statewide transportation improvement program (stip) 2013 … · 2019. 6. 5. · the 3.2% annual...

91
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 to 2016 Approved: January 25, 2013 Amended: ugust 21, 201 PREPARED BY THE NEW HAMPSHIRE DEPARTMENT OF TRANSPORTATION Bureau of Planning & Community Assistance Federal Aid & Regionally Significant Projects

Upload: others

Post on 23-Sep-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

STATEWIDE TRANSPORTATION

IMPROVEMENT PROGRAM

(STIP) 2013 to 2016

Approved: January 25, 2013

Amended: ugust 21, 201

PREPARED BY THE NEW HAMPSHIRE DEPARTMENT OF TRANSPORTATION Bureau of Planning & Community Assistance

Federal Aid & Regionally Significant Projects

Page 2: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help
Page 3: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

This!report!was!funded!in!part!through!grants!from!the!Federal!Highway!Administration!and!Federal!Transit!

Administration,!U.S.!Department!of!Transportation.!!The!views!and!opinions!of!the!authors!expressed!herein!do!not!

necessarily!state!or!reflect!those!of!the!U.!S.!Department!of!Transportation.!

Page 4: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help
Page 5: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help
Page 6: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

New HampshireStatewide Transportation Improvement Program

2013 - 2016

Table of Contents

Introduction ..............................................................................................................................................................................1

Financial Plan...........................................................................................................................................................................2Federal Resources .................................................................................................................................................................3State Resources.....................................................................................................................................................................5

Turnpike Toll Credits...........................................................................................................................................................6Advance Construction.........................................................................................................................................................7Turnpike Authority...............................................................................................................................................................8Bonds..................................................................................................................................................................................8Operations & Maintenance .................................................................................................................................................9

Other Resources ....................................................................................................................................................................9

Public Involvement ................................................................................................................................................................11STIP Revisions..................................................................................................................................................................... 12

Project List .............................................................................................................................................................................P1Appendix A............................................................................................................................................................................ A1

Page 7: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

Introduction

Moving Ahead for Progress in the 21st Century Act (MAP-21) was signed into law on July 6, 2012. MAP-21 builds upon previous legislation, outlining and restructuring funding categories as well as the associated requirements of the Federal-aid program for transportation. Those requirements, as codified in title 23 part 135 and 49 part 5305 of the United States Code (USC), stipulate that each state will develop a continuing, cooperative, and comprehensive statewide multimodal transportationplanning process, including the development of a statewide transportation improvement program (STIP). In New Hampshire the STIP is updated every two years and is developed through a coordinated statewide and metropolitan planning process.

The metropolitan planning process, as defined in 23 USC part 134 and 49 USC part 5303, is carried out by the four metropolitan planning organizations (MPOs) in New Hampshire: Nashua Regional Planning Commission, Rockingham Planning Commission, Southern NH Planning Commission, and Strafford Regional Planning Commission. Following the 2010 Census the Nashua Regional Planning Commission was also designated as a transportation management area (TMA). Each of the MPOs has adopted a metropolitan transportation plan (MTP) and a Transportation Improvement Program (TIP). The MTPs were developed and approved in accordance with 23 part 450.322 of the Code of Federal Regulations (CFR) and include a financially constrained program of transportation projects within their regions.

The MPO TIPs are consistent with the regulations outlined in 23 CFR §450.324, including requirements related to financial constraint, and have been incorporated into the 2013-2016 NH STIP. As there are nonattainment areas for ozone and carbon monoxide within the MPO boundaries, applicable findings of conformity to the NH State Implementation Plan of all MPO TIPs and MTPs have been made and documented through a process consistent with the requirements of 23 CFR part 450 and 40 CFR part 93. Summary tables for the criteria pollutants are available in Appendix C.

In the Fall of 2004, the Community Advisory Committee (CAC), a diverse group of individuals, businesses, and other interested parties, was created at the request of the NHDOT. This group held many public meetings to identify how changes in NH impact transportation in the state and what could be done to meet the challenges. In June of 2006, the CAC produced a Long Range Plan outlining a vision of transportation in NH. In 2010 the CAC Vision was refined and distilled to produce a new Long Range Transportation Plan for NH, 2010-2030. The Plan was developed in accordance with the requirements outlined in 23 USC part 134.

Every two years the State of NH prepares and adopts a Ten Year Transportation Improvement Plan (10-Year Plan). The recently approved 10-Year Plan (June 2012) was developed to be consistent with the framework established in the LRTP and

Page 8: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

includes a list of projects for the ten-year period from 2013-2022. The process to develop the 10-Year Plan involves substantial input from the public, elected officials, transit operators, state agencies, planning commissions, and MPOs. With the most recent update, the emphasis on fiscal responsibility continued ensuring that the list of projects remains in line with reasonably anticipated revenue estimates.

The 2013-2016 NH STIP has been developed through a coordinated statewide and metropolitan planning process that is consistent with the requirements of 23 CFR §450.216. All projects designated as regionally significant by the MPOs and through Interagency Consultation (IAC), regardless of the funding source, are included in the STIP. All surface transportation projects that utilize resources from programs funded under title 23 USC and title 49 USC part 53, with the exception of the programs identified in 23 CFR §450.216(g), are included in the STIP. The STIP has been constrained to the available financial resources for 2013 through 2014 and the resources that are reasonably anticipated to be available for 2015 through 2016. To more accurately depict the financial status of the STIP, inflation at a rate of 3.2% is included for projects, satisfying the year of expenditure requirement in 23 CFR §450.216(l).

In accordance with the NH STIP Revision Procedures and the MPO TIP Revision Procedures, a series of minor revisions to the NH 2011-2014 STIP have been approved during the development of the 2013-2016 NH STIP and MPO TIPs. Through an agreement with FHWA NH Division, the MPOs, and other Interagency Consultation Partners, those minor revisions will beincorporated into the 2013-2016 STIP.

Financial Plan

The STIP Financial Plan has been prepared to satisfy the requirements of 23 CFR §450.216 and to provide transparent information to the public. According to federal regulations, the STIP shall include projects, or identified phases of projects, only if full funding can reasonably be anticipated to be available for the project within the time period contemplated for completion of the project. Additionally, in the first two years of the STIP, 2013 and 2014, funds for projects located in the nonattainment or maintenance areas of NH must be committed or available.

This Program ensures that funding is available for all projects through the use of a variety of resources, including, but notlimited to, federal resources, with appropriate match amounts, state resources from the Highway Trust Fund and those provided in the budget of the State of NH, turnpike revenue, and local and private revenue sources.The NHDOT STIP Financial Constraint process is based on the following principles:

Page 9: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

! All Federal funds obligated will be appropriately matched and the matching funds are indicated in the constraint analysis and at the project level;

! Federal apportionments for federal fiscal years 2013 and 2014 are based figures published by FHWA! Federal apportionments for federal fiscal years 2015 and 2016 are estimated based on 2014 levels with annual growth

of 3.2%;! All projects funded in the STIP are included in the analysis of STIP financial constraint;! State match budgeted for FY 2013-2016 will be as submitted in NHDOT’s requested operating budget;! Matching funds provided by municipalities and other sources will be committed by those entities before any work may

begin on the project; ! Advance Construction (AC) may be used at the State’s discretion in accordance with Title 23, Section 115;! Turnpike Toll Credits may be used to provide the non-federal match requirements of a project provided that credits are

available.! GARVEE bonds or other bonding mechanisms may be used to fund specific projects within the STIP where those funds

can be considered to be reasonably anticipated to be available or are available.! To estimate year of expenditure dollars for future years in the STIP, an annual inflation rate of 3.2% is applied for each

year beyond the current.! The STIP will be constrained by year to estimated or actual apportionment levels.! By funding category, apportionment balances from previous years as well as the transfer flexibility inherent within

SAFETEA-LU will be utilized as necessary.

Working with the FHWA Resource Center, the NHDOT developed an annual estimated rate of inflation of 3.2%. That rate is based on historical trends over a 20-year period as published in the FHWA report Price Trends for Federal-aid Highway Construction. The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help account for the effects of inflation on the overall program. Similarly, in the 2013-2016 STIP that rate is applied to all projects beginning in 2013 and compounded annually for 2015 and 2016. For projects planned as advance construction, the entire construction cost is inflated in the year of advertising and not compounded in each year of anticipated conversion.

Federal Resources

The majority of federal resources are allocated to the states through annual apportionments outlined in the active transportation bill, MAP-21. In addition to the apportionment, the federal government establishes, on an annual basis and in accordance with Public Law 112-141, a “limit on obligations” that functions as a ceiling on the amount of funds that may be requested in a fiscal

Page 10: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

year. Figure 1 outlines the trend over recent years for both apportionments and limitation on obligations for NH in the coreapportioned programs.

Figure 1 – Trends in NH’s Apportionment & Limit on Obligations

In addition to annual apportionments, states may receive federal resources for transportation projects through other programs.Funding from these programs is typically contingent upon successful application for a specific project or projects. As there can be no reasonable assumption made that an application will be successful, FHWA guidance indicates that these funding sources should not be considered “available” or “committed” for purposes of financial constraint. The 2013-2016 NH STIP has been developed to be consistent with the guidance and does not include any revenue assumptions for such programs.

A third source of revenue for projects from the federal government is made available through congressional earmarks. Earmark funds are not subject to many of the limitations that normal apportionments are and may be moved between fiscal years based on availability and project schedule without adherence to the limitation on obligations. As such, the 2013-2016

$100,000,000

$110,000,000

$120,000,000

$130,000,000

$140,000,000

$150,000,000

$160,000,000

$170,000,000

$180,000,000

$190,000,000

$200,000,000

2004 2005 2006 2007 2008 2009 2010 2011 2012

Apportionment

Limitation on Obligations

Page 11: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

STIP was developed with the assumption that earmark funds that have already been designated will be available for the identified project when the project is ready to move forward. Federal guidance also specifies that future earmarks that have not yet been approved by Congress may not be assumed as revenue in a STIP. Consistent with that guidance, the NH STIP includes only approved and designated earmark funds.

State Resources

Per RSA 9:4, it is required that every state agency submits to the Commissioner of Administrative Services two budgets biennially for consideration:

On or before October 1(of all even years -October 2012), an operating budget that shows maintenance expenditures necessary for the agency. Maintenance expenditures are defined as “the cost of providing the same level of service authorized and funded in the preceding fiscal year, incorporating changes in the population, economic conditions, and other factors outside the control of the accounting unit”.

In addition, on or before November 15 prior to each biennial legislative session, all departments of the state shall transmit to the commissioner of administrative services, a reduction level expenditure estimate for each fiscal year of the ensuing biennium for administration, operation, and program services, including costs for workers' compensation and unemployment compensation. This estimate shall include:

1. An estimate for a reduced level of expenditure for the first year of the next biennium that is 10 percent, not including debt service, less than the actual expenses of the first year of the current biennium.

2. An estimate for a reduced level of expenditure for the second year of the next biennium that is 10 percent, not including debt service, less than the budget and any footnote adjustments or subsequent appropriations, additions, or reductions, implemented in the second year of the current biennium.

By June 30 of the following odd numbered year, the Governor and Legislature make the final recommendations and approvals of the agency budgets, based on their reviews, and the normal legislative process.

Agency budgets are to be built from the bottom-up using a zero-based budgeting approach. With this zero-based budgeting approach, it is ensured agencies review all program areas. This should aid in prioritization, determining the effectiveness of programs, and identifying areas where efficiencies can be achieved.

Page 12: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

For STIP planning purposes, the 2013-2015 budget contains the best information NHDOT has available as to anticipated state revenue, as well as total expenditures that are planned as part of the budget. If there were changes in the budgeted amountswithin NHDOT’s budget for Federal-aid projects, then it would be appropriate for the STIP Financial Constraint to be updated, adjusting project schedules to meet the projected resources. Any project changes in the STIP would require appropriate amendments, including coordination with MPO’s, FHWA, FTA, EPA and other agencies as required.

Toll Credits

Federal regulations (23 USC §120) allow a State to use toll credits toward the non-Federal match requirement of a project, provided that the project is listed in the STIP. These credits are based on toll revenues that are generated and used by public, quasi-public, and private agencies to build, improve, or maintain highways, bridges, or tunnels that serve the public purpose of interstate commerce. Such public, quasi- public, or private agencies shall have built, improved, or maintained such facilities without Federal funds.

To receive these toll credits, a State shall show that it has maintained its non-Federal transportation capital expenditures in accordance with the given requirements. NHDOT has shown that they have met these requirements in the past, and has utilized toll credits to match federal funds. Consistent with existing practices, the 2013-2016 STIP identifies the use of toll credits by project and accounts for the use as part of the financial constraint information.

In 2011 NH had a balance of toll credits in the amount of $198m. Identified at the project level in the STIP, NHDOT may coordinate with FHWA to use toll credits on a case by case basis in any of the STIP years. The use of this matching mechanism will be documented in the STIP as Amendments are published.

Advance Construction

Under the provisions of 23 USC part 115(a) and as further outlined in 23 CFR §630, the State may utilize Advance Construction (AC) on Federal-aid projects with the approval of FHWA. Guidance from the FHWA Resource Center has indicated that the cumulative amount of AC should remain below 1½ times the annual apportionment of federal funds for FHWA programs. Advance construction is subject to approval from FHWA and will be tracked as normal Federal-aid projects are in the federal Financial Management Information System.

Projects have been identified in the 2013-2016 STIP that are anticipated to utilize the flexibility of AC. Additionally, the conversion of the anticipated AC to normal Federal-aid has been listed for each project by fiscal year and is included in

Page 13: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

the financial constraint analysis. The NHDOT has assumed a conservative approach for AC with a standing goal to ensure that conversions to Federal-aid remain ahead of actual project expenditures. The STIP must remain financially constrained if there are any modifications to the anticipated AC conversion schedules of projects.

Beginning in the summer of 2009 the NHDOT revised the process of AC to include preliminary engineering and right of way. All active projects were updated with the appropriate AC amount for all phases resulting in an increased AC balance.

$-

$50,000,000

$100,000,000

$150,000,000

$200,000,000

$250,000,000

2004 2005 2006 2007 2008 2009 2010 2011 2012

Figure 2 – Trends in Advance Construction

Page 14: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

Turnpike Authority

Pursuant to 23 CFR §450.216(h) a STIP must contain all regionally significant projects regardless of funding source. On the turnpike system most capacity related improvements or system expansions qualify as regionally significant as defined in federal regulations. The determination of regional significance is made at the MPO level, or by the DOT in rural areas, with input through Interagency Consultation. As the 2013-2016 STIP contains all projects that have been identified as regionally significant, several projects on the turnpike system are listed.

Additionally, the federal regulations governing the MPO TIPs, MTPs and the associated air quality conformity determination for nonattainment and maintenance areas, including 23 CFR §450.324(i) and 40 CFR §93, stipulate that the availability of funds must be demonstrated for all included projects. To provide information to the MPOs and to demonstrate financial constraint of the STIP, anticipated revenue and expenditures for the turnpike system have been documented in the Financial Constraint Summary tables. As illustrated in those tables, the turnpike system is financially constrained overall within each year of the STIP.

Bonds

The State of NH, through action of the legislature, has the ability to issue and utilize Grant Anticipation Revenue Vehicles (GARVEE) up to an amount equal to $445,000,000 for construction associated with the improvement and expansion of Interstate 93 from Salem to Manchester. A GARVEE is essentially a bond issued by the state with the presumption that federal funds will continue to be available to pay for debt service in the future. GARVEE bonds provide a short-term influx of funding to advance projects that may otherwise take many years to construct. GARVEE bonds may only be issued with the concurrence of FHWA.

A memorandum of agreement is issued between the NHDOT, NH Treasurer, and FHWA to facilitate each bond issuance. In November of 2010 the first bonds were issued for the Salem to Manchester project totaling nearly $80m.Since then an additional $115m of GARVEE bonds has been issued for the I-93 project. With a proven track-record of GARVEE bond issuance and management, additional bond funds are assumed for various portions of the I-93 Salem to Manchester project in the 2013-2016 STIP. The financial constraint information reflects the anticipated use of GARVEE funds for the I-93 projects, including the applicable debt service costs. The project list identifies the construction cost of each project as well as the relative share of interest costs.

Page 15: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

The NHDOT strives to meet the financial challenges of the State’s transportation system, all potential revenue sources will continue to be evaluated. In the event that new financing techniques are used to meet the funding requirements of any Federal-aid projects, the STIP will be updated accordingly.

Operations & Maintenance

As outlined in 23 CFR §450.216(m), the STIP must include financial information on revenues and expenditures to adequately operate and maintain Federal-aid highways. To satisfy that requirement, system-level estimates for operations and maintenance of the Federal-aid system are provided in the Financial Constraint Analysis Summary tables for each year of the STIP. The estimates provided include funds for all anticipated needs for the regular maintenance and operation of the Federal-aid system in NH. The NHDOT asserts that the Federal-aid system in NH is adequately maintained through the maintenance and operations budget of the Department and through the more substantial maintenance and preservation projects funded through specific state and Federal-aid categories.

Other Resources

The 2013-2016 NH STIP documents the amount of funds contributed by other sources to match Federal-aid funds for every project. Other sources of funds to match Federal-aid dollars are typically municipalities, but also include private entities, other public entities, and other states. Other sources of funds for projects in nonattainment or maintenance areas in the first twoyears of the STIP will be listed only if funding has been committed.

Page 16: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

Public Involvement

The continual and coordinated planning process in NH involves substantial public involvement throughout the entire process. Beginning with the development of the statewide LRTP and the regional MTPs, public outreach and input serves as the basis to create the overall framework for transportation planning in the State. For the development of the 10-Year Plan more than 30 public hearings were held throughout the State that were attended by over 800 members of the public. Following the approval of the 10-Year Plan, the MPOs continued public outreach efforts, consistent with federal regulations, for the development of each MPOs TIP.

The development of the NH STIP is the last step in the continuing transportation planning process. A public comment period for the 2013-2016 NH STIP was held during the months of September and October of 2012. The notice was posted in astatewide newspaper, on the internet and through each of the nine regional planning commissions.

Page 17: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

STIP Revisions

In March of 2008 the NHDOT adopted and both FHWA and FTA approved STIP Revision Procedures (Appendix A) for the NH STIP. Those procedures outline thresholds and protocols for revisions to the STIP in the form of both minor revisions and major revisions. The Procedures also established an Expedited Project Selection Procedure, to advance or delay projects, for the non-MPO areas of NH. Subsequent to the development of these procedures at the statewide level, each of the 4 MPOs adopted similar procedures resulting in improved consistency and coordination between STIP and TIP revisions.

Major Revisions to the STIP and TIPs in the form of Amendments will be processed as outlined in Figure 3. The dates listed indicate when the proposed Amendments will be ready for public comment.

Figure 3 – Amendment Schedule

1 January, 2013

2 April, 2013

3 July, 2013

4 October, 2013

5 January, 2014

6 April, 2014

Page 18: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

blank for printing

Page 19: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

Statewide Transportation Improvement Program (STIP)

2013 to 2016

Financial Constraint Summary

May 15, 2014

Prepared by the New Hampshire Department of Transportation

Page 20: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

NH STIP 2013-2016

Financial Constraint Documentation

Federal

Resources

State

Resources

Local/Other

Resources

Total

Resources

Total

Programmed

Federal

Resources

State

Resources

Local/Other

Resources

Total

Resources

Total

Programmed

Available Available Available Available Programmed Available Available Available Available Programmed

FHWA - Federal-aid w/ Match

Bridge Off System $ - $ - $ 1,148,000 $ 1,148,000 $ 6,686,780 $ - $ - 1,020,000.00$ $ 1,020,000 $ 5,737,120

Bridge On/Off System $ - $ - $ 61,800 $ 61,800 $ 26,803,236 $ - $ - 387,617.00$ $ 387,617 $ 32,761,675

Congestion Mitigation and Air Quality Program $ 9,878,278 $ - $ 616,134 $ 10,494,412 $ 8,863,784 $ 9,883,164 $ - 359,105.00$ $ 10,242,269 $ 5,560,972

Emergency Relief $ 1,000,000 $ - $ - $ 1,000,000 $ 78,582 $ - $ - $ -

Equity Bonus (Flexible) $ 335,019 $ - $ - $ 335,019 $ 699,850 $ 188,075 $ - -$ $ 188,075 $ 165,000

Forest Highways $ 850,000 $ - $ - $ 850,000 $ 850,000 $ 850,000 $ - -$ $ 850,000 $ 850,000

Highway Safety Improvement Program (HSIP) $ 8,821,327 $ - $ - $ 8,821,327 $ 5,620,000 $ 8,824,497 $ - -$ $ 8,824,497 $ 13,546,000

Interstate Maintenance $ - $ - $ - $ - $ 27,898,289 $ - $ - -$ $ - $ 19,752,035

National Historic Covered Bridge Preservation (NHCBP) $ 963,566 $ - $ 32,892 $ 996,458 $ 996,458 $ 552,000 $ - 126,000.00$ $ 678,000 $ 678,000

National Scenic Byways Program $ - $ - $ - $ - $ 500,000 $ - $ - -$ $ - $ 500,000

Recreational Trails $ 1,265,408 $ - $ - $ 1,265,408 $ 1,241,000 $ 1,267,944 $ - -$ $ 1,267,944 $ 1,241,000

Safe Routes to School $ - $ - $ - $ - $ 832,000 $ - $ - -$ $ - $ 1,323,000

STP-Areas Less Than 200K $ 7,000,517 $ - $ 349,346 $ 7,349,863 $ 4,780,757 $ 7,003,980 $ - 424,359.21$ $ 7,428,339 $ 8,108,796

STP-Areas Over 200K $ 4,897,953 $ - $ - $ 4,897,953 $ 479,999 $ 4,900,376 $ - 718,963.47$ $ 5,619,339 $ 3,594,817

STP-DBE $ - $ - $ - $ - $ 105,000 $ 75,000 $ - -$ $ 75,000 $ 75,000

STP-Enhancement $ - $ - $ 420,983 $ 420,983 $ 2,524,501 $ - $ - 638,867.59$ $ 638,868 $ 3,890,775

STP-Hazard Elimination $ - $ - $ 105,000 $ 105,000 $ 2,560,000 $ - $ - 105,000.00$ $ 105,000 $ 2,560,000

STP-Non Urban Areas Under 5K $ 8,760,278 $ - $ - $ 8,760,278 $ 1,634,124 $ 8,764,611 $ - -$ $ 8,764,611 $ 1,782,228

STP-Safety $ - $ - $ - $ - $ 495,000 $ - $ - -$ $ - $ 495,000

Transportation Assistance $ - $ - $ - $ - $ 30,000 $ 30,000 $ - -$ $ 30,000 $ 30,000

Transportation & Community & System Preservation $ 300,000 $ - $ 75,000 $ 375,000 $ 375,000 $ - $ - $ -

Tiger Grant $ 1,024,200 $ - $ 682,800 $ 1,707,000 $ 1,707,000 $ 3,307,800 $ - 2,205,200.00$ $ 5,513,000 $ 5,513,000

National Highway (NHPP) $ 46,496,748 $ - $ - $ 46,496,748 $ 10,227,869 $ 27,188,878 $ - -$ $ 27,188,878 $ 17,729,279

STP-Flexible $ 60,190,308 $ - $ 1,911,000 $ 62,101,308 $ 49,945,456 $ 76,996,126 $ - 1,566,723.74$ $ 78,562,850 $ 40,167,706

Rail-Hwy: Haz Elim-Protective Devices $ 1,097,800 $ - $ - $ 1,097,800 $ 790,000 $ 1,100,000 $ - -$ $ 1,100,000 $ 140,000

STP-Off System Bridge $ 3,665,496 $ - $ - $ 3,665,496 $ - $ 3,672,842 $ - $ 3,672,842

National Summer Trans Inst Sk TRNG $ 20,000 -$ $ 20,000 $ 20,000

Transportation Alternatives $ 2,496,198 $ - $ - $ 2,496,198 $ - $ 2,553,117 $ - $ - $ 2,553,117

Homeland Security Grant $ - $ - $ 387,178 $ 387,178 $ 387,178 $ - $ - $ - $ -

National Highway (NHPP) Exempt $ 2,489,203 $ 2,489,203 $ - $ - $ 2,489,203

Earmarks $ 6,834,784 $ - $ 754,488 $ 7,589,273 $ 7,589,273 $ 6,997,898 $ - $ 779,635 $ 7,777,534 $ 7,777,534

FHWA FEDERAL-AID TOTAL $ 168,367,084 $ - $ 6,544,620 $ 172,422,501 $ 164,701,137 $ 166,665,511 $ - $ 8,331,471 $ 174,996,983 $ 173,998,937

2014

Improvement Program

FISCAL CONSTRAINT - ANTICIPATED REVENUES WITH MATCH VERSUS PROGRAMMED FUNDING FOR PROJECTS WITHIN THE STIP

Dollars in Millions

2013

Improvement Program

5/15/2014

n46lbd
Typewritten Text
n46lbd
Typewritten Text
n46lbd
Typewritten Text
n46lbd
Typewritten Text
n46lbd
Typewritten Text
Page 2 of 6
Page 21: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

NH STIP 2013-2016

Financial Constraint Documentation

Federal

Resources

State

Resources

Local/Other

Resources

Total

Resources

Total

Programmed

Federal

Resources

State

Resources

Local/Other

Resources

Total

Resources

Total

Programmed

Available Available Available Available Programmed Available Available Available Available Programmed

