Steve Varnedoe

Condition Assessment & Funding Needs

for

North Carolina’s Highway System

North Carolina Department of Transportation

Report to the

Joint Legislative Transportation Oversight Committee

January 14, 2003

Condition Assessment & Funding Needs For North Carolina’s Highway System

• Reporting Requirements• Overview of the System• Assessment Methodologies• Current Conditions• Funding Needs• Maintenance Operational Improvements

Biennial Report on Maintenance Requirements. G.S. 136-44.3

• The annual cost of routine maintenance

• The cost of eliminating maintenance backlog

• Annual resurfacing cost based on a 12-year cycle for

primary roads and a 15-year cycle for other systems

• The cost of eliminating any resurfacing backlog

Since the Highway Trust Fund was enacted:Since the Highway Trust Fund was enacted:

1989• 76,808 road miles

• 127,809 paved lane miles

• 16,104 miles of unpaved roads

• 16,900 structures

• 61.1 M sf bridge deck area

1989• 76,808 road miles

• 127,809 paved lane miles

• 16,104 miles of unpaved roads

• 16,900 structures

• 61.1 M sf bridge deck area

2003• 78,347 road miles

• 155,960 paved lane miles

• 6,644 miles of unpaved roads

• 17,463 structures

• 72.3 M sf bridge deck area

2003• 78,347 road miles

• 155,960 paved lane miles

• 6,644 miles of unpaved roads

• 17,463 structures

• 72.3 M sf bridge deck area

North Carolina State Highway SystemNorth Carolina State Highway System

Highway System Growth(Paved Lane Miles)

0%

5%

10%

15%

20%

25%19

89

1990

1991

1992

1993

1994

1995

1996

1997

1998

1999

2000

2001

System

G

row

th

Bridge System Growth(Square Feet of Bridge Deck)

0%2%4%6%8%

10%12%14%16%18%20%

1989

1990

1991

1992

1993

1994

1995

1996

1997

1998

1999

2000

2001

Deck A

rea G

row

th

Highway System Usage(Vehicle Miles Traveled)

Gro

wth

0%5%

10%15%20%25%30%35%40%45%50%

19

89

19

91

19

93

19

95

19

97

19

99

20

01

Vehicle Miles Traveled Paved Lane Miles

Rating the Condition of the Highway System

• Maintenance Condition Survey

• Bridge Condition Survey

• Pavement Condition Survey

• Maintenance Condition Survey

• Bridge Condition Survey

• Pavement Condition Survey

Maintenance Condition Elements

RoadwayLow ShoulderHigh ShoulderLateral DitchesLateral Ditch

Erosion

DrainageCrossline PipeDriveway PipeCurb & GutterCatch Basin &

Drop InletsOther Drainage

Features

Roadside MowingBrush and Tree

ControlLitter & DebrisSlopeGuardrail

Traffic Control DevicesTraffic SignsPavement StripingWords and SymbolsPavement Markers

EnvironmentalTurf ConditionMiscellaneous

Vegetation Management

PavementFlexibleRigid

BridgeDecksRailsExpansion JointsSuperstructureSubstructure

Roadway Performance Measures(Interstate)

ElementPavement

Shoulders/Ditches

Roadside

Drainage

Traffic Control Devices

Environmental

Total

Target93

88

88

88

88

88

90

Actual86

74

70

73

68

47

76

Scale 1-100

RoadwayLevel of Service

(2002 Survey)

Interstate Primary Urban SecondaryF

D

C

B

A

90

82 82 82

76 73 74 76

Performance Measure Trends(Roadway)

64

66

68

70

72

74

76

78

80

82

1998 1999 2000 2002

InterstatePrimarySecondaryUrban

Bridge Performance Measures(Statewide)

ElementDecks

Rails

Expansion Joints

Superstructure

Substructure

Total

Target7

7

7

7

7

7

Actual6.6

7.1

6.5

6.9

6.4

6.7

Scale 1- 9

Bridge Performance Measures(Statewide)

ElementDecks

Rails

Expansion Joints

Superstructure

Substructure

Total

Target7

7

7

7

7

7

Actual6.6

7.1

6.5

6.9

6.4

6.7

Scale 1- 9

BridgeLevel of Service

(2002 Survey)

F

D

C

B

A

Bridges

76.7

Performance Measure Trends(Bridge)

