811 West 7 th Street, 9 th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com September 4, 2019 Mr. Robert Welch Project Manager City of Beverly Hills 345 Foothill Road Beverly Hills, CA 90210 Mr. Daniel Comorre Sr. Director, Construction Management Los Angeles County Metropolitan Transportation Authority One Gateway Plaza, 17th Floor Los Angeles, CA 90012 Subject: Segment 2 - Purple Line Extension Project ICM Weekly Report August 18, 2019 August 24, 2019 Dear Mr. Welch and Mr. Comorre: Environmental Intelligence, LLC (EI) has been retained by the City of Beverly Hills (COBH) and the Los Angeles County Metropolitan Transportation Authority (Metro) to serve as the independent compliance monitor (ICM) during construction of the Purple Line Extension Project. Monitoring is required to ensure that construction is in compliance with (1) the Permit titled "Demolition and Public Right-of-Way Use Permit for the Los Angeles County Metropolitan Transportation Authority and its Contractor to Clear All Buildings and Existing Improvements at 9430 Wilshire Boulevard, Install Noise Monitoring Equipment and Sound Walls for Future Construction and a Laydown Area for the Wilshire/Rodeo Station of Section Two of the Purple Line Extension Project" (Dated June 5th, 2018); (2) the Permit titled "The Demolition and Clearing of all Buildings and Existing Improvements at 9383-9393 and 9395-9399 Wilshire Boulevard, Installation of Sound Walls, and Relocation of City Owned Utilities in Preparation for Construction and Staging for Section Two of the Purple Line Extension Project" (Dated November 6th, 2018); and (3) the "Memorandum of Agreement for Contract C1120 of the Purple Line Extension Project - Between the City of Beverly Hills and the Los Angeles County Metropolitan Transportation Authority" (Final Version 62). The following information summarizes the ICM monitoring activities that occurred at the Segment 2 site (Rodeo Station site) during the week of August 18, 2019 August 24, 2019. Construction activities were not conducted on August 24, 2019. Construction activities during the week included setting up lane closures, installing water line pipe, breaking pavement and hauling debris, laying steel plates, cold patching and welding, excavating and back- filling trenches, installation of water lines, manhole installation, excavating for installation of bollards around electrical equipment in the N. Canon yard, delivery of trailers to the N. Canon yard, potholing, UMP installation, material deliveries within Reeves yard, geotechnical instrumentation boring, gravel and sand deliveries, and transporting equipment. In addition, EI ICMs conducted sound monitoring near the back alley of the Beverly Hills High School bungalows adjacent to the project site. EI ICMs were present during all construction activities and conducted routine noise measurements at selected noise monitoring locations as well as compliance checks in accordance with the MOAs and associated attachments, exhibits, traffic closure notifications, and traffic management plans. At the conclusion of each work shift, daily monitoring reports were prepared by each ICM. Attachment B (Daily Monitoring Reports) provides detailed daily monitoring reports and photographs of construction activities.

Upload: others

Post on 15-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY

811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com

September 4, 2019

Mr. Robert Welch

Project Manager

City of Beverly Hills

345 Foothill Road

Beverly Hills, CA 90210

Mr. Daniel Comorre

Sr. Director, Construction Management

Los Angeles County Metropolitan Transportation Authority

One Gateway Plaza, 17th Floor

Los Angeles, CA 90012

Subject: Segment 2 - Purple Line Extension Project ICM Weekly Report

August 18, 2019 – August 24, 2019

Dear Mr. Welch and Mr. Comorre:

Environmental Intelligence, LLC (EI) has been retained by the City of Beverly Hills (COBH) and the Los

Angeles County Metropolitan Transportation Authority (Metro) to serve as the independent compliance

monitor (ICM) during construction of the Purple Line Extension Project. Monitoring is required to ensure

that construction is in compliance with (1) the Permit titled "Demolition and Public Right-of-Way Use

Permit for the Los Angeles County Metropolitan Transportation Authority and its Contractor to Clear All

Buildings and Existing Improvements at 9430 Wilshire Boulevard, Install Noise Monitoring Equipment

and Sound Walls for Future Construction and a Laydown Area for the Wilshire/Rodeo Station of Section

Two of the Purple Line Extension Project" (Dated June 5th, 2018); (2) the Permit titled "The Demolition

and Clearing of all Buildings and Existing Improvements at 9383-9393 and 9395-9399 Wilshire Boulevard,

Installation of Sound Walls, and Relocation of City Owned Utilities in Preparation for Construction and

Staging for Section Two of the Purple Line Extension Project" (Dated November 6th, 2018); and (3) the

"Memorandum of Agreement for Contract C1120 of the Purple Line Extension Project - Between the City

of Beverly Hills and the Los Angeles County Metropolitan Transportation Authority" (Final Version 62).

The following information summarizes the ICM monitoring activities that occurred at the Segment 2 site

(Rodeo Station site) during the week of August 18, 2019 – August 24, 2019. Construction activities were

not conducted on August 24, 2019.

Construction activities during the week included setting up lane closures, installing water line pipe,

breaking pavement and hauling debris, laying steel plates, cold patching and welding, excavating and back-

filling trenches, installation of water lines, manhole installation, excavating for installation of bollards

around electrical equipment in the N. Canon yard, delivery of trailers to the N. Canon yard, potholing, UMP

installation, material deliveries within Reeves yard, geotechnical instrumentation boring, gravel and sand

deliveries, and transporting equipment. In addition, EI ICMs conducted sound monitoring near the back

alley of the Beverly Hills High School bungalows adjacent to the project site. EI ICMs were present during

all construction activities and conducted routine noise measurements at selected noise monitoring locations

as well as compliance checks in accordance with the MOAs and associated attachments, exhibits, traffic

closure notifications, and traffic management plans. At the conclusion of each work shift, daily monitoring

reports were prepared by each ICM. Attachment B (Daily Monitoring Reports) provides detailed daily

monitoring reports and photographs of construction activities.

Page 2: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY

Robert Welch

Daniel Comorre

September 4, 2019

Weekly_Report_Section_2_0818-0824_EI01_20190904

VIOLATION SUMMARY

During the week, EI ICMs identified three (3) violations during construction activities. Table I provides a

summary of the violations identified during the week of August 18, 2019 to August 24, 2019 and Exhibit 1

provides a location map for the submitted violations. Details for the violations are included as Attachment

A. Daily monitoring reports and photographs of construction activities are provided as Attachment B (Daily

Monitoring Reports). Daily noise monitoring data are provided in Attachment C (Noise Monitoring Data

Log).

CONCLUSION

To date, 85 violations have been issued, four (4) of which have been rescinded since the beginning of

construction of the Purple Line Extension Project – Segment 2. Please note, no violation 77 was ever issued,

therefore it is skipped in the numbering sequence and is omitted from this count. Project construction

activities are ongoing and EI ICMs continue to monitor all construction activities applicable to the MOA

on a daily basis.

If you have any questions or comments regarding this letter, please contact me directly at 310.469.8989 or

[email protected].

Sincerely,

ENVIRONMENTAL INTELLIGENCE, LLC

Jeremiah George

Project Manager

Attachments: Attachment A: Violations

Attachment B: Daily Monitoring Reports

Attachment C: Noise Monitoring Data Log

cc: Valerie Mudegoren, City of Beverly Hills

Alexander Cantwell, Los Angeles County Metropolitan Transportation Authority

Kimberly Wilson, Los Angeles County Metropolitan Transportation Authority

David Cooper, Los Angeles County Metropolitan Transportation Authority

Namrata Cariapa, Los Angeles County Metropolitan Transportation Authority

Stacy Sinclair, Los Angeles County Metropolitan Transportation Authority

Hank Scheetz, Los Angeles County Metropolitan Transportation Authority

Brett Barnett, Psomas

Bill Zein, Psomas

Farzad Vakilitabar, Psomas

Alex Kay, City of Beverly Hills

Page 3: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY

811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com

TABLE I: VIOLATION SUMMARY (AUGUST 18 – AUGUST 24, 2019)

Violation

ID Date Time ICM Location Condition Violated

Iteration -

Violation Metro Response

84 8/21/2019 11:38 Benjamin

Rosenkoetter

Reeves Dr. and

Charleville Blvd.

Intersection

Article XII of the

Memorandum of

Agreement for

contract C1120 of

the Purple Line

Extension Project -

Section 2

1 - Warning

“Metro is gathering information and data from

the crew, our inspectors, and the DIR to

investigate the validity of and conditions

leading to the violation. If the investigation

results in the identification of corrective

actions, Metro will implement such actions in a

timely manner.”

85 8/23/2019 11:00 Jorge

Guzman

AKA alley

between N.

Crescent Dr. and

N. Canon Dr.

Article XIV Noise

and Vibration

Control Plans and

Mitigation Measures

of the MOA

2 - $15,000

Violation

“Metro is currently gathering information and

data from the crew, our inspectors, and the DIR

to investigate the validity of and conditions

leading to the violation. If the investigation

results in the identification of corrective

actions, Metro will implement such actions in a

timely manner.”

86 8/23/2019 12:28 Benjamin

Rosenkoetter

9378 Wilshire

Blvd.

Article XII of the

MOA 1- Warning

“Metro is currently gathering information and

data from the crew, our inspectors, and the DIR

to investigate the validity of and conditions

leading to the violation. If the investigation

results in the identification of corrective

actions, Metro will implement such actions in a

timely manner.”

Page 4: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY

Exhibit 1 : Violation Locations (August 18 - August 24, 2019)Section 2 - Rodeo Station | City of Beverly Hills, CA

SOUR

CE: b

ing M

aps,

ESRI

Worl

d Tran

sport

ation

and W

orld I

mage

ry Ba

se M

aps,

LACM

TA, C

ity of

Beve

rly H

ills

!( Violation Location (with Violation ID)

Envir

onme

ntal In

tellig

ence

. I:\C

ity of

Beve

rly H

ills\C

ompli

ance

Mon

itorin

g Svc

RFQ

17-3

- Marc

h 201

7\02_

GIS_

Data\

maps

\2019

\Wee

klyRe

ports

\Sec

tion2

_Rod

eo\20

1908

18_to

_201

9082

4\Exh

01_V

iol_E

I01_2

0190

828.m

xd

City ofLos Angeles

City ofBeverly Hills

«0 400200

Feet1:2,400 1 in = 200 feet

Updated: 8/28/2019

Coord

inate

Syste

m: N

AD 19

83 S

tateP

lane C

alifor

nia V

FIPS

0405

Feet,

Proj

ectio

n: La

mbert

Con

forma

l Con

ic, D

atum:

Nort

h Ame

rican

1983

Page 5: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY

ICM Violation Form - Section 2 AUR MOA 648-17 (1)

Latitude:Longitude:Elevation: - - -

34.064991-118.398003

UID:2502  Date:8/21/2019  ICM Violation Form - Section 2 AUR MOA 648-17

NotesViolation ID #84At 10:00 hours, ICM Benjamin Rosenkoetter observed several missing or incorrect signs for the detour associated with C1120 LCN 25.1.1 Geotech Stage 8 Lane Closure. The ICM notified the Metro inspectors of the deficiencies so that they could be corrected. At 11:38 hours, the ICM observed that the missing detour signs had not been replaced and incorrect detour signs had been installed at the intersection of S. Reeves Drive and Charleville Blvd. The signage was not implemented in accordance with the COBH traffic control plan and is therefore a violation of Article XII of the Memorandum of Agreement for contract C1120 of the Purple Line Extension Project - Section 2. The ICM notified Inspectors Luis Garcia and Jason Johnson (Metro) of the violation. This is the first incidence of this violation at this location within the last 14 days.

Violation Details1. Violation ID 842. Violation Iteration 1 - Warning3. Time of Violation 11:384. Address Reeves Dr. and Charleville Blvd. intersection.

Applicable Measures5. Memorandum of Agreement No. 648-17 Not Applicable•6. Exhibit A: Third Party Utility Permit and City of Beverly Hills Conditions for Approval

Not Applicable•

7. Exhibit D: Metro 5-Step Noise Control Plan for Advanced Utility Work in Beverly Hills

Not Applicable•

8. Other Plans Not Applicable•9. Other Plan Description See Notes

Attachment AViolations

This report was generated by Environmental Intelligence, LLC - www.enviro-intel.com - Copyright (2019)1590 S. Pacific Coast Hwy, Suite 17 | Laguna Beach, California 92651 | (949) 497-0931 1/3

Report Tracking: Created by Ben Rosenkoetter on 8/21/2019 2:40:36 PM, Approved by Ben Rosenkoetter on 8/22/2019 11:30:42 AM

Page 6: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY

ICM Violation Form - Section 2 AUR MOA 648-17 (1)

Latitude:Longitude:Elevation: - - -

34.0673-118.3967

UID:2542  Date:8/23/2019  ICM Violation Form - Section 2 AUR MOA 648-17

NotesViolation ID # 85

At 11:15 hours ICM Jorge Guzman recorded an exceedance of 3.3 dB adjacent to receptor RD-15 in the AKA alley. The noise threshold for RD-15 at this time of day is 74 LAeq. The measured noise level was 77.3 LAeq, ambient noise was negligible at the time. RD-15 EL also experienced an overage during the same sampling period. Construction noise resulted from saw cutting in the AKA alley approximately 100 feet from the intersection of Wilshire Blvd. and the alley. Positioning of sound wall enclosure was insufficient to mitigate for noise in the direction of the sensitive receptor. The activity is in violation of Article XIV of the MOA. Mr. Guzman notified Metro inspector Luis Garcia of the violation. This is the second incidence of the violation at this location in the last 14 days.

