Mårten Krogerus
NAME OF PRESENTATION 1
SUB HEADER – A SHORT DESCRIPTIVE TEXT
Marten Krogerus is presently manager and leading technology specialist at ÅF-Pöyry and has more than 35 years of experience of working with environmental assignments for the pulp and paper, and other industry both as process supplier and as technical consultant. He has a broad know-how and understanding of all the environmental issues related to the industry branch. His special area of expertise is effluent treatment in the pulp and paper industry. Along with other areas he has worked specifically with conceptual studies, mill environmental audits, and process optimisation and improvement tasks. Marten has been working in more than 20 countries worldwide.
Initially, Marten was involved in the development and implementation of the first biological treatment plants for Pulp&Paper industry in the Nordic countries in the 1980’s as a turnkey supplier. Later, as a consultant, he has worked out from Finland, Sweden and the U.S. for pulp and paper industry clients locally and abroad.
Marten is very knowledgeable in design and operation of biological treatment systems. One of his specialties is analysis of treatment plant performance and assessing corrective measures for achieving optimal results. He has developed strategies for assuring continuous good results.
Marten has also a capability to quickly evaluate design issues and bottlenecks in an existing plant and propose measures to avoid such problems.
Aerobic biologic treatment / Activated sludge
NAME OF PRESENTATION 2
P&P EFFLUENT TREATMENT - MODULE I
Technology and control - Day 2 14:00 – 18:00
Technology and control session
General description of the activated sludge process
Technology concepts
Pretreatment requirements─ Primary sedimentation─ Cooling─ Neutralisation─ Nutrient addition
Aeration concepts─ Flow patterns, selectors, plugflow, alternative aeration concepts─ Aeration equipment─ Main aeration design principles
Sedimentation process, sludge recycling and excess sludge removal─ Sedimentation process alternatives─ Sludge recycling rate principles
Sludge dewatering─ Sludge characteristics and how this will impact on dewatering concept─ Alternative dewatering equipment
NAME OF PRESENTATION 3
Technology and control session, cont.
Operational control
Key control parameters─ Impact of temperature─ Impact of of incoming solids─ Impact of incoming pH─ Organic loading
─ F:M ratio
─ Sludge age
─ Oxygen control principles─ Nutrient control principles
Process optimisation principles─ Pretreatment─ Aeration basin─ Sedimentation process and sludge recycling rate principles─ Sludge dewatering
Expected removal efficiencies─ Impact of operational control─ Other parameters
NAME OF PRESENTATION 4
General description of the activated sludge process
5
GENERAL DESCRIPTION OF THE ACTIVATED SLUDGE PROCESS
Activated sludge process
6
pH control,Nutrients addition
Aeration Tank Sedimentation
Return Sludge Excess Sludge
GENERAL DESCRIPTION OF THE ACTIVATED SLUDGE PROCESS
Background and objectives• A biological wastewater treatment method for treatment of biodegradble
organic matter
• Process ”invented” already 100 years ago but has gradually improved over the years
• Today activated sludge is the most common biological technology for industrial wastewater treatment
•
• Efficiently remove biodegradable organic substances (BOD, COD, TOC)
• Remove specific substances
• Remove toxic substances
• Ammonium or nitrogen removal (nitrification, denitrification)
7
GENERAL DESCRIPTION OF THE ACTIVATED SLUDGE PROCESS
Activated sludge• A biological treatment process where optimal conditions for high removal of
organics are created by:
Recirculation of biologically active biosludge and thus increasing the concentration of biosolids in aeration tank
Assuring that all physical and chemical conditions are optimised in incoming water and in the treatment process
8
GENERAL DESCRIPTION OF THE ACTIVATED SLUDGE PROCESS
Types of activated sludge• Completely mixed systems
• Plug flow
• Selector
• Low/Minimum Biosludge Production
• Pure oxygen
• Two stage systems
• Nitrification - Denitrification
• Powdered activated carbon in activated sludge
9
GENERAL DESCRIPTION OF THE ACTIVATED SLUDGE PROCESS
Prerequisites for optimal conditions in incomingwater to an activated sludge processes
• Low concentration of suspended solids
• pH within optimal range
• Sufficient levels of nutrients
• Temperature within optimal range
