status of production of pulses during kharif 2011 karnataka state status of production of pulses...

21
STATUS OF PRODUCTION OF PULSES DURING KHARIF 2011 KARNATAKA STATE

Upload: norman-lester

Post on 12-Jan-2016

237 views

Category:

Documents


9 download

TRANSCRIPT

Page 1: STATUS OF PRODUCTION OF PULSES DURING KHARIF 2011 KARNATAKA STATE STATUS OF PRODUCTION OF PULSES DURING KHARIF 2011 KARNATAKA STATE

STATUS OF PRODUCTION OF PULSES DURING KHARIF 2011

KARNATAKA STATE

STATUS OF PRODUCTION OF PULSES DURING KHARIF 2011

KARNATAKA STATE

Page 2: STATUS OF PRODUCTION OF PULSES DURING KHARIF 2011 KARNATAKA STATE STATUS OF PRODUCTION OF PULSES DURING KHARIF 2011 KARNATAKA STATE

Sl.NoName of Pulses crop

Target of area

Area sown Kharif 2010

Area sown as on

29.08.2011

Difference of area between target and achivements

Reason of difference in area

1Redgram (Tur) 8.60 8.91 7.11 -1.49Area coverage under pulses is low due to failure of rainfall in 2nd fortnight of June in Bidar, Gulbarga, Yadgiri, Bijapur and parts of Gadag and Dharwad distrcits. In some parts diversion of pulses area to Soyabean is observed.

2Horsegram 1.11 0.88 0.28 -0.83

3Blackgram 1.25 1.18 0.85 -0.40

4Greengram 3.80 3.91 2.67 -1.13

5Cowpea 0.90 0.70 0.70 -0.20

6Avare 0.98 0.71 0.55 -0.43

7Mothbean 0.04 0.10 0.06 0.02

  Total Pulses 16.68 16.39 12.22 -4.46

Note: In view of late receipt of rains in some parts, kharif sowings are still under progress, it is likely that State may achieve 13.40 lakh hectares under pulses by end of Kharif season. Greengram & Blackgram area shifted to Soyabean in some parts. In some districts Redgram area has been diverted to Cotton on account better market prices.

Page 3: STATUS OF PRODUCTION OF PULSES DURING KHARIF 2011 KARNATAKA STATE STATUS OF PRODUCTION OF PULSES DURING KHARIF 2011 KARNATAKA STATE

Sl. No

Name of Pulses crop

Target of production

in 000 tonnes

Expected Production

Difference of production between target and

achievements

Reason of difference in production

1Redgram 520 436 -84As area coverage under pulses was low due to failure of rainfall in 2nd fortnight of June in Pulse growing districts pf Bidar, Gulbarga, Yadgiri,Bijapur and parts of Gadag and Dharwad . These estimates are subject to favourable climatic conditions in the remaining period of the crop growth.

2Horsegram 45 54 9

3Blackgram 56 31 -25

4Greengram 114 78 -36

5Cowpea 41 40 -1

6Avare 59 85 26

7Mothbean 1 2 1

  Total Pulses 836 726 -110

Page 4: STATUS OF PRODUCTION OF PULSES DURING KHARIF 2011 KARNATAKA STATE STATUS OF PRODUCTION OF PULSES DURING KHARIF 2011 KARNATAKA STATE

Sl.NOName of

pulses crop

Target of area in 000

ha

Target of production

in 000 tonnes

Proposed additional

area during 2011-12 as

compared to last year

Proposed additional

production during 2011-12 as

compared to last year

1Bengalgram 966 580

Details will be furnished after

State Level Rabi Workshop

Details will be furnished after State Level Rabi

Workshop

2Horsegram135 63

3Blackgram13 6

4Greengram12 5

5Cowpea33 8

6Avare7 3

7Mothbean0.00 0.00

  Total Pulses 1166 665

Page 5: STATUS OF PRODUCTION OF PULSES DURING KHARIF 2011 KARNATAKA STATE STATUS OF PRODUCTION OF PULSES DURING KHARIF 2011 KARNATAKA STATE

