statewide transportation improvement program (stip) 2013 … · 2019. 6. 5. · the 3.2% annual...
TRANSCRIPT
STATEWIDE TRANSPORTATION
IMPROVEMENT PROGRAM
(STIP) 2013 to 2016
Approved: January 25, 2013
Amended: ugust 21, 201
PREPARED BY THE NEW HAMPSHIRE DEPARTMENT OF TRANSPORTATION Bureau of Planning & Community Assistance
Federal Aid & Regionally Significant Projects
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
This!report!was!funded!in!part!through!grants!from!the!Federal!Highway!Administration!and!Federal!Transit!
Administration,!U.S.!Department!of!Transportation.!!The!views!and!opinions!of!the!authors!expressed!herein!do!not!
necessarily!state!or!reflect!those!of!the!U.!S.!Department!of!Transportation.!
New HampshireStatewide Transportation Improvement Program
2013 - 2016
Table of Contents
Introduction ..............................................................................................................................................................................1
Financial Plan...........................................................................................................................................................................2Federal Resources .................................................................................................................................................................3State Resources.....................................................................................................................................................................5
Turnpike Toll Credits...........................................................................................................................................................6Advance Construction.........................................................................................................................................................7Turnpike Authority...............................................................................................................................................................8Bonds..................................................................................................................................................................................8Operations & Maintenance .................................................................................................................................................9
Other Resources ....................................................................................................................................................................9
Public Involvement ................................................................................................................................................................11STIP Revisions..................................................................................................................................................................... 12
Project List .............................................................................................................................................................................P1Appendix A............................................................................................................................................................................ A1
Introduction
Moving Ahead for Progress in the 21st Century Act (MAP-21) was signed into law on July 6, 2012. MAP-21 builds upon previous legislation, outlining and restructuring funding categories as well as the associated requirements of the Federal-aid program for transportation. Those requirements, as codified in title 23 part 135 and 49 part 5305 of the United States Code (USC), stipulate that each state will develop a continuing, cooperative, and comprehensive statewide multimodal transportationplanning process, including the development of a statewide transportation improvement program (STIP). In New Hampshire the STIP is updated every two years and is developed through a coordinated statewide and metropolitan planning process.
The metropolitan planning process, as defined in 23 USC part 134 and 49 USC part 5303, is carried out by the four metropolitan planning organizations (MPOs) in New Hampshire: Nashua Regional Planning Commission, Rockingham Planning Commission, Southern NH Planning Commission, and Strafford Regional Planning Commission. Following the 2010 Census the Nashua Regional Planning Commission was also designated as a transportation management area (TMA). Each of the MPOs has adopted a metropolitan transportation plan (MTP) and a Transportation Improvement Program (TIP). The MTPs were developed and approved in accordance with 23 part 450.322 of the Code of Federal Regulations (CFR) and include a financially constrained program of transportation projects within their regions.
The MPO TIPs are consistent with the regulations outlined in 23 CFR §450.324, including requirements related to financial constraint, and have been incorporated into the 2013-2016 NH STIP. As there are nonattainment areas for ozone and carbon monoxide within the MPO boundaries, applicable findings of conformity to the NH State Implementation Plan of all MPO TIPs and MTPs have been made and documented through a process consistent with the requirements of 23 CFR part 450 and 40 CFR part 93. Summary tables for the criteria pollutants are available in Appendix C.
In the Fall of 2004, the Community Advisory Committee (CAC), a diverse group of individuals, businesses, and other interested parties, was created at the request of the NHDOT. This group held many public meetings to identify how changes in NH impact transportation in the state and what could be done to meet the challenges. In June of 2006, the CAC produced a Long Range Plan outlining a vision of transportation in NH. In 2010 the CAC Vision was refined and distilled to produce a new Long Range Transportation Plan for NH, 2010-2030. The Plan was developed in accordance with the requirements outlined in 23 USC part 134.
Every two years the State of NH prepares and adopts a Ten Year Transportation Improvement Plan (10-Year Plan). The recently approved 10-Year Plan (June 2012) was developed to be consistent with the framework established in the LRTP and
includes a list of projects for the ten-year period from 2013-2022. The process to develop the 10-Year Plan involves substantial input from the public, elected officials, transit operators, state agencies, planning commissions, and MPOs. With the most recent update, the emphasis on fiscal responsibility continued ensuring that the list of projects remains in line with reasonably anticipated revenue estimates.
The 2013-2016 NH STIP has been developed through a coordinated statewide and metropolitan planning process that is consistent with the requirements of 23 CFR §450.216. All projects designated as regionally significant by the MPOs and through Interagency Consultation (IAC), regardless of the funding source, are included in the STIP. All surface transportation projects that utilize resources from programs funded under title 23 USC and title 49 USC part 53, with the exception of the programs identified in 23 CFR §450.216(g), are included in the STIP. The STIP has been constrained to the available financial resources for 2013 through 2014 and the resources that are reasonably anticipated to be available for 2015 through 2016. To more accurately depict the financial status of the STIP, inflation at a rate of 3.2% is included for projects, satisfying the year of expenditure requirement in 23 CFR §450.216(l).
In accordance with the NH STIP Revision Procedures and the MPO TIP Revision Procedures, a series of minor revisions to the NH 2011-2014 STIP have been approved during the development of the 2013-2016 NH STIP and MPO TIPs. Through an agreement with FHWA NH Division, the MPOs, and other Interagency Consultation Partners, those minor revisions will beincorporated into the 2013-2016 STIP.
Financial Plan
The STIP Financial Plan has been prepared to satisfy the requirements of 23 CFR §450.216 and to provide transparent information to the public. According to federal regulations, the STIP shall include projects, or identified phases of projects, only if full funding can reasonably be anticipated to be available for the project within the time period contemplated for completion of the project. Additionally, in the first two years of the STIP, 2013 and 2014, funds for projects located in the nonattainment or maintenance areas of NH must be committed or available.
This Program ensures that funding is available for all projects through the use of a variety of resources, including, but notlimited to, federal resources, with appropriate match amounts, state resources from the Highway Trust Fund and those provided in the budget of the State of NH, turnpike revenue, and local and private revenue sources.The NHDOT STIP Financial Constraint process is based on the following principles:
! All Federal funds obligated will be appropriately matched and the matching funds are indicated in the constraint analysis and at the project level;
! Federal apportionments for federal fiscal years 2013 and 2014 are based figures published by FHWA! Federal apportionments for federal fiscal years 2015 and 2016 are estimated based on 2014 levels with annual growth
of 3.2%;! All projects funded in the STIP are included in the analysis of STIP financial constraint;! State match budgeted for FY 2013-2016 will be as submitted in NHDOT’s requested operating budget;! Matching funds provided by municipalities and other sources will be committed by those entities before any work may
begin on the project; ! Advance Construction (AC) may be used at the State’s discretion in accordance with Title 23, Section 115;! Turnpike Toll Credits may be used to provide the non-federal match requirements of a project provided that credits are
available.! GARVEE bonds or other bonding mechanisms may be used to fund specific projects within the STIP where those funds
can be considered to be reasonably anticipated to be available or are available.! To estimate year of expenditure dollars for future years in the STIP, an annual inflation rate of 3.2% is applied for each
year beyond the current.! The STIP will be constrained by year to estimated or actual apportionment levels.! By funding category, apportionment balances from previous years as well as the transfer flexibility inherent within
SAFETEA-LU will be utilized as necessary.
Working with the FHWA Resource Center, the NHDOT developed an annual estimated rate of inflation of 3.2%. That rate is based on historical trends over a 20-year period as published in the FHWA report Price Trends for Federal-aid Highway Construction. The 3.2% annual rate was used by the NHDOT in the development of the 2013-2022 10-Year Plan to help account for the effects of inflation on the overall program. Similarly, in the 2013-2016 STIP that rate is applied to all projects beginning in 2013 and compounded annually for 2015 and 2016. For projects planned as advance construction, the entire construction cost is inflated in the year of advertising and not compounded in each year of anticipated conversion.
Federal Resources
The majority of federal resources are allocated to the states through annual apportionments outlined in the active transportation bill, MAP-21. In addition to the apportionment, the federal government establishes, on an annual basis and in accordance with Public Law 112-141, a “limit on obligations” that functions as a ceiling on the amount of funds that may be requested in a fiscal
year. Figure 1 outlines the trend over recent years for both apportionments and limitation on obligations for NH in the coreapportioned programs.
Figure 1 – Trends in NH’s Apportionment & Limit on Obligations
In addition to annual apportionments, states may receive federal resources for transportation projects through other programs.Funding from these programs is typically contingent upon successful application for a specific project or projects. As there can be no reasonable assumption made that an application will be successful, FHWA guidance indicates that these funding sources should not be considered “available” or “committed” for purposes of financial constraint. The 2013-2016 NH STIP has been developed to be consistent with the guidance and does not include any revenue assumptions for such programs.
A third source of revenue for projects from the federal government is made available through congressional earmarks. Earmark funds are not subject to many of the limitations that normal apportionments are and may be moved between fiscal years based on availability and project schedule without adherence to the limitation on obligations. As such, the 2013-2016
$100,000,000
$110,000,000
$120,000,000
$130,000,000
$140,000,000
$150,000,000
$160,000,000
$170,000,000
$180,000,000
$190,000,000
$200,000,000
2004 2005 2006 2007 2008 2009 2010 2011 2012
Apportionment
Limitation on Obligations
STIP was developed with the assumption that earmark funds that have already been designated will be available for the identified project when the project is ready to move forward. Federal guidance also specifies that future earmarks that have not yet been approved by Congress may not be assumed as revenue in a STIP. Consistent with that guidance, the NH STIP includes only approved and designated earmark funds.
State Resources
Per RSA 9:4, it is required that every state agency submits to the Commissioner of Administrative Services two budgets biennially for consideration:
On or before October 1(of all even years -October 2012), an operating budget that shows maintenance expenditures necessary for the agency. Maintenance expenditures are defined as “the cost of providing the same level of service authorized and funded in the preceding fiscal year, incorporating changes in the population, economic conditions, and other factors outside the control of the accounting unit”.
In addition, on or before November 15 prior to each biennial legislative session, all departments of the state shall transmit to the commissioner of administrative services, a reduction level expenditure estimate for each fiscal year of the ensuing biennium for administration, operation, and program services, including costs for workers' compensation and unemployment compensation. This estimate shall include:
1. An estimate for a reduced level of expenditure for the first year of the next biennium that is 10 percent, not including debt service, less than the actual expenses of the first year of the current biennium.
2. An estimate for a reduced level of expenditure for the second year of the next biennium that is 10 percent, not including debt service, less than the budget and any footnote adjustments or subsequent appropriations, additions, or reductions, implemented in the second year of the current biennium.
By June 30 of the following odd numbered year, the Governor and Legislature make the final recommendations and approvals of the agency budgets, based on their reviews, and the normal legislative process.
Agency budgets are to be built from the bottom-up using a zero-based budgeting approach. With this zero-based budgeting approach, it is ensured agencies review all program areas. This should aid in prioritization, determining the effectiveness of programs, and identifying areas where efficiencies can be achieved.
For STIP planning purposes, the 2013-2015 budget contains the best information NHDOT has available as to anticipated state revenue, as well as total expenditures that are planned as part of the budget. If there were changes in the budgeted amountswithin NHDOT’s budget for Federal-aid projects, then it would be appropriate for the STIP Financial Constraint to be updated, adjusting project schedules to meet the projected resources. Any project changes in the STIP would require appropriate amendments, including coordination with MPO’s, FHWA, FTA, EPA and other agencies as required.
Toll Credits
Federal regulations (23 USC §120) allow a State to use toll credits toward the non-Federal match requirement of a project, provided that the project is listed in the STIP. These credits are based on toll revenues that are generated and used by public, quasi-public, and private agencies to build, improve, or maintain highways, bridges, or tunnels that serve the public purpose of interstate commerce. Such public, quasi- public, or private agencies shall have built, improved, or maintained such facilities without Federal funds.
To receive these toll credits, a State shall show that it has maintained its non-Federal transportation capital expenditures in accordance with the given requirements. NHDOT has shown that they have met these requirements in the past, and has utilized toll credits to match federal funds. Consistent with existing practices, the 2013-2016 STIP identifies the use of toll credits by project and accounts for the use as part of the financial constraint information.
In 2011 NH had a balance of toll credits in the amount of $198m. Identified at the project level in the STIP, NHDOT may coordinate with FHWA to use toll credits on a case by case basis in any of the STIP years. The use of this matching mechanism will be documented in the STIP as Amendments are published.
Advance Construction
Under the provisions of 23 USC part 115(a) and as further outlined in 23 CFR §630, the State may utilize Advance Construction (AC) on Federal-aid projects with the approval of FHWA. Guidance from the FHWA Resource Center has indicated that the cumulative amount of AC should remain below 1½ times the annual apportionment of federal funds for FHWA programs. Advance construction is subject to approval from FHWA and will be tracked as normal Federal-aid projects are in the federal Financial Management Information System.
Projects have been identified in the 2013-2016 STIP that are anticipated to utilize the flexibility of AC. Additionally, the conversion of the anticipated AC to normal Federal-aid has been listed for each project by fiscal year and is included in
the financial constraint analysis. The NHDOT has assumed a conservative approach for AC with a standing goal to ensure that conversions to Federal-aid remain ahead of actual project expenditures. The STIP must remain financially constrained if there are any modifications to the anticipated AC conversion schedules of projects.
Beginning in the summer of 2009 the NHDOT revised the process of AC to include preliminary engineering and right of way. All active projects were updated with the appropriate AC amount for all phases resulting in an increased AC balance.
$-
$50,000,000
$100,000,000
$150,000,000
$200,000,000
$250,000,000
2004 2005 2006 2007 2008 2009 2010 2011 2012
Figure 2 – Trends in Advance Construction
Turnpike Authority
Pursuant to 23 CFR §450.216(h) a STIP must contain all regionally significant projects regardless of funding source. On the turnpike system most capacity related improvements or system expansions qualify as regionally significant as defined in federal regulations. The determination of regional significance is made at the MPO level, or by the DOT in rural areas, with input through Interagency Consultation. As the 2013-2016 STIP contains all projects that have been identified as regionally significant, several projects on the turnpike system are listed.
Additionally, the federal regulations governing the MPO TIPs, MTPs and the associated air quality conformity determination for nonattainment and maintenance areas, including 23 CFR §450.324(i) and 40 CFR §93, stipulate that the availability of funds must be demonstrated for all included projects. To provide information to the MPOs and to demonstrate financial constraint of the STIP, anticipated revenue and expenditures for the turnpike system have been documented in the Financial Constraint Summary tables. As illustrated in those tables, the turnpike system is financially constrained overall within each year of the STIP.
Bonds
The State of NH, through action of the legislature, has the ability to issue and utilize Grant Anticipation Revenue Vehicles (GARVEE) up to an amount equal to $445,000,000 for construction associated with the improvement and expansion of Interstate 93 from Salem to Manchester. A GARVEE is essentially a bond issued by the state with the presumption that federal funds will continue to be available to pay for debt service in the future. GARVEE bonds provide a short-term influx of funding to advance projects that may otherwise take many years to construct. GARVEE bonds may only be issued with the concurrence of FHWA.
A memorandum of agreement is issued between the NHDOT, NH Treasurer, and FHWA to facilitate each bond issuance. In November of 2010 the first bonds were issued for the Salem to Manchester project totaling nearly $80m.Since then an additional $115m of GARVEE bonds has been issued for the I-93 project. With a proven track-record of GARVEE bond issuance and management, additional bond funds are assumed for various portions of the I-93 Salem to Manchester project in the 2013-2016 STIP. The financial constraint information reflects the anticipated use of GARVEE funds for the I-93 projects, including the applicable debt service costs. The project list identifies the construction cost of each project as well as the relative share of interest costs.
The NHDOT strives to meet the financial challenges of the State’s transportation system, all potential revenue sources will continue to be evaluated. In the event that new financing techniques are used to meet the funding requirements of any Federal-aid projects, the STIP will be updated accordingly.
Operations & Maintenance
As outlined in 23 CFR §450.216(m), the STIP must include financial information on revenues and expenditures to adequately operate and maintain Federal-aid highways. To satisfy that requirement, system-level estimates for operations and maintenance of the Federal-aid system are provided in the Financial Constraint Analysis Summary tables for each year of the STIP. The estimates provided include funds for all anticipated needs for the regular maintenance and operation of the Federal-aid system in NH. The NHDOT asserts that the Federal-aid system in NH is adequately maintained through the maintenance and operations budget of the Department and through the more substantial maintenance and preservation projects funded through specific state and Federal-aid categories.
Other Resources
The 2013-2016 NH STIP documents the amount of funds contributed by other sources to match Federal-aid funds for every project. Other sources of funds to match Federal-aid dollars are typically municipalities, but also include private entities, other public entities, and other states. Other sources of funds for projects in nonattainment or maintenance areas in the first twoyears of the STIP will be listed only if funding has been committed.
Public Involvement
The continual and coordinated planning process in NH involves substantial public involvement throughout the entire process. Beginning with the development of the statewide LRTP and the regional MTPs, public outreach and input serves as the basis to create the overall framework for transportation planning in the State. For the development of the 10-Year Plan more than 30 public hearings were held throughout the State that were attended by over 800 members of the public. Following the approval of the 10-Year Plan, the MPOs continued public outreach efforts, consistent with federal regulations, for the development of each MPOs TIP.
The development of the NH STIP is the last step in the continuing transportation planning process. A public comment period for the 2013-2016 NH STIP was held during the months of September and October of 2012. The notice was posted in astatewide newspaper, on the internet and through each of the nine regional planning commissions.
STIP Revisions
In March of 2008 the NHDOT adopted and both FHWA and FTA approved STIP Revision Procedures (Appendix A) for the NH STIP. Those procedures outline thresholds and protocols for revisions to the STIP in the form of both minor revisions and major revisions. The Procedures also established an Expedited Project Selection Procedure, to advance or delay projects, for the non-MPO areas of NH. Subsequent to the development of these procedures at the statewide level, each of the 4 MPOs adopted similar procedures resulting in improved consistency and coordination between STIP and TIP revisions.
Major Revisions to the STIP and TIPs in the form of Amendments will be processed as outlined in Figure 3. The dates listed indicate when the proposed Amendments will be ready for public comment.