• Equalization if incoming water is highly variable
• Use of spill pond in emergency conditions
10
GENERAL DESCRIPTION OF THE ACTIVATED SLUDGE PROCESS
Micro-organisms
• The key requisite in activated sludge process is a healty culture of micro-organisms
• The micro-organisms or microbes form the biomass or biosludge
• The biosludge must flocculate to enable separation and return ofbiosolids back to aeration tank
• The biomass in the system is a mix of different aerobic micro-organisms an ecosystem where the species interact and feed on each other
11
GENERAL DESCRIPTION OF THE ACTIVATED SLUDGE PROCESS
Micro-organisms
Micro-organism
OxygenNutrients
Organic matter
Heat
Carbon DioxideWater New micro-organisms
Other compounds(degradation products)
GENERAL DESCRIPTION OF THE ACTIVATED SLUDGE PROCESS
Micro-organisms
13
13
Free swimming bacteria
Floc forming bacteria
Filamentous bacteria
GENERAL DESCRIPTION OF THE ACTIVATED SLUDGE PROCESS
Micro-organisms and micro-animals
14
14
Protozoa Rotifers
Nematods
Free living
Flagellates
Ciliates
Stalked ciliates
GENERAL DESCRIPTION OF THE ACTIVATED SLUDGE PROCESS
Bacteria
15
Floc forming
Filamentous
Free living cells
GENERAL DESCRIPTION OF THE ACTIVATED SLUDGE PROCESS
Type of bacteria
16
Good quality sludge Poor quality sludge
GENERAL DESCRIPTION OF THE ACTIVATED SLUDGE PROCESS
Growth of micro-organism cultures
17
Amount ofBOD / Sludge
Time
High loadedAS
ConventionalAS
Extendedaeration
Logarithmicgrowth
Declininggrowth
Endogenousphase
Biosludge
BOD
GENERAL DESCRIPTION OF THE ACTIVATED SLUDGE PROCESS
Growth of micro-organisms
18
Time Weight0 1 kg20 min 2 kg40 min 4 kg1 h 8 kg2 h 64 kg3 h 512 kg4 h 4096 kg
• Generation time is 20 min for some bacteria
• Microbe culture is constantly changing – part of the culture dies and become food for others
Technology concepts
Pretreatment requirements
19
TECHNOLOGY CONCEPTS – PRETREATMENT REQUIREMENTS
Primary sedimentation
20
Objectives
• There are two primary objectives why goodprimary sedimentation is required:1. To reduce COD load related to solids entering
biological process 2. To avoid accumulation of inactive deadload in the
biological system
• By achieving good suspended solids removalhigher sludge age can be achieved
TECHNOLOGY CONCEPTS – PRETREATMENT REQUIREMENTS
Primary sedimentation
21
Principles
• Primary sedimentation may be carried out on total incoming flow or only the fiber-containing flows
• Primary clarifiers must have capacity to allow settling of settleablesolids• The clarifiers are principally design based on surface load (m3/m2, h)
• Primary clarifiers must have volume to allow some buffering of the settled solids • The clarifiers must be designed deep enough
• Primary clarifiers may be circular or rectangular• Circular clarifiers are ofter preferred based on operation and cost
TECHNOLOGY CONCEPTS – PRETREATMENT REQUIREMENTS
Primary sedimentation
22
Principles
• Solids transport and removal must be designed sufficient
• Surface solids skimming systems
• Sufficient controls on solids amount and consistency in clarifier
TECHNOLOGY CONCEPTS – PRETREATMENT REQUIREMENTS
Cooling
23
Objectives
• Assure optimal temperature conditions for microbes• Too high temperatures will kill the microbes• Low temperatures reduce biological activity and
degradation rates
• Optimal temperature for mesofilic microbes is about 37 C
• Cooling is typically carried out using heat exchangers or cooling tower or both
TECHNOLOGY CONCEPTS – PRETREATMENT REQUIREMENTS
Cooling
24
Principles
• Cooling can be carried out using• Spray cooling in ponds• Direct cooling in cooling tower• Indirect cooling using heat exchangers and own cooling
loop with cooling tower • Indirect cooling using heat exchangers and common
cooling water
• Cooling towers and heat exchangers are generally sensitive to suspended solids• Different design available to avoid clogging
• Redundancy recommended
TECHNOLOGY CONCEPTS – PRETREATMENT REQUIREMENTS
Direct cooling
25
Advantages:• Proven technology most commonly used in
P&P industry• Simple technology• Maintenance (cleaning) relatively easy • Low investment cost
Drawbacks:
• In case, the effluent includes unstripped condensate, the cooling tower will drive it off and create a significant odour problem. With no cooling tower a part of the odour would still be released in aeration tank. Consequently, to assure no odorous emissions to atmosphere, odorous condensate should never be directed to the effluent.