2014

Improvement Program

FISCAL CONSTRAINT - ANTICIPATED REVENUES WITH MATCH VERSUS PROGRAMMED FUNDING FOR PROJECTS WITHIN THE STIP

Dollars in Millions

2013

Improvement Program

FTA - Federal-aid w/ Match

FTA 5307 Capital and Operating Program $ 6,722,909 $ - $ 3,369,915 $ 10,092,824 $ 11,211,853 $ 6,924,596 $ - $ 3,145,404 $ 10,070,000 $ 9,765,139

FTA 5309 Capital Funding Program - Formula $ - $ - $ - $ - $ 157,097 $ 157,097 $ 785,485

FTA 5310 Capital Program $ 1,069,107 $ - $ 186,200 $ 1,255,307 $ 931,000 $ 2,214,302 $ - $ 186,200 $ 2,400,502 $ 931,000

FTA 5311 Capital & Operating Program $ 3,903,474 $ - $ 2,800,000 $ 6,703,474 $ 7,000,000 $ 4,418,453 $ - $ 2,800,000 $ 7,218,453 $ 7,000,000

FTA 5316 JARC $ - $ - $ 350,000 $ 350,000 $ 700,000 $ - $ - $ 350,000 $ 350,000 $ 700,000

FTA 5317 New Freedom Program $ - $ - $ 348,438 $ 348,438 $ 722,188 $ - $ - $ 348,438 $ 348,438 $ 722,188

FTA 5339 Bus & Bus Facilities $ 1,828,889 $ - $ 438,069 $ 2,266,958 $ 2,190,346 $ 1,961,006 $ - $ 440,483 $ 2,401,488 $ 2,202,414

FTA FEDERAL-AID TOTAL $ 13,524,379 $ - $ 7,492,621 $ 21,017,000 $ 22,755,386 $ 15,518,357 $ - $ 7,427,621 $ 22,945,979 $ 22,106,225

FHWA/FTA FEDERAL-AID TOTAL $ 181,891,463 $ - $ 14,037,241 $ 193,439,501 $ 187,456,523 $ 182,183,869 $ - $ 15,759,093 $ 197,942,961 $ 196,105,163

Innovative Financing

GARVEE Bond Funds $ - $ 57,172,615 $ - $ 57,172,615 $ 57,172,615 $ - $ 41,529,459 $ - $ 41,529,459 $ 41,529,459

Toll Credit $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -

Other $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -

Total Innovative Financing $ - $ 57,172,615 $ - $ 57,172,615 $ 57,172,615 $ - $ 41,529,459 $ - $ 41,529,459 $ 41,529,459

State Fund Sources (State Funded Projects Only)

State Funds - No Federal-Aid Match $ - $ 170,600,000 $ - $ 170,600,000 $ 85,060,000 $ - $ 100,440,000 $ - $ 100,440,000 $ 52,277,420

Total State Fund Sources $ - $ 170,600,000 $ - $ 170,600,000 $ 85,060,000 $ - $ 100,440,000 $ - $ 100,440,000 $ 52,277,420

Other Fund Sources

Non-Particpating Funds (other states, municipalities, private sources) $ - $ - $ 27,403,524 $ 27,403,524 $ 27,403,524 $ - $ - $ 20,601,078 $ 20,601,078 $ 20,601,078

Total Other Fund Sources $ - $ - $ 27,403,524 $ 27,403,524 $ 27,403,524 $ - $ - $ 20,601,078 $ 20,601,078 $ 20,601,078

TOTAL ALL PROGRAMS $ 181,891,463 $ 227,772,615 $ 41,440,765 $ 448,615,640 $ 357,092,662 $ 182,183,869 $ 141,969,459 $ 36,360,170 $ 360,513,498 $ 310,513,119

5/15/2014

n46lbd
Typewritten Text
Page 3 of 6
n46lbd
Typewritten Text
n46lbd
Typewritten Text
Page 22: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

NH STIP 2013-2016:

Financial Constraint Documentation

Federal

Resources

State

Resources

Local/Other

Resources

Total

Resources

Total

Programmed

Federal

Resources

State

Resources

Local/Other

Resources

Total

Resources

Total

Programmed

Available Available Available Available Programmed Available Available Available Available Programmed

FHWA - Federal-aid w/ Match

Bridge Off System $ - $ - $ 1,230,000 $ 1,230,000 $ 10,858,810 $ - $ - $ 830,000 $ 830,000 $ 5,678,808

Bridge On/Off System $ - $ - $ 1,568,538 $ 1,568,538 $ 43,505,079 $ - $ - $ 1,142,958 $ 1,142,958 $ 44,206,695

Congestion Mitigation and Air Quality Program $ 10,199,425 $ - $ 2,667,890 $ 12,867,315 $ 11,335,794 $ 10,525,807 $ - $ 10,525,807

Emergency Relief $ - $ - $ - $ - $ - $ -

Equity Bonus (Flexible) $ 194,093 $ - $ 194,093 $ 200,304 $ - $ 200,304

Forest Highways $ 877,200 $ - $ - $ 877,200 $ 850,000 $ 905,270 $ - $ - $ 905,270 $ 850,000

Highway Safety Improvement Program (HSIP) $ 9,106,881 $ - $ - $ 9,106,881 $ 9,000,000 $ 9,398,301 $ - $ - $ 9,398,301 $ 9,000,000

Interstate Maintenance $ - $ - $ 11,352 $ 11,352 $ 11,015,799 $ - $ - $ - $ - $ 11,126,196

National Historic Covered Bridge Preservation (NHCBP) $ - $ - $ - $ 2,641,200 $ - $ - $ 2,641,200 $ 2,641,200

National Scenic Byways Program $ - $ - $ - $ - $ - $ -

Recreational Trails $ 1,308,518 $ - $ - $ 1,308,518 $ 1,241,000 $ 1,350,391 $ - $ - $ 1,350,391 $ 1,241,000

Safe Routes to School $ - $ - $ - $ - $ 1,170,000 $ - $ - $ - $ - $ 1,170,000

STP-Areas Less Than 200K $ 7,228,107 $ - $ 206,400 $ 7,434,507 $ 1,735,880 $ 7,459,407 $ - $ - $ 7,459,407 $ 3,608,435

STP-Areas Over 200K $ 5,057,188 $ - $ 123,873 $ 5,181,061 $ 619,363 $ 5,219,018 $ - $ 70,000 $ 5,289,018 $ 350,000

STP-DBE $ 90,000 $ - $ - $ 90,000 $ 90,000 $ 90,000 $ - $ - $ 90,000 $ 90,000

STP-Enhancement $ - $ - $ 849,881 $ 849,881 $ 4,249,405 $ - $ - $ -

STP-Hazard Elimination $ - $ - $ - $ - $ 2,035,000 $ - $ - $ 149,100 $ 149,100 $ 2,780,500

STP-Non Urban Areas Under 5K $ 9,045,079 $ - $ - $ 9,045,079 $ 4,010,256 $ 9,334,521 $ - $ - $ 9,334,521 $ 15,016,365

STP-Safety $ - $ - $ - $ - $ - $ -

Transportation Assistance $ 30,960 $ - $ - $ 30,960 $ 30,000 $ 31,951 $ - $ - $ 31,951 $ 30,000

Transportation & Community & System Preservation $ - $ - $ - $ - $ - $ -

Tiger Grant $ 390,096 $ - $ 260,064 $ 650,160 $ 650,160 $ - $ - $ -

National Highway (NHPP) $ 28,058,922 $ - $ - $ 28,058,922 $ 18,181,772 $ 28,956,808 $ - $ - $ 28,956,808 $ 25,552,577

STP-Flexible $ 79,460,002 $ - $ 56,760 $ 79,516,762 $ 40,673,006 $ 82,002,722 $ - $ - $ 82,002,722 $ 33,338,929

Rail-Hwy: Haz Elim-Protective Devices $ 1,135,200 $ - $ 1,135,200 $ 440,000 $ 1,171,526 $ - $ 1,171,526 $ 440,000

STP-Off System Bridge $ 3,790,373 $ - $ 3,790,373 $ 3,911,665 $ - $ - $ 3,911,665 $ 3,514,500

Transportation Alternatives $ 2,634,817 $ - $ 2,634,817 $ 30,000 $ 2,719,131 $ - $ 2,719,131 $ 30,000

Homeland Security Grant $ - $ - $ - $ - $ - $ -

National Highway (NHPP) Exempt $ 2,568,857 $ - $ - $ 2,568,857 $ - $ 2,651,061 $ - $ - $ 2,651,061

Earmarks $ 7,340,246 $ - $ 302,272 $ 7,642,518 $ 7,642,518 $ 5,667,819 $ - $ 769,923 $ 6,437,743 $ 6,437,743

FHWA FEDERAL-AID TOTAL $ 168,515,965 $ - $ 7,277,029 $ 175,792,994 $ 169,363,842 $ 174,236,902 $ - $ 2,961,981 $ 177,198,884 $ 167,102,946

2016

Improvement Program

FISCAL CONSTRAINT - ANTICIPATED REVENUES WITH MATCH VERSUS PROGRAMMED FUNDING FOR PROJECTS WITHIN THE STIP

Dollars in Millions

2015

Improvement Program

5/15/2014

n46lbd
Typewritten Text
n46lbd
Typewritten Text
Page 4 of 6
Page 23: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

NH STIP 2013-2016:

Financial Constraint Documentation

Federal

Resources

State

Resources

Local/Other

Resources

Total

Resources

Total

Programmed

Federal

Resources

State

Resources

Local/Other

Resources

Total

Resources

Total

Programmed

Available Available Available Available Programmed Available Available Available Available Programmed

2016

Improvement Program

FISCAL CONSTRAINT - ANTICIPATED REVENUES WITH MATCH VERSUS PROGRAMMED FUNDING FOR PROJECTS WITHIN THE STIP

Dollars in Millions

2015

Improvement Program

FTA - Federal-aid w/ Match

FTA 5307 Capital and Operating Program $ 7,146,183 $ - $ 3,308,052 $ 10,454,236 $ 10,249,887 $ 7,374,861 $ - $ 3,459,974 $ 10,834,836 $ 10,683,587

FTA 5309 Capital Funding Program - Formula $ - $ - $ 161,680 $ 161,680 $ 808,400 $ -

FTA 5310 Capital Program $ 2,285,160 $ - $ 186,200 $ 2,471,360 $ 931,000 $ 2,358,285 $ - $ 186,200 $ 2,544,485 $ 931,000

FTA 5311 Capital & Operating Program $ 4,559,844 $ - $ 2,800,000 $ 7,359,844 $ 7,000,000 $ 4,705,759 $ - $ 2,800,000 $ 7,505,759 $ 7,000,000

FTA 5316 JARC $ - $ - $ 350,000 $ 350,000 $ 700,000 $ - $ - $ 350,000 $ 350,000 $ 700,000

FTA 5317 New Freedom Program $ - $ - $ 340,000 $ 340,000 $ 680,000 $ - $ - $ 340,000 $ 340,000 $ 680,000

FTA 5339 Bus and Facility Program $ 2,023,758 $ - $ 454,578 $ 2,478,336 $ 2,272,891 $ 2,088,518 $ - $ 470,399 $ 2,558,917 $ 2,351,997

FTA FEDERAL-AID TOTAL $ 16,014,945 $ - $ 7,600,510 $ 23,615,455 $ 22,642,178 $ 16,527,423 $ - $ 7,606,574 $ 24,133,997 $ 22,346,584

FHWA/FTA FEDERAL-AID TOTAL $ 184,530,910 $ - $ 14,877,540 $ 199,408,449 $ 192,006,020 $ 190,764,325 $ - $ 10,568,555 $ 201,332,881 $ 189,449,530

Innovative Financing

GARVEE Bonds $ - $ 37,951,182 $ - $ 37,951,182 $ 37,951,182 $ - $ 4,459,713 $ - $ 4,459,713 $ 4,459,713

Toll Credit $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -

Other $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -

Total Innovative Financing $ - $ 37,951,182 $ - $ 37,951,182 $ 37,951,182 $ - $ 4,459,713 $ - $ 4,459,713 $ 4,459,713

State Fund Sources (State Funded Projects Only)

State Funds - No Federal-Aid Match $ - $ 102,862,580 $ - $ 102,862,580 $ 52,038,853 $ - $ 66,123,727 $ - $ 66,123,727 $ 27,182,421

Total State Fund Sources $ - $ 102,862,580 $ - $ 102,862,580 $ 52,038,853 $ - $ 66,123,727 $ - $ 66,123,727 $ 27,182,421

Other Fund Sources

Non-Particpating Funds (other states, municipalities, private $ - $ - $ 37,173,036 $ 37,173,036 $ 37,173,036 $ - $ - $ 35,800,880 $ 35,800,880 $ 35,800,880

Total Other Fund Sources $ - $ - $ 37,173,036 $ 37,173,036 $ 37,173,036 $ - $ - $ 35,800,880 $ 35,800,880 $ 35,800,880

TOTAL ALL PROGRAMS $ 184,530,910 $ 140,813,762 $ 52,050,575 $ 377,395,247 $ 319,169,091 $ 190,764,325 $ 70,583,439 $ 46,369,435 $ 307,717,200 $ 256,892,543

State

Resources

Total

Programmed

State

Resources

Total

ProgrammedState Resources

Total

Programmed

State

Resources

Total

Programmed

Available Programmed Available Programmed Available Programmed Available Programmed

Statewide Operations & Maintenance 123,578,823$ 123,578,823$ 122,386,958$ 122,386,958$ 126,303,341$ 126,303,341$ 130,345,048$ 130,345,048$

2013 2014 2015 2016

5/15/2014

n46lbd
Typewritten Text
Page 5 of 6
Page 24: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

2013-2016 STIP:

Programmed Dollars versus Available Resources

9/12/2013

$-

$50,000,000

$100,000,000

$150,000,000

$200,000,000

$250,000,000

2013 2014 2015 2016

Innovative Finance

State & Other Resources

FHWA Resources

Total Program

$-

$5,000,000

$10,000,000

$15,000,000

$20,000,000

$25,000,000

$30,000,000

2013 2014 2015 2016

State & Other Resources

FTA Resources

Total Program

FHWA Programs

FTA Programs

n46lbd
Typewritten Text
n46lbd
Typewritten Text
n46lbd
Typewritten Text
n46lbd
Typewritten Text
n46lbd
Typewritten Text
Page 6 of 6
n46lbd
Typewritten Text
n46lbd
Typewritten Text
n46lbd
Typewritten Text
Page 25: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

2013 - 2016 STIP

Name Rte/Street: Location/Scope of Work

Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category

CommentsCAACode

FiscalYearPhase

Overall ProjectCost $(M)State#

Grouped / ParentRegionally Significant

Adv Const Payback

ACWORTH 16301

NH 123A REPLACE BRIDGE OVER BOWERS BROOK - 113/064 {Red List} [Oct 2005 Flood] (Bridge

Rehab = 14540T, FY 2007)

ATT2.983 Bridge repaired following flood

damage. 2011 Bridge Priority #12.

.1982013P .158 .000.040 Bridge On/Off System

.1102014 .088 .000.022

.0572015 .045 .000.011

.1762016 .141 .000.035

.0552014R .044 .000.011

.2612015 .209 .000.052

6641 .857.685 .000.171Totals

ALBANY

24182

BEAR NOTCH ROAD DECK REPLACEMENT AND BRIDGE REHABILITATION OF BRIDGE OVER SWIFT

RIVER - 080/148 (BRIDGE PRIORITY LIST # 117)

ATT3.062

.1172016P .117 .000.000 STP-Non Urban Areas Under 5K.022

.0232016R .023 .000.000 .004

8598 .141.141 .000.000Totals .026

ALSTEAD

20817

NH 123A REPLACE SINGLE SPAN BRIDGE OVER WARREN BROOK - 073/163 {Red List} ATT2.383 2011 Bridge Priority #98

.0502014P .040 .000.010 STP-Flexible

.0462015 .037 .000.009

.0482016 .038 .000.010

.0052014R .004 .000.001

.0102015 .008 .000.002

.0112016 .009 .000.002

7992 .170.136 .000.034Totals

ALTON 14121D

NH 28 INTERSECTION IMPROVEMENTS AT STOCKBRIDGE CORNER ROAD (PE Charged to

BARNSTEAD-ALTON 14121)

ATT1.987

.9902013C .990 .000.000 STP-Non Urban Areas Under 5K.198

.8692014 .869 .000.000

7555 1.8591.859 .000.000Totals .198

ANDOVER 14679A

US 4 / NH 11 CULVERT REPLACEMENT [MAY 2006 STORM EVENT] {Betterment} ATT1.100

.4792013C .000 .000.479 Betterment

.3872013 .310 .387-.310 Demonstration Projects (ISTEA 1991-1998)

.0792013 .063 .000.016 Emergency Relief

6840 .945.373 .387.185Totals

Phase: P - Preliminary Engineering R - Right of Way C - Construction

Page P-1 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6

Page 26: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

Name Rte/Street: Location/Scope of Work

Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category

CommentsCAACode

FiscalYearPhase

Overall ProjectCost $(M)State#

Grouped / ParentRegionally Significant

Adv Const Payback

ANDOVER 20650

NH 11 REPLACE 5-SPAN BRIDGE OVER NHRR(ABD) - 206/137 ATT3.997 2011 Bridge Priority #74

.0622013P .062 .000.000 Bridge On/Off System.012

.0432014 .034 .000.009

.0452015 .036 .000.009

.0482016 .038 .000.010

.0102013R .010 .000.000 .002

.0212014 .017 .000.004

.0232015 .018 .000.005

.0122016 .009 .000.002

7991 .264.225 .000.038Totals .014

ASHLAND 16237

US 3 & NH 25 BRIDGE REHABILITATION OVER OWL BROOK - 107/094 {Red List} ATT4.147 2011 Bridge Priority #94

.1102013P .110 .000.000 Bridge On/Off System.022

7814 .110.110 .000.000Totals .022

ASHLAND -

BRIDGEWATER 24904

US 3 BRIDGE REHAB AND SCOUR COUNTERMEASURES OVER PEMIGEWASSET RIVER -

076/080

ATT18.673

.1172016P .094 .000.023 Bridge On/Off System

8625 .117.094 .000.023Totals

BARNSTEAD - ALTON 14121

NH 28 RECONSTRUCTION FROM THE ALTON CIRCLE SOUTH APPROXIMATELY 7.0 MILES

TO THE IMPROVED SECTION IN BARNSTEAD

ATT3.727 Specific intersection priorities

programmed as separate

construction project. Remaining priorities to be identified.

.1102013P .110 .000.000 STP-Non Urban Areas Under 5K.022

.1762015 .176 .000.000 .034

.1822016 .182 .000.000 .034

.1592015R .159 .000.000 .031

.0592016 .059 .000.000 STP-Flexible.011

2738 .686.686 .000.000Totals .132

BATH 10425J

US 302 / NH 10 BUILDING DEMOLITION PARCEL 58 ATT.066

.0662014R .053 .000.013 STP-Non Urban Areas Under 5K

8734 .066.053 .000.013Totals

Phase: P - Preliminary Engineering R - Right of Way C - Construction

Page P-2 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6

Page 27: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

Name Rte/Street: Location/Scope of Work

Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category

CommentsCAACode

FiscalYearPhase

Overall ProjectCost $(M)State#

Grouped / ParentRegionally Significant

Adv Const Payback

BEDFORD 13953

NH 101 WIDEN TO 5 LANES FOR APPROXIMATELY 2 MILES, FROM NH 114 TO WALLACE

ROAD

ATT20.378

.1602013P .160 .000.000 National Highway (NHPP).032

2.1182014 2.118 .000.000

.3972015 .318 .000.079

.1762016 .141 .000.035

.1502013R .150 .000.000 .030

.0552014 .044 .000.011

1.7032015 1.362 .000.341

.0592016 .047 .000.012

1.8742016C 1.500 .000.375

1818 6.6915.839 .000.853Totals .062

BEDFORD

16156

NH 114 CULVERT REPLACEMENT - 151/151 {Red List} ATT2.568 2011 Bridge Priority # 95

.0572015P .057 .000.000 STP-Flexible.011

.0292016 .029 .000.000 .006

.0572015R .057 .000.000 .011

.0292016 .029 .000.000 .006

7730 .172.172 .000.000Totals .033

BELMONT

14400

LAKE WINNISQUAM

SCENIC TRAIL

CONSTRUCT A MULTI-USE TRAIL (Segments 9 & 10 - Approx 1.7 Miles) FROM US 3 TO

THE TOWN BEACH ("Winnisquam Lake Trail" - 5.2 Miles) (TE Program) [04-03TE]

ATT.967 Partially funded by BELMONT

.0172013P .014 .003.000 STP-Enhancement

.0152014 .012 .003.000

.0012015 .001 .000.000

.0012015R .001 .000.000

.7802015C .624 .156.000

5637 .814.651 .163.000Totals

BENNINGTON 16030

VILLAGE AREA PEDESTRIAN IMPROVEMENTS [09-02TE] ATT.700 Partially funded by BENNINGTON

Specific project from Statewide

program, Local Administration.

.0762013P .061 .015.000 STP-Enhancement

.0192014 .015 .004.000

.0012015 .001 .000.000

.0192014R .015 .004.000

.0012015 .001 .000.000

.5842015C .467 .117.000

7633 .700.560 .140.000Totals

Phase: P - Preliminary Engineering R - Right of Way C - Construction

Page P-3 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6

Page 28: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

Name Rte/Street: Location/Scope of Work

Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category

CommentsCAACode

FiscalYearPhase

Overall ProjectCost $(M)State#

Grouped / ParentRegionally Significant

Adv Const Payback

BERLIN 12958B

NH 110 PHASE 2 RECONSTRUCTION FROM FIRST AVENUE TO WIGHT STREET (APPROX.0.7

MILES) [Section 1702 - Designated Project; Demo Id NH043 & NH062]

ATT11.449 Partially funded by BERLIN

Earmark funding.

.0502013C .040 .010.000 High Priority Projects (SAFETEA-LU 2005)

.0582013 .046 .012.000

.1452013 .116 .029.000

1.7472013 1.397 .349.000 STP-Areas Less Than 200K

2.1222014 1.697 .424.000

1.0322015 .826 .206.000

3763 5.1544.123 1.031.000Totals

BERLIN 12958H

NH 110 CONSTRUCTION OF SCENIC VISTAS INTERPRETIVE PANELS AND OTHER APPROVED MITIGATION MEASURES

ATT.339 Partially funded by BERLIN

.0552013P .044 .011.000 STP-Flexible

.0572015 .045 .011.000

.2272015C .182 .045.000

8713 .339.271 .068.000Totals

BERLIN

16019

HUTCHINS STREET RECONSTRUCTION FROM NAPERT STREET TO BRIDGE STREET, EARMARK PROJECT

(Demo Id NH085)

ATT.801

.0802014P .080 .000.000 High Priority Projects (SAFETEA-LU-EXT 2010)

.0012015R .001 .000.000

.7202015C .720 .000.000

7620 .801.801 .000.000Totals

BOSTON EXPRESS NASHUA 68060

FEE TURNPIKE MANCHESTER - NASHUA (OPERATING SUBSIDY).130

.1042013 .104 .000.000 FTA 5307 Capital and Operating Program.052

.0262014 .026 .000.000 .013

8674 .130.130 .000.000Totals .065

Phase: P - Preliminary Engineering R - Right of Way C - Construction

Page P-4 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6

Page 29: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

Name Rte/Street: Location/Scope of Work

Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category

CommentsCAACode

FiscalYearPhase

Overall ProjectCost $(M)State#

Grouped / ParentRegionally Significant

Adv Const Payback

BOW - CONCORD 13742

I-93 WIDEN FROM I-89 TO BETWEEN EXITS 15 AND 16 TO MATCH INTO EXISTING

CONCORD PROJECT 11449 @ EXIT 16; 163/106 {Red List}

ATT174.501 "Future Turnpike Capital Program

for Construction, dependent on

Future System-Wide Toll increase,

Non-Turnpike portion funding to be addressed". 2011 Bridge Priority

#43, #44, & #65.

.3002014P .000 .000.300 Turnpike Program

1.0002015 .000 .0001.000

.4002016 .000 .000.400

.5002015R .000 .000.500

.5002016 .000 .000.500

2075

Regionally Significant 2.700.000 .0002.700Totals

BRISTOL

16026

CENTRAL SQUARE PEDESTRIAN / BICYCLE IMPROVEMENT [09-05TE] ATT1.647

.1182013C .000 .000.118 Betterment

.0062013 .006 .000.000 High Priority Grants (STEA04_Ext_2005)

.4172013 .417 .000.000 High Priority Projects (SAFETEA-LU 2005)

.1032013 .000 .103.000 Non Participating

7631 .644.423 .103.118Totals

BROOKLINE

20830

NH 130 CONSTRUCT SIDEWALKS IN TWO LOCATIONS (09-06TE) ATT.617 Partially funded by BROOKLINE

.0012013P .001 .000.000 STP-Enhancement

.0202013R .016 .004.000

.5072013C .406 .101.000

7998 .528.422 .106.000Totals

CAMPTON 12407

BLAIR ROAD REHAB BLAIR BRIDGE OVER PEMIGEWASSET RIVER - 117/076 {Red List} [National

Historic Covered Bridge Preservation Program]

ATT3.158 Specific project from Statewide

program, Local Administration.

.0402013C .040 .000.000 National Historic Covered Bridge Preservation (NHCBP)

.0102013 .000 .002.008 State Aid Bridge

.3812013 .000 .076.305

.9042013 .000 .181.723

676 1.335.040 .2591.036Totals

Phase: P - Preliminary Engineering R - Right of Way C - Construction

Page P-5 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6

Page 30: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

Name Rte/Street: Location/Scope of Work

Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category

CommentsCAACode

FiscalYearPhase

Overall ProjectCost $(M)State#

Grouped / ParentRegionally Significant

Adv Const Payback

CART

TRANSIT PREVENTATIVE MAINTENANCE ATT1.041 Boston urbanized area FTA funds.