Figure 3 – Amendment Schedule
1 January, 2013
2 April, 2013
3 July, 2013
4 October, 2013
5 January, 2014
6 April, 2014
blank for printing
Statewide Transportation Improvement Program (STIP)
2013 to 2016
Financial Constraint Summary
May 15, 2014
Prepared by the New Hampshire Department of Transportation
NH STIP 2013-2016
Financial Constraint Documentation
Federal
Resources
State
Resources
Local/Other
Resources
Total
Resources
Total
Programmed
Federal
Resources
State
Resources
Local/Other
Resources
Total
Resources
Total
Programmed
Available Available Available Available Programmed Available Available Available Available Programmed
FHWA - Federal-aid w/ Match
Bridge Off System $ - $ - $ 1,148,000 $ 1,148,000 $ 6,686,780 $ - $ - 1,020,000.00$ $ 1,020,000 $ 5,737,120
Bridge On/Off System $ - $ - $ 61,800 $ 61,800 $ 26,803,236 $ - $ - 387,617.00$ $ 387,617 $ 32,761,675
Congestion Mitigation and Air Quality Program $ 9,878,278 $ - $ 616,134 $ 10,494,412 $ 8,863,784 $ 9,883,164 $ - 359,105.00$ $ 10,242,269 $ 5,560,972
Emergency Relief $ 1,000,000 $ - $ - $ 1,000,000 $ 78,582 $ - $ - $ -
Equity Bonus (Flexible) $ 335,019 $ - $ - $ 335,019 $ 699,850 $ 188,075 $ - -$ $ 188,075 $ 165,000
Forest Highways $ 850,000 $ - $ - $ 850,000 $ 850,000 $ 850,000 $ - -$ $ 850,000 $ 850,000
Highway Safety Improvement Program (HSIP) $ 8,821,327 $ - $ - $ 8,821,327 $ 5,620,000 $ 8,824,497 $ - -$ $ 8,824,497 $ 13,546,000
Interstate Maintenance $ - $ - $ - $ - $ 27,898,289 $ - $ - -$ $ - $ 19,752,035
National Historic Covered Bridge Preservation (NHCBP) $ 963,566 $ - $ 32,892 $ 996,458 $ 996,458 $ 552,000 $ - 126,000.00$ $ 678,000 $ 678,000
National Scenic Byways Program $ - $ - $ - $ - $ 500,000 $ - $ - -$ $ - $ 500,000
Recreational Trails $ 1,265,408 $ - $ - $ 1,265,408 $ 1,241,000 $ 1,267,944 $ - -$ $ 1,267,944 $ 1,241,000
Safe Routes to School $ - $ - $ - $ - $ 832,000 $ - $ - -$ $ - $ 1,323,000
STP-Areas Less Than 200K $ 7,000,517 $ - $ 349,346 $ 7,349,863 $ 4,780,757 $ 7,003,980 $ - 424,359.21$ $ 7,428,339 $ 8,108,796
STP-Areas Over 200K $ 4,897,953 $ - $ - $ 4,897,953 $ 479,999 $ 4,900,376 $ - 718,963.47$ $ 5,619,339 $ 3,594,817
STP-DBE $ - $ - $ - $ - $ 105,000 $ 75,000 $ - -$ $ 75,000 $ 75,000
STP-Enhancement $ - $ - $ 420,983 $ 420,983 $ 2,524,501 $ - $ - 638,867.59$ $ 638,868 $ 3,890,775
STP-Hazard Elimination $ - $ - $ 105,000 $ 105,000 $ 2,560,000 $ - $ - 105,000.00$ $ 105,000 $ 2,560,000
STP-Non Urban Areas Under 5K $ 8,760,278 $ - $ - $ 8,760,278 $ 1,634,124 $ 8,764,611 $ - -$ $ 8,764,611 $ 1,782,228
STP-Safety $ - $ - $ - $ - $ 495,000 $ - $ - -$ $ - $ 495,000
Transportation Assistance $ - $ - $ - $ - $ 30,000 $ 30,000 $ - -$ $ 30,000 $ 30,000
Transportation & Community & System Preservation $ 300,000 $ - $ 75,000 $ 375,000 $ 375,000 $ - $ - $ -
Tiger Grant $ 1,024,200 $ - $ 682,800 $ 1,707,000 $ 1,707,000 $ 3,307,800 $ - 2,205,200.00$ $ 5,513,000 $ 5,513,000
National Highway (NHPP) $ 46,496,748 $ - $ - $ 46,496,748 $ 10,227,869 $ 27,188,878 $ - -$ $ 27,188,878 $ 17,729,279
STP-Flexible $ 60,190,308 $ - $ 1,911,000 $ 62,101,308 $ 49,945,456 $ 76,996,126 $ - 1,566,723.74$ $ 78,562,850 $ 40,167,706
Rail-Hwy: Haz Elim-Protective Devices $ 1,097,800 $ - $ - $ 1,097,800 $ 790,000 $ 1,100,000 $ - -$ $ 1,100,000 $ 140,000
STP-Off System Bridge $ 3,665,496 $ - $ - $ 3,665,496 $ - $ 3,672,842 $ - $ 3,672,842
National Summer Trans Inst Sk TRNG $ 20,000 -$ $ 20,000 $ 20,000
Transportation Alternatives $ 2,496,198 $ - $ - $ 2,496,198 $ - $ 2,553,117 $ - $ - $ 2,553,117
Homeland Security Grant $ - $ - $ 387,178 $ 387,178 $ 387,178 $ - $ - $ - $ -
National Highway (NHPP) Exempt $ 2,489,203 $ 2,489,203 $ - $ - $ 2,489,203
Earmarks $ 6,834,784 $ - $ 754,488 $ 7,589,273 $ 7,589,273 $ 6,997,898 $ - $ 779,635 $ 7,777,534 $ 7,777,534
FHWA FEDERAL-AID TOTAL $ 168,367,084 $ - $ 6,544,620 $ 172,422,501 $ 164,701,137 $ 166,665,511 $ - $ 8,331,471 $ 174,996,983 $ 173,998,937
2014
Improvement Program
FISCAL CONSTRAINT - ANTICIPATED REVENUES WITH MATCH VERSUS PROGRAMMED FUNDING FOR PROJECTS WITHIN THE STIP
Dollars in Millions
2013
Improvement Program
5/15/2014
NH STIP 2013-2016
Financial Constraint Documentation
Federal
Resources
State
Resources
Local/Other
Resources
Total
Resources
Total
Programmed
Federal
Resources
State
Resources
Local/Other
Resources
Total
Resources
Total
Programmed
Available Available Available Available Programmed Available Available Available Available Programmed
2014
Improvement Program
FISCAL CONSTRAINT - ANTICIPATED REVENUES WITH MATCH VERSUS PROGRAMMED FUNDING FOR PROJECTS WITHIN THE STIP
Dollars in Millions
2013
Improvement Program
FTA - Federal-aid w/ Match
FTA 5307 Capital and Operating Program $ 6,722,909 $ - $ 3,369,915 $ 10,092,824 $ 11,211,853 $ 6,924,596 $ - $ 3,145,404 $ 10,070,000 $ 9,765,139
FTA 5309 Capital Funding Program - Formula $ - $ - $ - $ - $ 157,097 $ 157,097 $ 785,485
FTA 5310 Capital Program $ 1,069,107 $ - $ 186,200 $ 1,255,307 $ 931,000 $ 2,214,302 $ - $ 186,200 $ 2,400,502 $ 931,000
FTA 5311 Capital & Operating Program $ 3,903,474 $ - $ 2,800,000 $ 6,703,474 $ 7,000,000 $ 4,418,453 $ - $ 2,800,000 $ 7,218,453 $ 7,000,000
FTA 5316 JARC $ - $ - $ 350,000 $ 350,000 $ 700,000 $ - $ - $ 350,000 $ 350,000 $ 700,000
FTA 5317 New Freedom Program $ - $ - $ 348,438 $ 348,438 $ 722,188 $ - $ - $ 348,438 $ 348,438 $ 722,188
FTA 5339 Bus & Bus Facilities $ 1,828,889 $ - $ 438,069 $ 2,266,958 $ 2,190,346 $ 1,961,006 $ - $ 440,483 $ 2,401,488 $ 2,202,414
FTA FEDERAL-AID TOTAL $ 13,524,379 $ - $ 7,492,621 $ 21,017,000 $ 22,755,386 $ 15,518,357 $ - $ 7,427,621 $ 22,945,979 $ 22,106,225
FHWA/FTA FEDERAL-AID TOTAL $ 181,891,463 $ - $ 14,037,241 $ 193,439,501 $ 187,456,523 $ 182,183,869 $ - $ 15,759,093 $ 197,942,961 $ 196,105,163
Innovative Financing
GARVEE Bond Funds $ - $ 57,172,615 $ - $ 57,172,615 $ 57,172,615 $ - $ 41,529,459 $ - $ 41,529,459 $ 41,529,459
Toll Credit $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
Other $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
Total Innovative Financing $ - $ 57,172,615 $ - $ 57,172,615 $ 57,172,615 $ - $ 41,529,459 $ - $ 41,529,459 $ 41,529,459
State Fund Sources (State Funded Projects Only)
State Funds - No Federal-Aid Match $ - $ 170,600,000 $ - $ 170,600,000 $ 85,060,000 $ - $ 100,440,000 $ - $ 100,440,000 $ 52,277,420
Total State Fund Sources $ - $ 170,600,000 $ - $ 170,600,000 $ 85,060,000 $ - $ 100,440,000 $ - $ 100,440,000 $ 52,277,420
Other Fund Sources
Non-Particpating Funds (other states, municipalities, private sources) $ - $ - $ 27,403,524 $ 27,403,524 $ 27,403,524 $ - $ - $ 20,601,078 $ 20,601,078 $ 20,601,078
Total Other Fund Sources $ - $ - $ 27,403,524 $ 27,403,524 $ 27,403,524 $ - $ - $ 20,601,078 $ 20,601,078 $ 20,601,078
TOTAL ALL PROGRAMS $ 181,891,463 $ 227,772,615 $ 41,440,765 $ 448,615,640 $ 357,092,662 $ 182,183,869 $ 141,969,459 $ 36,360,170 $ 360,513,498 $ 310,513,119
5/15/2014
NH STIP 2013-2016:
Financial Constraint Documentation
Federal
Resources
State
Resources
Local/Other
Resources
Total
Resources
Total
Programmed
Federal
Resources
State
Resources
Local/Other
Resources
Total
Resources
Total
Programmed
Available Available Available Available Programmed Available Available Available Available Programmed
FHWA - Federal-aid w/ Match
Bridge Off System $ - $ - $ 1,230,000 $ 1,230,000 $ 10,858,810 $ - $ - $ 830,000 $ 830,000 $ 5,678,808
Bridge On/Off System $ - $ - $ 1,568,538 $ 1,568,538 $ 43,505,079 $ - $ - $ 1,142,958 $ 1,142,958 $ 44,206,695
Congestion Mitigation and Air Quality Program $ 10,199,425 $ - $ 2,667,890 $ 12,867,315 $ 11,335,794 $ 10,525,807 $ - $ 10,525,807
Emergency Relief $ - $ - $ - $ - $ - $ -
Equity Bonus (Flexible) $ 194,093 $ - $ 194,093 $ 200,304 $ - $ 200,304
Forest Highways $ 877,200 $ - $ - $ 877,200 $ 850,000 $ 905,270 $ - $ - $ 905,270 $ 850,000
Highway Safety Improvement Program (HSIP) $ 9,106,881 $ - $ - $ 9,106,881 $ 9,000,000 $ 9,398,301 $ - $ - $ 9,398,301 $ 9,000,000
Interstate Maintenance $ - $ - $ 11,352 $ 11,352 $ 11,015,799 $ - $ - $ - $ - $ 11,126,196
National Historic Covered Bridge Preservation (NHCBP) $ - $ - $ - $ 2,641,200 $ - $ - $ 2,641,200 $ 2,641,200
National Scenic Byways Program $ - $ - $ - $ - $ - $ -
Recreational Trails $ 1,308,518 $ - $ - $ 1,308,518 $ 1,241,000 $ 1,350,391 $ - $ - $ 1,350,391 $ 1,241,000
Safe Routes to School $ - $ - $ - $ - $ 1,170,000 $ - $ - $ - $ - $ 1,170,000
STP-Areas Less Than 200K $ 7,228,107 $ - $ 206,400 $ 7,434,507 $ 1,735,880 $ 7,459,407 $ - $ - $ 7,459,407 $ 3,608,435
STP-Areas Over 200K $ 5,057,188 $ - $ 123,873 $ 5,181,061 $ 619,363 $ 5,219,018 $ - $ 70,000 $ 5,289,018 $ 350,000
STP-DBE $ 90,000 $ - $ - $ 90,000 $ 90,000 $ 90,000 $ - $ - $ 90,000 $ 90,000
STP-Enhancement $ - $ - $ 849,881 $ 849,881 $ 4,249,405 $ - $ - $ -
STP-Hazard Elimination $ - $ - $ - $ - $ 2,035,000 $ - $ - $ 149,100 $ 149,100 $ 2,780,500
STP-Non Urban Areas Under 5K $ 9,045,079 $ - $ - $ 9,045,079 $ 4,010,256 $ 9,334,521 $ - $ - $ 9,334,521 $ 15,016,365
STP-Safety $ - $ - $ - $ - $ - $ -
Transportation Assistance $ 30,960 $ - $ - $ 30,960 $ 30,000 $ 31,951 $ - $ - $ 31,951 $ 30,000
Transportation & Community & System Preservation $ - $ - $ - $ - $ - $ -
Tiger Grant $ 390,096 $ - $ 260,064 $ 650,160 $ 650,160 $ - $ - $ -
National Highway (NHPP) $ 28,058,922 $ - $ - $ 28,058,922 $ 18,181,772 $ 28,956,808 $ - $ - $ 28,956,808 $ 25,552,577
STP-Flexible $ 79,460,002 $ - $ 56,760 $ 79,516,762 $ 40,673,006 $ 82,002,722 $ - $ - $ 82,002,722 $ 33,338,929
Rail-Hwy: Haz Elim-Protective Devices $ 1,135,200 $ - $ 1,135,200 $ 440,000 $ 1,171,526 $ - $ 1,171,526 $ 440,000
STP-Off System Bridge $ 3,790,373 $ - $ 3,790,373 $ 3,911,665 $ - $ - $ 3,911,665 $ 3,514,500
Transportation Alternatives $ 2,634,817 $ - $ 2,634,817 $ 30,000 $ 2,719,131 $ - $ 2,719,131 $ 30,000
Homeland Security Grant $ - $ - $ - $ - $ - $ -
National Highway (NHPP) Exempt $ 2,568,857 $ - $ - $ 2,568,857 $ - $ 2,651,061 $ - $ - $ 2,651,061
Earmarks $ 7,340,246 $ - $ 302,272 $ 7,642,518 $ 7,642,518 $ 5,667,819 $ - $ 769,923 $ 6,437,743 $ 6,437,743
FHWA FEDERAL-AID TOTAL $ 168,515,965 $ - $ 7,277,029 $ 175,792,994 $ 169,363,842 $ 174,236,902 $ - $ 2,961,981 $ 177,198,884 $ 167,102,946
2016
Improvement Program
FISCAL CONSTRAINT - ANTICIPATED REVENUES WITH MATCH VERSUS PROGRAMMED FUNDING FOR PROJECTS WITHIN THE STIP
Dollars in Millions
2015
Improvement Program
5/15/2014
NH STIP 2013-2016:
Financial Constraint Documentation
Federal
Resources
State
Resources
Local/Other
Resources
Total
Resources
Total
Programmed
Federal
Resources
State
Resources
Local/Other
Resources
Total
Resources
Total
Programmed
Available Available Available Available Programmed Available Available Available Available Programmed
2016
Improvement Program
FISCAL CONSTRAINT - ANTICIPATED REVENUES WITH MATCH VERSUS PROGRAMMED FUNDING FOR PROJECTS WITHIN THE STIP
Dollars in Millions
2015
Improvement Program
FTA - Federal-aid w/ Match
FTA 5307 Capital and Operating Program $ 7,146,183 $ - $ 3,308,052 $ 10,454,236 $ 10,249,887 $ 7,374,861 $ - $ 3,459,974 $ 10,834,836 $ 10,683,587
FTA 5309 Capital Funding Program - Formula $ - $ - $ 161,680 $ 161,680 $ 808,400 $ -
FTA 5310 Capital Program $ 2,285,160 $ - $ 186,200 $ 2,471,360 $ 931,000 $ 2,358,285 $ - $ 186,200 $ 2,544,485 $ 931,000
FTA 5311 Capital & Operating Program $ 4,559,844 $ - $ 2,800,000 $ 7,359,844 $ 7,000,000 $ 4,705,759 $ - $ 2,800,000 $ 7,505,759 $ 7,000,000
FTA 5316 JARC $ - $ - $ 350,000 $ 350,000 $ 700,000 $ - $ - $ 350,000 $ 350,000 $ 700,000
FTA 5317 New Freedom Program $ - $ - $ 340,000 $ 340,000 $ 680,000 $ - $ - $ 340,000 $ 340,000 $ 680,000
FTA 5339 Bus and Facility Program $ 2,023,758 $ - $ 454,578 $ 2,478,336 $ 2,272,891 $ 2,088,518 $ - $ 470,399 $ 2,558,917 $ 2,351,997
FTA FEDERAL-AID TOTAL $ 16,014,945 $ - $ 7,600,510 $ 23,615,455 $ 22,642,178 $ 16,527,423 $ - $ 7,606,574 $ 24,133,997 $ 22,346,584
FHWA/FTA FEDERAL-AID TOTAL $ 184,530,910 $ - $ 14,877,540 $ 199,408,449 $ 192,006,020 $ 190,764,325 $ - $ 10,568,555 $ 201,332,881 $ 189,449,530
Innovative Financing
GARVEE Bonds $ - $ 37,951,182 $ - $ 37,951,182 $ 37,951,182 $ - $ 4,459,713 $ - $ 4,459,713 $ 4,459,713
Toll Credit $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
Other $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
Total Innovative Financing $ - $ 37,951,182 $ - $ 37,951,182 $ 37,951,182 $ - $ 4,459,713 $ - $ 4,459,713 $ 4,459,713
State Fund Sources (State Funded Projects Only)
State Funds - No Federal-Aid Match $ - $ 102,862,580 $ - $ 102,862,580 $ 52,038,853 $ - $ 66,123,727 $ - $ 66,123,727 $ 27,182,421
Total State Fund Sources $ - $ 102,862,580 $ - $ 102,862,580 $ 52,038,853 $ - $ 66,123,727 $ - $ 66,123,727 $ 27,182,421
Other Fund Sources
Non-Particpating Funds (other states, municipalities, private $ - $ - $ 37,173,036 $ 37,173,036 $ 37,173,036 $ - $ - $ 35,800,880 $ 35,800,880 $ 35,800,880
Total Other Fund Sources $ - $ - $ 37,173,036 $ 37,173,036 $ 37,173,036 $ - $ - $ 35,800,880 $ 35,800,880 $ 35,800,880
TOTAL ALL PROGRAMS $ 184,530,910 $ 140,813,762 $ 52,050,575 $ 377,395,247 $ 319,169,091 $ 190,764,325 $ 70,583,439 $ 46,369,435 $ 307,717,200 $ 256,892,543
State
Resources
Total
Programmed
State
Resources
Total
ProgrammedState Resources
Total
Programmed
State
Resources
Total
Programmed
Available Programmed Available Programmed Available Programmed Available Programmed
Statewide Operations & Maintenance 123,578,823$ 123,578,823$ 122,386,958$ 122,386,958$ 126,303,341$ 126,303,341$ 130,345,048$ 130,345,048$
2013 2014 2015 2016
5/15/2014
2013-2016 STIP:
Programmed Dollars versus Available Resources
9/12/2013
$-
$50,000,000
$100,000,000
$150,000,000
$200,000,000
$250,000,000
2013 2014 2015 2016
Innovative Finance
State & Other Resources
FHWA Resources
Total Program
$-
$5,000,000
$10,000,000
$15,000,000
$20,000,000
$25,000,000
$30,000,000
2013 2014 2015 2016
State & Other Resources
FTA Resources
Total Program
FHWA Programs
FTA Programs
2013 - 2016 STIP
Name Rte/Street: Location/Scope of Work
Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category
CommentsCAACode
FiscalYearPhase
Overall ProjectCost $(M)State#
Grouped / ParentRegionally Significant
Adv Const Payback
ACWORTH 16301
NH 123A REPLACE BRIDGE OVER BOWERS BROOK - 113/064 {Red List} [Oct 2005 Flood] (Bridge
Rehab = 14540T, FY 2007)
ATT2.983 Bridge repaired following flood
damage. 2011 Bridge Priority #12.
.1982013P .158 .000.040 Bridge On/Off System
.1102014 .088 .000.022
.0572015 .045 .000.011
.1762016 .141 .000.035
.0552014R .044 .000.011
.2612015 .209 .000.052
6641 .857.685 .000.171Totals
ALBANY
24182
BEAR NOTCH ROAD DECK REPLACEMENT AND BRIDGE REHABILITATION OF BRIDGE OVER SWIFT
RIVER - 080/148 (BRIDGE PRIORITY LIST # 117)
ATT3.062
.1172016P .117 .000.000 STP-Non Urban Areas Under 5K.022
.0232016R .023 .000.000 .004
8598 .141.141 .000.000Totals .026
ALSTEAD
20817
NH 123A REPLACE SINGLE SPAN BRIDGE OVER WARREN BROOK - 073/163 {Red List} ATT2.383 2011 Bridge Priority #98
.0502014P .040 .000.010 STP-Flexible
.0462015 .037 .000.009
.0482016 .038 .000.010
.0052014R .004 .000.001
.0102015 .008 .000.002
.0112016 .009 .000.002
7992 .170.136 .000.034Totals
ALTON 14121D
NH 28 INTERSECTION IMPROVEMENTS AT STOCKBRIDGE CORNER ROAD (PE Charged to
BARNSTEAD-ALTON 14121)
ATT1.987
.9902013C .990 .000.000 STP-Non Urban Areas Under 5K.198
.8692014 .869 .000.000
7555 1.8591.859 .000.000Totals .198
ANDOVER 14679A
US 4 / NH 11 CULVERT REPLACEMENT [MAY 2006 STORM EVENT] {Betterment} ATT1.100
.4792013C .000 .000.479 Betterment
.3872013 .310 .387-.310 Demonstration Projects (ISTEA 1991-1998)
.0792013 .063 .000.016 Emergency Relief
6840 .945.373 .387.185Totals
Phase: P - Preliminary Engineering R - Right of Way C - Construction
Page P-1 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6
Name Rte/Street: Location/Scope of Work
Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category
CommentsCAACode
FiscalYearPhase
Overall ProjectCost $(M)State#
Grouped / ParentRegionally Significant
Adv Const Payback
ANDOVER 20650
NH 11 REPLACE 5-SPAN BRIDGE OVER NHRR(ABD) - 206/137 ATT3.997 2011 Bridge Priority #74
.0622013P .062 .000.000 Bridge On/Off System.012
.0432014 .034 .000.009
.0452015 .036 .000.009
.0482016 .038 .000.010
.0102013R .010 .000.000 .002
.0212014 .017 .000.004
.0232015 .018 .000.005
.0122016 .009 .000.002
7991 .264.225 .000.038Totals .014
ASHLAND 16237
US 3 & NH 25 BRIDGE REHABILITATION OVER OWL BROOK - 107/094 {Red List} ATT4.147 2011 Bridge Priority #94
.1102013P .110 .000.000 Bridge On/Off System.022
7814 .110.110 .000.000Totals .022
ASHLAND -
BRIDGEWATER 24904
US 3 BRIDGE REHAB AND SCOUR COUNTERMEASURES OVER PEMIGEWASSET RIVER -
076/080
ATT18.673
.1172016P .094 .000.023 Bridge On/Off System
8625 .117.094 .000.023Totals
BARNSTEAD - ALTON 14121
NH 28 RECONSTRUCTION FROM THE ALTON CIRCLE SOUTH APPROXIMATELY 7.0 MILES
TO THE IMPROVED SECTION IN BARNSTEAD
ATT3.727 Specific intersection priorities
programmed as separate
construction project. Remaining priorities to be identified.
.1102013P .110 .000.000 STP-Non Urban Areas Under 5K.022
.1762015 .176 .000.000 .034
.1822016 .182 .000.000 .034
.1592015R .159 .000.000 .031
.0592016 .059 .000.000 STP-Flexible.011
2738 .686.686 .000.000Totals .132
BATH 10425J
US 302 / NH 10 BUILDING DEMOLITION PARCEL 58 ATT.066
.0662014R .053 .000.013 STP-Non Urban Areas Under 5K
8734 .066.053 .000.013Totals
Phase: P - Preliminary Engineering R - Right of Way C - Construction
Page P-2 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6
Name Rte/Street: Location/Scope of Work
Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category
CommentsCAACode
FiscalYearPhase
Overall ProjectCost $(M)State#
Grouped / ParentRegionally Significant
Adv Const Payback
BEDFORD 13953
NH 101 WIDEN TO 5 LANES FOR APPROXIMATELY 2 MILES, FROM NH 114 TO WALLACE
ROAD
ATT20.378
.1602013P .160 .000.000 National Highway (NHPP).032
2.1182014 2.118 .000.000
.3972015 .318 .000.079
.1762016 .141 .000.035
.1502013R .150 .000.000 .030
.0552014 .044 .000.011
1.7032015 1.362 .000.341
.0592016 .047 .000.012
1.8742016C 1.500 .000.375
1818 6.6915.839 .000.853Totals .062
BEDFORD
16156
NH 114 CULVERT REPLACEMENT - 151/151 {Red List} ATT2.568 2011 Bridge Priority # 95
.0572015P .057 .000.000 STP-Flexible.011
.0292016 .029 .000.000 .006
.0572015R .057 .000.000 .011
.0292016 .029 .000.000 .006
7730 .172.172 .000.000Totals .033
BELMONT
14400
LAKE WINNISQUAM
SCENIC TRAIL
CONSTRUCT A MULTI-USE TRAIL (Segments 9 & 10 - Approx 1.7 Miles) FROM US 3 TO
THE TOWN BEACH ("Winnisquam Lake Trail" - 5.2 Miles) (TE Program) [04-03TE]
ATT.967 Partially funded by BELMONT
.0172013P .014 .003.000 STP-Enhancement
.0152014 .012 .003.000
.0012015 .001 .000.000
.0012015R .001 .000.000
.7802015C .624 .156.000
5637 .814.651 .163.000Totals
BENNINGTON 16030
VILLAGE AREA PEDESTRIAN IMPROVEMENTS [09-02TE] ATT.700 Partially funded by BENNINGTON
Specific project from Statewide
program, Local Administration.
.0762013P .061 .015.000 STP-Enhancement
.0192014 .015 .004.000
.0012015 .001 .000.000
.0192014R .015 .004.000
.0012015 .001 .000.000
.5842015C .467 .117.000
7633 .700.560 .140.000Totals
Phase: P - Preliminary Engineering R - Right of Way C - Construction
Page P-3 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6
Name Rte/Street: Location/Scope of Work
Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category
CommentsCAACode
FiscalYearPhase
Overall ProjectCost $(M)State#
Grouped / ParentRegionally Significant
Adv Const Payback
BERLIN 12958B
NH 110 PHASE 2 RECONSTRUCTION FROM FIRST AVENUE TO WIGHT STREET (APPROX.0.7
MILES) [Section 1702 - Designated Project; Demo Id NH043 & NH062]
ATT11.449 Partially funded by BERLIN
Earmark funding.
.0502013C .040 .010.000 High Priority Projects (SAFETEA-LU 2005)
.0582013 .046 .012.000
.1452013 .116 .029.000
1.7472013 1.397 .349.000 STP-Areas Less Than 200K
2.1222014 1.697 .424.000
1.0322015 .826 .206.000
3763 5.1544.123 1.031.000Totals
BERLIN 12958H
NH 110 CONSTRUCTION OF SCENIC VISTAS INTERPRETIVE PANELS AND OTHER APPROVED MITIGATION MEASURES
ATT.339 Partially funded by BERLIN
.0552013P .044 .011.000 STP-Flexible
.0572015 .045 .011.000
.2272015C .182 .045.000
8713 .339.271 .068.000Totals
BERLIN
16019
HUTCHINS STREET RECONSTRUCTION FROM NAPERT STREET TO BRIDGE STREET, EARMARK PROJECT
(Demo Id NH085)
ATT.801
.0802014P .080 .000.000 High Priority Projects (SAFETEA-LU-EXT 2010)
.0012015R .001 .000.000
.7202015C .720 .000.000
7620 .801.801 .000.000Totals
BOSTON EXPRESS NASHUA 68060
FEE TURNPIKE MANCHESTER - NASHUA (OPERATING SUBSIDY).130
.1042013 .104 .000.000 FTA 5307 Capital and Operating Program.052
.0262014 .026 .000.000 .013
8674 .130.130 .000.000Totals .065
Phase: P - Preliminary Engineering R - Right of Way C - Construction
Page P-4 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6
Name Rte/Street: Location/Scope of Work
Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category
CommentsCAACode
FiscalYearPhase
Overall ProjectCost $(M)State#
Grouped / ParentRegionally Significant
Adv Const Payback
BOW - CONCORD 13742
I-93 WIDEN FROM I-89 TO BETWEEN EXITS 15 AND 16 TO MATCH INTO EXISTING
CONCORD PROJECT 11449 @ EXIT 16; 163/106 {Red List}
ATT174.501 "Future Turnpike Capital Program
for Construction, dependent on
Future System-Wide Toll increase,
Non-Turnpike portion funding to be addressed". 2011 Bridge Priority
#43, #44, & #65.
.3002014P .000 .000.300 Turnpike Program
1.0002015 .000 .0001.000
.4002016 .000 .000.400
.5002015R .000 .000.500
.5002016 .000 .000.500
2075
Regionally Significant 2.700.000 .0002.700Totals
BRISTOL
16026
CENTRAL SQUARE PEDESTRIAN / BICYCLE IMPROVEMENT [09-05TE] ATT1.647
.1182013C .000 .000.118 Betterment
.0062013 .006 .000.000 High Priority Grants (STEA04_Ext_2005)
.4172013 .417 .000.000 High Priority Projects (SAFETEA-LU 2005)
.1032013 .000 .103.000 Non Participating
7631 .644.423 .103.118Totals
BROOKLINE
20830
NH 130 CONSTRUCT SIDEWALKS IN TWO LOCATIONS (09-06TE) ATT.617 Partially funded by BROOKLINE
.0012013P .001 .000.000 STP-Enhancement
.0202013R .016 .004.000
.5072013C .406 .101.000
7998 .528.422 .106.000Totals
CAMPTON 12407
BLAIR ROAD REHAB BLAIR BRIDGE OVER PEMIGEWASSET RIVER - 117/076 {Red List} [National
Historic Covered Bridge Preservation Program]
ATT3.158 Specific project from Statewide
program, Local Administration.
.0402013C .040 .000.000 National Historic Covered Bridge Preservation (NHCBP)
.0102013 .000 .002.008 State Aid Bridge
.3812013 .000 .076.305
.9042013 .000 .181.723
676 1.335.040 .2591.036Totals
Phase: P - Preliminary Engineering R - Right of Way C - Construction
Page P-5 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6
Name Rte/Street: Location/Scope of Work
Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category
CommentsCAACode
FiscalYearPhase
Overall ProjectCost $(M)State#
Grouped / ParentRegionally Significant
Adv Const Payback
CART
TRANSIT PREVENTATIVE MAINTENANCE ATT1.041 Boston urbanized area FTA funds.
