subject: august 18, 2019 august 24, 2019...811 west 7th street, 9th floor, los angeles, california,...
TRANSCRIPT
![Page 1: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY](https://reader036.vdocuments.mx/reader036/viewer/2022081613/5fb72f8f201c2225c94a5642/html5/thumbnails/1.jpg)
811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com
September 4, 2019
Mr. Robert Welch
Project Manager
City of Beverly Hills
345 Foothill Road
Beverly Hills, CA 90210
Mr. Daniel Comorre
Sr. Director, Construction Management
Los Angeles County Metropolitan Transportation Authority
One Gateway Plaza, 17th Floor
Los Angeles, CA 90012
Subject: Segment 2 - Purple Line Extension Project ICM Weekly Report
August 18, 2019 – August 24, 2019
Dear Mr. Welch and Mr. Comorre:
Environmental Intelligence, LLC (EI) has been retained by the City of Beverly Hills (COBH) and the Los
Angeles County Metropolitan Transportation Authority (Metro) to serve as the independent compliance
monitor (ICM) during construction of the Purple Line Extension Project. Monitoring is required to ensure
that construction is in compliance with (1) the Permit titled "Demolition and Public Right-of-Way Use
Permit for the Los Angeles County Metropolitan Transportation Authority and its Contractor to Clear All
Buildings and Existing Improvements at 9430 Wilshire Boulevard, Install Noise Monitoring Equipment
and Sound Walls for Future Construction and a Laydown Area for the Wilshire/Rodeo Station of Section
Two of the Purple Line Extension Project" (Dated June 5th, 2018); (2) the Permit titled "The Demolition
and Clearing of all Buildings and Existing Improvements at 9383-9393 and 9395-9399 Wilshire Boulevard,
Installation of Sound Walls, and Relocation of City Owned Utilities in Preparation for Construction and
Staging for Section Two of the Purple Line Extension Project" (Dated November 6th, 2018); and (3) the
"Memorandum of Agreement for Contract C1120 of the Purple Line Extension Project - Between the City
of Beverly Hills and the Los Angeles County Metropolitan Transportation Authority" (Final Version 62).
The following information summarizes the ICM monitoring activities that occurred at the Segment 2 site
(Rodeo Station site) during the week of August 18, 2019 – August 24, 2019. Construction activities were
not conducted on August 24, 2019.
Construction activities during the week included setting up lane closures, installing water line pipe,
breaking pavement and hauling debris, laying steel plates, cold patching and welding, excavating and back-
filling trenches, installation of water lines, manhole installation, excavating for installation of bollards
around electrical equipment in the N. Canon yard, delivery of trailers to the N. Canon yard, potholing, UMP
installation, material deliveries within Reeves yard, geotechnical instrumentation boring, gravel and sand
deliveries, and transporting equipment. In addition, EI ICMs conducted sound monitoring near the back
alley of the Beverly Hills High School bungalows adjacent to the project site. EI ICMs were present during
all construction activities and conducted routine noise measurements at selected noise monitoring locations
as well as compliance checks in accordance with the MOAs and associated attachments, exhibits, traffic
closure notifications, and traffic management plans. At the conclusion of each work shift, daily monitoring
reports were prepared by each ICM. Attachment B (Daily Monitoring Reports) provides detailed daily
monitoring reports and photographs of construction activities.
![Page 2: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY](https://reader036.vdocuments.mx/reader036/viewer/2022081613/5fb72f8f201c2225c94a5642/html5/thumbnails/2.jpg)
Robert Welch
Daniel Comorre
September 4, 2019
Weekly_Report_Section_2_0818-0824_EI01_20190904
VIOLATION SUMMARY
During the week, EI ICMs identified three (3) violations during construction activities. Table I provides a
summary of the violations identified during the week of August 18, 2019 to August 24, 2019 and Exhibit 1
provides a location map for the submitted violations. Details for the violations are included as Attachment
A. Daily monitoring reports and photographs of construction activities are provided as Attachment B (Daily
Monitoring Reports). Daily noise monitoring data are provided in Attachment C (Noise Monitoring Data
Log).
CONCLUSION
To date, 85 violations have been issued, four (4) of which have been rescinded since the beginning of
construction of the Purple Line Extension Project – Segment 2. Please note, no violation 77 was ever issued,
therefore it is skipped in the numbering sequence and is omitted from this count. Project construction
activities are ongoing and EI ICMs continue to monitor all construction activities applicable to the MOA
on a daily basis.
If you have any questions or comments regarding this letter, please contact me directly at 310.469.8989 or
Sincerely,
ENVIRONMENTAL INTELLIGENCE, LLC
Jeremiah George
Project Manager
Attachments: Attachment A: Violations
Attachment B: Daily Monitoring Reports
Attachment C: Noise Monitoring Data Log
cc: Valerie Mudegoren, City of Beverly Hills
Alexander Cantwell, Los Angeles County Metropolitan Transportation Authority
Kimberly Wilson, Los Angeles County Metropolitan Transportation Authority
David Cooper, Los Angeles County Metropolitan Transportation Authority
Namrata Cariapa, Los Angeles County Metropolitan Transportation Authority
Stacy Sinclair, Los Angeles County Metropolitan Transportation Authority
Hank Scheetz, Los Angeles County Metropolitan Transportation Authority
Brett Barnett, Psomas
Bill Zein, Psomas
Farzad Vakilitabar, Psomas
Alex Kay, City of Beverly Hills
![Page 3: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY](https://reader036.vdocuments.mx/reader036/viewer/2022081613/5fb72f8f201c2225c94a5642/html5/thumbnails/3.jpg)
811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com
TABLE I: VIOLATION SUMMARY (AUGUST 18 – AUGUST 24, 2019)
Violation
ID Date Time ICM Location Condition Violated
Iteration -
Violation Metro Response
84 8/21/2019 11:38 Benjamin
Rosenkoetter
Reeves Dr. and
Charleville Blvd.
Intersection
Article XII of the
Memorandum of
Agreement for
contract C1120 of
the Purple Line
Extension Project -
Section 2
1 - Warning
“Metro is gathering information and data from
the crew, our inspectors, and the DIR to
investigate the validity of and conditions
leading to the violation. If the investigation
results in the identification of corrective
actions, Metro will implement such actions in a
timely manner.”
85 8/23/2019 11:00 Jorge
Guzman
AKA alley
between N.
Crescent Dr. and
N. Canon Dr.
Article XIV Noise
and Vibration
Control Plans and
Mitigation Measures
of the MOA
2 - $15,000
Violation
“Metro is currently gathering information and
data from the crew, our inspectors, and the DIR
to investigate the validity of and conditions
leading to the violation. If the investigation
results in the identification of corrective
actions, Metro will implement such actions in a
timely manner.”
86 8/23/2019 12:28 Benjamin
Rosenkoetter
9378 Wilshire
Blvd.
Article XII of the
MOA 1- Warning
“Metro is currently gathering information and
data from the crew, our inspectors, and the DIR
to investigate the validity of and conditions
leading to the violation. If the investigation
results in the identification of corrective
actions, Metro will implement such actions in a
timely manner.”
![Page 4: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY](https://reader036.vdocuments.mx/reader036/viewer/2022081613/5fb72f8f201c2225c94a5642/html5/thumbnails/4.jpg)
Exhibit 1 : Violation Locations (August 18 - August 24, 2019)Section 2 - Rodeo Station | City of Beverly Hills, CA
SOUR
CE: b
ing M
aps,
ESRI
Worl
d Tran
sport
ation
and W
orld I
mage
ry Ba
se M
aps,
LACM
TA, C
ity of
Beve
rly H
ills
!( Violation Location (with Violation ID)
Envir
onme
ntal In
tellig
ence
. I:\C
ity of
Beve
rly H
ills\C
ompli
ance
Mon
itorin
g Svc
RFQ
17-3
- Marc
h 201
7\02_
GIS_
Data\
maps
\2019
\Wee
klyRe
ports
\Sec
tion2
_Rod
eo\20
1908
18_to
_201
9082
4\Exh
01_V
iol_E
I01_2
0190
828.m
xd
_̂
City ofLos Angeles
City ofBeverly Hills
«0 400200
Feet1:2,400 1 in = 200 feet
Updated: 8/28/2019
Coord
inate
Syste
m: N
AD 19
83 S
tateP
lane C
alifor
nia V
FIPS
0405
Feet,
Proj
ectio
n: La
mbert
Con
forma
l Con
ic, D
atum:
Nort
h Ame
rican
1983
![Page 5: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY](https://reader036.vdocuments.mx/reader036/viewer/2022081613/5fb72f8f201c2225c94a5642/html5/thumbnails/5.jpg)
ICM Violation Form - Section 2 AUR MOA 648-17 (1)
Latitude:Longitude:Elevation: - - -
34.064991-118.398003
UID:2502 Date:8/21/2019 ICM Violation Form - Section 2 AUR MOA 648-17
NotesViolation ID #84At 10:00 hours, ICM Benjamin Rosenkoetter observed several missing or incorrect signs for the detour associated with C1120 LCN 25.1.1 Geotech Stage 8 Lane Closure. The ICM notified the Metro inspectors of the deficiencies so that they could be corrected. At 11:38 hours, the ICM observed that the missing detour signs had not been replaced and incorrect detour signs had been installed at the intersection of S. Reeves Drive and Charleville Blvd. The signage was not implemented in accordance with the COBH traffic control plan and is therefore a violation of Article XII of the Memorandum of Agreement for contract C1120 of the Purple Line Extension Project - Section 2. The ICM notified Inspectors Luis Garcia and Jason Johnson (Metro) of the violation. This is the first incidence of this violation at this location within the last 14 days.
Violation Details1. Violation ID 842. Violation Iteration 1 - Warning3. Time of Violation 11:384. Address Reeves Dr. and Charleville Blvd. intersection.
Applicable Measures5. Memorandum of Agreement No. 648-17 Not Applicable•6. Exhibit A: Third Party Utility Permit and City of Beverly Hills Conditions for Approval
Not Applicable•
7. Exhibit D: Metro 5-Step Noise Control Plan for Advanced Utility Work in Beverly Hills
Not Applicable•
8. Other Plans Not Applicable•9. Other Plan Description See Notes
Attachment AViolations
This report was generated by Environmental Intelligence, LLC - www.enviro-intel.com - Copyright (2019)1590 S. Pacific Coast Hwy, Suite 17 | Laguna Beach, California 92651 | (949) 497-0931 1/3
Report Tracking: Created by Ben Rosenkoetter on 8/21/2019 2:40:36 PM, Approved by Ben Rosenkoetter on 8/22/2019 11:30:42 AM
![Page 6: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY](https://reader036.vdocuments.mx/reader036/viewer/2022081613/5fb72f8f201c2225c94a5642/html5/thumbnails/6.jpg)
ICM Violation Form - Section 2 AUR MOA 648-17 (1)
Latitude:Longitude:Elevation: - - -
34.0673-118.3967
UID:2542 Date:8/23/2019 ICM Violation Form - Section 2 AUR MOA 648-17
NotesViolation ID # 85
At 11:15 hours ICM Jorge Guzman recorded an exceedance of 3.3 dB adjacent to receptor RD-15 in the AKA alley. The noise threshold for RD-15 at this time of day is 74 LAeq. The measured noise level was 77.3 LAeq, ambient noise was negligible at the time. RD-15 EL also experienced an overage during the same sampling period. Construction noise resulted from saw cutting in the AKA alley approximately 100 feet from the intersection of Wilshire Blvd. and the alley. Positioning of sound wall enclosure was insufficient to mitigate for noise in the direction of the sensitive receptor. The activity is in violation of Article XIV of the MOA. Mr. Guzman notified Metro inspector Luis Garcia of the violation. This is the second incidence of the violation at this location in the last 14 days.
Violation Details1. Violation ID 852. Violation Iteration 2 - $15,000 Violation3. Time of Violation 11:004. Address AKA alley between N. Crescent Dr. and N. Canon Dr.
Applicable Measures5. Memorandum of Agreement No. 648-17 Not Applicable•6. Exhibit A: Third Party Utility Permit and City of Beverly Hills Conditions for Approval
Not Applicable•
7. Exhibit D: Metro 5-Step Noise Control Plan for Advanced Utility Work in Beverly Hills
Not Applicable•
8. Other Plans Other Plans (see notes)•9. Other Plan Description Article XIV Noise and Vibration Control Plans and Mitigation Measures of the MOA
Attachment AViolations
This report was generated by Environmental Intelligence, LLC - www.enviro-intel.com - Copyright (2019)1590 S. Pacific Coast Hwy, Suite 17 | Laguna Beach, California 92651 | (949) 497-0931 2/3
Report Tracking: Created by Jorge Guzman on 8/23/2019 7:24:11 PM, Approved by Jeremiah George on 8/24/2019 12:02:24 PM
![Page 7: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY](https://reader036.vdocuments.mx/reader036/viewer/2022081613/5fb72f8f201c2225c94a5642/html5/thumbnails/7.jpg)
ICM Violation Form - Section 2 AUR MOA 648-17 (1)
Latitude:Longitude:
34.066972-118.396613
UID:2549 Date:8/23/2019 ICM Violation Form - Section 2 AUR MOA 648-17
Elevation: - - -
NotesViolation ID #86At 12:28 hours, ICM Benjamin Rosenkoetter observed a lane closure installed within the eastbound number 3 lane on Wilshire Blvd. east of S. Canon. The lane was closed for approximately 2 hours to facilitate UMP installation work. The lane closure was not part of COBH traffic control plan and is therefore a violation of Article XII of the Memorandum of Agreement for contract C1120 of the Purple Line Extension Project - Section 2. The ICM notified Inspectors Luis Garcia (Metro) of the violation. This is the first incidence of this violation at this location within the last 14 days.
