STATE OF CALIFORNIA DEPARTMENT OF FINANCE CAPITAL OUTLAY 915 L Street BUDGET CHANGE PROPOSAL (COBCP) Sacramento, CA 95814 COVER PAGE (REV 06/15) IMS Mail Code: A15 BUDGET YEAR 2016-17 BUSINESS UNIT: 3340 COBCP NO. 16-02 PRIORITY: PROJECT ID: 0000903 DEPARTMENT: California Conservation Corps (CCC) PROJECT TITLE: Residential Center. Pomona: New Residential Center TOTAL REQUEST (DOLLARS IN THOUSANDS): $ 100 MAJOR/MINOR: MAJOR PHASE(S) TO BE FUNDED: A PROJ CAT: CRI CCCI/EPI: SUMMARY OF PROPOSAL The California Conservation Corps (CCC) requests $100,000 General Fund for the acquisition phase of a new residential facility in Pomona, in place of the current non-residential program that the CCC operates on the Cal Poly Pomona property. This project is part of CCC's long-term residential program expansion plan. The current facility is 15,000 square feet and provides program space for 80 non-residential corpsmembers. This new project would be approximately 48,150 square feet and would house 80 permanent residential corpsmembers. The CCC would continue to operate a non-residential center at the current location on Cal Poly Pomona property until the new project is complete. HAS A BUDGET PACKAGE BEEN COMPLETED FOR THIS PROJECT? (E/U/N/?): _N_ REQUIRES LEGISLATION (Y/N): _N_IF YES, LIST CODE SECTIONS: REQUIRES PROVISIONAL LANGUAGE (Y/N) N IMPACT ON SUPPORT BUDGET: ONE-TIME COSTS (Y/N): J__ FUTURE COSTS (Y/N): J_ FUTURE SAVINGS (Y/N):J4_ REVENUE (Y/N):J ;L DOES THE PROPOSAL AFFECT ANOTHER DEPARTMENT (Y/N): _H_ IF YES, ATTACH COMMENTS OF AFFECTED DEPARTMENT SIGNED BY ITS DIRECTOR OR DESIGNEE. SIGNATURE APPROVALS: DATE RE\ PREPARED BY DEPAl^TMENT DIRECTOR DATE DATE HAAAAAAAAAAAAAAAA* DOF ISSUE # DOF ANALYST USE PROGRAM CAT: PROJECT CAT: ADDED REVIEW: SUPPORT: OCIU: BUDG PACK STATUS: FSCU/ITCU: OSAE: CALSTARS: Original Signed By: PPBA: Andrea Scharffer DATE SUBMITTED TO LEGISLATURE: /~ l'/C>

Upload: others

Post on 31-Aug-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: STATE OF CALIFORNIA DEPARTMENT OF FINANCE ...web1a.esd.dof.ca.gov/Documents/bcp/1617/FY1617_ORG3340...Multiple repairs are needed to bring the building up to compliance and to provide

S T A T E OF C A L I F O R N I A D E P A R T M E N T OF F INANCE C A P I T A L O U T L A Y 915 L St reet B U D G E T C H A N G E P R O P O S A L (COBCP) S a c r a m e n t o , C A 95814 COVER PAGE (REV 06/15) IMS Mai l C o d e : A15

B U D G E T Y E A R 2016-17

BUSINESS UNIT: 3340 C O B C P NO. 16-02 PRIORITY: PROJECT ID: 0000903

D E P A R T M E N T : Cali fornia Conservat ion Corps (CCC)

P R O J E C T TITLE: Residential Center. Pomona: New Residential Center

T O T A L REQUEST (DOLLARS IN T H O U S A N D S ) : $ 100 MAJOR/MINOR: MAJOR

PHASE(S) T O BE FUNDED: A PROJ CAT: CRI CCCI /EPI :

S U M M A R Y O F P R O P O S A L

The Cali fornia Conservat ion Corps (CCC) requests $100,000 General Fund for the acquisit ion phase of a new residential facil i ty in Pomona, in place of the current non-residential program that the CCC operates on the Cal Poly Pomona property. This project is part of CCC's long-term residential program expansion plan.

The current facil i ty is 15,000 square feet and provides program space for 80 non-residential corpsmembers . This new project would be approximately 48,150 square feet and would house 80 permanent residential corpsmembers . The CCC would cont inue to operate a non-residential center at the current location on Cal Poly Pomona property until the new project is complete.

