Page 1: Subawards Training Presentation

Subgrants & Subcontracts Training

1

Nov 2014

Page 2: Subawards Training Presentation

Drafting, execution, and termination of outgoing subgrants and subcontracts

Purchase order creation, management, and termination

2

Page 3: Subawards Training Presentation

A subgrant or subcontract is necessary when:◦ The site will perform work which satisfies a direct

objective or deliverable of the Prime Award◦ The site will be responsible for programmatic

decisions or design related to the project/study under the Prime Award

◦ The site will be held accountable to the compliance regulations of the Prime Award (COI, IP, etc) or may seek to publish/co author the study results

◦ The site will use the Prime Award funds to carry out its own programmatic work

◦ The site provides cost sharing or has key personnel mentioned in the NGA

3

Page 4: Subawards Training Presentation

Service/Vendor Agreement (drafted by Purchasing, PO set up by dept):◦ If the site is providing standard services (those in the normal

operations and markets to a variety of customers)◦ If the site has not/will not provide significant contributions to

the design/conduct of the project◦ If the site is not responsible for the project results◦ If the site performs work that involves routine or repeated

activities◦ If the site will not seek to publish or co-author based on the

academic standards such as the ICJME standards Storage (drug, supplies, etc.) Website design & management for a clinical trial. KKI Kirby Center Agreements Draft Examples: http://ssc.jhmi.edu/supplychain/forms/index.html

Data Use Agreement Complex Material Transfer Agreement Collaboration Agreement

4

Page 5: Subawards Training Presentation

Subaward Agreements under ◦ Federal and state grants/contracts◦ Foundation grants◦ Commercial contracts

Subaward Agreements with funding from multiple sources◦ Please try to make us aware of all the sources of funding

(commercial and non-commercial) for the Subaward Agreements under internal JHU awards (800

IOs)

5

Page 6: Subawards Training Presentation

INTERNALNTAP – Neurofibromatosis Therapeutic Acceleration Program ABTC – Adult Brain Tumor ConsortiumPACKARD – The Robert Packard Center for ALS Research

OTHERTBCRC – Translational Breast Cancer ConsortiumCRN – Clinical Research Network (AAHSRI, GBMC, INOVA, PRMC, RHMC)

6

Page 7: Subawards Training Presentation

7

Page 8: Subawards Training Presentation

For originals: A Subaward Determination Form

This is completed and signed by the JHU PI, and uploaded into COEUS during the proposal phase. The outgoing subs team will sign for ORA and keep the form in the Subaward file

A Subaward Information Sheet A budget for the subsite A statement of work for the subsite IRB/IACUC approval for the subsite (if applicable) Wire transfer agreements for subsites in foreign countries Conflict of Interest Documentation (Federal Prime)

if site is not in the FDP Clearinghouse http://sites.nationalacademies.org/PGA/fdp/PGA_070596

And for new sites… Questionnaire, DUNS #, SAM registration, W9 (domestic), W8 (foreign, using domestic bank)

For modifications: A Subaward Information Sheet A budget for the subsite A statement of work (but only if it has changed significantly) Updated IRB/IACUC approval (if applicable) Conflict of Interest Documentation (Federal Prime)

if site is not in the FDP Clearinghouse

8

Page 9: Subawards Training Presentation

[email protected] processing and assignment to a Subawards Team Member

Subawards Specialists draft subs under Federal Grants When the prime award is a federal contract, a commercial contract, or an award from a foundation, it will be handled by:

◦ Melody: Original subcontracts under federal and all commercial contracts CRN SSA’s, NTAP, TBCRC, internal accounts

◦ Michelle: Subs under foundation awards Modifications of subcontracts under federal contracts ABTC

9

Page 10: Subawards Training Presentation

JHU contact information The “Financial Contact” is the person who processes invoices and

goods receipts The “Study Contact” is the person who can answer scientific

questions about the protocol. Most recent subsite contact information

In most cases, the contact should be in the Research Administration office at the subsite.