TECHNOLOGY CONCEPTS – PRETREATMENT REQUIREMENTS
Indirect cooling with cooling water
26
Advantages:
• No odorous emissions
• Small footprint
Drawbacks:
• Permitting issues related to withdrawal and discharge of cooling water
• High risk for scaling and plugging of HXs
• High operation cost due to maintenance
TECHNOLOGY CONCEPTS – PRETREATMENT REQUIREMENTS
Indirect cooling with cooling tower
27
Advantages:
• No odorous emissions
• Closed cooling loop with make-up water only
Drawbacks:
• Significant risk for high maintenance (cleaning)
• High risk for scaling and plugging of HXs
• High operation cost due to maintenance
• High investment cost (increased cooling tower and HX sizing)
TECHNOLOGY CONCEPTS – PRETREATMENT REQUIREMENTS
Neutralisation
28
Objectives:
• Wastewaters from pulp and paper production aretypically not close to normal
• Wastewater pH will impact on the health ofmicrobes
• Each specie has a optimum pH range
TECHNOLOGY CONCEPTS – PRETREATMENT REQUIREMENTS
Neutralisation
29
Design
• Wastewaters are neutralised with acids and alkali• Sulfuric acid• Hydrochloric acid• Sodium hydroxide• Lime (CaO or Ca (OH)2)
• The retention time has to be properly chosen depending on neutralization chemical and temperature
• The required amount of chemicals should be confirmed with lab tests (titration)
• Add the chemicals to the most acid/alkaline effluent
Potential operation problems
• Odour gases
• Foam
TECHNOLOGY CONCEPTS – PRETREATMENT REQUIREMENTS
Nutrient addition
30
Objectives
• Nutrients deficiency are often a primary reason for poor performance• Nutrients – nitrogen and phosphorus• Micronutrients – trace elements
• Required to optimise microbial growth• Minimum requirement, but excess will not improve performance
Principles
• Nutrients are typically added as:• Urea• Ammonia water• Nitrate salts
• Phosphoric acid• Phosphate salts
Technology concepts
Aeration concepts
31
TECHNOLOGY CONCEPTS – AERATION CONCEPTS
Tank configuration
32
Tank dimensions
• Rectangular
• Circular
• Compartments/Divison walls
• Water depth from 4 m to 12 m
Construction
• Earth basins
• Concrete tanks
• Blasted in bedrock
TECHNOLOGY CONCEPTS – AERATION CONCEPTS
Flow patterns
33
Total mixed tanks
• Wastewater is mixed with total aeration volume
• Less costly investment
• Disadvantage is risk for filament formation
Plug flow tanks
• Plug flow
• Compartmented flow
TECHNOLOGY CONCEPTS – AERATION CONCEPTS
Selectors
34
Objectives
• To select bacteria/microbes which have a goodsettling characteristics and will enable the process to maintain a high sludge concentration
Principles
• Natural selection
