Statistics for Results Facility Catalytic Fund Annual Report May 2017 SRF Administration Unit Development Economics Data Group Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Upload: others

Post on 03-Jul-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Statistics for Results Facility - World Bankpubdocs.worldbank.org › ... › SRF-2017-Annual-Report.pdf · extension, the SRF Council approved the allocation of remaining funds to

Statistics for Results Facility Catalytic Fund Annual Report May 2017

SRF Administration Unit Development Economics Data Group

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Page 2: Statistics for Results Facility - World Bankpubdocs.worldbank.org › ... › SRF-2017-Annual-Report.pdf · extension, the SRF Council approved the allocation of remaining funds to

[1]

Acronyms and Abbreviations

AfDB African Development Bank AFRISTAT African Statistics Observatory ANSD National Agency for Statistics and Demography (Senegal) BOP Balance of Payments

BPM Balance of Payments Manual

CAPI CIDA

Computer-Assisted Personal Interview Canadian International Development Agency

COFOG Classification of Functions of Government

COICOP Classification of Individual Consumption according to Purpose

COPNI Classification of Purposes on Non-Profit Institutions

CPC Central Product Classification

CPI Consumer Price Index

CRVS Civil Registration and Vital Statistics

CSA Central Statistical Agency of Ethiopia

CSO Central Statistical Office of Afghanistan DANIDA Danish International Development Agency DfID Department for International Development (UK) DECDG Development Economics Data Group (World Bank) DFATD Department of Foreign Affairs, Trade, and Development (Canada) DHS Demographic and Household Survey DQAF Data Quality Assurance Framework DRC Democratic Republic of the Congo e-CSA Statistics-on-Wheels Initiative (Ethiopia) EICV Enquête intégrale sur les conditions de vie des ménages (Integrated Household Survey) ENSAE National School of Statistics and Economic Analysis (Senegal) ENSEA Ecole Nationale Supérieure de Statistique et d’Economie Appliquée (Abidjan) ESMF Environmental and Social Management Framework EU European Union FAO Food and Agriculture Organization GDP Gross Domestic Product GFS Government Finance Statistics GIMPA Ghana Institute of Management and Public Administration GIS Geographic Information System GIZ-IS German International Cooperation Agency- International Services GNI Gross National Income GOPA German consulting firm (twinning partner for Lao PDR) GPS Geographical Positioning System GSDP Ghana Statistical Development Plan GSS Ghana Statistical Service IBES Integrated Business Establishment Survey ICC Index of Construction Costs (Senegal) ICT Information and Communications Technology IDA International Development Association ILO International Labor Organization IMF International Monetary Fund IMIS Institute for the Management of Information Systems INS National Institute of Statistics (DRC) IPPSE Services Production Price Index (Senegal) ISE Ingenieur Statisticien-Economiste (MA equivalent)

Page 3: Statistics for Results Facility - World Bankpubdocs.worldbank.org › ... › SRF-2017-Annual-Report.pdf · extension, the SRF Council approved the allocation of remaining funds to

[2]

ITS Ingenieur Travaux Statistiques (BA equivalent) JICA Japan International Cooperation Agency KOICA Korean International Cooperation Agency LFS Labor Force Survey L2A Listening to Africa LSB Lao Statistical Bureau M&E Monitoring and Evaluation MDA Ministries, Departments, Agencies MICS Multiple Indicators Cluster Survey NADA National Data Archive NBS National Bureau of Statistics of Nigeria NISR National Institute of Statistics of Rwanda NPG National Partnership Group NPoPC National Population Commission (Nigeria) NSDS National Strategy for the Development of Statistics NSO National Statistical Office NSS National Statistical System OPCS Operations and Country Services (World Bank) PDO Project Development Objectives PIU Project Implementation Unit PPI Purchasing Price Index SDC Swiss Development Cooperation SDDS Special Data Dissemination Standard SDG Sustainable Development Goals SDMX Statistical Data and Metadata Exchange SITC Standards for International Trade Classification SNA System of National Accounts SQL Structures Query Language SPSS Statistical Package for the Social Sciences SRF Statistics for Results Facility SRF-CF Statistics for Results Facility – Catalytic Fund SSA/SSB State Statistical Agency/Bureau (Nigeria) SSMP State Statistical Master Plan (Nigeria) STATA Data Analysis and Statistical Software for Professionals TA Technical Assistance TSA Tourism Satellite Account UNDP United Nations Development Program UNESCO United Nations Education, Scientific and Cultural Organization UNFPA United Nations Fund for Population Activities UNICEF United Nations Children Fund UNSIAP United Nations Statistical Institute for Asia and Pacific USAID United States Agency for International Development USS User Satisfaction Survey WB World Bank WHO World Health Organization WFP World Food Program

Page 4: Statistics for Results Facility - World Bankpubdocs.worldbank.org › ... › SRF-2017-Annual-Report.pdf · extension, the SRF Council approved the allocation of remaining funds to

[3]

Contents

I. Introduction .......................................................................................................................................................... 9

II. New Developments in the SRF-CF Trust Fund ...................................................................................................... 9

SRF-CF Extension and Allocation of Funds ...................................................................................................... 9 Change in Governance Structure of SRF Council ............................................................................................. 9 Afghanistan Technical Assistance Project ..................................................................................................... 10

III. Country Progress with SRF-CF Pilot Phase .......................................................................................................... 10

Overview ....................................................................................................................................................... 10 Project Updates since May 2016 ................................................................................................................... 11

IV. Financial Status of the Catalytic Fund ................................................................................................................. 29

V. Summary Status of SRF Projects ......................................................................................................................... 29

ANNEX 1: Snapshot of Key Elements of SRF Projects, by Country .............................................................................. 31

ANNEX 2: SRF –Generic Results Framework, by pilot country ................................................................................... 33

ANNEX 3: AFGHANISTAN Strengthening the National Statistical System Project, Outputs by Components ............. 38

ANNEX 4: NIGERIA SRF Project, Outputs by Component ............................................................................................ 39

ANNEX 5: RWANDA – Achievements by Components ................................................................................................ 43

ANNEX 6: ETHIOPIA – Training Activities ..................................................................................................................... 44

ANNEX 7: GHANA Capacity Building Activities, 2014-2016 ........................................................................................ 45

ANNEX 8: AFGHANISTAN Results Framework – Strengthening Statistical Capacity Technical Assistance ................. 47

ANNEX 9: DEMOCRATIC REPUBLIC OF CONGO Results Framework -- Catalytic Project to Strengthen the National

Statistical Institute ....................................................................................................................................................... 48

ANNEX 10: ETHIOPIA: Results Framework -- Statistics for Results Project ................................................................. 49

ANNEX 11: GHANA Revised Results Framework – Statistics Development Project ................................................... 53

ANNEX 12: LAO PDR Results Framework -- Strengthening the National Statistical System Project (LAOSTAT) ......... 56

ANNEX 13: SENEGAL Results Framework -- Statistics for Results Project .................................................................. 58

Page 5: Statistics for Results Facility - World Bankpubdocs.worldbank.org › ... › SRF-2017-Annual-Report.pdf · extension, the SRF Council approved the allocation of remaining funds to

[4]

Highlights

This is the eighth annual report on the Statistics for Results Facility Catalytic Fund (SRF-CF), a multi-donor

supported initiative, which became operational in 2009. Its main objective is to increase the capacity of

developing countries in formulating policies and decision-making for development through sustained

improvement in the production, availability and use of quality statistics in participating countries. This

report summarizes the progress made over the period (May 2016 through May 2017) in the pilot projects

of the SRF -CF.

Since its inception, the SRF has supported eight countries, of which two have successfully completed and

fully disbursed their project (Nigeria, Rwanda), one closed without full disbursement (Afghanistan), and

the remaining (Democratic Republic of the Congo (DRC), Ethiopia, Ghana, Lao PDR, and Senegal) are at

various stages of project implementation. Another project, Listening to Africa (L2A), is nearly completed.

To build on activities of first project, Afghanistan received a small technical assistance grant in 2016. The

table below presents key specifics of these projects.

Key Details of the SRF Pilot Projects, as of May 2017

Country Amount (USD m)

Effectiveness Date Closing Date Disbursement Rate (%)

Afghanistan 14 March 2011 February 2016 30.0

Afghanistan 0.55 July 2016 December 2018 14.9

DRC 11.8 January 2015 April 2019 34.8

Ethiopia 10.0 June 2014 June 2019 63.1

Ghana 10.0 May 2014 June 2018 100.0

Lao PDR 8 July 2013 December 2017 66.1

L2A 1.8 May 2014 December 2017 78.1

Nigeria 10 June 2011 February 2014 97.7

Rwanda 10 June 2012 June 2015 99.8

Senegal 2.2 July 2014 October 2018 81.4

N.B. Disbursement levels reflect original commitments, excluding additional SRF funding for Ethiopia, Ghana, and Senegal approved in March 2017. The closing dates for DRC, Ethiopia, and Lao PDR are proposed dates, following SRF-CF extension.

In March 2017, a two-year extension of the SRF-CF Trust Fund became effective, to allow for the

completion of activities in a number of projects and give additional time to utilize remaining SRF funds.

The UK Department for International Development (DfID) agreed to the extension, while the Netherlands

decided to exit the Trust Fund, considering their financial contribution fully spent. Subsequent to this

extension, the SRF Council approved the allocation of remaining funds to the ongoing projects in Ethiopia

(USD 5 million), Ghana (USD 4.5 million) and Senegal (USD 1 million). The SRF-CF will close in December

2019.

Progress in SRF projects suggests that, overall, statistical capacity is improving, data is becoming more

accessible, and awareness of the importance of statistics is growing in the pilot countries. This is

particularly striking in Nigeria and Rwanda, where the completed projects successfully met their targets,

generally achieved their objectives, and garnered further support from World Bank operations. In Ghana,

Page 6: Statistics for Results Facility - World Bankpubdocs.worldbank.org › ... › SRF-2017-Annual-Report.pdf · extension, the SRF Council approved the allocation of remaining funds to

[5]

despite a two-year delay in getting Parliamentary approval, the project has made significant strides in

carrying out activities, including a sensitive buyout and redeployment program for statistical staff and

considerable investment in capacity building activities. In Ethiopia, the SRF project has contributed to

modernizing the organizational, human, and physical infrastructure of the statistical system, while in

Senegal, products, such as a quarterly labor force survey and the producer price index for services, have

raised Senegal’s profile as a pioneer in statistical development in Africa. In the Lao PDR, the arrival of the

twinning partner has led to visible progress in human resource development and IT activities. The L2A

initiative has shown the cost-effectiveness of mobile phone surveys, as well as the potential use of survey

results in policy dialogue and decision-making in volatile and high-risk environments. Encouraging stories

on the impact of the SRF experience are emerging (Below).

SRF – Getting Results on the Ground

Ethiopia

The introduction of IT tools, such as tablets and statistical

software, have resulted in large savings in both data

collection and data analyses (e.g. a saving of USD 200K

for the Central Statistical Agency’s agriculture sample

survey). In addition, the skills training program initiated

at CSA under the project is providing a more systematic

way of strengthening CSA performance.

Senegal

Through the introduction of products, such as the quarterly Labor

Force Survey, Senegal is now in a better position to qualify for

Special Data Dissemination Standard (SDDS) status with the IMF.

This is a notable achievement, as Senegal is currently the only sub-

Saharan country that produces this survey, other than South Africa.

Senegal is also a pioneer in Africa in the production and

dissemination of the producer price index for services.

Ghana

Extensive training activities in

statistics, data analysis, survey

research methods, and information

technology tools have strengthened

the ability of Ghana’s Statistical

Service staff to conduct

comprehensive surveys (business

census and household survey) and

prepare survey reports, with minimal

support from external consultants.

Listening to Africa

(Madagascar, Malawi,

Senegal, Togo)

This small project is changing

old habits/procedures and

making data more accessible:

All participating NSOs release

results from phone surveys

on website, free of charge.

Mobile phone surveys now

seen as cost-effective way to

collect data for World Bank’s

household survey strategy.

Survey results informing

policy dialogue, as in

Madagascar’s discussions on

taxation with public and

private sectors, and helping

to operationalize priorities, as

in Mali’s conflicted regions.

Page 7: Statistics for Results Facility - World Bankpubdocs.worldbank.org › ... › SRF-2017-Annual-Report.pdf · extension, the SRF Council approved the allocation of remaining funds to

[6]

Progress over the past year

The main achievements of the past year, starting with the more advanced projects, include:

Ghana: The USD 10 million SRF project, jointly implemented with an IDA credit of USD 30 million,

has advanced quickly, despite a two-year delay for Parliamentary signature. Significant

achievements are visible in the areas of institutional reform, including a buyout and deployment

program for statistical staff, and human resource development. Capacity building activities have

also received significant focus, with 53 staff of the Ghana Statistics Service pursuing master’s

degree programs in economics, statistics, demography and other relevant studies (6 already

graduated), while other staff have participated in a number of hands-on courses in economic

modeling, demographic analysis, sampling techniques, survey methods, data management,

information technology, and other areas. With regard to data development, the project has

supported a number of socio-economic data production and dissemination activities. These

include a post-census cartographic update and digitization of the enumeration area maps; the

Integrated Business Establishment Survey (IBES), including the production of a business register;

a Labor Force Survey; the capture of births and deaths record from 2009-2012 in electronic form;

the 2014/15 school census; and a report on the causes of maternal deaths. To build on these

notable achievements, the SRF Council allocated an additional USD 4.5 million to Ghana for

support to a household survey (MICS), an agricultural survey, and sensitization and training on

Sustainable Development Goals (SDG).

Senegal: The SRF project, operational since July 2014, has achieved most of its objectives. SRF

activities have introduced the quarterly Labor Force Survey (LFS), the construction cost index, the

producer price index for services and tourism surveys. A quarterly LFS was the last requirement

for Senegal’s eligibility to the IMF SDDS status. In addition, Senegal is currently the only sub-

Saharan country, other than South Africa, to produce a quarterly LFS and a pioneer in the

production and dissemination of a producer price index for services. Project support to the

National School of Statistics and Economic Analysis (ENSAE) has strengthened teaching capacity

and a number of its graduates are working in various ministries and international organizations.

The project has financed training sessions for third year students on international monetary

economics and micro modelling, has purchased statistics books for ENSAE students and the

school’s library and set up a language laboratory for English. Its objective of increasing the

presence of women at the ENSAE has faced some difficulties in that ENSAE students need a strong

base in science education, an area not often frequented by girls in high school. Over the last three

school years, 29 women graduated from ENSAE, representing roughly six percent of average total

enrollment. To support further these achievements in statistical development, the SRF Council

granted Senegal an additional USD 1 million to support a number of economic surveys, the

extension of the cost construction index to other regions and products, and improvements in

administrative data.

Page 8: Statistics for Results Facility - World Bankpubdocs.worldbank.org › ... › SRF-2017-Annual-Report.pdf · extension, the SRF Council approved the allocation of remaining funds to

[7]

Lao PDR: Project implementation continues to accelerate since the arrival of the twinning partner,

GOPA, in July 2015. The twinning arrangement has provided the Lao Bureau of Statistics with a

rich source of timely technical expertise in a variety of areas. On data development, the main

outputs include the re-benchmarking of GDP and rebasing of the CPI. With regard to capacity

building, the project supported the development of a long-term Human Resources Development

Strategy for LSB (completed), the preparation of an ICT modernization plan, and a variety of

training activities linked to both macroeconomic statistics and IT skills. The project has procured

a large IT equipment package for the new LSB building and a Data Center. Completion of the LSB

building, financed by the government, is critical to ensure proper installation of ICT infrastructure

and related training before project closing. In view of construction delays, the project team plans

to extend the project closing date.

Ethiopia: Project implementation is progressing satisfactorily. The construction of four branch

offices is almost complete, expected by the summer 2017, and the furbishing of these offices with

furniture and IT equipment is underway. An IT training room is functional at the CSA new building

for training of CSA staff on basic computer skills. Over 2000 staff from the CSA and public agencies

(MDA) have participated in local training (such as statistical awareness, sampling techniques, and

statistical software), while over one hundred staff of the national statistical system (NSS) have

benefited from experience-sharing training abroad. The CSA is preparing to launch a Statistics-on-

Wheels Initiative to raise statistical awareness among the public and improve the dissemination

of statistical information. To continue this positive progress, the SRF Council allocated an

additional USD 5.5 million, mainly focused on supporting the further development of a business

register, the upgrading of agriculture statistics, and rebasing the Consumer Price Index and

national accounts, as well as construct two additional CSA branch offices, equipped with IT

capabilities and training rooms.