Violation Details1. Violation ID 862. Violation Iteration 1 - Warning3. Time of Violation 12:284. Address 9378 Wilshire Blvd.
Applicable Measures5. Memorandum of Agreement No. 648-17 Not Applicable•6. Exhibit A: Third Party Utility Permit and City of Beverly Hills Conditions for Approval
Not Applicable•
7. Exhibit D: Metro 5-Step Noise Control Plan for Advanced Utility Work in Beverly Hills
Not Applicable•
8. Other Plans Other Plans (see notes)•9. Other Plan Description Article XII of the MOA
Attachment AViolations
This report was generated by Environmental Intelligence, LLC - www.enviro-intel.com - Copyright (2019)1590 S. Pacific Coast Hwy, Suite 17 | Laguna Beach, California 92651 | (949) 497-0931 3/3
Report Tracking: Created by Ben Rosenkoetter on 8/24/2019 8:04:00 AM, Approved by Jeremiah George on 8/24/2019 12:21:23 PM
![Page 8: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY](https://reader036.vdocuments.mx/reader036/viewer/2022081613/5fb72f8f201c2225c94a5642/html5/thumbnails/8.jpg)
This report was generated by Environmental Intelligence, LLC - www.enviro-intel.com - Copyright (2019) 1590 S. Pacific Coast Hwy, Suite 17 | Laguna Beach, California 92651 | (949) 497-0931
1/23
Attachment B Daily Monitoring Reports
8/18/2019 - 8/24/2019
Summaries (22)
Date
Monitor
Location
Time
Compliant
Summary
Sunday, August 18, 2019
Ben Rosenkoetter
Rodeo
07:45:00 to 18:45:00
Yes
Contractors/Subcontractors: Metro, TPOG, PSOMAS, Valverde Construction Inc, Griffith
Representatives On-Site: Luis Garcia (Metro); Farzad Vakilitabat (Psomas); Lance Reid (Valverde); Raul Luna (Valverde); Casey Underwood (TPOG); Nadim Bolous (TPOG)
Work Location(s): Reeves yard; Wilshire Blvd. between Beverly Dr. and N. Crescent Dr.; Reeves Dr. between Wilshire Blvd. and the alley; N. Canon yard.
The ICM was in possession of applicable COBH-approved closure notifications and TCP for the day’s work from 07:45 hours to 18:45 hours on August 18, 2019. EI ICM Ben Rosenkoetter met with Metro Inspector Luis Garcia to discuss the day’s activities. At the beginning of the shift, the ICM calibrated the sound meter to 94.0 dBA.
Work for the day included installation of lane closure per TPOG LCN 23.0.28, LCN 23.0.29, and LCN 23.0.30 WRS Sanitary Sewer Relocation; installing water line pipe on Wilshire Blvd. between Reeves Dr. and N. Canon Dr., breaking asphalt and hauling debris within the northbound lane of Reeves Dr. and lateral locations within Wilshire Blvd.; laying steel plates, cold patching and welding.
Lane closure implementation began at 09:00 hours. Lane closure removal completed at 18:45 hours.
Date
Monitor
Location
Time
Compliant
Summary
Monday, August 19, 2019
Yani Pohl
Rodeo
07:30:00 to 16:00:00
Yes
Contractors/Subcontractors: TPOG
Representatives On-Site: None
Work Location(s): Beverly Hills High School at 241 S. Moreno Dr., Beverly Hills, CA 90212.
The ICM was in possession of the MOA and draft Noise Control Plan (pending approval of all parties). Work was conducted from 7:30 hours to 16:00 hours on August 19th, 2019. EI ICM Yani Pohl arrived on site at 7:30 hours. At the beginning of the shift, the ICM calibrated the sound meter at (93.9) 94.00 dB.
ICM Yani Pohl took sound readings in the back alley of the Beverly Hills High School bungalows adjacent to the project site. No sound readings were above ambient levels for the duration of the workday. No vibrational issues were documented from the work site.
Note: A total of 8 readings for fugitive dust were taken over the course of the day utilizing an Extech VPC300 Video Particle Counter with a built-in camera. Readings were at ambient levels throughout the day
![Page 9: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY](https://reader036.vdocuments.mx/reader036/viewer/2022081613/5fb72f8f201c2225c94a5642/html5/thumbnails/9.jpg)
This report was generated by Environmental Intelligence, LLC - www.enviro-intel.com - Copyright (2019) 1590 S. Pacific Coast Hwy, Suite 17 | Laguna Beach, California 92651 | (949) 497-0931
2/23
Date Monday, August 19, 2019
Attachment B Daily Monitoring Reports
8/18/2019 - 8/24/2019
Monitor
Location
Time
Compliant
Summary
Ben Rosenkoetter
Rodeo
07:45:00 to 15:45:00
Yes
Contractors/Subcontractors: Metro; TPOG; PSOMAS; Valverde Construction Inc;
Representatives On-Site: Luis Garcia (Metro); Jason Johnson (Metro); Alex Lapostol (Metro); Gene Higginbotham (Psomas); Lance Reid (Valverde); Raul Luna (Valverde); Nate Burch (TPOG);
Work Location(s): Canon yard; northbound lane of S. Reeves Dr.; westbound number 3 lane of Wilshire Blvd. between N. Crescent Dr. and N. Canon Dr.; the alley between N. Canon yard and the AKA hotel; northeast intersection and sidewalk of Wilshire Blvd. and N. Canon Dr.
The ICM was in possession of applicable COBH-approved closure notifications and TCP for the day’s work from 08:00 hours to 16:00 hours on August 19, 2019. EI ICM Jorge Guzman met with Metro Inspectors Luis Garcia and Jason Johnson to discuss the day’s activities. At the beginning of the shift, the ICM calibrated the sound meter at 94.0 (from 93.9) dBA.
Work for the day included installation of lane closure per TPOG LCN 25.0.0 (Stage 4) and LCN 25.1.1 (Stage 8) WRS Geotechnical Instrumentation and LCN 26.0.0 (Stage 2) WRS CSA Driveway Lane and Sidewalk Closure; excavation of trench and installation of water line lateral along northbound S. Reeves Dr.; backfilling of trench at northeast intersection of Wilshire Blvd. and N. Canon Dr., and manhole installation at alley between N. Canon yard and AKA hotel. Work also included excavating for installation of bollards around electrical equipment in the N. Canon yard.
Lane closure implementation began at 09:05 hours. Lane closure removal completed at 15:50 hours.
Date
Monitor
Location
Time
Compliant
Summary
Monday, August 19, 2019
Daniel Chang
Rodeo
19:45:00 to 07:15:00
Yes
Contractors/Subcontractors: Valverde, PSOMAS, Tutor Perini, Metro, Triumph Security.
Representatives On-Site: Ariel Manalo (Metro); Joshua Lopez (Valverde); Nadim Baloa (TPOG); Ernie Tuscano (PSOMAS); Scott (TPOG).
Work Location(s): The westbound No. 1 and No. 2 lanes on Wilshire Blvd. between Elm Dr. and east of Beverly Dr. The southbound left turn lane on N Canon Dr. between the Beverly/Canon Gardens and Wilshire Blvd. The left turn lane on eastbound Wilshire Blvd at N. Canon Dr. The eastbound No.1 and No.2 lanes on Wilshire Blvd. between El Camino Dr. and S. Canon Dr. The westerly crosswalk (north-south) at the N. Canon Dr./Wilshire Blvd. intersection.
The ICM was in possession of applicable COBH-approved closure notifications and TCP for the night’s work from 19:45 hours to 7:15 hours on August 19th, 2019. EI ICM Daniel Chang met with Metro Inspector Ariel Manalo to discuss the night’s activities. At the beginning of the shift, the ICM calibrated the sound meter at 93.9 dB (to 94.00 dB).
Work for the night included removing trench plates, setting up noise barrier around work site, backfilling over water line pipe in trench at intersection of Wilshire Blvd. and N. Canon Dr., excavating sewer lateral trench at the center of N. Canon Dr. and Wilshire Blvd. intersection, installing water line pipe in trench, office trailer delivery for Canon yard, re-plating trench, welding and securing trench plates, setting up road closure and traffic control signs on Wilshire Blvd., transporting equipment from Reeves yard to work site, removing road closure, tabbing lanes, and sweeping/cleaning work site.
![Page 10: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY](https://reader036.vdocuments.mx/reader036/viewer/2022081613/5fb72f8f201c2225c94a5642/html5/thumbnails/10.jpg)
This report was generated by Environmental Intelligence, LLC - www.enviro-intel.com - Copyright (2019) 1590 S. Pacific Coast Hwy, Suite 17 | Laguna Beach, California 92651 | (949) 497-0931
3/23
Date Monday, August 19, 2019
Attachment B Daily Monitoring Reports
8/18/2019 - 8/24/2019
Monitor
Location
Time
Compliant
Summary
Yani Pohl
Rodeo
04:45:00 to 06:00:00
Yes
Contractors/Subcontractors: TPOG
Representatives On-Site: Nathan Burich (TPOG), Rick Chimal (TPOG), Gene Higginbotham (PSOMAS)
Work Location(s): North Canon yard
The ICM was in possession of applicable COBH-approved closure notifications and TCP for the day’s work from 04:45 hours to 06:00 hours on August 19, 2019. EI ICM Yani Pohl met with PSOMAS Inspectors Gene Higginbotham and TPOG Site Manager Nathan Burich to discuss the day’s activities. At the beginning of the shift, the ICM calibrated the sound meter at 94.0 (from 93.9) dBA.
Work for the day included the delivery of one trailer to the N. Canon yard. The delivery truck arrived at 05:09 hours.
Date
Monitor
Location
Time
Compliant
Summary
Monday, August 19, 2019
Jorge Guzman
Rodeo
08:00:00 to 16:00:00
Yes
Contractors/Subcontractors: Metro; TPOG; PSOMAS; Valverde Construction Inc; Jet Drilling;
Representatives On-Site: Luis Garcia (Metro); Jason Johnson (Metro); Alex Lapostol (Metro); Gene Higginbotham (Psomas); Lance Reid (Valverde); Raul Luna (Valverde); Nate Burch (TPOG); Terry Knox (ASC)
Work Location(s): Canon yard; northbound lane of S. Reeves Dr.; westbound number 3 lane of Wilshire Blvd. between N. Crescent Dr. and N. Canon Dr.; the alley between N. Canon yard and the AKA hotel; northeast intersection and sidewalk of Wilshire Blvd. and N. Canon Dr.
The ICM was in possession of applicable COBH-approved closure notifications and TCP for the day’s work from 08:00 hours to 16:00 hours on August 19, 2019. EI ICM Jorge Guzman met with Metro Inspectors Luis Garcia and Jason Johnson to discuss the day’s activities. At the beginning of the shift, the ICM calibrated the sound meter at 94.0 (from 93.9) dBA.
Work for the day included installation of lane closure per TPOG LCN 25.0.0 (Stage 4) and LCN 25.1.1 (Stage 8) WRS Geotechnical Instrumentation; excavation of trench along northbound S. Reeves Dr.; backfilling of trench at northeast intersection of Wilshire Blvd. and N. Canon Dr., and manhole installation at alley between N. Canon yard and AKA hotel. Work also included excavating for installation of bollards around electrical equipment in the N. Canon yard.
Lane closure implementation began at 09:05 hours. Lane closure removal completed at 15:50 hours.
![Page 11: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY](https://reader036.vdocuments.mx/reader036/viewer/2022081613/5fb72f8f201c2225c94a5642/html5/thumbnails/11.jpg)
This report was generated by Environmental Intelligence, LLC - www.enviro-intel.com - Copyright (2019) 1590 S. Pacific Coast Hwy, Suite 17 | Laguna Beach, California 92651 | (949) 497-0931
4/23
Date
Monitor
Location
Time
Compliant
Tuesday, August 20, 2019
Yani Pohl
Rodeo
07:30:00 to 16:00:00
Yes
Attachment B Daily Monitoring Reports
8/18/2019 - 8/24/2019
Summary Contractors/Subcontractors: TPOG
Representatives On-Site: None
Work Location(s): Beverly Hills High School at 241 S Moreno Dr, Beverly Hills, CA 90212.
The ICM was in possession of the MOA and draft Noise Control Plan (pending approval of all parties). Work was conducted from 7:30 hours to 16:00 hours on August 20th, 2019. EI ICM Yani Pohl arrived on site at 7:30 hours. At the beginning of the shift, the ICM calibrated the sound meter at (93.9) 94.00 dB.
ICM Yani Pohl took sound readings in the back alley of the Beverly Hills High School bungalows adjacent to the project site. No sound readings were above ambient levels for the duration of the workday. No vibrational issues were documented from the work site.
Note: A total of 7 readings for fugitive dust were taken over the course of the day utilizing an Extech VPC300 Video Particle Counter with a built-in camera. Readings were at ambient levels throughout the day.