• Takes place in a small initial volume (0,5 h-1 h retention)
• Flocforming bacteria have better possibility thanfilamentous to uptake substrate at highconcentrations
TECHNOLOGY CONCEPTS – AERATION CONCEPTS
Minimum Biosludge Production
35
Objectives
• To create conditions where sludge generation is minimised
Principles
• Aerated without sludge return
• Creates free-swimming micro-organisms whichreduces some organics
• Main aeration will feed on free-swimming
• Total sludge generation may be as low as 0,15 kg TSS/kg COD rem
TECHNOLOGY CONCEPTS – AERATION CONCEPTS
Aeration equipment
36
Aeration equipment alternatives
• Surface aeration• Fixed aerators• Floating aerators
• Bottom aeration• Perforated piping• Bottom turbines• Diffusers, fixed• Diffusers liftable• Jet aeration
• Blowers• Rotary displacement blowers• Centrifugal blowers (Turbo)• Helical screw blowers
TECHNOLOGY CONCEPTS – AERATION CONCEPTS
Surface aeration
37
Principles
• Floating surface aerators • are low cost equipment• Can be located at any position• Aerates through splashing up water in air
• Fixed surface aerators • Fixed at bridges etc.• Larger power of motors possible• Aerates through splashing up water in air
• Limitation is mixing capacity. Typically limited to about 5-6 m and relatively low sludge concentrations
• Surface aerators have low aeration efficiencytypically 0,5-1,5 kg O2/kWh
TECHNOLOGY CONCEPTS – AERATION CONCEPTS
Bottom aeration
38
Principles
• Perforated piping• Low risk of clogging, low maintenance demand• Lower aeration efficiency than other bottom aeration
• Diffusers, fixed or liftable• Good aeration efficiency• Liftable can be lifted up for maintenance if required
• Diffuser aerators have good aerationefficiency typically 3-4 kg O2/kWh
TECHNOLOGY CONCEPTS – AERATION CONCEPTS
Bottom aeration
39
Principles
• Bottom turbines (OKI aeration)• A main maintenance issue is motor located under
water• Requires blower for air supply
• Jet aeration (MTS or Flygt)• With air suction or blower feed
Mass Transfer Systems bi-directional jet aerators
TECHNOLOGY CONCEPTS – AERATION CONCEPTS
Blowers
40
Objective
• Provide air to bottom aeration equipment
Principles
• Positive displacement blower• Typically for smaller air flows
• Centrifugal blowers• Single or multistage• For larger air volumes• Up to 12 mwc pressure
TECHNOLOGY CONCEPTS – AERATION CONCEPTS
Aeration equipment
41
Main aeration design principles
• Aeration design shall be based on actual or future COD or BOD loads
• Aearation design shall be based on expected conditions in the aeration process (Variability, sludge age and residual DO in all parts of aeration tank).