Democratic Republic of the Congo (DRC): At the request of the government, the project was re-

configured in May 2017. Due to political and civil unrest, the cartography exercise of the

population census was delayed and the funds for this activity were re-allocated to the demolition

and construction of a new building for the National Statistical Institute (INS). The IDA’s Statistics

Development Project, active since June 2016, will fund the cartography exercise, along with

funding by the African Development Bank (AfDB) and the UNFPA. Prior to this re-allocation of

resources, the SRF project financed the preparation of the census cartography (including the

design of data collection tools, the methodology of the cartography, and the planning of a work

program) and its pilot phase. The pilot phase of the enterprise census is also completed and

fieldwork is ongoing. Progress is visible in the area of strengthening the capacity of the INS. The

23 students enrolled in the formal 2-year training program with the Statistical School in Abidjan

(Ecole Nationale Supérieure de Statistique et d’Economie Appliquée, ENSEA) successfully completed

their first year. In addition, the preparation of Congolese students for formal admission to ENSEA,

supported by the project, has proven very successful -- six students passed the exams, as

compared to none in the previous five years. Among the six students, one was admitted to a

master degree program in statistics and five to a bachelor degree in statistics. The bidding

documents for the demolition and construction of the INS building are completed and the

Page 9: Statistics for Results Facility - World Bankpubdocs.worldbank.org › ... › SRF-2017-Annual-Report.pdf · extension, the SRF Council approved the allocation of remaining funds to

[8]

selection process for a construction firm is underway. To allow sufficient time for building

construction and other data activities, the project will now close in April 2019.

Afghanistan: To build on efforts of the first SRF project, the SRF-CF allocated a Bank-executed

Technical Assistance grant of USD 0.55 million in July 2016. The project supports continued

improvements in the national accounts and in the website of the Central Statistical Office (CSO),

as well as training on statistical analysis and report writing of CSO staff.

Listening to Africa: This project, piloting the collection of household survey data using mobile

phones in four African countries, is nearing completion, with satisfactory results. Togo and

Madagascar have completed their phone surveys, while Malawi and Senegal will complete them

by June 2017. Welfare data from the surveys has contributed to analytical work in these countries

from overall country strategy to tracking poverty. Moreover, in June 2016, the project team

finalized a Handbook, “Mobile Phone Panel Surveys in Developing Countries: A practical guide for

micro data collection”, which will serve as a resource or practitioners who are increasingly turning

to mobile devices for data collection. In February 2017, the initiative, Listening to Africa, was

voted as the most impactful knowledge product in the Africa Region of the World Bank by Bank

staff.

Annex 2 presents the SRF Results Framework populated with the latest country data.

Page 10: Statistics for Results Facility - World Bankpubdocs.worldbank.org › ... › SRF-2017-Annual-Report.pdf · extension, the SRF Council approved the allocation of remaining funds to

[9]

I. Introduction

1. The Statistics for Results Facility (SRF) is a multi-donor supported initiative, funded by the United

Kingdom and the Netherlands and managed by the World Bank, to strengthen statistical capacity in poor

countries and act as a catalyst in mobilizing new finance from other sources. The ultimate objective of the

SRF and of the Catalytic Fund (SRF-CF) is to support better policy formulation and decision-making through

sustained improvement in the production, availability and use of official statistics. It places a strong focus

on statistical capacity building.

2. This is the eighth annual report issued by the SRF-CF, which became operational in 2009. The

report presents developments in the Trust Fund, as well as progress of project activities over the period

May 2016-May 2017 and future project activities.

3. The SRF strongly promotes support to a country’s National Strategy for the Development of

Statistics (NSDS), which provides the basis for strengthening a national statistical system, focusing on

strategic issues and coordination within the statistical system as a whole and among development

partners.

II. New Developments in the SRF-CF Trust Fund

SRF-CF Extension and Allocation of Funds

4. In March 2017, a two-year extension of the SRF-CF Trust Fund became effective, to allow for the

completion of activities in a number of projects and give additional time to utilize remaining SRF funds.

The UK Department for International Development (DfID) agreed to the extension, while the Netherlands

decided to exit the Trust Fund, considering their financial contribution fully spent. The bulk of the

remaining funds are due to the Afghanistan project, which closed in February 2016 with roughly one-third

of funds disbursed. Subsequent to the extension, the SRF Council approved the allocation of remaining

funds to the ongoing projects in Ethiopia (USD 5 million), Ghana (USD 4.5 million) and Senegal (USD 1

million). Details on the use of the additional funds are presented under each country’s section below.

The extension has also meant a restructuring of original project plans, including revised Results

Frameworks, which are underway.

Change in Governance Structure of SRF Council

5. As requested by the World Bank’s Vice President of Operations and Country Services (OPCS), the

Council agreed to replace OPCS as World Bank representative on the Council with the Development

Economics Vice Presidency to be represented by the Director of the Data Group of Development

Economics (DECDG). The Charter now reflects this change.

Page 11: Statistics for Results Facility - World Bankpubdocs.worldbank.org › ... › SRF-2017-Annual-Report.pdf · extension, the SRF Council approved the allocation of remaining funds to

[10]

Afghanistan Technical Assistance Project

6. When the Afghanistan project closed in 2016, the project team recommended building on the

progress made in specific areas of statistical development by the closed project. With the agreement of

the SRF Administration Unit, a small Technical Assistance project (USD 0.55 million) to focus on the

achievements of the first SRF project became active in July 2016. The project mainly focuses on

strengthening a number of areas of the national accounts, the statistical agency’s website, and improving

staff capacity in data analysis and report writing. To address project management difficulties encountered

by the previous project, the World Bank is responsible for project implementation.

III. Country Progress with SRF-CF Pilot Phase

Overview

7. Since February 2010,

the SRF Council has allocated

SRF-CF grants to pilot

projects in Afghanistan,

Democratic Republic of the

Congo (DRC), Ethiopia,

Ghana, Lao PDR, Nigeria,

Rwanda, and Senegal. In July

2016, the SRF-CF approved a

small Technical Assistance

grant to continue the work of

earlier project. The SRF also

supports an innovative

project, Listening to Africa

(L2A), which aims at piloting

the use of cell phones to

gather high frequent

household level data in a number of African countries. As of May 2017, two projects were completed

(Nigeria and Rwanda), another closed (Afghanistan), and the remaining projects under implementation,

as presented in Table 1. Although this report will not discuss the three closed projects, Annexes 3-5

present their key project outputs by component, for information purposes.

8. In all countries, except for the L2A project, the action plan of the NSDS is the basis for SRF projects.

In general, the projects place considerable emphasis on institutional strengthening, including capacity

building activities, and data development in official statistics, including sector statistics. As recommended

by the SRF Charter, all countries have in place a national partnership group that meets regularly or as

necessary.

Table 1: Status of Pilot Projects, as of May 2017

Country Amount (USD m)

Effectiveness Date

Closing Date Disbursement Rate (%)

Afghanistan 14 March 2011 February 2016 30.0

Afghanistan 0.55 July 2016 December 2018 14.9

DRC 11.8 January 2015 April 2019 34.8

Ethiopia 10 June 2014 June 2019 63.1

Ghana 10 May 2014 June 2018 100.0

Lao PDR 8 July 2013 December 2017 66.1

L2A 1.8 May 2014 December 2017 78.1

Nigeria 10 June 2011 February 2014 97.7

Rwanda 10 June 2012 June 2015 99.8

Senegal 2.2 July 2014 October 2018 81.4

N.B. Disbursement levels reflect original commitments, excluding additional SRF funding for Ethiopia, Ghana, and Senegal approved in March 2017. The closing dates for DRC, Ethiopia, and Lao PDR are proposed dates, following SRF-CF extension.

Page 12: Statistics for Results Facility - World Bankpubdocs.worldbank.org › ... › SRF-2017-Annual-Report.pdf · extension, the SRF Council approved the allocation of remaining funds to

[11]

9. To foster a network of collaboration among the pilot countries, the SRF Administration Unit

organized a sixth meeting of the heads of the statistical offices of the project countries in March 2017 (as

a side meeting to the annual UN Statistical Commission meetings). This experience-sharing meeting,

attended by the statistical heads of Ethiopia, Ghana, Lao PDR, and Senegal, reported on project

achievements and highlighted project impact on respective statistical systems.

Project Updates since May 2016

10. This section highlights achievements made in the pilot projects, as well as activities planned with

the additional SRF allocations to Ethiopia, Ghana, and Senegal. Project teams are in the process of revising

project documents and respective Results Frameworks, following the 2-year extension of the SRF-CF and

the additional allocation of SRF funds (revised Results Frameworks for the DRC and Ethiopia are presented

in Annexes 9-10). Country Results Frameworks reflect the latest information from project supervision

missions (Annexes 8-13). Annex 2 presents the SRF generic Results Framework.

Afghanistan (US$ 0.55 million)

11. As mentioned above, a World Bank-executed Technical Assistance project became operational in

July 2016 and will close in December 2018. Box 1 presents key elements of the TA project.

12. Overall project implementation is progressing

slowly, mainly due to rigid, hierarchical management at

the CSO and difficulty in identifying experts, acceptable

to the CSO, that are available and willing to go to

Afghanistan. The national accounts component is

progressing well, with the assistance of an expert that

was involved in the previous SRF project. At the request

of the CSO, the expert is working on setting the base for

the development of regional and quarterly GDP, as well

as preparing the groundwork for the development of a

Producer Price Index in one pilot industry. In addition,

the Business Establishment Survey was completed and

its results will be translated into Dari and/or Pashto,

possibly with SRF funding. A trade expert is also assisting

the CSO on improving external trade statistics. Given the

weak capacity at the CSO, the project will adopt a low-

key approach and focus on improving CSO’s website by

moving existing data from pdf format to Excel tables in

order to facilitate easier access by data users. The World

Bank IT expert in the Kabul office is working with the CSO to move this task forward. A training program

to build competencies and skills on STATA began in February 2017, with about 20 CSO staff from different

departments. The training expert is also working with the participants on analyzing gender-disaggregated

statistics. Other ongoing training activities, presently being carried out by World Bank staff, include:

report writing with a small number of staff, given the low level of English proficiency of CSO staff; training

Box 1: Afghanistan TA Project

The Bank-executed TA project aims to build

statistical capacity within the Central Statistics

Organization (CSO) and improve the quality

and accessibility of selected key statistical

data. To achieve this objective, it focuses on:

Improving the compilation

methodology for national accounts

Improving data reporting templates

and strengthening on-line data

accessibility

Initial needs assessment and

preparatory work for production and

publication of a Producer Price Index

Development of data quality

assessment framework and processes

Improving staff capacity in data

analysis and report writing.

Page 13: Statistics for Results Facility - World Bankpubdocs.worldbank.org › ... › SRF-2017-Annual-Report.pdf · extension, the SRF Council approved the allocation of remaining funds to

[12]

on poverty measurement; and gender analysis, using sex-disaggregated data from existing data sources.

Training on gender analysis is in line with the government’s initiative, Women’s Economic Empowerment

National Program.

13. Since the CSO is reluctant to develop a Quality Assessment Framework, the project team is re-

assessing this activity. It may decide to engage with the CSO on better understanding the gaps in CSO

capacity and propose future engagement. The NSDS 2016-20 is available, but the CSO has not yet

discussed the action plan with development partners. If the CSO is ready to engage with donors, the WB

team will facilitate this coordination process.

14. The Statistics Task Force, the donor coordination mechanism, continues to meet on a quarterly

basis, but discussions generally focus on existing donor support and are not forward-looking. Over the

past year, the World Bank has begun assuming greater responsibilities in leading donor coordination,

taking over from DfID. Other active members include the EU (household survey), USAID (Demographic

Health Survey), UNFPA (expert at the CSO and donor of the Socio-Demographic and Economic Survey),

and UNICEF.

Democratic Republic of the Congo – DRC (US$ 11.8 million)

15. The SRF project, operational since January 2015, aims to strengthen capacity of the National

Institute of Statistics to generate and disseminate statistics. Project implementation has moved slowly,

mainly due to the political situation, civil unrests, and changes in leadership at the National Statistical

Institute (INS). Given the very weak organizational and technical capacity of the statistical system in DRC,

the SRF project focuses on three critical areas: strengthening technical capacity of INS staff, data

development, and improving the non-technical environment of the INS.

16. In September 2016, the government requested a restructuring of the project. The cartography of

the population census, the largest project activity, was postponed due to political and security difficulties.

The key stakeholders decided that the ongoing IDA operation on statistical development1 and financial

and technical support from the African Development Bank (AfDB) and the UNFPA finance the cartography

exercise. The government requested that the unused funds allocated to the cartography be budgeted for

the demolition and construction of the INS building, to create a more viable environment for carrying out

the daily work of the INS. In light of these changes, the SRF project was restructured in May 2017, including

a revised Results Framework to reflect these changes (Annex 9). To give more time to complete project

activities, the closing date of the project was extended to April 2019. Box 2 presents the revised

components and respective budget amounts.

17. The project has made progress in increasing the technical capacity of the INS. The two-year

undergraduate program in statistics at ENSEA in Abidjan continues with 23 Congolese students. All

students successfully completed their first year. Project support to the preparation of Congolese students

for the competitive entrance exam of ENSEA proved particularly successful – six students passed the exam

this year, as compared to none in the previous five years. Out of these six students, one was admitted to

a master degree program in statistics and the remaining to a bachelor degree in statistics.

1 The Statistical Development Project of USD 32 million became operational in June 2016 and will close in 2020.

Page 14: Statistics for Results Facility - World Bankpubdocs.worldbank.org › ... › SRF-2017-Annual-Report.pdf · extension, the SRF Council approved the allocation of remaining funds to

[13]

18. The revised component,

strengthening the non-technical

environment, mainly finances the

demolition and construction of INS

facilities. A site evaluation of INS

facilities and architectural studies by

a local architecture firm concluded

that the rehabilitation of existing INS

facilities (as originally planned in the

project) was not a viable solution,

and thus proposed the demolition

and construction of new facilities.

Bidding documents are completed

and the selection of a construction

firm is underway. Work should begin

during the summer of 2017.

19. Prior to project

restructuring, a number of activities

were completed under the statistical

production and dissemination

component. These include the pilot

phase of the cartography of the

population census (all regions

completed; Kinshasa is underway); a

pilot enterprise census; and the

development of a dissemination policy. Fieldwork of the enterprise census, estimated at USD 8 million,

faces a financing gap of USD 3 million (the IDA project will provide USD 5 million). The Ministry of Planning

is working on mobilizing additional funding. To improve data accessibility, the project will recruit an

expert to improve INS’ website.

20. The complementarities between the SRF project and the IDA project, Statistical Development

Project, active since June 2016, are worth noting. The IDA operation will partly finance the cartography

of the population census and the fieldwork for the enterprise census, as well as furnishing the new INS

building with IT equipment and tools. The interaction process with the Statistics Thematic Group and

donors in general has brought awareness to both government and donors about the situation in regards

to statistics and of the need to support statistical capacity building efforts. This is particularly visible in the

financial and technical support of the AfDB and UNFPA in the cartography of the population census. The

Statistics Thematic Group, led by the AfDB, meets occasionally. Other members of the Group include DFID,

Belgium, the European Union, Japan, UN agencies (UNDP, UNESCO, UNFPA, and UNICEF), and the World

Bank.

Box 2: DRC - Catalytic Project to Strengthen the National Statistical

Institute -- Revised

The project development objective is to strengthen the capacity of

the National Institute of Statistics (INS) to generate and disseminate

statistical information. The main components are:

Increasing the technical capacity of the National Statistical

Institute (INS) (USD 1.25 million): Supports formal (study

abroad in degree-granting regional institutions) and on-the-

job and thematic training in statistics for NSS staff (including

survey data collection, quality control and analysis and

national accounting tools).

Strengthening the non-technical environment (USD 6.79

million): strengthens management capacity of the INS

through training in fiduciary issues and other managerial

areas for INS staff, both in Kinshasa and in the provinces.

The training would cover work planning, human resource

management, leadership, project management and

fiduciary concepts; fiduciary training, with IT equipment and

on-site technical assistance. Finances the demolition and

construction of a new INS building.

Statistical production and dissemination (USD 3.76 million):

Supports: (i) the population census cartography exercise

(pilot phase only); (ii) a pilot enterprise census; and (iii) data

archiving training and tools and the development of a

statistical dissemination policy.

Page 15: Statistics for Results Facility - World Bankpubdocs.worldbank.org › ... › SRF-2017-Annual-Report.pdf · extension, the SRF Council approved the allocation of remaining funds to

[14]

Ethiopia (USD 10 million, plus USD 5.5 million)

21. The SRF project aims at building the organizational, human, and physical capacity of the Central

Statistical Agency (CSA) in order to produce and disseminate reliable, accessible, and timely statistics. Its

key objective is to modernize the CSA’s institutional and data development capabilities and infrastructure

at headquarters and select branch offices, as well as improving data management skills of key line

ministries and agencies (MDA) in the national statistical system.