Verify that it is current each year an Information Sheet is submitted. SAP grant #, COEUS IPN #, Prime award/contract IO #, PI’s cost center

# Sponsor grant/contract # (JHU is only the “sponsor” under 800 act's) Deliverables and due dates/time-lines for new/revised SOW’s Whether animal and/or human subjects research is going to be

conducted at the subsite. Budget Period for the sub & amount to pay the subsite (PO amount) Information related to the Study for Clinical Trials Information related to Transfer of drug, equipment or materials.

10

Page 11: Subawards Training Presentation

11

Page 12: Subawards Training Presentation

Alternately known as a “work scope”, the SOW is a short paragraph describing what the Subsite is doing. The SOW should NOT be a summary of the whole grant.

The SOW should also state what the subsite is going to provide to JHU in exchange for being paid (“deliverables”). ◦ Examples include patient data from clinical trials, blood samples,

tissue samples, assays, scans, and analysis of samples, or even reports/publications and conference calls to discuss results.

Deliverables can be tied to payment (Fixed fee budgets: the site will be paid $10,000 for every five patients it enrolls)

SOW should be understandable to non-scientists. The SOW is used in a dispute to determine whether the site

is performing in accordance with the agreement, so be clear and specific.

The Deliverables table will be part of the SOW and subaward and should include concrete due dates/time lines

12

Page 13: Subawards Training Presentation

It is up to the Subsite’s IRB/IACUC to determine whether human subjects and/or vertebrate animals research is being conducted.

ORA does NOT need the Subsite IRB approval to send the Agreement, but we must have it to fully-execute the Agreement.

KKI and the CRN site Study Team Members should be included as part of the JHU IRB approval prior to submission of paperwork to ORASUBS

13

Page 14: Subawards Training Presentation

Contains bank account and payment information for the Subsite.

Is attached to the Subaward as an exhibit

Must be copied onto Subsite letterhead New foreign vendors also require a W8 if the site is using a domestic bank

NOTE: new domestic vendors may also require a W9 so that a vendor number can be requested for the PO

14

Page 15: Subawards Training Presentation

Under Federal grants and contracts, all Subrecipients should be registered in the System for Award Management (“SAM”), and must have a DUNS number◦ SAM website: https://sam.gov◦ DUNS number requests: http://fedgov/dnd.com/webform

High Risk Subrecipient Monitoring:◦ ORASUBS will identify sites that need to complete a Subrecipient

Questionnaire ◦ The Dept will send the Welcome Packet and Questionnaire to the

identified sites and return it to ORASUBS◦ ORA rates the sites and notifies the dept and Internal Audits who

confirms the rating and performs subsite audits◦ High Risk Subrecipients must submit invoices on template included

as exhibit to the cost reimbursement Sub Agreement.◦ The JHU dept must complete additional invoice audits per the new

risk management regulations which took effect on 7/1/14. 15

Page 16: Subawards Training Presentation

As of 8/24/12: Subsites are required to submit COI information at the time of JHU application to the JHU Grants Associates if they are not registered in the FDP Clearinghouse.

2 Options: ◦ Complete, and certify best ability at time of JHU

application◦ Opt to complete certification at time of Subagreement

award Subs team will choose appropriate COI language for

the Agreement If SCF was not completed at time of JHU application

and the site is not registered in the FDP Clearinghouse, Subs team will request that the dept get an SFI from the Subsite prior to submission of Subaward documents to ORASUBCONTRACTS.

16

Page 17: Subawards Training Presentation

Under Federal subs…(MTDC) For subs under federal grants and contracts, JHU takes additional IDC on the

first $25K of the subcontract budget. For every subaward agreement drafted JHU IDC is requested

Ex: Proj A, Core, Proj B under P50 – all to UMB, different PI’s = multiple 96s and POs and agreements = JHU additional IDC one time.