.0852013 .068 .000.017 FTA 5307 Capital and Operating Program

.0852014 .068 .000.017

.0882015 .070 .000.018

.0912016 .072 .000.018

2985 .348.279 .000.070Totals

CART

TRANSIT OPERATING ASSISTANCE ATT8.448 Annual Program Funding. Public

transit in Derry-Salem region

.6902013 .345 .000.345 FTA 5307 Capital and Operating Program

.6902014 .345 .000.345

.7122015 .356 .000.356

.7352016 .367 .000.367

7239 2.8271.414 .0001.414Totals

CENTER HARBOR

24579

WAUKEWAN ROAD BRIDGE REPLACEMENT OVER LAKE WAUKEWAN OUTLET - 080/040 {Redlist Bridge} ATT1.843

.1102013P .110 .000.000 STP-Flexible.022

.1702015 .136 .000.034

.0282013R .028 .000.000 .006

.0282014 .022 .000.006

8605 .335.296 .000.040Totals .028

CHESTERFIELD 13597

NH 63 RECONSTRUCT TO IMPROVE SAFETY ADJACENT TO SPOFFORD LAKE IN THE AREA

OF THE "S-CURVES" FROM NORTH SHORE ROAD SOUTHERLY APPROXIMATELY 0.5

MILES {STP-Safety}

ATT.758 Original scope to address pavement

and guardrail.

.0552014R .055 .000.000 STP-Safety.011

.4402014C .440 .000.000 .088

2747 .495.495 .000.000Totals .099

Phase: P - Preliminary Engineering R - Right of Way C - Construction

Page P-6 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6

Page 31: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

Name Rte/Street: Location/Scope of Work

Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category

CommentsCAACode

FiscalYearPhase

Overall ProjectCost $(M)State#

Grouped / ParentRegionally Significant

Adv Const Payback

CLAREMONT 13248

NH 12 NORTH STREET INTERSECTION RELOCATION [Section 1702 - Designated Project; Demo Id

NH039 & NH059]

ATT4.734 Partially funded by CLAREMONT

Earmark funding. Local

Administration

.0472013P .038 .009.000 High Priority Projects (SAFETEA-LU 2005)

.0782013 .062 .016.000

.1752013 .140 .035.000

.2062015 .165 .041.000

.0202013R .016 .004.000

.2992015 .239 .060.000

.3832016C .307 .077.000

3.4662016 2.773 .693.000

739 4.6753.740 .935.000Totals

CLAREMONT

23677

MAIN STREET IMPROVEMENTS TO THE ROADWAY CORRIDOR TO FIT WITHIN THE FY10 SPECIAL

APPROPRIATION. EARMARK NH086.

ATT.487

.0932014P .093 .000.000 High Priority Projects (SAFETEA-LU-EXT 2010)

.0012015 .001 .000.000

.0102014R .010 .000.000

.0012015 .001 .000.000

.3822014C .382 .000.000

8500 .487.487 .000.000Totals

CLAREMONT 27691

NH 12A BRIDGE REHABILITATION CARRYING NH12A OVER SUGAR RIVER, BR # 072/127. ATT.405

.1142015P .091 .000.023 Bridge On/Off System

.2342016 .187 .000.047 STP-Flexible

.0572015R .045 .000.011

11755 .405.324 .000.081Totals

COAST

COAST OPERATING ASSISTANCE ATT(Annual) Partially funded by COAST

Annual Program Funding

1.5662013 .783 .783.000 FTA 5307 Capital and Operating Program

1.6132014 .807 .807.000

1.6132015 .807 .807.000

1.6132016 .807 .807.000

567 Grouped6.4053.203 3.203.000Totals

Phase: P - Preliminary Engineering R - Right of Way C - Construction

Page P-7 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6

Page 32: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

Name Rte/Street: Location/Scope of Work

Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category

CommentsCAACode

FiscalYearPhase

Overall ProjectCost $(M)State#

Grouped / ParentRegionally Significant

Adv Const Payback

COAST

COAST PREVENTIVE MAINTENANCE ATT(Annual) Partially funded by COAST

Annual Program Funding

.3802013 .304 .076.000 FTA 5307 Capital and Operating Program

.3912014 .313 .078.000

.3912015 .313 .078.000

.3912016 .313 .078.000

2691 Grouped1.5531.242 .311.000Totals

COAST

COAST MISC. SUPPORT EQUIPMENT ATT(Annual) Partially funded by COASTAnnual Program Funding

.0332013 .026 .007.000 FTA 5307 Capital and Operating Program

.0342014 .027 .007.000

.0342015 .027 .007.000

.0342016 .027 .007.000

3067 Grouped.135.108 .027.000Totals

COAST

COAST MISC. BUS STATION EQUIPMENT [ARRA] ATT(Annual) Partially funded by COAST

Annual Program Funding

.0652013 .052 .013.000 FTA 5307 Capital and Operating Program

.0672014 .054 .013.000

.0672015 .054 .013.000

.0672016 .054 .013.000

3068 Grouped.266.213 .053.000Totals

COAST

COAST GENERAL & COMPREHENSIVE PLANNING ATT(Annual) Partially funded by COAST

Annual Program Funding

.0522013 .042 .010.000 FTA 5307 Capital and Operating Program

.0542014 .043 .011.000

.0542015 .043 .011.000

.0542016 .043 .011.000

3069 Grouped.214.171 .043.000Totals

COAST

COAST ADA OPERATIONS ATT(Annual) Partially funded by COAST

.1012013 .081 .020.000 FTA 5307 Capital and Operating Program

.1042014 .083 .021.000

.1042015 .083 .021.000

.1042016 .083 .021.000

3070 Grouped.413.330 .083.000Totals

Phase: P - Preliminary Engineering R - Right of Way C - Construction

Page P-8 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6

Page 33: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

Name Rte/Street: Location/Scope of Work

Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category

CommentsCAACode

FiscalYearPhase

Overall ProjectCost $(M)State#

Grouped / ParentRegionally Significant

Adv Const Payback

COAST

COAST CAPITAL PROGRAM [ARRA] ATT(Annual) Partially funded by COAST

Annual Program Funding

.9812013 .785 .196.000 FTA 5307 Capital and Operating Program

.1572014 .126 .031.000

.1572015 .126 .031.000

.1572016 .126 .031.000

3503 Grouped1.4531.163 .291.000Totals

COAST 68069

VARIES CAPITAL EQUIPMENT PURCHASES AND OPERATING SUPPORT FOR COAST BUS SERVICES [CMAQ]

ATT6.878

1.9952013P 1.596 .000.399 Congestion Mitigation and Air Quality Program

.4992013 .000 .000.499 Turnpike Program

1.3642013C 1.091 .000.273 Congestion Mitigation and Air Quality Program

.3412013 .000 .000.341 Turnpike Program

.7132014 .570 .000.143 Congestion Mitigation and Air Quality Program

.1782014 .000 .000.178 Turnpike Program

.8952015 .000 .000.895

.8952016 .000 .000.895

8572 6.8783.257 .0003.621Totals

COLUMBIA

16302

US 3 REHABILITATE / REPLACE BRIDGE OVER CONE BROOK - 059/089 ATT1.341 Prioity Corridor Weight Restricted

Bridge (C1)

.1142015P .091 .000.023 Bridge On/Off System

.0572015R .045 .000.011

7360 .170.136 .000.034Totals

CONCORD 12004

SEWALLS FALLS ROAD REPLACE BRIDGE OVER MERRIMACK RIVER - 070/117 [Section 1702 - Designated Project;

Demo Id NH045] {Red List}

ATT15.673 Partially funded by CONCORD

Earmark Funding (partial). City

pays 20% match, Municipal Red

List Bridge. {LPA} Local Project Administration

.6002014P .480 .120.000 Bridge On/Off System

.3082014R .246 .062.0002008 Adv Const

7.8432015C 6.274 1.569.000

.4642015 .371 .093.000 High Priority Projects (SAFETEA-LU 2005)

5.7152016 4.572 1.143.000 Bridge On/Off System

293 14.92911.943 2.986.000Totals

Phase: P - Preliminary Engineering R - Right of Way C - Construction

Page P-9 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6

Page 34: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

Name Rte/Street: Location/Scope of Work

Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category

CommentsCAACode

FiscalYearPhase

Overall ProjectCost $(M)State#

Grouped / ParentRegionally Significant

Adv Const Payback

CONCORD 13742D

STICKNEY AVENUE REMOVAL OF STATE OWNED BUILDINGS AT STICKNEY AVENUE2.414

.1172016P .117 .000.000 STP-Flexible.022

11768

Regionally Significant .117.117 .000.000Totals .022

CONCORD 14817

STORRS STREET PARK AND RIDE [06-02CM] (CMAQ Project) ATT2.550 Specific project from Statewide

program.

.1552015P .124 .000.031 Congestion Mitigation and Air Quality Program

1.3422015R 1.073 .000.268

6220 1.4961.197 .000.299Totals

CONCORD 16345

DATABASE DEVELOPMENTS/ IMPROVEMENT TO CAPTURE FHWA ELIGIBLE PROJECT COMMITMENTS

ATT.060

.0122013P .012 .000.000 STP-Flexible.002

7960 .012.012 .000.000Totals .002

CONCORD

23717

US 3 CONVERSION TO 3-LANES AND BICYCLE/PEDESTRIAN ENHANCEMENTS BETWEEN

THE INTERSECTIONS WITH STORRS ST.

ATT7.870 Partially funded by CONCORD

.6472013P .388 .259.000 Tiger Grant

1.0602013C .636 .424.000

.8032014 .482 .321.000

4.7102014 2.826 1.884.000

.6502015 .390 .260.000

8503 7.8704.722 3.148.000Totals

CONCORD 28977

STICKNEY AVE PARKING EXPANSION AT CONCORD INTERMODAL FACILITY TO INCREASE

CAPACITY (CMAQ)

1.838

.6002014P .600 .000.000 Congestion Mitigation and Air Quality Program.120

.0012014R .001 .000.000 .000

1.2372015C .990 .000.247

11776 1.8381.591 .000.247Totals .120

CONWAY 11339B

US 302 / NH 16 DESIGN & ROW ACQUISITIONS OF THE US 302 / NH 16 CONWAY BYPASS PHASES TO PROVIDE CONGESTION RELIEF [PE & ROW Only; CONSTRUCTION BROKEN INTO

OTHER 11339 PROJECTS] [Section 1602 - Designated Project; Demo Id NH004]

ATT67.663 Original overall project for PE and ROW.

.2062015P .206 .000.000 National Highway (NHPP).040

.2132016 .170 .000.043

.0572015R .057 .000.000 .011

176

Regionally Significant .476.434 .000.043Totals .051

Phase: P - Preliminary Engineering R - Right of Way C - Construction

Page P-10 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6

Page 35: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

Name Rte/Street: Location/Scope of Work

Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category

CommentsCAACode

FiscalYearPhase

Overall ProjectCost $(M)State#

Grouped / ParentRegionally Significant

Adv Const Payback

Conway 11339Z

US 302 / NH16 DESIGN & ROW ACQUISITIONS OF THE US 302 / NH 16 CONWAY BYPASS PHASES TO

PROVIDE CONGESTION RELIEF (PE&ROW ONLY) CONTINUATION OF 11339B PROJECT.

ATT.671

.2202013P .220 .000.000 National Highway (NHPP).044

.0572015 .057 .000.000 .011

.0592016 .059 .000.000 .011

.2202013R .220 .000.000 .044

.0572015 .057 .000.000 .011

.0592016 .059 .000.000 .011

8759 .671.671 .000.000Totals .132

CONWAY 14821

NH 16 VILLAGE STREETSCAPE PROJECT: REDESIGN WORK INCLUDES SIDEWALK UPGRADES, CROSS WALKS, UTILITY RELOCATION, LANDSCAPING, LIGHTING, AND

GATEWAY MARKERS (TE Program) [06-11TE]

ATT.136 Partially funded by CONWAY VILLAGE FIRE DISTRICT

Specific project from Statewide

program, Local Administration.

.0012013P .001 .000.000 STP-Enhancement

.0102013R .008 .002.000

6234 .011.009 .002.000Totals

CONWAY

14958

NH 16 BRIDGE REHABILITATION OVER SACO RIVER - 170/071 ATT3.982 Deck plate girder bridge, 2011

Bridge Priority #71.

.0062013P .006 .000.000 Bridge On/Off System.001

.0512013 .051 .000.000 .010

.0022013R .002 .000.000 .000

5552 .059.059 .000.000Totals .012

CONWAY 15864

US 302 REPLACE BRIDGE OVER CONWAY LAKE OUTLET - 158/137 {Red List} {Federal Aid

Bridge}

ATT4.346 2011 Bridge Priority #48.

.0112015P .011 .000.000 Bridge On/Off System.002

.0342015R .034 .000.000 .007

7458 .045.045 .000.000Totals .009

CONWAY 25103

EAST SIDE ROAD SACO RIVER BRIDGE SCOUR PROTECTION EFFORT [FBRPI*6601] {Statewide Federal

Bridge Program}{Covered Bridge Program}

ATT1.031

.0532014P .053 .000.000 Bridge On/Off System.011

.0242014 .024 .000.000 National Historic Covered Bridge Preservation (NHCBP).005

.0172014R .017 .000.000 Bridge On/Off System.003

.9372016C .937 .000.000 National Historic Covered Bridge Preservation (NHCBP).176

8666 1.0311.031 .000.000Totals .195

Phase: P - Preliminary Engineering R - Right of Way C - Construction

Page P-11 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6

Page 36: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

Name Rte/Street: Location/Scope of Work

Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category

CommentsCAACode

FiscalYearPhase

Overall ProjectCost $(M)State#

Grouped / ParentRegionally Significant

Adv Const Payback

CORNISH, NH - WINDSOR, VT 25067

CORNISH TOLL BRIDGE

ROAD

PROVIDE SCOUR PROTECTION FOR THE CORNISH WINDSOR COVERED BRIDGE

OVER THE CONNECTICUT RIVER - 064/108 [FBRPI*6601] {Statewide Federal Bridge

Program} {Covered Bridge Program}

ATT2.998

.0242014P .024 .000.000 National Historic Covered Bridge Preservation (NHCBP).005

.0182014 .000 .018.000 Non Participating

.0022014 .002 .000.000 STP-Non Urban Areas Under 5K.000

.0402014 .040 .000.000 .008

.0172014R .017 .000.000 .003

1.7042016C 1.704 .000.000 National Historic Covered Bridge Preservation (NHCBP).320

.3162016 .000 .316.000 Non Participating

.8772016 .877 .000.000 STP-Non Urban Areas Under 5K

8632 2.9982.663 .334.000Totals .337

DANBURY

16303

US 4 REHABILITATE BRIDGE OVER NHRR - 156/104 ATT1.956 2011 Bridge Prioity #55

.1502013P .120 .000.030 Bridge On/Off System

.0502013R .040 .000.010

7347 .200.160 .000.040Totals

DEERFIELD

24477

NH 107 REPLACE BRIDGE OVER FREESE POND - 137/116 (REDLIST BRIDGE)1.911

.1102014P .110 .000.000 STP-Non Urban Areas Under 5K.022

.2842015 .284 .000.000 .055

.0112014R .011 .000.000 .002

.0452015 .045 .000.000 .009

8735 .450.450 .000.000Totals .088

DERRY / LONDONDERRY 13065

I-93 CONSTRUCTION OF EXIT 4A - NEW INTERCHANGE BETWEEN EXISTING EXIT 4 AND

EXIT 5 TO: (1) RELIEVE TRAFFIC; (2) ALLOW ACCESS TO POTENTIAL DEVELOPMENT

OF INDUSTRIAL LAND (PE Only)

ATT1.153 Engineering for Final Design and

coordination with I-93

reconstruction. Partial funding with

communities.

.5682015P .454 .000.114 National Highway (NHPP)

.5862016 .469 .000.117

1816 1.153.923 .000.231Totals

Phase: P - Preliminary Engineering R - Right of Way C - Construction

Page P-12 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6

Page 37: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

Name Rte/Street: Location/Scope of Work

Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category

CommentsCAACode

FiscalYearPhase

Overall ProjectCost $(M)State#

Grouped / ParentRegionally Significant

Adv Const Payback

DUBLIN 16047

NH 101 PEDESTRIAN / BICYCLE IMPROVEMENT [09-12TE] ATT.774 Partially funded by DUBLIN

Specific project from Statewide

program, Local Administration.

.0292013P .023 .006.000 STP-Enhancement

.0452014 .036 .009.000

.0012015 .001 .000.000

.0102013R .008 .002.000

.0232014 .018 .005.000

.6662015C .533 .133.000

7652 .774.619 .155.000Totals

DUMMER - CAMBRIDGE - ERROL

16304

NH 16 WIDEN & REHABILITATE FROM ERROL SOUTHERLY 10 MILES ATT6.038 NCC priority. Scope of work and specific limits to be determined.

.1102013P .088 .000.022 STP-Non Urban Areas Under 5K

.4402014 .352 .000.088

.0112013R .009 .000.002

.0442014 .035 .000.009

2.2702015C 1.816 .000.454

3.1632016 2.530 .000.633

2766 6.0384.831 .0001.208Totals

DURHAM 16236

US 4 BRIDGE REPLACEMENT & APPROACHES OVER BUNKER CREEK - 145/116. BRIDGE IS

40 ON THE BRIDGE PRIORITY LIST

ATT6.704 2011 Bridge Priority #35

.0552013P .055 .000.000 National Highway (NHPP).011

.0552014 .055 .000.000 .011

.5002014 .400 .000.100

.0572015 .045 .000.011

.1072016 .085 .000.021

.2342016 .187 .000.047

.0112013R .011 .000.000 .002

4059 1.019.839 .000.180Totals .024

DURHAM 16254

US 4 / NH 108 INTERSECTION IMPROVEMENTS AT THE US 4 RAMP INTERSECTION WITH NH 108. ATT.820 From Route 4 Safety Study.

.0172013P .017 .000.000 STP-Flexible.003

.0132014 .013 .000.000 National Highway (NHPP).003

3286 .030.030 .000.000Totals .006

Phase: P - Preliminary Engineering R - Right of Way C - Construction

Page P-13 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6

Page 38: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

Name Rte/Street: Location/Scope of Work

Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category

CommentsCAACode

FiscalYearPhase

Overall ProjectCost $(M)State#

Grouped / ParentRegionally Significant

Adv Const Payback

DURHAM - NEWMARKET 13080

NH 108 CONSTRUCT 4' BIKE SHOULDERS FROM OYSTER RIVER BRIDGE TO DAME ROAD

AND SANBORN AVE IN NEWMARKET (3.4MI) STP & [98-17TE] (TE Program)

ATT3.493

.2202013P .220 .000.000 STP-Enhancement.044

.3012014 .301 .000.000 .060

.2842015 .227 .000.057 STP-Areas Less Than 200K

.4132013R .413 .000.000 STP-Enhancement.083

.6252014 .625 .000.000 .125

2296 1.8421.786 .000.057Totals .312

DURHAM - NEWMARKET

13080A

NH 108 CONSTRUCT 4' BIKE SHOULDERS FROM 1/2 MILE NORTH OF DURHAM / NEWMARKET T/L AND CONTINUING NORTH 1.5 MILES - STP-TE PROGRAM (98-17TE)

(Parent=13080)

ATT4.730

4.7302014C 4.730 .000.000 STP-Flexible.946

7820 4.7304.730 .000.000Totals .946

DURHAM -

NEWMARKET 13080B

NH 108 CONSTRUCT 4' BIKE SHOULDERS FROM OYSTER RIVER BR. TO DURHAM /

NEWMARKET T/L AND HAMEL BROOK BR. TO SANBORN AVE [98-17TE] (STP & TE PROGRAM) (Parent=13080)

ATT5.785

2.2702015C 2.270 .000.000 STP-Flexible.440

3.5152016 3.515 .000.000 .660

7981 5.7855.785 .000.000Totals 1.100

DURHAM - ROCHESTER 20256

NH 125 IMPLEMENT NEW PUBLIC TRANSIT SERVICES BETWEEN ROCHESTER AND DURHAM

[10-02CM]

ATT.803 Partially funded by DURHAM -

ROCHESTER

Specific project from Statewide program, Local Administration.

.2682013C .215 .054.000 FTA 5307 Capital and Operating Program

.2632014 .211 .053.000 Congestion Mitigation and Air Quality Program

.2722015 .217 .054.000

7901 .803.643 .161.000Totals

EAST KINGSTON 26942

NH 107A DECK REPLACEMENT AND REHABILITATION OVER B&M RAILROAD & ROAD -

061/064

ATT4.393

.2202014P .220 .000.000 Bridge Off System.044

.2272015 .227 .000.000 .044

.1762016 .176 .000.000 .033

.0282014R .028 .000.000 .006

11724 .650.650 .000.000Totals .127

Phase: P - Preliminary Engineering R - Right of Way C - Construction

Page P-14 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6

Page 39: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

Name Rte/Street: Location/Scope of Work

Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category

CommentsCAACode

FiscalYearPhase

Overall ProjectCost $(M)State#

Grouped / ParentRegionally Significant

Adv Const Payback

ENFIELD 12967B

MAIN STREET IMPROVEMENTS TO RAIL TRAIL CROSSING (12967 Breakout) ATT1.100

.1022015P .102 .000.000 STP-Non Urban Areas Under 5K.020

.0122016 .012 .000.000 .002

.0282015R .028 .000.000 .006

.0062016 .006 .000.000 .001

.7612016C .761 .000.000 .143

7619 .910.910 .000.000Totals .172

ENFIELD - LEBANON 13962

I-89 REHAB FROM EXIT 15 TO EXIT 17, INCLUDES BRIDGES 156/117, 155/117, 158/114, 159/114 {ALL Red List} (4.0 MILES) [BRPPI*6601] {4R & Statewide Federal Bridge Program}

ATT14.159 Interstate 4R. 2011 Bridge Priority #39, 40, 67, 68 respectively.

2.9842013C 2.984 .000.000 Interstate Maintenance2012 Adv Const .298

2761 2.9842.984 .000.000Totals .298

EXETER

16045

LINCOLN STREET RESTORATION OF BAGGAGE BUILDING [09-14TE] ATT.122 Partially funded by EXETER

.0942014P .066 .000.028 STP-Enhancement

7650 .094.066 .000.028Totals

FARMINGTON

16146

NH 153 REPLACE BRIDGE OVER COCHECO RIVER - 096/140 {Red List} ATT4.380 2011 Bridge Priority #26

.1102013P .110 .000.000 Bridge Off System.022

.2202014 .176 .000.044 Bridge On/Off System

.0282014R .028 .000.000 .006

.1992015 .199 .000.000 .039

3.5152016C 3.515 .000.000 .660

6778 4.0714.027 .000.044Totals .726

FRANCONIA 24497

NH 18 BRIDGE SUPERSTRUCTURE REPLACEMENT OVER LAFAYETTE BROOK - 089/099. RED

LIST BRIDGE.

ATT4.153

.1102013P .110 .000.000 Bridge On/Off System.022

.1102014 .088 .000.022

.2272015 .182 .000.045

.0282013R .022 .000.006

.0282014 .022 .000.006

8600 .502.424 .000.078Totals .022

Phase: P - Preliminary Engineering R - Right of Way C - Construction

Page P-15 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6

Page 40: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

Name Rte/Street: Location/Scope of Work

Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category

CommentsCAACode

FiscalYearPhase

Overall ProjectCost $(M)State#

Grouped / ParentRegionally Significant

Adv Const Payback

FRANCONIA - LITTLETON 15931

I-93 PAVEMENT REHABILITATION (9 Miles) (16 Bridges) FROM NORTH OF EXIT 42 (MM

123.2) TO BRIDGE OVER CONNECTICUT RIVER (MM 131.6) (4R)

ATT18.471 Interstate 4R. Formerly Littleton-

Waterford. Bridges over CT river

are now separate project [15926, id

7516].

2.3142013C 2.314 .000.000 Interstate Maintenance.231

13.0102013 13.010 .000.000 1.301

2.8432014 2.843 .000.000 .284

2785 18.16718.167 .000.000Totals 1.817

FRANKLIN 13928A

US 3 UPGRADE AT INTERSECTION OF INDUSTRIAL PARK DRIVE IN FRANKLIN [Section

1702 - Designated Project; Demo Id NH037 & NH057]

ATT6.630 Earmarked funding.