22. Project implementation is progressing relatively satisfactorily since it became operational in June

2014. Table 2 summarizes the main components of the project and achievements thus far.

23. The CSA’s in-house staff training program has included over 2000 staff from CSA and MDAs in a

variety of statistical and project management areas. The project has also provided 2-week training to 30

recent university graduates. Statistical awareness training through video conferencing has been

particularly effective to reach branch offices and regional MDAs. Pilot distance training courses on survey

design and methods took place for 225 government officials (about 20 from each region), of which 15%

were women. The NSS participants included staff from Regional State Bureaus of Finance, Health,

Agriculture, Education, and Water. In preparation for the inauguration of the new branch offices during

the summer of 2017, CSA staff of these offices are receiving training on modern IT tools, which should

serve as a model for other CSA branch offices (21 in total). The project also supported overseas training

and experience-sharing activities for over 100 staff from the CSA and National Planning Commission.

Annex 6 presents details of in-house and overseas training, as well as experience-sharing activities.

Page 16: Statistics for Results Facility - World Bankpubdocs.worldbank.org › ... › SRF-2017-Annual-Report.pdf · extension, the SRF Council approved the allocation of remaining funds to

[15]

Table 2: Ethiopia – SRF Project Achievements, by Components

Components Achievements

Organizational and infrastructure capacity development in the NSS (USD4.9 million)

strengthening institutional management and logistical capacity at CSA;

physical infrastructure (construction and furnishing of 4 branch offices of CSA);

IT infrastructure, systems and tools for data production and management (including data center, video conferencing equipment and infrastructure, and new survey technology and institutional management tools)

New CSA headquarters building is now operational with IT equipment and office furniture

Construction of 4 regional branch offices (Mekele, Hawassa, Bahirdar, and Ambo) are at completion stage.

Furnishing of branch offices, including IT equipment, expected completion by April/May 2017.

IT training room, equipped with video conference capabilities, operational at CSA for training on basic computer skills

Training courses via video links between CSA and NSS members have started, using government’s Woreda

Net2 – e.g. sampling methods, quality assurance and

outreach to NSS

Statistical data development and management (USD 1.5 million)

development of business statistics;

development of mining, energy, construction and transport sector statistics;

support to agriculture census 2014-15;

improving coverage and quality of the annual agricultural sample survey;

planning and compilation of vital statistics.

Development of Statistical Business Register System in progress: prototype system at draft level

Knowledge-sharing activities with Cape Verde on cartography and use of tablets in data collection; Rwanda on project management and census and Infographic competitions; Indonesia on poverty statistic among others. Technical visit to Canada on business statistics planned for fall 2017.

IT survey tools (GPS-enabled data loggers, measuring tapes, weighing scales, and solar panels for operating survey equipment in remote locations) tested for data collection of agriculture survey and household consumption survey

Tablets procured for pilot population census

New methodology for dry season irrigation agriculture household sample survey completed.

Support to development of NSDS2

Statistical methodology standards and data quality assurance information dissemination (USD 1.9 million)

statistical methodology, standards and data quality assurance in the NSS

information dissemination (including development of user satisfaction index, upgrades to CSA library and open web portal, publication of statistical reports and launch of eCSA mobile education office).

Training on poverty data analysis; data quality and standards, national accounts

Time Use Survey: gender-related in-depth analysis completed

First User Satisfaction Survey completed.

Execution rate of annual statistical release calendar has improved from 50% in 2014 to 67% in 2016.

2 The National Data Center of the Ministry of information, Communication, and Technology is responsible for the WoredaNet system in Ethiopia.

Page 17: Statistics for Results Facility - World Bankpubdocs.worldbank.org › ... › SRF-2017-Annual-Report.pdf · extension, the SRF Council approved the allocation of remaining funds to

[16]

24. In an effort to raise statistical awareness among citizens, improve dissemination of statistical

information and train NSS stakeholders, the CSA has developed a conceptual framework for the eCSA:

Statistics-on-Wheels Initiative, under the leadership of CSA’s Public Relations and Data Dissemination

Directorate. This initiative will enable the CSA to reach out more effectively to economic entities, NSS

stakeholders, educational institutions, and citizens at the sub-national level to promote the importance

of statistics in national and regional development. The procurement of a specialized vehicle (bus) is in

progress. Once the vehicle is available, CSA staff will receive training on the new eCSA program and an

eCSA pilot program will begin. The pilot will initially focus

on Addis Ababa and its surrounding areas, targeting

students, woreda associations and other informal public

gatherings. If successful, the program may be extended to

two other routes throughout Ethiopia, relying on CSA’s 25

branch offices.

25. The project also contributed to the preparation of

the NSDS2 by providing international technical experts

and supporting a series of consultations and meetings

with NSS stakeholders and policy makers. It also

facilitated experience-sharing field visits to Rwanda,

Malawi, and Indonesia on NSDS design and development.

The NSDS2, covering the period 2015-2020 and approved

by government, serves as a road map for the statistical

activities underpinning the Second Growth and

Transformation Plan and to meet data needs for

monitoring the Sustainable Development Goals (SDG). It

has identified several data needs and methodological

improvements, of which the SRF project supports

business statistics.3

26. The CSA is planning a second User Satisfaction

survey for 2017, with the help of an international

consulting firm. The 2015 survey indicated that 77% of

statistical users were satisfied with official statistics.

27. In view of the progress made in data production

and quality assurance and the improvements in

institutional development, the SRF-CF Council approved

the allocation on an additional USD 5.5 million to Ethiopia

in March 2017. As outlined in Box 3, the additional funds

3 Other data needs identified in the NSDS2 include: civil registration and vital statistics, a productivity index in terms of labor and capital, type of construction materials, use of soil fertilizers; commodities prices; employment of graduates.

Box 3 Ethiopia – Additional SRF Financing

Additional SRF resources will support the

following areas/activities:

Data production (USD 2.8 million): next

phase of the business register

(compilation of basic statistics and the

development of an IT database);

production and analyses of agriculture

statistics, based on basic agriculture

sampling frame data extracted from the

population census; preparatory

activities for next Household

Consumption and Expenditure Survey;

rebasing of CPI; rebasing of national

accounts to 2015/16.

Institutional development (USD 2.3

million): training of CSA staff in survey

design and data collection using IT

tools, change management, IT, and

organizational development; expand

the IT network of branch offices,

including computer equipment to

support automated data collection and

quicker dissemination; the construction

of 2 CSA branch offices equipped with IT

infrastructure and training rooms.

Project management (USD 0.4 million):

support to CSA for implementation,

procurement, financial management,

and M&E.

Page 18: Statistics for Results Facility - World Bankpubdocs.worldbank.org › ... › SRF-2017-Annual-Report.pdf · extension, the SRF Council approved the allocation of remaining funds to

[17]

will expand data production activities to support the development of a business register; the upgrading

of agriculture statistics; preparatory activities of the next household consumption survey, the rebasing of

the Consumer Price Index, and the rebasing of national accounts. The funds will also strengthen

organizational and infrastructure capacity through the construction of two additional CSA branch offices,

equipped with IT capabilities and training rooms, and the expansion of the branch office IT network with

internet and relevant IT training. To address the large-scale upgrade in data production and related

capacity building, as called for by the NSDS2, the World Bank is considering IDA support of USD40-60

million for statistical development, within a larger operation (Enhancing Shared Prosperity Equitable

Service). IDA funds will partially finance the population census, the household consumption survey, and

other statistical areas.

28. Since May 2012, the National Partnership Group (NPG), co-chaired by the government and DfID,

provides oversight for the implementation of the SRF project. The Partnership ensures that NSS members

and interested development partners receive information on statistical development.

Ghana (USD 10 million, plus additional USD 4.5 million)

29. The SRF grant for Ghana of USD 10 million and an IDA credit of USD 30 million, approved in August

2011 to support the implementation of the Ghana Statistical Development Program, are progressing

satisfactorily and have realized most of the planned activities. This is true despite a two-year delay in

Parliamentary approval of the project due to the sensitivity of the retrenchment issues included in the

project. The SRF grant and IDA credit give support to project activities in different ways. The SRF focusses

on equipment for data collection, processing, and dissemination, while IDA resources center on the

improvement of statistical frameworks, training, and data development and management. Since the two

operations are complementary, the project achievements presented below reflect the efforts of both

operations. Table 3 presents the components and achievements of the SRF-funded project and Annex 7

presents details of all training activities supported by the SRF project.

Page 19: Statistics for Results Facility - World Bankpubdocs.worldbank.org › ... › SRF-2017-Annual-Report.pdf · extension, the SRF Council approved the allocation of remaining funds to

[18]

4 The new Statistics Bill consolidates all laws on statistics in Ghana into one that encompasses the whole NSS. It stresses the independence of the GSS and its role in the coordination of the NSS, as well as clearly defining the role of the Government Statistician and the Governing Board of the GSS. As part of the Government’s Decentralization Program and the integration of statistics into the Local Government System, the Bill includes a clear provision for the establishment of a Statistics Department in each of the District Assemblies. The Bill also highlights the need for the adherence of the 10-year periodicity for conducting censuses and ensuring available resources for its implementation.

Table 3: Ghana – SRF Project Achievements, by Components

Components Achievements

Institutional reform and organizational change (USD 2.9 million)

training and redeployment capacity building program;

staff buyout program

New Statistics Bill awaiting passage by Parliament 4

New organizational structure of the GSS in place

53 staff of the GSS (18 females) pursuing Master’s degree courses in economics, statistics/math, demography, geography, GIS, IT/computer science

28 staff integrated into Local Government Service in the Statistics Department of each metropolitan, municipal and district assembly

Buyout program complete, with 54 staff separated from the GSS.

Enhancing capacity (USD 5 million)

investment in physical infrastructure and equipment: improving ICT connectivity, resource and data center, management information systems (enhanced data collection tools;

ICT skills training; upgrading physical infrastructure of GSS headquarters, regional offices, and statistical units in MDAs)

Significant progress in the area of capacity building: workshops/hands-on training (see Annex 7).

GSS staff now writing reports previously prepared by external experts

Post-census cartographic update and digitization of district maps and the enumeration area (EA) maps (ongoing)

Physical infrastructure (ICT software and equipment, vehicles and other office machinery) to MDAs statistical units significantly improved ICT connectivity in the GSS and its regional offices. This support has led to increased production and dissemination of statistics to a wide variety of stakeholders.

Establishment of the resource and data center, which serves as a one-stop center to request and provide data to a broad range of data users. Since the establishment of this center, data requests have increased and being addressed in a timely manner. More needs to be done to publicize the data center.

Data production and dissemination (USD 2 million)

data development and management (e.g., the Labor Force Survey, Integrated Business

By the GSS:

Integrated Business Establishment Survey (IBES), resulting in an Employment Report, a Job Creation

Page 20: Statistics for Results Facility - World Bankpubdocs.worldbank.org › ... › SRF-2017-Annual-Report.pdf · extension, the SRF Council approved the allocation of remaining funds to

[19]

30. The project is supporting the preparatory phase of the Agricultural Census, which started in early

2017. This phase will produce structural information on agricultural activities and provide the sample

frame for ensuing agricultural surveys (second phase). Other work initiated under the project includes

the fieldwork of the seventh round of the Living Standards Survey (using the CAPI method), which should

end in October 2017, and data collection for the rebasing of the CPI. Work on updating the Community

Population Registers with demographic data (birth, death, marriage, and migration) on all community

residents is ongoing. A communication and dissemination strategy, expected by mid-2017, will address a

variety of ways to disseminate statistical data, other than the more traditional methods (dissemination

workshops, hard copy reports, and ministerial websites).

Enterprise Survey and possibly an Industrial and Business Employment Survey);

improving economic statistics, including national accounts, producer price index, consumer price index;

communication (creation of a dissemination and resource hub within GSS; strengthening GSS and line ministry public relations and communications functions; training on communications and dissemination of statistics; outreach programs to non-statistical stakeholders; improving official statistics website; release calendar and dissemination policy).

Report, Regional Spatial Analysis Report and District Business Register

Economic Census resulting in a Business Register, useful frame for economic surveys to improve national accounts estimates

Labor Force Survey

Processing and publication of monthly and annual external trade statistics

Production and dissemination of Poverty Profile of Ghana and District Poverty Maps

Establishment of the Labor Market Information System

Dissemination of 216 District Census reports, providing district disaggregated data for planning of development programs.

Support to statistical literacy programs, such as the African Statistics Day celebrations

Training on survey-to-survey imputation method to produce high frequency poverty data

Media training prior to dissemination of statistical reports

By MDA’s:

Ministry of Education: 2015/16 Annual School Census for pre-tertiary levels and the publication of the School Statistical Yearbook, including training, data collection, and report preparation

Ministry of Health: Maternal Deaths Survey, which attempts to capture community perspectives on maternal deaths

GSS and Birth and Deaths Registry: Migration from manual entries to electronic files for proper storage and retrieval; comprehensive Assessment of CRVS; Strategic Plan for CRVS improvement

Page 21: Statistics for Results Facility - World Bankpubdocs.worldbank.org › ... › SRF-2017-Annual-Report.pdf · extension, the SRF Council approved the allocation of remaining funds to

[20]

31. In mid-2016, the GSS conducted a second User Satisfaction Survey on the products and services

of the GSS and NSS. The survey covered a wide range of data users (with 817 public, private, and

international agencies) and had a response rate of 95%. It found that overall 82% of users were satisfied

with the performance of the GSS and NSS, particularly with respect to the relevance of statistics produced,

the frequency of publication and the style of presentation. Areas requiring more attention by the NSS

include timeliness in the release of statistics and accessibility of statistics.

32. To build on the positive achievements of the SRF project, which are complementary to the IDA

operation, the SRF Council approved an additional USD 4.5 million to continue GSS’ data collection efforts.

The additional funds will support a household survey (MICS) for USD 1.4 million, an agricultural survey for

USD 3 million, and sensitization and training on SDGs for USD 0.1 million. To allow time for these activities,

the closing date is now June 2018, in line with the IDA project.

33. The catalytic effect of the SRF/IDA project are evident in a number of ways. Development partners

are aligning with national priorities, reflected in additional resources being allocated to statistical activities

(such as USD 900,000 for the Global Fund for Malaria Survey in 2016 and 1.8 million Euros from the EU

and USD 200,000 from the UNFPA for the Maternal Health Survey expected in 2017). More development

partners are supporting statistics (such as the World Bank, DFID, DANIDA, DFATD (formerly CIDA), JICA,

KOICA, EU, and the UN system). Increased cooperation is also visible between the GSS and other MDA,

resulting in prompt response to data requests from the GSS. The overall improvement in user satisfaction

of official statistics – from 79% in 2012 to 82% in 2016 – reflects on the positive catalytic effect of the SRF

grant and IDA operation on GSS performance.

34. The government continues to cover recurrent expenditures of GSS and statistical units, while

routine data collection activities and research (surveys) rely on partial funding from development

partners.

Lao PDR (USD 8 million)

35. The SRF project in the Lao PDR (LAOSTAT), operational since July 2013, focuses on the

implementation of the Lao Statistical Capacity Development Program and the NSDS for 2010-2020. Its

key objective is to improve the capacity of the national statistical system to produce and disseminate

reliable and timely macroeconomic and poverty statistics in accordance with international standards and

in response to user needs.

36. With the recruitment of a twinning partner and project technical advisor in July 2015, project

implementation is progressing satisfactorily.5 The twinning arrangement has provided the Lao Bureau of

Statistics with a rich source of timely technical expertise in a variety of areas. On the data development

side, the main outputs include the re-benchmarking of GDP and the rebasing of the CPI. As to

strengthening implementation capacity, the project completed the Human Resources and Training Plan

for LSB staff and developed 10 statistics textbooks and one English-Lao Dictionary for all universities and

colleges in Laos. With regard to improving data sharing and access, an ICT Plan is available and translated

5 The Lao Statistical Bureau selected GOPA as twinning partner, in joint venture with ISTAT (Italian Statistical Institute) and Teched Consulting Services (German firm).

Page 22: Statistics for Results Facility - World Bankpubdocs.worldbank.org › ... › SRF-2017-Annual-Report.pdf · extension, the SRF Council approved the allocation of remaining funds to

[21]

into Lao language, a draft dissemination strategy is in draft form, the LSB web portal interface was

upgraded, and ICT training is ongoing for LSB staff at headquarters and in the provinces. The twinning

partner has also facilitated project planning and budgeting, reduced procurement time in recruiting

experts, strengthened the implementation capacity of LSB staff, and assisted in project monitoring.