HAS A B U D G E T P A C K A G E BEEN C O M P L E T E D FOR THIS PROJECT? (E/U/N/?): _ N _

REQUIRES LEGISLATION (Y/N): _ N _ I F YES, LIST C O D E SECTIONS:

REQUIRES PROVIS IONAL L A N G U A G E (Y/N) N

IMPACT O N S U P P O R T BUDGET: ONE-T IME C O S T S (Y/N): J__ FUTURE C O S T S (Y/N): J_

F U T U R E SAVINGS ( Y / N ) : J 4 _ R E V E N U E ( Y / N ) : J ; L

DOES T H E P R O P O S A L A F F E C T A N O T H E R D E P A R T M E N T (Y/N): _H_ IF YES, ATTACH

C O M M E N T S OF A F F E C T E D D E P A R T M E N T S IGNED BY ITS DIRECTOR OR DESIGNEE.

SIGNATURE APPROVALS:

D A T E R E \P R E P A R E D BY

DEPA l ^TMENT D IRECTOR DATE DATE H A A A A A A A A A A A A A A A A *

DOF ISSUE # D O F ANALYST USE

P R O G R A M CAT: PROJECT CAT: A D D E D REVIEW: S U P P O R T : OCIU :

BUDG PACK STATUS: FSCU/ ITCU: OSAE: CALSTARS:

Original Signed By: PPBA: Andrea Scharffer D A T E S U B M I T T E D T O LEGISLATURE: / ~ l'/C>

Page 2: STATE OF CALIFORNIA DEPARTMENT OF FINANCE ...web1a.esd.dof.ca.gov/Documents/bcp/1617/FY1617_ORG3340...Multiple repairs are needed to bring the building up to compliance and to provide

BUSINESS UNIT: 3340 C O B C P NO. 16-02 PRIORITY: 2 PROJECT ID: 0000903

A. P U R P O S E O F T H E PROJECT:

Construct ion of a new residential facil i ty will enable the (CCC) to cont inue to address the needs of their program work in the Pomona area by providing a safe and healthy envi ronment for all corpsmembers and staff. The CCC desires to remain in this area due to its proximity to project work and the cultivation and expansion of an ongoing sponsor base that they have fostered since 1981 . In addit ion, this area is ideal for corpsmember deve lopment because the area surrounding Pomona, which serves the eastern Los Angeles County, the western San Bernardino County and Riverside County, the entire Orange County and the Ange les Nat ional Forest, provides ample opportuni ty for corpsmembers to work on var ious conservat ion projects to develop their employable skil lset.

Background:

The focus of the CCC's Pomona Resident ial Center is for corpsmembers to gain work exper ience, advance their educat ion through an excel lent high school d ip loma program with John Muir Charter School , and learn about careers, whi le helping to enhance Cali fornia's natural resources and its communi t ies . A residential center is critical in this area to recruit and retain corpsmembers . Economical ly, corpsmembers have l imited resources, particularly the ability to afford a vehicle to reach the Pomona Center, as public t ransportat ion is not avai lable. Due to the high attrit ion rate at a non­residential center, Pomona does not have sufficient number of corpsmembers to address the abundant conservat ion projects avai lable in the Pomona area. As such, current projects are l imited to the fo l lowing:

• Energy Crews - Data col lect ion on school facil i t ies' energy consumpt ion. This data is analyzed by experts who will develop energy eff iciency recommendat ions for schools. Partnering with U.C. Davis Energy Efficiency Center, state agencies, util it ies, and energy f i rms to assist schools , C C C Energy Crews will assist/directly install energy devices, such as lighting changes, occupancy detectors, and smart power strips.

• Fuel Reduct ion Crews - Risk reduct ion of f ire dangers within the state responsibi l i ty areas in local watersheds, in partnership with the Los Angeles County Fire and Forestry, and with local Fire Safe Counci ls .

• Public Land Projects - Work includes trail construct ion, habitat restorat ion, watershed restorat ion as wel l as many other unique projects. A long with State Parks and the U.S. Forest Service, the Pomona Center works with the Bureau of Land Management , National Parks, the Depar tment of Conservat ion, the Depar tment of Water Resources, Cal t rans, Watershed Conservat ion Author i ty, Rivers and Mountains Conservancy, Cal i fornia Fire Safe Counci ls, City and County of Public Works Depar tments , Amigos De Los Rios and others.

• Landscaping Projects - Year - round projects for Caltrans. In addit ion, Pomona Center is work ing on a mult i -year Transpor tat ion Enhancement Project planting native trees along Route 142 in Carbon Canyon .