4.Details of Contingent plannning during Rabi 2011-12 to meet the deficient production of Pulses during Kharif 2011

a) Through area expansion of Rabi Pulses It is proposed to enhance Bengal gram area to the extent of 20% during Rabi 2011-12 (Target- 9.66 lakh ha , Revised target- 11.30 lakh ha)

b) Additional area under IPM in Pigeonpea It is proposed to cover 10000 ha under IPM component as an additional area under pigeonpea apart from A3P and 60000 pulse village programme ( 75386

ha)

c) Additional area under certified seeds distribution It is proposed to cover 10000 ha under certified seed distribution component as an additional area during Rabi 2011-12 under Bengalgram apart from A3P and 60000 pulse village programme

d) Any other interventions It is proposed to take up Community spraying on 10000 ha pigeon pea area during Kharif 2011-12

Page 6: STATUS OF PRODUCTION OF PULSES DURING KHARIF 2011 KARNATAKA STATE STATUS OF PRODUCTION OF PULSES DURING KHARIF 2011 KARNATAKA STATE

Sl. No

InterventionsApproved Rate of

AssistanceUnit

Targets Approved by GOI for 2011-12

Progress up to the end of August

2011(Committed)

Phy Fin Phy Fin

1 Seeds (i) Purchase of Breeder Seeds of Pulses from ICAR

Full cost as per uniform rate fixed by DAC (Approx. Rs.5234/-per Qtl)

Qtl. 800 40.00 20 1.25

(ii) Production of Foundation Seeds Rs. 1000/-per Qtl Qtl. 10000 100.00 150 1.50(iii) Production of Certified Seeds Rs. 1000/-per Qtl Qtl. 80000 800.00 1500 15.00(iv) Distribution of Certified Seeds Rs.1200/- per Qtl Qtl. 63910 766.92 15600 187.20v) Strengthening of State Seed Certification Agency

Rs.25.00lakhs per year 0 0.00 0 0.00

Sub-total (i + v)   154710 1706.920 17270 204.952 Organizing Technology Demonstration Rs.2000/demo

NosTo be taken up

under A3P0.00 0 0.00

3 Frontline Demonstration of Pulses Rs.5000/demo of 1 ha Ha 0 0.00 0 0.004 Integrated Nutrient Management:

(a) Lime/GypsumRs.750/- per Ha Ha. 13333 99.998 6740 50.55

(b) Micro-nutrients Rs.500/- per Ha Ha. 40000 200.00 18760 93.80( c) Assistance for Rhizobium Culture/PSB distribution.

Rs.100/- per Ha Ha.40000 40.00 22165 22.17

Sub-total INM (4-a to 4-c)

 

Ha. 81333 339.998 47665 166.52

5 Integrated Pest Management (IPM) Rs.750/- per Ha. Ha. 60000 450.00 34640 259.806 Assistance for distribution of NPV Rs.250/Ha Ha 0 0.00 0 0.007 Assistance for Distribution of PP Chemicals Rs.500/- per Ha Ha. 50000 250.00 21342 106.71

Sub-total IPM (5-7)    

110000 700.00 55982 366.51

Page 7: STATUS OF PRODUCTION OF PULSES DURING KHARIF 2011 KARNATAKA STATE STATUS OF PRODUCTION OF PULSES DURING KHARIF 2011 KARNATAKA STATE

Sl. No

InterventionsApproved Rate of

AssistanceUnit

Targets Approved by GOI for 2011-12

Progress up to the end of

August 2011

Phy Fin Phy Fin

8 Assistance for Weedicides Rs.500/- per Ha Ha. 10000 50.00 3400 17.00

9 Incentive of Knap Sack Sprayers Rs.3000/- per machine Nos 1500 45.00 1110 23.30

10 Distribution of Zero Till Seed Drills Rs.15000/- per machine

Nos30 4.50 0 0.00

11 Distribution of Multi crop planter Rs.15000/- per machine

Nos30 4.50 0 0.00

12 Distribution of Seed drill Rs.15000/- per machine

Nos200 30.00 100 15.00

13 Distribution of RotovatorRs.30000/- per machine

Nos 100 30.00 10 3.00

14Incentive on Laser Land Levelers

Rs.150000/ machine for group of 10 farmers

Nos 5 7.50 0 0.00

Sub Total Machinery (Item 9 to 14)