Violation Details1. Violation ID 852. Violation Iteration 2 - $15,000 Violation3. Time of Violation 11:004. Address AKA alley between N. Crescent Dr. and N. Canon Dr.

Applicable Measures5. Memorandum of Agreement No. 648-17 Not Applicable•6. Exhibit A: Third Party Utility Permit and City of Beverly Hills Conditions for Approval

Not Applicable•

7. Exhibit D: Metro 5-Step Noise Control Plan for Advanced Utility Work in Beverly Hills

Not Applicable•

8. Other Plans Other Plans (see notes)•9. Other Plan Description Article XIV Noise and Vibration Control Plans and Mitigation Measures of the MOA

Attachment AViolations

This report was generated by Environmental Intelligence, LLC - www.enviro-intel.com - Copyright (2019)1590 S. Pacific Coast Hwy, Suite 17 | Laguna Beach, California 92651 | (949) 497-0931 2/3

Report Tracking: Created by Jorge Guzman on 8/23/2019 7:24:11 PM, Approved by Jeremiah George on 8/24/2019 12:02:24 PM

Page 7: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY

ICM Violation Form - Section 2 AUR MOA 648-17 (1)

Latitude:Longitude:

34.066972-118.396613

UID:2549  Date:8/23/2019  ICM Violation Form - Section 2 AUR MOA 648-17

Elevation: - - -

NotesViolation ID #86At 12:28 hours, ICM Benjamin Rosenkoetter observed a lane closure installed within the eastbound number 3 lane on Wilshire Blvd. east of S. Canon. The lane was closed for approximately 2 hours to facilitate UMP installation work. The lane closure was not part of COBH traffic control plan and is therefore a violation of Article XII of the Memorandum of Agreement for contract C1120 of the Purple Line Extension Project - Section 2. The ICM notified Inspectors Luis Garcia (Metro) of the violation. This is the first incidence of this violation at this location within the last 14 days.

Violation Details1. Violation ID 862. Violation Iteration 1 - Warning3. Time of Violation 12:284. Address 9378 Wilshire Blvd.

Applicable Measures5. Memorandum of Agreement No. 648-17 Not Applicable•6. Exhibit A: Third Party Utility Permit and City of Beverly Hills Conditions for Approval

Not Applicable•

7. Exhibit D: Metro 5-Step Noise Control Plan for Advanced Utility Work in Beverly Hills

Not Applicable•

8. Other Plans Other Plans (see notes)•9. Other Plan Description Article XII of the MOA

Attachment AViolations

This report was generated by Environmental Intelligence, LLC - www.enviro-intel.com - Copyright (2019)1590 S. Pacific Coast Hwy, Suite 17 | Laguna Beach, California 92651 | (949) 497-0931 3/3

Report Tracking: Created by Ben Rosenkoetter on 8/24/2019 8:04:00 AM, Approved by Jeremiah George on 8/24/2019 12:21:23 PM

Page 8: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY

This report was generated by Environmental Intelligence, LLC - www.enviro-intel.com - Copyright (2019) 1590 S. Pacific Coast Hwy, Suite 17 | Laguna Beach, California 92651 | (949) 497-0931

1/23

Attachment B Daily Monitoring Reports

8/18/2019 - 8/24/2019

Summaries (22)

Date

Monitor

Location

Time

Compliant

Summary

Sunday, August 18, 2019

Ben Rosenkoetter

Rodeo

07:45:00 to 18:45:00

Yes

Contractors/Subcontractors: Metro, TPOG, PSOMAS, Valverde Construction Inc, Griffith

Representatives On-Site: Luis Garcia (Metro); Farzad Vakilitabat (Psomas); Lance Reid (Valverde); Raul Luna (Valverde); Casey Underwood (TPOG); Nadim Bolous (TPOG)

Work Location(s): Reeves yard; Wilshire Blvd. between Beverly Dr. and N. Crescent Dr.; Reeves Dr. between Wilshire Blvd. and the alley; N. Canon yard.

The ICM was in possession of applicable COBH-approved closure notifications and TCP for the day’s work from 07:45 hours to 18:45 hours on August 18, 2019. EI ICM Ben Rosenkoetter met with Metro Inspector Luis Garcia to discuss the day’s activities. At the beginning of the shift, the ICM calibrated the sound meter to 94.0 dBA.

Work for the day included installation of lane closure per TPOG LCN 23.0.28, LCN 23.0.29, and LCN 23.0.30 WRS Sanitary Sewer Relocation; installing water line pipe on Wilshire Blvd. between Reeves Dr. and N. Canon Dr., breaking asphalt and hauling debris within the northbound lane of Reeves Dr. and lateral locations within Wilshire Blvd.; laying steel plates, cold patching and welding.

Lane closure implementation began at 09:00 hours. Lane closure removal completed at 18:45 hours.

Date

Monitor

Location

Time

Compliant

Summary

Monday, August 19, 2019

Yani Pohl

Rodeo

07:30:00 to 16:00:00

Yes

Contractors/Subcontractors: TPOG

Representatives On-Site: None

Work Location(s): Beverly Hills High School at 241 S. Moreno Dr., Beverly Hills, CA 90212.

The ICM was in possession of the MOA and draft Noise Control Plan (pending approval of all parties). Work was conducted from 7:30 hours to 16:00 hours on August 19th, 2019. EI ICM Yani Pohl arrived on site at 7:30 hours. At the beginning of the shift, the ICM calibrated the sound meter at (93.9) 94.00 dB.

ICM Yani Pohl took sound readings in the back alley of the Beverly Hills High School bungalows adjacent to the project site. No sound readings were above ambient levels for the duration of the workday. No vibrational issues were documented from the work site.

Note: A total of 8 readings for fugitive dust were taken over the course of the day utilizing an Extech VPC300 Video Particle Counter with a built-in camera. Readings were at ambient levels throughout the day

Page 9: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY

This report was generated by Environmental Intelligence, LLC - www.enviro-intel.com - Copyright (2019) 1590 S. Pacific Coast Hwy, Suite 17 | Laguna Beach, California 92651 | (949) 497-0931

2/23

Date Monday, August 19, 2019

Attachment B Daily Monitoring Reports

8/18/2019 - 8/24/2019

Monitor

Location

Time

Compliant

Summary

Ben Rosenkoetter

Rodeo

07:45:00 to 15:45:00

Yes

Contractors/Subcontractors: Metro; TPOG; PSOMAS; Valverde Construction Inc;

Representatives On-Site: Luis Garcia (Metro); Jason Johnson (Metro); Alex Lapostol (Metro); Gene Higginbotham (Psomas); Lance Reid (Valverde); Raul Luna (Valverde); Nate Burch (TPOG);

Work Location(s): Canon yard; northbound lane of S. Reeves Dr.; westbound number 3 lane of Wilshire Blvd. between N. Crescent Dr. and N. Canon Dr.; the alley between N. Canon yard and the AKA hotel; northeast intersection and sidewalk of Wilshire Blvd. and N. Canon Dr.

The ICM was in possession of applicable COBH-approved closure notifications and TCP for the day’s work from 08:00 hours to 16:00 hours on August 19, 2019. EI ICM Jorge Guzman met with Metro Inspectors Luis Garcia and Jason Johnson to discuss the day’s activities. At the beginning of the shift, the ICM calibrated the sound meter at 94.0 (from 93.9) dBA.

Work for the day included installation of lane closure per TPOG LCN 25.0.0 (Stage 4) and LCN 25.1.1 (Stage 8) WRS Geotechnical Instrumentation and LCN 26.0.0 (Stage 2) WRS CSA Driveway Lane and Sidewalk Closure; excavation of trench and installation of water line lateral along northbound S. Reeves Dr.; backfilling of trench at northeast intersection of Wilshire Blvd. and N. Canon Dr., and manhole installation at alley between N. Canon yard and AKA hotel. Work also included excavating for installation of bollards around electrical equipment in the N. Canon yard.

Lane closure implementation began at 09:05 hours. Lane closure removal completed at 15:50 hours.

Date

Monitor

Location

Time

Compliant

Summary

Monday, August 19, 2019

Daniel Chang

Rodeo

19:45:00 to 07:15:00

Yes

Contractors/Subcontractors: Valverde, PSOMAS, Tutor Perini, Metro, Triumph Security.

Representatives On-Site: Ariel Manalo (Metro); Joshua Lopez (Valverde); Nadim Baloa (TPOG); Ernie Tuscano (PSOMAS); Scott (TPOG).

Work Location(s): The westbound No. 1 and No. 2 lanes on Wilshire Blvd. between Elm Dr. and east of Beverly Dr. The southbound left turn lane on N Canon Dr. between the Beverly/Canon Gardens and Wilshire Blvd. The left turn lane on eastbound Wilshire Blvd at N. Canon Dr. The eastbound No.1 and No.2 lanes on Wilshire Blvd. between El Camino Dr. and S. Canon Dr. The westerly crosswalk (north-south) at the N. Canon Dr./Wilshire Blvd. intersection.

The ICM was in possession of applicable COBH-approved closure notifications and TCP for the night’s work from 19:45 hours to 7:15 hours on August 19th, 2019. EI ICM Daniel Chang met with Metro Inspector Ariel Manalo to discuss the night’s activities. At the beginning of the shift, the ICM calibrated the sound meter at 93.9 dB (to 94.00 dB).

Work for the night included removing trench plates, setting up noise barrier around work site, backfilling over water line pipe in trench at intersection of Wilshire Blvd. and N. Canon Dr., excavating sewer lateral trench at the center of N. Canon Dr. and Wilshire Blvd. intersection, installing water line pipe in trench, office trailer delivery for Canon yard, re-plating trench, welding and securing trench plates, setting up road closure and traffic control signs on Wilshire Blvd., transporting equipment from Reeves yard to work site, removing road closure, tabbing lanes, and sweeping/cleaning work site.

Page 10: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY

This report was generated by Environmental Intelligence, LLC - www.enviro-intel.com - Copyright (2019) 1590 S. Pacific Coast Hwy, Suite 17 | Laguna Beach, California 92651 | (949) 497-0931

3/23

Date Monday, August 19, 2019

Attachment B Daily Monitoring Reports

8/18/2019 - 8/24/2019

Monitor

Location

Time

Compliant

Summary

Yani Pohl

Rodeo

04:45:00 to 06:00:00

Yes

Contractors/Subcontractors: TPOG

Representatives On-Site: Nathan Burich (TPOG), Rick Chimal (TPOG), Gene Higginbotham (PSOMAS)

Work Location(s): North Canon yard

The ICM was in possession of applicable COBH-approved closure notifications and TCP for the day’s work from 04:45 hours to 06:00 hours on August 19, 2019. EI ICM Yani Pohl met with PSOMAS Inspectors Gene Higginbotham and TPOG Site Manager Nathan Burich to discuss the day’s activities. At the beginning of the shift, the ICM calibrated the sound meter at 94.0 (from 93.9) dBA.

Work for the day included the delivery of one trailer to the N. Canon yard. The delivery truck arrived at 05:09 hours.

Date

Monitor

Location

Time

Compliant

Summary

Monday, August 19, 2019

Jorge Guzman

Rodeo

08:00:00 to 16:00:00

Yes

Contractors/Subcontractors: Metro; TPOG; PSOMAS; Valverde Construction Inc; Jet Drilling;

Representatives On-Site: Luis Garcia (Metro); Jason Johnson (Metro); Alex Lapostol (Metro); Gene Higginbotham (Psomas); Lance Reid (Valverde); Raul Luna (Valverde); Nate Burch (TPOG); Terry Knox (ASC)

Work Location(s): Canon yard; northbound lane of S. Reeves Dr.; westbound number 3 lane of Wilshire Blvd. between N. Crescent Dr. and N. Canon Dr.; the alley between N. Canon yard and the AKA hotel; northeast intersection and sidewalk of Wilshire Blvd. and N. Canon Dr.

The ICM was in possession of applicable COBH-approved closure notifications and TCP for the day’s work from 08:00 hours to 16:00 hours on August 19, 2019. EI ICM Jorge Guzman met with Metro Inspectors Luis Garcia and Jason Johnson to discuss the day’s activities. At the beginning of the shift, the ICM calibrated the sound meter at 94.0 (from 93.9) dBA.

Work for the day included installation of lane closure per TPOG LCN 25.0.0 (Stage 4) and LCN 25.1.1 (Stage 8) WRS Geotechnical Instrumentation; excavation of trench along northbound S. Reeves Dr.; backfilling of trench at northeast intersection of Wilshire Blvd. and N. Canon Dr., and manhole installation at alley between N. Canon yard and AKA hotel. Work also included excavating for installation of bollards around electrical equipment in the N. Canon yard.