.0852013 .068 .000.017 FTA 5307 Capital and Operating Program
.0852014 .068 .000.017
.0882015 .070 .000.018
.0912016 .072 .000.018
2985 .348.279 .000.070Totals
CART
TRANSIT OPERATING ASSISTANCE ATT8.448 Annual Program Funding. Public
transit in Derry-Salem region
.6902013 .345 .000.345 FTA 5307 Capital and Operating Program
.6902014 .345 .000.345
.7122015 .356 .000.356
.7352016 .367 .000.367
7239 2.8271.414 .0001.414Totals
CENTER HARBOR
24579
WAUKEWAN ROAD BRIDGE REPLACEMENT OVER LAKE WAUKEWAN OUTLET - 080/040 {Redlist Bridge} ATT1.843
.1102013P .110 .000.000 STP-Flexible.022
.1702015 .136 .000.034
.0282013R .028 .000.000 .006
.0282014 .022 .000.006
8605 .335.296 .000.040Totals .028
CHESTERFIELD 13597
NH 63 RECONSTRUCT TO IMPROVE SAFETY ADJACENT TO SPOFFORD LAKE IN THE AREA
OF THE "S-CURVES" FROM NORTH SHORE ROAD SOUTHERLY APPROXIMATELY 0.5
MILES {STP-Safety}
ATT.758 Original scope to address pavement
and guardrail.
.0552014R .055 .000.000 STP-Safety.011
.4402014C .440 .000.000 .088
2747 .495.495 .000.000Totals .099
Phase: P - Preliminary Engineering R - Right of Way C - Construction
Page P-6 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6
Name Rte/Street: Location/Scope of Work
Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category
CommentsCAACode
FiscalYearPhase
Overall ProjectCost $(M)State#
Grouped / ParentRegionally Significant
Adv Const Payback
CLAREMONT 13248
NH 12 NORTH STREET INTERSECTION RELOCATION [Section 1702 - Designated Project; Demo Id
NH039 & NH059]
ATT4.734 Partially funded by CLAREMONT
Earmark funding. Local
Administration
.0472013P .038 .009.000 High Priority Projects (SAFETEA-LU 2005)
.0782013 .062 .016.000
.1752013 .140 .035.000
.2062015 .165 .041.000
.0202013R .016 .004.000
.2992015 .239 .060.000
.3832016C .307 .077.000
3.4662016 2.773 .693.000
739 4.6753.740 .935.000Totals
CLAREMONT
23677
MAIN STREET IMPROVEMENTS TO THE ROADWAY CORRIDOR TO FIT WITHIN THE FY10 SPECIAL
APPROPRIATION. EARMARK NH086.
ATT.487
.0932014P .093 .000.000 High Priority Projects (SAFETEA-LU-EXT 2010)
.0012015 .001 .000.000
.0102014R .010 .000.000
.0012015 .001 .000.000
.3822014C .382 .000.000
8500 .487.487 .000.000Totals
CLAREMONT 27691
NH 12A BRIDGE REHABILITATION CARRYING NH12A OVER SUGAR RIVER, BR # 072/127. ATT.405
.1142015P .091 .000.023 Bridge On/Off System
.2342016 .187 .000.047 STP-Flexible
.0572015R .045 .000.011
11755 .405.324 .000.081Totals
COAST
COAST OPERATING ASSISTANCE ATT(Annual) Partially funded by COAST
Annual Program Funding
1.5662013 .783 .783.000 FTA 5307 Capital and Operating Program
1.6132014 .807 .807.000
1.6132015 .807 .807.000
1.6132016 .807 .807.000
567 Grouped6.4053.203 3.203.000Totals
Phase: P - Preliminary Engineering R - Right of Way C - Construction
Page P-7 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6
Name Rte/Street: Location/Scope of Work
Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category
CommentsCAACode
FiscalYearPhase
Overall ProjectCost $(M)State#
Grouped / ParentRegionally Significant
Adv Const Payback
COAST
COAST PREVENTIVE MAINTENANCE ATT(Annual) Partially funded by COAST
Annual Program Funding
.3802013 .304 .076.000 FTA 5307 Capital and Operating Program
.3912014 .313 .078.000
.3912015 .313 .078.000
.3912016 .313 .078.000
2691 Grouped1.5531.242 .311.000Totals
COAST
COAST MISC. SUPPORT EQUIPMENT ATT(Annual) Partially funded by COASTAnnual Program Funding
.0332013 .026 .007.000 FTA 5307 Capital and Operating Program
.0342014 .027 .007.000
.0342015 .027 .007.000
.0342016 .027 .007.000
3067 Grouped.135.108 .027.000Totals
COAST
COAST MISC. BUS STATION EQUIPMENT [ARRA] ATT(Annual) Partially funded by COAST
Annual Program Funding
.0652013 .052 .013.000 FTA 5307 Capital and Operating Program
.0672014 .054 .013.000
.0672015 .054 .013.000
.0672016 .054 .013.000
3068 Grouped.266.213 .053.000Totals
COAST
COAST GENERAL & COMPREHENSIVE PLANNING ATT(Annual) Partially funded by COAST
Annual Program Funding
.0522013 .042 .010.000 FTA 5307 Capital and Operating Program
.0542014 .043 .011.000
.0542015 .043 .011.000
.0542016 .043 .011.000
3069 Grouped.214.171 .043.000Totals
COAST
COAST ADA OPERATIONS ATT(Annual) Partially funded by COAST
.1012013 .081 .020.000 FTA 5307 Capital and Operating Program
.1042014 .083 .021.000
.1042015 .083 .021.000
.1042016 .083 .021.000
3070 Grouped.413.330 .083.000Totals
Phase: P - Preliminary Engineering R - Right of Way C - Construction
Page P-8 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6
Name Rte/Street: Location/Scope of Work
Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category
CommentsCAACode
FiscalYearPhase
Overall ProjectCost $(M)State#
Grouped / ParentRegionally Significant
Adv Const Payback
COAST
COAST CAPITAL PROGRAM [ARRA] ATT(Annual) Partially funded by COAST
Annual Program Funding
.9812013 .785 .196.000 FTA 5307 Capital and Operating Program
.1572014 .126 .031.000
.1572015 .126 .031.000
.1572016 .126 .031.000
3503 Grouped1.4531.163 .291.000Totals
COAST 68069
VARIES CAPITAL EQUIPMENT PURCHASES AND OPERATING SUPPORT FOR COAST BUS SERVICES [CMAQ]
ATT6.878
1.9952013P 1.596 .000.399 Congestion Mitigation and Air Quality Program
.4992013 .000 .000.499 Turnpike Program
1.3642013C 1.091 .000.273 Congestion Mitigation and Air Quality Program
.3412013 .000 .000.341 Turnpike Program
.7132014 .570 .000.143 Congestion Mitigation and Air Quality Program
.1782014 .000 .000.178 Turnpike Program
.8952015 .000 .000.895
.8952016 .000 .000.895
8572 6.8783.257 .0003.621Totals
COLUMBIA
16302
US 3 REHABILITATE / REPLACE BRIDGE OVER CONE BROOK - 059/089 ATT1.341 Prioity Corridor Weight Restricted
Bridge (C1)
.1142015P .091 .000.023 Bridge On/Off System
.0572015R .045 .000.011
7360 .170.136 .000.034Totals
CONCORD 12004
SEWALLS FALLS ROAD REPLACE BRIDGE OVER MERRIMACK RIVER - 070/117 [Section 1702 - Designated Project;
Demo Id NH045] {Red List}
ATT15.673 Partially funded by CONCORD
Earmark Funding (partial). City
pays 20% match, Municipal Red
List Bridge. {LPA} Local Project Administration
.6002014P .480 .120.000 Bridge On/Off System
.3082014R .246 .062.0002008 Adv Const
7.8432015C 6.274 1.569.000
.4642015 .371 .093.000 High Priority Projects (SAFETEA-LU 2005)
5.7152016 4.572 1.143.000 Bridge On/Off System
293 14.92911.943 2.986.000Totals
Phase: P - Preliminary Engineering R - Right of Way C - Construction
Page P-9 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6
Name Rte/Street: Location/Scope of Work
Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category
CommentsCAACode
FiscalYearPhase
Overall ProjectCost $(M)State#
Grouped / ParentRegionally Significant
Adv Const Payback
CONCORD 13742D
STICKNEY AVENUE REMOVAL OF STATE OWNED BUILDINGS AT STICKNEY AVENUE2.414
.1172016P .117 .000.000 STP-Flexible.022
11768
Regionally Significant .117.117 .000.000Totals .022
CONCORD 14817
STORRS STREET PARK AND RIDE [06-02CM] (CMAQ Project) ATT2.550 Specific project from Statewide
program.
.1552015P .124 .000.031 Congestion Mitigation and Air Quality Program
1.3422015R 1.073 .000.268
6220 1.4961.197 .000.299Totals
CONCORD 16345
DATABASE DEVELOPMENTS/ IMPROVEMENT TO CAPTURE FHWA ELIGIBLE PROJECT COMMITMENTS
ATT.060
.0122013P .012 .000.000 STP-Flexible.002
7960 .012.012 .000.000Totals .002
CONCORD
23717
US 3 CONVERSION TO 3-LANES AND BICYCLE/PEDESTRIAN ENHANCEMENTS BETWEEN
THE INTERSECTIONS WITH STORRS ST.
ATT7.870 Partially funded by CONCORD
.6472013P .388 .259.000 Tiger Grant
1.0602013C .636 .424.000
.8032014 .482 .321.000
4.7102014 2.826 1.884.000
.6502015 .390 .260.000
8503 7.8704.722 3.148.000Totals
CONCORD 28977
STICKNEY AVE PARKING EXPANSION AT CONCORD INTERMODAL FACILITY TO INCREASE
CAPACITY (CMAQ)
1.838
.6002014P .600 .000.000 Congestion Mitigation and Air Quality Program.120
.0012014R .001 .000.000 .000
1.2372015C .990 .000.247
11776 1.8381.591 .000.247Totals .120
CONWAY 11339B
US 302 / NH 16 DESIGN & ROW ACQUISITIONS OF THE US 302 / NH 16 CONWAY BYPASS PHASES TO PROVIDE CONGESTION RELIEF [PE & ROW Only; CONSTRUCTION BROKEN INTO
OTHER 11339 PROJECTS] [Section 1602 - Designated Project; Demo Id NH004]
ATT67.663 Original overall project for PE and ROW.
.2062015P .206 .000.000 National Highway (NHPP).040
.2132016 .170 .000.043
.0572015R .057 .000.000 .011
176
Regionally Significant .476.434 .000.043Totals .051
Phase: P - Preliminary Engineering R - Right of Way C - Construction
Page P-10 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6
Name Rte/Street: Location/Scope of Work
Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category
CommentsCAACode
FiscalYearPhase
Overall ProjectCost $(M)State#
Grouped / ParentRegionally Significant
Adv Const Payback
Conway 11339Z
US 302 / NH16 DESIGN & ROW ACQUISITIONS OF THE US 302 / NH 16 CONWAY BYPASS PHASES TO
PROVIDE CONGESTION RELIEF (PE&ROW ONLY) CONTINUATION OF 11339B PROJECT.
ATT.671
.2202013P .220 .000.000 National Highway (NHPP).044
.0572015 .057 .000.000 .011
.0592016 .059 .000.000 .011
.2202013R .220 .000.000 .044
.0572015 .057 .000.000 .011
.0592016 .059 .000.000 .011
8759 .671.671 .000.000Totals .132
CONWAY 14821
NH 16 VILLAGE STREETSCAPE PROJECT: REDESIGN WORK INCLUDES SIDEWALK UPGRADES, CROSS WALKS, UTILITY RELOCATION, LANDSCAPING, LIGHTING, AND
GATEWAY MARKERS (TE Program) [06-11TE]
ATT.136 Partially funded by CONWAY VILLAGE FIRE DISTRICT
Specific project from Statewide
program, Local Administration.
.0012013P .001 .000.000 STP-Enhancement
.0102013R .008 .002.000
6234 .011.009 .002.000Totals
CONWAY
14958
NH 16 BRIDGE REHABILITATION OVER SACO RIVER - 170/071 ATT3.982 Deck plate girder bridge, 2011
Bridge Priority #71.
.0062013P .006 .000.000 Bridge On/Off System.001
.0512013 .051 .000.000 .010
.0022013R .002 .000.000 .000
5552 .059.059 .000.000Totals .012
CONWAY 15864
US 302 REPLACE BRIDGE OVER CONWAY LAKE OUTLET - 158/137 {Red List} {Federal Aid
Bridge}
ATT4.346 2011 Bridge Priority #48.
.0112015P .011 .000.000 Bridge On/Off System.002
.0342015R .034 .000.000 .007
7458 .045.045 .000.000Totals .009
CONWAY 25103
EAST SIDE ROAD SACO RIVER BRIDGE SCOUR PROTECTION EFFORT [FBRPI*6601] {Statewide Federal
Bridge Program}{Covered Bridge Program}
ATT1.031
.0532014P .053 .000.000 Bridge On/Off System.011
.0242014 .024 .000.000 National Historic Covered Bridge Preservation (NHCBP).005
.0172014R .017 .000.000 Bridge On/Off System.003
.9372016C .937 .000.000 National Historic Covered Bridge Preservation (NHCBP).176
8666 1.0311.031 .000.000Totals .195
Phase: P - Preliminary Engineering R - Right of Way C - Construction
Page P-11 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6
Name Rte/Street: Location/Scope of Work
Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category
CommentsCAACode
FiscalYearPhase
Overall ProjectCost $(M)State#
Grouped / ParentRegionally Significant
Adv Const Payback
CORNISH, NH - WINDSOR, VT 25067
CORNISH TOLL BRIDGE
ROAD
PROVIDE SCOUR PROTECTION FOR THE CORNISH WINDSOR COVERED BRIDGE
OVER THE CONNECTICUT RIVER - 064/108 [FBRPI*6601] {Statewide Federal Bridge
Program} {Covered Bridge Program}
ATT2.998
.0242014P .024 .000.000 National Historic Covered Bridge Preservation (NHCBP).005
.0182014 .000 .018.000 Non Participating
.0022014 .002 .000.000 STP-Non Urban Areas Under 5K.000
.0402014 .040 .000.000 .008
.0172014R .017 .000.000 .003
1.7042016C 1.704 .000.000 National Historic Covered Bridge Preservation (NHCBP).320
.3162016 .000 .316.000 Non Participating
.8772016 .877 .000.000 STP-Non Urban Areas Under 5K
8632 2.9982.663 .334.000Totals .337
DANBURY
16303
US 4 REHABILITATE BRIDGE OVER NHRR - 156/104 ATT1.956 2011 Bridge Prioity #55
.1502013P .120 .000.030 Bridge On/Off System
.0502013R .040 .000.010
7347 .200.160 .000.040Totals
DEERFIELD
24477
NH 107 REPLACE BRIDGE OVER FREESE POND - 137/116 (REDLIST BRIDGE)1.911
.1102014P .110 .000.000 STP-Non Urban Areas Under 5K.022
.2842015 .284 .000.000 .055
.0112014R .011 .000.000 .002
.0452015 .045 .000.000 .009
8735 .450.450 .000.000Totals .088
DERRY / LONDONDERRY 13065
I-93 CONSTRUCTION OF EXIT 4A - NEW INTERCHANGE BETWEEN EXISTING EXIT 4 AND
EXIT 5 TO: (1) RELIEVE TRAFFIC; (2) ALLOW ACCESS TO POTENTIAL DEVELOPMENT
OF INDUSTRIAL LAND (PE Only)
ATT1.153 Engineering for Final Design and
coordination with I-93
reconstruction. Partial funding with
communities.
.5682015P .454 .000.114 National Highway (NHPP)
.5862016 .469 .000.117
1816 1.153.923 .000.231Totals
Phase: P - Preliminary Engineering R - Right of Way C - Construction
Page P-12 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6
Name Rte/Street: Location/Scope of Work
Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category
CommentsCAACode
FiscalYearPhase
Overall ProjectCost $(M)State#
Grouped / ParentRegionally Significant
Adv Const Payback
DUBLIN 16047
NH 101 PEDESTRIAN / BICYCLE IMPROVEMENT [09-12TE] ATT.774 Partially funded by DUBLIN
Specific project from Statewide
program, Local Administration.
.0292013P .023 .006.000 STP-Enhancement
.0452014 .036 .009.000
.0012015 .001 .000.000
.0102013R .008 .002.000
.0232014 .018 .005.000
.6662015C .533 .133.000
7652 .774.619 .155.000Totals
DUMMER - CAMBRIDGE - ERROL
16304
NH 16 WIDEN & REHABILITATE FROM ERROL SOUTHERLY 10 MILES ATT6.038 NCC priority. Scope of work and specific limits to be determined.
.1102013P .088 .000.022 STP-Non Urban Areas Under 5K
.4402014 .352 .000.088
.0112013R .009 .000.002
.0442014 .035 .000.009
2.2702015C 1.816 .000.454
3.1632016 2.530 .000.633
2766 6.0384.831 .0001.208Totals
DURHAM 16236
US 4 BRIDGE REPLACEMENT & APPROACHES OVER BUNKER CREEK - 145/116. BRIDGE IS
40 ON THE BRIDGE PRIORITY LIST
ATT6.704 2011 Bridge Priority #35
.0552013P .055 .000.000 National Highway (NHPP).011
.0552014 .055 .000.000 .011
.5002014 .400 .000.100
.0572015 .045 .000.011
.1072016 .085 .000.021
.2342016 .187 .000.047
.0112013R .011 .000.000 .002
4059 1.019.839 .000.180Totals .024
DURHAM 16254
US 4 / NH 108 INTERSECTION IMPROVEMENTS AT THE US 4 RAMP INTERSECTION WITH NH 108. ATT.820 From Route 4 Safety Study.
.0172013P .017 .000.000 STP-Flexible.003
.0132014 .013 .000.000 National Highway (NHPP).003
3286 .030.030 .000.000Totals .006
Phase: P - Preliminary Engineering R - Right of Way C - Construction
Page P-13 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6
Name Rte/Street: Location/Scope of Work
Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category
CommentsCAACode
FiscalYearPhase
Overall ProjectCost $(M)State#
Grouped / ParentRegionally Significant
Adv Const Payback
DURHAM - NEWMARKET 13080
NH 108 CONSTRUCT 4' BIKE SHOULDERS FROM OYSTER RIVER BRIDGE TO DAME ROAD
AND SANBORN AVE IN NEWMARKET (3.4MI) STP & [98-17TE] (TE Program)
ATT3.493
.2202013P .220 .000.000 STP-Enhancement.044
.3012014 .301 .000.000 .060
.2842015 .227 .000.057 STP-Areas Less Than 200K
.4132013R .413 .000.000 STP-Enhancement.083
.6252014 .625 .000.000 .125
2296 1.8421.786 .000.057Totals .312
DURHAM - NEWMARKET
13080A
NH 108 CONSTRUCT 4' BIKE SHOULDERS FROM 1/2 MILE NORTH OF DURHAM / NEWMARKET T/L AND CONTINUING NORTH 1.5 MILES - STP-TE PROGRAM (98-17TE)
(Parent=13080)
ATT4.730
4.7302014C 4.730 .000.000 STP-Flexible.946
7820 4.7304.730 .000.000Totals .946
DURHAM -
NEWMARKET 13080B
NH 108 CONSTRUCT 4' BIKE SHOULDERS FROM OYSTER RIVER BR. TO DURHAM /
NEWMARKET T/L AND HAMEL BROOK BR. TO SANBORN AVE [98-17TE] (STP & TE PROGRAM) (Parent=13080)
ATT5.785
2.2702015C 2.270 .000.000 STP-Flexible.440
3.5152016 3.515 .000.000 .660
7981 5.7855.785 .000.000Totals 1.100
DURHAM - ROCHESTER 20256
NH 125 IMPLEMENT NEW PUBLIC TRANSIT SERVICES BETWEEN ROCHESTER AND DURHAM
[10-02CM]
ATT.803 Partially funded by DURHAM -
ROCHESTER
Specific project from Statewide program, Local Administration.
.2682013C .215 .054.000 FTA 5307 Capital and Operating Program
.2632014 .211 .053.000 Congestion Mitigation and Air Quality Program
.2722015 .217 .054.000
7901 .803.643 .161.000Totals
EAST KINGSTON 26942
NH 107A DECK REPLACEMENT AND REHABILITATION OVER B&M RAILROAD & ROAD -
061/064
ATT4.393
.2202014P .220 .000.000 Bridge Off System.044
.2272015 .227 .000.000 .044
.1762016 .176 .000.000 .033
.0282014R .028 .000.000 .006
11724 .650.650 .000.000Totals .127
Phase: P - Preliminary Engineering R - Right of Way C - Construction
Page P-14 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6
Name Rte/Street: Location/Scope of Work
Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category
CommentsCAACode
FiscalYearPhase
Overall ProjectCost $(M)State#
Grouped / ParentRegionally Significant
Adv Const Payback
ENFIELD 12967B
MAIN STREET IMPROVEMENTS TO RAIL TRAIL CROSSING (12967 Breakout) ATT1.100
.1022015P .102 .000.000 STP-Non Urban Areas Under 5K.020
.0122016 .012 .000.000 .002
.0282015R .028 .000.000 .006
.0062016 .006 .000.000 .001
.7612016C .761 .000.000 .143
7619 .910.910 .000.000Totals .172
ENFIELD - LEBANON 13962
I-89 REHAB FROM EXIT 15 TO EXIT 17, INCLUDES BRIDGES 156/117, 155/117, 158/114, 159/114 {ALL Red List} (4.0 MILES) [BRPPI*6601] {4R & Statewide Federal Bridge Program}
ATT14.159 Interstate 4R. 2011 Bridge Priority #39, 40, 67, 68 respectively.
2.9842013C 2.984 .000.000 Interstate Maintenance2012 Adv Const .298
2761 2.9842.984 .000.000Totals .298
EXETER
16045
LINCOLN STREET RESTORATION OF BAGGAGE BUILDING [09-14TE] ATT.122 Partially funded by EXETER
.0942014P .066 .000.028 STP-Enhancement
7650 .094.066 .000.028Totals
FARMINGTON
16146
NH 153 REPLACE BRIDGE OVER COCHECO RIVER - 096/140 {Red List} ATT4.380 2011 Bridge Priority #26
.1102013P .110 .000.000 Bridge Off System.022
.2202014 .176 .000.044 Bridge On/Off System
.0282014R .028 .000.000 .006
.1992015 .199 .000.000 .039
3.5152016C 3.515 .000.000 .660
6778 4.0714.027 .000.044Totals .726
FRANCONIA 24497
NH 18 BRIDGE SUPERSTRUCTURE REPLACEMENT OVER LAFAYETTE BROOK - 089/099. RED
LIST BRIDGE.
ATT4.153
.1102013P .110 .000.000 Bridge On/Off System.022
.1102014 .088 .000.022
.2272015 .182 .000.045
.0282013R .022 .000.006
.0282014 .022 .000.006
8600 .502.424 .000.078Totals .022
Phase: P - Preliminary Engineering R - Right of Way C - Construction
Page P-15 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6
Name Rte/Street: Location/Scope of Work
Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category
CommentsCAACode
FiscalYearPhase
Overall ProjectCost $(M)State#
Grouped / ParentRegionally Significant
Adv Const Payback
FRANCONIA - LITTLETON 15931
I-93 PAVEMENT REHABILITATION (9 Miles) (16 Bridges) FROM NORTH OF EXIT 42 (MM
123.2) TO BRIDGE OVER CONNECTICUT RIVER (MM 131.6) (4R)
ATT18.471 Interstate 4R. Formerly Littleton-
Waterford. Bridges over CT river
are now separate project [15926, id
7516].
2.3142013C 2.314 .000.000 Interstate Maintenance.231
13.0102013 13.010 .000.000 1.301
2.8432014 2.843 .000.000 .284
2785 18.16718.167 .000.000Totals 1.817
FRANKLIN 13928A
US 3 UPGRADE AT INTERSECTION OF INDUSTRIAL PARK DRIVE IN FRANKLIN [Section
1702 - Designated Project; Demo Id NH037 & NH057]
ATT6.630 Earmarked funding.