1765 121.50 1220 41.30

15 Incentive for Pump sets Rs.10000/- per machine

Nos1200 120.00 100 10.00

16 Distribution of Sprinkler Sets Rs.7500/- per Ha. Ha. 400 30.00 15 1.13

17Assistance for Pipe for carrying water from source to the field

Rs.15000/- for carrying pipe upto 800 meters

Mtrs1200 180.00 540 71.00

Page 8: STATUS OF PRODUCTION OF PULSES DURING KHARIF 2011 KARNATAKA STATE STATUS OF PRODUCTION OF PULSES DURING KHARIF 2011 KARNATAKA STATE

Sl. No InterventionsApproved

Rate of Assistance

Unit

Targets Approved by GOI for 2011-12

Progress up to the end of August

2011

Phy Fin Phy Fin

18

(a) Extension, Training including Award to Best Performing District (i) Training on pattern of FFS

Rs.17000/- per trg.

Nos 300 51.00 110 18.70

(ii) State Level Trainings for Trainers Rs.1.00 lakh per trg.

Nos1 1.00 1 1.00

(iii) Award for Best Performing District Rs.5.00 lakh per district

No. of Dist.

1 5.00 0 0.00

19 Local Initiatives (Activity-wise)

  

260.00 0 0.00

20

Miscellaneous Expenses relating to PMT including contractual services Pol and other expenses (a) District Level (Existing NFSM Districts)

Rs. 4.47 lakh per District

No of Dist

13 58.11 3 3.10

(b) State Level Rs.6.28 lakhper State

No. of State

1 6.28 0 1.50

(c ) Misc. expenses to State for other districts Rs. 1.00 lakh per district.

 17 17.00 0 2.67

TOTAL FINANCIAL (1 - 19)     3646.808 905.37

Page 9: STATUS OF PRODUCTION OF PULSES DURING KHARIF 2011 KARNATAKA STATE STATUS OF PRODUCTION OF PULSES DURING KHARIF 2011 KARNATAKA STATE

5.2. District-wise / Crop-wise A3P units and Financial allocation for Kharif 2011

Sl. No. Districts

Crop wise A3P units (1 unit=1000 ha.)

Tur Green gram

Black gram

Total

Financial allocation (including e- pest

surveillance grants) Rs. in lakhs

1 Bidar 2 2 3 7 348

2 Gulbarga 3 1 1 5 258

3 Yadgiri 1 1 1 3 150

4 Raichur 1 - - 1 54

5 Bijapur 1 - - 1 54

6 Gadag - 3 - 3 144

7 Dharwad - 2 - 2 96

Total 8 9 5 22 1104

Page 10: STATUS OF PRODUCTION OF PULSES DURING KHARIF 2011 KARNATAKA STATE STATUS OF PRODUCTION OF PULSES DURING KHARIF 2011 KARNATAKA STATE

Seed minikits distributed under A3P Programme during Kharif 2011-12

Sl. No. DistrictsTur Green gram Black gram Total

No.of Kits

AmountNo.of Kits

AmountNo.of Kits

AmountNo.of Kits

Amount

1 Bidar 2000 8.00 2000 8.00 3000 12.00 7000 28.00

2 Gulbarga 3000 12.00 1000 4.00 1000 4.00 5000 20.00

3 Raichur 1000 4.00 -   -   1000 4.00

4 Bijapur 1428 5.71   -   1428 5.71

5 Gadag - - -   -   -  

6 Dharwad - - -   -   -  

7 Yadgiri - - -   -   -  

Total 7428 29.71 3000 12.00 4000 16.00 14428 57.71

Note:- Distribution of seed minikits of greengram could not undertaken in Gadag (3000 kit), Dharwad(2000 kits) and Yadgir (1000kits)district during Kharif. Distribution of seed kits of Blackgram (1000 kits ) and Tur (1000 kits) could not be undertaken during Kharif in Yadgir district the same will be taken up during Rabi with Bengalgram Kits

Page 11: STATUS OF PRODUCTION OF PULSES DURING KHARIF 2011 KARNATAKA STATE STATUS OF PRODUCTION OF PULSES DURING KHARIF 2011 KARNATAKA STATE

Sl.no District Redgram Green gram Black gram TotalNo of

kits

Amount No of

kits

Amount No of kits

Amount No of kits

Amount Rs.