Lane closure implementation began at 09:05 hours. Lane closure removal completed at 15:50 hours.

Page 11: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY

This report was generated by Environmental Intelligence, LLC - www.enviro-intel.com - Copyright (2019) 1590 S. Pacific Coast Hwy, Suite 17 | Laguna Beach, California 92651 | (949) 497-0931

4/23

Date

Monitor

Location

Time

Compliant

Tuesday, August 20, 2019

Yani Pohl

Rodeo

07:30:00 to 16:00:00

Yes

Attachment B Daily Monitoring Reports

8/18/2019 - 8/24/2019

Summary Contractors/Subcontractors: TPOG

Representatives On-Site: None

Work Location(s): Beverly Hills High School at 241 S Moreno Dr, Beverly Hills, CA 90212.

The ICM was in possession of the MOA and draft Noise Control Plan (pending approval of all parties). Work was conducted from 7:30 hours to 16:00 hours on August 20th, 2019. EI ICM Yani Pohl arrived on site at 7:30 hours. At the beginning of the shift, the ICM calibrated the sound meter at (93.9) 94.00 dB.

ICM Yani Pohl took sound readings in the back alley of the Beverly Hills High School bungalows adjacent to the project site. No sound readings were above ambient levels for the duration of the workday. No vibrational issues were documented from the work site.

Note: A total of 7 readings for fugitive dust were taken over the course of the day utilizing an Extech VPC300 Video Particle Counter with a built-in camera. Readings were at ambient levels throughout the day.

Date

Monitor

Location

Time

Compliant

Summary

Tuesday, August 20, 2019

Ben Rosenkoetter

Rodeo

07:45:00 to 15:45:00

Yes

Contractors/Subcontractors: Metro; TPOG; PSOMAS; Valverde Construction Inc; Haaker Equipment; Jet Drilling

Representatives On-Site: Luis Garcia (Metro); Jason Johnson (Metro); David Ortiz (Metro); Gene Higginbotham (Psomas); Lance Reid (Valverde); Raul Luna (Valverde); Nate Burch (TPOG); Casey Underwood (TPOG); Terry Knox (ASC)

Work Location(s): Canon yard; northbound lane of S. Reeves Dr.; westbound number 3 lane of Wilshire Blvd. between N. Crescent Dr. and N. Canon Dr.; eastbound number 2 lane of Wilshire Blvd. between N. Canon Dr. and N. Crescent Dr.; the alley between N. Canon yard and the AKA hotel; southbound number 2 lane of N. Beverly Dr. and westbound number 3 lane of Wilshire Blvd. between S. Reeves Dr. and El Camino.

The ICM was in possession of applicable COBH-approved closure notifications and TCP for the day’s work from 07:45 hours to 15:45 hours on August 20, 2019. EI ICM Ben Rosenkoetter met with Metro Inspectors Luis Garcia and Jason Johnson to discuss the day’s activities. At the beginning of the shift, the ICM calibrated the sound meter to 94.0 dBA.

Work for the day included installation of lane closure per TPOG LCN 25.0.0 (Stage 4), LCN 25.0.0 (Geotech Stage 2) and LCN 25.1.1 (Stage 8) WRS Geotechnical Instrumentation; excavation of trench along northbound S. Reeves Dr.; excavation for manhole installation with water jet/vacuum truck at alley between N. Canon yard and AKA hotel, and geotechnical instrumentation boring on N. Beverly Dr., potholing and UMP installation along the number 2 lane of Wilshire Blvd. between N. Canon Dr. and N. Crescent Dr., K-Rail delivery within Reeves yard, and construction office trailer assembly within N. Canon yard.

Lane closure implementation began at 09:05 hours. Lane closure removal completed at 15:45 hours.

Page 12: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY

This report was generated by Environmental Intelligence, LLC - www.enviro-intel.com - Copyright (2019) 1590 S. Pacific Coast Hwy, Suite 17 | Laguna Beach, California 92651 | (949) 497-0931

5/23

Date

Monitor

Location

Time

Compliant

Tuesday, August 20, 2019

Jorge Guzman

Rodeo

08:00:00 to 16:00:00

Yes

Attachment B Daily Monitoring Reports

8/18/2019 - 8/24/2019

Summary Contractors/Subcontractors: Metro; TPOG; PSOMAS; Valverde Construction Inc; Haaker Equipment; Jet Drilling;

Representatives On-Site: Luis Garcia (Metro); Jason Johnson (Metro); David Ortiz (Metro); Gene Higginbotham (Psomas); Lance Reid (Valverde); Raul Luna (Valverde); Nate Burch (TPOG); Casey Underwood (TPOG); Terry Knox (ASC)

Work Location(s): Canon yard; northbound lane of S. Reeves Dr.; westbound number 3 lane of Wilshire Blvd. between N. Crescent Dr. and N. Canon Dr.; eastbound number 2 lane of Wilshire Blvd. between N. Canon Dr. and N. Crescent Dr.; the alley between N. Canon yard and the AKA hotel; southbound number 2 lane of N. Beverly Dr. and westbound number 3 lane of Wilshire Blvd. between S. Reeves Dr. and El Camino.

The ICM was in possession of applicable COBH-approved closure notifications and TCP for the day’s work from 08:00 hours to 16:00 hours on August 20, 2019. EI ICM Jorge Guzman met with Metro Inspectors Luis Garcia and Jason Johnson to discuss the day’s activities. At the beginning of the shift, the ICM calibrated the sound meter at 94.0 (from 93.9) dBA.

Work for the day included installation of lane closure per TPOG LCN 25.0.0 (Stage 4), LCN 25.0.0 (Geotech Stage 2) and LCN 25.1.1 (Stage 8) WRS Geotechnical Instrumentation; excavation of trench along northbound S. Reeves Dr.; excavation for manhole installation with water jet/vacuum truck at alley between N. Canon yard and AKA hotel, and geotechnical instrumentation boring on N. Beverly Dr. Work also included potholing and UMP installation along the number 2 lane of Wilshire Blvd. between N. Canon Dr. and N. Crescent Dr.

Lane closure implementation began at 09:05 hours. Lane closure removal completed at 15:45 hours.

Date

Monitor

Location

Time

Compliant

Summary

Tuesday, August 20, 2019

Daniel Chang

Rodeo

19:45:00 to 07:00:00

Yes

Contractors/Subcontractors: Valverde, PSOMAS, Tutor Perini, Metro, Triumph Security.

Representatives On-Site: Ariel Manalo (Metro); Joshua Lopez (Valverde); Nadim Baloa (TPOG); Ernie Tuscano (PSOMAS); Scott (TPOG); Lance (Valverde).

Work Location(s): The westbound No. 1 and No. 2 lanes on Wilshire Blvd. between Elm Dr. and east of Beverly Dr. The southbound left turn lane on N. Canon Dr. between the Beverly/Canon Gardens and Wilshire Blvd. The left turn lane on eastbound Wilshire Blvd. at N. Canon Dr. The eastbound No.1 and No.2 lanes on Wilshire Blvd. between El Camino Dr. and South Canon Dr. The westerly crosswalk (North-South) at the N. Canon Dr./Wilshire Blvd. intersection.

The ICM was in possession of applicable COBH-approved closure notifications and TCP for the night’s work from 19:45 hours to 7:00 hours on August 20th, 2019. EI ICM Daniel Chang met with Metro Inspector Ariel Manalo to discuss the night’s activities. At the beginning of the shift, the ICM calibrated the sound meter at 93.9 dB (to 94.00 dB).

Work for the night included removing trench plates, setting up noise barrier around work site, backfilling over water line pipe in trench, field assembly of water line pipe joints, beveling water line pipes, sewer line trench shaving, installing water line pipe in trench, re-plating trench, welding and securing trench plates, setting up road closure and traffic control signs on Wilshire Blvd., transporting equipment from Reeves yard to work site, removing road closure, tabbing lanes, and sweeping/cleaning work site

Page 13: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY

This report was generated by Environmental Intelligence, LLC - www.enviro-intel.com - Copyright (2019) 1590 S. Pacific Coast Hwy, Suite 17 | Laguna Beach, California 92651 | (949) 497-0931

6/23

Date

Monitor

Location

Time

Compliant

Wednesday, August 21, 2019

Yani Pohl

Rodeo

07:30:00 to 16:00:00

Yes

Attachment B Daily Monitoring Reports

8/18/2019 - 8/24/2019

Summary Contractors/Subcontractors: TPOG

Representatives On-Site: None

Work Location(s): Beverly Hills High School at 241 S Moreno Dr, Beverly Hills, CA 90212.

The ICM was in possession of the MOA and draft Noise Control Plan (pending approval of all parties). Work was conducted from 7:30 hours to 16:00 hours on August 21th, 2019. EI ICM Yani Pohl arrived on site at 7:30 hours. At the beginning of the shift, the ICM calibrated the sound meter at (93.9) 94.00 dB.

ICM Yani Pohl took sound readings in the back alley of the Beverly Hills High School bungalows adjacent to the project site. No sound readings were above ambient levels for the duration of the workday. No vibrational issues were documented from the work site.

Note: A total of 8 readings for fugitive dust were taken over the course of the day utilizing an Extech VPC300 Video Particle Counter with a built-in camera. Readings were at ambient levels throughout the day.

Date

Monitor

Location

Time

Compliant

Summary

Wednesday, August 21, 2019

Ben Rosenkoetter

Rodeo

07:45:00 to 16:00:00

No

Contractors/Subcontractors: Metro; TPOG; PSOMAS; Valverde Construction Inc; Haaker Equipment; Jet Drilling;

Representatives On-Site: Luis Garcia (Metro); Jason Johnson (Metro); David Ortiz (Metro); Gene Higginbotham (Psomas); Lance Reid (Valverde); Raul Luna (Valverde); Nate Burch (TPOG); Casey Underwood (TPOG); Terry Knox (ASC);

Work Location(s): Canon yard; northbound lane of S. Reeves Dr.; westbound number 3 lane of Wilshire Blvd. between N. Crescent Dr. and N. Canon Dr.; eastbound number 2 lane of Wilshire Blvd. between N. Canon Dr. and N. Crescent Dr.; the alley between N. Canon yard and the AKA hotel; southbound curb lane of S. Beverly Dr., southbound number 2 lane of N. Beverly Dr. and westbound number 3 lane of Wilshire Blvd. between S. Reeves Dr. and El Camino.

The ICM was in possession of applicable COBH-approved closure notifications and TCP for the day’s work from 07:45 hours to 16:00 hours on August 21, 2019. EI ICM Ben Rosenkoetter met with Metro Inspectors Luis Garcia and Jason Johnson to discuss the day’s activities. At the beginning of the shift, the ICM calibrated the sound meter to 94.0 dBA.

Work for the day included installation of lane closure per TPOG LCN 25.0.0 (Stage 4), LCN 25.0.0 (Geotech Stage 2), LCN 25.0.4 (Stage 13) and LCN 25.1.1 (Stage 8) WRS Geotechnical Instrumentation; excavation of trench along northbound S. Reeves Dr.; excavation for manhole installation with water jet/vacuum truck at alley between N. Canon yard and AKA hotel, and geotechnical instrumentation boring on N. Beverly Dr., UMP installation along the number 2 lane of Wilshire Blvd. between N. Canon Dr. and N. Crescent Dr., K-Rail delivery within Reeves yard, and construction office trailer assembly within N. Canon yard.

Lane closure implementation began at 09:05 hours. Lane closure removal completed at 16:00 hours.

Violation ID #84

At 10:00 hours, ICM Benjamin Rosenkoetter observed several missing or incorrect signs for the detour associated with C1120 LCN 25.1.1 Geotech Stage 8 Lane Closure. The ICM notified the Metro inspectors of the deficiencies so that they could be corrected. At 11:38 hours, the ICM observed that the missing detour signs had not been replaced and incorrect detour signs had been installed at the intersection of S. Reeves Dr. and Charleville Blvd. The signage was not implemented in accordance with the COBH traffic control plan and is therefore a violation of Article XII of the Memorandum of Agreement for contract C1120 of the Purple Line Extension Project - Section 2. The ICM notified Inspectors Luis Garcia and Jason Johnson (Metro) of the violation. This is the first incidence of this violation at this location within the last 14 days.

Page 14: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY

This report was generated by Environmental Intelligence, LLC - www.enviro-intel.com - Copyright (2019) 1590 S. Pacific Coast Hwy, Suite 17 | Laguna Beach, California 92651 | (949) 497-0931

7/23

Date

Monitor

Location

Time

Compliant

Wednesday, August 21, 2019

Jorge Guzman

Rodeo

08:00:00 to 16:00:00

Yes

Attachment B Daily Monitoring Reports

8/18/2019 - 8/24/2019

Summary Contractors/Subcontractors: Metro; TPOG; PSOMAS; Valverde Construction Inc; Haaker Equipment; Jet Drilling;

Representatives On-Site: Luis Garcia (Metro); Jason Johnson (Metro); David Ortiz (Metro); Gene Higginbotham (Psomas); Lance Reid (Valverde); Raul Luna (Valverde); Nate Burch (TPOG); Mark Olson (COBH); Alex Kay (COBH); Terry Knox (ASC);

Work Location(s): Canon yard; northbound lane of S. Reeves Dr.; westbound number 3 lane of Wilshire Blvd. between N. Crescent Dr. and N. Canon Dr.; the alley between N. Canon yard and the AKA hotel; southbound number 2 lane of N. Beverly Dr. and westbound number 3 lane of Wilshire Blvd. between S. Reeves Dr. and El Camino; Number 2 lane of S. Beverly Dr. and northbound right turn pocket of S. Beverly Dr. at Wilshire Blvd.