.1702015P .170 .000.000 High Priority Projects (SAFETEA-LU 2005).033

.0222013R .022 .000.000 .004

.1162014 .116 .000.0002009 Adv Const

.1262014 .126 .000.0002009 Adv Const

.0572015 .057 .000.000 .011

1.7102015C 1.710 .000.000 .331

3.7022015 3.702 .000.000 STP-Flexible.717

6047 5.9035.903 .000.000Totals 1.097

FTA5309 CAPITAL

BUS/FACILITIES FTA5309

VARIOUS FTA 5309 PROGRAM (CAPITAL BUS AND BUS FACILITIES) ATT2.375 Partially funded by LOCAL

.7812013 .625 .156.000 FTA 5309 Capital Funding Program - Formula

.7852014 .628 .157.000

.8082015 .647 .162.000

8672 2.3751.900 .475.000Totals

FTA5339 CAPITAL BUS/FACILITIES

FTA5339

VARIOUS FTA 5339 PROGRAM (Capital bus and bus facilities) ATT11.432 Partially funded by LOCAL

2.1902013 1.752 .438.000 FTA 5339 Bus & Bus Facilities

2.2022014 1.762 .440.000

2.2732015 1.818 .455.000

2.3522016 1.882 .470.000

8673 9.0187.214 1.804.000Totals

GILFORD

15903

US 3 BYP & NH 11 BRIDGE REHABILITATION / DECK REPLACEMENT OVER NH 11A - 160/053 {Red List}

[Highways for Life Grant]

ATT2.988

.0172013P .000 .000.017 Betterment

.0552013 .055 .000.000 Bridge On/Off System.011

.0112015 .009 .000.002

7494 .083.064 .000.019Totals .011

Phase: P - Preliminary Engineering R - Right of Way C - Construction

Page P-16 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6

Page 41: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

Name Rte/Street: Location/Scope of Work

Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category

CommentsCAACode

FiscalYearPhase

Overall ProjectCost $(M)State#

Grouped / ParentRegionally Significant

Adv Const Payback

GILFORD 26005

US 3 & NH 11 BYPASS DECK REPLACEMENT OF REDLIST BRIDGE 114/066 OVER US 3 AND NH 11 ATT2.614

.0552013P .055 .000.000 Equity Bonus (Flexible).011

.1702015 .170 .000.000 STP-Areas Less Than 200K.033

.1702015 .170 .000.000 .033

.0282013R .028 .000.000 .006

8724 .423.423 .000.000Totals .083

GOFFSTOWN 16029

GOFFSTOWN BRANCH RAIL

CORRIDOR

4 PROJECT IMPROVEMENT SITES [09-17TE] ATT.486 Partially funded by GOFFSTOWN

.0012015P .001 .000.000 STP-Enhancement

.3682015C .294 .074.000

7632 .369.295 .074.000Totals

GOFFSTOWN

20246

NH 114 & NH 13 IMPROVE TWO INTERSECTIONS ALONG THE NH 114 & NH 13 CORRIDOR THROUGH

DOWN TOWN. TOWN SEEKS TO RECONSTRUCT MAST RD / PLEASANT ST INTO A MODERN ROUNDABOUT. THE SECOND INTERSECTION PROJECT INVOLVES TRAFFIC

CALMING IMPROVEMENTS TO HIGH ST / ELM ST / MAIN ST IN

ATT.929 Partially funded by TOWN OF

GOFFSTOWN

.0112013P .006 .005.000 Congestion Mitigation and Air Quality Program

.0612013 .033 .027.000

.0162014 .009 .007.000

.0012015 .001 .000.000

.0052015R .003 .002.000

.7542015C .414 .339.000

7884 .848.466 .381.000Totals

HAMPTON 23821

NH 1A / OCEAN BLVD /

ASHWORTH AVE

UPDATE TO TRANSPORTATION ELEMENT OF THE HAMPTON BEACH AREA MASTER

PLAN {TCSP}

ATT.375 Partially funded by TOWN OF

HAMPTON

.3752013P .300 .075.000 Transportation & Community & System Preservation

8515 .375.300 .075.000Totals

HAMPTON - PORTSMOUTH

26485

HAMPTON BRANCH RAIL

CORRIDOR

PURCHASE RAIL CORRIDOR FROM HAMPTON TO PORTSMOUTH APPROXIMATLY 9.7

MILES TO IMPROVE TRAIL SURFACE [13-01CM]

ATT5.447

.1102013P .110 .000.000 Congestion Mitigation and Air Quality Program.022

3.5002014R 3.500 .000.000 .700

.8152015 .815 .000.000 .158

1.0222015C 1.022 .000.000 .198

8744 5.4475.447 .000.000Totals 1.078

Phase: P - Preliminary Engineering R - Right of Way C - Construction

Page P-17 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6

Page 42: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

Name Rte/Street: Location/Scope of Work

Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category

CommentsCAACode

FiscalYearPhase

Overall ProjectCost $(M)State#

Grouped / ParentRegionally Significant

Adv Const Payback

HARTS LOCATION 16396B

US 302 CONSTRUCTION OF A TEMPORARY PARKING AREA FOR THE 4TH IRON

CAMPGROUND TO REPLACE THE LOT USED BY THE US 302 DETOUR ROUTE [AUG

2011 HURRICANE IRENE STORM EVENT] {ER DISASTER CODE NH 11-1}

ATT.025

.0252013C .025 .000.000 STP-Flexible.005

8488 .025.025 .000.000Totals .005

HAVERHILL 16238

MILL STREET BRIDGE REPLACEMENT OVER ABANDONED RAILROADAND ACTIVE MULTI-USE

TRAIL - 215/158 {Red List}

ATT1.527 2011 Bridge Priority #109

.0552013P .055 .000.000 Bridge On/Off System.011

.0012013 .001 .000.000 Equity Bonus (Flexible).000

.0182013 .018 .000.000 STP-Flexible.004

.1652014 .165 .000.000 Bridge On/Off System.033

7815 .240.240 .000.000Totals .048

HAZMAT

HAZMAT

VARIOUS PROGRAMMATIC PROJECT FOR POST CONSTRUCTION HAZMAT OBLIGATIONS ATT.027

.0272013R .027 .000.000 STP-Flexible.005

8671 .027.027 .000.000Totals .005

HOOKSETT

20259

COLLEGE PARK DRIVE CONSTRUCT SIDEWALK ALONG COLLEGE PARK DRIVE BETWEEN PARK DRIVE

BETWEEN MAIN ST AND US 3 [10-07CM]

ATT.384 Partially funded by HOOKSETT

.0352013P .028 .007.000 Congestion Mitigation and Air Quality Program

.0152014 .012 .000.003

.0012015 .001 .000.000

.0072014R .006 .000.001

.0012015 .001 .000.000

.3252015C .260 .065.000

7896 .384.307 .072.005Totals

HUDSON 14408

TRAIN DEPOT HUDSON CENTER TRAIN STOP DEPOT - RELOCATION AND RESTORATION OF

FORMER HUDSON CENTER TRAIN DEPOT, WORCESTER, NASHUA, & PORTLAND

RAILROAD BUILT IN 1873 (TE Program) [04-25TE]

ATT.399 Partially funded by HUDSON

.0122013P .009 .003.000 STP-Enhancement

.3192015C .239 .080.000

5646 .331.248 .083.000Totals

HUDSON 20245

NH 111 / LIBRARY ST UPGRADE 3 SETS OF TRAFFIC LIGHTS THAT CONTROL TRAFFIC FROM 3 MAIN CORRIDORS IN HUDSON. NH 111, NH3A & NH 102 MERGE [10-08CM]

ATT.308 Partially funded by TOWN OF HUDSON

.2802015C .224 .056.000 Congestion Mitigation and Air Quality Program

7886 .280.224 .056.000Totals

Phase: P - Preliminary Engineering R - Right of Way C - Construction

Page P-18 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6

Page 43: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

Name Rte/Street: Location/Scope of Work

Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category

CommentsCAACode

FiscalYearPhase

Overall ProjectCost $(M)State#

Grouped / ParentRegionally Significant

Adv Const Payback

JACKSON 27709

NH 16 BRIDGE REPLACEMENT, RED LIST BR#144/056 OVER ELLIS RIVER. ATT.287

.1142015P .114 .000.000 Bridge On/Off System.022

.1172016 .094 .000.023 STP-Flexible

.0572015R .057 .000.000 .011

11764 .287.264 .000.023Totals .033

JAFFREY 16307

US 202 RECONFIGURE 'DOG-LEG' @ INTERSECTION OF NH 124 ATT9.736 SWRPC priority #1

.0552013P .055 .000.000 STP-Non Urban Areas Under 5K.011

7442 .055.055 .000.000Totals .011

JEFFERSON 16153

US 2 BRIDGE REHABILITATION OVER ISRAEL RIVER - 046/178 {Red List} ATT3.436 2011 Bridge Priority #90

.1002013P .100 .000.000 Bridge On/Off System.020

7728 .100.100 .000.000Totals .020

KEENE

10309B

WINCHESTER STREET RECONSTRUCTION FROM NH 101 ROUNDABOUT NORTH TO PEARL STREET / ISLAND

STREET INCLUDING INTERSECTION AT KEY ROAD [MUPCA*450] {Municipal Urban Projects}

ATT5.548 Local Administration and 20%

match.

.2622014P .210 .000.052 STP-Areas Less Than 200K

.3802014R .304 .000.076

1828 .642.514 .000.128Totals

KEENE 16152

NH 9 & NH 12 BRIDGE REHABILITATION - 129/099 {Red List} ATT2.385 2011 Bridge Priority #92

.1602013P .160 .000.000 Bridge On/Off System.032

.0552014 .055 .000.000 .011

.0112013R .011 .000.000 .002

7727 .226.226 .000.000Totals .045

KEENE 27790

GILBO AVE MULTI- USE PATH ALONG GILBO AVE AND COLONY MILL MARKET PLACE.

TRANSPORTATION ENHANCEMENT. (TE)

ATT.752 Partially funded by KEENE

.0682014P .054 .014.000 STP-Enhancement

.0052014R .004 .001.000

.6792015C .544 .136.000

11750 .752.602 .150.000Totals

LACONIA

16144

US 3 BRIDGE REHABILITATION OVER NH RAILROAD - 131/154 {Red List} ATT2.372 2011 Bridge Priority #74

.2272015P .227 .000.000 Bridge On/Off System.044

.1142015R .114 .000.000 .022

7723 .341.341 .000.000Totals .066

Phase: P - Preliminary Engineering R - Right of Way C - Construction

Page P-19 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6

Page 44: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

Name Rte/Street: Location/Scope of Work

Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category

CommentsCAACode

FiscalYearPhase

Overall ProjectCost $(M)State#

Grouped / ParentRegionally Significant

Adv Const Payback

LACONIA 24181

CENTENARY AVENUE BRIDGE REPLACEMENT OR REMOVAL - 126/163 {Redlist} ATT4.750

.2842015P .284 .000.000 Bridge Off System.055

.2932016 .293 .000.000 .055

.0282015R .028 .000.000 .006

8597 .605.605 .000.000Totals .116

LANCASTER, NH - GUILDHALL, VT

16155

US 2 BRIDGE REPLACEMENT OVER CONNECTICUT RIVER - 111/129 (ROGER'S RANGER'S

BRIDG

ATT13.077 2011 Bridge Priority #60

.4132015P .330 .000.083 Bridge On/Off System

.0412015 .000 .000.041 Non Participating

.0222014R .022 .000.000 Bridge On/Off System.004

.0202014 .000 .020.000 Non Participating

3524 .496.352 .020.124Totals .004

LEBANON

10034B

US 4 RECONSTRUCTION FROM HIGH STREET TO I-89 RAMPS. (MUPCA *450) ATT3.095

.1472014P .117 .000.029 STP-Areas Less Than 200K

.1552015 .124 .000.031

.0202014R .016 .000.004

.5162015 .413 .000.103

2.2582016C 1.806 .000.452

11770 3.0952.476 .000.619Totals

LEBANON 13951

US 4 BRIDGE REPLACEMENT OVER MASCOMA RIVER - 188/126 NEAR INTERSECTION OF

US 4 AND NH 4A {Red List}

ATT12.290 2011 Bridge Priority #9

.1502013P .150 .000.000 Bridge Off System2008 Adv Const .030

.1602014 .160 .000.000 Bridge On/Off System.032

.2252013R .225 .000.0002008 Adv Const .045

.0502014 .050 .000.000 .010

5.5002014C 5.500 .000.000 1.100

.2192014 .219 .000.000 Non Participating.219

5.0362015 5.036 .000.000 Bridge On/Off System.976

1875 11.34011.340 .000.000Totals 2.412

LEBANON

15880

I-89 NB/SB ROADWAY RECONSTRUCTION AND BRIDGE DECK

REPLACEMENT/REHABILITATION (7 BRIDGES: 093/109 (Red List), 094/108, 097/112, 098/111, 140/124, 141/123, 099/111) FROM MILE MARKER 54.8 TO MILE MARKER 60.0

ATT17.887 Interstate 4R. 2011 Bridge priority

#41 & #42.

.1032016P .103 .000.000 Interstate Maintenance2010 Adv Const .010

1900 .103.103 .000.000Totals .010

Phase: P - Preliminary Engineering R - Right of Way C - Construction

Page P-20 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6

Page 45: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

Name Rte/Street: Location/Scope of Work

Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category

CommentsCAACode

FiscalYearPhase

Overall ProjectCost $(M)State#

Grouped / ParentRegionally Significant

Adv Const Payback

LEBANON 16046

NH 120 PEDESTRIAN / BICYCLE IMPROVEMENT [09-22TE] ATT.557 Partially funded by LEBANON

.0012014P .001 .000.000 STP-Enhancement

.0032014R .002 .001.000

.4672015C .373 .093.000

7651 .471.377 .094.000Totals

LEBANON 25784

I-89 DECK REPLACEMENT AND BRIDGE REHABILITATION ON TWO REDLISTED BRIDGES

CARRYING I-89 NB & SB OVER HARDY HILL ROAD

ATT6.605

.0552013P .055 .000.000 Equity Bonus (Flexible).011

.2752014 .275 .000.000 STP-Areas Less Than 200K.055

.2842015 .284 .000.000

.0282014R .028 .000.000 .006

.0282015 .028 .000.000

8720 .670.670 .000.000Totals .072

LEBANON

25821

MASCOMA STREET BRIDGE REHABILITATION AND DECK REPLACEMENT OVER I-89 - 103/116 {REDLIST} ATT6.266

.0552013P .055 .000.000 Equity Bonus (Flexible).011

.2202014 .220 .000.000 STP-Areas Less Than 200K.044

.0282014R .028 .000.000 .006

.0282015 .028 .000.000

8721 .331.331 .000.000Totals .061

LEBANON, NH - HARTFORD, VT 14957

US 4 REPLACE BRIDGE OVER CONNECTICUT RIVER - 058/127 {Red List} ATT14.063 2011 Bridge Priority #3

.1322013P .132 .000.000 STP-Flexible.026

2.7912013C 2.791 .000.000 Bridge On/Off System.558

.3162013 .000 .000.316 Non Participating

.7502013 .000 .000.750

6.2822014 6.282 .000.000 Bridge On/Off System1.256

1.2242014 .000 1.224.000 Non Participating

1.2752015 1.020 .000.255 Bridge On/Off System

.1582015 .000 .158.000 Non Participating

2753 12.92710.225 1.3821.321Totals 1.841

Phase: P - Preliminary Engineering R - Right of Way C - Construction

Page P-21 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6

Page 46: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

Name Rte/Street: Location/Scope of Work

Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category

CommentsCAACode

FiscalYearPhase

Overall ProjectCost $(M)State#

Grouped / ParentRegionally Significant

Adv Const Payback

LEBANON, NH - HARTFORD, VT 16148

I-89 REHABILITATION & WIDENING OF BRIDGES OVER CONNECTICUT RIVER - 044/103 &

044/104

ATT39.192 2011 Bridge Priorities #49 and #50.

.4132013P .413 .000.000 Interstate Maintenance.041

.1252013 .000 .125.000 Non Participating

.4372015 .437 .000.000 Interstate Maintenance.042

.1182015 .000 .118.000 Non Participating

.0402014R .000 .040.000

2771 1.133.850 .283.000Totals .084

LINCOLN 15755

I-93 PAVEMENT REHABILITATION FROM EXIT 32 TO NORTH 6 MILES & BRIDGE REHABILITATION - 202/100 (Lincoln) {Red List} [4R]

ATT17.904 Specific project from 4R program combined with Lincoln 15754.

2011 Bridge Priority #51

.0402013P .040 .000.000 Interstate Maintenance.004

.1472013 .147 .000.000 .015

.0052013R .005 .000.000 .001

.0502013C .000 .000.050 Betterment

17.5022013 15.751 .0001.750 Interstate Maintenance

7292 17.74415.943 .0001.800Totals .019

LONDONDERRY -

SALEM

TRANSIT CAPITAL ATT2.681

.2192013 .175 .000.044 FTA 5307 Capital and Operating Program

.2192014 .175 .000.044

.2262015 .181 .000.045

.2332016 .187 .000.047

2903

Regionally Significant .897.718 .000.179Totals

LONDONDERRY - SALEM

TRANSIT COMMUTER BUS PREVENTATIVE MAINTENANCE ATT3.443 Partially funded by LOCAL

.2812013 .225 .056.000 FTA 5307 Capital and Operating Program

.2812014 .225 .056.000

.2902015 .232 .058.000

.3002016 .240 .060.000

6292 1.152.922 .230.000Totals

Phase: P - Preliminary Engineering R - Right of Way C - Construction

Page P-22 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6

Page 47: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

Name Rte/Street: Location/Scope of Work

Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category

CommentsCAACode

FiscalYearPhase

Overall ProjectCost $(M)State#

Grouped / ParentRegionally Significant

Adv Const Payback

LYME, NH - THETFORD, VT 14460

EAST THETFORD ROAD BRIDGE REHABILITATION OVER THE CONNECTICUT RIVER - 053/112 ATT4.839 2011 Bridge Priority #75

.0892013P .089 .000.000 Equity Bonus (Flexible)2012 Adv Const .018

.0092013 .000 .009.000 Non Participating

.0242014 .000 .024.000

.2342014 .234 .000.000 STP-Non Urban Areas Under 5K2012 Adv Const .047

.0212015 .000 .021.000 Non Participating

.2042015 .163 .000.041 STP-Non Urban Areas Under 5K

.0132013R .013 .000.000 Equity Bonus (Flexible)2012 Adv Const .003

.0012013 .000 .001.000 Non Participating

.0022014 .000 .002.000

.0182014 .018 .000.000 STP-Non Urban Areas Under 5K2012 Adv Const .004

3269 .615.517 .056.041Totals .071

MANCHESTER

TRANSIT AUTHORITY OPERATING ASSISTANCE FOR FIXED ROUTE SERVICE E-2145.426 Partially funded by MANCHESTER

TRANSIT AUTHORITYAnnual Program Funding

2.9252013 1.462 1.462.000 FTA 5307 Capital and Operating Program

.0422013 .034 .008.000 FTA 5317 New Freedom Program

3.0422014 1.521 1.521.000 FTA 5307 Capital and Operating Program

.0422014 .034 .008.000 FTA 5317 New Freedom Program

3.2652015 1.632 1.632.000 FTA 5307 Capital and Operating Program

3.5042016 1.752 1.752.000

602 12.8196.435 6.384.000Totals

MANCHESTER

TRANSIT AUTHORITY OPERATING ASSISTANCE FOR CAPITAL MAINTENANCE OF MTA FLEET E-216.300 Partially funded by MANCHESTER

TRANSIT AUTHORITY

Annual Program Funding

.4512013 .361 .090.000 FTA 5307 Capital and Operating Program

.4692014 .376 .094.000

.5042015 .403 .101.000

.5412016 .433 .108.000

2496 1.9651.572 .393.000Totals

MANCHESTER

TRANSIT AUTHORITY REPLACEMENT BUSES E-302.530 Partially funded by MANCHESTER TRANSIT AUTHORITY

Annual Program Funding

.4082013 .326 .082.000 FTA 5307 Capital and Operating Program

3062 .408.326 .082.000Totals

Phase: P - Preliminary Engineering R - Right of Way C - Construction

Page P-23 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6

Page 48: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

Name Rte/Street: Location/Scope of Work

Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category

CommentsCAACode

FiscalYearPhase

Overall ProjectCost $(M)State#

Grouped / ParentRegionally Significant

Adv Const Payback

MANCHESTER

TRANSIT AUTHORITY OPERATING ASSISTANCE FOR ADA PARATRANSIT SERVICE E-213.301 Partially funded by MANCHESTER

Annual Program Funding

.2862013 .229 .057.000 FTA 5307 Capital and Operating Program

.2972014 .238 .059.000

.3192015 .255 .064.000

.3432016 .274 .069.000

5916 1.245.996 .249.000Totals

MANCHESTER

TRANSIT AUTHORITY REPLACEMENT OF ADA PARATRANSIT VANS E-30.641 Partially funded by MANCHESTER

Annual Program Funding

.1672015 .134 .033.000 FTA 5307 Capital and Operating Program

.1812016 .145 .036.000

5917 .348.279 .070.000Totals

MANCHESTER

TRANSIT AUTHORITY REPLACEMENT OF TRANSIT SERVICE VEHICLES E-30.160 Partially funded by MANCHESTER

.1362013 .109 .027.000 FTA 5307 Capital and Operating Program

5919 .136.109 .027.000Totals

MANCHESTER

TRANSIT AUTHORITY MISCELLANEOUS CAPITAL [ARRA] E-301.495 Partially funded by CITY OF

MANCHESTER

Annual Program Funding

.1042013 .083 .021.000 FTA 5307 Capital and Operating Program

.1092014 .087 .022.000

.1182015 .094 .024.000

.1282016 .102 .026.000

6923 .458.367 .092.000Totals

MANCHESTER 14412A

PISCATAQUOG TRAILWAYS PHASE III-A, REHAB OR REPLACE WOOD TRESTLE BRIDGE OVER PISCATAQUOG

RIVER FOR MULTI-USE ACCESS AND CONST 1/2 MILE OF MULTI-USE TRAIL (TE

Program) [Part of 04-33TE & 09-26TE]

.794 Partially funded by MANCHESTER

.0082013P .007 .002.000 STP-Enhancement

.0022015 .002 .000.000

.6622014C .529 .132.000

.0012015 .001 .000.000

7255 .673.538 .134.000Totals

Phase: P - Preliminary Engineering R - Right of Way C - Construction

Page P-24 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6

Page 49: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

Name Rte/Street: Location/Scope of Work

Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category

CommentsCAACode

FiscalYearPhase

Overall ProjectCost $(M)State#

Grouped / ParentRegionally Significant

Adv Const Payback

MANCHESTER 16016

ELM, GRANITE, & AUBURN

STREETS

ELM ST FROM GRANITE TO VALLEY; GRANITE ST FROM CANAL TO ELM; WEST

AUBURN ST TO OLD GRANITE ST; AKA GAS LIGHT IMPROVE INFRASTRUCTURE &

PED AMENITIES. High Priority Project (HPP) Demo Id NH084

E-331.029

.0102013P .010 .000.000 High Priority Projects (SAFETEA-LU-EXT 2010)

.0012014 .001 .001-.001

.0012015 .001 .001-.001

.0012015R .001 .000.000

.9502015C .950 .000.000

7618 .963.963 .002-.002Totals

MANCHESTER 16099

I-293 / FEE TPK PLANNING AND ENGINEERING STUDY FOR RECONSTRUCTION OF THE F.E. EVERETT TURNPIKE AT EXIT 6 (AMOSKEAG) INTERCHANGE AND NEW EXIT 7 (NH 3A)

INTERCHANGE {Turnpike}

E-3469.150 "Future Turnpike Capital Program for Construction, dependent on

Future System-Wide Toll increase".

2.0002013P .000 .0002.000 Turnpike Program

1.0002015 .000 .0001.000

1.0002016 .000 .0001.000

.2502014R .000 .000.250

7692

Regionally Significant 4.250.000 .0004.250Totals

MANCHESTER

20162

US 3 & CAMPBELL STREET TRAFFIC OPERATION AND SAFETY IMPROVEMENTS TO 3 CONGESTED

INTERSECTIONS [10-09CM]

E-62.641 Partially funded by CITY OF

MANCHESTER

.0012013P .001 .001.000 Congestion Mitigation and Air Quality Program

.0832013 .031 .051.000

.1502013R .057 .093.000

2.4082015C .915 1.493.000

7862 2.6411.004 1.638.000Totals

MANCHESTER 20257

RAIL CORRIDOR CONSTRUCT MULTI-USE PATH ALONG ABANDONED RAIL CORRIDOR FROM GOLD

ST TO GOFFS FALLS ROAD [10-10CM]

E-33.727 Partially funded by CITY OF

MANCHESTER

.0012013P .001 .000.000 Congestion Mitigation and Air Quality Program

.0012013R .001 .000.000

.6892015C .475 .214.000

7902 .691.477 .214.000Totals

Phase: P - Preliminary Engineering R - Right of Way C - Construction

Page P-25 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6

Page 50: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

Name Rte/Street: Location/Scope of Work

Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category

CommentsCAACode

FiscalYearPhase

Overall ProjectCost $(M)State#

Grouped / ParentRegionally Significant

Adv Const Payback

MEREDITH 10430

US 3 / NH 25 ROADWAY AND INTERSECTION IMPROVEMENTS @ NH 104, NORTH TO NH 25, AND

NH 25 FROM US 3, EAST TO MEREDITH / CENTER HARBOR T/L [Section 1702 -

Designated Project; Demo Id NH041, NH060, & NH071]

ATT11.749 Scope to address pavment and

priority intersections only.

.1702015P .136 .000.034 High Priority Projects (SAFETEA-LU 2005)

.1762016 .141 .000.035

1.0392015R .832 .000.208

.4942016 .396 .000.099

.1552016 .124 .000.031 STP-Flexible

94 2.0351.628 .000.407Totals

MEREDITH 24597

MEREDITH CENTER ROAD DECK REPLACEMENT & BRIDGE REHABILITATION OVER WICKWAS POND OUTLET - 131/105 {Redlist Bridge}

.599

.1102014P .110 .000.000 Bridge Off System.022

.2272015 .227 .000.000 .044

.2342016 .234 .000.000 .044

.0282014R .028 .000.000 .006

8587 .599.599 .000.000Totals .116

MILFORD

13692B

NH 101 SAFETY IMPROVEMENTS FROM WILTON ROAD TO NH101 AND ELM STREET

INTERSECTION

ATT3.405

1.6482015C 1.318 .000.330 National Highway (NHPP)

1.7572016 1.406 .000.351

8621 3.4052.724 .000.681Totals

MILFORD 14492

NH 101A & NH 13 IMPROVEMENTS IN THE AREA KNOWN AS THE "OVAL" TO IMPROVE TRAFFIC FLOW

BASED ON RESULTS OF ONGOING TRAFFIC STUDIES WITHIN THE TOWN [Section

1702 - Designated Project; Demo Id NH038 & NH058]

ATT2.643 Partially funded by MILFORD

Earmarked funding.