37. Overall, the project has made good progress during the past year. The procurement of major ICT

packages, including the recruitment of a local IT consultant, is completed. IT equipment is waiting for

configuration and installation. Cabling work is completed for LSB’s offices in Vientiane Capital, Vientiane

Province, and Champasack province, while network connection of these sites will start in late April 2017.

However, the delay of a new LSB building, financed by the Government, has meant that the project’s

major ICT-related activities (set-up of IT networks and systems, IT equipment and capacity building, etc.)

could not be carried out by the project closing date of June 2017. In order to ensure the installation and

testing of ICT networks and the provision of accompanying IT training for LSB staff and staff of line

ministries, the closing data of the project has been extended by 6 months to December 2017. Table 4

presents key project achievements by component.

38. Ongoing project activities mainly include ICT-related work, namely (i) the continuation of setting-

up the cabling and electrical network; (ii) the full installation of network systems equipment and data

center; and (iii) IT system training.

39. The baseline user survey, conducted during the second half of 2014, showed that roughly 50% of

users were satisfied with official statistics. The survey covered 2500 persons, with a two-thirds response

rate, and adopted a questionnaire method, followed by face-to-face interviews. A second user survey is

underway and expected by June 2017. For comparability, the second survey parallels the first survey to

the extent possible.

Page 23: Statistics for Results Facility - World Bankpubdocs.worldbank.org › ... › SRF-2017-Annual-Report.pdf · extension, the SRF Council approved the allocation of remaining funds to

[22]

Table 4: Lao PDR – SRF Project Achievements, by Component

Component Key Achievements

Strengthening Macroeconomic and Poverty Data Development and Management: ($3.13 million)

Ensures the generation and dissemination of macroeconomic and poverty statistics and services which can respond to the needs of the planning, monitoring and evaluation of national development programs.

National accounts: rebase of GDP 2012 completed; new data time series for 2012-2016 launched in March 2017.

Price Statistics: New CPI basket updated and expanded to 495 items, covering whole country. Pilot CPI data collection by CAPI (tablet) started, but slow progress due to complexity of CPI questionnaire, limited IT capacity of LSB and difficulty of CAPI software (hands-on training and TA field support provided).

Balance of Payments statistics: first International Investment Position (IIP) survey 2-16 completed; finalization of baseline survey report by March 2017. Bank of Laos started to introduce BMP6, based on the International Investment Position (IIP) survey.

Macro Framework and Modeling: development of macroeconomic framework and forecasting tool, with support from IMF/WB experts completed; the framework updated on quarterly basis.

Household surveys and Poverty: poverty profile report 2015 from the fifth household survey available; poverty mapping disseminated; poverty-related analytical capacity building on using STATA and SPSS software (using data from 2015 population and household census); revision of LECS6 questionnaire for 2017/18 survey completed.

Adaptation of internationally accepted standards and methodologies: COICOP, COFOG, COPNI and CPC adapted and adopted to local language.

Microdata documentation and dissemination (Living Conditions Survey 4-5, population census 2005)

National training on Government Financial Statistics Manual (63 participants)

Study tour on energy and mining statistics management in Japan (Ministry of Industry and Commerce) for 6 top management officers

Study tour on macroeconomic statistics in Thailand (National Social Economic Development Committee) – 18 participants

Knowledge exchange visit to Bank of Thailand on balance of payments, monetary statistics, and data management by Bank of Laos

Improving policies and strengthening implementation capacity: ($1.16 million)

Supports activities including:

strengthening the institutional capacity of LBS and SMA’s Statistical Units to implement the data development component

Statistics Law and NSDS 2016-2025: endorsed by government; waiting for endorsement by National Assembly (April 2017)

Human Resources Strategy and Training Plan for LSB: completed

Long-term Institutional Capacity Building Action Plan (2017-2025): finalization expected by May 2017

Statistical curricula at University: development of around 10 applied statistics textbooks and one English-Lao Dictionary for all universities and colleges in Laos; National University of Laos is piloting textbooks

GDP Manual: completed and training for officials from provincial statistical offices conducted in November 2016

Training:

Basic statistics training for provinces and districts (44 participants)

Applied village database training for provinces and districts (70 technical staff)

Page 24: Statistics for Results Facility - World Bankpubdocs.worldbank.org › ... › SRF-2017-Annual-Report.pdf · extension, the SRF Council approved the allocation of remaining funds to

[23]

enforcing policy and regulations on statistics and eliminating duplication of responsibilities between LSB and SMAs.

On Manual for Collection of Industry Data prepared by the Ministry of Industry and Commerce (171 participants)

Study tour to Japan on data compilation and analysis for CPI, PPI, and GNI (1 participant)

Training on Computer Assisted Personal Interviewing (CAPI) in Vietnam, using digital solution to collect CPI data (6 participants); two 1-week hands-on training for developing a new CPI questionnaire for tablets; final questionnaire and pilot survey expected during July- September 2016 (12 LSB staff)

Study tour to Thailand on using IT system management to improve Balance of Payments, monetary statistics and data warehousing (4 technical staff from Bank of Laos)

Leadership training on Organization Development tools (100 high-level managers)

Study tour to Thai Statistic Centre on human resources and data management (12 middle management officers)

Improving data sharing and access: ($2.68 million)

ensuring appropriate data sharing and access to information, backed by adequate physical infrastructure and equipment.

ICT Plan: ICT packages approved and translated into Lao language.

Dissemination Strategy: final draft approved

ICT Infrastructure (in 3 phases): (1) set-up of cabling and electrical network is ongoing. Cabling work for Vientiane Capital, Vientiane Province and Champasack province completed; (2) full installation of network systems, equipment and data center expected to being in May 2017 and completed by July 2017 (depending on completion of new LSB building, expected by May 2017). This requires installation of IT networks, data center and server rooms, PC stations, VC and meeting rooms; and (3) IT system training, planned during July-November 2017.

IT Software Training: IT skills for LSB and provincial staffs on Linux and Windows operating system and data analysis applications, like STATA, Arc GIS, web portal and security management.

User Satisfaction Survey: survey tool developed; first survey conducted in 2014 and the second (end-project) survey is ongoing and expected by June 2017.

Data Sharing and Access: training on android application development for tablet and smart phone; on data dissemination strategy

Upgrading of LSB web portal interface, including NADA

Launch of 2015 population census results to mass media (75 participants)

Training on basic data analysis (using MS Access) – 26 participants; installation and website development

Training in graphic and publication design (10 participants)

Supporting LAOSTAT Project Management ($0.8 million)

Finances goods, consultants’ services, training and incremental operating costs including secretarial support to the LAOSTAT Project Steering Committee (PSC) and the Statistical Working Group (SWG)

Twinning Arrangement: a main platform for external technical assistance and advisory services: ongoing and progressing well.

Page 25: Statistics for Results Facility - World Bankpubdocs.worldbank.org › ... › SRF-2017-Annual-Report.pdf · extension, the SRF Council approved the allocation of remaining funds to

[24]

40. The Lao Statistical Working Group (the national partnership group under the Macro Sector

Working Group), chaired by the Lao Bureau of Statistics (LBS) and co-chaired by the World Bank and

UNFPA, meets regularly. Active donors in the Working Group include the Asian Development Bank, FAO,

SDC/Switzerland, UNDP, UNFPA, UNICEF, China, the World Bank, WFP, WHO, UNSIAP (capacity building).

Additional donors (Australia/AID, European Union, GIZ, and Japan International Cooperation Agency

(JICA)) provide support to statistics and are invited and encouraged to participate in the Group’s regular

meetings. The LSB conducted a stakeholders meeting in 2016 as part of the evaluation of NSDS

implementation and plans to host another one in July or September 2017 to disseminate the amended

Statistical Law, present the revised NSDS, and request donor support its 2016-2025 action plan. At

present, Korea Stats has agreed to provide USD 4.5 million to support the LSB during 2017-2020. While

terms of reference for this support have been signed, no funding is expected in 2017.

41. The government continues to provide budget support to several analytical and survey activities

carried out by LSB and other line ministries. The LSB and Ministry of Planning and Investment actively

mobilized resources for the 2015 population census. Both staffing and recurrent expenditure on statistics

has increased steadily in recent years – LSB staff at headquarters increased from 60 in 2013 to 160 in

2016. During 2017, the government will finance the completion of the new LSB office building, the Lao

Social Indicator Survey (LSIS), and the sixth household survey (LSEC6).

Listening to Africa (USD 1.8 million)

42. Listening to Africa (L2A), an initiative to collect survey data using mobile phones in four pilot

countries (Madagascar, Malawi, Senegal, and Togo), is piloting a novel way of collecting data, combining

baseline household surveys with mobile phone interviews over a two-year period. The goal is to produce

high frequency statistics that will facilitate real time welfare monitoring and decision-making. The L2A

team works in collaboration with the National Statistical Offices (NSO) of the pilot countries in order to

build their capacity to implement this new data collection approach and to ensure continuity of the survey

once the project is completed. The high frequency surveys serve as complements, not replacements, to

regular products of the NSS (census, household surveys, and administrative data).

43. To ensure comparable country data, all countries use the baseline questionnaire, developed by

the L2A team, even in cases where other relevant surveys exist. At the completion of the baseline surveys,

each household is interviewed by phone on a monthly basis on a specific topic. The phone questionnaire

is country-specific and covers a wide range of topics on welfare, including nutrition and food security,

education, water, labor, and financial inclusion.

44. A call center to carry out the mobile surveys was either set up at the NSO (Malawi, Senegal, and

Togo) or contracted out to a professional call center (Madagascar). Regardless of who operates the call

center, the NSO owns and publicizes the data collected and oversees the implementation of the phone

survey. One lesson learned is that data collection and availability are more likely to follow the schedule

when the call center is outsourced rather that carried out by the NSO.

45. The SRF contribution to this initiative started in March 2013 and will conclude in December 2017.

Table 5 presents the status of the L2A countries, as of April 2017. Madagascar has completed all phone

surveys (28 rounds), with a 90% response rate. Malawi has completed 22 rounds of phone surveys, with

Page 26: Statistics for Results Facility - World Bankpubdocs.worldbank.org › ... › SRF-2017-Annual-Report.pdf · extension, the SRF Council approved the allocation of remaining funds to

[25]

two rounds remaining. A low response rate continues to be an issue, mainly due to power cuts and delays

in payment of phone lines. To address this issue, the NSO acquired a generator as backup during power

outages and negotiated a new contract with the mobile phone service provider. Senegal has completed

20 rounds of phone surveys, out of a planned 24. Malawi and Senegal will complete their surveys by June

2017. To improve data availability of Senegal’s survey results on the NSO’s website, the NSO has organized

its internal process from data collection to online publication. Togo completed its surveys, with 10 rounds

of phone interviews, and disseminated the results at a workshop, chaired by the Ministry of Planning, to

media representatives in February 2016.

46. To disseminate and expand the use of survey data, the project team organizes regular

dissemination events to share key findings from the surveys. Participants at these events usually include

local stakeholders, such as government departments, World Bank country teams, other international

organizations, the NSO, researchers, and journalists. Some development partners, such as the World Food

Program and the Center for Disease Control and Prevention, are using data from L2A. The L2a website6

contains project materials, which are global public goods.

Table 5: L2A – Survey Status by Country, as of May 2017

Country Baseline Sample

size (no.)

Baseline survey

Date

Phone Interviews

(number)

Website

Malawi 1500 June-Aug 2014

22

http://www.nsomalawi.mw/

Senegal 1500 Nov 2014-Jan 2015

20

http://anads.ansd.sn/index/php/catalog/83

Madagascar 2000 Mar-Apr 2014

28 http://instat.mg

Togo 541 Mar 2014

10 http://www.stat-togo.org/nada/index.php/catalog/19

47. The impact of the L2A program is visible in a number of ways. Participating countries in the

program have committed to open data principles – to make survey materials free of charge – on their

websites. All NSO have created designated webpages for the mobile phone surveys on their websites,

which is linked to the L2A website (http://www.worldbank.org/en/programs/listening-to-africa). Also, the

project has shown that mobile phone surveys are a cost-effective tool to collect reliable data and is helping

change old habits/procedures. In fact, the World Bank’s household survey strategy mentions this tool in

its new protocol.

6 http://www.worldbank.org/en/programs/listening-to-africa

Page 27: Statistics for Results Facility - World Bankpubdocs.worldbank.org › ... › SRF-2017-Annual-Report.pdf · extension, the SRF Council approved the allocation of remaining funds to

[26]

48. A number of different stakeholders is using data from the L2A project. World Bank sector teams

use the data to inform the design of new operations. The Madagascar Taxation Department collaborated

on two survey on taxes and discussed the results at an event with private sector (40 representatives) and

with local media coverage. The results will help the Tax Department inform its future communication

strategy and design an enterprise perception survey with the objective of improving its services to the

private sector. The Government of Senegal plans to use data from satisfaction surveys on service delivery

to inform its public administration reforms. Moreover, a number of follow-up studies have shared lessons

learned from the L2A experience and have contributed to informing poverty monitoring in other

countries. For example, in Mali, the Office for the Coordination of Humanitarian Affairs used mobile

phone surveys to inform the Assessment of Recovery and Development Priorities in conflicted regions.

Nigeria is adapting the L2A approach for monitoring conflict and poverty, particularly in the North East.

49. In addition to the baseline

and mobile phone surveys, the L2A

team finalized a Handbook entitled

“Mobile Phone Panel Surveys in

Developing Countries: a practical

guide for micro data collection”, in

June 2016.7 The Handbook, a key

output of the L2A project, is a

resource for practitioners who are

increasingly turning to these mobile

devices for data collection. It

articulates the rationale for mobile

phone surveys, and discusses how to

design and implement a

representative mobile phone survey.

The book also deals with the

challenges associated with designing

and implementing high frequency

representative mobile phone

surveys. For example, how do you

ensure that the data collected are of

good quality? How do you deal with

the risk of attrition and non-

response, which is not as high in face-to-face surveys? Box 4 lists the chapters of the Handbook. The

book, available through a number of dissemination channels, is receiving positive reviews.

50. In February 2017, the initiative, Listening to Africa, was voted as the most impactful knowledge

product in the Africa Region of the World Bank by Bank staff.

7 The Handbook can be found at https://openknowledge.worldbank.org/handle/10986/24595.

Box 4: Mobile Phone Panel Surveys in Developing Countries:

A practical guide for micro data collection

Chapter 1: Rationale for Mobile Phone Panel Surveys (MPPS) and the key issues

Chapter 2: Designing a mobile phone panel survey: a concise overview of the main issues for the design of a representative mobile phone survey

Chapter 3: Baseline Survey preparation and implementation: a set of questions before carrying out fieldwork of the baseline survey, and details of fieldwork involved in implementing a large scale, nationally representative MPPS baseline survey.

Chapter 4: Call round preparations: decisions and necessary steps in setting up a call center for an MPPS.

Chapter 5: Conducting mobile phone panel surveys: elements of a typical mobile phone survey round, highlighting those aspects that are specific to mobile phone panels

Chapter 6: Data analysis and management: four important components that follow data collection: data analysis, report writing, dissemination of the results and making data available to the public

Chapter 7: Budget or How Much Does it Cost: a synopsis of key budget items for an MPPS project, with examples of budgets for some of our projects.

Page 28: Statistics for Results Facility - World Bankpubdocs.worldbank.org › ... › SRF-2017-Annual-Report.pdf · extension, the SRF Council approved the allocation of remaining funds to

[27]

Senegal (USD 2.2 million, plus additional USD 1 million)

51. The Senegal SRF project aims to improve data production and strengthen the capacity of the

National Statistics and Demography Agency (ANSD). With over 80% of its funds disbursed, the project has

achieved most of its objectives. Table 6 presents project components and achievements.

52. As shown in Table 6, key achievements include the production of the quarterly Labor Force survey,

which now allows Senegal to qualify for Special Data Dissemination Standard (SDDS) status with the IMF8

In addition, the project has had a positive impact on ENSAE’s teaching capabilities, as reflected in the

number of graduates working in various ministerial departments and international organizations. Access

of girls to ENSAE remains low, however, due to a

small pool of girls in science education courses (the

key source of ENSAE students).

53. To build on the positive progress made with

the SRF project, the SRF-CF Council approved and

additional USD 1 million in March 2017 to strengthen

further the production of statistics in line with

recommendations of Senegal’s NSDS 2014-2019 and

in the context of its long-term economic and social

development plan. In light of these additional

activities, the project will now close on October 2018.

Box 5 presents the activities to be financed with the

additional funding.