The ICM was in possession of applicable COBH-approved closure notifications and TCP for the day’s work from 08:00 hours to 16:00 hours on August 21, 2019. EI ICM Jorge Guzman met with Metro Inspectors Luis Garcia and Jason Johnson to discuss the day’s activities. At the beginning of the shift, the ICM calibrated the sound meter at 94.0 (from 93.9) dBA.

Work for the day included installation of lane closure per TPOG LCN 25.0.0 (Stage 4), LCN 25.0.0 (Geotech Stage 2), LCN 25.0.5, and LCN 25.1.1 (Stage 8) WRS Geotechnical Instrumentation; excavation of trench along northbound S. Reeves Dr. and setting of new water line; excavation for manhole installation with water jet/vacuum truck at alley between N. Canon yard and AKA hotel, and geotechnical instrumentation boring on N. Beverly Dr. Work also included setting up of electrical for TPOG and Metro trailers in Canon yard.

Lane closure implementation began at 09:05 hours. Lane closure removal completed at 15:45 hours.

Date

Monitor

Location

Time

Compliant

Summary

Wednesday, August 21, 2019

Daniel Chang

Rodeo

19:45:00 to 07:00:00

Yes

Contractors/Subcontractors: Valverde, PSOMAS, Tutor Perini, Metro, Triumph Security.

Representatives On-Site: Ariel Manalo (Metro); Joshua Lopez (Valverde); Nadim Baloa (TPOG); Ernie Tuscano (PSOMAS); Scott (TPOG).

Work Location(s): The westbound No. 1 and No. 2 lanes on Wilshire Blvd. between Elm Dr. and east of Beverly Dr. The southbound left turn lane on N. Canon Dr. between the Beverly/Canon Gardens and Wilshire Blvd. The left turn lane on eastbound Wilshire Blvd. at N. Canon Dr. The eastbound No.1 and No.2 lanes on Wilshire Blvd. between El Camino Dr. and South Canon Dr. The westerly crosswalk (north-south) at the N. Canon Dr./Wilshire Blvd. intersection.

The ICM was in possession of applicable COBH-approved closure notifications and TCP for the night’s work from 19:45 hours to 7:00 hours on August 21st, 2019. EI ICM Daniel Chang met with Metro Inspector Ariel Manalo to discuss the night’s activities. At the beginning of the shift, the ICM calibrated the sound meter at 93.9 dB (to 94.00 dB).

Work for the night included removing trench plates, setting up noise barrier around work site, backfilling over water line pipe in trench, installing pipe in sewer lateral trench (A2A), excavating sewer lateral trench (A2), sand bedding in sewer lateral trench (A2A), light backfill to hold pipe in place in sewer lateral trench (A2A), sand delivery, installing water line pipe in trench, field assembly of waterline pipe joint in Reeves yard, re- plating trench, welding and securing trench plates, setting up road closure and traffic control signs on Wilshire Blvd., transporting equipment from Reeves yard to work site, removing road closure, tabbing lanes, and sweeping/cleaning work site.

Page 15: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY

Date

Monitor

Location

Time

Compliant

Thursday, August 22, 2019

Jorge Guzman

Rodeo

07:00:00 to 16:00:00

Yes

This report was generated by Environmental Intelligence, LLC - www.enviro-intel.com - Copyright (2019) 1590 S. Pacific Coast Hwy, Suite 17 | Laguna Beach, California 92651 | (949) 497-0931

8/23

Attachment B Daily Monitoring Reports

8/18/2019 - 8/24/2019

Summary Contractors/Subcontractors: Metro; TPOG; PSOMAS; Valverde Construction Inc; Nor-Cal Pipeline Services; Jet Drilling;

Representatives On-Site: Luis Garcia (Metro); David Ortiz (Metro); Gene Higginbotham (Psomas); Lance Reid (Valverde); Raul Luna (Valverde); Nate Burch (TPOG); Terry Knox (ASC);

Work Location(s): Canon yard; northbound lane of S. Reeves Dr.; westbound number 3 lane of Wilshire Blvd. between N. Crescent Dr. and N. Canon Dr.; the alley between N. Canon yard and the AKA hotel; southbound number 2 lane of N. Beverly Dr. and westbound number 3 lane of Wilshire Blvd. between S. Reeves Dr. and El Camino; Number 2 lane of S. Beverly Dr. and northbound right turn pocket of S. Beverly Dr. at Wilshire Blvd.

The ICM was in possession of applicable COBH-approved closure notifications and TCP for the day’s work from 07:00 hours to 16:00 hours on August 22, 2019. EI ICM Jorge Guzman met with Metro Inspector Luis Garcia to discuss the day’s activities. At the beginning of the shift, the ICM calibrated the sound meter at 94.0 (from 93.9) dBA.

Work for the day included installation of lane closure per TPOG LCN 25.0.0 (Stage 4), LCN 25.0.0 (Geotech Stage 2), LCN 25.0.5, and LCN 25.1.1 (Stage 8) WRS Geotechnical Instrumentation; excavation of waterlines on southbound and northbound S. Beverly Dr.; excavation for manhole installation with water jet/vacuum truck at alley between N. Canon yard and AKA hotel, and geotechnical instrumentation boring on N. Beverly Dr. north of Wilshire Blvd. Work also included setting up of electrical for TPOG and Metro trailers in Canon yard.

Lane closure implementation began at 09:05 hours. Lane closure removal completed at 15:45 hours.

Date

Monitor

Location

Time

Compliant

Summary

Thursday, August 22, 2019

Yani Pohl

Rodeo

07:00:00 to 17:00:00

Yes

Contractors/Subcontractors: TPOG

Representatives On-Site: None

Work Location(s): Beverly Hills High School at 241 S Moreno Dr, Beverly Hills, CA 90212.

The ICM was in possession of the MOA and draft Noise Control Plan (pending approval of all parties). Work was conducted from 7:00 hours to 17:00 hours on August 22th, 2019. EI ICM Yani Pohl arrived on site at 7:00 hours. At the beginning of the shift, the ICM calibrated the sound meter at (93.9) 94.00 dB.

ICM Yani Pohl took sound readings in the back alley of the Beverly Hills High School bungalows adjacent to the project site. No sound readings were above ambient levels for the duration of the workday. No vibrational issues were documented from the work site. Three additional monitors were installed along the wall between the Constellation yard and BHHS.

Note: A total of 9 readings for fugitive dust were taken over the course of the day utilizing an Extech VPC300 Video Particle Counter with a built-in camera. Readings were at ambient levels throughout the day

Page 16: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY

This report was generated by Environmental Intelligence, LLC - www.enviro-intel.com - Copyright (2019) 1590 S. Pacific Coast Hwy, Suite 17 | Laguna Beach, California 92651 | (949) 497-0931

9/23

Date

Monitor

Location

Time

Compliant

Summary

Thursday, August 22, 2019

Ben Rosenkoetter

Rodeo

07:45:00 to 15:45:00

Yes

Contractors/Subcontractors: Metro; TPOG; PSOMAS; Valverde Construction Inc; Jet Drilling;

.

Attachment B Daily Monitoring Reports

8/18/2019 - 8/24/2019

Representatives On-Site: Luis Garcia (Metro); David Ortiz (Metro); Gene Higginbotham (Psomas); Lance Reid (Valverde); Raul Luna (Valverde); Nate Burch (TPOG); Casey Underwood (TPOG); Terry Knox (ASC)

Work Location(s): Canon yard; westbound number 3 lane on Wilshire Blvd. between Crescent Dr. and Beverly Dr.; northbound lane on S. Reeves Dr.; southbound number 2 lane on N. Beverly Dr. between Wilshire Blvd. and approx. 200 ft. north of Wilshire Blvd.; Reeves yard. The ICM was in possession of applicable COBH-approved closure notifications and TCP for the day’s work from 07:45 hours to 15:45 hours on August 22, 2019. EI ICM Ben Rosenkoetter met with Metro Inspectors Luis Garcia to discuss the day’s activities. At the beginning of the shift, the ICM calibrated the sound meter to 94.0 dBA. Work for the day included installation of lane closure per TPOG LCN 23.2.27 (Stage 2), LCN 25.0.0 (Stage 4), LCN 25.0.5 (Stage 17), 25.1.1 (Stage 8), LCN 25.1.4 (Stage 16), and LCN 26.1.0 (Stage 2); excavation of trench and water line installation along northbound S. Reeves Dr.; excavation for storm water line installation with water jet/vacuum truck within Wilshire Blvd. west of N. Canon Dr., and geotechnical instrumentation installation on N. Beverly Dr. Lane closure implementation began at 09:05 hours. Lane closure removal completed at 15:30 hours.

Date

Monitor

Location

Time

Compliant

Summary

Thursday, August 22, 2019

Daniel Chang

Rodeo

19:45:00 to 07:00:00

Yes

Contractors/Subcontractors: Valverde, PSOMAS, Tutor Perini, Metro, Triumph Security. Representatives On-Site: Ariel Manalo (Metro); Joshua Lopez (Valverde); Nadim Baloa (TPOG); Ernie Tuscano (PSOMAS); Scott (TPOG). Work Location(s): The westbound No. 1 and No. 2 lanes on Wilshire Blvd. between Elm Dr. and east of Beverly Dr. The southbound left turn lane on N. Canon Dr. between the Beverly/Canon Gardens and Wilshire Blvd. The left turn lane on eastbound Wilshire Blvd. at N. Canon Dr. The eastbound No.1 and No.2 lanes on Wilshire Blvd. between El Camino Dr. and South Canon Dr. The westerly crosswalk (north-south) at the N. Canon Dr./Wilshire Blvd. intersection. The left turn lane on westbound Wilshire Blvd. at S. Canon Dr. The left turn lane on westbound Wilshire Blvd. at Beverly Dr. The ICM was in possession of applicable COBH-approved closure notifications and TCP for the night’s work from 19:45 hours to 7:00 hours on August 22nd, 2019. EI ICM Daniel Chang met with Metro Inspector Ariel Manalo to discuss the night’s activities. At the beginning of the shift, the ICM calibrated the sound meter at 93.9 dB (to 94.00 dB).

Work for the night included removing trench plates, setting up noise barrier around work site, backfilling over water line pipe in trench, installing pipe water line trench, field assembly of waterline pipe joints and butterfly valves in Reeves yard, excavating water line trench, re-plating trench, welding and securing trench plates, setting up road closure and traffic control signs on Wilshire Blvd., transporting equipment from Reeves yard to work site, removing road closure, tabbing lanes, and sweeping/cleaning work site.

Page 17: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY

Date

Monitor

Location

Time

Compliant

Summary

Friday, August 23, 2019

Yani Pohl

Rodeo

07:30:00 to 16:00:00

Yes

Contractors/Subcontractors: TPOG.

This report was generated by Environmental Intelligence, LLC - www.enviro-intel.com - Copyright (2019) 1590 S. Pacific Coast Hwy, Suite 17 | Laguna Beach, California 92651 | (949) 497-0931

10/23

Attachment B Daily Monitoring Reports

8/18/2019 - 8/24/2019

Representatives On-Site: None

Work Location(s): Beverly Hills High School at 241 S Moreno Dr, Beverly Hills, CA 90212.

The ICM was in possession of the MOA and draft Noise Control Plan (pending approval of all parties). Work was conducted from 7:30 hours to 16:00 hours on August 23th, 2019. EI ICM Yani Pohl arrived on site at 7:30 hours. At the beginning of the shift, the ICM calibrated the sound meter at (93.9) 94.00 dB.

ICM Yani Pohl took sound readings in the back alley of the Beverly Hills High School bungalows adjacent to the project site. No sound readings were above ambient levels for the duration of the workday. No vibrational issues were documented from the work site.

Note: A total of 8 readings for fugitive dust were taken over the course of the day utilizing an Extech VPC300 Video Particle Counter with a built-in camera. Readings were at ambient levels throughout the day.

Date

Monitor

Location

Time

Compliant

Summary

Friday, August 23, 2019

Ben Rosenkoetter

Rodeo

07:45:00 to 15:45:00

No

Contractors/Subcontractors: Metro; TPOG; PSOMAS; Valverde Construction Inc; Jet Drilling;

Representatives On-Site: Luis Garcia (Metro); David Ortiz (Metro); Gene Higginbotham (Psomas); Lance Reid (Valverde); Raul Luna (Valverde); Nate Burch (TPOG); Terry Knox (ASC)

Work Location(s): Canon yard; eastbound number 3 lane of Wilshire Blvd. between N. Beverly Dr. and N. Crescent Dr.; westbound number 3 lane of Wilshire Blvd. between N. Crescent Dr. and N. Beverly Dr.; the alley between N. Canon yard and the AKA hotel; southbound number 2 lanes of S. Beverly Dr. and northbound right turn lane of S. Beverly Dr.; Number 2 lane of S. Beverly Dr and northbound right turn pocket of S. Beverly Dr. at Wilshire Blvd.