.1122014R .090 .022.000 High Priority Projects (SAFETEA-LU 2005)

.5192014C .415 .104.000

1.8062014 1.445 .361.000

3278 2.4371.950 .487.000Totals

MILFORD 14837

SOUTH STREET SOUTH ST IMPROVEMENT PROJECT: CONSTRUCT PHASE 2 PORTION OF

DOWNTOWN REVITALIZATION PLAN TO IMPROVE OVERALL SAFETY, PHYSICAL /

ADA ACCESSIBILITY, FUNCTIONALITY, DESIGN AND GENERAL AESTHETIC OF

INTERSECTION (TE Program) [06-28TE] [NH038 & NH058]

ATT1.421 Partially funded by MILFORD

Specific project from Statewide

program, Local Administration.

.0012014P .001 .000.000 STP-Enhancement

.0012014R .001 .000.000

.5422015C .433 .108.000 High Priority Projects (SAFETEA-LU 2005)

.5332015 .426 .107.000 STP-Enhancement

6240 1.076.861 .215.000Totals

Phase: P - Preliminary Engineering R - Right of Way C - Construction

Page P-26 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6

Page 51: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

Name Rte/Street: Location/Scope of Work

Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category

CommentsCAACode

FiscalYearPhase

Overall ProjectCost $(M)State#

Grouped / ParentRegionally Significant

Adv Const Payback

MILFORD 20253

NH 13 / EMERSON RD /

ARMORY RD

SIGNAL MODIFICATION AND ADDITIONAL TURNING LANES TO ADDRESS

CONGESTION AND AIR QUALITY RELATED IMPACTS [10-11CM]

ATT.489 Partially funded by TOWN OF

MILFORD

.0102013P .008 .002.000 Congestion Mitigation and Air Quality Program

.0022015 .002 .000.000

.0012015R .001 .000.000

.4022014C .322 .080.000

.0012015 .001 .000.000

7891 .416.333 .082.001Totals

MILFORD TO NASHUA 10136

NH 101A INTERSECTION IMPROVEMENTS AT SEVERAL LOCATIONS BETWEEN NH 101 TO FEE TPK (7.5 MILES); AS DETERMINED BY CORRIDOR STUDY

E-533.440 Parent Project for PE & ROW. Specific Safety & Capacity

improvements at 3 intersections as

determined by corridor study,

programmed as separate construction projects.

.1272014R .101 .000.025 National Highway (NHPP)

.6922015 .554 .000.138 STP-Areas Less Than 200K

730 .819.655 .000.164Totals

NASHUA

NASHUA TRANSIT SYSTEM CAPITAL PLANNING PROGRAM E-212.115 Partially funded by NASHUA

Annual Program Funding

.2122013 .170 .042.000 FTA 5307 Capital and Operating Program

.2182014 .174 .044.000

.1652015 .132 .033.000

.1702016 .136 .034.000

608 .765.612 .153.000Totals

NASHUA

NASHUA TRANSIT SYSTEM OPERATING ASSISTANCE E-2116.900 Partially funded by NASHUA

Annual Program Funding

1.1492013 .919 .230.000 FTA 5307 Capital and Operating Program

1.1742014 .939 .235.000

1.5022015 1.201 .300.000

1.5502016 1.240 .310.000

609 5.3754.300 1.075.000Totals

NASHUA

NASHUA TRANSIT SYSTEM CAPITAL EQUIPMENT [ARRA] E-30.340 Partially funded by NASHUAAnnual Program Funding

.0222013 .017 .004.000 FTA 5307 Capital and Operating Program

.0222014 .018 .004.000

3797 .044.035 .009.000Totals

Phase: P - Preliminary Engineering R - Right of Way C - Construction

Page P-27 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6

Page 52: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

Name Rte/Street: Location/Scope of Work

Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category

CommentsCAACode

FiscalYearPhase

Overall ProjectCost $(M)State#

Grouped / ParentRegionally Significant

Adv Const Payback

NASHUA

NASHUA TRANSIT SYSTEM PREVENTIVE MAINTENANCE E-315.545 Partially funded by NASHUA

Annual Program Funding

.4332013 .347 .087.000 FTA 5307 Capital and Operating Program

.4452014 .356 .089.000

.4742015 .379 .095.000

.4892016 .391 .098.000

3799 1.8411.473 .368.000Totals

NASHUA

NASHUA TRANSIT SYSTEM ADA OPERATIONS E-21.780 Partially funded by NASHUA

TRANSIT SYSTEM

.2602013 .208 .052.000 FTA 5307 Capital and Operating Program

.2672014 .214 .053.000

7927 .527.422 .105.000Totals

NASHUA

10040A

BROAD STREET PARKWAY CON OF 1.8 MI OF NEW 2-LANE RDWAY THAT WILL CONNECT BROAD ST (NH130) TO

WEST HOLLIS ST(NH 111) IN NASHUA. APPRAISAL ACQUISITION,MISC. ROW, PRE/FIN DESIGN REQUIRED FOR LATER PHASES (CON) [SECTION 1602-DESIGNATED PROJECT;

DEMO ID NH003] [SISTER DEMO PROJECT

N/E28.907 Original overall project for PE and

ROW. Earmark funding (partial), project being re-scoped by City.

Local Administration.

.2582013R .258 .000.000 High Priority Projects (TEA-21 1998-2003)

.1002014 .100 .000.000

18

Regionally Significant .358.358 .000.000Totals

NASHUA 10040W

44 BROAD STREET

PARKWAY

BUILDING DEMOLITION (Parent = Nashua 10040A) [Section 1602 - Designated Project; Demo

Id NH003]

.142

.1422013R .142 .000.000 High Priority Projects (TEA-21 1998-2003)

8578 .142.142 .000.000Totals

NASHUA 13117

FEE TPK CONSTRUCT PARK AND RIDE AND ACCESSORY FACILITIES AT UP TO TWO NASHUA

LOCATIONS (CMAQ Program) [98-13CM]

N/E6.878 Specific project from Statewide

program. ROW funds programmed

previously. Local Administration.

.1002013P .100 .000.000 Congestion Mitigation and Air Quality Program2008 Adv Const .020

.1302014 .130 .000.000 .026

1.5002013R 1.500 .000.0002008 Adv Const .300

2344

Regionally Significant 1.7301.730 .000.000Totals .346

NASHUA 14815

PURCHASE TWO NEW CNG BUSES (CMAQ Program) [06-13CM] N/E.913 Partially funded by NASHUASpecific project from Statewide

program. Local Administration.

.9132013C .730 .183.000 FTA 5309 Capital Funding Program - Formula

6225 .913.730 .183.000Totals

Phase: P - Preliminary Engineering R - Right of Way C - Construction

Page P-28 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6

Page 53: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

Name Rte/Street: Location/Scope of Work

Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category

CommentsCAACode

FiscalYearPhase

Overall ProjectCost $(M)State#

Grouped / ParentRegionally Significant

Adv Const Payback

NASHUA 16050

RAIL CORRIDOR EAST OF MAIN STREET, PURCHASE RAIL CORRIDOR AT VARIOUS LOCATIONS [09-

32TE]

.361 Partially funded by NASHUA

.0012014P .001 .000.000 STP-Enhancement

.0152014R .012 .003.000

.3452015 .276 .069.000

7656 .361.289 .072.000Totals

NASHUA 16110

BROAD STREET PARKWAY CONSTRUCT NEW 2 LANE ROAD 1.8 MILES FROM NH 130 (BROAD ST) TO NH 111

(HOLLIS STREET) (Parent Construction Project) {Earmark Project} [Section 1602 - Designated

Project; Demo Id NH003 & NH083]

N/E7.115 Partially funded by NASHUA

Local Administration. Rescoped

from Nashua 10040 Series projects.

5.0002013C .000 5.000.000 Non Participating

2.1152014 .000 2.115.000

7781 7.115.000 7.115.000Totals

NASHUA

16110B

BROAD STREET PARKWAY CONSTRUCTION OF BROAD STREET PARKWAY NORTH INCLUDING REPLACEMENT

OF BALDWIN STREET BRIDGE (PARENT PROJECT 16110*7781)Demo ID NH003 & NH083

12.471 Partially funded by NASHUA

7.5022013C 7.502 1.500-1.500 High Priority Projects (TEA-21 1998-2003)

2.5232013 .000 2.523.000 Non Participating

2.4452013 1.956 .489.000 STP-Flexible

8586 12.4719.458 4.513-1.500Totals

NASHUA

16110C

BROAD STREET PARKWAY CONSTRUCTION OF THE NEW BRIDGE OVER NASHUA RIVER (PARENT PROJECT

16110*7781)

10.243

.4872014C .487 .000.000 High Priority Projects (SAFETEA-LU-EXT 2010)

4.4042014 .000 4.404.000 Non Participating

2.3522014 1.882 .470.000 STP-Flexible

3.0002014 2.400 .600.000

8588 10.2434.769 5.475.000Totals

NASHUA 16110D

BROAD STREET PARKWAY CONSTRUCTION OF THE SOUTH SECTION (PARENT PROJECT NASHUA 16110*7781)6.100 Partially funded by NASHUA

3.6182014C .000 3.618.000 Non Participating

2.4822014 1.985 .496.000 STP-Flexible

8593 6.1001.985 4.115.000Totals

NASHUA 16110E

BROAD STREET PARKWAY PART OF NASHUA BROAD STREET PARKWAY THIS IS THE FAIRMOUNT STREET BRIDGE 118/118 (PARENT PROJECT NASHUA 16110* 7781

8.708 Partially funded by NASHUA

1.4612014C 1.169 .292.000 High Priority Projects (TEA-21 1998-2003)

3.7272014 .000 3.727.000 Non Participating

3.5202014 2.816 .704.000 STP-Areas Over 200K

8738 8.7083.985 4.723.000Totals

Phase: P - Preliminary Engineering R - Right of Way C - Construction

Page P-29 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6

Page 54: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

Name Rte/Street: Location/Scope of Work

Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category

CommentsCAACode

FiscalYearPhase

Overall ProjectCost $(M)State#

Grouped / ParentRegionally Significant

Adv Const Payback

NASHUA 16314

EAST HOLLIS STREET CONSTRUCT A MULTI-LANE ROUNDABOUT AT THE INTERSECTION OF EAST HOLLIS

ST, BRIDGE ST AND CANAL ST.

E-513.807 Local Administration, NHDOT

Match.

.1002014P .100 .000.000 STP-Areas Less Than 200K.020

.3102015 .310 .000.000 STP-Flexible.060

.0502014R .050 .000.000 STP-Areas Less Than 200K.010

.1552015 .155 .000.000 STP-Flexible.030

2.0942015C 2.094 .000.000 .406

1.0992016 1.099 .000.000 .206

3536 3.8073.807 .000.000Totals .732

NASHUA-MERRIMACK -

BEDFORD 13761

F.E.E.Tpk F.E.E.TURNPIKE WIDENING OF 2-LANE SECTIONS FROM EXIT 8 IN NASHUA TO I-293 INTERCHANGE IN BEDFORD,

N/E71.000 "Future Turnpike Capital Program for Construction, dependent on

Future System-Wide Toll increase".

.2502014P .000 .000.250 Turnpike Program

1.7502015 .000 .0001.750

1.0002016 .000 .0001.000

.1002014R .000 .000.100

.1002015 .000 .000.100

3662 3.200.000 .0003.200Totals

NEW CASTLE - RYE

16127

NH 1B REHABILITATE SINGLE LEAF BASCULE MOVEABLE BRIDGE OVER LITTLE HARBOR -

066/071 {Red List}

ATT27.687 2011 Bridge Priority #24

.7982013P .638 .000.160 Bridge On/Off System

1.3482014 1.348 .000.000 STP-Flexible.270

.5682015 .568 .000.000 .110

.0592016 .059 .000.000 .011

.0112014R .011 .000.000 .002

.0232015 .023 .000.000 .004

.0232016 .019 .000.005

11.7152016C 9.372 .0002.343 Bridge On/Off System

5558 14.54312.036 .0002.507Totals .397

NEW HAMPTON 25365

SMITH CROSSING REMOVE BRIDGE OVER NH RAILROAD - 240/104 ATT.789

.0292016P .023 .000.006 Bridge Off System

.0292016R .029 .000.000 .006

8668 .059.053 .000.006Totals .006

Phase: P - Preliminary Engineering R - Right of Way C - Construction

Page P-30 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6

Page 55: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

Name Rte/Street: Location/Scope of Work

Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category

CommentsCAACode

FiscalYearPhase

Overall ProjectCost $(M)State#

Grouped / ParentRegionally Significant

Adv Const Payback

NEW IPSWICH 14465

NH 123 / 124 REPLACE BRIDGE OVER SOUHEGAN RIVER - 157/093 {Red List} ATT5.044 2011 Bridge Priority #10

.1652013P .165 .000.000 Bridge On/Off System.033

.1102013 .110 .000.000 Equity Bonus (Flexible).022

.1652014 .165 .000.000 .033

.2702013R .270 .000.000 .054

1.8062014C 1.806 .000.000 Bridge On/Off System.361

1.9962015 1.996 .000.000 .387

2757 4.5124.512 .000.000Totals .890

NEW LONDON 16051

ELKINS ROAD & WILMOT CENTER ROAD

PEDESTRIAN / BICYCLE IMPROVEMENTS IN ELKINS VILLAGE [09-34TE] ATT.818 Specific project from Statewide program, Local Administration.

.0012013R .001 .000.000 STP-Enhancement

.0242014 .019 .005.000

.6442015C .515 .129.000

7657 .669.535 .134.000Totals

NEW LONDON

16310

NH 114 (Main St) RECONSTRUCTION, NH 11 (CROCKETT'S CORNER) NORTHERLY TO NEWPORT ROAD

(HOMAN'S CORNER)

ATT2.308

.1002014P .080 .000.020 STP-Flexible

.0522015 .041 .000.010

.0252014R .020 .000.005

.0532016 .043 .000.011

3526 .230.184 .000.046Totals

NEWINGTON - DOVER 11238

NH 16 / US 4 / SPLDG TPK WIDEN TURNPIKE INCLUDING LITTLE BAY BRIDGES FROM GOSLING ROAD TO

DOVER TOLL

ATT23.983 Turnpike Capital Program - overall

project for Little Bay bridge and

Newington interchange

construction, pe, & row. Specific Construction projects broken out

separately and include earmark

federal funding.

2.9762013P .000 .0002.976 Turnpike Program

1.0002014 .000 .0001.000

.2502013R .000 .000.250

1.1832014 .000 .0001.183

.2282014C .000 .000.228

.0802015 .000 .000.080

.0802016 .000 .000.080

1191

Regionally Significant 5.797.000 .0005.797Totals

Phase: P - Preliminary Engineering R - Right of Way C - Construction

Page P-31 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6

Page 56: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

Name Rte/Street: Location/Scope of Work

Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category

CommentsCAACode

FiscalYearPhase

Overall ProjectCost $(M)State#

Grouped / ParentRegionally Significant

Adv Const Payback

NEWINGTON - DOVER 11238K

NH 16 / US 4 / SPAULDING

TURNPIKE

RECONFIGURATION AND RELOCATION OF RAMPS AND ACCESS (To provide matching

funds only to the federally-funded portion of the 11238 project for PE, ROW & Construction)

ATT6.709 Specific project breakout from

Newington-Dover 11238, Turnpike

Capital Program.

.0282013C .000 .000.028 Turnpike Program

.0292014 .000 .000.029

.0202015 .000 .000.020

.0202016 .000 .000.020

6138

Regionally Significant .097.000 .000.097Totals

NEWINGTON - DOVER 11238L

NH 16 / US 4 / SPLDG TPK CONSTRUCTION OF LITTLE BAY BRIDGE, INDEPENDENT SISTER STRUCTURE (FROM N-D 11238) [INCLUDES DEMO IDS (NH036), (NH053), (NH070), (NH080), TCSP, AND

TURNPIKE FUNDED REMAINDER]

ATT54.140 Specific project breakout from Newington-Dover 11238, Turnpike

Capital Program.

4.4462013C .000 .0004.446 Turnpike Program

7082

Regionally Significant 4.446.000 .0004.446Totals

NEWINGTON - DOVER

11238M

NH 16 / US 4 / SPLDG TPK EXIT 3 & 4 INTERCHANGE CONSTRUCTION AND MAINLINE TURNPIKE

CONSTRUCTION [PARENT = N-D 11238]

ATT49.450 Partially funded by CITY OF

NEWINGTONSpecific Project Breakout from

Newington-Dover 11238

.0962013C .000 .096.000 Non Participating

.4542013 .000 .454.000

10.9282013 .000 .00010.928 Turnpike Program

23.1302014 .000 .00023.130

11.8552015 .000 .00011.855

7075

Regionally Significant 46.462.000 .55045.912Totals

NEWINGTON - DOVER 11238O

NH 16 / US 4 / SPLDG TPK REHABILITATION OF EXISTING LITTLE BAY BRIDGE & BRIDGE APPROACH

CONSTRUCTION [PARENT N-D 11238]

ATT33.984 Specific project breakout from

Newington-Dover 11238, Turnpike

Capital Program.

9.7512014C .000 .0009.751 Turnpike Program

17.2682015 .000 .00017.268

6.9652016 .000 .0006.965

7077

Regionally Significant 33.984.000 .00033.984Totals

Phase: P - Preliminary Engineering R - Right of Way C - Construction

Page P-32 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6

Page 57: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

Name Rte/Street: Location/Scope of Work

Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category

CommentsCAACode

FiscalYearPhase

Overall ProjectCost $(M)State#

Grouped / ParentRegionally Significant

Adv Const Payback

NEWINGTON - DOVER 11238Q

NH 16, US 4 & SPAULDING

TURNPIKE

EXIT 6 INTERCHANGE AND MAINLINE TURNPIKE CONSTRUCTION, INCLUDING

SOUNDWALLS (PARENT N-D 11238)

ATT42.179 Specific project breakout from

Newington-Dover 11238, Turnpike

Capital Program. Authorized under

HB 391. Funding Contingent on Future Toll Increase.

15.8222014C .000 .00015.822 Turnpike Program

18.4662015 .000 .00018.466

7.8902016 .000 .0007.890

7228

Regionally Significant 42.179.000 .00042.179Totals

NEWINGTON - DOVER 11238S

SPAULDING TURNPIKE / LITTLE BAY BRIDGES

GENERAL SULLIVAN BRIDGE REHABILITATION ATT31.069 Specific project breakout from Newington-Dover 11238, Turnpike

Capital Program. Authorized under

HB 391. Funding Contingent on

Future Toll Increase.

9.3272016C .000 .0009.327 Turnpike Program

7233

Regionally Significant 9.327.000 .0009.327Totals

NEWMARKET

13878

NH 108 CONSTRUCT 4' BIKE SHOULDERS FROM THE SOUTHERLY LIMIT OF PROJECT 13107

IN NEWMARKET TO NEWFIELDS T/L (CMAQ Program) [02-25CM]

ATT.832

.0902013P .090 .000.000 Congestion Mitigation and Air Quality Program.018

.0242015 .024 .000.000 .005

.0042014R .003 .000.001

.0122015 .010 .000.002

.7012015C .701 .000.000 .136

3708 .832.829 .000.003Totals .159

NEWMARKET 16048

NH 108 FACILITY IMPROVEMENTS IN MAIN STREET (NH RTE 108) BETWEEN ELM ST. AND

WILLEY COURT. [09-35TE]

ATT.687 Partially funded by NEWMARKET

Specific project from Statewide

program, Local Administration.

.0382014P .030 .008.000 STP-Enhancement

.0012015 .001 .000.000

.0012015R .001 .000.000

.5472015C .438 .109.000

7654 .587.469 .117.000Totals

Phase: P - Preliminary Engineering R - Right of Way C - Construction

Page P-33 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6

Page 58: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

Name Rte/Street: Location/Scope of Work

Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category

CommentsCAACode

FiscalYearPhase

Overall ProjectCost $(M)State#

Grouped / ParentRegionally Significant

Adv Const Payback

NORTH HAMPTON 24457

US 1 REPLACE BRIDGE OVER BOSTON & MAINE RAILROAD - 148/132 {Redlist Bridge} ATT7.084

.1102013P .088 .000.022 Bridge On/Off System

.1142015 .114 .000.000 .022

.0292016 .029 .000.000 .006

.0282013R .028 .000.000 .006

.0282015 .028 .000.000 .006

.0292016 .029 .000.000 .006

8601 .338.316 .000.022Totals .044

NORTHFIELD - TILTON

16147

I-93 REHABILITATE BRIDGES OVER WINNIPESAUKEE RIVER AND RAILROAD DECK REPLACEMENT - 117/157 & 118/158 (Red List)

ATT16.461 2011 Bridge Prioity #52 & 53

.1982013P .198 .000.000 Bridge On/Off System.040

.2752014 .220 .000.055

.2842015 .227 .000.057

7357 .757.645 .000.112Totals .040

NSTI

NSTI

NA COOPERATIVE PROJECT AGREEMENT WITH THE UNIVERSITY OF NEW HAMPSHIRE

FOR OUTREACH PROGRAM TO INTRODUCE STUDENTS TO ENGINEERING &

TECHNOLOGY. NATIONAL SUMMER TRANSPORTATION INSTITUTE (NSTI)

.221

.0202014P .020 .000.000 Misc- Other Funds

.0312015 .031 .000.000

.0322016 .032 .000.000

11779 .083.083 .000.000Totals

OSSIPEE 10431

NH 16 PAVEMENT REHABILITATION & INTERSECTION IMPROVEMENTS FROM NH 28

NORTH 3.36 MILES

ATT4.862 Scope intent, address pavement

condition and intersection area.

.0882013P .088 .000.000 National Highway (NHPP).018

.1002014 .100 .000.000 .020

.2842015 .284 .000.000 .055

.0592016 .059 .000.000 .011

.0552013R .055 .000.000 .011

.1842014 .184 .000.000 .037

.3412015 .341 .000.000 .066

.0592016 .059 .000.000 .011

95 1.1681.168 .000.000Totals .228

Phase: P - Preliminary Engineering R - Right of Way C - Construction

Page P-34 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6

Page 59: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

Name Rte/Street: Location/Scope of Work

Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category

CommentsCAACode

FiscalYearPhase

Overall ProjectCost $(M)State#

Grouped / ParentRegionally Significant

Adv Const Payback

OSSIPEE 13910

NH 16, NH 25, NH 41 INTERSECTION IMPROVEMENTS IN WEST OSSIPEE AT THE INTERSECTION OF NH 16

AND NH 25

ATT2.617 Scope intent. Immediate

Intersection needs.

.0442013P .044 .000.000 STP-Non Urban Areas Under 5K.009

.0512014 .051 .000.000 National Highway (NHPP).010

.0832015 .083 .000.0002011 Adv Const .017

.0592016 .059 .000.000 .011

.0552013R .044 .000.011

.1952014 .195 .000.000 .039

.0172015 .014 .000.003

.0172016 .017 .000.000 STP-Non Urban Areas Under 5K2011 Adv Const .003

1888 .520.505 .000.014Totals .089

OSSIPEE 14749

NH 16 / NH 25 REPLACE THREE RED LIST BRIDGES 137/299, 137/297, & 152/268 & RESURFACE APPROX 3.2 MILES

ATT11.834 Scope intent to address bridges and pavement condition only. 2011

Bridge Priorities #32, #33, and #34

.1102013P .110 .000.000 National Highway (NHPP).022

.5002014 .500 .000.000

.4542015 .363 .000.091

.0292016 .023 .000.006 STP-Areas Less Than 200K

.0802013R .080 .000.000 National Highway (NHPP).016

.1942015 .155 .000.039

.1172016 .094 .000.023 Bridge On/Off System

2762 1.4841.325 .000.159Totals .038

OSSIPEE 15296A

NUDD ROAD BRIDGE REHABILITATION, WHITTIER COVERED BRIDGE OVER BEARCAMP RIVER -

108/333 {Federal Grant} [National Historic Covered Bridge Preservation Program]

ATT.778 Partially funded by OSSIPEE

.1642013C .132 .033.000 National Historic Covered Bridge Preservation (NHCBP)

6878 .164.132 .033.000Totals

PELHAM 16145

MAIN STREET BRIDGE REPLACEMENT OVER BEAVER BROOK - 110/090 & 111/090 {Both Red List} ATT2.437 2011 Bridge Priority #25 & 122

.0572014P .057 .000.000 Bridge On/Off System.011

.0112015 .009 .000.002

.0112013R .011 .000.0002011 Adv Const .002

.0092015 .007 .000.002

7436 .088.084 .000.004Totals .014

Phase: P - Preliminary Engineering R - Right of Way C - Construction

Page P-35 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6

Page 60: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

Name Rte/Street: Location/Scope of Work

Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category

CommentsCAACode

FiscalYearPhase

Overall ProjectCost $(M)State#

Grouped / ParentRegionally Significant

Adv Const Payback

PEMBROKE 14477A

US 3 / PEMBROKE HILL RD INTERSECTION IMPROVEMENT PROJECT [Section 1702 - Designated Project; Demo Id

NH042 & NH061]

ATT3.229 Earmarked funding.