.1702015P .170 .000.000 High Priority Projects (SAFETEA-LU 2005).033
.0222013R .022 .000.000 .004
.1162014 .116 .000.0002009 Adv Const
.1262014 .126 .000.0002009 Adv Const
.0572015 .057 .000.000 .011
1.7102015C 1.710 .000.000 .331
3.7022015 3.702 .000.000 STP-Flexible.717
6047 5.9035.903 .000.000Totals 1.097
FTA5309 CAPITAL
BUS/FACILITIES FTA5309
VARIOUS FTA 5309 PROGRAM (CAPITAL BUS AND BUS FACILITIES) ATT2.375 Partially funded by LOCAL
.7812013 .625 .156.000 FTA 5309 Capital Funding Program - Formula
.7852014 .628 .157.000
.8082015 .647 .162.000
8672 2.3751.900 .475.000Totals
FTA5339 CAPITAL BUS/FACILITIES
FTA5339
VARIOUS FTA 5339 PROGRAM (Capital bus and bus facilities) ATT11.432 Partially funded by LOCAL
2.1902013 1.752 .438.000 FTA 5339 Bus & Bus Facilities
2.2022014 1.762 .440.000
2.2732015 1.818 .455.000
2.3522016 1.882 .470.000
8673 9.0187.214 1.804.000Totals
GILFORD
15903
US 3 BYP & NH 11 BRIDGE REHABILITATION / DECK REPLACEMENT OVER NH 11A - 160/053 {Red List}
[Highways for Life Grant]
ATT2.988
.0172013P .000 .000.017 Betterment
.0552013 .055 .000.000 Bridge On/Off System.011
.0112015 .009 .000.002
7494 .083.064 .000.019Totals .011
Phase: P - Preliminary Engineering R - Right of Way C - Construction
Page P-16 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6
Name Rte/Street: Location/Scope of Work
Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category
CommentsCAACode
FiscalYearPhase
Overall ProjectCost $(M)State#
Grouped / ParentRegionally Significant
Adv Const Payback
GILFORD 26005
US 3 & NH 11 BYPASS DECK REPLACEMENT OF REDLIST BRIDGE 114/066 OVER US 3 AND NH 11 ATT2.614
.0552013P .055 .000.000 Equity Bonus (Flexible).011
.1702015 .170 .000.000 STP-Areas Less Than 200K.033
.1702015 .170 .000.000 .033
.0282013R .028 .000.000 .006
8724 .423.423 .000.000Totals .083
GOFFSTOWN 16029
GOFFSTOWN BRANCH RAIL
CORRIDOR
4 PROJECT IMPROVEMENT SITES [09-17TE] ATT.486 Partially funded by GOFFSTOWN
.0012015P .001 .000.000 STP-Enhancement
.3682015C .294 .074.000
7632 .369.295 .074.000Totals
GOFFSTOWN
20246
NH 114 & NH 13 IMPROVE TWO INTERSECTIONS ALONG THE NH 114 & NH 13 CORRIDOR THROUGH
DOWN TOWN. TOWN SEEKS TO RECONSTRUCT MAST RD / PLEASANT ST INTO A MODERN ROUNDABOUT. THE SECOND INTERSECTION PROJECT INVOLVES TRAFFIC
CALMING IMPROVEMENTS TO HIGH ST / ELM ST / MAIN ST IN
ATT.929 Partially funded by TOWN OF
GOFFSTOWN
.0112013P .006 .005.000 Congestion Mitigation and Air Quality Program
.0612013 .033 .027.000
.0162014 .009 .007.000
.0012015 .001 .000.000
.0052015R .003 .002.000
.7542015C .414 .339.000
7884 .848.466 .381.000Totals
HAMPTON 23821
NH 1A / OCEAN BLVD /
ASHWORTH AVE
UPDATE TO TRANSPORTATION ELEMENT OF THE HAMPTON BEACH AREA MASTER
PLAN {TCSP}
ATT.375 Partially funded by TOWN OF
HAMPTON
.3752013P .300 .075.000 Transportation & Community & System Preservation
8515 .375.300 .075.000Totals
HAMPTON - PORTSMOUTH
26485
HAMPTON BRANCH RAIL
CORRIDOR
PURCHASE RAIL CORRIDOR FROM HAMPTON TO PORTSMOUTH APPROXIMATLY 9.7
MILES TO IMPROVE TRAIL SURFACE [13-01CM]
ATT5.447
.1102013P .110 .000.000 Congestion Mitigation and Air Quality Program.022
3.5002014R 3.500 .000.000 .700
.8152015 .815 .000.000 .158
1.0222015C 1.022 .000.000 .198
8744 5.4475.447 .000.000Totals 1.078
Phase: P - Preliminary Engineering R - Right of Way C - Construction
Page P-17 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6
Name Rte/Street: Location/Scope of Work
Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category
CommentsCAACode
FiscalYearPhase
Overall ProjectCost $(M)State#
Grouped / ParentRegionally Significant
Adv Const Payback
HARTS LOCATION 16396B
US 302 CONSTRUCTION OF A TEMPORARY PARKING AREA FOR THE 4TH IRON
CAMPGROUND TO REPLACE THE LOT USED BY THE US 302 DETOUR ROUTE [AUG
2011 HURRICANE IRENE STORM EVENT] {ER DISASTER CODE NH 11-1}
ATT.025
.0252013C .025 .000.000 STP-Flexible.005
8488 .025.025 .000.000Totals .005
HAVERHILL 16238
MILL STREET BRIDGE REPLACEMENT OVER ABANDONED RAILROADAND ACTIVE MULTI-USE
TRAIL - 215/158 {Red List}
ATT1.527 2011 Bridge Priority #109
.0552013P .055 .000.000 Bridge On/Off System.011
.0012013 .001 .000.000 Equity Bonus (Flexible).000
.0182013 .018 .000.000 STP-Flexible.004
.1652014 .165 .000.000 Bridge On/Off System.033
7815 .240.240 .000.000Totals .048
HAZMAT
HAZMAT
VARIOUS PROGRAMMATIC PROJECT FOR POST CONSTRUCTION HAZMAT OBLIGATIONS ATT.027
.0272013R .027 .000.000 STP-Flexible.005
8671 .027.027 .000.000Totals .005
HOOKSETT
20259
COLLEGE PARK DRIVE CONSTRUCT SIDEWALK ALONG COLLEGE PARK DRIVE BETWEEN PARK DRIVE
BETWEEN MAIN ST AND US 3 [10-07CM]
ATT.384 Partially funded by HOOKSETT
.0352013P .028 .007.000 Congestion Mitigation and Air Quality Program
.0152014 .012 .000.003
.0012015 .001 .000.000
.0072014R .006 .000.001
.0012015 .001 .000.000
.3252015C .260 .065.000
7896 .384.307 .072.005Totals
HUDSON 14408
TRAIN DEPOT HUDSON CENTER TRAIN STOP DEPOT - RELOCATION AND RESTORATION OF
FORMER HUDSON CENTER TRAIN DEPOT, WORCESTER, NASHUA, & PORTLAND
RAILROAD BUILT IN 1873 (TE Program) [04-25TE]
ATT.399 Partially funded by HUDSON
.0122013P .009 .003.000 STP-Enhancement
.3192015C .239 .080.000
5646 .331.248 .083.000Totals
HUDSON 20245
NH 111 / LIBRARY ST UPGRADE 3 SETS OF TRAFFIC LIGHTS THAT CONTROL TRAFFIC FROM 3 MAIN CORRIDORS IN HUDSON. NH 111, NH3A & NH 102 MERGE [10-08CM]
ATT.308 Partially funded by TOWN OF HUDSON
.2802015C .224 .056.000 Congestion Mitigation and Air Quality Program
7886 .280.224 .056.000Totals
Phase: P - Preliminary Engineering R - Right of Way C - Construction
Page P-18 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6
Name Rte/Street: Location/Scope of Work
Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category
CommentsCAACode
FiscalYearPhase
Overall ProjectCost $(M)State#
Grouped / ParentRegionally Significant
Adv Const Payback
JACKSON 27709
NH 16 BRIDGE REPLACEMENT, RED LIST BR#144/056 OVER ELLIS RIVER. ATT.287
.1142015P .114 .000.000 Bridge On/Off System.022
.1172016 .094 .000.023 STP-Flexible
.0572015R .057 .000.000 .011
11764 .287.264 .000.023Totals .033
JAFFREY 16307
US 202 RECONFIGURE 'DOG-LEG' @ INTERSECTION OF NH 124 ATT9.736 SWRPC priority #1
.0552013P .055 .000.000 STP-Non Urban Areas Under 5K.011
7442 .055.055 .000.000Totals .011
JEFFERSON 16153
US 2 BRIDGE REHABILITATION OVER ISRAEL RIVER - 046/178 {Red List} ATT3.436 2011 Bridge Priority #90
.1002013P .100 .000.000 Bridge On/Off System.020
7728 .100.100 .000.000Totals .020
KEENE
10309B
WINCHESTER STREET RECONSTRUCTION FROM NH 101 ROUNDABOUT NORTH TO PEARL STREET / ISLAND
STREET INCLUDING INTERSECTION AT KEY ROAD [MUPCA*450] {Municipal Urban Projects}
ATT5.548 Local Administration and 20%
match.
.2622014P .210 .000.052 STP-Areas Less Than 200K
.3802014R .304 .000.076
1828 .642.514 .000.128Totals
KEENE 16152
NH 9 & NH 12 BRIDGE REHABILITATION - 129/099 {Red List} ATT2.385 2011 Bridge Priority #92
.1602013P .160 .000.000 Bridge On/Off System.032
.0552014 .055 .000.000 .011
.0112013R .011 .000.000 .002
7727 .226.226 .000.000Totals .045
KEENE 27790
GILBO AVE MULTI- USE PATH ALONG GILBO AVE AND COLONY MILL MARKET PLACE.
TRANSPORTATION ENHANCEMENT. (TE)
ATT.752 Partially funded by KEENE
.0682014P .054 .014.000 STP-Enhancement
.0052014R .004 .001.000
.6792015C .544 .136.000
11750 .752.602 .150.000Totals
LACONIA
16144
US 3 BRIDGE REHABILITATION OVER NH RAILROAD - 131/154 {Red List} ATT2.372 2011 Bridge Priority #74
.2272015P .227 .000.000 Bridge On/Off System.044
.1142015R .114 .000.000 .022
7723 .341.341 .000.000Totals .066
Phase: P - Preliminary Engineering R - Right of Way C - Construction
Page P-19 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6
Name Rte/Street: Location/Scope of Work
Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category
CommentsCAACode
FiscalYearPhase
Overall ProjectCost $(M)State#
Grouped / ParentRegionally Significant
Adv Const Payback
LACONIA 24181
CENTENARY AVENUE BRIDGE REPLACEMENT OR REMOVAL - 126/163 {Redlist} ATT4.750
.2842015P .284 .000.000 Bridge Off System.055
.2932016 .293 .000.000 .055
.0282015R .028 .000.000 .006
8597 .605.605 .000.000Totals .116
LANCASTER, NH - GUILDHALL, VT
16155
US 2 BRIDGE REPLACEMENT OVER CONNECTICUT RIVER - 111/129 (ROGER'S RANGER'S
BRIDG
ATT13.077 2011 Bridge Priority #60
.4132015P .330 .000.083 Bridge On/Off System
.0412015 .000 .000.041 Non Participating
.0222014R .022 .000.000 Bridge On/Off System.004
.0202014 .000 .020.000 Non Participating
3524 .496.352 .020.124Totals .004
LEBANON
10034B
US 4 RECONSTRUCTION FROM HIGH STREET TO I-89 RAMPS. (MUPCA *450) ATT3.095
.1472014P .117 .000.029 STP-Areas Less Than 200K
.1552015 .124 .000.031
.0202014R .016 .000.004
.5162015 .413 .000.103
2.2582016C 1.806 .000.452
11770 3.0952.476 .000.619Totals
LEBANON 13951
US 4 BRIDGE REPLACEMENT OVER MASCOMA RIVER - 188/126 NEAR INTERSECTION OF
US 4 AND NH 4A {Red List}
ATT12.290 2011 Bridge Priority #9
.1502013P .150 .000.000 Bridge Off System2008 Adv Const .030
.1602014 .160 .000.000 Bridge On/Off System.032
.2252013R .225 .000.0002008 Adv Const .045
.0502014 .050 .000.000 .010
5.5002014C 5.500 .000.000 1.100
.2192014 .219 .000.000 Non Participating.219
5.0362015 5.036 .000.000 Bridge On/Off System.976
1875 11.34011.340 .000.000Totals 2.412
LEBANON
15880
I-89 NB/SB ROADWAY RECONSTRUCTION AND BRIDGE DECK
REPLACEMENT/REHABILITATION (7 BRIDGES: 093/109 (Red List), 094/108, 097/112, 098/111, 140/124, 141/123, 099/111) FROM MILE MARKER 54.8 TO MILE MARKER 60.0
ATT17.887 Interstate 4R. 2011 Bridge priority
#41 & #42.
.1032016P .103 .000.000 Interstate Maintenance2010 Adv Const .010
1900 .103.103 .000.000Totals .010
Phase: P - Preliminary Engineering R - Right of Way C - Construction
Page P-20 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6
Name Rte/Street: Location/Scope of Work
Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category
CommentsCAACode
FiscalYearPhase
Overall ProjectCost $(M)State#
Grouped / ParentRegionally Significant
Adv Const Payback
LEBANON 16046
NH 120 PEDESTRIAN / BICYCLE IMPROVEMENT [09-22TE] ATT.557 Partially funded by LEBANON
.0012014P .001 .000.000 STP-Enhancement
.0032014R .002 .001.000
.4672015C .373 .093.000
7651 .471.377 .094.000Totals
LEBANON 25784
I-89 DECK REPLACEMENT AND BRIDGE REHABILITATION ON TWO REDLISTED BRIDGES
CARRYING I-89 NB & SB OVER HARDY HILL ROAD
ATT6.605
.0552013P .055 .000.000 Equity Bonus (Flexible).011
.2752014 .275 .000.000 STP-Areas Less Than 200K.055
.2842015 .284 .000.000
.0282014R .028 .000.000 .006
.0282015 .028 .000.000
8720 .670.670 .000.000Totals .072
LEBANON
25821
MASCOMA STREET BRIDGE REHABILITATION AND DECK REPLACEMENT OVER I-89 - 103/116 {REDLIST} ATT6.266
.0552013P .055 .000.000 Equity Bonus (Flexible).011
.2202014 .220 .000.000 STP-Areas Less Than 200K.044
.0282014R .028 .000.000 .006
.0282015 .028 .000.000
8721 .331.331 .000.000Totals .061
LEBANON, NH - HARTFORD, VT 14957
US 4 REPLACE BRIDGE OVER CONNECTICUT RIVER - 058/127 {Red List} ATT14.063 2011 Bridge Priority #3
.1322013P .132 .000.000 STP-Flexible.026
2.7912013C 2.791 .000.000 Bridge On/Off System.558
.3162013 .000 .000.316 Non Participating
.7502013 .000 .000.750
6.2822014 6.282 .000.000 Bridge On/Off System1.256
1.2242014 .000 1.224.000 Non Participating
1.2752015 1.020 .000.255 Bridge On/Off System
.1582015 .000 .158.000 Non Participating
2753 12.92710.225 1.3821.321Totals 1.841
Phase: P - Preliminary Engineering R - Right of Way C - Construction
Page P-21 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6
Name Rte/Street: Location/Scope of Work
Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category
CommentsCAACode
FiscalYearPhase
Overall ProjectCost $(M)State#
Grouped / ParentRegionally Significant
Adv Const Payback
LEBANON, NH - HARTFORD, VT 16148
I-89 REHABILITATION & WIDENING OF BRIDGES OVER CONNECTICUT RIVER - 044/103 &
044/104
ATT39.192 2011 Bridge Priorities #49 and #50.
.4132013P .413 .000.000 Interstate Maintenance.041
.1252013 .000 .125.000 Non Participating
.4372015 .437 .000.000 Interstate Maintenance.042
.1182015 .000 .118.000 Non Participating
.0402014R .000 .040.000
2771 1.133.850 .283.000Totals .084
LINCOLN 15755
I-93 PAVEMENT REHABILITATION FROM EXIT 32 TO NORTH 6 MILES & BRIDGE REHABILITATION - 202/100 (Lincoln) {Red List} [4R]
ATT17.904 Specific project from 4R program combined with Lincoln 15754.
2011 Bridge Priority #51
.0402013P .040 .000.000 Interstate Maintenance.004
.1472013 .147 .000.000 .015
.0052013R .005 .000.000 .001
.0502013C .000 .000.050 Betterment
17.5022013 15.751 .0001.750 Interstate Maintenance
7292 17.74415.943 .0001.800Totals .019
LONDONDERRY -
SALEM
TRANSIT CAPITAL ATT2.681
.2192013 .175 .000.044 FTA 5307 Capital and Operating Program
.2192014 .175 .000.044
.2262015 .181 .000.045
.2332016 .187 .000.047
2903
Regionally Significant .897.718 .000.179Totals
LONDONDERRY - SALEM
TRANSIT COMMUTER BUS PREVENTATIVE MAINTENANCE ATT3.443 Partially funded by LOCAL
.2812013 .225 .056.000 FTA 5307 Capital and Operating Program
.2812014 .225 .056.000
.2902015 .232 .058.000
.3002016 .240 .060.000
6292 1.152.922 .230.000Totals
Phase: P - Preliminary Engineering R - Right of Way C - Construction
Page P-22 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6
Name Rte/Street: Location/Scope of Work
Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category
CommentsCAACode
FiscalYearPhase
Overall ProjectCost $(M)State#
Grouped / ParentRegionally Significant
Adv Const Payback
LYME, NH - THETFORD, VT 14460
EAST THETFORD ROAD BRIDGE REHABILITATION OVER THE CONNECTICUT RIVER - 053/112 ATT4.839 2011 Bridge Priority #75
.0892013P .089 .000.000 Equity Bonus (Flexible)2012 Adv Const .018
.0092013 .000 .009.000 Non Participating
.0242014 .000 .024.000
.2342014 .234 .000.000 STP-Non Urban Areas Under 5K2012 Adv Const .047
.0212015 .000 .021.000 Non Participating
.2042015 .163 .000.041 STP-Non Urban Areas Under 5K
.0132013R .013 .000.000 Equity Bonus (Flexible)2012 Adv Const .003
.0012013 .000 .001.000 Non Participating
.0022014 .000 .002.000
.0182014 .018 .000.000 STP-Non Urban Areas Under 5K2012 Adv Const .004
3269 .615.517 .056.041Totals .071
MANCHESTER
TRANSIT AUTHORITY OPERATING ASSISTANCE FOR FIXED ROUTE SERVICE E-2145.426 Partially funded by MANCHESTER
TRANSIT AUTHORITYAnnual Program Funding
2.9252013 1.462 1.462.000 FTA 5307 Capital and Operating Program
.0422013 .034 .008.000 FTA 5317 New Freedom Program
3.0422014 1.521 1.521.000 FTA 5307 Capital and Operating Program
.0422014 .034 .008.000 FTA 5317 New Freedom Program
3.2652015 1.632 1.632.000 FTA 5307 Capital and Operating Program
3.5042016 1.752 1.752.000
602 12.8196.435 6.384.000Totals
MANCHESTER
TRANSIT AUTHORITY OPERATING ASSISTANCE FOR CAPITAL MAINTENANCE OF MTA FLEET E-216.300 Partially funded by MANCHESTER
TRANSIT AUTHORITY
Annual Program Funding
.4512013 .361 .090.000 FTA 5307 Capital and Operating Program
.4692014 .376 .094.000
.5042015 .403 .101.000
.5412016 .433 .108.000
2496 1.9651.572 .393.000Totals
MANCHESTER
TRANSIT AUTHORITY REPLACEMENT BUSES E-302.530 Partially funded by MANCHESTER TRANSIT AUTHORITY
Annual Program Funding
.4082013 .326 .082.000 FTA 5307 Capital and Operating Program
3062 .408.326 .082.000Totals
Phase: P - Preliminary Engineering R - Right of Way C - Construction
Page P-23 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6
Name Rte/Street: Location/Scope of Work
Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category
CommentsCAACode
FiscalYearPhase
Overall ProjectCost $(M)State#
Grouped / ParentRegionally Significant
Adv Const Payback
MANCHESTER
TRANSIT AUTHORITY OPERATING ASSISTANCE FOR ADA PARATRANSIT SERVICE E-213.301 Partially funded by MANCHESTER
Annual Program Funding
.2862013 .229 .057.000 FTA 5307 Capital and Operating Program
.2972014 .238 .059.000
.3192015 .255 .064.000
.3432016 .274 .069.000
5916 1.245.996 .249.000Totals
MANCHESTER
TRANSIT AUTHORITY REPLACEMENT OF ADA PARATRANSIT VANS E-30.641 Partially funded by MANCHESTER
Annual Program Funding
.1672015 .134 .033.000 FTA 5307 Capital and Operating Program
.1812016 .145 .036.000
5917 .348.279 .070.000Totals
MANCHESTER
TRANSIT AUTHORITY REPLACEMENT OF TRANSIT SERVICE VEHICLES E-30.160 Partially funded by MANCHESTER
.1362013 .109 .027.000 FTA 5307 Capital and Operating Program
5919 .136.109 .027.000Totals
MANCHESTER
TRANSIT AUTHORITY MISCELLANEOUS CAPITAL [ARRA] E-301.495 Partially funded by CITY OF
MANCHESTER
Annual Program Funding
.1042013 .083 .021.000 FTA 5307 Capital and Operating Program
.1092014 .087 .022.000
.1182015 .094 .024.000
.1282016 .102 .026.000
6923 .458.367 .092.000Totals
MANCHESTER 14412A
PISCATAQUOG TRAILWAYS PHASE III-A, REHAB OR REPLACE WOOD TRESTLE BRIDGE OVER PISCATAQUOG
RIVER FOR MULTI-USE ACCESS AND CONST 1/2 MILE OF MULTI-USE TRAIL (TE
Program) [Part of 04-33TE & 09-26TE]
.794 Partially funded by MANCHESTER
.0082013P .007 .002.000 STP-Enhancement
.0022015 .002 .000.000
.6622014C .529 .132.000
.0012015 .001 .000.000
7255 .673.538 .134.000Totals
Phase: P - Preliminary Engineering R - Right of Way C - Construction
Page P-24 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6
Name Rte/Street: Location/Scope of Work
Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category
CommentsCAACode
FiscalYearPhase
Overall ProjectCost $(M)State#
Grouped / ParentRegionally Significant
Adv Const Payback
MANCHESTER 16016
ELM, GRANITE, & AUBURN
STREETS
ELM ST FROM GRANITE TO VALLEY; GRANITE ST FROM CANAL TO ELM; WEST
AUBURN ST TO OLD GRANITE ST; AKA GAS LIGHT IMPROVE INFRASTRUCTURE &
PED AMENITIES. High Priority Project (HPP) Demo Id NH084
E-331.029
.0102013P .010 .000.000 High Priority Projects (SAFETEA-LU-EXT 2010)
.0012014 .001 .001-.001
.0012015 .001 .001-.001
.0012015R .001 .000.000
.9502015C .950 .000.000
7618 .963.963 .002-.002Totals
MANCHESTER 16099
I-293 / FEE TPK PLANNING AND ENGINEERING STUDY FOR RECONSTRUCTION OF THE F.E. EVERETT TURNPIKE AT EXIT 6 (AMOSKEAG) INTERCHANGE AND NEW EXIT 7 (NH 3A)
INTERCHANGE {Turnpike}
E-3469.150 "Future Turnpike Capital Program for Construction, dependent on
Future System-Wide Toll increase".
2.0002013P .000 .0002.000 Turnpike Program
1.0002015 .000 .0001.000
1.0002016 .000 .0001.000
.2502014R .000 .000.250
7692
Regionally Significant 4.250.000 .0004.250Totals
MANCHESTER
20162
US 3 & CAMPBELL STREET TRAFFIC OPERATION AND SAFETY IMPROVEMENTS TO 3 CONGESTED
INTERSECTIONS [10-09CM]
E-62.641 Partially funded by CITY OF
MANCHESTER
.0012013P .001 .001.000 Congestion Mitigation and Air Quality Program
.0832013 .031 .051.000
.1502013R .057 .093.000
2.4082015C .915 1.493.000
7862 2.6411.004 1.638.000Totals
MANCHESTER 20257
RAIL CORRIDOR CONSTRUCT MULTI-USE PATH ALONG ABANDONED RAIL CORRIDOR FROM GOLD
ST TO GOFFS FALLS ROAD [10-10CM]
E-33.727 Partially funded by CITY OF
MANCHESTER
.0012013P .001 .000.000 Congestion Mitigation and Air Quality Program
.0012013R .001 .000.000
.6892015C .475 .214.000
7902 .691.477 .214.000Totals
Phase: P - Preliminary Engineering R - Right of Way C - Construction
Page P-25 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6
Name Rte/Street: Location/Scope of Work
Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category
CommentsCAACode
FiscalYearPhase
Overall ProjectCost $(M)State#
Grouped / ParentRegionally Significant
Adv Const Payback
MEREDITH 10430
US 3 / NH 25 ROADWAY AND INTERSECTION IMPROVEMENTS @ NH 104, NORTH TO NH 25, AND
NH 25 FROM US 3, EAST TO MEREDITH / CENTER HARBOR T/L [Section 1702 -
Designated Project; Demo Id NH041, NH060, & NH071]
ATT11.749 Scope to address pavment and
priority intersections only.
.1702015P .136 .000.034 High Priority Projects (SAFETEA-LU 2005)
.1762016 .141 .000.035
1.0392015R .832 .000.208
.4942016 .396 .000.099
.1552016 .124 .000.031 STP-Flexible
94 2.0351.628 .000.407Totals
MEREDITH 24597
MEREDITH CENTER ROAD DECK REPLACEMENT & BRIDGE REHABILITATION OVER WICKWAS POND OUTLET - 131/105 {Redlist Bridge}
.599
.1102014P .110 .000.000 Bridge Off System.022
.2272015 .227 .000.000 .044
.2342016 .234 .000.000 .044
.0282014R .028 .000.000 .006
8587 .599.599 .000.000Totals .116
MILFORD
13692B
NH 101 SAFETY IMPROVEMENTS FROM WILTON ROAD TO NH101 AND ELM STREET
INTERSECTION
ATT3.405
1.6482015C 1.318 .000.330 National Highway (NHPP)
1.7572016 1.406 .000.351
8621 3.4052.724 .000.681Totals
MILFORD 14492
NH 101A & NH 13 IMPROVEMENTS IN THE AREA KNOWN AS THE "OVAL" TO IMPROVE TRAFFIC FLOW
BASED ON RESULTS OF ONGOING TRAFFIC STUDIES WITHIN THE TOWN [Section
1702 - Designated Project; Demo Id NH038 & NH058]
ATT2.643 Partially funded by MILFORD
Earmarked funding.