The ICM was in possession of applicable COBH-approved closure notifications and TCP for the day’s work from 07:45 hours to 15:45 hours on August 23, 2019. EI ICM Ben Rosenkoetter met with Metro Inspector Luis Garcia to discuss the day’s activities. At the beginning of the shift, the ICM calibrated the sound meter at 94.0 (from 93.9) dBA.

Work for the day included installation of lane closure per TPOG LCN 25.0.0 (Stage 4), LCN 25.0.0 (Geotech Stage 2), LCN 25.0.5, LCN 25.1.4, LCN 26.1.0, and LCN 25.1.1 (Stage 8) WRS Geotechnical Instrumentation; excavation of water line along northbound S. Beverly Dr. and southbound S. Beverly Dr., excavation for storm drain on number 3 lane of westbound Wilshire Blvd. west of N. Canon Dr., saw cutting and water jet/vacuum truck at alley between N. Canon yard and AKA hotel, and geotechnical instrumentation boring and UMP installation on southern sidewalk of Wilshire Blvd. between N. Crescent Dr. and N. Canon Dr. Work also included setting up of electrical for TPOG and Metro trailers in Canon yard.

Lane closure implementation began at 09:00 hours. Lane closure removal completed at 15:30 hours.

Violation ID #86

At 12:28 hours, ICM Benjamin Rosenkoetter observed a lane closure installed within the eastbound number 3 lane on Wiltshire Blvd. east of S. Canon. The lane was closed for approximately 2 hours to facilitate UMP installation work. The lane closure was not part of COBH traffic control plan and is therefore a violation of Article XII of the Memorandum of Agreement for contract C1120 of the Purple Line Extension Project - Section 2. The ICM notified Inspectors Luis Garcia (Metro) of the violation. This is the first incidence of this violation at this location within the last 14 days.

Page 18: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY

This report was generated by Environmental Intelligence, LLC - www.enviro-intel.com - Copyright (2019) 1590 S. Pacific Coast Hwy, Suite 17 | Laguna Beach, California 92651 | (949) 497-0931

11/23

Date

Monitor

Location

Time

Compliant

Summary

Friday, August 23, 2019

Jorge Guzman

Rodeo

08:00:00 to 15:30:00

No

Contractors/Subcontractors: Metro; TPOG; PSOMAS; Valverde Construction Inc; Jet Drilling;

Attachment B Daily Monitoring Reports

8/18/2019 - 8/24/2019

Representatives On-Site: Luis Garcia (Metro); David Ortiz (Metro); Gene Higginbotham (Psomas); Lance Reid (Valverde); Raul Luna (Valverde); Nate Burch (TPOG); Terry Knox (ASC)

Work Location(s): Canon yard; eastbound number 3 lane of Wilshire Blvd. between N. Beverly Dr. and N. Crescent Dr.; westbound number 3 lane of Wilshire Blvd. between N. Crescent Dr. and N. Beverly Dr.; the alley between N. Canon yard and the AKA hotel; southbound number 2 lanes of S. Beverly Dr. and northbound right turn lane of S. Beverly Dr.; Number 2 lane of S. Beverly Dr. and northbound right turn pocket of S. Beverly Dr. at Wilshire Blvd.

The ICM was in possession of applicable COBH-approved closure notifications and TCP for the day’s work from 08:00 hours to 15:30 hours on August 21, 2019. EI ICM Jorge Guzman met with Metro Inspector Luis Garcia to discuss the day’s activities. At the beginning of the shift, the ICM calibrated the sound meter at 94.0 (from 93.9) dBA.

Work for the day included installation of lane closure per TPOG LCN 25.0.0 (Stage 4), LCN 25.0.0 (Geotech Stage 2), LCN 25.0.5, LCN 25.1.4, LCN 26.1.0, and LCN 25.1.1 (Stage 8) WRS Geotechnical Instrumentation; excavation of water line along northbound S. Beverly Dr. and southbound S. Beverly Dr., excavation for storm drain on number 3 lane of westbound Wilshire Blvd. west of N. Canon Dr., saw cutting and water jet/vacuum truck at alley between N. Canon yard and AKA hotel, and geotechnical instrumentation boring and UMP installation on southern sidewalk of Wilshire Blvd. between N. Crescent Dr. and N. Canon Dr. Work also included setting up of electrical for TPOG and Metro trailers in Canon yard.

Lane closure implementation began at 09:00 hours. Lane closure removal completed at 15:30 hours.

Violation ID # 85

At 1115 hours ICM Jorge Guzman recorded an exceedance of 3.3 dB adjacent to receptor RD-15 in the AKA alley. The noise threshold for RD-15 at this time of day is 74 LAeq. The measured noise level was 77.3 LAeq, ambient noise was negligible at the time. RD-15 EL also experienced an overage during the same sampling period. Construction noise resulted from saw cutting in the AKA alley approximately 100 feet from the intersection of Wilshire Blvd. and the alley. Positioning of sound wall enclosure was insufficient to mitigate for noise in the direction of the sensitive receptor. The activity is in violation of Article XIV of the MOA. Mr. Guzman notified Metro inspector Luis Garcia of the violation. This is the second incidence of the violation at this location in the last 14 days.

Date

Monitor

Location

Time

Compliant

Summary

Friday, August 23, 2019

Daniel Chang

Rodeo

19:45:00 to 06:00:00

Yes

Contractors/Subcontractors: Valverde, PSOMAS, Tutor Perini, Metro, Triumph Security.

Representatives On-Site: Ariel Manalo (Metro); Joshua Lopez (Valverde); Nadim Bolous (TPOG); Ernie Tuscano (PSOMAS); Scott (TPOG).

Work Location(s): Westbound Wilshire Blvd. No.1, No.2, and No.3 lanes between Crescent Dr. and N. Canon Dr. The AKA Alley remains open. Westbound Wilshire Blvd. No.1, No.2, and No.3 lane between N. Canon Dr. and S. Reeves Dr. Eastbound Wilshire Blvd. No.1 and No.2 lane between S. Reeves Dr. and El Camino Dr. The left turn lane on westbound Wilshire Blvd. at Beverly Dr. Westbound Wilshire Blvd. No.1 and No.2 lane between Montage Alley and Beverly Dr. The left turn lane on southbound N. Canon Dr. at Wilshire Blvd. The left turn lane on eastbound Wilshire Blvd. at N. Canon Dr.

The ICM was in possession of applicable COBH-approved closure notifications and TCP for the night’s work from 19:45 hours to 6:00 hours on August 23rd, 2019. EI ICM Daniel Chang met with Metro Inspector Ariel Manalo to discuss the night’s activities. At the beginning of the shift, the ICM calibrated the sound meter at 93.9 dB (to 94.00 dB).

Work for the night included removing trench plates, gravel delivery, sand delivery, excavation of sewer lateral trenches, excavation of water line lateral trench, backfilling over water line pipe, welding water line pipe in trench, installation of water line T’s and butterfly valve, re-plating trench, welding and securing trench plates, setting up road closure and traffic control signs on Wilshire Blvd., transporting equipment from Reeves yard to work site, removing road closure, tabbing lanes, and sweeping/cleaning work site.

Page 19: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY

Photos

This report was generated by Environmental Intelligence, LLC - www.enviro-intel.com - Copyright (2019) 1590 S. Pacific Coast Hwy, Suite 17 | Laguna Beach, California 92651 | (949) 497-0931

12/23

Photos (71)

UID:

Date:

2476

Aug 18, 2019

Latitude:

Longitude:

34.066994

-118.397339

Type:

Notes

Construction Activity Elevation: - - -

Contractor loading broken concrete and asphalt into haul trucks within Wilshire Blvd.

UID:

Date:

2475

Aug 18, 2019

Latitude:

Longitude:

34.066982

-118.397797

Type:

Notes

Construction Activity Elevation: - - -

Valverde crews installing water line within Wilshire Blvd.

UID:

Date:

2528

Aug 19, 2019

Latitude:

Longitude:

34.060314

-118.412415

Type:

Notes

Construction Activity Elevation: - - -

View of the alley behind bungalows of BHHS adjacent to Constellation yard.

UID:

Date:

2527

Aug 19, 2019

Latitude:

Longitude:

34.060516

-118.41188

Type:

Notes

Construction Activity Elevation: - - -

View of Constellation yard from BHHS parking lot.

UID:

Date:

2487

Aug 19, 2019

Latitude:

Longitude:

34.06646

-118.39814

Type:

Notes

Construction Activity Elevation: - - -

Valverde excavating water line trench within northbound lane of S. Reeves Dr.

Page 20: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY

Photos

This report was generated by Environmental Intelligence, LLC - www.enviro-intel.com - Copyright (2019) 1590 S. Pacific Coast Hwy, Suite 17 | Laguna Beach, California 92651 | (949) 497-0931

13/23

UID:

Date:

2489

Aug 19, 2019

Latitude:

Longitude:

34.067078

-118.397369

Type:

Notes

Construction Activity Elevation: - - -

Valverde compacting trench within N. Canon Dr. and Wilshire Blvd. intersection.

UID:

Date:

2488

Aug 19, 2019

Latitude:

Longitude:

34.067184

-118.397446

Type:

Notes

Construction Activity Elevation: - - -

Valverde backfilling sewer line trench within the intersection of Wilshire Blvd. and N. Canon Dr.

UID:

Date:

2483

Aug 19, 2019

Latitude:

Longitude:

34.067036

-118.397491

Type:

Notes

Construction Activity Elevation: - - -

Valverde backhoe excavating sewer lateral trench and loading spoils in dump truck to transport to Reeves yard.

UID:

Date:

2482

Aug 19, 2019

Latitude:

Longitude:

34.06707

-118.398079

Type:

Notes

Construction Activity Elevation: - - -

Valverde worker preparing water line pipe in trench to connect another pipe.

UID:

Date:

2484

Aug 19, 2019

Latitude:

Longitude:

34.067032

-118.39743

Type:

Notes

Construction Activity Elevation: - - -

Valverde workers using mini excavator to remove shoring in waterline trench in preparation for backfilling over pipe.

UID:

Date:

2481

Aug 19, 2019

Latitude:

Longitude:

34.066998

-118.398177

Type:

Notes

Construction Activity Elevation: - - -

Valverde forklift transporting water line pipes to trench on Wilshire Blvd.

Page 21: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY

Photos

This report was generated by Environmental Intelligence, LLC - www.enviro-intel.com - Copyright (2019) 1590 S. Pacific Coast Hwy, Suite 17 | Laguna Beach, California 92651 | (949) 497-0931

14/23

UID:

Date:

2525

Aug 19, 2019

Latitude:

Longitude:

34.067203

-118.397451

Type:

Notes

Construction Activity Elevation: - - -

A trailer being delivered to the N. Canon yard.

UID:

Date:

2526

Aug 19, 2019

Latitude:

Longitude:

34.067257

-118.397308

Type:

Notes

Construction Activity Elevation: - - -

TPOG crew unloading trailer from delivery truck in N. Canon yard.

UID:

Date:

2478

Aug 19, 2019

Latitude:

Longitude:

34.06686

-118.39846

Type:

Notes

Construction Activity Elevation: - - -

Valverde crew setting up lane closure along northbound S. Reeves Dr.

UID:

Date:

2479

Aug 19, 2019

Latitude:

Longitude:

34.06634

-118.39805

Type:

Notes

Construction Activity Elevation: - - -

Excavator loading spoils into Valverde dump truck. Photo shows sound panels set up along the southern end of the work site to mitigate for noise.

UID:

Date:

2480

Aug 19, 2019

Latitude:

Longitude:

34.06719

-118.39737

Type:

Notes

Construction Activity Elevation: - - -

Valverde crew compacting backfill along trench at intersection of Wilshire Blvd. and N. Canon Dr.

UID:

Date:

2485

Aug 20, 2019

Latitude:

Longitude:

34.067123

-118.397781

Type:

Notes

Construction Activity Elevation: - - -

Office trailer delivery for N Canon yard.

Page 22: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY

Photos

This report was generated by Environmental Intelligence, LLC - www.enviro-intel.com - Copyright (2019) 1590 S. Pacific Coast Hwy, Suite 17 | Laguna Beach, California 92651 | (949) 497-0931

15/23

UID:

Date:

2486

Aug 20, 2019

Latitude:

Longitude:

34.066995

-118.39741

Type:

Notes

Construction Activity Elevation: - - -

Valverde dump truck unloading soil in water line trench to backfill over pipe.

UID:

Date:

2496

Aug 20, 2019

Latitude:

Longitude:

34.067059

-118.398254

Type:

Notes

Construction Activity Elevation: - - -

Valverde excavator removing metal plates from water line trench in preparation for laying pipe and installing pipe joints.