.0112013P .011 .000.000 High Priority Projects (SAFETEA-LU 2005)

.0222013 .022 .000.000 .004

.0442013 .044 .000.000

.1432013 .143 .000.000 .029

.1652014 .132 .000.033

.1032014R .103 .000.000

.1622015C .130 .000.032

1.4472015 1.158 .000.289

.7892015 .789 .000.000 STP-Flexible.153

6049 2.8872.532 .000.355Totals .186

PETERBOROUGH

14772A

US 202 RECONSTRUCT 1000' AT MAIN STREET INTERSECTION. ALSO RECONSTRUCT

GRANITE BLOCK WALL ALONG US 202 THAT CONNECTS TO MAIN STREET BRIDGE ABUTMENT (Town-Owned)

ATT2.578 Specific project from overall project

(id #2760)

.1282013P .103 .000.026 STP-Areas Less Than 200K

.0982015R .098 .000.000 .019

6501 .226.201 .000.026Totals .019

PETERBOROUGH

15879

US 202 / NH 101 REHABILITATE BRIDGE INCLUDING REPLACE DECK AND PAINT GIRDERS OVER

CONTOOCOOK RIVER - 087/077 {Red List}

ATT.859 2011 Bridge Priority #57

.1532014P .122 .000.031 Bridge On/Off System

.2272015 .182 .000.045

.0232014R .018 .000.005

6779 .402.322 .000.080Totals

PETERBOROUGH 24500

NH 136 BRIDGE REPLACEMENT - 110/115 {Redlist Bridge} ATT.391

.1102013P .110 .000.000 STP-Flexible.022

.0552014 .044 .000.011

.1702015 .136 .000.034

.0282013R .028 .000.000 .006

.0282015 .023 .000.006

8604 .391.340 .000.051Totals .028

PINKHAMS GRANT 16311

NH 16 REHABILITATE / REPLACE BRIDGE OVER NEW RIVER - 058/048 ATT1.270 Prioity Corridor Weight Restricted Bridge (E1)

.0552013P .055 .000.000 National Highway (NHPP).011

7359 .055.055 .000.000Totals .011

Phase: P - Preliminary Engineering R - Right of Way C - Construction

Page P-36 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6

Page 61: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

Name Rte/Street: Location/Scope of Work

Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category

CommentsCAACode

FiscalYearPhase

Overall ProjectCost $(M)State#

Grouped / ParentRegionally Significant

Adv Const Payback

PLAISTOW 10044G

NH 125 RECONSTRUCT EAST RD TO OLD RD (Parent = Plaistow-Kingston 10044B) ATT8.650 Specific project breakout project

from Plaistow-Kingston project.

6.6232016C 5.298 .0001.325 National Highway (NHPP)

.2132016 .000 .213.000 Non Participating

6371 6.8365.298 .2131.325Totals

PLAISTOW 20163

RAIL EXTEND MBTA COMMUTER RAIL SERVICE FROM HAVERHILL, MA. TO PLAISTOW.

CONSTRUCT PLATFORM & ENCLOSED WAITING AREA. ACQUIRE EASEMENT FOR

CONSTRUCTION OF RAIL SIDING. ACQUIRE LAND FOR LOCOMOTIVE LAYOVER

FACILITY. OPERATE 10 TRAILS ROUND TRIPS [10-17CM]

ATT2.964 Partially funded by PLAISTOW

2.1402015R 1.712 .428.000 Congestion Mitigation and Air Quality Program

7880 2.1401.712 .428.000Totals

PLAISTOW - KINGSTON

10044K

NH 125 RECONSTRUCTION EAST ROAD, PLAISTOW NORTHERLY APPROXIMATELY 6.0 MILES TO MAIN STREET KINGSTON

ATT3.380

.7042013P .704 .000.000 National Highway (NHPP).141

.1102014 .110 .000.000 .022

2.4562013R 2.456 .000.000 .491

.1102014 .110 .000.000 .022

8763 3.3803.380 .000.000Totals .676

PORTSMOUTH

13455

US 1 BYPASS REPLACE BRIDGES OVER THE BYPASS: PE & ROW FOR BRIDGES 173/071,183/087,

188/097, 205/116, 211/114, & 227/112 {Red List}

ATT9.226 Scope intent to address priority of

red list bridges.

.4802013P .480 .000.000 STP-Areas Over 200K.096

.4402013 .440 .000.000 STP-Flexible.088

.5062015 .506 .000.000 Bridge On/Off System

.2002013R .200 .000.000 .040

.2592015 .207 .000.052

2759

Regionally Significant 1.8851.833 .000.052Totals .224

PORTSMOUTH 13455B

US 1 BYPASS REPLACE MIDDLE ROAD BRIDGE (183/087) {Red List} & ISLINGTON STREET BRIDGE

(188/097) {Red List} OVER US 1 BYPASS (Pe & Row in Parent 13455)

ATT5.124 2011 Bridge Priority #19 & 20.

Breakout from 13455

5.1242013C 5.124 .000.000 Bridge On/Off System1.025

7432

Regionally Significant 5.1245.124 .000.000Totals 1.025

PORTSMOUTH

13455C

US 1 BYPASS REPLACE MAPLEWOOD AVENUE BRIDGE OVER US 1 BYPASS - 227/112 {Red List} (Pe

& Row in Parent 13455)

ATT4.987 2011 Bridge Priority #18. Breakout

from 13455

.9872013C .987 .000.000 STP-Areas Less Than 200K.197

4.0002014 3.200 .000.800

7433

Regionally Significant 4.9874.187 .000.800Totals .197

Phase: P - Preliminary Engineering R - Right of Way C - Construction

Page P-37 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6

Page 62: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

Name Rte/Street: Location/Scope of Work

Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category

CommentsCAACode

FiscalYearPhase

Overall ProjectCost $(M)State#

Grouped / ParentRegionally Significant

Adv Const Payback

PORTSMOUTH 14417

GRAFTON DRIVE TRADE PORT MULTI-USE PATH - CONSTRUCT A MULTI USE PATH ALONG GRAFTON

DR BETWEEN NH AVENUE AND PORTSMOUTH TRANSPORTATION CENTER, AND

BETWEEN PEASE GOLF COURSE AND AIRPORT RD (TE Program) [04-54TE]

ATT1.400 Specific project from Statewide

program, Local Administration.

.3322013C .332 .000.000 STP-Flexible.066

5655 .332.332 .000.000Totals .066

PORTSMOUTH 20222A

NH 33/Grafton Dr. RESTRIPE/EXPAND PORTSMOUTH TRANSPORTATION CENTER PARKING TO

ACCOMMODATE EAST-WEST EXPRESS. (CMAQ)

ATT.676

.1102014P .088 .000.022 Congestion Mitigation and Air Quality Program

.0552014R .044 .000.011

.5112015C .409 .000.102

11759 .676.541 .000.135Totals

PORTSMOUTH 20222B

NH33/GRAFTON DR RE-STRIPE EXISTING LOT & MINOR WIDENING TO ACCOMMODATE IMMEDIATE NEED FOR EAST-WEST SERVICE

ATT.880

.8802014C .704 .000.176 Congestion Mitigation and Air Quality Program

11782 .880.704 .000.176Totals

PORTSMOUTH

20255

WOODBURY AVE /

MARKET ST / GRANITE ST

UPGRADE 5 EXISTING TRAFFIC CONTROLLERS AND INTERCONNECTS [10-18CM] ATT.348 Partially funded by TOWN OF

PORTSMOUTH

.0622015P .050 .012.000 Congestion Mitigation and Air Quality Program

.2862015C .229 .057.000

7892 .348.279 .070.000Totals

PORTSMOUTH 20258

PEVERLY HILL ROAD CONST NEW SIDEWALK AND STRIPED BICYCLE SHOULDERS & ASSOCIATED

DRAINAGE TO PROMOTE SAFE BIKING & WALKING [10-19CM]

ATT.472 Partially funded by PORTSMOUTH

.0582015P .047 .012.000 Congestion Mitigation and Air Quality Program

.4142015C .331 .083.000

7894 .472.378 .094.000Totals

PORTSMOUTH 27690

US 1 BY-PASS CULVERT REPLACEMENT, US 1 BY-PASS OVER HODGSON BROOK NO 192/1062.743

.2202014P .220 .000.000 Bridge On/Off System.044

.0282014R .028 .000.000 .006

11753 .248.248 .000.000Totals .050

Phase: P - Preliminary Engineering R - Right of Way C - Construction

Page P-38 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6

Page 63: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

Name Rte/Street: Location/Scope of Work

Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category

CommentsCAACode

FiscalYearPhase

Overall ProjectCost $(M)State#

Grouped / ParentRegionally Significant

Adv Const Payback

PORTSMOUTH - MANCHESTER 68087

VARIOUS BUS SERVICE BETWEEN PORTSMOUTH & MANCHESTER. CONNECT PORTSMOUTH,

DOWNTOWN MANCHESTER & BR AIRPORT [06-02CM]

N/E5.059 Specific project from Statewide

program, Local Administration.

.1032013C .103 .000.000 CMAQ Transfer.021

1.0632014 1.063 .000.000 .213

.8602015 .860 .000.000 .167

.5332016 .533 .000.000 .100

7881 2.5592.559 .000.000Totals .500

PORTSMOUTH, NH - KITTERY, ME

13678F

US 1 MEMORIAL BRIDGE OVER PISCATAQUA RIVER - 247/084 {Red List}, BASED ON CONNECTION STUDY. REPLACEMENT OF SCOTT AVENUE BRIDGE AND

REHABILITATION OF THE KITTERY APPROACH SPANS

ATT98.601 2011 Bridge Priority #1. Funding split with Maine. TIGER Grant

funding being received.

11.8752013C 11.875 .000.000 Bridge On/Off System

1.4432013 1.443 .000.000 STP-Enhancement.289

.4412014 .000 .441.000 Non Participating

7.9322014 6.346 .0001.586 STP-Flexible

7262

Regionally Significant 21.69119.664 .4411.586Totals .289

PORTSMOUTH, NH -

KITTERY, ME 15731

US 1 BYPASS BRIDGE REPLACEMENT & PAINT OVER PISCATAQUA RIVER - 251/108 (Sarah Mildred

Long Bridge) (Red List)

ATT183.765 Partially funded by MAINE

2011 Bridge Priority #2. Funding

as outlined in Bi-State Task Force report.

3.4402013P .000 3.440.000 Non Participating

3.4332013 3.433 .000.000 STP-Flexible.687

3.7502014 3.750 .000.000 Bridge On/Off System

3.4602014 .000 3.460.000 Non Participating

.6052015 .605 .000.000 Bridge On/Off System

.0502013R .000 .050.000 Non Participating

.0502013 .050 .000.000 STP-Flexible.010

.4502014 .450 .000.000 Bridge On/Off System.090

.2002014 .000 .200.000 Non Participating

19.8002015C 19.800 .000.000 Bridge On/Off System

28.0502015 .000 28.050.000 Non Participating

19.8002016 19.800 .000.000 Bridge On/Off System

34.0002016 .000 34.000.000 Non Participating

5559 117.08847.888 69.200.000Totals .787

Phase: P - Preliminary Engineering R - Right of Way C - Construction

Page P-39 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6

Page 64: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

Name Rte/Street: Location/Scope of Work

Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category

CommentsCAACode

FiscalYearPhase

Overall ProjectCost $(M)State#

Grouped / ParentRegionally Significant

Adv Const Payback

PORTSMOUTH-KITTERY 13678H

RTE 1 PREPARATION OF THE NATIONAL REGISTER HISTORIC DISTRICT NOMINATION FOR

PORTSMOUTH DOWNTOWN DISTRICT

.187 Partially funded by MAINE

.0382014C .000 .038.000 Non Participating

.0412014 .033 .000.008 STP-Flexible

.0522015 .000 .052.000 Non Participating

.0572015 .045 .000.011 STP-Flexible

11778 .187.078 .089.020Totals

RAYMOND 20818

DUDLEY ROAD REMOVAL OF BRIDGE, WINGS, AND PIER OVER LAMPREY RIVER - 083/154 {Red List} ATT.010

.0052013P .005 .000.000 Bridge Off System.001

.0052013R .005 .000.000 .001

7993 .011.011 .000.000Totals .002

ROCHESTER

14350

NH 202A (WALNUT STREET) INTERSECTION IMPROVEMENTS TO IMPROVE SAFETY THROUGH STRAFFORD

SQUARE, NORTH MAIN, & WASHINGTON STREETS

ATT1.461 Partially funded by ROCHESTER

Local Administration, 20% city match.

.5252014R .420 .105.000 STP-Hazard Elimination

.7462016C .596 .149.000

2750 1.2711.016 .254.000Totals

ROCHESTER

20254

US 202 CONSTRUCT 201 SPACE PARK-N-RIDE LOT ADJACENT TO US 202 [10-16CM] ATT2.452

.0532013P .053 .000.000 Congestion Mitigation and Air Quality Program

.0132013 .000 .013.000 Turnpike Program

.0152014 .000 .015.000 Non Participating

.0152013R .015 .000.000 Congestion Mitigation and Air Quality Program

.4472013 .447 .000.000

.0042013 .000 .000.004 Turnpike Program

.1122013 .000 .112.000

1.6382013C 1.638 .000.000 Congestion Mitigation and Air Quality Program

7900

Regionally Significant 2.2962.152 .140.004Totals

Phase: P - Preliminary Engineering R - Right of Way C - Construction

Page P-40 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6

Page 65: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

Name Rte/Street: Location/Scope of Work

Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category

CommentsCAACode

FiscalYearPhase

Overall ProjectCost $(M)State#

Grouped / ParentRegionally Significant

Adv Const Payback

ROXBURY - SULLIVAN 10439

NH 9 RECONSTRUCT SHOULDERS & WIDEN FROM EAST SULLIVAN, SOUTH 2.04 MI,

INCLUDING BRIDGE REPLACEMENT - 093/061 (Red List)

ATT8.332 Scope intent to address bridge,

pavement and safety improvement

on existing alignment. 2011 Bridge

Priority #64.

.2312013P .231 .000.000 National Highway (NHPP).046

.2342015 .234 .000.000 .045

.1872016 .187 .000.000 .035

.0572015R .057 .000.000 .011

.2342016 .234 .000.000 .044

102 .944.944 .000.000Totals .182

SALEM 12334

NH 28 RECONSTRUCT INTERSECTION, MAIN STREET @ DEPOT STREET, INCLUDING SIGNALS, LEFT TURN LANES & APPROACHES [MUPCA*450] {Municipal Urban Program}

ATT4.227 Partially funded by SALEMMunicipal jurisdiction at 20%

match.

.0812015P .065 .016.000 STP-Areas Over 200K

.2132016 .170 .043.000

.0092013R .007 .002.000

.7502016 .600 .150.0002008 Adv Const

630 1.053.842 .211.000Totals

SALEM

16031

MANCHESTER &

LAWRENCE RAIL

CORRIDOR

MULTI-USE TRAIL IMPROVEMENTS IN SALEM & WINDHAM [09-47TE] ATT1.121 Partially funded by SALEM

Specific project from Statewide

program, Local Administration.

.1522014P .122 .030.000 STP-Enhancement

.0012014R .001 .000.000

.9682015C .774 .194.000

7636 1.121.897 .224.000Totals

SALEM TO MANCHESTER 10418

I-93 PROGRAMMATIC MITIGATION (CTAP, NHDES Land Protection Program) (PE & ROW Only)

[Section 117 - Designated Project; Demo Id NH032, SEE 13933K]

N/E7.110 I-93 reconstruction. Costs reflect

PE and ROW needs necessary to go

forward with construction..

.2172013P .217 .000.000 National Highway (NHPP).043

.4402015 .440 .000.000 Interstate Maintenance.044

.1102016 .110 .000.000 .011

.5002015R .500 .000.000 National Highway (NHPP).100

1.0002016 1.000 .000.000 .200

66

Regionally Significant 2.2672.267 .000.000Totals .398

Phase: P - Preliminary Engineering R - Right of Way C - Construction

Page P-41 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6

Page 66: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

Name Rte/Street: Location/Scope of Work

Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category

CommentsCAACode

FiscalYearPhase

Overall ProjectCost $(M)State#

Grouped / ParentRegionally Significant

Adv Const Payback

SALEM TO MANCHESTER 10418C

I-93 RECONSTRUCT & WIDEN MAINLINE, ENVIRONMENTAL IMPACT STUDY AND FINAL

DESIGN FROM MASS S/L IN SALEM TO I-293 IN MANCHESTER (PE & ROW Only)

[Section 1602 - Designated Project; Demo Id NH014]

N/E154.858 Overall, corridor project overall for

PE & ROW, construction broken

out to individual projects.

1.7472013P 1.747 .000.000 Interstate Maintenance.175

.5502014 .495 .000.055

5.8672013R 5.867 .000.000

4.7362014 4.262 .000.474

69

Regionally Significant 12.90012.371 .000.529Totals .175

SALEM TO MANCHESTER

10418H

I-93 PARK & RIDE @ EXIT 3 (Windham) (CMAQ Program) [Part of 04-33CM] N/E8.433 Reflects current construction sequencing and costs. GARVEE

bonding to facilitate construction

program.

.3102015C .310 .000.000 Congestion Mitigation and Air Quality Program.062

.5002015 .500 .000.000 STP-Flexible.100

5.6902016 5.690 .000.000 1.138

3138

Regionally Significant 6.5006.500 .000.000Totals 1.300

SALEM TO

MANCHESTER 10418L

I-93 IMPLEMENT EXPANDED BUS SERVICE & NEW COMMUTER INCENTIVE PROGRAM.

PURCHASE 14 COMMUTER COACHES & PROVIDE 3 YEARS OF OPERATING SUPPORT

(CMAQ Program) [04-04CM]

N/E12.500

.7002013C .700 .000.000 STP-Areas Less Than 200K.140

.7002014 .700 .000.000 .140

5613 1.4001.400 .000.000Totals .280

SALEM TO MANCHESTER 10418T

I-93 CORRIDOR SERVICE PATROL (Salem to Manchester) E-7.899 Service to help manage incidents

and reduce delay.

.0752013P .075 .000.000 National Highway (NHPP).015

.0752014 .060 .000.015

.1002015 .080 .000.020

.1002016 .080 .000.020

7112 .350.295 .000.055Totals .015

SALEM TO MANCHESTER

10418V

I-93 FINAL DESIGN SERVICES FOR PE AND ROW (Garvee 2012 FUNDED) [14800H = Debt Service]

N/E9.400

8.0002013P .000 .0008.000 Garvee Bond

1.4002013R .000 .0001.400

8650 9.400.000 .0009.400Totals

Phase: P - Preliminary Engineering R - Right of Way C - Construction

Page P-42 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6

Page 67: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

Name Rte/Street: Location/Scope of Work

Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category

CommentsCAACode

FiscalYearPhase

Overall ProjectCost $(M)State#

Grouped / ParentRegionally Significant

Adv Const Payback

SALEM TO MANCHESTER 10418W

I-93 WATER QUALITY STUDY [Section 1702 - Designated Project; Demo Id NH054, Demo NH087] E-346.608 Earmark funds to help address salt

issues.

.9062013P .724 .000.181 High Priority Projects (SAFETEA-LU 2005)2008 Adv Const

.9902014 .792 .000.1982008 Adv Const

.6532015 .523 .000.1312008 Adv Const

.6812016 .544 .000.136

1.2382016 1.238 .000.000

.0282016 .023 .000.006 STP-Flexible

6052 4.4953.844 .000.652Totals

SALEM TO MANCHESTER

13933D

I-93 MAINLINE, EXIT 1 TO STA. 1130 & NH38 (Salem), INCLUDES BRIDGES 073/063 & 077/063 {Both Red List} [Partial Garvee Bonded Project] (Parent = Salem to Manchester

13933*) (14800A = Debt & 13933D = Const)

N/E32.754 Reflects current construction sequencing and costs. GARVEE

bonded construction project. 2011

Bridges Priorities #2 and #3

.8532013C .000 .000.853 Garvee Bond

4.0002013 .000 .0004.000

7893 4.853.000 .0004.853Totals

SALEM TO

MANCHESTER 13933E

I-93 EXIT 2 INTERCHANGE RECONSTRUCTION, INCLUDING I-93 MAINLINE & NH97,

INCLUDES BRIDGES 068/078 & 070/079 {Both Red List}(Tracked under the 14800E Project)

(Salem) (Parent = Salem to Manchester)

N/E40.587 Reflects current construction

sequencing and costs. GARVEE

bonding to facilitate construction program. 2011 Bridges Priorities

#5 and #6.

12.8122013C .000 .00012.812 Garvee Bond

13.4162014 .000 .00013.416

11.2812015 .000 .00011.281

3819 37.509.000 .00037.509Totals

SALEM TO MANCHESTER

13933H

I-93 EXIT 3 AREA RECONSTRUCT THE NB MAINLINE, NB RAMPS, EASTERLY PORTION OF

NH 111, NH11A RELOCATION AND REMOVAL OF EXISTING NB BRIDGES (WINDHAM)

(SEGMENT III CONSTRUCTION) [Garvee Bonded Project] (Being Tracked under 14800F)

(Parent = Salem to Manchester 139

N/E35.475 Reflects current construction

sequencing and costs. GARVEE

bonding to facilitate construction

program.

2.0502013C .000 .0002.050 Garvee Bond

15.5652014 .000 .00015.565

14.5002015 .000 .00014.500

.0482015 .000 .048.000 Non Participating

3.3122016 .000 .0003.312 Garvee Bond

3817 35.475.000 .04835.426Totals

Phase: P - Preliminary Engineering R - Right of Way C - Construction

Page P-43 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6

Page 68: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

Name Rte/Street: Location/Scope of Work

Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category

CommentsCAACode

FiscalYearPhase

Overall ProjectCost $(M)State#

Grouped / ParentRegionally Significant

Adv Const Payback

SALEM TO MANCHESTER 13933I

I-93 EXIT 3 AREA, RECONSTRUCT SOUTHBOUND MAINLINE FROM BROOKDALE ROAD

TO NORTH OF NH111, INCLUDING THE SOUTHBOUND ON RAMP AND THE NORTH

BOUND ON RAMP (WINDHAM) [Parent = Sal-Man 13933*]

N/E39.544 Reflects current construction

sequencing and costs. GARVEE

bonding to facilitate construction

program.

12.5072013C .000 .00012.507 Garvee Bond

12.5492014 .000 .00012.549

12.1702015 .000 .00012.170

1.1482016 .000 .0001.148

3820 38.374.000 .00038.374Totals

SALEM TO MANCHESTER

13933N

I-93 EXIT 3 AREA, RECONSTRUCT THE SB MAINLINE BRIDGES OVER NH 111 AND NH 111A (Windham) - 134/101 & 135/090 {Both Red List} (Garvee Bond Project)

N/E14.459 Partially funded by GARV BOND ISSUE #1

Reflects current construction

sequencing and costs. GARVEE

bonded construction project. 2011 Bridge Priority #4 & 22

6.4592013C .000 6.459.000 Garvee Bond

7958 6.459.000 6.459.000Totals

SALEM TO

MANCHESTER 14633F

I-93 EXIT 5 AREA, RECONSTRUCT INTERCHANGE INCLUDING NORTH BOUND AND

SOUTH BOUND MAINLINE AND NORTH BOUND OFF-RAMP, INCLUDES BRIDGES

096/163, 097/163, 099/160, & 100/160 {All Red List} (Londonderry) (Garvee Bonded)

N/E37.975 Reflects current construction

sequencing and costs. GARVEE

bonded construction project. 2011 Bridges Priorities #6, #7, #8, and

#9.

11.4722013C .000 .00011.472 Garvee Bond2011 Adv Const

.0002013 .000 .000.000 High Priority Grants (STEA04_Ext_2005)

1.9802013 1.980 .000.000 High Priority Projects (SAFETEA-LU 2005)

1.5212014 1.217 .000.304 National Highway (NHPP)2011 Adv Const

6338 14.9733.197 .00011.776Totals

SALEM TO MANCHESTER

14800A

I-93 MAINLINE, EXIT 1 TO STA. 1130 & NH38 (Salem), INCLUDES BRIDGES 073/063 & 077/063

{Both Red List} [Partial Garvee Bonded Project] (Parent = Salem to Manchester 13933*)

[14800A=DEBT SERVICE & 13933D=CONST]

N/E52.248 GARVEE Bond debt service,

interim issuance approximately $3.5

million annually through 2019

increasing to approximately 17

Million annually through 2026. Debt Service portion with specific

construction project. 2011 Bridges

Priorities #2 and #3

.6402014C .000 .000.640 Garvee Bond Related

.8582014 .686 .000.172 National Highway (NHPP)

.6402015 .000 .000.640 Garvee Bond Related

.8582015 .686 .000.172 National Highway (NHPP)

.6402016 .000 .000.640 Garvee Bond Related

.8582016 .686 .000.172 National Highway (NHPP)

3818 4.4952.059 .0002.436Totals

Phase: P - Preliminary Engineering R - Right of Way C - Construction

Page P-44 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6

Page 69: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

Name Rte/Street: Location/Scope of Work

Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category

CommentsCAACode

FiscalYearPhase

Overall ProjectCost $(M)State#

Grouped / ParentRegionally Significant

Adv Const Payback

SALEM TO MANCHESTER 14800B

I-93 EXIT 5 AREA, RECONSTRUCT INTERCHANGE INCLUDING NB & SB MAINLINE & NB

OFF-RAMP, INCLUDES BRIDGES 096/163, 097/163, 099/160 & 100/160 {All Red List}

(Londonderry) (Garvee Bonded) [14800B = Debt Service & 14633F = Const]

E-055.130 GARVEE Bond debt service,

interim issuance approximately $3.5

million annually through 2019

increasing to approximately 17 Million annually through 2026.

Debt Service portion with specific

construction project.

