECHNICAL INVESTIGATION FOR PAVEMENT ......The following report presents the findings, conclusions, and recommendations of our ... slip faulting associated with the separation](https://reader033.vdocuments.mx/reader033/viewer/2022042202/5ea37d1e3496641c485860e5/html5/thumbnails/24.jpg)
R-Value (S.G.): 5 FOR THE FOLLOWING STREETS:R-Value (A.B.): 78Safety Factor: 0.2
Gf (A.B.): 1.1 [ft] Gf (A.S.): 1.0 [ft]
CALCULATIONS RECOMMENDEDTraffic Index: 8.0 PAVEMENT SECTIONGf (A.C.): 2.01 [ft]GE (Total): 2.43 [ft]GE (A.C.): 0.56 [ft]GE (A.C.) + S.F.: 0.76 [ft]T (A.C.): 0.38 [ft] UseT (A.C.): (Rounded 0.05) 0.40 [ft] 4.8 [in] 5GE (A.C.): (Actual) 0.84 [ft] inches asphalt concreteGE ( A.B.): 1.59 [ft] overT (A.B.): 1.45 [ft] = 17.4 [in] 18GE (A.B.): (Actual) 1.65 [ft] inches of aggregate baseGE (Act. Tot): 2.49
CALCULATIONS RECOMMENDEDTraffic Index: 9.0 PAVEMENT SECTIONGf (A.C.): 1.89 [ft]GE (Total): 2.74 [ft]GE (A.C.): 0.63 [ft]GE (A.C.) + S.F.: 0.83 [ft]T (A.C.): 0.44 [ft] UseT (A.C.): (Rounded 0.05) 0.45 [ft] 5.4 [in] 6GE (A.C.): (Actual) 0.95 [ft] inches asphalt concreteGE ( A.B.): 1.79 [ft] overT (A.B.): 1.63 [ft] = 19.5 [in] 20GE (A.B.): (Actual) 1.83 [ft] inches of aggregate baseGE (Act. Tot): 2.78
CALCULATIONS RECOMMENDEDTraffic Index: 10.0 PAVEMENT SECTIONGf (A.C.): 1.79 [ft]GE (Total): 3.04 [ft]GE (A.C.): 0.70 [ft]GE (A.C.) + S.F.: 0.90 [ft]T (A.C.): 0.51 [ft] UseT (A.C.): (Rounded 0.05) 0.50 [ft] 6.0 [in] 6GE (A.C.): (Actual) 0.90 [ft] inches asphalt concreteGE ( A.B.): 2.15 [ft] overT (A.B.): 1.95 [ft] = 23.4 [in] 24GE (A.B.): (Actual) 2.20 [ft] inches of aggregate baseGE (Act. Tot): 3.10
PAVEMENT SECTIONDESIGN
FIGURE C-2
Imperial Ave,. Wake Ave,Danenberg Dr.
PAVEMENT CALCULATION SHEET(Based On CalTrans Topic 608.4)
Project No. EC-461