UID:

Date:

2495

Aug 20, 2019

Latitude:

Longitude:

34.066691

-118.398369

Type:

Notes

Construction Activity Elevation: - - -

Valverde crew field assembling water line pipe joint in Reeves yard.

UID:

Date:

2494

Aug 20, 2019

Latitude:

Longitude:

34.067142

-118.397224

Type:

Notes

Construction Activity Elevation: - - -

Valverde opening water line trench and removing shoring in preparation to backfill over pipe.

UID:

Date:

2530

Aug 20, 2019

Latitude:

Longitude:

34.060123

-118.412178

Type:

Notes

Construction Activity Elevation: - - -

View of crane in yard adjacent to sound wall of Constellation yard.

UID:

Date:

2529

Aug 20, 2019

Latitude:

Longitude:

34.060379

-118.412041

Type:

Notes

Construction Activity Elevation: - - -

View of Constellation yard from parking lot of BHHS.

Page 23: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY

Photos

This report was generated by Environmental Intelligence, LLC - www.enviro-intel.com - Copyright (2019) 1590 S. Pacific Coast Hwy, Suite 17 | Laguna Beach, California 92651 | (949) 497-0931

16/23

UID:

Date:

2500

Aug 20, 2019

Latitude:

Longitude:

34.066803

-118.398216

Type:

Notes

Construction Activity Elevation: - - -

Valverde crews excavating water line lateral trench within the northbound lane of S. Reeves Dr.

UID:

Date:

2501

Aug 20, 2019

Latitude:

Longitude:

34.067322

-118.399483

Type:

Notes

Construction Activity Elevation: - - -

Jet drilling conducting geotechnical boring activities within southbound number one lane within N. Beverly Dr.

UID:

Date:

2491

Aug 20, 2019

Latitude:

Longitude:

34.06697

-118.3967

Type:

Notes

Construction Activity Elevation: - - -

Water jet/vacuum truck being utilized to excavate at the intersection of the AKA alley and Wilshire Blvd.

UID:

Date:

2490

Aug 20, 2019

Latitude:

Longitude:

34.06717

-118.39948

Type:

Notes

Construction Activity Elevation: - - -

Jet Drilling rig setting up along intersection of N. Beverly Dr. and Wilshire Blvd. for geotechnical instrumentation boring.

UID:

Date:

2492

Aug 20, 2019

Latitude:

Longitude:

34.06659

-118.398

Type:

Notes

Construction Activity Elevation: - - -

Valverde crew trenching along northbound S. Reeves Dr. Excavator loading spoils into Valverde dump truck.

UID:

Date:

2493

Aug 20, 2019

Latitude:

Longitude:

34.06717

-118.39659

Type:

Notes

Construction Activity Elevation: - - -

Valverde crew setting up to saw cut along number 2 lane of Wilshire Blvd. for potholing.

Page 24: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY

Photos

This report was generated by Environmental Intelligence, LLC - www.enviro-intel.com - Copyright (2019) 1590 S. Pacific Coast Hwy, Suite 17 | Laguna Beach, California 92651 | (949) 497-0931

17/23

UID:

Date:

2497

Aug 21, 2019

Latitude:

Longitude:

34.067177

-118.398277

Type:

Notes

Construction Activity Elevation: - - -

Valverde installing water line pipe in trench.

UID:

Date:

2499

Aug 21, 2019

Latitude:

Longitude:

34.067059

-118.397514

Type:

Notes

Construction Activity Elevation: - - -

Valverde using excavator for sewer line trench shaving. Excavator loading spoils into dump truck.

UID:

Date:

2498

Aug 21, 2019

Latitude:

Longitude:

34.067135

-118.398308

Type:

Notes

Construction Activity Elevation: - - -

Valverde crew inspecting water line pipe joint and preparing to install in trench.

UID:

Date:

2532

Aug 21, 2019

Latitude:

Longitude:

34.061123

-118.412697

Type:

Notes

Construction Activity Elevation: - - -

View of Constellation yard from between Building A and BHHS bungalows.

UID:

Date:

2531

Aug 21, 2019

Latitude:

Longitude:

34.060513

-118.412102

Type:

Notes

Construction Activity Elevation: - - -

View of Constellation yard from parking lot of BHHS.

UID:

Date:

2504

Aug 21, 2019

Latitude:

Longitude:

34.067169

-118.396729

Type:

Notes

Construction Activity Elevation: - - -

Photo shows Valverde utilizing a vacuum truck to excavate sewer line manhole location within AKA Alley

Page 25: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY

Photos

This report was generated by Environmental Intelligence, LLC - www.enviro-intel.com - Copyright (2019) 1590 S. Pacific Coast Hwy, Suite 17 | Laguna Beach, California 92651 | (949) 497-0931

18/23

UID:

Date:

2503

Aug 21, 2019

Latitude:

Longitude:

34.067055

-118.398491

Type:

Notes

Construction Activity Elevation: - - -

Photo shows Valverde excavating water line trench within S. Reeves Dr.

UID:

Date:

2507

Aug 21, 2019

Latitude:

Longitude:

34.066996

-118.397469

Type:

Notes

Construction Activity Elevation: - - -

Valverde backhoe unloading sand in sewer line trench as bedding for pipe installation.

UID:

Date:

2513

Aug 21, 2019

Latitude:

Longitude:

34.067116

-118.396805

Type:

Notes

Construction Activity Elevation: - - -

Valverde mini excavator using sheep’s head attachment to compact backfilled soil in water line trench.

UID:

Date:

2505

Aug 21, 2019

Latitude:

Longitude:

34.067105

-118.39814

Type:

Notes

Construction Activity Elevation: - - -

Sand delivery truck for Valverde on Wilshire Blvd.

UID:

Date:

2509

Aug 21, 2019

Latitude:

Longitude:

34.067116

-118.396843

Type:

Notes

Construction Activity Elevation: - - -

Valverde removing water line trench plates in preparation for the nights work to backfill over pipe.

UID:

Date:

2506

Aug 21, 2019

Latitude:

Longitude:

34.067105

-118.398361

Type:

Notes

Construction Activity Elevation: - - -

Valverde connecting water line joint to pipe in trench on Wilshire Blvd.

Page 26: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY

Photos

This report was generated by Environmental Intelligence, LLC - www.enviro-intel.com - Copyright (2019) 1590 S. Pacific Coast Hwy, Suite 17 | Laguna Beach, California 92651 | (949) 497-0931

19/23

UID:

Date:

2510

Aug 21, 2019

Latitude:

Longitude:

34.06652

-118.39909

Type:

Notes

Construction Activity Elevation: - - -

Valverde crew excavating with pneumatic chipper on S. Beverly Dr.

UID:

Date:

2508

Aug 21, 2019

Latitude:

Longitude:

34.06772

-118.39873

Type:

Notes

Construction Activity Elevation: - - -

Jet Drilling rig set up at the intersection of Wilshire Blvd. and N. Beverly Dr. Sound blankets in place to mitigate for noise.

UID:

Date:

2511

Aug 21, 2019

Latitude:

Longitude:

34.0667

-118.39799

Type:

Notes

Construction Activity Elevation: - - -

Valverde crew welding and setting up water pipe along trench on northbound S. Reeves Dr.

UID:

Date:

2512

Aug 21, 2019

Latitude:

Longitude:

34.06684

-118.39954

Type:

Notes

Construction Activity Elevation: - - -

Street sweeper cleaning along N. Beverly Dr. work site to mitigate for dust.

UID:

Date:

2514

Aug 22, 2019

Latitude:

Longitude:

34.067105

-118.398392

Type:

Notes

Construction Activity Elevation: - - -

Valverde excavator lowering pipe into trench and crew positioning and installing pipe in place.

UID:

Date:

2515

Aug 22, 2019

Latitude:

Longitude:

34.067108

-118.398532

Type:

Notes

Construction Activity Elevation: - - -

Valverde backhoe excavating water line lateral trench at Wilshire and Montage Alley. Backhoe loading spoils in dump truck to transport to Reeves yard.

Page 27: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY

Photos

This report was generated by Environmental Intelligence, LLC - www.enviro-intel.com - Copyright (2019) 1590 S. Pacific Coast Hwy, Suite 17 | Laguna Beach, California 92651 | (949) 497-0931

20/23

UID:

Date:

2519

Aug 22, 2019

Latitude:

Longitude:

34.0672

-118.39745

Type:

Notes

Construction Activity Elevation: - - -

Water jet vacuum truck set up on westbound number 3 lane west of the intersection of N. Canon Dr. and Wilshire Blvd. Valverde crew implemented sound enclosure to mitigate for noise.

UID:

Date:

2517

Aug 22, 2019

Latitude:

Longitude:

34.06726

-118.39936

Type:

Notes

Construction Activity Elevation: - - -

Jet Drilling rig set up at intersection of N. Beverly Dr. and Wilshire Blvd. Geotech boring for instrumentation completed at the end of the day, 08/22/2019.

UID:

Date:

2534

Aug 22, 2019

Latitude:

Longitude:

34.060772

-118.412689

Type:

Notes

General Elevation: - - -

Location of a monitor in alley between Constellation yard and BHHS bungalows.

UID:

Date:

2535

Aug 22, 2019

Latitude:

Longitude:

34.060646

-118.412605

Type:

Notes

Construction Activity Elevation: - - -

Location of a monitor in alley between Constellation yard and BHHS bungalows.

UID:

Date:

2533

Aug 22, 2019

Latitude:

Longitude:

34.060577

-118.411865

Type:

Notes

Construction Activity Elevation: - - -

View of Constellation yard from parking lot of BHHS.

Page 28: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY

Photos

This report was generated by Environmental Intelligence, LLC - www.enviro-intel.com - Copyright (2019) 1590 S. Pacific Coast Hwy, Suite 17 | Laguna Beach, California 92651 | (949) 497-0931

21/23

UID:

Date:

2518

Aug 22, 2019

Latitude:

Longitude:

34.067101

-118.398521

Type:

Notes

Construction Activity Elevation: - - -

Valverde skid steer unloading sand in water line trench as bedding for pipe installation.

UID:

Date:

2516

Aug 22, 2019

Latitude:

Longitude:

34.067146

-118.396568

Type:

Notes

Construction Activity Elevation: - - -

Valverde backhoe excavating water line lateral trench on Wilshire Blvd. south of AKA Alley. Sound blankets set up on north side of work to mitigate noise.

UID:

Date:

2524

Aug 22, 2019

Latitude:

Longitude:

34.0671017

-118.397537

Type:

Notes

Construction Activity Elevation: - - -

Valverde mini excavator removing shoring from sewer lateral trench in preparation for backfilling.

UID:

Date:

2537

Aug 22, 2019

Latitude:

Longitude:

34.06707

-118.397911

Type:

Notes

Construction Activity Elevation: - - -

Valverde crews excavating water line location within S. Reeves Dr.

UID:

Date:

2538

Aug 22, 2019

Latitude:

Longitude:

34.06765

-118.397583

Type:

Notes

Construction Activity Elevation: - - -

Valverde utilizing a vacuum truck to excavate storm water line within Wilshire Blvd. west of N. Canon Dr.

UID:

Date:

2540

Aug 23, 2019

Latitude:

Longitude:

34.067024

-118.398453

Type:

Notes

Construction Activity Elevation: - - -

Sand delivery truck for Valverde.

Page 29: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY

Photos

This report was generated by Environmental Intelligence, LLC - www.enviro-intel.com - Copyright (2019) 1590 S. Pacific Coast Hwy, Suite 17 | Laguna Beach, California 92651 | (949) 497-0931

22/23

UID:

Date:

2539

Aug 23, 2019

Latitude:

Longitude:

34.067089

-118.397812

Type:

Notes

Construction Activity Elevation: - - -

Valverde worker breaking through pipe in sewer lateral trench on Wilshire Blvd. west of N. Canon Dr.

UID:

Date:

2541

Aug 23, 2019

Latitude:

Longitude:

34.066906

-118.398277

Type:

Notes

Construction Activity Elevation: - - -

Haul truck unloading gravel delivery for Valverde in Reeves yard.

UID:

Date:

2546

Aug 23, 2019

Latitude:

Longitude:

34.067146

-118.397629

Type:

Notes

Construction Activity Elevation: - - -

Hand digging sewer lateral trench at intersection of N. Canon Dr. and Wilshire Blvd.

UID:

Date:

2550

Aug 23, 2019

Latitude:

Longitude:

34.066853

-118.399124

Type:

Notes

Construction Activity Elevation: - - -

Photo shows contractor excavating trench within the southbound curb lane of S. Beverly Dr.

UID:

Date:

2551

Aug 23, 2019

Latitude:

Longitude:

34.067028

-118.39727

Type:

Notes

Construction Activity Elevation: - - -

Jet Drilling conducting geotechnical borings within sidewalk at 9420 Wilshire Blvd.

UID:

Date:

2594

Aug 23, 2019

Latitude:

Longitude:

34.060169

-118.41201

Type:

Notes

Construction Activity Elevation: - - -

View of Constellation yard from BHHS parking lot.