Date
Monitor
Location
Time
Compliant
Summary
Tuesday, August 20, 2019
Ben Rosenkoetter
Rodeo
07:45:00 to 15:45:00
Yes
Contractors/Subcontractors: Metro; TPOG; PSOMAS; Valverde Construction Inc; Haaker Equipment; Jet Drilling
Representatives On-Site: Luis Garcia (Metro); Jason Johnson (Metro); David Ortiz (Metro); Gene Higginbotham (Psomas); Lance Reid (Valverde); Raul Luna (Valverde); Nate Burch (TPOG); Casey Underwood (TPOG); Terry Knox (ASC)
Work Location(s): Canon yard; northbound lane of S. Reeves Dr.; westbound number 3 lane of Wilshire Blvd. between N. Crescent Dr. and N. Canon Dr.; eastbound number 2 lane of Wilshire Blvd. between N. Canon Dr. and N. Crescent Dr.; the alley between N. Canon yard and the AKA hotel; southbound number 2 lane of N. Beverly Dr. and westbound number 3 lane of Wilshire Blvd. between S. Reeves Dr. and El Camino.
The ICM was in possession of applicable COBH-approved closure notifications and TCP for the day’s work from 07:45 hours to 15:45 hours on August 20, 2019. EI ICM Ben Rosenkoetter met with Metro Inspectors Luis Garcia and Jason Johnson to discuss the day’s activities. At the beginning of the shift, the ICM calibrated the sound meter to 94.0 dBA.
Work for the day included installation of lane closure per TPOG LCN 25.0.0 (Stage 4), LCN 25.0.0 (Geotech Stage 2) and LCN 25.1.1 (Stage 8) WRS Geotechnical Instrumentation; excavation of trench along northbound S. Reeves Dr.; excavation for manhole installation with water jet/vacuum truck at alley between N. Canon yard and AKA hotel, and geotechnical instrumentation boring on N. Beverly Dr., potholing and UMP installation along the number 2 lane of Wilshire Blvd. between N. Canon Dr. and N. Crescent Dr., K-Rail delivery within Reeves yard, and construction office trailer assembly within N. Canon yard.
Lane closure implementation began at 09:05 hours. Lane closure removal completed at 15:45 hours.
![Page 12: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY](https://reader036.vdocuments.mx/reader036/viewer/2022081613/5fb72f8f201c2225c94a5642/html5/thumbnails/12.jpg)
This report was generated by Environmental Intelligence, LLC - www.enviro-intel.com - Copyright (2019) 1590 S. Pacific Coast Hwy, Suite 17 | Laguna Beach, California 92651 | (949) 497-0931
5/23
Date
Monitor
Location
Time
Compliant
Tuesday, August 20, 2019
Jorge Guzman
Rodeo
08:00:00 to 16:00:00
Yes
Attachment B Daily Monitoring Reports
8/18/2019 - 8/24/2019
Summary Contractors/Subcontractors: Metro; TPOG; PSOMAS; Valverde Construction Inc; Haaker Equipment; Jet Drilling;
Representatives On-Site: Luis Garcia (Metro); Jason Johnson (Metro); David Ortiz (Metro); Gene Higginbotham (Psomas); Lance Reid (Valverde); Raul Luna (Valverde); Nate Burch (TPOG); Casey Underwood (TPOG); Terry Knox (ASC)
Work Location(s): Canon yard; northbound lane of S. Reeves Dr.; westbound number 3 lane of Wilshire Blvd. between N. Crescent Dr. and N. Canon Dr.; eastbound number 2 lane of Wilshire Blvd. between N. Canon Dr. and N. Crescent Dr.; the alley between N. Canon yard and the AKA hotel; southbound number 2 lane of N. Beverly Dr. and westbound number 3 lane of Wilshire Blvd. between S. Reeves Dr. and El Camino.
The ICM was in possession of applicable COBH-approved closure notifications and TCP for the day’s work from 08:00 hours to 16:00 hours on August 20, 2019. EI ICM Jorge Guzman met with Metro Inspectors Luis Garcia and Jason Johnson to discuss the day’s activities. At the beginning of the shift, the ICM calibrated the sound meter at 94.0 (from 93.9) dBA.
Work for the day included installation of lane closure per TPOG LCN 25.0.0 (Stage 4), LCN 25.0.0 (Geotech Stage 2) and LCN 25.1.1 (Stage 8) WRS Geotechnical Instrumentation; excavation of trench along northbound S. Reeves Dr.; excavation for manhole installation with water jet/vacuum truck at alley between N. Canon yard and AKA hotel, and geotechnical instrumentation boring on N. Beverly Dr. Work also included potholing and UMP installation along the number 2 lane of Wilshire Blvd. between N. Canon Dr. and N. Crescent Dr.
Lane closure implementation began at 09:05 hours. Lane closure removal completed at 15:45 hours.
Date
Monitor
Location
Time
Compliant
Summary
Tuesday, August 20, 2019
Daniel Chang
Rodeo
19:45:00 to 07:00:00
Yes
Contractors/Subcontractors: Valverde, PSOMAS, Tutor Perini, Metro, Triumph Security.
Representatives On-Site: Ariel Manalo (Metro); Joshua Lopez (Valverde); Nadim Baloa (TPOG); Ernie Tuscano (PSOMAS); Scott (TPOG); Lance (Valverde).
Work Location(s): The westbound No. 1 and No. 2 lanes on Wilshire Blvd. between Elm Dr. and east of Beverly Dr. The southbound left turn lane on N. Canon Dr. between the Beverly/Canon Gardens and Wilshire Blvd. The left turn lane on eastbound Wilshire Blvd. at N. Canon Dr. The eastbound No.1 and No.2 lanes on Wilshire Blvd. between El Camino Dr. and South Canon Dr. The westerly crosswalk (North-South) at the N. Canon Dr./Wilshire Blvd. intersection.
The ICM was in possession of applicable COBH-approved closure notifications and TCP for the night’s work from 19:45 hours to 7:00 hours on August 20th, 2019. EI ICM Daniel Chang met with Metro Inspector Ariel Manalo to discuss the night’s activities. At the beginning of the shift, the ICM calibrated the sound meter at 93.9 dB (to 94.00 dB).
Work for the night included removing trench plates, setting up noise barrier around work site, backfilling over water line pipe in trench, field assembly of water line pipe joints, beveling water line pipes, sewer line trench shaving, installing water line pipe in trench, re-plating trench, welding and securing trench plates, setting up road closure and traffic control signs on Wilshire Blvd., transporting equipment from Reeves yard to work site, removing road closure, tabbing lanes, and sweeping/cleaning work site
![Page 13: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY](https://reader036.vdocuments.mx/reader036/viewer/2022081613/5fb72f8f201c2225c94a5642/html5/thumbnails/13.jpg)
This report was generated by Environmental Intelligence, LLC - www.enviro-intel.com - Copyright (2019) 1590 S. Pacific Coast Hwy, Suite 17 | Laguna Beach, California 92651 | (949) 497-0931
6/23
Date
Monitor
Location
Time
Compliant
Wednesday, August 21, 2019
Yani Pohl
Rodeo
07:30:00 to 16:00:00
Yes
Attachment B Daily Monitoring Reports
8/18/2019 - 8/24/2019
Summary Contractors/Subcontractors: TPOG
Representatives On-Site: None
Work Location(s): Beverly Hills High School at 241 S Moreno Dr, Beverly Hills, CA 90212.
The ICM was in possession of the MOA and draft Noise Control Plan (pending approval of all parties). Work was conducted from 7:30 hours to 16:00 hours on August 21th, 2019. EI ICM Yani Pohl arrived on site at 7:30 hours. At the beginning of the shift, the ICM calibrated the sound meter at (93.9) 94.00 dB.
ICM Yani Pohl took sound readings in the back alley of the Beverly Hills High School bungalows adjacent to the project site. No sound readings were above ambient levels for the duration of the workday. No vibrational issues were documented from the work site.
Note: A total of 8 readings for fugitive dust were taken over the course of the day utilizing an Extech VPC300 Video Particle Counter with a built-in camera. Readings were at ambient levels throughout the day.
Date
Monitor
Location
Time
Compliant
Summary
Wednesday, August 21, 2019
Ben Rosenkoetter
Rodeo
07:45:00 to 16:00:00
No
Contractors/Subcontractors: Metro; TPOG; PSOMAS; Valverde Construction Inc; Haaker Equipment; Jet Drilling;
Representatives On-Site: Luis Garcia (Metro); Jason Johnson (Metro); David Ortiz (Metro); Gene Higginbotham (Psomas); Lance Reid (Valverde); Raul Luna (Valverde); Nate Burch (TPOG); Casey Underwood (TPOG); Terry Knox (ASC);
Work Location(s): Canon yard; northbound lane of S. Reeves Dr.; westbound number 3 lane of Wilshire Blvd. between N. Crescent Dr. and N. Canon Dr.; eastbound number 2 lane of Wilshire Blvd. between N. Canon Dr. and N. Crescent Dr.; the alley between N. Canon yard and the AKA hotel; southbound curb lane of S. Beverly Dr., southbound number 2 lane of N. Beverly Dr. and westbound number 3 lane of Wilshire Blvd. between S. Reeves Dr. and El Camino.
The ICM was in possession of applicable COBH-approved closure notifications and TCP for the day’s work from 07:45 hours to 16:00 hours on August 21, 2019. EI ICM Ben Rosenkoetter met with Metro Inspectors Luis Garcia and Jason Johnson to discuss the day’s activities. At the beginning of the shift, the ICM calibrated the sound meter to 94.0 dBA.
Work for the day included installation of lane closure per TPOG LCN 25.0.0 (Stage 4), LCN 25.0.0 (Geotech Stage 2), LCN 25.0.4 (Stage 13) and LCN 25.1.1 (Stage 8) WRS Geotechnical Instrumentation; excavation of trench along northbound S. Reeves Dr.; excavation for manhole installation with water jet/vacuum truck at alley between N. Canon yard and AKA hotel, and geotechnical instrumentation boring on N. Beverly Dr., UMP installation along the number 2 lane of Wilshire Blvd. between N. Canon Dr. and N. Crescent Dr., K-Rail delivery within Reeves yard, and construction office trailer assembly within N. Canon yard.
Lane closure implementation began at 09:05 hours. Lane closure removal completed at 16:00 hours.
Violation ID #84
At 10:00 hours, ICM Benjamin Rosenkoetter observed several missing or incorrect signs for the detour associated with C1120 LCN 25.1.1 Geotech Stage 8 Lane Closure. The ICM notified the Metro inspectors of the deficiencies so that they could be corrected. At 11:38 hours, the ICM observed that the missing detour signs had not been replaced and incorrect detour signs had been installed at the intersection of S. Reeves Dr. and Charleville Blvd. The signage was not implemented in accordance with the COBH traffic control plan and is therefore a violation of Article XII of the Memorandum of Agreement for contract C1120 of the Purple Line Extension Project - Section 2. The ICM notified Inspectors Luis Garcia and Jason Johnson (Metro) of the violation. This is the first incidence of this violation at this location within the last 14 days.
![Page 14: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY](https://reader036.vdocuments.mx/reader036/viewer/2022081613/5fb72f8f201c2225c94a5642/html5/thumbnails/14.jpg)
This report was generated by Environmental Intelligence, LLC - www.enviro-intel.com - Copyright (2019) 1590 S. Pacific Coast Hwy, Suite 17 | Laguna Beach, California 92651 | (949) 497-0931
7/23
Date
Monitor
Location
Time
Compliant
Wednesday, August 21, 2019
Jorge Guzman
Rodeo
08:00:00 to 16:00:00
Yes
Attachment B Daily Monitoring Reports
8/18/2019 - 8/24/2019
Summary Contractors/Subcontractors: Metro; TPOG; PSOMAS; Valverde Construction Inc; Haaker Equipment; Jet Drilling;
Representatives On-Site: Luis Garcia (Metro); Jason Johnson (Metro); David Ortiz (Metro); Gene Higginbotham (Psomas); Lance Reid (Valverde); Raul Luna (Valverde); Nate Burch (TPOG); Mark Olson (COBH); Alex Kay (COBH); Terry Knox (ASC);
Work Location(s): Canon yard; northbound lane of S. Reeves Dr.; westbound number 3 lane of Wilshire Blvd. between N. Crescent Dr. and N. Canon Dr.; the alley between N. Canon yard and the AKA hotel; southbound number 2 lane of N. Beverly Dr. and westbound number 3 lane of Wilshire Blvd. between S. Reeves Dr. and El Camino; Number 2 lane of S. Beverly Dr. and northbound right turn pocket of S. Beverly Dr. at Wilshire Blvd.
The ICM was in possession of applicable COBH-approved closure notifications and TCP for the day’s work from 08:00 hours to 16:00 hours on August 21, 2019. EI ICM Jorge Guzman met with Metro Inspectors Luis Garcia and Jason Johnson to discuss the day’s activities. At the beginning of the shift, the ICM calibrated the sound meter at 94.0 (from 93.9) dBA.
Work for the day included installation of lane closure per TPOG LCN 25.0.0 (Stage 4), LCN 25.0.0 (Geotech Stage 2), LCN 25.0.5, and LCN 25.1.1 (Stage 8) WRS Geotechnical Instrumentation; excavation of trench along northbound S. Reeves Dr. and setting of new water line; excavation for manhole installation with water jet/vacuum truck at alley between N. Canon yard and AKA hotel, and geotechnical instrumentation boring on N. Beverly Dr. Work also included setting up of electrical for TPOG and Metro trailers in Canon yard.
Lane closure implementation began at 09:05 hours. Lane closure removal completed at 15:45 hours.
Date
Monitor
Location
Time
Compliant
Summary
Wednesday, August 21, 2019
Daniel Chang
Rodeo
19:45:00 to 07:00:00
Yes
Contractors/Subcontractors: Valverde, PSOMAS, Tutor Perini, Metro, Triumph Security.