The Pomona Center is currently located on the former the State of Cal i fornia Lanterman Developmenta l Center (LDC) property. On July 1, 2015, the property was transferred to Cal Poly Pomona. The CCC intends to build the new residential center on the same property that it is located now that is owned by Cal Poly Pomona. Th is property will most likely be located on Cal Poly Campus South.

The CCC's Pomona Center serves Los Ange les , San Bernardino, Riverside, and Orange Count ies. Historically, the Pomona Center was the largest residential location in Southern Cali fornia housing up to 150 corpsmembers . Due to budget cuts suffered by the CCC in 2002-2004, the Pomona Center was downgraded to a satell i te and went f rom offering residential opportunit ies for 150 corpsmembers to a

DF-151 (Rev 06/15) Page 2 of 7

Page 3: STATE OF CALIFORNIA DEPARTMENT OF FINANCE ...web1a.esd.dof.ca.gov/Documents/bcp/1617/FY1617_ORG3340...Multiple repairs are needed to bring the building up to compliance and to provide

non-resident ial satell i te wi th 65 corpsmembers . This proposal is in line with the Governor 's priority to rebuild the C C C residential centers statewide, as init iated in the 2015-16 May Revision.

In order for the Pomona Center to become a full residential operat ion, a nearby location must be found and a new campus constructed. The building currently being leased does not meet the CCC's residential center needs and would not accommodate 80 residential corpsmembers . The new residential center would include the fol lowing:

• Dormitory space for 80 corpsmembers .

• A full funct ioning ki tchen and dining area that can feed 80 corpsmembers .

• A suff icient number of restrooms and shower facil i t ies to accommodate 80 corpsmembers .

• Office space and meet ings rooms to accommoda te staff and equipment.

• C lassroom and training facil it ies for up to 104 corpsmembers .

• Conference rooms for up to 130 corpsmembers and staff.

• Warehous ing and tool s torage for hand tools used daily by corpsmembers on project work, project mater ials, corpsmember uni forms, commerc ia l washing machine and dryer for returned clothing and s leeping bags, facility maintenance i tems, f leet maintenance i tems, areas for repair of power tools and equipment , storage of i tems await ing repair by outside vendors, i tems transit ioning f rom surveyed to disposal , and space for minor/major automot ive repairs.

The current Pomona non-resident ial center was built in 1927 and is approximately 15,000 square feet, including exterior s torage units adjacent to the bui lding. There are mult iple health and safety concerns related to the interior, exterior, and structure of the bui lding. Multiple repairs are needed to bring the building up to compl iance and to provide a safe work ing envi ronment for CCC corpsmembers and staff. Fol lowing is a partial list of the needed repairs:

• The roof needs replacing. Sect ions of the roof's ti les and shingles are shattered, fall ing and/or miss ing. The roof contains mult iple holes, al lowing water to seep into the building interior at mult iple locat ions.

• Al l exterior siding and wood is rotted due to termites and weather damage.

• All w indows are cracked, broken, or non-funct ioning and need replacement.

• The entire interior of the building needs repaint ing. The ceil ing contains mult iple holes, cracks and water stains that need to be repaired.

• The bui lding's six restrooms need to be upgraded to current A D A and energy efficiency requirements, a long with two banks of showers (four each) that are also not ADA-compl iant .

• The ki tchen is non-funct ional and is also not ADA-compl iant .

• Current te lephone and computer l ines do not support the CCC's day-to-day program administrat ion, project management , procurement unit, personnel management , training, or corpsmember educat ional needs. Mult iple at tempts to upgrade phone/computer lines have fai led.

• Securi ty is an issue as the building has no securi ty a larm. There are numerous doors for entry/exit, and with the current condit ions of the w indows, the center is susceptible to burglaries and theft.

• The fire life safety sys tem is not up to date, and the building does not contain a fire sprinkler sys tem.

• The utility infrastructure is in very poor condi t ion. Sewer sys tems are decayed and fai l ing. The electr ical system/wir ing needs replacement . All l ighting f ixtures need to be retrofitted and bulbs replaced to be energy efficient. Both sewer and electr ical systems are in constant need of repeated repairs.

DF-151 (Rev 06/15) Page 3 of 7

Page 4: STATE OF CALIFORNIA DEPARTMENT OF FINANCE ...web1a.esd.dof.ca.gov/Documents/bcp/1617/FY1617_ORG3340...Multiple repairs are needed to bring the building up to compliance and to provide

• Avai lable parking is not suff icient for the number of state staff and corpsmember parking.