54. The overall supervision of NSDS

implementation is the responsibility of the National

Statistics Council, chaired annually by the Prime

Minister and assisted by the multi-sector Technical

Committee of Statistical Programs (CTPS), with ANSD

as secretariat. This annual meeting is also the

occasion to approve the working plan of the National

Statistics System. Government support to statistics

appears to be increasing, as reflected by its

important contributions to recent activities, such as

the first 2013 enterprise census, the rebasing of the

GDP, and the progressive recruitment of young

statisticians in line ministries. The Government has

8 The SDDS is a standard that requires eligible countries to provide the IMF with data on key macroeconomic variables and their monetary and financial situation on a voluntary basis. The objective of the SDDS is to facilitate the monitoring of international investors and to contribute positively to the pursuit of sound and transparent economic policies.

Box 5: Senegal: Additional SRF Financing

Additional SRF resources will support the following

activities:

Data production (USD 0.84 million)

Surveys: employment survey; improving the

enterprise sample frame, including

computerization of trade register, and

demography of enterprises;

Extension of the Cost Construction Index:

geographical coverage and scope of construction

products

Administrative data: improvement of higher-level

education statistics; improvement of

administrative data on labor; production of

yearbooks on civil service workforce; improvement

of statistics on justice

Support to ENSAE (USD 0.03 million)

Decentralization of certification program for

survey field staff: extension to other regions

of the country

Granting laptop to females who succeed

entrance exam

Improved data accessibility (USD 0.13 million)

Improved access to microdata on ANSD

website

Page 29: Statistics for Results Facility - World Bankpubdocs.worldbank.org › ... › SRF-2017-Annual-Report.pdf · extension, the SRF Council approved the allocation of remaining funds to

[28]

also assumed ownership of SRF activities by funding the quarterly labor force survey and the IPPSE. In

2015, ANSD conducted a baseline User Satisfaction Survey, suggesting that two-thirds of users are

satisfied with official statistics. A second user satisfaction survey was launched in 2016, with results

expected in the second half of 2017.

55. The Working Group on Statistics of the Statistical Master Plan, co-chaired by the AfDB and the

UNFPA, meets regularly. Other key development partners are the World Bank, the EU, USAID, and UN

agencies (FAO, ILO, UNDP, UNFPA, and WFP). The Group acts as a forum for discussion on statistical

activities (e.g., the user satisfaction survey and GDP rebasing) and an advocacy group to raise funds for

statistical development.

Table 6: Senegal - SRF Project Achievements, by Component

Component Achievements

Production of statistics Methodology and production of the Services Production Price Index – IPPSE (to track price movements of supply and demand in markets for services) on a monthly basis

Baseline survey completed. 6 set of quarterly data on IPPSE. Senegal is a pioneer in the production and dissemination of this indicator in Africa.

Methodology and production of a monthly Construction Price Index (ICC)

Baseline indices for the four most common types of construction and a note on the Indices of Construction Costs (ICC) are available. Training of ANSD staff on methodology completed. Quarterly data on ICC in 2016 and 1 quarter for 2017.

Production of a quarterly Labor Force Survey (LFS)

Baseline survey report available on ANSD’s website. 3 Quarterly LFS achieved in 2016 and corresponding analytical reports available in ANSD website; first quarter of 2017 being finalized. Senegal is currently only sub-Saharan country to produce this survey, other than South Africa.

Introduction of Satellite Tourism Accounts into national accounts

2 tourism surveys on demand side (high and low season) and one survey on supply side available as input into Satellite Tourism Account, being finalized.

ENSAE-Senegal training Support the overall teaching capacity of ENSAE by strengthening capacity of trainers

Study tours for teachers of ENSAE. Training sessions for ENSAE students: (i) on international monetary economics by a macroeconomist from AFRISTAT, and (ii) on micro modeling by a professor from ENSEA-Abidjan. For ENSAE: Mini-bus purchased for internship activities; books for students; IT equipment/software on statistics (SPSS, STATA). 14 classrooms equipped with video projectors and projection screen; 3 meeting rooms equipped with projection screen.

Facilitating the enrollment of women 29 women graduates for 2013/2014-2015/2016 school years, representing between 3-8% of total enrollment; laptops being offered to girls to promote women access to statistics learning.

Reinforcing bilingualism (French and English) of students, teachers and ANSD staff

Language laboratory at ANSD, with appropriate equipment.

Project coordination Annual user satisfaction survey

Baseline USS completed in 2015. Second USS for 2016: ongoing. 10 staff received high-level training on project management and monitoring.

Page 30: Statistics for Results Facility - World Bankpubdocs.worldbank.org › ... › SRF-2017-Annual-Report.pdf · extension, the SRF Council approved the allocation of remaining funds to

[29]

IV. Financial Status of the Catalytic Fund

56. The United Kingdom (DfID) and the Netherlands have contributed to the SRF-CF. As of May 2017,

donors’ pledged contributions amounted to USD 85.8 million, of which USD 79.0 million (GBP 50 million)

from DFID and USD 6.8 million (Euro 5.25 million) from the Netherlands.

57. Committed expenditures as of May 2017 for the eight SRF pilot countries and the L2A project,

including additional grant allocations to three countries, project preparation and supervision, in-country

donor statisticians (the SRF-CF funded the statisticians in Nigeria and DRC), and SRF Administration, are

estimated at roughly USD 87 million, of which USD 57 million have been disbursed.

58. Table 7 presents a breakdown of the financial situation of the SRF as of May 2017.

Table 7: SRF–CF Financial Situation – May 2017 (USD million)

Pledged/Committed Received/Disbursed

Total Contributions (including investment income)

87.6

Contributions 85.8 85.8

UK/DFID 79.0 79.0

Netherlands 6.8 6.8

Investment income 1.8

Expenditures 86.5 57.6

SRF Grants 79.3** 53.0

Project Preparation 0.8 0.8

Project Supervision 1.7 1.4

Donor Statisticians 0.9 0.9

SRF Administration 3.8 1.1

Administration fee 0.4 0.4

** Includes the committed amount of USD 0.55 million for the new Bank-executed Technical Assistance project in Afghanistan, and additional allocations of USD 5.5 million to Ethiopia, USD 4.5 million to Ghana, and USD 1 million to Senegal.

V. Summary Status of SRF Projects

Table 8 presents the key project stages and responsible staff of the nine projects, as of May 2017.

Page 31: Statistics for Results Facility - World Bankpubdocs.worldbank.org › ... › SRF-2017-Annual-Report.pdf · extension, the SRF Council approved the allocation of remaining funds to

[30]

Table 8: SRF Key Project Stages and Responsible Staff, as of May 2017

Project Name SRF Amount

(US$ mill)

World Bank Task Team Leader

In-country statistician (Financier)

Key Project Stages

Comments

Afghanistan: Strengthening the National Statistical System Project

14 Mohammad Omar Joya

Caroline Hoy (DfID)

Allocation approval: February 18, 2010 Project Approval: Oct 2010 Effectiveness: March 2011 Closing: February 29, 2016 ICR: August 2016 (expected)

CLOSED

Afghanistan:

0.55 Tobias Haque Christina Wieser

Project approval: July 2016 Effectiveness: August 2016 Closing: December 2018

DRC: Strengthening the Statistical System Project

11.8 Franck Adoho Abdoullahi Beidou (till April 2015)

Allocation approval: November 23, 2010 Project approval: March 2014 Effectiveness: January 2015 Closing: April 2019 (proposed)

Ethiopia 15.5 Waleed Haider Malik Eyasu Tsehaye

Allocation approval: January 2013 Project Approval: May 2014 Effectiveness: January 2014 Closing: June 2019 (proposed)

Include additional financing of USD 5.5 million

Ghana: Statistical Development Project

14.5 Smile Kwawukume Ayago Esmubancha Wambile

Allocation approval: February 3, 2010 Project Approval: August 2011 Effectiveness: April 2014 Closing: June 2018

Includes additional financing of USD 4.5 million

Lao PDR: Strengthening the National Statistical System Project

8 Somneuk Davading Allocation approval: September 2011 Project approval: April 2013 Effectiveness: July 2013 Closing: December 2017 (proposed)

Twinning arrangement: GOPA since 2015

Listening to Africa: High Frequency Welfare Statistics Using Mobile Phones

1.8 Andrew Dabalen

Alvin Etang Ndip (WB)

Allocation approval: March 2013 Concept Note Approval: June 2013 Effectiveness: May 2014 Closing: December 2017

Pilot countries: Malawi, Senegal, Madagascar, and Togo (Lome)

Nigeria: Statistics Development Project

10 John Ngwafon Alain Gaugris (WB)

Allocation approval: November 23, 2010 Project Approval: May 2011 Effectiveness: June 2011 Closing: February 28, 2014 ICR: January 30, 2015

COMPLETED

Rwanda: Statistics for Results Project

10 Tom Bundervoet Allocation approval: February 18, 2010 Project Approval: December 2011 Effectiveness: June 2012 Closing: June 30, 2015 ICR: December 10, 2015

COMPLETED

Senegal: Statistics for Results Facility Project

3.2 Djibril Ndoye

Allocation approval: September 2011 Project approval/signing: May 2014 Effectiveness: July 2014 Closing: October 2018

Includes additional financing of USD 1 million

Page 32: Statistics for Results Facility - World Bankpubdocs.worldbank.org › ... › SRF-2017-Annual-Report.pdf · extension, the SRF Council approved the allocation of remaining funds to

[31]

ANNEX 1: Snapshot of Key Elements of SRF Projects, by Country

Afghanistan DRC Ethiopia Ghana Lao PDR Nigeria Rwanda Senegal

NSDS ANSP 2010-2014 NSDS 2016-2020

NSDS 2013-2017

NSDS1 2009/10-2013/14 NSDS2 2015-2020

GSDP 2009-2013 NSDSII 2017-2021

NSDS1 2010-2020 NSDS2 2016-2025

NSDS1 2010-2014

NSDS1 2009-2014 NSDS2 2014/15-2018/19

NSDS1 2 008-2013 NSDS2 2014-2019

Data development

National accounts Household surveys Social statistics Website improvements

Census cartography Pilot enterprise census Data archiving and dissemination

Business register Data for national accounts (mining, energy, construction and transport) Agriculture census methodology for dry season irrigation Training on vital registration systems Open data portal

Labor force survey Integrated business enterprise survey Industrial and business employment survey (maybe) National accounts PPI CPI

Macroeconomic statistics Poverty statistics

Standards and methodologies for the production of: GDP, poverty statistics, CPI, water and sanitation statistics, population census and collection of migration and vital statistics

2012 population census Pilot ag. Survey DHS Business survey CPI National accounts Standards on data quality Administrative statistics Open data portal

Price index for production of services Construction cost indices Quarterly labor force survey Tourism satellite account

Capacity building

University degree Professional training; technical courses; study tours; on-the job training (e.g. national accounts, survey design, data analysis)

Formal training Thematic courses On-the-job training

Training on (a) poverty data analysis; (b) data quality standards, national accounts Time Use Survey: gender-related in-depth analysis

Master’s degree program Hands-on training (e.g., economic stats, analysis and modeling Vital stats Communication & dissemination of statistics

Specific training on poverty data analysis, macro statistics, ICT

Training on survey data management, demographic techniques, compilation of sector statistics (price indices, agriculture, environment), and IT

Harmonized data collection tools in five sectors Hand-on/on-the-job training Short thematic courses Long-term program Training center for government officials

Support to ENSAE: Training of trainers French/English classes Facilitate enrollment of women Library expansion

Technical assistance

In-country statistician (DfID)

In-country statistician until April 2014 Census expert

Business Register expert

In-country statistician until end-2013

Twinning partner (GOPA) since July 2015

In-country donor statistician until Feb 2014

Page 33: Statistics for Results Facility - World Bankpubdocs.worldbank.org › ... › SRF-2017-Annual-Report.pdf · extension, the SRF Council approved the allocation of remaining funds to

[32]

Afghanistan DRC Ethiopia Ghana Lao PDR Nigeria Rwanda Senegal

Twinning partner (GIZ) 2013-2016

National Partnership Group

Statistics Task Force

Statistics Thematic Group

National Partnership Group

M&E Sector Working Group

Statistical Working Group

Development Partners’ Statistics and M&E Group

Statistics Steering Committee/NPG

Working Group on Statistical Master Plan

Catalytic effect Japan: contribution of digital equipment for census IDA operation under implementation

IDA USD 40-60 million in context of a governance operation

IDA USD 30 million (ongoing) EU 1.8 million Euros Global Fund for Malaria Survey USD 0.9 million UNFPA USD 0.2 mill for Maternal Health Survey

Korea expressed support of USD 4.5 million to LSB

AfDB support to living conditions survey Statistical component in IDA Public Governance operation

Government funding quarterly labor force surveys

User satisfaction survey

Sept. 2011 May-June 2014 Sept 2015

Not planned Mid-2015 2017 (planned)

April 2012 (MDTF) Early 2017 (ongoing)

March 2014 early 2017 (ongoing)

July-Oct 2011 Feb 2014

July-Sept 2012 Dec 2014-Mar 2015

Mid-2015 Early 2017 (ongoing)

User outreach Workshops for users of statistics

eCSA Statistics-on-Wheel Initiative: mobile education office for educational institutions and citizens to promote importance of statistics in national and regional development

Outreach program with non-statistical stakeholders

Training for journalists on use of statistics

Training of journalists; annual inter-university infographics competition

Page 34: Statistics for Results Facility - World Bankpubdocs.worldbank.org › ... › SRF-2017-Annual-Report.pdf · extension, the SRF Council approved the allocation of remaining funds to

[33]

ANNEX 2: SRF –Generic Results Framework, by pilot country

Narrative Indicator Country Baseline Milestone 1 Milestone 2 Target Comment

Adoption of program-based approach for supporting statistical development in grant-recipient countries

1. Existence of National Partnership Group where implementation and status of national statistical development plan status is monitored (additional information to be provided: frequency of meetings, composition and “decision-making” level of meeting participants)

Afghanistan Yes Yes Yes Yes Statistics Task Force (development partners and ISAF) meets quarterly.

DRC Yes Yes Statistics Thematic Group meets regularly.

Ethiopia Yes Yes Yes Yes CSA meets on a one-to-one basis with development partners on a periodic basis; National Partnership Group ensures that statistical stakeholders receive necessary information

Ghana Yes Yes Yes Yes Steering Committee for Statistical Development Plan, composed of government officials and development partners, meets quarterly. The M&E Statistical Working Group meets quarterly with regular updates on statistics.

Lao PDR Yes Yes Yes Yes Statistical Working Group meets semi-annually.

Nigeria Yes Yes Yes Yes Monitoring and Evaluation Support Group on Statistical Development (development partners) met regularly

Rwanda Yes Yes Yes Yes Statistics Steering Committee/National Partnership Group meets quarterly and is engaged in activities of basket fund. It includes representatives from government, development partners and civil society.

Senegal Yes Yes Yes Yes Working Group on Statistics of the Statistical Master Plan meets quarterly, with participation of about 70% of donors that support statistics.

Source: Minutes of Partnership Group; progress reports; supervision reports

Increase financial resources for statistical systems

2. Trends in donor funding for statistics (yearly)

Afghanistan Continues to receive donor funding for large surveys, such as household surveys and socio-demographic surveys.

DRC AfDB and UNFPA supporting cartography of population census

Ethiopia Possible support from IDA of about USD 40-60 million

Ghana Up Support increasing, mainly in the form of technical assistance from UN agencies.

Lao PDR Korea Stats pledged support of USD 4.5 million; Vietnam and Netherlands potential new partners

Nigeria Up Up Up Up

Rwanda Up Up Up Up DfID funding through 2017-18; proposed EU Euro 10 million for 2016-20.

Senegal Expected to increase with partner support to government’s development policy

Source: NPG reports and interviews with key stakeholders

Page 35: Statistics for Results Facility - World Bankpubdocs.worldbank.org › ... › SRF-2017-Annual-Report.pdf · extension, the SRF Council approved the allocation of remaining funds to

[34]

Narrative Indicator Country Baseline Milestone 1 Milestone 2 Target Comment

3. Proportion of budget for national statistical system (or NSO) covered by domestic resources, yearly (%)

Afghanistan Domestic resources are limited in Afghanistan. Almost all development budget and about half of recurrent budget funded by foreign grants. While government budget funds CSO recurrent expenditures, donor finance major household surveys.

DRC

Ethiopia Government finances all recurrent spending and a number of routine surveys (e.g., agriculture); an partial funding for other surveys, relying on partners for any financial gap

Ghana Government finances routine data collection activities; partly funds surveys in collaboration with development partners

Lao PDR Government continues to support several analytical and survey activities. Budget information only available for LSB.

Nigeria Very difficult to measure because the budget allocated to statistics usually different from the budget released for statistics.

