Working with three federal partners
State Route 11 and Otay Mesa East Port of Entry Intelligent Transportation Systems (ITS) Pre-deployment Strategy
(and coordination with SCT in Mexico)
PROJECTMANAGEMENT
COMMUNICATIONS & COORDINATION
KEY DELIVERABLES
1.1.1.1 Initial Definition of
Business Objectives
1.1.1.1 Communications
Plan
1.1.3.1 Initiate Bilingual
Project Newsletter
1.1.3.2 Initial Introduction
Mtgs with Key Users/Stakeholders
1.1.1.3 Policy &
Institutional Arrangements
Tracking
1.1.1.3 Policy &
Institutional Arrangements
Tracking
3.3 Requirements
Traceability Checks
1.1.2.1 Requirements
Traceability Tool
1.1.1Project Management
Plan
1.1.2Systems Engineering
Management Plan
OBJECTIVESOVERVIEW
- Prepare independent cost estimates- Ensure vendor responses address requirements- Assist SANDAG in achieving a best performance/best value
procurement- Provide foundation for effective/timely implementation
- Elicit, refine, define & prioritize functional, system, environmental, performance, and physical requirements
- Validate requirements for consistency with user needs, policies, business objectives, etc.
- Develop system verification plan- Ensure value to customer is still a focus- Feedback requirements to define near-term concept operations
- Define & finalize operational concept- Initiate requirements tracking- Ensure value to customer is still a focus- Resolve big picture policy decisions for
cross-border & tolling
- Establish project framework (PMP, SEMP, etc.)- Initiate stakeholder involvement - Baseline project schedule - Develop project performance metrics
- Define policy/institutional issues/constraints- Develop initial system concept & business objectives - Establish close ties with SANDAG T&R efforts
- PMP Draft/Final w/Baseline Project Schedule, Issues Tracking - Submittals Tracking Tools- Communications Plan- SEMP Draft/Final- Memo – State-of-Practice Draft/Final- Memo – Preliminary Ops Scenarios
- Memo – Institutional Arrangements/MOU Considerations- Memo – Overview of DHS, CBP, CTOC Policies with Potential Impact- Memo – Initial Market Analysis- Survey Instrument/Results- Workshop Materials/Results- Project Website/Newsletters - Bilingual
- Concept of Operations – Draft/Final- Memo – Focus Group Input- System Validation Plan – Draft/Final- Memo – Toll Policy Considerations Updated
- System Requirements (Preliminary, Draft, Final)- Updated Traceability Matrices- System Verification Plan Draft/Final- Memo – Customer Presentation Feedback- Memo – Toll Policy Considerations Updated v2
- Independent Cost Estimates- Technical Sections of RFP- Evaluation Matrices/Memo (Strengths/Weaknesses)- Updated Risk Management Plan- Updated Traceability Matrices- Conformed Specification
INITIAL SYSTEM CONCEPT DEVELOPMENT CONCEPT OF OPERATIONS SYSTEM REQUIREMENTS SYSTEM PROCUREMENT
2.1.4.1Survey/Interview Plan
& Instrument
2.1.2Definitions of Users &
Customer Profiles
Input From Recent Team Efforts On TxDOT & USDOT
Cross-BorderTechnology Studies
TECHNICAL & SYSTEMS ENGINEERING
PHASE 2 OPTIONAL IMPLEMENTATION
SUPPORT
1.1 Direct Project Management – Project Performance Metrics, CPM, and Schedule (Also One on One Coordination)
1.1.3 SANDAG PM Team Meetings (Monthly)
1.1.3 Caltrans Project Delivery Team (Coordination Meetings – Monthly)
1.1.1.3 Policy &
Institutional Arrangements
Tracking
2.1.1 DHS, CBP,
CTOC, Other Policies of
Potential Impact
2.1.1State of the
Practice Scan
2.1.2Initial Market
Analysis
3.2.1 Initial System
Concept &Business Objectives
3.2.2 Define/Refine Scenarios &
Conceptual Model
3.1Regional
ArchitectureReview & Input
2.1.3Border Information
FlowsWorkshop
2.1Consolidated
Customer Profiles, Stakeholder
Requirements, & Considerations
3.2Refined
Concept of Operations
3.3System
Verification/Acceptance Plans
3.3Cost
Estimates
3.3Prioritize/Finalize System
Requirements (IEEE 1233)
3.2System Validation
Plan
3.2Draft Concept of
Operations (IEEE 1362-
1998)
1.1.3.3 Follow-up User Focus Group
3.3Elicit/Define
System Requirements
(MoSCoW)
3.3Review/
Refine System Requirements
Vendor(s)Response
4.1.1RFP(s)
Development Support
4.1.2ProcurementNegotiations
Support
1.1.3 Project Stakeholder Meetings, Website, & Bilingual Newsletter (4 times per year)
1.1.3 Coordination with SANDAG T&R Study
4.1.3Conformed
Specification
1.1.1.2 Risk Tracking &
Management Plan
1.1.1.2 Revised Risk Tracking &
Management Plan
2.1.4.1Conduct Surveys/
Interviews
1.1.3.4 Customer/Stakeholder Presentation/Feedback
ITS Pre-Deployment Strategy
PRELIMINARY WORKFLOW OVERVIEW - PHASE 1
Team Suggested Identified in RFP