B. RELATIONSHIP TO T H E STRATEGIC PLAN:

The CCC offers young men and women the chance to serve their state and become employable cit izens through hard work on envi ronmenta l , conservat ion, fire protect ion, and emergency response projects. The CCC also provides educat ion and training opportunit ies.

Resident ial facil i t ies provide capacity to house approximately 40 percent of the CCC's corpsmember populat ion who live, eat, and sleep every day in C C C facil i t ies. These residential locations serve as the "hub" of the CCC's service delivery. All depar tmenta l object ives, which include but are not l imited to: corpsmember educat ion and training; disaster response; f ield administrat ion; and communi ty serv ice/outreach are administered f rom these locat ions.

Because of the importance residential facil i t ies play in the achievement of the departmental objectives l isted above, it is essential that they be safe, c lean, and conducive to an envi ronment that contributes to the ach ievement of the CCC's mission.

The CCC's Revised Strategic Plan reads: Goal 6 "... to create a safe and healthy home-l ike env i ronment within C C C facil it ies." To achieve these goals. Min imum Facility Standards have been deve loped. Every C C C facil ity has been inspected to determine the extent to which these standards are being met, and to ensure compl iance with all appl icable code. Fire, Life/Safety requirements.

C. A L T E R N A T I V E S :

Al ternat ive 1: Acqui re property f rom Cal Poly Pomona on which to build a new facility designed to the CCC's residential center needs.

Scope: A new 48,150 square foot (sf) residential center would include nine buildings consist ing of an administrat ion building (3,000 sf), four dormitor ies (15,000 sf), an educat ion building (5,500 sf), a recreat ion building (5,000 sf), a mult i -purpose with ki tchen and dining (9,000 sf), warehouse with work area (10,500 sf), and a hazardous mater ials storage room (150 sf). There would also be 100,000 sf of paved surface for service and staging areas, wa lkways, dr iveways, and parking. This facil ity is des igned based on the CCC's residential center needs and would accommodate 80 permanent corpsmembers .

Cost: Tota l project costs are est imated to be $28 mil l ion for acquisi t ion, prel iminary plans, working drawings, and construct ion costs. This cost est imate is based on prior similar CCC capital outlay projects.

Funding: Genera l Fund and Public Building Construct ion Fund

Program Benefits: This would ensure that the C C C can cont inue to meet its legislated intent to provide opportuni t ies to young adults and services to the communi ty . CCC's residential program is the core of the C C C program f rom which a signif icant port ion of the work is emergency response. Key to fulfi l l ing the CCC 's mission is to be strategically located throughout the state to provide emergency response and project work for other state agencies and the natural resources that they protect and preserve. Th is would restore a historically signif icant residential center to the CCC statewide program.

Facility Management Benefits: This residential wou ld be constructed to meet the CCC program needs as well as current bui lding codes and energy s tandards. In addit ion, C C C will pursue a min imum LEED Silver cert i f ication in order to attain the highest possible energy eff iciency and may require "zero net energy" (ZNE) per the Governor 's execut ive order B 18-12.

Impact to Support Budget: The CCC will submi t a future support Budget Change Proposal (BCP) to request addit ional resources needed to operate a residential center as compared to a non-residential center, seek ing an est imated $700,000 in annual increased cost. This est imate includes a cook

DF-151 (Rev 06/15) Page 4 of 7

Page 5: STATE OF CALIFORNIA DEPARTMENT OF FINANCE ...web1a.esd.dof.ca.gov/Documents/bcp/1617/FY1617_ORG3340...Multiple repairs are needed to bring the building up to compliance and to provide

supervisor, cook, maintenance mechanic and night watch posit ions. It also includes operat ional costs for addit ional bui ldings for a residential program such as dormitor ies and kitchen/dining facilit ies for 80 permanent corpsmembers .

Alternat ive 2: Acquire new property outside the former state grounds at Cal Poly Pomona and build a new facil i ty des igned to CCC's program needs.

Scope: A new 48,150 square foot (sf) residential center would include an administrat ion building (3,000 sf) , four dormitor ies (15,000 sf) , an educat ion building (5,500 sf) , a recreat ion building (5,000 sf), a mult i -purpose with kitchen and dining (9,000 sf), warehouse with work area (10,500 sf), and a hazardous materials storage room (150 sf). There would also be 100,000 sf of paved surface for service and staging areas, wa lkways, dr iveways, and park ing. This facil ity is designed based on the CCC's residential center needs and would accommoda te 80 corpsmembers .