Under non-Federal agreements…(TDC) Generally, under foundation awards and commercial contracts, the same

IDC rate is applied to both the JHU and the subsite budget. For foundation awards, it must be determined if the awarded IDC is shared

with the subsite or if the subsite TC is part of the JHU TDC. If the IDC is shared JHU does not take additional IDC against the 96. If the

subsite total costs are part of the JHU TDC, JHU takes the additional IDC % allowed by the Sponsor against the entire Subsite amount, not just the first 25K.

When setting up 96 numbers for subs under commercial agreements with fixed fee budgets, JHU does NOT charge any additional IDC against the 96#; o For commercial clinical trials a “receipt tax” is charged at the time the

money is paid to JHU. When setting up 96 numbers for subs under commercial agreements with

cost reimbursement budgets, JHU does charge additional IDC against the 96# per the prime award budget/terms;

17

Page 18: Subawards Training Presentation

The 96 number simply refers to the SAP account number for the sub.

A 96 number is a “child” of a “parent” Internal Order number (IO), which will always start with “900”.

The 96 # will be set up with the sub amount, plus whatever IDC JHU is entitled to take. o Except in the case of commercial clinical trials and

most foundation awards. Generally speaking, the IDC rate for the 96 # must

match the IDC rate for the IO # it is based upon, although there may be some (limited) exceptions.

After the first year of the Subaward, the departments are responsible for distributing money to the 96 #.

18

Page 19: Subawards Training Presentation

JHU has negotiated a number of IDC rates with the NIH. Determining which rate applies to the 96 number depends in part upon whether the work for the Prime Award (at JHU) is conducted “on- campus” or “off-campus.”

“On-campus”- means that the University is paying for the space where the work is conducted.

“Off-campus”- means that the University is NOT paying for the space where the work is conducted.

Note that the decision about which rate to use for the 96 number is made based on the work being performed at JHU. It has nothing to do with the location of the subsite.

19

Page 20: Subawards Training Presentation

ORA’s default position on carry over: subs follow the terms of the prime grant or contract

However, even in cases where the prime grant/contract allows for automatic carryover, the department and PI may request ORA to set up subs so that the subsite must obtain authorization to carry over any funding.

In order for funding to be carried over under Federal funding, the balance should be reported on the Financial Status Report as an “unliquidated obligation.”

If the prime award is from a foundation, the carryover process should comply with award guidelines about how much money can be carried over, etc.

20

Page 21: Subawards Training Presentation

Carryover modifications are always necessary when the prime grant or contract requires JHU to obtain authorization for carrying over prime grant/contract funding. ◦ Almost always necessary for P and U awards

A carryover modification authorizes the subsite to carryover funding from one subgrant/contract budget period to another.

Carryover modifications must specify the amount of funding being carried over, but do not need to include a whole new budget.

21

Page 22: Subawards Training Presentation

The Federal Funding Accountability and Transparency Act (“FFATA”) was a 2006 federal law intended to hold the government accountable for its spending by allowing individuals to track information on federal grants and contracts on a searchable website (www.USASpending.gov)

Under FFATA, recipients of federal grants and contracts must report Subaward and Subcontract spending.

The SOM Subawards Coordinator will handle the reporting Subsites will be asked to provide certain information to

facilitate the reporting process. 22

Page 23: Subawards Training Presentation

What’s in a Sub Agreement??

Payment Information

Technical and

Financial Reporting

Indemnifica-tion

Adverse Event

Reporting

Contact Information

Confid-entiality

Intellectual Property

Period of Perform-

anceTerminatio

n

Certifica-tions to the Grantor or Sponsor

23

Page 24: Subawards Training Presentation

Managing Purchase OrdersWhat the Subs group does in relation to purchase

orders:

Creation:P.O. is created when the contract is created.

Modification:Time and/or money added (or removed) when sub is modified.

Close-out:P.O. is closed when project period of grant/contract ends, or sub is terminated early. If money is left on 96#, the close out process will unencumber it.