.1122014R .090 .022.000 High Priority Projects (SAFETEA-LU 2005)
.5192014C .415 .104.000
1.8062014 1.445 .361.000
3278 2.4371.950 .487.000Totals
MILFORD 14837
SOUTH STREET SOUTH ST IMPROVEMENT PROJECT: CONSTRUCT PHASE 2 PORTION OF
DOWNTOWN REVITALIZATION PLAN TO IMPROVE OVERALL SAFETY, PHYSICAL /
ADA ACCESSIBILITY, FUNCTIONALITY, DESIGN AND GENERAL AESTHETIC OF
INTERSECTION (TE Program) [06-28TE] [NH038 & NH058]
ATT1.421 Partially funded by MILFORD
Specific project from Statewide
program, Local Administration.
.0012014P .001 .000.000 STP-Enhancement
.0012014R .001 .000.000
.5422015C .433 .108.000 High Priority Projects (SAFETEA-LU 2005)
.5332015 .426 .107.000 STP-Enhancement
6240 1.076.861 .215.000Totals
Phase: P - Preliminary Engineering R - Right of Way C - Construction
Page P-26 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6
Name Rte/Street: Location/Scope of Work
Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category
CommentsCAACode
FiscalYearPhase
Overall ProjectCost $(M)State#
Grouped / ParentRegionally Significant
Adv Const Payback
MILFORD 20253
NH 13 / EMERSON RD /
ARMORY RD
SIGNAL MODIFICATION AND ADDITIONAL TURNING LANES TO ADDRESS
CONGESTION AND AIR QUALITY RELATED IMPACTS [10-11CM]
ATT.489 Partially funded by TOWN OF
MILFORD
.0102013P .008 .002.000 Congestion Mitigation and Air Quality Program
.0022015 .002 .000.000
.0012015R .001 .000.000
.4022014C .322 .080.000
.0012015 .001 .000.000
7891 .416.333 .082.001Totals
MILFORD TO NASHUA 10136
NH 101A INTERSECTION IMPROVEMENTS AT SEVERAL LOCATIONS BETWEEN NH 101 TO FEE TPK (7.5 MILES); AS DETERMINED BY CORRIDOR STUDY
E-533.440 Parent Project for PE & ROW. Specific Safety & Capacity
improvements at 3 intersections as
determined by corridor study,
programmed as separate construction projects.
.1272014R .101 .000.025 National Highway (NHPP)
.6922015 .554 .000.138 STP-Areas Less Than 200K
730 .819.655 .000.164Totals
NASHUA
NASHUA TRANSIT SYSTEM CAPITAL PLANNING PROGRAM E-212.115 Partially funded by NASHUA
Annual Program Funding
.2122013 .170 .042.000 FTA 5307 Capital and Operating Program
.2182014 .174 .044.000
.1652015 .132 .033.000
.1702016 .136 .034.000
608 .765.612 .153.000Totals
NASHUA
NASHUA TRANSIT SYSTEM OPERATING ASSISTANCE E-2116.900 Partially funded by NASHUA
Annual Program Funding
1.1492013 .919 .230.000 FTA 5307 Capital and Operating Program
1.1742014 .939 .235.000
1.5022015 1.201 .300.000
1.5502016 1.240 .310.000
609 5.3754.300 1.075.000Totals
NASHUA
NASHUA TRANSIT SYSTEM CAPITAL EQUIPMENT [ARRA] E-30.340 Partially funded by NASHUAAnnual Program Funding
.0222013 .017 .004.000 FTA 5307 Capital and Operating Program
.0222014 .018 .004.000
3797 .044.035 .009.000Totals
Phase: P - Preliminary Engineering R - Right of Way C - Construction
Page P-27 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6
Name Rte/Street: Location/Scope of Work
Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category
CommentsCAACode
FiscalYearPhase
Overall ProjectCost $(M)State#
Grouped / ParentRegionally Significant
Adv Const Payback
NASHUA
NASHUA TRANSIT SYSTEM PREVENTIVE MAINTENANCE E-315.545 Partially funded by NASHUA
Annual Program Funding
.4332013 .347 .087.000 FTA 5307 Capital and Operating Program
.4452014 .356 .089.000
.4742015 .379 .095.000
.4892016 .391 .098.000
3799 1.8411.473 .368.000Totals
NASHUA
NASHUA TRANSIT SYSTEM ADA OPERATIONS E-21.780 Partially funded by NASHUA
TRANSIT SYSTEM
.2602013 .208 .052.000 FTA 5307 Capital and Operating Program
.2672014 .214 .053.000
7927 .527.422 .105.000Totals
NASHUA
10040A
BROAD STREET PARKWAY CON OF 1.8 MI OF NEW 2-LANE RDWAY THAT WILL CONNECT BROAD ST (NH130) TO
WEST HOLLIS ST(NH 111) IN NASHUA. APPRAISAL ACQUISITION,MISC. ROW, PRE/FIN DESIGN REQUIRED FOR LATER PHASES (CON) [SECTION 1602-DESIGNATED PROJECT;
DEMO ID NH003] [SISTER DEMO PROJECT
N/E28.907 Original overall project for PE and
ROW. Earmark funding (partial), project being re-scoped by City.
Local Administration.
.2582013R .258 .000.000 High Priority Projects (TEA-21 1998-2003)
.1002014 .100 .000.000
18
Regionally Significant .358.358 .000.000Totals
NASHUA 10040W
44 BROAD STREET
PARKWAY
BUILDING DEMOLITION (Parent = Nashua 10040A) [Section 1602 - Designated Project; Demo
Id NH003]
.142
.1422013R .142 .000.000 High Priority Projects (TEA-21 1998-2003)
8578 .142.142 .000.000Totals
NASHUA 13117
FEE TPK CONSTRUCT PARK AND RIDE AND ACCESSORY FACILITIES AT UP TO TWO NASHUA
LOCATIONS (CMAQ Program) [98-13CM]
N/E6.878 Specific project from Statewide
program. ROW funds programmed
previously. Local Administration.
.1002013P .100 .000.000 Congestion Mitigation and Air Quality Program2008 Adv Const .020
.1302014 .130 .000.000 .026
1.5002013R 1.500 .000.0002008 Adv Const .300
2344
Regionally Significant 1.7301.730 .000.000Totals .346
NASHUA 14815
PURCHASE TWO NEW CNG BUSES (CMAQ Program) [06-13CM] N/E.913 Partially funded by NASHUASpecific project from Statewide
program. Local Administration.
.9132013C .730 .183.000 FTA 5309 Capital Funding Program - Formula
6225 .913.730 .183.000Totals
Phase: P - Preliminary Engineering R - Right of Way C - Construction
Page P-28 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6
Name Rte/Street: Location/Scope of Work
Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category
CommentsCAACode
FiscalYearPhase
Overall ProjectCost $(M)State#
Grouped / ParentRegionally Significant
Adv Const Payback
NASHUA 16050
RAIL CORRIDOR EAST OF MAIN STREET, PURCHASE RAIL CORRIDOR AT VARIOUS LOCATIONS [09-
32TE]
.361 Partially funded by NASHUA
.0012014P .001 .000.000 STP-Enhancement
.0152014R .012 .003.000
.3452015 .276 .069.000
7656 .361.289 .072.000Totals
NASHUA 16110
BROAD STREET PARKWAY CONSTRUCT NEW 2 LANE ROAD 1.8 MILES FROM NH 130 (BROAD ST) TO NH 111
(HOLLIS STREET) (Parent Construction Project) {Earmark Project} [Section 1602 - Designated
Project; Demo Id NH003 & NH083]
N/E7.115 Partially funded by NASHUA
Local Administration. Rescoped
from Nashua 10040 Series projects.
5.0002013C .000 5.000.000 Non Participating
2.1152014 .000 2.115.000
7781 7.115.000 7.115.000Totals
NASHUA
16110B
BROAD STREET PARKWAY CONSTRUCTION OF BROAD STREET PARKWAY NORTH INCLUDING REPLACEMENT
OF BALDWIN STREET BRIDGE (PARENT PROJECT 16110*7781)Demo ID NH003 & NH083
12.471 Partially funded by NASHUA
7.5022013C 7.502 1.500-1.500 High Priority Projects (TEA-21 1998-2003)
2.5232013 .000 2.523.000 Non Participating
2.4452013 1.956 .489.000 STP-Flexible
8586 12.4719.458 4.513-1.500Totals
NASHUA
16110C
BROAD STREET PARKWAY CONSTRUCTION OF THE NEW BRIDGE OVER NASHUA RIVER (PARENT PROJECT
16110*7781)
10.243
.4872014C .487 .000.000 High Priority Projects (SAFETEA-LU-EXT 2010)
4.4042014 .000 4.404.000 Non Participating
2.3522014 1.882 .470.000 STP-Flexible
3.0002014 2.400 .600.000
8588 10.2434.769 5.475.000Totals
NASHUA 16110D
BROAD STREET PARKWAY CONSTRUCTION OF THE SOUTH SECTION (PARENT PROJECT NASHUA 16110*7781)6.100 Partially funded by NASHUA
3.6182014C .000 3.618.000 Non Participating
2.4822014 1.985 .496.000 STP-Flexible
8593 6.1001.985 4.115.000Totals
NASHUA 16110E
BROAD STREET PARKWAY PART OF NASHUA BROAD STREET PARKWAY THIS IS THE FAIRMOUNT STREET BRIDGE 118/118 (PARENT PROJECT NASHUA 16110* 7781
8.708 Partially funded by NASHUA
1.4612014C 1.169 .292.000 High Priority Projects (TEA-21 1998-2003)
3.7272014 .000 3.727.000 Non Participating
3.5202014 2.816 .704.000 STP-Areas Over 200K
8738 8.7083.985 4.723.000Totals
Phase: P - Preliminary Engineering R - Right of Way C - Construction
Page P-29 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6
Name Rte/Street: Location/Scope of Work
Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category
CommentsCAACode
FiscalYearPhase
Overall ProjectCost $(M)State#
Grouped / ParentRegionally Significant
Adv Const Payback
NASHUA 16314
EAST HOLLIS STREET CONSTRUCT A MULTI-LANE ROUNDABOUT AT THE INTERSECTION OF EAST HOLLIS
ST, BRIDGE ST AND CANAL ST.
E-513.807 Local Administration, NHDOT
Match.
.1002014P .100 .000.000 STP-Areas Less Than 200K.020
.3102015 .310 .000.000 STP-Flexible.060
.0502014R .050 .000.000 STP-Areas Less Than 200K.010
.1552015 .155 .000.000 STP-Flexible.030
2.0942015C 2.094 .000.000 .406
1.0992016 1.099 .000.000 .206
3536 3.8073.807 .000.000Totals .732
NASHUA-MERRIMACK -
BEDFORD 13761
F.E.E.Tpk F.E.E.TURNPIKE WIDENING OF 2-LANE SECTIONS FROM EXIT 8 IN NASHUA TO I-293 INTERCHANGE IN BEDFORD,
N/E71.000 "Future Turnpike Capital Program for Construction, dependent on
Future System-Wide Toll increase".
.2502014P .000 .000.250 Turnpike Program
1.7502015 .000 .0001.750
1.0002016 .000 .0001.000
.1002014R .000 .000.100
.1002015 .000 .000.100
3662 3.200.000 .0003.200Totals
NEW CASTLE - RYE
16127
NH 1B REHABILITATE SINGLE LEAF BASCULE MOVEABLE BRIDGE OVER LITTLE HARBOR -
066/071 {Red List}
ATT27.687 2011 Bridge Priority #24
.7982013P .638 .000.160 Bridge On/Off System
1.3482014 1.348 .000.000 STP-Flexible.270
.5682015 .568 .000.000 .110
.0592016 .059 .000.000 .011
.0112014R .011 .000.000 .002
.0232015 .023 .000.000 .004
.0232016 .019 .000.005
11.7152016C 9.372 .0002.343 Bridge On/Off System
5558 14.54312.036 .0002.507Totals .397
NEW HAMPTON 25365
SMITH CROSSING REMOVE BRIDGE OVER NH RAILROAD - 240/104 ATT.789
.0292016P .023 .000.006 Bridge Off System
.0292016R .029 .000.000 .006
8668 .059.053 .000.006Totals .006
Phase: P - Preliminary Engineering R - Right of Way C - Construction
Page P-30 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6
Name Rte/Street: Location/Scope of Work
Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category
CommentsCAACode
FiscalYearPhase
Overall ProjectCost $(M)State#
Grouped / ParentRegionally Significant
Adv Const Payback
NEW IPSWICH 14465
NH 123 / 124 REPLACE BRIDGE OVER SOUHEGAN RIVER - 157/093 {Red List} ATT5.044 2011 Bridge Priority #10
.1652013P .165 .000.000 Bridge On/Off System.033
.1102013 .110 .000.000 Equity Bonus (Flexible).022
.1652014 .165 .000.000 .033
.2702013R .270 .000.000 .054
1.8062014C 1.806 .000.000 Bridge On/Off System.361
1.9962015 1.996 .000.000 .387
2757 4.5124.512 .000.000Totals .890
NEW LONDON 16051
ELKINS ROAD & WILMOT CENTER ROAD
PEDESTRIAN / BICYCLE IMPROVEMENTS IN ELKINS VILLAGE [09-34TE] ATT.818 Specific project from Statewide program, Local Administration.
.0012013R .001 .000.000 STP-Enhancement
.0242014 .019 .005.000
.6442015C .515 .129.000
7657 .669.535 .134.000Totals
NEW LONDON
16310
NH 114 (Main St) RECONSTRUCTION, NH 11 (CROCKETT'S CORNER) NORTHERLY TO NEWPORT ROAD
(HOMAN'S CORNER)
ATT2.308
.1002014P .080 .000.020 STP-Flexible
.0522015 .041 .000.010
.0252014R .020 .000.005
.0532016 .043 .000.011
3526 .230.184 .000.046Totals
NEWINGTON - DOVER 11238
NH 16 / US 4 / SPLDG TPK WIDEN TURNPIKE INCLUDING LITTLE BAY BRIDGES FROM GOSLING ROAD TO
DOVER TOLL
ATT23.983 Turnpike Capital Program - overall
project for Little Bay bridge and
Newington interchange
construction, pe, & row. Specific Construction projects broken out
separately and include earmark
federal funding.
2.9762013P .000 .0002.976 Turnpike Program
1.0002014 .000 .0001.000
.2502013R .000 .000.250
1.1832014 .000 .0001.183
.2282014C .000 .000.228
.0802015 .000 .000.080
.0802016 .000 .000.080
1191
Regionally Significant 5.797.000 .0005.797Totals
Phase: P - Preliminary Engineering R - Right of Way C - Construction
Page P-31 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6
Name Rte/Street: Location/Scope of Work
Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category
CommentsCAACode
FiscalYearPhase
Overall ProjectCost $(M)State#
Grouped / ParentRegionally Significant
Adv Const Payback
NEWINGTON - DOVER 11238K
NH 16 / US 4 / SPAULDING
TURNPIKE
RECONFIGURATION AND RELOCATION OF RAMPS AND ACCESS (To provide matching
funds only to the federally-funded portion of the 11238 project for PE, ROW & Construction)
ATT6.709 Specific project breakout from
Newington-Dover 11238, Turnpike
Capital Program.
.0282013C .000 .000.028 Turnpike Program
.0292014 .000 .000.029
.0202015 .000 .000.020
.0202016 .000 .000.020
6138
Regionally Significant .097.000 .000.097Totals
NEWINGTON - DOVER 11238L
NH 16 / US 4 / SPLDG TPK CONSTRUCTION OF LITTLE BAY BRIDGE, INDEPENDENT SISTER STRUCTURE (FROM N-D 11238) [INCLUDES DEMO IDS (NH036), (NH053), (NH070), (NH080), TCSP, AND
TURNPIKE FUNDED REMAINDER]
ATT54.140 Specific project breakout from Newington-Dover 11238, Turnpike
Capital Program.
4.4462013C .000 .0004.446 Turnpike Program
7082
Regionally Significant 4.446.000 .0004.446Totals
NEWINGTON - DOVER
11238M
NH 16 / US 4 / SPLDG TPK EXIT 3 & 4 INTERCHANGE CONSTRUCTION AND MAINLINE TURNPIKE
CONSTRUCTION [PARENT = N-D 11238]
ATT49.450 Partially funded by CITY OF
NEWINGTONSpecific Project Breakout from
Newington-Dover 11238
.0962013C .000 .096.000 Non Participating
.4542013 .000 .454.000
10.9282013 .000 .00010.928 Turnpike Program
23.1302014 .000 .00023.130
11.8552015 .000 .00011.855
7075
Regionally Significant 46.462.000 .55045.912Totals
NEWINGTON - DOVER 11238O
NH 16 / US 4 / SPLDG TPK REHABILITATION OF EXISTING LITTLE BAY BRIDGE & BRIDGE APPROACH
CONSTRUCTION [PARENT N-D 11238]
ATT33.984 Specific project breakout from
Newington-Dover 11238, Turnpike
Capital Program.
9.7512014C .000 .0009.751 Turnpike Program
17.2682015 .000 .00017.268
6.9652016 .000 .0006.965
7077
Regionally Significant 33.984.000 .00033.984Totals
Phase: P - Preliminary Engineering R - Right of Way C - Construction
Page P-32 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6
Name Rte/Street: Location/Scope of Work
Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category
CommentsCAACode
FiscalYearPhase
Overall ProjectCost $(M)State#
Grouped / ParentRegionally Significant
Adv Const Payback
NEWINGTON - DOVER 11238Q
NH 16, US 4 & SPAULDING
TURNPIKE
EXIT 6 INTERCHANGE AND MAINLINE TURNPIKE CONSTRUCTION, INCLUDING
SOUNDWALLS (PARENT N-D 11238)
ATT42.179 Specific project breakout from
Newington-Dover 11238, Turnpike
Capital Program. Authorized under
HB 391. Funding Contingent on Future Toll Increase.
15.8222014C .000 .00015.822 Turnpike Program
18.4662015 .000 .00018.466
7.8902016 .000 .0007.890
7228
Regionally Significant 42.179.000 .00042.179Totals
NEWINGTON - DOVER 11238S
SPAULDING TURNPIKE / LITTLE BAY BRIDGES
GENERAL SULLIVAN BRIDGE REHABILITATION ATT31.069 Specific project breakout from Newington-Dover 11238, Turnpike
Capital Program. Authorized under
HB 391. Funding Contingent on
Future Toll Increase.
9.3272016C .000 .0009.327 Turnpike Program
7233
Regionally Significant 9.327.000 .0009.327Totals
NEWMARKET
13878
NH 108 CONSTRUCT 4' BIKE SHOULDERS FROM THE SOUTHERLY LIMIT OF PROJECT 13107
IN NEWMARKET TO NEWFIELDS T/L (CMAQ Program) [02-25CM]
ATT.832
.0902013P .090 .000.000 Congestion Mitigation and Air Quality Program.018
.0242015 .024 .000.000 .005
.0042014R .003 .000.001
.0122015 .010 .000.002
.7012015C .701 .000.000 .136
3708 .832.829 .000.003Totals .159
NEWMARKET 16048
NH 108 FACILITY IMPROVEMENTS IN MAIN STREET (NH RTE 108) BETWEEN ELM ST. AND
WILLEY COURT. [09-35TE]
ATT.687 Partially funded by NEWMARKET
Specific project from Statewide
program, Local Administration.
.0382014P .030 .008.000 STP-Enhancement
.0012015 .001 .000.000
.0012015R .001 .000.000
.5472015C .438 .109.000
7654 .587.469 .117.000Totals
Phase: P - Preliminary Engineering R - Right of Way C - Construction
Page P-33 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6
Name Rte/Street: Location/Scope of Work
Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category
CommentsCAACode
FiscalYearPhase
Overall ProjectCost $(M)State#
Grouped / ParentRegionally Significant
Adv Const Payback
NORTH HAMPTON 24457
US 1 REPLACE BRIDGE OVER BOSTON & MAINE RAILROAD - 148/132 {Redlist Bridge} ATT7.084
.1102013P .088 .000.022 Bridge On/Off System
.1142015 .114 .000.000 .022
.0292016 .029 .000.000 .006
.0282013R .028 .000.000 .006
.0282015 .028 .000.000 .006
.0292016 .029 .000.000 .006
8601 .338.316 .000.022Totals .044
NORTHFIELD - TILTON
16147
I-93 REHABILITATE BRIDGES OVER WINNIPESAUKEE RIVER AND RAILROAD DECK REPLACEMENT - 117/157 & 118/158 (Red List)
ATT16.461 2011 Bridge Prioity #52 & 53
.1982013P .198 .000.000 Bridge On/Off System.040
.2752014 .220 .000.055
.2842015 .227 .000.057
7357 .757.645 .000.112Totals .040
NSTI
NSTI
NA COOPERATIVE PROJECT AGREEMENT WITH THE UNIVERSITY OF NEW HAMPSHIRE
FOR OUTREACH PROGRAM TO INTRODUCE STUDENTS TO ENGINEERING &
TECHNOLOGY. NATIONAL SUMMER TRANSPORTATION INSTITUTE (NSTI)
.221
.0202014P .020 .000.000 Misc- Other Funds
.0312015 .031 .000.000
.0322016 .032 .000.000
11779 .083.083 .000.000Totals
OSSIPEE 10431
NH 16 PAVEMENT REHABILITATION & INTERSECTION IMPROVEMENTS FROM NH 28
NORTH 3.36 MILES
ATT4.862 Scope intent, address pavement
condition and intersection area.
.0882013P .088 .000.000 National Highway (NHPP).018
.1002014 .100 .000.000 .020
.2842015 .284 .000.000 .055
.0592016 .059 .000.000 .011
.0552013R .055 .000.000 .011
.1842014 .184 .000.000 .037
.3412015 .341 .000.000 .066
.0592016 .059 .000.000 .011
95 1.1681.168 .000.000Totals .228
Phase: P - Preliminary Engineering R - Right of Way C - Construction
Page P-34 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6
Name Rte/Street: Location/Scope of Work
Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category
CommentsCAACode
FiscalYearPhase
Overall ProjectCost $(M)State#
Grouped / ParentRegionally Significant
Adv Const Payback
OSSIPEE 13910
NH 16, NH 25, NH 41 INTERSECTION IMPROVEMENTS IN WEST OSSIPEE AT THE INTERSECTION OF NH 16
AND NH 25
ATT2.617 Scope intent. Immediate
Intersection needs.
.0442013P .044 .000.000 STP-Non Urban Areas Under 5K.009
.0512014 .051 .000.000 National Highway (NHPP).010
.0832015 .083 .000.0002011 Adv Const .017
.0592016 .059 .000.000 .011
.0552013R .044 .000.011
.1952014 .195 .000.000 .039
.0172015 .014 .000.003
.0172016 .017 .000.000 STP-Non Urban Areas Under 5K2011 Adv Const .003
1888 .520.505 .000.014Totals .089
OSSIPEE 14749
NH 16 / NH 25 REPLACE THREE RED LIST BRIDGES 137/299, 137/297, & 152/268 & RESURFACE APPROX 3.2 MILES
ATT11.834 Scope intent to address bridges and pavement condition only. 2011
Bridge Priorities #32, #33, and #34
.1102013P .110 .000.000 National Highway (NHPP).022
.5002014 .500 .000.000
.4542015 .363 .000.091
.0292016 .023 .000.006 STP-Areas Less Than 200K
.0802013R .080 .000.000 National Highway (NHPP).016
.1942015 .155 .000.039
.1172016 .094 .000.023 Bridge On/Off System
2762 1.4841.325 .000.159Totals .038
OSSIPEE 15296A
NUDD ROAD BRIDGE REHABILITATION, WHITTIER COVERED BRIDGE OVER BEARCAMP RIVER -
108/333 {Federal Grant} [National Historic Covered Bridge Preservation Program]
ATT.778 Partially funded by OSSIPEE
.1642013C .132 .033.000 National Historic Covered Bridge Preservation (NHCBP)
6878 .164.132 .033.000Totals
PELHAM 16145
MAIN STREET BRIDGE REPLACEMENT OVER BEAVER BROOK - 110/090 & 111/090 {Both Red List} ATT2.437 2011 Bridge Priority #25 & 122
.0572014P .057 .000.000 Bridge On/Off System.011
.0112015 .009 .000.002
.0112013R .011 .000.0002011 Adv Const .002
.0092015 .007 .000.002
7436 .088.084 .000.004Totals .014
Phase: P - Preliminary Engineering R - Right of Way C - Construction
Page P-35 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6
Name Rte/Street: Location/Scope of Work
Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category
CommentsCAACode
FiscalYearPhase
Overall ProjectCost $(M)State#
Grouped / ParentRegionally Significant
Adv Const Payback
PEMBROKE 14477A
US 3 / PEMBROKE HILL RD INTERSECTION IMPROVEMENT PROJECT [Section 1702 - Designated Project; Demo Id
NH042 & NH061]
ATT3.229 Earmarked funding.