Representatives On-Site: Ariel Manalo (Metro); Joshua Lopez (Valverde); Nadim Baloa (TPOG); Ernie Tuscano (PSOMAS); Scott (TPOG).
Work Location(s): The westbound No. 1 and No. 2 lanes on Wilshire Blvd. between Elm Dr. and east of Beverly Dr. The southbound left turn lane on N. Canon Dr. between the Beverly/Canon Gardens and Wilshire Blvd. The left turn lane on eastbound Wilshire Blvd. at N. Canon Dr. The eastbound No.1 and No.2 lanes on Wilshire Blvd. between El Camino Dr. and South Canon Dr. The westerly crosswalk (north-south) at the N. Canon Dr./Wilshire Blvd. intersection.
The ICM was in possession of applicable COBH-approved closure notifications and TCP for the night’s work from 19:45 hours to 7:00 hours on August 21st, 2019. EI ICM Daniel Chang met with Metro Inspector Ariel Manalo to discuss the night’s activities. At the beginning of the shift, the ICM calibrated the sound meter at 93.9 dB (to 94.00 dB).
Work for the night included removing trench plates, setting up noise barrier around work site, backfilling over water line pipe in trench, installing pipe in sewer lateral trench (A2A), excavating sewer lateral trench (A2), sand bedding in sewer lateral trench (A2A), light backfill to hold pipe in place in sewer lateral trench (A2A), sand delivery, installing water line pipe in trench, field assembly of waterline pipe joint in Reeves yard, re- plating trench, welding and securing trench plates, setting up road closure and traffic control signs on Wilshire Blvd., transporting equipment from Reeves yard to work site, removing road closure, tabbing lanes, and sweeping/cleaning work site.
![Page 15: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY](https://reader036.vdocuments.mx/reader036/viewer/2022081613/5fb72f8f201c2225c94a5642/html5/thumbnails/15.jpg)
Date
Monitor
Location
Time
Compliant
Thursday, August 22, 2019
Jorge Guzman
Rodeo
07:00:00 to 16:00:00
Yes
This report was generated by Environmental Intelligence, LLC - www.enviro-intel.com - Copyright (2019) 1590 S. Pacific Coast Hwy, Suite 17 | Laguna Beach, California 92651 | (949) 497-0931
8/23
Attachment B Daily Monitoring Reports
8/18/2019 - 8/24/2019
Summary Contractors/Subcontractors: Metro; TPOG; PSOMAS; Valverde Construction Inc; Nor-Cal Pipeline Services; Jet Drilling;
Representatives On-Site: Luis Garcia (Metro); David Ortiz (Metro); Gene Higginbotham (Psomas); Lance Reid (Valverde); Raul Luna (Valverde); Nate Burch (TPOG); Terry Knox (ASC);
Work Location(s): Canon yard; northbound lane of S. Reeves Dr.; westbound number 3 lane of Wilshire Blvd. between N. Crescent Dr. and N. Canon Dr.; the alley between N. Canon yard and the AKA hotel; southbound number 2 lane of N. Beverly Dr. and westbound number 3 lane of Wilshire Blvd. between S. Reeves Dr. and El Camino; Number 2 lane of S. Beverly Dr. and northbound right turn pocket of S. Beverly Dr. at Wilshire Blvd.
The ICM was in possession of applicable COBH-approved closure notifications and TCP for the day’s work from 07:00 hours to 16:00 hours on August 22, 2019. EI ICM Jorge Guzman met with Metro Inspector Luis Garcia to discuss the day’s activities. At the beginning of the shift, the ICM calibrated the sound meter at 94.0 (from 93.9) dBA.
Work for the day included installation of lane closure per TPOG LCN 25.0.0 (Stage 4), LCN 25.0.0 (Geotech Stage 2), LCN 25.0.5, and LCN 25.1.1 (Stage 8) WRS Geotechnical Instrumentation; excavation of waterlines on southbound and northbound S. Beverly Dr.; excavation for manhole installation with water jet/vacuum truck at alley between N. Canon yard and AKA hotel, and geotechnical instrumentation boring on N. Beverly Dr. north of Wilshire Blvd. Work also included setting up of electrical for TPOG and Metro trailers in Canon yard.
Lane closure implementation began at 09:05 hours. Lane closure removal completed at 15:45 hours.
Date
Monitor
Location
Time
Compliant
Summary
Thursday, August 22, 2019
Yani Pohl
Rodeo
07:00:00 to 17:00:00
Yes
Contractors/Subcontractors: TPOG
Representatives On-Site: None
Work Location(s): Beverly Hills High School at 241 S Moreno Dr, Beverly Hills, CA 90212.
The ICM was in possession of the MOA and draft Noise Control Plan (pending approval of all parties). Work was conducted from 7:00 hours to 17:00 hours on August 22th, 2019. EI ICM Yani Pohl arrived on site at 7:00 hours. At the beginning of the shift, the ICM calibrated the sound meter at (93.9) 94.00 dB.
ICM Yani Pohl took sound readings in the back alley of the Beverly Hills High School bungalows adjacent to the project site. No sound readings were above ambient levels for the duration of the workday. No vibrational issues were documented from the work site. Three additional monitors were installed along the wall between the Constellation yard and BHHS.
Note: A total of 9 readings for fugitive dust were taken over the course of the day utilizing an Extech VPC300 Video Particle Counter with a built-in camera. Readings were at ambient levels throughout the day
![Page 16: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY](https://reader036.vdocuments.mx/reader036/viewer/2022081613/5fb72f8f201c2225c94a5642/html5/thumbnails/16.jpg)
This report was generated by Environmental Intelligence, LLC - www.enviro-intel.com - Copyright (2019) 1590 S. Pacific Coast Hwy, Suite 17 | Laguna Beach, California 92651 | (949) 497-0931
9/23
Date
Monitor
Location
Time
Compliant
Summary
Thursday, August 22, 2019
Ben Rosenkoetter
Rodeo
07:45:00 to 15:45:00
Yes
Contractors/Subcontractors: Metro; TPOG; PSOMAS; Valverde Construction Inc; Jet Drilling;
.
Attachment B Daily Monitoring Reports
8/18/2019 - 8/24/2019
Representatives On-Site: Luis Garcia (Metro); David Ortiz (Metro); Gene Higginbotham (Psomas); Lance Reid (Valverde); Raul Luna (Valverde); Nate Burch (TPOG); Casey Underwood (TPOG); Terry Knox (ASC)
Work Location(s): Canon yard; westbound number 3 lane on Wilshire Blvd. between Crescent Dr. and Beverly Dr.; northbound lane on S. Reeves Dr.; southbound number 2 lane on N. Beverly Dr. between Wilshire Blvd. and approx. 200 ft. north of Wilshire Blvd.; Reeves yard. The ICM was in possession of applicable COBH-approved closure notifications and TCP for the day’s work from 07:45 hours to 15:45 hours on August 22, 2019. EI ICM Ben Rosenkoetter met with Metro Inspectors Luis Garcia to discuss the day’s activities. At the beginning of the shift, the ICM calibrated the sound meter to 94.0 dBA. Work for the day included installation of lane closure per TPOG LCN 23.2.27 (Stage 2), LCN 25.0.0 (Stage 4), LCN 25.0.5 (Stage 17), 25.1.1 (Stage 8), LCN 25.1.4 (Stage 16), and LCN 26.1.0 (Stage 2); excavation of trench and water line installation along northbound S. Reeves Dr.; excavation for storm water line installation with water jet/vacuum truck within Wilshire Blvd. west of N. Canon Dr., and geotechnical instrumentation installation on N. Beverly Dr. Lane closure implementation began at 09:05 hours. Lane closure removal completed at 15:30 hours.
Date
Monitor
Location
Time
Compliant
Summary
Thursday, August 22, 2019
Daniel Chang
Rodeo
19:45:00 to 07:00:00
Yes
Contractors/Subcontractors: Valverde, PSOMAS, Tutor Perini, Metro, Triumph Security. Representatives On-Site: Ariel Manalo (Metro); Joshua Lopez (Valverde); Nadim Baloa (TPOG); Ernie Tuscano (PSOMAS); Scott (TPOG). Work Location(s): The westbound No. 1 and No. 2 lanes on Wilshire Blvd. between Elm Dr. and east of Beverly Dr. The southbound left turn lane on N. Canon Dr. between the Beverly/Canon Gardens and Wilshire Blvd. The left turn lane on eastbound Wilshire Blvd. at N. Canon Dr. The eastbound No.1 and No.2 lanes on Wilshire Blvd. between El Camino Dr. and South Canon Dr. The westerly crosswalk (north-south) at the N. Canon Dr./Wilshire Blvd. intersection. The left turn lane on westbound Wilshire Blvd. at S. Canon Dr. The left turn lane on westbound Wilshire Blvd. at Beverly Dr. The ICM was in possession of applicable COBH-approved closure notifications and TCP for the night’s work from 19:45 hours to 7:00 hours on August 22nd, 2019. EI ICM Daniel Chang met with Metro Inspector Ariel Manalo to discuss the night’s activities. At the beginning of the shift, the ICM calibrated the sound meter at 93.9 dB (to 94.00 dB).
Work for the night included removing trench plates, setting up noise barrier around work site, backfilling over water line pipe in trench, installing pipe water line trench, field assembly of waterline pipe joints and butterfly valves in Reeves yard, excavating water line trench, re-plating trench, welding and securing trench plates, setting up road closure and traffic control signs on Wilshire Blvd., transporting equipment from Reeves yard to work site, removing road closure, tabbing lanes, and sweeping/cleaning work site.
![Page 17: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY](https://reader036.vdocuments.mx/reader036/viewer/2022081613/5fb72f8f201c2225c94a5642/html5/thumbnails/17.jpg)
Date
Monitor
Location
Time
Compliant
Summary
Friday, August 23, 2019
Yani Pohl
Rodeo
07:30:00 to 16:00:00
Yes
Contractors/Subcontractors: TPOG.
This report was generated by Environmental Intelligence, LLC - www.enviro-intel.com - Copyright (2019) 1590 S. Pacific Coast Hwy, Suite 17 | Laguna Beach, California 92651 | (949) 497-0931
10/23
Attachment B Daily Monitoring Reports
8/18/2019 - 8/24/2019
Representatives On-Site: None
Work Location(s): Beverly Hills High School at 241 S Moreno Dr, Beverly Hills, CA 90212.
The ICM was in possession of the MOA and draft Noise Control Plan (pending approval of all parties). Work was conducted from 7:30 hours to 16:00 hours on August 23th, 2019. EI ICM Yani Pohl arrived on site at 7:30 hours. At the beginning of the shift, the ICM calibrated the sound meter at (93.9) 94.00 dB.
ICM Yani Pohl took sound readings in the back alley of the Beverly Hills High School bungalows adjacent to the project site. No sound readings were above ambient levels for the duration of the workday. No vibrational issues were documented from the work site.
Note: A total of 8 readings for fugitive dust were taken over the course of the day utilizing an Extech VPC300 Video Particle Counter with a built-in camera. Readings were at ambient levels throughout the day.
Date
Monitor
Location
Time
Compliant
Summary
Friday, August 23, 2019
Ben Rosenkoetter
Rodeo
07:45:00 to 15:45:00
No
Contractors/Subcontractors: Metro; TPOG; PSOMAS; Valverde Construction Inc; Jet Drilling;
Representatives On-Site: Luis Garcia (Metro); David Ortiz (Metro); Gene Higginbotham (Psomas); Lance Reid (Valverde); Raul Luna (Valverde); Nate Burch (TPOG); Terry Knox (ASC)
Work Location(s): Canon yard; eastbound number 3 lane of Wilshire Blvd. between N. Beverly Dr. and N. Crescent Dr.; westbound number 3 lane of Wilshire Blvd. between N. Crescent Dr. and N. Beverly Dr.; the alley between N. Canon yard and the AKA hotel; southbound number 2 lanes of S. Beverly Dr. and northbound right turn lane of S. Beverly Dr.; Number 2 lane of S. Beverly Dr and northbound right turn pocket of S. Beverly Dr. at Wilshire Blvd.
The ICM was in possession of applicable COBH-approved closure notifications and TCP for the day’s work from 07:45 hours to 15:45 hours on August 23, 2019. EI ICM Ben Rosenkoetter met with Metro Inspector Luis Garcia to discuss the day’s activities. At the beginning of the shift, the ICM calibrated the sound meter at 94.0 (from 93.9) dBA.
Work for the day included installation of lane closure per TPOG LCN 25.0.0 (Stage 4), LCN 25.0.0 (Geotech Stage 2), LCN 25.0.5, LCN 25.1.4, LCN 26.1.0, and LCN 25.1.1 (Stage 8) WRS Geotechnical Instrumentation; excavation of water line along northbound S. Beverly Dr. and southbound S. Beverly Dr., excavation for storm drain on number 3 lane of westbound Wilshire Blvd. west of N. Canon Dr., saw cutting and water jet/vacuum truck at alley between N. Canon yard and AKA hotel, and geotechnical instrumentation boring and UMP installation on southern sidewalk of Wilshire Blvd. between N. Crescent Dr. and N. Canon Dr. Work also included setting up of electrical for TPOG and Metro trailers in Canon yard.
Lane closure implementation began at 09:00 hours. Lane closure removal completed at 15:30 hours.