• Max month and max day conditions shall be design basis not annual average
• In selecting equipment the main criteria is:• Aearation efficiency of equipment (including blowers) , kg O2/kWh in
standard conditions• Maintenance of equipment• Sufficient redundancy installed to handle unexpected conditions
Technology concepts
Sedimentation process, sludge recycling and excess sludge removal
42
TECHNOLOGY CONCEPTS – SEDIMENTATION
Sedimentation processes
Objectives
• Separate biosolids from treated water
Principles
• Circular or rectangular clarifiers• Circular gives more even return sludge
concentration
• Scraper type, plates or suction pipes• Suction type have shorter retention time in
clarifier
43
TECHNOLOGY CONCEPTS – SEDIMENTATION
Sedimentation process
44
• Location and type of overflow weirs• Periferal overflow in circular• Midway overflow• The main issue is to assure the proper flow patterns
• Clarifier sizing• Over 80 m in diamater clarifiers have been designed• Wind effect to be considered
Technology concepts
Sludge dewatering
45
TECHNOLOGY CONCEPTS – SLUDGE DEWATERING
Principles in handling ofsludges
• Collection of various sludges
• Mixing or separate handling
• Conditioning
• Thickening
• Dewatering
• Disposal of dewatered sludges
46
TECHNOLOGY CONCEPTS – SLUDGE DEWATERING
Factors impacting on equipment an anticipatedresult
• Amount and quality of fiber sludge and biosludge
• Ratio Biosludge to Fibersludge
• Targeted dryness (final disposal alternative)
47
TECHNOLOGY CONCEPTS – SLUDGE DEWATERING
Sludge conditioningObjective
• Improved dewatering characteristics of sludge
• Improve degree of solids retention in sludge dewatering
Methods
• Chemical• Coagulants (Alum, Fe-salts)• Polyelectrolytes• Mixing and flocculation important
• Thermal
• Biological
48
TECHNOLOGY CONCEPTS – SLUDGE DEWATERING
Sludge ThickeningObjective
• Initial dewatering step
• Increase dryness from 0.5 ==> 3…10 %
Principles
• Directly in sedimentation basins
• Gravitation thickening• Thickening basins• Centrifuge
• Flotation thickening
• Screen thickening• Gravity table• Drum screen 49
TECHNOLOGY CONCEPTS – SLUDGE DEWATERING
Sludge DewateringObjective
• Final dewatering step
• Increase dryness from 3...10 ==> 20…50 %
Principles
• Belt presses
• Screw presses
• Chamber filter presses
50
Operational control
Key control parameters
51
TECHNOLOGY CONCEPTS – OPERATIONAL CONTROL
Key control parameters
52
• In order to assure the best operational result in an activated sludge plantthe key control parameters must be monitored continuously and measurestaken to correct characteristics if needed
• The key control parameters include both• Incoming wastewater (parameters that can be controlled)• Process conditions
• In addition all pertinent operational parameters and analysyes must be monitored and follow-up.
TECHNOLOGY CONCEPTS – OPERATIONAL CONTROL
Incoming wastewater key control parameters
53
TemperatureIssue
• Incoming temperature is too high. Wastewater temperaturewill directly impact on the system temperature and thusbiological activity
Target
• Temperatures in the aeration tank above 37 C for periods longer than 24 h should be avoided
Control/Mitigation measure
• Increase cooling capacity to reduce system to targetedtemperature.
• If capacity is not sufficient, install additional capacity
TECHNOLOGY CONCEPTS – OPERATIONAL CONTROL
Incoming wastewater key control parameters
54
pHIssue
• Incoming pH is outside targeted range of 6,5 to 8,0
Target
• Incoming wastewater pH 6,5 -8,0 as daily average
Control/Mitigation measure
• Check neutralisation process to assure proper functionality
• If capacity is not sufficient, install additional capacity
TECHNOLOGY CONCEPTS – OPERATIONAL CONTROL
Incoming wastewater key control parameters
55
Suspended solidsIssue
• Incoming TSS higher than target
Target
• Incoming wastewater 100-150 mg/l as daily average. (target may depend on the type of production).
Control/Mitigation measure
• Check primary settling process to assess reason for increaseand assure proper functionality for sludge removal, hydraulicload
• Perform sludge settling tests
• If capacity is not sufficient, install additional capacity
TECHNOLOGY CONCEPTS – OPERATIONAL CONTROL
Process condition key control parameters
56
Nutrient availabilityIssue
• Are the available nutrient levels suffient in the process?