Page 30: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY

Photos

This report was generated by Environmental Intelligence, LLC - www.enviro-intel.com - Copyright (2019) 1590 S. Pacific Coast Hwy, Suite 17 | Laguna Beach, California 92651 | (949) 497-0931

23/23

UID:

Date:

2593

Aug 23, 2019

Latitude:

Longitude:

34.061176

-118.412926

Type:

Notes

Construction Activity Elevation: - - -

View of Constellation yard from BHHS between bungalows and Building A.

UID:

Date:

2545

Aug 23, 2019

Latitude:

Longitude:

34.06708

-118.39701

Type:

Notes

Construction Activity Elevation: - - -

TPOG water jet vacuum rig set up with noise mitigating panels.

UID:

Date:

2544

Aug 23, 2019

Latitude:

Longitude:

34.06704

-118.39698

Type:

Notes

Construction Activity Elevation: - - -

Jet Drilling rig for geotechnical instrumentation set up on the southern sidewalk of Wilshire Blvd. west of S. Canon Dr.

UID:

Date:

2543

Aug 23, 2019

Latitude:

Longitude:

34.06724

-118.39948

Type:

Notes

Construction Activity Elevation: - - -

Valverde crews excavating for water lines on southbound number 2 lane and northbound right turn lane of S. Beverly Dr.

UID:

Date:

2548

Aug 24, 2019

Latitude:

Longitude:

34.067139

-118.396729

Type:

Notes

Construction Activity Elevation: - - -

Valverde excavator removing metal trench plates from water line lateral trench at entrance to AKA Alley.

UID:

Date:

2547

Aug 24, 2019

Latitude:

Longitude:

34.067165

-118.398285

Type:

Notes

Construction Activity Elevation: - - -

Valverde backhoe unloading soil in trench for backfilling over water line pipe.

Page 31: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY

1590 South Coast Highway Suite #17, Laguna Beach, California, 92651 • Phone: 949.497.0931 • www. enviro-intel.com

Attachment C – Construction Noise Monitoring Results

Receptor

ID

Time of

Measurement

Measured

Noise Level

Leq (15-

Minute)

Applicable

Noise

Threshold

Exceeded

Threshold? Notes

August 18, 2019

RD-7 9:41 74 80 No Valverde crews beginning to install water line within Wilshire Blvd.

RD-16 10:20 76.2 75 Yes

Valverde crews utilizing skid steer mounted breaker within Wilshire

Blvd.

RD-10 10:41 59 68 No Valverde crews breaking concrete within Wilshire Blvd.

RD-16 11:15 73.2 75 No Valverde crews breaking pavement within Wilshire Blvd.

RD-8 13:41 65.3 70 No Valverde crews breaking pavement within Reeves Dr.

RD-2 14:51 69.7 80 No Valverde crews breaking pavement within Wilshire Blvd.

RD-8 15:15 71.6 75 No Valverde crews removing asphalt from trench in Reeves Dr.

RD-7 17:34 74.1 80 No Valverde continues water line installation and welding plates.

August 19, 2019

RD-16 5:08 66.3 71 No Trailer getting delivered to N Canon yard.

RD-8 9:30 70.3 75 No Valverde crews excavating trench within Reeves Dr. closure.

RD-5 9:40 64.4 68 No

Valverde crew trenching along S. Reeves Dr. from alley to Wilshire

Blvd. Crew utilizing excavator for trenching activities and

implementing sound panels for noise mitigation.

RD-5 10:07 69 66 Yes

Valverde crew trenching along S. Reeves Dr. from alley to Wilshire

Blvd. Crew utilizing excavator for trenching activities and

implementing sound panels for noise mitigation.

During reading, emergency vehicles heading eastbound on Wilshire

Blvd. increased non-project related noise to a level causing

exceedance of threshold.

RD-5 10:30 64.5 66 No

Valverde crew trenching along S. Reeves Dr. from alley to Wilshire

Blvd. Crew utilizing excavator for trenching activities and

implementing sound panels for noise mitigation.

Page 32: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY

1590 South Coast Highway Suite #17, Laguna Beach, California, 92651 • Phone: 949.497.0931 • www. enviro-intel.com

Receptor

ID

Time of

Measurement

Measured

Noise Level

Leq (15-

Minute)

Applicable

Noise

Threshold

Exceeded

Threshold? Notes

RD-5 11:07 62.8 65 No

Valverde crew trenching along water line with excavator on

northbound lane of S. Reeves Dr. crew utilizing sound panels to

mitigate for work noise.

RD-5 11:30 70 66 Yes

Valverde crew trenching along water line with excavator on

northbound lane of S. Reeves Dr. crew utilizing sound panels to

mitigate for work noise.

During reading, non-project related delivery truck utilized the loading

zone in front of 120 S. Reeves Dr. Delivery truck utilized high impact

backup alarm and increased noise levels to exceedance of threshold.

RD-16 11:41 66.8 75 No

Valverde crews backfilling storm water line trench within Wilshire/N

Canon intersection.

RD-16 13:27 67.2 76 No

Valverde crews backfilling sewer line trench within Canon/Wilshire

intersection.

RD-15 13:49 64.9 75 No

Valverde hand digging within Alley. TPOG using pneumatic shovel

to prep bollard locations within N Canon yard.

RD-16 14:12 65.8 74 No

Valverde crews compacting backfill within trench in N. Canon/

Wilshire intersection.

RD-5 14:45 64.6 65 No

Street sweeper cleaning along northbound S. Reeves Dr. at end of

activity in work site.

RD-8 22:49 65.1 69 No

Valverde installing water line pipe in trench. Skid steer laying sand in

trench, excavator digging sewer lateral trench on Wilshire Blvd.

RD-8 23:16 58.2 68 No

Valverde using impact wrench to secure pipe joint to pipe. Valverde

using forklift to hold pipe up while wrapping it in protective

covering. Impact wrench running causes approximately 67db

disturbance as it tightens screws.

August 20, 2019

RD-6 0:21 57 70 No

Valverde backhoe excavating lateral trench for sewer line at Wilshire

Blvd. and N. Canon intersection.

Page 33: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY

1590 South Coast Highway Suite #17, Laguna Beach, California, 92651 • Phone: 949.497.0931 • www. enviro-intel.com

Receptor

ID

Time of

Measurement

Measured

Noise Level

Leq (15-

Minute)

Applicable

Noise

Threshold

Exceeded

Threshold? Notes

RD-8 0:39 58 67 No

Sawcutting shoring in Reeves yard causes 62 dB disturbance while

saw is active. Construction crew installing water line pipe in trench

on Wilshire Blvd.

RD-8 1:07 62.5 63 No

Valverde crew using impact wrench to connect water line pipe joints

together. When torque wrench is tightening screws, it causes a 70db

disturbance. LEQ is able to drop back down to acceptable thresholds

as the wrench is not consistently tightening the screws.

RD-8 2:34 56 62 No

Valverde forklift holding pipe in place while workers secure and

install pipe in trench.

RD-6 3:49 53.8 68 No

Valverde backhoe excavating sewer lateral trench at intersection of

Wilshire Blvd. and N. Canon Dr.

RD-8 4:14 56.5 63 No Construction excavator re-plating water line trench on Wilshire Blvd.

RD-8 9:22 66.9 75 No

Valverde crews continuing water line excavation within S. Reeves

Dr.

RD-7 9:46 73.9 87 No Valverde crews continuing to excavate water line trench in S. Reeves.

RD-2 10:15 79.2 80 No Jet Drilling conducting geotechnical borings within N. Beverly.

RD-3 10:37 69.6 75 No Jet Drilling conducting geotechnical borings within N. Beverly.

RD-7 11:22 75.4 81 No Valverde continuing to excavate water lateral trench in S. Reeves.

RD-2 12:01 73.7 81 No Jet Drilling continue geotechnical borings within N. Beverly.

RD-3 12:40 68.4 76 No Jet Drilling conducting geotechnical borings within N. Beverly.

RD-2 13:05 75 80 No Jet Drilling continue geotechnical borings within N. Beverly.

RD-8 13:48 67.1 75 No Valverde welding plates and sweeping S. Reeves Dr.

RD-2 14:41 71.3 80 No Jet drilling cleaning up site within Beverly Dr.

August 21, 2019

RD-8 0:05 55.2 67 No

Field assembly of water pipe joint in Reeves yard (no impact wrench

used at this time). Excavator loading dump truck with soil in Reeves

yard.

Page 34: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY

1590 South Coast Highway Suite #17, Laguna Beach, California, 92651 • Phone: 949.497.0931 • www. enviro-intel.com

Receptor

ID

Time of

Measurement

Measured

Noise Level

Leq (15-

Minute)

Applicable

Noise

Threshold

Exceeded

Threshold? Notes

RD-15 0:26 54.9 71 No

Valverde dump truck unloading soil in water line trench for

backfilling over pipe. Mini-excavator compacting soil with sheep

head attachment.

RD-8 0:58 54.1 63 No

Field assembly of water pipe joint in Reeves yard (no impact wrench

used at this time). Excavator loading dump truck with soil in Reeves

yard.

RD-8 2:00 56.6 62 No

Construction excavator loading soil in dump truck to transport to

water line trench and backfill over pipe. Construction street sweeper

cleaning Wilshire Blvd.

RD-8 2:49 60.2 62 No

Construction excavator driving on Wilshire Blvd. is audible.

Construction street sweeper cleaning Wilshire Blvd. Grinding pipe

edge in Reeves yard causes approximately 62-63 dB of noise

disturbance while active, inconsistent use of equipment throughout

reading keeps LEQ threshold.

RD-8 4:00 58.5 63 No

Valverde using grinder to grind edge of water line pipe in Reeves

yard. Grinding causes approximately 62-62.5 dB of disturbance while

active. Inconsistent use of grinder allows LEQ to remain under

threshold.

RD-8 5:01 57 66 No

Construction excavator re-playing water line trench. Construction

street sweeper cleaning Wilshire Blvd. Workers loading equipment

onto truck and transporting to Reeves yard.

RD-8 9:30 64.1 75 No Valverde excavating water line trench within S. Reeves.

RD-2 10:15 74.5 80 No

Jet Drilling drill rig in operation along intersection of N. Beverly Dr.

and Wilshire Blvd. Sound blanket enclosure in place around work

site.

RD-2 10:38 75.8 80 No

Jet Drilling drill rig in operation along intersection of N. Beverly Dr.

and Wilshire Blvd. Sound blanket enclosure in place around work

site.

Page 35: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY

1590 South Coast Highway Suite #17, Laguna Beach, California, 92651 • Phone: 949.497.0931 • www. enviro-intel.com

Receptor

ID

Time of

Measurement

Measured

Noise Level

Leq (15-

Minute)

Applicable

Noise

Threshold

Exceeded

Threshold? Notes

RD-15 10:42 73 73 No

Valverde crews excavating sewer manhole location with vacuum

trucks.

RD-15 11:00 73 75 No Valverde continue vac-truck excavation of sewer manhole location.

RD-2 11:22 73.9 79 No

Jet Drilling drill rig in operation along intersection of N. Beverly Dr.

and Wilshire Blvd. Sound blanket enclosure in place around work

site.

RD-2 12:00 76.1 82 No

Jet Drilling drill rig in operation along intersection of N. Beverly Dr.

and Wilshire Blvd. Sound blanket enclosure in place around work

site.

During reading, wind gust blew sound blankets out of place

temporarily until crew were able to reset loose blankets.

RD-7 12:00 72.8 82 No Valverde crew excavating along trench on northbound S. Reeves Dr.

RD-3 12:30 76.9 76 Yes

Valverde crew utilizing pneumatic chipper to excavate along

southbound number 2 lane of S. Beverly Dr. Crew implemented

sound enclosure to mitigate for noise from equipment.

RD-11 12:33 75.6 80 No

UMP being installed within Wilshire, vac-truck excavation ongoing

at AKA Alley.

RD-8 13:36 66.7 75 No Valverde crew excavating along trench on northbound S. Reeves Dr.

RD-2 13:40 71.4 80 No

Jet Drilling crew rigging down and cleaning for end of day at

intersection of N. Beverly Dr. and Wilshire Blvd.

RD-5 14:20 65 65 No

Valverde crew breaking down sound panels along southern end of S.

Reeves Dr. closure. Crew demobilizing equipment and machinery

and welding trench plates together.

RD-5 14:45 64.6 65 No

Street sweeper cleaning along northbound S. Reeves Dr. at end of

activity in work site.

RD-15 22:32 59.4 78 No

Construction excavator removing metal trench plates from water line

trench on Wilshire Blvd.

Page 36: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY

1590 South Coast Highway Suite #17, Laguna Beach, California, 92651 • Phone: 949.497.0931 • www. enviro-intel.com

Receptor

ID

Time of

Measurement

Measured

Noise Level

Leq (15-

Minute)

Applicable

Noise

Threshold

Exceeded

Threshold? Notes

RD-15 23:23 61.5 66 No

Valverde backfilling over pipe in water line trench. Dump truck

unloading soil into trench on Wilshire Blvd. Construction excavator

compacting soil with sheep’s head attachment.