Violation ID #86
At 12:28 hours, ICM Benjamin Rosenkoetter observed a lane closure installed within the eastbound number 3 lane on Wiltshire Blvd. east of S. Canon. The lane was closed for approximately 2 hours to facilitate UMP installation work. The lane closure was not part of COBH traffic control plan and is therefore a violation of Article XII of the Memorandum of Agreement for contract C1120 of the Purple Line Extension Project - Section 2. The ICM notified Inspectors Luis Garcia (Metro) of the violation. This is the first incidence of this violation at this location within the last 14 days.
![Page 18: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY](https://reader036.vdocuments.mx/reader036/viewer/2022081613/5fb72f8f201c2225c94a5642/html5/thumbnails/18.jpg)
This report was generated by Environmental Intelligence, LLC - www.enviro-intel.com - Copyright (2019) 1590 S. Pacific Coast Hwy, Suite 17 | Laguna Beach, California 92651 | (949) 497-0931
11/23
Date
Monitor
Location
Time
Compliant
Summary
Friday, August 23, 2019
Jorge Guzman
Rodeo
08:00:00 to 15:30:00
No
Contractors/Subcontractors: Metro; TPOG; PSOMAS; Valverde Construction Inc; Jet Drilling;
Attachment B Daily Monitoring Reports
8/18/2019 - 8/24/2019
Representatives On-Site: Luis Garcia (Metro); David Ortiz (Metro); Gene Higginbotham (Psomas); Lance Reid (Valverde); Raul Luna (Valverde); Nate Burch (TPOG); Terry Knox (ASC)
Work Location(s): Canon yard; eastbound number 3 lane of Wilshire Blvd. between N. Beverly Dr. and N. Crescent Dr.; westbound number 3 lane of Wilshire Blvd. between N. Crescent Dr. and N. Beverly Dr.; the alley between N. Canon yard and the AKA hotel; southbound number 2 lanes of S. Beverly Dr. and northbound right turn lane of S. Beverly Dr.; Number 2 lane of S. Beverly Dr. and northbound right turn pocket of S. Beverly Dr. at Wilshire Blvd.
The ICM was in possession of applicable COBH-approved closure notifications and TCP for the day’s work from 08:00 hours to 15:30 hours on August 21, 2019. EI ICM Jorge Guzman met with Metro Inspector Luis Garcia to discuss the day’s activities. At the beginning of the shift, the ICM calibrated the sound meter at 94.0 (from 93.9) dBA.
Work for the day included installation of lane closure per TPOG LCN 25.0.0 (Stage 4), LCN 25.0.0 (Geotech Stage 2), LCN 25.0.5, LCN 25.1.4, LCN 26.1.0, and LCN 25.1.1 (Stage 8) WRS Geotechnical Instrumentation; excavation of water line along northbound S. Beverly Dr. and southbound S. Beverly Dr., excavation for storm drain on number 3 lane of westbound Wilshire Blvd. west of N. Canon Dr., saw cutting and water jet/vacuum truck at alley between N. Canon yard and AKA hotel, and geotechnical instrumentation boring and UMP installation on southern sidewalk of Wilshire Blvd. between N. Crescent Dr. and N. Canon Dr. Work also included setting up of electrical for TPOG and Metro trailers in Canon yard.
Lane closure implementation began at 09:00 hours. Lane closure removal completed at 15:30 hours.
Violation ID # 85
At 1115 hours ICM Jorge Guzman recorded an exceedance of 3.3 dB adjacent to receptor RD-15 in the AKA alley. The noise threshold for RD-15 at this time of day is 74 LAeq. The measured noise level was 77.3 LAeq, ambient noise was negligible at the time. RD-15 EL also experienced an overage during the same sampling period. Construction noise resulted from saw cutting in the AKA alley approximately 100 feet from the intersection of Wilshire Blvd. and the alley. Positioning of sound wall enclosure was insufficient to mitigate for noise in the direction of the sensitive receptor. The activity is in violation of Article XIV of the MOA. Mr. Guzman notified Metro inspector Luis Garcia of the violation. This is the second incidence of the violation at this location in the last 14 days.
Date
Monitor
Location
Time
Compliant
Summary
Friday, August 23, 2019
Daniel Chang
Rodeo
19:45:00 to 06:00:00
Yes
Contractors/Subcontractors: Valverde, PSOMAS, Tutor Perini, Metro, Triumph Security.
Representatives On-Site: Ariel Manalo (Metro); Joshua Lopez (Valverde); Nadim Bolous (TPOG); Ernie Tuscano (PSOMAS); Scott (TPOG).
Work Location(s): Westbound Wilshire Blvd. No.1, No.2, and No.3 lanes between Crescent Dr. and N. Canon Dr. The AKA Alley remains open. Westbound Wilshire Blvd. No.1, No.2, and No.3 lane between N. Canon Dr. and S. Reeves Dr. Eastbound Wilshire Blvd. No.1 and No.2 lane between S. Reeves Dr. and El Camino Dr. The left turn lane on westbound Wilshire Blvd. at Beverly Dr. Westbound Wilshire Blvd. No.1 and No.2 lane between Montage Alley and Beverly Dr. The left turn lane on southbound N. Canon Dr. at Wilshire Blvd. The left turn lane on eastbound Wilshire Blvd. at N. Canon Dr.
The ICM was in possession of applicable COBH-approved closure notifications and TCP for the night’s work from 19:45 hours to 6:00 hours on August 23rd, 2019. EI ICM Daniel Chang met with Metro Inspector Ariel Manalo to discuss the night’s activities. At the beginning of the shift, the ICM calibrated the sound meter at 93.9 dB (to 94.00 dB).
Work for the night included removing trench plates, gravel delivery, sand delivery, excavation of sewer lateral trenches, excavation of water line lateral trench, backfilling over water line pipe, welding water line pipe in trench, installation of water line T’s and butterfly valve, re-plating trench, welding and securing trench plates, setting up road closure and traffic control signs on Wilshire Blvd., transporting equipment from Reeves yard to work site, removing road closure, tabbing lanes, and sweeping/cleaning work site.
![Page 19: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY](https://reader036.vdocuments.mx/reader036/viewer/2022081613/5fb72f8f201c2225c94a5642/html5/thumbnails/19.jpg)
Photos
This report was generated by Environmental Intelligence, LLC - www.enviro-intel.com - Copyright (2019) 1590 S. Pacific Coast Hwy, Suite 17 | Laguna Beach, California 92651 | (949) 497-0931
12/23
Photos (71)
UID:
Date:
2476
Aug 18, 2019
Latitude:
Longitude:
34.066994
-118.397339
Type:
Notes
Construction Activity Elevation: - - -
Contractor loading broken concrete and asphalt into haul trucks within Wilshire Blvd.
UID:
Date:
2475
Aug 18, 2019
Latitude:
Longitude:
34.066982
-118.397797
Type:
Notes
Construction Activity Elevation: - - -
Valverde crews installing water line within Wilshire Blvd.
UID:
Date:
2528
Aug 19, 2019
Latitude:
Longitude:
34.060314
-118.412415
Type:
Notes
Construction Activity Elevation: - - -
View of the alley behind bungalows of BHHS adjacent to Constellation yard.
UID:
Date:
2527
Aug 19, 2019
Latitude:
Longitude:
34.060516
-118.41188
Type:
Notes
Construction Activity Elevation: - - -
View of Constellation yard from BHHS parking lot.
UID:
Date:
2487
Aug 19, 2019
Latitude:
Longitude:
34.06646
-118.39814
Type:
Notes
Construction Activity Elevation: - - -
Valverde excavating water line trench within northbound lane of S. Reeves Dr.
![Page 20: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY](https://reader036.vdocuments.mx/reader036/viewer/2022081613/5fb72f8f201c2225c94a5642/html5/thumbnails/20.jpg)
Photos
This report was generated by Environmental Intelligence, LLC - www.enviro-intel.com - Copyright (2019) 1590 S. Pacific Coast Hwy, Suite 17 | Laguna Beach, California 92651 | (949) 497-0931
13/23
UID:
Date:
2489
Aug 19, 2019
Latitude:
Longitude:
34.067078
-118.397369
Type:
Notes
Construction Activity Elevation: - - -
Valverde compacting trench within N. Canon Dr. and Wilshire Blvd. intersection.
UID:
Date:
2488
Aug 19, 2019
Latitude:
Longitude:
34.067184
-118.397446
Type:
Notes
Construction Activity Elevation: - - -
Valverde backfilling sewer line trench within the intersection of Wilshire Blvd. and N. Canon Dr.
UID:
Date:
2483
Aug 19, 2019
Latitude:
Longitude:
34.067036
-118.397491
Type:
Notes
Construction Activity Elevation: - - -
Valverde backhoe excavating sewer lateral trench and loading spoils in dump truck to transport to Reeves yard.
UID:
Date:
2482
Aug 19, 2019
Latitude:
Longitude:
34.06707
-118.398079
Type:
Notes
Construction Activity Elevation: - - -
Valverde worker preparing water line pipe in trench to connect another pipe.
UID:
Date:
2484
Aug 19, 2019
Latitude:
Longitude:
34.067032
-118.39743
Type:
Notes
Construction Activity Elevation: - - -
Valverde workers using mini excavator to remove shoring in waterline trench in preparation for backfilling over pipe.
UID:
Date:
2481
Aug 19, 2019
Latitude:
Longitude:
34.066998
-118.398177
Type:
Notes
Construction Activity Elevation: - - -
Valverde forklift transporting water line pipes to trench on Wilshire Blvd.
![Page 21: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY](https://reader036.vdocuments.mx/reader036/viewer/2022081613/5fb72f8f201c2225c94a5642/html5/thumbnails/21.jpg)
Photos
This report was generated by Environmental Intelligence, LLC - www.enviro-intel.com - Copyright (2019) 1590 S. Pacific Coast Hwy, Suite 17 | Laguna Beach, California 92651 | (949) 497-0931
14/23
UID:
Date:
2525
Aug 19, 2019
Latitude:
Longitude:
34.067203
-118.397451
Type:
Notes
Construction Activity Elevation: - - -
A trailer being delivered to the N. Canon yard.
UID:
Date:
2526
Aug 19, 2019
Latitude:
Longitude:
34.067257
-118.397308
Type:
Notes
Construction Activity Elevation: - - -
TPOG crew unloading trailer from delivery truck in N. Canon yard.
UID:
Date:
2478
Aug 19, 2019
Latitude:
Longitude:
34.06686
-118.39846
Type:
Notes
Construction Activity Elevation: - - -
Valverde crew setting up lane closure along northbound S. Reeves Dr.
UID:
Date:
2479
Aug 19, 2019
Latitude:
Longitude:
34.06634
-118.39805
Type:
Notes
Construction Activity Elevation: - - -
Excavator loading spoils into Valverde dump truck. Photo shows sound panels set up along the southern end of the work site to mitigate for noise.
UID:
Date:
2480
Aug 19, 2019
Latitude:
Longitude:
34.06719
-118.39737
Type:
Notes
Construction Activity Elevation: - - -
Valverde crew compacting backfill along trench at intersection of Wilshire Blvd. and N. Canon Dr.
UID:
Date:
2485
Aug 20, 2019
Latitude:
Longitude:
34.067123
-118.397781
Type:
Notes
Construction Activity Elevation: - - -
Office trailer delivery for N Canon yard.
![Page 22: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY](https://reader036.vdocuments.mx/reader036/viewer/2022081613/5fb72f8f201c2225c94a5642/html5/thumbnails/22.jpg)
Photos
This report was generated by Environmental Intelligence, LLC - www.enviro-intel.com - Copyright (2019) 1590 S. Pacific Coast Hwy, Suite 17 | Laguna Beach, California 92651 | (949) 497-0931
15/23
UID:
Date:
2486
Aug 20, 2019
Latitude:
Longitude:
34.066995
-118.39741
Type:
Notes
Construction Activity Elevation: - - -
Valverde dump truck unloading soil in water line trench to backfill over pipe.
UID:
Date:
2496
Aug 20, 2019
Latitude:
Longitude:
34.067059
-118.398254
Type:
Notes
Construction Activity Elevation: - - -
Valverde excavator removing metal plates from water line trench in preparation for laying pipe and installing pipe joints.
UID:
Date:
2495
Aug 20, 2019
Latitude:
Longitude:
34.066691
-118.398369
Type:
Notes
Construction Activity Elevation: - - -
Valverde crew field assembling water line pipe joint in Reeves yard.
UID:
Date:
2494
Aug 20, 2019
Latitude:
Longitude:
34.067142
-118.397224
Type:
Notes
Construction Activity Elevation: - - -
Valverde opening water line trench and removing shoring in preparation to backfill over pipe.
UID:
Date:
2530
Aug 20, 2019
Latitude:
Longitude:
34.060123
-118.412178
Type:
Notes
Construction Activity Elevation: - - -
View of crane in yard adjacent to sound wall of Constellation yard.
UID:
Date:
2529
Aug 20, 2019
Latitude:
Longitude:
34.060379
-118.412041
Type:
Notes
Construction Activity Elevation: - - -
View of Constellation yard from parking lot of BHHS.
![Page 23: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY](https://reader036.vdocuments.mx/reader036/viewer/2022081613/5fb72f8f201c2225c94a5642/html5/thumbnails/23.jpg)
Photos
This report was generated by Environmental Intelligence, LLC - www.enviro-intel.com - Copyright (2019) 1590 S. Pacific Coast Hwy, Suite 17 | Laguna Beach, California 92651 | (949) 497-0931
16/23
UID:
Date:
2500
Aug 20, 2019
Latitude:
Longitude:
34.066803
-118.398216
Type:
Notes
Construction Activity Elevation: - - -
Valverde crews excavating water line lateral trench within the northbound lane of S. Reeves Dr.