**Do NOT have Purchasing or SAP help do these things!**

24

Page 25: Subawards Training Presentation

ORA closes the Purchase Order once the final invoice is approved, submitted to AP, confirmed and paid. If the period of performance for the subaward has expired, the department sends the ORA Subawards Team ([email protected]) and email with the PO number indicating to close it. PLEASE DO NOT EMAIL PURCHASING/AP/SPSS/SAP/PO MAINTENANCE FIRST!

The Subawards Team does not move money off of or unencumber money from the 96. If this does not automatically happen when the PO closes, please reach out to [email protected] or [email protected] for more help.

If there were expenses on a P.O. before the January 2007 conversion to SAP, they will show up on the 642400 general ledger number, which links to the IO number, NOT to the 96 number. Thus, if we are closing a P.O., and there is money on 642400, the Real Time Grant Report will still show that there is an encumbrance on the IO number. ORA cannot fix this problem. For help, contact the SAP help line and/or Purchasing.

25

Page 26: Subawards Training Presentation

There are several situations where a Subaward might need to be closed out before the period of performance expires.  

If the period of performance has not expired AND a final invoice has been paid: ◦ The department should send an infosheet to ORASUBCONTRACTS◦ On the infosheet the period of performance should start on the date of their last

agreement and end on the final invoiceable date◦ On the infosheet the amount should be the total amount paid for that period of

performance◦ ORA will send the site a termination modification AND close out the PO/SC once the

mod is fully executed   The period of performance has expired AND a final invoice has not been sent:

◦ The department should send an infosheet to ORASUBCONTRACTS◦ On the infosheet the period of performance should start on the date of their last

agreement and end on the last date the sub PI completed work for JHU◦ ORA will send the site a termination modification◦ The department should email ORASUBCONTRACTS when the final invoice is paid◦ ORA will close out the PO/SC at that time

26

Page 27: Subawards Training Presentation

 If the subsite PI is moving to another subsite and will still conduct work for JHU under the project◦ The department should request paperwork from

ORASUBCONTRACTS for a new subsite◦ The department should complete and return the paperwork to

ORASUBCONTRACTS◦ ORA will draft and submit the new sub AND create new 96/PO

If the subsite is appointing another sub-PI to do the work at their Institution◦ The department should send an infosheet to

ORASUBCONTRACTS with the new PI’s information on it and a new budget for that PI for the remaining portion of the current grant year

◦ ORA will modify the current agreement with the subsite◦ The existing 96/PO will continue to be used

27

Page 28: Subawards Training Presentation

• Process and pay invoices

• Complete goods receipts

• Ensure consistency with Real Time Grant Report and BW reports

What the Departments do in relation to purchase

orders:

28

Page 29: Subawards Training Presentation

Per the terms of our contracts, subsites should send invoices to the department financial contact on the sub information sheet.

If ORA receives an invoice erroneously, it will be forwarded to the

Financial Contact for the sub.

Confirm with the PI that the work has been performed and that any necessary reports have been submitted. PI should be aware of payments.

Certification for Payment should be completed and signed by PI

Departmental contact sends invoice and Certification to Accounts Payable via e-mail. Make sure to keep a copy. The e-mail should indicate if the invoice should be split between lines on the purchase order and how much to put on each line.

For Fixed Fee/Per Patient budgets, dept should send an email to ORASUBS asking for money to be added to the PO BEFORE submission of the invoice to AP.

29

Page 30: Subawards Training Presentation

Name of the subrecipient JHU purchase order number Date of the invoice Invoice number and project title Period of performance covered by the invoice Breakdown of costs in accordance with expenditure

categories Current period costs and cumulative project costs Cost sharing (if applicable) Program income (if generated) Contact person for invoice questions Certification as to the truth and accuracy of the invoice Shouldn’t overlap with previous invoice and should NEVER

exceed the termination date.

30

Page 31: Subawards Training Presentation

Review for standard invoice elements as required by current policy (e.g., cumulative costs, certification etc.)