.0112013P .011 .000.000 High Priority Projects (SAFETEA-LU 2005)
.0222013 .022 .000.000 .004
.0442013 .044 .000.000
.1432013 .143 .000.000 .029
.1652014 .132 .000.033
.1032014R .103 .000.000
.1622015C .130 .000.032
1.4472015 1.158 .000.289
.7892015 .789 .000.000 STP-Flexible.153
6049 2.8872.532 .000.355Totals .186
PETERBOROUGH
14772A
US 202 RECONSTRUCT 1000' AT MAIN STREET INTERSECTION. ALSO RECONSTRUCT
GRANITE BLOCK WALL ALONG US 202 THAT CONNECTS TO MAIN STREET BRIDGE ABUTMENT (Town-Owned)
ATT2.578 Specific project from overall project
(id #2760)
.1282013P .103 .000.026 STP-Areas Less Than 200K
.0982015R .098 .000.000 .019
6501 .226.201 .000.026Totals .019
PETERBOROUGH
15879
US 202 / NH 101 REHABILITATE BRIDGE INCLUDING REPLACE DECK AND PAINT GIRDERS OVER
CONTOOCOOK RIVER - 087/077 {Red List}
ATT.859 2011 Bridge Priority #57
.1532014P .122 .000.031 Bridge On/Off System
.2272015 .182 .000.045
.0232014R .018 .000.005
6779 .402.322 .000.080Totals
PETERBOROUGH 24500
NH 136 BRIDGE REPLACEMENT - 110/115 {Redlist Bridge} ATT.391
.1102013P .110 .000.000 STP-Flexible.022
.0552014 .044 .000.011
.1702015 .136 .000.034
.0282013R .028 .000.000 .006
.0282015 .023 .000.006
8604 .391.340 .000.051Totals .028
PINKHAMS GRANT 16311
NH 16 REHABILITATE / REPLACE BRIDGE OVER NEW RIVER - 058/048 ATT1.270 Prioity Corridor Weight Restricted Bridge (E1)
.0552013P .055 .000.000 National Highway (NHPP).011
7359 .055.055 .000.000Totals .011
Phase: P - Preliminary Engineering R - Right of Way C - Construction
Page P-36 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6
Name Rte/Street: Location/Scope of Work
Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category
CommentsCAACode
FiscalYearPhase
Overall ProjectCost $(M)State#
Grouped / ParentRegionally Significant
Adv Const Payback
PLAISTOW 10044G
NH 125 RECONSTRUCT EAST RD TO OLD RD (Parent = Plaistow-Kingston 10044B) ATT8.650 Specific project breakout project
from Plaistow-Kingston project.
6.6232016C 5.298 .0001.325 National Highway (NHPP)
.2132016 .000 .213.000 Non Participating
6371 6.8365.298 .2131.325Totals
PLAISTOW 20163
RAIL EXTEND MBTA COMMUTER RAIL SERVICE FROM HAVERHILL, MA. TO PLAISTOW.
CONSTRUCT PLATFORM & ENCLOSED WAITING AREA. ACQUIRE EASEMENT FOR
CONSTRUCTION OF RAIL SIDING. ACQUIRE LAND FOR LOCOMOTIVE LAYOVER
FACILITY. OPERATE 10 TRAILS ROUND TRIPS [10-17CM]
ATT2.964 Partially funded by PLAISTOW
2.1402015R 1.712 .428.000 Congestion Mitigation and Air Quality Program
7880 2.1401.712 .428.000Totals
PLAISTOW - KINGSTON
10044K
NH 125 RECONSTRUCTION EAST ROAD, PLAISTOW NORTHERLY APPROXIMATELY 6.0 MILES TO MAIN STREET KINGSTON
ATT3.380
.7042013P .704 .000.000 National Highway (NHPP).141
.1102014 .110 .000.000 .022
2.4562013R 2.456 .000.000 .491
.1102014 .110 .000.000 .022
8763 3.3803.380 .000.000Totals .676
PORTSMOUTH
13455
US 1 BYPASS REPLACE BRIDGES OVER THE BYPASS: PE & ROW FOR BRIDGES 173/071,183/087,
188/097, 205/116, 211/114, & 227/112 {Red List}
ATT9.226 Scope intent to address priority of
red list bridges.
.4802013P .480 .000.000 STP-Areas Over 200K.096
.4402013 .440 .000.000 STP-Flexible.088
.5062015 .506 .000.000 Bridge On/Off System
.2002013R .200 .000.000 .040
.2592015 .207 .000.052
2759
Regionally Significant 1.8851.833 .000.052Totals .224
PORTSMOUTH 13455B
US 1 BYPASS REPLACE MIDDLE ROAD BRIDGE (183/087) {Red List} & ISLINGTON STREET BRIDGE
(188/097) {Red List} OVER US 1 BYPASS (Pe & Row in Parent 13455)
ATT5.124 2011 Bridge Priority #19 & 20.
Breakout from 13455
5.1242013C 5.124 .000.000 Bridge On/Off System1.025
7432
Regionally Significant 5.1245.124 .000.000Totals 1.025
PORTSMOUTH
13455C
US 1 BYPASS REPLACE MAPLEWOOD AVENUE BRIDGE OVER US 1 BYPASS - 227/112 {Red List} (Pe
& Row in Parent 13455)
ATT4.987 2011 Bridge Priority #18. Breakout
from 13455
.9872013C .987 .000.000 STP-Areas Less Than 200K.197
4.0002014 3.200 .000.800
7433
Regionally Significant 4.9874.187 .000.800Totals .197
Phase: P - Preliminary Engineering R - Right of Way C - Construction
Page P-37 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6
Name Rte/Street: Location/Scope of Work
Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category
CommentsCAACode
FiscalYearPhase
Overall ProjectCost $(M)State#
Grouped / ParentRegionally Significant
Adv Const Payback
PORTSMOUTH 14417
GRAFTON DRIVE TRADE PORT MULTI-USE PATH - CONSTRUCT A MULTI USE PATH ALONG GRAFTON
DR BETWEEN NH AVENUE AND PORTSMOUTH TRANSPORTATION CENTER, AND
BETWEEN PEASE GOLF COURSE AND AIRPORT RD (TE Program) [04-54TE]
ATT1.400 Specific project from Statewide
program, Local Administration.
.3322013C .332 .000.000 STP-Flexible.066
5655 .332.332 .000.000Totals .066
PORTSMOUTH 20222A
NH 33/Grafton Dr. RESTRIPE/EXPAND PORTSMOUTH TRANSPORTATION CENTER PARKING TO
ACCOMMODATE EAST-WEST EXPRESS. (CMAQ)
ATT.676
.1102014P .088 .000.022 Congestion Mitigation and Air Quality Program
.0552014R .044 .000.011
.5112015C .409 .000.102
11759 .676.541 .000.135Totals
PORTSMOUTH 20222B
NH33/GRAFTON DR RE-STRIPE EXISTING LOT & MINOR WIDENING TO ACCOMMODATE IMMEDIATE NEED FOR EAST-WEST SERVICE
ATT.880
.8802014C .704 .000.176 Congestion Mitigation and Air Quality Program
11782 .880.704 .000.176Totals
PORTSMOUTH
20255
WOODBURY AVE /
MARKET ST / GRANITE ST
UPGRADE 5 EXISTING TRAFFIC CONTROLLERS AND INTERCONNECTS [10-18CM] ATT.348 Partially funded by TOWN OF
PORTSMOUTH
.0622015P .050 .012.000 Congestion Mitigation and Air Quality Program
.2862015C .229 .057.000
7892 .348.279 .070.000Totals
PORTSMOUTH 20258
PEVERLY HILL ROAD CONST NEW SIDEWALK AND STRIPED BICYCLE SHOULDERS & ASSOCIATED
DRAINAGE TO PROMOTE SAFE BIKING & WALKING [10-19CM]
ATT.472 Partially funded by PORTSMOUTH
.0582015P .047 .012.000 Congestion Mitigation and Air Quality Program
.4142015C .331 .083.000
7894 .472.378 .094.000Totals
PORTSMOUTH 27690
US 1 BY-PASS CULVERT REPLACEMENT, US 1 BY-PASS OVER HODGSON BROOK NO 192/1062.743
.2202014P .220 .000.000 Bridge On/Off System.044
.0282014R .028 .000.000 .006
11753 .248.248 .000.000Totals .050
Phase: P - Preliminary Engineering R - Right of Way C - Construction
Page P-38 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6
Name Rte/Street: Location/Scope of Work
Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category
CommentsCAACode
FiscalYearPhase
Overall ProjectCost $(M)State#
Grouped / ParentRegionally Significant
Adv Const Payback
PORTSMOUTH - MANCHESTER 68087
VARIOUS BUS SERVICE BETWEEN PORTSMOUTH & MANCHESTER. CONNECT PORTSMOUTH,
DOWNTOWN MANCHESTER & BR AIRPORT [06-02CM]
N/E5.059 Specific project from Statewide
program, Local Administration.
.1032013C .103 .000.000 CMAQ Transfer.021
1.0632014 1.063 .000.000 .213
.8602015 .860 .000.000 .167
.5332016 .533 .000.000 .100
7881 2.5592.559 .000.000Totals .500
PORTSMOUTH, NH - KITTERY, ME
13678F
US 1 MEMORIAL BRIDGE OVER PISCATAQUA RIVER - 247/084 {Red List}, BASED ON CONNECTION STUDY. REPLACEMENT OF SCOTT AVENUE BRIDGE AND
REHABILITATION OF THE KITTERY APPROACH SPANS
ATT98.601 2011 Bridge Priority #1. Funding split with Maine. TIGER Grant
funding being received.
11.8752013C 11.875 .000.000 Bridge On/Off System
1.4432013 1.443 .000.000 STP-Enhancement.289
.4412014 .000 .441.000 Non Participating
7.9322014 6.346 .0001.586 STP-Flexible
7262
Regionally Significant 21.69119.664 .4411.586Totals .289
PORTSMOUTH, NH -
KITTERY, ME 15731
US 1 BYPASS BRIDGE REPLACEMENT & PAINT OVER PISCATAQUA RIVER - 251/108 (Sarah Mildred
Long Bridge) (Red List)
ATT183.765 Partially funded by MAINE
2011 Bridge Priority #2. Funding
as outlined in Bi-State Task Force report.
3.4402013P .000 3.440.000 Non Participating
3.4332013 3.433 .000.000 STP-Flexible.687
3.7502014 3.750 .000.000 Bridge On/Off System
3.4602014 .000 3.460.000 Non Participating
.6052015 .605 .000.000 Bridge On/Off System
.0502013R .000 .050.000 Non Participating
.0502013 .050 .000.000 STP-Flexible.010
.4502014 .450 .000.000 Bridge On/Off System.090
.2002014 .000 .200.000 Non Participating
19.8002015C 19.800 .000.000 Bridge On/Off System
28.0502015 .000 28.050.000 Non Participating
19.8002016 19.800 .000.000 Bridge On/Off System
34.0002016 .000 34.000.000 Non Participating
5559 117.08847.888 69.200.000Totals .787
Phase: P - Preliminary Engineering R - Right of Way C - Construction
Page P-39 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6
Name Rte/Street: Location/Scope of Work
Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category
CommentsCAACode
FiscalYearPhase
Overall ProjectCost $(M)State#
Grouped / ParentRegionally Significant
Adv Const Payback
PORTSMOUTH-KITTERY 13678H
RTE 1 PREPARATION OF THE NATIONAL REGISTER HISTORIC DISTRICT NOMINATION FOR
PORTSMOUTH DOWNTOWN DISTRICT
.187 Partially funded by MAINE
.0382014C .000 .038.000 Non Participating
.0412014 .033 .000.008 STP-Flexible
.0522015 .000 .052.000 Non Participating
.0572015 .045 .000.011 STP-Flexible
11778 .187.078 .089.020Totals
RAYMOND 20818
DUDLEY ROAD REMOVAL OF BRIDGE, WINGS, AND PIER OVER LAMPREY RIVER - 083/154 {Red List} ATT.010
.0052013P .005 .000.000 Bridge Off System.001
.0052013R .005 .000.000 .001
7993 .011.011 .000.000Totals .002
ROCHESTER
14350
NH 202A (WALNUT STREET) INTERSECTION IMPROVEMENTS TO IMPROVE SAFETY THROUGH STRAFFORD
SQUARE, NORTH MAIN, & WASHINGTON STREETS
ATT1.461 Partially funded by ROCHESTER
Local Administration, 20% city match.
.5252014R .420 .105.000 STP-Hazard Elimination
.7462016C .596 .149.000
2750 1.2711.016 .254.000Totals
ROCHESTER
20254
US 202 CONSTRUCT 201 SPACE PARK-N-RIDE LOT ADJACENT TO US 202 [10-16CM] ATT2.452
.0532013P .053 .000.000 Congestion Mitigation and Air Quality Program
.0132013 .000 .013.000 Turnpike Program
.0152014 .000 .015.000 Non Participating
.0152013R .015 .000.000 Congestion Mitigation and Air Quality Program
.4472013 .447 .000.000
.0042013 .000 .000.004 Turnpike Program
.1122013 .000 .112.000
1.6382013C 1.638 .000.000 Congestion Mitigation and Air Quality Program
7900
Regionally Significant 2.2962.152 .140.004Totals
Phase: P - Preliminary Engineering R - Right of Way C - Construction
Page P-40 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6
Name Rte/Street: Location/Scope of Work
Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category
CommentsCAACode
FiscalYearPhase
Overall ProjectCost $(M)State#
Grouped / ParentRegionally Significant
Adv Const Payback
ROXBURY - SULLIVAN 10439
NH 9 RECONSTRUCT SHOULDERS & WIDEN FROM EAST SULLIVAN, SOUTH 2.04 MI,
INCLUDING BRIDGE REPLACEMENT - 093/061 (Red List)
ATT8.332 Scope intent to address bridge,
pavement and safety improvement
on existing alignment. 2011 Bridge
Priority #64.
.2312013P .231 .000.000 National Highway (NHPP).046
.2342015 .234 .000.000 .045
.1872016 .187 .000.000 .035
.0572015R .057 .000.000 .011
.2342016 .234 .000.000 .044
102 .944.944 .000.000Totals .182
SALEM 12334
NH 28 RECONSTRUCT INTERSECTION, MAIN STREET @ DEPOT STREET, INCLUDING SIGNALS, LEFT TURN LANES & APPROACHES [MUPCA*450] {Municipal Urban Program}
ATT4.227 Partially funded by SALEMMunicipal jurisdiction at 20%
match.
.0812015P .065 .016.000 STP-Areas Over 200K
.2132016 .170 .043.000
.0092013R .007 .002.000
.7502016 .600 .150.0002008 Adv Const
630 1.053.842 .211.000Totals
SALEM
16031
MANCHESTER &
LAWRENCE RAIL
CORRIDOR
MULTI-USE TRAIL IMPROVEMENTS IN SALEM & WINDHAM [09-47TE] ATT1.121 Partially funded by SALEM
Specific project from Statewide
program, Local Administration.
.1522014P .122 .030.000 STP-Enhancement
.0012014R .001 .000.000
.9682015C .774 .194.000
7636 1.121.897 .224.000Totals
SALEM TO MANCHESTER 10418
I-93 PROGRAMMATIC MITIGATION (CTAP, NHDES Land Protection Program) (PE & ROW Only)
[Section 117 - Designated Project; Demo Id NH032, SEE 13933K]
N/E7.110 I-93 reconstruction. Costs reflect
PE and ROW needs necessary to go
forward with construction..
.2172013P .217 .000.000 National Highway (NHPP).043
.4402015 .440 .000.000 Interstate Maintenance.044
.1102016 .110 .000.000 .011
.5002015R .500 .000.000 National Highway (NHPP).100
1.0002016 1.000 .000.000 .200
66
Regionally Significant 2.2672.267 .000.000Totals .398
Phase: P - Preliminary Engineering R - Right of Way C - Construction
Page P-41 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6
Name Rte/Street: Location/Scope of Work
Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category
CommentsCAACode
FiscalYearPhase
Overall ProjectCost $(M)State#
Grouped / ParentRegionally Significant
Adv Const Payback
SALEM TO MANCHESTER 10418C
I-93 RECONSTRUCT & WIDEN MAINLINE, ENVIRONMENTAL IMPACT STUDY AND FINAL
DESIGN FROM MASS S/L IN SALEM TO I-293 IN MANCHESTER (PE & ROW Only)
[Section 1602 - Designated Project; Demo Id NH014]
N/E154.858 Overall, corridor project overall for
PE & ROW, construction broken
out to individual projects.
1.7472013P 1.747 .000.000 Interstate Maintenance.175
.5502014 .495 .000.055
5.8672013R 5.867 .000.000
4.7362014 4.262 .000.474
69
Regionally Significant 12.90012.371 .000.529Totals .175
SALEM TO MANCHESTER
10418H
I-93 PARK & RIDE @ EXIT 3 (Windham) (CMAQ Program) [Part of 04-33CM] N/E8.433 Reflects current construction sequencing and costs. GARVEE
bonding to facilitate construction
program.
.3102015C .310 .000.000 Congestion Mitigation and Air Quality Program.062
.5002015 .500 .000.000 STP-Flexible.100
5.6902016 5.690 .000.000 1.138
3138
Regionally Significant 6.5006.500 .000.000Totals 1.300
SALEM TO
MANCHESTER 10418L
I-93 IMPLEMENT EXPANDED BUS SERVICE & NEW COMMUTER INCENTIVE PROGRAM.
PURCHASE 14 COMMUTER COACHES & PROVIDE 3 YEARS OF OPERATING SUPPORT
(CMAQ Program) [04-04CM]
N/E12.500
.7002013C .700 .000.000 STP-Areas Less Than 200K.140
.7002014 .700 .000.000 .140
5613 1.4001.400 .000.000Totals .280
SALEM TO MANCHESTER 10418T
I-93 CORRIDOR SERVICE PATROL (Salem to Manchester) E-7.899 Service to help manage incidents
and reduce delay.
.0752013P .075 .000.000 National Highway (NHPP).015
.0752014 .060 .000.015
.1002015 .080 .000.020
.1002016 .080 .000.020
7112 .350.295 .000.055Totals .015
SALEM TO MANCHESTER
10418V
I-93 FINAL DESIGN SERVICES FOR PE AND ROW (Garvee 2012 FUNDED) [14800H = Debt Service]
N/E9.400
8.0002013P .000 .0008.000 Garvee Bond
1.4002013R .000 .0001.400
8650 9.400.000 .0009.400Totals
Phase: P - Preliminary Engineering R - Right of Way C - Construction
Page P-42 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6
Name Rte/Street: Location/Scope of Work
Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category
CommentsCAACode
FiscalYearPhase
Overall ProjectCost $(M)State#
Grouped / ParentRegionally Significant
Adv Const Payback
SALEM TO MANCHESTER 10418W
I-93 WATER QUALITY STUDY [Section 1702 - Designated Project; Demo Id NH054, Demo NH087] E-346.608 Earmark funds to help address salt
issues.
.9062013P .724 .000.181 High Priority Projects (SAFETEA-LU 2005)2008 Adv Const
.9902014 .792 .000.1982008 Adv Const
.6532015 .523 .000.1312008 Adv Const
.6812016 .544 .000.136
1.2382016 1.238 .000.000
.0282016 .023 .000.006 STP-Flexible
6052 4.4953.844 .000.652Totals
SALEM TO MANCHESTER
13933D
I-93 MAINLINE, EXIT 1 TO STA. 1130 & NH38 (Salem), INCLUDES BRIDGES 073/063 & 077/063 {Both Red List} [Partial Garvee Bonded Project] (Parent = Salem to Manchester
13933*) (14800A = Debt & 13933D = Const)
N/E32.754 Reflects current construction sequencing and costs. GARVEE
bonded construction project. 2011
Bridges Priorities #2 and #3
.8532013C .000 .000.853 Garvee Bond
4.0002013 .000 .0004.000
7893 4.853.000 .0004.853Totals
SALEM TO
MANCHESTER 13933E
I-93 EXIT 2 INTERCHANGE RECONSTRUCTION, INCLUDING I-93 MAINLINE & NH97,
INCLUDES BRIDGES 068/078 & 070/079 {Both Red List}(Tracked under the 14800E Project)
(Salem) (Parent = Salem to Manchester)
N/E40.587 Reflects current construction
sequencing and costs. GARVEE
bonding to facilitate construction program. 2011 Bridges Priorities
#5 and #6.
12.8122013C .000 .00012.812 Garvee Bond
13.4162014 .000 .00013.416
11.2812015 .000 .00011.281
3819 37.509.000 .00037.509Totals
SALEM TO MANCHESTER
13933H
I-93 EXIT 3 AREA RECONSTRUCT THE NB MAINLINE, NB RAMPS, EASTERLY PORTION OF
NH 111, NH11A RELOCATION AND REMOVAL OF EXISTING NB BRIDGES (WINDHAM)
(SEGMENT III CONSTRUCTION) [Garvee Bonded Project] (Being Tracked under 14800F)
(Parent = Salem to Manchester 139
N/E35.475 Reflects current construction
sequencing and costs. GARVEE
bonding to facilitate construction
program.
2.0502013C .000 .0002.050 Garvee Bond
15.5652014 .000 .00015.565
14.5002015 .000 .00014.500
.0482015 .000 .048.000 Non Participating
3.3122016 .000 .0003.312 Garvee Bond
3817 35.475.000 .04835.426Totals
Phase: P - Preliminary Engineering R - Right of Way C - Construction
Page P-43 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6
Name Rte/Street: Location/Scope of Work
Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category
CommentsCAACode
FiscalYearPhase
Overall ProjectCost $(M)State#
Grouped / ParentRegionally Significant
Adv Const Payback
SALEM TO MANCHESTER 13933I
I-93 EXIT 3 AREA, RECONSTRUCT SOUTHBOUND MAINLINE FROM BROOKDALE ROAD
TO NORTH OF NH111, INCLUDING THE SOUTHBOUND ON RAMP AND THE NORTH
BOUND ON RAMP (WINDHAM) [Parent = Sal-Man 13933*]
N/E39.544 Reflects current construction
sequencing and costs. GARVEE
bonding to facilitate construction
program.
12.5072013C .000 .00012.507 Garvee Bond
12.5492014 .000 .00012.549
12.1702015 .000 .00012.170
1.1482016 .000 .0001.148
3820 38.374.000 .00038.374Totals
SALEM TO MANCHESTER
13933N
I-93 EXIT 3 AREA, RECONSTRUCT THE SB MAINLINE BRIDGES OVER NH 111 AND NH 111A (Windham) - 134/101 & 135/090 {Both Red List} (Garvee Bond Project)
N/E14.459 Partially funded by GARV BOND ISSUE #1
Reflects current construction
sequencing and costs. GARVEE
bonded construction project. 2011 Bridge Priority #4 & 22
6.4592013C .000 6.459.000 Garvee Bond
7958 6.459.000 6.459.000Totals
SALEM TO
MANCHESTER 14633F
I-93 EXIT 5 AREA, RECONSTRUCT INTERCHANGE INCLUDING NORTH BOUND AND
SOUTH BOUND MAINLINE AND NORTH BOUND OFF-RAMP, INCLUDES BRIDGES
096/163, 097/163, 099/160, & 100/160 {All Red List} (Londonderry) (Garvee Bonded)
N/E37.975 Reflects current construction
sequencing and costs. GARVEE
bonded construction project. 2011 Bridges Priorities #6, #7, #8, and
#9.
11.4722013C .000 .00011.472 Garvee Bond2011 Adv Const
.0002013 .000 .000.000 High Priority Grants (STEA04_Ext_2005)
1.9802013 1.980 .000.000 High Priority Projects (SAFETEA-LU 2005)
1.5212014 1.217 .000.304 National Highway (NHPP)2011 Adv Const
6338 14.9733.197 .00011.776Totals
SALEM TO MANCHESTER
14800A
I-93 MAINLINE, EXIT 1 TO STA. 1130 & NH38 (Salem), INCLUDES BRIDGES 073/063 & 077/063
{Both Red List} [Partial Garvee Bonded Project] (Parent = Salem to Manchester 13933*)
[14800A=DEBT SERVICE & 13933D=CONST]
N/E52.248 GARVEE Bond debt service,
interim issuance approximately $3.5
million annually through 2019
increasing to approximately 17
Million annually through 2026. Debt Service portion with specific
construction project. 2011 Bridges
Priorities #2 and #3
.6402014C .000 .000.640 Garvee Bond Related
.8582014 .686 .000.172 National Highway (NHPP)
.6402015 .000 .000.640 Garvee Bond Related
.8582015 .686 .000.172 National Highway (NHPP)
.6402016 .000 .000.640 Garvee Bond Related
.8582016 .686 .000.172 National Highway (NHPP)
3818 4.4952.059 .0002.436Totals
Phase: P - Preliminary Engineering R - Right of Way C - Construction
Page P-44 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6
Name Rte/Street: Location/Scope of Work
Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category
CommentsCAACode
FiscalYearPhase
Overall ProjectCost $(M)State#
Grouped / ParentRegionally Significant
Adv Const Payback
SALEM TO MANCHESTER 14800B
I-93 EXIT 5 AREA, RECONSTRUCT INTERCHANGE INCLUDING NB & SB MAINLINE & NB
OFF-RAMP, INCLUDES BRIDGES 096/163, 097/163, 099/160 & 100/160 {All Red List}
(Londonderry) (Garvee Bonded) [14800B = Debt Service & 14633F = Const]
E-055.130 GARVEE Bond debt service,
interim issuance approximately $3.5
million annually through 2019
increasing to approximately 17 Million annually through 2026.