RD-15 23:52 60.7 66 No

Construction excavator compacting soil in water line trench with

sheep’s head attachment.

August 22, 2019

RD-16 0:30 65.4 76 No

Water jet /vacuum truck being utilized to excavate water line west of

N. Canon Rd. and Wilshire Blvd. intersection. Sound enclosure in

place to mitigate for noise.

RD-6 1:27 60.9 66 No

Valverde backhoe transporting sand from Reeves yard and pouring in

sewer later trench at intersection of Wilshire and N. Canon Dr.

RD-8 -

EL 2:00 62.8 62 Yes

Construction excavator loading soil in dump truck in Reeves yard.

City of Beverly Hills street sweeper driving on Wilshire Blvd and S.

Reeves Dr.

RD-6 2:02 60.4 69 No

Valverde dump truck unloading soil in sewer lateral trench at

Wilshire and N. Canon Dr. intersection. Construction street sweeper

cleaning Wilshire Blvd.

RD-8 2:29 57.7 62 No

Construction excavator loading soil into dump truck in Reeves yard.

Construction backhoe excavating water line lateral trench on Wilshire

Blvd at Montage Alley.

RD-8 3:30 59.2 61 No

Field assembly of water line pipe joint in Reeves yard. Backhoe

excavating sewer lateral trench on Wilshire Blvd. west of S. Reeves

Dr. Construction backhoe transporting equipment from Wilshire

Blvd. closure to Reeves yard.

RD-8 4:00 58.4 63 No

Construction backhoe scooping soil in Reeves yard and driving on

Wilshire Blvd. to unload in water line trench at intersection of N.

Canon Dr. and Wilshire Blvd. Field assembly of pipe joint in Reeves

yard is utilizing an impact wrench, audible and causes spurts of 57 dB

instantaneous disturbances throughout reading.

Page 37: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY

1590 South Coast Highway Suite #17, Laguna Beach, California, 92651 • Phone: 949.497.0931 • www. enviro-intel.com

Receptor

ID

Time of

Measurement

Measured

Noise Level

Leq (15-

Minute)

Applicable

Noise

Threshold

Exceeded

Threshold? Notes

RD-8 4:32 60.5 63 No

Valverde crew assembling pipe joint in Reeves yard. Impact wrench

is audible but does not produce an exceedance. Construction street

sweeper cleaning Wilshire Blvd.

RD-8 9:17 72 75 No Valverde continuing water line lateral work within S. Reeves.

RD-2 10:01 74.8 80 No Jet Drilling preparing to install instrumentation within N. Beverly Dr.

RD-15 10:15 68.4 73 No

Valverde setting up sound enclosure and positions water jet vacuum

truck in road closure along Wilshire Blvd. and AKA Alley.

RD-2 10:45 73 80 No

Jet Drilling rig in operation of intersection of N. Beverly Dr. and

Wilshire Blvd. Drilling and setting up for sample collection.

RD-15 10:45 69.3 73 No

Valverde crew and water jet vacuum truck operator test noise level of

equipment and adjust sound enclosure to aid in noise mitigation.

RD-7 11:00 75.7 82 No Valverde installing water line connections in S. Reeves.

RD-15 11:10 74.3 74 Yes

Water jet vacuum truck utilized for excavating at intersection of AKA

Alley and Wilshire Blvd. Sound enclosure utilized at north end of

work site to mitigate for noise.

Saw cutting for pot holing in westbound number 2 lane of Wilshire

Blvd. occurring concurrently. Sound enclosure utilized around saw

cutting activities to mitigate for noise.

RD-16 11:15 69.1 75 No

Water jet/vacuum truck utilized for excavation of water line west of

N. Canon Dr. and Wilshire Blvd. intersection. Valverde crew set up

sound enclosure to mitigate for noise.

RD-15 11:25 74.3 74 Yes

Water jet vacuum truck utilized for excavating at intersection of AKA

Alley and Wilshire Blvd. Sound enclosure utilized at north end of

work site to mitigate for noise.

Saw cutting for pot holing in westbound number 2 lane of Wilshire

Blvd. occurring concurrently. Sound enclosure utilized around saw

cutting activities to mitigate for noise.

During reading at 3:00 minutes, emergency vehicles heading

westbound on Wilshire Blvd. increasing ambient noise levels.

Page 38: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY

1590 South Coast Highway Suite #17, Laguna Beach, California, 92651 • Phone: 949.497.0931 • www. enviro-intel.com

Receptor

ID

Time of

Measurement

Measured

Noise Level

Leq (15-

Minute)

Applicable

Noise

Threshold

Exceeded

Threshold? Notes

RD-2 11:45 73.7 79 No Jet Drilling crew clearing borehole for instrumentation and casing.

RD-11 12:05 73.9 80 No

Water jet vacuum truck utilized for excavating at intersection of AKA

Alley and Wilshire Blvd. Sound enclosure utilized at north end of

work site to mitigate for noise.

Saw cutting for pot holing in westbound number 2 lane of Wilshire

Blvd. occurring concurrently. Sound enclosure utilized around saw

cutting activities to mitigate for noise.

RD-11 12:25 77.7 80 No

Water jet vacuum truck utilized for excavating at intersection of AKA

Alley and Wilshire Blvd. Sound enclosure utilized at north end of

work site to mitigate for noise.

Valverde crew utilizing skid steer with breaker attachment to break

asphalt for pot holing in westbound number 2 lane of Wilshire Blvd.

Sound enclosure utilized around saw cutting activities to mitigate for

noise.

Jet Drilling crew utilizing core drill and gas-powered generator for

UMP installation along number 2 land of Wilshire Blvd. Noise

blanket placed over generator to mitigate for noise.

RD-2 12:41 73.1 82 No Jet Drilling installing clinometer within N. Beverly.

RD-15 13:00 70.9 77 No

Water jet vacuum truck utilized for potholing along westbound

number 2 lane of Wilshire Blvd. east of S. Canon Dr. Sound

enclosure utilized to mitigate for noise.

RD-2 13:10 73.2 80 No

Jet Drilling rig on intersection of N. Beverly Dr. and Wilshire Blvd.

pulling casing from borehole. Crew removing and setting casings in

support truck.

RD-10 13:31 63.3 73 No

Water jet vacuum truck utilized for potholing along westbound

number 2 lane of Wilshire Blvd. east of S. Canon Dr. Sound

enclosure utilized to mitigate for noise.

Page 39: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY

1590 South Coast Highway Suite #17, Laguna Beach, California, 92651 • Phone: 949.497.0931 • www. enviro-intel.com

Receptor

ID

Time of

Measurement

Measured

Noise Level

Leq (15-

Minute)

Applicable

Noise

Threshold

Exceeded

Threshold? Notes

RD-11 14:00 72.1 80 No

Skid steer with grinder attachment utilized to create a recess for

trench plate at potholing location on westbound number 2 lane of

Wilshire Blvd. east of S. Canon Dr.

RD-16 14:06 68.4 74 No

Valverde utilizing water jet/vacuum truck for excavation of storm

drain line west of N. Canon Dr. and Wilshire Blvd. intersection. Crew

implemented sound enclosure to mitigate for noise.

RD-15 21:45 59.8 71 No

Construction excavator digging water line trench and loading soil in

dump truck on Wilshire Blvd.

RD-11 -

EL 21:45 81.4 78 Yes

Valverde backhoe excavating water line trench and loading spoils

into dump truck on Wilshire Blvd south of AKA Alley. Noise

overage due to fire truck and ambulance driving on Wilshire Blvd.

westbound at approximately 21:34 hours.

RD-15 22:20 61.1 78 No

Valverde backhoe excavating lateral water line trench and loading

spoils in dump truck on Wilshire Blvd. south of AKA Alley.

RD-15 23:02 62.3 66 No

Construction backhoe excavating water line lateral trench and loading

spoils in dump truck.

RD-15 23:41 59.8 66 No

Valverde backhoe excavating water line lateral trench and loading

soil in dump truck on Wilshire Blvd. south of AKA Alley.

August 23, 2019

RD-6 0:16 64.1 70 No

Valverde dump truck unloading soil in sewer lateral trench at

intersection of Wilshire and N. Canon Drive. Valverde mini

excavator using sheep’s head attachment to compact backfill.

Motorcycle on N. Canon Dr. at 12:24 hours caused 90.5 dB

instantaneous disturbance and raised LEQ to 65db.

RD-15 1:41 54.7 72 No

Construction backhoe excavating water line lateral trench and loading

soil in dump truck.

RD-8 2:18 52.2 62 No

Valverde installing water line pipe on Wilshire Blvd. west of S.

Reeves Dr.

Page 40: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY

1590 South Coast Highway Suite #17, Laguna Beach, California, 92651 • Phone: 949.497.0931 • www. enviro-intel.com

Receptor

ID

Time of

Measurement

Measured

Noise Level

Leq (15-

Minute)

Applicable

Noise

Threshold

Exceeded

Threshold? Notes

RD-8 3:05 55 61 No

Valverde backhoe picking up soil from Reeves yard and unloading in

water line trench on Wilshire Blvd. for backfilling over pipe.

RD-15 3:32 58.3 63 No

Valverde backhoe re-playing water line trench on Wilshire Blvd.

south of AKA Alley. Valverde crew loading equipment onto truck

and transporting to Reeves yard. Police sirens at 3:43 hours from

unknown location causes approximately 64db disturbance for 2

minutes and raised LEQ to 60db when previously residing at

approximately 57.6db.

RD-15 3:51 63.3 63 Yes

Construction street sweeper cleaning Wilshire Blvd. worksite south

of AKA Alley. Valverde crew securing metal plates with coldmix.

RD-7 8:25 74.6 82 No

Non-project work at 9401 Wilshire. No project related work

occurring.

RD-16 10:34 68.2 75 No

Valverde crews excavating and chipping with pneumatic concrete

chipper in westbound number 3 lane of Wilshire Blvd., west of

intersection with N. Canon Dr. Sound enclosure implemented to

mitigate for noise.

RD-10 10:45 63 73 No

Jet drilling preparing to drill within sidewalk at S. Canon and

Wilshire.

RD-15 11:00 77.3 74 Yes

TPOG crew saw cutting in AKA Alley for electrical connections to

Canon yard. Sound enclosure utilized to mitigate for noise, however

noise impacts from construction activities still exceeded threshold.

Elevated meter alerted to overage as well.

RD-15 11:16 75 74 Yes

TPOG crew saw cutting in AKA Alley for electrical connections to

Canon yard. Sound enclosure utilized to mitigate for noise, however

noise impacts from construction activities still exceeded threshold.

Elevated meter alerted to overage as well.

RD-10 12:33 64.8 79 No

Jet Drilling rig in operation on southern sidewalk west of Wilshire

Blvd. and S. Canon Dr. intersection. Jet Drilling crew using core

Page 41: Subject: August 18, 2019 August 24, 2019...811 West 7th Street, 9th Floor, Los Angeles, California, 90017 • Phone: 424.263.9359 • www. enviro-intel.com TABLE I: VIOLATION SUMMARY

1590 South Coast Highway Suite #17, Laguna Beach, California, 92651 • Phone: 949.497.0931 • www. enviro-intel.com

Receptor

ID

Time of

Measurement

Measured

Noise Level

Leq (15-

Minute)

Applicable

Noise

Threshold

Exceeded

Threshold? Notes

driller on southern sidewalk east of S. Canon Dr. and Wilshire Blvd.

intersection for UMP installation.

RD-16 12:55 70.3 76 No

Jet Drilling rig in operation on southern sidewalk of Wilshire Blvd.

west of S. Canon Dr. Noise blanket barrier is utilized to mitigate for

noise.

RD-3 13:15 70.8 75 No Valverde excavating water line within S. Beverly Dr.

RD-11 13:30 71.5 84 No

Jet Drilling rig in operation on southern sidewalk of Wilshire Blvd.

west of S. Canon Dr.

RD-10 14:16 63.8 73 No Jet drilling completing drilling activities on Wilshire Blvd.

RD-8 22:56 61.8 69 No

Valverde excavating sewer lateral trench. Excavator loading soil in

dump truck in Reeves yard. Traffic on Wilshire Blvd. Metal plates on

S. Reeves Dr. rattle when cars drive over them.

August 24, 2019

RD-6 1:16 60 66 No

Construction excavator digging sewer lateral trench at intersection of

Wilshire and N. Canon Dr.

RD-15 1:39 61 72 No

Construction excavator lifting and removing metal trench plates from

waterline trench at AKA Alley entrance.

RD-15 2:00 61.6 63 No

Valverde excavator digging water line lateral trench and loading soil

in dump truck on Wilshire Blvd. at entrance of AKA Alley.

RD-15 2:47 55.7 63 No

Valverde excavator digging water line lateral trench and loading soil

in dump truck on Wilshire Blvd. at entrance of AKA Alley.

RD-15 4:02 60 63 No

Valverde welding and securing metal plates at AKA Alley entrance

with coldmix. Construction skid steer is audible transporting cold mix

to worksite. Welding generator is audible.