UID:
Date:
2501
Aug 20, 2019
Latitude:
Longitude:
34.067322
-118.399483
Type:
Notes
Construction Activity Elevation: - - -
Jet drilling conducting geotechnical boring activities within southbound number one lane within N. Beverly Dr.
UID:
Date:
2491
Aug 20, 2019
Latitude:
Longitude:
34.06697
-118.3967
Type:
Notes
Construction Activity Elevation: - - -
Water jet/vacuum truck being utilized to excavate at the intersection of the AKA alley and Wilshire Blvd.
UID:
Date:
2490
Aug 20, 2019
Latitude:
Longitude:
34.06717
-118.39948
Type:
Notes
Construction Activity Elevation: - - -
Jet Drilling rig setting up along intersection of N. Beverly Dr. and Wilshire Blvd. for geotechnical instrumentation boring.
UID:
Date:
2492
Aug 20, 2019
Latitude:
Longitude:
34.06659
-118.398
Type:
Notes
Construction Activity Elevation: - - -
Valverde crew trenching along northbound S. Reeves Dr. Excavator loading spoils into Valverde dump truck.
UID:
Date:
2493
Aug 20, 2019
Latitude:
Longitude:
34.06717
-118.39659
Type:
Notes
Construction Activity Elevation: - - -
Valverde crew setting up to saw cut along number 2 lane of Wilshire Blvd. for potholing.
![Page 24: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY](https://reader036.vdocuments.mx/reader036/viewer/2022081613/5fb72f8f201c2225c94a5642/html5/thumbnails/24.jpg)
Photos
This report was generated by Environmental Intelligence, LLC - www.enviro-intel.com - Copyright (2019) 1590 S. Pacific Coast Hwy, Suite 17 | Laguna Beach, California 92651 | (949) 497-0931
17/23
UID:
Date:
2497
Aug 21, 2019
Latitude:
Longitude:
34.067177
-118.398277
Type:
Notes
Construction Activity Elevation: - - -
Valverde installing water line pipe in trench.
UID:
Date:
2499
Aug 21, 2019
Latitude:
Longitude:
34.067059
-118.397514
Type:
Notes
Construction Activity Elevation: - - -
Valverde using excavator for sewer line trench shaving. Excavator loading spoils into dump truck.
UID:
Date:
2498
Aug 21, 2019
Latitude:
Longitude:
34.067135
-118.398308
Type:
Notes
Construction Activity Elevation: - - -
Valverde crew inspecting water line pipe joint and preparing to install in trench.
UID:
Date:
2532
Aug 21, 2019
Latitude:
Longitude:
34.061123
-118.412697
Type:
Notes
Construction Activity Elevation: - - -
View of Constellation yard from between Building A and BHHS bungalows.
UID:
Date:
2531
Aug 21, 2019
Latitude:
Longitude:
34.060513
-118.412102
Type:
Notes
Construction Activity Elevation: - - -
View of Constellation yard from parking lot of BHHS.
UID:
Date:
2504
Aug 21, 2019
Latitude:
Longitude:
34.067169
-118.396729
Type:
Notes
Construction Activity Elevation: - - -
Photo shows Valverde utilizing a vacuum truck to excavate sewer line manhole location within AKA Alley
![Page 25: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY](https://reader036.vdocuments.mx/reader036/viewer/2022081613/5fb72f8f201c2225c94a5642/html5/thumbnails/25.jpg)
Photos
This report was generated by Environmental Intelligence, LLC - www.enviro-intel.com - Copyright (2019) 1590 S. Pacific Coast Hwy, Suite 17 | Laguna Beach, California 92651 | (949) 497-0931
18/23
UID:
Date:
2503
Aug 21, 2019
Latitude:
Longitude:
34.067055
-118.398491
Type:
Notes
Construction Activity Elevation: - - -
Photo shows Valverde excavating water line trench within S. Reeves Dr.
UID:
Date:
2507
Aug 21, 2019
Latitude:
Longitude:
34.066996
-118.397469
Type:
Notes
Construction Activity Elevation: - - -
Valverde backhoe unloading sand in sewer line trench as bedding for pipe installation.
UID:
Date:
2513
Aug 21, 2019
Latitude:
Longitude:
34.067116
-118.396805
Type:
Notes
Construction Activity Elevation: - - -
Valverde mini excavator using sheep’s head attachment to compact backfilled soil in water line trench.
UID:
Date:
2505
Aug 21, 2019
Latitude:
Longitude:
34.067105
-118.39814
Type:
Notes
Construction Activity Elevation: - - -
Sand delivery truck for Valverde on Wilshire Blvd.
UID:
Date:
2509
Aug 21, 2019
Latitude:
Longitude:
34.067116
-118.396843
Type:
Notes
Construction Activity Elevation: - - -
Valverde removing water line trench plates in preparation for the nights work to backfill over pipe.
UID:
Date:
2506
Aug 21, 2019
Latitude:
Longitude:
34.067105
-118.398361
Type:
Notes
Construction Activity Elevation: - - -
Valverde connecting water line joint to pipe in trench on Wilshire Blvd.
![Page 26: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY](https://reader036.vdocuments.mx/reader036/viewer/2022081613/5fb72f8f201c2225c94a5642/html5/thumbnails/26.jpg)
Photos
This report was generated by Environmental Intelligence, LLC - www.enviro-intel.com - Copyright (2019) 1590 S. Pacific Coast Hwy, Suite 17 | Laguna Beach, California 92651 | (949) 497-0931
19/23
UID:
Date:
2510
Aug 21, 2019
Latitude:
Longitude:
34.06652
-118.39909
Type:
Notes
Construction Activity Elevation: - - -
Valverde crew excavating with pneumatic chipper on S. Beverly Dr.
UID:
Date:
2508
Aug 21, 2019
Latitude:
Longitude:
34.06772
-118.39873
Type:
Notes
Construction Activity Elevation: - - -
Jet Drilling rig set up at the intersection of Wilshire Blvd. and N. Beverly Dr. Sound blankets in place to mitigate for noise.
UID:
Date:
2511
Aug 21, 2019
Latitude:
Longitude:
34.0667
-118.39799
Type:
Notes
Construction Activity Elevation: - - -
Valverde crew welding and setting up water pipe along trench on northbound S. Reeves Dr.
UID:
Date:
2512
Aug 21, 2019
Latitude:
Longitude:
34.06684
-118.39954
Type:
Notes
Construction Activity Elevation: - - -
Street sweeper cleaning along N. Beverly Dr. work site to mitigate for dust.
UID:
Date:
2514
Aug 22, 2019
Latitude:
Longitude:
34.067105
-118.398392
Type:
Notes
Construction Activity Elevation: - - -
Valverde excavator lowering pipe into trench and crew positioning and installing pipe in place.
UID:
Date:
2515
Aug 22, 2019
Latitude:
Longitude:
34.067108
-118.398532
Type:
Notes
Construction Activity Elevation: - - -
Valverde backhoe excavating water line lateral trench at Wilshire and Montage Alley. Backhoe loading spoils in dump truck to transport to Reeves yard.
![Page 27: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY](https://reader036.vdocuments.mx/reader036/viewer/2022081613/5fb72f8f201c2225c94a5642/html5/thumbnails/27.jpg)
Photos
This report was generated by Environmental Intelligence, LLC - www.enviro-intel.com - Copyright (2019) 1590 S. Pacific Coast Hwy, Suite 17 | Laguna Beach, California 92651 | (949) 497-0931
20/23
UID:
Date:
2519
Aug 22, 2019
Latitude:
Longitude:
34.0672
-118.39745
Type:
Notes
Construction Activity Elevation: - - -
Water jet vacuum truck set up on westbound number 3 lane west of the intersection of N. Canon Dr. and Wilshire Blvd. Valverde crew implemented sound enclosure to mitigate for noise.
UID:
Date:
2517
Aug 22, 2019
Latitude:
Longitude:
34.06726
-118.39936
Type:
Notes
Construction Activity Elevation: - - -
Jet Drilling rig set up at intersection of N. Beverly Dr. and Wilshire Blvd. Geotech boring for instrumentation completed at the end of the day, 08/22/2019.
UID:
Date:
2534
Aug 22, 2019
Latitude:
Longitude:
34.060772
-118.412689
Type:
Notes
General Elevation: - - -
Location of a monitor in alley between Constellation yard and BHHS bungalows.
UID:
Date:
2535
Aug 22, 2019
Latitude:
Longitude:
34.060646
-118.412605
Type:
Notes
Construction Activity Elevation: - - -
Location of a monitor in alley between Constellation yard and BHHS bungalows.
UID:
Date:
2533
Aug 22, 2019
Latitude:
Longitude:
34.060577
-118.411865
Type:
Notes
Construction Activity Elevation: - - -
View of Constellation yard from parking lot of BHHS.
![Page 28: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY](https://reader036.vdocuments.mx/reader036/viewer/2022081613/5fb72f8f201c2225c94a5642/html5/thumbnails/28.jpg)
Photos
This report was generated by Environmental Intelligence, LLC - www.enviro-intel.com - Copyright (2019) 1590 S. Pacific Coast Hwy, Suite 17 | Laguna Beach, California 92651 | (949) 497-0931
21/23
UID:
Date:
2518
Aug 22, 2019
Latitude:
Longitude:
34.067101
-118.398521
Type:
Notes
Construction Activity Elevation: - - -
Valverde skid steer unloading sand in water line trench as bedding for pipe installation.
UID:
Date:
2516
Aug 22, 2019
Latitude:
Longitude:
34.067146
-118.396568
Type:
Notes
Construction Activity Elevation: - - -
Valverde backhoe excavating water line lateral trench on Wilshire Blvd. south of AKA Alley. Sound blankets set up on north side of work to mitigate noise.
UID:
Date:
2524
Aug 22, 2019
Latitude:
Longitude:
34.0671017
-118.397537
Type:
Notes
Construction Activity Elevation: - - -
Valverde mini excavator removing shoring from sewer lateral trench in preparation for backfilling.
UID:
Date:
2537
Aug 22, 2019
Latitude:
Longitude:
34.06707
-118.397911
Type:
Notes
Construction Activity Elevation: - - -
Valverde crews excavating water line location within S. Reeves Dr.
UID:
Date:
2538
Aug 22, 2019
Latitude:
Longitude:
34.06765
-118.397583
Type:
Notes
Construction Activity Elevation: - - -
Valverde utilizing a vacuum truck to excavate storm water line within Wilshire Blvd. west of N. Canon Dr.
UID:
Date:
2540
Aug 23, 2019
Latitude:
Longitude:
34.067024
-118.398453
Type:
Notes
Construction Activity Elevation: - - -
Sand delivery truck for Valverde.
![Page 29: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY](https://reader036.vdocuments.mx/reader036/viewer/2022081613/5fb72f8f201c2225c94a5642/html5/thumbnails/29.jpg)
Photos
This report was generated by Environmental Intelligence, LLC - www.enviro-intel.com - Copyright (2019) 1590 S. Pacific Coast Hwy, Suite 17 | Laguna Beach, California 92651 | (949) 497-0931
22/23
UID:
Date:
2539
Aug 23, 2019
Latitude:
Longitude:
34.067089
-118.397812
Type:
Notes
Construction Activity Elevation: - - -
Valverde worker breaking through pipe in sewer lateral trench on Wilshire Blvd. west of N. Canon Dr.
UID:
Date:
2541
Aug 23, 2019
Latitude:
Longitude:
34.066906
-118.398277
Type:
Notes
Construction Activity Elevation: - - -
Haul truck unloading gravel delivery for Valverde in Reeves yard.
UID:
Date:
2546
Aug 23, 2019
Latitude:
Longitude:
34.067146
-118.397629
Type:
Notes
Construction Activity Elevation: - - -
Hand digging sewer lateral trench at intersection of N. Canon Dr. and Wilshire Blvd.
UID:
Date:
2550
Aug 23, 2019
Latitude:
Longitude:
34.066853
-118.399124
Type:
Notes
Construction Activity Elevation: - - -
Photo shows contractor excavating trench within the southbound curb lane of S. Beverly Dr.
UID:
Date:
2551
Aug 23, 2019
Latitude:
Longitude:
34.067028
-118.39727
Type:
Notes
Construction Activity Elevation: - - -
Jet Drilling conducting geotechnical borings within sidewalk at 9420 Wilshire Blvd.
UID:
Date:
2594
Aug 23, 2019
Latitude:
Longitude:
34.060169
-118.41201
Type:
Notes
Construction Activity Elevation: - - -
View of Constellation yard from BHHS parking lot.
![Page 30: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY](https://reader036.vdocuments.mx/reader036/viewer/2022081613/5fb72f8f201c2225c94a5642/html5/thumbnails/30.jpg)
Photos
This report was generated by Environmental Intelligence, LLC - www.enviro-intel.com - Copyright (2019) 1590 S. Pacific Coast Hwy, Suite 17 | Laguna Beach, California 92651 | (949) 497-0931
23/23
UID:
Date:
2593
Aug 23, 2019
Latitude:
Longitude:
34.061176
-118.412926
Type:
Notes
Construction Activity Elevation: - - -
View of Constellation yard from BHHS between bungalows and Building A.