Debt Service portion with specific
construction project.
.9052014C .724 .000.181 Bridge On/Off System2011 Adv Const
.6762014 .000 .000.676 Garvee Bond Related2011 Adv Const
.9052015 .724 .000.181 Bridge On/Off System2011 Adv Const
.6762015 .000 .000.676 Garvee Bond Related2011 Adv Const
.9052016 .724 .000.181 Bridge On/Off System2011 Adv Const
.6762016 .000 .000.676 Garvee Bond Related2011 Adv Const
7895 4.7422.173 .0002.570Totals
SALEM TO
MANCHESTER 14800C
I-93 PROJECT INITIATED TO TRACK GARVEE BOND DEBT SERVICE ATTRIBUTABLE TO
THE 13933N PROJECT [SB MAINLINE BRIDGES OVER NH 111 AND NH 111A] [134/101 & 135/090] {Both Red List} (Garvee Bond Project)
E-019.175 GARVEE Bond debt service,
interim issuance approximately $3.5 million annually through 2019
increasing to approximately 17
Million annually through 2026.
Debt Service portion with specific construction project.
.2372014C .000 .000.237 Garvee Bond Related
.3172014 .285 .000.032 National Highway (NHPP)
.2372015 .000 .000.237 Garvee Bond Related
.3172015 .285 .000.032 National Highway (NHPP)
.2372016 .000 .000.237 Garvee Bond Related
.3172016 .285 .000.032 National Highway (NHPP)
7952 1.662.856 .000.805Totals
SALEM TO MANCHESTER
14800D
I-93 PROJECT INITIATED TO TRACK GARVEE BOND DEBT SERVICE ATTRIBUTABLE TO
EHT 13933I PROJECT {Both Red List} [Partial Garvee Bonded Project] (Parent = Salem to
Manchester 13933*)
E-042.233
4.8042013C 4.804 .000.000 National Highway (NHPP)2012 Adv Const .961
4.7342014 4.734 .000.0002012 Adv Const .947
4.7692015 4.769 .000.0002012 Adv Const .954
.1202015 .000 .120.000 Non Participating2012 Adv Const
4.7692016 4.769 .000.000 National Highway (NHPP)2012 Adv Const .954
7953 19.19619.075 .120.000Totals 3.815
Phase: P - Preliminary Engineering R - Right of Way C - Construction
Page P-45 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6
Name Rte/Street: Location/Scope of Work
Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category
CommentsCAACode
FiscalYearPhase
Overall ProjectCost $(M)State#
Grouped / ParentRegionally Significant
Adv Const Payback
SALEM TO MANCHESTER 14800E
I-93 PROJECT INITIATED TO TRACK GARVEE BOND DEBT SERVICE ATTRIBUTABLE TO
THE 13933E PROJECT.[Partial Garvee Bonded Project] (Parent = Salem to Manchester 13933*)
E-043.343
4.9242013C 4.924 .000.000 Interstate Maintenance.492
4.8522014 4.366 .000.485
4.8882015 3.910 .000.978 STP-Flexible
4.8882016 4.399 .000.489 Interstate Maintenance
7954 19.55117.600 .0001.952Totals .492
SALEM TO MANCHESTER
14800F
I-93 PROJECT INITIATED TO TRACK GARVEE BOND DEBT SERVICE ATTRIBUTABLE TO THE 13933H PROJECT [Partial Garvee Bonded Project] (Parent = Salem to Manchester 13933*)
E-037.329
3.6902013C 3.690 .000.000 National Highway (NHPP)
.5222013 .000 .000.522 Non Participating
4.2822014 3.426 .000.856 National Highway (NHPP)
4.4522015 3.562 .000.890
.0522015 .000 .052.000 Non Participating
5.5462016 4.437 .0001.109 National Highway (NHPP)
7955 18.54415.114 .0523.378Totals
SALEM TO
MANCHESTER 14800H
I-93 FINAL DESIGN SERVICES FOR PE AND ROW (Garvee 2012 bond issue) [DEBT SERVICE
PROJECT FOR FINAL DESIGN PROJECT 10418V]
E-09.633
.9142013P .914 .000.000 National Highway (NHPP).183
1.0682014 1.068 .000.000 .214
1.1032015 1.103 .000.000 .214
1.1382016 1.138 .000.000 .214
.1722013R .172 .000.000 .034
.2012014 .201 .000.000 .040
.2082015 .208 .000.000 .040
.2152016 .215 .000.000 .040
8651 5.0205.020 .000.000Totals .979
SALEM TO MANCHESTER
16477
I-93 MAINTENANCE PERIOD OF 'ITS' FOR PARENT PROJECT*3888. E-6.252
.0632013C .063 .000.000 Interstate Maintenance.006
.1262013 .126 .000.000 .013
.0632014 .057 .000.006
8387 .252.245 .000.006Totals .019
Phase: P - Preliminary Engineering R - Right of Way C - Construction
Page P-46 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6
Name Rte/Street: Location/Scope of Work
Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category
CommentsCAACode
FiscalYearPhase
Overall ProjectCost $(M)State#
Grouped / ParentRegionally Significant
Adv Const Payback
SALEM-MANCHESTER 10418X
I-93 FINAL DESIGN (PE) AND ROW FOR I-93 SALEM TO MANCHESTER CORRIDOR POST
JUNE 30, 2014.
5.719
.3582014P .322 .000.036 Interstate Maintenance
2.2002015 1.980 .000.220
1.0162016 .915 .000.102
.5502014R .495 .000.055
1.1002015 .990 .000.110
.4952016 .446 .000.050
11781 5.7195.147 .000.572Totals
SANBORNTON 16154
I-93 BOX CULVERT REHABILITATION OVER SALMON BROOK - 127/099 {Red List} ATT1.177 2011 Bridge Priority #59
.0882014P .088 .000.000 Bridge On/Off System.018
.0792015 .064 .000.016
.0112014R .009 .000.002
7729 .178.160 .000.018Totals .018
SEABROOK
15769
NH 107 BRIDGE WIDENING OVER I-95 AND REHABILITATION OF EXISTING PORTION OF
BRIDGE {Turnpike}
ATT7.040 Specific project from HB 391,
Turnpike Capital Program. Supplemental to developer
improvements.
.0502013C .000 .000.050 Turnpike Program
7305
Regionally Significant .050.000 .000.050Totals
SEACOAST 14818
SEACOAST COMMUTER OPTIONS - PROGRAM EXPANSION / ACCELERATED
IMPLEMENTATION (CMAQ Program) [06-25CM]
ATT.402 Partially funded by TURNPIKES
HARD MATCH
.1282013C .102 .026.000 Congestion Mitigation and Air Quality Program
.1342014 .107 .027.000
6227 .262.209 .052.000Totals
SEACOAST 20244
VARIOUS THROUGH CAPITAL EQUIPMENT PURCHASES AND OPERATING SUPPORT THE
PROJECT WILL INCREASE PEAK-HOUR TRANSIT SERVICES [10-12CM]
ATT6.557 Partially funded by TURNPIKE
FUNDS (SEE APPLICATION FOR
DETAILS)
1.1042013C .883 .221.000 Congestion Mitigation and Air Quality Program
1.1042014 .883 .221.000
7885 2.2071.766 .441.000Totals
SOMERSWORTH
16049
HIGH, MARKET, & MAIN
STREETS
PEDESTRIAN / BICYCLE IMPROVEMENT [09-48TE] ATT.474 Partially funded by
SOMERSWORTHSpecific project from Statewide
program, Local Administration.
.3882014C .311 .078.000 STP-Enhancement
7655 .388.311 .078.000Totals
Phase: P - Preliminary Engineering R - Right of Way C - Construction
Page P-47 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6
Name Rte/Street: Location/Scope of Work
Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category
CommentsCAACode
FiscalYearPhase
Overall ProjectCost $(M)State#
Grouped / ParentRegionally Significant
Adv Const Payback
SOMERSWORTH, NH - BERWICK, ME 12228
NH 9 BRIDGE REHABILITATION OVER SALMON FALLS RIVER - 101/114 [Demo Id NH082] ATT3.000 Local Administration.
.0602013P .060 .000.000 High Priority Projects (SAFETEA-LU-EXT 2010)
.0702013 .070 .000.000
.0602013 .000 .060.000 Non Participating
.0702013 .000 .070.000
.0052013R .005 .000.000 High Priority Projects (SAFETEA-LU-EXT 2010)
.0052013 .000 .005.000 Non Participating
1.0302014C .824 .206.000 Bridge On/Off System
.3152014 .315 .000.000 High Priority Projects (SAFETEA-LU-EXT 2010)
1.3452014 .000 1.345.000 Non Participating
417 2.9601.274 1.686.000Totals
SPRINGFIELD
20509
GEORGES MILLS ROAD REHAB OR REPLACE TWIN 5' DIA. CULVERTS CARRYING STARK LAKE OUTLET AT
INTERSECTION OF FISHER CORNER RD - 091/048 {Red List}
ATT.924
.0402013P .040 .000.000 STP-Flexible.008
.0502014 .050 .000.000
.0512015 .041 .000.010
.0062016 .005 .000.001
.0052013R .005 .000.000 .001
.0062014 .006 .000.000
.0062015 .005 .000.001
.7612016C .609 .000.152
7987 .924.759 .000.165Totals .009
STARK 20224
NORTHSIDE ROAD BRIDGE REHABILITATION OVER UPPER AMMONOOSUC RIVER - 115/091 {Red List} -
STARK COVERED BRIDGE. NHCBP(NH COVERED BRIDGE PRESERVATION)
[SAB*4216] {State Aid Bridge Program}
ATT1.518 Partially funded by TOWN OF
STARK
Specific project from Statewide
program, Local Administration.
.0302013P .000 .006.024 State Aid Bridge
.0022014 .000 .000.002
.0012014R .000 .000.001
.8322013C .666 .000.166 National Historic Covered Bridge Preservation (NHCBP)
.2082013 .000 .042.166 State Aid Bridge
.3552013 .000 .071.284
7908 1.428.666 .119.643Totals
Phase: P - Preliminary Engineering R - Right of Way C - Construction
Page P-48 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6
Name Rte/Street: Location/Scope of Work
Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category
CommentsCAACode
FiscalYearPhase
Overall ProjectCost $(M)State#
Grouped / ParentRegionally Significant
Adv Const Payback
STATEWIDE
TRANSIT ELDERLY AND PERSONS WITH DISABILITIES TRANSPORTATION PROGRAM E-21(Annual) Partially funded by LOCAL
AGENCIES
Replaces deficient vehicles serving
elderly and disabled people. Uses local match. Cost decrease reflects
anticipated federal revenue.
.9312013 .745 .186.000 FTA 5310 Capital Program
.9312014 .745 .186.000
.9312015 .745 .186.000
.9312016 .745 .186.000
3505 Grouped3.7242.979 .745.000Totals
STATEWIDE
TRANSIT RURAL PUBLIC TRANSIT E-21(Annual) Partially funded by RURAL TRANSIT SYSTEMS
Continues transit service in
communities outside urbanized
areas. Uses local match.
7.0002013 4.200 2.800.000 FTA 5311 Capital & Operating Program
7.0002014 4.200 2.800.000
7.0002015 4.200 2.800.000
7.0002016 4.200 2.800.000
3506 Grouped28.00016.800 11.200.000Totals
STATEWIDE
TRANSIT JOB ACCESS & REVERSE COMMUTE E-21(Annual) Partially funded by LOCAL
Supports transportation services
providing access to employment.
.7002013 .350 .350.000 FTA 5316 JARC
.7002014 .350 .350.000
.7002015 .350 .350.000
.7002016 .350 .350.000
6290 Grouped2.8001.400 1.400.000Totals
STATEWIDE
TRANSIT NEW FREEDOMS INITIATIVE E-21(Annual) Partially funded by LOCALSupports transportation services for
persons with disabilities.
.6802013 .340 .340.000 FTA 5317 New Freedom Program
.6802014 .340 .340.000
.6802015 .340 .340.000
.6802016 .340 .340.000
6291 Grouped2.7201.360 1.360.000Totals
Phase: P - Preliminary Engineering R - Right of Way C - Construction
Page P-49 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6
Name Rte/Street: Location/Scope of Work
Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category
CommentsCAACode
FiscalYearPhase
Overall ProjectCost $(M)State#
Grouped / ParentRegionally Significant
Adv Const Payback
STATEWIDE
TRANSIT ELDERLY AND DISABLED (POINT OF SERVICE) [STP Transfer to 5310] E-215.992 Supports Point of Service
Transportation activities through the
region coordinating committees.
(reflects 1/3 reduction per year from 2011 level)
.5332013C .426 .000.107 STP-Flexible
.5332014 .426 .000.107
.5502015 .440 .000.110
.5682016 .454 .000.114
8334 2.1841.747 .000.437Totals
STATEWIDE 16346
VARIOUS MITIGATION SITE INVESTIGATIONS AND REPORTING, NOISE-SOUNDWALL REPORTING, INVASIVE SPECIES INVESTIGATIONS
E-0.100
.0502013R .050 .000.000 STP-Flexible
.0502014 .050 .000.000 .010
7961 .100.100 .000.000Totals .010
STATEWIDE
20226
VARIOUS EVALUATE & OPTIMIZE TIMING AT 65 SIGNALIZE INTERSECTION TO IMPROVE
TRAFFIC FLOW AND REDUCE DELAYS [10-14 CM]
.334
.0852015P .085 .000.000 Congestion Mitigation and Air Quality Program.017
.0282015C .028 .000.000 .006
7882 .114.114 .000.000Totals .022
STATEWIDE 22912
VARIOUS TITLE RESEARCH ON NHDOT SURPLUS PROPERTIES IN ACCORDANCE WITH NH
TITLE STANDARDS
E-0.500
.4502013R .450 .000.000 STP-Flexible.090
8417 .450.450 .000.000Totals .090
STATEWIDE 27022
VARIOUS MAINTENANCE OF STATEWIDE ITS DEVICES.251
.1382014C .138 .000.000 Interstate Maintenance.014
.1142015 .102 .011.000
11731 .251.240 .011.000Totals .014
Phase: P - Preliminary Engineering R - Right of Way C - Construction
Page P-50 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6
Name Rte/Street: Location/Scope of Work
Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category
CommentsCAACode
FiscalYearPhase
Overall ProjectCost $(M)State#
Grouped / ParentRegionally Significant
Adv Const Payback
STATEWIDE CBI
PRESERVATION COMPLEX BRIDGE INSPECTION (PARENT) DNA(Annual)
.2502013P .250 .000.000 Bridge On/Off System.050
.2502014 .200 .000.050
.1002014 .000 .100.000 Non Participating
.2502015 .200 .000.050 Bridge On/Off System
.1002015 .000 .100.000 Non Participating
.2502016 .200 .000.050 Bridge On/Off System
.0052013R .004 .000.001
.0052014 .004 .000.001
.0052015 .004 .000.001
.0052016 .004 .000.001
7237 Grouped1.220.866 .200.154Totals .050
STATEWIDE
CRDR
VARIOUS CULVERT REPLACEMENT/REHABILITATION & DRAINAGE REPAIRS (Annual Project) E-19(Annual) Culvert replacement program $1
million annually for preservation needs.
.3002013P .300 .000.000 STP-Flexible.060
.2002014 .160 .000.040
.1002015 .080 .000.020
.1002016 .080 .000.020
.0702013R .070 .000.000 .014
.0302014 .024 .000.006
.0302015 .024 .000.006
.0302016 .024 .000.006
.8702013C .870 .000.000 .174
.8702014 .696 .000.174
.8702015 .696 .000.174
.8702016 .696 .000.174
4157 Grouped4.3403.720 .000.620Totals .248
Phase: P - Preliminary Engineering R - Right of Way C - Construction
Page P-51 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6
Name Rte/Street: Location/Scope of Work
Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category
CommentsCAACode
FiscalYearPhase
Overall ProjectCost $(M)State#
Grouped / ParentRegionally Significant
Adv Const Payback
STATEWIDE FBRPI
PRESERVATION BRIDGE REHABILITATION, PAINTING, PRESERVATION & IMPROVEMENT PROJECTS
(Federal Program)
E-19(Annual) Bridge preservation program $8
million annually for preservation
needs.
.4002013P .400 .000.000 Bridge On/Off System.080
.1002014 .080 .000.020
.1002015 .080 .000.020
.1002016 .080 .000.020
.0502013R .050 .000.000 .010
.0202014 .016 .000.004
.0202015 .016 .000.004
.0202016 .016 .000.004
11.0002013C 11.000 .000.000 2.200
7.8802014 6.304 .0001.576
7.8802015 6.304 .0001.576
7.8802016 6.304 .0001.576
6601 Grouped35.45030.650 .0004.800Totals 2.290
STATEWIDE
FOHWY
LOW VOLUME CORRIDORS TO ENHANCE NATIONAL BENEFITS BY PROVIDING CONSTRUCTION &
MAINTENANCE OF FOREST HIGHWAYS (Annual Project)
ATT(Annual) Federal specified funding for Forest
Highways.
.0802013P .080 .000.000 Forest Highways
.0802014 .080 .000.000
.0802015 .080 .000.000
.0802016 .080 .000.000
.0202013R .020 .000.000
.0202014 .020 .000.000
.0202015 .020 .000.000
.0202016 .020 .000.000
.7502013C .750 .000.000
.7502014 .750 .000.000
.7502015 .750 .000.000
.7502016 .750 .000.000
444 Grouped3.4003.400 .000.000Totals
Phase: P - Preliminary Engineering R - Right of Way C - Construction
Page P-52 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6
Name Rte/Street: Location/Scope of Work
Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category
CommentsCAACode
FiscalYearPhase
Overall ProjectCost $(M)State#
Grouped / ParentRegionally Significant
Adv Const Payback
STATEWIDE GRR
PRESERVATION GUARDRAIL REPLACEMENT [Federal Aid Guardrail Improvement Program] (Annual Project) E-9(Annual) Guardrail Replacement program, $2
million annually for preservation
needs.
.1502013P .150 .000.000 STP-Hazard Elimination.030
.1502014 .120 .000.030
.1502015 .120 .000.030
.1502016 .120 .000.030
.0052013R .005 .000.000 .001
.0052014 .004 .000.001
.0052015 .004 .000.001
.0052016 .004 .000.001
1.8802013C 1.504 .000.376
1.8802014 1.504 .000.376
1.8802015 1.504 .000.376
1.8802016 1.504 .000.376
785 Grouped8.1406.543 .0001.597Totals .031
STATEWIDE
HSIP
PRESERVATION HIGHWAY SAFETY IMPROVEMENT PROGRAM (HSIP) [PARENT] E-6(Annual) Federal specified funding for safety
projects in accordance with the
Highway Safety Improvement Program. 50% Discretionary
transfer assumed.
.5752013P .575 .000.000 Highway Safety Improvement Program (HSIP).058
4.0002014 4.000 .000.000 .400
1.0002015 1.000 .000.000 .100
1.0002016 1.000 .000.000 .100
.0452013R .045 .000.000 .005
1.6002014 1.600 .000.000 .160
.5002015 .500 .000.000 .050
.5002016 .500 .000.000 .050
5.0002013C 5.000 .000.000 .500
15.0002014 15.000 .000.000 1.500
7.5002015 7.500 .000.000 .750
7.5002016 7.500 .000.000 .750
6767 Grouped44.22044.220 .000.000Totals 4.422
Phase: P - Preliminary Engineering R - Right of Way C - Construction
Page P-53 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6
Name Rte/Street: Location/Scope of Work
Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category
CommentsCAACode
FiscalYearPhase
Overall ProjectCost $(M)State#
Grouped / ParentRegionally Significant
Adv Const Payback
STATEWIDE IMPPP
PAVEMENT INTERSTATE MAINTENANCE & INTERSTATE PAVEMENT PRESERVATION PROGRAM
(Annual Program)
E-10(Annual) Interstate paving program, average
of $6 million annually for
preservation needs.
.2002013P .200 .000.000 Interstate Maintenance.020
.2002014 .180 .000.020
.1002015 .090 .000.010
.1002016 .090 .000.010
.0052013R .005 .000.000 .001
.0052014 .005 .000.001
.0052015 .005 .000.001
.0052016 .005 .000.000 .001
9.1902013C 9.190 .000.000 .919
5.9202014 5.328 .000.592
5.9202015 5.328 .000.592
5.9202016 5.328 .000.592
3927 Grouped27.57025.753 .0001.817Totals .940
STATEWIDE
MOBRR
MUNICIPAL MUNICIPAL OWNED BRIDGE REHABILITATION & REPLACEMENT PROJECTS (Federal,
State, Local Funds) (Annual Project)
E-19(Annual) Partially funded by MUNICIPAL
Special Municipal Projects Occupy
the Vacant FYs & Below Normal FY Funding.
.7202013P .576 .144.000 Bridge Off System
.0802014 .064 .016.000
.1002015 .080 .020.000
.1002016 .080 .020.000
.0202013R .016 .004.000
.0202014 .016 .004.000
.0502015 .040 .010.000
.0502016 .040 .010.000
5.0002013C 4.000 1.000.000
5.0002014 4.000 1.000.000
6.0002015 4.800 1.200.000
4.0002016 3.200 .800.000
221 Grouped21.14016.912 4.228.000Totals
Phase: P - Preliminary Engineering R - Right of Way C - Construction
Page P-54 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6
Name Rte/Street: Location/Scope of Work
Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category
CommentsCAACode
FiscalYearPhase
Overall ProjectCost $(M)State#
Grouped / ParentRegionally Significant
Adv Const Payback
STATEWIDE PRRCS
PAVEMENT PAVEMENT RESURFACING, REHABILITATION & CRACKSEAL PROGRAM & RELATED
WORK (Annual Federal Resurfacing Program)
E-10(Annual) Federal Resurfacing program. $16
million annually for preservation
needs.
1.0252013P 1.025 .000.000 STP-Flexible.205
.5002014 .400 .000.100
.3752015 .300 .000.075
.3752016 .300 .000.075
.2402013R .240 .000.000 .048
.1002014 .080 .000.020
.0252015 .020 .000.005
.0252016 .020 .000.005
29.0002013C 29.000 .000.000 5.800
15.7752014 12.620 .0003.155
15.7752015 12.620 .0003.155
15.7752016 12.620 .0003.155
452 Grouped78.99069.245 .0009.745Totals 6.053
STATEWIDE
PVMRK
TRAFFIC PAVEMENT MARKING (Annual Project) E-11(Annual) Annual pavement striping program
funding.
3.1002013C 3.100 .000.000 STP-Flexible
3.1002014 3.100 .000.000
3.1002015 3.100 .000.000
3.1002016 3.100 .000.000
1146 Grouped12.40012.400 .000.000Totals
Phase: P - Preliminary Engineering R - Right of Way C - Construction
Page P-55 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6
Name Rte/Street: Location/Scope of Work
Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category
CommentsCAACode
FiscalYearPhase
Overall ProjectCost $(M)State#
Grouped / ParentRegionally Significant
Adv Const Payback
STATEWIDE RCTRL
LOW VOLUME CORRIDORS RECREATIONAL TRAILS FUND ACT- PROJECTS SELECTED ANNUALLY E-33(Annual) Specified Funding for Recreational
Trail Program Administered by
DRED.
.0912013P .091 .000.000 Recreational Trails.018
.0912014 .073 .000.018
.0912015 .073 .000.018
.0912016 .073 .000.018
.0252013R .025 .000.000 .005
.0252014 .020 .000.005
.0252015 .020 .000.005
.0252016 .020 .000.005
1.1252013C 1.125 .000.000 .225
1.1252014 .900 .000.225
1.1252015 .900 .000.225
1.1252016 .900 .000.225
2570 Grouped4.9644.219 .000.745Totals .248
STATEWIDE
RRRCS
RAIL RECONSTRUCTION OF CROSSINGS, SIGNALS, & RELATED WORK (Annual Project) E-1(Annual) Force Account with Railroad to
improve safety of railroad crossings.
.0802013P .080 .000.000 Rail-Hwy: Haz Elim-Protective Devices.008
.0302014 .027 .000.003
.0302015 .027 .000.003
.0302016 .027 .000.003
.0102013R .010 .000.000 .001
.0102014 .009 .000.001
.0102015 .009 .000.001
.0102016 .009 .000.001
.7002013C .700 .000.000 .070
.7002013 .700 .000.000 .070
.1002014 .090 .000.010
.1002014 .090 .000.010
.4002015 .360 .000.040
.4002015 .360 .000.040
.4002016 .360 .000.040
.4002016 .360 .000.040
1147 Grouped3.4103.218 .000.192Totals .149
Phase: P - Preliminary Engineering R - Right of Way C - Construction
Page P-56 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6
Name Rte/Street: Location/Scope of Work
Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category
CommentsCAACode
FiscalYearPhase
Overall ProjectCost $(M)State#
Grouped / ParentRegionally Significant
Adv Const Payback
STATEWIDE SBCM
LOW VOLUME CORRIDORS SCENIC BYWAYS CORRIDOR MANAGEMENT, PLANNING, AND DEVELOPMENT OF
FACILITIES, TO ENHANCE SCENIC QUALITIES OF NEW HAMPSHIRE (Annual Project)
E-34(Annual) Federal specified funding for
Highways designated as scenic
byways.