1153.30 perKit

Rs. 456.80 perKit

Rs. 456.80 perKit

1 Bidar 8000 92.264 25700 117.398 24500 111.916 58200 321.578

2 Gulbarga 11340 130.784 8698 39.732 12698 58.004 32736 228.52

3 Raichur 4000 46.132 - - - - 4000 46.132

4 Bijapur 5800 66.892 - - - - 5800 66.892

5 Gadag - - 20000 91.36 - - 20000 91.36

6 Dharwad - - 20000 91.36 - - 20000 91.36

7 Yadgiri 4160 47.977 9302 42.4915 9302 42.4915 22764 134.96

Total 33300 384.049 83700 382.3415 46500 212.4115 163500 978.802

In order to cover more number of small and marginal farmers under A3P for large number of small and marginal farmers INM/IPM input kits for acre demonstration size were distributed in the selected districts. The cost of input kit for tur crop worked out to Rs.1153.30 and for greengram and blackgram it worked out to Rs.456.80. Hence, the State could enable to takeup demonstrations in 65400 ha (163500 acres) instead of targeted 22000 ha (55000 acres).

Crop-wise/District-wise distribution of Input kits (containing INM/IPM) under A3P Programme during Kharif 2011-12

Page 12: STATUS OF PRODUCTION OF PULSES DURING KHARIF 2011 KARNATAKA STATE STATUS OF PRODUCTION OF PULSES DURING KHARIF 2011 KARNATAKA STATE

Sl. No InterventionsApproved

Rate of Assistance

Unit

Targets Approved by GOI for 2011-12

Progress up to the end of August 2011

Phy Fin Phy Fin

1 Accelerated Pulse Production Programme(A3P) -

I) Kharif Seed and IPM/INM kits for 22units of 1000 ha each for Kharif

Tur-Rs. 54.00 lakh per unit

Greengram- Rs. 48.00 lakh per unit

Blackgram Rs. 48.00 lakh per unit

Ha. 22000ha 1104.001047600 INM and IPM kits

978.80

Rabi Seed and IPM/INM kits for 10 units of 1000 ha each for Kharif

Bengal gram -Rs.56.00lakhs per unit

Ha 10000 ha 560.00 0 0.00

Total (Kharif and Rabi) 32000 ha 1664.00 1047600 978.80ii) e- Pest surveillance Kharif 67.20

93.90 0 0.00Rabi 26.70

  Total 20 (i) to (ii)     1757.90 978.80

Physical and Financial Progress of A3P during Kharif 2011

Page 13: STATUS OF PRODUCTION OF PULSES DURING KHARIF 2011 KARNATAKA STATE STATUS OF PRODUCTION OF PULSES DURING KHARIF 2011 KARNATAKA STATE

5.3.Physical and Financial Progress of 60,000 village Programme 2011

The main components proposed by GOI are: i) Insitu moisture conservation ii) A3P Programme iii) Support for formation of Market Linked Supply Chain Management utilizing SFAC

I. Insitu moisture conservation

• Action has already been initiated to enroll farmers for opening of Farm Ponds including lining by advertising in local newspapers at District level

• Guidelines have been finalized and communicated to selected four districts: Gulbarga, Yadgir, Bidar and Bijapur

Progress achieved

Page 14: STATUS OF PRODUCTION OF PULSES DURING KHARIF 2011 KARNATAKA STATE STATUS OF PRODUCTION OF PULSES DURING KHARIF 2011 KARNATAKA STATE

