state project office shiksha sankul, mayur vihar, sahstradhara road, dehradun

9
State Project Office Shiksha Sankul, Mayur Vihar, Sahstradhara Road, Dehradun

Upload: hilary-winfred-hunter

Post on 04-Jan-2016

217 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: State Project Office Shiksha Sankul, Mayur Vihar, Sahstradhara Road, Dehradun

State Project OfficeShiksha Sankul, Mayur Vihar,

Sahstradhara Road, Dehradun

Page 2: State Project Office Shiksha Sankul, Mayur Vihar, Sahstradhara Road, Dehradun

ZoneIV

Tehri

Dehradun

Haridwar

Nainital

Champawat

U.Singh Nagar

Pauri

Almora

Zone V

Chamoli

Rudraprayag

Bageshwar

Pithoragarh

Uttarkashi

Pauri

Almora

SEISMIC ZONE

Page 3: State Project Office Shiksha Sankul, Mayur Vihar, Sahstradhara Road, Dehradun

.

Seismic Zone India and Uttarakhand

Page 4: State Project Office Shiksha Sankul, Mayur Vihar, Sahstradhara Road, Dehradun

Year Type of School Total

2007-08 Primary 229

2007-08 Upper primary 150

2007-08 Additional Class Rooms (PS & UPS)

369

2008-09 Primary 217

2008-09 Upper Primary 254

2008-09 Additional Class Rooms (PS & UPS)

900

Number of major Civil Works

Page 5: State Project Office Shiksha Sankul, Mayur Vihar, Sahstradhara Road, Dehradun

School designs were prepared by C.B.R.I Roorkee.as per availability of land and sites. C.B.R.I took measures for earth quake resistance designs.Training regarding construction work was /is being imparted to… 1-Three days training to D.P.Os at CBRI campus with illustrative demo. in labs & lab areas.

2-Five days training to A.Es & J.Es by experts from G.B.Pant University of Agriculture & Technology Pantnagar.

3-One day training to the concerned VEC members.4-On side support to the masons.

Training & Designs

Page 6: State Project Office Shiksha Sankul, Mayur Vihar, Sahstradhara Road, Dehradun

Implementing Agency &Supervisory Staff.

All type of construction works are undertaken by VEC.

For technical support, one Junior Engineer is deputed at

each block and one Assistant Engineer for district.At state

level a team of engineers comprising one Executive

Engineer with two Junior Engineers are to monitor civil

works.

Besides this, a civil work co-ordinator is appointed at

state level for better co-ordination among the stake-

holders.

Page 7: State Project Office Shiksha Sankul, Mayur Vihar, Sahstradhara Road, Dehradun

G.O.I guidelines To maintain quality of civil works.To assure the standard quality of construction material

and to obtain independent assessment of the technical

quality of civil works. To motivate and train VECs. To highlight the problem area and to suggest

step/solutions to achieve overall quality assurance. Periodical supervision of physical progress for

completion of works in schedule time frame.

Third Party Evaluation of Civil Works

Page 8: State Project Office Shiksha Sankul, Mayur Vihar, Sahstradhara Road, Dehradun

For this job MoU was singed with C.B.R.I because of…

1- National wide reputed institution.2- Easy to access.3- World class laboratory.4- Expertise in the field of technical evaluation and quality assurance of building construction. 5- Vested with the responsibility of generating, cultivating and promoting building science and technology in the service of the country.6- Finding timely, appropriate and economical solutions to the problem of materials, efficiency, structural and foundation problems and disaster mitigation.

Engaging C.B.R.I. for TPE

Page 9: State Project Office Shiksha Sankul, Mayur Vihar, Sahstradhara Road, Dehradun

Budgetary Provision

• Total No. of 2119 Civil Works to be evaluated.• Total amount to be paid to CBRI Rs. 93.50 lacs.• Amount is released to CBRI on installment basis:-

1-Rupees Twenty Five lakhs + Service Tax. along with acceptance of this MoU.

2-Rupees Twenty Five lakhs + Service Tax after six month and submission of first interim report of schools inspected during the last six months

3-Rupees Twenty Five lakhs + Service Tax. after twelve months and submission of second interim report.

4-Rupees Eighteen lakhs & Fifty Thousands + Service Tax. after eighteen months and submission of final report.