.1502013P .120 .000.030 National Scenic Byways Program
.1502014 .120 .000.030
.1002013R .080 .000.020
.1002014 .080 .000.020
.2502013C .200 .000.050
.2502014 .200 .000.050
1155 Grouped1.000.800 .000.200Totals
STATEWIDE SRTS
VARIOUS SAFE ROUTES TO SCHOOL PROGRAM [Parent] [SRTS] {Safe Routes To School Program} E-33(Annual) Federal program under SAFETEA-LU.
.1202013P .120 .000.000 Safe Routes to School
.0452014 .045 .000.000
.1752014 .175 .000.000
.0452015 .045 .000.000
.1752015 .175 .000.000
.0452016 .045 .000.000
.1752016 .175 .000.000
.0252013R .025 .000.000
.0502014 .050 .000.000
.0502015 .050 .000.000
.0502016 .050 .000.000
.6872013C .687 .000.000
.2282014 .228 .000.000
.8252014 .825 .000.000
.0752015 .075 .000.000
.8252015 .825 .000.000
.0752016 .075 .000.000
.8252016 .825 .000.000
6002 Grouped4.4954.495 .000.000Totals
Phase: P - Preliminary Engineering R - Right of Way C - Construction
Page P-57 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6
Name Rte/Street: Location/Scope of Work
Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category
CommentsCAACode
FiscalYearPhase
Overall ProjectCost $(M)State#
Grouped / ParentRegionally Significant
Adv Const Payback
STATEWIDE SSRR
PAVEMENT SECONDARY SYSTEM RECLAMATION / REHAB WITH VARIOUS PAVEMENT
TREATMENTS [Parent]
E-10(Annual) Secondary road rehabilitation
program, $3 million annually for
preservation needs.
.2002013P .200 .000.000 STP-Flexible.040
.1002014 .080 .000.020
.1002015 .080 .000.020
.1002016 .080 .000.020
.0502013R .050 .000.000 .010
.0202014 .016 .000.004
.0052015 .004 .000.001
.0052016 .004 .000.001
5.7002013C 5.700 .000.000 1.140
2.8952014 2.316 .000.579
2.8952015 2.895 .000.000 .579
2.8952016 2.316 .000.579
4148 Grouped14.96513.741 .0001.224Totals 1.769
STATEWIDE
TRAIN
ADMINISTRATION ANNUAL TRAINING PROGRAM (Annual Project) E-35(Annual) Program Funding for Departmental
Training.
.2002013P .200 .000.000 STP-Flexible.040
.1382014 .110 .000.028
.1382015 .110 .000.028
.1382016 .110 .000.028
451 Grouped.614.531 .000.083Totals .040
STATEWIDE TSMO
TRAFFIC TRANSPORTATION SYSTEMS MANAGEMENT & OPERATIONS (ITS, CARS-511) N/E(Annual) Programmatic operational funding
support for TMC.
.2502013P .250 .000.000 STP-Flexible.050
.2502014 .200 .000.050
.2502015 .200 .000.050
.2502016 .200 .000.050
4227 Grouped1.000.850 .000.150Totals .050
Phase: P - Preliminary Engineering R - Right of Way C - Construction
Page P-58 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6
Name Rte/Street: Location/Scope of Work
Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category
CommentsCAACode
FiscalYearPhase
Overall ProjectCost $(M)State#
Grouped / ParentRegionally Significant
Adv Const Payback
STATEWIDE UBI
ENG & ROW UNDERWATER BRIDGE INSPECTION (Annual Project) E-38(Annual) Consultant services for underwater
bridge inspections.
.0102013P .010 .000.000 Bridge On/Off System.002
.0102014 .008 .000.002
.0502015 .040 .000.010
.0502016 .040 .000.010
186 Grouped.120.098 .000.022Totals .002
STATEWIDE USSS
TRAFFIC UPDATE SIGNING ON STATE SYSTEM (Annual Project) E-44(Annual) Signing Replacement / Upgrade Program. $0.5M annually for
preservation needs.
.0102013P .010 .000.000 STP-Flexible.002
.0102014 .008 .000.002
.0102015 .008 .000.002
.0102016 .008 .000.002
.5002013C .500 .000.000 .100
.5002014 .400 .000.100
.5002015 .400 .000.100
.5002016 .400 .000.100
2735 Grouped2.0401.734 .000.306Totals .102
STATEWIDE (CCTV) 16229
CONTRACTED SERVICES TO INCLUDE SCHEDULED & UNSCHEDULED
MAINTENANCE, TECHNICAL SUPPORT, ORIGINAL MANUFACTURER REPLACEMENT
PARTS AND SOFTWARE SUPPORT
E-0.044 Specific project from Statewide
program
.0442013C .044 .000.000 STP-Flexible.009
7803 .044.044 .000.000Totals .009
STATEWIDE (DMS) 16230
CONTRACTED SERVICES TO INCLUDE SCHEDULED & UNSCHEDULED
MAINTENANCE, TECHNICAL SUPPORT, ORIGINAL MANUFACTURER REPLACEMENT
PARTS AND SOFTWARE SUPPORT
E-0.011 Specific project from Statewide
program
.0112013C .011 .000.000 STP-Flexible.002
7804 .011.011 .000.000Totals .002
STATEWIDE CONSULTANT
16055
VARIOUS INSPECTION OF SIGN STRUCTURES ON STATE MAINTAINED HIGHWAYS E-13.400 Sign frame structures require in depth inspection every 5 years to
assure structural capacity for safety
purposes.
.0502013P .050 .000.000 STP-Flexible2010 Adv Const .010
.0502014 .040 .000.0102010 Adv Const
2681 .100.090 .000.010Totals .010
Phase: P - Preliminary Engineering R - Right of Way C - Construction
Page P-59 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6
Name Rte/Street: Location/Scope of Work
Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category
CommentsCAACode
FiscalYearPhase
Overall ProjectCost $(M)State#
Grouped / ParentRegionally Significant
Adv Const Payback
STATEWIDE CULTURAL 16347
VARIOUS CULTURAL RESOURCES, POST-CONSTRUCTION COMMITMENTS FOR FHWA ELIGIBLE
PROJECTS
.073
.0732013R .073 .000.000 STP-Flexible.015
7962 .073.073 .000.000Totals .015
STATEWIDE CULTURAL
16347B
VARIOUS ARCHAEOLOGICAL SURVEY OF SURPLUS LANDS, MONITORING COVENANTS,
HISTORICAL SURVEYS OF RAILROAD CORRIDORS, AND HISTORIC BRIDGE
RELOCATION
E-0.190
.1172013R .093 .000.023 STP-Flexible
7964 .117.093 .000.023Totals
STATEWIDE HAZMAT 16344
VARIOUS CONTAMINATION ISSUES ON POST-CONSTRUCTION ELIGIBLE PROJECTS.144
.0302013R .030 .000.000 STP-Flexible.006
.0302014 .030 .000.000 .006
.0312015 .025 .000.006
7957 .090.084 .000.006Totals .012
STATEWIDE M & R
ACTIVITIES MRSRV
ENG & ROW EQUIPMENT SERVICE & CALIBRATION AGREEMENTS AND PROJECT RELATED
CONSUMABLES (Annual Project)
E-34(Annual) Means of Servicing Sophisticated
Electronic Lab & Materials
Equipment used on Federal Aid Highway & Bridge Projects
.0452013P .045 .000.000 STP-Areas Less Than 200K.009
.0452014 .036 .000.009
.0452015 .036 .000.009
.0452016 .036 .000.009
.0502013C .050 .000.000 .010
.0502014 .040 .000.010
.0502015 .040 .000.010
.0502016 .040 .000.010
3801 Grouped.380.323 .000.057Totals .019
STATEWIDE RWIS 25198
VARIOUS DESIGN, PROCURE AND INSTALL ROAD AND WEATHER INFORMATION SYSTEM INFRASTRUCTURE. FIELD INSTALLED WEATHER STATIONS AND MOBILE WEATHER
DEVICES
.528
.0282013P .028 .000.000 STP-Flexible.006
.0832014 .066 .000.017
.2482014C .198 .000.050
.1702015 .136 .000.034
8635 .528.428 .000.100Totals .006
Phase: P - Preliminary Engineering R - Right of Way C - Construction
Page P-60 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6
Name Rte/Street: Location/Scope of Work
Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category
CommentsCAACode
FiscalYearPhase
Overall ProjectCost $(M)State#
Grouped / ParentRegionally Significant
Adv Const Payback
STATEWIDE SPECIAL DBE
ADMINISTRATION IN HOUSE ADMINISTRATION OF THE FHWA SUPPORTIVE SERVICES PROGRAM: "DBE"
COMPLIANCE MONITORING (Annual Program)
E-34(Annual) Federal specified funding for
disadvantaged business enterprises.
.1052013P .105 .000.000 STP-DBE
.0752014 .075 .000.000
.0902015 .090 .000.000
.0902016 .090 .000.000
45 Grouped.360.360 .000.000Totals
STATEWIDE SPECIAL LTAP
MUNICIPAL TECHNICAL ASSISTANCE PROGRAM TO RURAL COMMUNITIES AND ORGANIZATIONS THROUGH-OUT THE STATE - (LTAP*10344) (Annual Project)
E-35(Annual) Federal specified funding for providing technical assistance on
transportation issues to
municipalities.
.0302014P .015 .000.015 Transportation Assistance
.1502015 .075 .000.075
58 Grouped.180.090 .000.090Totals
STATEWIDE-TRAC
13668
ADMINISTRATION IMPLEMENT AND PARTICIPATE IN AASHTO TRAC PROGRAM IN LOCAL HIGH
SCHOOLS TO ENCOURAGE STUDENTS TO EXPLORE OPPORTUNITIES IN TRANSPORTATION CAREERS (Annual Program)
E-34(Annual) Program Funding for 'Education
Outreach' Working with Local High Schools.
.0222013P .022 .000.000 STP-Flexible2008 Adv Const .004
.0222014 .018 .000.0042008 Adv Const
.0222015 .018 .000.0042008 Adv Const
.0222016 .018 .000.0042008 Adv Const
3512 Grouped.088.075 .000.013Totals .004
STEWARTSTOWN 16312
NH 145 REPLACE BRIDGE OVER BISHOP BROOK - 121/114 (Red List) ATT2.289 2011 Bridge Priority #11
.0282013P .028 .000.000 Bridge On/Off System
.0392014 .031 .000.008
.0402015 .032 .000.008
.0412016 .033 .000.008
.0062013R .006 .000.000 .001
.0112014 .009 .000.002
.0112015 .009 .000.002
.0062016 .005 .000.001
2.1092016C 1.687 .000.422
6782 2.2891.838 .000.451Totals .001
Phase: P - Preliminary Engineering R - Right of Way C - Construction
Page P-61 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6
Name Rte/Street: Location/Scope of Work
Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category
CommentsCAACode
FiscalYearPhase
Overall ProjectCost $(M)State#
Grouped / ParentRegionally Significant
Adv Const Payback
STEWARTSTOWN, NH - CANAAN, VT 15838
BRIDGE STREET BRIDGE REHABILITATION OVER CONNECTICUT RIVER - 054/163 {Red List} ATT6.551 2011 Bridge Priority #7
.0642013P .064 .000.000 Bridge Off System.013
.0232013 .000 .023.000 Non Participating
.0782014 .078 .000.000 Bridge Off System
.0272014 .000 .027.000 Non Participating
.0612015 .061 .000.000 Bridge Off System.012
.0222015 .000 .000.022 Non Participating
.0132013R .013 .000.000 Bridge Off System.003
.0142015 .014 .000.000 .003
3.7162015C 2.972 .000.743
1.3142015 .000 1.314.000 Non Participating
.7672016 .614 .000.153 Bridge Off System
.2722016 .000 .272.000 Non Participating
7416 6.3703.816 1.635.918Totals .030
STRATHAM
27771
RTE 33/RTE 108 This Project will install sidewalks, curbing, solar light fixtures and delineation of bike paths along
NH RTE 33 & NH RTE 108 through Stratham's town center. [TE]
ATT.516
.0502014P .040 .000.010 STP-Enhancement
.0412014R .033 .000.008
.4252015C .340 .000.085
11749 .516.413 .000.103Totals
SUMMER YOUTH LANDSCAPE PROGRAM
SMRLN
ADMINISTRATION ESTABLISHMENT OF SUMMER LANDSCAPING YOUTH PROGRAM TO PERFORM
MAINTENANCE & OTHER RELATED WORK STATEWIDE [Annual Project]
ATT(Annual) Program Funding for Summer
Landscaping Youth Program.
.0572013C .057 .000.000 STP-Flexible.011
.0572014 .046 .000.011
.0572015 .046 .000.011
.0572016 .046 .000.011
1766 Grouped.228.194 .000.034Totals .011
SWANZEY 23737
SAWYERS CROSSING BRIDGE REHABILITATION OVER ASHUELOT RIVER - SCOUR PROTECTION FOR ABUTMENTS AND PIER - 136/143 [NATIONAL HISTORIC COVERED BRIDGE
PRESERVATION PROGRAM]
ATT.355 Partially funded by SWANZEY
.0552013P .044 .011.000 National Historic Covered Bridge Preservation (NHCBP)
.3002014C .240 .060.000
8506 .355.284 .071.000Totals
Phase: P - Preliminary Engineering R - Right of Way C - Construction
Page P-62 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6
Name Rte/Street: Location/Scope of Work
Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category
CommentsCAACode
FiscalYearPhase
Overall ProjectCost $(M)State#
Grouped / ParentRegionally Significant
Adv Const Payback
TAMWORTH 15831
VARIOUS ROUTES SAFETY IMPROVEMENTS (Demo Ids NH077 & NH081) ATT.965 Earmark funding. Local
Administration.
.3962013C .396 .000.000 High Priority Projects (SAFETEA-LU 2005)
.4402013 .440 .000.000
7410 .836.836 .000.000Totals
TAMWORTH 16239
NH 113 BRIDGE REPLACEMENT OVER BEARCAMP RIVER - 150/106 {Red List} ATT4.963 2011 Bridge Priority #96
.1652014P .165 .000.000 Bridge On/Off System.033
.3412015 .341 .000.000 .066
.0222014R .022 .000.000 .004
7813 .528.528 .000.000Totals .103
TILTON - NORTHFIELD
14839
PHASE 2: RAIL WITH TRAIL IMPROVEMENTS INCLUDING A STEEL ARCH BRIDGE OVER THE WINNIPESAUKEE RIVER (TE Program) [06-55TE & 09-37TE]
ATT.561 Specific project from Statewide program. Local Administration.
.0572014P .046 .000.011 STP-Enhancement
.0152014R .012 .003.000
.3712015C .297 .074.000
6249 .444.355 .077.011Totals
UNH BUS LIVABILITY
24962
VARIES UNH BUS LIVABILITY INITIATIVE, SECTION 5309 CAPITAL INVESTMENTS ATT.190 Partially funded by UNIVERSITY
OF NEW HAMPSHIRE
.0412013 .037 .004.000 FTA 5309 Capital Funding Program - Formula
.1492013 .134 .015.000
8634 .190.171 .019.000Totals
WALPOLE - CHARLESTOWN 14747
NH 12 RECONSTRUCTION FROM MAIN STREET IN WALPOLE TO NH 12A IN CHARLESTOWN,
REMOVE CONCRETE BASE, ADD SHOULDERS AND IMPROVE DRAINAGE
ATT17.758 ULSRPC Regional Priority #1
.4542015P .454 .000.000 STP-Non Urban Areas Under 5K.088
.2342016 .234 .000.000 .044
.5682015R .568 .000.000 .110
.0592016 .059 .000.000 .011
9.5852016C 7.668 .0001.917
1891 10.9008.983 .0001.917Totals .253
Phase: P - Preliminary Engineering R - Right of Way C - Construction
Page P-63 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6
Name Rte/Street: Location/Scope of Work
Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category
CommentsCAACode
FiscalYearPhase
Overall ProjectCost $(M)State#
Grouped / ParentRegionally Significant
Adv Const Payback
WALPOLE, NH - ROCKINGHAM, VT 12905
BRIDGE STREET VILAS BRIDGE REHABILITATION OVER CONNECTICUT RIVER - 062/052 {Red List} ATT4.682 2011 Bridge Priority #8
.0562013P .056 .000.000 Bridge On/Off System.011
.0042013 .000 .004.000 Non Participating
.1022014 .102 .000.000 Bridge On/Off System.020
.0082014 .000 .008.000 Non Participating
.0092013R .009 .000.000 Bridge On/Off System.002
1877 .179.167 .012.000Totals .033
WARNER 15907
NH 127 BRIDGE REPLACEMENT OVER WARNER RIVER - 254/180 {Red List} ATT2.774 2011 Bridge Priority #76
.0662014P .066 .000.000 Bridge On/Off System.013
.0112015 .011 .000.000 .002
.0022014R .002 .000.000 .000
.0062015 .006 .000.000 .001
7497 .085.085 .000.000Totals .017
WHITEFIELD
14425
US 3 PROJECT INVOLVES IMPROVING PEDESTRIAN ACCESS TO TOWN CENTER VIA
POTENTIAL SIDEWALKS, LIGHTING AND ADA RELATED UPGRADES (TE Program) [04-
66TE] & [09-50TE]
ATT.153 Partially funded by WHITEFIELD
.0182013P .015 .004.000 STP-Enhancement
.0022014 .001 .000.000
.0012015 .001 .000.000
.0012014R .001 .000.000
.1312015C .105 .026.000
5663 .153.122 .030.000Totals
WILTON 16128
NH 31 BRIDGE DECK REPLACEMENT OVER SOUHEGAN RIVER -129/126 (Red List) ATT1.533 2011 Bridge Prioity #36
.0012013P .001 .000.000 Bridge On/Off System.000
.0552013 .055 .000.000 .011
1.2672014C 1.267 .000.000 .253
7720 1.3231.323 .000.000Totals .265
Phase: P - Preliminary Engineering R - Right of Way C - Construction
Page P-64 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6
Name Rte/Street: Location/Scope of Work
Fed-I$ DOT-I$ Other-I$ Tot-I$ TpkC$ Funding Category
CommentsCAACode
FiscalYearPhase
Overall ProjectCost $(M)State#
Grouped / ParentRegionally Significant
Adv Const Payback
WILTON - MILFORD - AMHERST - BEDFORD 13692
NH 101 SAFETY IMPROVEMENTS @ VARIOUS LOCATIONS FROM WILTON TO WALLACE RD
IN BEDFORD AS DETERMINED BY CORRIDOR STUDY
ATT10.380 Interim safety improvements
.1102014P .110 .000.000 National Highway (NHPP).022
.0222013R .022 .000.000 STP-Flexible.004
.0222014 .022 .000.000 National Highway (NHPP).004
.1172016 .117 .000.000 .022
2739 .271.271 .000.000Totals .053
WINCHESTER 16034
MAIN STREET & WARWICK ROAD
PEDESTRIAN / BICYCLE IMPROVEMENT [09-51TE] ATT.406 Partially funded by WINCHESTER
.0012013P .001 .000.000 STP-Enhancement
.0202013 .016 .004.000
.3002013C .240 .060.000
7639 .321.257 .064.000Totals
WINCHESTER
20819
NH 10 REHABILITATION OR REPLACEMENT OF 12' CONCRETE BOX OVER FOREST LAKE
OUTLET - 137/121
ATT1.343 2011 Bridge Priority #94
.0462013P .046 .000.000 Equity Bonus (Flexible).009
.0482014 .038 .000.010 STP-Non Urban Areas Under 5K
.0512015 .040 .000.010
.0122016 .009 .000.002
.0052013R .005 .000.000 Equity Bonus (Flexible).001
.0052014 .004 .000.001 STP-Non Urban Areas Under 5K
.0112015 .009 .000.002
7994 .178.152 .000.025Totals .010
WINCHESTER 23738
GUNN MOUNTATIN ROAD BRIDGE REHABILITATION OVER ASHUELOT RIVER- SCOUR PROTECTION FOR
ABUTMENTS AND PIER - 082/087 [NATIONAL HISTORIC BRIDGE PRESERVATION
PROGRAM]
ATT.385 Partially funded by SWANZEY
.0552013P .044 .011.000 National Historic Covered Bridge Preservation (NHCBP)
.3302014C .264 .066.000
8507 .385.308 .077.000Totals
WINCHESTER - SWANZEY
12906
NH 10 BRIDGE REPLACEMENT OVER ASHUELOT RIVER - 152/181 [Designated Demo Id NH007] {Red List}
ATT6.629 2011 Bridge Priority #13
.3012013C .301 .000.000 Bridge On/Off System.060
5.4122013 5.412 .000.000 STP-Areas Less Than 200K1.082
1873 5.7135.713 .000.000Totals 1.143
Project-Id Count: 278
Phase: P - Preliminary Engineering R - Right of Way C - Construction
Page P-65 of 67Print Date: 02-Sep-14 NH Statewide Transportation Improvement Program 2013-2016 With Amendments 1, 2, 3, 4, 5 and 6
FY 2014 - FY 2017 Transportation Improvement ProgramEFLHD
FHWA Eastern Federal Lands Highway Division
PROJECT AWARDFY STATE COUNTY
PARK, REFUGE, FOREST OR OTHER PARTNER /
AGENCYDESCRIPTION CATEGORY PRIMARY FUND
SOURCETOTAL PROGRAM AMOUNT (RANGE)
FUNDSFROMTITLE
ADMINBY /
DELIVERBY
PhaseCHANGE FROM LAST UPDATE (Feb.7, 2013)
CONG DIST NUMBER FLMA REGION
NH FSR 2011-1(1) 2014 NH Carroll U.S. Forest Service, White
Mountain National Forest
ERFO - replace 2 bridges, slide repair, pipe replacements & road repairs in White Mountain NF
BRRH_LSR ERFOBetween$1,000,001 and $5,000,000
Title 23 EFLHD In Design No Change NH-01 USFS_R9
NH FH-47-1(001) 2014 NH Grafton U.S. Forest Service, White
Mountain National Forest
Culvert replacements and spot pavement repairs on Tripoli Road from the FS gate to intersection of Campground Road
3R FTFS Between $500,001 and $1,000,000 Title 23 EFLHD Planned New Project NH-02 USFS_R9
FW LAUM103(1) SICO10(1) 2015 NH Coos & Essex Umbagog National Wildlife
Refuge & Silvio O'Conte
Umbagog- new box culv. Potter Farm Rd.Replace pipe culverts at 5 sites at Silvio O'Conte NWR.
MISC FTFW Between $500,001 and $1,000,000 Title 23 EFLHD In Design No Change _VARIOUS FWS_R5
FW GREA 10(1) 2015 NH RockinghamU.S. Fish and Wildlife Service, Great Bay National Wildlife Refuge
Rehabilitate Arboretum Drive 3RL FTFW Between $250,001 and $500,000 Title 23 EFLHD Planned No Change NH-01 FWS_R5
FW LAUM 906(1)907(1) 2017 NH Coos
U.S. Fish and Wildlife Service, Umbagog National Wildlife Refuge
Recreational Enhancement Design Project MISC FTFWBetween$1,000,001 and $5,000,000
Title 23 EFLHD Planned New Project NH-02 FWS_R5
Page P64 of
15731
Federal $ NHDOT Other Total $
New Hampshire 2012 $77,000.00 $0.00 $0.00 $77,000.00
2013 $3,433,000.00 $0.00 $0.00 $3,433,000.00
2014 $3,750,000.00 $0.00 $0.00 $3,750,000.00
2015 $605,000.00 $0.00 $0.00 $605,000.00
Maine 2012 $0.00 $0.00 $0.00 $0.00
2013 $0.00 $0.00 $3,440,000.00 $3,440,000.00
2014 $0.00 $0.00 $3,460,000.00 $3,460,000.00
New Hampshire 2013 $50,000.00 $0.00 $0.00 $50,000.00
2014 $450,000.00 $0.00 $0.00 $450,000.00
Maine 2013 $0.00 $0.00 $50,000.00 $50,000.00
2014 $0.00 $0.00 $200,000.00 $200,000.00
New Hampshire 2015 $19,800,000.00 $0.00 $0.00 $19,800,000.00
2016 $19,800,000.00 $0.00 $0.00 $19,800,000.00
2017 $19,800,000.00 $0.00 $0.00 $19,800,000.00
2018 $28,600,000.00 $0.00 $0.00 $28,600,000.00
Maine 2015 $0.00 $0.00 $28,050,000.00 $28,050,000.00
2016 $0.00 $0.00 $34,000,000.00 $34,000,000.00
2017 $0.00 $0.00 $15,000,000.00 $15,000,000.00
2018 $0.00 $0.00 $3,200,000.00 $3,200,000.00
Totals $96,365,000.00 $0.00 $87,400,000.00 $183,765,000.00
* NHDOT anticipates the use of Advance Construction. Construction costs reflect the estimated conversion of
AC by year to federal funds.
Portsmouth, NH-Kittery, ME
Construction
Preliminary Engineering
Right of Way
Bridge Replacement & Paint over Piscataqua River-251/108
(Sarah Mildred Long Bridge)(Red List)