Expense in line with budget category amounts Amounts aren’t round dollars solely based on a percentage of budget Previous expense + Current expense = Cumulative expense for

each budget category Column totals equal the amount of individual column amounts in

total Fringe cost are in line with salary expense for the agreed upon fringe

rate Facilities and Administrative (F&A) costs are in line with applicable

costs for the agreed upon F&A rate Period of performance invoiced is not in advance of the current

calendar date unless immediate cash needs are being met. If so, cash balances and interest must be tracked and reconciled before additional payments can be made.

Be sure that cumulative amount invoiced is less than or equal to total amount of the subaward/subcontract.

31

Page 32: Subawards Training Presentation

Certification for Payment and Performance must be completed for all invoices

Confirm with the PI that the work has been performed and that any necessary reports have been submitted. PI should be aware of payments.

Approval by both Financial Analyst and Principal Investigator is required

Form must be included with invoice in order to process payment in SAP

Form is emailed to JHU PI with every fully executed agreement and is located on JHU Finance website. https://apps.finance.jhu.edu/policy_procedures/policy/sub/cert_pymt_perf.docx

32

Page 33: Subawards Training Presentation

High-risk subrecipients will be required to submit general ledger summary and detailed financial reports along with all invoices

Departmental personnel will be responsible for completing a summary comparison of the invoice to the financial reports

Every six months, departmental personnel will complete a more detailed review of a subrecipient financial report supporting one invoice, including obtaining supporting documentation for a selection of charges

The Certification for Payment and Performance form has been revised to evidence these reviews◦ A summary review is required to be performed and must be

documented on the Certification for Payment and Performance◦ Date of last detailed review must also be documented

Problems identified with billings must be resolved and the resolution documented

33

Page 34: Subawards Training Presentation

How to handle discrepancies identified during invoice reviews:◦ Must be resolved prior to payment◦ Partial payments of invoices are allowable (e.g.,

withholding questioned costs)◦ Significant discrepancies may indicate the need for a

100% desk audit of the specific invoice or all invoices depending on the nature of the concern

◦ Resolutions must be formally documented on the invoice or payment certification form

◦ At discretion of departments, results may dictate future invoicing requirements (e.g., submission of timesheets with every invoice)

34

Page 35: Subawards Training Presentation

Goods Receipts (GR) are confirmations that goods or services have been received. A GR must be completed for each invoice that is submitted to AP for payment.

Goods Receipts facilitate the “Three Way Match”, which means that the P.O., the Goods Receipt, and the vendor invoice all show the same price and quantity. A GR request is sent to the ORA STM’s ECC inboxes, who forwards

it to the ECC inbox of the appropriate departmental contact. The Subawards Manager is able to reverse GR’s that were done

through the ECC inbox. The dept contact is able to reverse GR’s that were done through Central Receiving.

Two methods for completing goods receipts (see handout). (Central Receiving SAP Role: ZESC_SC_RCV_CNT_All)

SAP manuals available at: http://ssc.jhmi.edu/supplychain/training GRs can be reversed by the dept if it was completed via Central

Receiving or by the Subawards Manager if not

35

Page 36: Subawards Training Presentation

Complicating factors in completing a sub:◦ Subsite wants indemnification from sponsor◦ Subsite has not obtained IRB approval◦ Sponsor has to approve something- like the replacement

of a project director.◦ Payment/Purchase Order issues

Please do NOT:◦ Make payments to subsites via online check requests◦ Provide subsites with purchase order numbers before

original contracts are fully-executed.◦ Create goods receipts before the invoice has been posted

in SAP. 36

Page 37: Subawards Training Presentation

Generally speaking, the Subs group cannot resolve BW and Real Time Grant Report issues (incorrect encumbrances, etc.).

We only close the PO/SC, and reverse GRs.

For encumbrance issues contact Purchasing, PO Maintenance, or SPSS accordingly.

37

Page 38: Subawards Training Presentation

If you have questions about what you need to submit or something the subsite is asking for, please call or e-mail us.

38