.9052014C .724 .000.181 Bridge On/Off System2011 Adv Const

.6762014 .000 .000.676 Garvee Bond Related2011 Adv Const

.9052015 .724 .000.181 Bridge On/Off System2011 Adv Const

.6762015 .000 .000.676 Garvee Bond Related2011 Adv Const

.9052016 .724 .000.181 Bridge On/Off System2011 Adv Const

.6762016 .000 .000.676 Garvee Bond Related2011 Adv Const

7895 4.7422.173 .0002.570Totals

SALEM TO

MANCHESTER 14800C

I-93 PROJECT INITIATED TO TRACK GARVEE BOND DEBT SERVICE ATTRIBUTABLE TO

THE 13933N PROJECT [SB MAINLINE BRIDGES OVER NH 111 AND NH 111A] [134/101 & 135/090] {Both Red List} (Garvee Bond Project)

E-019.175 GARVEE Bond debt service,

interim issuance approximately $3.5 million annually through 2019

increasing to approximately 17

Million annually through 2026.

Debt Service portion with specific construction project.

.2372014C .000 .000.237 Garvee Bond Related

.3172014 .285 .000.032 National Highway (NHPP)

.2372015 .000 .000.237 Garvee Bond Related

.3172015 .285 .000.032 National Highway (NHPP)

.2372016 .000 .000.237 Garvee Bond Related

.3172016 .285 .000.032 National Highway (NHPP)

7952 1.662.856 .000.805Totals

SALEM TO MANCHESTER

14800D

I-93 PROJECT INITIATED TO TRACK GARVEE BOND DEBT SERVICE ATTRIBUTABLE TO

EHT 13933I PROJECT {Both Red List} [Partial Garvee Bonded Project] (Parent = Salem to

Manchester 13933*)

E-042.233

4.8042013C 4.804 .000.000 National Highway (NHPP)2012 Adv Const .961

4.7342014 4.734 .000.0002012 Adv Const .947

4.7692015 4.769 .000.0002012 Adv Const .954

.1202015 .000 .120.000 Non Participating2012 Adv Const

4.7692016 4.769 .000.000 National Highway (NHPP)2012 Adv Const .954

7953 19.19619.075 .120.000Totals 3.815

Phase: P - Preliminary Engineering R - Right of Way C - Construction

Page P-45 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6

Page 70: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

Name Rte/Street: Location/Scope of Work

Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category

CommentsCAACode

FiscalYearPhase

Overall ProjectCost $(M)State#

Grouped / ParentRegionally Significant

Adv Const Payback

SALEM TO MANCHESTER 14800E

I-93 PROJECT INITIATED TO TRACK GARVEE BOND DEBT SERVICE ATTRIBUTABLE TO

THE 13933E PROJECT.[Partial Garvee Bonded Project] (Parent = Salem to Manchester 13933*)

E-043.343

4.9242013C 4.924 .000.000 Interstate Maintenance.492

4.8522014 4.366 .000.485

4.8882015 3.910 .000.978 STP-Flexible

4.8882016 4.399 .000.489 Interstate Maintenance

7954 19.55117.600 .0001.952Totals .492

SALEM TO MANCHESTER

14800F

I-93 PROJECT INITIATED TO TRACK GARVEE BOND DEBT SERVICE ATTRIBUTABLE TO THE 13933H PROJECT [Partial Garvee Bonded Project] (Parent = Salem to Manchester 13933*)

E-037.329

3.6902013C 3.690 .000.000 National Highway (NHPP)

.5222013 .000 .000.522 Non Participating

4.2822014 3.426 .000.856 National Highway (NHPP)

4.4522015 3.562 .000.890

.0522015 .000 .052.000 Non Participating

5.5462016 4.437 .0001.109 National Highway (NHPP)

7955 18.54415.114 .0523.378Totals

SALEM TO

MANCHESTER 14800H

I-93 FINAL DESIGN SERVICES FOR PE AND ROW (Garvee 2012 bond issue) [DEBT SERVICE

PROJECT FOR FINAL DESIGN PROJECT 10418V]

E-09.633

.9142013P .914 .000.000 National Highway (NHPP).183

1.0682014 1.068 .000.000 .214

1.1032015 1.103 .000.000 .214

1.1382016 1.138 .000.000 .214

.1722013R .172 .000.000 .034

.2012014 .201 .000.000 .040

.2082015 .208 .000.000 .040

.2152016 .215 .000.000 .040

8651 5.0205.020 .000.000Totals .979

SALEM TO MANCHESTER

16477

I-93 MAINTENANCE PERIOD OF 'ITS' FOR PARENT PROJECT*3888. E-6.252

.0632013C .063 .000.000 Interstate Maintenance.006

.1262013 .126 .000.000 .013

.0632014 .057 .000.006

8387 .252.245 .000.006Totals .019

Phase: P - Preliminary Engineering R - Right of Way C - Construction

Page P-46 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6

Page 71: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

Name Rte/Street: Location/Scope of Work

Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category

CommentsCAACode

FiscalYearPhase

Overall ProjectCost $(M)State#

Grouped / ParentRegionally Significant

Adv Const Payback

SALEM-MANCHESTER 10418X

I-93 FINAL DESIGN (PE) AND ROW FOR I-93 SALEM TO MANCHESTER CORRIDOR POST

JUNE 30, 2014.

5.719

.3582014P .322 .000.036 Interstate Maintenance

2.2002015 1.980 .000.220

1.0162016 .915 .000.102

.5502014R .495 .000.055

1.1002015 .990 .000.110

.4952016 .446 .000.050

11781 5.7195.147 .000.572Totals

SANBORNTON 16154

I-93 BOX CULVERT REHABILITATION OVER SALMON BROOK - 127/099 {Red List} ATT1.177 2011 Bridge Priority #59

.0882014P .088 .000.000 Bridge On/Off System.018

.0792015 .064 .000.016

.0112014R .009 .000.002

7729 .178.160 .000.018Totals .018

SEABROOK

15769

NH 107 BRIDGE WIDENING OVER I-95 AND REHABILITATION OF EXISTING PORTION OF

BRIDGE {Turnpike}

ATT7.040 Specific project from HB 391,

Turnpike Capital Program. Supplemental to developer

improvements.

.0502013C .000 .000.050 Turnpike Program

7305

Regionally Significant .050.000 .000.050Totals

SEACOAST 14818

SEACOAST COMMUTER OPTIONS - PROGRAM EXPANSION / ACCELERATED

IMPLEMENTATION (CMAQ Program) [06-25CM]

ATT.402 Partially funded by TURNPIKES

HARD MATCH

.1282013C .102 .026.000 Congestion Mitigation and Air Quality Program

.1342014 .107 .027.000

6227 .262.209 .052.000Totals

SEACOAST 20244

VARIOUS THROUGH CAPITAL EQUIPMENT PURCHASES AND OPERATING SUPPORT THE

PROJECT WILL INCREASE PEAK-HOUR TRANSIT SERVICES [10-12CM]

ATT6.557 Partially funded by TURNPIKE

FUNDS (SEE APPLICATION FOR

DETAILS)

1.1042013C .883 .221.000 Congestion Mitigation and Air Quality Program

1.1042014 .883 .221.000

7885 2.2071.766 .441.000Totals

SOMERSWORTH

16049

HIGH, MARKET, & MAIN

STREETS

PEDESTRIAN / BICYCLE IMPROVEMENT [09-48TE] ATT.474 Partially funded by

SOMERSWORTHSpecific project from Statewide

program, Local Administration.

.3882014C .311 .078.000 STP-Enhancement

7655 .388.311 .078.000Totals

Phase: P - Preliminary Engineering R - Right of Way C - Construction

Page P-47 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6

Page 72: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

Name Rte/Street: Location/Scope of Work

Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category

CommentsCAACode

FiscalYearPhase

Overall ProjectCost $(M)State#

Grouped / ParentRegionally Significant

Adv Const Payback

SOMERSWORTH, NH - BERWICK, ME 12228

NH 9 BRIDGE REHABILITATION OVER SALMON FALLS RIVER - 101/114 [Demo Id NH082] ATT3.000 Local Administration.

.0602013P .060 .000.000 High Priority Projects (SAFETEA-LU-EXT 2010)

.0702013 .070 .000.000

.0602013 .000 .060.000 Non Participating

.0702013 .000 .070.000

.0052013R .005 .000.000 High Priority Projects (SAFETEA-LU-EXT 2010)

.0052013 .000 .005.000 Non Participating

1.0302014C .824 .206.000 Bridge On/Off System

.3152014 .315 .000.000 High Priority Projects (SAFETEA-LU-EXT 2010)

1.3452014 .000 1.345.000 Non Participating

417 2.9601.274 1.686.000Totals

SPRINGFIELD

20509

GEORGES MILLS ROAD REHAB OR REPLACE TWIN 5' DIA. CULVERTS CARRYING STARK LAKE OUTLET AT

INTERSECTION OF FISHER CORNER RD - 091/048 {Red List}

ATT.924

.0402013P .040 .000.000 STP-Flexible.008

.0502014 .050 .000.000

.0512015 .041 .000.010

.0062016 .005 .000.001

.0052013R .005 .000.000 .001

.0062014 .006 .000.000

.0062015 .005 .000.001

.7612016C .609 .000.152

7987 .924.759 .000.165Totals .009

STARK 20224

NORTHSIDE ROAD BRIDGE REHABILITATION OVER UPPER AMMONOOSUC RIVER - 115/091 {Red List} -

STARK COVERED BRIDGE. NHCBP(NH COVERED BRIDGE PRESERVATION)

[SAB*4216] {State Aid Bridge Program}

ATT1.518 Partially funded by TOWN OF

STARK

Specific project from Statewide

program, Local Administration.

.0302013P .000 .006.024 State Aid Bridge

.0022014 .000 .000.002

.0012014R .000 .000.001

.8322013C .666 .000.166 National Historic Covered Bridge Preservation (NHCBP)

.2082013 .000 .042.166 State Aid Bridge

.3552013 .000 .071.284

7908 1.428.666 .119.643Totals

Phase: P - Preliminary Engineering R - Right of Way C - Construction

Page P-48 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6

Page 73: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

Name Rte/Street: Location/Scope of Work

Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category

CommentsCAACode

FiscalYearPhase

Overall ProjectCost $(M)State#

Grouped / ParentRegionally Significant

Adv Const Payback

STATEWIDE

TRANSIT ELDERLY AND PERSONS WITH DISABILITIES TRANSPORTATION PROGRAM E-21(Annual) Partially funded by LOCAL

AGENCIES

Replaces deficient vehicles serving

elderly and disabled people. Uses local match. Cost decrease reflects

anticipated federal revenue.

.9312013 .745 .186.000 FTA 5310 Capital Program

.9312014 .745 .186.000

.9312015 .745 .186.000

.9312016 .745 .186.000

3505 Grouped3.7242.979 .745.000Totals

STATEWIDE

TRANSIT RURAL PUBLIC TRANSIT E-21(Annual) Partially funded by RURAL TRANSIT SYSTEMS

Continues transit service in

communities outside urbanized

areas. Uses local match.

7.0002013 4.200 2.800.000 FTA 5311 Capital & Operating Program

7.0002014 4.200 2.800.000

7.0002015 4.200 2.800.000

7.0002016 4.200 2.800.000

3506 Grouped28.00016.800 11.200.000Totals

STATEWIDE

TRANSIT JOB ACCESS & REVERSE COMMUTE E-21(Annual) Partially funded by LOCAL

Supports transportation services

providing access to employment.

.7002013 .350 .350.000 FTA 5316 JARC

.7002014 .350 .350.000

.7002015 .350 .350.000

.7002016 .350 .350.000

6290 Grouped2.8001.400 1.400.000Totals

STATEWIDE

TRANSIT NEW FREEDOMS INITIATIVE E-21(Annual) Partially funded by LOCALSupports transportation services for

persons with disabilities.

.6802013 .340 .340.000 FTA 5317 New Freedom Program

.6802014 .340 .340.000

.6802015 .340 .340.000

.6802016 .340 .340.000

6291 Grouped2.7201.360 1.360.000Totals

Phase: P - Preliminary Engineering R - Right of Way C - Construction

Page P-49 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6

Page 74: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

Name Rte/Street: Location/Scope of Work

Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category

CommentsCAACode

FiscalYearPhase

Overall ProjectCost $(M)State#

Grouped / ParentRegionally Significant

Adv Const Payback

STATEWIDE

TRANSIT ELDERLY AND DISABLED (POINT OF SERVICE) [STP Transfer to 5310] E-215.992 Supports Point of Service

Transportation activities through the

region coordinating committees.

(reflects 1/3 reduction per year from 2011 level)

.5332013C .426 .000.107 STP-Flexible

.5332014 .426 .000.107

.5502015 .440 .000.110

.5682016 .454 .000.114

8334 2.1841.747 .000.437Totals

STATEWIDE 16346

VARIOUS MITIGATION SITE INVESTIGATIONS AND REPORTING, NOISE-SOUNDWALL REPORTING, INVASIVE SPECIES INVESTIGATIONS

E-0.100

.0502013R .050 .000.000 STP-Flexible

.0502014 .050 .000.000 .010

7961 .100.100 .000.000Totals .010

STATEWIDE

20226

VARIOUS EVALUATE & OPTIMIZE TIMING AT 65 SIGNALIZE INTERSECTION TO IMPROVE

TRAFFIC FLOW AND REDUCE DELAYS [10-14 CM]

.334

.0852015P .085 .000.000 Congestion Mitigation and Air Quality Program.017

.0282015C .028 .000.000 .006

7882 .114.114 .000.000Totals .022

STATEWIDE 22912

VARIOUS TITLE RESEARCH ON NHDOT SURPLUS PROPERTIES IN ACCORDANCE WITH NH

TITLE STANDARDS

E-0.500

.4502013R .450 .000.000 STP-Flexible.090

8417 .450.450 .000.000Totals .090

STATEWIDE 27022

VARIOUS MAINTENANCE OF STATEWIDE ITS DEVICES.251

.1382014C .138 .000.000 Interstate Maintenance.014

.1142015 .102 .011.000

11731 .251.240 .011.000Totals .014

Phase: P - Preliminary Engineering R - Right of Way C - Construction

Page P-50 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6

Page 75: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

Name Rte/Street: Location/Scope of Work

Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category

CommentsCAACode

FiscalYearPhase

Overall ProjectCost $(M)State#

Grouped / ParentRegionally Significant

Adv Const Payback

STATEWIDE CBI

PRESERVATION COMPLEX BRIDGE INSPECTION (PARENT) DNA(Annual)

.2502013P .250 .000.000 Bridge On/Off System.050

.2502014 .200 .000.050

.1002014 .000 .100.000 Non Participating

.2502015 .200 .000.050 Bridge On/Off System

.1002015 .000 .100.000 Non Participating

.2502016 .200 .000.050 Bridge On/Off System

.0052013R .004 .000.001

.0052014 .004 .000.001

.0052015 .004 .000.001

.0052016 .004 .000.001

7237 Grouped1.220.866 .200.154Totals .050

STATEWIDE

CRDR

VARIOUS CULVERT REPLACEMENT/REHABILITATION & DRAINAGE REPAIRS (Annual Project) E-19(Annual) Culvert replacement program $1

million annually for preservation needs.

.3002013P .300 .000.000 STP-Flexible.060

.2002014 .160 .000.040

.1002015 .080 .000.020

.1002016 .080 .000.020

.0702013R .070 .000.000 .014

.0302014 .024 .000.006

.0302015 .024 .000.006

.0302016 .024 .000.006

.8702013C .870 .000.000 .174

.8702014 .696 .000.174

.8702015 .696 .000.174

.8702016 .696 .000.174

4157 Grouped4.3403.720 .000.620Totals .248

Phase: P - Preliminary Engineering R - Right of Way C - Construction

Page P-51 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6

Page 76: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

Name Rte/Street: Location/Scope of Work

Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category

CommentsCAACode

FiscalYearPhase

Overall ProjectCost $(M)State#

Grouped / ParentRegionally Significant

Adv Const Payback

STATEWIDE FBRPI

PRESERVATION BRIDGE REHABILITATION, PAINTING, PRESERVATION & IMPROVEMENT PROJECTS

(Federal Program)

E-19(Annual) Bridge preservation program $8

million annually for preservation

needs.

.4002013P .400 .000.000 Bridge On/Off System.080

.1002014 .080 .000.020

.1002015 .080 .000.020

.1002016 .080 .000.020

.0502013R .050 .000.000 .010

.0202014 .016 .000.004

.0202015 .016 .000.004

.0202016 .016 .000.004

11.0002013C 11.000 .000.000 2.200

7.8802014 6.304 .0001.576

7.8802015 6.304 .0001.576

7.8802016 6.304 .0001.576

6601 Grouped35.45030.650 .0004.800Totals 2.290

STATEWIDE

FOHWY

LOW VOLUME CORRIDORS TO ENHANCE NATIONAL BENEFITS BY PROVIDING CONSTRUCTION &

MAINTENANCE OF FOREST HIGHWAYS (Annual Project)

ATT(Annual) Federal specified funding for Forest

Highways.

.0802013P .080 .000.000 Forest Highways

.0802014 .080 .000.000

.0802015 .080 .000.000

.0802016 .080 .000.000

.0202013R .020 .000.000

.0202014 .020 .000.000

.0202015 .020 .000.000

.0202016 .020 .000.000

.7502013C .750 .000.000

.7502014 .750 .000.000

.7502015 .750 .000.000

.7502016 .750 .000.000

444 Grouped3.4003.400 .000.000Totals

Phase: P - Preliminary Engineering R - Right of Way C - Construction

Page P-52 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6

Page 77: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

Name Rte/Street: Location/Scope of Work

Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category

CommentsCAACode

FiscalYearPhase

Overall ProjectCost $(M)State#

Grouped / ParentRegionally Significant

Adv Const Payback

STATEWIDE GRR

PRESERVATION GUARDRAIL REPLACEMENT [Federal Aid Guardrail Improvement Program] (Annual Project) E-9(Annual) Guardrail Replacement program, $2

million annually for preservation

needs.

.1502013P .150 .000.000 STP-Hazard Elimination.030

.1502014 .120 .000.030

.1502015 .120 .000.030

.1502016 .120 .000.030

.0052013R .005 .000.000 .001

.0052014 .004 .000.001

.0052015 .004 .000.001

.0052016 .004 .000.001

1.8802013C 1.504 .000.376

1.8802014 1.504 .000.376

1.8802015 1.504 .000.376

1.8802016 1.504 .000.376

785 Grouped8.1406.543 .0001.597Totals .031

STATEWIDE

HSIP

PRESERVATION HIGHWAY SAFETY IMPROVEMENT PROGRAM (HSIP) [PARENT] E-6(Annual) Federal specified funding for safety

projects in accordance with the

Highway Safety Improvement Program. 50% Discretionary

transfer assumed.

.5752013P .575 .000.000 Highway Safety Improvement Program (HSIP).058

4.0002014 4.000 .000.000 .400

1.0002015 1.000 .000.000 .100

1.0002016 1.000 .000.000 .100

.0452013R .045 .000.000 .005

1.6002014 1.600 .000.000 .160

.5002015 .500 .000.000 .050

.5002016 .500 .000.000 .050

5.0002013C 5.000 .000.000 .500

15.0002014 15.000 .000.000 1.500

7.5002015 7.500 .000.000 .750

7.5002016 7.500 .000.000 .750

6767 Grouped44.22044.220 .000.000Totals 4.422

Phase: P - Preliminary Engineering R - Right of Way C - Construction

Page P-53 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6

Page 78: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

Name Rte/Street: Location/Scope of Work

Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category

CommentsCAACode

FiscalYearPhase

Overall ProjectCost $(M)State#

Grouped / ParentRegionally Significant

Adv Const Payback

STATEWIDE IMPPP

PAVEMENT INTERSTATE MAINTENANCE & INTERSTATE PAVEMENT PRESERVATION PROGRAM

(Annual Program)

E-10(Annual) Interstate paving program, average

of $6 million annually for

preservation needs.

.2002013P .200 .000.000 Interstate Maintenance.020

.2002014 .180 .000.020

.1002015 .090 .000.010

.1002016 .090 .000.010

.0052013R .005 .000.000 .001

.0052014 .005 .000.001

.0052015 .005 .000.001

.0052016 .005 .000.000 .001

9.1902013C 9.190 .000.000 .919

5.9202014 5.328 .000.592

5.9202015 5.328 .000.592

5.9202016 5.328 .000.592

3927 Grouped27.57025.753 .0001.817Totals .940

STATEWIDE

MOBRR

MUNICIPAL MUNICIPAL OWNED BRIDGE REHABILITATION & REPLACEMENT PROJECTS (Federal,

State, Local Funds) (Annual Project)

E-19(Annual) Partially funded by MUNICIPAL

Special Municipal Projects Occupy

the Vacant FYs & Below Normal FY Funding.

.7202013P .576 .144.000 Bridge Off System

.0802014 .064 .016.000

.1002015 .080 .020.000

.1002016 .080 .020.000

.0202013R .016 .004.000

.0202014 .016 .004.000

.0502015 .040 .010.000

.0502016 .040 .010.000

5.0002013C 4.000 1.000.000

5.0002014 4.000 1.000.000

6.0002015 4.800 1.200.000

4.0002016 3.200 .800.000

221 Grouped21.14016.912 4.228.000Totals

Phase: P - Preliminary Engineering R - Right of Way C - Construction

Page P-54 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6

Page 79: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

Name Rte/Street: Location/Scope of Work

Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category

CommentsCAACode

FiscalYearPhase

Overall ProjectCost $(M)State#

Grouped / ParentRegionally Significant

Adv Const Payback

STATEWIDE PRRCS

PAVEMENT PAVEMENT RESURFACING, REHABILITATION & CRACKSEAL PROGRAM & RELATED

WORK (Annual Federal Resurfacing Program)

E-10(Annual) Federal Resurfacing program. $16

million annually for preservation

needs.

1.0252013P 1.025 .000.000 STP-Flexible.205

.5002014 .400 .000.100

.3752015 .300 .000.075

.3752016 .300 .000.075

.2402013R .240 .000.000 .048

.1002014 .080 .000.020

.0252015 .020 .000.005

.0252016 .020 .000.005

29.0002013C 29.000 .000.000 5.800

15.7752014 12.620 .0003.155

15.7752015 12.620 .0003.155

15.7752016 12.620 .0003.155

452 Grouped78.99069.245 .0009.745Totals 6.053

STATEWIDE

PVMRK

TRAFFIC PAVEMENT MARKING (Annual Project) E-11(Annual) Annual pavement striping program

funding.

3.1002013C 3.100 .000.000 STP-Flexible

3.1002014 3.100 .000.000

3.1002015 3.100 .000.000

3.1002016 3.100 .000.000

1146 Grouped12.40012.400 .000.000Totals

Phase: P - Preliminary Engineering R - Right of Way C - Construction

Page P-55 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6

Page 80: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

Name Rte/Street: Location/Scope of Work

Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category

CommentsCAACode

FiscalYearPhase

Overall ProjectCost $(M)State#

Grouped / ParentRegionally Significant

Adv Const Payback

STATEWIDE RCTRL

LOW VOLUME CORRIDORS RECREATIONAL TRAILS FUND ACT- PROJECTS SELECTED ANNUALLY E-33(Annual) Specified Funding for Recreational

Trail Program Administered by

DRED.

.0912013P .091 .000.000 Recreational Trails.018

.0912014 .073 .000.018

.0912015 .073 .000.018

.0912016 .073 .000.018

.0252013R .025 .000.000 .005

.0252014 .020 .000.005

.0252015 .020 .000.005

.0252016 .020 .000.005

1.1252013C 1.125 .000.000 .225

1.1252014 .900 .000.225

1.1252015 .900 .000.225

1.1252016 .900 .000.225

2570 Grouped4.9644.219 .000.745Totals .248

STATEWIDE

RRRCS

RAIL RECONSTRUCTION OF CROSSINGS, SIGNALS, & RELATED WORK (Annual Project) E-1(Annual) Force Account with Railroad to

improve safety of railroad crossings.

.0802013P .080 .000.000 Rail-Hwy: Haz Elim-Protective Devices.008

.0302014 .027 .000.003

.0302015 .027 .000.003

.0302016 .027 .000.003

.0102013R .010 .000.000 .001

.0102014 .009 .000.001

.0102015 .009 .000.001

.0102016 .009 .000.001

.7002013C .700 .000.000 .070

.7002013 .700 .000.000 .070

.1002014 .090 .000.010

.1002014 .090 .000.010

.4002015 .360 .000.040

.4002015 .360 .000.040

.4002016 .360 .000.040

.4002016 .360 .000.040

1147 Grouped3.4103.218 .000.192Totals .149

Phase: P - Preliminary Engineering R - Right of Way C - Construction

Page P-56 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6

Page 81: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

Name Rte/Street: Location/Scope of Work

Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category

CommentsCAACode

FiscalYearPhase

Overall ProjectCost $(M)State#

Grouped / ParentRegionally Significant

Adv Const Payback

STATEWIDE SBCM

LOW VOLUME CORRIDORS SCENIC BYWAYS CORRIDOR MANAGEMENT, PLANNING, AND DEVELOPMENT OF

FACILITIES, TO ENHANCE SCENIC QUALITIES OF NEW HAMPSHIRE (Annual Project)

E-34(Annual) Federal specified funding for

Highways designated as scenic

byways.

.1502013P .120 .000.030 National Scenic Byways Program

.1502014 .120 .000.030

.1002013R .080 .000.020

.1002014 .080 .000.020

.2502013C .200 .000.050

.2502014 .200 .000.050

1155 Grouped1.000.800 .000.200Totals

STATEWIDE SRTS

VARIOUS SAFE ROUTES TO SCHOOL PROGRAM [Parent] [SRTS] {Safe Routes To School Program} E-33(Annual) Federal program under SAFETEA-LU.