UID:
Date:
2545
Aug 23, 2019
Latitude:
Longitude:
34.06708
-118.39701
Type:
Notes
Construction Activity Elevation: - - -
TPOG water jet vacuum rig set up with noise mitigating panels.
UID:
Date:
2544
Aug 23, 2019
Latitude:
Longitude:
34.06704
-118.39698
Type:
Notes
Construction Activity Elevation: - - -
Jet Drilling rig for geotechnical instrumentation set up on the southern sidewalk of Wilshire Blvd. west of S. Canon Dr.
UID:
Date:
2543
Aug 23, 2019
Latitude:
Longitude:
34.06724
-118.39948
Type:
Notes
Construction Activity Elevation: - - -
Valverde crews excavating for water lines on southbound number 2 lane and northbound right turn lane of S. Beverly Dr.
UID:
Date:
2548
Aug 24, 2019
Latitude:
Longitude:
34.067139
-118.396729
Type:
Notes
Construction Activity Elevation: - - -
Valverde excavator removing metal trench plates from water line lateral trench at entrance to AKA Alley.
UID:
Date:
2547
Aug 24, 2019
Latitude:
Longitude:
34.067165
-118.398285
Type:
Notes
Construction Activity Elevation: - - -
Valverde backhoe unloading soil in trench for backfilling over water line pipe.
![Page 31: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY](https://reader036.vdocuments.mx/reader036/viewer/2022081613/5fb72f8f201c2225c94a5642/html5/thumbnails/31.jpg)
1590 South Coast Highway Suite #17, Laguna Beach, California, 92651 • Phone: 949.497.0931 • www. enviro-intel.com
Attachment C – Construction Noise Monitoring Results
Receptor
ID
Time of
Measurement
Measured
Noise Level
Leq (15-
Minute)
Applicable
Noise
Threshold
Exceeded
Threshold? Notes
August 18, 2019
RD-7 9:41 74 80 No Valverde crews beginning to install water line within Wilshire Blvd.
RD-16 10:20 76.2 75 Yes
Valverde crews utilizing skid steer mounted breaker within Wilshire
Blvd.
RD-10 10:41 59 68 No Valverde crews breaking concrete within Wilshire Blvd.
RD-16 11:15 73.2 75 No Valverde crews breaking pavement within Wilshire Blvd.
RD-8 13:41 65.3 70 No Valverde crews breaking pavement within Reeves Dr.
RD-2 14:51 69.7 80 No Valverde crews breaking pavement within Wilshire Blvd.
RD-8 15:15 71.6 75 No Valverde crews removing asphalt from trench in Reeves Dr.
RD-7 17:34 74.1 80 No Valverde continues water line installation and welding plates.
August 19, 2019
RD-16 5:08 66.3 71 No Trailer getting delivered to N Canon yard.
RD-8 9:30 70.3 75 No Valverde crews excavating trench within Reeves Dr. closure.
RD-5 9:40 64.4 68 No
Valverde crew trenching along S. Reeves Dr. from alley to Wilshire
Blvd. Crew utilizing excavator for trenching activities and
implementing sound panels for noise mitigation.
RD-5 10:07 69 66 Yes
Valverde crew trenching along S. Reeves Dr. from alley to Wilshire
Blvd. Crew utilizing excavator for trenching activities and
implementing sound panels for noise mitigation.
During reading, emergency vehicles heading eastbound on Wilshire
Blvd. increased non-project related noise to a level causing
exceedance of threshold.
RD-5 10:30 64.5 66 No
Valverde crew trenching along S. Reeves Dr. from alley to Wilshire
Blvd. Crew utilizing excavator for trenching activities and
implementing sound panels for noise mitigation.
![Page 32: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY](https://reader036.vdocuments.mx/reader036/viewer/2022081613/5fb72f8f201c2225c94a5642/html5/thumbnails/32.jpg)
1590 South Coast Highway Suite #17, Laguna Beach, California, 92651 • Phone: 949.497.0931 • www. enviro-intel.com
Receptor
ID
Time of
Measurement
Measured
Noise Level
Leq (15-
Minute)
Applicable
Noise
Threshold
Exceeded
Threshold? Notes
RD-5 11:07 62.8 65 No
Valverde crew trenching along water line with excavator on
northbound lane of S. Reeves Dr. crew utilizing sound panels to
mitigate for work noise.
RD-5 11:30 70 66 Yes
Valverde crew trenching along water line with excavator on
northbound lane of S. Reeves Dr. crew utilizing sound panels to
mitigate for work noise.
During reading, non-project related delivery truck utilized the loading
zone in front of 120 S. Reeves Dr. Delivery truck utilized high impact
backup alarm and increased noise levels to exceedance of threshold.
RD-16 11:41 66.8 75 No
Valverde crews backfilling storm water line trench within Wilshire/N
Canon intersection.
RD-16 13:27 67.2 76 No
Valverde crews backfilling sewer line trench within Canon/Wilshire
intersection.
RD-15 13:49 64.9 75 No
Valverde hand digging within Alley. TPOG using pneumatic shovel
to prep bollard locations within N Canon yard.
RD-16 14:12 65.8 74 No
Valverde crews compacting backfill within trench in N. Canon/
Wilshire intersection.
RD-5 14:45 64.6 65 No
Street sweeper cleaning along northbound S. Reeves Dr. at end of
activity in work site.
RD-8 22:49 65.1 69 No
Valverde installing water line pipe in trench. Skid steer laying sand in
trench, excavator digging sewer lateral trench on Wilshire Blvd.
RD-8 23:16 58.2 68 No
Valverde using impact wrench to secure pipe joint to pipe. Valverde
using forklift to hold pipe up while wrapping it in protective
covering. Impact wrench running causes approximately 67db
disturbance as it tightens screws.
August 20, 2019
RD-6 0:21 57 70 No
Valverde backhoe excavating lateral trench for sewer line at Wilshire
Blvd. and N. Canon intersection.
![Page 33: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY](https://reader036.vdocuments.mx/reader036/viewer/2022081613/5fb72f8f201c2225c94a5642/html5/thumbnails/33.jpg)
1590 South Coast Highway Suite #17, Laguna Beach, California, 92651 • Phone: 949.497.0931 • www. enviro-intel.com
Receptor
ID
Time of
Measurement
Measured
Noise Level
Leq (15-
Minute)
Applicable
Noise
Threshold
Exceeded
Threshold? Notes
RD-8 0:39 58 67 No
Sawcutting shoring in Reeves yard causes 62 dB disturbance while
saw is active. Construction crew installing water line pipe in trench
on Wilshire Blvd.
RD-8 1:07 62.5 63 No
Valverde crew using impact wrench to connect water line pipe joints
together. When torque wrench is tightening screws, it causes a 70db
disturbance. LEQ is able to drop back down to acceptable thresholds
as the wrench is not consistently tightening the screws.
RD-8 2:34 56 62 No
Valverde forklift holding pipe in place while workers secure and
install pipe in trench.
RD-6 3:49 53.8 68 No
Valverde backhoe excavating sewer lateral trench at intersection of
Wilshire Blvd. and N. Canon Dr.
RD-8 4:14 56.5 63 No Construction excavator re-plating water line trench on Wilshire Blvd.
RD-8 9:22 66.9 75 No
Valverde crews continuing water line excavation within S. Reeves
Dr.
RD-7 9:46 73.9 87 No Valverde crews continuing to excavate water line trench in S. Reeves.
RD-2 10:15 79.2 80 No Jet Drilling conducting geotechnical borings within N. Beverly.
RD-3 10:37 69.6 75 No Jet Drilling conducting geotechnical borings within N. Beverly.
RD-7 11:22 75.4 81 No Valverde continuing to excavate water lateral trench in S. Reeves.
RD-2 12:01 73.7 81 No Jet Drilling continue geotechnical borings within N. Beverly.
RD-3 12:40 68.4 76 No Jet Drilling conducting geotechnical borings within N. Beverly.
RD-2 13:05 75 80 No Jet Drilling continue geotechnical borings within N. Beverly.
RD-8 13:48 67.1 75 No Valverde welding plates and sweeping S. Reeves Dr.
RD-2 14:41 71.3 80 No Jet drilling cleaning up site within Beverly Dr.
August 21, 2019
RD-8 0:05 55.2 67 No
Field assembly of water pipe joint in Reeves yard (no impact wrench
used at this time). Excavator loading dump truck with soil in Reeves
yard.
![Page 34: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY](https://reader036.vdocuments.mx/reader036/viewer/2022081613/5fb72f8f201c2225c94a5642/html5/thumbnails/34.jpg)
1590 South Coast Highway Suite #17, Laguna Beach, California, 92651 • Phone: 949.497.0931 • www. enviro-intel.com
Receptor
ID
Time of
Measurement
Measured
Noise Level
Leq (15-
Minute)
Applicable
Noise
Threshold
Exceeded
Threshold? Notes
RD-15 0:26 54.9 71 No
Valverde dump truck unloading soil in water line trench for
backfilling over pipe. Mini-excavator compacting soil with sheep
head attachment.
RD-8 0:58 54.1 63 No
Field assembly of water pipe joint in Reeves yard (no impact wrench
used at this time). Excavator loading dump truck with soil in Reeves
yard.
RD-8 2:00 56.6 62 No
Construction excavator loading soil in dump truck to transport to
water line trench and backfill over pipe. Construction street sweeper
cleaning Wilshire Blvd.
RD-8 2:49 60.2 62 No
Construction excavator driving on Wilshire Blvd. is audible.
Construction street sweeper cleaning Wilshire Blvd. Grinding pipe
edge in Reeves yard causes approximately 62-63 dB of noise
disturbance while active, inconsistent use of equipment throughout
reading keeps LEQ threshold.
RD-8 4:00 58.5 63 No
Valverde using grinder to grind edge of water line pipe in Reeves
yard. Grinding causes approximately 62-62.5 dB of disturbance while
active. Inconsistent use of grinder allows LEQ to remain under
threshold.
RD-8 5:01 57 66 No
Construction excavator re-playing water line trench. Construction
street sweeper cleaning Wilshire Blvd. Workers loading equipment
onto truck and transporting to Reeves yard.
RD-8 9:30 64.1 75 No Valverde excavating water line trench within S. Reeves.
RD-2 10:15 74.5 80 No
Jet Drilling drill rig in operation along intersection of N. Beverly Dr.
and Wilshire Blvd. Sound blanket enclosure in place around work
site.
RD-2 10:38 75.8 80 No
Jet Drilling drill rig in operation along intersection of N. Beverly Dr.
and Wilshire Blvd. Sound blanket enclosure in place around work
site.
![Page 35: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY](https://reader036.vdocuments.mx/reader036/viewer/2022081613/5fb72f8f201c2225c94a5642/html5/thumbnails/35.jpg)
1590 South Coast Highway Suite #17, Laguna Beach, California, 92651 • Phone: 949.497.0931 • www. enviro-intel.com
Receptor
ID
Time of
Measurement
Measured
Noise Level
Leq (15-
Minute)
Applicable
Noise
Threshold
Exceeded
Threshold? Notes
RD-15 10:42 73 73 No
Valverde crews excavating sewer manhole location with vacuum
trucks.
RD-15 11:00 73 75 No Valverde continue vac-truck excavation of sewer manhole location.
RD-2 11:22 73.9 79 No
Jet Drilling drill rig in operation along intersection of N. Beverly Dr.
and Wilshire Blvd. Sound blanket enclosure in place around work
site.
RD-2 12:00 76.1 82 No
Jet Drilling drill rig in operation along intersection of N. Beverly Dr.
and Wilshire Blvd. Sound blanket enclosure in place around work
site.
During reading, wind gust blew sound blankets out of place
temporarily until crew were able to reset loose blankets.
RD-7 12:00 72.8 82 No Valverde crew excavating along trench on northbound S. Reeves Dr.
RD-3 12:30 76.9 76 Yes
Valverde crew utilizing pneumatic chipper to excavate along
southbound number 2 lane of S. Beverly Dr. Crew implemented
sound enclosure to mitigate for noise from equipment.
RD-11 12:33 75.6 80 No
UMP being installed within Wilshire, vac-truck excavation ongoing
at AKA Alley.
RD-8 13:36 66.7 75 No Valverde crew excavating along trench on northbound S. Reeves Dr.
RD-2 13:40 71.4 80 No
Jet Drilling crew rigging down and cleaning for end of day at
intersection of N. Beverly Dr. and Wilshire Blvd.
RD-5 14:20 65 65 No
Valverde crew breaking down sound panels along southern end of S.
Reeves Dr. closure. Crew demobilizing equipment and machinery
and welding trench plates together.
RD-5 14:45 64.6 65 No
Street sweeper cleaning along northbound S. Reeves Dr. at end of
activity in work site.
RD-15 22:32 59.4 78 No
Construction excavator removing metal trench plates from water line
trench on Wilshire Blvd.
![Page 36: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY](https://reader036.vdocuments.mx/reader036/viewer/2022081613/5fb72f8f201c2225c94a5642/html5/thumbnails/36.jpg)
1590 South Coast Highway Suite #17, Laguna Beach, California, 92651 • Phone: 949.497.0931 • www. enviro-intel.com
Receptor
ID
Time of
Measurement
Measured
Noise Level
Leq (15-
Minute)
Applicable
Noise
Threshold
Exceeded
Threshold? Notes
RD-15 23:23 61.5 66 No
Valverde backfilling over pipe in water line trench. Dump truck
unloading soil into trench on Wilshire Blvd. Construction excavator
compacting soil with sheep’s head attachment.