II. INM/IPM Kits allotted under A3P programme (Targets)

District Crop wise A3P units

Kharif Rabi Total Total Budget

provision (In lakh

Rs.) including

e- pest

surveillance

Pigeon pea Black gramgram

1 Bidar - 3 1 4

2 Gulbarga 3 3 - 6

3 Bijapur 3 - 1 4

4 Dharwad - - 1 1

5 Gadag - - 1 1

Total 6 6 4 16 836.00

Page 15: STATUS OF PRODUCTION OF PULSES DURING KHARIF 2011 KARNATAKA STATE STATUS OF PRODUCTION OF PULSES DURING KHARIF 2011 KARNATAKA STATE

IIa.Seed minikits distributed under 60,000 village Programme(A3P) during Kharif 2011-12

Sl. No. Districts

Tur

No.of KitsAmount

Rs. In lakhs

1 Bidar 1000 4.00

2 Gulbarga 2000 8.00

3 Bijapur 2000 8.00

4 Yadgiri 1000 4.00

Total 6000 24.00

Page 16: STATUS OF PRODUCTION OF PULSES DURING KHARIF 2011 KARNATAKA STATE STATUS OF PRODUCTION OF PULSES DURING KHARIF 2011 KARNATAKA STATE

IIb.Crop-wise/District-wise distribution of Input kits (containing INM/IPM)

Sl.no District Redgram

No of kits Amount Rs. In lakhs

Rs. 1153.30 perKit

1 Bidar 4161 47.99

2 Gulbarga 8322 95.98

3 Yadgir 4161 47.99

4 Bijapur 8322 95.98

Total 24966 287.94

Page 17: STATUS OF PRODUCTION OF PULSES DURING KHARIF 2011 KARNATAKA STATE STATUS OF PRODUCTION OF PULSES DURING KHARIF 2011 KARNATAKA STATE

iii) Support for formation of Market Linked Supply Chain Management utilizing SFAC

3 Agencies identified by Government of India

a. Vrutti Livelihood Resource Centre b. Indian Society Agri-business Professionals

c. Access Livelihood Consulting India

Interaction meeting between the Agencies , distrct level Implementing Officers will be organized by middle of September 2011

Formation of groups and providing Marketing linkages will be completed by the end of September

Page 18: STATUS OF PRODUCTION OF PULSES DURING KHARIF 2011 KARNATAKA STATE STATUS OF PRODUCTION OF PULSES DURING KHARIF 2011 KARNATAKA STATE

5.4. E-pest Surveillance

Training of 6 Master Trainers completed

Selection of 70 Scouts completed

Identification of farmers and training to the groups is under progress

Regular interaction with Scientists of NCIPM is undertaken

Grants have been released to the districts .

Page 19: STATUS OF PRODUCTION OF PULSES DURING KHARIF 2011 KARNATAKA STATE STATUS OF PRODUCTION OF PULSES DURING KHARIF 2011 KARNATAKA STATE

5.5. Scheme-wise reasons for less achievements in Pulse Programme

Due to delayed monsoon the area under Blackgram and Greengram is reduced and the same will be covered by enhancing the area under Bengalgram

Blackgram and Greengram A3P kits allotted during Kharif could not be taken up due to the above reason and the same will be carried forward for Rabi 2011 with Bengalgram

Page 20: STATUS OF PRODUCTION OF PULSES DURING KHARIF 2011 KARNATAKA STATE STATUS OF PRODUCTION OF PULSES DURING KHARIF 2011 KARNATAKA STATE

5.7. Additional Funds requirement for additional programme of Pulses

Sl. No

Crop Inputs required Amount required in lakhs

1. Bengalgram Seeds (10,000 ha x 0.62 Qtls x Rs.0.05 lakhs)

310.00

2. Bengalgram INM/IPM Kits(10,000 ha. X Rs. 0.05 lakhs)

500.00

3. Pigeonpea Community spraying (10,000 ha. X Rs.0.005 lakh)

50.00

Total 860.00

Page 21: STATUS OF PRODUCTION OF PULSES DURING KHARIF 2011 KARNATAKA STATE STATUS OF PRODUCTION OF PULSES DURING KHARIF 2011 KARNATAKA STATE