Rwanda 41 26 28 Recurrent spending is funded by government; all major household surveys directly financed by donors through non-discretionary grants. Decrease in government contribution (in relative terms) reflects additional donor contribution: 2012/13 to cover population census and 2013/14 unplanned contribution from AfDB to finance living conditions survey (EICV3)

Senegal Government increasing support, as reflected in contributions to 2013 enterprise census, rebasing of GDP and recruitment of young statisticians in line ministries. It will continue to fund quarterly LFS and IPPSE

Source: Analysis of existing documentation on support and budgets

Improved response of statistical system to national and sector needs

4. % of users satisfied with official statistics

Afghanistan 62 77 Baseline: 2011. Second survey: May 2014 not methodologically comparable to first. Final survey: Sept 2015

DRC USS not envisaged

Ethiopia 77 Baseline: mid-2015; second: 2017 under preparation

Ghana 79 82 +5% Baseline 2012; second survey mid-2016

Lao PDR 49 60 Baseline: March 2014; second: early 2017 ongoing

Nigeria 15.61 20 Baseline: 2011; second: 2014, but results not received by Bank

Rwanda 51 66 Baseline: July/Sept 2012; second: Dec 2014-Mar 2015

Senegal 67 Baseline: mid-2015; second: mid-2017, ongoing.

Source: User satisfaction survey

Page 36: Statistics for Results Facility - World Bankpubdocs.worldbank.org › ... › SRF-2017-Annual-Report.pdf · extension, the SRF Council approved the allocation of remaining funds to

[35]

Narrative Indicator Country Baseline Milestone 1 Milestone 2 Target Comment

Improved dialogue and partnership between statistics users and producers

5. Existence of mechanism for users and producers of data (if possible, indicate frequency of meetings)

Afghanistan No Yes Events for dialogue between users and producers of data not held on a regular basis.

DRC No Yes Ethiopia Yes Yes Statistical stakeholders are actively involved in specific

activities, such as the NSDS process.

Ghana Yes Yes Technical Committee for Statistical Development Plan, composed of directors of statistics, research and information management directorates of ministries, meets monthly.

Lao PDR Random and

infrequent meetings

Producer-user annual conference

Data user-producer

forum organized annually

Regular Corresponds to indicator six of Lao’s RF Inter-ministerial coordination is improving

Nigeria Yes Yes Yes Yes The National Consultative Committee for Statistics (NCCS) meets twice yearly.

Rwanda Yes Yes Quarterly steering committee meetings and stakeholder dialogue

Senegal Group exists for NSDS under National Statistics Council

Source: Reports of NPG and NSO and interviews with key stakeholders

6. Number of events or programs designed to increase the capacity to analyze and use statistics

Afghanistan 1 3 Open data development events and workshops for users of statistics

DRC 23 students successfully completed first year of 2-year formal program at ENSEA; preparation of Congolese students for competitive entrance exam of ENSEA proved particularly successful – six students passed the exam this year, as compared to none in the previous five years.

Ethiopia Statistical on Wheels Initiative (e-CSA) to promote the importance of statistics at national and regional levels is underway. Proposed Data Center will increase data accessibility and potentially its use. Statistical awareness training through video conferencing has been particularly effective to reach branch offices and regional MDAs.

Ghana Increased demand for statistics and Resource and Data Center promptly responds to data request. Media training prior to dissemination of statistical reports; Interest in data dissemination at sub-national level growing, as reflected in dissemination of 216 district census reports.

Lao PDR Development of 10 applied statistics textbooks and an English-Lao Dictionary for all universities/colleges

Nigeria Project included training for journalists.

Page 37: Statistics for Results Facility - World Bankpubdocs.worldbank.org › ... › SRF-2017-Annual-Report.pdf · extension, the SRF Council approved the allocation of remaining funds to

[36]

Narrative Indicator Country Baseline Milestone 1 Milestone 2 Target Comment

Rwanda 6 9 15 23 Project included training of journalists, an annual inter-university infographics competition to stimulate students’ awareness of the availability and accessibility of statistical data and promote use of data for research and policy purposes.

Senegal

Source: Reports of NPG and NSO and interviews with key stakeholders

Delivering more effective aid

7. Proportion of support to statistics by development partners that is aligned with the national priorities identified in the national statistical development plan

Afghanistan 90 90 90 90 Baseline 2009; Target 2016

DRC 80 80 80 80 Baseline 2015; Target 2019

Ethiopia 75 85 85 85 Baseline 2014; Target 2019

Ghana 90 90 90 95 Baseline 2014; Target 2018

Lao PDR 65 75 80 80 Baseline 2014; Target 2017

Nigeria 90 95 95 95 Baseline 2009; Target 2014

Rwanda 95 95 95 95 Baseline 2011; Target 2015

Senegal 80 85 90 95 Baseline 2014; Target 2019

Source: Survey of donor activities by Partnership Group or NSO or through bilateral meetings

Capacity (skills) building

8. Number of people trained under the SRF grant by categories (government staff vs. other data users), type of training (formal degrees, professional training, other), and in areas trained (management, ICT, statistical areas)

Afghanistan NA 99 (35) (64)

197 (35: 2 women)

(64) (33) (15) (50)

Na NB: Numbers are annually cumulative Formal University degree Professional training Technical courses Study tours to other NSOs On-the-job training by twinning partner

DRC 10 (30)

0 (0)

140 (28)

0 (0)

629 (28) 23

(23)

991 (28) 23

(25)

Technical training Of which women Graduates (formal training) Of which women (%)

Ethiopia Ongoing needs

assessment in CSA and

MDA

Recommendations of

needs assessment approved

2028 CSA and MDA staff local

training

50% Implemented

Organizational training program (annually) in: organizational change and strategic planning; management and IT; statistical topics See Annex 6 for details

Overseas training and experience

sharing (103 CSA and MDA

staff)

70% implemented

Training in specialized quality assurance topics, including EDQAF, poverty data analysis, national accounts, agricultural statistics, web GIS application

Ghana 13 36 28

53 40

175

Master’s Degree in statistics-related programs Technical training in basic statistics Technical training in data collection/analysis

Page 38: Statistics for Results Facility - World Bankpubdocs.worldbank.org › ... › SRF-2017-Annual-Report.pdf · extension, the SRF Council approved the allocation of remaining funds to

[37]

Narrative Indicator Country Baseline Milestone 1 Milestone 2 Target Comment

274 567 14

Training in ITC of statistics Study tour See Annex 7 for details

Lao PDR 1075 1781

115

Training since 2014 cover basic statistics, economic statistics, poverty analysis, data management and IT Study tours – experience sharing

Nigeria 350 350 1150 1150 By March 2013: over 1,150 staff from NPoPC, NBS, line ministries, and state statistical agencies

Rwanda 70 116 132 Capacity building plan for July 2013-June 2018 focuses on hands-on and on-the-job training and short thematic courses for NISR staff. Training center at NISR will provide skills training on data analysis and other practical courses to government officials in the NSS.

Senegal NA 12% NA

Install lab 12%

5

15% 3-8%

5

30% 18%

5

English Women graduates from ENSAE – 15 in 2014/15; 6 in 2015/16 Number of trainers trained

Source: Project supervision reports

Finance from the SRF-CF and from other development partners

9. Catalytic Fund project disbursement rates (%)

Afghanistan 17.5 (3/13) 30 100 Milestone 2 reflects disbursements as of May 2017.

Afghanistan TA

14.9 100

DRC 32.9 100

Ethiopia 10.9 (4/15) 63.1 100

Ghana 20 (4/15) 100 100

Lao PDR 5 (3/14)) 66.1 100

Nigeria 20 98 100

Rwanda 56.3 99.8 100

Senegal 14.8 (4/15) 81.4 100

Page 39: Statistics for Results Facility - World Bankpubdocs.worldbank.org › ... › SRF-2017-Annual-Report.pdf · extension, the SRF Council approved the allocation of remaining funds to

[38]

ANNEX 3: AFGHANISTAN Strengthening the National Statistical System Project,

Outputs by Components

Component Outputs

Institutional improvement and capacity development

Improved CSO website (easier access and regular updates) in English and local languages

Web dissemination strategy

Outreach events in 7 provinces to raise awareness for statistics

2 high-level Open Data events, with representatives of government, donor community, civil society, and private sector

Digitized Human Resources database

Library for the Statistical Training Center

Undergraduate qualification program for 35 CSO staff ( including 2 women) at local private university

Technical courses on national accounts, industrial classification systems, and data analysis techniques for social statistical surveys

Training on computer skills, English language proficiency, and mathematics (64 staff)

South-South Knowledge Exchange program to Tajikistan and Bhutan

2 study tours to NSO of Malaysia and Thailand for 15 mid-level CSO staff

Training on report writing with Indian Statistical Institute

On-the-job training by experts of twinning partner on national accounts, survey design, data analysis, and data quality systems

Capacity improvement in data collection and analysis

Improved compilation methodology and data sources for GDP

Development of methodology for quarterly GDP estimates

Methodological improvements in national accounts expected to be reflected in GDP when it is rebased in the near future

Expanded coverage of price statistics to all provinces and rebasing the CPI

Implementation of a Business Establishment Survey

Administrative data systems and other statistics from line ministries

MoU with several line ministries for regular data reporting

Workshops on data collection and reporting of administrative data

Improvement of ICT infrastructure

Modernized basic ICT infrastructure in CSO (computing equipment; internet facility in CSO and 34 provincial offices; software packages for GIS and SPSS)

Statistical Data Center – technical specifications and bidding document prepared

Page 40: Statistics for Results Facility - World Bankpubdocs.worldbank.org › ... › SRF-2017-Annual-Report.pdf · extension, the SRF Council approved the allocation of remaining funds to

[39]

ANNEX 4: NIGERIA SRF Project, Outputs by Component9

Component10 National Bureau of Statistics (NBS) National Population Commission (NPoPC) Comments

1. Organizational, Institutional and Human Resource Development

1.1 Organizational and Institutional Development at NBS (US$1.41m)

- Procurement of office furniture for 6 SSAs - Consultancy for the design of State Statistical

Master Plan (SSMP) for Bauchi, Edo and Kaduna - Procurement of overhead tank for Anambra SBS - Consultancy for development of an Abridged

Version of the NSDS - Consultancy for the development of Code of

Conduct - 3 meetings of National Consultative Committee

on Statistics - Workshop on survey management for NBS staff

and 6 State Statistical Agencies (SSA) - Consultancy for the review and update of the

Compendium of Statistical Terms - Consultancy in office of the Statistician General

on various areas of statistical operations

The working environment significantly improved in all participating states -- verified by the ICR mission in the field, to the extent possible. The SSMPs drafted by state governments and in some cases approved. The adopted Code of Conduct serves as a guide for the SSAs/SBSs.

1.2 Human Resource Development and Management (NBS: US$0.62m; NPoPC: US$0.85m)

- Training on methodologies for surveys/census and data management (including analysis and reporting)

- Training on project management, target setting, M&E

- Training on human resources management for NBS, MDAs and 6 SSAs

- Training on project management, financial management and procurement for NBS PIU staff

- Training on leadership and management skills for MDS, SSAs, and NBS staff

- Training on management of sector statistics on

- Training in Oracle Database Management System (45 cartographers)

- Training in Demographic techniques at Obafemi Awolowo University (20 trainers)

- Training in demographic techniques & analysis (100 staff)

- Consultancy in design and analysis of complex survey data (50 staff)

- Workshop on report writing (vital registration report)

- In-house training workshop on design

A vast domestic training program (more than thousand participants overall) was conducted for both federal and state institutions, with a very positive feedback from the SSAs/SBSs, requesting in some cases longer courses, repetition of basics, and inclusion of new topical training.

9 Source: Nigeria Implementation Completion and Results Report for Statistical Development Project, January 30, 2015. 10 The amount for each sub-component represents the actual amount spent for NBS and the budgeted amount for NPoPC.

Page 41: Statistics for Results Facility - World Bankpubdocs.worldbank.org › ... › SRF-2017-Annual-Report.pdf · extension, the SRF Council approved the allocation of remaining funds to

[40]

Component10 National Bureau of Statistics (NBS) National Population Commission (NPoPC) Comments

SQL Database Platform - Training on management of State Statistical

Yearbook on SQL Database Platform - Training on compilation of agricultural statistics - Training on compilation of environment

statistics - Training on effective communication

and analysis of complex sample survey data (50 staff)

- Training on project management, procurement and financial management (project team/staff)

- Training in research methodology, population dynamics, gender issues, reproductive health and population coordination (45 staff)

- Training in planning and - M&E (40 staff) - Procurement specialist to support

Project Implementation Task Team - Training consultant on project

management, procurement/FM

2. Statistical Framework and Information Technology

2.1 Roll-out of Statistical Template at SSAs (US$0.35m)

- Consultancy for development of e-template for management of statistical yearbooks

- Stakeholders Forum on the MDAs - Consultancy for design of sector statistics

strategy for 18 MDAs - Consultancy for computerization of Computer

Center in Ondo State Purchase of computer software (for all pilot states)

- Consultancy for upgrading and re-engineering of NBS website

2.2 Information Technology at NBS (US$1.24m)

- Workshop on User Satisfaction Baseline Survey at national level and in 6 states

- Training on application of Microsoft Office in statistical production

- Training of MDAs and SSAs staff on SPSS for data analysis and interpretation

- Training on computation and compilation of national accounts

The USS conducted and its results disseminated for the first time on NSS operations.

Page 42: Statistics for Results Facility - World Bankpubdocs.worldbank.org › ... › SRF-2017-Annual-Report.pdf · extension, the SRF Council approved the allocation of remaining funds to

[41]

Component10 National Bureau of Statistics (NBS) National Population Commission (NPoPC) Comments

- Training on methodology for computation of price statistics and CPI

- Training of field officers (supervisors and enumerators) on the use of CAPI

- Training in E-accounting for accounting staff of NBS, MDAs and 6 SSAs

- Procurement of ICT hardware, other than computers (scanners, projectors, cameras, etc.)

- SPSS License Renewal - Consultancy for design and implementation of

NBS on-line research data portal - Consultancy for maintenance of NBS website - Consultancy on annual maintenance of research

Data Portal

2.3 Pilot Phase of Electronic Birth and Deaths Registration Centers at NPoPC (US$1.87m)

- Mobile birth and death registration centers

- Security devices for mobile registration centers

- Pilot phase networking implementation

- Motorcycles for data collection - Training on data processing - Consultant for capacity building on

writing codes for scanners - Consultant installation of mini-GIS

laboratories in 6 state offices - Consultant training on Oracle Spatial

Database Management - Consultant training on GIS using ArcGIS

100 - Consultant training on research

methodology - Consultant training on planning, M&E

The local staff in participating states demonstrated their performance in GIS laboratories. They stressed that the established centers also accommodate requests from non-participating states, which do not have similar facilities.

Page 43: Statistics for Results Facility - World Bankpubdocs.worldbank.org › ... › SRF-2017-Annual-Report.pdf · extension, the SRF Council approved the allocation of remaining funds to

[42]

Component10 National Bureau of Statistics (NBS) National Population Commission (NPoPC) Comments

2.4 Data Development, Management and Dissemination (NBS: US$1.03m; NPoPC: US$1.53m)

- Transport for supervision of data collection (1 per State and 2 for NBS)

- Motorcycles for data collectors - Laptop computers for State Statistical Offices - Desktop computers - Printing of backlog of State Statistical Yearbooks

for 2007-2010 - Other printing (sector outputs from MDAs and

local governments) - Data dissemination tools (Robocalls, SMS) - Consultancy on harmonization of methodology

for production of NBS integrating publications - Consultancy for upgrading of NBS Library to e-

Library

- GIS equipment in 6 states - Desktop computers and other

hardware (NPoPC, 6 states (including MDAs, zonal offices and LGA offices)

- Server hardware and software for internet solutions

- Training in GIS using ArcGIS 10 and Spatial Database Management System (148 cartographers)

- Capacity building in writing CODES for scanner

- Capacity building in CSPro (15 staff) - Vital registration program review

workshop

To the extent possible, the ICR mission witnessed the procured equipment in use in the state statistical offices and NPoPC state branches.