Cost: Total project costs are est imated to be $28 mill ion for acquisi t ion, prel iminary plans, working drawings, and construct ion. This cost est imate is based on prior similar CCC capital outlay projects.

Funding: General Fund and Public Building Construct ion Fund

Program Benefits: This would ensure that the C C C can cont inue to meet its legislated intent to provide opportuni t ies to young adults and services to the communi ty . The residential program is the core of the C C C program f rom which a signif icant port ion of the work is emergency response. Key to fulfil l ing the CCC's mission is to be strategically located throughout the state to provide emergency response and project work for other state agencies and the natural resources that CCC protects and preserves. This wou ld restore a historically signif icant residential center to the CCC statewide program.

Facility l\/lanagement Benefits: Th is residential wou ld be constructed to meet the CCC program needs as well as current building codes and energy s tandards. In addit ion, CCC will pursue a min imum LEED Silver certif ication in order to attain the highest possible energy eff iciency and may require "zero net energy" (ZNE) per the Governor 's execut ive order B 18-12.

Impact to Support Budget: The C C C will submi t a future support BCP to request addit ional resources needed to operate a residential center as compared to a non-residential center, seeking an est imated $700,000 in annual increased cost. This est imate includes a cook supervisor, cook, maintenance mechan ic and night watch posit ions. It a lso includes operat ional costs for addit ional buildings for a residential program such as dormitor ies and ki tchen/dining facil it ies for 80 corpsmembers .

Al ternat ive 3: Obtain an exist ing facil i ty by means of a long-term lease or purchase.

Scope: Engage DGS to lease/acquire and renovate an existing facil ity to meet CCC program needs.

Cost: Costs will vary if appropr iate facil i t ies exist. Costs depend on facil ity improvements needed to meet CCC program needs.

Funding: General Fund or Public Bui lding Construct ion Fund

Program Benefits: If a sui table a facil i ty is located that meets the CCC program needs, there may be savings over construct ing a new facil i ty.

Facility Management Benefits: Util izing an exist ing facil ity, over building new, provides no measurable benefit. In fact, it is more likely to have more risks s ince the building, equipment, and the infrastructure's funct ional history is unknown.

Impact to Support Budget: The C C C will submi t a future support BCP to request addit ional resources needed to operate a residential center as compared to a non-residential center, seeking an est imated $700,000 in annual increased cost. This est imate includes a cook supervisor, cook, maintenance mechan ic and night watch posi t ions. It a lso includes operat ional costs for addit ional buildings for a residential program such as dormitor ies and ki tchen/dining facil i t ies for 80 corpsmembers .

DF-151 (Rev 06/15) Page 5 of 7

Page 6: STATE OF CALIFORNIA DEPARTMENT OF FINANCE ...web1a.esd.dof.ca.gov/Documents/bcp/1617/FY1617_ORG3340...Multiple repairs are needed to bring the building up to compliance and to provide

D. R E C O M M E N D E D S O L U T I O N :

1. Which alternative and why?

The C C C recommends Alternat ive 1, acquire property f rom Cal Poly Pomona des igned to CCC's program needs. This would ensure that the C C C can cont inue to meet its legislated intent to provide opportuni t ies to young adults and services to the communi ty . The residential program is the core of the C C C program f rom which a signif icant port ion of the work is emergency response. Key to fulfi l l ing the CCC 's mission is to be strategically located throughout the state to provide emergency response and project work for other state agencies and the natural resources that they protect and preserve. The new facil i ty's design and construct ion would be based on the CCC's residential center needs developed with the assistance of the Depar tment of Genera l Services.

2. Detail scope description.

This new 48,150 square foot (sf) residential center would include an administrat ion building (3,000 sf) , four dormitor ies (15,000 sf), an educat ion building (5,500 sf), a recreat ion building (5,000 sf) , a mult i -purpose with ki tchen and dining (9,000 sf), warehouse with work area (10,500 sf), and a hazardous materials s torage room (150 sf). There would also be 100,000 sf of paved surface for service and staging areas, wa lkways, dr iveways, and park ing. This facil ity is des igned based on the CCC's residential center needs and would accommodate 80 permanent corpsmembers .

3. Basis for cost information.

The cost est imate is based on construct ion costs of three prior similar C C C capital outlay projects.

