STOCKPILE MAINTENANCE PROCEDURES

Upload: marlene-kimbro

Post on 14-Dec-2015

219 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: STOCKPILE MAINTENANCE PROCEDURES. 2 Preparation Plant Overview  Annual Processing Capacity  12 Million Raw Tons (2,000 Raw Tons / Hour)  7.3 Million

STOCKPILE MAINTENANCE PROCEDURES

Page 2: STOCKPILE MAINTENANCE PROCEDURES. 2 Preparation Plant Overview  Annual Processing Capacity  12 Million Raw Tons (2,000 Raw Tons / Hour)  7.3 Million

2

Preparation Plant Overview

Annual Processing Capacity 12 Million Raw Tons (2,000 Raw

Tons / Hour) 7.3 Million Clean

Stockpile Maintenance Procedures

Clean CoalStockpile & Reclaim

LoadoutCSX Train

Clean Coal Storage Capacity 100,000 Tons, 3 Stackers Full Length Reclaim Tunnel

(4000 TPH Capacity) 17 Variable Rate Feeders Vibrating Pile Dischargers

Stockpile & ReclaimRaw Coal

Raw Coal Storage Capacity 80,000 Tons, 3 Stackers Full Length Reclaim Tunnel With

15 Variable Rate Feeders Vibrating Pile Dischargers

Page 3: STOCKPILE MAINTENANCE PROCEDURES. 2 Preparation Plant Overview  Annual Processing Capacity  12 Million Raw Tons (2,000 Raw Tons / Hour)  7.3 Million

3

Safety Precautions on Coal Stockpiles

Due to the relatively small stockpiles, dozers are continuously required to store and reclaim both raw and clean coal.

Stockpile Maintenance Procedures

Where people are required to operate equipment or travel on foot on a stockpile equipped with a reclaim belt and draw-off feeders, West Virginia Code 36-27-5.1 requires an approved plan.

The Approved Plan Has Proven to be a Good Practice

The Plan Consists of Three Basic Elements

Equipment Requirements

Entrapment Rescue Procedures

General Rules and Safe Procedures Required for Working on Stockpiles

Page 4: STOCKPILE MAINTENANCE PROCEDURES. 2 Preparation Plant Overview  Annual Processing Capacity  12 Million Raw Tons (2,000 Raw Tons / Hour)  7.3 Million

4

Safety Precautions on Coal Stockpiles Equipment operated on stockpiles will be equipped with the following;

Stockpile Maintenance Procedures

At least two separate means of two way communication (with independent power sources).

• Company FM Radio

• CB Radio

• Hand Held Radio (Pictured Later)

Page 5: STOCKPILE MAINTENANCE PROCEDURES. 2 Preparation Plant Overview  Annual Processing Capacity  12 Million Raw Tons (2,000 Raw Tons / Hour)  7.3 Million

5

Safety Precautions on Coal Stockpiles Equipment operated on stockpiles will be equipped with the following;

Stockpile Maintenance Procedures

Enclosed cab with 40 psi tempered glass and window support system

Window Support Grating

Page 6: STOCKPILE MAINTENANCE PROCEDURES. 2 Preparation Plant Overview  Annual Processing Capacity  12 Million Raw Tons (2,000 Raw Tons / Hour)  7.3 Million

6

Safety Precautions on Coal Stockpiles Equipment operated on stockpiles will be equipped with the following;

Stockpile Maintenance Procedures

Remote control stop device capable of shutting off reclaim feeders and belt conveyors.

Emergency lighting (chemical light sticks).

Body harness / safety belt. Two self-contained self-rescuers

Page 7: STOCKPILE MAINTENANCE PROCEDURES. 2 Preparation Plant Overview  Annual Processing Capacity  12 Million Raw Tons (2,000 Raw Tons / Hour)  7.3 Million

7

Safety Precautions on Coal Stockpiles Equipment operated on stockpiles will be equipped with the following additional non-regulatory safety features;

Stockpile Maintenance Procedures

Anti-glare paint treatment.

Operator activated fire suppression system.

Page 8: STOCKPILE MAINTENANCE PROCEDURES. 2 Preparation Plant Overview  Annual Processing Capacity  12 Million Raw Tons (2,000 Raw Tons / Hour)  7.3 Million

8

Safety Precautions on Coal Stockpiles In the event equipment becomes entrapped;

Stockpile Maintenance Procedures

On-shift supervisor in charge will be notified immediately.

Emergency Notification Plan will be implemented.

Equipment on site will begin recovery / rescue procedure as needed .

Page 9: STOCKPILE MAINTENANCE PROCEDURES. 2 Preparation Plant Overview  Annual Processing Capacity  12 Million Raw Tons (2,000 Raw Tons / Hour)  7.3 Million

9

Safety Precautions on Coal Stockpiles In the event equipment becomes entrapped;

Stockpile Maintenance Procedures

Additional equipment will be brought on site as necessary.

Any additional equipment will be provided with two SCSR’s and two way communication.

Page 10: STOCKPILE MAINTENANCE PROCEDURES. 2 Preparation Plant Overview  Annual Processing Capacity  12 Million Raw Tons (2,000 Raw Tons / Hour)  7.3 Million

10

Safety Precautions on Coal Stockpiles Required rules and safe job procedures.

Stockpile Maintenance Procedures

Before entering the stockpile area, the equipment operator will communicate with the plant operator to verify communication systems are working properly.

Equipment operator shall test the remote emergency stop system.

Examine SCSR’s.

Examine emergency lighting.

Close all cab doors securely.

Check position of feeders marked by suspended colored balls.

Plant operator will communicate with equipment operators before starting or stopping any feeders.

Page 11: STOCKPILE MAINTENANCE PROCEDURES. 2 Preparation Plant Overview  Annual Processing Capacity  12 Million Raw Tons (2,000 Raw Tons / Hour)  7.3 Million

11

Safety Precautions on Coal Stockpiles Required rules and safe job procedures.

Stockpile Maintenance Procedures

Warning signs will be posted at all entrances to live stockpile areas.

No person shall travel on foot over feeders without a secured overhead life line and feeders locked and tagged out.

In the event of an emergency on any stockpile, all feeders shall be turned off by the plant operator until the entire situation has been accessed by the on-shift supervisor in charge.

If equipment communications or remote stop device fail, then the effected piece of equipment will be removed from stockpile operation until repaired .

When a cavity is suspected, the equipment operator will fill the cavity by side cutting along the bottom of the stockpile area until the cavity is filled.

Water sprayed from inside the reclaim tunnel up through a feeder may also be used to attempt to collapse the cavity until the cavity is filled.

A copy of the approved plan shall be posted at the mine and persons performing such work shall be properly instructed on the plan contents prior to any work being performed.