RD-15 23:52 60.7 66 No
Construction excavator compacting soil in water line trench with
sheep’s head attachment.
August 22, 2019
RD-16 0:30 65.4 76 No
Water jet /vacuum truck being utilized to excavate water line west of
N. Canon Rd. and Wilshire Blvd. intersection. Sound enclosure in
place to mitigate for noise.
RD-6 1:27 60.9 66 No
Valverde backhoe transporting sand from Reeves yard and pouring in
sewer later trench at intersection of Wilshire and N. Canon Dr.
RD-8 -
EL 2:00 62.8 62 Yes
Construction excavator loading soil in dump truck in Reeves yard.
City of Beverly Hills street sweeper driving on Wilshire Blvd and S.
Reeves Dr.
RD-6 2:02 60.4 69 No
Valverde dump truck unloading soil in sewer lateral trench at
Wilshire and N. Canon Dr. intersection. Construction street sweeper
cleaning Wilshire Blvd.
RD-8 2:29 57.7 62 No
Construction excavator loading soil into dump truck in Reeves yard.
Construction backhoe excavating water line lateral trench on Wilshire
Blvd at Montage Alley.
RD-8 3:30 59.2 61 No
Field assembly of water line pipe joint in Reeves yard. Backhoe
excavating sewer lateral trench on Wilshire Blvd. west of S. Reeves
Dr. Construction backhoe transporting equipment from Wilshire
Blvd. closure to Reeves yard.
RD-8 4:00 58.4 63 No
Construction backhoe scooping soil in Reeves yard and driving on
Wilshire Blvd. to unload in water line trench at intersection of N.
Canon Dr. and Wilshire Blvd. Field assembly of pipe joint in Reeves
yard is utilizing an impact wrench, audible and causes spurts of 57 dB
instantaneous disturbances throughout reading.
![Page 37: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY](https://reader036.vdocuments.mx/reader036/viewer/2022081613/5fb72f8f201c2225c94a5642/html5/thumbnails/37.jpg)
1590 South Coast Highway Suite #17, Laguna Beach, California, 92651 • Phone: 949.497.0931 • www. enviro-intel.com
Receptor
ID
Time of
Measurement
Measured
Noise Level
Leq (15-
Minute)
Applicable
Noise
Threshold
Exceeded
Threshold? Notes
RD-8 4:32 60.5 63 No
Valverde crew assembling pipe joint in Reeves yard. Impact wrench
is audible but does not produce an exceedance. Construction street
sweeper cleaning Wilshire Blvd.
RD-8 9:17 72 75 No Valverde continuing water line lateral work within S. Reeves.
RD-2 10:01 74.8 80 No Jet Drilling preparing to install instrumentation within N. Beverly Dr.
RD-15 10:15 68.4 73 No
Valverde setting up sound enclosure and positions water jet vacuum
truck in road closure along Wilshire Blvd. and AKA Alley.
RD-2 10:45 73 80 No
Jet Drilling rig in operation of intersection of N. Beverly Dr. and
Wilshire Blvd. Drilling and setting up for sample collection.
RD-15 10:45 69.3 73 No
Valverde crew and water jet vacuum truck operator test noise level of
equipment and adjust sound enclosure to aid in noise mitigation.
RD-7 11:00 75.7 82 No Valverde installing water line connections in S. Reeves.
RD-15 11:10 74.3 74 Yes
Water jet vacuum truck utilized for excavating at intersection of AKA
Alley and Wilshire Blvd. Sound enclosure utilized at north end of
work site to mitigate for noise.
Saw cutting for pot holing in westbound number 2 lane of Wilshire
Blvd. occurring concurrently. Sound enclosure utilized around saw
cutting activities to mitigate for noise.
RD-16 11:15 69.1 75 No
Water jet/vacuum truck utilized for excavation of water line west of
N. Canon Dr. and Wilshire Blvd. intersection. Valverde crew set up
sound enclosure to mitigate for noise.
RD-15 11:25 74.3 74 Yes
Water jet vacuum truck utilized for excavating at intersection of AKA
Alley and Wilshire Blvd. Sound enclosure utilized at north end of
work site to mitigate for noise.
Saw cutting for pot holing in westbound number 2 lane of Wilshire
Blvd. occurring concurrently. Sound enclosure utilized around saw
cutting activities to mitigate for noise.
During reading at 3:00 minutes, emergency vehicles heading
westbound on Wilshire Blvd. increasing ambient noise levels.
![Page 38: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY](https://reader036.vdocuments.mx/reader036/viewer/2022081613/5fb72f8f201c2225c94a5642/html5/thumbnails/38.jpg)
1590 South Coast Highway Suite #17, Laguna Beach, California, 92651 • Phone: 949.497.0931 • www. enviro-intel.com
Receptor
ID
Time of
Measurement
Measured
Noise Level
Leq (15-
Minute)
Applicable
Noise
Threshold
Exceeded
Threshold? Notes
RD-2 11:45 73.7 79 No Jet Drilling crew clearing borehole for instrumentation and casing.
RD-11 12:05 73.9 80 No
Water jet vacuum truck utilized for excavating at intersection of AKA
Alley and Wilshire Blvd. Sound enclosure utilized at north end of
work site to mitigate for noise.
Saw cutting for pot holing in westbound number 2 lane of Wilshire
Blvd. occurring concurrently. Sound enclosure utilized around saw
cutting activities to mitigate for noise.
RD-11 12:25 77.7 80 No
Water jet vacuum truck utilized for excavating at intersection of AKA
Alley and Wilshire Blvd. Sound enclosure utilized at north end of
work site to mitigate for noise.
Valverde crew utilizing skid steer with breaker attachment to break
asphalt for pot holing in westbound number 2 lane of Wilshire Blvd.
Sound enclosure utilized around saw cutting activities to mitigate for
noise.
Jet Drilling crew utilizing core drill and gas-powered generator for
UMP installation along number 2 land of Wilshire Blvd. Noise
blanket placed over generator to mitigate for noise.
RD-2 12:41 73.1 82 No Jet Drilling installing clinometer within N. Beverly.
RD-15 13:00 70.9 77 No
Water jet vacuum truck utilized for potholing along westbound
number 2 lane of Wilshire Blvd. east of S. Canon Dr. Sound
enclosure utilized to mitigate for noise.
RD-2 13:10 73.2 80 No
Jet Drilling rig on intersection of N. Beverly Dr. and Wilshire Blvd.
pulling casing from borehole. Crew removing and setting casings in
support truck.
RD-10 13:31 63.3 73 No
Water jet vacuum truck utilized for potholing along westbound
number 2 lane of Wilshire Blvd. east of S. Canon Dr. Sound
enclosure utilized to mitigate for noise.
![Page 39: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY](https://reader036.vdocuments.mx/reader036/viewer/2022081613/5fb72f8f201c2225c94a5642/html5/thumbnails/39.jpg)
1590 South Coast Highway Suite #17, Laguna Beach, California, 92651 • Phone: 949.497.0931 • www. enviro-intel.com
Receptor
ID
Time of
Measurement
Measured
Noise Level
Leq (15-
Minute)
Applicable
Noise
Threshold
Exceeded
Threshold? Notes
RD-11 14:00 72.1 80 No
Skid steer with grinder attachment utilized to create a recess for
trench plate at potholing location on westbound number 2 lane of
Wilshire Blvd. east of S. Canon Dr.
RD-16 14:06 68.4 74 No
Valverde utilizing water jet/vacuum truck for excavation of storm
drain line west of N. Canon Dr. and Wilshire Blvd. intersection. Crew
implemented sound enclosure to mitigate for noise.
RD-15 21:45 59.8 71 No
Construction excavator digging water line trench and loading soil in
dump truck on Wilshire Blvd.
RD-11 -
EL 21:45 81.4 78 Yes
Valverde backhoe excavating water line trench and loading spoils
into dump truck on Wilshire Blvd south of AKA Alley. Noise
overage due to fire truck and ambulance driving on Wilshire Blvd.
westbound at approximately 21:34 hours.
RD-15 22:20 61.1 78 No
Valverde backhoe excavating lateral water line trench and loading
spoils in dump truck on Wilshire Blvd. south of AKA Alley.
RD-15 23:02 62.3 66 No
Construction backhoe excavating water line lateral trench and loading
spoils in dump truck.
RD-15 23:41 59.8 66 No
Valverde backhoe excavating water line lateral trench and loading
soil in dump truck on Wilshire Blvd. south of AKA Alley.
August 23, 2019
RD-6 0:16 64.1 70 No
Valverde dump truck unloading soil in sewer lateral trench at
intersection of Wilshire and N. Canon Drive. Valverde mini
excavator using sheep’s head attachment to compact backfill.
Motorcycle on N. Canon Dr. at 12:24 hours caused 90.5 dB
instantaneous disturbance and raised LEQ to 65db.
RD-15 1:41 54.7 72 No
Construction backhoe excavating water line lateral trench and loading
soil in dump truck.
RD-8 2:18 52.2 62 No
Valverde installing water line pipe on Wilshire Blvd. west of S.
Reeves Dr.
![Page 40: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY](https://reader036.vdocuments.mx/reader036/viewer/2022081613/5fb72f8f201c2225c94a5642/html5/thumbnails/40.jpg)
1590 South Coast Highway Suite #17, Laguna Beach, California, 92651 • Phone: 949.497.0931 • www. enviro-intel.com
Receptor
ID
Time of
Measurement
Measured
Noise Level
Leq (15-
Minute)
Applicable
Noise
Threshold
Exceeded
Threshold? Notes
RD-8 3:05 55 61 No
Valverde backhoe picking up soil from Reeves yard and unloading in
water line trench on Wilshire Blvd. for backfilling over pipe.
RD-15 3:32 58.3 63 No
Valverde backhoe re-playing water line trench on Wilshire Blvd.
south of AKA Alley. Valverde crew loading equipment onto truck
and transporting to Reeves yard. Police sirens at 3:43 hours from
unknown location causes approximately 64db disturbance for 2
minutes and raised LEQ to 60db when previously residing at
approximately 57.6db.
RD-15 3:51 63.3 63 Yes
Construction street sweeper cleaning Wilshire Blvd. worksite south
of AKA Alley. Valverde crew securing metal plates with coldmix.
RD-7 8:25 74.6 82 No
Non-project work at 9401 Wilshire. No project related work
occurring.
RD-16 10:34 68.2 75 No
Valverde crews excavating and chipping with pneumatic concrete
chipper in westbound number 3 lane of Wilshire Blvd., west of
intersection with N. Canon Dr. Sound enclosure implemented to
mitigate for noise.
RD-10 10:45 63 73 No
Jet drilling preparing to drill within sidewalk at S. Canon and
Wilshire.
RD-15 11:00 77.3 74 Yes
TPOG crew saw cutting in AKA Alley for electrical connections to
Canon yard. Sound enclosure utilized to mitigate for noise, however
noise impacts from construction activities still exceeded threshold.
Elevated meter alerted to overage as well.
RD-15 11:16 75 74 Yes
TPOG crew saw cutting in AKA Alley for electrical connections to
Canon yard. Sound enclosure utilized to mitigate for noise, however
noise impacts from construction activities still exceeded threshold.
Elevated meter alerted to overage as well.
RD-10 12:33 64.8 79 No
Jet Drilling rig in operation on southern sidewalk west of Wilshire
Blvd. and S. Canon Dr. intersection. Jet Drilling crew using core
![Page 41: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY](https://reader036.vdocuments.mx/reader036/viewer/2022081613/5fb72f8f201c2225c94a5642/html5/thumbnails/41.jpg)
1590 South Coast Highway Suite #17, Laguna Beach, California, 92651 • Phone: 949.497.0931 • www. enviro-intel.com
Receptor
ID
Time of
Measurement
Measured
Noise Level
Leq (15-
Minute)
Applicable
Noise
Threshold
Exceeded
Threshold? Notes
driller on southern sidewalk east of S. Canon Dr. and Wilshire Blvd.
intersection for UMP installation.
RD-16 12:55 70.3 76 No
Jet Drilling rig in operation on southern sidewalk of Wilshire Blvd.
west of S. Canon Dr. Noise blanket barrier is utilized to mitigate for
noise.
RD-3 13:15 70.8 75 No Valverde excavating water line within S. Beverly Dr.
RD-11 13:30 71.5 84 No
Jet Drilling rig in operation on southern sidewalk of Wilshire Blvd.
west of S. Canon Dr.
RD-10 14:16 63.8 73 No Jet drilling completing drilling activities on Wilshire Blvd.
RD-8 22:56 61.8 69 No
Valverde excavating sewer lateral trench. Excavator loading soil in
dump truck in Reeves yard. Traffic on Wilshire Blvd. Metal plates on
S. Reeves Dr. rattle when cars drive over them.
August 24, 2019
RD-6 1:16 60 66 No
Construction excavator digging sewer lateral trench at intersection of
Wilshire and N. Canon Dr.
RD-15 1:39 61 72 No
Construction excavator lifting and removing metal trench plates from
waterline trench at AKA Alley entrance.
RD-15 2:00 61.6 63 No
Valverde excavator digging water line lateral trench and loading soil
in dump truck on Wilshire Blvd. at entrance of AKA Alley.
RD-15 2:47 55.7 63 No
Valverde excavator digging water line lateral trench and loading soil
in dump truck on Wilshire Blvd. at entrance of AKA Alley.
RD-15 4:02 60 63 No
Valverde welding and securing metal plates at AKA Alley entrance
with coldmix. Construction skid steer is audible transporting cold mix