5

5.5

6

6.5

7

7.5

8

1998 1999 2000 2002

Statewide

Pavement Preventive Maintenance

Program has doubled since 2000

2002 - 2800 miles at $ 31.3 million

Program has doubled since 2000

2002 - 2800 miles at $ 31.3 million

RetreatmentRetreatment

Goal - 5000 miles per year at $ 77.5 millionGoal - 5000 miles per year at $ 77.5 million

Traffic Systems Maintenance

• Signal Preventive Maintenance Program(7,000 Traffic Signals Statewide)

• Intelligent Transportation System/Incident Response Program

Total $26.8 million

Contract Resurfacing

Resurfacing Cycles Per G.S. 136-44.3

Primary System 12 yrs

All Other Systems 15 yrs

Total Cost $ 227.4 million

Resurfacing Cycles Per G.S. 136-44.3

Primary System 12 yrs

All Other Systems 15 yrs

Total Cost $ 227.4 million

Floyd $ 62.4Snow Storm (Jan. ‘00) $ 17.4Ice Storm (Dec. ‘02) $ 44.4Total $ 124.2

Anticipated Reimbursement (67.0)Estimated DOT Debt $ 57.2

Floyd $ 62.4Snow Storm (Jan. ‘00) $ 17.4Ice Storm (Dec. ‘02) $ 44.4Total $ 124.2

Anticipated Reimbursement (67.0)Estimated DOT Debt $ 57.2

FEMA/FHWA Emergencies and Disasters (millions)

Storm CostStorm Cost

Maintenance Funding Needs(Millions)

Needs

Routine Maintenance

(Roads & Bridges) $ 620.6

Backlog ($247.30 Million) $ 36.0

Contract Resurfacing $ 227.4

Backlog ($103.70 Million) $ 10.4Disasters $ 25.0

Total Maintenance Funding Need $ 919.4

2003-04

History of Routine Maintenance Funding

$150

$200

$250

$300

$350

$400

$450

90 91 92 93 94 95 96 97 98 99 00 01 02 03

Allocation CPI Adjusted Allocation

Millio

ns

$ 94.6 M

History of Resurfacing Funding

$0

$20

$40

$60

$80

$100

$120

$140

$160

$180

90 91 92 93 94 95 96 97 98 99 00 01 02 03

Allocation CPI Adjusted Allocation

Millio

ns

$ 28.4 M

Supplemental Maintenance Funds(Annual Basis)

• TIP Funding– Traffic System Operations - $ 10 million– Positive Guidance Program - $ 6.6 million– ITS Traffic Operations - $ 11.3 million– Bridge Preservation Funds - $ 2 million

• Senate Bill 1005– Traffic Mgmt. System Improvements - $ 15 million– Primary Pavement Preservation - $ 135 million

Impact of SB 1005 on Pavement Needs

• Authorized use of Highway Trust Fund cash balances

• Targets major primary system corridors

• Provides approx. $423 million over 3 years

• Approx. 5,500 lane miles will be strengthened and resurfaced

• Helps eliminate resurfacing backlog

• Reduces pavement needs

Primary Route Preservation ProjectsSB 1005 (Year 1 and 2)

Primary

Statewide Annual Maintenance Funding Plan

Maintenance Programs 2003-2004 2004-2005 2005-2006 2006-2007 2007-2008

Disasters/Emergencies 25.00 30.00 32.00 15.00 15.00Total Maintenance Needs 656.60 691.78 728.55 766.30 804.54Total Resurfacing Needs 237.77 249.45 261.71 274.57 288.08Total Maint. Funding Needed 919.36 971.23 1,022.25 1,055.88 1,107.62Supplemental Maint. Funds (179.90) (35.06) (40.13) (44.64) (48.00)Adj. Total Maint. Fund. Need 739.46 936.16 982.12 1,011.24 1,059.62Estimated Maint. Fund Alloc. 585.43 585.43 585.43 585.43 585.43

Shortfall (154.03) (350.73) (396.69) (425.81) (474.19)

Fiscal Year ($ Millions)

Maintenance Operational Improvements

• LED Replacement for Signal Bulbs

• Signal Preventive Maintenance

• Improved Primary Pavements (SB)

• ITS (IMAP) Initiatives

• Road Oil Incentive Pay Program

• DOC Litter Pickup Program

• Pavement Preservation Implementation