.1202013P .120 .000.000 Safe Routes to School

.0452014 .045 .000.000

.1752014 .175 .000.000

.0452015 .045 .000.000

.1752015 .175 .000.000

.0452016 .045 .000.000

.1752016 .175 .000.000

.0252013R .025 .000.000

.0502014 .050 .000.000

.0502015 .050 .000.000

.0502016 .050 .000.000

.6872013C .687 .000.000

.2282014 .228 .000.000

.8252014 .825 .000.000

.0752015 .075 .000.000

.8252015 .825 .000.000

.0752016 .075 .000.000

.8252016 .825 .000.000

6002 Grouped4.4954.495 .000.000Totals

Phase: P - Preliminary Engineering R - Right of Way C - Construction

Page P-57 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6

Page 82: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

Name Rte/Street: Location/Scope of Work

Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category

CommentsCAACode

FiscalYearPhase

Overall ProjectCost $(M)State#

Grouped / ParentRegionally Significant

Adv Const Payback

STATEWIDE SSRR

PAVEMENT SECONDARY SYSTEM RECLAMATION / REHAB WITH VARIOUS PAVEMENT

TREATMENTS [Parent]

E-10(Annual) Secondary road rehabilitation

program, $3 million annually for

preservation needs.

.2002013P .200 .000.000 STP-Flexible.040

.1002014 .080 .000.020

.1002015 .080 .000.020

.1002016 .080 .000.020

.0502013R .050 .000.000 .010

.0202014 .016 .000.004

.0052015 .004 .000.001

.0052016 .004 .000.001

5.7002013C 5.700 .000.000 1.140

2.8952014 2.316 .000.579

2.8952015 2.895 .000.000 .579

2.8952016 2.316 .000.579

4148 Grouped14.96513.741 .0001.224Totals 1.769

STATEWIDE

TRAIN

ADMINISTRATION ANNUAL TRAINING PROGRAM (Annual Project) E-35(Annual) Program Funding for Departmental

Training.

.2002013P .200 .000.000 STP-Flexible.040

.1382014 .110 .000.028

.1382015 .110 .000.028

.1382016 .110 .000.028

451 Grouped.614.531 .000.083Totals .040

STATEWIDE TSMO

TRAFFIC TRANSPORTATION SYSTEMS MANAGEMENT & OPERATIONS (ITS, CARS-511) N/E(Annual) Programmatic operational funding

support for TMC.

.2502013P .250 .000.000 STP-Flexible.050

.2502014 .200 .000.050

.2502015 .200 .000.050

.2502016 .200 .000.050

4227 Grouped1.000.850 .000.150Totals .050

Phase: P - Preliminary Engineering R - Right of Way C - Construction

Page P-58 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6

Page 83: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

Name Rte/Street: Location/Scope of Work

Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category

CommentsCAACode

FiscalYearPhase

Overall ProjectCost $(M)State#

Grouped / ParentRegionally Significant

Adv Const Payback

STATEWIDE UBI

ENG & ROW UNDERWATER BRIDGE INSPECTION (Annual Project) E-38(Annual) Consultant services for underwater

bridge inspections.

.0102013P .010 .000.000 Bridge On/Off System.002

.0102014 .008 .000.002

.0502015 .040 .000.010

.0502016 .040 .000.010

186 Grouped.120.098 .000.022Totals .002

STATEWIDE USSS

TRAFFIC UPDATE SIGNING ON STATE SYSTEM (Annual Project) E-44(Annual) Signing Replacement / Upgrade Program. $0.5M annually for

preservation needs.

.0102013P .010 .000.000 STP-Flexible.002

.0102014 .008 .000.002

.0102015 .008 .000.002

.0102016 .008 .000.002

.5002013C .500 .000.000 .100

.5002014 .400 .000.100

.5002015 .400 .000.100

.5002016 .400 .000.100

2735 Grouped2.0401.734 .000.306Totals .102

STATEWIDE (CCTV) 16229

CONTRACTED SERVICES TO INCLUDE SCHEDULED & UNSCHEDULED

MAINTENANCE, TECHNICAL SUPPORT, ORIGINAL MANUFACTURER REPLACEMENT

PARTS AND SOFTWARE SUPPORT

E-0.044 Specific project from Statewide

program

.0442013C .044 .000.000 STP-Flexible.009

7803 .044.044 .000.000Totals .009

STATEWIDE (DMS) 16230

CONTRACTED SERVICES TO INCLUDE SCHEDULED & UNSCHEDULED

MAINTENANCE, TECHNICAL SUPPORT, ORIGINAL MANUFACTURER REPLACEMENT

PARTS AND SOFTWARE SUPPORT

E-0.011 Specific project from Statewide

program

.0112013C .011 .000.000 STP-Flexible.002

7804 .011.011 .000.000Totals .002

STATEWIDE CONSULTANT

16055

VARIOUS INSPECTION OF SIGN STRUCTURES ON STATE MAINTAINED HIGHWAYS E-13.400 Sign frame structures require in depth inspection every 5 years to

assure structural capacity for safety

purposes.

.0502013P .050 .000.000 STP-Flexible2010 Adv Const .010

.0502014 .040 .000.0102010 Adv Const

2681 .100.090 .000.010Totals .010

Phase: P - Preliminary Engineering R - Right of Way C - Construction

Page P-59 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6

Page 84: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

Name Rte/Street: Location/Scope of Work

Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category

CommentsCAACode

FiscalYearPhase

Overall ProjectCost $(M)State#

Grouped / ParentRegionally Significant

Adv Const Payback

STATEWIDE CULTURAL 16347

VARIOUS CULTURAL RESOURCES, POST-CONSTRUCTION COMMITMENTS FOR FHWA ELIGIBLE

PROJECTS

.073

.0732013R .073 .000.000 STP-Flexible.015

7962 .073.073 .000.000Totals .015

STATEWIDE CULTURAL

16347B

VARIOUS ARCHAEOLOGICAL SURVEY OF SURPLUS LANDS, MONITORING COVENANTS,

HISTORICAL SURVEYS OF RAILROAD CORRIDORS, AND HISTORIC BRIDGE

RELOCATION

E-0.190

.1172013R .093 .000.023 STP-Flexible

7964 .117.093 .000.023Totals

STATEWIDE HAZMAT 16344

VARIOUS CONTAMINATION ISSUES ON POST-CONSTRUCTION ELIGIBLE PROJECTS.144

.0302013R .030 .000.000 STP-Flexible.006

.0302014 .030 .000.000 .006

.0312015 .025 .000.006

7957 .090.084 .000.006Totals .012

STATEWIDE M & R

ACTIVITIES MRSRV

ENG & ROW EQUIPMENT SERVICE & CALIBRATION AGREEMENTS AND PROJECT RELATED

CONSUMABLES (Annual Project)

E-34(Annual) Means of Servicing Sophisticated

Electronic Lab & Materials

Equipment used on Federal Aid Highway & Bridge Projects

.0452013P .045 .000.000 STP-Areas Less Than 200K.009

.0452014 .036 .000.009

.0452015 .036 .000.009

.0452016 .036 .000.009

.0502013C .050 .000.000 .010

.0502014 .040 .000.010

.0502015 .040 .000.010

.0502016 .040 .000.010

3801 Grouped.380.323 .000.057Totals .019

STATEWIDE RWIS 25198

VARIOUS DESIGN, PROCURE AND INSTALL ROAD AND WEATHER INFORMATION SYSTEM INFRASTRUCTURE. FIELD INSTALLED WEATHER STATIONS AND MOBILE WEATHER

DEVICES

.528

.0282013P .028 .000.000 STP-Flexible.006

.0832014 .066 .000.017

.2482014C .198 .000.050

.1702015 .136 .000.034

8635 .528.428 .000.100Totals .006

Phase: P - Preliminary Engineering R - Right of Way C - Construction

Page P-60 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6

Page 85: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

Name Rte/Street: Location/Scope of Work

Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category

CommentsCAACode

FiscalYearPhase

Overall ProjectCost $(M)State#

Grouped / ParentRegionally Significant

Adv Const Payback

STATEWIDE SPECIAL DBE

ADMINISTRATION IN HOUSE ADMINISTRATION OF THE FHWA SUPPORTIVE SERVICES PROGRAM: "DBE"

COMPLIANCE MONITORING (Annual Program)

E-34(Annual) Federal specified funding for

disadvantaged business enterprises.

.1052013P .105 .000.000 STP-DBE

.0752014 .075 .000.000

.0902015 .090 .000.000

.0902016 .090 .000.000

45 Grouped.360.360 .000.000Totals

STATEWIDE SPECIAL LTAP

MUNICIPAL TECHNICAL ASSISTANCE PROGRAM TO RURAL COMMUNITIES AND ORGANIZATIONS THROUGH-OUT THE STATE - (LTAP*10344) (Annual Project)

E-35(Annual) Federal specified funding for providing technical assistance on

transportation issues to

municipalities.

.0302014P .015 .000.015 Transportation Assistance

.1502015 .075 .000.075

58 Grouped.180.090 .000.090Totals

STATEWIDE-TRAC

13668

ADMINISTRATION IMPLEMENT AND PARTICIPATE IN AASHTO TRAC PROGRAM IN LOCAL HIGH

SCHOOLS TO ENCOURAGE STUDENTS TO EXPLORE OPPORTUNITIES IN TRANSPORTATION CAREERS (Annual Program)

E-34(Annual) Program Funding for 'Education

Outreach' Working with Local High Schools.

.0222013P .022 .000.000 STP-Flexible2008 Adv Const .004

.0222014 .018 .000.0042008 Adv Const

.0222015 .018 .000.0042008 Adv Const

.0222016 .018 .000.0042008 Adv Const

3512 Grouped.088.075 .000.013Totals .004

STEWARTSTOWN 16312

NH 145 REPLACE BRIDGE OVER BISHOP BROOK - 121/114 (Red List) ATT2.289 2011 Bridge Priority #11

.0282013P .028 .000.000 Bridge On/Off System

.0392014 .031 .000.008

.0402015 .032 .000.008

.0412016 .033 .000.008

.0062013R .006 .000.000 .001

.0112014 .009 .000.002

.0112015 .009 .000.002

.0062016 .005 .000.001

2.1092016C 1.687 .000.422

6782 2.2891.838 .000.451Totals .001

Phase: P - Preliminary Engineering R - Right of Way C - Construction

Page P-61 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6

Page 86: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

Name Rte/Street: Location/Scope of Work

Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category

CommentsCAACode

FiscalYearPhase

Overall ProjectCost $(M)State#

Grouped / ParentRegionally Significant

Adv Const Payback

STEWARTSTOWN, NH - CANAAN, VT 15838

BRIDGE STREET BRIDGE REHABILITATION OVER CONNECTICUT RIVER - 054/163 {Red List} ATT6.551 2011 Bridge Priority #7

.0642013P .064 .000.000 Bridge Off System.013

.0232013 .000 .023.000 Non Participating

.0782014 .078 .000.000 Bridge Off System

.0272014 .000 .027.000 Non Participating

.0612015 .061 .000.000 Bridge Off System.012

.0222015 .000 .000.022 Non Participating

.0132013R .013 .000.000 Bridge Off System.003

.0142015 .014 .000.000 .003

3.7162015C 2.972 .000.743

1.3142015 .000 1.314.000 Non Participating

.7672016 .614 .000.153 Bridge Off System

.2722016 .000 .272.000 Non Participating

7416 6.3703.816 1.635.918Totals .030

STRATHAM

27771

RTE 33/RTE 108 This Project will install sidewalks, curbing, solar light fixtures and delineation of bike paths along

NH RTE 33 & NH RTE 108 through Stratham's town center. [TE]

ATT.516

.0502014P .040 .000.010 STP-Enhancement

.0412014R .033 .000.008

.4252015C .340 .000.085

11749 .516.413 .000.103Totals

SUMMER YOUTH LANDSCAPE PROGRAM

SMRLN

ADMINISTRATION ESTABLISHMENT OF SUMMER LANDSCAPING YOUTH PROGRAM TO PERFORM

MAINTENANCE & OTHER RELATED WORK STATEWIDE [Annual Project]

ATT(Annual) Program Funding for Summer

Landscaping Youth Program.

.0572013C .057 .000.000 STP-Flexible.011

.0572014 .046 .000.011

.0572015 .046 .000.011

.0572016 .046 .000.011

1766 Grouped.228.194 .000.034Totals .011

SWANZEY 23737

SAWYERS CROSSING BRIDGE REHABILITATION OVER ASHUELOT RIVER - SCOUR PROTECTION FOR ABUTMENTS AND PIER - 136/143 [NATIONAL HISTORIC COVERED BRIDGE

PRESERVATION PROGRAM]

ATT.355 Partially funded by SWANZEY

.0552013P .044 .011.000 National Historic Covered Bridge Preservation (NHCBP)

.3002014C .240 .060.000

8506 .355.284 .071.000Totals

Phase: P - Preliminary Engineering R - Right of Way C - Construction

Page P-62 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6

Page 87: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

Name Rte/Street: Location/Scope of Work

Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category

CommentsCAACode

FiscalYearPhase

Overall ProjectCost $(M)State#

Grouped / ParentRegionally Significant

Adv Const Payback

TAMWORTH 15831

VARIOUS ROUTES SAFETY IMPROVEMENTS (Demo Ids NH077 & NH081) ATT.965 Earmark funding. Local

Administration.

.3962013C .396 .000.000 High Priority Projects (SAFETEA-LU 2005)

.4402013 .440 .000.000

7410 .836.836 .000.000Totals

TAMWORTH 16239

NH 113 BRIDGE REPLACEMENT OVER BEARCAMP RIVER - 150/106 {Red List} ATT4.963 2011 Bridge Priority #96

.1652014P .165 .000.000 Bridge On/Off System.033

.3412015 .341 .000.000 .066

.0222014R .022 .000.000 .004

7813 .528.528 .000.000Totals .103

TILTON - NORTHFIELD

14839

PHASE 2: RAIL WITH TRAIL IMPROVEMENTS INCLUDING A STEEL ARCH BRIDGE OVER THE WINNIPESAUKEE RIVER (TE Program) [06-55TE & 09-37TE]

ATT.561 Specific project from Statewide program. Local Administration.

.0572014P .046 .000.011 STP-Enhancement

.0152014R .012 .003.000

.3712015C .297 .074.000

6249 .444.355 .077.011Totals

UNH BUS LIVABILITY

24962

VARIES UNH BUS LIVABILITY INITIATIVE, SECTION 5309 CAPITAL INVESTMENTS ATT.190 Partially funded by UNIVERSITY

OF NEW HAMPSHIRE

.0412013 .037 .004.000 FTA 5309 Capital Funding Program - Formula

.1492013 .134 .015.000

8634 .190.171 .019.000Totals

WALPOLE - CHARLESTOWN 14747

NH 12 RECONSTRUCTION FROM MAIN STREET IN WALPOLE TO NH 12A IN CHARLESTOWN,

REMOVE CONCRETE BASE, ADD SHOULDERS AND IMPROVE DRAINAGE

ATT17.758 ULSRPC Regional Priority #1

.4542015P .454 .000.000 STP-Non Urban Areas Under 5K.088

.2342016 .234 .000.000 .044

.5682015R .568 .000.000 .110

.0592016 .059 .000.000 .011

9.5852016C 7.668 .0001.917

1891 10.9008.983 .0001.917Totals .253

Phase: P - Preliminary Engineering R - Right of Way C - Construction

Page P-63 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6

Page 88: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

Name Rte/Street: Location/Scope of Work

Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category

CommentsCAACode

FiscalYearPhase

Overall ProjectCost $(M)State#

Grouped / ParentRegionally Significant

Adv Const Payback

WALPOLE, NH - ROCKINGHAM, VT 12905

BRIDGE STREET VILAS BRIDGE REHABILITATION OVER CONNECTICUT RIVER - 062/052 {Red List} ATT4.682 2011 Bridge Priority #8

.0562013P .056 .000.000 Bridge On/Off System.011

.0042013 .000 .004.000 Non Participating

.1022014 .102 .000.000 Bridge On/Off System.020

.0082014 .000 .008.000 Non Participating

.0092013R .009 .000.000 Bridge On/Off System.002

1877 .179.167 .012.000Totals .033

WARNER 15907

NH 127 BRIDGE REPLACEMENT OVER WARNER RIVER - 254/180 {Red List} ATT2.774 2011 Bridge Priority #76

.0662014P .066 .000.000 Bridge On/Off System.013

.0112015 .011 .000.000 .002

.0022014R .002 .000.000 .000

.0062015 .006 .000.000 .001

7497 .085.085 .000.000Totals .017

WHITEFIELD

14425

US 3 PROJECT INVOLVES IMPROVING PEDESTRIAN ACCESS TO TOWN CENTER VIA

POTENTIAL SIDEWALKS, LIGHTING AND ADA RELATED UPGRADES (TE Program) [04-

66TE] & [09-50TE]

ATT.153 Partially funded by WHITEFIELD

.0182013P .015 .004.000 STP-Enhancement

.0022014 .001 .000.000

.0012015 .001 .000.000

.0012014R .001 .000.000

.1312015C .105 .026.000

5663 .153.122 .030.000Totals

WILTON 16128

NH 31 BRIDGE DECK REPLACEMENT OVER SOUHEGAN RIVER -129/126 (Red List) ATT1.533 2011 Bridge Prioity #36

.0012013P .001 .000.000 Bridge On/Off System.000

.0552013 .055 .000.000 .011

1.2672014C 1.267 .000.000 .253

7720 1.3231.323 .000.000Totals .265

Phase: P - Preliminary Engineering R - Right of Way C - Construction

Page P-64 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6

Page 89: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

Name Rte/Street: Location/Scope of Work

Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category

CommentsCAACode

FiscalYearPhase

Overall ProjectCost $(M)State#

Grouped / ParentRegionally Significant

Adv Const Payback

WILTON - MILFORD - AMHERST - BEDFORD 13692

NH 101 SAFETY IMPROVEMENTS @ VARIOUS LOCATIONS FROM WILTON TO WALLACE RD

IN BEDFORD AS DETERMINED BY CORRIDOR STUDY

ATT10.380 Interim safety improvements

.1102014P .110 .000.000 National Highway (NHPP).022

.0222013R .022 .000.000 STP-Flexible.004

.0222014 .022 .000.000 National Highway (NHPP).004

.1172016 .117 .000.000 .022

2739 .271.271 .000.000Totals .053

WINCHESTER 16034

MAIN STREET & WARWICK ROAD

PEDESTRIAN / BICYCLE IMPROVEMENT [09-51TE] ATT.406 Partially funded by WINCHESTER

.0012013P .001 .000.000 STP-Enhancement

.0202013 .016 .004.000

.3002013C .240 .060.000

7639 .321.257 .064.000Totals

WINCHESTER

20819

NH 10 REHABILITATION OR REPLACEMENT OF 12' CONCRETE BOX OVER FOREST LAKE

OUTLET - 137/121

ATT1.343 2011 Bridge Priority #94

.0462013P .046 .000.000 Equity Bonus (Flexible).009

.0482014 .038 .000.010 STP-Non Urban Areas Under 5K

.0512015 .040 .000.010

.0122016 .009 .000.002

.0052013R .005 .000.000 Equity Bonus (Flexible).001

.0052014 .004 .000.001 STP-Non Urban Areas Under 5K

.0112015 .009 .000.002

7994 .178.152 .000.025Totals .010

WINCHESTER 23738

GUNN MOUNTATIN ROAD BRIDGE REHABILITATION OVER ASHUELOT RIVER- SCOUR PROTECTION FOR

ABUTMENTS AND PIER - 082/087 [NATIONAL HISTORIC BRIDGE PRESERVATION

PROGRAM]

ATT.385 Partially funded by SWANZEY

.0552013P .044 .011.000 National Historic Covered Bridge Preservation (NHCBP)

.3302014C .264 .066.000

8507 .385.308 .077.000Totals

WINCHESTER - SWANZEY

12906

NH 10 BRIDGE REPLACEMENT OVER ASHUELOT RIVER - 152/181 [Designated Demo Id NH007] {Red List}

ATT6.629 2011 Bridge Priority #13

.3012013C .301 .000.000 Bridge On/Off System.060

5.4122013 5.412 .000.000 STP-Areas Less Than 200K1.082

1873 5.7135.713 .000.000Totals 1.143

Project-Id Count: 278

Phase: P - Preliminary Engineering R - Right of Way C - Construction

Page P-65 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6

Page 90: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

FY 2014 - FY 2017 Transportation Improvement ProgramEFLHD

FHWA Eastern Federal Lands Highway Division

PROJECT AWARDFY STATE COUNTY

PARK, REFUGE, FOREST OR OTHER PARTNER /

AGENCYDESCRIPTION CATEGORY PRIMARY FUND

SOURCETOTAL PROGRAM AMOUNT (RANGE)

FUNDSFROMTITLE

ADMINBY /

DELIVERBY

PhaseCHANGE FROM LAST UPDATE (Feb.7, 2013)

CONG DIST NUMBER FLMA REGION

NH FSR 2011-1(1) 2014 NH Carroll U.S. Forest Service, White

Mountain National Forest

ERFO - replace 2 bridges, slide repair, pipe replacements & road repairs in White Mountain NF

BRRH_LSR ERFOBetween$1,000,001 and $5,000,000

Title 23 EFLHD In Design No Change NH-01 USFS_R9

NH FH-47-1(001) 2014 NH Grafton U.S. Forest Service, White

Mountain National Forest

Culvert replacements and spot pavement repairs on Tripoli Road from the FS gate to intersection of Campground Road

3R FTFS Between $500,001 and $1,000,000 Title 23 EFLHD Planned New Project NH-02 USFS_R9

FW LAUM103(1) SICO10(1) 2015 NH Coos & Essex Umbagog National Wildlife

Refuge & Silvio O'Conte

Umbagog- new box culv. Potter Farm Rd.Replace pipe culverts at 5 sites at Silvio O'Conte NWR.

MISC FTFW Between $500,001 and $1,000,000 Title 23 EFLHD In Design No Change _VARIOUS FWS_R5

FW GREA 10(1) 2015 NH RockinghamU.S. Fish and Wildlife Service, Great Bay National Wildlife Refuge

Rehabilitate Arboretum Drive 3RL FTFW Between $250,001 and $500,000 Title 23 EFLHD Planned No Change NH-01 FWS_R5

FW LAUM 906(1)907(1) 2017 NH Coos

U.S. Fish and Wildlife Service, Umbagog National Wildlife Refuge

Recreational Enhancement Design Project MISC FTFWBetween$1,000,001 and $5,000,000

Title 23 EFLHD Planned New Project NH-02 FWS_R5

Page P64 of

n46lbd
Typewritten Text
NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3 and 4
n46lbd
Typewritten Text
n46lbd
Typewritten Text
n46lbd
Rectangle
n46lbd
Rectangle
n46lbd
Text Box
NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4 and 5
n46lbd
Text Box
Print Date: 21-Apr-14
n46lbd
Typewritten Text
n46lbd
Typewritten Text
n46lbd
Typewritten Text
n46lbd
Typewritten Text
n46lbd
Typewritten Text
n46lbd
Rectangle
n46lbd
Typewritten Text
n46lbd
Typewritten Text
Page P-66 of 67
n46lbd
Typewritten Text
n46lbd
Typewritten Text
n46lbd
Typewritten Text
n46lbd
Typewritten Text
n46lbd
Rectangle
Page 91: STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 2013 … · 2019. 6. 5. · The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help

15731

Federal $ NHDOT Other Total $

New Hampshire 2012 $77,000.00 $0.00 $0.00 $77,000.00

2013 $3,433,000.00 $0.00 $0.00 $3,433,000.00

2014 $3,750,000.00 $0.00 $0.00 $3,750,000.00

2015 $605,000.00 $0.00 $0.00 $605,000.00

Maine 2012 $0.00 $0.00 $0.00 $0.00

2013 $0.00 $0.00 $3,440,000.00 $3,440,000.00

2014 $0.00 $0.00 $3,460,000.00 $3,460,000.00

New Hampshire 2013 $50,000.00 $0.00 $0.00 $50,000.00

2014 $450,000.00 $0.00 $0.00 $450,000.00

Maine 2013 $0.00 $0.00 $50,000.00 $50,000.00

2014 $0.00 $0.00 $200,000.00 $200,000.00

New Hampshire 2015 $19,800,000.00 $0.00 $0.00 $19,800,000.00

2016 $19,800,000.00 $0.00 $0.00 $19,800,000.00

2017 $19,800,000.00 $0.00 $0.00 $19,800,000.00

2018 $28,600,000.00 $0.00 $0.00 $28,600,000.00

Maine 2015 $0.00 $0.00 $28,050,000.00 $28,050,000.00

2016 $0.00 $0.00 $34,000,000.00 $34,000,000.00

2017 $0.00 $0.00 $15,000,000.00 $15,000,000.00

2018 $0.00 $0.00 $3,200,000.00 $3,200,000.00

Totals $96,365,000.00 $0.00 $87,400,000.00 $183,765,000.00

* NHDOT anticipates the use of Advance Construction. Construction costs reflect the estimated conversion of

AC by year to federal funds.

Portsmouth, NH-Kittery, ME

Construction

Preliminary Engineering

Right of Way

Bridge Replacement & Paint over Piscataqua River-251/108

(Sarah Mildred Long Bridge)(Red List)

n46lbd
Typewritten Text
Page P-65 of 65
n46lbd
Typewritten Text
n46lbd
Typewritten Text
n46lbd
Typewritten Text
n46lbd
Typewritten Text
Page P-67 of 67
n46lbd
Typewritten Text
n46lbd
Typewritten Text
n46lbd
Typewritten Text
n46lbd
Typewritten Text
n46lbd
Rectangle