3. Project Management, Monitoring and Evaluation, and Statistical Communication (M&E)

3.1 Project Management and M&E at NBS (US$0.27m)

- Adverts in print and electronic media - Monitoring and supervision of SRF-CF project - Courtesy visit to selected states and MDAs for

sensitization on NSDS - Operating costs of Project Unit - External Auditor

3.2 Statistical Communication at NBS (US$0.3m)

- Statistical communication in 6 State Statistical Offices Consultancy on Audio Visual documentary of NSS

3.3 Project Management and M&E at NPoPC (US$0.3m)

- Operating costs and M&E

Page 44: Statistics for Results Facility - World Bankpubdocs.worldbank.org › ... › SRF-2017-Annual-Report.pdf · extension, the SRF Council approved the allocation of remaining funds to

[43]

ANNEX 5: RWANDA – Achievements by Components

Project component Achievements

Data development and management

2012 Population and Housing Census: results disseminated April 2014 Pilot National Agricultural Survey: results April 2014; to be conducted annually Fourth Integrated Household Living Conditions Survey (EICV4): Oct. 2014 Fifth Demographic and Health Survey: 2014/2015 – key findings available First Integrated Business Enterprise Survey and Second Establishment census: July 2014 Consumer Price Index: published on 10th of each month Rebasing of National Accounts to 2011 base year: completed and methodology upgraded to SNA2008 standards – June 2014 Adherence to standards on data quality: (i) classification of Government data according to GFS 2001 manual: completed; (ii) Balance of Payment Manual version 6: 85% implemented; (iii) trade statistics now using SITC Strengthening of administrative statistics: NISR pilot-tested a Civil Registration and Vital Statistics system throughout the country. Analysis of results of the pilot underway; these results will serve as the basis for the national CRVS system.

Information dissemination and services to users

Annual release calendar: execution rate around 80% Deployment of pro-active data dissemination (e.g., SDMX, Rapid-SMS); Rapid-SMS allows subscribers to request any indicator through their mobile phones. Internet-based data dissemination channels (NADA, IMIS, DevInfo): up-to-date; micro data 2013 agricultural survey and 10% of 2012 population census: available by June 2015. Statistical Data Portal: data from surveys and censuses of NISR are available to the public, except for administrative data from agencies and ministries. 3 outreach workshops to promote awareness of the existence of open micro data Enhancement of use of IT survey tools, e-learning, and infographics High-level press conference for public on Africa Statistics Day (2013), hosted by Ministry of Finance and Economic Planning) User satisfaction survey: baseline (July-Sept 2012); second (Dec 2014-Mar 2015).

Coordination of National Statistical System

Completion of NSDS1 (2009-2014) Approval of NSDS2 (2014/15-2018/19) in September 2014 Statistical information dissemination policy approved and NSS information published in respective statistical yearbooks Knowledge sharing with good practice locations on organizational structure for NSS: a study trip to Mexico and one of the EU accession countries (under consideration)

Capacity development (human and physical)

Development of and training in harmonized data collection tools to local staff in 5 sectors: health, education, agriculture, population and macroeconomic/finance Capacity building plan (July 2013-June 2018) approved by Statistics Steering Committee; hands-on/on-the-job training, thematic course, profile upgrading, long-term programs. Training Center at NISR for government officials in NSS: architectural model completed; construction of Center supported by IDA’s Public Sector Governance Program-for-Results. Procurement of computers and application software to all sectors.

Page 45: Statistics for Results Facility - World Bankpubdocs.worldbank.org › ... › SRF-2017-Annual-Report.pdf · extension, the SRF Council approved the allocation of remaining funds to

[44]

ANNEX 6: ETHIOPIA – Training Activities

Ethiopia SRF Project – Training Activities

Training Area No. of Participants

Agency of Participants

IN-HOUSE TRAINING 2028

Statistical awareness training through video conference (using WoredaNet11)

1237 CSA branch offices & MDAs

Basic computer training 294 CSA & branch offices

Sampling techniques 80 CSA & branch offices

STATA and SPSS software 91 CSA & branch offices

Training on finance, procurement, audit, property administration

248 CSA, branch offices, & regional sector bureaus

Training on safety & maintenance 52 CSA & branch offices

Training on leadership & change management 26 CSA & National Planning Commission (NPC)

OVERSEAS TRAINING 103

Poverty data analysis (Thailand) 10 CSA (8) & NPC (2)

Data quality & standards 5 CSA

National accounts 6 NPC

Agricultural statistics 5 CSA

Web GIS application 18 CSA

Advanced project management 4 CSA

EXPERIENCE-SHARING ACTIVITIES

Vital statistics and civil registration 7 CSA

Data management & other statistical areas 10 CSA & Vital Events Registration Agency (VERA)

NSDS II design (Rwanda, Malawi, Indonesia) 11 CSA

Data center IT-related areas 9 CSA

GIS-GPS field application 5 CSA

User Satisfaction Survey 5 CSA

Experience-sharing on fast track office construction methods (Tanzania)

3 CSA

11 Woreda Net is a video-conference-based national learning network under the National Data Center of the Ministry of Information, Communication, and Technology.

Page 46: Statistics for Results Facility - World Bankpubdocs.worldbank.org › ... › SRF-2017-Annual-Report.pdf · extension, the SRF Council approved the allocation of remaining funds to

[45]

ANNEX 7: GHANA Capacity Building Activities, 2014-2016

No Training Activity Date of training

Place of

training

Number of

Participants

Male Female Total

1 Monitoring and Evaluation in GIMPA 14 Jun - 6 Sept 2014 Ghana 2 0 2

2 Monitoring and Evaluation in SETYM International, Canada 11-29 Aug 2014 Canada 0 1 1

3 Macroeconomic Analysis 15-23 Sept 2014 Gambia 2 0 2

4 Economics of Biodiversity and Ecosystem Services 20-22 Sept 2014 UK 1 0 1

5 Modelling & forecasting for Policy Analysis 6-10 Oct 2014 Nigeria 2 0 2

6 Android Mobile application Development 13-17 Oct 2014 Ghana 6 1 7

7

Statistics for Policymaking - Identifying Macroeconomic and

Vulnerabilities 17-19 Oct 2014 USA 1 0 1

8 Performance Management 29 Oct.-28 Nov 2014 Ghana 291 133 424

9 UN Statistics Commission (46th Session) 26 Feb. -5 Mar 2015 USA 1 1 2

10 Microsoft Lync, outlook and SharePoint (3 sessions) 15 Mar-10Apr 2015 Ghana 266 51 317

11 Exports and Imports Data and computation of Terms of Trade Index 29 Mar – 3 Apr 2015 Ghana 22 5 27

12 Economic Census in the US Bureau of Census 2-16 Apr 2015 USA 2 0 2

13 Basic Statistics 12-18 Apr. 2015 Ghana 34 2 36

14 Poverty Mapping 19 Apr-2 May 2015 Ghana 15 6 21

15

Computer Assisted Personal Interview (CAPI)-CsPro Android for

intermediate Users - in the US Census Bureau 15-26 Jun 2015 USA 2 1 3

16

Demographic analysis software (spectrum, q-five, mortpack and other

demographic spreadsheets) 10-23 May 2015 Ghana 14 2 16

17 Basic Statistics, Econometrics and Research Methods 11-15 May 2015 Nigeria 2 0 2

18 Data management and statistical analysis using STATA/SPSS 26 May to 6 Jun 2015 Ghana 18 2 20

19

Research methodology and report writing, Data management and survey

research methods -1 Jun-24 Jul 2015 Ghana 10 1 11

20

Survey Program for Sampling Statisticians at the Michigan University

Summer Institute, USA 1 Jul-28 Aug 2015 USA 1 1 2

21 Computer Application in Accounting, Auditing and Financial Management 6-14 Jul 2015 Nigeria 1 0 1

22

Making Corporate Boards More Effective. (GSS Governing Board

Members) 22-25 Jul 2015 USA 4 1 5

23 Specialized Report Writing Skills and Presentation Techniques 27 Jul-4 Aug 2015 Nigeria 0 1 1

24

SDGs side event of the UN General Assembly and forum on Global

Partnership for Sustainable Development 23-29 Sept 2015 USA 1 1 2

25 Civil Registration - Birth & Death Registration (study tour) 3-17 Oct 2015 UK 5 1 6

26 African Symposium on Statistical Development 19-29 Nov 2015 Gabon 3 0 3

27 7th International African Population Conference 30 Nov - 4 Dec 2015

South

Africa 1 0 1

28 Trade Ministers Forum 2-4 Dec 2015 Gambia 1 0 1

29 Fundamentals of Macroeconomic Analysis 7-19 Feb 2016 Nigeria 2 0 2

30 UN Statistics Commission (47th Session) 3-12 Mar 2016 USA 2 1 3

31 Techniques of Economic Analysis, Monetary Policy and Fiscal Analysis 6-18 Mar 2016 Gambia 2 0 2

32 Management Information System (Min Land & Natural Resources) 28 Mar-1 Apr. 2016 Ghana 20 5 25

33 Statistical Methods (MLNR) 11-15Apr 2016 Ghana 18 4 22

Page 47: Statistics for Results Facility - World Bankpubdocs.worldbank.org › ... › SRF-2017-Annual-Report.pdf · extension, the SRF Council approved the allocation of remaining funds to

[46]

No Training Activity Date of training

Place of

training

Number of

Participants

Male Female Total

34 Human Resource Management 11-22 Apr 2016 Ghana 2 4 6

35 Microsoft Excel 17-31 May 2016 Ghana 100 50 150

36 Annual Government Forum on Electronic Identity in Africa (ID4Africa) 23-26 May 2016 Rwanda 2 0 2

37 Collaborative program with Statistics Norway 28 May-3 Jun 2016 Norway 5 0 5

38 Sampling Program for Survey Statisticians 30 May-30 Jun 2016

Ann

Arbor

USA 1 1 2

39 Multiple Imputation in Practice & Multi-Level Analysis of Survey Data 25 Jun-23 Jul 2016

Ann

Arbor

USA 0 1 1

40 Data Analysis software – SPSS Training (Ministry of Health) 26 Jun-3 Jul 2016 Ghana 22 7 29

41 System Administrators training (Min Employment & Labor Relations) Jul-Oct 2016 Ghana 1 1 2

42 Public Financial Management: Budgeting, Planning and Performance 9-21 Jul 2016

Sierra

Leone 1 0 1

43 3oth Contemporary Public Administration Management Seminar 12-27 Jul 2016 Israel 1 0 1

44 Data Quality Management (Min Health Data Managers) 10-12 Aug 2016 Ghana 1 1 2

45 Data collection methodology (Min Land & Natural Resources) 24-26 Aug 2016 Ghana 18 6 24

46 Economic and Financial Report Writing Skills and Presentation Techniques 3-14 Sept 2016 Gambia 1 0 1

47 Financial Programming and Policies 19-30 Sept 2016 Ghana 2 0 2

48 Goods and Equipment Procurement Management and Consultants 3-28 Oct 2016 Ghana 2 0 2

49 Cognos Impromptu software (Min Trade & Industry/GSS)

30 Oct-4 Nov 2016;

15-21 Jan 2017 Ghana 21 7 28

50 12th African Symposium on Statistics Development 1-5 Nov 2016 Tunisia 4 0 4

51 West Africa Monetary Zone Trade Ministers Forum 1-5 Nov 2016 Liberia 2 0 2

52 Modelling & forecasting for Policy Analysis 6-19 Nov 2016 Nigeria 1 1 2

53 Project Management, Monitoring and Evaluation 7-18 Nov 2016 Ghana 10 4 14

54 Financial Management Course for Project Accountants 13-25 Nov 2016 Kenya 1 0 1

55 Fundamentals of Economic Statistics 19-26 Nov 2016 Gambia 1 0 1

56 First UN World Data Forum 13-20 Jan 2017

South

Africa 6 0 6

57 West African Monetary Zone Meeting 5-11 Feb 2017 Liberia 1 0 1

58 First Technical Meeting on Human Settlements Indicators for SDGs 12-18 Feb 2017 Kenya 1 0 1

59 Ghana Integrate Financial Management System (GIFMIS), (GSS) 22-24 Feb 2017 Ghana 25 6 31

60 Methodology, data management (Min Gender & Social Protection) Feb-Mar 2017 Ghana 10 13 25

61 Sensitization on Data Quality Reporting (Min Land & Natural Resources) 1-3 Mar 2017 Ghana 30 17 47

62 UN Statistics Commission (48th Session) 1-11 Mar 2017 USA 3 0 3

63

61st Session of the Commission on Status of Women (Min Gender & Social

Protection) 12-25 Mar 2017 USA 0 1 1

64 Training in Web Mapping (Min Land & Natural Resources) 27 Mar-9 Apr 2017 Ghana 8 2 10

Page 48: Statistics for Results Facility - World Bankpubdocs.worldbank.org › ... › SRF-2017-Annual-Report.pdf · extension, the SRF Council approved the allocation of remaining funds to

[47]

ANNEX 8: AFGHANISTAN Results Framework – Strengthening Statistical Capacity Technical Assistance

Activity Output/result Verifications

Improving the compilation methodology, classifications, and sources for national accounts

Business Establishment Survey and the Afghanistan Financial Management Information System data integrated into National Account compilation methodology

CSO confirmation of use of new methodology in preparation of 2016 National Accounts

Improving data reporting templates and strengthening online accessibility of national account and other economic statistics data

National Account data available in extractable formats from CSO website

Three data reporting templates produced for significant economic statistics datasets

CSO website TA outputs

Initial needs assessment and foundational work towards production and publication of a Producer Price Index (PPI)

Needs assessment for PPI production completed

TA outputs

Improving staff capacity in data analysis and report writing

Data analysis training provided to 20 CSO staff and report writing to 5 CSO staff

Data analysis provided to 10 staff from other ministries

Attendance records

Page 49: Statistics for Results Facility - World Bankpubdocs.worldbank.org › ... › SRF-2017-Annual-Report.pdf · extension, the SRF Council approved the allocation of remaining funds to

[48]

ANNEX 9: DEMOCRATIC REPUBLIC OF CONGO Results Framework -- Catalytic Project to Strengthen the

National Statistical Institute

Revised Version after Project Restructuring

Project development objective (PDO): To strengthen the capacity of INS to generate and disseminate statistical information.

PDO indicators Baseline Cumulative target values Frequency Responsibility

YR 1 YR 2 YR 3 YR 4 YR 5

Completion rate of activities required before fieldwork for cartography of population census (validation of methodology; training and deployment of field teams; pilot cartography; validation of cartography report) (%)

0 0 0 60 5/17

80 100 Annual INS DG’s office and Department of General Statistics (DSG)

Execution rate of activities required for a Master business sample frame for enterprise census (preparatory works; pilot census; definition of maps for enumeration areas; communication campaign; purchase of equipment and office supplies; identification phase of enumeration areas); enumerations; data processing & report; creation of master sample frame for business survey) (%)

0 0 0 40 5/17

70 80 Annual INS Department for Economic Analysis (DSE)

Statistical products available on the INS web site (e.g., CPI, poverty indices, national accounts, input-output tables)

0

0 0 0

5 10 Quarterly Departments responsible for IT and for documentation within INS

Intermediate Results

Increasing INS technical capacity

Technical training session beneficiaries: students prepared to exam ITS Ingenieur Travaux Statistiques (ITS) (BA equivalent) and Ingenieur Statisticien-Economiste (ISE) (MA equivalent) (80) and INS agents who benefitted from thematic and practical training (100)

0 80 180 Quarterly INS training department (CFP)

Technical training session beneficiaries: women (%) 0 15 15 Quarterly INS training department (CFP)

Graduates financed by the project (scholarship recipients) 0 0 0 0 23 23 Annual INS training department (CFP)

Graduates financed by the project, of which women (%) 0 0 0 0 15 15 Annual INS training department (CFP)

Number ITS and ISE (equivalent to Bachelor of Arts and Master of Arts) beneficiaries trained for admission into regional schools of statistics

0 0 0 0 14 16 INS training department (CFP)

Strengthening the non-technical environment

Unqualified annual audit reports 0 0 0 0 1 2 Annual INS Administration & Finance Dir.

Execution rate of demolition and reconstruction works of INS facilities at Limete (%)

0 0 0 10 50 100 Annual INS Administration & Finance Dir.

Statistical production and dissemination

Dissemination policy designed and approved No No No Yes Yes Yes Annual INS and SRF project

Page 50: Statistics for Results Facility - World Bankpubdocs.worldbank.org › ... › SRF-2017-Annual-Report.pdf · extension, the SRF Council approved the allocation of remaining funds to

[49]

ANNEX 10: ETHIOPIA: Results Framework -- Statistics for Results Project

Revised following SRF-CF Extension

Project Development Objective (PDO): The objective of the Project is to enhance the capacity of the CSA at the organizational, human, and physical levels in order to produce and

disseminate reliable, accessible, and timely statistics.

Expected PDO Level

Results Indicators Baseline

Cumulative Target Values**

Frequency Data Source/

Methodology

Responsibility

for Data

Collection

June 2015 June 2016 June 2019

Result One: Data Quality:

The CSA applies

internationally-accepted

statistical techniques and ICT

applications in the collection,

compilation and authenticity

verification of data, and

carries out key pilot MDAs

and validation for data sources

and statistical products.

1) Ethiopia’s Statistical

Capacity Index.