Target
• Nitrogen minimum 3 mg/l as dissolved total nitrogen in treated effluent
• Phosphorus 0,3 mg/l as dissolved total phosphorus in treated effluent
Control/Mitigation measure
• Correct dosage stepwise to control residual levels towards target
• If capacity is not sufficient, install additional capacity
TECHNOLOGY CONCEPTS – OPERATIONAL CONTROL
Process condition key control parameters
57
Organic loading – Sludge ageIssue
• To maintain stable and optimal biodegradation conditions in the process
Target
• Maintain a sludge age at 15 days +- 3 days calculated as gliding 7 days average(The target days may be different depending on original design)
Control/Mitigation measure
• Correct excess sludge wasting stepwise to control sludge age towards target
• If capacity is not sufficient, install additional capacity
TECHNOLOGY CONCEPTS – OPERATIONAL CONTROL
Process condition key control parameters
58
Dissolved oxygen concentrationIssue
• To maintain stable and optimal biodegradation conditions in the process
Target
• Maintain the following levels in the aeration tank (on 6 hour basis)• Selector 0,5-2 mg/l• Beginning aeration tank 1,5-2,5 mg/l• End of aeration tank 2 -3 mg/l
Control/Mitigation measure
• Correct air supply or aeration energy to control DO towards target
• If capacity is not sufficient, install additional capacity
Operational control
Optimisation principles
59
TECHNOLOGY CONCEPTS – OPERATIONAL CONTROL
Optimisation principles
60
• General• Follow-up performance regulary and continuously• Act on trends and occasions when exceeding target ranges• Regular visual inspections
• Pretreatment (primary clarifier, cooling , neutralisation, nutrients)• Perform settling tests on incoming wastewater to compare with primary clarifier data• Calculate regular nutrient balances to compare with measured data• Make sure no anoxic activity occurs in the basin. In that case reduce sludge retention time.• Use of polymer in specfic cases may be warranted
• Aeration process• Calculate daily, sludge age (7 d avg), and SVI, and make visual microscopic analysis• In case of filament growth, increase nutrient levels above target and maintain high removal of excess sludge.
Gradually return then to normal.
• Sedimentation process and sludge recycling• Check functionality of suction pipes• Maintain stable return sludge flo back to aeration. Target 80-120% of average inflow rate
TECHNOLOGY CONCEPTS – OPERATIONAL CONTROL
Optimisation principles
61
• Sedimentation process and sludge recycling• Make sure no anoxic activity occurs in the basin. In that case increase sludge recycling rate .• Check functionality of suction pipes• In general maintain stable return sludge flo back to aeration. Target 80-120% of average inflow
rate
• Sludge thickening dewatering• Ensure stable an even mix of sludges to sludge dewatering• Use sufficient amount of polymer for flocculation. Sample regularly filtrate TSS
quality and calculate sludge retention percentage. Target >95-98%.
Operational control
Expected removal efficiencies
62
TECHNOLOGY CONCEPTS – OPERATIONAL CONTROL
Expected removal efficiences
63
• Conditions of incoming wastewater and treatment process will affect the removal efficienciesand treated wastewater quality
• A direct connection is often difficult to pinpoint from monitoring results
• The best way of assuring highest possible removal rates is to maintain that all key controlparameters are with given ranges
• Most important is to monitor key operational parameters on a daily basis and make the rightconclusions from the data
• Many of the upsets that happen in activatred sludge plant can often be observed long beforethe results are deteriorating clearly.
TECHNOLOGY CONCEPTS – OPERATIONAL CONTROL
Some basic rules
64
Increased TSS concentration in treated effluent can be either a result of
a. TSS losses as flocs/sludge overflow• Too low sludge age• Poor sludge quality (High SVI)• Too low sludge recycling rate• Secondary clarifier problems (suction pipes, flow pattern)
b. TSS losses as dispersed growth (not as clear flocs)• Too high sludge age• Too high temperature• pH out of range• Too low nutrient levels• High internal TSS load due to poor sludge retention in dewatering• Too low DO
Increasing SVI in aeration can be a result of • Too low sludge age• Too high temperature• pH out of range• Too low nutrient levels
TECHNOLOGY CONCEPTS – OPERATIONAL CONTROL
Some basic rules
65
Increased dissolved COD concentration in treated effluent can be an indication of • Too low high sludge age• Too low DO• High temperature• pH out of range• Too low nutrient levels
Increased dissolved phosphorus concentration in treated effluent can be an indicationof
• Too low high sludge age• Too low DO• Nitrogen deficiency• High temperature• pH out of range• Too high dosage of phosphorus
66
67
68
69
70
71