steam boiler_ hydrostatic test in steam boiler
TRANSCRIPT
-
7/28/2019 Steam Boiler_ Hydrostatic Test in Steam Boiler
1/2
All of About Steam Boiler, Heat Exchanger, Energy and Power Generation
Hydrostatic Test in Steam Boiler
Hydrostatic test in steam boiler is one of non destructive examinations which should be
performed for new steam boiler or steam boiler which has been repaired such as replace water
wall, superheater, reheater, economizer and so on to. Hydrostatic test must be done to make
sure that steam boiler is free from leakage before start up is performed. Before hydrostatic test
s executed, inspection for all welds and installation of pressure parts should be done. Moreover
nside and outside of steam boiler and pressure part shall be free from all dirt, scale, paint,
debris, dirt, weld slag, rust, oil, spatter and all other foreign matter.
Before perform hydrostatic test (hydrotest) in steam boiler, the following matter should be
prepared as follow:
Non-destructive examination shall be verified to confirm acceptance as per Code and
specification.
1.
Dimensional inspection.2.
Full visual inspection for all welds.3.
Boiler pressure part installation is completed.4.
No painting work on pressure part before hydrostatic test.5.
Inside and outside of boiler and pressure part shall be free from all dirt, debris, weld slag
and spatter, oil, rust, scale, paint and all other foreign matter.
6.
Prepare and check valve line-up.7.
All gags shall be installed on safety valve.8.
Vent and drain are to be provided for the system before commence of hydrostatic test.9.
All temporary fitting, blind flange shall be suitable for the test procedure and should not
have defect that may cause failure during hydrostatic test.
10.
Fill boiler with treated water and free from mineral or other suspended matter
(Demineralized water).
11.
Requirement of gauge and record during hydrostatic test in steam boiler (hydro test):
A minimum of 2 (two) pressure gauge shall be used for pressure tests. One shall be a
pressure temperature recorder with a range suitable for recording of the test pressure.
The full scale of the other pressure gauge shall preferably 1 to 4 times of test pressure.
1.
The test pump and the line to be tested shall be provided with the separate indicating
test gauges. In case of testing between a high and low point of the module, gauges shall
be placed one at the top and one at the bottom to measure the pressured drop.
2.
The pressure gauge shall be calibrated and still valid before used. Any gauges showing
incorrect zero error more than + 1% of full-scale range shall not be used without repair
and recalibrate.
3.
Hydrostatic test must follow the determined procedure which is generally a s follows:
Install suitable temporary fitting such as blind flange or end plate to close opening and1.
Beauty & Fashion
Cosmetics
Cosmetic Surgery
Designer Footwear
Perfume
Sunglasses
Computers
Computer Games
Domain Hosting
Domain Registration
Free Internet
Firewall
Electronics
DVDs
Digital Cameras
Laptops
Mobile Phones
MP3 Players
Entertainment
Books
Concert Tickets
Games
Fantasy Football
MP3 Download
Finance
Credit Card Help
Debt Consolidation
Financial Adviser
InvestingLoans
Travel
Airline Tickets
Car Rental
Cruises
Golf Vacation
Romantic Getaways
Chitika | Select
Performance Testing of Boiler
Performance Assessment of Boiler
Hydrostatic Test in Steam Boiler
Boiling Out in Steam Boiler
Chemical Cleaning in Steam Boiler
Boiler Evaluation
Related Post
steam boiler update
-
7/28/2019 Steam Boiler_ Hydrostatic Test in Steam Boiler
2/2
Newer Post Older PostHome
Subscribe to: Post Comments (Atom)
Labels: Steam Boiler Testing
ensure all of openings are closed except venting valve.
Fill the steam boiler with treated water, free from mineral or other suspended matter at
temperature not under 70 F or ambient temperature.
2.
Inspect leakage when steam boiler is being filled, remove air through venting valve, close
it if there is not leakage and air is totally removed.
3.
Increase pressure gradually with maximum pressure rate 5 kg/cm2 until 1.5 times of
maximum allowable working pressure for new boiler and 1.2 times for repaired boiler.
4.
Record pressure, time and temperature during test and inspect all of pressure parts of
steam boiler at holding time of hydrostatic test approximately 10 minutes. 6. After
hydrostatic test, the pressure should be release in a manner and at rate so as not to
endanger personnel or damage equipment.
5.
Recommend this on Google
Post a Comment
0 comments:
Server not found
Firefox can't find the
server at
r1rk9np7bpcsfoeekl0k
a-fc-opensocial.google
Check the
address for
typing errors
such as
ww.example.com
instead of
www.example.com
l
Travel template. Powered by Blogger.