61

(2014)

69 70 77 Annual World Bank CSA

2) % key NSS members

who have applied the

EDQAF manual

NA

-

20% 50% Annual

Metadata as

published on

CSA and MDAs

website.

CSA and key

MDAs

3) Percentage of users who

are satisfied with official

statistics methodologies as

determined by the user

satisfaction survey

NA NA 66% 75% Annual User Satisfaction

Survey

CSA

Result Two: Timeliness:

Timeliness of publication of

key statistics in line with

national standards as agreed

upon by CSA and MDAs.

Execution rate of annual

statistical release calendar

NA 67% 75% Annual CSA Release

Calendar.

Annual Review

Reports

CSA.

Result Three: Data Access:

Data readily available to users

through Open Data Portal and

Percentage of users who are

satisfied with the

accessibility of official

statistics as determined by

the user satisfaction survey.

NA 73% 80% Annual User Satisfaction

Survey

CSA

Page 51: Statistics for Results Facility - World Bankpubdocs.worldbank.org › ... › SRF-2017-Annual-Report.pdf · extension, the SRF Council approved the allocation of remaining funds to

[50]

Results Indicators Baseline Cumulative Target Values**

Frequency Data Source/

Methodology

Responsibility for

Data Collection

June 2015 June 2016 June 2019

INTERMEDIATE RESULTS

Intermediate Result (Component One): Organizational Strengthening and Infrastructure Development in NSS

Intermediate Result One: Full

and timely implementation of

organizational training program

at CSA headquarters, branch

offices and at the NSS members

in areas of Organizational

Change, Strategic Planning

Management and IT

Number of staff from CSA

and MDAs trained

annually, of which female

(%)

0 20 (10%) 323 (15%) 725 (25%) Annual

Annual Training

Plans

Performance

reports

CSA Head and

key MDAs

Intermediate Result Two: four

branch offices and training

center at Headquarters

constructed and made

operational

Execution rate of Branch

office construction

0 0 40 % 100% Bi-annual PIU progress

report and

disbursement

report

CSA (PIU)

Number of new branch

offices buildings being

operational

0 6 PIU progress

report

CSA (PIU)

A training center

established at

Headquarters

1 Bi-annual PIU progress

report

CSA

Intermediate Result Three:

Establish Video Conference

center

Number of video VC

center established

6

operational

VC

facilities

bi-annual Project progress

reports

CSA/ PIU

Intermediate Result (Component Two): Statistical Data Development and Management

Intermediate Result One:

Full and timely implementation

of surveys and statistical tasks

identified in the project work

plans for FY13-18, including

those related to business

statistics; mining, energy,

transport and construction;

agriculture census support,

agriculture sample survey; and

vital statistics.

Number of surveys

directly supported by the

project

0 0

2

4

Annual Project progress

reports

CSA

Number of people trained

on areas of statistical data

production, of which

female (%)

0 98 (15%) 209 (25%) Annual Project progress

reports

CSA

Page 52: Statistics for Results Facility - World Bankpubdocs.worldbank.org › ... › SRF-2017-Annual-Report.pdf · extension, the SRF Council approved the allocation of remaining funds to

[51]

Results Indicators Baseline Cumulative Target Values**

Frequency Data Source/

Methodology

Responsibility for

Data Collection

June 2015 June 2016 June 2019

Intermediate Result (Component Three Sub-Component 3.1): Statistical Methodology, Standards and Data Quality Assurance

Intermediate Result One:

Number of CSA and NSS staff

trained in specialized quality

assurance topics including

EDQAF, survey methods,

poverty mapping techniques,

national accounts, and gender

analysis of household surveys.

Number of trainees from

CSA and MDAs staffs, of

which female (%)

0 5 (10%) 239 (15%) 1250

(25%)

Bi-annual Planning and

progress reports

CSA and MDAs

Intermediate Result (Component Three Sub-component 3.2): Information Dissemination and User Services

Intermediate Result One: User

satisfaction survey conducted

Number of user

satisfaction reports

Not

available

0 1-per year 1 per year -annual User Satisfaction

Survey document

CSA

Intermediate Result Two:

Launch of eCSA mobile

education unit on wheels for

user outreach (eCSA Program

on Wheels).

Number of eCSA buses in

use

0 0 0 2 annual CSA progress

reports

CSA

communication

directorate

Intermediate Result indicator

Three: User friendly CSA

website with adequate server

capacity established

User-friendly CSA website

established

User-

friendliness

of CSA

website

established

- CSA website CSA/ IT

directorate ,

Intermediate Result (Component Four): Monitoring and Evaluation

Intermediate Result one:

IDA approved Audit Report

submitted six months after the

end of every FY

Number of audit reports

produced

0 1 1 1

Annual

Audit Reports

CSA, Finance and

Administration,

PIU

Intermediate result two:

IDA approved Project M&E

Report (complete with ESMF

implementation status and

related DP and NSS tasks)

submitted two months after the

end of every 6 month period

number of ESMF

implementation reports

produced

0 1 1 1 annual Implementation

Reports

CSA

Page 53: Statistics for Results Facility - World Bankpubdocs.worldbank.org › ... › SRF-2017-Annual-Report.pdf · extension, the SRF Council approved the allocation of remaining funds to

[52]

Results Indicators Baseline Cumulative Target Values**

Frequency Data Source/

Methodology

Responsibility for

Data Collection

June 2015 June 2016 June 2019

Intermediate result three:

CSA project coordination team

and PIU established

Quality and timeliness in

decision making and

project coordination

Project

coordinatio

n unit

established

&

functional

1 1 1 annual Progress reports

Intermediate result four :

support provided for NSDS2

development

revised & finalized NSDS

II draft document

0 1 annual NSDS II

document

CSA

Intermediate result five:

Implementation of project

evaluation at mid-term & end of

project

Number of project

evaluation reports

produced

0 2* annual Evaluation

reports

CSA

Includes End-term project evaluation.

Page 54: Statistics for Results Facility - World Bankpubdocs.worldbank.org › ... › SRF-2017-Annual-Report.pdf · extension, the SRF Council approved the allocation of remaining funds to

[53]

ANNEX 11: GHANA Revised Results Framework – Statistics Development Project

Baseline Cumulative target values Frequency Data Source/ Methodology

Responsible for data

collection

Description (indicator

definition, etc.) Actual Target

Project Development Objective (PDO): To strengthen the National Statistical System in the production and dissemination of timely and robust statistics, relevant for evidence-based policy-making and other uses.

PDO Level Results Indicators

Relevance (%)

User satisfaction with statistical products and services of the NSS (disaggregated by GSS, MDA, products)

40 (2011) 82.1 (2016) 90 Baseline, mid-term, end-of-project

User satisfaction survey

GSS USS covers internationally recognized elements of statistical quality

Overall quality

Statistical Capacity overall score and

Disaggregated by:

(a) Methodology (b) Source data (c) Periodicity & timeliness

64 (2010)

50

50

92

66.9 (2016)

60 (2016)

60(2016)

86.7 (2016)

70

65

65

92

Annual WB Statistical Capacity Indicator

WB/DECDG Internationally recognized indicator

Dissemination of timely and robust statistics

Number of months between end of data collection and release of main report for household surveys

Annual School Census

GLSS

Labor Force Survey

3

18

-

2 (2016)

9 (2016)

11 (2017)

1

6

3

Annual Review of implementation of census and survey plan

GSS Number of months elapsed between end of data collection and release of data for LFS does not exist but introduced in year 1 of project. GLSS is not an annual survey.

Economic statistics produced in accordance with internationally recommended duration of base year (rebased within last 5 years) for CPI and for GDP

No No Yes

Page 55: Statistics for Results Facility - World Bankpubdocs.worldbank.org › ... › SRF-2017-Annual-Report.pdf · extension, the SRF Council approved the allocation of remaining funds to

[54]

Baseline Cumulative target values Frequency Data Source/ Methodology

Responsible for data

collection

Description (indicator

definition, etc.) Actual Target

INTERMEDIATE RESULTS

Intermediate Result (Component One): institutional Reform and Organizational Change

Intermediate Result Indicator One: % of staff with professional qualifications: GSS MDA statistical units at Headquarters

39 65

62.1 (2017) 65.6 (2016)

70 70

Annual Review of staffing profile in GSS and MDA statistical units

GSS and MDAs

Staff with at least Bachelor’s degree in related discipline

Intermediate Result Indicator Two: number of staff (full-time equivalent) employed by GSS

532

372 (2016)

350

Intermediate Result (Component Two): Enhancing Capacity

Intermediate Result Indicator One (sub-component 2a): Persons trained (for a period of two months and above)

50

25(2016)

70

Annual Review of staffing profile in GSS/MDA stat units

GSS and MDAs

Intermediate Result Indicator Two (sub-component 2b): use of master sampling frame based on updated cartographic maps for household surveys

No

Yes

Yes

Annual Review of implementation of census and survey plan

GSS

Intermediate Result Indicator Three (sub-component 2c): MDA and regional statistics offices fully equipped and operational with computers, essential equipment and furniture and ICT connectivity (No.)

-

20 (2016)

20

Annual Review as part of project implementation progress reports

GSS and MDAs

Basic equipment includes desk, chair, computer, access to printer photocopier, and internet connection. Refers to 10+10 regional offices

Intermediate Result (Component Three): Data Production and Dissemination

Intermediate Result Indicator One (sub-component 3a): Economic statistics produced in accordance with internationally accepted standards, including rebased within last 5 years:

Producer Price Index

Supply and Use Tables

No No

-

No No

Yes Yes

Annual Review of quality of economic statistics (supported through IMF EDDI program)

GSS These statistics to be rebased every 5 years.

Page 56: Statistics for Results Facility - World Bankpubdocs.worldbank.org › ... › SRF-2017-Annual-Report.pdf · extension, the SRF Council approved the allocation of remaining funds to

[55]

Baseline Cumulative target values Frequency Data Source/ Methodology

Responsible for data

collection

Description (indicator

definition, etc.) Actual Target

Intermediate Result Indicator Two (sub-component 3b): Communications and Dissemination Policy adopted by NSS Technical Committee

No

No

Yes

Annual (until adopted)

Review of minutes of NSS technical committee meetings

GSS

Intermediate Results indicator Three (sub-component 3b): Production and publication of a statistics release calendar on GSS website (new since June 2016)

No Yes (2016) Yes

Page 57: Statistics for Results Facility - World Bankpubdocs.worldbank.org › ... › SRF-2017-Annual-Report.pdf · extension, the SRF Council approved the allocation of remaining funds to

[56]

ANNEX 12: LAO PDR Results Framework -- Strengthening the National Statistical System Project (LAOSTAT)

Indicators Baseline (2012)

Cumulative Target Values Data source/ Methodology

Responsibility for Data

Collection

Current Target

Project development objective (PDO): To improve the capacity of the national statistical system to produce and disseminate reliable and timely macroeconomic and poverty statistics in accordance with international standards and in response to user needs.

PDO Level Results Indicators

Indicator one: User satisfaction with macroeconomic and poverty statistical products and services of the NSS (disaggregated by LBS and SMA) improved (%)

49 3/14

78

12/17 Baseline user

survey LBS

Indicator two: Macroeconomic and poverty-related statistical capacity score improved and disaggregated:

(a) Methodology (b) Source data (c) Periodicity & timeliness (d) Survey data

50 50 74 83

50 60 83 --

65 65 85 90

WB

Indicator three: Comprehensive macroeconomic framework is developed and used by government for policy-making and planning process

None Developed Available LBS

Intermediate Results

Indicator one: Macroeconomic statistics produced in line with internationally accepted standards.

Poor Ongoing, with much progress

Improved Implementation

reports LBS

Indicator two: Social and demographic statistics (particularly household and poverty data , including sex-disaggregated data) are produced in line with internationally accepted standards

Poor

LECS5 completed;

poverty report 2014/15

released; LECS6 underway

Improved Implementation

reports LBS/SMA

Indicator three: Internationally accepted standards, classifications and methodologies in macroeconomic and poverty-related data collection, compilation, and validation are in place.

Poor

Good progress on national

accounts, CPI basket, BoP, poverty and

other statistics

Improved standards and methodologies

used

LBS

Indicator four: Interagency coordination mechanism

Unclear

Interagency coordination carried out periodically

through statistical

Functional NSDS progress

reports LBS

Page 58: Statistics for Results Facility - World Bankpubdocs.worldbank.org › ... › SRF-2017-Annual-Report.pdf · extension, the SRF Council approved the allocation of remaining funds to

[57]

working group, annual user-

producer forum, and

macro monitoring and modelling team

Indicator five: Human resource management strategy is in place and LBS and MDA staff trained and maintain their skills

No strategy

Training in place

HR strategy finalized and approved by

LBS; final long-term

institutional capacity

building plan expected by May 2017

Strategy & training

program in place

Implementation reports

LBS/MDA

Indicator six: Data user-producer dialogue established and functional Random & infrequent

Data user-producer forum

organized annually

Regular Implementation

reports

LSB/Statistical Working Group

Indicator seven: Dissemination strategy is developed and implemented No

strategy

Strategy and plan to be

launched by May 2017

Strategy in place

Implementation reports

LSB

Indicator eight: IT plan for LBS and SMA is developed and implemented

None

Implementation of IT plan

underway, but slowly due to

delays in construction of

LSB building

Plans in place & implemented

Implementation reports

LBS/SMA

Indicator nine: LSB web portal improved with increased number of data available Weak Ongoing

Portal improved

LBS

Indicator ten: IT staff trained and their skills retained Limited skills

Ongoing. More IT training

planned in 2017 as ICT activities

take off

Skills learned and applied

LBS/SMA

Page 59: Statistics for Results Facility - World Bankpubdocs.worldbank.org › ... › SRF-2017-Annual-Report.pdf · extension, the SRF Council approved the allocation of remaining funds to

[58]

ANNEX 13: SENEGAL Results Framework -- Statistics for Results Project

PDO Level Results Indicators* Unit of

Measure Baseline

Cumulative Target Values** Frequency Data Source/

Methodology

Responsibility

for Data

Collection

Descrip

tion

YR 1 YR 2 YR3

Project Development Objective (PDO): To better inform public and private sector decision-makers by filling gaps in the statistical knowledge base in the areas of

employment, tourism, construction and services, as identified in the NSDS, as well as build capacity for the production and dissemination of reliable and relevant

data.

User satisfaction with project outputs:

Average % across 4 data sets

ND baseline survey

conducted

67% 80%

Annual

User

satisfaction

survey

ANSD

Share of women graduating from ENSAE

% 12% 12% 12% 15% Annual ENSAE ENSAE NA

INTERMEDIATE RESULTS

Intermediate Result (Component One): Production of Statistics

Intermediate Result (Sub-component One): Service Production Price Index

Methodology adapted Paper NA Available NA ANSD ANSD NA

Sample of providers and services

Data Base NA Available NA ANSD ANSD NA

Service Production Price Index SPPI

Index NA Test Year Final SPPI available

Annual ANSD ANSD See AFRISTAT

Intermediate Result (Sub - component Two): Construction Cost statistics

Methodology Paper NA Available NA ANSD ANSD NA

Baselines survey results Data Base NA Available NA ANSD ANSD NA

Construction Cost Index (ICC) Index NA CCI available (Pilot Year)

Final CCI available Annual ANSD ANSD See AFRISTAT

Intermediate Result (Sub-component Three): Employment and labor market conditions Statistics

Annual survey (SNES) pilot Data Base NA Conducted NA ANSD ANSD NA

SNES Pilot Survey data Data Base NA Available Pilot ANSD ANSD NA

Data on employment Data Base & Index

NA Bi-monthly data available (Pilot)

Quarterly data available

Quarterly ANSD ANSD NA

Page 60: Statistics for Results Facility - World Bankpubdocs.worldbank.org › ... › SRF-2017-Annual-Report.pdf · extension, the SRF Council approved the allocation of remaining funds to

[59]

PDO Level Results Indicators* Unit of

Measure Baseline

Cumulative Target Values** Frequency Data Source/

Methodology

Responsibility

for Data

Collection

Descrip

tion

YR 1 YR 2 YR3

Intermediate Result (Sub-component Four): Tourism Satellite Account

Tourism Satellite Account Data base NA TSA approach finalized and basic data collected

Input surveys achieved

TSA being finalized. Inclusion in national accounts to be done in context of GDP rebasing

Annual Ministry of Tourism and Air Transport

Ministry of Tourism and Air Transport

NA

Intermediate Result (Component Two): ENSAE–Senegal & Training

Students fluent in English (Level 3)

NA NA Laboratory installed

15% 30% Annual ENSAE ENSAE NA

Number of women statisticians enrolled in ENSAE

Number 12% 12% 15% 18% Annual ENSAE ENSAE NA

Number of trainers trained Number NA 5 5 5 Annual ENSAE ENSAE NA