4. Factors/benefits for recommended solution other than the least expensive alternative.

A newly constructed campus would be des igned within the CCC program requirements and mission goals.

5. Complete description of impact on support budget.

The C C C will submi t a future support (BCP) to request addit ional resources needed to operate a residential center as compared to a non-resident ial center, seeking an est imated $1.4 million in annual increased costs.

6. Identify and explain any project risks.

Any construct ion project carr ies risk of increased cost and scope due to discovery of unknown subsur face site condit ions throughout the design and construct ion process that can alter the est imated construct ion cost.

7. List requested interdepartmental coordination and/or special project approval (including mandatory reviews and approvals, e.g. technology proposals).

a) DGS/ Real Estate Service Depar tment for budget, plan creat ion and project management funct ions.

b) State Fire Marshal l for f i re, life safety.

c) State Archi tect for A D A and code compl iance.

d) Cal Poly Pomona - the new lessor.

DF-151 (Rev 06/15) Page 6 of 7

Page 7: STATE OF CALIFORNIA DEPARTMENT OF FINANCE ...web1a.esd.dof.ca.gov/Documents/bcp/1617/FY1617_ORG3340...Multiple repairs are needed to bring the building up to compliance and to provide

E. C O N S I S T E N C Y W I T H G O V E R N M E N T C O D E SECTION 65041 .1 :

1. Does the recommended solution (project) promote infill development by rehabilitating existing infrastructure and how? Explain.

Yes, C C C is proposing construct ion of a new facil i ty on prior state hospital grounds now turned over to Cal Poly Pomona.

2. Does the project improve the protection of environmental and agricultural resources by protecting and preserving the state's most valuable natural resources? Explain.

C E Q A review will ensure the project protects the state's natural resources.

3. Does the project encourage efficient development patterns by ensuring that infrastructure associated with development, other than infill, support efficient use of land and is appropriately planned for growth? Explain

The Depar tment of General Service, Real Estate Service Depar tment will support and ensure eff icient land use and appropr iate project development . Cal Poly Pomona is also developing a masterp lan for the former state hospital property in which the new facil i ty needs will be considered/ inc luded.

DF-151 (Rev 06/15) Page 7 of 7

Page 8: STATE OF CALIFORNIA DEPARTMENT OF FINANCE ...web1a.esd.dof.ca.gov/Documents/bcp/1617/FY1617_ORG3340...Multiple repairs are needed to bring the building up to compliance and to provide

" K r " ' • - r - „Cy.K'-^P^.'Pj!^"v]^ Critical Infrastructure Deficiencies PiLografnj3)i.l|aiQ'dE^^ New Construction

Prpj ID "

M ^ l i > | * ^ : ' ; MA

3340-301-0001-16-16 3340-301-0001-17-17 3340-301-0001-18-18 3340-301-0660-19-19

A BA P FF W FF C FF

g | ™ i 0 7 : ^ r i j | | : . ^ ^ A j y ^ c t i o n ^ ^ ^ c t i f f l i ^ s ^ p t i ' ^ ^ i ; ^ ^ ^

100

I

100 1,000 2,000

Page 9: STATE OF CALIFORNIA DEPARTMENT OF FINANCE ...web1a.esd.dof.ca.gov/Documents/bcp/1617/FY1617_ORG3340...Multiple repairs are needed to bring the building up to compliance and to provide

At]NQAL:GNG0INGjMREG•QSTS•^1MEfi'''^^^^ Estimated incrimental change in annual costs of operating a prototype CCC residential center versus a non-residential center

ANrJflAi;pnG0l|;TG'̂ UT,UI3E;S'̂ VirJi '^'r^-wmm^^:^ TOTAL- su6pgBT.̂ hrmAL-msis -̂̂ .

Page 10: STATE OF CALIFORNIA DEPARTMENT OF FINANCE ...web1a.esd.dof.ca.gov/Documents/bcp/1617/FY1617_ORG3340...Multiple repairs are needed to bring the building up to compliance and to provide

This new 48,150 square foot (sf) residential center will include nine (9) buildings consisting of an administration building (3,000 sf), four dormitories (15,000 sf), an education building (5,500 sf), a recreation building (5,000 sf), a multi-purpose with kitchen and dining (9,000 sf), warehouse with work area (10,500 sf), and a hazardous materials storage room (150 sf). There will also be 100,000 sf of paved surface for service and staging areas, walkways, driveways, and parking. This facility is designed based on the CCC's residential center prototype and will accommodate 80 corpsmembers.